Related Laws :

Florida Laws: 120.569120.57163.3164163.3167163.3209380.04403.509403.52403.521403.522403.525403.526403.527403.5271403.529403.531403.5365403.537704.0683.61

Florida Administrative Code: 62-17.625

03-001629TL  IN RE: FLORIDA POWER AND LIGHT, COLLIER-ORANGE RIVER NO. 3, 230 KV PROJECT, TRANSMISSION LINE SITING APPLICATION NO. TA03-12 vs *  (2003)
Division of Administrative Hearings, Florida Filed: May 02, 2003
The issues for determination are whether either of the properly proposed corridors (the FPL Corridor or the Alternate Corridor) for the Collier-Orange River #3 230-kV transmission line (the COR #3 Line) comply with the criteria in Section 403.529(4)(a)-(e), Florida Statutes (2003); and, if so, which of the corridors have the least adverse impacts with respect to the criteria in Section 403.529(4)(a)-(e), Florida Statutes, including cost. (All citations are to the 2002 version of the Florida Statutes unless otherwise indicated.) If the Florida Power & Light Company (FPL) Preferred Corridor (FPL Corridor) is determined to have the least adverse impacts, or if the two corridors are determined to be substantially equal in adverse impacts, the Siting Board must determine whether the FPL application for corridor certification should be approved in whole, with modifications or conditions, or denied. § 403.529(4) & (5)(c), Fla. Stat. If it is determined that the Alternate Corridor proposed by Collier Enterprises, Ltd. (CE) and Barron Collier Companies (BCC) has the least adverse impacts, including costs, since this corridor was rejected by FPL for consideration pursuant to Section 403.5271(1)(b), Florida Statutes, certification shall be denied or FPL shall be allowed to submit an amended application to include such corridor. § 403.529(5)(b), Fla. Stat.Florida Power & Light proved by a preponderance of the evidence that its proposed corridor complied with criteria under Section 403.529(4)(a)-(e) and should be certified rather than an alternate corridor proposed by Collier Enterprises and Barron Collier.
98-004570EPP  IN RE: DUKE ENERGY NEW SMYRNA BEACH POWER COMPANY, LTD., L.L.P., ET AL. vs *  (1998)
Division of Administrative Hearings, Florida Filed: Oct. 12, 1998
Project meets requirements of certification criteria and certification should be granted.