Quantum Research International, Inc. v. United States, 18-272 (2018)

Court: United States Court of Federal Claims Number: 18-272 Visitors: 3
Filed: Jun. 29, 2018
Latest Update: Mar. 03, 2020
Summary: In the United States Court of Federal Claims No. 18-272C (Filed: June 14, 2018) (Re-filed: June 29, 2018)1 ********************** QUANTUM RESEARCH INTERNATIONAL, INC., Plaintiff, Bid protest; post- v. protest corrective action; 28 U.S.C. § THE UNITED STATES, 1491(b)(1) (2012); instructions in request Defendant, for quotation; unequal evaluation. and TORCH TECHNOLOGIES, INC., Intervenor. ********************** Jon Davidson Levin, Huntsville, AL, for plaintiff. Michael Duane Austin, United States
More
     In the United States Court of Federal Claims
                                No. 18-272C
                           (Filed: June 14, 2018)
                         (Re-filed: June 29, 2018)1

**********************
QUANTUM RESEARCH INTERNATIONAL,
INC.,

                    Plaintiff,
                                                Bid protest; post-
v.
                                                protest corrective
                                                action; 28 U.S.C. §
THE UNITED STATES,
                                                1491(b)(1) (2012);
                                                instructions in request
                    Defendant,
                                                for quotation; unequal
                                                evaluation.
             and

TORCH TECHNOLOGIES, INC.,

           Intervenor.
**********************

       Jon Davidson Levin, Huntsville, AL, for plaintiff.

       Michael Duane Austin, United States Department of Justice, Civil
Division, Commercial Litigation Branch, Washington, DC, for defendant.

       Robert J. Symon, Washington, DC, for intervenor.

                                 OPINION

BRUGGINK, Judge.

       This is a post-award bid protest by Quantum Research International,
Inc. (“Quantum”), of the Army’s post-protest corrective action in which it

1
  This opinion was originally issued under seal. The parties offered joint
proposed redactions. We adopt the proposed redactions because we find them
to be appropriate. Those redactions are indicated herein with brackets.
awarded a task order to Torch Technologies, Inc. (“Torch”), through Task
Order Request for Quote 2016T-12. Quantum was the incumbent on the
previous contract. Torch appears as intervenor.

        The parties have filed cross-motions for judgment on the administrative
record. The matter is fully briefed, and we held oral argument on June 7,
2018. Because the Army did not act arbitrarily or capriciously, abuse its
discretion, or otherwise act in violation of the law, we grant defendant’s and
intervenor’s cross-motions for judgment on the administrative record and deny
plaintiff’s motion.

                              BACKGROUND

       On August 31, 2016, the U.S. Army Contracting Command—Redstone,
Redstone Arsenal, Alabama (“the Army”), issued Task Order Request for
Quotation 2016T-12 (“TORFQ”) to all express technical domain contractors
as a total small business set-aside. The Army sought engineering, system
engineering, test, and technical support for communications, navigation, and
mission planning systems within Product Director—Aviation Networks and
Mission Planning (“PD ANMP”).2 The Army amended the TORFQ on
September 15, 2016. The TORFQ contemplated the award of a time and
materials, cost reimbursement task order with a 12-month base period and four
12-month options.

       The Evaluation Criteria provided, “Award will be made to the Offeror
whose quotation provides the best value to the Government based upon
evaluation of all submitted quotations using the [evaluation criteria] and a
tradeoff process.” Administrative Record (“AR”) 40. “‘Best value’ means the
expected outcome of the acquisition that, in the Government’s estimation,

2
 PD ANMP manages acquiring and supporting avionics equipment for the
Aviation Systems Project Management Office under the Program Executive
Office, Aviation. The Aviation and Missile Command Expedited Professional
and Engineering Support Services (“AMCOM EXPRESS”) is a Blanket
Purchase Agreement program that utilizes the General Service Administration
Federal Supply Schedule contractors to acquire services in four domains:
business and analytical, logistics, programmatic, and technical. These Blanket
Purchase Agreements are “multiple-award task order type contract vehicles
with provisions for time (labor hours at a fixed rate) and material, travel, and
other direct costs (ODCs) on a cost reimbursement basis.” AR 531.

                                       2
provides the greatest overall benefit in response to the requirement (FAR
2.101).” 
Id. The agency
was permitted to “accept other than the lowest priced
quotation, where the decision is consistent with the evaluation criteria and the
Government reasonably determines that the perceived benefits of a higher
priced quotation warrant the additional price.” 
Id. The agency
evaluated three
criteria: Technical Expertise, Risk Mitigation and Management, and Price. AR
58. Technical Expertise and Risk Mitigation and Management were equally
important and both more important than Price. The importance of the price
increased as the differences between the evaluation results for the other two
criteria decreased, but it was not the controlling criterion in the selection.

       The Army evaluated Technical Expertise “based on how well the
quotation demonstrates a clear understanding of the requirements and
deliverables, and on the Offeror’s expressed ability to successfully perform.”
AR 40. Under Technical Expertise, the Army provided,

       While award of this task order will require the Offeror to
       perform all of the [Performance Work Statement] requirements,
       the Government considers the requirement in the following
       [Performance Work Statement] paragraphs to be critical to
       evaluation of the Offeror’s technical expertise. Thus, these
       requirements must be specifically addressed in the quotation
       paragraphs: 2.1.5, 2.1.6, 2.2.1, 2.2.3, 2.2.5, 2.2.7, 2.2.8, 2.2.14,
       2.3.2.

AR 41.

        The Army’s evaluation of Performance Work Statement (“PWS”)
critical requirements 2.1.5 and 2.1.6 are at issue here. PWS 2.1.5 provides:

               Provide technical expertise with respect to digital mission
       information exchange to facilitate/improve Command & Control
       [] and Situational Awareness [] among air and ground mission
       systems of Joint and Coalition forces. Provide technical
       expertise on Joint Battle Command-Platform [], Army Battle
       Command System [], Global Command & Control System [], ,
       [sic] Blue Force Tracking [], Joint Variable Message Format [],
       Condition Based Maintenance [], Joint Technical Data Interface
       [], Future Avionics Capability Environment [], and digital data
       waveforms and networks such as Link-16 Tactical Digital

                                        3
       Information Link- Joint [], Wideband Network Waveform [],
       Soldier Radio Waveform [], Warfighter Information Network-
       Tactical [], and Advanced Network Wideband Waveform [].

AR 23 (abbreviations omitted).

       PWS 2.1.6 provides:

              Maintain direct and continuing technical liaison with
       other Government centers, laboratories, and other contractors.
       Provide           technical             expertise            to
       conferences/briefings/meetings/working groups/teams such as
       on-site creation and delivery of high quality graphics and
       briefing material. The contractor shall participate in Technical
       Reviews, In Process Reviews [], Design Reviews, Program
       Reviews to include milestone decisions, System Engineering
       Reviews, and Technical Interchange Meetings []/Technical
       Exchange Meetings []. The contractor shall also provide
       technical support systems integration and network
       interoperability demonstrations such as the Army’s Network
       Integration Evaluations [], Army Warfighting Assessments
       (AWAs), Army Expeditionary Warfighter Experiments [], and
       the Joint BOLD QUEST [] events.

Id. The agency
evaluated Technical Expertise on a scale using
“Outstanding,” “Good,” “Acceptable,” and “Unacceptable” ratings.
“Outstanding” means the quotation “meets requirements and indicates an
exceptional level of expertise and an understanding of the requirements.
Strengths far outweigh any weaknesses. Risk of unsuccessful performance is
very low.” AR 41.

        The agency evaluated each offeror’s Risk Mitigation and Management
approach for “completeness, feasibility, and how well it addresses the details
of the PWS.” AR 42. The agency used five factors in this evaluation: (1) the
ability to obtain and retain qualified personnel; (2) the ability to bring together
the right team to perform the PWS requirements; (3) the ability to effectively
manage the project; (4) Offeror’s identification of significant anticipated
technical or management risks and an effective plan for overcoming them; and

                                        4
(5) Offeror’s identification of any possible adverse impacts to existing
program/projects. 
Id. Under Risk
Mitigation and Management, each offeror was rated
“Outstanding,” “Good,” “Acceptable,” or “Unacceptable.” 
Id. “Outstanding” means
the quotation “meets requirements and indicates an exceptional Risk
Mitigation and Management approach. Strengths far outweigh any
weaknesses. Risk of unsuccessful performance is very low.” 
Id. “Good” means
the quotation “meets requirements and indicates a thorough Risk
Mitigation and Management approach. Strengths outweigh any weaknesses.
Risk of unsuccessful performance is low.” 
Id. “Acceptable” means
the
quotation “meets requirements and indicates an adequate Risk Mitigation and
Management approach. Strengths and weaknesses are offsetting or will have
little or no impact on contract performance. Risk of unsuccessful performance
is moderate.” 
Id. The agency
evaluated price for “overall price reasonableness.” AR 43.
“Reasonableness means a fair and reasonable price; i.e., a price that a prudent
businessperson would pay for an item or service under competitive market
conditions, given a reasonable knowledge of the marketplace.” 
Id. The Evaluation
Criteria further stated:

       The proposed overall price will be evaluated to assess the level
       of effort and the mix of labor proposed to perform the tasks
       outlined in the PWS and to determine that the total price is
       reasonable. Offerors shall provide a written basis of estimate
       with the pricing volume to fully explain the basis for their
       estimated price.

Id. The TORFQ
instructed offerors in paragraph 5.b, “Pricing”:

       For quotation preparation purposes, Offerors shall assume that
       the hours shall be distributed as follows:

       (Base Period) Task Order Award through 12 months         11%
       (Option Period) 13-24 Months                             16%
       (Option Period) 25-36 Months                             20%
       (Option Period) 37-48 Months                             24%

                                      5
       (Option Period) 49-60 Months                               29%

AR 58.

       After details regarding how to quote price, the TORFQ instructed
offerors in paragraph 6, “Labor Mix and Crosswalk”: “Quotations shall
include a labor mix and crosswalk spreadsheet. . . . The first tab of the
spreadsheet shall include the Labor Mix. It shall list the labor categories and
number of hours proposed for the base and any options periods.” AR 59.

       Finally, the TORFQ in paragraph 9, “Historical Information—Provided
for information only” gave a summary of the labor mix for the legacy
requirement and explained:

       The PWS for the previous effort and the new effort are basically
       the same. The labor mix for the final year of the current effort
       and the labor mix for the new effort are identical. There is a
       decrease in overall required hours because one of the products
       previously managed by PD ANMP is now being managed by
       another office along with the associated contract services.

AR 61.

       The historical information section continued, “The Government does
not warrant that experience under the task order to be issued as a result of this
TORFQ will be the same as under the previous task order.” 
Id. The government’s
Independent Government Cost Estimate (“IGCE”) of
$12,492,460.05 took into account its assessment that the number of hours
required would decrease as compared to the incumbent contract because one
element of the prior work managed by PD ANMP had shifted to another
office. It estimated 89,270 hours to be required.

Quantum’s Quotation

       Quantum, the protestor, is the incumbent. It has supported PD ANMP
for more than fifteen years, providing engineering, system engineering, test,
and technical support for communications, navigation, and mission planning
systems. Contrary to the TORFQ, Quantum proposed a yearly allocation of
hours that were uniformly distributed over the base year and four option


                                       6
periods, i.e., Quantum distributed 20% to each year. It quoted a total of 76,800
hours.

       In its Technical Expertise section, Quantum addressed the PWS critical
requirements 2.1.5 and 2.1.6 by providing “Team Quantum Expertise” in the
form of one narrative block paragraph of experience for each PWS
requirement. Relevant to this protest, Quantum addressed the Army Battle
Command System in PWS 2.1.5 by stating, “We perform detailed coordination
with Army Mission Command programs (formerly known as Army Battle
Command System (ACBS)) . . . .” AR 72. Quantum did not include a
reference to Global Command & Control System or Joint Technical Data
Interface, both elements listed in PWS 2.1.5. AR 23.

       Regarding its Risk Mitigation and Management plan, for its Task Order
Lead, Quantum stated, “Mr. Corwyn Tiede will be the Task Order Lead and
LNO for this effort. . . . Mr. Tiede has extensive aviation acquisition
experience, and has supported PEO AVN in a contractor capacity since 2001.
He currently provides on-site support . . . . Mr. Tiede will not be a Direct
Labor Charge to the ANMP customer.” AR 87. With respect to “Anticipated
Technical and/or Management Risks,” Quantum stated, “We reduced cost risk
through the exclusion of the Task Order/Project Lead labor category (see Basis
of Estimate (BOE)), and instead offer[] the services of a Quantum PM and
Liaison Officer (LNO) at no charge to the government.” AR 89–90.

       In its Basis of Estimate, Quantum stated, “We are not proposing a Task
Order/Project Lead. Historically, ANMP efforts and activities have not
required the services of a full-time Task Order/Project Lead. As a Strength,
Quantum will provide, at no cost to the government, the services of a Program
Manager and Liaison Officer (LNO) . . . .” AR 99 (emphasis omitted). In its
Basis of Estimate “Base Period & Transition” section, Quantum wrote, “PM
(no charge), LNO (no charge).” AR 100.

Army’s Original Evaluation of Quantum

        Three technical evaluators (a lead engineer, a systems engineer, and a
logistics management specialist) reviewed the non-price factors and assigned
a rating for each factor. The Source Selection Authority then provided a
summary of those evaluations in the best value determination, adopted the
technical evaluators’ ratings assignments, and performed the price evaluation
and tradeoff discussion. Regarding Technical Expertise, the Army’s technical

                                       7
evaluators rated Quantum “Outstanding,” assessing eighteen strengths, zero
weaknesses, and zero deficiencies. The agency wrote, “Seven of the Offeror’s
assessed strengths related to a PWS paragraph that was previously identified
as one of the critical requirements which must be addressed in the quotation.”
AR 400. In its detailed analysis, the Army addressed seven of the nine critical
requirements and assigned ten strengths based on non-critical requirements.

        The agency noted that Quantum’s quotation demonstrated strong
expertise and capabilities relating to PWS 2.1.5. The agency also noted that
Quantum’s quotation provided examples of experience that demonstrated
capability to support the PD ANMP liaison with other Government centers in
fulfillment of PWS 2.1.6. The agency did not discuss PWS critical
requirements 2.2.1 or 2.2.14 in its evaluation of Quantum’s Technical
Expertise, nor did it mention that Quantum’s response to PWS 2.1.5 did not
reference Global Command & Control System or Joint Technical Data
Interface. In summary, the Army wrote, “Risk of unsuccessful performance
is very low.” AR 402.

       Under Risk Mitigation and Management, the Army rated Quantum
“Good” and assessed it four strengths out of the five criteria, zero weaknesses,
and zero deficiencies. AR 403–04. The agency discussed three of the criteria,
determining that Quantum’s strengths were (1) ability to obtain and retain
qualified personnel, (2) ability to bring together the right team to perform the
PWS requirements, and (4) identification of significant anticipated technical
or management risks and an effective plan for overcoming the risk. 
Id. The Army
noted that “[t]he program manager’s duties, however, will
not be a direct labor charge to PD ANMP. Quantum instead proposes a
Program Manager and Liaison Officer at no cost to the government.” AR 404.
The technical evaluators stated a concern that Quantum’s quotation may
thereby include gratuitous services that the Army could not accept. The
agency concluded, however, “The Offeror’s proposal satisfactorily addressed
all the risk mitigation and management areas required.” 
Id. Torch’s Quotation
        In its quotation, Torch distributed its total of [  ] hours as provided
in the TORFQ. In its Technical Expertise section, Torch addressed PWS 2.1.5
and 2.1.6 by providing two paragraphs addressing each. We provide an
excerpt from these paragraphs here:

                                       8
           2.1.5 . . . The Torch Team has an extensive breadth of
knowledge working with Command and Control systems
supporting Army, Joint and Coalitions forces. We will use our
expertise to translate operational requirements into digital
mission information exchange requirements to improve IDM,
AMPS, CFARS, ADEC, ACN, and NMCI support to aviation
units’ C2 capability. We will remain current with Department
of Defense Information Technology Standards Registry [] and
Common Operating Environment [] Standards Profile [] for
Army C2 systems (such as: Joint Battle Command-Platform [],
Global Command and Control System-Army (GCCS-A, Blue
Force Tracker [] and Warfighter Information Network-Tactical
[]). . . .
           Experience: Team Torch planned and implemented
interoperability testing [
                                ] in preparation for Army
Interoperability Certification (AIC) events, where we led
troubleshooting efforts to correct identified errors. . . .

       2.1.6 . . . Team Torch understands the critical nature of
maintaining a strong liaison with the PM/Users of ANMP
products, in order to ensure fielding priorities, product
interoperability, and the realization of mission enhancements
that ANMP provides. Team Torch will leverage our experience
supporting numerous Aviation program and technical support
offices [



        ] to maintain direct and continuing technical liaison with
other Government centers, laboratories, and other contractors.
. . . Our experienced Subject Matter Experts (SMEs), analysts,
and engineers will follow the same or similar processes used to
support [              ] organizations to support . . . Army
Warfighting Assessments (AWAs) . . . .

      Experience: Team Torch members have actively
supported and participated in Technical Reviews for [


                                9
                                                       ]

AR 237–39 (emphasis omitted).

       Because it serves as the basis for one of Quantum’s bid protest
arguments, we note that Torch did not make a direct reference to Army Battle
Command System in its explanation for how it was capable of meeting PWS
2.1.5. Quantum also alleges that Torch did not sufficiently address Army
Warfighting Assessments in PWS 2.1.6.

      For Task Order Lead, Torch wrote in its Basis of Estimate,

             [




                                                              ]

      AR 268.

      [


                           ]

Army’s Original Evaluation of Torch

       Regarding Technical Expertise, the Army rated Torch “Outstanding,”
assessing it nineteen strengths, zero weaknesses, and zero deficiencies. The
agency wrote, “Six of the Offeror’s assessed strengths related to a PWS

                                    10
paragraph that was previously identified as one of the critical requirements
which must be addressed in the quotation.” AR 358. The agency’s analysis
listed seven of the critical requirements and it found that “[s]trengths far
outweigh any weaknesses” for all seven. AR 350–58. For seven of the nine
critical requirements, the Army dedicated one paragraph of analysis, but it did
not address two of the critical requirements, including PWS 2.1.6.

      Its analysis noted that Torch’s quotation demonstrated strong expertise
and capabilities relating to PWS 2.1.5, and the evaluation team did not appear
concerned by the lack of reference to what Torch proposed with respect to
Army Battle Command System. It assigned an additional twelve strengths
based on non-critical requirements. The agency summarized Torch’s risk of
unsuccessful performance quotation the same as Quantum: “very low.” AR
363.

        Under Risk Mitigation and Management, the Army rated Torch
“Outstanding” and assessed it four strengths out of the five criteria evaluated,
zero weaknesses, and zero deficiencies. AR 366. The agency stated that
Torch’s strengths were (1) ability to obtain and retain qualified personnel, (2)
ability to bring together the right team to perform the PWS requirements, (3)
ability to manage the project effectively, and (4) identification of significant
anticipated technical or management risks and an effective plan for
overcoming the risk. AR 363–66. The agency concluded, “The Offeror’s
proposal satisfactorily addressed all the risk mitigation and management areas
required.” AR 366.

       Regarding Task Order Lead, the Army noted that Torch proposed a
Task Order Lead “providing program management interface to PD ANMP and
oversight of assigned Torch personnel and corporate team members.” AR 367.
The task order lead had 31-years of experience as a government employee
serving in technical leadership positions and had experience in relevant areas.
In summary, the Army determined Torch’s “[r]isk of unsuccessful
performance is very low.” 
Id. Agency’s Original
Best Value Determination




                                      11
        In the initial best value determination, the Army’s Source Selection
Authority repeated the concern that Quantum’s proposal of a Task Order Lead
“will not be a direct labor charge to PD ANMP.” AR 442. The agency noted
that the Task Order Lead’s extensive experience would be helpful, but that
“[t]heir services, however, will be gratuitous and cannot be accepted.” 
Id. The Army
also observed that “it does not appear that Quantum makes any
representation in their quotation as to how much support (how many hours)
they can commit to provide for the Task Order/Project Lead requirement.” AR
461. This was a “significant deviation from the past approach,” and although
the Army acknowledged that Quantum offered some explanation, it concluded
that the explanation was “insufficient to overcome to potential impact to the
program.” 
Id. The agency
deemed each offeror’s submitted price to be fair and
reasonable. Quantum’s price was $9,415,247.22. Torch’s price was
$10,216,335.22. The IGCE was $12,492,460.05.

      The agency concluded that, although Torch’s quoted price was 8%
higher than Quantum’s price, Torch posed less risk of unsuccessful
performance. It noted that

      Quantum’s total quoted labor hours of 76,800 is 14% less than
      the total IGCE labor hours of 89,270. One of the concerns is
      Quantum’s understanding of the requirement. The fact that
      Quantum quoted 12,470 hours less than the IGCE could be
      interpreted to mean that Quantum does not understand the
      requirement as it pertains to the number of hours and the type of
      support required to successfully perform the requirement.

AR 454. The agency expressed concern that Quantum failed to convey how
it would meet the Army’s requirements while performing fewer hours,
particularly when the IGCE took into account the reduced program effort.

       Finally, the Army preferred Torch’s labor mix approach [
                                                       ].     The agency
ultimately concluded that, although both offers were technically acceptable,



                                     12
Torch’s price, while somewhat higher, offered the best value because it
represented less risk of non-performance.

       On August 4, 2017, the Army made an award to Torch, prompting
Quantum to file its first bid protest here on August 15, 2017, challenging the
agency’s evaluation of the Risk Mitigation and Management factor for both
offerors. The agency notified the court that it would take corrective action and
the protest was dismissed. Because Quantum had expressed no objections to
its Technical Expertise rating, the Government re-evaluated only the Risk
Mitigation and Management factor for both Torch and Quantum.

Quantum’s Reevaluation

        Upon reevaluation, the Army rated Quantum “Acceptable” for Risk
Mitigation and Management, which was a downgrade from its original “Good”
rating. Quantum received three strengths, one weakness, and zero
deficiencies. AR 526–29. The agency again determined that Quantum’s
strengths were (1) ability to obtain and retain qualified personnel, (2) ability
to bring together the right team to perform the PWS requirements, and (4)
identification of significant anticipated technical or management risks and an
effective plan for overcoming the risk. AR 526–27.

        The Army determined that Quantum’s weakness was in its ability to
manage the project effectively: “Offerors were required to allocate total labor
hours across the option and base years as follows: 11%, 16%, 20%, 24%, and
29% respectively (TORFQ 5.b).” AR 527. The agency noted that Quantum
instead allocated its hours at a uniform 20% annually. It concluded that
Quantum’s “distribution of labor hours compromises task manning, surge
capability and reach-back capability. These are integral to effectively
managing the project.” AR 527–28. The agency also reasoned that the total
number of hours proposed, 76,800, particularly as uniformly allocated
annually, did not allow “for an increase in hours over the option years. As a
result, the Offeror will have insufficient hours to support PD ANMP mission
critical requirements for option year 4 and potentially option year 3.” AR 528.

      The Army also repeated its concern that Quantum’s proposal was
ambiguous with respect to the Task Order Lead. It noted that “the Offeror

                                      13
indicates there is no Task Order Lead,” and later states that the Program
Manager and the Liaison officer “will be provided at no charge.” 
Id. The agency
concluded that Quantum’s quotation demonstrated ambiguity as to how
Task Order Lead hours would be performed and billed. The agency thus
assessed a “moderate risk that the Offeror will not be able to provide adequate
support to PD ANMP.” 
Id. Torch’s Reevaluation
       Upon reevaluation of Torch’s Risk Mitigation and Management, the
Army once again rated it “Outstanding.” Torch received four strengths, zero
weaknesses, and zero deficiencies. The agency again determined that Torch’s
strengths were (1) ability to obtain and retain qualified personnel, (2) ability
to bring together the right team to perform the PWS requirements, (3) ability
effectively to manage the project, and (4) identification of significant
anticipated technical or management risks and an effective plan for
overcoming the risk. The agency determined that Torch “satisfactorily
addressed all the risk mitigation and management areas required.” AR 513.

       In assessing Risk Mitigation and Management, the technical evaluators
accepted Torch’s Task Order Lead management proposal as capable of
effectively managing the project. In its Basis of Estimate comments, the Army
noted that Torch quoted [ ] hours, [
       ], and distributed those hours over the five years as specified in the
TORFQ. The agency found Torch’s labor mix reasonable and appropriate.
The agency thus rated Quantum’s risk of unsuccessful performance as “very
low.” AR 514.

Agency’s Best Value Determination Reevaluation

       The agency restated its Technical Expertise evaluation that both
offerors were “Outstanding.” It rated Quantum “Acceptable” and Torch
“Outstanding” for Risk Mitigation and Management.

      In its price evaluation, the Army set out the difference in quotations
provided by each offeror and its comparison to the IGCE. (Quantum
$9,415,247.22; Torch $10,216,335.22; IGCE $12,492,460.05. AR 565.) The

                                      14
agency deemed both offerors’ quotations fair and reasonable.

       The Army also concluded that both offerors’ composite labor rates were
lower than the IGCE. Quantum’s composite labor rate was $119.24 per hour.
Torch’s composite labor rate was [          ] and the IGCE was $137.05. AR
566. Torch’s composite labor rate was [             ] less than Quantum’s
composite labor rate, despite its higher overall bid, because Torch quoted more
hours.

       The Army noted that Quantum quoted 14% fewer hours than the IGCE
and that Quantum distributed its 76,800 hours equally across the base period
and four option years, whereas the TORFQ allocation called for an annual
increase of approximately 5%. The agency reasoned that the discrepancy in
hours “raises several concerns.” AR 567.

       The Army’s first expressed concern was that the 12,470-hour
discrepancy between the government’s estimate of the anticipated hours
required and Quantum’s quote meant that plaintiff did not understand “the
number of hours and the type of support required to successfully perform the
requirement.” 
Id. Secondly, the
agency noted that Quantum chose not to
include “the Project Manager or Task Order Project Lead in its calculation of
labor hours,” thus reducing the number of labor hours in Quantum’s quotation.
This led to a concern that Quantum’s allocation of hours evenly across each
year meant that “Quantum may fail to provide adequate coverage for Option
Years 3 and 4 of the Task Order.” 
Id. The Army
reasoned that Quantum did
not adequately explain how it would achieve the efficiencies that its fewer-
hours approach purportedly offered.

        Ultimately, the Army determined that the two offerors had “essentially
equivalent capabilities” under Technical Expertise, although Torch scored
slightly better than Quantum in a few areas. AR 573. Under Risk Mitigation
and Management, the Army did not have the same concerns with Torch as it
did with Quantum. Specifically, Torch distributed its hours according to the
instruction in the TORFQ, [


                                                                       ]

                                      15
       Moreover, the Army determined that “[b]ased on the advice of the
technical team, it is clear that [                                        ]
to Quantum’s stated approach, particularly without more explanation.” AR
575. Thus athough Torch’s price was higher than Quantum’s, the Army
determined Torch offered the best value. On January 31, 2018, the Army once
again awarded the task order to Torch.

       Quantum filed the pending bid protest on February 21, 2018.

                                    DISCUSSION

        This court has jurisdiction over challenges brought by interested parties
to actions taken by federal agencies in connection with procurements. 28
U.S.C. § 1491(b)(1) (2012). We review agency action pursuant to the
standards set forth in the Administrative Procedures Act, 5 U.S.C. § 706
(2012). 
Id. § 1491(b)(4).
Thus, to prevail, the protester first must establish
that the agency acted arbitrarily or capriciously, abused its discretion, or
conducted itself in a manner that is otherwise not in accordance with law. 5
U.S.C. § 706. Even if a reasonable person might have reached a different
conclusion than the agency, we will not set aside the agency’s determination
unless the protestor can demonstrate that the agency lacked a rational basis or
violated law or regulation. Impresa Construzioni Geom. Domenico Garufi v.
United States, 
238 F.3d 1324
, 1332–33 (Fed. Cir. 2001) (citations omitted).
If plaintiff clears the first hurdle, it must also “show that it was prejudiced by
a significant error in the procurement process.” Labatt Food Servs., Inc. v.
United States, 
577 F.3d 1375
, 1378 (Fed. Cir. 2009). In other words, plaintiff
must show that, had it not been for the Army’s error, “it would have had a
substantial chance of securing the contract.” 
Id. Quantum alleges
that the award to Torch was flawed for three reasons.
First, it argues that the Army arbitrarily and in violation of the terms of the
TORFQ applied the yearly percentage-of-hours allocation stated at AR 58 as
a requirement rather than a suggestion. If it had not been penalized for
deviating from the Army’s annual allocation of hours, Quantum argues that it
would have received an “Outstanding” rating for Risk Mitigation and
Management. Second, Quantum contends that the Army arbitrarily allowed
Torch to omit two components of the PWS critical requirements from its

                                       16
quotation without being disqualified or assessed any weakness, leading to the
Army’s assessment that Torch offered outstanding Technical Expertise (an
identical rating to Quantum). Finally, Quantum argues that the Army
irrationally viewed Quantum’s Task Order Lead proposal as a price risk and
did not sufficiently analyze Torch’s Task Order Lead proposal. Quantum
alleges that absent any of these mistakes, Quantum would have been more
favorably evaluated and thus would have had a substantial likelihood of being
awarded the contract.

        We consider the yearly percentage-of-hours allocation issue first. The
TORFQ states in paragraph 5.b, “Pricing,” “For quotation preparation
purposes, Offerors shall assume that the hours shall be distributed as follows:
11% in the base period, 16% in the first option period, 20% in the second
option period, 24% in the third option period, and 29% in the fourth option
period.” AR 58 (emphasis added). The plain language of this provision is that
quotations must allocate hours to each year of the contract as listed. The Army
is entitled to determine the level of effort it desires for each year of the
contract and to instruct offerors to adhere to its determination so that it can
uniformly evaluate offers.

        Quantum does not cite any other provision of the TORFQ that modifies
or negates this requirement. The PWS places the onus on the contractor to
provide sufficient effort and resources to complete the required tasks. The
Evaluation Criteria provides that price “will be evaluated to assess the level of
effort and the mix of labor proposed to perform the tasks outlined in the PWS
and to determine if the total price is reasonable.” AR 43. Neither section
indicates that offerors may propose a yearly percentage-of-hours allocation that
differs from the distribution set out in the TORFQ.

        The Army nevertheless evaluated Quantum’s quotation on the merits,
but explained why Quantum’s allocation of hours (20% each year) posed the
risk that Quantum would not be able to provide the anticipated amount of labor
in option years three and four. This concern apparently factored heavily in the
Army’s tradeoff evaluation. Even though Quantum’s price was lower than
Torch’s price overall, the Army remained concerned that Quantum would
reach the later option years without the ability to provide the necessary amount
of labor. Torch, on the other hand, quoted the anticipated number of hours and

                                       17
spread those hours across the base and option years of the contract as
anticipated by the Army. We find nothing irrational or arbitrary in this
analysis.

       The Army likewise did not abuse its discretion in its evaluation of
Technical Expertise. The Evaluation Criteria instructed offerors to
“specifically address” nine critical requirements, which included PWS 2.1.5
and 2.1.6. AR 41. The agency evaluated these critical requirements in its
assessment of Technical Expertise. For Technical Expertise, the Army
evaluated offerors “based on how well the quotation demonstrates a clear
understanding of the requirements and deliverables, and on the Offeror’s
expressed ability to successfully perform.” AR 40.

       The Army’s instructions to offerors did not state that an offeror had to
address every component of the section by name or risk disqualification. The
Army was apparently satisfied that Torch met the requirement to specifically
address PWS 2.1.5 and 2.1.6 when it offered two narrative paragraphs
discussing both sections, albeit without mentioning every single system listed
in PWS 2.1.5. It treated Quantum in the same way.

        The Army did not specifically address Torch’s approach to PWS 2.1.6,
but it did discuss nineteen PWS paragraphs individually, including seven of
the nine critical requirements. The Army found in its assessment of Technical
Expertise, moreover, that Torch had “experience as a technical liaison
includ[ing] supporting numerous aviation program and technical support
offices,” and went on to list those offices. AR 507. The Army wrote that
Torch’s “plan is to leverage this experience to liaison with other Government
centers, laboratories, and other contractors.” 
Id. It concluded,
“This
architecture, requirements, networking and interoperability knowledge and
experience related to PD ANMP systems demonstrates the Offerors capability
to support PD ANMP requirements development and system development in
a highly complex, interoperable networking environment.” 
Id. Thus without
specifically referencing PWS 2.1.6, the Army nevertheless addressed Torch’s
capability to do the work embraced by PWS 2.1.6. Ultimately, the Army
reviewed both offerors’ Technical Expertise in detail and provided a
reasonable explanation of its assessment of both.



                                      18
       We note, in any event, that Quantum is in no position to complain. It
omitted discussion of two elements of PWS 2.1.5, Global Command & Control
System and Joint Technical Data Interface, from its quotation. If Torch’s
quotation were in fact ineligible for an “Outstanding” rating due to its
omission, Quantum’s would be as well.

        Finally, we turn to Quantum’s argument that the Army irrationally
viewed Quantum’s Task Order Lead proposal as a price risk and did not
sufficiently analyze Torch’s Task Order Lead proposal. The Army’s IGCE
stated that the Army anticipated the contract awardee would provide a Task
Order Lead that would perform 11,520 hours. The TORFQ permitted offerors
to propose their own mix of labor categories and hours for each type of labor.
Both Quantum and Torch proposed a plan for Task Order Lead in its
quotation.

      Quantum proposed an experienced, on-site Task Order Lead but
proposed to bill this individual as an indirect cost, i.e., as an element of built-in
overhead. It refers to the Task Order Lead variously in its proposal as “no
charge,” “no direct charge,” “no cost, and “indirect charge.”

       In its original evaluation, the Army expressed confusion regarding
Quantum’s Task Order Lead proposal, writing that it could not determine from
Quantum’s quotation whether the offeror intended its Task Order Lead to be
an indirect cost or gratuitous service. The Army also expressed concern that
Quantum’s quotation did not provide a standard by which it could judge
Quantum’s Task Order Lead’s work, because its quotation did not state how
many hours the Task Order Lead would perform.

       The Army’s reevaluation of Quantum’s Task Order Lead echoed those
same concerns. It noted the indirect versus “no cost” ambiguity in Quantum’s
proposal. The Source Selection Authority also explained that Quantum had
not provided enough details for the Army to determine how Quantum would
achieve efficiencies through its Task Order Lead approach.

      Torch ultimately quoted the Army [                                           ].
Unlike Quantum, it explained that its [
                                                                                    ]

                                         19
[                    ]. Torch also explained in its quotation [

                                                 ]. The Army accepted this
explanation and we are in no position to question it.

        Quantum argues that the Army should have understood that its
relatively low quotation for total hours—76,800—not as a risk but as a
reflection of uncharged hours for its Task Order Lead. Quantum did not state
in its quotation how many hours it anticipated its Task Order Lead would
perform. Although Quantum contends that the Army should have understood
that the delta between the number of hours in its quotation and the number of
hours the Army anticipated was the amount of hours its Task Order Lead
would perform, Quantum did not make that clear in its offer and it offers no
proof from the record that this assertion is correct.

                               CONCLUSION

        In sum, the Army was entitled to, and did, require bidders to follow its
determination of how hours were to be allocated over each year of the contract.
By not following that directive, Quantum affected the Army’s ability to
determine whether Quantum would meet the Army’s needs and how
Quantum’s quotation compared to others. Nor did the Army err in its
Technical Expertise evaluation or in its assessment that Quantum posed a
higher risk of non-performance. We therefore grant the government’s and
intervenor’s cross-motions for judgment on the administrative record and deny
plaintiff’s motion. The Clerk is directed to enter judgment for defendant. No
costs.


                                           s/Eric G. Bruggink
                                           Eric G. Bruggink
                                           Senior Judge




                                      20
