Elawyers Elawyers
Washington| Change

COMMUNITY DIALYSIS CENTERS, INC. vs. WATSON CLINIC AND DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 84-001131 (1984)

Court: Division of Administrative Hearings, Florida Number: 84-001131 Visitors: 10
Judges: WILLIAM C. SHERRILL
Agency: Agency for Health Care Administration
Latest Update: May 29, 1985
Summary: Certificate of Need (CON) for dialysis facility granted. Only existing provider in area gave unreliable services which demonstrated need for another provider.
84-1131

STATE OF FLORIDA

DIVISION OF ADMINISTRATIVE HEARINGS


COMMUNITY DIALYSIS CENTERS, ) INC. d/b/a COMMUNITY DIALYSIS ) SERVICES OF LAKELAND, )

)

Petitioner, )

)

vs. ) CASE NO. 84-1131

)

DEPARTMENT OF HEALTH AND )

REHABILITATIVE SERVICES, )

and WATSON CLINIC, )

)

Respondents. )

)


RECOMMENDED ORDER


The final administrative hearing in this case was held before William C. Sherrill, Jr., Hearing Officer with the Division of Administrative Hearings, on November 5 through 7, 1985, in Lakeland, Florida.


Appearing for the parties were:


For Petitioner Mary Ann Presswood, Esquire COMMUNITY DIALYSIS 2204 East Fourth Street CENTERS: Santa Ana, California 92705


For the Respondent, Louise Jerosolow, Legal Intern DEPARTMENT OF HEALTH 318 North Calhoun Street

AND REHABILITATIVE Tallahassee, Florida 32301 SERVICES (HRS):


For the Respondent, E. G. Boone, Esquire WATSON CLINIC: Stephen K. Boone, Esquire

1001 Avenida Del Circo Venice, Florida 34284


FINDINGS OF FACT


  1. Procedural background: Petitioner, COMMUNITY DIALYSIS CENTERS, INC., d/b/a COMMUNITY DIALYSIS SERVICES OF LAKELAND (CDC), owns and operates a 16- station outpatient kidney dialysis facility in Lakeland, Florida. On February 14, 1984, Respondent, WATSON CLINIC (WATSON), received a certificate of need to operate a four-station outpatient kidney dialysis center in Lakeland, Florida, CON No. 2916, from the DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES (HRS). Petitioner contests the grant of this certificate of need as an existing provider. Timely notice of the final hearing was issued June 26, 1984, and the final hearing was held as stated above.


  2. WATSON presented the testimony of Spero Moutsatos, Dudley Towne, Franklin L. Smith, Carter Fitzgerald, Joy Harrison, Nell Boutwell, Eugene

    DeBerry (by deposition), Sandra Biller, Dr. James Whitfield, John Dowless, Robert L. Mayer, Don Morris, Marilyn Neff, and Dr. Henry M. Haire. HRS presented the testimony of Ed Carter. CDC presented the testimony of Elaine Feegel, Jan Graff, and Michael Sullivan. CDC presented seven exhibits which were received into evidence, HRS had one exhibit, and WATSON presented into evidence 27 exhibits.


  3. The parties stipulated that subparagraphs 6, 7, 10, and 11 of Section 381.494(6)(c), Fla.Stat., are not applicable to this case, but that subparagraphs 1 through 5, 8, 9, 12, and 13 are in dispute in this proceeding.


  4. WATSON seeks a certificate of need to provide kidney dialysis for end- state renal disease (ESRD) patients in the western portion of Polk County, District 8, and particularly in the vicinity of Lakeland, Florida. WATSON's proposal would also include training for home hemodialysis and chronic ambulatory peritoneal dialysis (CAPD). WATSON originally applied for ten dialysis stations, HRS Exhibit 1, but amended its application at the hearing to four stations. WATSON Exhibit 14, hereinafter W. Exhibit 14. The area in which WATSON seeks to provide services is now served primarily by the 16 dialysis stations operated by CDC.


  5. ESRD patients must either successfully dialyze, obtain a successful kidney transplant, or they will die.


  6. Evidence as to need was provided by Spero Moutsatos, Executive Director of the Florida End-Stage Renal Disease Network 19. Network 19 was established in August 1977 as a part of a national network established by Congress, administered by the Health Care Financing Administration. Network 19 gathers data in Florida regarding End-Stage Renal Disease (ESRD) patients, provides data and projections of ESRD dialysis need to the Department of Health and Rehabilitative Services (HRS), assists patients and professionals with information, serves as an ombudsman for patient complaints, and monitors and evaluates the quality of care delivered in dialysis facilities.


  7. Network 19 did two evaluations of need with respect to the WATSON proposal, WATSON Exhibits 1 and 2. In the last three years, following the growth in availability generally of renal dialysis facilities in Florida, Network 19 has considered need on the basis of sub-areas within a District in about 75 percent of the cases considered.


  8. As of September 1, 1984, most of the ESRD patients residing in Polk County were dialyzing at CDC in Lakeland. CDC Lakeland provided services for 51 patients and one home patient, while the remainder (10 in-clinic patients and 16 home dialysis patients) were treated at Lakeland Regional Medical Center, CDC Winter Haven, CDC Tampa, and BMA of Orlando (one patient). WATSON Exhibit 2.


  9. Dialysis often leaves a patient feeling very weak at the end of the dialysis session. Dialysis in-clinic is required at least three times each week and takes about four hours. Emergency services are needed nearby since on occasion a dialysis patient will become unconscious and need immediate attention and hospitalization. Patients needing dialysis frequently are not employed or underemployed and do not have money for extensive travel for dialysis.


  10. Based upon the zip code analysis in WATSON Exhibit 2 and the testimony of patients, the appropriate service area for consideration of the need for dialysis facilities in this case is at a minimum in Polk County, and more appropriately, the vicinity of Lakeland.

  11. While some Lakeland area patients in the past drove all the way to Tampa for in-center dialysis, this is not a suitable alternative. Only CDC Lakeland and CDC Winter Haven adequately provide in-center dialysis to persons living in the Polk County and Lakeland areas. Lakeland Regional Memorial Center does not provide in-center dialysis, but only provides services for chronic ambulatory peritoneal dialysis (CAPD)


  12. Rule 10-5.11(18), F.A.C., establishes the methodology applicable in this case for determining need for chronic renal dialysis facilities. This rule sets forth the method to project the number of patients who will need dialysis one year from the date the application is deemed complete. The number of dialysis stations needed is then computed by using an 80 percent use rate for each station. The rule provides that each station at 100 percent use can dialyze four patients, assuming two shifts, six days each week. (Each patient dialyzes three times during the week.) Evening or third shifts are not counted as a part of capacity. The 80 percent use rate results in a capacity of 3.2 patients per station. The record evidence reflects that 80 percent is a reasonable level of use to set as a maximum justifying additional stations. The

    20 percent additional capacity is needed for transient patient dialysis during the winter season, to account for repairs and maintenance on machines, and to provide some leeway when there are staffing problems. The net number of new stations needed is then computed by dividing the number of projected patients by

    3.2 stations and subtracting from this the number of existing stations.


  13. The use rates for the two in-center dialysis facilities in the Lakeland area for the most recent quarter prior to the hearing show that facilities in the area are over the threshold for expansion:


    Utilization

    Month Rate (percent)


    CDC

    Lakeland

    July 1984

    78



    August 1984

    81



    September 1984

    81

    CDC

    Winter Haven

    July 1984

    85



    August 1984

    87



    September 1984

    88


    The evidence indicates that the above rates are not unusual, but reflect an upward trend in the area. In 1983, CDC Lakeland operated at an average of 76.5 percent, and CDC Winter Haven operated at 77 percent of its capacity.


  14. Network 19 projects a need by September 1, 1985, for six additional in-center dialysis stations for Polk County, and seven additional stations for

    the Lakeland sub-area. These calculations are explained in WATSON Exhibit 2 and the testimony of Mr. Moutsatos, transcript pages 68-72. The methodology for these projections is to take the ESRD patient census from Net work 19 records as of September 1, 1984, for the particular area, subtract the number of actual home dialysis patients on that date, add the number of patients projected for the area as new patients by September 1, 1985, calculated using 116 new patients per one million of projected population, subtract the number of these new patients expected to go on home dialysis, subtract the projected number of kidney transplants for the coming year, add back 25 percent of these transplant patients as transplant failures, subtract projected deaths of patients, and add back the number of patients on home dialysis which must return for in center

    dialysis. The final number is the number of patients expected to need in-center dialysis by September 1, 1985. Then, using 3.2 patients as the optimum per station, the number of stations projected as needed by that date, less the existing number, yields the projected net need.


  15. These projections of need followed the formula set forth in the rule. Moreover, there was no evidence that the assumptions or data underlying the above methodology was unreasonable, inaccurate, and for any other reason unreliable.


  16. Based upon the evidence, there is in fact a need for six in-center kidney dialysis stations for Polk County by September 1, 1985, and a need for seven stations by the same time for the Lakeland sub-area.


  17. Polk County is the only county in Florida where all in center dialysis facilities are owned by one owner. That owner is Community Dialysis Centers, Inc., CDC. CDC also owns the only other somewhat near facility in Plant City. Of the 97 patients using in-center dialysis in Polk County on September 1, 1984, 54 percent of these (52 patients) were using CDC in Lakeland.


  18. Home dialysis and CAPD are two alternatives to dialysis in-center. These alternatives for certain patients are more desirable due to the greater freedom afforded by these methods. Training and continued assistance, however, is needed to allow use of these methods. CDC Lakeland has not in the last few years provided adequately in this area. CDC's current home training nurse, unit administrator Elaine Feegel, lives in Tampa and must commute to Lakeland each day, thus making it more difficult for her to provide home training. Ms. Feegel further has not been able to provide home training because she has been so busy trying to correct problems at the CDC Lakeland facility.


  19. In addition to the lack of home training, the evidence showed that for significant periods of time in the past few years the ESRD patients who have had to use the CDC Lakeland facility as their only reasonable source of dialysis have been subjected to seriously inadequate, and at times, dangerous health care. Several patients who now dialyze at CDC Lakeland, and who have used that facility for several years, testified to the quality of care received. The facility was initially named Kidneycare, and was not opened or operated by CDC. In late 1980 or sometime in 1981, CDC bought Kidneycare and took over the management of the facility. (The precise date was not established by competent non-hearsay evidence, but is irrelevant.) At some time after patients became aware that CDC was managing the Lakeland unit, the quality of care began to decline. The quality of care when the unit was operated as Kidneycare was adequate.


  20. Joy Harrison is a resident of Lakeland, Florida, and has depended upon kidney dialysis since 1978 to stay alive. She moved to Lakeland, Florida, in 1981. She is 41 years old and has two children, 12 and 8 years of age. Ms. Harrison dialyzed at CDC from March 29, 1981, until June 1984 when she went on CAPD. Dr. Haire has been her physician since 1981. Her testimony concerned the quality of health care at CDC from 1981 until June 1984. Ms. Harrison testified to the following regarding the quality of care at CDC, all of which were unrebutted and is found to be true:


  21. Another patient was dialyzing at the station immediately next to Ms. Harrison. Ms. Harrison, who was then being disconnected from her dialyzer at the end of her session, noticed that the other patient was getting sick. She told the CDC employee on duty. Ms. Harrison had to tell the employee three

    times, and still the employee failed to respond, continuing to work on disconnecting Ms. Harrison from her dialyzer. By this time, the adjacent patient had passed out and began vomiting. When CDC staff finally responded, it took 20 minutes to revive her.


  22. CDC staff failed to turn on the air bubble detector on another occasion when Mrs. Harrison as dialyzing. Air got into the lines. The air bubble came within three inches of entering Ms. Harrison's body when CDC staff stopped it. (The distance is the estimate of the Hearing Officer observing the witness indicate the distance.) Had the air bubble entered her blood stream, it may have killed her.


  23. CDC staff failed to observe or record the correct number of bags of saline solution that is normally to be given to a patient at the end of the dialyzing session to restore the correct balance of fluid and weight, and ended up giving her two bags too many. Ms. Harrison got very sick as a result.


  24. On another occasion, there was only one nurse on the floor. Ms. Harrison was dialyzing, and her feet began to cramp. Saline solution at times must be injected when cramps occur to prevent cramping. Ms. Harrison called out to the nurse, who was talking on the telephone, to tell her she was cramping and needed saline solution. The nurse continued to talk. A few minutes went by and the pain of the cramps got worse. Again, Ms. Harrison called to the nurse for help. The nurse continued to talk on the telephone. The cramps worsened, and Ms. Harrison's hands started to cramp, and she was in much pain. She then told the nurse that if she did not get off the phone and help, she (Ms. Harrison) was going to pull the dialyzing lines out by herself. The dialyzing lines are inserted into Ms. Harrison's arms with two 16-gauge needles. The nurse finally came to assist her. Ms. Harrison could hear the nurse's conversation on the telephone as she was cramping, and the nurse was "laughing and joking on the phone to somebody." (This testimony is not hearsay, but is admissible as proof of what Ms. Harrison heard, not for the truth of what the nurse said on the phone.)


  25. During the dialyzing process, nurses each hour are supposed to take blood pressure, weight, and temperature to insure that the patient's system remains stabilized during the otherwise rather intrusive and disruptive process of having all of their blood circulating outside their body to be cleansed. Nurses at CDC frequently failed to check these vital signs when Ms. Harrison was dialyzing for two and three hours at a stretch. Ms. Harrison later checked her medical record and discovered that weights and blood pressures would be recorded at hourly intervals when in fact no one at CDC had actually observed and taken these readings at these times.


  26. On other occasions she was given 5 percent extra saline solution, but CDC staff failed to record this in the record. Someone else came along and read the chart and tried to give her another dose of 5 percent saline solution. Ms. Harrison stopped her.


  27. When Ms. Harrison first dialyzed at the Lakeland facility, it was in good location near the hospital. Shortly thereafter, while under the ownership of CDC, it was moved to a small shopping center. The location, as will be discussed in additional findings ahead, was undesirable for two reasons: the outside was trashy, and alcoholics and transients hung around the parking lot and rear of the facility.

  28. ESRD patients who must dialyze to remain alive depend upon the continued health of special grafts that are placed in their arms or legs which provide access for the dialyzing needles three times each week. Ms. Harrison lost her arm graft apparently due to the negligence of CDC staff in the insertion of the needle or use of a needle with a burr on it. (Additional findings have been made ahead as to the substantial likelihood that the injury was caused by a needle with a burr on it.) On the day of the injury, Ms. Harrison felt unusual pain during the entire dialyzing process. When CDC staff took the needle out at the end of the dialyzing session, an aneurysm (a sac formed by enlargement of the wall of an artery, caused by disease or injury, Webster's New World Dictionary) had formed in her arm. That night the aneurysm broke and a blood clot came out. Ms. Harrison had to go to the hospital. Her graft was destroyed, and surgeons next created a Bentley button for further dialyzing.


  29. A Bentley button is another method of allowing access to the blood stream of an ESRD patient. Ms. Harrison still had some infection in her system from the failed arm graft. It was very important that the Bentley button be kept antiseptic and clean because it is a direct open hole providing access to the patient's blood steam. Ms. Harrison's infection was doing well, responding to antibiotics given to her by her physician. But as she was dialyzing at the CDC facility, the attending nurse failed to use the antiseptic procedure of wearing a mask and using gloves. At the end of the session, the button must be carefully cleaned and Betadine placed in the two holes. The nurse said she was in a hurry and did not carefully clean the Bentley button or put any Betadine in the button. She simply replaced the cap and wrapped gauze around it. By the next treatment several days later, Ms. Harrison's infection was worse, and she had to start again on antibiotics. For the next two months Ms. Harrison could not use the Bentley button. Finally, it failed entirely as a method of dialysis, and it was removed. Ms. Harrison now is on CAPD, but testified it is not working very well, and she does not know what alternative for dialysis she may have if it too fails. CAPD (chronic ambulatory peritoneal dialysis) is a method of dialysis that involves the implantation of a tube into the interior of the peritoneum. A bag of fluid is placed above the point of insertion so that the fluid will slowly drain into the peritoneal area. Blood slowly exchanges its impurities with this fluid. After a few hours, when the bag has drained fully, the process is reversed. The bag is lowered, and the fluid drains out. When the bag is again full, it is discarded, a new bag is attached, and the process begins again.


  30. On another occasion, the dialyzing machine was not working properly. A line collapsed, the red light was flashing, and when the line collapses, it hurts the patient. The nurses failed to respond. A technician, who is not supposed to do any work in connection with treatment of a patient, tried to come over and get the machine working again.


  31. During the time CDC owned the facility at Lakeland, there was a significant continuing turnover of nurses, thus subjecting patients to new nurses who were not very experienced in dialysis. Some stayed only a few months; others, longer. Ms. Harrison dreaded getting a new nurse because an untrained nurse often took three or four attempts to implant the needle and it hurt. Also, as described above, ESRD patients depend upon the life of their access point for their own life. An untrained nurse who is likely to cause injury to an ESRD patient's access is particularly hazardous to the health of that patient.

  32. Ms. Harrison served for a time as a patient representative for patients on her shift. Of the complaints made by patients, CDC only responded to the request that curtains be installed on the back windows to prevent vagrants from looking in at the patients. (A man was seen at the window on one occasion.) Another request, that a particular nurse not pump the blood pressure cuff up so high as to be painful, was not corrected.


  33. Nell Boutwell is an ESRD patient who has dialyzed for about seven years. She began her dialysis at Tampa General Hospital, then dialyzed at Tampa BMA. In about August 1978, she began to dialyze at Kidneycare in Lakeland. She had no complaints about the quality of care at the Kidneycare unit. There then came a time, which the witness was unable to establish precisely, when it became generally known among patients and staff that Kidneycare had been purchased by Community Dialysis Centers, Inc. The purchase by CDC occurred before Ms. Boutwell wrote a certain letter dated August 25, 1981. Ms. Boutwell testified to a number of matters concerning the quality of health care at the CDC Lakeland facility. Her testimony was unrebutted and is found to be true:


  34. Under Kidneycare, the Lakeland facility was typically staffed at about two nurses for four patients, or six nurses for a shift of 12 patients. When CDC took over, the number of nurses declined until there were only two or three nurses for 11 or 12 patients, about one nurse for four patients, which is approximately 50 percent fewer nurses.


  35. One result of having fewer nurses was that patients had to stay on the dialyzer machine longer because a nurse is needed to disconnect that patient, thus causing patient discomfort.


  36. The replacement nurses were not well trained.


  37. On one occasion, air got into the lines of Ms. Boutwell's machine.

    The available nurses were busy and failed to respond to her calls for help. A technician came over, and he finally was directed by another patient to turn off the machine. Then a nurse appeared and fixed the machine. Air in the machine is a life-threatening condition, as described above.


  38. CDC was short on tape and frequently had no Band Aids to cover the place where the needles are removed at the end of the session.


  39. When Kidneycare ran the Lakeland facility, it was clean. When CDC took over, the new location was dirty on the outside: there were bottles, dirt, and Pampers in the parking lot. A streak of blood was on the wall of the reception room a week before the hearing. Blood is sometimes left on the dialysis chairs from the last patient to dialyze, including the arm rest. Ms. Boutwell was concerned about cleanliness due to the risk of infection.


  40. A patient with a heart monitor attached during dialysis was left unattended as all nurses left the floor, and the monitor began to "act up", although Ms. Boutwell is not trained in reading such a monitor and could not say what it meant.


  41. The needle came out of the arm of one patient and he became unconscious as his blood drained onto the floor. This accident was not discovered by CDC staff, but was first discovered by another patient.


  42. The restrooms had no paper towels so that patients who wished to wash their hands had nothing sanitary to dry them on.

  43. A CDC nurse by mistake put Clorox into Ms. Boutwell's machine as she was dialyzing. The Clorox was intended for another machine which was being cleaned. Ms. Boutwell caught the error before it harmed her.


  44. Ms. Boutwell dialyzes early in the morning now, and in the winter it is dark when she arrives. Having vagrants hanging around the shopping center causes her fear.


  45. As will be discussed ahead, the artificial kidney in a dialysis machine is a relatively small tubular filter. After appropriate cleaning, an artificial kidney under some circumstances can be reused. Ms. Boutwell did not want to dialyze with an artificial kidney that had been used before. She had had experience with reused kidneys, and they did not clear her blood as well as new kidneys. Ms. Boutwell's insurance pays for a new kidney for each dialysis. CDC staff brought a consent form for Ms. Boutwell to sign agreeing to reuse. She refused to sign. CDC told her she either had to sign or she would not be allowed to dialyze at CDC Lakeland. Her only other choices involved unreasonable travel (Tampa, Orlando) or facilities owned by CDC (Winter Haven,

    Plant City) After continuing to refuse to sign the consent form, CDC allowed her to have a new artificial kidney for each dialysis.


  46. CDC Lakeland periodically was inspected by outside agencies. For the week or so prior to inspections, Ms. Boutwell observed CDC staff making unusual efforts to clean the facility and bring patient records up-to-date.


  47. For four years, Ms. Boutwell worked during the day, and thus had to dialyze at night. The administrator of CDC Lakeland told Ms. Boutwell that CDC was going to discontinue the evening shift. She told Ms. Boutwell that she could come early in the morning to dialyze, drive to Tampa in the evenings after work, or quit work. There were four patients using the evening shift. As a result of the proposal to stop the evening shift, Ms. Boutwell wrote a letter dated August 25, 1981, to Dr. Michael Pickering. Dr. Pickering had been one of the physicians associated with the clinic when it was Kidneycare and knew of the needs of those patients. In the letter, Ms. Boutwell asked for his help to prevent the cessation of the evening shift. She explained that dialysis left her in a weak condition, and that travel home from Tampa at 10:00 p.m. would not be safe, that dialysis at 6:00 a.m. at CDC Lakeland would require too many hours away from her job, that she did not have help for home dialysis, and that CAPD was not suited for her due to her work. Her letter is WATSON Exhibit 17. CDC sent a representative to investigate as a result of her letter. The representative told Ms. Boutwell that CDC was only "talking" about discontinuing the evening shift, but that they were not actually going to do it. This contradicted what the administrator had told Ms. Boutwell initially, leading to the conclusion that either on the first occasion or the second occasion, and more probably the second occasion, the CDC administrative staff was untruthful to one of their patients.


  48. On each occasion mentioned above when CDC staff told Ms. Boutwell that she could go somewhere else to dialyze if she did not like the new CDC policy, there was no adequate alternative for Ms. Boutwell to turn to. The suggestion that she could go somewhere else when no reasonable alternative existed was evidence of a callous indifference to her needs as a patient, and was harmful to the trust needed for a healthy clinical patient relationship.


  49. Ms. Boutwell had experienced dialysis at CDC since January 1984 when Elaine Feegel became unit administrator. Ms. Boutwell was of the opinion that

    Ms. Feegel was doing a good job as the new administrator, trying to clean the place up, trying to hire good nurses, and personally on the floor more often than her predecessor checking on the operation of the unit. She felt that she was personally getting good treatment at CDC Lakeland at the time of the hearing, November 6, 1984.


  50. The deposition of Eugene DeBerry, another patient who dialyzes at CDC Lakeland, was received into evidence as WATSON Exhibit 18. Petitioner's objections to certain portions of that deposition have been ruled upon in the conclusions of law. Mr. DeBerry began dialysis in January 1977 at Tampa General Hospital. Mr. DeBerry has dialyzed at seven other clinics and CDC Lakeland since he began at Tampa General Hospital. Mr. DeBerry's testimony has not been rebutted and is found to be true with respect to the following matters concerning the quality of care at CDC Lakeland:


  51. Of all of the units in which Mr. DeBerry dialyzed, the Lakeland unit operated by Kidneycare was the best, in his opinion.


  52. Mr. DeBerry was one of the six initial patients at Kidneycare when it opened on June 22, 1977. Kidneycare operated the clinic for two or three years before CDC purchased it. The original locations of the Kidneycare facilities (there were two) were about a block from the Lakeland General Hospital. The second facility that was used by Kidneycare had a central nurses station that permitted observation of all kidney dialysis stations at one time.


  53. About a year after CDC bought the Kidneycare facility, CDC moved it to its present shopping center location. Mr. DeBerry described the same problem with vagrants and trash on the outside of the CDC facility as described by other witnesses.


  54. There have been occasions when these vagrants have entered the clinic to use the restrooms, sit in patient chairs, or steal.


  55. Mr. DeBerry requires a wheelchair for movement. The restroom at the CDC unit is too small to allow him to use the toilet, that is, it is not accessible to a wheelchairbound person.


  56. Similarly, the waiting room for patients is not suitable for wheelchair patients, and Mr. DeBerry has to wait in his wheelchair in the hall.


  57. Kidney dialysis patients are restricted on intake of fluids, so being able to have coffee or a soft drink is a special treat. At the beginning of dialysis in the first hour there is an opportunity to drink a liquid. Kidneycare used to provide this treat; CDC cut it out, stating that it was expensive.


  58. When CDC took over the unit, the attitude of the nurses changed. The nurses said that CDC was very cost-conscious, and were cutting back on expenses, including nursing staff, that CDC wanted to get rid of four nurses. (This hearsay evidence was corroborative of direct testimony that the staffing under CDC was decreased by about 50 percent compared to Kidneycare staffing.)


  59. When CDC took over the unit, it attempted to require all patients to use only one type of artificial kidney, or to stock only a few. ESRD patients, however, have different needs. Some still have a portion of their natural kidneys intact and operative, and need less dialysis, and especially cannot tolerate large losses of fluid during dialysis because this causes painful

    cramps. Others, like Dr. DeBerry, have no kidneys, and need an artificial kidney that dialyzes more completely. The CDC effort to cut this cost ultimately was blocked by the orders of individual physicians requiring specific artificial kidneys for their patients.


  60. Within six months of the CDC takeover, CDC circulated a consent to reuse form among all patients. The form relieved CDC from responsibility for harm that might be caused by reuse of artificial kidneys. Darlene, the CDC unit administrator told Mr. DeBerry that he could either reuse the artificial kidneys or he could dialyze someplace else. Mr. DeBerry did not want to reuse due to the possibility of infection. He had already lost not only his kidneys, but his bladder, prostate, and both legs due to infection. But Mr. DeBerry could not go on home dialysis because it caused him severe hypertension, and travel to Tampa was unacceptable, so he signed the consent form. After about a year of reuse, Mr. DeBerry again discussed his options with the unit administrator, then Pat Segien. Ms. Segien said that the CDC units at Plant City and Winter Haven also required reuse.


  61. The CDC unit was often short on important supplies. Mr. DeBerry had to dialyze with the wrong needle and the wrong kidney on occasion. The unit was out of Band Aids, tape, blood lines, and saline solution on a regular basis, and Mr. DeBerry complained about this several times.


  62. The CDC facility was not clean inside. Blood would remain on dialysis chairs, the floor, and on walls for a week or more.


  63. As a result of these problems with the quality of care at the CDC unit, Mr. DeBerry complained to Senator Lawton Chiles' office. Thereafter, Network 19 came in to inspect and the unit was cleaned up.


  64. When CDC took over Kidneycare, they began using a cheaper grade dialysis needle, and Mr. DeBerry began to experience a tearing of the place where the needle was inserted, resulting in bleeding around the needle throughout the four hours of dialysis. Mr. DeBerry complained to his physician. His physician then ordered CDC to provide him with the needle he had formerly used. CDC complied. Mr. DeBerry encouraged other patients who were experiencing the same bleeding to contact their own physicians. Now CDC seems to use the good needles generally throughout the unit. Pat Segien, the unit administrator, told Mr. DeBerry that CDC used the new, inferior, needles because they were cheaper.


  65. CDC cut the nurse/patient ratio to 1:4. It had been 1:3 or less under Kidneycare. The problem with having only one nurse for four patients is that nurses routinely during dialysis have to respond to special needs, including sick patients. Mr. DeBerry described the following example of why three nurses cannot adequately handle 12 patients: one patient passed out; two nurses responded. Another patient started vomiting, Mr. DeBarry's line got air in it, and another patient was nearly unconscious due to low blood pressure. The nurses were unable to handle all of this and continue to do the routine work of checking blood pressure of other patients. Mr. Deberry was home trained, and therefore knew to clamp off the incoming air bubble and turn off his blood pump, which he did himself. Mr. DeBerry had seen air enter the lines of other patients on a number of other occasions because CDC staff allowed saline or blood bags to be pumped dry without properly attending to them.

  66. Many of the patients sleep during the four hours of dialysis, and thus the attentiveness of CDC staff is very important to their health. Since CDC took over, there has been so much turnover of nurses that many of the nurses are not experienced.


  67. Under CDC management, technicians who were not trained as nurses were allowed to do blood pressures, put heparin in the dialysis machine, and mix the formula for the bicarbonate bath. These practices have now been discontinued by CDC.


  68. CDC suffered from a frequent lack of soap, towels, and toilet paper in the restrooms, and a lack of soap at the sink at the exit to the isolation room. Nurses had no soap to wash their hands after leaving the isolation room when that room was in use dialyzing a patient that required isolation from the other patients.


  69. It took six to eight months for CDC to buy curtains to stop vagrants from looking into the back windows at the patients at night.


  70. In May 1984, Mr. DeBerry was mistakenly given a double dose of Desferal, and went into such shock that he could not talk so as to tell the nurses the mistake they had made.


  71. CDC has been constantly out of blankets, and once recently was out of sheets. Mr. DeBerry's wife had to buy a sheet to enable him to dialyze on schedule that day.


  72. CDC nurses are supposed to keep patient medical records current. On several occasions, Mr. DeBerry was asked to go over and sign his records for as many as four months earlier, which had-not been kept up-to-date. This happened before inspections in particular. Prior to inspections, CDC staff makes a number of improvements, including updating records and cleaning the facility.


  73. The front door of the CDC facility is not adequately constructed to allow a wheelchair to enter unless the patient has one person to push him up the ramp and another person to hold the door.


  74. Since Elaine Feegel became unit administrator at CDC, the quality of care has improved, but the nurses still need to improve in implementation of sterile procedures. Mr. DeBerry felt that he had received good quality care in the last few months.


  75. Sandra Biller is a registered nurse specializing in hemodialysis. She is currently employed by the Lakeland Regional Medical Center. She has specialized in hemodialysis for six and one-half years. She was accepted as an expert witness in ESRD nursing. She has worked in hemodialysis nursing at the Kidneycare facility beginning in 1979 and remained employed there under CDC until October 1982. During the time that the facility was managed as Kidneycare, the quality of care was good. Then CDC purchased the facility and began management thereof. Ms. Biller testified to the following aspects of health care at CDC when she was employed by CDC. The testimony was not rebutted, and is found to be true:


  76. When CDC took over the facility, it changed the type of needle used. The new needles had burrs on them that tore the access points in the patients' bodies and prolonged bleeding. Trauma to the access ultimately decreases the life of the access. As was seen by the medical history of Joy Harrison, an ESRD

    patient depends upon the life of the access for her own continued life. When all accesses and dialysis methods have been exhausted, and dialysis becomes impossible, the patient dies. Moreover, burrs on the needles caused unnecessary pain to the patients. Kidneycare did not have these problems because they used Terumo needles. CDC "frowned" upon use of these needles, and required a special order by the physician to use these needles. The new needles used by CDC were cheaper and were used to save money. Patients and nurses complains about the use of the cheaper needles, but nothing was done about it.


  77. A policy was instituted by CDC requiring reuse of artificial kidneys by all patients. Patients were told to dialyze elsewhere if they refused to reuse. Some patients who objected to reuse long enough were allowed not to reuse, but CDC told nurses to keep that fact quiet among other patients, and did not tell other patients about the exceptions. Jerry Bryant, the area administrator for CDC, told Ms. Biller that the reuse policy was premised upon the size of the facility and a goal of having a certain percentage of patients reusing. CDC's reuse policy was initially limited by a standard that the reused kidney function at 80 percent of its initial capacity. This was then changed to

    75 percent of initial capacity. At one point reuse was also limited to 12 reuses, but later some artificial kidneys were reused 25 or 30 times. Patients and nurses complained about reuse without success.


  78. The primary harm to patients caused by reuse was that Ms. Biller's patients did not feel well at the end of dialysis on a reused kidney. Reused artificial kidneys frequently still had dark brown clots of fibrin in them. CDC reused the parallel plate type of dialyzer, and this type of dialyzer was inappropriate for reuse because it was impossible to inspect between the parallel plates to see if the dialyzer was clean. One patient became septic reusing a parallel plate kidney. Reuse caused an additional health problem or potential health problem for CDC patients because a reused kidney is cleaned with formaldehyde which is toxic to humans and must not be ingested in excessive quantities. Cleaning the dialyzers with formaldehyde released fumes into the air. Although CDC had an instrument to measure the quantities of formaldehyde fumes in the air to insure safety to patients, it did not use it to test the air as required on a regular basis.


  79. There are several types of artificial kidneys, and some are more suitable than others for the needs of specific patients. CDC would not provide the type of dialyzers specifically needed by individual patients.


  80. Dialyzing machines were not maintained according to the 100- and 500- hour schedules for maintenance that they were supposed to have.


  81. Staffing at Kidneycare was two patients per nurse. Under CDC, the staffing ratio ultimately became four patients per nurse, a loss of 50 percent of the nursing staff. It was a dangerous condition for the patients sometimes. Many of the patients were unstable. The nurses did not have enough time to care for sick patients and monitor the equipment properly due to the staffing shortages.


  82. When CDC took over, the pay and benefits for nurses was regulated more strictly. All nurses were paid on an hourly basis. Sick leave went from an informal system to a strict accounting policy. CDC refused to carry over certain forms of sick leave earned as employees of Kidneycare.


  83. New nurses were placed in charge of direct care of patients without sufficient training. Nurses require four to six weeks not only to learn how to

    operate the machines, but more importantly, to learn what to look for as trouble signs in a dialyzing patient. Jerry Bryant stated it should not take more than two weeks to train a CDC nurse, and CDC nurses were put onto the floor with less than four weeks' training. One nurse was found to be doing dangerous things, and when Ms. Biller reported this, she was ignored and told to "watch her closely." The nurse was failing to turn on the air bubble detector and failed to close the saline line to prevent an overdose of saline solution. On one occasion a patient was negligently given three liters of saline solution, and this mistake was never documented on the patient's record. This sort of mistake happened more than once. One liter was the normal amount, and probably was not proper for this patient, who usually needed fluid taken off during dialysis.


  84. CDC staff generally did not show a professional attitude toward their work. They came in late without correction by the administrator. One nurse, who did the reuse job, wore dirty clothes, and she was handling the dialyzers. Sometimes a nurse would see that a patient was sick and vomiting and would walk right by, failing to stop and care for the patient.


  85. All of the nurses who originally worked for Kidneycare have left CDC and most work for Lakeland Regional Medical Center now. Typically, within a period of four years nurses do not leave a good dialysis center. Ms. Biller left CDC due to her dissatisfaction with the quality of health care provided at CDC.


  86. Patient charts were supposed to be done at least every two weeks. Sometimes the CDC staff would fail to complete these records for six or eight months, but would do so for an inspection. Charts were not kept current due to the shortage of nursing staff.


  87. Dr. de Quesada was the Medical Director of CDC when Ms. Biller was a nurse employed by CDC. He lived in Tampa where he had his practice, and she saw him at the CDC Lakeland facility about once a month. During emergencies, it was sometimes difficult to reach the Tampa physicians until two or three hours later. The Watson Clinic physicians were always available. Watson Clinic nephrologists were seen at the CDC clinic at least every week or so.


  88. James Whitfield is a physician specializing in internal medicine and kidney diseases. He practices nephrology with Dr. Haire and has treated ESRD patients who dialyze at the CDC Lakeland facility since July 1983. Dr. Whitfield observed the following matters with respect to the quality of medical care at CDC Lakeland which were not adequately rebutted and are found to be true:


  89. The most frequent problem at CDC was failure to achieve the proper weight at the end of the dialysis session. CDC staff is supposed to monitor the process so as to achieve the correct weight at the end. Leaving a patient with either too much fluid or too little fluid is hazardous to the patient. One patient on two successive occasions had too much fluid taken off, causing the patient to go into shock and necessitating emergency procedures to revive the patient. The problem was that the CDC dialysis machine had a part stuck in an open position, thus operating to remove excessive amounts of fluid.


  90. Patient records were not maintained in a current condition.


  91. Orders were given to CDC to take a blood count at the end of each dialysis because the patient had recurrent internal bleeding. CDC failed to take the blood count. The patient suffered a substantial drop in blood count,

    and had to be hospitalized for anemia. On another occasion, an order to use a particular type of artificial kidney was not followed by CDC.


  92. CDC delayed a long time in providing a bicarbonate dialysis machine, which was needed for several patients.


  93. Four or five weeks before the hearing, Dr. Whitfield had a patient that for a two-week period needed to be dialyzed daily. CDC refused to do this, stating that they would only get recompensed for routine dialysis and would not be paid for the extra dialysis. Medicare will pay for non-routine dialysis in certain cases, but in this case, CDC did not apply.


  94. In the summer of 1983, Dr. Whitfield performed a rectal examination of a patient, taking a small amount of fecal matter to test for blood. A week later he used the same examination room at CDC Lake land. He found the feces and towel he had used the week before in the same place he left it. CDC had not cleaned it up for a week.


  95. CDC has a goal of requiring all patients to reuse artificial kidneys. Formaldehyde is used to clean the kidney for reuse. The long-range toxic effects of formaldehyde are unknown. Many of the leaders in the field of dialysis feel it is inappropriate for ESRD patients to constantly be exposed to formaldehyde. Formaldehyde use also creates a heard of fumes in the air. Moreover, a reused dialyzer is not as efficient as a new one, and results in fluid not being removed properly from the patient, causing the patient to come back the next day for dialysis. On one occasion, a dialyzer that had been reused 15 times was supposed to have removed 10 pounds from a patient, but removed only two pounds, resulting in the discomfort of another dialysis session the next day. Reuse can, for some patients, be beneficial because the reused kidney does not cause a mild allergic reaction suffered by some patients. But the safe level of reuse cannot be established administratively at a single standard or level because the medical needs of patients vary greatly.


  96. Supervision of nursing staff at CDC has improved considerably since Elaine Feegel became unit administrator.


  97. John Dowless is a hospital consultant/supervisor, Office of Licensure and Certification, Department of Health and Rehabilitative Services. He is a team leader on an interdisciplinary survey of health care team. The team determines if health care facilities in Florida meet federal and state requirements. He has 40 years of experience in health care, and has worked in the above capacity for eight years. He was accepted as an expert in health care surveying. In late March 1983 his office received a request from the Health Care Financing Administration that Mr. Dowless' office conduct an investigation of the CDC Lakeland facility with respect to complaints received about the quality of health care at that facility. Mr. Dowless and Maryanne Judkins, R.N., constituted the survey team that conducted the investigation on or about April 8, 1983. The investigation was an unannounced visit. (Annual routine surveys conducted by HRS are announced in advance.) The purpose of the April investigation was to determine if the CDC Lakeland clinic was in compliance with Medicare regulations. WATSON Exhibit 4 contains the HCFA forms used by Mr. Dowless in conducting this survey. Mr. Dowless found more patient care deficiencies at the CDC Lakeland facility than he had previously found at any other renal dialysis facility. The survey team found three Medicare "conditions" not met by CDC Lakeland. Failure to meet a condition results in disqualification for Medicare participation by the facility. Mr. Dowless at that time was considering decertifying the CDC Lakeland facility as a Medicare

    provider. CDC then sent a representative from its Atlanta office, and CDC promised to make corrections. On June 20, 1983, a reinspection was made. Mr. Dowless found that the facility had made quite a bit of improvement. The facility did not lose its Medicare certification, and sufficient progress was made toward correcting the deficiencies. The April 1983 survey of CDC Lakeland by HRS found the following substantial deficiencies:


  98. One member of the nursing staff did not have a current Florida license. This was a violation of a condition to obtain Medicare participation.


  99. The governing body failed to effectively manage. It has no written policy on reuse of dialyzers. Patients were scheduled without an adequate time between treatments. The facility failed to adequately insure that physicians made rounds when the patients were in the facility. Records did not have physician signatures for orders. Patient copies of the grievance procedure did not inform them they could complaint to Network 19. The above cumulatively was a violation of a Medicare condition.


  100. There were no written policies regarding patients' rights available to relatives. This was a violation of a Medicare condition.


  101. The patient environment was found to be unsafe and unsanitary. A bloody reused kidney was placed on top of a disinfected dialysis machine. Two chairs used by patients for dialysis were soiled with blood. The nursing station had 21 items marked sterile with an expiration date 12 months earlier. Other dusty, dirty, and cluttered items were noted. The floor of the dialyzing area had soiled gauze, cotton, rubber gloves, and paper. A soiled mop and dirty water were stored in the supply room, and the floor of the supply room was dirty and cluttered. The acetate hemodialysis concentrate solution was contaminated.


  102. The emergency tray was not fully stocked.


  103. The facility had been directed by a written memorandum to discharge patients who refused to reuse dialyzers, in violation of the written discharge policy. CDC failed to recognize individual needs concerning reuse, forcing patients to choose between reuse and traveling 60 miles to Orlando to dialyze, and refusing to allow one patient to reuse who offered to pay for the new kidney.


  104. A year later, on April 5, 1984, HRS conducted its annual survey for Medicare certification. Annual surveys are announced beforehand, and as prior testimony indicated, CDC would make a special effort to clean up and correct deficiencies before such surveys. This annual survey found no discernible deficiencies.


  105. As a result of complaints about the quality of care at CDC Lakeland, Network 19 also conducted an investigation of the facility on May 2, 1983. The report of that investigation is contained in WATSON Exhibit 4. The report was acted upon by the executive committee of Network 19 and transmitted to HCFA for its information and action. The site visit was announced ahead of time to CDC. Network 19 concludes in the report that the problems existed at CDC due to lack of leadership at all management levels and poor communication. It also concluded that the physician director appeared to have no direct or deciding input into unit operations, and the new unit administrator was following corporate policy changes. It was reported to Network 19 that CDC had instituted changes to correct these deficiencies. Finally, after recommending that the physician director become more involved in directing the unit, the report

    concluded with the finding that there was no direct evidence that the health and safety of the patients were then being compromised.


  106. It is evident from the findings above that between the unannounced inspection by HRS on April 8, 1983, and the announced inspection by Network 19 on May 2, 1983, CDC made improvements.


  107. Dr. Alejandro de Quesada is the Medical Director of CDC Lakeland and CDC Winter Haven. He originally became involved with the Lakeland unit as an owner and investor, as well as a physician having ESRD patients treated three. He is responsible for delivery of medical care, but is not directly responsible for machine maintenance, purchasing of supplies, or personnel matters, including hiring and firing. In these areas, he becomes only involved to the extent that the Lakeland staff tells him about problems they have identified. Dr. de Quesada lives and works in Tampa and is an Associate Professor of Medicine at the University of South Florida as well. Dr. Tapia is Associate Director of the unit and he is located in Lakeland. Dr. de Quesada has been Medical Director at the Lakeland facility either in the fall of 1983 or 1982; he could not state precisely when. Neither Dr. de Quesada or Dr. Tapia attended the hearing, and Dr. de Quesada's testimony was made a part of the record by deposition. Dr. de Quesada admitted in general terms many of the problems found above (loss of experienced nurses, reuse of dialyzers, problems with needles) but did not have any detailed knowledge of these problems, did not state whether he felt the problems were serious or minor, did not elaborate on the cause of the problems, and asserted that each one had been corrected. He admitted that at about the time he became Medical director, there was a large turnover of nurses and medical care was not "optimum."


  108. The location and external condition of the CDC facility in Lakeland is very unpleasant. WATSON Exhibits 19, 20, and 21 are photographs taken during the work week (October 19, 22, and 26, 1984) and very close to the date of the hearing. The CDC facility is located in a small strip shopping center. Immediately next door is a grocery store. Drunks and vagrants hang around the shopping center. Thus, CDC dialysis patients must come three times every week to a place not associated with health care, but with vagrants and groceries.

    For two years CDC has received complaints about unsightly trash outside the CDC facility. Yet, one week before the final hearing these photographs show a dishearteningly filthy collection of debris in the gutter immediately in front of the door into the CDC facility. For patients who are so critically vulnerable to infection, this array of trash at the entrance to the place they depend upon for cleansing of their blood directly erodes their confidence in the CDC facility and is demeaning to them.


  109. Dr. Henry M. Haire lives in Lakeland and is a nephrologist. Since early in 1980, he has both been on the staff of Watson Clinic and a member of the treating staff at Kidneycare and CDC. He was accepted as an expert in nephrology. Dr. Haire wrote the original certificate of need application for WATSON. The original application for a certificate of need was the result of Dr. Haire's assessment in January or February of 1983 that it was unsafe for his patients to dialyze at CDC Lakeland due to the quality of care at that facility. Dr. Haire testified to the following matters concerning the quality of health care at the CDC Lakeland clinic. These matters were not adequately rebutted by the Petitioner and are found to be true:


  110. The quality of health care at CDC Lakeland has been like a roller coaster for the last four years, with poor care followed by improvement and then another decline in care. Care improved after the HRS and Network 19

    investigation in April-May 1983, and then declined again. Since July 1984 the quality of care has again improved.


  111. There have been occasions when the Tampa treating physicians could not be located in emergencies, and Dr. Haire had to respond for their patients at CDC.


  112. Some patients need a bicarbonate dialysis machine to reduce acid levels. Dr. Haire waited 18 months after he requested CDC to obtain one of these machines before they did so.


  113. CDC on two occasions transferred patients of Dr. Haire without prior notification to him. One patient was transferred to Tampa when the night shift was discontinued. Two other patients were transferred to Winter Haven one month before the hearing. One of these patients was very unstable and needed to be dialyzed near Dr. Haire. Dr. Haire had her transferred to a physician in Winter Haven.


  114. As recently as July 1984, Dr. Haire had found that CDC staff had failed to take weights and record other data in the charts.


  115. On one occasion, Dr. Tapia, the Associate Medical Director at CDC who lives in Lakeland, was not available to handle an emergency involving evacuation of patients due to formaldehyde fumes in the room, and Dr. Haire had to fill in for him.


  116. Based upon the foregoing findings, the following additional findings are made:


  117. End-State Renal Disease (ESRD) patients are captive consumers. Without continuing adequate renal dialysis they will die. ESRD patients are particularly vulnerable in a variety of ways. Loss of the use of one's kidneys demands a major psychological readjustment for the patient. Confidence in the quality of health care is critical to the readjustment. Some ESRD patients are frail, confused, disabled in other ways, elderly, and cannot adequately protect themselves from inadequate health care during dialysis. Further, ESRD patients have a well justified fear of infection, since loss of dialysis access may mean loss of ability to dialyze and death. Dialysis is uncomfortable and painful under the best circumstances, and is easily made more uncomfortable and more painful if treating staff is overworked, untrained, or indifferent.


  118. The quality of health care at the Lakeland facility since 1980 when CDC purchased it and began to manage it has been inadequate in a number of ways. From 1980 until 1984, despite repeated complaints from patients, physicians, and nursing staff, the quality of care at CDC for substantial periods of time was inadequate. Improvements have been made in 1984. The current administrator, who took that job in July 1904, is doing an excellent job. She is well- qualified for the job and has shown a genuine interest in improving CDC Lakeland. The current regional administrator is equally well-qualified, and has also demonstrated a sincere desire to improve the Lakeland facility. But problems persist. A few instances of questionable care occurred within a few months of the November 1984 hearing. The outside of the facility remains trashy as of ten days before the hearing and the location of the facility continues to suffer from proximity to vagrants. From 1980 to 1984, the health care at CDC Lakeland has been erratic and unstable, improving only in response to an investigation under threat of loss of Medicare money, annual inspections, or the

    potential of competition that may occur as a result of this certificate of need proceeding. Health care which is erratic and unstable is unreliable and, for that reason, inadequate, and the health care provided by CDC Lakeland for this additional reason has not been adequate.


  119. The Watson Clinic was started in 1926. Today, it is a large specialty hospital providing a wide range of services, from primary care to open-heart surgery. It has 22 departments and specialty services. The Clinic has 75 affiliated physicians, all of whom, with the exception of two, are specialists. Of these, 67 physicians are partners in the partnership which owns and manages the Clinic. The organization of the Clinic as a multispecialty group practice was derived from the Mayo Clinic example. Major decisions are made by the full partnership. Day to-day management is committed to an Executive Committee and to the Clinic Manager, Dudley Towne. The Clinic is located in Lakeland, Florida, in Polk County.


  120. The Watson Clinic currently has approximately 265,000 outpatient visits annually. As of January 31, 1984, Watson Clinic had current assets of

    $3,084,200.36, of which more than 50 percent was in cash deposits. For the year ended January 31, 1984, the Watson Clinic collected over $27 million in fees and distributed more than $12 million to its 67 partners.


  121. The Watson Clinic partnership, through its Executive Committee and by vote of the partnership, approved the plan to seek a certificate of need for a kidney dialysis center. Watson Clinic's amended application for a certificate of need seeks a four-station unit.


  122. The Watson Clinic partnership will pay for the purchase of equipment of the proposed dialysis center, will pay all start-up costs, and will continue to absorb all losses until the dialysis center becomes profitable. The dialysis center would be managed as another one of the entities of the Watson Clinic.


  123. Watson Clinic does not necessarily plan to do more than break even in its operation of the dialysis center. From a fiscal perspective, the Watson Clinic frequently undertakes to provide a new service to its patients that itself may only be marginally profitable but that furthers the goal of the Clinic to be a full-service multi-specialty clinic.


  124. WATSON Exhibit 14 is WATSON's amended certificate of need application. The amendments were primarily to conform the application to the number of dialysis stations initially approved by HRS. WATSON originally requested ten stations, but HRS approved only four.


  125. The projected staffing for the dialysis center is one head nurse who would administer the unit, two staff registered nurses, one licensed practical nurse, and part-time assistance from a dietician, a social worker, and a secretary/receptionist. Watson Clinic is currently aware of six registered nurses with some background in nephrology who might fill one of the three nursing positions, and four licensed practical nurses. Of these, only one (one LPN) is currently on the staff of CDC Lakeland. There was no rebuttal evidence on these facts, and it thus appears that the new center could be staffed reasonably soon, and without causing a loss of staff to CDC.


  126. The projected salaries for staff were reasonable and sufficiently high to attract reasonably qualified staff.

  127. The total cost of the project is projected to be $81,500, and the underlying costs which make up this figure are reasonable. Two additional costs not included in the above figure were identified. Legal fees have been incurred in the amount of about $25,000, and this is paid by the Watson Clinic partnership, and future fees will be paid in a like manner. Most renovation costs will be of minimal expense. The dialysis center will be in a building owned by the Watson Clinic partnership directly across the street from the Clinic. The only cost not identified in the application that may be substantial is the cost of putting in plumbing. This, however, does not affect the financial feasibility of the project since the Watson Clinic clearly has sufficient assets to absorb the costs of plumbing renovation.


  128. The projected utilization of the new dialysis center is reasonable based upon the projected need data discussed above. It is projected that the new center will have ten patients the first month and will grow to a maximum of

    16 patients by the seventh month, October 1985. Thereafter, the center is projected to operate at full capacity of 16 patients. WATSON Exhibit 2, page 3, shows a predicted 75 ESRD patients needing dialysis in the Lakeland sub-area by September 1, 1905. If 16 of these dialyzed at the WATSON dialysis unit, the remaining 59 would dialyze at CDC Lakeland, which would be seven or eight more patients at CDC than are currently using that facility. The data of projected ESRD patients from Network 19 were corroborated by evidence provided by Dr. Haire. Dr. Haire and his partners are currently following 12 patients with renal problems and expect six of these will need dialysis in the next four or five months. Dr. Haire estimated that initially four of his 22 patients now using CDC would immediately transfer to the new unit, and that later in the year another one or two would transfer. Dr. Haire finally estimated that the remaining six patients of the 12 mentioned above as having renal problems would need dialysis by the end of the year. Thus, the majority of the projected patients were in fact known to Dr. Haire by name and their projected needs currently identified.


  129. The projected operating revenues were based upon reasonable assumptions from experience in reimbursement and payment in dialysis centers in the industry and actual reimbursement experience at Watson Clinic.


  130. The operating expenses were likewise based upon experience in the industry and are found to be reasonable projections.


  131. Attached to WATSON Exhibit 14 are computer-generated pro forma financial statements. These statements project net income and operating profit for the new facility for a two-year period, and are premised upon the patient utilization rates discussed above, as well as projected revenues and expenses, including the expense of amortizing the initial project cost. The first year operating profit is projected to be $19,809, with a pretax profit of $428. The second year has a projected operating profit of $20,790 and a pretax profit of

    $13,126. The financial statements erroneously show a corporate income tax, which does not exist since the Clinic is a partnership, so the pretax profit is the same as the net income. The financial statements are conservative in that they presume that all patient revenue will come from patients who dialyze in the unit. Medicare pays for home dialysis as well, to encourage that form of dialysis, but since operating expenses are less for home dialysis, the new center will enjoy greater net revenue (approximately $6,000 more per patient per year) for each patient on home dialysis. Dr. Haire and his partners in their practice have historically placed great emphasis on home dialysis, and it is reasonably certain that the center will have greater net revenue as a result of their efforts to train new patients on home dialysis.

  132. The projected revenues are conservative for another reason: they are based on patient visits at a 90 percent rate during the year, rather than 100 percent of the available dialysis days. The 10 percent shortfall was used to account for missed appointments or hospitalization. For example, there are three dialysis days per week, or 156 dialysis days per year for 52 weeks. Thus, at 100 percent 16 patients would generate 2,496 revenue visits. WATSON's second year projection of revenue, however, is based upon 2,254 visits, or 90 percent of 2,496. Elaine Feegel, CDC's current administrator, however, testified that "very few" patients ever miss a dialysis visit.


  133. The willingness of the Watson Clinic, with its clearly ample resources, to absorb all losses from the new dialysis unit in order to provide a full range of services, means that the unit will always have a resource to turn to during the start-up phase and during lean periods. The evidence in the record also shows that the facility will be self-supporting in a reasonable period of time and therefore is financially feasible. The facility will break even in the first year based upon an average of 14.25 patients per month. While this utilization rate is somewhat high, it is supported by the evidence. First, Network 19 projects 75 patients needing dialysis in the Lakeland area by September 1, 1985. If 14 of these patients use the Watson unit, the remaining

    61 can use the CDC unit, putting CDC at 95 percent of its capacity of 64 patients. Given the record of inadequate care at CDC and the fact that the Watson unit will be brand new, coupled with the association of the Watson unit with the adjacent Watson Clinic, it is very likely that the Watson unit will have from 14 to 16 patients regularly using the facility by the end of the first year.


  134. CDC's expert on accounting, Michael Sullivan, sought to discredit the financial feasibility of the proposed four station dialysis center, but his testimony was not persuasive. The portion of his testimony based upon the original CON application data was not relevant because the data was altered by the amended application. Mr. Sullivan also excluded pharmacy and EKG revenue from his calculations of revenue. The main Watson Clinic has both a pharmacy and EKG that will be used by the dialysis center. It is unclear on this record whether the revenues from these activities will, for accounting purposes, be treated as separate revenues of the dialysis center, or revenue of the Watson Clinic. The point is irrelevant, however, since the Watson Clinic will cover all losses that may occur at the dialysis center, and can use these center generated revenues to do so. Moreover, the amounts in question are relatively small. The annual projected EKG revenue is only about $600, and the annual projected pharmacy revenue is only about $7,000. If Watson Clinic successfully has three patients on home dialysis, it will enjoy $18,000 in additional revenue annually, which will more than cover any overstatement of pharmacy or EKG revenue. Mr. Sullivan's criticism that there was no expense indicated for fees of the medical director was not relevant since Dr. Haire will provide those services without charge until the center becomes financially self-sustaining. Mr. Sullivan's further criticism that administrative costs were not accounted for was similarly not correct. A portion of the rental fee will cover administrative services to be provided by the Watson Clinic. Further, the current plan is to computerize much of the billing, and the cost of the computer equipment is included in the financial statements.


  135. In summary, the evidence shows that the proposed dialysis center will be financially feasible.

  136. The quality of care that will be delivered by the proposed four- station center will with a reasonable probability be adequate. There was a substantial amount of evidence as to the qualifications of persons who will be involved in delivery of that health care, and no rebuttal of any consequence from CDC. WATSON intends to offer complete dialysis services consistent with the current state of the art, with new equipment, properly trained staff, professional operating and management procedures. a patients' bill of rights, adequate professional supervision, and adequate staffing. Dr. Haire, who will be the Medical Director, is well-qualified for the job. Initial planning and consultation will be provided by a professional consulting firm. The medical staff will be open staff. The proposed center will place great emphasis on self care and home dialysis since Dr. Haire and other nephrologists at the Watson Clinic actively encourage these techniques. Additionally, the Watson Clinic plans to offer a full range of support services, including dietary counseling, rehabilitation services, social services, and the like.


  137. When the new Watson facility opens, CDC Lakeland should experience some loss of patients, but will not suffer harm in the long run. Dr. Haire will continue to use CDC Lakeland for some of his 24 patients, since the new facility can only handle 16 patients at its maximum capacity. By September 1, 1985, there will be enough new patients in the Lakeland area that even if WATSON served 16 of these, CDC Lakeland still would be needed to serve the remaining 51 patients and would at that time be operating at 92 percent of its capacity.


  138. The new clinic will, over the long run, compete with CDC Lakeland for staff, but as discussed ahead, competition will be beneficial to patients and should result in better health care in dialysis in the area. Initially, however, as found above, the Watson facility could be staffed without "raiding" the staff at CDC since there is an adequate, identified pool of potential staff other than current CDC staff.


  139. Since CDC Lakeland has enjoyed a virtual monopoly over dialysis services in the Lakeland area for the last few years, and the quality of health care provided by CDC has been so unreliable, there is a great need for the Watson Clinic facility to provide CDC Lakeland with competition. Patients at CDC tried to persuade the management of CDC to improve, but when these patients objected to CDC policies and sought change, they were told to dialyze elsewhere if they were dissatisfied. Having the Watson Clinic facility available will enable CDC patients to make that choice, which should then result in sustained and real improvement at CDC. In sum, the need is such that the new facility will not really be duplicative of services provided by CDC, but to the extent it may be duplicative, the competition that will result will be beneficial, not detrimental, to ESRD patients.


  140. The parties may have proposed other findings of fact which have not been considered in the paragraphs above. Many of these are subordinate to findings stated above, are cumulative, or are irrelevant to the above findings and this case. Those of marginal relevance are considered in the following paragraphs:


  141. WATSON proposes that a finding be made as to the accidental infusion of formaldehyde and bleach into two patients on two separate occasions. This proposed finding was based solely upon hearsay, and therefore cannot be made on this record.


  142. WATSON proposes that a finding be made that formaldehyde causes cancer. There is no evidence in the record to support this finding.

  143. CDC Lakeland proposes a finding that the fluctuations in health care occurred as a natural consequence of change in management. This finding is contrary to the evidence and has no evidence to support it.


  144. CDC Lakeland proposes a finding that the absence of any projected cost for accounting or legal fees shows the project to be financially not feasible. The evidence does show that Watson Clinic has incurred about $25,000 to date in legal fees, and that it intends to pay these costs without attribution to the dialysis center. The issue, however, is basically irrelevant, since the Watson Clinic, which has sufficient funds to underwrite this project, intends to fund all costs until the project is self-sustaining.


  145. CDC Lakeland proposes a finding that Watson Clinic might expand to three shifts. There is no evidence to support this finding, and the only evidence on the evidence on the point is to the contrary.


    CONCLUSIONS OF LAW


  146. The following are the recommended rulings upon the objections to portions of the deposition of Eugene DeBerry:


  147. Objection 1 should be denied. The testimony is explanatory of the deponent's earlier testimony that he did not wish to reuse a kidney dialyzer due to fear of infection, and thus is responsive.


  148. Objection 2 should be denied. The additional testimony explains what is meant by the cryptic initial response, the "nurses are supposed to."


  149. Objections 3 and 4 should be denied. Statements by nurses employed by CDC to patients concerning promises made to them by CDC administrative staff as to pay and working conditions, and their own statements as to dissatisfaction with their jobs, are an exception to the hearsay rule, Section 90.803(18)9(d), Fla. Stat., as an admission against a party. These are statements by servants within the scope of their employment during that employment. Additionally, this testimony is corroborative of direct testimony by former CDC nurse Biller.


  150. Objection 5 should be denied. The question is not unintelligible.


  151. Further, Objections 1, 2, and 5, which are objections to the form of the questions or answers and might have been obviated by objection at the deposition, should be denied because the objections were waived by failure to object at the depositions. Rule 1.330(d)(3)(B), Fla. R. Civ. P.


  152. The application of the Watson Clinic for a four station kidney dialysis facility in Lakeland, Florida, satisfies all certificate of need statutory and rule criteria in dispute in this case. Indeed, at no point in this case was any disputed criteria even a close issue. It is regrettable that ESRD patients in the Lakeland area have been delayed over one year in receiving the benefits of this clearly needed alternative dialysis facility. The following subparts of Section 381.494(6)(c) Fla. Stat., have been satisfied by the evidence in this case:


  153. Subpart 2: Existing services are insufficient for the projected need and have shown a substantial record of inadequate health care.

  154. Subpart 3: The applicant has the ability to provide high quality health care.


  155. Subpart 4: There are no other alternatives to the facilities proposed by the applicant.


  156. Subpart 5: By locating a dialysis facility close to and in conjunction with the Watson Clinic, there will be economies and improvements in service.


  157. Subpart 8: Staffing and financial resources for success of the project are available.


  158. Subpart 9: The project will be financially feasible in the short and long range.


  159. Subpart 12: The proposed project will improve the quality of health care provided ESRD patients on dialysis in the Lakeland area by providing competition to CDC Lakeland.


  160. Subparts 1, 6, 7, 10, 11, and 13: These subparts do not apply in this case.


THEREFORE, it is recommended that the application for a certificate of need to the Watson Clinic in this case be APPROVED.


DONE AND ORDERED this 28th day of January, 1985, at Tallahassee, Florida.


WILLIAM C. SHERRILL

Hearing Officer

Division of Administrative Hearings The Oakland Building

2009 Apalachee Parkway

Tallahassee, Florida 32301

(904) 488-9675


Filed with the Clerk of the Division of Administrative Hearings this 28th day of January, 1985.


COPIES FURNISHED:


Mary Ann Presswood, Esquire 2204 East Fourth Street Santa Ana, California 92705


Louise Jerosolow, Legal Intern

318 North Calhoun Street Tallahassee, Florida 32301


E. G. Boone, Esquire Stephen K. Boone, Esquire 1001 Avenida Del Circo Venice, Florida 34234

David H. Pingree, Secretary Department of Health and

Rehabilitative Services 1321 Winewood Boulevard

Tallahassee, Florida 32301


Docket for Case No: 84-001131
Issue Date Proceedings
May 29, 1985 Final Order filed.
Jan. 28, 1985 Recommended Order sent out. CASE CLOSED.

Orders for Case No: 84-001131
Issue Date Document Summary
May 28, 1985 Agency Final Order
Jan. 28, 1985 Recommended Order Certificate of Need (CON) for dialysis facility granted. Only existing provider in area gave unreliable services which demonstrated need for another provider.
Source:  Florida - Division of Administrative Hearings

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer