Petitioner: DONALD BRENNAN
Respondent: STEWART A. SATTER AND DEPARTMENT OF ENVIRONMENTAL PROTECTION
Judges: J. LAWRENCE JOHNSTON
Agency: Department of Environmental Protection
Locations: Manalapan, Florida
Filed: Oct. 09, 2007
Status: Closed
Settled and/or Dismissed prior to entry of RO/FO on Thursday, April 24, 2008.
Latest Update: Dec. 22, 2024
AUG-27-208@7 B5:56P FROM: . TO: 18506816836 P.4
STATE OF FLORIDA .
DEPARTMENT OF ENVIRONMENTAL PROTECTION
eo gg ivision of Water Resource Management
a i H “Buren of Beaches and Coastal Systems
. =" 3900’ Commonwealth Blvd, - Mail Station 300
Tallahassee, Florida 32399-3000
07 OCT -9 PH 3:54 (850) 488-7708
DIVISION OF PERMIT NUMBER: PB-876
ADMINISTRATIVE
PERMITTER . HEARINGS
Stewart A. Satter | OT ° Y& oY
c/o Dallas H. Durrance, P.E.
Cunningham & Durrance Consulting Engineers, Inc.
400 Executive Center Drive, Suite 108
West Palm Beach, Florida 33401
PERMIT FOR CONSTRUCTION OR. OTHER ACTIVITIES
PURSUANT TO SECTION 161.053, FLORIDA STATUTES
FINAL ORDER
FINDINGS OF FACT: An application for authorization to conduct the activities seaward of the coastal construction
control line that are indicated in the project description, was filed by the applicant/permittee named herein on
October 11, 2006, and was determined to be complete pursuant to rule on January 12, 2007, However, on April 5,
2007, and July 5, 2007 the applicant waived the 90-day time limit imposed on the Department for processing
completed applications pursuant to Chapter 120, Florida Statutes, until August 15, 2007. The proposed project is to
be located landward of the 30-year erosion projection and the existing line of construction established by major
structures in the immediate area,
CONCLUSIONS OF LAW: After considering the merits of the proposal and any written objections from affected
persons, the Department finds that upon compliance with the permit conditions, the activities indicated in the project
description of this amended permit are of such a nature that they will result in no significant adverse impacts to the
beach/dune areas or to adjacent properties; that the work is not expected to adversely impact nesting sea turtles, their
hatchlings, or their habitat; that the work is expendable in nature and/or is appropriately designed in accordance with
Section 62B-33.005, Florida Administrative Code; and that it is an.activity or type of construction which the Chief
of the Bureau of Beaches and Coastal Systems has authority to approve or deny pursuant to Delegation of Authority,
DEP Directive 100, effective September 27, 2002. The direct and cumulative impacts to the beach and dune system
that will be caused by both the seaward location and shore-parallel width of the proposed construction represent the
maximum such impacts that is acceptable to the Department. Therefore, future construction on the site seaward of
the coastal construction control line shall not extend further seaward of, or increase the shore-parallel coverage
occupied by, the proposed structures approved pursuant to this permit. Based on the foregoing considerations, the
Bureau Chief approves the application; authorizes construction and/or activities at the location indicated below in
strict accordance with the project description, the approved plans (if any) and the General Permit Conditions which
are attached and are by this reference incorporated herein, and any additional conditions shown below, pursuant to
Section 161.053(5), Florida Statutes.
EXPIRATION DATE: August 14, 2010
LOCATION: Between approximately 190 feet and 342.5 feet north of the Department of Environmental Protection's
reference. monument R-146, in Palm Beach County. Project address: 1560 South Ocean Boulevard, Manalapan.
AUG-27-2887 @5:57P FROM: iia 1BS5a6816836° P.S
PERMIT NAME: Stewart A. Satter
PERMITTEE: PB-876'
PAGE 2
PROJECT DESCRIPTION:
Pedestrian Tunnel
1. Location relative to control line: -A maximum of 105 feet seaward, as measured perpendicular from the
control line, ;
2. Exterior dimensions: A maximum of 42 feet in the shore-normal direction by 11.7 feet in the shore-parallel
direction, not including east and west stair box structures of maximum dimensions 12.0 feet shore-normal,
by 22.0 feet shore-parallel. ,
3. Type of foundation: Piles to support the east and west stair box structures; earthen supported for the pre-cast
concrete tunnel, .
4, Floor elevation: Varying from +8.0 (NGVD) at the west stair box structure to +8,1 (NGVD) on the east stair
box structure,
Excavation/Fill
1. Volume of excavation seaward of the control line for tunnel installation: Approximately 500 cubic yards.
Volume of net excavation: None; excavated material to be placed as fill on the project site,
2, Location of excavation: Within the footprint of the tunnel.
3. Volume of fill to be placed: Approximately 500 cubic yards.
4, Location of fill to be placed: Across the shore-paralle] length of the property to a maximum distance of 121
feet seaward of the control line.
Other Structure/Activity
1, A frangible garden wall sited across the shore-parallel length of the property.to a maximum distance of 105
feet seaward of the control line.
2. Two 6-inch dome bollards located seaward of the east stair box structure.
3. Planting of dune stabilizing vegetation including the planting of seagrapes within the fill placement area,
See Special Permit Condition 5.
SPECIAL PERMIT CONDITIONS:
1.
Prior to commencement of construction activity authorized by this permit, a preconstruction conference shall
be held at the site among the contractor, the owner or authorized agent, and a staff representative of the
Bureau of Beaches and Coastal Systems (contact Mark Taynton at toll-free pager number 1-877-314-
1329) to establish an understanding among the parties as to the items specified in the special and general
- conditions of the permit. The proposed locations of the structures shall be staked out for the conference.
AUG-27-2887 @5:58P- FROM: - TO: 18586816836 P.6
or. ;
Y
PERMIT NAME: Stewart A.-Satter
PERMITTEE: PB-876. ~
PAGE 3
Construction activity authorized by this permit shall not commence until after the time period provided in
the public notice for the public to exercise ‘any rights they may have under Chapter 120, Florida Statutes, has /
expired, or if'a hearing is requested, disposition of the hearing request has been made, _
3, Prior to commencement of construction activity authorized by this permit, a temporary construction fence
shall be erected along the perimeter of the permitted activity. The fence shall remain in place until the
construction authorized by this permit is complete, The optimum siting of the construction fence shall be
determined during the preconstruction conference by the staff representative so as to provide maximum
protection to the existing vegetation located on the site.
4. - All excavated beach compatible fill shall remain on the site seaward of the coastal construction control line.
5. Prior to submitting the final certification, referenced in General Permit Condition 1(g), the permittee shall
submit an as-built plan prepared and certified by a licensed landscape architect showing the new access
pathway with vegetated areas referenced under the project description to be completed.
All rubble and debris resulting from this construction shall be removed to a location landward of the coastal
construction control line.
7. All lighting shall be installed and maintained as depicted in the approved lighting schematic. No additional
permanent exterior lighting is authorized.
CAVEAT:
Due to potential adverse impacts to the beach and dune system that may result from additional development on the
property, the shore-parallel and seaward extent of the permitted structures shall not be increased, nor will any
additional major structures be permitted which would exceed the limits established by the permitted construction
seaward of the coastal construction control line.
Approved plans are incorporated into this permit by reference.
Done and ordered this 14 day of Pirs vst 2007, in Tallahassee, Florida.
Attachment: General Permit Conditions
FILING AND ACKNOWLEDGEMENT FILED, State of Florida
Department of Environmental Protection
on this date, pursuant to $120.52 Florida
Statutes, with the designated Department Clerk,
receipt of which is hereby acknowledged.
Michael R. Barnett, P.E., Chief
Bureau of Beaches and Coastal Systems
Docket for Case No: 07-004624
Issue Date |
Proceedings |
Apr. 24, 2008 |
Order Closing File. CASE CLOSED.
|
Feb. 05, 2008 |
Notice of Voluntary Dismissal with Prejudice filed.
|
Dec. 17, 2007 |
Order Continuing Case in Abeyance (parties to advise status by February 12, 2008).
|
Dec. 14, 2007 |
Joint Status Report filed.
|
Oct. 18, 2007 |
Order Placing Case in Abeyance (parties to advise status by December 14, 2007).
|
Oct. 17, 2007 |
Joint Motion to Abate Proceedings filed.
|
Oct. 10, 2007 |
Initial Order.
|
Oct. 09, 2007 |
Notice to Proceed Withheld filed.
|
Oct. 09, 2007 |
Final Order filed.
|
Oct. 09, 2007 |
Public Notice filed.
|
Oct. 09, 2007 |
Amended Petition for Formal Administrative Hearing filed.
|
Oct. 09, 2007 |
Request for Assignment of Administrative Law Judge and Motion in Limine with Respect to Issues Outside Jurisdiction of Division of Administrative Hearings filed.
|