REGGIE B. WALTON, District Judge.
The plaintiff brings this action against the federal defendants pursuant to the Clean Water Act, 33 U.S.C. § 1251 (2006), the Surface Mining Control and Reclamation Act, 30 U.S.C. § 1201 (2006), and the Administrative Procedure Act ("APA"), 5 U.S.C. § 702 (2006), challenging a series of memoranda and a detailed guidance released by the Environmental Protection Agency ("EPA"). The parties appeared before the Court on December 15, 2010, for argument on the federal defendants' motion to dismiss, Defendants' Motion to Dismiss ("Defs.' Mot. to Dismiss"), and the plaintiff's motion for a preliminary injunction, Plaintiff's Motion for a Preliminary Injunction ("Pl.'s PI Mot."). For the reasons that follow, the Court denies both the motion to dismiss and the motion for a preliminary injunction.
This section summarizes the relevant Clean Water Act permit granting scheme.
Section 404 permits are issued by the United States Army Corps of Engineers ("Corps") "for the discharge of dredged and fill material into navigable waters at specified disposal sites." 33 U.S.C. § 1344(a). The Corps has sole authority to issue Section 404 permits, but in doing so it must apply guidelines that it develops in conjunction with the EPA.
Known as National Pollutant Discharge Elimination System ("NPDES") permits, Section 402 permits are typically issued by states for the discharge of non-dredged and non-fill material. 33 U.S.C. § 1342(a)(5). These permits govern pollutants that are assimilated into receiving waters by establishing limits placed on the make-up of wastewater discharge. Once the EPA approves a state permitting program, states have exclusive authority to issue NPDES permits, although the EPA does have limited authority to review the issuance of such permits by states. 33 U.S.C. § 1342(d). All of the Appalachian States allegedly impacted by the EPA actions at issue in this litigation (Kentucky, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia) have EPA-approved Section 402 permit authority.
Section 303 of the Clean Water Act allocates primary authority for the development of water quality standards to the states. 33 U.S.C. § 1313. A water quality standard designates uses for a particular body of water and establishes criteria for protecting and maintaining those uses. 40
Plaintiff National Mining Association ("NMA") alleges that recent actions taken by the EPA and the Corps have unlawfully obstructed the Clean Water Act permitting processes for coal mining. Complaint ("Compl.") ¶ 2. The plaintiff identifies two series of documents that it asserts unlawfully changed the established permitting process: (1) the June 11, 2009 Enhanced Coordination Process ("EC Process") Memoranda, and (2) the April 1, 2010 Detailed Guidance Memorandum ("Guidance Memorandum"). Id. The plaintiff represents that its member companies are "not seeking to shirk their responsibilities under any environmental protection laws or regulations; rather, they are merely asking [the] EPA and the Corps to regulate" within the bounds of the law. Pl.'s PI Mem. at 41-42.
The plaintiff asserts that the EC Process memoranda formalized an "extraregulatory" practice that commenced in January 2009. Id. at 7. At that time, the EPA issued a series of letters to the Corps raising questions about the legality of Section 404 permits that, the plaintiff claims, the Corps was poised to issue imminently. Id. According to the plaintiff, the EC Process memoranda then "imposed substantive changes to the Section 404 permitting process by creating a new level of review by [the] EPA and an alternate permitting pathway not contemplated by the current regulatory structure." Id. The plaintiff represents that the EC Process utilizes the Multi-Criteria Integrated Resource Assessment ("MCIR Assessment") to screen pending Section 404 permits and determine which of those pending permits will proceed for standard review by the Corps and which will be subject to the EC process. Id. at 8. The plaintiff contends that once a permit is designated for the EC Process, it faces a burdensome review process wholly different than that contemplated by the Clean Water Act.
Then, in April 2010, the EPA released its Guidance Memorandum in which, the plaintiff asserts, the EPA "made sweeping pronouncements regarding the need for water quality-based limits" in Section 402 and 404 permits. Id. The plaintiff maintains that the Guidance (1) effectively established a region-wide water quality standard based on conductivity levels it associated with adverse impacts to water quality, (2) was being used by the EPA to cause indefinite delays in the permitting process, and (3) caused various permitting
Rule 12(b)(1) of the Federal Rules of Civil Procedure provides for the dismissal of claims for which the complaint does not set forth allegations sufficient to establish the court's jurisdiction over the subject matter of the claims presented. Fed. R.Civ.P. 12(b)(1). In deciding a motion to dismiss challenging the Court's subject matter jurisdiction under Rule 12(b)(1), a court "must accept as true all of the factual allegations contained in the complaint" and draw all reasonable inferences in favor of the plaintiff, Brown v. District of Columbia, 514 F.3d 1279, 1283 (D.C.Cir. 2008), but courts are "not required . . . to accept inferences unsupported by the facts or legal conclusions that are cast as factual allegations." Rann v. Chao, 154 F.Supp.2d 61, 64 (D.D.C.2001). Further, the "court may consider such materials outside the pleadings as it deems appropriate to resolve the question whether it has jurisdiction in the case." Scolaro v. D.C. Bd. of Elections & Ethics, 104 F.Supp.2d 18, 22 (D.D.C.2000). Ultimately, however, the plaintiff bears the burden of establishing the Court's jurisdiction, Rasul v. Bush, 215 F.Supp.2d 55, 61 (D.D.C.2002), and where subject matter jurisdiction does not exist, "the court cannot proceed at all in any cause." Steel Co. v. Citizens for a Better Env't, 523 U.S. 83, 94, 118 S.Ct. 1003, 140 L.Ed.2d 210 (1998).
The federal defendants assert three separate but related jurisdictional grounds for dismissal: (1) the lack of final agency action; (2) the plaintiff's claims are not ripe for review; and (3) the plaintiff's lack of standing. The Court will address each argument in turn.
The APA limits judicial review to "final agency action for which there is no other adequate remedy in court." 5 U.S.C. § 704. In other words, finality is a "threshold question" that determines whether judicial review is available. Fund for Animals, Inc. v. U.S. Bureau of Land Mgmt., 460 F.3d 13, 18 (D.C.Cir.2006). The Supreme Court has explained that, "[a]s a general matter, two conditions must be satisfied for agency action to be final: First, the action must mark the consummation of the agency's decision[-]making process," Bennett v. Spear, 520 U.S. 154, 177-78, 117 S.Ct. 1154, 137 L.Ed.2d 281 (1997) (quotation marks omitted), and second, "the action must be one by which rights or obligations have been determined, or from which legal consequences will flow."
The plaintiff counters that the federal "defendants' interpretation of finality is too restrictive, as it encompasses only the last possible agency decision." Pl.'s Opp'n re: Dismiss at 24-25. It asserts that the issuance of the MCIR Assessment reflects the EPA's settled, final position concerning how it would screen all pending Section 404 permit applications; that the creation of the EC process reflects the settled, final position to establish an alternate permitting framework, thus changing the legal landscape set forth in the 404(b)(1) guidelines; and that the Guidance Memorandum marks the consummation of the decision-making process and has had practical effects that have changed the legal obligations of the permitting authorities, i.e., the Corps and the state regulators, and the plaintiff's members who are seeking permits. Id. at 26-27.
The plaintiff points to both Appalachian Power Co. v. EPA, 208 F.3d 1015 (D.C.Cir.
Id. at 1023. There was evidence in Appalachian Power that "State authorities, with EPA's guidance in hand, [were] insisting on continuous opacity monitors," id., i.e., compliance with the standards set forth in the guidance. Next, in CropLife, the District of Columbia Circuit determined that an EPA directive, which had been published in a press release and changed the established practice of relying on third-party studies, was a binding regulation. 329 F.3d at 876. The court held that "the directive clearly establishe[d] a substantive rule declaring that third-party human studies are now deemed immaterial in EPA regulatory decision[-]making," id. at 883, and further concluded that the "disputed directive concretely injures petitioners, because it unambiguously precludes the agency's consideration of all third-party human studies, i.e., studies that petitioners previously have been permitted to use to verify the safety of their products." Id. at 884.
The federal defendants argue that the EC Process memoranda here can be distinguished from the actions in Appalachian Power and CropLife because the EC process memoranda are not binding on their face and the EPA explicitly stated they were not binding. Defs.' Reply re: Dismiss at 3-4. The federal defendants further attempt to distinguish the Guidance by pointing out that it was issued as an interim document and clearly stated, on its face, that it would be issued in final form in 2011. Id. at 9-10. The federal defendants assert that the Court should follow Gem County Mosquito Abatement District v. EPA, 398 F.Supp.2d 1 (D.D.C. 2005), in which the court held that an interim EPA guidance advising a county mosquito abatement entity that it did not need an NPDES permit to apply pesticides to waters was not final agency action. In Gem County, although believing it did not need one, the plaintiff nonetheless sought an NPDES permit because it had been threatened with being sued and was then sued by organic farmers who asserted that the pesticides used to abate the mosquitoes threatened their certification as organic farms. Id. at 4. The EPA advised the abatement entity that its position that it did not need an NPDES permit was correct, which ultimately lead to dismissal
Here, because the agency actions more closely resemble those at issue in Appalachian Power and CropLife than was the situation before the Court in Gem County, the MCIR Assessment, the EC Process, and the Guidance Memorandum all meet the criteria of final agency actions. The federal defendants' view of what amounts to finality is too narrow, as it is possible for an agency to take final agency actions during a permit assessment process prior to actually determining whether to grant or deny an application for a permit. Although the federal defendants stress in their filings, and vigorously reiterated at the December 15, 2010 hearing, that the MCIR Assessment, the EC Process, and the Guidance Memorandum impose no new substantive requirements on permit applications, see, e.g., Defs' Mem. re: Dismiss at 18 (asserting that the "Guidance does not . . . establish any new standards that supplement or amend the existing statutory and regulatory requirements"), it is clear to the Court that the EPA has implemented a change in the permitting process.
It appears obvious on the current record that the MCIR Assessment reflects the EPA's final decision to evaluate pending permits to determine whether they would undergo the EC Process. As shown in Appalachian Power, a reworking of the permitting process gives rise to legal consequences for companies that must obtain those permits to operate. 208 F.3d at 1023. From the moment a permit is screened pursuant to the MCIR Assessment, the EPA seems to be imposing an additional step to the permitting process that is not contemplated or set forth in the 404(b)(1) guidelines. This is also true for the EC Process itself. Again, like the documents at issue in Appalachian Power, the EC Process Memoranda impose unequivocal requirements on the exercise of regulatory authority regarding the pending permit applications.
While the Guidance Memorandum is perhaps a closer call than the MCIR Assessment and the EC Process, it too, qualifies as final agency action because, despite the representation that it is an interim document, it is nonetheless being applied in a binding manner and has been implemented in its current version even though the EPA continues to receive comments about it. Therefore, based on the record before the Court at this time, it appears that the EPA is treating the Guidance as binding. See Pl.'s PI Mem. at 21 (quoting an EPA official as saying that the "guidance stands" and "will continue to [be used to ensure] that mining permits issued in West Virginia and other Appalachian states provide the protection required under federal law"). The EPA official's statement can only be interpreted as reflecting the EPA's settled, final stance on its current application of the Guidance Memorandum, even if this position may change at some point in the future once the EPA promulgates a new version of the Guidance Memorandum. See Appalachian Power, 208 F.3d at 1022 (noting that the "EPA may think that because the Guidance. . . is subject to change, it is not binding and therefore not final action," but concluding that "all laws are subject to change. . . . The fact that a law may be altered in the future has nothing to do with whether it is subject to judicial review at the moment.").
Thus, unlike the guidance in Gem County, which merely had the effect of preserving the status quo, the Guidance Memorandum here has a practical impact on the plaintiff's members seeking permits. In other words, despite the EPA's assertions that the Guidance Memorandum is only an interim document, the Guidance Memorandum is being treated and applied in practice as if it were final. The practical impact imposed upon permit applicants by the recent actions of the EPA are sufficient to satisfy the Bennett finality test because the "`finality' element is interpreted in a `pragmatic way.'" Gem Cnty., 398 F.Supp.2d at 11 (quoting FTC v. Standard Oil Co. of Cal., 449 U.S. 232, 239, 101 S.Ct. 488, 66 L.Ed.2d 416 (1980)); accord Nat'l Ass'n of Home Builders v. Norton, 415 F.3d 8, 15 (D.C.Cir.2005) ("Finality resulting from the practical effect of an ostensibly non-binding agency proclamation is a concept [this Circuit has] recognized in the past.") (citing Gen. Elec. Co. v. EPA, 290 F.3d 377, 383 (D.C.Cir.2002)).
"[R]epresent[ing] a prudential attempt to balance the interests of the court and the agency in delaying review against the petitioner's interest in prompt consideration of allegedly unlawful agency action," Florida Power & Light Co. v. EPA, 145 F.3d 1414, 1420-21 (D.C.Cir. 1998), the ripeness doctrine requires courts to consider the framework set forth by the Supreme Court in Abbott Laboratories v. Gardner, 387 U.S. 136, 148-49, 87 S.Ct. 1507, 18 L.Ed.2d 681 (1967). First, a
The federal defendants assert that the plaintiff's claims should be dismissed because they are not ripe for review. Defs.' Mem. re: Dismiss at 19. Specifically, the federal defendants again argue that the MCIR Assessment, the EC Process, and Guidance Memorandum are not final agency actions, and further, that their review "outside the context of a specific permitting decision would entangle the court in abstract considerations." Id. at 21. The plaintiff in turn again contends that the three actions at issue here constitute final agency actions and present primarily, if not purely, legal questions for which further factual development in the context of a specific permitting decision is unnecessary. Pl.'s Opp'n re: Dismiss at 30, 34.
As explained above, based on the record currently before the Court, the MCIR Assessment, the EC Process, and the Guidance all appear to constitute final agency actions. Moreover, the claims raised by the plaintiff, i.e., whether the actions constitute legislative rules and whether the EPA violated the notice and comment requirement of the APA, present purely legal questions. See Cement Kiln Recycling Coal. v. EPA, 493 F.3d 207, 215 (D.C.Cir. 2007) (explaining that it is "well-established that claims that an agency's action is . . . contrary to law present purely legal issues . . . [s]o, too, do claims that an agency violated the APA by failing to provide notice and opportunity for comment."). The federal defendants' insistence on "specific permitting decisions," Defs.' Mem. re: Dismiss at 21, echoes their argument that their actions could not be final as they had not granted or denied any permits it has subjected to the EC process. This, however, misses the point of the plaintiff's claim: that the process itself is unlawful, and not simply any decisions that may result from the application of that process. See Pl.'s Opp'n re: Dismiss at 31 ("NMA's contention is that Defendants acted contrary to law in issuing the EC Process Memoranda, which unambiguously dictated that the memoranda—and not existing regulations—would govern [pending] permit applications."). Thus, no factual developments would clarify these issues or assist the Court in evaluating the plaintiff's claims. See Appalachian Power, 208 F.3d at 1023 n. 18 ("Whether EPA properly instructed state authorities to conduct sufficiency reviews of existing state and federal standards and to make those standards more stringent if not enough monitoring was provided will not turn on the specifics of any particular permit."). Accordingly, the Court finds the plaintiff's claims ripe for review on the defendants' dismissal motion.
The irreducible constitutional minimum of standing contains three elements: (1) injury in fact, (2) causation, and (3) the possibility of redress by a favorable decision. Lujan v. Defenders of Wildlife, 504 U.S. 555, 560-61, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992). These requirements apply whether an organization asserts standing on its own behalf, or on behalf of its members. Havens Realty Corp. v. Coleman, 455 U.S. 363, 378, 102 S.Ct. 1114, 71 L.Ed.2d 214 (1982). "[A]t the pleading stage, general factual allegations of injury resulting from the defendant's conduct may suffice, for on a motion to dismiss we presume that general allegations embrace those specific facts that are necessary to support the claim." Bennett, 520 U.S. at 168, 117 S.Ct. 1154 (internal quotations omitted).
The federal defendants assert that the plaintiff has failed to establish the requisite injury-in-fact prong of the test for standing because it has not shown that its members have suffered a particularized and concrete injury traceable to the MCIR Assessment, the EC Process, or the Guidance Memorandum. Defs.' Mem. re: Dismiss at 30. They again rely on the fact that "none of the permit applications subject to the process has been denied by the Corps or vetoed by EPA." Id. The federal defendants' acknowledge that the plaintiff "may allege procedural injury based on its notice and comment claims," id., but assert that deprivation of a procedural right without some concrete interest affected by the deprivation is insufficient to create standing. Id. The plaintiff, however, asserts that "being subject to this additional, illegal process is itself sufficient injury for standing purposes," Pl.'s Opp'n re: Dismiss at 40, an injury which in turn is "threatening the financial viability of proposed mining projects." Id. The plaintiff further alleges that the delays in the permitting process its members have experienced are attributable to the EC Process and that a favorable decision—declaring the EC Process and Guidance Memorandum illegal—would redress the injuries its members are incurring. Id. at 41-42.
The Court agrees that the procedural injury alleged by the plaintiff is more than just that stemming from the claimed notice and comment violations. While the plaintiff does allege notice and comment violations, its main point of contention is that the additional process created by the EPA's actions has and will continue to cause its members "injury that is concrete and particularized." Id. at 39; see id. (asserting that the "EC Process Memoranda have allowed [the] Defendants to restart and pause the clock with respect to Section 404 permit applications pending on March 31, 2009, even in instances where [the] EPA did not comment during the Corps' designated comment period"). As noted above, on the record currently before the Court, it seems clear that the EPA has imposed additional processes— the MCIR Assessment and the EC Process—to the permitting procedures, and that these additional processes are not contemplated or set forth in the 404(b)(1) guidelines. It also appears that the Guidance Memorandum is being applied in a binding manner. There is therefore support for both the plaintiff's allegations of injury in the form of notice and comment violation and, more importantly so far as standing is concerned, in the form of "additional, illegal process." Pl.'s Opp'n re: Dismiss at 39. Thus, on the record currently before it, and in light of the fact that "at the pleading stage, general factual allegations of injury resulting from the defendant's conduct may suffice," Bennett, 520 U.S. at 168, 117 S.Ct. 1154, the Court can and does conclude that at this stage of
District courts have the power to grant preliminary injunctions under Rule 65 of the Federal Rules of Civil Procedure. Fed.R.Civ.P. 65. As a general matter, preliminary injunctions are "extraordinary" forms of relief and should be granted sparingly. Mazurek v. Armstrong, 520 U.S. 968, 972, 117 S.Ct. 1865, 138 L.Ed.2d 162 (1997). "An injunction is designed to deter future wrongful acts," United States v. W.T. Grant Co., 345 U.S. 629, 633, 73 S.Ct. 894, 97 L.Ed. 1303 (1953), and thus, while past harm is relevant, the ultimate inquiry remains "whether there is a real and immediate threat of repeated injury." D.C. Common Cause v. District of Columbia, 858 F.2d 1, 8-9 (D.C.Cir.1988).
In evaluating a motion for preliminary injunctive relief, courts must balance: "(1) the [movant's likelihood] of success on the merits; (2) the threat of irreparable injury in the absence of an injunction; (3) the possibility of substantial harm to other interested parties from the issuance of an injunction; and (4) the interests of the public." Wagner v. Taylor, 836 F.2d 566, 575 (D.C.Cir. 1987). Although a particularly strong showing on one factor may compensate for a weak showing on one or more of the other factors, id. at 576, the movant must show that the threat of irreparable harm is "likely," as opposed to just a "possibility." Winter v. Natural Res. Def. Council, Inc., 555 U.S. 7, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008).
Unsurprisingly, the plaintiff argues that it is likely to succeed on the merits of its claims. The plaintiff first asserts that the EC Process Memoranda and the Guidance are legislative rules that were promulgated in violation of the APA. Pl.'s PI Mem. at 12. The plaintiff further maintains that the EPA has exceeded its statutory authority under the Clean Water Act, the National Environmental Policy Act, and the APA. Id. at 24.
As previously noted, the standard for determining whether an agency pronouncement is a legislative rule is very similar to the second element of the Bennett finality analysis. A legislative rule is agency action that has "the force and effect of law." Appalachian Power, 208 F.3d at 1020. Such a rule "grant[s] rights, impose[s] obligations, or produce[s] other significant effects on private interests;" "narrowly constrict[s] the discretion of agency officials by largely determining the issue addressed"; and "[has] substantive legal effect." Batterton v. Marshall, 648 F.2d 694, 701-02 (D.C.Cir.1980). A rule that effectively amends a prior legislative rule is a legislative, not an interpretative rule. Am. Mining Cong. v. Mine Safety & Health Admin., 995 F.2d 1106, 1112 (D.C.Cir.1993). "[N]ew rules that work substantive changes . . . or major substantive legal additions . . . to prior regulations are subject to the APA's procedures." U.S. Telecom Ass'n v. FCC, 400 F.3d 29, 34-35 (D.C.Cir.2005) (citations omitted). If an agency adopts a new position inconsistent with an existing regulation, or effects a substantive change in the regulation, notice and comment are required. Id. at 35.
Under the APA, courts must hold unlawful and set aside agency actions found to be in excess of the agency's statutory jurisdiction, authority, or limitations. 5 U.S.C. § 706(2)(C). To determine whether an agency exceeded its statutory authority under the APA, the Court must engage in the two-step inquiry adopted by the Supreme Court in Chevron U.S.A, Inc. v. Natural Res. Def. Council, 467 U.S. 837, 104 S.Ct. 2778, 81 L.Ed.2d 694 (1984). Under Chevron, if the text of a statute shows that Congress has directly addressed the question at issue, then the court and the agency must give effect to the clearly expressed intent of Congress. See id. at 842-43, 104 S.Ct. 2778. If, however, the court determines that an agency's enabling statute is silent or unclear with respect to the issue at hand, the question for the court then becomes whether the agency's action is based on a permissible construction of the statute. See id. at 843, 104 S.Ct. 2778.
The plaintiff maintains that the EPA and the Corps are violating the plain language of the Clean Water Act. Pl.'s PI Mem. at 25. Specifically, it alleges that the MCIR Assessment and the EC Process Memoranda violate the congressional statutory division of authority between the two agencies as set forth in Section 404 of the Clean Water Act because they improperly expanded the EPA's role in Section 404 permitting decisions. Id. Similarly, the plaintiff maintains that the Guidance Memorandum requires permitting authorities to require adherence to the conductivity levels designated in the Guidance Memorandum, thus resulting in the EPA overstepping the authority it was granted under Section 303 of the Clean Water Act. Id. at 28. By promulgating this region-wide water quality standard and by applying it to Section 404 permits, in addition to Section 402 permits, the plaintiff asserts that the EPA has significantly exceeded its statutory authority. Id. at 30-31.
The federal defendants respond that the Clean Water Act authorizes coordination between the EPA and the Corps during the permit review process and expressly requires the agencies to enter into an agreement to facilitate such coordination. Defs.' PI Opp'n at 23. They contend that nothing more than this has been done and assert that the Corps remains the final decision-maker with respect to issuance of permits, subject only to the EPA's exercise of its 404(c) veto authority. Id. at 24.
Again, for reasons that mirror its finality analysis, the Court finds the plaintiff's arguments more persuasive and agrees that the plaintiff is likely to prevail on its claim that the EPA has exceeded its statutory authority. As to the MCIR Assessment,
A preliminary injunction should issue only when irreparable injury is likely to occur in the absence of an injunction. See Brady Campaign to Prevent Gun Violence v. Salazar, 612 F.Supp.2d 1, 12 (D.D.C.2009) (explaining that the Supreme Court in Winter rejected as sufficient for the purpose of acquiring a preliminary injunction the plaintiff's showing of a "possibility" of irreparable harm). The failure to demonstrate irreparable harm is "grounds for refusing to issue a preliminary injunction, even if the other three factors entering the [preliminary injunction] calculus merit such relief." Chaplaincy of Full Gospel Churches v. England, 454 F.3d 290, 297 (D.C.Cir.2006). "[P]roving `irreparable' injury is a considerable burden, requiring proof that the movant's injury is `certain, great and actual—not theoretical—and imminent, creating a clear and present need for extraordinary equitable relief to prevent harm.'" Power Mobility Coal. v. Leavitt, 404 F.Supp.2d 190, 204 (D.D.C.2005) (Walton, J.) (quoting Wis. Gas Co. v. FERC, 758 F.2d 669, 674 (D.C.Cir.1985)) (emphasis in original). In this Circuit, it is "well settled that economic loss does not, in and of itself, constitute irreparable harm." Wis. Gas Co., 758 F.2d at 674. However, economic loss that threatens the survival of the movant's business can amount to irreparable harm. Power Mobility Coal., 404 F.Supp.2d at 204.
Here, the plaintiff asserts that its members face likely irreparable harm in three respects: (1) its "small business members are likely to be driven out of business by the delays in permitting . . . resulting from the Guidance"; (2) its "members are likely to incur substantial economic losses as a result of [additional] permit[ting] conditions being imposed under the Guidance [Memorandum]"; and, (3) "the EC Process and Guidance [Memorandum] are impermissibly interfering with the exercise of private property rights." Pl.'s PI Mem. at 35-36.
The federal defendants counter all three of these arguments. First, they point out that the president of Best Coal, whose declaration the plaintiff offers to support its small business argument, fails to satisfy the irreparable harm standard because it merely states that his "company will be out of business within [eighteen] months if" it does not receive the requisite mining permits. Defs.' PI Opp'n at 30, 33. Second, the federal defendants assert that the alleged economic losses identified by the
The Court agrees with the federal defendants' position that the plaintiff has not shown that its small business members face irreparable harm in the form of certain or imminent business closings due to delays in receiving permits caused by the Guidance Memorandum. In Power Mobility Coalition, a case in which a national association whose membership included manufacturers and suppliers of motorized wheelchairs sought an injunction enjoining enforcement of the Department of Health and Human Services regulations that changed the reimbursement structure under Medicare for motorized scooters, 404 F.Supp.2d at 192, this Court held that the plaintiff had not demonstrated that the new regulation would cause any of its members irreparable harm as a result of being forced out of business. Id. at 205. There, this Court considered a declaration from the president of one member company in which he stated that "`if the new rule take[s] effect as planned . . . [it is anticipated] that Mr. Mobility will wind-down its operations and stop doing business as a supplier of mobility equipment in [five or six months].'" Id. at 204 (quoting Declaration of Philip DeLernia). The Court determined that because the plaintiff was "basically predicting that many of their claims for reimbursement" would be denied, the "plaintiff's claim of imminent harm [was], at best, remote and speculative." Id. at 205.
Here, as the federal defendants aptly recognize, the plaintiff's only support for its claim that its small business members will be driven out of business by the permitting delays being occasioned by the EPA's actions is the declaration of Randy Johnson, president of Best Coal, Inc.
Pl.'s PI Mem., Ex. 4 (Declaration of Randy Johnson ("R. Johnson Decl.")) ¶ 19. Mr. Johnson further maintains that (i) the company's
While Mr. Johnson's representations raise legitimate concerns about the current and future health of his company, his declaration falls short of what is necessary to merit a finding of irreparable harm. Much like the plaintiff in Power Mobility Coalition, the plaintiff here is offering nothing more than a "predict[ion]" that is "at best, remote and speculative." 404 F.Supp.2d at 205. Something more than Mr. Johnson's conclusory projection is necessary to show that any of the plaintiff's small business members currently face certain, imminent business closings. Accordingly, there is no "`clear and present need for extraordinary equitable relief to prevent harm.'" Id. at 204 (quoting Wis. Gas Co., 758 F.2d at 674).
Likewise, the Court finds that the plaintiff has not shown to the degree required by law that its members are likely to incur substantial economic losses as a result of the additional permitting conditions imposed by the Guidance Memorandum. While it is true that "if a movant seeking a preliminary injunction `will be unable to sue to recover any monetary damages against' a government agency in the future because of, among other things, sovereign immunity, financial loss can constitute irreparable injury," Pl.'s PI Mem. at 38 (quoting Brendsel v. Office of Fed. Hous. Enter. Oversight, 339 F.Supp.2d 52, 66-67 (D.D.C.2004), the fact that economic losses may be unrecoverable does not absolve the movant from its "considerable burden" of proving that those losses are "`certain, great and actual.'" Power Mobility Coal., 404 F.Supp.2d at 204 (quoting Wis. Gas Co., 758 F.2d at 674) (emphasis in original)).
Although this Circuit has not specifically addressed the issue of how recoverability of economic losses should fit into the irreparable harm analysis, this Court has confronted the issue and repeatedly held that recoverability of the claimed losses is but one element for consideration. First, in Bracco Diagnostics, Inc. v. Shalala, 963 F.Supp. 20 (D.D.C.1997), a case in which medical device manufacturers sought a preliminary injunction to enjoin FDA action, the Court found that the "plaintiffs' greater financial costs, which are on-going, can never be recouped. Id. at 29. The Court went on to find that while the injury to plaintiffs was `admittedly economic,' there [wa]s `no adequate compensatory or other corrective relief' that [could] be provided at a later date, tipping the balance in favor of injunctive relief." Id. (quoting Hoffmann-Laroche, Inc. v. Califano, 453 F.Supp. 900, 903 (D.D.C.1978)) (finding that "[t]he possibility that adequate compensatory or other corrective relief will be available at a later date, in the ordinary course of litigation, weighs heavily against a claim of irreparable harm"). In Bracco, however, the court also determined that the plaintiffs had shown "two primary sources of non-speculative, on-going, and imminent harm." 963 F.Supp. at 28-29. Next, although this Court held in Feinerman that "where . . . the plaintiff in question
If a plaintiff has shown that financial losses are certain, imminent, and unrecoverable, then the imposition of a preliminary injunction is appropriate and necessary; here, however, the plaintiff has not demonstrated the certainness or the imminence of any of its members' losses. In fact, and perhaps most importantly to this discussion of the role of recoverability in the irreparable harm calculus, the plaintiff has not even shown that the losses are wholly unrecoverable. While the plaintiff has correctly asserted that it cannot recover economic losses in the form of money damages from the EPA and the Corps due to sovereign immunity, the plaintiff has not demonstrated how or why these losses cannot ultimately be recovered if and when the mining projects in question are permitted to proceed. See Defs.' PI Surreply at 4 (recognizing that the Higgins Declaration, Pl.'s Opp'n re): Dismiss, Ex. 24 (Declaration
Nonetheless, even assuming arguendo that the purported losses are totally beyond remediation, the plaintiff has still not shown that they are imminent or certain. The Court has no reason to doubt Mr. Higgins's assertion that the "coal mined from the Paynter Branch South Mine could have produced revenues of about $189 million at today's current sales price," Pl.'s Opp'n re: Dismiss, Ex. 24 (Higgins Decl.) ¶ 8, or his statement that "other costs . . . as a result of [the decision to forego the removal of the coal reserves at Paynter Branch South Mine] include the costs of relocating two spreads of equipment,. . . the relocation of about 20 employees to other mines[,] and the severing of about 20 employees," id., Ex. 24 (Higgins Decl.) ¶ 8. These, however, are examples of past harm, resulting from a decision made before this case ever reached this Court. Mr. Higgins does not provide any information on currently planned or future projects in jeopardy or at risk of incurring losses.
To conclude its examination of the plaintiff's allegations of irreparable harm, the Court need merely state that it agrees with the federal defendants that the plaintiff's argument that the EC Process and
While the plaintiff's assertion that a preliminary injunction "in this case will do nothing more than restore the regulatory environment that existed prior to the unlawful application of the EC Process and the Guidance to coal mining operations," Pl.'s PI Mem. at 41, may be true, the fact remains that the plaintiff has made an inadequate showing of irreparable harm. The issuance of a preliminary injunction to "restore" the previously existing regulatory environment would not be in line with the purposes of injunctive relief, as the ultimate inquiry would still remain "whether there is a real and immediate threat of repeated injury." D.C. Common Cause, 858 F.2d at 8-9.
Having concluded that a showing of irreparable harm is lacking, it is not necessary to engage in a lengthy discussion of the remaining two factors, see Chaplaincy of Full Gospel Churches, 454 F.3d at 297 (holding that the failure to demonstrate harm provides "grounds for refusing to issue a preliminary injunction, even if the other three factors entering the [preliminary injunction] calculus merit such relief"), and the Court will therefore address them only briefly. See id. at 304-05 (observing that "[i]t is of the highest importance to a proper review of the action of a court in granting or refusing a preliminary injunction that there should be fair compliance with [Federal Rule of Civil Procedure] 52(a)," which provides that when denying a preliminary injunction a district court "shall . . . set forth the findings of fact and conclusions of law which constitute the grounds of its action." Fed. R.Civ.P. 52(a)).
The plaintiff maintains that a preliminary injunction in this case will not harm the federal defendants or the defendant intervenors as it "will do nothing more than restore the regulatory environment that existed prior to the" MCIR Assessment, the EC Process, and the Guidance Memorandum. Pl.'s PI Mem. at 41. Both the federal defendants and the defendant intervenors, on the other hand, assert that "significant environmental interests are at stake here." Defs.' PI Opp'n at 41. While it may be true that the challenged EPA actions were "designed to significantly reduce the harmful environmental consequences
The plaintiff maintains that a preliminary injunction is in the public interest as it would protect "the integrity of the administrative regulatory process" and because the public has a strong interest in developing domestic sources of energy and job growth. Pl.'s PI Mem. at 42-43. On the other hand, the federal defendants assert that the public interest is served by allowing the Corps and the EPA to complete their review and consideration of permit applications in a thoughtful and considered manner. Defs.' PI Opp'n at 42. The Court, however, finds neither of these arguments determinative of whether preliminary injunctive relief should be granted in this case.
For the above reasons, the federal defendants' motion to dismiss and the plaintiff's motion for a preliminary injunction are both
Ctr. for Auto Safety v. Nat'l Highway Traffic Safety Admin., 452 F.3d 798, 806 (D.C.Cir. 2006). Agency action, however, can meet the first prong of the Bennett test without meeting the second. See, e.g., id. at 808 ("The guidelines are nothing more than general policy statements with no legal force. . . . Therefore, the guidelines cannot be taken as `final agency action,' nor can they otherwise be seen to constitute a binding legal norm.").