SYLVIA H. RAMBO, District Judge.
In this action for "equitable contribution" for unreimbursed remediation expenditures incurred by Plaintiff related to the cleanup of a hazardous substance at the Quehanna Wild Area Nuclear Site, Third-Party Defendant has moved for summary judgment on the grounds that a settlement agreement between itself and Plaintiff affords it protection from contribution claims brought by Third-Party Plaintiff pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act. The principal issue raised in the instant motion is whether a settlement agreement between the plaintiff-state and a potentially responsible third-party defendant that was neither judicially approved nor subject to administrative review operates to bar the original potentially responsible defendant's Section 113(f)(1) contribution claim. For the following reasons, the court holds that such an agreement does not conclusively afford the third-party defendant protection from any claim for contribution under Section 113(f)(1) when the proper response costs allocation method remains to be determined and will, therefore, deny the instant motion for summary judgment.
The background surrounding the Quehanna Wild Area Nuclear Site, including the ownership and the use of radioactive material at the Site, was extensively recited by this court upon resolution of Lockheed Martin Corporation's motion to dismiss, see Pennsylvania v. Lockheed Martin Corp., 684 F.Supp.2d 564 (M.D. Pa. 2010), and by the Third Circuit Court of Appeals, see 681 F.3d 503 (3d Cir. 2012). Thus, for the purposes of resolving the instant motion, the court believes that the following factual recitation is sufficient to place the matter into context.
This action arises out of response costs incurred by the Pennsylvania Department of Environmental Protection ("PADEP") in its cleanup of Strontium-90 ("Sr-90"), a radioactive isotope and hazardous nuclear byproduct material, from the Quehanna Wild Area Nuclear Site in the Quehanna Wild Area of the Moshannon State Forest in Clearfield County, Pennsylvania ("Site"). The predecessor of Defendant Lockheed Martin Corporation ("LMC"), Martin-Marietta Corporation, was the last known user of Sr-90 at the Site.
The Site was constructed in 1957 by the Commonwealth of Pennsylvania ("Commonwealth") for the purpose of creating a research facility. From 1962 through 1967, the Site was leased by Martin-Marietta Corporation from the Pennsylvania State University, to conduct work at the Site involving Sr-90 for the United States Atomic Energy Commission ("AEC"), the predecessor agency to the Nuclear Regulatory Commission ("NRC").
In the 1990s, the NRC ordered the Commonwealth, PADEP, and the Pennsylvania Department of Conservation and Natural Resources to decommission the facility. This process required removal of any residual Sr-90 as well as demolition of the facilities and monitoring and sampling. As a result, PADEP and, by extension, the Commonwealth have incurred more than $35 million in out-of-pocket expenditures.
PADEP initiated the underlying action against LMC to recover costs incurred in its remediation efforts pursuant to Section 107(a) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended 42 U.S.C. §§ 9601-9675 ("CERCLA"), as well as by certain state environmental statutes. LMC filed both a counterclaim, alleging that PADEP is liable under CERCLA as a past owner and operator of the Quehanna Facility,
Sometime between 2000 and 2003, the United States and PADEP commenced negotiations for the purposes of addressing the United States's liability for response costs at the Site. As a result of those negotiations, the United States and the Commonwealth entered into an Interim Agreement in 2003 (Doc. 98-1) and a Final Agreement in 2004 (Doc. 98-2). In the Interim Agreement, the United States, without admitting liability, agreed to pay to the Commonwealth $7 million for the purposes of reimbursing the Commonwealth for carrying out response actions at the Site. (Doc. 98-1, ¶ 2.1.) In the Final Agreement, the United States agreed to pay the Commonwealth an additional $3 million in return for a release and covenant not to sue, which provided as follows:
(Doc. 98-2, Final Agreement, ¶ 14.) The Commonwealth and the United States also agreed that the payment operated to provide the United States with contribution protection by including the following language:
(Id. at ¶ 15.) Significantly, the agreement was not filed as a proposed consent decree and public notice was not published.
PADEP initiated this action on April 30, 2009 (Doc. 1), and filed an amended complaint on May 7, 2009, wherein it named LMC as the sole defendant, asserting, inter alia, a CERCLA Section 107(a) claim seeking to recover costs associated with PADEP's remediation of the Site (see Doc. 3). Following the court's denial of LMC's motion to dismiss, see Pennsylvania v. Lockheed Martin Corp., 684 F.Supp.2d 564 (M.D. Pa. 2010), and facing the threat of potential liability to PADEP, LMC filed a third-party complaint against the United States, asserting, inter alia, a CERCLA Section 113(f)(1) claim seeking contribution. (Doc. 32.) The United States answered the complaint on June 17, 2010 (Doc. 56), and the case was thereafter placed on a complex case management track (Doc. 78).
Although the period for discovery remains ongoing (see Doc. 121 (granting joint motion for extension of time and extending deadline for fact discovery to October 20, 2015)), the United States filed a motion for summary judgment on February 25, 2014 (Doc. 97; see also Doc. 98). On April 1, 2014, LMC filed a timely brief in opposition. (Doc. 104; see also Doc. 103 (granting LMC's motion for an extension of time).) On April 28, 2014, the United States filed a timely reply brief. (Doc. 110; see also Doc. 108 (granting the United States's motion for an extension of time).) On May 5, 2014, LMC filed an authorized surreply. (Doc. 113; see also Doc. 112.) On November 12, 2014, the court heard oral argument pursuant to the United States's unopposed request. (Doc. 117.)
The parties made their positions clear during oral argument. The United States contends that its potential liability for contribution costs was eliminated by virtue of the Final Agreement, which is a position supported by the Commonwealth. LMC takes the opposite position, contending that the Final Agreement only impacts the rights of the parties to the agreement and, therefore, does not affect its ability to seek contribution from the United States.
Summary judgment may only be granted where the moving party shows that there is no genuine dispute as to any material fact and that judgment as a matter of law is warranted. Fed. R. Civ. P. 56(a). Pursuant to Federal Rule of Civil Procedure 56, the court must enter summary judgment against a party who fails to make a showing sufficient to establish an element essential to that party's case and on which that party will bear the burden of proof at trial. Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986). In evaluating the evidence, the court must interpret the facts in the light most favorable to the nonmoving party, drawing all reasonable inferences in that party's favor. Montville Twp. v. Woodmont Builders LLC, 436 F. App'x 87, 89 n.4 (3d Cir. 2011) (citing Kossler v. Crisanti, 564 F.3d 181, 186 (3d Cir. 2009)). There is no genuine issue for trial only when the record taken as a whole could not lead a rational trier of fact to find for the non-moving party. Id. (citing Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986)).
Resolution of this motion requires the court to first determine whether the Final Agreement impacts LMC's Section 113(f)(1) contribution claim against the United States for purposes of the contribution protection provision contained in Section 113(f)(2). The court must then determine whether the Final Agreement impacts LMC's claim for contribution against the United States in light of PADEP's interrogatory response indicating that it only seeks to collect a sum from LMC that reflects LMC's fair share.
The court first turns to the statutory provisions. Generally, CERCLA provides a financial scheme whereby persons responsible for generating, handling, brokering, and/or transporting hazardous materials are jointly and severally liable for treating or disposing of such materials. See New Jersey Tpk. Auth. v. PPG Indus., Inc., 197 F.3d 96, 104 (3d Cir. 1999). CERCLA facilitates the achievement of Congress' goal to place the cleanup costs of the nation's hazardous waste sites on the polluter by permitting the United States
42 U.S.C. § 9607(a)(1)-(4). Due to the broad definition of a PRP, a party who is only marginally responsible for the presence of minimal hazardous substances at a site remains liable for the site's cleanup. See United States v. Atlantic Research Corp., 551 U.S. 128, 136 (2007).
As originally enacted in 1980, CERCLA did not expressly provide for contribution actions among PRPs. However, with the passage of the Superfund Amendments and Reauthorization Act of 1986 ("SARA"), Congress amended CERCLA to include several provisions addressing the issue of contribution among PRPs and the effect of settlements on such claims. See 42 U.S.C. § 9613(f). Relevant to the matter sub judice, Section 113(f)(1) permits a PRP to seek contribution from another PRP during or following a CERCLA suit brought against the original PRP and provides, in pertinent part, as follows:
42 U.S.C. § 9613(f)(1); see also Atlantic Research, 551 U.S. at 139 (explaining that "Section 113(f)(1) authorizes a contribution action to PRPs with common liability stemming from an action instituted under [CERCLA]"). The amendment further provides an incentive for PRPs to settle their potential liability with the government by granting settling parties protection from contribution actions by other PRPs. See 42 U.S.C. § 9613(f)(2). Particularly relevant for purposes of the instant motion, the amendment specifically provide that:
42 U.S.C. § 9613(f)(2). Contribution is defined as "the tortfeasor's right to collect from others responsible for the same tort after the tortfeasor has paid more than his or her proportionate share, [with] the shares being determined as a percentage of fault." Atlantic Research, 551 U.S. at 138 (quoting
It is clear, under the provisions of Section 113(f)(2), that contribution claims against persons who have resolved their liability to the United States or a state in an administrative or judicially approved settlement are barred if they arise from matters addressed in the settlement. The United States argues that LMC's Section 113(f)(1) claim is barred because it has entered into a settlement with the Commonwealth that resolved its liability for remediation costs incurred by the state at the Site. Initially, the court notes that the United States is a person, 42 U.S.C. § 9601(21) (defining "person" as including the "United States Government"), and that the settlement is, therefore, between a person and a state. Furthermore, the Final Agreement covers "any and all past or future claims that were or could now or hereafter be asserted by the Commonwealth against the United States arising out of or in connection with any conditions at the Site, including . . . any and all claims that could be asserted by the Commonwealth under CERCLA . . . to recover certain costs it may incur in response to the release . . . of hazardous substances at the Site." (Doc. 98-2, ¶ 3.) Thus, it appears LMC's contribution claim against the United States is for a matter addressed in the Final Agreement.
However, the scope of the Final Agreement is not the end of the court's contribution protection inquiry. Significantly, the contribution protection provision of Section 113(f)(2) only provides immunity from further contribution claims when the party has resolved its CERCLA liability through "an administrative or judicially approved settlement." 42 U.S.C. § 9613(f)(2). LMC argues that the Final Agreement fails to qualify as either an administrative settlement or judicially approved settlement. The court agrees.
A judicially approved settlement is one that can take the form of a consent decree and results from the court's approval of a settlement that is "fair, reasonable, and consistent with CERCLA's goals." See United States v. SEPTA, 235 F.3d 817, 823 (3d Cir. 2000) (citing United States v. Cannons Eng'g Corp., 899 F.2d 79, 85 (1st Cir. 1990)). Procedures used in a CERCLA administrative settlement are set forth in Section 122(i), which mandates that: (1) at least thirty days before a settlement may become final, the head of the department or agency which has jurisdiction over the proposed settlement publish in the Federal Register notice of the proposed settlement; (2) for a thirty-day period beginning on the date of publication, an opportunity be provided to persons who are not parties to the proposed settlement to file written comments relating to the proposed settlement; and (3) the head of the department or agency consider any comments that have been submitted. 42 U.S.C. § 9622(i). Although CERCLA's specific notice and comment procedures are arguably required only of the federal government, several courts have recognized that because due process concerns are also present when an administrative settlement is entered into with a state, a non-settling party should still be provided with notice and an opportunity to be heard when the action was commenced by a state. See American Special Risk Ins. Co. v. City of Centerline, 180 F.Supp.2d 903, 909-10 (E.D. Mich. 2001) (recognizing the need for notice and comment procedure concerning a state settlement); CPC Int'l, Inc. v. Aerojet-Gen. Corp., 759 F.Supp. 1269, 1283 (W.D. Mich. 1991) (stating in dicta that a settlement entered under process devoid of any hearings or public comment is not an "administrative or judicially approved" settlement under Section 9613(f)(2)).
The Final Agreement is neither an administrative settlement nor a judicially approved settlement within the meaning of Section 113(f)(2). No administrative procedures, including any public comment period, were followed nor did any impartial arbiter determine that the settlement amount was fair and reasonable in light of the United States's potential liability. The court holds that, notwithstanding the identity of the settling parties, if procedural safeguards similar to those set forth in Section 122(i) are not followed, a settlement cannot constitute a Section 113(f)(2) administrative settlement resulting in a contribution action being statutorily barred. See United States v. Moore, 703 F.Supp. 455, 459 (E.D. Va. 1988). In the Final Agreement, the Commonwealth agreed to release the United States from potential liability for $10 million. This agreement, however, does not conclusively equate to the United States being only responsible for causing $10 million worth of response costs at the Site. Unlike a scenario where there is either an approved settlement that is subject to scrutiny by an agency head with the benefit of public comments or a judicially approved settlement which must be assessed to be fair and reasonable, the Final Agreement is simply a settlement between two parties that may or may not reflect the actual proportionate liability of the United States. The due process concerns that Section 122(i) aims to safeguard "are magnified when a PRP seeks to use an administrative settlement to extinguish another PRP's contribution rights." General Time Corp. v. Bulk Materials, Inc., 826 F.Supp. 471, 476 (M.D. Ga. 1993). LMC, who was neither a party to the settlement nor able to comment thereon, should not be barred from seeking contribution from a PRP for the amount it may ultimately be adjudged jointly and severally liable to the Commonwealth pursuant to the Section 107 action.
Therefore, the court holds that, for a settlement with a state to constitute an administrative settlement for purposes of Section 113(f)(2)'s contribution bar, the procedures designed to ensure due process must be followed.
The United States next contends that, even if Section 113(f)(2) is inapplicable to bar a contribution action, PADEP's indication that it is only seeking LMC's fair share of remediation expenses otherwise bars any contribution action. The United States relies on the Final Agreement to represent that $10 million is the extent of its own liability, so the balance of the cost recovery falls on LMC's shoulders.
CERCLA directs that "[a] person who has resolved its liability to the United States or a State in an administrative or judicially approved settlement. . . . reduces the potential liability of the others by the amount of the settlement." 42 U.S.C. § 9613(f)(2) (emphasis added). The plain language lends itself to no construction other than a dollar-for-dollar reduction of the aggregate liability, which is an approach consistent with that embodied in the Uniform Contribution Among Tortfeasors Act ("UCATA"), 12 U.L.A. 194 (1996). Under this "pro tanto" approach, the combined liability of the non-settling parties is reduced by the amount of any settlement regardless of the actual percentage of the total fault of the settling parties.
However, CERCLA provides no direction regarding how a settlement other than one that was administrative or judicially approved affects contribution liability of non-settling parties. Rather, Section 113(f)(1) instructs courts to "allocate response costs among liable parties using such equitable factors as the court determines are appropriate," 42 U.S.C. § 9613(f)(1), thereby conferring broad discretion in the equitable apportionment of liability to the courts, Action Mfg. Co. Inc. v. Simon Wrecking Co., 428 F.Supp.2d 288, 328 (E.D. Pa. 2006). In contrast to the pro tanto approach is the "pro rata" approach, which is embodied in the Uniform Comparative Fault Act ("UCFA"), UCFA § 6, 12 U.L.A. 126 (1996). This approach calls for the reduction of the non-settling PRP's liability by the equitable share of the settling party's liability based on relative fault. See UCFA § 2. The application of this allocation method results in the combined liability of the non-settling parties being reduced by the percentage of total actual fault of the settling parties. These two approaches, therefore, assign the risk of an inadequate partial settlement, i.e., a settlement below the amount of actual damage attributable to the settling PRP, to different parties, with the non-settling PRPs bearing the risk under the pro tanto approach and the settling plaintiff bearing the risk under the proportionate share approach.
The United States argues that, under the terms of the Final Agreement, the potential liability of LMC as a nonsettlor is reduced by the amount of the settlement, to wit, $10 million. This position presupposes that the court will apply a pro tanto allocation scheme consistent with direction of Section 113(f)(2). However, the court has already determined that the Final Agreement does not qualify as an administrative or judicially approved settlement for purposes of Section 113(f)(2), and, therefore, the pro tanto approach is not mandated by CERCLA. See supra Part III.B. Moreover, based on the record now in existence, the court concludes that a mechanical application of the pro tanto approach would not be equitable. At this juncture, the record does not establish that the payment provision in the Final Agreement accurately represents the amount of harm caused by the settling party. Indeed, applying a pro tanto approach here would be akin to accepting the Final Agreement as establishing that LMC caused the remaining balance of PADEP's remediation costs, without giving LMC an opportunity to present facts to the contrary, which puts the risk of an insufficient settlement on the shoulders of a party who did not have a chance to object. Certainly, the court's acceptance in this regard would side-step due process-the exact concerns addressed by the inclusion of the qualifying "administrative or judicially approved settlement" language in Section 113(f)(2).
Without the pro tanto approach mandated by Section 113(f)(2), the court is directed to " allocate response costs among liable parties using such equitable factors as [it] determines are appropriate." 42 U.S.C. § 9613(f)(1). Such a discretionary function cannot be fulfilled on a record that continues to be developed, especially when fact discovery is ongoing. Indeed, to grant the United States the relief it requests in the instant motion would be to allocate to the United States the responsibility for $10 million of the total response costs sought by the Commonwealth, leaving the responsibility for the balance of the Section 107 action to be carried by LMC. Such a result is inappropriate at this time because the allocation method has not yet been addressed.
The inequitable impact of applying a common law contribution bar at this juncture is further exemplified by the nature of PADEP's action against LMC. The instant action was commenced pursuant to Section 107 and sought to recover from LMC all unreimbursed remediation expenditures incurred during the decommissioning of the Site. LMC, in turn, filed its third-party complaint against the United States under Section 113(f)(1) and sought recovery of, inter alia, the amount equitably allocable to the United States, alleged to be a fellow PRP, as to be proven at trial.
The United States relies heavily on the Commonwealth's representation that it seeks to recover from LMC no more than LMC's reasonable allocation of the Commonwealth's past total cleanup expenditures for the Site. The United States argues that it is impossible for LMC to recover anything in a contribution action against the United States because contribution is only available to a PRP that is liable for more than its fair share of response costs. The United States reasons that, because LMC will be only liable for response costs attributable to its own conduct, LMC cannot pay more than its fair share and cannot maintain a Section 113(f)(1) contribution action.
While the United States's position is logical and may reflect the outcome of this litigation, the record fails to demonstrate that the United States is entitled to judgment as a matter of law. Notwithstanding the Commonwealth's representation that it only seeks recovery of LMC's fair share, this action was commenced pursuant to Section 107, which provides that LMC, as a PRP, may be jointly and severally liable for all costs of remedial action incurred by the Commonwealth. LMC is, in turn, entitled to "blunt any inequitable distribution of costs" and to seek, under Section 113, contribution from another PRP for any amount paid in excess of its allocable costs as determined by the court using equitable factors. See Atlantic Research Corp., 551 U.S. at 140. Without knowing either the fault attributable to each PRP or the amount of damages attributable to LMC, the court cannot conclusively determine whether LMC will be held jointly and severally liable for an amount in excess of its fair share.
The Final Agreement is not entitled to a statutory contribution bar because it is neither an administrative nor judicially approved settlement for purposes of Section 113(f)(2). Furthermore, because Section 113(f)(2) is inapplicable, Section 113(f)(1) gives the court authority to allocate response costs among liable parties by using such equitable factors as it deems appropriate. Because the equitable method for allocation remains at issue, it is not clear whether LMC may be jointly and severally liable under Section 107(a) for more than its share of remediation costs incurred by PADEP. Thus, if judgment is granted in favor of the United States on LMC's properly asserted Section 113(f)(1) contribution claim and it is ultimately determined that LMC is a responsible party for purposes of Section 107(a), LMC will be unable to reduce its liability through Section 113(f)(1) allocation. Accordingly, because PADEP's Section 107 claim seeks to hold LMC jointly and severally liable for all remediation costs incurred for cleanup of the Site, the record does not establish that the United States is entitled to judgment as a matter of law. Therefore, the court will deny the motion for summary judgment without prejudice to the United States's right to seek summary judgment once an appropriate allocation method is established.
While not identical, the Final Agreement has many of the same characteristics as those found in the Hobart settlement agreement, namely that the agreement resolved the liability of the contracting parties and stated that it provided contribution protection to the settling PRP. However, Hobart is nevertheless distinguishable. In Hobart, the settling PRP was not seeking to bar contribution actions raised by non-settling parties who were not parties to the agreement. Rather, the question was whether settling parties' agreement could be an administrative settlement such that it permitted a settling party to bring a Section 113(f)(3)(B) action. Here, the United States argues that the Final Agreement between itself and PADEP affirmatively extinguishes the contribution rights of LMC. Such a scenario was not before the Hobart court.
The additional cases cited by the United States are likewise distinguishable because, unlike here, procedures intended to ensure due process were followed. In United States v. Hercules, 961 F.2d 796, 798 (8th Cir. 1992), the United States and the Arkansas Department of Pollution Control and Ecology (ADPCE) entered into a proposed consent decree with certain private PRPs. Significantly, the proposed consent decree was entered by the court, over objection from a non-settling PRP, following publication of the proposed consent decree and invitation for the public's comment. Id.; see also United States v. Vertac Chem. Corp., 756 F.Supp. 1215, 1217 (D. Ark. 1991). Indeed, the appeal in Hercules arose from the district court's approval of the proposed decree after finding it fair, reasonable, and consistent with CERCLA. Hercules, 961 F.2d at 798. Here, the court did not approve the Final Agreement and the court did not have occasion to consider any objections from LMC, as none had been solicited. Thus, Hercules presented a different scenario than is present in the instant matter.
Similarly, in Trinity Industries v. Chicago Bridge and Iron Co., 735 F.3d 131 (3d Cir. 2013), Pennsylvania and the plaintiff-PRP entered into a consent order that resolved the settling plaintiff PRP's liability under state law but did not address its CERCLA liability. Id. at 133. The Third Circuit found that the consent order was nevertheless an administrative settlement for purposes of CERCLA and, therefore, concluded that the settling PRP was able to pursue a Section 113(f)(3)(B) claim against the non-settling defendant PRP. Id. at 138. Here, it is the non-settling PRP that commenced a contribution action against a settling PRP. Moreover, as highlighted by LMC, notice of the consent order was published in the