JOHN J. THARP, Jr., District Judge.
The plaintiffs, Natural Resources Defense Council, Inc., Sierra Club, Inc., and Prairie Rivers Network are non-profit environmental groups who have brought this case pursuant to the citizen-suit provision of the federal Clean Water Act. In Count Two, the subject of the instant motions, the plaintiffs claim that the Metropolitan Water Reclamation District of Greater Chicago ("MWRD" or "District") violated the terms of its National Pollution Discharge Elimination System ("NPDES") permits, and thus the Act itself, at three area water reclamation plants ("WRPs") that it operates. Specifically, the plaintiffs claim that the effluent from the WRPs contains levels of phosphorus that have caused conditions in the receiving waters that violate Illinois water quality standards with respect to levels of algal and plant growth and dissolved oxygen ("DO"). The plaintiffs maintain that the water quality standards are enforceable against the District because Special Condition 5 of the three WRPs' applicable NPDES permits incorporates those standards.
Two summary judgment motions are pending. In the first, the District requests judgment as a matter of law based on two legal defenses: primary jurisdiction and the Clean Water Act's so-called "permit shield." In the second, the plaintiffs seek judgment on the merits of their claim that the District was and is violating the water quality standards, its permit, and the Act, as a result of the conditions created by the WRPs' effluent. The legal defenses do not defeat the plaintiffs' claims, but those claims present material disputes of fact that make summary judgment for the plaintiffs inappropriate. Accordingly, both motions are denied.
The District is a unit of local government that operates wastewater collection, treatment, and discharge facilities in the greater Chicago area. As relevant here, the District operates the North Side, Stickney, and Calumet water reclamation plants. These WRPs discharge into the Chicago Area Waterway System ("CAWS"), which includes the North Shore Channel, the North Branch of the Chicago River below its confluence with the North Shore Channel, the Main Branch and South Branch of the Chicago River, the Chicago Sanitary and Ship Canal ("CSSC"), the Calumet-Sag Channel, and the portion of the Little Calumet River east of its confluence with the Calumet-Sag Channel. The CAWS normally flows from the CSSC into the Des Plaines River, which joins downstream with the Kankakee River to form the Illinois River, which flows generally southwest and ultimately into the Mississippi River near Alton, Illinois. It is estimated that over 70% of the flow in the CAWS, and even more than that (about 85%) when water diversions from Lake Michigan are reduced, consists of treated wastewater from the three District WRPs at issue in this case.
In 1992, the District applied for, and ultimately was granted, National Pollutant Discharge Elimination System permits for the three relevant WRPs. The NPDES permits were issued by the Illinois Environmental Protection Agency (IEPA) pursuant to the authority delegated to the State by the federal EPA. The WRPs' permits were issued in 2002 and, although they technically expired in 2007, they remained in effect in 2011, when this lawsuit commenced, and during permit renewal proceedings that culminated in the issuance of revised permits that became effective on January 1, 2014. The parties refer to the two sets of permits as the "2002 permits" and the "2013 permits," respectively (the latter having been granted in December 2013), and the Court does the same.
As noted in the District's 1992 permit applications, the WRPs' discharges contain phosphorus from sources including human excreta, industry, and storm water runoff containing animal waste, fertilizers, fallen leaves, dishwasher detergents, food waste, and tap water. Phosphorus is a naturally occurring basic element and a nutrient that enables plants and algae to grow. When the supply of phosphorus is limited in a freshwater system, the growth of plants and algae in the system likewise is limited. Where phosphorus is present in high levels that are no longer limiting, plants and algae have what amounts to an unlimited food supply; unless other factors are limiting, the growth of plants and algae increases. It is undisputed that in the CAWS and Illinois River, phosphorus is not a limiting factor to plant and algae growth.
The 2002 permits did not place any numeric effluent limitations on phosphorus, even though the District's permit applications identified the quantity of phosphorus in its treated wastewater discharges and disclosed that the WRPs had no original design capacity to remove phosphorus. The 2002 permits do impose numeric limitations on other constituents of the discharges from the WRPs. Those limitations are coupled with mandatory self-reporting and monitoring obligations. The IEPA's decision not to impose numeric phosphorus limitations was over objections by the plaintiffs and others during the public comment period of the permit process. In its Responsiveness Summary, which addressed the public comments, IEPA stated, in part: "[T]his permit does not authorize or provide any legal protection to the [District] for violation of downstream water quality standards that may result from the discharges covered by these permits."
The 2002 permits include a provision, Special Condition 5, that states in its entirety: "The effluent, alone or in combination with other sources, shall not cause a violation of any applicable water quality standards outlined in 35 Ill. Adm. Code 302." In turn, the state administrative code sets forth water quality standards ("WQS") for waterways based upon their use. One such WQS, entitled "Offensive Conditions," requires that so-called general use waters "shall be free from . . . plant or algal growth . . . of
In 2009, IEPA provided public notice of the proposed terms for the District's renewed NPDES permits for the WRPs. The plaintiffs again participated in public comment and advocated for the inclusion of numeric effluent limits on phosphorus discharges. Ultimately, the 2013 permits included new numeric effluent limits on the discharge of phosphorus; however, the three WRPs were given from 49 to 120 months to comply with those new numeric standards. In the interim, there are design, construction, and reporting milestones that the WRPs must meet. The 2013 permits also continue to impose Special Condition 5.
In a 2011 memorandum prompted by its Gulf Hypoxia Action Plan, the federal EPA instructed that IEPA "must determine whether nutrient discharges will cause, have a reasonable potential to cause, or contribute to an excursion beyond the criteria in 35 Ill. Adm. Code 302.203 ["unnatural" algal growth] or 302.205 [phosphorus] in proximate and downstream waters; and (2) set nutrient effluent limitations which are derived from and comply with 35 Ill. Adm. Code 302.203 and 302.205, as applicable." It is undisputed that currently the State of Illinois, acting through the IPCB, is actively considering modifications to its WQS that set numeric nutrient limitations for phosphorus and other nutrients and that the plaintiffs have been actively participating in that process. IEPA, in cooperation with the Illinois Department of Agriculture, also funded and recently published a report entitled Illinois Nutrient Loss Reduction Strategy, prepared by a working group of state and local government agencies, public and private interest groups, and researchers, in order to "direct efforts to reduce nutrients from point and non-point sources in a coordinated, primarily voluntary, and cost-effective manner."
At times the District has been subject to enforcement action under the narrative WQS regulating unnatural algal growth. In September 2006, the IEPA issued a Notice of Violation to the District after the District self-reported an incident involving a combined sewer overflow (CSO) discharge from a District pumping station—a facility other than those at issue in this case—that killed fish. The District was charged with violating "the `Offensive Conditions' water quality standard contained in [section] 302." Sewer overflows were also the subject of a 2011 federal lawsuit against the District by the federal and state EPAs, which, in relevant part, alleged that overflows from the same three WRPs at issue in this case violated Special Condition 5 of the applicable permits. That lawsuit ended with the entry of a consent decree. See Note 3, infra.
The operative complaint in this case brings two counts against the District, but only Count II, alleging that the WRPs' phosphorus discharges violate their NPDES permits by way of the incorporated water quality standards, is currently at issue.
Summary judgment should be granted where "the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." Fed. R. Civ. P. 56(a). In deciding each motion, the Court examines the record in the light most favorable to the non-moving party, resolving all evidentiary conflicts in its favor and according it the benefit of all reasonable inferences that may be drawn from the record. See Rosenbaum v. White, 692 F.3d 593, 599 (7th Cir. 2012).
The District's summary judgment motion presents two legal defenses to Count II. First, the District contends that pursuant to the doctrine of primary jurisdiction, this Court should defer the issue of its purported WQS violations to the pertinent administrative authorities. Second, it argues that as a matter of law, the Clean Water Act's "permit shield" applies and insulates it from liability for any discharge of phosphorus. The plaintiffs dispute the applicability of these defenses.
The Seventh Circuit has described the concept of primary jurisdiction as "really two doctrines," encompassing both "exclusive agency jurisdiction," which is not argued here, and abstention in favor of an agency with superior expertise over the subject matter. Arsberry v. Illinois, 244 F.3d 558, 563 (7th Cir. 2001). The latter doctrine, which the defendant invokes, allows a court to "refer" some "issue" to an agency with the specialized expertise or experience to resolve. See id; Reiter v. Cooper, 507 U.S. 258, 268 (1993) (Primary jurisdiction doctrine applies to claims properly cognizable in court that contain some issue within the special competence of an administrative agency" and "requires the court to enable a `referral' to the agency, staying further proceedings so as to give the parties reasonable opportunity to seek an administrative ruling."). There is no "fixed formula" for deciding whether to abstain pursuant to the primary jurisdiction doctrine; rather, a case-by-case determination must be made in light of the purpose of the applicable statute and the relevance of the administrative expertise. See Ryan v. Chemlawn Corp., 935 F.2d 129, 131 (7th Cir. 1991) (citing Bradford School Bus Transit v. Chicago Transit Authority, 537 F.2d 943, 949 (7th Cir. 1976)).
The difficulty here is that the District, which invokes the defense, does not identify with precision any relevant proceedings to which this Court should defer for the resolution of the question presented by the plaintiffs' Count II. The defendant points to ongoing efforts by the federal and state EPAs and the IPCB to develop water quality standards that impose numeric limitations on phosphorus discharges. See, e.g., Reply, Dkt. # 125 at 2, 12. But it does not identify any proceedings, whether ongoing or that could be initiated, which would adjudicate whether Special Condition 5 substantively incorporates the Illinois water quality standards into the WRPs' NPDES permits and, if so, whether the District is in violation of those standards because of conditions caused by the phosphorus in the three WRPs' effluent. The 2013 permit appeal pertains to the new numeric limit on phosphorus; only some kind of enforcement proceeding could now address the meaning of Special Condition 5. And here, the plaintiffs have brought a citizen suit precisely because no such proceeding has been brought by any regulator.
Moreover, the district is seeking
In any event, the CWA contemplates the interpretation of the terms of NPDES permits even by non-expert courts, because the citizen-suit provision is one of the primary means of enforcing those terms. See 33 U.S.C. § 1365 (a) ("The district courts shall have jurisdiction . . . to enforce such an effluent standard or limitation . . . and to apply any appropriate civil penalties under section 1319(d) of this title."); see also Ass'n of Irritated Residents v. Fred Schakel Dairy, No. 105CV00707, 2008 WL 850136, at *10-11 (E.D. Cal. Mar. 28, 2008) (discussing applicability of primary jurisdiction doctrine to citizen environmental suits). Federal judges and juries do so routinely, both in citizen suits and actions initiated by the federal and state EPAs. See, e.g., NRDC v. Cnty. of Los Angeles, 725 F.3d 1194, 1205 (9th Cir. 2013) cert. denied sub nom. Los Angeles Cnty. Flood Control Dist. v. NRDC, 134 S.Ct. 2135 (2014); Parker v. Scrap Metal Processors, Inc., 386 F.3d 993 (11th Cir. 2004); Altamaha Riverkeeper, Inc. v. Rayonier, Inc., No. CV 214-44, 2015 WL 1505971, at *3 (S.D. Ga. Mar. 31, 2015); Wishtoyo Found. v. Magic Mountain LLC, No. CV 12-05600 GAF MANX, 2014 WL 6841554 (C.D. Cal. Dec. 3, 2014); Adams v. Teck Cominco Alaska, Inc., 414 F.Supp.2d 925 (D. Alaska 2006); United States v. Allegheny Ludlum Corp., 187 F.Supp.2d 426, 447 (W.D. Pa. 2002) aff'd in part, vacated in part, 366 F.3d 164 (3d Cir. 2004) (assessing damages after jury determination of liability for violating NPDES permit); Hudson Riverkeeper Fund, Inc. v. Yorktown Heights Sewer Dist., 949 F.Supp. 210 (S.D.N.Y. 1996). And where, in a suit like this one, it becomes necessary to determine whether the District violated the water quality standards incorporated into Special Condition 5, expert testimony is available to assist fact-finders with the scientific or technical issues the standards implicate.
Finally, the District and its expert have argued that the "unnatural" and "of other than natural origin" criteria in the Illinois narrative WQS cannot be scientifically and meaningfully applied. It is therefore unclear why the District believes that any state administrative body is better suited to parsing what the District insists are non-scientific, and, indeed, non-substantive, criteria to begin with.
For these reasons, the District's primary-jurisdiction defense fails.
Next, the District argues that the CWA's permit shield defense absolutely insulates it from the claim in Count II that its phosphorus discharges violate its NPDES permit. The permit shield defense is derived from 33 U.S.C. § 1342(k), which provides: "Compliance with a permit issued pursuant to this section [§1342 is the NPDES provision] shall be deemed compliance, for purposes of section[] . . . 1365 of this title [the citizen suit provision], with sections 1311, 1312, 1316, 1317, and 1343 of this title, except any standard imposed under section 1317 of this title for a toxic pollutant injurious to human health." In short, if a polluter holds an NPDES permit, then compliance with the terms of the permit satisfies its obligations under the CWA, and it cannot be liable for discharges in accordance with the permit. NRDC v. Cnty of Los Angeles, 725 F.3d 1194, 1204 (9th Cir. 2013). Conversely, "a permittee violates the CWA when it discharges pollutants in excess of the levels specified in the permit, or where the permittee otherwise violates the permit's terms." Id.
The seminal case construing § 1342(k), the permit shield, is Piney Run Preservation Association v. County Commissioners of Carroll County, Maryland, 268 F.3d 255 (4th Cir. 2001). In that case, a CWA citizen suit challenging a county's discharge of thermal pollution (a.k.a. "heat") from its sewage treatment plants into a stream, allegedly in violation of its NPDES permit, the Fourth Circuit held that the permit shield applies whenever the polluter complies with the terms of its permit and makes full disclosure of its discharges such that the challenged discharge is within the reasonable contemplation of the permitting authority. Id. at 269. In Piney Run, the heat effluent was not explicitly addressed by the permit; the plaintiffs argued that any discharge not explicitly allowed was a violation, while the defendant contended that any discharge not expressly forbidden was allowed. Rejecting both arguments, the Fourth Circuit reasoned that the permit should be deemed to incorporate implicitly all discharges known to the permitting authority, whether or not expressly addressed in the permit. In arriving at this interpretation of the permit shield, the court deferred to the EPA's reasoning in In Re Ketchikan Pulp Co., 7 E.A.D. 605, 1998 WL 284964, (E.P.A. May 15, 1998). Under the Piney Run formulation of the permit shield, the discharger retains liability for all discharges not in compliance with the permit—meaning any discharge that is specifically barred or that was not adequately disclosed to the permitting authority and reasonably within its contemplation when the permit was issued. See 268 F.3d at 269.
Relying on Piney Run, the District contends that its phosphorus discharges are protected by the permit shield because it fully disclosed them during the permitting process. See, e.g., Mem., Dkt # 114-1 at 6. The plaintiffs do not dispute that the District made a full disclosure in its permit applications of the levels of phosphorus in its treated effluent and of the fact that it had no original design capacity to reduce phosphorus. And given those disclosures, the discharge of phosphorus was plainly within the permitting authority's reasonable contemplation when the permits were issued. Therefore, the discharges are not forbidden by the permit, and, indeed, under Piney Run, were implicitly incorporated into the permit. The District ends the analysis right there, concluding that the permit shield bars liability for its phosphorus discharges.
But, contrary to the District's argument, Piney Run does not get it across the finish line. As the District sees things, disclosure + issuance of permit = immunity. But more is required for the permit shield to apply. Piney Run clarified that discharges are within the scope of a permit when they are adequately disclosed to the permitting authority even if the permit does not specifically allow them. But that does not answer the question whether such a discharge is protected if it violates a term of the permit itself. And subsequent cases have held that the permit shield requires compliance with all terms of the permit. Alaska Community Action on Toxics v. Aurora Energy Servs., LLC, 765 F.3d 1169 (9th Cir. 2014) (("If a discharger is covered by a NPDES permit and complies with that permit, the permit `shields' it from liability under the CWA") (emphasis added)); S. Appalachian Mountain Stewards v. A & G Coal Corp., 758 F.3d 560, 564 566 (4th Cir. 2014) (explaining that the permit shield's "broad protection comes with an important responsibility at the permit application stage: full compliances with federal and state reporting requirements, as well as with the conditions of the permit" and noting that permit holder "failed to fully comply with the express terms of the permit"). See also Wisconsin Resources Protection Council v. Flambeau Mining Co., 727 F.3d 700, 706 (7th Cir. 2013); Coon v. Willet Dairy, LP, 536 F.3d 171,173 (2d Cir. 2008) ("[C]ompliance with an authorized permit is deemed compliance with CWA, so as long as Willet Dairy was acting in accordance with its permit it could not be liable in a citizen suit for CWA violations."). The EPA decision that provided the basis for the Fourth Circuit's analysis in Piney Run makes this clear: "[S]ection 402(k) shields a discharger from liability under the CWA
Therefore, the pertinent question for purposes of the District's permit shield defense is whether Special Condition 5, which incorporates Illinois water quality standards, is a substantive term of the permit. If it is, then the District's discharges must be in compliance with the WQS in order for it to avail itself of the permit shield defense.
The District would have the Court bypass this inquiry because, it argues, Special Condition 5 cannot override the statutory defense. Or, as the District states the argument: "vague narrative water quality standards generally referenced by a permit cannot form a backdoor basis for limiting the discharge of wastewater constituents that were disclosed to the appropriate regulatory body and that the regulator chose not to subject to discharge limits." Reply, Dkt. # 125 at 3. On the other hand, the plaintiffs contend that Special Condition 5 is not a "general reference" to the WQS but incorporates them as substantive terms.
An NPDES permit is interpreted just like any contract or other legal document. NRDC, 725 F.3d at 1204; Piney Run, 268 F.3d at 269. Under Illinois law, this means that unambiguous terms are to be given their plain and ordinary meaning, and all provisions are to be given effect and not interpreted in such a way as to nullify them or render them meaningless. See Thompson v. Gordon, 241 Ill.2d 428, 442, 948 N.E.2d 39, 47 (2011); Buenz v. Frontline Transp. Co., 227 Ill.2d 302, 308, 882 N.E.2d 525, 529 (2008). Special Condition 5, by its plain language, incorporates the Illinois WQS and requires that the permittee's effluent discharges not cause a violation of the WQS, irrespective of whether the discharge itself is otherwise allowed.
Other courts have held that state WQS substantively incorporated into an NPDES permit are enforceable terms of the permit. In Northwest Environmental Advocates v. City of Portland, 56 F.3d 979 (1995), the Ninth Circuit held that a citizen suit to enforce state WQS was cognizable where the WQS were conditions of an NPDES permit. Id. at 986. The District protests that this case preceded Piney Run, but it does not persuasively explain why the Fourth Circuit's interpretation of the permit shield in that case obviates the general principle that WQS incorporated into a permit become substantively enforceable terms. At least one other district court has agreed with this proposition in the post-Piney Run era. See Ohio Valley Envtl. Coal., Inc. v. Marfork Coal Co., 966 F.Supp.2d 667, 683 (S.D.W. Va. 2013)) ("[I]f a permit holder does cause a violation of the water quality standards applicable to the body of water into which it discharges pollutants, then the permit holder has violated the terms of its permit. The permit shield would not protect such a permittee from liability, because the shield only applies to a permit holder who complies with all the conditions of its permit."); see also Ohio Valley Envtl. Coal. v. Elk Run Coal Co., No. CIV.A. 3:12-0785, 2014 WL 29562, at *3 (S.D.W. Va. Jan. 3, 2014). By contrast, the District identifies no authority supporting its view that Special Condition 5 can be dismissed as inapplicable boilerplate rather than as a substantive limitation imposed on the District's effluent discharges.
Moreover, contrary to the District's arguments, water quality standards are no less binding when they are in the form of narrative or qualitative criteria instead of numeric limitations. See PUD No. 1 of Jefferson County v. Washington Dep't of Ecology, 511 U.S. 700, 716-717 (1994); Nw. Env'l Advocates, 56 F.3d at 987. Jefferson County addressed a state's authority to enforce broad narrative criteria as a condition of certifying the building of a hydroelectric power plant. After holding that states may condition their CWA certification upon compliance with water quality standards and any other "appropriate condition of state law," the Court went on to conclude that Washington's minimum flow condition was such a requirement. The Court rejected the contention that numerical criteria were required for enforcement, holding that the state could enforce its qualitative requirement that stream flow be sufficient to allow particular uses. 511 U.S. at 716-717. In the NWEA case, the Ninth Circuit similarly rejected an argument that only WQS that had been translated into numeric effluent limitations were actionable. 56 F.3d at 986. The court reasoned that technological effluent limitations were meant to improve enforcement but not to supplant the systems of water quality standards. Id. It is true that the narrative criteria themselves must be sufficiently clear to allow for meaningful regulation, see, e.g., NRDC v. U.S. EPA, 808 F.3d 556, 578 (2d Cir. 2015), but the enforceability of any particular standard goes to whether a violation has been or can be established, not to the threshold question of what terms are part of the permit.
In this case, the District equates the lack of
Accordingly, Special Condition 5 incorporates the WQS as substantive terms of the permit, compliance with which is required in order for the permit shield to apply. The WQS do not restrict phosphorus discharges per se; and, as the District argues, its permit contemplates some such discharges because they were properly disclosed in the permitting process. But the WQS incorporated into Special Condition 5 do impose an outer limit to the extent that the District must ensure that its effluent does not cause certain conditions in the receiving waters. Therefore, the District is not "in compliance" with its NPDES permits for the WRPs simply because it disclosed the phosphorus content of its effluent. Under Special Condition 5, it must ensure that its effluent does not cause a violation of the Illinois WQS.
In light of that interpretation of the District's relevant permits, the permit shield defense can apply only if the three WRPs' effluent does not cause violations of the Illinois WQS. Whether the phosphorus in the effluent causes violations of the narrative unnatural-growth and numeric dissolved oxygen standards is precisely the subject of the plaintiff's motion for summary judgment on the merits. And it remains to be decided, in the context of that motion, whether the plaintiffs have proved any violation of the WQS by the District. But for purposes of the District's motion, it is enough to say that it has not demonstrated that the permit shield defense applies as a matter of law.
Because it has not established that either of its legal defenses applies, the District's motion for summary judgment on Count II is denied.
The plaintiffs seek judgment as a matter of law on the basis of what they say is undisputed evidence of pollution in the CAWS and the relevant segments of the Des Plaines and Illinois Rivers (the "waters") caused by phosphorus in the effluent from the three District WRPs at issue. In opposition to the motion, the District does not attempt to show that the waters are not encumbered with algal and plant growth or depleted levels of dissolved oxygen, nor does it dispute the quantity of phosphorus in the effluent. Instead, it primarily argues that the plaintiffs fail to meet their burden of proof, particularly with respect to causation. That is, the District contends that the plaintiffs have not shown that, as a matter of law, the observed conditions are attributable to the phosphorus content of the WRPs' effluent.
Both sides rely primarily on expert testimony, the main points of which are summarized below. On the plaintiff's side are Dr. JoAnn Burkholder, a professor of aquatic science and the director of the Centrer for Applied Aquatic Ecology at North Carolina State University, with a doctorate in Botantical Limnology; and Dr. Patricia Glibert, a professor of Envirconemntal Science at the University of Maryland's Horn Point Laboratory, with a doctorate in Organismal and Evolutionary Biology. On the District's side is Dr. Todd Royer, a professor of environmental science at Indiana University with a doctorate in Biology.
The concentration of phosphorus in the effluent of the three relevant District WRPs ranges between 1.0mg/L and 2.5mg/L. Treated effluent from the WRPs contributes the major portion of the actual water flow of the CAWS. Over 70% of the annual flow in the system is from the discharge of treated municipal wastewater effluent from the three WRPs plus the District's Lemont plant. About 70% of the annual flow leaving the CAWS at Lockport consists of treated wastewater, and discharges from the three water reclamation plants at issue constitute 90% of the treated wastewater in the system.
The phosphorus from the WRPs makes up a substantial portion of the phosphorus in the CAWS. Some portion of the phosphorus from the WRPs makes it way from the CAWS into the Des Plaines River and then into the Illinois River. The Illinois River also receives phosphorus from the Kankakee River and other tributaries that do not receive any effluent from the WRPs; the phosphorus from those rivers derives primarily from agricultural runoff and various point sources unrelated to the District's facilities. As previously noted, the phosphorus in the waters is at high enough levels such that it is not limiting to the growth of algae and aquatic plants. The District's expert testified that it was safe to assume that the District is the largest source of phosphorus to plant and algal growth "in the affected streams."
During at least some of the time period relevant to this lawsuit, the District's water quality monitoring in the CSSC at Lockport showed phosphorus levels above 1.0mg/L. Advisory guidelines from the federal EPA suggest that total phosphorus concentrations in the waters of the Midwest region should be .076 mg/L. These were published in the EPA's 2000 document entitled Ambient Water Quality Criteria Recommendations: Information Supporting the Development of State and Tribal Nutrient Criteria. These criteria are not laws or regulations, however; according to the EPA, "they are guidance that States and Tribes may use as a starting point for the criteria for their water quality standards."
Flora in waterways consists of rooted and floating plants, benthic algae (which is attached to rocks or other surfaces), and sestonic (or floating) algae and cyano-bacteria. An accepted method of estimating the level of sestonic algal biomass is by measuring the level of chlorophyll α in the water (Dr. Royer, the District's expert, does not disagree). Higher levels of chlorophyll α correlate with higher levels of algae. And high algae concentrations may indicate nutrient (such as phosphorus) pollution. The federal EPA has suggested advisory criteria for sestonic algae in certain waters in Michigan and Ohio under which chlorophyll α levels should be .07 mg/L or lower. The District regularly samples chlorophyll α at fixed locations in the CAWS and the Des Plaines and Illinois Rivers as part of its water quality monitoring program. The North Shore Channel, the Little Calumet River, the Calumet Sag Channel, and the Illinois River, which all receive effluent from the plaints, have had levels of chlorophyll α much higher that .07 mg/L. The District does employ any other means of measuring plant and algal biomass other than measuring chlorophyll α. According to Dr. Royer, data about chlorophyll α does not provide any insight into the source of the phosphorus nor do they indicate anything about what is "natural" or "unnatural" about the phosphorus-algae relationship.
Aquatic plants and algae photosynthesize and respire; they put oxygen into the water during daylight, and they absorb it at night. Twenty-four hour variations in dissolved oxygen levels, known as "diel" or "diurnal" DO variations or swings, reflect the variations in DO levels. Dense concentrations of plant and algal growth often exhibit substantial diel DO variations. But not all diurnal DO swings are attributable to high levels of plant and algal growth. When the DO level rises above the oxygen level in the air, the water is said to be "supersaturated" with oxygen. Plant and algal growth can cause supersaturation. According to Dr. Burkholder, "3.5 mg DO/L is considered at the maximum diel DO swing above which undesirable impacts on aquatic communities in the CAWS are likely to occur."
The District continuously monitors DO. Based on the District's data, Dr. Burkholder found a total of 48 days on which there DO swings in excess of 3.5mg/L and DO supersaturation that, in her opinion, indicate "excessive and harmful" algal growth at different sites in the North Shore Channel, CSSC, Little Calumet River, and Cal-Sag Channel. Dr. Burkholder further identified more than 100 instances between 2007 and 2012 where the DO levels at points in the North Shore Channel, North Branch of the Chicago Ricer, Sourth Branch of the Chicago River, CSSC, Cal-Sag Channel, Little Calumet River and Lower Des Plaines River fell below the minimum level set by the applicable Illinois DO water quality standards. In Dr. Burkholder's opinion, those violations were due to plant or algal growth because they occurred in conjunction with large DO fluctuations over 24 hours and during periods of dry weather
Dr. Glibert, also one of the plaintiffs' experts, analyzed the nitrogen isotopes in suspended aquatic plants in the CAWS and Lower Des Plaines River on two days in August 2013 and concluded that they "were suggestive of" a "sewage source," meaning "treated sewage" or "sewage effluent." Her stable isotope analysis of nitrogen is based on the ratio of nitrogen's two naturally occurring isotopes,
The District's expert witness, Dr. Royer, opines that the underlying data do not support the conclusions drawn by Dr. Burkholder and Dr. Glibert. He further opines that defining "unnatural" growth based on the sources of the nutrients in the water is "untenable" and unscientific because all Ilinnois waterways have significant human-related nutrient inputs, and therefore all waterways could be said to have "unnatural" growth under the plaintiffs' interpretation. Instead, Dr. Royer proposes an "effects-based" interpretation of "unnatural" that defines a critical level of biomass beyond which growth is considered "unnatural," though he does not identify the critical level.
Dr. Royer further opines on the cause of the observed conditions with respect to DO and plant and algal growth. He concludes that "degraded physical habitat and altered hydrology, not phosphorus, are the primary drivers of ecological health" in the relevant waterways.
As noted, both parties rely on expert testimony to support their positions on the plaintiffs' motion. Neither party challenges the opposing experts' qualifications or the reliability of their respective methodologies under Federal Rule of Evidence 702 and Daubert v. Merrell Dow Pharmaceuticals, Inc., 509 U.S. 579 (1993). A true "battle of the experts" generally necessitates a trial. See Gicla v. United States, 572 F.3d 407, 414 (7th Cir. 2009) (explaining that "classic battle of the experts" requires "the factfinder to determine what weight and credibility to give the testimony of each expert and physician"); Wipf v. Kowalski, 519 F.3d 380, 385 (7th Cir. 2008) (explaining that "in a case of dueling experts . . . it is left to the trier of fact . . . to decide how to weigh the competing expert testimony"); Lebow v. Am. Trans Air, Inc., 86 F.3d 661, 667 (7th Cir. 1996) (resolution of battle of experts "is best reserved for the trier of fact"); Jenkins v. Electro-Med Indus., Inc., 916 F.2d 715 (7th Cir. 1990) (in battle of the experts, "the jury must determine credibility"). But to the extent that one side's expert opinions are substantially incomplete or inaccurate, they do not create a genuine issue of material fact that precludes summary judgment. See NutraSweet Co. v. X-L Eng'g Co., 227 F.3d 776, 785 (7th Cir. 2000).
Without yet drawing any conclusion as to the plaintiffs' entitlement to judgment, the record establishes that parts of the relevant waters were observed to be encumbered with algae and plant growth and have exhibited low levels of dissolved oxygen. Other than challenging the legitimacy or workability of the "unnatural" standard, the defendants do not meaningfully dispute the plaintiff's evidence of the amount of sestonic algae, as estimated by levels of chlorophyll α, that were observed by Dr. Burkholder based on her own tests and the analysis of the District's own monitoring data. See, e.g., Burkholder Report, Pl. Ex. 41 at 70-71. They vigorously dispute what might have caused those conditions, and the conclusion that the plant and algal growth is "unnatural," but they do not undermine the basic facts of what conditions were observed and measured.
As for the dissolved oxygen levels, the District again takes issue with the standard; in particular, suggesting that there is "violation" unless a condition has persisted for some unstated time period, rather than simply being observed in a given sample. But the WQS unambiguously provides a floor below which DO levels must not fall. There is nothing that suggests that it is permissible for DO levels to fall below those levels for any amount of time, and therefore the District's attempt to undermine the conclusion that violations occurred by pointing out that the conditions were not observed for any particular amount of time (it does not suggest any specific duration) is irrelevant. Whether those drops in DO levels are attributable to sewer overflows or ecological conditions or anything other than plant growth caused by the phosphorus in the WRPs' effluent is a question of causation. But the District has not adduced any evidence that disputes that at the times and places identified by Dr. Burkholder, the levels of the DO in the waters—for whatever reason—fell below the minimum levels set by the WQS. Accordingly, there is uncontested evidence that the waters were out of compliance with the WQS for dissolved oxygen in those instances.
To prove a violation of Special Condition 5, the plaintiffs must establish that the WRPs' effluent, "alone or in combination with any other source,"
The District contends that because no authoritative administrative interpretations of the plant/algal growth WQS exist, and the plaintiffs do not identify "a definitive measure for what constitutes
Under Illinois law, "[a]dministrative regulations are construed according to the same standards that govern the construction of statutes; accordingly, the best indicator of the agency's intent is found in the plain, ordinary and popularly understood meaning of the language of the regulation. Securus Technologies, Inc. v. Illinois Commerce Comm'n, 2014 IL App (1st) 131716, ¶ 33, 12 N.E.3d 634, 643 (2014).
The relevant narrative WQS provide that the applicable waters "shall be free from" either "
The plaintiffs, primarily supported by Dr. Burkholder, contend that "unnatural" growth is that which originates from human activities.
Because the plaintiff's interpretation of the narrative standard is consistent with the plain and ordinary meaning of "unnatural," and the defendant's effects-based interpretation lacks support in the text of the regulations, the plaintiffs' interpretation will be assumed for purposes of their motion. As will be seen, however, even accepting the plaintiffs' definition, they are not relieved of their burden to establish causation with respect to the "unnatural" growth, and defining unnatural growth by reference to human intervention does not simplify the plaintiffs' task when the waterways at issue are themselves largely the product of human intervention.
Assuming arguendo that the relevant WQS regulates all plant and algal growth that orginates from human activities, the plaintiffs' motion can be granted only if they have established conclusively (that is, to a point that no reasonable juror could disagree) that the phosphorus component from the District WRPs' effluent, "alone or in combination with other sources," caused the water conditions identified by the plaintiffs.
The plaintiffs contend that just the very small universe of undisputed facts requires summary judgment in their favor. Those facts are: "(1) MWRD puts large amounts of phosphorus into the CAWS, (2) MRWD's phosphorus is consumed by plants and algae living in the CAWS, and (3) levels of phosphorus in the CAWS are so high that phosphorus no longer limits the growth of plants and algae." Reply, Dkt. # 135 at 9.
The District, on the other hand, contends that the plaintiffs' correlation of phosphorus levels and algal growth fail to establish causation. As to the narrative plant and algal growth WQS, the District argues:
Mem., Dkt. # 131 at 6-7. In short, the District argues, based on the testimony of Dr. Royer, that any causal link between excess plant and algal growth and the phosphorus in the WRPs' effluent is "speculative" because growth fluctuates for many other reasons and because any particular instance of plant and algal growth cannot be linked reliably to phosphorus levels in the water.
The Court agrees that the plaintiffs have failed to establish that a reasonable jury would have to conclude that the observed conditions are violations of the unnatural-growth standard caused by the phosphorus in the effluent from District's WRPs. Despite the apparent detail of their expert submissions, the plaintiffs have not sufficiently explained the connection between the WRPs' effluent and the observed conditions in the waters to preclude any reasonable alternative explanation, as they must do to merit summary judgment. See D.Z. v. Buell, 796 F.3d 749, 756 (7th Cir. 2015) (explaining that the district court's role on summary judgment "`is not to sift through the evidence, pondering the nuances and inconsistencies, and decide whom to believe,'" and that district court need not "sift through hundreds of pages of expert testimony" where citations to expert's report and deposition were "without any specificity or discussion"). Although the plaintiffs persuasively argue that more phosphorus can produce more plant and algal growth as a general matter, they have not established that any identified condition is specifically attributable to the WRPs' effluent.
That is due in part to the absence of a definitive baseline of what is "natural" within the CAWS; the plaintiffs have not established that the conditions they document constitute "unnatural" growth under their own standard. The plaintiffs do not contest that phosphorus is a naturally occurring element and would be present in the waters absent the effluent from the WRPs, but contend that "natural" levels of phosphorus are far below those found in the CAWS. But Dr. Burkholder's efforts to establish a baseline "natural" level of phosphorus by reference to otherwise natural bodies of water, Report, Pl. Ex. 42, at 10-11, is, in Dr. Royer's view, inapt because the CAWS is anything but a natural body of water. Considering that significant portions of the CAWS were constructed as a sewer to carry Chicagoland's wastewater away from Lake Michigan, and that even the system's "natural" components have been re-engineered so fundamentally that they operate, literally, in a manner that is 180 degrees opposite of what nature devised originally, it is particularly uncertain what amount of algal growth in the CAWS could ever be considered "natural"—that is, growth that is not influenced by human intervention. Dr. Royer makes the same point more broadly with respect to the entire upper Illinois River basin:
Def. Ex. 1, Royer Report at 3-4, Dkt. # ,133-1.
Though it is their burden as the summary judgment movant to do so, the plaintiffs do not provide a convincing answer to the question: What is unnatural growth in such an unnatural system?
The plaintiffs also fail to answer the question of
This omission is telling. If the permitted amount of phosphorus is not zero, then to meet their burden on causation the plaintiffs must articulate what level of phosphorus input from the effluent promotes unnatural growth in the receiving waters "alone or in combination with other sources." Otherwise, they cannot establish that the District's effluent exceeded that level. It is here that the District's criticism of the plaintiffs' definition of "unnatural" resonates—the plaintiffs cannot prove liability until they can say what action by the District constitutes the violation. See NRDC v. U.S. EPA, 808 F.3d 556, 578 (2d Cir. 2015) (striking down narrative standard that was insufficient to give guidance as to what is expected or to allow regulators to determine whether the standard was violated).
This hole in the plaintiffs' evidence has ramifications not only for the question of the District's liability, but also for the relief sought by the plaintiffs. The principal remedy requested by the plaintiffs is an injunction against further violations of the CWA. See Compl. 10, Dkt. # 1. But an injunction would, consistent with Rule 65(d)(1), have to do more than tell the District to stop violating the CWA; it would have to "describe in reasonable detail . . . the act or acts restrained or required." See, e.g., E.E.O.C. v. AutoZone, Inc., 707 F.3d 824, 841-42 (7th Cir. 2013) (noting some of the problems with an "obey-the-law" injunction, including overbreadth and failing to state specifically the acts restrained as required by Rule 65(d)(1)); City of New York v. Mickalis Pawn Shop, LLC, 645 F.3d 114, 144 (2d Cir. 2011) ("an injunction must be more specific than a simple command that the defendant obey the law"). In other words, the Court would be required to tell the District to stop discharging phosphorous at levels that cause unnatural algal growth—without any idea about what those levels are.
It is not the Court's task to wade into these murky waters to assign a permissible level of phosphorus above which the District is liable for violating the unnatural-growth standard. As the movants, the plaintiffs have the burden of establishing that it was the District WRPs' effluent that caused the conditions that they claim violate the WQS. The District is liable only for the growth that is unnatural, and so far the plaintiffs have not demonstrated how much, if any, plant and algal growth in the CAWS can identified as "unnatural" nor how much man-made phosphorus causes it. They therefore cannot prevail on summary judgment as to the alleged violations of the unnatural-growth WQS standards.
The plaintiffs also fall short of establishing causation with respect to the violations of the numeric DO standards. At a minimum, the District has raised a genuine issue of material fact regarding the cause of the observed concentrations of DO in the subject waters.
As to the dissolved oxygen WQS, the District disputes causation as follows:
Mem., Dkt. # 131 at 8. In sum, the District contends that the plaintiffs fail to establish that the low dissolved oxygen levels observed by Dr. Burkholder were caused by the WRPs' effluent because low dissolved oxygen levels occur even without abundant phosphorus and because the plaintiffs fail to account for the oxygen used up in biological processes that occur independent of phosphorus concentrations.
The plaintiffs can cite only their own experts' disagreements with Dr. Royer to support a contrary conclusion. But they have not established that Dr. Royer's reports are "substantially incomplete or inaccurate" such that they can be effectively disregarded. See NutraSweet Co., 227 F.3d at 785. It is therefore the province of the jury to weigh the experts' opinions about what causes the depressed DO levels in the CAWS.
Moreover, the causation question with respect to DO is more complicated than simply whether the phosphorus in the effluent depresses DO levels. The plaintiffs' theory is that the phosphorus feeds overgrowth of plants and algae which in turn depresses the levels of DO in the water. The plaintiffs therefore must establish both that the WRPs' effluent caused plant and algal growth and that the growth is in turn what caused the DO levels. On this subject, the plaintiffs rely on Dr. Burkholder's expert opinion that "the phosphorus-rich, partially treated sewage effluents from [the District's] three largest [water reclamation plants] are causing or contributing to unnatural algal and plant growth in the CAWS, the Lower Des Plaines River from the CSSC to the I-55 Bridge, the LDPR from the I-55 bridge to the Illinois River, and the Illinois River down to the Peoria pool. The unnatural algal and plant growth is contributing, in turn, to violations of the Illinois Pollution Control Board (IPCB) DO standards for these waters." The Court has already concluded that the plaintiffs have not established the former, so the latter premise, on which it depends, must also fail at this stage.
Because the plaintiffs fail to establish as a matter of law that the phosphorus content of the WRPs' effluent caused violations of the unnatural-growth and DO water quality standards, they have not proved any violation of Special Condition 5 of the NPDES permits and the Clean Water Act. Therefore, their motion for partial summary judgment on liability cannot be granted.
The defendant's and the plaintiffs' motions for summary judgment are both denied.
An NPDES permit is required to discharge any pollutant, that is to add "any pollutant to navigable waters from any point source." 33 U.S.C. § 1342(a)(1). "Discharge of a pollutant," in turn, is defined as "any addition of any pollutant to navigable waters from any point source." 33 U.S.C. § 1362(12)(A); Froebel, 217 F.3d at 937. Given that the term "source" appears in the Districts' NPDES permit, the most natural reading of the term is that it refers to "point sources," not to every natural or manmade source from which phosphorus (or whatever pollutant) might originate.