KURT D. ENGELHARDT, District Judge.
Before the Court is plaintiff's Motion to Remand
Plaintiff Walter Ross suffers from pseudomesotheliomatous adenocarcinoma, which he alleges was caused by his occupational exposure to asbestos in his work as an insulator. Rec. Doc. 1-1. He brought suit in the Civil District Court, Parish of Orleans, against several defendants, including alleged manufacturers and suppliers of asbestos products, as well as his former employers. Id. One of the employer defendants, Rust Engineering & Construction, Inc. ("Rust"), filed a notice of removal in this Court, seeking to remove pursuant to the Federal Officer Removal Statute, 28 U.S.C. § 1442(a). Rec. Doc. 1. The plaintiff has moved to remand. Rec. Doc. 8.
The purpose of the federal officer removal statute has always been "to provide a federal forum for officers whose duties under federal law conflict with state law." Ruppel v. CBS Corp., 701 F.3d 1176, 1180 (7
28 U.S.C. § 1442(a)(1). "Unlike the general removal statute, which must be `strictly construed in favor of remand,' the federal officer removal provision's broad language must be liberally interpreted." St. Bernard Port, Harbor & Terminal Dist. v. Violet Dock Port, Inc., 809 F.Supp.2d 524 (2011) (internal citation omitted). "Also unlike the general removal provision, there is no requirement in the federal officer removal provision that the district court have original jurisdiction over the plaintiff's claim." Id.; see Willingham, 395 U.S. at 406. It is the federal officer removal statute itself that creates the federal jurisdiction. Ruppel, 701 F.3d at 1180.
It is the defendant who bears the burden of establishing this basis for federal jurisdiction. Winters v. Diamond Shamrock Chemical Co., 149 F.3d 387, 397 (5th Cir. 1998), cert. denied, 526 U.S. 1034 (1999). Where the defendant invoking section 1442(a) is a government contractor, the Fifth Circuit has adopted a three-part test for determining whether such contractor qualifies as a "person acting under [a federal] officer" who is sued for an "act under color of such office." 28 U.S.C. § 1442(a). The contractor must prove that: (1) it is a "person" within the meaning of the statute; (2) it "acted pursuant to a federal officer's directions and that a causal nexus exists between the defendant's actions under color of federal office and the plaintiff's claims;" and (3) it has asserted a "colorable federal defense." Winters, 149 F.3d at 398-400.
There is no argument with respect to the first factor. Rust is a corporate entity, which qualifies as a "person" within the meaning of the statute. See Winters, 149 F.3d at 398.
"The second factor necessary for § 1442 removal is a finding that the defendants acted pursuant to a federal officer's directions and that a causal nexus exists between the defendants' actions under color of federal office and the plaintiff's claims." Winters, 149 F.3d at 398. As the Fifth Circuit and Supreme Court have admonished, this "`color of federal office' requirement is neither `limited' nor `narrow,' but should be afforded a broad reading so as not to frustrate the statute's underlying rationale." Id. "On the other hand, the [Supreme] Court has clarified that the right to removal is not unbounded, and only arises when `a federal interest in the matter' exists." Id. (quoting Willingham, 395 U.S. at 406).
The plaintiff alleges that from 1963 to 1975, he worked for Rust at the NASA Michoud Assembly Facility in New Orleans. Rec. Doc. 1-1 at ¶ 31. He alleges that he was exposed to asbestos from installing and removing heat insulation, boiler insulation, insulation pads, boiler lagging, boiler jackets, and other asbestos insulation on the boilers, turbines, and piping systems. Id. at ¶¶ 34-35. He alleges that until the early 1970s, he was not told of the hazards associated with asbestos or told that he should wear protective equipment and clothing. Id. at ¶ 36.
Rust asserts that it is entitled to federal officer removal because it performed its maintenance and repair work at the Michoud facility pursuant to a contract with the National Aeronautics and Space Administration ("NASA"), dated December 29, 1961 (Rec. Doc. 32-1). It contends that its use of any asbestos materials was done in accordance with the contract and "under the direction of NASA." Rec. Doc. 32 at 4. However, Rust fails to point a single instance, either in the contract itself or otherwise, where NASA required or directed the use of asbestos or asbestos-containing materials in connection with Rust's work on heat insulation, boiler insulation, insulation pads, boiler lagging, boiler jackets, and/or other asbestos insulation on the boilers, turbines, and piping systems.
Unable to point to any NASA specification regarding asbestos, Rust asserts conclusorily that "NASA specifically controlled safety and all other aspects of Rust's work at Michoud." Rec. Doc. 32 at 8. Regarding safety, the contract required that Rust comply with specified general safety standards (e.g., ASA safety standards, National Fire Protection Association Handbook of Fire Protection) and take such additional measures as the Contracting Officer "may determine to be reasonably necessary." Rec. Doc. at 10 of 70. How these standards might relate to asbestos the Court can only guess, for Rust fails to demonstrate or even point out a single connection between any safety standard imposed by the contract and the claims herein. Nor has Rust offered evidence of a single instance in which the Contracting Officer imposed a safety measure that related to asbestos or effectively required the use of asbestos. Although the "color of office" requirement is construed broadly, it is the defendant's burden to demonstrate that it is met, and Rust has failed to make even a minimal showing.
Rust's oblique suggestion that NASA controlled "all other aspects" of Rust's work is belied by the contract itself, which gives Rust vast and broad responsibilities with only very general specifications as to how those duties are to be carried out. See, e.g., Rec. Doc. 37-1 at 3 of 3 ("The Contractor shall operate a supply service encompassing complete responsibility for the acquisition, custody, care, and safekeeping of supplies and materials required in support of Contractor's operations only. . . ."); Rec. Doc. 32-1 at 62-63 of 78 ("The Contractor shall perform the following plant maintenance, repair, and operations as set forth below: * * * 9. Install and/or maintain and repair insulation on hot and cold water lines, steam lines, air ducts. . ., hot water tanks, boilers, and other items requiring insulation."). Rust argues that despite being vested with "complete responsibility" for acquiring its own supplies, it remained subject to NASA supply regulations. Rec. Doc. 42 at 2; see Rec. Doc. 32-1 at 53 of 78 at ¶ A(1) and Rec. Doc. 37-1 at 3 of 3. However, Rust fails to demonstrate (or even argue) that any NASA supply regulation required the use of asbestos insulation.
Finally, Rust argues that the "color of office" requirement is met by virtue of the fact that Rust performed its contractual duties at a government-owned facility, rather than at a privatelyowned one. See Rec. Doc. 32 at 8. However, other than Lalonde, supra, Rust cites no authority for this proposition, and this Court can find none.
"The third and final factor necessary for removal pursuant to § 1442 is the assertion of a `colorable federal defense.'" Winters, 149 F.3d at 400 (quoting Willingham, 395 U.S. at 406-07). In this case, Rust has raised the government contractor defense. See Rec. Doc. 1 at 4. The test for immunity under this defense is met where: "(1) the United States approved reasonably precise specifications; (2) the equipment conformed to those specifications; and (3) the supplier warned the United States about the dangers in the use of the equipment that were known to the supplier but not to the United States." Winters, 149 F.3d at 400 (quoting Boyle v. United Techs. Corp., 487 U.S. 500, 512 (1988)). The defendant "need not prove the asserted defense, but need only articulate its `colorable' applicability to the plaintiff's claims." Id. Rust fails to do even this. Although Rust states in its notice of removal that its federal defense is the government contractor defense, it fails to make a single argument in either its notice or its memoranda to support this assertion. Nowhere does it analyze the requirements of this defense or state what facts in this case make out a colorable basis for application of the defense.
Therefore, Rust having failed to establish either the second or third factors necessary for federal contractors to remove pursuant to 28 U.S.C. § 1442(a)(1), the Court finds the removal to have been improper. Accordingly;