John C. Nivison, U.S. Magistrate Judge.
In this action, Plaintiff alleges Defendant breached an insurance contract by applying three separate deductibles, rather than a single deductible, to an insurance claim submitted as the result of mechanical difficulties with Plaintiff's heat and power plant.
The matter is before the Court on the parties' motions for summary judgment. (ECF Nos. 23, 25.) Following a review of the summary judgment record, and after consideration of the parties' arguments, the Court denies Plaintiff's motion and grants in part Defendant's motion.
Plaintiff filed its complaint in state court (State Court Docket Record, ECF No. 3-1; Complaint, ECF No. 3-4), and Defendant subsequently removed the case to federal court based on diversity of citizenship jurisdiction. (Notice of Removal, ECF No. 1.)
In connection with the anticipated motions for summary judgment, the parties filed a stipulated statement of material facts. (Stipulations of Fact, ECF No. 21, hereinafter SSMF). Plaintiff subsequently filed a motion for summary judgment, (ECF No. 23), and an accompanying statement of material facts. (ECF No. 21, hereinafter PSMF.) Defendant filed a motion for summary judgment on the same day.
Plaintiff owns and operates a wood pellet production facility in Athens, Maine. (SSMF ¶ 28.) For raw materials, Plaintiff purchases wood products from local woodlands and wood chips and sawdust from a network of sawmills. (Id. ¶ 30.) The facility processes the raw materials into wood pellets for both bulk and bagged fuel markets. Id.
The pellet production facility includes a heat and power plant. (Id. ¶ 28.) This cogeneration plant began operating in October 2016. (Id. ¶ 29.) During the wood pellet production process, certain raw materials, including tree bark and wood chips with excessive moisture content, known as biomass, are gathered and staged in a
The cogeneration plant includes traditional power plant components such as a boiler, heat exchanger, turbine and condenser. (Id. ¶ 32.) The system uses cyclopentane as the "working fluid" rather than water. Id. During operation, liquid cyclopentane is heated and converted to a vapor. Id. The vapor flows to a turbine producing mechanical energy in the form of turbine shaft rotation. Id. The turbine is connected to a generator which produces electricity that is sold to a third party. Id. After passing through the turbine, the vaporized cyclopentane eventually enters a condenser. Id. The condenser is a shell and tube heat exchanger with cooling water flowing through the tubes and vaporized cyclopentane flowing through the shell and around the tubes. Id. This process condenses the vaporized cyclopentane into a liquid, which is then returned to the beginning of the cycle. Id.
The water side of the condenser is divided into two sections. (Id. ¶ 34.) One section contains the entry points for the cooling water to enter the tubes, and the other section contains the exit points where the now heated cooling water exits the tubes. Id. The condenser contains 2,410 U-shaped tubes. (Id. ¶ 35.) Each condenser tube extends from the support plate into the cyclopentane-filled shell, makes a U-bend, and passes back through the support plate. (Id. ¶ 34.)
Beginning on December 20, 2016, the cogeneration plant experienced reduced energy efficiency, and required more biomass to achieve its expected energy output. (Id. ¶ 36.) On January 8, 2017, Plaintiff identified water entry and damage to the purge pump motor and instituted periodic shutdowns to remove water. (Id. ¶ 37.)
During the shutdowns, which occurred every 2-3 days, an average of 5-12 gallons of water were removed from the cyclopentane side of the condenser. (ECF No. 21-5 ¶ 23). The process for removing water involved shutting down the plant and allowing the water to settle to the lowest part of the circuit, as water is heavier than the cyclopentane. (PSAMF ¶ 4.) The water is drained off the bottom, and when the presence of cyclopentane is detected floating on water and by smell, the process is stopped and repeated as necessary until little to no water is detected. Id. The plant would then resume operation. Id.
On January 17, 2017, excessive water, on this occasion hundreds of gallons, entered the system and Plaintiff shut down the cogeneration plant. (SSMF ¶¶ 38, 43; ECF No. 21-5 at 56-58.) On January 22, 2017, Plaintiff performed a bubble test to identify leaks. (SSMF ¶¶ 39, 40.) During a bubble test, soapy solution is applied to the tubes in the water side, and the cyclopentane side is pressurized so that gas will come through fractures or breaks in the tubes. (Id. ¶ 40.) A fracture or leak can be identified by the presence of bubbles where the soapy water is applied. Id. The bubble test revealed leaks from two fractured condenser tubes. (Id. ¶ 39.) Between January 22 and 25, 2017, the tubes were plugged and sealed. (Id. ¶ 41.) Plaintiff again ran a bubble test, which did not reveal any further leaks. (Id. ¶ 42.)
The cogeneration plant restarted on January 30, 2017, and between January 30 and March 9, 2017, Plaintiff's system was operational, with the exception of brief shutdowns to remove water. (Id. ¶ 43.) At first, the shutdowns occurred daily, typically lasting two to five hours, and Plaintiff removed approximately 5-12 gallons of water. (ECF No. 21-5 ¶ 32). The frequency of the water removals diminished in the weeks that followed, and on February 20,
On March 9, 2017, Plaintiff again shut down the cogeneration plant after discovering excessive water in the cyclopentane side of the condenser and in the feed loop. (SSMF ¶¶ 45, 49.) On March 10, 2017, a bubble test identified one broken tube. (Id. ¶ 46.) Plaintiff put a boroscope down the tube, which revealed that the tube was sheared off. (PSMF ¶ 3.) Between March 10 and March 12, 2017, the broken tube was plugged and sealed. (SSMF ¶ 47.) Plaintiff again ran a bubble test, which did not reveal any further leaks. (Id. ¶ 48.) During the January 17 and March 9 shutdowns, no one entered the cyclopentane side of the condenser because doing so required the removal of a 48-inch diameter custom elbow, a physical and logistical challenge. (Id. ¶ 50.) Before the second shutdown, the cause of the damaged tubes was unknown, but after this second shutdown, Plaintiff suspected the cause might have been vibration of the tubes in the cyclopentane side of the condenser. (PSMF ¶¶ 1-2, 4-5.)
The cogeneration plant began operating on March 12, 2017, and between March 12 and March 20, 2017, Plaintiff's system was operational, with the exception of brief shutdowns to remove water on a daily basis. (SSMF ¶ 51; ECF No. 21-5 ¶ 36.)
On March 20, 2017, Plaintiff again shut down the cogeneration plant for scheduled cleaning and passivation procedures and for inspection of the cyclopentane side of the condenser to further assess the cause of the January 17 and March 9 shutdowns. (SSMF ¶ 52.) The plugging of the damaged tubes during the previous two shutdowns prevented the tubes from leaking further, but did not fix the underlying cause of the problems. (PSMF ¶ 6.) Unlike during bubble tests, Plaintiff drained and purged the cyclopentane side and left the water side pressurized. (SSMF ¶ 53.) Plaintiff identified a tube with discoloration, which leaked when it was moved. Id. The damaged tube was plugged and sealed, and MWP installed modifications to the condenser, designed by the manufacturer, to reduce vibration of the tubes in the future, including banding groups of condenser tubes together and installing a baffle to deflect the high velocity cyclopentane vapor from making direct contact with the condenser tubes. (Id. ¶ 54; PSMF ¶ 13.) The water and cyclopentane sides were both pressure tested before reassembly. (SSMF ¶ 55.)
The cogeneration plant restarted on March 25, 2017. (Id. ¶ 56.) After the installation of the modifications, the short, periodic shutdowns to remove water have become unnecessary and a very small amount of water typically is removed once a year. (PSMF ¶ 16.)
Defendant issued Plaintiff an insurance policy for the May 3, 2016 to May 3, 2017 policy year. (Id. ¶ 1; ECF No. 21-1.) Defendant and Travelers entered into a reinsurance agreement effective February 1, 2015. (Id. ¶ 2.) Travelers first received notice of Plaintiff's claim from Defendant on February 8, 2017. (Id. ¶ 59.)
Initially, corrosion was assumed to be the cause of the shutdowns. (Id. ¶ 60.) The claim was complex and the cause in question. Id. On March 23, 2017, Travelers retained John Imperatore, M.S.E., P.E. of Engineering Design & Testing Corp. to determine the cause and extent of Plaintiff's loss. (Id. ¶ 65.) Mr. Imperatore determined that the manufacturer's initial conclusion that corrosion had caused the condenser problems was incorrect. (Id. ¶ 69.) Mr. Imperatore determined that all of the damaged condenser tubes were damaged by turbulence caused by the cyclopentane
Travelers' claims adjuster determined that three $100,000 deductibles applied to Plaintiff's losses because the tubes broke at three separate times and the unit operated between the events. (Id. ¶¶ 74-89). Defendant paid Plaintiff $159,711.53 after applying a $100,000 deductible for the January 17, 2017 covered loss. (Id. ¶ 90.) Defendant paid Plaintiff $67,413.62 after applying a $100,000 deductible for the March 9, 2017 covered loss. (Id. ¶ 91.) Although Defendant concluded that a covered loss occurred in the amount of $93,877.70 on March 20, 2017, Defendant did not pay Plaintiff for that loss because the damage did not exceed the $100,000 deductible. (Id. ¶ 92).
Plaintiff did not agree that three deductibles applied to its loss. (Id. ¶¶ 88-89). The total adjusted damage Defendants calculated was $521,002.85. (Id. ¶ 104.) The total amount Defendant paid Plaintiff on the three claims resulting from the shutdowns was $227,125.15. (Id. ¶ 105.) Had Defendant applied only one deductible, it would have paid Plaintiff an additional $193,877.70. (Id. ¶ 106.)
"The court shall grant summary judgment if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." Fed. R. Civ. P. 56(a). "After the moving party has presented evidence in support of its motion for summary judgment, the burden shifts to the nonmoving party, with respect to each issue on which he has the burden of proof, to demonstrate that a trier of fact reasonably could find in his favor.'" Woodward v. Emulex Corp., 714 F.3d 632, 637 (1st Cir. 2013) (quoting Hodgens v. Gen. Dynamics Corp., 144 F.3d 151, 158 (1st Cir. 1998)). "Cross-motions for summary judgment do not alter the basic Rule 56 standard, but rather simply require [a court] to determine whether either of the parties deserves judgment as a matter of law on facts that are not disputed." Adria Int'l Grp., Inc. v. Ferre Dev., Inc., 241 F.3d 103, 107 (1st Cir. 2001).
A court reviews the factual record in the light most favorable to the non-moving party, resolving evidentiary conflicts and drawing reasonable inferences in the non-movant's favor. Perry v. Roy, 782 F.3d 73, 77 (1st Cir. 2015). If a court's review of the record reveals evidence sufficient to support findings in favor of the non-moving party on one or more of his claims, a trial-worthy controversy exists and summary judgment must be denied as to any supported claim. Id. ("The district court's role is limited to assessing whether there exists evidence such that a reasonable jury could return a verdict for the nonmoving party." (internal quotation marks omitted)). Unsupported claims are properly dismissed. Celotex Corp. v. Catrett, 477 U.S. 317, 323-24, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986) ("One of the principal purposes of the summary judgment rule is to isolate and dispose of factually unsupported claims or defenses.").
On Plaintiff's breach of contract claim, the issue is whether Defendant satisfied its obligation under the insurance contract or whether it failed to do so by improperly calculating Plaintiff's deductible.
Under Maine law, the elements of breach of contract are "(1) breach of a
A few supplemental rules apply in the insurance context. "The meaning of language used in insurance contracts is a question of law." York Ins. Grp. of Maine v. Van Hall, 1997 ME 230, ¶ 8, 704 A.2d 366, 369. Ambiguous terms are generally construed in favor of the insured and against the insurer. Id. Courts are to "view the contract language from the perspective of an average person, untrained in either the law or the insurance field, in light of what a more than casual reading of the policy would reveal to an ordinarily intelligent insured." Peerless Ins. Co. v. Wood, 685 A.2d 1173, 1174 (Me. 1996). The insured bears the initial burden of showing that coverage for the injury exists, then the insurer bears the burden of showing that there is an exclusion from coverage, and the insured then bears the burden of showing there is an exception to an exclusion. Middlesex Mut. Assur. Co. v. Fish, 738 F.Supp.2d 124, 132 (D. Me. 2010).
Plaintiff's commercial property insurance policy states that Defendant "will pay for direct physical loss of or damage to Covered Property ... caused by or resulting from any Covered Cause of Loss." (ECF No. 21-1 at 16). The Policy also provides that Defendant "will pay for the actual loss of Business Income ... sustain[ed] due to the necessary `suspension' of ... `operations' during the `period of restoration.'" (Id. at 31.) "Covered Cause of Loss" means "Risks of Direct Physical Loss" unless covered by an exclusion or limitation in other sections of the policy. (Id. at 42.) Under exclusions to coverage, the policy states that Defendant "will not pay for loss or damage caused by or resulting from" a series of listed exclusions, including "faulty, inadequate or defective... design" and "[m]echanical breakdown." (Id. at 43-45.)
Plaintiff also purchased additional coverage for equipment breakdowns. The equipment breakdown coverage modified some of the exclusions in the base policy, including the exclusion related to mechanical breakdowns. The equipment breakdown coverage provided: "But if an excluded cause of loss ... results in an `accident,' we will pay for the loss, damage or expense caused by that `accident.'" (Id. at 85.) In the equipment breakdown coverage, "accident" is defined as follows:
Id. at 83.
The equipment breakdown coverage also specified that Defendant "will not pay for loss, damage or expense resulting from any `one accident' until the amount of loss, damage or expense exceeds the applicable Deductible...." (Id. at 87.) The term "one accident" means that "[i]f an initial `accident' causes other `accidents,' all will be considered `one accident.' All `accidents' that are the result of the same event will be considered `one accident.'" (Id. at 86.)
The parties do not dispute that based on the coverage exclusions for design defects and mechanical breakdowns, the plant shutdowns of early 2017 are not covered under the base policy. The equipment breakdown coverage applies, subject to the applicable deductible.
Not infrequently, insurers and insureds have disagreed over the number of "accidents" or "occurrences" when insurance claims have been adjusted. Courts and scholars have noted that the parties' respective positions often depend on the amount of the applicable deductible and the policy limits as compared to the claimed losses:
Scott M. Seaman and Jason R. Schulze, Allocation of Losses in Complex Insurance Coverage Claims § 7:1 (2018).
Plaintiff argues that when interpreting the meaning of undefined or broadly defined words like "accident" or "occurrence," "[t]he majority of courts look to the cause or causes of damage rather than to each individual claimant's injury or the number of claims to determine whether there is one occurrence or multiple occurrences under a contract." Id. § 7:2. "Using this analysis, the court asks if there was but one proximate, uninterrupted, and continuing cause which resulted in all of the injuries and damage." Appalachian Ins. Co. v. Liberty Mut. Ins. Co., 676 F.2d 56, 61 (3d Cir. 1982) (internal quotations and modifications omitted). "A minority of courts look to the `effects' of a claim in determining the number of occurrences." Allocation of Losses in Complex Insurance Coverage Claims § 7:2. "The effect theory suggests that the wording `each accident' `must be construed from the point of view of the person whose property was injured.'" SECURA Ins. v. Lyme St. Croix Forest Co., LLC, 384 Wis.2d 282, 918 N.W.2d 885, 890 (2018) (quoting Anchor Casualty Co. v. McCaleb, 178 F.2d 322, 324 (5th Cir. 1949)). Using this analysis, some courts treat each injury or claimed damage as a separate occurrence even when each injury was caused by the same conduct of the same wrongdoer. See Exxon Corp. v. St. Paul Fire & Marine Ins. Co., 129 F.3d 781, 788 (5th Cir. 1997) (discussing Louisiana law); Steven Pitt et al., 12 Couch on Ins. § 172:13 ("By this view, it has been held that if one cause operates on several individuals at one time, it is not one accident—rather, the injury to each individual is a separate accident").
The characterization of the competing tests results from one court's use of "cause" as shorthand for the conduct of a wrongdoer and the word "effects" as shorthand for the damage to each victim—terms that apply in the liability context, but do not necessarily apply in other insurance contexts. Saint Paul-Mercury Indem. Co. v. Rutland, 225 F.2d 689, 692 (5th Cir. 1955). In Rutland, the Fifth Circuit considered a liability contract with one tortfeasor and multiple individuals suffering losses. Id. The Court found "it clear that the word `accident' as used in the disputed phrase was intended to be construed from the point of view of the cause rather than the effect." Id. The Court's use of the phrase "point of view," suggests that "cause" and "effect" referred to actors—the responsible party and complaining parties.
The cause theory originated in the liability insurance context, and the vast majority of cases applying the cause theory of interpretation did so in that context. See e.g., Matty, 690 S.E.2d at 619 ("For the foregoing reasons, we adopt the cause theory for use in liability insurance cases in Georgia"); Aldridge Elec., Inc. v. Fid. & Deposit Co. of Maryland, No. 04 C 4021, 2008 WL 4287639, at *5 (N.D. Ill. Sept. 10, 2008) (Noting that Illinois applies the cause test to standardized liability policies but looking to other sources because "Illinois law has not yet defined `occurrence' in the context of employee dishonesty in a fidelity insurance case"). Indeed, some "[c]ourts have noted that the cause theory is founded in the purpose of liability coverage." Just v. Farmers Auto. Ins. Ass'n, 877 N.W.2d 467, 474 (Iowa 2016); see also Truck Ins. Exch. v. Rohde, 49 Wn.2d 465, 303 P.2d 659, 662 (1956) (adopting the cause approach because "[p]roximate cause is an integral part of any interpretation of
While a few courts have applied the cause theory when interpreting coverage in property loss policies, the cases typically involved wrongful conduct that arguably resembles a liability claim. See EOTT Energy Corp. v. Storebrand Internat. Ins. Co., 45 Cal.App.4th 565, 52 Cal.Rptr.2d 894, 901 (1996) (series of thefts was a single occurrence). Some courts have noted that transferring causation concepts from one context to another can be unreliable because "[c]ause is a slippery concept with various meanings in various contexts." Wright, 322 P.3d at 484; see also Garvey v. State Farm Fire & Cas. Co., 48 Cal.3d 395, 257 Cal.Rptr. 292, 770 P.2d 704, 705 (1989) (admonishing against utilizing causation tests from liability insurance cases in other insurance contexts).
Plaintiff contends that all the shutdowns had the same cause (i.e., high-velocity cyclopentane vapor vibrating the tubes) and, therefore, Plaintiff's losses are the result of one accident under the policy. At one level, Plaintiff's contention has some appeal. The cracks in the tubes were caused by the same phenomenon (i.e., the high-velocity cyclopentane vapor vibrating the tubes). When the cause is examined in the broad sense urged by Plaintiff, however, the cause is arguably a design defect, which would not be covered. If a series of shutdowns over the course of several months constitutes a single prolonged accident, the contractual exclusion for design defects would essentially be meaningless in this context. Contracts, however, are to be read as a whole and courts should "avoid any interpretation that renders a provision meaningless." Richardson, 2009 ME 109, ¶ 9, 983 A.2d 400 (internal citation omitted).
While the cause theory might be useful when interpreting "accident" and "occurrence" in a liability policy, the approach is not particularly helpful in a property loss policy. Standard liability policies, from which the cause test derives, ordinarily do not specifically define "accident" and usually define an "occurrence" broadly as including "continuous or repeated exposure to substantially the same general harmful conditions." See e.g., Donegal Mut. Ins. Co. v. Baumhammers, 595 Pa. 147, 153, 938 A.2d 286 (2007) (internal modification omitted). In this equipment breakdown policy, the term "accident" is more narrowly defined. In the relevant provision of this contract, "accident" means a "fortuitous event," and that "event," in this case, "must be" a "mechanical breakdown" to be covered. The question is whether three mechanical breakdowns or a single prolonged mechanical breakdown occurred.
The policy excludes all damages caused by design defects, but the equipment breakdown provision covers mechanical breakdowns, even when caused by a design defect. In other words, the mechanical breakdown coverage is a limited exception to the design defect exclusion. A breakdown, not a design defect, triggers coverage and the corresponding deductible. To determine the number of deductibles that apply under a specified peril policy, the focus should remain on the specified peril—the mechanical breakdown—not the design
"Mechanical breakdown" is not specifically defined in the contract. The cogeneration plant is a machine, and "breakdown" in this context can fairly be defined as "a failure to function," Breakdown, Merriam-Webster, www.merriam-webster.com/dictionary/breakdown, or "stops working." Breakdown, Macmillan Dictionary, www.macmillandictionary.com/us/dictionary/american/breakdown; see also Soil Remediation of Philidelphia v. Eclipse Combustion, No. CIV. A. 95-591, 1995 WL 590176, at *6 (E.D. Pa. Oct. 5, 1995) ("The noun `breakdown' is defined as `the action or result of breaking down as ... a failure to function"). This ordinary definition is consistent with other equipment breakdown insurance policies, which have defined "breakdown" as a "sudden and accidental direct physical loss to Covered Equipment, which manifests itself by physical damage, necessitating its repair or replacement." Cowiche Growers, Inc. v. Cont'l Cas. Co., 449 F. App'x 594, 595 (9th Cir. 2011). Under this basic definition, logic suggests that a "breakdown" ends once the component of the machine has been repaired or replaced, and the machine begins working or functioning again.
When considering whether one or many incidents occurred for purposes of liability coverage, including deductibles, many courts have considered the temporal and spatial separation or proximity of the incidents. See e.g., Nat'l Cas. Co. v. W. Express, 356 F.Supp.3d 1288, 1298 (W.D. Okla. 2018) ("In both of those cases, the time between injuries exceeded two days. Here, the impacts as well as their affiliated injuries and deaths were separated in certain cases by minutes"); SECURA, 918 N.W.2d at 890 ("If cause and result are so simultaneous or so closely linked in time and space as to be considered by the average person as one event, then only a single occurrence has taken place") (internal quotations omitted); Roman Catholic Diocese of Brooklyn v. Nat'l Union Fire Ins. Co. of Pittsburgh, Pa., 87 A.D.3d 1057, 1061, 930 N.Y.S.2d 215, 220 (2011) ("In this regard, courts `must analyze the temporal and spatial relationships between the incidents and the extent to which they were part of an undisrupted continuum to determine whether they can ... be viewed as a single unfortunate event—a single occurrence'") (quoting Appalachian Ins. Co. v. General Elec. Co., 8 N.Y.3d 162, 831 N.Y.S.2d 742, 863 N.E.2d 994 (2007)).
The temporal proximity or separation is relevant here. While terms like "occurrence" in other insurance contracts can reasonably refer to a broader scope of events, the word "breakdown" is ordinarily used with a far narrower temporal scope. A series of similar mechanical failures are ordinarily referred to as separate breakdowns, not a single breakdown. See e.g., Janke v. Brooks, No. 11-CV-00837-REB-BNB, 2012 WL 1229891, at *2 (D. Colo. Apr. 11, 2012) ("The car broke down several times in the first 25 miles, after which plaintiffs hired [a] mechanic ... to inspect and evaluate the build"); Nicklasson v. Roper, 491 F.3d 830, 832 (8th Cir. 2007) ("Their vehicle broke down a number of times along I-70" in a single day); McAlpine v. Dahl, 179 Mont. 23, 24, 585 P.2d 1307, 1308 (1978) ("The truck and trailer had four breakdowns" in a single day, "the final one occurring about 9:30 p.m.").
The record establishes that Plaintiff experienced multiple tube breakages that resulted
Plaintiff principally relies on the defined term "one accident." Under the equipment breakdown coverage, "[i]f an initial `accident' causes other `accidents,' all will be considered `one accident'" and "[a]ll `accidents' that are the result of the same event will be considered `one accident.'" An "accident" is defined as a "fortuitous event" which "must be" one of the five named perils, and the only named peril that applies to these facts is a "mechanical breakdown." In other words, it will constitute "one accident" "if an initial [named peril] causes other [named perils]" or if "all [named perils] are the result of the same event." Plaintiff argues that it experienced "one accident" because all tube breakages were caused by high-velocity cyclopentane vapor vibrating the tubes. "High-velocity cyclopentane vapor vibrating the tubes" describes an ongoing process; it describes the effects of a design defect that is excluded from coverage; it does not describe an "event."
To interpret the policy as urged by Plaintiff would essentially render the exclusion for design defects meaningless in this context and in any context in which a design defect caused multiple breakdowns. In other words, if the physical effects of an underlying defect constituted an "event" for purposes of defining "one accident" under the equipment breakdown coverage, coverage for all losses resulting from a design defect would be covered despite the exclusion. Instead, as Defendant argues, under these circumstances where only one of the five specified perils applies, the contract, including the definition of "accident" or "one accident" is logically construed to apply to multiple shutdowns only where the break in one tube caused other tubes to break.
The record lacks any evidence upon which a fact finder could reasonably conclude that the second tube fracture in March 2017 was caused by the tubes that fractured and were the cause of the shutdown in January 2017. The January shutdown and the March 9 shutdown, therefore, constitute two separate events/accidents/mechanical breakdowns.
The current record, however, generates a factual question as to whether the tube fracture discovered during the March 9 shutdown caused or contributed to the tube fracture discovered during the March 20 shutdown. Among thousands of tubes, the two fractures occurred on immediately adjacent tubes and in virtually identical locations, where those tubes connected to the last support plate before making their U-bends at the far end of the condenser. (Imperatore Report, ECF No. 21-5 at 40, Figure 13.) Not insignificantly, the March 9 tube fracture was a clean break, with part of the tube separating entirely from the remainder of the tube. (Imperatore
(Imperatore Report at 14-15 ¶ 42.)
The record evidence, including the expert evidence, thus presents the possibility that the fracture discovered on March 20 was damaged when part of the adjacent tube broke free or that the fracture occurred because the tube had additional room to vibrate once its neighboring tube broke free of the support bracket. The temporal relationship between the two fractures also suggests a possible connection between the fractures. If the March 20 fracture was caused in part by the March 9 breakage, the two fractures could be considered one accident under the policy. Because a factual issue exists as to whether the March 20 fracture was caused in some way by the March 9 breakage, the Court cannot determine on summary judgment whether the March shutdowns constitute one or two accidents and thus one or two mechanical breakdowns under the policy.
Maine's Unfair Claims Settlement Practices Act generally prohibits insurers from offering threats or knowing misrepresentations, failing to act within a reasonable time, or contesting the basis or amount of liability without a reasonable basis. 24-A M.R.S. § 2436-A; see generally Curtis v. Allstate Ins. Co., 787 A.2d 760, 766 (Me. 2002). Plaintiff has not produced any evidence that would constitute threats or knowing misrepresentations. Given the Court's conclusion that Defendant's interpretation of the policy is correct, the record lacks any evidence that Defendant acted unreasonably even if the March shutdowns are ultimately determined to constitute one mechanical breakdown.
Based on the foregoing analysis, the Court denies Plaintiff's Motion for Summary Judgment, (ECF No. 23), and grants Defendant's Motion for Summary Judgment in part. (ECF No. 25.) The Court grants Defendant's Motion for Summary Judgment as to the Unfair Claims Settlement Practices claim, grants Defendant's Motion for Summary Judgment to the extent Defendant contends at least two deductibles apply, and denies Defendant's Motion for Summary Judgment to the extent Defendant contends a third deductible applies.
SO ORDERED.