KLINE, P. J. —
Contra Costa County (the County) owns and operates a drainage system on Lettia Road in the Montalvin Manor residential subdivision (Montalvin Manor). This drainage system connects to a drainage channel on adjacent property owned by Pinole Point Properties, LLC (Pinole Point). When the drainage channel is functioning, its water flows into the San Pablo Bay (the Bay).
After experiencing storm-related flooding, homeowners on Lettia Road sued the County; the County cross-complained against Pinole Point for, among other things, nuisance and negligence. The County alleged that Pinole Point was responsible for the flooding by permitting the drainage channel to
The County and Pinole Point settled with the homeowners and their claims against each other proceeded to a bench trial. The court, applying the reasonableness test set forth in Keys v. Romley (1966) 64 Cal.2d 396 [50 Cal.Rptr. 273, 412 P.2d 529] (Keys) and Locklin v. City of Lafayette (1994) 7 Cal.4th 327 [27 Cal.Rptr.2d 613, 867 P.2d 724] (Locklin), found in favor of the County and against Pinole Point. The court determined that the drainage channel is a natural watercourse, that the County's conduct with respect to its property had been reasonable, and that Pinole Point's failure to maintain the drainage channel had been "entirely unreasonable" in light of its actual or constructive knowledge when purchasing the property of the existence of the drainage channel and the need to keep it clear of debris to prevent flooding to the adjacent homeowners. The court awarded damages to the County and ordered Pinole Point to clear and maintain the obstructed drainage channel.
On appeal, Pinole Point contends that it has no legal duty as the downstream property owner to maintain the drainage channel, especially since it did not create any diversion or obstruction to the flow of the water. Even if it had a duty, the County's conduct, according to Pinole Point, was unreasonable and therefore the County should be liable for all costs related to maintaining the drainage system.
As we explain, the trial court properly applied the reasonableness test and substantial evidence supported its findings. Accordingly, we affirm.
The superior court consolidated two lawsuits by homeowners seeking damages against the County for storm-related flooding of their homes on Lettia Road in Montalvin Manor that occurred on February 17, 2009. (Cardenas v. Contra Costa County (Super. Ct. Contra Costa County, 2013, No. MSC09-01011); Puckett v. Contra Costa County (Super. Ct. Contra Costa County, 2013, No. MSC10-00185).) The County answered and filed cross-complaints against Pinole Point, BNSF, and Union Pacific Railroad Company (Union Pacific) for indemnity and contribution, negligence, nuisance and trespass, and injunctive relief. Subsequently, the County dismissed Union
Pinole Point answered the County's cross-complaint and filed its own cross-complaint against the County, BNSF, and Union Pacific for indemnity, contribution, inverse condemnation, declaratory relief, and tortious diversion of surface waters. Subsequently, Union Pacific obtained a summary judgment against Pinole Point's cross-complaint.
The homeowners settled their lawsuit for $90,000. Under the settlement terms, the County and Pinole Point agreed to contribute $45,000; both agreed each could seek recovery from the other at trial. On the first day of trial, the County stipulated that sediment it had not removed from the storm drain proximately caused the flooding of the homes on February 17, 2009. The County conceded liability for the $45,000 Pinole Point paid to the homeowners. The matter proceeded to trial on the two cross-complaints.
The property that is the subject of this litigation is a 26-acre undeveloped parcel, including wetlands, in Richmond, California. (A copy of the map is attached as appen. A, post, at p. 943.) In 1979, Pinole Point acquired the low-lying parcel near the Bay from Bethlehem Steel Company (Bethlehem Steel) as part of a 500-acre block of land. Pinole Point sold off some of the larger parcels; it still owns a portion of this land, which the parties refer to as the "Remainder Parcel."
Prior to the 1890s, the Remainder Parcel existed in a natural state. The property received tidal flow intrusions from the Bay to the north. It also received storm water runoff from upland areas to the south.
In the 1890s, BNSF and Union Pacific, or their predecessors, constructed high berms and railroad tracks across the property (UP berm). The UP berm extends from west to east and lies adjacent to the northern limit of the Remainder Parcel. Before construction of the UP berm, storm waters reaching the Remainder Parcel flowed freely out to the Bay. The UP berm contains a single outlet that measures approximately 1.5 feet by 2.5 feet (UP culvert). The UP culvert extends through the UP berm near the eastern side of the Remainder Parcel.
Additionally, in the late 1800s, immediately upslope and adjacent to the southern limit of the Remainder Parcel, a second elevated earthen railroad
The UP and BNSF berms prevented the natural flow of drainage waters into the Bay. The BNSF berm trapped water to the south of the BNSF tracks on what would later become the Lettia Road area in Montalvin Manor. The UP berm trapped water between the tracks on the Remainder Parcel.
Aerial photographs of the Remainder Parcel taken in the late 1940s, prior to the construction of Montalvin Manor, revealed that the drainage pipes constructed by the railroads were not working very well. The 1947 aerial photograph confirmed that water was being trapped in the lowlands south of the BNSF tracks in the area that would become Lettia Road. Additionally, the Remainder Parcel between the two tracks had become a water detention basin that held water drained through the BNSF berm until it eventually drained into the Bay through the drainage pipe in the UP berm. The aerial photographs also indicated that there were no defined drainage channels at the easterly side of the Remainder Parcel between the 24-inch Pipe (upstream) and the UP culvert (downstream).
In the 1950s, Montalvin Manor was constructed. Pinole Point's civil engineering expert, Michael Milani, testified that the housing development built in the early 1950s significantly increased the volume of water, flow rate of water, and velocity of water discharged onto the Remainder Parcel.
The trial court found that the original drainage scheme of Montalvin Manor tied into the preexisting 24-inch Pipe installed on the eastern edge of the low portion of the Remainder Parcel. The court also found that by 1957 a drainage channel (the Drainage Channel) was constructed on the Remainder Parcel and it directly conveyed water from the 24-inch Pipe in the BNSF berm to the culvert in the UP berm. In the 1960s and 1970s, the Drainage Channel was 14 to 16 feet wide and six to eight feet deep. Storm waters from Montalvin Manor also discharged through a 36-inch concrete storm drain (36-inch Pipe) located west of the 24-inch Pipe. Water from the 36-inch Pipe did not empty into the Drainage Channel, but collected in a large marshy area to the west of the 36-inch Pipe.
The Drainage Channel was kept clear of vegetation and debris from the time of its construction until Pinole Point took title to the Remainder Parcel. Although no conclusive evidence showed who maintained the Drainage
At the time Pinole Point purchased the large piece of property from Bethlehem Steel in 1979, the Drainage Channel running across the Remainder Parcel was functional, open, and obvious. The trial court found that Pinole Point knew or should have known about the Drainage Channel and the intermittent maintenance it required to remain functional.
The County owned or controlled Lettia Road. In 1981, it approved a project to address flooding along Lettia Road in Montalvin Manor. The County installed a 54-inch diameter storm drain pipe (54-inch Pipe) on Lettia Road that extended northward a distance of approximately 190 feet from Lettia Road through the BNSF berm near the 24-inch Pipe to replace the existing 24-inch Pipe and 36-inch Pipe. The 54-inch Pipe was located at approximately the same location as the 24-inch Pipe, and discharged water into the Drainage Chanel. This project was approved over Pinole Point's objections, and construction was completed in 1982. The trial court determined that this construction did not increase the amount of water discharged onto the Remainder Parcel from Montalvin Manor but simply redirected some of the water already discharging onto the Remainder parcel from the 36-inch Pipe. The trial court found that the 54-inch Pipe might have increased the rate of silt deposits in the Drainage Channel due to the increase in runoff flow at that location, but the same amount of silt would have been deposited through the drainage facilities that were in place prior to 1982.
Pinole Point did not maintain the Drainage Channel and over time it became obstructed with large trees, bushes, debris, and sediment. In 1991, Gregory Marshal Connaughton, a supervising civil engineer with the County, sent a letter notifying Pinole Point that the Drainage Channel was "obstructed with silt and vegetation" and "as a result, water ponds in Montalvin Manor." He requested that it reexcavate the channel and warned that, without the appropriate action, Lettia Road would flood. He also wrote to Pinole Point on November 5, 2002, warning about the accumulation of sediment and vegetation. He again warned Pinole Point about the problems on January 21, 2003, January 30, 2003, and October 24, 2007.
Following the flooding on February 17, 2009, the County sent its maintenance crews to Lettia Road to prevent flooding whenever it anticipated a significant rainstorm. During rainstorms, the crews operated portable pumps to pump water from the 54-inch Pipe junction box to the drainage inlet of the
With the consent of all counsel, Judge Steven K. Austin independently inspected the site, which included his walking the entire length of the Drainage Channel, the area of the 54-inch Pipe, and Lettia Road.
At the end of the trial, the court found the Drainage Channel to be a "natural watercourse." It concluded that the County acted reasonably by attempting to persuade Pinole Point to maintain the Drainage Channel and in implementing temporary pumping programs during storms to prevent additional flood damage. In contrast, it concluded that Pinole Point had acted "entirely unreasonabl[y]" elaborating: Pinole Point "purchased property with a long-standing, functioning Drainage Channel. At the time, it knew or should have known that the Drainage Channel existed and that it had been maintained by the prior owner. It allowed the Drainage Channel to become clogged with debris, vegetation and sediment to the point that the Drainage Channel was no longer functional. It has steadfastly refused to take any action to maintain the Drainage Channel in any way. It has done so with the knowledge that its inaction has resulted in substantial damage to the County and to the homeowners along Lettia Road, and with the knowledge that its inaction will result in continued damage in the future." It ruled that Pinole Point was negligent in failing to maintain the Drainage Channel and liable in nuisance as its conduct damaged the County as the owner of Lettia Road and interfered with the free use and enjoyment of that property. It found that the flood damage was not the result of any type of physical invasion of surface waters from the Remainder Parcel and rejected the County's claim of trespass.
The trial court awarded the County $141,090.10 in damages for emergency flood protection efforts. The court also granted the County's request for an injunction. It determined that the blockages within the Drainage Channel caused the 54-inch Pipe not to function and made flooding on Lettia Road likely. The court ordered Pinole Point to clear its Drainage Channel of the obstructions and to provide temporary pumping services until it completed the required work. The court denied all of Pinole Point's causes of action on the cross-complaint except for its claim for indemnity.
Judgment was entered on April 25, 2013. Pinole Point filed a timely notice of appeal.
Pinole Point contends that it has no legal duty to maintain the Drainage Channel, and objects to the trial court's reasonableness rulings and determination that the Drainage Channel is a natural watercourse. Pinole Point contends it has no liability for negligence and nuisance and the court should have found the County liable for tort and inverse condemnation. It also maintains that the remedy of an injunction was improper. As explained below, we conclude that these contentions lack merit.
Our review presumes a judgment is correct. (Winograd v. American Broadcasting Co. (1998) 68 Cal.App.4th 624, 631-632 [80 Cal.Rptr.2d 378].) The appellant has the burden of demonstrating prejudicial error based on an adequate record and appropriate legal argument. (Code Civ. Proc., § 475; Pool v. City of Oakland (1986) 42 Cal.3d 1051, 1069 [232 Cal.Rptr. 528, 728 P.2d 1163].)
We review de novo all questions of law, such as the trial court's decision to apply the reasonableness test. (See, e.g., Biron v. City of Redding (2014) 225 Cal.App.4th 1264, 1272 [170 Cal.Rptr.3d 848]; Gutierrez v. County of San Bernardino (2011) 198 Cal.App.4th 831, 844 [130 Cal.Rptr.3d 482].) The issue of reasonableness is a factual question (Keys, supra, 64 Cal.2d at p. 410), which we review to determine whether substantial evidence supports it (Gutierrez, at p. 844). In examining the sufficiency of the evidence, "we view the evidence and draw all reasonable inferences therefrom in support of the judgment. [Citation.] Credibility of witnesses and weight of the evidence are matters for the trier of fact. [Citation.] We do not substitute our views for those of the trial court. [Citation.]" (Biren v. Equality Emergency Medical Group, Inc. (2002) 102 Cal.App.4th 125, 143 [125 Cal.Rptr.2d 325].)
"The grant or denial of a permanent injunction rests within the trial court's sound discretion and will not be disturbed on appeal absent a showing of a clear abuse of discretion. [Citation.] The exercise of discretion must be supported by the evidence and, `to the extent the trial court had to review the evidence to resolve disputed factual issues, and draw inferences from the presented facts, [we] review such factual findings under a substantial evidence standard.' [Citation.]" (Horsford v. Board of Trustees of California State University (2005) 132 Cal.App.4th 359, 390 [33 Cal.Rptr.3d 644].) A trial court's discretionary "ruling `will be sustained on review unless it falls outside the bounds of reason.' [Citation.] We could therefore disagree with the trial court's conclusion, but if the trial court's conclusion was a reasonable exercise of its discretion, we are not free to substitute our discretion for
Historically, under the "natural watercourse rule," upstream property owners had "immunity for any damage to downstream riparian property caused by discharge of surface water runoff into a natural watercourse." (Locklin, supra, 7 Cal.4th at pp. 344, 345-346.) This immunity extended to public entities. (Archer v. City of Los Angeles (1941) 19 Cal.2d 19 [119 P.2d 1], overruled on another issue as stated in Locklin, at p. 337.)
The Keys court set forth the rules for determining liability under the reasonableness test: "If the weight is on the side of" the person "who alters the natural watercourse, then" that person "has acted reasonably and without liability; if the harm to the lower landowner is unreasonably severe, then the economic costs incident to the expulsion of surface waters must be borne by the upper owner whose development caused the damage. If the facts should indicate both parties conducted themselves reasonably, then courts are bound by our well-settled civil law rule" (Keys, supra, 64 Cal.2d at pp. 409-410) and "the lower owner wins" (Burrows v. State of California (1968) 260 Cal.App.2d 29, 33 [66 Cal.Rptr. 868]).
In the context of inverse condemnation, Locklin holds that a public entity may be liable "for downstream damage caused by an increased volume or velocity of surface waters discharged into a natural watercourse from public works or improvements on publicly owned land. It will be liable if it fails to use reasonably available, less injurious alternatives, or if it has incorporated the watercourse into a public drainage system or otherwise converted the watercourse itself into a public work." (Locklin, supra, 7 Cal.4th at pp. 337-338.) Such "liability exists only if the agency acts unreasonably, with reasonableness determined by balancing the public benefit and private damage in each case." (Id. at p. 368.) "The reasonableness of the public agency's conduct must be determined on the facts of each case, taking into consideration the public benefit and the private damages in each instance." (Id. at p. 367.) The departure from a strict liability standard was based on public policy: "[B]ecause strict liability would discourage construction of needed public improvements which affect surface water drainage, liability exists only if the agency acts unreasonably, with reasonableness determined by balancing the public benefit and private damage in each case." (Id. at p. 368; see Bunch v. Coachella Valley Water Dist. (1997) 15 Cal.4th 432, 436 [63 Cal.Rptr.2d 89, 935 P.2d 796].)
Pinole Point contends that the County is liable, even if the County acted reasonably, because the Drainage Channel is not a watercourse. Pinole Point's argument is not entirely clear but, after Locklin, there is no valid reason for distinguishing between surface waters and those that flow through a natural watercourse when determining the obligations of landowners. (See Locklin, supra, 7 Cal.4th at p. 352.) The court in Locklin held that the rule of reasonableness applies to cases involving the discharge of surface waters whether the water is discharged onto the land of an adjoining owner or into a natural watercourse. (Id. at p. 357; see Biron v. City of Redding, supra, 225 Cal.App.4th at p. 1274.)
Pinole Point stresses the trial court's finding that aerial photographs showed "the absence of any defined drainage channel" prior to the construction of Montalvin Manor in the 1950s. Pinole Point argues that the Drainage Channel was built in 1957 as a mitigation effort to handle the increased
The fact that the Drainage Channel did not exist in 1953 is not significant. In San Gabriel, for example, the court explained that the channel at issue "did not exist as a definite watercourse, at least as far as the plaintiff's land, before the region was settled up, but was created as the result of settlement. Nevertheless it is natural in the sense that it was originally made by the waters themselves[,] and not by man, although it is possible that except for the acts of man the waters would not have been kept together so as to make a channel. In any event, it has now existed for such a length of time as the channel for the natural drainage of the watershed tributary to it, that the manner of its creation is not material, and it has all the attributes of a water channel wholly natural in origin." (San Gabriel, supra, 182 Cal. at p. 397; see Larrabee v. Cloverdale (1900) 131 Cal. 96, 98-100 [63 P. 143].)
The trial court assessed the evidence using the correct definition of watercourse. It found that people constructed the Drainage Channel no later than 1957 and it has been in its present form for more than 50 years. Witnesses testified that from 1958 until 1979 the Drainage Channel featured a bed and banks. The court stated that the "only reason that the lower portions of the Remainder Parcel are not underwater in the winter months due to runoff from the hills above and frequently subject to tidal surges throughout the year from the Bay is the presence of the railroad berms[,] which effectively create a levee system protecting the Remainder Parcel. Without the berms, surface waters from upper landowners would naturally flow to the Bay across the Remainder Parcel and tidal flows from the Bay would flow in the opposite direction across the property. The Drainage Channel simply serves to facilitate that same flow given the unnatural berms that prevent that natural flow from occurring." This evidence supports the finding that the Drainage Channel is a natural watercourse.
Pinole Point asserts that it, as the downstream property owner, has no legal duty to take affirmative action to remove the sediment or to maintain the Drainage Channel, especially since the sediment buildup that is causing the
The County responds that Pinole Point ignores the long-standing rule under Civil Code section 1714, subdivision (a), that a person is liable for injuries caused "by his or her want of ordinary care or skill in the management of his or her property ...." (See, e.g., Sprecher v. Adamson Companies (1981) 30 Cal.3d 358, 362 [178 Cal.Rptr. 783, 636 P.2d 1121] [possessor of land not immune from liability for harm caused by a natural condition of the land and liability based on duty of reasonable care enunciated in Civ. Code, § 1714]; Ektelon v. City of San Diego (1988) 200 Cal.App.3d 804, 810 [246 Cal.Rptr. 483] [upstream landowner has no absolute right to protect land from floodwaters by constructing structures that increase downstream flow of water into natural watercourse, and court applied ordinary principles of negligence]; Linvill v. Perello (1987) 189 Cal.App.3d 195, 199 [234 Cal.Rptr. 392] [property owner must act reasonably in building barriers to protect his or her property from floodwater damage].)
Pinole Point answers that Civil Code section 1714, subdivision (a), and the cases applying traditional notions of negligence to landowners are not applicable to water law cases.
We need not settle the question whether Civil Code section 1714, subdivision (a), and the cases on the general rights and liabilities of landowners are applicable to this water law case
Martinson, supra, 199 Cal.App.3d 318, like this case, involved the failure to keep a natural watercourse free of debris. The lower owner in Martinson blocked a natural watercourse with debris, which backed water up onto the upper land. The court applied the rule of reasonableness and concluded: "[T]he upper owner has the right to discharge reasonable and noninjurious amounts of irrigation water through natural areas of flow onto the lower owner's property. The lower owner has a co-equal burden to receive reasonable and noninjurious amounts of irrigation water through natural flowage channels." (Id. at p. 328; see Weaver v. Bishop (1988) 206 Cal.App.3d 1351, 1358 [254 Cal.Rptr. 425] [rejected claim that strict liability applied and affirmed both the trial court's application of the reasonableness rule and its findings that defendants' conduct of altering the flow of the creek by placing boulders on the creek's banks was reasonable as this action was necessary to prevent the washing away of defendants' property].)
Pinole Point argues that it is relieved of any duty to protect adjoining landowners from flooding because it did not create any barrier or take any other affirmative act to "alter the natural flow of water onto the land of another ...." (Gdowski, supra, 84 Cal.App.4th at p. 1405.) It points out that the cases cited by the County involved the defendants taking some action to divert or obstruct the drainage. (E.g., Martinson, supra, 199 Cal.App.3d 318 [defendant constructed a berm].) Pinole Point maintains that it had no duty to volunteer to maintain the Drainage Channel simply because its predecessor had done that and it had no obligation to accommodate the drainage needs of Montalvin Manor. It claims that the Good Samaritan rule cannot create a duty to act. (See, e.g., Paz v. State of California (2000) 22 Cal.4th 550, 558 [93 Cal.Rptr.2d 703, 994 P.2d 975] ["a person who has not created a peril is not liable in tort for failing to take affirmative action to protect another unless they have some relationship that gives rise to a duty to act"].)
Pinole Point relies on Gdowski, supra, 84 Cal.App.4th 1395; Pagliotti v. Acquistapace (1966) 64 Cal.2d 873 [50 Cal.Rptr. 282, 412 P.2d 538] (Pagliotti), a companion case of Keys; Sheffet v. County of Los Angeles, supra, 3 Cal.App.3d 720 (Sheffet); and a New Jersey case cited in Keys, Armstrong v. Francis Corp. (1956) 20 N.J. 320 [120 A.2d 4] (Armstrong). Pinole Point incorrectly maintains that these cases demonstrate that the upstream party always has to pay for maintenance caused by improvements it makes. It denies that it has any obligation to act in a particular manner to minimize the damage or injury caused by the County's action.
None of the cases cited by Pinole Point imposed liability solely on the basis of the flooding or injury being caused by the party's status as the upper landowner. In Sheffet, supra, 3 Cal.App.3d 720, the question before the court was whether substantial evidence supported the lower court's finding that the lower landowner had acted reasonably while the upper landowner had acted unreasonably. Indeed, the appellate court observed that it was bound by the trial court's decision unless substantial evidence did not support the trial court's finding on reasonableness. (Id. at pp. 728, 731, 741.) In both Sheffet and Armstrong, the court imposed liability on the upper landowner because that party had engaged in some affirmative conduct creating the flooding problems and the adjacent property owner's actions had been reasonable. (Sheffet, at pp. 726-727, 731-732 [county liable in inverse condemnation for damages from overflow of surface waters from public streets onto plaintiff's property where county approved subdivision and drainage system, plaintiff acted reasonably in relation to his property, and damage to adjacent property resulted from improvements]); Armstrong, supra, 120 A.2d 4 [defendant, in the course of developing large housing project, substantially augmented flow
Pinole Point also maintains that it had no duty to maintain the Drainage Channel because the holder of a prescriptive easement has the duty to maintain the easement. (See, e.g., Reinsch v. City of Los Angeles (1966) 243 Cal.App.2d 737 [52 Cal.Rptr. 613]; Conklin v. Goodson (1954) 125 Cal.App.2d 823 [271 P.2d 147]; Whalen v. Ruiz (1953) 40 Cal.2d 294 [253 P.2d 457].) It concludes that "any acquisition of prescriptive rights by the County to continue using the Drainage Channel after 1979 could not shift the duty to maintain the Drainage Channel" to Pinole Point. All of these cases predate Locklin and both Conklin and Whalen predate Keys. Reinsch was filed two months after Keys was decided, and did not consider the reasonableness test set forth in Keys. After Keys, "[t]he modern rule governing landowner liability for surface water runoff and drainage is no longer simply a rule of property law dependent upon the existence of rights, servitudes, or easements.... Today a landowner's conduct in using or altering the property in a manner which affects the discharge of surface waters onto adjacent property is subject to a test of reasonableness." (Locklin, supra, 7 Cal.4th at p. 351; see id. at pp. 351, 355-356, fn. 17.) Moreover, neither Pinole Point nor the County pled or proved in the trial court that the County has a prescriptive easement and therefore cases on prescriptive easements are inapplicable.
The trial court did not create any new legal duty. It correctly applied the modern rule of reasonableness as "`[f]ailure to exercise reasonable care may result in liability by an upper to a lower landowner.'" (Locklin, supra, 7 Cal.4th at p. 352.) Here, Pinole Point did not create a new structure or divert the flow of water; instead, it blocked the flow of the natural waterway on its property by failing to keep it free of debris. The question whether this conduct was reasonable and whether the County as the owner of Lettia Road
As already noted, the civil law rule of reasonable conduct rather than traditional principles of nuisance or negligence law applies. (Gdowski, supra, 84 Cal.App.4th at pp. 1403-1406.) In reaffirming the test of reasonableness in the tort context, the Locklin court stated: "The test is whether, under all the circumstances, the upper landowner's conduct was reasonable. This rule of reasonableness applies to both private and public landowners, but it requires reasonable conduct on the part of downstream owners as well. This test requires consideration of the purpose for which the improvements were undertaken, the amount of surface water runoff added to the streamflow by the defendant's improvements in relation to that from development of other parts of the watershed, and the cost of mitigating measures available to both upper and downstream owners. Those costs must be balanced against the magnitude of the potential for downstream damage. If both plaintiff and defendant have acted reasonably, the natural watercourse rule imposes the burden of stream-caused damage on the downstream property." (Locklin, supra, 7 Cal.4th at p. 337.)
We have two grounds for affirming the trial court's findings on reasonableness. First, Pinole Point's appellate briefs do not "`fairly summarize all of the facts in the light most favorable to the judgment.'" (Myers v. Trendwest Resorts, Inc. (2009) 178 Cal.App.4th 735, 739 [100 Cal.Rptr.3d 658] ["In every appeal, `the appellant has the duty to fairly summarize all of the facts
The two County projects involving drainage were the approval of Montalvin Manor in the early 1950s, which resulted in connecting the 24-inch Pipe to the Drainage Channel, and the 1982 improvement project, resulting in the installation of the 54-inch Pipe. With regard to the Montalvin Manor development, Pinole Point maintains that the diversion of the water into the Drainage Channel in the 1950s was improper and that the County had safer alternatives. Additionally, Milani testified that the housing development built in the early 1950s significantly increased the volume of water, flow rate of water, and velocity of water discharged from the UP culvert onto the Remainder Parcel.
The evidence in the record does not establish that the County's conduct with regard to the development of Montalvin Manor created the drainage problems. The Drainage Channel had been constructed by 1957; this channel was maintained and kept clear of vegetation and debris until 1979, when Pinole Point purchased the Remainder Parcel. There is no evidence of any damage to the residents on Lettia Road from flooding in the 1950s, 1960s, or 1970s. Thus, even if alternative drainage methods were available to the County when it developed Montalvin Manor in the 1950s, the absence of any evidence of flooding problems prior to the 1980s supports a finding that the County's conduct in connecting the 24-inch Pipe to the Drainage Channel was reasonable.
The 1982 project involved the County's installation of additional street catch basins to capture runoff more quickly; the runoff was directed into the subdivision's underground storm drain system. The County installed a 54-inch Pipe that extended approximately 190 feet from Lettia Road through the BNSF berm near the 24-inch Pipe. The 54-inch Pipe essentially replaced the 24-inch Pipe and the 36-inch Pipe. Pinole Point argues that its evidence showed that the County did not satisfy the applicable standards of care for a storm drain design. Pinole Point's expert testified that this flawed design caused the Drainage Channel to overflow; he asserted that the County had other feasible alternatives. Pinole Point maintains that the evidence showed that this drainage system caused the sediment dam deposited in the Drainage Channel.
Evidence in the record, although not cited by Pinole Point, clearly supported the trial court's findings. Peter Morris Mesard, the County's engineering expert, testified that the County's 1982 drainage improvements did not change the total flow to the Remainder Parcel. He maintained that "the total flow from the tributary area in Montalvin Manor to the Remainder Parcel remained the same both before and after the improvements in" 1982.
The trial court also addressed Pinole Point's argument that the 54-inch Pipe increased the rate of silt deposits in the Drainage Channel and found that the 1982 project might have "somewhat increased the rate of silt deposit in the Drainage Channel due to the increased flow in that location, [but] the same silt would have been deposited onto the Remainder Parcel through the old drainage system." This finding was supported by Mesard's testimony that there was nothing unusual about the quantities of sediment transported from Montalvin Manor to the Remainder Parcel.
In contrast to its findings regarding the County's conduct, the trial court found Pinole Point's failure to keep the Drainage Channel free of debris caused the repeated flooding and posed a serious risk of future flooding. This finding was supported by testimony of Robert Van Bibber, a resident of Montalvin Manor since the late 1950s. He testified he had walked on the Remainder Parcel since moving there and observed that originally the Drainage Channel had no vegetation. At the time of the trial, he noticed that the current vegetation prevented him from even seeing a ditch there. The record contained evidence that there was a five-foot-high "sediment dam" blocking the Drainage Channel a short distance downstream of the 54-inch Pipe and this dam effectively made it impossible for the 54-inch Pipe to drain the storm waters from Montalvin Manor. This evidence supported a finding that the sediment buildup that is blocking the Drainage Channel could have been avoided if the Drainage Channel had been adequately maintained and cleared of all debris and vegetation.
The trial court also properly considered the County's conduct. It found that the overall purpose served by the County's drainage projects, which allowed storm waters from Montalvin Manor to flow through the BNSF berm and into the Drainage Channel, "[c]learly" furthered "an important overall public purpose" of safely conveying storm waters. Moreover, the court rejected Pinole Point's evidence that there were feasible alternatives and concluded that the BNSF berm precluded any other possibility. The record supported an implied finding that the County's conduct in developing the drainage system was reasonable as no flooding occurred until Pinole Point stopped maintaining the Drainage Channel.
Additionally, the trial court ruled that the County acted reasonably in attempting to get Pinole Point to maintain the Drainage Channel and in
Article I, section 19 of the California Constitution provides: "Private property may be taken or damaged for a public use and only when just compensation ... has first been paid ...." In analyzing the inverse condemnation cause of action, we use the rule of reasonableness set forth in Locklin, supra, 7 Cal.4th 327.
Under Locklin, inverse condemnation liability attaches only where there has been damage from "an increased volume or velocity of surface waters discharged into a natural watercourse from public works or improvements on publicly owned land. [The government agency] will be liable if it fails to use reasonably available, less injurious alternatives, or if it has incorporated the watercourse into a public drainage system or otherwise converted the watercourse itself into a public work." (Locklin, supra, 7 Cal.4th at pp. 337-338.)
The predicate condition of damage to the Remainder Parcel is not met here. In contrast to the cases cited by Pinole Point where the evidence established that the public entity's conduct had increased the flow of water onto the plaintiff's property (see Yue v. City of Auburn (1992) 3 Cal.App.4th 751, 760-762 [4 Cal.Rptr.2d 653] [city approved subdivision that resulted in increased runoff on plaintiff's property]; Inns v. San Juan Unified Sch. Dist. (1963) 222 Cal.App.2d 174, 177 [34 Cal.Rptr. 903] [school altered its property's natural surface drainage pattern, which increased volume and velocity of water released onto plaintiff's property]), here, as already discussed, the record shows that flooding did not occur as a result of building Montalvin Manor and the record supported the trial court's finding that the 1982 project did not significantly increase the amount of water discharged onto the Remainder Parcel. (See Souza v. Silver Development Co. (1985) 164 Cal.App.3d 165, 172 [210 Cal.Rptr. 146] [no inverse condemnation liability
For the same reasons discussed with regard to tort liability, the evidence supported the trial court's findings regarding reasonableness in the inverse condemnation context: The overall purpose of the County's improvement projects was to safely convey storm waters; the County's projects did not cause the flooding; there were no other feasible storm drainage alternatives with lower risks; the Remainder Parcel historically had received the runoff and the water had always accumulated on this property because of the UP berm and the UP culvert; Pinole Point sustained no damage as a result of the runoff from Montalvin Manor; the only damage was the sediment deposited, which the court found not to be overly burdensome and part of every riparian landowner's maintenance obligations; and clearing a Drainage Channel is necessary when the property owner has actual or constructive notice that the property has a natural watercourse that must be maintained to prevent flooding to adjacent property.
Accordingly, we affirm the lower court's determination that the County is not liable to Pinole Point for inverse condemnation.
The trial court awarded the County $141,090.10 in damages for its emergency flood protection efforts. In the trial court, Pinole Point claimed the evidence did not support this sum but, other than claim it has no liability for any damages, Pinole Point has not raised any challenge in its appellate briefs to the actual amount awarded. It has therefore waived any appeal on the basis that the evidence did not support this sum.
In addition to awarding damages, the court granted the County's request for a permanent mandatory injunction. The court ordered Pinole Point to clear the Drainage Channel of obstructions and debris to permit the storm waters from the 54-inch Pipe to flow through the Drainage Channel and out to the Bay. Until the project is completed, the court ordered Pinole Point to operate a temporary pumping service or to make arrangements for the County to continue to provide such services. The court retained jurisdiction to ensure that Pinole Point uses its best efforts to obtain the necessary regulatory approvals.
Pinole Point claims that it is unreasonable to require it to clear the Drainage Channel because the drainage work does not benefit it and the costs of doing the drainage work are very high: The County's expert estimated the cost, without including expected environmental mitigation costs, at $84,000; Pinole Point's expert testified that his plan for drainage work would cost $300,000. Additionally, regulatory permits, which could be an arduous process, are required.
We conclude that the trial court did not abuse its discretion in issuing a mandatory injunction requiring Pinole Point to clear the Drainage Channel. The trial court found that unless the obstructions to the Drainage Channel were removed, Lettia Road and adjacent homes would be subject to frequent and repeated flooding. The costs to remedy the situation are significant because of Pinole Point's own inaction for over 30 years. Given the danger of
The trial court noted that the Remainder Parcel includes regulated wetlands and regulatory permits are needed before clearing the Drainage Channel. The trial court acknowledged that the process for obtaining the necessary regulatory approvals for clearing and maintaining the Drainage Channel might "be arduous" but the evidence indicated it was likely these regulatory permits could be obtained. Furthermore, we agree with the trial court's determination that the regulatory permitting requirements could neither excuse nor justify Pinole Point's refusal to act because it had never applied for the necessary permits.
Pinole Point again argues that it has no legal duty to keep the Drainage Channel clear and stresses that the court could not compel it to take affirmative action. In situations such as Costello v. Bowen, supra, 80 Cal.App.2d 621, the defendants had caused an injury by their affirmative action, not by their inaction. As repeatedly stressed, Pinole Point had a duty to act reasonably in its relations with other landowners. (See Locklin, supra, 7 Cal.4th at p. 352.)
For these reasons, we conclude that the trial court acted within its discretion when it issued a mandatory injunction that requires Pinole Point, using any proposal of its choosing, to clear the Drainage Channel and to provide storm water pumping services until the Drainage Channel is cleared.
The judgment is affirmed. Pinole Point is to pay the costs of appeal.
Stewart, J., and Miller, J., concurred.
We need not consider Pinole Point's arguments that the Drainage Channel was a public work.