RIPPLE, Circuit Judge.
I. Background ... 661
A. Statutory and Regulatory Context ...661
1. Energy Policy and Conservation Act ...661
2. Energy Policy Act of 2005 ...663
3. 2009 Final Rule ...663
4. American Energy Manufacturing Technical Corrections Act ...663
B. The New Standards Rule ...664
C. The 2014 Test Procedure Rule ...666
D. Petitions for Review ...667
II. Discussion ...667
A. Engineering Analysis ...669
1. Notice and Comment ...669
2. Compressors ... 671
3. Insulation Foam Thickness ...673
4. Validation ...674
B. Economic Analysis ...675
1. Elasticity ... 675
2. Environmental Benefits ...677
3. Cost-Benefit Analysis ...678
4. Anticompetitive Effects ...680
C. Regulatory Flexibility Analysis ...683
D. Cumulative Regulatory Burden ...685
1. EPA Significant New Alternatives Policy Program ...685
2. ENERGY STAR Program ...686
E. 2014 Test Procedure Rule ...686
1. Conformity to Industry Standards ...687
2. Operation of the Rule ...688
3. Procedural Challenges ...689
Conclusion ... 690
The United States Department of Energy ("DOE") published two final rules aimed at improving the energy efficiency of commercial refrigeration equipment ("CRE").
Petitioners Zero Zone, Inc. ("Zero Zone"), a small business specializing in CRE, and Air-Conditioning, Heating and Refrigeration Institute ("AHRI"), a trade association of CRE manufacturers, petitioned for review of both rules. Petitioner North American Association of Food Equipment Manufacturers ("NAFEM"), another trade association of CRE manufacturers, petitioned for review of the first rule. AHRI and Zero Zone moved to consolidate the cases, and we granted the motion.
Petitioners challenge both the decisionmaking process and the substance of the final rules. Upon review of those challenges, we conclude that DOE acted in a manner worthy of our deference. The New Standards Rule is premised on an analytical model that is supported by substantial evidence and is neither arbitrary nor capricious. DOE conducted a cost-benefit analysis that is within its statutory authority and is supported by substantial evidence. Its methodology and conclusions were not arbitrary or capricious. It also gave appropriate consideration to the rule's effect on small businesses and the role of other agency regulations. DOE similarly acted within its authority, and within reason, when it promulgated the 2014 Test Procedure Rule. For these reasons, we deny the petitions in their entirety.
The Energy Policy and Conservation Act ("EPCA"), Pub. L. No. 94-163, §§ 321-339, 89 Stat. 871, 917-32 (1975) (codified as amended at 42 U.S.C. §§ 6201-6422) was enacted in part to improve the energy efficiency of specific types of equipment and appliances. § 2(5), 89 Stat. at 874. Congress enacted the
As originally enacted, the EPCA authorized the Federal Energy Administration ("FEA") — the predecessor to DOE
When establishing new energy conservation standards, DOE must follow certain statutory requirements. First, standards may not "increase[ ] the maximum allowable energy use" of any individual unit. Id. § 6295(o)(1). Second, standards must be "designed to achieve the maximum improvement in energy efficiency" and be "technologically feasible and economically justified." Id. § 6295(o)(2)(A). The EPCA explains that:
Id. § 6295(o)(2)(B)(I). The EPCA further explains that, for the purposes of determining anticompetitive effects, the Attorney General must submit his or her opinion in writing "not later than 60 days after the publication of a proposed rule" and that "[a]ny such determination and analysis shall be published by the Secretary in the Federal Register." Id. § 6295(o)(2)(B)(ii).
The EPCA also charges DOE with establishing test procedures for measuring the energy use of covered equipment. Id. § 6314. Manufacturers must use these test procedures when determining whether their equipment complies with the applicable energy conservation standards. Id. §§ 6295(s), 6316(e)(1). According to the EPCA:
Id. § 6314(c).
Congress amended the EPCA in 2005, and in doing so added CRE to the industrial equipment category. Energy Policy Act of 2005, Pub. L. No. 109-58, § 136, 119 Stat. 594, 638-39 (codified at 42 U.S.C. § 6313(c)(2)-(3)) ("EPACT"). The EPACT prescribed standards for six different classes of CRE. § 136, 119 Stat. at 639.
Accordingly, DOE published a final rule on January 9, 2009, that prescribed energy conservation standards for thirty-eight additional equipment classes. 74 Fed. Reg. 1092. These classes were defined by a combination of the equipment's geometry (vertical, semivertical, or horizontal), door type (solid, transparent, or open), condensing-unit configuration (self-contained or remote-condensing), and operating temperature (medium, low, or ice-cream).
Congress made an additional amendment to the statute in January 2012, which prescribed a specific standard for self-contained
DOE published a sixty-page framework document in 2010, which discussed the relevant issues and processes in determining whether to amend the CRE energy efficiency standards. 75 Fed. Reg. 24,824, 24,824-25 (May 6, 2010); App. R.6, Admin. R.2. DOE then published a notice of proposed rulemaking for new CRE energy efficiency standards on September 11, 2013. 78 Fed. Reg. 55,890. The notice of proposed rulemaking listed new standards for forty-nine classes of CRE. See id. at 55,890-92. DOE also made available a technical support document for the proposed rule. App. R.6, Admin. R.51. On October 3, 2013, DOE held a public meeting in Washington, D.C. to solicit comments and provide some preliminary responses. App. R.6, Admin. R.62. DOE also permitted the public to submit further comments until a November 12, 2013 deadline, although a few comments were submitted after that date. On March 28, 2014, DOE published the New Standards Rule, the rule before us in this proceeding.
The New Standards Rule establishes energy conservation standards for forty-nine classes of CRE. 79 Fed. Reg. at 17,727. Just as in DOE's earlier 2009 Final Rule, the classes were defined by a combination of the equipment's geometry, door type, condensing-unit configuration, and operating temperature. Id. at 17,743. For each class, the maximum daily energy consumption is determined by a function of either the unit's refrigerated volume ("V") or the unit's total display area ("TDA"). Id. at 17,727.
To determine the appropriate standard for each class of equipment, DOE used a design-option engineering analysis. Id. at 17,745; Final Technical Support Document, App. R.6, Admin. R.102 at 5-41 to 5-68. In that analysis, DOE chose a representative unit from each class of CRE. App. R.6, Admin. R.102 at 5-1 to 5-2. DOE intentionally chose a unit that "was toward the larger end of the equipment available within that class." Id. at 5-68. DOE then, using an analytical model, estimated the cost to manufacturers of implementing more efficient components into that unit, as well as the "calculated daily energy consumption" ("CDEC") that would result from implementing those components. Id. at 5-1 to 5-3, 5-13 to 5-41. This analysis included modeling the effect of more efficient
This maximum energy consumption level served as an "analysis point" for DOE, which it used to establish an equation for determining a CRE unit's maximum energy consumption level. Id. at 5-68. DOE's method for establishing this equation is illustrated in the graphs below:
Id. As the graph to the left shows, DOE first plotted the analysis point on a graph measuring the relationship between a CRE unit's CDEC and its TDA (or, in some cases, CDEC and refrigerated volume). Id. DOE then drew a line from the analysis point to the origin. Under the scheme contemplated by the left graph, a CRE unit would need to have a CDEC at or below that line. Id.
DOE originally had intended to employ this scheme in its 2009 Final Rule, but it had received comments about the effects of such an equation on smaller equipment. Id. As the comments pointed out, drawing a line from the origin assumed that a small CRE unit with a TDA approaching zero could consume energy at a level close to zero. Id. DOE therefore chose to include an "offset" factor for each class, which allowed smaller equipment to consume more energy under the standards. Id. The offset "represent[s] energy consumption end effects inherent in equipment operation regardless of the size of the equipment." Id. at 5-3. As shown in the graph above on the right, the offset serves as the y-intercept for the CDEC equation. Id. at 5-68.
The resulting energy conservation standards do not compel manufacturers to use any particular components to achieve improved
DOE then considered whether its new standards were economically justified. Id. at 17,737. It developed five potential "trial standard levels" of energy efficiency requirements for each class and considered the costs and benefits at each level. Id. at 17,738, 17,803-11. DOE initially proposed that the standards be set at the second-highest level. 78 Fed. Reg. at 55,948. However, after the notice and comment period, DOE determined that the third-highest level "will offer the maximum improvement in efficiency that is technologically feasible and economically justified and will result in the significant conservation of energy." 79 Fed. Reg. at 17,810.
As part of this economic analysis, DOE requested a letter on September 24, 2013 from the United States Department of Justice ("DOJ") that would assess the rule's anticompetitive effect. DOJ did not respond until November 25, 2013, when the Assistant Attorney General for Antitrust sent a letter to DOE. App. R.6, Admin. R.106. According to DOJ, the new rule would not have anticompetitive effects. Id. DOE added this letter to the record on June 17, 2014 — several months after the public hearing on the rule. See id. DOE also published this letter in the Federal Register on July 28, 2015 — over a year after the Final Rule had been published and one day before it filed its appellate brief in this case. 80 Fed. Reg. 44,892.
After receiving the DOJ letter and other sources, DOE concluded in the Final Rule, published on March 28, 2014, that the new standards would result in lower energy use and thus produce a net benefit to consumers between $4.93 and $11.74 billion. 79 Fed. Reg. at 17,728, 17,810. In addition, DOE noted the monetary benefits of the reductions in greenhouse gas emissions. Id. at 17,811. DOE then determined that the development of new CRE would cost manufacturers between $93.9 and $165 million. Id. at 17,810. DOE concluded that the benefits outweighed the costs and that the standards therefore would be economically justified. Id. at 17,810-11.
The New Standards Rule noted that "[t]he test procedure amendments established in the 2012 test procedure final rule are required to be used in conjunction with the amended standards promulgated in this ... final rule." 79 Fed. Reg. at 17,735. In that 2012 Test Procedure Rule, DOE incorporated the method for calculating the TDA of CRE required by statute. 77 Fed. Reg. 10,292, 10,318 (Feb. 21, 2012). As shown above, the maximum allowable daily energy consumption for some units is dependent on their TDA.
To measure the TDA of a CRE unit, one must take certain measurements of the unit and enter those measurements into a general equation.
DOE issued a notice of proposed rulemaking on October 28, 2013, which proposed a clarification on the meaning of "L" in the 2012 Test Procedure Rule. 78 Fed. Reg. 64,296, 64,309-12.
A little less than a month after the CRE standards were published, on April 21, 2014, DOE published a CRE test procedure that clarified how energy efficiency was to be measured. Id. at 22,278. In light of the comments it received, DOE departed from its proposed rule and published a CRE test procedure that was "consistent with and clarifie[d] current industry practice and the existing provisions of the DOE test procedure." Id. at 22,301. According to this final rule, "L" was defined "as the interior length of the CRE model, provided no more than 10 percent of that length consists of non-transparent material." Id. The rule provided further clarification on measuring "L" for units where more than ten percent of the surface was not transparent. Id.
NAFEM timely filed a petition for review on May 23, 2014, challenging the New Standards Rule. Four days later, on May 27, 2014, AHRI and Zero Zone filed a petition similarly challenging the New Standards Rule. AHRI and Zero Zone then filed a petition challenging the 2014 Test Procedure Rule on June 19, 2014. Upon AHRI's and Zero Zone's motion, we consolidated the petitions.
The petitioners raise a series of procedural and substantive challenges to DOE's final rules pertaining to energy efficiency standards. We will consider, in turn, the challenges to: (1) DOE's engineering analysis; (2) DOE's economic analysis; (3) DOE's regulatory flexibility analysis, which considered the effect of the new standards on small businesses; (4) DOE's assessment of the cumulative regulatory burden; and (5) the 2014 Test Procedure Rule.
Pursuant to the Administrative Procedure Act ("APA"), we will "hold unlawful and set aside agency action, findings, and conclusions" that are:
Nat'l Ass'n of Home Builders v. Defs. of Wildlife, 551 U.S. 644, 658, 127 S.Ct. 2518, 168 L.Ed.2d 467 (2007) (quoting Motor Vehicle Mfrs. Ass'n v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43, 103 S.Ct. 2856, 77 L.Ed.2d 443 (1983)) (internal quotation marks omitted). "Substantial evidence," we have explained, "means `such relevant evidence as a reasonable mind might accept as adequate to support the conclusion'" reached by the agency. Local 65-B, Graphic Commc'ns Conference of Int'l Bhd. of Teamsters v. NLRB, 572 F.3d 342, 347 (7th Cir. 2009) (quoting Huck Store Fixture Co. v. NLRB, 327 F.3d 528, 533 (7th Cir. 2003)); see also Consol. Edison Co. v. NLRB, 305 U.S. 197, 229, 59 S.Ct. 206, 83 L.Ed. 126 (1938) (explaining that the agency must produce "more than a mere scintilla" of evidence).
In our review, "[w]e give great deference to an agency's predictive judgments about areas that are within the agency's field of discretion and expertise." W. Fuels-Ill., Inc. v. ICC, 878 F.2d 1025, 1030 (7th Cir. 1989) (internal quotation marks omitted); see also Pub. Citizen, Inc. v. NHTSA, 374 F.3d 1251, 1260-61 (D.C. Cir. 2004). "[W]hen reviewing an agency's scientific and technical determinations, `a reviewing court must generally be at its most deferential.'" Indiana v. EPA, 796 F.3d 803, 811 (7th Cir. 2015) (quoting Balt. Gas & Elec. Co. v. NRDC, 462 U.S. 87, 103, 103 S.Ct. 2246, 76 L.Ed.2d 437 (1983)). However, we also note that the Supreme Court "has stressed the importance of not simply rubber-stamping agency factfinding." Dickinson v. Zurko, 527 U.S. 150, 162, 119 S.Ct. 1816, 144 L.Ed.2d 143 (1999). Further, "[t]he reviewing court should not attempt itself to make up for... deficiencies" in the agency's reasoning; "`we may not supply a reasoned basis for the agency's action that the agency itself has not given.'" Motor Vehicle Mfrs. Ass'n, 463 U.S. at 43, 103 S.Ct. 2856 (quoting SEC v. Chenery Corp., 332 U.S. 194, 196, 67 S.Ct. 1760, 91 L.Ed. 1995 (1947)).
For those of petitioners' challenges based on the statutory language of the EPCA, our review is structured by Chevron, U.S.A. Inc. v. Natural Resources Defense Council, Inc., 467 U.S. 837, 104 S.Ct. 2778, 81 L.Ed.2d 694 (1984). At the first step of Chevron review, we ask whether Congress has spoken directly on the precise question of interpretation. Chevron, 467 U.S. at 842, 104 S.Ct. 2778 ("If the intent of Congress is clear, that is the end of the matter ...."). When there is a statutory ambiguity, we then move to the second step of Chevron review and ask whether the agency's interpretation is "arbitrary or capricious in substance." Mayo Found. for Med. Educ. & Research v. United States, 562 U.S. 44, 53, 131 S.Ct. 704, 178 L.Ed.2d 588 (2011) (internal quotation marks omitted). As the Supreme Court has noted, this second step of Chevron is functionally equivalent to traditional arbitrary and capricious review under the APA. Judulang v. Holder, ___ U.S. ___, 132 S.Ct. 476, 483 n. 7, 181 L.Ed.2d 449 (2011). For those of petitioners' challenges based on the language of DOE regulations, we will uphold DOE's interpretations of its own regulation "unless plainly erroneous or inconsistent with the regulation." Auer v.
The New Standards Rule was based in part on a "design option" engineering analysis. 79 Fed. Reg. at 17,763. To conduct this analysis, DOE defined a hypothetical "representative unit" from each class of CRE. App. R.6, Admin. R.102 at 5-1 to 5-2. The unit displayed the characteristics of that class of CRE, id., but was "toward the larger end of equipment available for that class," id. at 5-68. DOE then, using an analytical model, estimated the cost to manufacturers of implementing more efficient components into that unit, as well as the "calculated daily energy consumption" that would result from implementing those components. Id. at 5-1 to 5-3, 5-13 to 5-41. This analysis included, for example, modeling the effect of more efficient lighting, compressors, and insulation. Id. at 5-13 to 5-41. From this model, DOE determined an appropriate energy consumption level for a unit of that size, id. at 5-2 to 5-3, and then extrapolated from those results to create an equation for determining the energy consumption level for the rest of the class, id. at 5-68.
The petitioners raise several procedural and substantive challenges to DOE's engineering analysis. We will discuss each in turn.
NAFEM contends that DOE failed to provide a meaningful opportunity for notice and comment of an "engineering spreadsheet" that compiled all the data that was used in DOE's analysis. See App. R.6, Admin. R.98. Early in the promulgation of the standards rule, DOE provided two technical support documents that explained its planned analysis. App. R.6, Admin. R.2; App. R.6, Admin. R.30. On August 29, 2013 — two weeks before the publication of the notice of proposed rulemaking — DOE published a more complete technical support document that further spelled out its engineering analysis and included all the relevant raw data. See App. R.6, Admin. R.51 at 5-1 to 5A-17. However, at that time, DOE did not provide the engineering spreadsheet that it
We previously expressed "reluctan[ce] to approve a regulation where ... much of the information in support of the proposed rule was kept secret until after the hearing," Granite City Steel Co. v. EPA, 501 F.2d 925, 927-28 (7th Cir. 1974), but we have never held that petitioners have a right to full notice and comment of the scientific data relied upon by the agency. Several of our sister circuits have held that "[a]mong the information that must be revealed for public evaluation are the technical studies and data upon which the agency relie[d]." Chamber of Commerce v. SEC, 443 F.3d 890, 899 (D.C. Cir. 2006) (internal quotation marks omitted); Lloyd Noland Hosp. & Clinic v. Heckler, 762 F.2d 1561, 1565 (11th Cir. 1985); Wash. Trollers Ass'n v. Kreps, 645 F.2d 684, 686 (9th Cir. 1981); United States v. Nova Scotia Food Prods. Corp., 568 F.2d 240, 251-52 (2d Cir. 1977).
This case presents no occasion for us to determine whether we ought to join these circuits. Here, an examination of the proceedings before the agency makes clear that the petitioners received adequate notice of the engineering spreadsheet. NAFEM first criticizes DOE for only providing the spreadsheet a month before final comments were due. However, NAFEM and the rest of the public had access to all of the spreadsheet's underlying data almost three months earlier when the technical support document was published. See App. R.6, Admin. R.51 at 5-1 to 5A-17. The spreadsheet simply organized this information in a different manner. We note as well that several members of the public provided meaningful commentary in direct response to the spreadsheet by the November deadline.
NAFEM also submits that DOE was obliged to provide a spreadsheet that could be "manipulated" to permit manufacturers to ascertain how DOE's analysis would apply to specific products in their present or future inventories. In NAFEM's view, DOE should have been required to provide manufacturers with the capacity to insert data about their own units into the spreadsheet, so that they could "predict how [their] individual products would perform under the same analysis."
In any event, if a manufacturer wanted to determine the accuracy of the calculations in the engineering spreadsheet, it could have compared the spreadsheet's results for a given type of refrigeration product to units of the same type and size in its own product line. See App. R.6, Admin. R.98. Moreover, if a manufacturer wished to go further and test the accuracy of DOE's overall analysis, including the results that the analysis would produce for units of varying sizes, it could have looked to the actual energy efficiency standards provided by DOE in the notice of proposed rulemaking. See 78 Fed. Reg. at 55,892. If the manufacturer's product, when altered to conform to the energy standards proposed by DOE, could not reach those standards, the manufacturer would have cause to believe that DOE's underlying computations on the hypothetical model could not be replicated in the real world or were otherwise faulty. Petitioners were provided with a sufficient opportunity to see and comment upon technical data. There is no basis here for our disturbing the agency's decision.
We now turn to the substance of DOE's engineering analysis. As we have discussed earlier, DOE modeled the effect of different component designs on energy efficiency in order to determine a technologically feasible energy consumption level for each class of CRE. NAFEM challenges DOE's modeling of one of those components: compressors.
DOE concluded "that two levels of technology were applicable for the compressor design option:" "standard single-speed hermetic compressors" and "high-efficiency single-speed hermetic compressors." App. R.6, Admin. R.102 at 5-33. DOE could obtain "publicly-available performance data for standard single-speed hermetic compressors." Id. However, DOE pointed out, "[a]lthough several compressor manufacturers produce high-efficiency compressors, little data are currently available on their performance." Id. at 5-34.
Despite this absence of data, DOE initially estimated that high-efficiency compressors could achieve an efficiency level that was ten percent above the standard level. 79 Fed. Reg. at 17,760. According to the technical support document that was provided alongside the notice of proposed rulemaking, "DOE developed this multiplier through its own research, consultation with outside experts, and verification through discussion with commercial refrigeration equipment manufacturers." App. R.6, Admin. R.51 at 5-30; see also App. R.6, Admin. R.62 at 71 ("A general market-vetted, industry-vetted assumption of a ten percent improvement in compressor EER being feasible across the board at a five percent cost premium was used based on the input that we got from the industry."). However, subsequent comments from several manufacturers persuaded DOE to abandon its optimism and to expect lower performance during the compliance period. Several manufacturers suggested there could only be meager product improvement on the basis of present technology,
This revision was not an "eyeball guesstimate." In altering its decision, DOE had the benefit of its earlier research as well as the commentary of the manufacturers. It therefore was confronted with significant warning that the state of the technology made its earlier estimation unrealistic. In short, the primary purpose of the notice and comment period functioned as it should have, and the agency was apprised of responsible opinions contrary to its own. "[A]n agency's change of course, so long as generally consistent with the tenor of its original proposals, indicates that the agency treats the notice-and-comment process seriously, and is willing to modify its position where the public's reaction persuades the agency that its initial regulatory suggestions were flawed." Am. Med. Ass'n v. United States, 887 F.2d 760, 767 (7th Cir. 1989).
We also cannot fault DOE for placing significant weight on the view of the Danfoss group that "it would be reasonable to assume either continued use of efficient compressors available today, or alternatively a 1% to 2% efficiency improvement." App. R.6, Admin. R.61-A1 at 2; 79 Fed. Reg. at 17,760. The agency had a basis for considering this manufacturer to be a major supplier of CRE and one with significant institutional experience.
NAFEM nevertheless submits that the two percent increase is inconsistent with DOE's statement in the final rule "that existing technologies should be the basis of its engineering analysis." Id. We believe that is an uncharitable and unrealistic reading of the administrative record in its entirety. DOE simply concluded that the current state of the technology, including the increased use of high-efficiency compressors, would yield at least an incremental improvement. Such an incremental improvement "reflect[s] the options available to manufacturers of commercial refrigeration equipment." Id. at 17,760. DOE's decision may be questionable in the minds of some, but its decision is supported by substantial evidence and was reached through a reasoned decisionmaking process. "[O]ur role is limited; we require only that the agency acknowledge factual uncertainties and identify the considerations it found persuasive." Rural Cellular Ass'n v. FCC, 588 F.3d 1095, 1105 (D.C. Cir. 2009).
The petitioners also submit that DOE acted arbitrarily and capriciously when it modeled another component: insulation. DOE explained that increasing insulation foam thickness by a half-inch was a viable design option for eight primary equipment classes of CRE. 79 Fed. Reg. at 17,749; App. R.6, Admin. R.102 at 5-43 to 5-67. However, the petitioners contend that increasing insulation is not an available design option because the "footprint" of a refrigerator or freezer is sometimes fixed due to limited floor space. In their view, increasing insulation either will decrease a unit's internal volume (which could prevent the storage of industry-standard sheets and pans at restaurants) or will increase its external dimensions (which could lead to narrower walkways and restrict the ability to move CRE units through doorways).
In promulgating the final rule, however, DOE explained that it had conducted manufacturer interviews during the rulemaking period and that the manufacturers had agreed that an extra half-inch of insulation was feasible. 79 Fed. Reg. at 17,749-50. DOE also noted that a number of models currently on the market were already using this thickness of insulation, which suggested that a product with this thickness of insulation was useful and marketable to consumers. Id. at 17,750. "DOE believe[d] that this serves as a proof of concept and that the resulting changes ... would be of minimal impact to end users." Id. We must conclude that DOE's investigation of the situation clearly justifies its conclusion. The determination is supported by substantial evidence and certainly cannot be characterized as arbitrary and capricious.
Moreover, in promulgating the rule, DOE stated explicitly that manufacturers were "free to use different design paths in order to attain the performance levels required by today's rule," should they decide that increasing the thickness of insulation would not be a viable option for some of their consumers. Id. DOE noted, for example, that if a manufacturer determines that adding insulation is not a possible or desirable way to enhance energy performance, the manufacturers can instead implement enhanced evaporator coils, high-efficiency reciprocating compressors, and more effective vacuum insulated panels. See App. R.6, Admin. R.102 at 5-27, 5-32 to 5-34.
The petitioners point out that these recommended alternatives are not viable options for at least one class of CRE. See id. at 5-51, 10B-3 (describing the available design options for horizontal self-contained freezers without doors). They also contend that, for other classes, alternatives such as evaporator coils can result in frost buildup; that high-efficiency reciprocating compressors are noisy, expensive, and unreliable; and that vacuum insulated panels are prohibitively expensive. Even if these design options have their faults, however, they are still alternative solutions that manufacturers can choose in order to increase energy efficiency for the vast majority of CRE units. That one energy-saving solution is not feasible in one class of CRE does not prevent DOE from including it among the energy-saving devices that might be employed by the industry as a whole. Similarly, drawbacks in the other energy-saving devices do not prevent DOE from concluding that, for units in other classes, the industry may have to settle for a less-than-optimum situation to achieve the necessary conservation goals. In short, DOE was on solid ground in concluding that increasing the thickness of insulation was a feasible design option. That conclusion is worthy of deference.
AHRI and Zero Zone also contend that DOE acted capriciously by failing to address directly a comment submitted by AHRI during the rulemaking
Finally, the petitioners contend broadly that DOE's engineering analysis is not based on real-world application and therefore must be verified by testing actual equipment. This submission is governed by some basic principles. "That a model is limited or imperfect is not, in itself, a reason to remand agency decisions based upon it." Appalachian Power Co. v. EPA, 249 F.3d 1032, 1052 (D.C. Cir. 2001); see also In re Polar Bear Endangered Species Act Listing & Section 4(d) Rule Litig. — MDL No. 1993, 709 F.3d 1, 13 (D.C. Cir. 2013). Rather, we will remand only if the model "bears no rational relationship to the reality it purports to represent" or if the agency fails to "provide a full analytical defense" when the model is challenged. Columbia Falls Aluminum Co. v. EPA, 139 F.3d 914, 923 (D.C. Cir. 1998) (internal quotation marks omitted).
Our previous discussions go a long way toward answering this broad-brush assault on DOE's general manner of proceeding. As we have demonstrated throughout our earlier discussion, DOE provided a complete analytical defense to each of the challenges that were raised during the notice and comment period. Our review of the record gives us a high level of confidence that DOE was fully aware of the inherent difficulties of formulating regulations for real-world situations on the basis of a model. DOE correctly noted that "[i]nputs to the model included data from tangible sources such as manufacturer literature, manufacturer interviews, production facility tours, reverse engineering and teardown of existing products on the market, and tests of commercial refrigeration equipment and components." 79 Fed. Reg. at 17,763. DOE explained that its present analytical model was consistent with models used in at least three other final rules — including the 2009 CRE Standards Rule. Id. Indeed, in many respects, this process can be characterized as a continuing dialogue with the industry before the backdrop of DOE's earlier regulations.
The petitioners nevertheless contend that DOE acted arbitrarily and capriciously by failing to test its conclusions against a full range of actual CRE equipment. As an initial matter, we note that an agency need not "`justify [its] model on an ad hoc basis for every [unit] to which the model is applied.'" Columbia Falls Aluminum Co., 139 F.3d at 923 (quoting Chemical Mfrs. Ass'n v. EPA, 28 F.3d 1259, 1265 (D.C. Cir. 1994)). In any event, DOE performed validation testing on a representative sample of units:
79 Fed. Reg. at 17,763; see also App. R.6, Admin. R.102 at 5-40 to 5-41 ("The results of the energy consumption model were compared against the performance data gathered through testing or certification, and the two showed sound agreement, with the energy consumption model generally being slightly conservative (modeling the units as using slightly more energy than they consumed as tested)."). Further, "DOE utilized information from the ENERGY STAR and California Energy Commission appliance databases as a point of comparison to its engineering analysis results." 79 Fed. Reg. at 17,763 (footnotes omitted). Although DOE did not provide data or further details of its validation testing, DOE did publish the web addresses for the appliance databases, which included the "certified data" that "DOE compared its results against ... as a check." Id.
This is not a close call. We are convinced that DOE's engineering analysis, including its use of an analytical model, was neither arbitrary nor capricious.
The EPCA requires that efficiency standards be "economically justified." 42 U.S.C. § 6295(o)(2)(A). In addressing this statutory mandate, DOE established five different "trial standard levels," and determined which "level" would be economically and technologically feasible. See 79 Fed. Reg. at 17,738, 17,803. It originally proposed that the benefits of the second-highest level of standards would outweigh the costs. 78 Fed. Reg. at 55,948. After receiving public comment, it determined that the third-highest level would be more appropriate. 79 Fed. Reg. at 17,810. DOE concluded that this level of standards would produce a net benefit to consumers between $4.93 and $11.74 billion and reduce greenhouse gas emissions. Id. at 17,728-29, 17,780-11. Conversely, the new standards would cost manufacturers between $93.9 and $165 million. Id. at 17,795-96. DOE determined therefore that the standards were justified. Id. at 17,810-11. The petitioners fault DOE's economic analysis in several ways. We now address each of those arguments.
The petitioners first contend that DOE acted arbitrarily and capriciously when it assumed that the new standards would not result in significant changes in purchasing behavior. DOE essentially treated CRE as "price inelastic," meaning that an increase in the price of CRE would not impact the amount of CRE purchased. See 79 Fed. Reg. at 17,770. The petitioners object to that assumption, noting that consumers could refurbish used equipment or switch to cheaper, less-efficient models of CRE.
Our review of the record convinces us that DOE's consideration of this issue was certainly more balanced and careful than the petitioners suggest. DOE explained in
App. R.6, Admin. R.102 at 9-8 to 9-9.
DOE's analysis hardly is arbitrary and capricious. A business must store food at a proper temperature in order to comply with health code regulations. Consequently, in DOE's view, restaurants and other businesses will purchase CRE regardless of its price. A refrigerator cannot easily be substituted. DOE reasonably concluded that CRE is a "necessity" for restaurants and other businesses, which makes demand relatively inelastic.
The petitioners note that businesses could refurbish used equipment and that this ability to "substitute" proves that the market for CRE is elastic. Indeed, in the New Standards Rule, "DOE acknowledge[d] that increases in price due to amended standards could lead to more refurbishing of equipment (or purchase of used equipment)." 79 Fed. Reg. at 17,770 (emphasis added). DOE simply decided "that the extent of refurbishing would not be so significant as to change the ranking of the [trial standard levels] considered for today's rule." Id. DOE has the authority "to make such a prediction about the market it regulates, and a reasonable prediction deserves our deference notwithstanding that there might also be another reasonable view." Envtl. Action, Inc. v. FERC, 939 F.2d 1057, 1064 (D.C. Cir. 1991); see also White Eagle Coop. Ass'n v. Conner, 553 F.3d 467, 475 (7th Cir. 2009).
The petitioners also suggest that businesses could switch to more affordable and less efficient CRE. The trend in the CRE market has been towards more efficient "closed" equipment with transparent doors and away from "open" equipment that does not have doors. See 79 Fed. Reg. at 17,770. The petitioners contend that the new standards will reverse that trend, as closed equipment will lose its utility. DOE acknowledged this concern in the New Standards Rule. DOE pointed out that at least one manufacturer "had not observed
Without evidence that contradicts DOE's assumptions, we cannot conclude that DOE's conclusions were "so implausible that it could not be ascribed to a difference in view or the product of agency expertise." Nat'l Ass'n of Home Builders, 551 U.S. at 658, 127 S.Ct. 2518 (internal quotation marks omitted); see also USA Grp. Loan Servs., Inc., v. Riley, 82 F.3d 708, 714 (7th Cir. 1996); W. Fuels-Ill., Inc., 878 F.2d at 1030. The petitioners have failed to show that DOE acted arbitrarily or capriciously when it determined that CRE was price inelastic.
DOE considered the environmental benefits of the amended standards when determining whether the New Standards Rule was "economically justified." 79 Fed. Reg. at 17,738. In particular, DOE employed "an estimate of the monetized damages associated with an incremental increase in carbon emissions in a given year," known as the Social Cost of Carbon ("SCC"). Id. at 17,777.
We turn first to DOE's statutory authority under the EPCA. An agency decision is arbitrary and capricious when the agency "has relied on factors which Congress had not intended it to consider." Nat'l Ass'n of Home Builders, 551 U.S. at 658, 127 S.Ct. 2518 (internal quotation marks omitted). Here, however, the EPCA specifically requires DOE to consider "the need for national energy ... conservation." 42 U.S.C. § 6295(o)(2)(B)(i)(VI). In the New Standards Rule, DOE explained that the "Need of the Nation to Conserve Energy" includes the "potential environmental benefits" which would result. 79 Fed. Reg. at 17,738 (citing the Rule's subsection on SCC). To determine whether an energy conservation measure is appropriate under a cost-benefit analysis, the expected reduction in environmental costs needs to be taken into account.
The petitioners raise a series of objections to DOE's general approach to weighing the costs and benefits of its new standards. In their view, DOE's analysis overestimated the benefits of the new rule and underestimated its costs.
The petitioners first contend that DOE arbitrarily considered indirect benefits like carbon reduction over hundreds of years but ignored indirect costs like the long-term effects on displaced workers. DOE fully responded to that objection in the New Standards Rule:
AHRI and Zero Zone next contend that DOE arbitrarily considered the global benefits to the environment but only considered the national costs. They emphasize that the EPCA only concerns "national energy and water conservation." 42 U.S.C. § 6295(o)(2)(B)(i)(VI). In the New Standards Rule, DOE did not let this submission go unanswered. It explained that climate change "involves a global externality," meaning that carbon released in the United States affects the climate of the entire world. 79 Fed. Reg. at 17,779. According to DOE, national energy conservation has global effects, and, therefore, those global effects are an appropriate consideration when looking at a national policy. Id. Further, AHRI and Zero Zone point to no global costs that should have been considered alongside these benefits. Therefore, DOE acted reasonably when it compared global benefits to national costs.
Finally, AHRI and Zero Zone criticize DOE's determination of discount rates for CRE in its cost estimate. DOE used the "Capital Asset Pricing Model" ("CAPM") to estimate the cost of equity financing. The CAPM assumes that the cost of equity is proportional to the amount of systemic risk of failure associated with a company. The model therefore estimates the overall risks and returns for all of a firm's capital, rather than the risks and returns associated with one specific asset. The petitioners, however, believe that DOE should have used a model specific to the risks and returns of CRE. They contend that DOE did not adequately respond to a comment from the Mercatus Center at George Mason University, which urged DOE to adopt an analysis of capital costs that was particular to CRE.
Id. at 17,767. DOE considered the point and concluded that the cost of equity financing is commonly determined at the firm-wide level rather than unit-by-unit. Id. Therefore, the CAPM provided an appropriate estimate of the cost of equity financing. DOE's choice of economic model was neither arbitrary nor capricious.
The petitioners contend that DOE's consideration of anticompetitive effects was both substantively and procedurally arbitrary and capricious. In its cost-benefit analysis, DOE must consider the anticompetitive effects of its proposed rule "as determined in writing by the Attorney General." 42 U.S.C. § 6295(o)(2)(B)(i)(V). Pursuant to this provision, the Assistant Attorney General for the Antitrust Division, acting on behalf of the Attorney General, sent DOE a letter (the "DOJ letter"). The letter stated that "the proposed energy conservation standards for commercial refrigeration equipment [we]re unlikely to have a significant adverse impact on competition." 80 Fed. Reg. at 44,892. DOE relied on this letter in the New Standards Rule and considered the Attorney General's determination in its cost-benefit analysis. 79 Fed. Reg. at 17,803. The petitioners contend that the DOJ letter does not articulate adequately the reasoning behind the Attorney General's determination. They also contend that both the DOJ letter's submission to DOE and its publication to the Federal Register were untimely.
As originally enacted, the EPCA instructed the rulemaking agency (then the FEA, now DOE) to consider anticompetitive effects in its cost-benefit analysis. Pub. L. No. 94-163, § 325, 89 Stat. at 924-25.
Three years after the EPCA's enactment, these clauses were amended to their current form. Pub. L. No. 95-619, § 422, 92 Stat. at 3259-60. Under the EPCA as amended, the Attorney General always makes a determination about a proposed rule's anticompetitive effects.
The petitioners contend that the DOJ letter provided insufficient reasoning and that DOE therefore erred in relying on this letter. We cannot accept this argument. DOE's reliance on the DOJ letter was clearly consistent with its secondary role under this provision of the EPCA. DOE's statutory duty under the EPCA is to defer to the Attorney General. The New Standards Rule makes clear that DOE acted in complete accordance with the statute:
79 Fed. Reg. at 17,803. DOE did exactly what the EPCA instructs. Once it published the notice of proposed rulemaking, it awaited the Attorney General's assessment of the effect on competition. In fact, DOE provided the Attorney General with additional information — in a technical support document — so that it could receive a more informed determination. After reviewing this document, the transcript of the public
We must also determine whether the submission and publication of the DOJ letter were "without observance of procedure required by law." 5 U.S.C. § 706(2)(D). AHRI and Zero Zone contend that the DOJ letter was submitted to DOE after the EPCA's deadline. They also contend that the DOJ letter was untimely published in the Federal Register.
Under the EPCA, the Attorney General is required to submit its letter "not later than 60 days after the publication of a proposed rule." 42 U.S.C. § 6295(o)(2)(B)(ii). However, the Assistant Attorney General for Antitrust did not respond to DOE until 75 days after the notice of proposed rulemaking. 80 Fed. Reg. at 44,892. Although DOJ erred when it submitted the letter fifteen days late, the error was harmless. "[D]ue account shall be taken of the rule of prejudicial error." 5 U.S.C. § 706. "[I]f we are sure that the agency would if we remanded the case reinstate its decision — if in other words the error in its decision was harmless — a reversal would be futile ...." People of the State of Ill. v. ICC, 722 F.2d 1341, 1348 (7th Cir. 1983); see also Spiva v. Astrue, 628 F.3d 346, 353 (7th Cir. 2010). Further, "[w]e will not invalidate [an agency] decision based on procedural error unless the errors alleged could have affected the outcome." Zevallos v. Obama, 793 F.3d 106, 115 (D.C. Cir. 2015). The DOJ letter was submitted on November 25, 2013. See 80 Fed. Reg. at 44,892. The final rule was not published until several months later, on March 28, 2014. 79 Fed. Reg. at 17,726. DOE had enough time to consider fully the Attorney General's determination of anticompetitive effects and to factor that determination into its cost-benefit analysis. Indeed, DOE fully considered the DOJ letter in its final rule. Id. at 17,803.
The petitioners note that the DOJ letter was submitted thirteen days after the period for public comment had closed; the public therefore was denied the opportunity to respond to the Attorney General's analysis. However, this lack of time for public comment does not render the procedural error harmful. Under the EPCA, the notice and comment period shall last "not less than 60 days" after publication of the notice of proposed rulemaking. 42 U.S.C. § 6295(p)(2) (emphasis added). However, the DOJ must submit its letter within sixty days of the publication of the notice of proposed rulemaking. Id. § 6295(o)(2)(B)(ii). Had Congress intended the public to have the opportunity to respond to the DOJ letter, it would have imposed its deadline for submission of the letter before the end of any notice and comment period. Instead, Congress imposed a deadline that ensured DOE — but not necessarily the public — had enough time to consider the letter. We are convinced that this procedural error did not impair DOE's ability to consider anticompetitive effects and we will not reverse on this basis.
The EPCA also states that "[a]ny such determination and analysis shall be published by the Secretary in the Federal Register." Id. Here, DOE did not publish the DOJ letter until July 28, 2015, which
The petitioners' concerns about the New Standards Rule's anticompetitive effects also were addressed, in part, by DOE's discussion of the standards' impact on small businesses. The Regulatory Flexibility Act ("RFA"), 5 U.S.C. § 601 et seq., requires agencies to assess the effect of their rules on small entities. Under the RFA, "[w]hen an agency promulgates a final rule under section 553 of this title,... the agency shall prepare a final regulatory flexibility analysis." 5 U.S.C. § 604(a). Accordingly, DOE included such an analysis in its final rule. 79 Fed. Reg. at 17,812-14. In that analysis, DOE acknowledged that "[s]mall firms would likely be at a disadvantage," but it determined that no alternative program would be viable. Id. at 17,814.
The petitioners contend that DOE's final regulatory flexibility analysis failed to comply with the RFA. The RFA requires a final regulatory flexibility analysis to include, in relevant part:
5 U.S.C. § 604(a)(6). At the outset, we note that "the Act does not require rules that are less burdensome for small businesses;" it instead requires that "agencies ... explain why any such alternatives were rejected." Council for Urological Interests v. Burwell, 790 F.3d 212, 226 (D.C. Cir. 2015). When reviewing an agency's compliance with the RFA, we ask whether the agency's analysis "demonstrat[es] a `reasonable, good-faith effort to carry out [the RFA's] mandate.'" U.S. Cellular Corp. v. FCC, 254 F.3d 78, 88 (D.C. Cir. 2001) (quoting Alenco Commc'ns, Inc. v. FCC, 201 F.3d 608, 625 (5th Cir. 2000)).
In its final regulatory flexibility analysis, DOE identified thirty-two CRE manufacturers that met the definition of a small business, and it interviewed four of those manufacturers. 79 Fed. Reg. at 17,813. DOE concluded that "small businesses will likely have greater increases in component costs than large businesses," and "may have greater difficulty obtaining credit." Id. After reaching this conclusion, DOE considered several different policy alternatives, including: "(1) [n]o change in the standard; (2) consumer rebates; (3) consumer tax credits; (4) manufacturer tax credits; (5) voluntary energy efficiency targets; and (6) bulk government purchases." Id. at 17,814. Those policy alternatives were discussed in detail in the technical support document.
The petitioners nevertheless note that DOE failed to consider an exemption for small businesses in its final regulatory flexibility analysis. Under § 604 of the RFA, an agency must discuss "each one of the other significant alternatives" in its final regulatory flexibility analysis. 5 U.S.C. § 604. The RFA does not require that an agency "address every alternative, but only that it address significant ones." Associated Fisheries, Inc. v. Daley, 127 F.3d 104, 115 (1st Cir. 1997); see also Ranchers Cattlemen Action Legal Fund United Stockgrowers of Am. v. U.S. Dep't of Agric., 415 F.3d 1078, 1102 (9th Cir. 2005). In the petitioners' view, a small business exemption constitutes a significant alternative and must be considered.
Section 604 does not define what the RFA considers to be "significant" alternatives. See 5 U.S.C. § 604. However, when describing an agency's duty to write an initial regulatory flexibility analysis, § 603 states that:
Id. § 603(c) (emphases added). According to the petitioners, agencies must also consider all four of these "significant alternatives" in their final regulatory flexibility analysis. Therefore, the petitioners contend, by not considering one of the alternatives listed in § 603 during its final analysis, DOE failed to comply with its obligation under § 604 of the RFA.
Section 603 of the RFA limits the definition of a "significant alternative" to one which is "[c]onsistent with the stated objectives of applicable statutes." Id. § 603(c). Therefore, to determine the merits of petitioners' argument, we must first consider the objectives of the EPCA. One of the EPCA's stated "purposes" is to "provide Federal energy conservation standards applicable to covered products." 42 U.S.C. § 6295(a)(1). The EPCA contemplates exemptions for small manufacturers. Id. § 6295(t). However, those exemptions are temporary, lasting for a "period not longer than the 24-month period beginning on the date such rule becomes effective." Id. § 6295(t)(1). In addition, an exemption will only be made "on application of [the] manufacturer" and only after DOE investigates the unique circumstances of that manufacturer. Id. Further, the exemption can only be provided after
DOE made a "good-faith effort" to describe both the impact of its amended standard on small businesses and the significant alternatives it considered. U.S. Cellular Corp., 254 F.3d at 88. Therefore, its final regulatory flexibility analysis fully complied with the RFA.
The petitioners contend that DOE failed to properly consider the impact of two other regulatory burdens on CRE manufacturers: EPA's Significant New Alternatives Policy ("SNAP") Rule and the ENERGY STAR Program. According to DOE Process Rule 10(g), DOE must consider the cumulative impacts of other federal regulations. 10 C.F.R. pt. 430, subpt. C, app. A, at 10(g) (2016). DOE decided that neither the SNAP rule nor the ENERGY STAR Program warranted a change in its regulations. 79 Fed. Reg. at 17,754, 17,798. Therefore, we must determine whether DOE has "articulate[d] a satisfactory explanation for its action including a rational connection between the facts found and the choice made." Motor Vehicle Mfrs. Ass'n, 463 U.S. at 43, 103 S.Ct. 2856 (internal quotation marks omitted).
We first turn to EPA's proposed SNAP rulemaking. At the time of DOE's rulemaking, EPA was reviewing the refrigerants R404 and R134a and was considering removing those refrigerants from commercial refrigeration applications. 79 Fed. Reg. at 17,754.
Responding to this critique, DOE explained that "there are currently no mandatory initiatives such as refrigerant phaseouts," id., and that "DOE does not include the impacts of pending legislation
Further, DOE explained that even if it assumed the SNAP rulemaking would become binding, it did not have adequate "publicly-available data on the design, construction, and operation of equipment featuring alternative refrigerants to facilitate the level of analysis of equipment performance which would be needed." 79 Fed. Reg. at 17,754. NAFEM finds this rationale inadequate; it contends that DOE should have relied on data regarding the use of alternative refrigerants in Europe. However, NAFEM does not point to any comment that raised this issue before the agency during the notice and comment period. Further, DOE notes that the basic design of CRE in Europe differs from CRE in the United States, making that data unreliable. In light of the deference due to DOE, White Eagle Coop. Ass'n, 553 F.3d at 474, DOE's decision to ignore the EPA SNAP rulemaking was not arbitrary or capricious.
NAFEM also contends that DOE failed to take account of the ENERGY STAR program. ENERGY STAR is a program that provides voluntary certifications and ratings to energy efficient products as a way to incentivize manufacturers. 79 Fed. Reg. at 17,739. DOE noted that the program was "voluntary for manufacturers. As such, [it is] not part of DOE's consideration of cumulative regulatory burden." Id. at 17,798. That determination was entirely reasonable. DOE's decision not to consider ENERGY STAR was neither arbitrary nor capricious.
In sum, DOE satisfied its duty laid out in Process Rule 10(g). 10 C.F.R. pt. 430, subpt. C, app. A. Neither the possibility of a SNAP rulemaking nor the ENERGY STAR program needed to be considered by DOE.
We now consider AHRI's and Zero Zone's challenges to the 2014 Test Procedure Rule, a rule published after the New Standards Rule. As discussed above, DOE encountered an interpretive difficulty when measuring the total display area ("TDA") of a CRE unit.
AHRI and Zero Zone first contend that the 2014 Test Procedure's definition of "L" is contrary to the EPCA's definition of "L." As previously mentioned, "L" is a variable in the function for determining the TDA of a CRE unit. The EPCA states that "`TDA' means the total display area (ft
We cannot accept petitioners' understanding of the "compromise" DOE made when defining "L." As DOE explained in its notice of proposed rulemaking for the 2014 Test Procedure Rule, AHRI Standard 1200 does not define or illustrate the meaning of "L." 78 Fed. Reg. at 64,309-12. Because the promulgation and enforcement of energy standards required a precise definition of the term "L," DOE undertook to define the term in a manner that, while remaining faithful to the statutory language, would provide both the regulator and the industry with a workable metric. DOE proposed a definition of "L" that was consistent with AHRI Standard 1200's stated definition of the TDA: "the sum of the projected area(s) for visible product." 79 Fed. Reg. at 22,299 (emphasis added). DOE reasoned that if the TDA was defined as only consisting of the visible area on a CRE unit, then a variable of the TDA also must only consist of the visible area on a CRE unit. Id. After considering comments from the industry, however, DOE determined "that defining TDA as strictly the total length of transparent area may be inconsistent with the method used by industry to calculate TDA today." Id. at 22,300. That method typically included non-transparent areas like door frames and mullions. DOE therefore chose what it termed, somewhat imprudently and improvidently, a "compromise" value. See id. "L" would be defined
Id. at 22,301.
Contrary to AHRI and Zero Zone's contention that DOE created a "compromise" between the department's desired standard and the AHRI standard, DOE actually crafted a more precise definition of "L" — one not fully articulated in the text of the AHRI Standard but found in the method of implementing the AHRI Standard. Id. at 22,299-301. DOE's definition of "L"
AHRI and Zero Zone next raise a series of challenges to the operation of the new test procedure. When issuing the 2014 Test Procedure Rule, DOE concluded that the clarified definition of "L" will "not change the measured energy consumption of covered equipment" and therefore will not change the expected impact of the amended standards on the CRE industry. 79 Fed. Reg. at 22,301. AHRI and Zero Zone disagree with this conclusion and contend that DOE's definition of "L" in the 2014 Test Procedure Rule will result in smaller maximum energy consumption levels for CRE units than the previously enforced definition. In their view, DOE acted arbitrary and capriciously when it modeled the new standards on a less stringent definition of "L." More significantly, they contend that DOE failed to adhere to the EPCA's requirement that it "determine, in the rulemaking carried out with respect to prescribing such procedure, to what extent, if any, the proposed test procedure would alter the measured energy efficiency [or] measured energy use ... of any covered product as determined under the existing test procedure." 42 U.S.C. § 6293(e)(1).
This contention has no merit. Our review confirms that DOE did explain why the definition of "L" in the 2014 Test Procedure Rule was consistent with the definition it had previously employed. DOE referred back to its engineering analysis for the New Standards Rule, and it explained that the calculation for the length of the relevant model of CRE was based "upon the continuous length of transparent area of the CRE model, which included mullions and door frames, but excluded any additional case wall present on the front face of the unit. In other words, DOE included the entire length of the transparent doors, including minor non-transparent areas." 79 Fed. Reg. at 22,300; see also App. R.6, Admin. R.102 at 5A-6 (displaying the length of the doors and TDA for the CRE models); App. R.13, Admin. R.13-A1 at 2-3 (comment from Hillphoenix noting that mullion and door frame widths were included in DOE's calculation). DOE stated that the "10 percent of non-transparent area that may be included in the dimension L" was consistent with its consideration of the mullions and door frames during the engineering analysis. 79 Fed. Reg. at 22,301. DOE adequately explained how it reached the conclusion "that this amendment should not change the measured energy consumption of covered equipment." Id.
We note that multiple manufacturers — including AHRI — believed that an even more stringent definition of "L" would have been consistent with prior practice. They suggested in comments that DOE only account for door mullion and door frame widths of five inches or less; any non-transparent area greater than five inches would be excluded from the calculation of "L."
AHRI and Zero Zone also object to the timing of both the proposal and the publication of the 2014 Test Procedure Rule. The Rule was proposed after the New Standards Rule was proposed and published after the New Standards Rule was published.
We begin with the challenge under the EPCA. According to the EPCA, "[a]ny new or amended energy conservation standard prescribed under this section shall include, where applicable, test procedures." 42 U.S.C. § 6295(r) (emphases added). The petitioners contend that DOE therefore was obligated under the EPCA to include the 2014 Test Procedures in the New Standards Rule. DOE did not fulfill this statutory mandate, they contend, because the 2014 Test Procedures were not published at the time of the publication of the New Standards Rule. In response, DOE contends that it satisfied the EPCA by including the 2012 Test Procedures in its New Standards Rule.
We agree with DOE's interpretation: the inclusion of the 2012 Test Procedures satisfies § 6295(r). The EPCA clearly contemplates that DOE will amend and proscribe test procedures independent of energy conservation standards. Indeed, the EPCA states that "[i]f [DOE] determines that the amended test procedure will alter the measured efficiency or measured use, [DOE] shall amend the applicable energy conservation standard during the rulemaking carried out with respect to such test procedure." Id. § 6293(e)(2). It naturally follows that if DOE determines that the amended test procedures will not alter efficiency standards — as DOE did here — DOE does not need to amend the applicable efficiency standards during that rulemaking.
We now turn to the challenges under DOE's own process rules. DOE Process Rule 7(b) explains that "[a]ny necessary modifications [to test procedures] will be proposed before issuance of an [advance notice of proposed rulemaking]." 10 C.F.R. pt. 430, subpt. C, app. A. DOE Process Rule 7(c) further explains that "[f]inal, modified test procedures will be issued prior to the [notice of proposed rulemaking] on proposed standards." Id. The petitioners
DOE created these Process Rules, so we will affirm DOE's interpretation of those rules "unless plainly erroneous or inconsistent with the regulation." Auer, 519 U.S. at 461, 117 S.Ct. 905 (internal quotation marks omitted); see also Whetsel v. Network Prop. Servs., LLC, 246 F.3d 897, 901 (7th Cir. 2001). Here, DOE's interpretation is worthy of such deference. The Supreme Court has explained that an "interpretation" of a rule, which is meant to ascertain the meaning of text, is not the same as an "amendment" of a rule, which is meant to change the text. Perez v. Mortg. Bankers Ass'n, ___ U.S. ___, 135 S.Ct. 1199, 1207-08, 191 L.Ed.2d 186 (2015) ("One would not normally say that a court `amends' a statute when it interprets its text. So too can an agency `interpret' a regulation without `effectively amend[ing]' the underlying source of law." (alteration in original)). Similarly, a clarification of a rule, which is also meant to ascertain the meaning of text, can be distinguished from a modification of a rule, which, according to the Supreme Court, "connotes moderate change." MCI Telecomms. Corp. v. AT&T Co., 512 U.S. 218, 228, 114 S.Ct. 2223, 129 L.Ed.2d 182 (1994). DOE determined that "L," as defined in its previous test procedure rules, was ambiguous. By clarifying the meaning of "L" in the 2014 Test Procedure Rule, DOE acted within its authority and did not violate any regulatory or statutory provisions.
For the foregoing reasons, we deny the petitions for review in their entirety.
PETITIONS DENIED
42 U.S.C. § 6311(9)(A).
42 U.S.C. § 6306(b)(1). The New Standards Rule was prescribed under § 6295. The 2014 Test Procedure Rule was prescribed under § 6314, which is covered by § 6306(b). See id. § 6316(a)(1) (explaining that "references to sections 6293, 6294, and 6295 of this title shall be considered as references to sections 6314, 6315, and 6313 of this title").
Christopher v. SmithKline Beecham Corp., ___ U.S. ___, 132 S.Ct. 2156, 2166-67, 183 L.Ed.2d 153 (2012).
Energy Policy and Conservation Act, Pub. L. No. 94-163, § 325, 89 Stat. 871, 924-25 (1975).
42 U.S.C. § 6295(o)(2)(B).
Nat'l Ass'n of Home Builders v. EPA, 682 F.3d 1032, 1041 (D.C. Cir. 2012); see also Allied Local & Reg'l Mfrs. Caucus v. EPA, 215 F.3d 61, 79 (D.C. Cir. 2000).
Id. at 42,921. After assessing the impact of the New Standards Rule, EPA went on to extend the "change of status" date for certain units. See id. at 42,908, 42,916-17.