Summary: [PUBLISH] IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT FILED _ U.S. COURT OF APPEALS ELEVENTH CIRCUIT JUNE 28, 2011 No. 09-14657 JOHN LEY _ CLERK D. C. Docket No. 07-00001 MD-J-PAM-JRK In Re: MDL-1824 TRI-STATE WATER RIGHTS LITIGATION - 3:07-cv-00249 STATE OF ALABAMA, ALABAMA POWER COMPANY, STATE OF FLORIDA, Plaintiffs-Appellees, versus UNITED STATES ARMY CORPS OF ENGINEERS, JOHN M. McHUGH, Secretary of the Army, et al., Defendants-Appellees Cross-Appellants. - 3:07-cv-00252 ST
More
                                                                                     [PUBLISH]

                  IN THE UNITED STATES COURT OF APPEALS
                         FOR THE ELEVENTH CIRCUIT           FILED
                          ________________________ U.S. COURT OF APPEALS
                                                                        ELEVENTH CIRCUIT
                                                                           JUNE 28, 2011
                                     No. 09-14657
                                                                            JOHN LEY
                              ________________________                        CLERK
                       D. C. Docket No. 07-00001 MD-J-PAM-JRK


In Re:

               MDL-1824 TRI-STATE WATER RIGHTS LITIGATION

----------------------------------------------------------------------------------------------------
                                         3:07-cv-00249

STATE OF ALABAMA, ALABAMA
POWER COMPANY, STATE OF FLORIDA,

                                                                            Plaintiffs-Appellees,

                                              versus

UNITED STATES ARMY CORPS OF ENGINEERS,
JOHN M. McHUGH, Secretary of the Army, et al.,

                                                                          Defendants-Appellees
                                                                             Cross-Appellants.

----------------------------------------------------------------------------------------------------
                                          3:07-cv-00252

STATE OF GEORGIA, GWINNETT
COUNTY, GEORGIA, et al.,
                                                                           Plaintiffs-Appellants
                                                                               Cross-Appellees,
                                              versus
UNITED STATES ARMY CORPS OF ENGINEERS,
JOHN M. McHUGH, in his official capacity as Secretary
of the United States Army, et al.,

                                                                          Defendants-Appellees
                                                                             Cross-Appellants.

----------------------------------------------------------------------------------------------------
                                           3:08-cv-233

CITY OF APALACHICOLA, FLORIDA,

                                                                              Plaintiff-Appellee,
                                              versus

UNITED STATES ARMY CORPS OF ENGINEERS,
JOHN M. McHUGH, Secretary of the Army, et al.,

                                                                          Defendants-Appellees
                                                                              Cross-Appellants

----------------------------------------------------------------------------------------------------

                                           3:08-cv-640

SOUTHEAST FEDERAL POWER CUSTOMERS, INC.,
CITY OF APALACHICOLA, FLORIDA,
                                                                            Plaintiffs-Appellees,

                                              versus

UNITED STATES ARMY CORPS OF ENGINEERS,
JOHN M. McHUGH, Secretary of the Army, et al.,

                                                                          Defendants-Appellees
                                                                             Cross-Appellants.



                                                 2
                               _________________________

                       Appeals from the United States District Court
                            for the Middle District of Florida
                             _________________________

                                         (June 28, 2011)

Before MARCUS and ANDERSON, Circuit Judges, and MILLS,* District Judge.

PER CURIAM:

       The Georgia Parties,1 Gwinnett County, Georgia, and the United States Army

Corps of Engineers (“the Corps”) appeal from the Middle District of Florida’s grant

of summary judgment in this consolidated suit. The appeal arises from more than

20 years of litigation involving the above parties as well as the States of Alabama

and Florida, Alabama Power Company, the City of Apalachicola, Florida, and

Southeastern Federal Power Customers, Inc. (“SeFPC”), a consortium of

companies that purchase power from the federal government. All of the underlying

cases2 relate to the Corps’ authority to operate the Buford Dam and Lake Lanier,

       *
         Honorable Richard Mills, United States District Judge for the Central District of Illinois,
sitting by designation.
       1
               The designation “Georgia Parties” refers to the State of Georgia, the City of
Atlanta, Fulton County, DeKalb County, the Cobb County-Marietta Water Authority, the City of
Gainesville, the Atlanta Regional Commission, and the Lake Lanier Association. Gwinnett
County, Georgia appeals separately and is not included in this denomination.
       2
              The four underlying cases are Alabama v. United States Army Corps of
Engineers; Southeastern Federal Power Customers, Inc. v. Caldera; Georgia v. United States
Army Corps of Engineers; and City of Apalachicola v. United States Army Corps of Engineers.

                                                  3
the reservoir it created, for local water supply. In its order, the district court found

that the Corps’ current operation of the Buford Project—Buford Dam and Lake

Lanier collectively—had allocated more than 21% of Lake Lanier’s storage space

to water supply. The court determined that such an allocation exceeded the Corps’

statutory authority and ordered the Corps to drastically reduce the quantity of water

that it made available for water supply. The court’s summary judgment order also

affirmed the Corps’ rejection of Georgia’s 2000 request for additional water supply

allocations to meet the needs of the localities through 2030. The court stayed its

order for three years to give the parties time to reach a settlement or to approach

Congress for additional water supply authority.

       On appeal, the parties argue several jurisdictional matters. Alabama and

Florida3 contend that this Court does not have appellate jurisdiction to hear the

appeal of three of the four underlying cases because there is no final judgment in


Subsequent short-form references to the district court and previous appellate decisions in the
several cases will be as follows: Alabama v. United States Army Corps of Engineers as Alabama
and Georgia v. United States Army Corps of Engineers as Georgia. Southeastern Federal Power
Customers, Inc. v. Caldera became Southeastern Federal Power Customers v. Geren on appeal
due to Luis Caldera’s succession by Pete Geren as Secretary of the Army. Short-form references
to the district court case will be to SeFPC, while the appellate decision in the case will be
referred to in the short-form as Geren.
       3
                The State of Alabama, the State of Florida, Alabama Power Company, and the
City of Apalachicola have written a joint brief in this case. The designation “Alabama and
Florida” refers to all four parties. The designation “Appellees” in this opinion refers to these four
parties and SeFPC. The Corps is also an appellee in Georgia, but for the sake of clarity it will
always be referred to by name.

                                                  4
the cases and pendent jurisdiction is inappropriate. The Georgia Parties and the

Corps argue that the district court lacked jurisdiction over these three matters

because there was no final agency action, and, therefore, the Administrative

Procedures Act (“APA”) did not provide for judicial intervention at this juncture.

      The parties also assert a number of substantive claims. The Georgia Parties

argue that the district court erred by concluding that the Corps lacked authority to

allocate substantial quantities of storage in Lake Lanier to water supply on the

basis of the legislation that authorized the creation of the Buford Project, the 1946

Rivers and Harbors Act (“RHA”), Pub. L. No. 79-525, 60 Stat. 634 (1946).

Although not in agreement with the Georgia Parties that water supply for the

Atlanta area is an authorized project purpose under the RHA, the Corps does argue

that the district court underestimated its authority to accommodate the water supply

needs of the Atlanta area. The Georgia Parties and the Corps both assert that the

district court erred by misinterpreting the scope of the Corps’ authority under the

1958 Water Supply Act. The Georgia Parties and the Corps urge this Court to

remand the case to the agency to make, in the first instance, a final determination of

its water supply authority. Gwinnett County also individually asserts statutory,

constitutional, and contractual claims relating to authority granted to it for its

current withdrawals from Lake Lanier.

                                           5
      For the reasons explained below, we hold: First, the district court erred in

finding that it had jurisdiction to hear Alabama, SeFPC, and Apalachicola because

the Corps has not taken final agency action. The three cases therefore must be

remanded to the Corps in order to take a final agency action. Second, the district

court and the Corps erred in concluding that water supply was not an authorized

purpose of the Buford Project under the RHA. The Corps’ denial of Georgia’s 2000

water-supply request is therefore not entitled to Chevron deference, and the request

must be remanded to the Corps for reconsideration. Third, the district court erred in

finding that the 1956 Act, which authorized the Corps to contract with Gwinnett

County to withdraw 10 million gallons of water per day, expired after 50 years.

Gwinnett County’s contractual and just-compensation claims are without merit.

Fourth, we also provide certain instructions to the Corps on remand. And finally,

the Corps shall have one year to make a final determination of its authority to

operate the Buford Project under the RHA and WSA. Our opinion is organized as

follows:

      FACTS AND PROCEDURAL HISTORY

      DISCUSSION

             Part I.        Jurisdictional Matters

                       A.   Appellate Jurisdiction over Alabama, SeFPC, and

                                           6
                           Apalachicola

                   B.      Final Agency Action in Alabama, SeFPC, and
                           Apalachicola

            Part II.       Georgia’s 2000 Request: The Corps’ Water Supply
                           Authority Under the RHA

            Part III.      Georgia’s 2000 Request Must Be Remanded to the Corps

            Part IV.       Gwinnett County’s Claims Not Involving Authorization
                           Under the RHA and WSA

                   A.      The Expiration of the 1956 Act

                   B.      Forty MGD from the 1974 Supplemental Agreement to
                           the Corps’ Contract

                   C.      Just Compensation for Relocation of the Duluth Intake

            Part V.        Remand Instructions to the Corps

            Part VI.       Collateral Estoppel Effects on Remand Instructions

            Part VII.      One-Year Time Limit on Remand

      CONCLUSION


                        FACTS AND PROCEDURAL HISTORY

      The facts of this appeal are intertwined with the history of Buford Dam and

Lake Lanier. Buford Dam sits on the Chattahoochee River, approximately forty miles

upstream of Atlanta. The Chattahoochee’s headwaters are in Northeastern Georgia in



                                          7
the Blue Ridge Mountains. The river flows southwest to Columbus and then along

much of the length of the Georgia-Alabama border and into the Florida Panhandle,

where it combines with the Flint River to form the Apalachicola River. The

Chattahoochee, Flint, and Apalachicola Rivers together are referred to as the ACF

Basin.

         The Corps first began surveying the ACF Basin for suitable sites for

hydroelectric facilities at the request of Congress in 1925. River and Harbor Act of

1925, Pub. L. No. 68-585, ch. 467, 43 Stat. 1186, 1194 (Mar. 3, 1925). As a result of

this survey, the Corps produced a report in 1939. See H.R. Doc. No. 76-342 (1939)

[hereinafter “Park Report”]. The Park Report analyzed eleven projects at various

stages of development in the ACF basin, including one at Roswell, Georgia, sixteen

miles north of Atlanta. 
Id. ¶ 196.
District Engineer Colonel R. Park, the report’s

author, referred to transportation, hydroelectric power, national defense, commercial

value of riparian lands, recreation, and industrial and municipal water supply as

“principal direct benefits” of the various projects under consideration. Park Report ¶

243. Col. Park noted that at the time the Atlanta area had no immediate need for

increased water supply, though such a future need was “not improbable.” Park Report

¶ 260. He stated that a large reservoir might have value as “an assured continuous

water supply” due to the “continued rapid growth of the area.” 
Id. Though he
assigned

                                          8
the other direct benefits a monetary value, he declined to do so for water supply,

presumably because the benefit of this purpose, unlike all of the others, could only

accrue in the future, rendering any valuation at that time speculative. Congress

adopted the Corps’ proposals in the Park Report in full in its 1945 RHA. Pub. L. No.

79-14, 59 Stat. 10, 17 (1945).

      In 1946, the Corps, in its “Newman Report,” recommended certain amendments

and revisions to the original plan for the ACF system, including combining several of

the hydroelectric sites near Atlanta into one large reservoir at Buford, Georgia to

increase power generation and to better regulate flows downstream. H.R. Doc. No. 80-

300, ¶ 69 (1947) [hereinafter “Newman Report”]. Division Engineer Brigadier General

James B. Newman noted that the Chattahoochee River would be an excellent source

of hydropower. Newman Report ¶ 7. According to Newman, a large reservoir—what

would become Lake Lanier—was needed to make the locks and dams downstream

more effective. The Newman Report noted that the proposed dam at Buford would be

valuable for the purpose of flood control because of the frequent flooding in the basin

and the severe damage that previous floods had caused. The report also explained that

the various dams in the proposal would help keep flows continuous. These continuous

flows would benefit navigation because they would allow barges to travel from

Atlanta to Columbus and beyond, and they would assure a source of water supply for

                                          9
the City of Atlanta. Just as the Park Report had done before it, the Newman Report

attempted to quantify the value of the benefits of the project. Only three value-

calculated benefits were listed: power, navigation, and flood control. 
Id. ¶ 98,
Table

10. It is probable that Newman, like Park, deemed there to be no immediate benefit

from water supply, rendering any benefit purely prospective and any valuation of this

benefit entirely speculative.

       The Newman Report, at several junctures, spoke of the benefit that the dam

would provide for water supply. The report concluded that the project would “greatly

increase the minimum flow in the river at Atlanta,” which would safeguard the city’s

water supply during dry periods. 
Id. ¶ 68.
In discussing the operation of the dam, the

Newman Report noted that releases of 600 cubic feet per second (“cfs”) should be

made during off-peak hours4 in order to ensure a continuous flow of the river at

Atlanta of not less than 650 cfs, even though this flow would have a slight detrimental

effect on power generation. The report noted that this “minimum release may have to

be increased somewhat as the area develops.” 
Id. ¶ 80.
The Report expected that any

decrease in power value would be marginal and outweighed by the benefits of an



       4
               Off-peak hours are those time periods when the demand for power is relatively
low. Hydroelectric plants attempt to minimize the amount of water released during off-peak
hours so that power generation can operate at maximum levels during peak hours when the
demand for power is high.

                                               10
“assured” water supply for the City of Atlanta. 
Id. The 1946
RHA stated that the

project would be “prosecuted . . . in accordance with the report of the Chief of

Engineers, dated May 13, 1946,” Pub. L. No. 79-525, 60 Stat. 634, 635 (1946).

Because that report incorporated the Newman Report in full, the Newman Report

became part of the authorizing legislation for the project.

      Congress continued to consider the purposes of the Buford Dam in debates

about appropriations bills for the project’s funding. The purposes mentioned most

frequently in Congressional hearings were power, navigation, and flood control, but

water supply was also discussed with some frequency. Then-mayor of Atlanta,

William Hartsfield testified before a Senate subcommittee that water from the

Chattahoochee was “necessary” but that Atlanta did not immediately need the water

in the same manner as cities in more arid locations. Civil Functions, Dep’t of the Army

Appropriation Bill 1949: Hearing Before the Subcomm. of the S. Comm. on

Appropriations, 80th Cong. 644 (statement of William B. Hartsfield, Mayor, Atlanta,

Georgia). Congress debated whether Atlanta should be asked to contribute part of the

cost of building the Buford Dam. Corps officer Colonel Potter testified that the Corps

was not recommending that Atlanta be asked to pay because the services that would

be provided in the field of water supply were all incidental to the purposes of

hydropower and flood control and would “not cost the Federal Government 1 cent to

                                          11
supply.” Civil Functions, Dep’t of the Army Appropriations for 1952: Hearings Before

the Subcomm. of the H. Comm. on Appropriations, 82d Cong. 121–122 (1951)

(exchange between Rep. Gerald Ford, Member, H. Comm. on Appropriations, and Col.

Potter, Corps officer). Congressman Gerald Ford presciently asked Colonel Potter

whether it was foreseeable that one day in the future Atlanta would begin to request

greater amounts of water from the project. 
Id. at 122.
Col. Potter responded that the

Corps would have to study the effect that such a request would have on power

production. He said that the Corps would have to obtain additional water supply

authorization if a request amounted to “a major diversion of water.” 
Id. Ultimately, Atlanta
was never asked to, and did not, contribute to the construction costs.

      The Corps released its “Definite Project Report” for the project in 1949. The

report provided a detailed discussion of the plans for the Buford Project and its

operations. The report referred to flood control, hydroelectric power, navigation, and

an increased water supply for Atlanta as “the primary purposes of the Buford project.”

U.S. Army Corps of Eng’rs: Mobile District, Definite Project Report on Buford Dam

Chattahoochee River, Georgia, ¶ 48 (1949) [hereinafter “Definite Project Report”]. A

later passage in the report referred to flood control, power generation, navigation, and

water supply as “principle purposes of the Buford project.” 
Id. ¶ 115.
The report

concluded by calculating and explaining the benefits of the various project purposes.

                                          12
As to water supply, it explained that the project would result in “[a] real benefit,” but

it did not estimate the monetary value because “definite evaluation of this benefit

cannot be made at this time.” 
Id. ¶ 124.
       Buford Dam was constructed from 1950 to 1957, creating the reservoir known

today as Lake Sidney Lanier. The Southeastern Power Administration (“SEPA”), the

federal government agency from which SeFPC purchases the power generated at the

dam, paid approximately $30 million of the $47 million of construction costs. The

creation of Lake Lanier inundated the water intake structures of the Cities of Buford,

Georgia and Gainesville, Georgia. As a method of compensation, the Corps signed

relocation agreements with the two municipalities authorizing water withdrawals

directly from the reservoir—these agreements allowed Gainesville to withdraw 8

million gallons per day (“mgd”)5 and Buford 2 mgd.6 Although no storage7 was

specifically allocated for water supply, the fact that the dam operated during “off-

peak” hours, to the detriment of power generation, demonstrated that downstream

       5
               A contract to this effect was entered into on June 22, 1953. Contract Between the
United States of America and City of Gainesville, Georgia for Withdrawal from Lake Sidney
Lanier.
       6
               A contract to this effect was entered into on December 19, 1955. Contract
Between the United States of America and City of Buford, Georgia for Withdrawal from Lake
Sidney Lanier.
       7
               Storage refers to the amount of space in Lake Lanier dedicated to a particular
project purpose. Lake Lanier is the reservoir for the Buford Project and provides space sufficient
to store approximately 2.5 million gallons of water.

                                                13
water supply was a consideration. In accordance with the recommendations of the

Newman Report, the Corps maintained the necessary minimum river flow at Atlanta

by making off-peak releases of 600 cfs during these hours of the week.

      During construction of the dam, Gwinnett County requested permission from

the Corps to withdraw 10 mgd directly from Lake Lanier. The Corps denied the

request, explaining that the approval of Congress was required for it to meet such a

request. In 1955, the Corps stated to Congress that the proposed withdrawals would

be in the public interest and would not have a materially adverse effect on downstream

interests or power output. F.G. Turner, Ass't Chief, Eng'g Div., U.S. Army Corps of

Eng’rs: Mobile District, Report on Withdrawal of Domestic Water Supply from

Buford Reservoir ¶ 1 (1955). The following year, Congress passed a law that granted

the Corps authority to enter into a contract with Gwinnett County for the allocation of

11,200 acre-feet of storage for regulated water supply and granted the county an

easement across government property for the construction and maintenance of a

pumping station and pipelines. Pub. L. No. 84-841, 70 Stat. 725 (1956).

      Construction was completed in 1957. Lake Lanier covers 38,000 acres and has

692 miles of shoreline. The large size of the lake allows for a substantial benefit in the

form of recreation.

      Lake Lanier is divided into three tiers, or pools, divided by elevation. The first

                                           14
tier extends from the bottom of the lake, at an elevation of 919 feet above sea level,

to an elevation of 1,035 feet. This tier holds 867,600 acre-feet of “inactive” storage.

The inactive pool is generally left untouched and saved for instances of severe

drought. The next tier extends from an elevation of 1,035 feet to an elevation of 1,070

feet (1,071 feet in the summer) and contains 1,049,000 acre-feet (1,087,600 acre-feet

in the summer) of conservation storage. The conservation pool generally provides the

water that is used for all downstream purposes. The Newman Report contemplated that

conservation storage would be used primarily for hydropower and repeatedly referred

to it as storage for power. The final tier extends from an elevation of 1,070 feet (1,071

feet in the summer) to an elevation of 1085 feet. This tier provides 598,800 acre-feet

of flood storage. The flood pool is generally left empty so that it can accommodate

excess water during flood conditions.

      Buford Dam was constructed to release water from Lake Lanier through a

powerhouse that generates hydropower. The powerhouse contains three turbines. Two

of the turbines are large and release about 5,000 cfs when running. These two turbines

operate during peak hours, when energy consumption is at its greatest. They are the

most efficient source of power generation—generating 40,000 kilowatt hours (“kwh”)

originally and 60,000 kwh after improvements in 2004—and would be the only

turbines used if a minimum off-peak flow at Atlanta were not a project concern. To

                                           15
accommodate this concern, the powerhouse also contains a third, smaller turbine

which releases 600 cfs, generating approximately 7,000 kwh. At peak performance,

the dam releases approximately 11,000 cfs of water into the river. However, when

energy demand is low—so-called off-peak hours—only the small turbine is operated,

allowing the dam to produce some energy while providing for a minimal continuous

flow. The Corps can also release water through a small sluice gate, but this is typically

done only when the small turbine is shut down for repairs or in cases of an emergency.

In this manner, Buford Dam was designed to generate maximum power while also

ensuring a minimum continuous flow of water downstream to accommodate water

supply.

      In 1958, Congress passed the Water Supply Act (“WSA”). The statute was

designed to allocate some storage in multi-purpose projects like Buford to water

supply. The policy underlying the statute was:

      to recognize the primary responsibilities of the States and local interests
      in developing water supplies for domestic, municipal, industrial, and
      other purposes and that the Federal Government should participate and
      cooperate with States and local interests in developing such water
      supplies in connection with the construction, maintenance, and operation
      of Federal navigation, flood control, irrigation, or multiple purpose
      projects.

43 U.S.C. § 390b(a) (2011). To further that policy, Congress authorized the Corps to

allocate storage in federal reservoirs for water supply, provided that the localities paid

                                           16
for the allocated storage. 
Id. § 390b(b).
However, Congress placed the following

limitation on its authorization:

      Modifications of a reservoir project heretofore authorized, surveyed,
      planned, or constructed to include storage as provided by subsection (b)
      of this section which would seriously affect the purposes for which the
      project was authorized, surveyed, planned, or constructed, or which would
      involve major structural or operational changes shall be made only upon
      the approval of Congress as now provided by law.

Id. § 390b(d)
(emphasis added). The policy of subsection (a) indicates that Congress

aimed only to expand water supply allocations, not contract them by limiting previous

authorizations. The articulation of the bounds of the statute’s authorization makes no

mention of a limit on previously granted water supply authorization. In the case of

Buford, the WSA’s grant of authority for water supply constitutes a supplement to any

authority granted by the 1946 RHA.

      In 1959, the Corps issued its Reservoir Regulation Manual for Buford Dam

(“Buford Manual”) as an appendix to the Corps’ 1958 manual for the entire river basin.

U.S. Army Corps of Eng’rs: Mobile District, Apalachicola River Basin Reservoir

Regulation Manual, Appendix B (1959). The Buford Manual has not been updated and

remains in effect today. The manual describes the technical features of the dam,

including a description of the three tiers and their storage capacities, the size of Lake

Lanier, and the general operation of the plant. It states that the project will be run to


                                           17
maximize releases of water during peak hours but will also utilize off-peak releases in

order to maintain a minimum flow of 650 cfs at Atlanta.8 
Id. at B-13.
The manual

makes multiple mentions of regulations that are designed to ensure this minimum flow.

Id. at B-18–19,
B-22.

       There was very little change in water supply operations at the Buford Project

between 1960 and 1973. Only Gainesville and Buford withdrew water directly from

Lake Lanier. Gwinnett, with which the Corps was authorized to contract, did not

withdraw water directly from the reservoir. In the meantime, the City of Atlanta and

DeKalb County withdrew water from the river downstream from the dam but made no

recorded requests that the schedule of releases be altered to accommodate their needs.

The Atlanta metropolitan area increased its water use from the Chattahoochee by 37%

(from 117 mgd to 160 mgd) between 1960 and 1968. U.S. Army Corps of Eng’rs:

Mobile District, Final Environmental Impact Statement: Buford Dam and Lake Sidney

Lanier, Georgia (Flood Control, Navigation and Power), Statement of Findings 14

(1974). This amount was still well below the amount released by the Corps to maintain

a minimum off-peak flow. Moreover, between 1956 and 1969, the number of

residences within two and a quarter miles of the reservoir doubled. 
Id. at 15.
The



       8
              The Manual categorizes 7 a.m.–11 p.m. on weekdays, 7 a.m.–10 p.m. on Saturday,
and 9 a.m.–2 p.m. on Sunday as peak hours (for a total of 100 peak hours per week).

                                             18
growing water needs of Atlanta came to the attention of the Senate, which in 1973

commissioned the Metropolitan Atlanta Area Water Resources Management Study

(“MAAWRMS”) to develop a plan for the long-term needs of the Atlanta area. The

study was conducted by the Corps, the Atlanta Regional Commission (“ARC”), the

State of Georgia, and the U.S. Environmental Protection Agency in combination.

      By the 1970s, it became clear that area localities desired greater access to water

in Lake Lanier. The Corps determined that it could not grant permanent water

allocation rights to the localities before the completion of the MAAWRMS. While the

study was being performed, the Corps entered into a number of interim contracts for

water withdrawal. The first water supply contract was given to Gwinnett County and

allowed for the withdrawal of up to 40 mgd directly from Lake Lanier during the

course of the study. Contract of July 2, 1973, Gwinnett Record Excerpts vol. 1,

ACF004024. The contract cited the WSA for authority and was based on findings of

the Corps’ District Engineer that the proposed withdrawals would not have significant

adverse affects on the other authorized purposes of the project. No mention was made

of the 1956 Act, possibly because the Act authorized only 10 mgd and thus would not

have been sufficient authority for the Corps’ actions. In 1975, the county informed its

bond investors that the construction costs alone for its water supply facilities would be

$28 million.

                                          19
      In 1975, the Corps concluded, and SEPA agreed, that the Buford Project could

supply an annual average of 230 mgd of water for downstream withdrawal (with a

maximum of 327 mgd in the summer) without significantly affecting hydropower

generation. The Corps revised this number in 1979, concluding that by scheduling

additional peak weekend releases it could raise the annual average to 266 mgd as an

incident of power generation. In 1986, the Corps would again raise the figure for

available water supply downstream incident to power generation, concluding that it

could guarantee an annual average of 327 mgd by implementing a new water

management system that had been proposed in the MAAWRMS.

      The final report of the MAAWRMS was issued in September 1981. The report

evaluated three alternative plans for dealing with Atlanta’s increasing long-term water

supply needs. The first alternative was to build a reregulation dam 6.3 miles below the

Buford Dam. This new dam would store outflows released from Buford during peak

operations and release them as needed for water supply. The study found that this

alternative had the highest estimated ratio of benefits to costs. This alternative received

the most support from federal and state agencies, and the study concluded it was best.

The second alternative was to reallocate storage space in Lake Lanier for water supply.

According to the study, in 1980, 10,512 acre-feet had been allocated to water supply,

amounting to 14.6 mgd withdrawn directly from Lake Lanier. This alternative called

                                           20
for an increase of allocated storage space to 141,685 acre-feet by the year 2010,

allowing for a total withdrawal of 53 mgd from the lake. The final alternative was to

dredge the Morgan Falls Reservoir, which lies downstream from Buford, and also

reallocate 48,550 acre-feet of storage space in Lake Lanier for water supply by 2010.

      In 1986, Congress, in the Water Resources Development Act, authorized the

construction of a reregulation dam, the MAAWRMS’ favored first alternative. Pub. L.

No. 99-662, § 601(a)(1), 100 Stat. 4137, 4140–41. However, the project had previously

not received approval from the Office of Management and Budget, which said that state

and local money should be used to construct such a project, and Congress did not

appropriate any funding towards the construction of the proposed reregulation dam.

Shortly thereafter, the Corps determined that the second alternative of the

MAAWRMS—reallocating storage in Lake Lanier instead of constructing a new

dam—would be more economical. The change was based, at least in part, on an

environmental study generated by new computer models that concluded that the costs

of acquiring the land flooded by the reregulation dam could rise and make the first

alternative less economical than originally thought. U.S. Army Corps of Eng’rs: Mobile

District, Additional Information, Lake Lanier Reregulation Dam 2 (1988).

      In the late 1980s, the Corps began to prepare a Post-Authorization Change

Notification Report (“PAC Report”) suggesting that the authorization for the new

                                         21
reregulation dam be set aside in favor of the reallocation of storage alternative. A draft

of the PAC Report was completed in 1989. The draft recommended that 207,000 acre-

feet be allocated to water supply, allowing for 151 mgd to be withdrawn directly from

Lake Lanier and 378 mgd (51 mgd more than the 327 mgd that the Corps determined

was available as an incident of power supply) from the river downstream. This

represented a significant increase from the 142,000 acre-feet of storage recommended

by the second alternative of the MAAWRMS. The draft PAC Report also included a

draft Water Control Manual that would have replaced the manual from 1958 and

governed the Corps’ water operations in the ACF basin. In this appeal, the Corps

claims that the PAC Report’s recommendations would have been made pursuant to

authority from the WSA. The draft report itself noted the Corps’ authority under the

statute but stated that approval from Congress might be required due to the fact that the

allocation exceeded 50,000 acre-feet.9 The draft report estimated that the purchased

       9
                Internal policies require the Corps to obtain the approval of the Secretary of the
Army for all storage allocations exceeding 15% of total storage capacity or 50,000 acre-feet,
whichever is less. The parties have not made this Court aware of any internal regulations that set
a threshold for allocations above which Congressional approval is required. However, the Corps
had warned the preceding year that such a reallocation of storage might require Congressional
approval:

       The Chief of Engineers has the discretionary authority to approve reallocation of
       storage if the amount does not exceed 50,000 acre-feet, or 15 percent of total
       usable storage, whichever is lower, and if the reallocation would not have a
       significant impact on authorized project purposes. [The reallocation contemplated
       in the MAAWRMS] would require the reallocation of 202,000 acre-feet of storage
       to meet the year 2010 peak demand of 103 mgd from the lake and 510 mgd from

                                                22
storage in Lake Lanier would cost $49,360,600. The final PAC Report was never

completed due to resistance and the initiation of a lawsuit by the State of Alabama.

       The Corps followed the recommendation of the MAAWRMS to make water

available for water supply in the interim before a long-term solution was reached, as

it had done while the study was being completed, and it entered into a temporary water

supply contract with the ARC. The contract was based on the Corps’ revised

determination that it could provide, incidentally to power generation, 327 mgd as a

year-round average with no impact on hydropower. The Corps agreed to provide

releases sufficient to accommodate up to 50 mgd in withdrawals above this 327 mgd

threshold, for which the ARC would pay. The contract was renewed in 1989 but

expired in 1990. Since then, the ARC has continued to withdraw water from the

Chattahoochee on roughly the same basis as that specified in the contract, though it has

generally not needed to withdraw more than 327 mgd.

       The Corps signed several other water supply contracts in the 1970s and 1980s,

all of which expired in 1990, but which roughly dictate the terms under which the


       the river. . . . Therefore, the required reallocation is not within the discretionary
       authority of the Chief of Engineers to approve. It can only be approved by the
       [Assistant Secretary of the Army for Civil Works] if impacts are determined to be
       insignificant. We believe the power losses are significant and expect that
       Congressional approval would be required for the reallocation.

Letter from C.E. Edgar III, Major Gen., U.S. Army Corps of Eng’rs, to Harry West, Exec. Dir.,
ARC 5 (Apr. 15, 1988).

                                                 23
localities have continued to withdraw water from the Buford Project. In 1978, the

Corps agreed to terms with the City of Cumming, Georgia for the paid withdrawal of

2.5 mgd. In 1985, the amount was raised to 5 mgd, and in 1987 it was raised to 10 mgd.

In 1987, the Corps signed a contract with the City of Gainesville, allowing the city to

withdraw up to 20 mgd, up from the 8 mgd authorized in 1953 as just compensation.

The contract required Gainesville to pay for the water that it withdrew in excess of 8

mgd. In 1988, the 1973 contract with Gwinnett County was supplemented, expanding

the cap on withdrawals from 40 mgd to 53 mgd. All of the contracts signed in the

1980s specifically stated that they were interim contracts to satisfy water supply needs

while the Corps was studying the issue and determining a permanent plan. As a

component of their interim nature, the contracts explicitly stated that they did not create

any permanent rights to storage space in Lake Lanier. The Corps originally cited the

Independent Offices Appropriations Act of 1952, 31 U.S.C. § 9701, as authority for

these contracts, but it later deemed the statute to be ineffective in authorizing such

transactions. Later contracts cited the Water Supply Act for authority.

      On January 1, 1990, all of the interim contracts expired. The only remaining

water supply allocations were the combined 10 mgd granted to Buford and Gainesville

in the 1950s by the Corps as just compensation. However, the Corps continued to

permit the localities to withdraw water from the Buford Project for water supply.

                                           24
Appellees refer to these water withdrawals as pursuant to “holdover” contracts.

       In June, 1990, Alabama filed suit against the Corps in the Northern District of

Alabama to challenge a section of the draft PAC Report and the continued withdrawal

of water from the Buford Project by the Georgia Parties, which Appellees characterize

as a de facto reallocation of storage. This suit is the first of the four currently on appeal.

In September of 1990, Alabama and the Corps moved jointly for a stay of proceedings,

which was granted, to negotiate a settlement agreement. Florida and Georgia later

intervened as plaintiff and defendant, respectively. The stay order at issue in Alabama

v. United States Army Corps of Engineers, 
357 F. Supp. 2d 1313
(N.D. Ala. 2005),

required the Corps not to “execute any contracts or agreements which are the subject

of the complaint in this action unless expressly agreed to, in writing, by [Alabama] and

Florida.” 
Id. at 1316.
The stay provided that either side could terminate it at will. It did

not discuss the continued water withdrawals of the Georgia Parties.

       In 1992, Alabama, Florida, Georgia, and the Corps entered into a Memorandum

of Agreement (“MOA”) authorizing a comprehensive study of the water supply

question and requiring the Corps to withdraw the draft PAC Report along with its

accompanying Water Supply Reallocation Reports and Environmental Assessments.

The MOA contained a “live and let live” provision that allowed the Georgia Parties to

continue to withdraw water from the Buford Project at the level of their withdrawals

                                             25
in 1990, with reasonable increases over time. The provision made clear that it did not

grant any permanent rights to the water being consumed. The MOA was originally set

to last for three years but was extended several times.

      In 1997, after the completion of a comprehensive study, the parties entered into

the Apalachicola-Chattahoochee-Flint River Basin Compact (“ACF Compact”), which

was ratified by Congress and the three states and replaced the MOA. Pub. L. No. 105-

104, 111 Stat. 2219 (1997). The ACF Compact included a provision allowing

continued withdrawals similar to the live and let live provision in the MOA. The

Compact created an “ACF Basin Commission” composed of the governors of the three

states and a non-voting representative of the federal government, to be appointed by

the President. The commission was charged with establishing “an allocation formula

for apportioning the surface waters of the ACF Basin among the states of Alabama,

Florida, and Georgia.” 
Id. art. VI(q)(12),
111 Stat. at 2222. Under the Compact,

existing water supply contracts would be honored, and water-supply providers could

increase their withdrawals “to satisfy reasonable increases in the demand” for water.

Id. art. VII(c),
111 Stat. 2223–24. The Compact initially was scheduled to expire

December 31, 1998, but it was extended several times; it ultimately expired on August

31, 2003, when the Commission failed to agree on a water allocation formula. The stay

of the Alabama case remained in effect through the duration of the Compact. In the

                                          26
meantime, the Corps continued to allow the Georgia Parties to withdraw water from the

Buford Project. Because there were no contracts in place, the Corps froze the rates that

it charged for water and continued to proceed on the basis of the prices that were set

in the interim contracts of the 1980s. This rate scheme angered hydropower customers

who purchased power produced by the project directly or indirectly from SEPA.

      In December 2000, SeFPC filed suit under the APA against the Corps in the

United States District Court for the District of Columbia, the second of the four suits

currently on appeal. SeFPC alleged that the agency had wrongfully diverted water from

hydropower generation to water supply, thereby causing SeFPC’s members to pay

unfairly high rates for their power. SeFPC sought a judicial declaration of the Buford

Project’s authorized purposes as well as compensation. In March 2001, the district

court referred the parties to mediation, and Georgia was joined. In January 2003,

SeFPC, the Corps, and the Georgia Parties agreed to a settlement in the case, which

called for an allocation of 240,858 acre-feet (estimated to be 22% of conservation

storage) to water supply for once-renewable 10-year interim contracts that could be

converted into permanent storage if approved by Congress (or if a court deemed

Congressional approval unnecessary). In exchange, the Georgia Parties agreed to pay

higher rates for water, with the income being applied as a credit against the rates

charged to SeFPC’s members. The D.C. district court then allowed Alabama and

                                          27
Florida to intervene.

      In October 2003, the Alabama court enjoined the filing of the settlement

agreement in the D.C. case, finding that the agreement violated the stay in its case

because the approval of Alabama and Florida was not obtained. The district court in the

District of Columbia approved the Agreement in February 2004, contingent upon the

dissolution of the Alabama court’s injunction, rejecting Alabama and Florida’s

argument that the Agreement exceeded the Corps’ authority conferred by Congress.

SeFPC, 
301 F. Supp. 2d 26
, 35 (D.D.C. 2004). In April 2004, a panel of this Court

stayed an appeal of the Alabama court’s injunction to allow the Alabama district court

to decide whether to dissolve or modify the injunction in light of the D.C. district

court’s order approving the Agreement. In the meantime, an initial appeal of the D.C.

district court’s order in SeFPC by Alabama and Florida was denied by the D.C. Circuit

Court of Appeals for lack of a final judgment. The Alabama district court denied a

motion to dissolve the preliminary injunction, 
Alabama, 357 F. Supp. 2d at 1320-21
,

but in September 2005, a panel of this Court held that the district court abused its

discretion in granting the injunction and vacated the injunction. Alabama, 
424 F.3d 1117
, 1133 (11th Cir. 2005). Once this Court dissolved the injunction over the

implementation of the Agreement, the D.C. district court in March 2006 entered a final

judgment in SeFPC, and Alabama and Florida again appealed to the D.C. Circuit.

                                         28
      In Southeastern Federal Power Customers, Inc. v. Geren, 
514 F.3d 1316
, 1324

(D.C. Cir. 2008), the D.C. Circuit held that the settlement agreement exceeded the

Corps’ authority under the WSA. The parties to the settlement agreement argued that

the Corps was authorized to enter into the settlement on the basis of its WSA authority

alone, so the court specifically refrained from making any holdings on the basis of the

RHA. 
Id. at 1324
n.4. The court found that “[o]n it’s face, . . . reallocating more than

twenty-two percent . . . of Lake Lanier’s storage capacity to local consumption uses . . .

constitutes the type of major operational change referenced by the WSA.” 
Id. at 1324
.

After the circuit court’s remand, the Judicial Panel on Multidistrict Litigation

transferred the case, along with Alabama and several others, to the Middle District of

Florida.

      Meanwhile, in 2000, the State of Georgia submitted a formal request to the Corps

to modify its operation of the Buford Project in order to meet the Georgia Parties’ water

supply needs through 2030. The request was to withdraw 408 mgd from the river and

297 mgd directly from the lake, which, combined, required approximately 370,930

acre-feet of storage. In February 2001, nine months after the request was sent to the

Corps and without a response from the Corps, the State of Georgia filed suit in the

United States District Court for the Northern District of Georgia seeking to compel the

Corps to grant its request, beginning the third of the four underlying cases. The Corps

                                           29
responded in April 2002 with a letter denying the request and an accompanying legal

memorandum. Memorandum from Earl Stockdale, Deputy General Counsel,

Department of the Army, to Acting Assistant Secretary of the Army for Civil Works:

Georgia Request for Water Supply from Lake Lanier 1 (Apr. 15, 2002) [hereinafter

“2002 Stockdale Memo”]. The 2002 Stockdale Memo concluded that the Corps lacked

the authority to grant Georgia’s request without legislative approval. The memo stated

that water supply was not an authorized purpose of the Buford Project under the RHA.

Further, it stated that even if water supply was authorized, the Corps would still lack

the authority to make a storage allocation of the size requested because the reallocation

“would involve substantial effects on project purposes and major operational changes.”

Id. The district
court denied Florida’s and SeFPC’s motions to intervene in the case,

but this Court reversed the denial and remanded for further proceedings. Georgia v.

U.S. Army Corps of Eng’rs, 
302 F.3d 1242
, 1260 (11th Cir. 2002). On remand, Florida

moved to dismiss or abate the proceedings; Alabama, Gwinnett County, the City of

Gainesville, and the ARC moved to intervene; and Alabama moved to abate or transfer

the proceedings. The district court allowed Alabama to intervene as of right and the

local governments to intervene permissively, and it held that the case would be abated

pending the resolution of the Alabama case. Georgia, 
223 F.R.D. 691
, 699 (N.D. Ga.

2004). On appeal, a panel of this Court in an unpublished decision affirmed the district

                                          30
court’s decision to abate the case. Georgia, 144 F. App’x 850 (11th Cir. 2005). The

case was then consolidated into the multidistrict litigation in the Middle District of

Florida.

       In January 2008, the City of Apalachicola sued the Corps in the federal district

court for the Northern District of Florida. This is the last of the four cases being

considered as part of this appeal. This case was also consolidated into the multidistrict

litigation.

       While the litigation was pending, the Corps began an update of its plans and

operations in the ACF Basin with a focus on whether it could continue to meet the

current water supply needs of the localities. In order to answer these question,

specifically in light of the D.C. Circuit’s Geren opinion, the Corps released a new legal

memorandum by Earl Stockdale. Memorandum from Earl Stockdale, Chief Counsel,

Department of the Army, to the Chief of Engineers: Authority to Reallocate Storage for

Municipal & Industrial Water Supply Under the Water Supply Act of 1958, 43 U.S.C.

§ 390b 1 (Jan. 9, 2009) [hereinafter “2009 Stockdale Memo”]. In this memorandum, the

Corps determined that the current water supply withdrawal under the “interim

contracts” could be accommodated by a permanent reallocation of approximately

11.7% of the conservation storage in Lake Lanier. The Corps concluded that such a

permanent reallocation would not constitute a major operational change, and it would

                                          31
not seriously affect any project purposes.

      The Middle District of Florida, in its consideration of the multidistrict litigation,

divided the trial into two phases. Phase One, which is at issue here, pertained to the

Corps’ authority for its operations of the project. The plaintiffs in the four underlying

cases moved for summary judgment, and the Corps filed an opposition and cross-

motion for summary judgement in each case. On July 17, 2009, the court granted partial

summary judgment to the plaintiffs in Alabama, Apalachicola, and SeFPC and to the

Corps in Georgia, and it denied summary judgment to the Georgia Parties.

      The court’s order concluded that the Corps had exceeded its authority in its “de

facto” reallocation of storage to accommodate current water supply withdrawals. In re

Tri-State Water Rights Litig., 
639 F. Supp. 2d 1308
, 1350 (M.D. Fla. 2009). The court

first held that only two conclusions of the D.C. Circuit had preclusive effect on its

judgment under the principle of collateral estoppel: (1) that the WSA applied to interim

reallocations of storage; and (2) that a reallocation of 22% of Lake Lanier’s total

conservation storage was a major operational change under the WSA. 
Id. at 1343.
Next,

the district court concluded that there was virtually no authorization for the reallocation

of water supply storage in the RHA and that the Corps’ sole source of authority to

allocate storage for water supply was the WSA.

      The court went on to hold that the 2009 Stockdale Memo was a litigation

                                           32
document with post hoc analysis that was not part of the administrative record. 
Id. at 1347.
Without the memo, the district court concluded that the record contained

insufficient support for the Corps’ calculations of the amount of storage required for

the water supply withdrawals as of 2006. The court attempted its own calculation of

this figure and determined that the allocation was for 226,600 acre-feet or 21.5% of

Lake Lanier’s total conservation storage. 
Id. at 1350.
In reaching its conclusion on the

amount of storage necessary for the project’s current operations, the court rejected

several key figures that the Corps had used in making previous calculations, most

notably rejecting the Corps’ figure for the amount of water available for downstream

withdrawal as a byproduct of hydropower operations. The district court held that the

21.5% allocation was a major operational change that exceeded the Corps’ WSA

authority. The court also concluded that the Corps’ current operations exceeded the

WSA because they seriously affected the authorized purpose of hydropower generation.

Because the Georgia request represented an even larger water supply storage allocation

than the current operations, the court also found that it exceeded the Corps’ authority.

      The district court directed the Corps to limit releases from the Buford Project to

600 cfs during off-peak hours and to discontinue all water supply withdrawals being

made directly from Lake Lanier, except for the 10 mgd that Gainesville and Buford had




                                          33
been permitted to withdraw in their 1950s reallocation agreements.10 The court stayed

its order for three years, until July 17, 2012, to give the parties an opportunity to settle

or to seek Congressional approval. In the meantime, the court allowed current

withdrawals to continue but forbade any increases without the consent of all of the

parties.



                                           DISCUSSION

       This opinion will begin by examining threshold jurisdictional questions, then

will analyze the primary substantive matters involved, and finally will provide some

guidance and instruction for the Corps pertaining to its analysis of its water supply

authority on remand.

       Part I.         Jurisdictional Matters

                 A.     Appellate Jurisdiction over Alabama, SeFPC, and Apalachicola

       Alabama and Florida argue that this court lacks appellate jurisdiction over the



       10
                 The district court failed to state its reasoning for choosing 600 cfs as the level for
off-peak releases. Six hundred cfs was the rate of off-peak releases in the 1950s when the plant
opened. The Newman Report explicitly contemplated raising off-peak releases so as to provide
for a minimum flow of the river at Atlanta of 800 cfs by 1965. Newman Report ¶ 79. The district
court fails to explain why it mandated that the level of off-peak releases not be raised from where
it stood at the time of the Buford Project’s construction in spite of the fact that the RHA
explicitly contemplated such a raise and in spite of the additional water supply authority granted
to the Corps by the WSA. As our discussion below will make apparent, the district court
committed obvious error in this regard. See infra, note 19.

                                                  34
appeals in Alabama, SeFPC, and Apalachicola. They note that the district court did not

render a final judgment in the cases, as the summary judgment order on the Phase One

claims did not resolve the Phase Two claims in those cases. Appellees concede that this

court has jurisdiction over the appeal in the Georgia case because the district court’s

order did amount to a final judgment in that case. However, Alabama and Florida argue

that the claims in the cases are sufficiently distinct that extending pendent jurisdiction

from Georgia over the Alabama, SeFPC, and Apalachicola claims would be

inappropriate.11 We disagree. Issues in the three contested cases and the Georgia case

are inextricably intertwined, rendering pendent jurisdiction proper. Even if this Court

did not have pendent jurisdiction over these claims, this Court would still have

jurisdiction because the district court’s order amounted to an injunction.

       “Pendent appellate jurisdiction is present when a nonappealable decision is

inextricably intertwined with the appealable decision or when review of the former

decision is necessary to ensure meaningful review of the latter.” King v. Cessna

Aircraft Co., 
562 F.3d 1374
, 1379 (11th Cir. 2009) (internal quotation marks omitted).

The exercise of such jurisdiction is only appropriate in “rare circumstances” so only


       11
                A panel of this court rejected this argument in a January 20, 2010 order accepting
pendent jurisdiction over the district court’s entire order because “all issues raised by the
appellants are inextricably intertwined.” Order of Jan. 20, 2010 at 5. (Citing Sierra Club v. Van
Antwerp, 
526 F.3d 1353
, 1359 (11th Cir. 2008); Summit Med. Assocs., P.C. v. Pryor, 
180 F.3d 1326
, 1335 (11th Cir. 1999)). We agree with the findings of the panel on this matter.

                                                35
“limited factual scenarios” will qualify. 
Id. at 1379–80.
Thus, the critical inquiry is

whether the appealable issue can be resolved without reaching the merits of the

nonappealable issues. Thomas v. Blue Cross & Blue Shield Ass’n, 
594 F.3d 814
, 821

(11th Cir. 2010).

      Alabama and Florida argue that the appeal of Georgia can be resolved without

addressing the issues in the other cases. They argue that the district court found that

Georgia’s request for a reallocation of 34% of the available storage exceeded the

Corps’ authority because the argument was simply foreclosed by collateral estoppel and

the preclusive effects of the D.C. Circuit’s Geren decision. Thus, they argue that the

merits of the Georgia appeal can be determined without considering the underlying

issues in the other cases.

      Alabama and Florida misread both the district court’s opinion and the opinion

in Geren. The district court did not, and could not, simply dismiss the Georgia case on

the basis of collateral estoppel. The Corps’ authority to allocate storage for water

supply depends on an analysis of both the RHA and the WSA. As noted above, the

district court held that only two issues were precluded, and neither of them were the

authority of the Corps under the RHA. In fact, the D.C. Circuit clearly stated that the

issue of water supply authority in the RHA was not before it. See 
Geren, 514 F.3d at 1324
n.4 (“The court, in responding to the Corps’ defense of its approval of the

                                          36
Agreement, has no occasion to opine whether the Corps’ previous storage reallocations

were unlawful.”). Thus, it is clear that the holding in Geren—i.e. that a 22%

reallocation of storage to water supply constitutes a “major operational change” under

the WSA—cannot operate as collateral estoppel with respect to the issue of the Corps’

combined authority under the RHA and the WSA.12

       Thus, the district court did not apply collateral estoppel in granting summary

judgment against the Georgia Parties and holding that Georgia’s 2000 request exceeded

the Corps’ authority. Rather, the district court came to an independent conclusion on

this matter and found that water supply was not an authorized purpose under the RHA.

Tri-State, 639 F. Supp. 2d at 1347
. This finding was central to the court’s holding in

all four cases. Ultimately, it is impossible for this Court to rule on the merits of the

appeal in Georgia without determining whether water supply was an authorized

purpose of the Buford Project under the RHA. Thus, the issues raised in the various

appeals are inextricably intertwined and pendent jurisdiction is proper in Alabama,

SeFPC, and Apalachicola.

       As an alternative basis for jurisdiction in the three cases (other than the Georgia

case), this Court also has appellate jurisdiction over all of the underlying claims



       12
                Our complete discussion of the collateral estoppel effects of Geren can be found
infra at Part VI.

                                                37
because the district court’s order was an injunction. The order very clearly directs the

parties to act, imposing a set of directives that, if disobeyed, could subject the parties

to contempt proceedings. We are granted jurisdiction to review injunctions (or denials

thereof) by 28 U.S.C. § 1292(a)(1). Alabama and Florida argue that this statute does

not apply in this case because the district court’s order is not an injunction. Instead,

they argue, the district court merely set aside the Corps’ actions because they were not

in accordance with the law, and therefore in violation of the APA. See Citizens to

Preserve Overton Park, Inc. v. Volpe, 
401 U.S. 402
, 413–14, 
91 S. Ct. 814
, 822 (1971)

overruled on unrelated grounds by Califano v. Sanders, 
430 U.S. 99
, 105, 
97 S. Ct. 980
,

984 (1977). This argument is unpersuasive.

      The district court’s order is “a clearly defined and understandable directive by

the court to act or to refrain from a particular action.” 
Alabama, 424 F.3d at 1128
. The

district court mandated the return of operations to the levels of the mid-1970s by 2012,

meaning that the Corps was required to set off-peak flows to 600 cfs and only Buford

and Gainesville were allowed to withdraw any water directly from Lake Lanier (in the

amounts established in their 1950s contracts). 
Tri-State, 639 F. Supp. 2d at 1355
. The

court gave the Corps explicit instruction on how it was to act in the future. The Corps

was also prohibited from entering into any new water supply contracts and therefore

stripped of any discretion on how to allocate storage space for water supply. The

                                           38
district court did not refer to its order as an injunction, but the district court’s intention

in this regard is irrelevant. See Sierra Club v. Van Antwerp, 
526 F.3d 1353
, 1358–59

(11th Cir. 2008) (utilizing a functional analysis to determine that the district court order

was an injunction in spite of the district court’s specific denial in this regard); United

States v. Gila Valley Irrigation Dist., 
31 F.3d 1428
, 1441 (9th Cir. 1994) (“In

determining whether or not an order is appealable under § 1292(a)(1), the courts do not

look to the terminology of the order but to its substantial effect.”) (citation omitted).

       The district court’s order was also sufficiently definite to be enforced via

contempt proceedings. See 
Alabama, 424 F.3d at 1128
. Federal Rule of Civil Procedure

65(d) requires that an injunctive order “state its terms specifically” and “describe in

reasonable detail . . . the act or acts restrained or required.” Alabama and Florida do not

question the definitive nature of the order in 2012. Rather, they focus on the court’s

directives in the interim period: “the parties may continue to operate at current water-

supply withdrawal levels but should not increase those withdrawals absent the

agreement of all other parties to this matter.” 
Tri-State, 639 F. Supp. 2d at 1355
.

Alabama and Florida argue that the order does not state with specificity the amount of

water that each of the localities may withdraw. However, this is of no moment because

no party would dare risk being held in contempt for violating the court’s order by

exploiting any of these ambiguities. The practical effect of this order makes it such that

                                             39
none of the localities would withdraw any more water than they did before the order

was issued. Furthermore, it is irrelevant whether this injunction was defective under

Rule 65(d) because this Court could still exercise jurisdiction under § 1291(a)(1) over

a defective injunction. See Int’l Longshoremen’s Ass’n, Local 1291 v. Phila. Marine

Trade Ass’n, 
389 U.S. 64
, 76, 
88 S. Ct. 201
, 208 (1967). The proper remedy in such a

case would be to vacate the injunction and remand the case to the district court.13

Because pendent jurisdiction is proper in this case and because the district court order

is an injunction, this Court possesses appellate jurisdiction and will consider the merits

of the issues raised by the parties.

               B.      Final Agency Action in Alabama, SeFPC, and Apalachicola

       The Corps and the Georgia Parties argue that the district court did not have

jurisdiction to hear the Alabama case, the SeFPC case, and the Apalachicola case

because the Corps had not taken a final agency action, as required by the APA for

judicial review. See 5 U.S.C. § 704. In these three cases, Appellees challenge what they

have characterized as the “de facto reallocations”—the temporary water withdrawals

       13
                 Alabama and Florida also argue that the district court order is not appealable
because it is conditional. As a factual matter, this position is incorrect. The court’s order, though
stayed for three years, does not depend on the happening of a specific event to go into operation.
Just the opposite; the injunction was final when issued and would take effect without the
occurrence of any contingency whatsoever. Moreover, a portion of the order forbids the parties
from increasing withdrawals and the Corps from entering into new contracts without the consent
of all of the parties to the litigation. This is a negative injunction which was not stayed until 2012
and took effect immediately.

                                                  40
the Corps has allowed and continues to allow. The Corps argues that it never made a

formal reallocation of storage in the reservoir. Instead, it argues that it accommodated

water supply under ad hoc arrangements with the localities and a series of agreements

among all three States, while launching multiple, ultimately futile, attempts to reach a

long-term solution to the issue. The parties all concede that the denial of Georgia’s

water supply request was a final agency action and that the district court possessed

jurisdiction over the Georgia case. With respect to the other three cases, we conclude

that there was no final agency action, and the district court therefore lacked jurisdiction

to review the claims.

       The APA states that “final agency action for which there is no other adequate

remedy in a court [is] subject to judicial review.” 5 U.S.C. § 704. The APA defines

“agency action” as including “the whole or a part of an agency rule, order, license,

sanction, relief, or the equivalent or denial thereof, or failure to act.” 5 U.S.C. §

551(13). Because the definition of action under the APA is so broad, the critical inquiry

is whether the action is final. Whitman v. Am. Trucking Ass’ns, 
531 U.S. 457
, 478, 
121 S. Ct. 903
, 915 (2001) (“The bite in the phrase ‘final action’ . . . is not in the word

‘action,’ which is meant to cover comprehensively every manner in which an agency

may exercise its power. . . . It is rather in the word ‘final’ . . . .”) (citations omitted).

The test for finality involves two steps:

                                            41
      First, the action must mark the “consummation” of the agency’s
      decisionmaking process . . . —it must not be of a merely tentative or
      interlocutory nature. And second, the action must be one by which rights
      or obligations have been determined, or from which legal consequences
      will flow.

Bennett v. Spear, 
520 U.S. 154
, 177–78, 
117 S. Ct. 1154
, 1168 (1997) (internal

quotation marks and citations omitted).

      We analyze whether the Corps’ actions were final by using the two-step

Bennett test. The Corps contends that it has not consummated its decisionmaking

process because it has not made any final decisions on how to allocate water storage

at Buford. The Corps notes that it never made any permanent water supply storage

allocations and has not published any implementation guidelines. As evidence that

no decisionmaking process has been consummated, the Corps notes that it has not

performed the cost analyses or prepared the written reports required by the WSA,

the Corps’ internal guidelines, and the National Environmental Policy Act to make

permanent reallocations. The Corps asserts that it attempted to start the

decisionmaking process in 1989 with its draft PAC Report, which included a draft

manual for operations in the ACF basin, but that the report was abandoned prior to

its completion as part of the negotiations in the Alabama litigation.

       The “de facto reallocations” do not meet the first prong of the Bennett test.


                                          42
They are based on contracts that have all expired and water withdrawals that have

been extended on the basis of multi-party agreements and court orders. The various

contracts that the Corps entered into with Gwinnett, the ARC, and the Cities of

Gainesville and Cumming all specified their interim nature, expired in 1990, and did

not purport to provide any permanent right to storage in Lake Lanier. As the Corps

notes, these contracts are long expired now and are not themselves being challenged

in this litigation.

       What is being challenged is the continuous withdrawal of water from the

Buford Project over the last forty years. Appellees assert that the Corps has utilized

a practice of entering into temporary agreements in order to avoid the appearance of

consummating its decisionmaking process. “[A]s a general matter, . . . an

administrative agency cannot legitimately evade judicial review forever by

continually postponing any consequence-laden action and then challenging federal

jurisdiction on ‘final agency action’ grounds.” Nat’l Parks Conservation Ass’n v.

Norton, 
324 F.3d 1229
, 1239 (11th Cir. 2003) (citing Cobell v. Norton, 
240 F.3d 1081
, 1095 (D.C. Cir. 2001)). The record in this case demonstrates that the Corps

has not acted to avoid judicial review. Rather, the factual history of this case

indicates that the Corps has made sincere efforts to effectuate permanent water

supply allocations but has been thwarted by the litigation process.

                                          43
      The Corps has been attempting to reach a final decision on water storage

allocations in the Buford Project since at least the mid-1980s, when it became aware

that a permanent determination of water supply needs was vital. The agency

concluded at the time that it was best to wait until the MAAWRMS was complete

before making such a determination and to enter into interim contracts that would

expire in 1990. Once the study was complete, the Corps embarked on the process of

issuing the PAC Report and permanently reallocating certain amounts of storage to

water supply—after first proposing and receiving Congressional authorization (but

not funding) to build a reregulation dam. However, the Corps’ plan to issue the PAC

was derailed by developments in the Alabama case.

      In 1992, the parties agreed to a stay and entered into a Memorandum of

Agreement, which required that the Corps withdraw the PAC and prohibited it from

entering into any new contracts. Memorandum of Agreement By, Between, and

Among the State of Alabama, the State of Florida, the State of Georgia, and the

United States Department of the Army 2 (Jan. 3, 1992). The Corps retained

permission to continue to accommodate current withdrawal levels. In the

memorandum, the parties agreed to conduct a Comprehensive Study, stating that

“during the term of the Comprehensive Study, it is premature for the Army to

commit, grant or approve any reallocation, allocation, or apportionment of water

                                        44
resources to service long-term future water supply.” 
Id. Thus, during
the duration of

the term of the Memorandum of Agreement, the Corps was restricted from moving

toward taking final agency action due to the terms agreed upon by the parties.

      The same held true during the period of enforcement of the ACF Compact,

the joint resolution that the three states agreed to and Congress ratified in 1997,

which replaced the Memorandum of Agreement. The ACF Compact created an ACF

Basin Commission charged with the power “to establish and modify an allocation

formula for apportioning the surface waters of the ACF Basin among the states of

Alabama, Florida and Georgia.” 111 Stat. at 2222. The Compact specified that

parties could continue withdrawing water but that no vested rights would be granted

until the Commission adopted an allocation formula. 
Id. at 2223–24.
The Compact

provided that the Army Corps of Engineers “shall cooperate with the ACF Basin

Commission in accomplishing the purposes of the Compact and fulfilling the

obligations of each of the parties to the Compact regarding the allocation formula.”

Id. at 2225.
Much like the Memorandum of Agreement before it, the ACF Compact,

which remained in effect until 2003, restricted the Corps’ ability to consummate a

decisionmaking process on its water allocation policy. Thus, from 1992 to 2003, the

Corps was operating under agreements signed by all three states that denied it the

ability to make any permanent water supply allocations.

                                          45
         By the time the negotiations in the Alabama case fell apart in 2003, the

Georgia Parties, the Corps, and SeFPC had entered into a settlement agreement in

SeFPC. In pertinent part, the agreement set forth a process for entering into water

supply contracts that could become permanent reallocations of storage. Evaluation

of the legality of the settlement agreement in the D.C. district and circuit courts was

delayed for several years by a preliminary injunction entered by the Northern

District of Alabama. In March 2005, while the injunction was still in effect, the

Corps filed a notice in the Alabama litigation that it intended to proceed with

updating the water control plans and manuals for the ACF Basin. In response,

Alabama’s Congressional delegation sent a letter to the Corps stating its opposition

to such actions during the pendency of the litigation, and the Corps abandoned its

plans.

         This Court vacated the Alabama court’s injunction in late 2005 and the Corps

informed the states that it considered the “relevant litigation” concluded and would

proceed to update the water control manuals for the ACF Basin. However, on

remand, the Alabama district court sent the parties into settlement negotiations, and

the Corps again agreed to delay the update.

         The SeFPC settlement was struck down in 2008 and never took effect. The

Corps argues that it began the process of updating its operating manuals for the

                                           46
ACF basin almost immediately after the settlement agreement was invalidated. The

Corps also issued a legal memorandum on its authority to allocate water storage at

Buford, the 2009 Stockdale Memorandum. However, the district court deemed the

2009 Stockdale Memo to be a litigation document and not part of the administrative

record. The district court issued its summary judgment order in this case on July 17,

2009, and the Corps asserts that this order once again thwarted it in its attempts to

consummate the decisionmaking process. The Corps states that “every single day

since 1990 the Corps was either operating under an agreement that barred it from

formally taking any steps to reallocate storage, or was actively engaged in a process

that could have led to a final agency action reallocating storage.” The historical

sequence of events supports the veracity of this claim.

       This Court has accepted legal and practical barriers to administrative action

as legitimate explanations for agency inaction.14 See Nat’l 
Parks, 324 F.3d at 1238
,

       14
                The Corps cites Home Builders Ass’n of Greater Chicago v. United States Army
Corps of Engineers, 
335 F.3d 607
, 616 (7th Cir. 2003), for the proposition that the circuits have
reached a consensus that agency delay must be “egregious” for it to be considered the
consummation of the decisionmaking process. This proposition is not entirely accurate. Home
Builders was evaluating the second prong of the Bennett test, not the first, when it made this
statement. Thus, the Seventh Circuit was referring to the manner in which agency inaction
determines the rights or obligations of the parties, not whether agency inaction constitutes the
consummation of the decisionmaking process. The cases from other circuits cited by that court
also deal with the manner in which agency action affects the rights of the parties. There may be
some overlap between the two prongs of the analysis, but we need not decide whether the Home
Builders “egregious” threshold applies also to evaluating delays with respect to the first prong. In
this case, the Corps is able to demonstrate that its actions were not only not egregious but also
understandable due to the circumstances in this case. Thus, its argument that the first prong of

                                                 47
1239 (holding that the National Parks Service’s delay in implementing a

management plan was excusable in part because a judicial order and a legislative

mandate had prevented it from taking action). The courts have expressed a

legitimate concern for agency avoidance of judicial review through intentional

inaction. 
Id. at 1239.
In this case, however, the lack of a definitive allocation of

storage for water supply is explained by factors beyond the agency’s control, rather

than the Corps’ inaction.

       Appellees argue that the Corps has attempted to avoid judicial review of its

management of the Buford Project, but they offer almost no evidence to support this

contention. Alabama and Florida point out that the Corps, though required by court

order not to enter into any new contracts, was not required to continue to allow the

parties to withdraw water from the project. This argument misses the point. That the

Corps chose to continue to permit water supply withdrawals sanctioned by the

multi-party agreements does not demonstrate that the Corps effectuated a policy in

regard to water supply and was attempting to avoid a judicial review of this policy.

The states also note that the Corps had seven years since the time of the expiration

of the agreements in 2003 to undertake a formal action. As stated above, the Corps

attempted on multiple occasions after 2003 to begin the process of making final


Bennett was not met is persuasive even without support from Home Builders.

                                             48
decisions on water allocations, but it was consistently thwarted by the litigation

process. The Corps’ two statements to the parties in 2005 that it intended to move

forward with updating the water control manuals, the settlement agreement in

SeFPC, which was struck down in 2008, and the 2009 Stockdale Memorandum,

demonstrate that the Corps intended to move forward in consummating a

decisionmaking process after 2003 but could not. Appellees point to no specific

final actions on the part of the Corps and there is insufficient evidence to conclude

that the agency has attempted to avoid judicial review via incremental changes in

operational policy. Thus, Appellees are unable to meet the first prong of the Bennett

analysis.

      The Corps’ current operations of the Buford Project also do not meet the

second prong of the Bennett test because the Corps’ alleged “de facto allocations”

are not actions “by which rights or obligations have been determined, or from which

legal consequences will 
flow.” 520 U.S. at 178
, 117 S. Ct. at 1168 (internal

quotation marks omitted). Current water supply withdrawals have taken place under

the “live and let live” and other similar provisions in the stays, the Memorandum of

Agreement, and the ACF Compact. These provisions, like the interim contracts that

preceded them, have clearly stated the temporary nature of the allocations being

made. As outlined above, the Corps has not had the opportunity to engage in a

                                          49
determination of rights or obligations due to the constraints imposed on it by the

specific circumstances of the ongoing litigation. While it is true that access to water

has been affected by the Corps’ water supply allocations, as Appellees argue, that

fact does not demonstrate that any future rights have been determined.15 Appellees

are simply unable to produce evidence of such a determination.

       Because there has been no final agency action in the Alabama, SeFPC, and

Apalachicola actions, the district court lacked jurisdiction over these claims.

Therefore, we vacate the district court’s rulings in this regard and remand to the

Corps to make final determinations pertaining to its current policy for water supply

storage allocation.16

       15
              Even if the past withdrawals of water could be deemed sufficient to satisfy the
second prong (notwithstanding the absence of any determination of future rights or
obligations)—a matter we need not decide—there would still be no final agency action because
Appellees have failed to satisfy Bennett’s first prong.
       16
                Alabama and Florida argue that this issue was decided by this Court and that
collateral estoppel bars the Corps and the Georgia Parties from making this claim. In our
consideration of the appeal in Alabama, we indicated in a footnote that some of the Corps’
storage allocations were final agency actions under the 
APA. 424 F.3d at 1131
& n.19. However,
this issue lacks preclusive effect because it was not actually litigated in Alabama. See In re Held,
734 F.2d 628
, 629 (11th Cir. 1984).

        In Alabama, the Georgia Parties argued that the complaint was moot as a result of the fact
that Alabama challenged the PAC Report, a report which had long since been withdrawn by the
Corps. We dismissed the mootness argument by noting that Alabama was challenging other
Corps actions, namely the ongoing reallocations of storage capacity. With respect to such other
Corps actions, this court in footnote 19 commented that Alabama had identified such actions as
final agency actions. It is possible that this footnote was not merely a comment on what Alabama
had said, but an implied acknowledgment that on-going reallocations of storage capacity were
indeed final agency actions. Even if the latter, this court’s statement was a passing, bald

                                                 50
       Part II.        Georgia’s 2000 Request: The Corps’ Water Supply Authority
                       Under the RHA

       With respect to the merits, we turn first to the appeal in the Georgia case. This


statement with no discussion at all, and was not the product of an actually litigated issue.
Accordingly, the statement does not have collateral estoppel effect. See 
id. The parties
did not
brief the issue and there is no evidence that the question of final agency action was litigated at
all. The matter was addressed as an afterthought to the rejection of a wholly separate, tangential
argument. Having heard full and thorough argument on the matter by the parties, we conclude
that the action alleged in these appeals was not final.

         Even if collateral estoppel did apply and the district court did have jurisdiction, we would
still be required to vacate the order and remand the case to the Corps, because of the numerous
errors of the district court. Although we need not enumerate each error, we note the overarching
error in conducting de novo factfinding of issues that must be considered by the Corps in the first
instance. In an administrative case, the Supreme Court has said, “[t]he reviewing court is not
generally empowered to conduct a de novo inquiry into the matter being reviewed and to reach
its own conclusions based on such an inquiry.” Fla. Power & Light Co. v. Lorion, 
470 U.S. 729
,
744, 
105 S. Ct. 1598
, 1607 (1985). The wisdom of that decree is apparent in this case. The Corps
has yet to undertake any final, well-reasoned actions in regard to current water supply
withdrawals at the Buford Project. As a result, the judicial record in this case is incomplete.
Because this record is incomplete, the district court undertook on its own to perform calculations
to determine the percentage of Lake Lanier’s storage space currently being allocated to water
supply. As part of this determination, the court substituted its judgment for that of the Corps on a
number of highly technical matters better left to the expertise of the agency. First and foremost,
the court rejected several determinations by the Corps of the baseline amount of water available
for downstream water withdrawal as a byproduct of power generation. Second, it used data from
expired contracts even though there were no binding commitments, rather than using figures of
actual water withdrawals, allegedly compounding this mistake by double-counting the City of
Gainesville’s withdrawals. Finally, the court took no account of return flows even though the
return of those flows directly to the lake would offset the effect on the power interest. The
expertise of the Corps renders it better equipped to handle such questions than a court. The
district court should not have usurped the agency’s fact-finding role. Without identifying each
error of the district court, suffice it to say that the district court’s overearching error in engaging
in de novo fact-finding would have required remand even if there had been final agency actions.

        Moreover, the district court also erred in failing to recognize that water supply for the
Atlanta area was an authorized purpose of the RHA. See Part II, infra. The fact that water supply
is an authorized purpose of the Project has the potential to cause significant changes in the
relevant calculations, and thus constitutes an independent basis for requiring a remand to the
Corps for de novo reconsideration.

                                                  51
Court previously summarized Georgia’s 2000 request of the Corps as follows:

      1.     Allow municipal and industrial withdrawals from Lake Lanier to
             increase as necessary to the projected annual need of 297 mgd in
             2030;

      2.     Increase the water released from the Buford Dam sufficiently to
             permit municipal and industrial withdrawals in the Chattahoochee
             River south of the dam to be increased as necessary to the
             projected annual need of 408 mgd in 2030;

      3.     Enter into long-term contracts with Georgia or municipal and
             industrial water users in order to provide certainty for the
             requested releases;

      4.     Ensure that sufficient flow is maintained south of the Buford Dam
             to provide the requisite environmental quality—that is, assimilate
             discharged wastewater; and

      5.     Assess fees on the municipal and industrial water users in order to
             recoup any losses incurred by a reduction in the amount of
             hydropower generated by the dam as a result of the increased
             withdrawals or releases.

Georgia, 302 F.3d at 1247
–48.

      The parties agree that the Corps’ rejection of Georgia’s 2000 request

constituted a final agency action, of which both the district court and this Court

have jurisdiction to review. Central to the Corps’ rejection was the Corps’

conclusion that water supply was not an authorized purpose of the Buford Project.

We now hold that the Corps erred in drawing this conclusion. The text of the 1946

Rivers and Harbors Act— specifically, the Newman Report, whose language is

                                          52
incorporated into the statute—clearly indicates Congress’ intent to include water

supply as an authorized purpose in the Buford Project.

       The 1945 and 1946 Rivers and Harbors Acts authorized the building of the

Buford Project and serve as the baseline for the Corps’ authority to operate the

dam.17 The Georgia Parties contend that the district court seriously erred in its

interpretation of the scope of its authority under the Act and neglected to note the

specific authorization for water supply in the statute. The district court rejected this

argument and held that water supply was only intended to be an incidental benefit of

other operations and that the RHA did not authorize any storage for water supply in

Lake Lanier.

       The RHA authorized the development of the ACF Basin “in accordance with

the report of the Chief of Engineers, dated May 13, 1946.” 60 Stat. at 635. The

Chief of Engineers Report incorporated the Division Engineer’s Report—i.e. the

Newman Report. Thus, the statute fully incorporated the terms of the Newman

Report. The Newman Report specifically modified the recommendations of the Park

Report—the foundational report for the 1945 RHA—by proposing the building of a


       17
                The 1945 RHA is less pertinent to the analysis than the 1946 Act because the final
plans for the Buford Project, most notably its location and size, were not determined until the
writing of the Newman Report, which post-dated the 1945 statute. Therefore, the majority of the
discussion in this opinion centers on the 1946 RHA and any mention of the RHA without a
specific year is a reference to the 1946 statute.

                                                53
single multi-purpose reservoir upstream of Atlanta instead of three separate

reservoirs. One advantage of such a move was that the new dam could more easily

accommodate water supply needs.

      As the Newman Report made clear, the dam was designed with water supply

specifically in mind. At times, water supply was even to be accommodated at the

expense of optimal hydropower generation. The Newman Report explained:

              If operated at 100-percent load factor, the Buford development
      would provide a minimum continuous flow of 1,634 second-feet,18 more
      than sufficient for the water needs of the Atlanta area. However, if the
      plant were operated on peak loads, as it should be for maximum power
      value, it would be shut down during week ends and week-day off-peak
      periods; as a result of those shut-downs, the minimum flow at Atlanta
      from the area below Buford Dam would be only about 50 second-feet.
      Under the same conditions of operation, the maximum flow at Atlanta at
      the daily peak of the load would be over 3,000 second-feet. In order to
      meet the estimated present needs of the city, and to prevent damage to
      fish, riparian owners, and other interests by complete shutdowns of the
      Buford plant during the daily and week-end off-peak periods, varying
      flows up to a maximum of 600 second-feet should be released from
      Buford so as to insure at all times a flow at Atlanta not less than 650
      second-feet. This flow could be used to operate a small generator to
      generate off-peak power as secondary energy, reserving the remaining
      storage for peak operation. This minimum release may have to be
      increased somewhat as the area develops. This release at Buford would
      not materially reduce the power returns from the plant, and would not
      affect the power benefits from plants downstream; the benefits to the
      Atlanta area from an assured water supply for the city and Georgia Power
      Co.’s steam plant would outweigh any slight decrease in system power
      value.


      18
            “Second-feet” is another way of saying cfs.

                                            54
Newman Report ¶ 80.

      There are several critical provisions in this paragraph of the report. First,

Congress contemplated that “the estimated present needs of the city” for water

supply would be met by the initial Project by “insur[ing] at all times a flow at

Atlanta not less than 650 second-feet.” 
Id. Indeed, Congress
provided in the

construction of the project that, in addition to the two large turbines, there would be

“a small generator to generate off-peak power as secondary energy, reserving the

remaining storage for peak operation.” 
Id. This small
turbine was constructed for

the sole purpose of providing off-peak releases of 600 cfs (without completely

losing the value of these releases for power generation). If operated for maximum

power value, the dam would be shut down during off-peak hours and would release

no water, limiting water flow at Atlanta to a rate of 50 cfs. Such an operational

scheme would not require a small turbine at all. Thus, the design of the project and

the operational scheme were influenced by water supply concerns.

      Second, the minimum flow was provided for notwithstanding the clear

Congressional intent that it would be at the expense of “maximum power value.” 
Id. Congress recognized
that shutting down all water releases during off-peak hours

would create an insufficient flow in the river downstream at Atlanta to meet the

city’s water supply needs. Therefore, even though Congress recognized that there

                                          55
would be some detriment to power generation, it nevertheless provided for a

minimum flow of 650 cfs at Atlanta. The Newman Report, and thus the authorizing

legislation itself, explicitly stated as much. The legislation provided, in connection

with the initial minimum release requirement and the contemplated increases

thereof, that “the benefits to the Atlanta area from an assured water supply for the

city . . . would outweigh any slight decrease in system power value.” 
Id. Third, Congress
recognized that “[t]his minimum release may have to be

increased somewhat as the area develops.” 
Id. Indeed, in
the immediately preceding

paragraph, the authorizing legislation considered the growing need for water supply

to the metropolitan area over a future 19-year period and spoke of increasing off-

peak releases to accommodate the water supply needs of the Atlanta area in 1965.

That future water supply need was estimated to require a river flow at Atlanta of

800 cfs. 
Id. ¶ 79.
Thus, the original authorizing legislation expressly contemplated a

very substantial increase in the operation of the Buford Project to satisfy the water

supply needs of the Atlanta area (i.e., from 650 cfs to 800 cfs in the river flow at

Atlanta).19

      19
              The language of the paragraph reads:

              Local interests state that, in 1941, 70 second-feet of water were required
      for domestic and industrial purposes at Atlanta, and 415 second-feet for
      condensing water at the Atkinson steam-electric plant of the Georgia Power Co.
      on the river bank near mile 299.5; that an additional unit since installed has raised

                                                56
       In light of the foregoing statutory language, and particularly Congress’ intent

that the Corps should have authority to accommodate the Atlanta area’s water

supply needs at the expense of some detriment to “system power value,” we cannot

conclude that Congress intended for water supply to be a mere incidental benefit.

By definition, one purpose that is to be accomplished to the detriment of another

cannot be incidental.20 Thus, the language of Sections 79 and 80 clearly indicates

that Congress intended for water supply to be an authorized, rather than incidental,

use of the water stored in Lake Lanier.21

       the total requirement of the steam plant to 565 second-feet; and that the total
       requirement for the Atlanta area for 1965, based on a population of 600,000 at that
       time, will be 600 second-feet for condensing water, 120 second-feet for municipal
       supply, and 80 second-feet of raw water for industries—a total of 800 second-feet.

Newman Report ¶ 79. Thus, as of the time of the 1946 statute, it seems that domestic and
industrial water supply needs at Atlanta required a minimum river flow at Atlanta of 635 cfs (70 +
565). And the authorizing legislation contemplated that 19 years hence, in 1965, that requirement
would increase to 800 cfs, a substantial increase. In evaluating the extent of the Corps’ authority
to satisfy the water supply needs of the Atlanta area, it is clearly relevant that Congress explicitly
contemplated this substantial increase in water supply. The district court’s injunction, limiting off-
peak releases to 600 cfs, is obviously inconsistent with this contemplated increase in water supply.
The 600 cfs level was the initial mandate in the authorizing legislation, 
id. ¶ 80,
and Congress
explicitly contemplated substantial increases. 
Id. ¶¶ 79,
80; see also, supra, note 10.
       20
               The adjectival forms of the term “incident” can mean “subordinate to something
of greater importance; having a minor role” or “dependent upon, subordinate to, arising out of, or
otherwise connected with.” Black’s Law Dictionary 830 (9th ed. 2009). The superiority of water
supply to hydropower in certain instances demonstrates that it could not have been a purely
subordinate purpose. Likewise, the superiority of water supply under certain circumstances
demonstrates that it was not meant to be fully dependent upon hydropower.
       21
                In Alabama, we stated, “Lake Lanier was created for the explicitly authorized
purposes of flood control, navigation, and electric power 
generation.” 424 F.3d at 1122
. We went
on to say, “the Corps has historically maintained that water supply use is an ‘incidental benefit’

                                                 57
       Appellees argue that the Newman Report’s references to water supply as

“incidental” demonstrates that water supply was not an authorized purpose of the

Buford Project. This is an attractive proposition due to its simplicity, but the context

of these references undermines this claim. The language in question is as follows:

       The city of Atlanta and other local interests in that area have strongly
       urged that the Roswell development, 16 miles upstream of Atlanta, or
       one or more other reservoirs above Atlanta, be provided first, in order to
       meet a threatened shortage of water, during low-flow periods, for
       municipal and industrial purposes. If the regulation storage reservoir
       required for the economical operation of the proposed developments
       below Columbus could be located above Atlanta, it would greatly
       increase the minimum flow in the river at Atlanta, thereby producing
       considerable incidental benefits by reinforcing and safeguarding the
       water supply of the metropolitan area.

Newman Report ¶ 68 (emphasis added). We conclude that this single reference to

water supply as an “incidental benefit” was an explanation for why the dam would

be built above Atlanta and was not meant to confer a subordinate status.

       The Corps in the Park Report proposed the construction of three dams at


flowing from the creation of the reservoir.” 
Id. These statements
were mere dicta. The issue on
appeal in Alabama was whether the district court’s enjoining of the proceedings in the D.C.
District Court (halting the finalization of the settlement agreement in SeFPC) was proper. The
parties did not brief the issue of the Corps’ water supply authority and this Court gave the topic
no discussion, save for that quoted above. Thus, these statements were not the product of actual
litigation, were not a “critical and necessary part of the judgment,” and have no preclusive effect
on the decision in this case. See Christo v. Padgett, 
223 F.3d 1324
, 1339 (11th Cir. 2000)
(quotation omitted). The current appeal has allowed the Court to scrutinize more closely the
Corps’ water supply authority. After a full analysis of the language and legislative history of the
RHA and consideration of the arguments of the parties, we conclude that Congress intended for
water supply to be included as an authorized purpose of the Buford Project.

                                                 58
Cedar Creek, Lanier, and Roswell. 
Id. The Corps
subsequently determined in the

Newman Report that the system of dams in the ACF Basin would operate

substantially more efficiently if one large dam was built instead. The agency

decided to locate the dam at Buford, approximately 47 miles upstream of Atlanta.

Paragraph 68 was an explanation for why the Corps deemed it beneficial to build

the dam at this location; the explanation: water supply. An upstream location would

allow the Corps to secure Atlanta’s water supply as an incident of the other

authorized purposes. That is to say that the aim of benefitting water supply could be

accomplished without any significant detriment to hydropower, navigation, or flood

control. The report stated that the revised location and size of the dam and reservoir

would result in “greatly increase[d] . . . minimum flow in the river at Atlanta,

thereby . . . reinforcing and safeguarding the water supply of the metropolitan area.”

Id. This benefit
would be incidental to power generation because the water

constituting the river flow at Atlanta would have generated power as it passed

through the generators. There is no indication that the use of the word “incidental”

in Paragraph 68 was meant to describe the importance of water supply to the project

or even the importance of water supply vis-a-vis the other project purposes.

      This reading is further supported by the phrase “safeguarding the water

supply of the metropolitan area.” 
Id. The fact
that references to incidental benefits

                                          59
and the safeguarding of water supply were made in the same breath demonstrates

that the Newman Report did not use the term as an indication of a subordination of

the importance of water supply. Instead, the “safeguarding” language of Paragraph

68 indicates the critical nature of the water supply purpose to the project. In fact, the

Newman Report went on to describe the importance of the Buford Project for the

protection and assurance of Atlanta’s water supply on at least four other occasions.

Id. ¶¶ 73
(“would ensure an adequate water supply for the rapidly growing Atlanta

metropolitan area”), 80 (“insure at all times a flow at Atlanta”) (“the benefits to the

Atlanta area of an assured water supply for the city”), 100 (“would ensure an

adequate municipal and industrial water supply for the Atlanta area”). Congress’

focus on the need to ensure the Atlanta area’s water supply serves as strong

evidence of the primary role given to water supply in the project.

      The only other reference in the authorizing legislation to water supply as

incidental appears in the Newman Report at Paragraph 100.22 There, the final


      22
             The language of this paragraph reads:

              The foregoing results cannot be secured by the plants below Columbus
      proposed herein unless a considerable storage be provided upstream to increase
      the minimum regulated flow and the firm capacities at those plants; without such
      upstream storage, the developments would not be economically justified. The best
      development for that purpose is that at Buford proposed herein. Provision of that
      development as part of the system would increase the minimum monthly flow at
      the Upper Columbia site from about 1,300 second-feet to 6,040 second-feet, with
      a corresponding increase at the Junction site. It would greatly increase both the

                                             60
sentence of the paragraph begins with the word “incidentally” and lists several

project benefits that would not significantly harm other project purposes. One of the

listed benefits is flood control, which Appellees concede is an authorized purpose.

This use of the term “incidentally” cannot be construed to mean that water supply

was intended to be a subordinate use because flood control is referred to in the same

manner in the sentence. This fact is further illustrated by yet another reference to the

protection of water supply in the same sentence—“would ensure an adequate

municipal and industrial water supply for the Atlanta area.” 
Id. ¶ 100.
Again, as in

Paragraph 68, the meaning conveyed in Paragraph 100 is a description of how the

several authorized purposes could be accomplished harmoniously and the manner in

which all were better served by locating the project at Buford. For these reasons,

and especially because of the clear language in Paragraphs 79 and 80 of the



      quality and quantity of the energy output at existing plants above Columbus. It
      would simplify the reregulation of flows at Junction to provide a more adequate
      continuous flow at all times in the Apalachicola River for navigation. Without
      Buford, about 4,000,000 cubic yards of excavation would be required in the
      Apalachicola River below Junction to provide a channel 9 feet deep; with Buford,
      the excavation required would be reduced to about one-half that amount.
      Incidentally, it would ensure an adequate municipal and industrial water supply
      for the Atlanta area, would produce large benefits in the way of recreation, fish
      and wildlife conservation, and similar matters, and would, with the added flood-
      control storage proposed herein, contribute to the reduction of floods and flood
      damages in the basin below.


      
Id. ¶ 100
(emphasis added).

                                              61
authorizing legislation, we do not read the sparse use of the term “incidental” as

indicative of the status of water supply as an authorized use vel non.

      Appellees argue that the original project did not contemplate storage in Lake

Lanier for water supply and that this is an indication that Congress did not intend

for water supply to be an authorized purpose. We disagree. The lack of storage

allocation for water supply sheds no light on the intentions of Congress. No storage

allocation was specified for navigation in the Newman Report even though

navigation is universally accepted as an authorized purpose of the Buford Project.

See H.R. Doc. No. 80-300, Letter from Lieutenant General R.A. Wheeler, Chief of

Engineers, ¶ 11(d). Furthermore, no storage was needed at the time for water supply.

Almost all of the Atlanta area’s water supply requirements could be met at the time

as an incident to, or byproduct of, the generation of power. Thus, the lack of initially

allocated storage for water supply is not at all inconsistent with the Congressional

intent that water supply was an authorized purpose.

      For the same reason, we believe that the fact that the localities were not asked

initially to contribute to the costs of the project is of no moment in determining

Congress’ intent with respect to water supply authorization. Georgia, in 1946, did

not require a significant amount of water beyond that which was provided by

normal project operations for power generation, so a request for state contribution to

                                          62
the project would not have made sense. It would have meant asking the state to pay

for a service that the Corps could provide essentially without cost. Moreover, at that

time, Atlanta’s current water supply usage required a flow of the river at Atlanta of

635 cfs.23 Even “[d]uring the extremely low-flow month of October 1941, the

average flow for the month was 493 second-feet, and the minimum daily flow [was]

422 second-feet.” 
Id. ¶ 79.
In other words, before the Buford Dam was built, the

river was providing the water supply needs of the Atlanta area. The requirement in

the legislation that the Corps make releases “so as to [e]nsure at all times a flow at

Atlanta not less than 650 second-feet,” 
id. ¶ 80,
merely provided water supply

roughly commensurate to that which the river was already providing. It is not likely

that the Corps or Congress would have thought it appropriate to charge Atlanta for

construction costs of a project that merely replaced its currently available water

supply.

       The Corps could potentially have asked Georgia to pay on the basis of future

water supply needs that would affect project operations, but it was not at all clear




       23
                See Newman Report ¶ 79 (“70 second-feet of water were required for domestic
and industrial purposes at Atlanta.” In addition, the Atkinson steam-electric plant had recently
installed an “additional unit . . . [that] raised the total requirement of the steam plant to 565
second-feet.” The two requirements total 635 cfs.).

                                                 63
how much water would be needed in the future.24 After all, it would be almost 30

years after the Newman Report before the Corps would sign its first water supply

contract— excluding the small relocation contracts made as compensation for

inundating the intakes of Gainesville and Buford. Divining the value of water

supply to the localities in the future would have resulted in speculative and

potentially misleading results.25 Similarly, the fact that in its cost-benefit analysis,

the Newman Report did not assign a particular dollar amount to water supply is not

an indication that it was not authorized because the benefits of water supply were

indeterminate at the time.26



       24
                In 1949, the Corps stated that the Buford Project’s assurance of Atlanta’s water
supply would be a “real benefit” but that it was premature to attempt a specific calculation of that
benefit. Definite Project Report ¶ 124.
       25
                The 1937 Flood Control Act (“FCA”) allowed states and localities to request that
the Corps, prior to construction of a flood control project based on a given set of plans, modify
those plans for the inclusion of storage for water supply. The act required that localities pay the
full cost of such increased storage capacity. Alabama and Florida argue that it is inconceivable, in
light of the framework of the FCA, the only general statutory grant of water supply authority to
the Corps in 1946, that Congress would authorize water supply storage in Lake Lanier without
requiring contribution from the localities. The FCA itself is not applicable to this project because
Buford was designed to be a multi-purpose project, and not merely a flood control project.
Furthermore, it was not inconsistent for Congress to request contribution for projects that had to
be altered to accommodate water supply, but not to request contribution for projects which
merely replaced water supply already provided by the river, which water supply could be
provided by the project as a by-product of power generation and with little detriment to other
project purposes.
       26
                It bears noting that the Corps was not required to conduct cost-benefit analyses on
all project purposes until 1952. See Bureau of Budget, Executive Office of the President, Budget
Circular A-47 (Dec. 31, 1952).

                                                 64
      One final point merits mentioning. Before the Dam was built, or even

planned, the Chattahoochee provided almost all of the City of Atlanta’s water

supply. The building of the dam could have been a potential threat to the city’s

ability to withdraw water from the river because the Corps had an

incentive—optimal power generation—to shut off all water flow in the river for

long stretches of time. Congress responded to this concern by establishing a

minimum flow requirement and noting that this requirement might have to be

increased over time. Congress also clearly indicated that the Buford Project was

intended to benefit the Atlanta area’s needs by assuring the water supply. If water

supply had been deemed a subordinate purpose by Congress, the Buford Project

would have been detrimental, rather than beneficial, to the Atlanta area’s water

supply needs. That is to say, if the only water being supplied was to be a

subordinate byproduct of power generation, then the City of Atlanta would have

eventually found itself able to withdraw less water from the river than it would have

been had no dam been built at all. In light of the repeated references in the

authorizing legislation to safeguarding and ensuring an adequate water supply for

Atlanta, Congress very clearly did not intend the dam to harm the city’s water

supply.

      The language of the RHA clearly indicates that water supply was an

                                          65
authorized purpose of the Buford Project. Appellees’ arguments to the contrary are

unconvincing for all of the reasons mentioned above. Thus, we conclude that water

supply was an authorized purpose of the RHA and that the RHA authorized the

Corps to allocate storage in Lake Lanier for water supply.



      Part III.    Georgia’s 2000 Request Must Be Remanded to the Corps

      The Corps argues that its interpretation of the RHA in the 2002 Stockdale

Memo, which supplied the legal reasoning for the denial of Georgia’s water supply

request, is entitled to deference from this Court. The RHA authorized the Corps to

build the Buford Project in accordance with the Corps’ plans and “with such

changes therein as in the discretion of the Secretary of War and the Chief of

Engineers may be advisable.” H.R. Doc. No. 80-300, Letter from Lieutenant

General R.A. Wheeler, Chief of Engineers ¶ 16. The Corps asserts that this gives the

agency wide latitude in its interpretive authority. Additionally, the Corps argues that

because it prepared the reports which comprise the language of the RHA, its

“interpretation of the statute merits greater than normal weight because it was the

[Corps] that drafted the legislation and steered it through Congress with little

debate.” Howe v. Smith, 
452 U.S. 473
, 485, 
101 S. Ct. 2468
, 2476 (1981). Despite

the high level of respect owed to the Corps’ interpretations with regard to the RHA

                                          66
due to its unique role in shaping the statute, we cannot defer to the Corp’s

interpretation of its water supply authorization in this instance. Even heightened

deference cannot lead this Court to ignore the plain and express will of Congress,

especially where, as here, the Corps’ interpretation has not been consistent.

      Under the APA, reviewing courts must set aside agency action that is

“arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with

law.” 5 U.S.C. § 706(2)(A). The denial of Georgia’s request was based on a clear

error of law—the Corps’ misinterpretation of the RHA. Therefore, the Corps’

interpretation cannot be granted deference, in spite of the agency’s role in drafting

the language of the legislation.

      The seminal case Chevron, U.S.A., Inc. v. Natural Resources Defense

Council, Inc., 
467 U.S. 837
, 842–44, 
104 S. Ct. 2778
, 2781–82 (1984), set up a two-

step framework for evaluating whether a court must defer to an agency’s

construction of a statute it is charged with administering. Deference from the court

is due if (1) Congress has not spoken directly on the precise question at issue and its

intent is unclear, and (2) the agency’s interpretation is based on a permissible

construction of the statute. 
Id. The argument
for Chevron deference in this case fails

at both steps because Congress made clear its intention that water supply was an

authorized purpose of the Buford Project. As discussed above, the Newman Report

                                          67
repeatedly stated that the Buford project would protect and assure the water supply

of the Atlanta metropolitan area. Furthermore, the Report authorized the use of

water for water supply at the expense of maximum hydropower generation.

Congress’ acknowledgment that water supply, in certain instances, was to be

provided at the expense of maximum power generation necessitates the conclusion

that water supply was not to be subordinate to other project purposes and was

instead an authorized purpose in its own right. The Corps’ interpretation that the

RHA relegated water supply to incidental status cannot be reconciled with the plain

language of the statute. The clear Congressional intent in the 1946 RHA was that

water supply was to be an authorized purpose, and the Corps’ contrary interpretation

is erroneous and cannot be accepted by this Court.27

       A significant fact undermining any deference to the Corps on this issue is the

fact that the Corps has also been inconsistent in its statements about whether water


       27
                 The Corps concedes that the 2002 Stockdale Memo might not be entitled to
Chevron deference because it may be deemed an internal guidance document that does not decide
legal rights. See Christensen v. Harris Cnty., 
529 U.S. 576
, 587, 
120 S. Ct. 1655
, 1662–63
(2000). If this is the case, then the Corps’ legal interpretations in the document deserve Skidmore
deference, meaning that the interpretations are “entitled to respect . . . but only to the extent that
those interpretations have the power to persuade.” 
Id. (internal quotation
marks and citations
omitted). Because the clear intent of the RHA forecloses the higher Chevron level of deference, it
follows that Skidmore deference is also not applicable to the facts of this case. In light of
Congress’ intent to include water supply as an authorized purpose, the Corps’ contrary
determination is not at all persuasive. Since neither type of deference can be given to the Corps’
legal determinations, we need not decide whether the Skidmore or Chevron framework is
applicable on the instant facts.

                                                  68
supply was an authorized purpose. The 2002 Stockdale Memo concluded

(incorrectly) that water supply was not an authorized purpose, but this is not

consistent with previous Corps statements on the matter. In the Corps’ 1949

Definite Project Report, the Corps referred to water supply as one of the “primary

purposes” and one of “the princip[al] purposes of the Buford Project.” ¶¶ 48, 115.

This 1949 Report was a formal pronouncement on the issue, and the one most

nearly contemporaneous to the actual enactment. In a 1987 regulation, 33 C.F.R. §

222.5, App’x E, the Corps listed water supply as a project purpose for Buford. In the

Corps’ comprehensive 1994 report to Congress, which listed the authorized

purposes for Corps projects across the country, water supply was included as an

authorized purpose of Buford under the RHA.28 U.S. Army Corps of Eng’rs:

Hydrologic Engineering Center, Authorized and Operating Purposes of Corps of

Engineers Reservoirs E-94 (1994). That report also defined the term “incidental

benefits” and stated that incidental benefits, though they were important, were not

the subject of the report and would not be listed. 
Id. at 3–4.
The Corps and the

Appellees offer no explanation for why the Corps indicated that water supply was

an authorized purpose in 1949, 1987, and 1994 but took a contrary position in


       28
              Recreation and fish and wildlife are also listed as authorized purposes in the
report. However, the authorizing statute listed in the report for water supply is the RHA.
Recreation and fish and wildlife are listed as being authorized by statutes not at issue in this case.

                                                  69
2002.29

       The Corps argues that even if it erred in its interpretation of the RHA, its

rejection of Georgia’s water supply request should be allowed to stand. The Corps

suggests that it accounted for the possibility that water supply was an authorized

purpose of the Buford Project and still concluded that the request exceeded its

authority. In support of this contention, the Corps points to the following language

in the Stockdale Memo: “Even if water supply were a specifically authorized

purpose of the reservoir (and the 1958 Act did not apply), the state’s request would

require substantial changes in the relative sizes of project purposes. This would

represent a material alteration of the project, which would require congressional

action.” 2002 Stockdale Memo at 11 (internal quotation marks omitted).

       The Corps argues that this constitutes an alternative conclusion and that there

is no reason to believe that it is incapable of considering a legal hypothetical. It


       29
                The Corps argues that any inconsistency in its interpretation is irrelevant to the
deference analysis, citing National Cable & Telecommunications Ass’n v. Brand X Internet
Services, 
545 U.S. 967
, 981, 
125 S. Ct. 2688
, 2699–2700 (2005). However, the holding of Brand
X does not go quite this far. The case merely states that Chevron may be applicable to instances
in which the agency has changed its position “if the agency adequately explains the reasons for a
reversal of policy.” 
Id. at 981,
125 S. Ct. at 2699. This Court has also noted that an agency must
be allowed to shift its position over time and that such shifts should even be accorded deference
by reviewing courts. Friends of the Everglades v. S. Fla. Water Mgmt. Dist., 
570 F.3d 1210
,
1219 (11th Cir. 2009). But in this case, the Corps has given no explanation for the reasoning
behind any changes in policy. Also, the Corps’ position has not merely changed; rather, it has
been in such a constant state of flux that it appears to have not yet fully formed. In any event, the
authorizing legislation itself is sufficiently clear; water supply is an authorized purpose.

                                                 70
argues that remanding the case for a consideration that it already gave would be

duplicative. However, an administrative agency’s alternative explanation for

denying a state’s request is “arbitrary, capricious . . . or otherwise not in accordance

with law” if it is based on an impermissible reading of the authorizing statute or

statutes. See Massachusetts v. Envtl. Prot. Agency, 
549 U.S. 497
, 532–34, 127 S.

Ct. 1438, 1462–63 (2007) (holding that the EPA’s reading of a statutory phrase in

its alternative explanation for why it did not regulate greenhouse gas emissions was

not in conformity with the statute, and thus remanding to the EPA). The Corps’

hypothetical, which is reiterated almost verbatim in the conclusion of the memo,

2002 Stockdale Memo at 13, rests squarely on an erroneous legal proposition. In

this alternative hypothetical, the Corps mistakenly assumes that the WSA would not

apply to the agency’s determination of its authority to grant the Georgia request if

water supply were authorized by the RHA. This assumption has no foundation in

law. The WSA nowhere indicates that it is superceded by, or supercedes, original

authorizations for water supply. The Act was merely intended to offer greater water

supply authority in federal water projects than had previously existed. For that

authority to be supplemental to authority already extant in a given project is

perfectly consistent with the language and purpose of the statute. To assume, as the

Corps has in its alternative conclusion, that the WSA does not apply to the Buford

                                          71
Project merely because the authorizing statute included water supply as an

authorized purpose is not supported by the language of the WSA or by its intended

aim of increasing water supply authority in federal projects. The Corps’ holding in

the alternative must be rejected because it misinterprets the scope of the WSA.

      The Corps’ alternative conclusion is also undermined because, despite the

Corps’ contentions otherwise, its misinterpretation of the RHA was essential to its

conclusion that it lacked authority to grant Georgia’s request. The majority of the

memorandum is devoted to the potential effects of granting the request and whether

these effects would be consistent with the Corps’ authority under the WSA. The

discussion of the agency’s authority under the WSA is predicated on the assumption

that the baseline level of authorization from the RHA is zero and that no storage

may be allocated to water supply pursuant to the RHA. It is only at the very end of

the discussion of the Corps’ authority that the agency considers arguendo the

possibility that the RHA authorized water supply. Its brief discussion of this

alternative is flawed in two respects. First, as noted above, the Corps erroneously

assumes that if the RHA included water supply as an authorized purpose, the WSA

would not be applicable at all. Second, although purporting to assume water supply

was an authorized purpose of the RHA, the Corps nevertheless underestimated its

RHA authority. It failed to recognize that the authorizing legislation in 1946 not

                                         72
only included water supply as an authorized purpose but explicitly contemplated

that the Corps was authorized to increase water supply usage over time as the

Atlanta area grew and that this increase would not be a change from

Congressionally contemplated operations at all. Thus, the Corps never considered

its authority under the RHA to substantially increase its provision of water supply

and reallocate storage therefor—authority which we hold today was granted by the

RHA. And the Corps never considered its WSA authority to provide water supply as

an addition to (or as supplementing) its RHA authority. The failure of the Corps in

these respects renders its alternative reason for denying Georgia’s request arbitrary,

capricious, or otherwise not in accordance with the law.30

       Several other factors also indicate that the Corps’ rejection of the water

supply request should be remanded for further consideration. First, attached to the

2002 Memo is a “preliminary analysis of the impacts of Georgia’s water supply

request on authorized project purposes and operations.” The Corps’ analysis on the



       30
                For example, in the portion of the 2002 Stockdale Memo dealing with the
alternative rationale, Stockdale 2002 at 11, the Corps spoke of the general limitation on its
discretionary authority to make post-authorization changes in projects without seeking additional
Congressional authority—i.e., the Corps’ lack of authority to make substantial changes in the
relative sizes of project purposes—without any recognition of the fact that the authorizing
legislation here already gave the Corps authority to increase the water supply purpose at the
expense of the hydropower purpose and without recognition of the fact that the legislation
explicitly contemplated a considerable such increase to meet the water supply needs estimated 19
years in the future. See Newman Report ¶¶ 79, 80.

                                               73
effects of the Georgia request was thus incomplete. Because the Corps’ authority to

grant the request may be dependant on the precise size and effect of the request, it is

crucial that the Corps complete its evaluation of the request. The need for further

study recommends remand to the Corps.

       Second, it is also apparent that the Corps’ views regarding its authority to

allocate storage in Lake Lanier to water supply are evolving and that it has not come

to a final, determinative decision regarding the issues underlying this authority.

There are several pieces of evidence for this. In 2002, the Corps rejected the

Georgia request, asserting that it did not have sufficient authority to reallocate 34%

of conservation storage. However, in 2004, it agreed to settle the Geren case, in part

by reallocating what the settling parties determined at that time to be 22% of the

conservation storage. The Corps determined that it could make such a reallocation

on the basis of its WSA authority alone. Though these decisions are not directly

conflicting, the Corps never explained why it believed that the 12% storage

allocation difference between the two caused it to exceed its authority. If the RHA

authorizes some storage reallocation to water supply, as we hold today that it does,

then the Corps should explain why this difference in allocated storage between the

Georgia request and the settlement agreement pushed it beyond the boundaries of its

authority. Additionally, the Corps has revised its figures for how much storage must

                                          74
be allocated to accommodate current levels of water supply withdrawal. In the 2002

memo, the Corps asserted that current withdrawals required a 13% reallocation of

conservation storage. On appeal, the Corps claims that the current withdrawal levels

are only 11.7%. It appears that the Corps may no longer conclude that Georgia’s

request would require an allocation as large as 34%. Any such decrease in the

Corps’ projection of the amount of storage it deems required for water withdrawals

could also affect its determination of its authority over the Georgia request.31



       31
                 The Corps’ position in this appeal seems to favor evaluating water supply
authority via an analysis of the detrimental effect of increased water supply on the production of
hydropower as an alternative to an analysis predicated solely on the percentage of conservation
storage being reallocated. See Brief of U.S. Army Corps of Eng’rs, et al. at 99–100, Tri-State
Water Rights Litigation, No. 09-14657 (11th Cir. May 3, 2010) (explaining that the “de facto”
reallocations of storage to account for current water supply uses causes a systemwide reduction
of hydropower of only 1%). The present discussion of percentage allocations is not meant to be
an endorsement of this method of evaluating the Corps’ authority. It is merely meant to describe
the evolving nature of the Corps’ stated reasoning for its conclusions with respect to the bounds
of its authority. In fact, the Corps’ former reliance on percentage-based allocations and its
seeming current reliance on effects on project purposes may also represent a shift in policy. We
conclude that the D.C. Circuit’s Geren opinion does not foreclose the Corps from fully exploring
this issue. See infra, Part VI. On remand, the Corps should determine the optimal methodology
for measuring its authority over water supply allocations.

        A companion consideration in the Corps’ WSA analysis is the concept of compensating
the power users for the detrimental effects of water supply on the power purpose. The Corps
accepted the notion of such compensation in the proposed settlement in Geren, though the record
shows no preceding endorsement of this concept. Because the RHA authorized the
accommodation of some water supply needs at the expense of the power purpose, the Corps must
determine the proper balance between water supply and power. Consequently, the Corps must
analyze whether compensation is a factor in determining the extent of the Corps’ authority under
the RHA, whether under the WSA a reallocation of storage is an operational change, and whether
such a change is major. See infra, Part VI, note 41, indicating that Geren’s comments on the
compensation concept have no collateral estoppel effect.

                                                75
       Finally, because the other matters in this appeal must be remanded to the

Corps, it is sensible and efficient for the agency to consider the overlapping issues

that are common to Georgia and the other cases together as part of a comprehensive

decision about the Corps’ future water supply operations. The conclusions that the

Corps reaches with respect to the questions at issue in the other cases will provide it

with a more complete analysis of the issues in Georgia, as well. For example, the

Corps’ determinations of its authorization over current water supply withdrawals

will necessitate a thorough study of the amount of storage required for water supply.

Also, this appeal represents the first opportunity for a court to consider the Corps’

authority under both the RHA and the WSA. Our holding—that water supply is an

authorized purpose under the RHA, that the Corps does have some authority under

the RHA to balance as among the authorized uses and increase the water supply

purpose at the expense of the power purpose and to reallocate storage therefor, and

that the Corps’ authority under the WSA is in addition to its authority under the

RHA—constitutes a clarification of the legal environment which will aid the Corps

in its analysis on remand. For these reasons, we conclude that the Corps must

reexamine the request in light of its combined authority under the RHA and WSA.32


       32
                It should also be noted that the Corps was granted additional water supply
authority in the 1956 Act. See infra, Part IV Section A. References in this opinion to the Corps’
authority under the RHA and the WSA are not to be construed as negating its additional authority

                                               76
       Part IV.       Gwinnett County’s Claims Not Involving Authorization Under
                      the RHA and WSA

       Gwinnett County asserts three claims that are distinct from the claims of the

Georgia Parties and the Corps. First, the county asserts that a 1956 Act of Congress

authorized the Corps to contract with it for 10 mgd for water supply. Second,

Gwinnett asserts that the Corps contracted with it to provide permanent storage for

roughly 40 mgd. Finally, the county asserts that the Buford Project rendered its

intake facility at Duluth, Georgia inoperable and that it is therefore entitled to water

withdrawal rights as just compensation. We find merit in the first of these claims but

reject the final two.

              A. The Expiration of the 1956 Act

       In 1956, Congress passed an act, in part, stating the following:

       [T]he Secretary of the Army is hereby authorized to contract with
       Gwinnett County, Georgia, upon such terms and for such period not to
       exceed fifty years as he may deem reasonable for the use of storage space
       in the Buford Reservoir for the purpose of providing said county a
       regulated water supply in an amount not to exceed eleven thousand two
       hundred acre-feet of water annually . . . .


Pub. L. No. 84-841, 70 Stat. 725. The district court noted in a footnote that

Gwinnett had not contracted with the Corps pursuant to this authorization and held



under the 1956 Act.

                                          77
that the authorization “expired in 2006.” 
Tri-State, 639 F. Supp. 2d at 1350
n.24.

The district court has misread the plain language of the statute. The fifty-year

limitation in the Act refers to the duration of any contract with Gwinnett, not to the

expiration of the Act itself. The phrase “not to exceed fifty years” immediately

follows the words “contract . . . upon such terms and for such period” and there is

no grammatical cue that it should not be read as modifying this phrase. The district

court offers no explanation for its unnatural reading of the statute and none is

evident to this Court. Moreover, the Act also authorized the Corps to enter into a

perpetual easement with Gwinnett, authorizing Gwinnett to build the necessary

facilities to withdraw water directly from Lake Lanier on the Corps’ land. 70 Stat. at

725. It would be illogical for Congress to give Gwinnett a perpetual easement to

implement an authorization that would expire in fifty years. The district court’s

interpretation of the Act, which is espoused by Appellees in this appeal, is

inconsistent with the Act’s language and its grant of an easement in perpetuity.

      To date there has not been a single contract between the Corps and Gwinnett

predicated on the authority of the 1956 Act. Such a contract in the future would not

be a reallocation of storage under the WSA or the RHA because it is directly

authorized by Congress.

             B.    Forty mgd from the 1974 Supplemental Agreement to the Corps’

                                          78
                   Contract

      Gwinnett argues that in 1974 the Corps granted the county the right to 38,100

acre-feet of permanent storage so that it could withdraw roughly 40 mgd directly

from Lake Lanier. In 1973, Gwinnett and the Corps entered into an interim water

contract for 40 mgd. The following year, the parties revised Article 9 of the contract

to provide:

      Upon expiration of the period of contract . . . the User shall have the right
      to acquire from the Government . . . the right to utilize storage space in
      the project containing at least 38,100 acre feet (which is estimated to be
      adequate to yield approximately 40 MGD of water).

Supplemental Agreement No.1 to Contract No. DACW01-9-73-624 Between United

States and Gwinnett County, Georgia for Withdrawal of Water from Lake Sidney

Lanier (Apr. 29, 1974). The contract stated that this revision was being made “in

order to facilitate the sale of bonds to finance [Gwinnett’s] proposed water works

facilities.” 
Id. Subsequent supplemental
agreements extended the life of the contract

until it was finally allowed to expire in 1990.

      The contract gave Gwinnett the “right to acquire” the storage space at the

time of the expiration of the contract. Thus, Gwinnett possessed an option (an offer)

to purchase storage space at the time of the contract’s expiration, which the parties

agree occurred in 1990. “If no time is prescribed for accepting an offer, it must be



                                           79
done within a reasonable time.” Wilkins v. Butler, 
369 S.E.2d 267
, 268 (Ga. Ct.

App. 1988) (quotation omitted); see Home Ins. Co. v. Swann, 
128 S.E. 70
, 72 (Ga.

Ct. App. 1925); Restatement (Second) of Contracts § 41 (1981). Gwinnett has not

demonstrated that it exercised its acceptance of the option in 1990 or at any time

since then. More than twenty years have elapsed since the time that the option

became available, and the right to accept the Corps’ offer to acquire the 38,100

acre-feet of storage clearly has lapsed.33

               C. Just Compensation for Relocation of the Duluth Intake

       On appeal, Gwinnett argues that it should have been compensated because the

creation of the Buford Project led to contamination of its intake structure at Duluth,

which had to be abandoned in the early 1970s. Gwinnett failed to make this

argument before the district court. We generally do not consider arguments raised

for the first time on appeal and need not do so here. Peek-a-Boo Lounge of

Bradenton, Inc. v. Manatee Cnty., 
630 F.3d 1346
, 1358 (11th Cir. 2011).

       In any event, this argument is meritless. Gwinnett fails to discuss the rights of

the federal government to make alterations to navigable waters. The federal

       33
               Gwinnett argues that any challenges to its right to storage under the 1974
supplement are barred by the six-year statute of limitations for actions against the United States.
28 U.S.C. § 2401(a). Though the statute has been extended to suits under the APA, it is clearly
inapplicable here. Appellees, and/or the Corps, have nothing to challenge here, and consequently
nothing that they are barred from challenging, because the Corps merely granted Gwinnett an
unexercised option. No permanent storage rights were ever conferred on Gwinnett by the Corps.

                                                 80
government possesses what is known as a navigational servitude, “the privilege to

appropriate without compensation which attaches to the exercise of the power of the

government to control and regulate navigable waters in the interest of commerce.”

United States v. Va. Elec. & Power Co., 
365 U.S. 624
, 627, 
81 S. Ct. 784
, 787–88

(1961) (internal quotation marks omitted). The navigational servitude is a dominant

servitude, trumping all competing and conflicting rights to the waterway. 
Id. This servitude
extends to the entire river and the riverbed lying below the high-water

mark. United States v. Rands, 
389 U.S. 121
, 123, 
88 S. Ct. 265
, 267 (1967). It is

anchored in Congress’ commerce clause power. “The power to regulate commerce

comprehends the control for that purpose, and to the extent necessary, of all the

navigable waters of the United States. For this purpose they are public property of

the nation, and subject to all the requisite legislation by Congress.” 
Id. at 122–23,
88 S. Ct. at 266–67 (alteration omitted) (internal quotation marks omitted).

      The federal government does not execute a taking of riparian interests by

altering rivers for navigational purposes. The government’s dominant right to make

use of these waterways means that its actions do not amount to an appropriation.

This premise has been explicitly stated several times in the context of hydropower

interests: The federal government is not required to give compensation for water

power when it takes riparian lands in accordance with the navigational servitude.

                                          81
E.g., Va. 
Elec., 365 U.S. at 629
, 81 S. Ct. at 788; United States v. Twin City Power

Co., 
350 U.S. 222
, 226–27, 
76 S. Ct. 259
, 262 (1956); United States v. Appalachian

Elec. Power Co., 
311 U.S. 377
, 424, 
61 S. Ct. 291
, 307 (1940); United States v.

Chandler-Dunbar Water Power Co., 
229 U.S. 53
, 73–74, 
33 S. Ct. 667
, 676 (1913).

Gwinnett offers no explanation for why this principle should not be applied to the

riparian interest in water supply.

      Because of the federal government’s dominant right to make alterations in the

river, the effect on Gwinnett’s riparian interests is not a taking. Thus, even if

Gwinnett had not abandoned its claim, the claim would not be compensable.



      Part V. Remand Instructions to the Corps

      On remand, the Corps is to reconsider Georgia’s request, as well as its

authority with respect to the current provisions for water supply, in light of its

authority under the RHA as well as the WSA and the 1956 Act. In particular, it

should consider several important factors with respect to the Newman Report (i.e.,

the RHA). First, the Corps should take into consideration that water supply for the

Atlanta metropolitan area was an authorized purpose of the Buford Project as well

as hydroelectric power, flood control, and navigation. Second, Congress

contemplated that the Corps would be authorized to calibrate operations to balance

                                           82
between the water supply use and the power use. Third, because Congress explicitly

provided that the “estimated present needs” of the Atlanta area for water supply be

satisfied at the expense of “maximum power value,” Newman Report ¶ 80, we know

that the water supply use is not subordinate to the power use. Fourth, from

Paragraphs 79 and 80 of the Newman Report, we know that Congress contemplated

that water supply may have to be increased over time as the Atlanta area grows.

       However, the authorizing legislation is ambiguous with respect to the extent

of the Corps’ balancing authority—i.e., the extent of the Corps’ authority under the

RHA to provide water supply for the Atlanta area. On the one hand, the authorizing

legislation recognized that the Chattahoochee River was the source of the water

supply for the Atlanta area, and the legislation repeatedly referred to safeguarding or

assuring the water supply of the metropolitan area. See Newman Report ¶¶ 79 and

80. It also recognized that the minimum releases initially provided by the legislation

to satisfy the present water needs “may have to be increased somewhat as the area

develops.” 
Id. ¶ 80.
On the other hand, the legislation also contemplates that

assuring such water supply for the Atlanta area can be done with a “slight decrease

in system power value.” Id.34 We conclude that the Corps, the agency authorized by


       34
               Adding to the possible ambiguity, the quoted phrase from Paragraph 80 refers to a
“slight decrease in system power value,” but Congress contemplated, in the preceding Paragraph
79, a considerable increase in the river flow at Atlanta during off-peak hours in order to provide

                                                83
Congress to implement and enforce this legislation, should, in the first instance,

evaluate precisely what this balance should be.35

       Once the Corps has determined the extent of its authority under the RHA, it

should then determine its authority pursuant to the WSA. The authority under the

WSA will be in addition to the Corps’ authority under the RHA and the 1956 Act.



for Atlanta’s water supply needs nineteen years in the future. Paragraph 79 contemplated
increasing the river flow at Atlanta from 650 cfs to 800 cfs.
       35
                 The Georgia Parties specifically assert that the Corps has authority under the RHA
to increase releases from the dam in order to provide water supply to downstream users, and to
reallocate storage for this purpose, an assertion with which we agree today. However, The
Georgia Parties do not specifically assert that, in addition to the foregoing authority, the RHA
also gives the Corps authority to make direct withdrawals from Lake Lanier for water supply.
Although the authorizing legislation recognized that the Chattahoochee River was the source of
water supply for the Atlanta area, and although Congress specifically contemplated ensuring and
safeguarding the area’s water supply, the only way that the RHA mentions for ensuring the water
supply of the Atlanta area is by means of increasing releases from the dam for the purpose of
downstream withdrawals. It also appears that the Corps’ position has been more consistent with
respect to its lack of authority under the RHA to provide direct withdrawals than it has in other
regards. See F. G. Turner, U.S. Army Corps of Eng’rs: Mobile Division, Report on Withdrawal
of Domestic Water Supply from Buford Reservoir (1955) (stating that the Corps advised
Gwinnett County that it did not have the authority at that time—i.e., before the 1958 WSA—to
grant a request for direct withdrawals for water supply and recommending that Congress provide
the Corps with the additional authority necessary to grant this request). Finally, because it is
unclear at this point precisely how much of the Atlanta area’s water supply the Corps will
determine on remand it can provide pursuant to its clear RHA authority to increase releases for
downstream water supply, because the 1956 Act clearly gives the Corps authority for a specific
amount of direct withdrawals for Gwinnett County, and because the WSA clearly provides the
Corps authority for direct withdrawals from the Lake (as long as the cumulative exercise of such
Corps authority pursuant solely to the WSA does not constitute a “major operational change” or
“seriously affect the purposes for which the project was authorized”), it is not clear that the issue
of RHA authority for direct withdrawals is a live issue in this case. For all of the foregoing
reasons, we express no opinion on whether the RHA could be construed to provide authorization
for the Corps to satisfy the authorized water supply purpose, not only by increasing releases for
downstream withdrawal but also by direct withdrawals from the reservoir.

                                                 84
       It is apparent from the record and the evolving position of the Corps that the

Corps has not arrived at a final, definitive determination of the scope of its authority

to allocate storage to water supply. For example, it is not clear whether the Corps

has arrived at a firm calculation of how many gallons per day can be provided for

the Atlanta area’s water supply needs as a mere incident to, or byproduct of, power

generation. The Corps’ latest figure, developed in 1986, in this regard has been 327

mgd; however, at oral argument the Corps asserted that the calculation was not

definitive and deserved more study. Also, it is apparent that the Corps has not

arrived at a definitive, final determination of whether, and to what extent, storage

reallocation would be necessary for RHA-authorized releases from the dam

primarily for water supply purposes (and how to factor in the fact that these releases

will still generate some power, though not of peak value). It is also unclear whether

the Corps has arrived at a final determination of the appropriate measure for

determining under the RHA what the impact of increased water supply use on power

is, or the appropriate measure for determining under the WSA what constitutes a

“major operational change.”36 Finally, the Corps has not yet articulated a policy on



       36
               In this regard, for example, the Corps should consider whether, and to what
extent, considerations such as the following are relevant: percentage reallocation of conservation
and/or other storage, measurements of decreases in systemwide power, and compensation to
power customers. See also supra, note 31.

                                                85
whether to account for return flows, and if so, how to differentiate between flows

returned directly to the lake and flows returned downstream from the dam. These

are some of the questions that the Corps should answer on remand, although we

make no attempt to be exhaustive in that regard.

      As part of the final, definitive statement of the Corps’ water supply analysis,

if the agency ultimately concludes that it does not have the authority to grant the

Georgia request, it nevertheless should indicate the scope of the authority it thinks it

does have, under the RHA, the WSA, and the 1956 Act. This way, the parties will

have some further instruction, based on sophisticated analysis, of what the Corps

believes to be the limitations on its power.



      Part VI.      Collateral Esoppel Effects on Remand Instructions

      To assist the Corps in making these determinations on remand, we address

here whether certain statements from this Court’s decision in Alabama or the D.C.

Circuit’s decision in Geren carry the force of collateral estoppel. Specifically, we

discuss whether either of the two claims found to have preclusive force by the

district court in the instant case is binding on the Corps and whether any of

Alabama and Florida’s additional collateral estoppel arguments have merit. At the

outset, we note that collateral estoppel applies only if (1) the issue at stake is

                                           86
identical to the one involved in the prior proceeding; (2) the issue was actually

litigated in the prior proceeding; (3) the determination of the issue was critical and

necessary to the earlier judgment; and (4) the party against whom collateral estoppel

is asserted had a full and fair opportunity to litigate the issue in the prior

proceeding. Christo v. Padgett, 
223 F.3d 1324
, 1339 (11th Cir. 2000).

      The district court found collateral estoppel, preclusive effect in the D.C.

Circuit’s conclusion that the WSA applied to interim reallocations of storage. Tri-

State, 639 F. Supp. 2d at 1343
. We take no issue with this application of collateral

estoppel. On remand, the Corps will determine the extent of its authority to supply

the current water supply needs of the Atlanta area, combining its authority under the

1956 Act, the RHA, and the WSA. The Corps’ authority under the WSA (as well as

the statutory limits thereto) are applicable to the Corps’ determination of its

authority to supply current water supply needs, whether by force of collateral

estoppel or clear statutory meaning or both.

      The district court also found preclusive effect in the D.C. Circuit’s holding

that the reallocation of 22% of Lake Lanier’s conservation storage is a major

operational change on its face. 
Id. Several aspects
of this holding merit discussion.

First, and foremost, the Geren court considered only the Corps’ authority under the




                                            87
WSA, not its authority under the RHA.37 Accordingly, a different issue is presented

here. At the very least, this difference means that any water the Corps finds it is

authorized to supply pursuant to the RHA is separate from the water it is authorized

to supply pursuant to the WSA, and that this RHA-authorized water supply would

not count against the Geren court’s 22% limit.38

       It is also possible that our reading of the authority provided by the RHA

fundamentally changes the WSA analysis, given that the RHA congressionally

authorizes the Corps to increase water supply in its balancing of hydropower and

water supply needs, meaning that such reallocations to water supply arguably do not

actually constitute a “change” of operations at all, and that the issue is therefore

entirely different than the one presented to the Geren court. In other words, it is

possible that the 22% holding has no preclusive force at all. However, because it is

not clear that the Geren court’s 22% limit will be reached in this case,39 we

       37
                The settling parties—the Corps, SeFPC, and the Georgia Parties—did not make
an issue of the Corps’ authority under the RHA because they were not in full agreement on
whether water supply was an authorized purpose of the Buford Project. As settling parties
defending a settlement, they had no incentive to assert issues about which they disagreed.
       38
               Of course, the authority granted under the 1956 Act for Gwinnett County also
would not count against the Geren court’s 22% limit. Likewise, the parties and the courts have
consistently assumed, and so do we, that the 10 mgd in compensatory withdrawals by Buford and
Gainesville do not affect the amount of water that the Corps is authorized to supply under the
various statutory grants.
       39
               There are two reasons the 22% limit may not be reached. First, the Corps has yet
to determine the extent of its authority to allocate water to water supply under the RHA. The 22%

                                               88
expressly decline to address the collateral estoppel effect of the Geren court’s 22%

limit.40

       Second, it is clear that the question of whether percent reallocation of storage

is the correct or sole measure of operational change was not actually litigated.

Examination of the parties’ briefs in Geren makes clear that the parties assumed, but

did not put at issue, the question of whether percent reallocation of storage is the

correct or sole measure of operational change. Similarly, because the parties merely

assumed that percent reallocation was the appropriate measure, the Geren court

made the same assumption in its opinion, without any discussion of the issue. When

an issue is merely assumed, it does not meet the actual litigation requirement for



limit would not be reached unless the water allocated under the WSA represented at least a 22%
reallocation above whatever allocation is authorized under the RHA. Second, as discussed in the
two paragraphs immediately following this paragraph, percent reallocation of conservation
storage may not be the correct or sole measure of operational change.
       40
                 We do, however, expressly address the collateral estoppel effect of Geren’s
alternative holding—that even a 9% increase in storage for water supply is a major operational
change. The district court did not find preclusive effect to this holding. Alabama and Florida do
not argue in their briefs that this holding is entitled to collateral estoppel, and Alabama and
Florida expressly abandoned any such claim at oral argument. Nonetheless, we consider this
issue in order to provide complete remand instructions to the Corps. Because the issue arose in
Geren for the first time at oral argument, the Corps and the Georgia Parties had no opportunity to
brief the issue. This alternative, and secondary, holding therefore wholly fails the “actually
litigated” requirement for collateral estoppel. See Chi. Truck Drivers, Helpers & Warehouse
Union (Independent) Pension Fund v. Century Motor Freight, Inc., 
125 F.3d 526
, 530 (7th Cir.
1997) (expressing doubt that the issue of a regulation’s validity was actually litigated when it
emerged only at the reply brief stage and received little discussion in the opinion,
notwithstanding the fact that the party against whom collateral estoppel was asserted had raised
the application of the regulation in its earlier response to summary judgment).

                                                89
collateral estoppel. See Fields v. Apfel, 
234 F.3d 379
, 383 (8th Cir. 2000) (finding

no issue preclusion with respect to whether a particular method for calculating

disability benefits applied, because its applicability had merely been assumed by the

court and both parties in a prior case and not placed at issue). The fact that the

Geren court ruled “without thoroughly examining” the issue further undermines the

preclusive effect of the ruling. A.J. Taft Coal Co. v. Connors, 
829 F.2d 1577
, 1581

(11th Cir. 1987) (declining to apply collateral estoppel where the issue was not fully

litigated, which resulted in the prior court tendering a conclusion “without

thoroughly examining” the issue). Moreover, in this case, the district court did not

hold that percent reallocation of storage is, as a matter of collateral estoppel, the

correct or sole measure, and Appellees do not argue on appeal that we are bound by

collateral estoppel to hold that percent reallocation of storage is the only appropriate

measure of operational change. We conclude, for the foregoing reasons, that

collateral estoppel does not bar the Corps from determining the appropriate measure

of operational change on the basis of its own expertise. The Corps is free to consider

on remand whether other measures, such as impact on hydropower,41 should be

       41
                It may be that the percent impact on hydropower is significantly less than the
percent of storage reallocated to water supply under a given allocation scheme. For example, the
Corps’ brief at 99–100 explained that the “de facto” reallocations of storage to account for
current uses causes a systemwide reduction of hydropower of only 1%.

       Another aspect of the evaluation of detriment to hydropower is whether compensation to

                                               90
considered instead of or in addition to percent reallocation of storage.

       Third, examination of the briefs in Geren also shows that the parties merely

assumed that conservation storage was the appropriate frame of reference against

which percent reallocation should be calculated, and the court likewise made this

assumption. Accordingly, the actual litigation requirement is not met and the Corps

is free to consider on remand whether some other portion of the dam’s capacity

should also be considered. For instance, it may be that the flood control storage,

which sometimes contains excess water that could be released to satisfy water

supply needs, should be factored into the calculation.



power users can be considered to mitigate any detriment. Although the Geren court rejected the
idea that compensation to hydropower users might be relevant under the WSA, see 
Geren, 514 F.3d at 1324
, Alabama and Florida do not argue that this rejection gives rise to collateral
estoppel. We consider the issue nonetheless in order to provide complete remand instructions to
the Corps. For the following reasons, we conclude that collateral estoppel does not preclude the
Corps from considering compensation to power users as a mitigating factor in its analysis of
detriment to hydropower, if the Corps finds it appropriate to consider compensation for this
purpose based on the exercise of its expertise. The concept of compensating power customers
presents a different issue than the one considered in Geren because the D.C. Circuit failed to
recognize the Corps’ authority under the RHA. As we hold today, the RHA authorizes the Corps
to increase water supply at the expense of hydropower, and it contemplates that, in balancing the
water supply and hydropower interests, the Corps should consider the magnitude of the detriment
to hydropower. Because the Geren court failed to recognize this authority, it treated the proposed
change in storage, and flow through, as a major operational change without considering the
magnitude of the effect on hydropower and without considering whether financial compensation
is relevant to that inquiry. Accordingly, the Geren court did not face the same issue with respect
to the effect of compensation on the Corps’ authority as this Court. Because the issue is different,
collateral estoppel does not apply. See 
Christo, 223 F.3d at 1339
. The Corps on remand may
therefore make a fresh determination regarding whether financial compensation to power
customers is material for the purpose of evaluating the magnitude of the detriment to
hydropower.

                                                 91
       Alabama and Florida advance two collateral estoppel arguments in addition to

those already covered above. First, they argue that the Geren court decided that, for

purposes of the WSA analysis, the baseline for storage against which major

operational change should be measured is zero. They further argue that the decision

has the effect of collateral estoppel. We disagree. As noted above, the Geren court

expressly made no decision with respect to the Corps’ authority to allocate storage

to water supply under the RHA.42 It addressed the issue of the appropriate baseline

for the WSA analysis only in the context of rejecting the settling parties’ argument

that the interim reallocation level prior to the settlement was the correct baseline. A

wholly different issue is presented in this appeal, in which we are required to assess

the Corps’ authority under the RHA to reallocate storage or otherwise provide water

supply, and to factor this authority into the WSA analysis. Thus, the Geren court’s

decision with respect to the baseline for storage reallocation has no collateral

estoppel effect in this case.

       Second, Appellees argue that this Court’s earlier statement in Alabama, that

water supply is not an authorized purpose of the Buford Project, is preclusive. As


       42
                Accordingly, Alabama and Florida are plainly wrong to the extent they argue that
this aspect of Geren establishes collateral estoppel for purposes of finding that the RHA
authorizes no storage for water supply. Likewise, Alabama and Florida are wrong to the extent
that they argue that Geren establishes estoppel for the proposition that grants of authority under
the RHA and WSA are not supplemental. Geren made no such holdings.

                                                92
noted earlier in this opinion, this statement does not give rise to collateral estoppel

because it was not actually litigated and it was mere dicta and therefore was not

critical or necessary to the judgment. See supra, note 21. In conclusion, the Corps is

not bound by collateral estoppel in making the aforementioned determinations and

should make its decisions on remand on the basis of its own reasoned analysis.



      Part VII.     One-Year Time Limit on Remand

      This controversy has lasted a very long time. Since 1990, litigation related to

this controversy has taken place in the Northern District of Alabama, the District

Court for the District of Columbia, the Northern District of Georgia, the Northern

District of Florida, the Middle District of Florida, the District of Columbia Circuit,

and now five times in the Eleventh Circuit, and various attempts at compromise

have been initiated and abandoned. Progress towards a determination of the Buford

Dam’s future operations is of the utmost importance to the millions of power

customers and water users that are affected by the operations of the project. The

stakes are extremely high, and all parties are entitled to a prompt resolution.

Accordingly, the process for arriving at a conclusion of the bounds of the Corps’

authority should be as swift as possible without sacrificing thoroughness and

thoughtfulness. Given the importance of this case, the length of time it has been

                                           93
bouncing around the federal courts, and the amount of resources the parties and the

courts have already expended, we believe that one year is sufficient for the Corps to

complete its analysis of its water supply authority and release its conclusions. This

panel will retain limited jurisdiction to monitor compliance with this time frame. At

the end of this one-year period, we expect the Corps to have arrived at a well-

reasoned, definitive, and final judgment as to its authority under the RHA and the

WSA.



                                    CONCLUSION

       The Corps’ did not consummate its decision-making process in the Alabama,

Apalachicola, and SeFPC cases. Therefore, the district court lacked jurisdiction to

hear these claims. The Corps’ denial of Georgia’s 2000 water supply request did

constitute final agency action, and the district court’s conclusion that it had

jurisdiction to hear the Georgia case was proper. However, the court erred in its

analysis of the Corps’ rejection of the request. The decisions of the District Court

and the Corps were based on a clear error of law—the determination that water

supply was not an authorized purpose of the RHA. Furthermore, the Corps failed to

reach a final, determinative position about its water supply authority before

rejecting the state’s request. Consequently, we reverse the district court’s order

                                          94
granting the Corps summary judgment, and conclude that the Corps’ decision was

arbitrary and capricious or not otherwise in accordance with the law. All four cases

are remanded to the district court with instructions to remand to the Corps for

reconsideration. This panel will retain limited jurisdiction to monitor the one-year

time limit.

      Accordingly, the judgment of the district court is reversed, its findings of fact

and conclusions of law in all four cases are vacated, and these cases are remanded to

the district court with instructions to remand to the Corps for further proceedings

not inconsistent with this opinion.

      REVERSED, VACATED, AND REMANDED; LIMITED

JURISDICTION RETAINED.




                                          95
