Summary: 06-5696-cv NextG Networks of NY, Inc., v. City of New York, et al. 1 UNITED STATES COURT OF APPEALS 2 3 FOR THE SECOND CIRCUIT 4 5 - 6 7 August Term, 2007 8 9 (Argued: October 17, 2007 Decided: January 15, 2008) 10 11 Docket No. 06-5696-cv 12 13 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 X 15 NEXTG NETWORKS OF NY, INC., 16 17 Plaintiff-Appellant, 18 19 - against - 20 21 CITY OF NEW YORK, CITY OF NEW YORK DEPARTMENT OF INFORMATION 22 TECHNOLOGY AND TELECOMMUNICATIONS and P
Summary: 06-5696-cv NextG Networks of NY, Inc., v. City of New York, et al. 1 UNITED STATES COURT OF APPEALS 2 3 FOR THE SECOND CIRCUIT 4 5 - 6 7 August Term, 2007 8 9 (Argued: October 17, 2007 Decided: January 15, 2008) 10 11 Docket No. 06-5696-cv 12 13 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 X 15 NEXTG NETWORKS OF NY, INC., 16 17 Plaintiff-Appellant, 18 19 - against - 20 21 CITY OF NEW YORK, CITY OF NEW YORK DEPARTMENT OF INFORMATION 22 TECHNOLOGY AND TELECOMMUNICATIONS and PA..
More
06-5696-cv
NextG Networks of NY, Inc., v. City of New York, et al.
1 UNITED STATES COURT OF APPEALS
2
3 FOR THE SECOND CIRCUIT
4
5 -------------
6
7 August Term, 2007
8
9 (Argued: October 17, 2007 Decided: January 15, 2008)
10
11 Docket No. 06-5696-cv
12
13 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 X
15 NEXTG NETWORKS OF NY, INC.,
16
17 Plaintiff-Appellant,
18
19 - against -
20
21 CITY OF NEW YORK, CITY OF NEW YORK DEPARTMENT OF INFORMATION
22 TECHNOLOGY AND TELECOMMUNICATIONS and PAUL J. COSGRAVE, in his
23 official capacity,
24
25 Defendants-Appellees.
26
27 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
28 X
29
30 Before: KEARSE and HALL, Circuit Judges, and
31 RAKOFF, District Judge.*
32
33 Plaintiff NextG Networks of NY, Inc. appeals from a
34 judgment of the United States District Court for the Southern
35 District of New York (Berman, J.), entered March 7, 2006,
36 granting defendants’ motion for summary judgment. We hold that
*
The Honorable Jed S. Rakoff, United States District Judge
for the Southern District of New York, sitting by designation.
-1-
1 a telecommunications provider may not bring a cause of action
2 for money damages under 42 U.S.C. § 1983 for violation of
3 Section 253 of the Telecommunications Act of 1996. We also hold
4 that NextG’s claims for declarative and injunctive relief on the
5 basis that Section 253 prohibits or preempts the City’s laws and
6 regulations governing the provision of telecommunications
7 services via the public rights-of-way are not moot and should be
8 considered by the District Court on remand. Affirmed in part,
9 reversed in part, and remanded.
10
11 T. SCOTT THOMPSON (David M. Shapiro on the
12 brief), Davis Wright Tremaine LLP,
13 Washington, D.C. for Plaintiff-
14 Appellant.
15
16 KAREN M. GRIFFIN, Assistant Corporation
17 Counsel (Francis F. Caputo, Bruce
18 Regal, Diana M. Murray on the brief),
19 for Michael A. Cardozo, Corporation
20 Counsel of the City of New York, New
21 York, N.Y. for Defendants-Appellees.
22 RAKOFF, District Judge.
23 Plaintiff-appellant NextG Networks of NY, Inc. (“NextG”)
24 appeals from a judgment of the United States District Court for
25 the Southern District of New York (Berman, J.), granting summary
26 judgment in favor of the defendants-appellees (collectively,
27 “the City”).
28 Broadly speaking, this case concerns whether the City has
29 impeded NextG’s access to the New York City telecommunications
30 market by unlawfully denying NextG the use of City-owned poles.
31 NextG, a wholesale provider of telecommunications services,
32 offers other wireless carriers a method for extending wireless
-2-
1 coverage to "dead spots." It does this, among other ways, by
2 constructing a continuous grid of low-level antennas (“nodes”)
3 mounted at heights of no more than approximately 30 feet from
4 the ground. To construct such a network in New York City, NextG
5 proposes to install nodes and node equipment on City-owned
6 utility poles and streetlight poles in the public
7 rights-of-way.1 Under the New York City Charter, before any
8 entity can use the "inalienable property" of the City, including
9 City poles, it must first obtain a franchise. Such a franchise
10 is available only if the City’s Department of Information
11 Technology and Telecommunications ("DoITT") makes an initial
12 determination of the need for franchises of a particular type,
13 and the New York City Council then adopts a resolution
14 authorizing the granting of such franchises. Once this is done,
15 DoITT issues a Request for Proposals (“RFP”) pursuant to which
16 an individual entity may apply for such a franchise. If DoITT
17 approves the application, the franchise is subject to a public
18 hearing, approval by the Mayor, and review and approval by the
19 Franchise and Concession Review Committee, before it can finally
1
While NextG claims, and the City disputes, that NextG has
no reasonable alternative to such use of City-owned property, we
do not reach that issue here.
-3-
1 be granted.
2 In connection with the provision of mobile
3 telecommunications services, the City Council, beginning in
4 1994, passed three successive resolutions authorizing DoITT to
5 issue franchises for the installation of telecommunications
6 equipment and facilities on, over, and under the “inalienable
7 property” of the City. The resolution that was in place when
8 NextG first brought this action was Resolution No. 957, which
9 took effect on August 11, 1999. Even though, under Resolution
10 No. 957, no entity could apply for or obtain a franchise unless
11 and until DoITT issued an RFP, for the first four-and-a-half
12 years after the enactment of Resolution No. 957 DoITT did not
13 issue an RFP. Thus, when, in March 2002, NextG first contacted
14 the City about obtaining a franchise to deploy its equipment on
15 City-owned poles, it was told, in effect, that it would have to
16 await the issuance of an RFP, which it was assured would issue
17 shortly. When, however, no RFP issued, NextG nonetheless
18 submitted an application for a franchise, to which the City did
19 not respond in writing. After waiting many months for a
20 response, NextG, in December 2003, filed this action.
21 After the action was filed, DoITT, on February 9, 2004,
22 finally issued an RFP (the “2004 RFP”) entitled a “Request For
-4-
1 Proposals For Franchises For The Installation And Use, On
2 City-Owned Street Light Poles, Traffic Light Poles And Highway
3 Sign Support Poles, Of Telecommunications Equipment And
4 Facilities, Including Base Station And Access Point Facilities,
5 In Connection With The Provision Of Mobile Telecommunications
6 Services.” The deadline for submitting franchise applications
7 pursuant to the 2004 RFP was April 16, 2004. NextG and
8 eight other companies duly submitted applications. Two
9 applicants then withdrew their proposals. On April 30, 2004,
10 DoITT sent letters to the remaining applicants, stating, in
11 effect, that no franchise would be granted to any applicant who
12 did not commit to various requirements. NextG declined to
13 commit to a number of the requirements, including a commitment
14 to pay a minimum annual “zone” compensation fee of $100,000 and
15 a minimum bid of $250 per pole per month for the zone
16 encompassing Manhattan; an agreement to accept a “priority
17 rating” for a particular zone based on an entity’s per pole bid;
18 and an agreement to a system whereby if there were competing
19 requests for use of the same pole, the requesting company with
20 the highest priority rating in that zone would have first option
21 to utilize the pole for a certain period of time. Accordingly,
22 the City refused to grant NextG a franchise. It did, however,
-5-
1 grant franchises to the other six applicants, who agreed to
2 these conditions.
3 Meanwhile, on March 2, 2004, NextG amended its complaint to
4 seek a declaration that the City’s rules, regulations and
5 requirements embodied in the City Charter, in Resolution No.
6 957, and in the 2004 RFP violated Section 253 of the
7 Telecommunications Act of 1996, 47 U.S.C. § 253. It also
8 requested an order enjoining the City from enforcing these rules
9 and regulations. Finally, it sought damages under 42 U.S.C. §
10 1983 for the City’s alleged violations of Section 253.
11 On August 11, 2004, Resolution No. 957 expired, by its own
12 terms. Although a new, similar resolution, Resolution No. 519,
13 was enacted on March 23, 2005, no RFP was issued pursuant to
14 Resolution No. 519 until July 19, 2007.
15 In the interim, on March 6, 2006, the District Court
16 granted the City’s motion for summary judgment. In its Decision
17 and Order, the District Court concluded that it would be
18 “inappropriate to issue a declaratory judgment with respect to
19 the [City] Charter, Resolution No. 957, and 2004 RFP because (i)
20 Resolution No. 957 and the 2004 RFP have expired and (ii) NextG
21 has an available claim for money damages under Section 1983."
22 In a footnote, the District Court noted that “NextG does not
-6-
1 appear to have requested that the Court declare that the City’s
2 new franchise scheme under Resolution No. 519 is preempted by
3 Section 253. In any event, on this record, there does not
4 appear to be a ‘real and immediate controversy’ regarding
5 Resolution No. 519.”2
6 The District Court also found that injunctive relief was
7 not warranted because, given its prior ruling that an action for
8 damages was available, NextG had not established “that it
9 suffered or is likely to suffer irreparable injury.”
10 Finally, with regard to NextG’s claim for money damages,
11 the District Court held that, because NextG had offered no
12 evidence as to the actual economic effect on NextG of the City’s
13 requirements that NextG was challenging, NextG’s claim for
14 damages must be dismissed.
15 We review a district court’s grant of summary judgment de
16 novo. Physicians Comm. for Responsible Med. v. Johnson, 436
17 F.3d 326, 331 (2d Cir. 2006). To begin with, we agree with the
18 District Court that NextG’s claim for damages under 42 U.S.C. §
2
On March 17, 2006, NextG moved for leave to amend its
complaint to challenge the legality of Resolution No. 519. The
district court denied plaintiff's motion to amend its complaint,
finding that Resolution No. 519 had not been previously
litigated in the case and that allowing plaintiff to amend would
be prejudicial at this stage.
-7-
1 1983 must be dismissed, but for a different reason than that
2 given by the District Court.3 Specifically, we conclude that a
3 telecommunications provider may not bring a cause of action for
4 damages under Section 1983 for violations of Section 253 of the
5 Telecommunications Act of 1996.
6 Only “rights, not the broader or vaguer benefits or
7 interests” may be enforced through § 1983. Gonzaga Univ. v.
8 Doe,
536 U.S. 273, 283 (2002) (internal quotation marks omitted)
9 (emphasis in original). See also Blessing v. Freestone, 520
10 U.S. 329, 340 (1997) (“In order to seek redress through § 1983,
11 . . . a plaintiff must assert the violation of a federal right,
12 not merely a violation of federal law”) (emphasis in original).
13 The determination of whether a particular federal statute
14 creates a federal right of the kind enforceable by an action for
15 damages under § 1983 requires inquiry into “whether or not
16 Congress intended to confer individual rights upon a class of
17 beneficiaries.”
Gonzaga, 536 U.S. at 285. See also Loyal Tire
18 & Auto Ctr., Inc. v. Town of Woodbury,
445 F.3d 136, 149-50 (2d
3
A Court of Appeals “may, of course, affirm the district
court’s judgment on any ground appearing in the record, even if
the ground is different from the one relied on by the district
court.” ACEquip Ltd. v. Am. Eng'g Corp.,
315 F.3d 151, 155 (2d
Cir. 2003).
-8-
1 Cir. 2006).
2 The District Court believed that such rights were conferred
3 on telecommunications providers by Section 253, primarily
4 because, in the District Court’s view, Section 253 “is phrased
5 in terms of persons (entities) benefitted, i.e.
6 telecommunications providers.” But the statutory language to
7 which the District Court referred in support of this analysis
8 simply states, in relevant part, that “No State or local statute
9 or regulation, or other State or local legal requirement, may
10 prohibit or have the effect of prohibiting the ability of any
11 entity to provide any interstate or intrastate
12 telecommunications service.” 47 U.S.C. § 253(a). We read this
13 language as intended to place limits on state and local
14 governments, rather than as intended to benefit an identified
15 class of putative plaintiffs.
16 This reading is further confirmed by the additional
17 statutory language that “Nothing in this section affects the
18 authority of a State or local government to manage the public
19 rights-of-way or to require fair and reasonable compensation
20 from telecommunications providers, on a competitively neutral
21 and nondiscriminatory basis, for use of public rights-of-way on
22 a nondiscriminatory basis, if the compensation required is
-9-
1 publicly disclosed by such government.” 47 U.S.C. § 253(c). In
2 other words, the purpose of Section 253 is to impose some limits
3 on the ability of state and local governments to regulate
4 telecommunications but not to interfere with the right of such
5 governments to impose reasonable charges for the concomitant use
6 of public property. Similarly, the legislative history,
7 although not definitive on this issue, shows that Congress was
8 concerned with requirements to be placed on state and local
9 governments and not with benefits to be conferred on
10 telecommunications providers. See, e.g., 141 Cong. Rec. S8170
11 (daily ed. June 12, 1995), 141 Cong. Rec. S8308 (daily ed. June
12 14, 1995) (discussion of where local governments would be
13 permitted to defend preemption challenges to local ordinances).
14 The two other Circuits that have addressed this issue
15 directly have similarly held that there is no private damages
16 action under Section 1983 for a violation of Section 253. See
17 Sprint Telephony PCS, L.P. v. County of San Diego,
490 F.3d 700,
18 716-17 (9th Cir. 2007) (no cause of action for damages under §
19 1983 for violation of § 253 because § 253 is phrased in terms of
20 the parties restricted, i.e. states and local governments);
21 Qwest Corp. v. City of Santa Fe,
380 F.3d 1258, 1265-67 (10th
22 Cir. 2004) (no cause of action under § 1983 for violation of §
-10-
1 253 because § 253 grants “no private rights to any identifiable
2 class”) (internal quotation marks omitted). Although the
3 District Court appeared to believe that a contrary view had been
4 expressed by two other Circuits, in TCG Detroit v. City of
5 Dearborn,
206 F.3d 618, 622-23 (6th Cir. 2000) and BellSouth
6 Telecomms., Inc. v. Town of Palm Beach,
252 F.3d 1169, 1189-91
7 (11th Cir. 2001), these cases, which preceded the Supreme
8 Court’s decision in Gonzaga, concerned, not the existence of a
9 right enforceable by an action in damages under § 1983, but
10 rather whether a private cause of action existed directly under
11 § 253 to assert preemption of a state or local statute or
12 regulation.4 Neither case expressed any view on the availability
4
In TCG Detroit, the Sixth Circuit declined to hold that it
had jurisdiction to adjudicate a claim for preemption under the
Supremacy Clause and instead analyzed whether § 253(c) created a
private right of action in federal
courts. 206 F.3d at 622-23.
After holding that § 253(c) was not a safe harbor provision but
instead an independent basis for municipal liability under § 253,
the Court held that § 253(c) authorized a private right of action
in federal court for telecommunications providers aggrieved by
municipal action.
Id. at 624. In addition to not presenting the
issue now before this Court, the TCG Detroit decision is directly
contradicted by our decision in TCG New York, Inc. v. City of
White Plains,
305 F.3d 67, 77 (2d Cir. 2002), which concluded
that § 253(c) is a savings clause, and by our decision in W. Air
Lines, Inc. v. Port Auth.,
817 F.2d 222, 225-26 (2d Cir. 1987),
which held that a private right of action is not required where
a party seeks to enjoin the enforcement of a local rule or
regulation on the ground that the regulation is preempted by
federal law. Similarly, in
BellSouth, 252 F.3d at 1189-91, the
Eleventh Circuit did not consider possible jurisdiction under the
Supremacy Clause and instead held that because Congress clearly
-11-
1 of damages under § 1983.
2 From our conclusion that § 253 does not create a private
3 right of action for damages, it follows that we do not agree
4 either with the portion of the District Court’s decision that
5 denied injunctive relief on the ground that NextG had an
6 adequate remedy in damages and could not establish irreparable
7 harm or with the correlative portion of the District Court’s
8 decision that found that the availability of an action for
9 damages under § 1983 weighed against the granting of declarative
10 relief. But the District Court also suggested that it would be
11 “inappropriate” to grant such relief in light of the expiration
12 of Resolution No. 957 and the 2004 RFP. Again, we are
13 constrained to disagree. The gist of NextG’s claims in the
14 Amended Complaint was that the City’s entire approach to the
15 granting of franchises for the purposes here sought is
16 prohibited or preempted by Section 253. Nothing in the
17 expiration of Resolution No. 957 and the 2004 RFP (and their
18 replacement by Resolution No. 519 and the 2007 RFP) renders this
19 issue moot. See County of Los Angeles v. Davis,
440 U.S. 625,
intended that local governments be permitted to defend preemption
challenges in their local district courts, a private cause of
action in federal district court exists under § 253 to seek
preemption of state or local regulations.
-12-
1 631 (1979).
2 A dispute usually becomes moot if the defendant can
3 demonstrate that “(1) there is no reasonable expectation that
4 the alleged violation will recur and (2) interim relief or
5 events have completely and irrevocably eradicated the effects of
6 the alleged violation.” Granite State Outdoor Adver. v. Town of
7 Orange,
303 F.3d 450, 451 (2d Cir. 2002) (per curiam) (internal
8 quotation marks omitted). Specifically, with regard to state or
9 local ordinances that expire by their own terms, expiration will
10 not moot a challenge “if there is a reasonably concrete basis to
11 anticipate that the expired rule will be reenacted in a form
12 that will raise the same questions.” Catanzano v. Wing, 277
13 F.3d 99, 107 (2d Cir. 2001) (internal quotation marks omitted).
14 Here, the expiration of Resolution No. 957 and the 2004 RFP
15 did not obviate appellant’s claims or completely eradicate the
16 effects of the City’s regulatory scheme. For one thing, NextG's
17 Amended Complaint challenged not only Resolution No. 957 and the
18 2004 RFP, but also the provisions of the City Charter on which
19 the Resolution and RFP were predicated. Therefore, at a
20 minimum, NextG’s claim that these provisions of the City Charter
21 are preempted by the Telecommunications Act of 1996 is not moot.
22 See Lamar Adver. of Penn, LLC. v. Town of Orchard Park, New
-13-
1 York,
356 F.3d 365, 379 (2d Cir. 2004).
2 Furthermore, the gravamen of NextG’s complaint was that the
3 City’s regulatory scheme as a whole violated Section 253 of the
4 Telecommunications Act of 1996 because the “City assumes that it
5 has the unfettered discretion and power to determine who may or
6 may not provide telecommunications services.” This claim was
7 not mooted by the expiration of Resolution No. 957 or the 2004
8 RFP. On the contrary, it applied with even greater force after
9 the Resolution and the RFP expired because the expirations
10 worked to prevent, perhaps indefinitely, any entity from using
11 City poles to provide telecommunications services.
12 Further still, even NextG’s more specific claims regarding
13 Resolution No. 957 and the 2004 RFP were not mooted when the
14 Resolution and the RFP expired because there was a reasonable
15 basis on which to anticipate that the ordinances would be
16 reenacted in a form that would raise the same questions, see
17 Catanzano,
277 F.3d 99 at 107-08. Just as Resolution No. 957
18 itself was essentially identical to its predecessor, Resolution
19 No. 438 of 1994, so also, well before the District Court
20 rendered its judgment in this case, the City enacted, on March
21 23, 2005, a successor resolution, Resolution No. 519, that,
22 again, was substantially similar to Resolution No. 957 in many
-14-
1 of the respects challenged by NextG’s complaint. From this past
2 practice, moreover, it was predictable that the 2007 RFP, though
3 issued after the District Court rendered its decision, would be
4 substantially similar to the 2004 RFP –- as indeed proved to be
5 the case.5
6 Accordingly, while we affirm the dismissal of NextG’s claim
7 for damages, we reverse the dismissal of its claims for
8 declarative and injunctive relief and remand to the District
9 Court for consideration, inter alia, of NextG’s claims that the
10 City’s regulatory scheme is in material respects prohibited or
11 preempted by the Telecommunications Act of 1996.
12
13
14
15
16
5
Without disturbing the District Court’s December 2006 Order
denying NextG’s motion to amend the complaint, we conclude that
it would be appropriate on remand for the District Court to
permit NextG to amend its complaint to challenge Resolution No.
519 and the 2007 RFP.
-15-