Summary: IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT United States Court of Appeals Fifth Circuit FILED May 19, 2011 No. 10-20217 Lyle W. Cayce Clerk J.D. FIELDS & COMPANY, INC., Plaintiff-Appellant v. UNITED STATES STEEL INTERNATIONAL, INC., Defendant-Appellee Appeal from the United States District Court for the Southern District of Texas USDC No. 4:08-CV-3076 Before JONES, Chief Judge, BENAVIDES, Circuit Judge, and AYCOCK, District Judge.* SHARION AYCOCK, District Judge:** J.D. Fields &
Summary: IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT United States Court of Appeals Fifth Circuit FILED May 19, 2011 No. 10-20217 Lyle W. Cayce Clerk J.D. FIELDS & COMPANY, INC., Plaintiff-Appellant v. UNITED STATES STEEL INTERNATIONAL, INC., Defendant-Appellee Appeal from the United States District Court for the Southern District of Texas USDC No. 4:08-CV-3076 Before JONES, Chief Judge, BENAVIDES, Circuit Judge, and AYCOCK, District Judge.* SHARION AYCOCK, District Judge:** J.D. Fields & ..
More
IN THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT United States Court of Appeals
Fifth Circuit
FILED
May 19, 2011
No. 10-20217
Lyle W. Cayce
Clerk
J.D. FIELDS & COMPANY, INC.,
Plaintiff-Appellant
v.
UNITED STATES STEEL INTERNATIONAL, INC.,
Defendant-Appellee
Appeal from the United States District Court
for the Southern District of Texas
USDC No. 4:08-CV-3076
Before JONES, Chief Judge, BENAVIDES, Circuit Judge, and AYCOCK,
District Judge.*
SHARION AYCOCK, District Judge:**
J.D. Fields & Company, Inc. appeals the district court’s grant of summary
judgment in favor of United States Steel International. The district court held
that two separate price quotations sent from United States Steel International
could not be construed as offers as a matter of law. The district court further, in
*
District Judge of the Northern District of Mississippi, sitting by designation.
**
Pursuant to 5TH CIR. R. 47.5, the court has determined that this opinion should not be
published and is not precedent except under the limited circumstances set forth in 5TH
CIR. R. 47.5.4.
No. 10-20217
a sua sponte grant of summary judgment, held that J.D. Fields could not prove
a claim of fraudulent inducement. We affirm in part and reverse in part the
district court’s judgment.
Background
United States Steel International (“USSI”) sells and markets steel
products manufactured at domestic steel mills for international sale.1 J.D.
Fields is a steel-product distributor, serving as a conduit between manufacturers
and end-users. On at least thirty occasions from 2003 through 2008, J.D. Fields
entered into contracts with USSI to purchase steel products. USSI produced
copied documents pertaining to its prior transactions with J.D. Fields. These
documents appear to show that, on most occasions, USSI and J.D. Fields
followed a general course of dealing. This course of dealing appears to be as
follows: (1) J.D. Fields requested a price quotation from USSI, either orally or
via email; (2) USSI sent J.D. Fields a price quotation; (3) J.D. Fields sent USSI
a purchase order; (4) USSI sent J.D. Fields an order acknowledgment; and (5)
USSI shipped the product and sent J.D. Fields an invoice. J.D. Fields contests
this general course of dealing, stating that USSI had an “inconsistent pattern of
delivering its acknowledgments.”
The current dispute arises out of two specific transactions stemming from
a series of emails. In both transactions, it is undisputed that while USSI sent
J.D. Fields a price quotation and J.D. Fields responded with a purchase order,
USSI never transmitted an order acknowledgment. USSI did, however,
correspond with J.D. Fields several times regarding the orders. J.D. Fields
contends that the series of emails created two separate binding contracts.
1
USSI is a subsidiary of the United States Steel Corporation.
2
No. 10-20217
Specifically, J.D. Fields asserts that USSI’s price quotations constituted “offers,”
which J.D. Fields accepted by submitting purchase orders.
A. First Alleged Contract: Purchase Order 45850
On February 6, 2008, Guillermo Moll, a J.D. Fields representative, sent
an email to Kris Blackman, a USSI representative, requesting “price and
delivery options” for 800 feet of a type of seamless carbon steel pipe. After a
short email exchange between the parties specifying the destination of the
product, Blackman responded by email on the same day providing Moll with a
price quote. Blackman’s email stated as follows:
I can offer:
800 FT - 16" OD x 0.844" WT (SCH80) $2133/mt ($132.30/ft)
Subject to heat lot accumulation 100 tons
Net 30 days
Quote valid for 14 days
Delivery: Rolling end of March
Moll then, on the same day, requested a modification in the steel specifications,
asking Blackman if USSI could “roll it to API 5L-X56/60 PSL-2” since the
customer had sent Moll a new note. Blackman responded with a new price quote
of “$2205/mt ($136.74/ft).”
Five days later, on February 11, 2008, Moll faxed Blackman Purchase
Order (“P.O.”) 45850 for 880 feet at a unit price of $136.74 per foot. It is entirely
undisputed that 880 feet of the specified type of pipe requires approximately 60
tons of steel. It is also undisputed that “[s]ubject to heat lot accumulation 100
tons” means that the steel mill will only roll the steel in a batch of at least 100
tons.
On February 14, 2008, Moll emailed Blackman regarding this order,
3
No. 10-20217
stating “Please advise when is the expected rolling for the subject PO.”
Blackman responded the same day as follows:
The mill has gotten back with me . . . this material is subject to heat
lot of 100 tons and has to be rolled. This material is subject to roll
at the mill the first part of April. Please let me know if we can
proceed with the order of 100 tons and if so I will need a revised PO.
It is undisputed that Moll never sent a revised purchase order. It is also
undisputed that USSI never remitted an order acknowledgment regarding P.O.
45850.
On March 26, 2008, another email exchange took place between the
parties regarding P.O. 45850. Moll initially contacted Blackman stating:
Per our conversation of last Wednesday pertaining the subject
purchase order, could you please provide us with an update on the
heat-lot accumulation and where this order stands, including the
increase? Also, please send to us an order confirmation form [sic] the
mill.
Blackman responded the same day as follows:
I have ran [sic] my traps and have not found any other order to
piggy back on, so that means 100 tons minimum and I can not [sic]
deliver this until August 08 and is subject to price increase. Let me
know how you would like to proceed.
Moll then responded:
Thank you for your reply; unfortunately, we cannot keep our
overseas customers waiting indefinitely, we have to give them a
more accurate answer or we risk loosing [sic] them. Therefore, we
are looking into increasing our order to the point you have the
minimum 100 tons; have you received any other orders for this size?
Please advise when we can have the material rolled considering that
we will reach the 100 tons.
4
No. 10-20217
As the district court noted, Moll alleged in his deposition testimony that he also
discussed this order with Blackman on the phone and stated that, “if need be, we
will go up to 100 tons.” However, Moll never sent a revised purchase order for
an order of 100 tons or greater.
On April 24, 2008, Moll sent another email to Tom Verellen, Blackman’s
supervisor at USSI, requesting a status update and order acknowledgment
regarding purchase orders 45850 and 46110.2 In regards to P.O. 45850, Moll
wrote the following:
We would like to bring to your attention the following matters, for
which we kindly request a prompt reply: PO # 45850:
1) Order placed in 02.11.08
2) In March of this year we were advised that you did not have any
other orders for the material ordered and that you needed 100 NT
minimum.
3) On 03.26.08 we advised we would increase the order to 100 NT
4) On 04.10.08 we requested an update on the delivery, to no avail.
We are yet to see an acknowledgment.
Verellen responded that Blackman would respond to the email when he returned
to town the following week. Blackman’s follow-up email to Moll, sent on May 30,
2008, stated:
I will attempt to address the issues below. As I stated in our last
phone conversation about 4-5 weeks ago concerning these PO’s, we
were in the middle of a price increase and not taking orders at that
time. Both of these PO’s fell into these categories.
We still are currently not taking orders because 1 our mills are full
and 2 we have consumed all of our tons for export. I apologize for
the inconvenience or misunderstanding but I recall stating in our
conversation on the phone that these orders were never excepted
2
P.O. 46110 is the second disputed transaction in this case and is discussed in
detail below.
5
No. 10-20217
[sic] nor acknowledged therefore, we do not have these orders in our
system and do not have the material available at this time.
Moll responded:
The fact that these Purchase orders were sent to US Steel in early
February and early March, did not put them in the same group of
our conversation of 4 to 5 weeks ago and my follow-up emails. What
really worries me, is that we commited [sic] to customers based on
US Steel’s word of profunction [sic] for June 2008 and proceeded to
send you purchase orders and increase our order to meet minimums,
as well; now we will have to tell them that their orders were never
accepted?
Blackman in turn responded that, after checking his records, he confirmed that
USSI was indeed not taking orders in February and March. Blackman stated
that USSI could not accept the orders, as there was no material available to
offer. Moll responded that Blackman’s previous emails “pointed towards
[USSI’s] acceptance” of the orders. To this, Blackman responded that the “fact
of the matter is these orders were never acknowledged.” Blackman further
concluded that he had “given [ ] valid information why these orders were not
accepted,” and that USSI would “not be accepting orders from J.D. Fields from
this point forward.”
B. Second Alleged Contract: Purchase Order 46110
On March 5, 2008, Moll emailed Blackman stating that he had “another
inquiry for [him]” regarding two types of seamless pipe. Moll requested
Blackman provide him with a quote on the two types of pipe to be delivered FOB
Port of Houston:
Please quote the following materials from a LATAM request: 3260
ft 16" x .500 wall, SMLS, API5LX52 PSL2, 40 ft max., NACE MRO
6
No. 10-20217
175 certified 2890 ft 12" x .500 wall, SMLS, API5LX52 PSL2, 40 ft
max., NACE MRO 175 certified
Blackman responded to this email on March 13, 2008:
We can offer
$2000/nt for the 12"
$2040/nt for the 16"
June or sooner
FCA Houston
Net 30 days
Valid for 14 days
On March 18, 2008, Moll faxed Blackman P.O. 46110, ordering 3,260 feet of a
specified sixteen-inch pipe at $2,040 per net ton ($84.507 per foot) and 2,890 feet
of a specified twelve-inch pipe at $2,000 per net ton ($136.740 per foot). It is
entirely unclear what happened to P.O. 46110 after Moll faxed it to USSI. In his
deposition testimony, Blackman stated that the order may have “fallen through
the cracks,” and thus was never processed at USSI.
On April 24, 2008, Moll contacted Blackman’s supervisor, Verellen,
requesting a status update and order acknowledgment regarding purchase
orders 45850 and 46110. Moll asked Verellen to “please advise what is the status
on both orders and when can we expect them to be shipped, as well as, receiving
an order acknowledgment for each one[.]” Blackman emailed Moll on May 30,
2008, notifying that P.O. 45850 and P.O. 46110 had not been entered into USSI’s
systems, that USSI never sent J.D. Fields an order acknowledgment, and that
USSI did not plan to fill the orders.
7
No. 10-20217
Standard of Review
The court reviews de novo a district court’s grant or denial of summary
judgment, applying the same standard as the district court. Holt v. State Farm
Fire & Cas. Co.,
627 F.3d 188, 191 (5th Cir. 2010) (citing Am. Int’l Specialty
Lines Ins. Co. v. Canal Indem. Co.,
352 F.3d 254, 259-60 (5th Cir. 2003)).
Discussion
A. Contract Formation
The first issue on appeal is whether the district court properly granted
summary judgment on J.D. Fields’ breach of contract claims when it concluded
that USSI’s price quotations could not reasonably be construed as offers as a
matter of law. Because this case is before the Court on diversity jurisdiction,
state law supplies the applicable substantive authority. Erie R.R. Co. v.
Tompkins,
304 U.S. 64, 78-79,
58 S. Ct. 817,
822 L. Ed. 1188 (1938). “‘When
parties enter into a contract for the sale of goods, the Uniform Commercial Code
(“UCC”) controls the conduct of the parties.” Coburn Supply Co., Inc. v. Kohler
Co.,
342 F.3d 372, 375 (5th Cir. 2003) (quoting Glenn Thurman, Inc. v. Moore
Constr., Inc.,
942 S.W.2d 768, 771 (Tex. App. 1997)). There is no dispute that
Article 2 of the UCC governs this transaction, as the contracts at issue concern
the sale of steel.3 Steel qualifies as a “thing[] . . . which [is] movable at the time
of identification to the contract for sale,” and therefore it is considered a “good.”
3
While there is no dispute that the UCC controls, there was some disagreement in the
district court as to whether Texas or Pennsylvania law should govern the contract
negotiations at issue. After finding that the result would not be different under
Pennsylvania law, the district court concluded that Texas law should control. The decision
to apply Texas law is not challenged on appeal. Further, Texas and Pennsylvania both
have adopted UCC Article 2 in substantially similar form, and the parties have both cited
to Texas law in their briefs. Thus, we apply Texas law in analyzing this action.
8
No. 10-20217
TEX. BUS. & COM. CODE ANN. § 2.105(a). Where the UCC applies, it displaces all
common law rules of law regarding breach of contract and substitutes instead
those rules of law and procedures set forth in the UCC. Pacific Prods., Inc. v.
Great W. Plywood, Ltd.,
528 S.W.2d 286, 291 (Tex. App. 1975). However,
common law principles of law and equity continue to supplement its provisions.
Crest Ridge Constr. Group, Inc. v. Newcourt Inc.,
78 F.3d 146, 152 (5th Cir.
1996).
In Texas, “the essential elements of a breach of contract claim are: (1) the
existence of a valid contract; (2) performance or tendered performance by the
plaintiff; (3) breach of the contract by the defendant, and (4) damages sustained
by the plaintiff as a result of the breach.” Mullins v. TestAmerica, Inc.,
564 F.3d
386, 418 (5th Cir. 2009) (citing Aguiar v. Segal,
167 S.W.3d 443, 450 (Tex. App.
2005)). The central dispute in this action revolves around the first element:
whether the parties ever formed a valid contract as to Purchase Order 45850 and
Purchase Order 46110. “Contract formation [ ] hinge[s] on the existence of an
acceptable offer. The UCC, however, provides no guidance as to what an ‘offer’
is.” Crest
Ridge, 78 F.3d at 152 (Benavides, J., concurring). Although the UCC
does not define the term “offer,” we have held that “[a]n offer is an act that leads
the offeree reasonably to believe that assent (i.e., acceptance) will conclude the
deal.” Axelson, Inc. v. McEvoy-Willis,
7 F.3d 1230, 1232 (5th Cir. 1993).
A contract for the sale of goods may be made in any manner sufficient to
show agreement, including conduct by both parties which recognizes the
existence of such a contract. TEX. BUS. & COM. CODE ANN. §§ 2.201-.210.
Generally, a price quotation, such as one appearing in a brochure or on a flyer,
is not considered an offer; rather, it is typically viewed as an invitation to offer.
9
No. 10-20217
See, e.g., E.C. Styberg Eng’g Co. v. Eaton Corp.,
492 F.3d 912, 918 (7th Cir.
2007); Nordyne, Inc. v. Int’l Controls & Measurements Corp.,
262 F.3d 843, 846
(8th Cir. 2001). Despite this general rule, a price quotation, if detailed enough,
can constitute an offer capable of acceptance. Crest
Ridge, 78 F.3d at 152
(Benavides, J., concurring);
Axelson, 7 F.3d at 1232-33; Gulf States Utils. Co. v.
NEI Peebles Elec. Prods., Inc.,
819 F. Supp. 538, 549 (M.D. La. 1993); Quaker
State Mushroom v. Dominick’s Finer Foods,
635 F. Supp. 1281, 1284 (N.D. Ill.
1986). “However, to do so, it must reasonably appear from the price quote that
assent to the quote is all that is needed to ripen the offer into a contract.” Crest
Ridge, 78 F.3d at 152 (Benavides, J., concurring) (citations omitted).
Contract formation is a question of fact under Texas law. See, e.g., Delta
Brands, Inc. v. Wysong & Miles Co.,
203 F.3d 828,
1999 WL 1240802, at *1 (5th
Cir. Nov. 30, 1999) (per curiam); Crest
Ridge, 78 F.3d at 153 (citing Preston
Farm & Ranch Supply, Inc. v. Bio-Zyme Enters.,
625 S.W.2d 295, 298 (Tex. 1981)
(“The question of whether an agreement was reached is generally a fact question
where, as here, the existence of the agreement is disputed.”)). Summary
judgment, however, is proper if “there is no genuine dispute as to any material
fact and the movant is entitled to judgment as a matter of law.” FED. R. CIV. P.
56(a). All fact questions must be viewed in the light most favorable to the
nonmovant. Delta Brands,
203 F.3d 828,
1999 WL 1240802, at *1.
Purchase Order 45850
The first emailed price quotation was sent from USSI to J.D. Fields on
February 6, 2008. The price quotation contained the following: (i) a specified
price per ton, (ii) specified payment term, (iii) a general delivery time, (iv) a
validity period (“valid for 14 days”), (v) specified rolling/manufacturing time
10
No. 10-20217
frame, (vi) product specification, (vii) the quantity (800 feet), and (viii) that the
price quote was subject to heat lot accumulation of 100 tons. The price quote did
not contain the specific shipping location, the mode of shipping, or the legal
terms and conditions. Five days after receiving this price quote, J.D. Fields
faxed USSI Purchase Order 45850.
Purchase Order 45850 contained a different quantity than the initial
inquiry. That is, the purchase order requested 880 feet, whereas the price quote
was for 800 feet.4 Importantly, neither a quantity of 800 feet nor 880 feet was
enough to meet the 100 ton minimum expressly required by USSI. J.D. Fields,
while conceding that its quantity specifications failed to meet this 100 ton
minimum, asserts that it told USSI it would increase its order. On March 26,
2008, J.D. Fields’ representative, Guillermo Moll, emailed USSI representative,
Kris Blackman, stating that J.D. Fields was “looking into increasing [the] order
to . . . the minimum 100 tons.” Similarly, Moll alleged in his deposition
testimony that he also discussed this order with Blackman on the phone and
stated that, “if need be, we will go up to 100 tons.”
The exchange between Moll and Blackman at most establishes that J.D.
Fields was considering -- or “looking into” -- increasing its order to reach the 100
ton minimum. There is no evidence that J.D. Fields in fact did increase its order
or that the parties ever reached an agreement as to a quantity term meeting the
100 ton minimum.5 The quote contained a 14-day validity period. By the time
4
We note that the resolution of this issue does not require us to undertake a UCC Section
2-207 “Battle of the Forms” analysis.
5
Quantity is a crucial component of an agreement under the Texas UCC. See OKC Corp.
v. UPG, Inc.,
798 S.W.2d 300, 305 (Tex. App. 1990), overruled on other grounds by
Spangler v. Jones,
861 S.W.2d 392 (Tex. App. 1993).
11
No. 10-20217
the March 2008 exchange between Moll and Blackman occurred, the validity
period for the price quote had long lapsed. Further, USSI representative
Blackman repeatedly informed Moll that it would need a revised purchase order.
J.D. Fields concedes that it never submitted such a revised order. As such, the
district court did not err in finding that it was unreasonable as a matter of law
for J.D. Fields to believe that the price quotation was an offer. Thus, we affirm
the grant of summary judgment as to Purchase Order 45850.
Purchase Order 46110
Purchase Order 46110 falls on different footing than Purchase Order
45850. While the general rule is that a price quote is not an offer, we have held
that a price quote, if detailed enough, can constitute an offer capable of
acceptance. See, e.g.,
Axelson,, 7 F.3d at 1232-33. In Tubelite, Inc. v. Risica &
Sons, Inc.,
819 S.W.2d 801, 803 (Tex.1991), the Texas Supreme Court found a
price quotation sufficiently detailed to constitute an offer under the Texas UCC
when the quote stated it was valid for 60 days, was signed by Tubelite's
authorized agent, and did not limit acceptance to a specified manner. Further,
in affirming the lower court in Delta Brands v. Wysong & Miles Company, we
found that the characteristics of the price quote at issue “compel[ed] the
conclusion that it qualifi[ed] as a firm offer under the Texas UCC and Texas
precedent.”
203 F.3d 828,
1999 WL 1240802, at *1; see also
Axelson, 7 F.3d at
1233 (noting that a price quote containing material terms could be construed as
an offer capable of acceptance by the buyer). In Delta Brands, the lower court
had noted that the price quote contained product specifications, service options,
and an itemized price breakdown. See Delta Brands, Inc. v. Wysong & Miles Co.,
1998 WL 641810, at *4 (N.D. Tex. Sept. 14, 1998), aff’d,
203 F.3d 828,
1999 WL
12
No. 10-20217
1240802 (5th Cir. Nov. 30, 1999). The price quote in Delta Brands likewise
contained no language of approval, or any other indicia suggesting that an order
would be subject to approval before it was accepted.
Id.
Here, the price quotation preceding Purchase Order 46110 was
considerably detailed.6 It was also only transmitted to J.D. Fields. See
RESTATEMENT (SECOND) OF CONTRACTS § 26, cmt c (stating that a “relevant
factor” for “determining whether an offer is made” is the “number of persons to
whom a communication is addressed”). The quote contained the following
information: (i) a specified price, (ii) delivery time, (iii) a validity period (“valid
6
The Restatement (Second) of Contracts states, “In determining whether an offer is
made[,] relevant factors include . . . the completeness of the terms of the suggested
bargain.” RESTATEMENT (SECOND) OF CONTRACTS § 26, cmt c; see also Architectural Metal
Sys., 58 F.3d at 1229 (holding that the quotation specifying items to be sold, the quantity,
and price of each item precluded summary judgment as to whether the quote constituted
an offer); Northrop Corp. v. Litronic Indus.,
29 F.3d 1173, 1176 (7th Cir. 1994) (holding
that quotations submitted in response to request for offers to produce printed wire boards
for defense systems constituted offers within the meaning of the UCC); Verasun Fort
Dodge, LLC v. Indus. Air Tech.,
2008 WL 5069121, at *16 (N.D. Iowa Nov. 25, 2008)
(concluding that, as a matter of law, the quotation at issue was an offer, as it contained
a description of the product, charts, quantity, price, anticipated delivery date, and length
of the product’s warranty); Reaction Molding Tech., Inc. v. Gen. Elec. Co.,
585 F. Supp.
1097, amended,
588 F. Supp. 1280 (E.D. Pa. 1985) (holding that quotation sent in
response to buyer’s request and containing description, price, and payment constituted an
offer).
The UCC tolerates a great deal of incompleteness and even contradiction in offer
and acceptance; thus, although the price quote did not contain the specific shipping
location, mode of shipping, or the legal terms and conditions, the absence of these three
terms does not in and of itself prohibit the formation of a contract in light of the “gap-
filling” provisions found throughout the UCC. See, e.g., TEX. BUS. & COM. CODE ANN. §
2.204(3), cmt (“the fact that one or more terms are left to be agreed upon [is not] enough
[ ] to defeat an otherwise adequate agreement”); TEX. BUS. & COM. CODE ANN. § 2-308 (gap
filler for when a contract does not specify a place for delivery); Crest
Ridge, 78 F.3d at 153
(Benavides, J., concurring); Step-Saver Data Sys., Inc. v. Wyse Tech.,
939 F.2d 91, 100 (3d
Cir. 1991) (noting that the absence of certain warranty terms was immaterial in light of
UCC’s gap-filling provisions); Verasun Fort Dodge,
2008 WL 5069121, at *16 (noting that
the details which were missing from the offer, including specific warranty provisions,
choice-of-law clauses, and cancellation provisions, were all terms that could be filled in by
the UCC).
13
No. 10-20217
for 14 days”), (iv) specified rolling/manufacturing time frame, (v) product
specification, (vi) a reference to the quantity listed in J.D. Fields’ email, and (vii)
a delivery location. Further, unlike some of the previous price quotations sent
to J.D. Fields from USSI, this particular price quote was devoid of any language
which would condition the formation of a contract on some further step, such as
approval by the mill, corporate headquarters, or subject to prior sell.7 See Crest
Ridge, 78 F.3d at 152 (Benavides, J., concurring) (“The inclusion of [a] condition
[can] preclude[] [a] price quote from operating as an offer.”); Architectural
Metal,
58 F.3d at 1230 (“A person can prevent his [price quote] from being treated as
an offer by suitable language conditioning the formation of a contract on some
further step . . . such as approval by corporate headquarters.”). Specifically, J.D.
Fields provided evidence that previous emailed price quotes were explicitly
conditioned on “mill and steel availability” or were “subject to prior sale.” Moll
testified via sworn affidavit that it was his understanding that when a quote
from USSI gave a validity period without further condition on mill approval, it
meant that the representative presenting the quote had already checked with
the mill regarding the availability of the steel needed to meet the request.8 See
7
The price quote also did not contain a clause stating that it was subject to a certain heat
lot accumulation.
8
Moll’s affidavit states as follows:
The offer provided that the pipe would be delivered FCA Houston, in June or
sooner, and payment would be due net thirty (30) days of the invoice. The offer
further expressly stated that it was valid for fourteen (14) days. In my
experience in the steel industry and in commercial sales, a validity period such
as this means that the price quoted will remain unchanged if it is accepted
within time prescribed by the provision. USSI’s offer would therefore remain
valid until Thursday, March 27, 2008 pursuant to the email. Based on the
representations made in the email, my experience in the industry and my prior
experience with USSI, I believed that the only further step necessary to form
the contract for sale of the pipe was for J.D. Fields to accept the terms provided
by USSI in a purchase order.
14
No. 10-20217
Architectural
Metal, 58 F.3d at 1230 (finding that the district court’s conclusion
that the inclusion of a clause conditioning acceptance upon approval by
headquarters in previous quotes should have put the parties on notice that such
approval was required was a “non sequitur,” as “[f]or all [the plaintiff] knew, the
clause had been left out because the . . . requisite approval from the home office
[had been obtained]”). J.D. Fields transmitted Purchase Order 46110 five days
after receiving USSI’s price quote, and the purchase order mirrored the terms
contained in the price quotation.
While the district court’s conclusions regarding industry custom and
course of dealing in this case are relevant to the issue of reasonableness, the
UCC never informs that industry custom and course of dealing are alone
determinative of the issue of contract formation. See, e.g., Crest
Ridge, 78 F.3d
at 152 (Benavides, J., concurring) (“Industry custom can fill in missing terms of
a contract or determine the meaning of an agreement”); Audio Visual Assocs.,
Inc. v. Sharp Elecs. Corp.,
210 F.3d 254 260 (4th Cir. 2000) (noting that the UCC
“does not suggest that course of dealing may in and of itself provide the basis for
a contract. Rather, it supplies a mode of interpretation for construing existing
Moll’s supplemental affidavit similarly states:
When a sale’s manager provides a quotation that includes a price, a validity
period for the quote, and an approximate rolling date without any further
limitations or conditions, it means that he or she has already checked the mill’s
schedule and verified that it has ability to process (manufacture) the order at or
around the rolling date. Accordingly when I submit a purchase order which
mirrors the terms of the quoted offer, it is based on the belief that USSI can
provide the goods as offered.
If, however, additional approval is needed from the mill, the quote would
expressly condition the offer on acceptance by the mill. In such circumstances,
I understand that the salesperson would need further approval from the mill
before the order will be processed and added to the rolling schedule, and I
consider this prior to submitting a purchase order and inform my customer.
15
No. 10-20217
contracts.”) (emphasis in original). As such, industry custom and course of
dealing do not compel the conclusion that a price quotation cannot be construed
as an offer as a matter of law.
Contract formation is a question of fact under Texas law and, here, the
price quotation was detailed, transmitted only to J.D. Fields, void of any
conditional language, sent in direct response to an inquiry from J.D. Fields’
representative, did not limit acceptance to a specified manner, and contained a
validity period. Viewing the evidence in the light most favorable to the
nonmovant, there are questions of material fact present as to whether J.D.
Fields could reasonably construe the price quote relating to Purchase Order
46110 as an offer. At the summary judgment stage, we may not weigh or decide
factual disputes or make credibility determinations. Although we find that
summary judgment was not appropriate, we express no view on the ultimate
merits of J.D. Fields’ breach of contract claim. Accordingly, the grant of
summary judgment as to Purchase Order 46110 is reversed and remanded for
further proceedings as the district court may deem appropriate.
B. Fraudulent Inducement Claims
The next issue on appeal is whether the district court erred in sua sponte
granting summary judgment on J.D. Fields’ fraud claims. It is well settled that
a district court can grant summary judgment sua sponte so long as the adverse
party had adequate notice to come forward with all of its evidence. See Celotex
Corp. v. Catrett,
477 U.S. 317, 326,
106 S. Ct. 2548,
91 L. Ed. 2d 265 (1986); see
also Love v. Nat'l Med. Enters.,
230 F.3d 765, 770-71 (5th Cir. 2000).9 The
9
We have stated that a court provides a party with adequate notice by adhering to the
same time frame prescribed for a party's motion for summary judgment. See
Love, 230
F.3d at 770. Specifically, in Love, we stated that adequate notice for a sua sponte grant
of summary judgment is “10 days before the time fixed for the
hearing.” 230 F.3d at 770-
71 (quoting Federal Rule of Civil Procedure 56(c)); Stingley v. Den-Mar Inc., 347 F. App’x
16
No. 10-20217
failure to provide such notice is reviewed for harmless error.
Love, 230 F.3d at
771. The error “is harmless if the nonmoving party admits that he has no
additional evidence anyway or if . . . the appellate court evaluates all of the
nonmoving party’s additional evidence and finds no genuine issue of material
fact.” Leatherman v. Tarrant County Narcotics Intelligence & Coordination Unit,
28 F.3d 1388, 1398 (5th Cir. 1994).
Here, the district court did not expressly give J.D. Fields notice of its
intent to rule on its fraudulent inducement claims. However, even so, we find
that any such error is harmless. We have held that the district court can
“rectif[]y [its] initial procedural error” in not giving notice before granting
summary judgment “by ruling on a motion for reconsideration.” Winters v.
Diamond Shamrock Chem. Co.,
149 F.3d 387, 402 (5th Cir. 1998). That is, if the
party opposing the motion for summary judgment “is afforded an opportunity .
. . to present the court with evidence supporting [its] arguments” in a motion for
reconsideration, “the court’s failure to provide an opportunity to respond is
harmless error.”
Id. J.D. Fields had the opportunity to present additional
evidence in its motion for reconsideration which it filed in the district court.
However, J.D. Fields failed to produce additional evidence, or any evidence at
all, of fraud in its motion for reconsideration. J.D. Fields also failed to produce
any evidence of fraud on appeal. Accordingly, we find that any error in the
district court’s sua sponte grant of summary judgment as to J.D. Fields’ claims
14, at 17 (5th Cir. 2009). While not impacting this case, we note that Federal Rule of Civil
Procedure 56(c) was amended in 2010 and 2011. The amended Rule no longer contains
this ten-day notice requirement. See FED. R. CIV. P. 56(c). Instead, Rule 56(f) now
expressly recognizes that district courts may grant summary judgment sua sponte, stating
that, “After giving notice and a reasonable time to respond, the court may: (1) grant
summary judgment for a nonmovant; (2) grant the motion on grounds not raised by a
party; or (3) consider summary judgment on its own after identifying for the parties
material facts that may not be genuinely in dispute.” FED. R. CIV. P. 56(f).
17
No. 10-20217
of fraudulent inducement is harmless. Thus, the district court’s judgment is
affirmed as to this claim.
Conclusion
For the foregoing reasons, we affirm in part, reverse in part, and remand
for further proceedings consistent herewith.
18