CARL E. STEWART, Circuit Judge:
In 2003, the Environmental Protection Agency (EPA) revised its regulations, implementing the Clean Water Act's (CWA or the Act) oversight of Concentrated Animal Feeding Operations (CAFOs). Several parties challenged the 2003 revisions (hereinafter the 2003 Rule), and the Second Circuit reviewed the challenges in Waterkeeper Alliance, Inc. v. Environmental Protection Agency, 399 F.3d 486 (2d Cir.2005). In 2008, the EPA, responding to Waterkeeper, revised its regulations (hereinafter the 2008 Rule or the Rule). Subsequently, the Farm Petitioners
At issue here is the EPA's regulation of animal feeding operations (AFOs). AFOs are facilities that house, raise, and feed animals until they are ready for transport to processing facilities that prepare meat for shipment and, eventually, consumption. Because these facilities house hundreds
Because the improper management of this waste can pose a significant hazard to the environment, the EPA focuses much of its attention on regulating certain AFOs that meet the EPA's definition of a CAFO.
In 1948, Congress enacted the Federal Water Pollution Control Act (FWPCA).
The NPDES permit program, which is primarily articulated in 33 U.S.C. § 1342, allows the EPA to "issue a permit for the discharge of any pollutant, or combination of pollutants. . . ." 33 U.S.C. § 1342(a)(1). To be clear, the CWA prohibits the discharge of pollutants into navigable waters. 33 U.S.C. § 1311. However, if a facility requests a permit, it can discharge within certain parameters called effluent limitations and will be deemed a point source. 33 U.S.C. §§ 1342, 1362(14). Accordingly, the point source will be regulated pursuant to the NPDES permit issued by the EPA or one of 46 States authorized to issue permits.
If a CAFO discharges without a permit, it is strictly liable for discharging without a permit and subject to severe civil and criminal penalties. 33 U.S.C. § 1319. For example, monetary sanctions can accrue at a rate of up to $50,000 per violation, per day, for criminally negligent violations, or up to $100,000 per violation, per day, for repeated, knowing violations. Id. Criminal violators may be subject to imprisonment. 40 C.F.R. § 122.41(a)(2).
The EPA enacted the first set of CAFO regulations in 1976. Since that time, the substance of these regulations, regarding CAFOs, has changed only twice, in 2003 and 2008. We discuss the applicable portions of these regulations below.
The 1976 regulations specified that CAFOs that wanted to discharge were required to have a permit primarily based on the number of animals housed in the facility. All large CAFOs, those with 1,000 or more animals, were required to have an NPDES permit to discharge pollutants. 41 Fed.Reg. 11,458, 11,458 (Mar. 18, 1976).
The 1976 regulatory scheme was in place for almost thirty years. However, after being sued for failing to revise the effluent limitations for CAFO operations, the EPA revised its regulations "to address not only inadequate compliance with existing policy, but also the `changes that have occurred in the animal production industries.'" Waterkeeper, 399 F.3d at 494 (citing 66 Fed.Reg. 2960, 2972 (Jan. 12, 2001)). Subsequently, in the 2003 Rule, the EPA shifted from a regulatory framework that explained what type of CAFO must have a permit to a broader regulatory framework that explained what type of CAFO must apply for a permit.
Under the 2003 Rule, all CAFOs were required to apply for an NPDES permit whether or not they discharged. 68 Fed. Reg. 7176, 7266 (Feb. 12, 2003). Specifically, every CAFO was assumed to have a "potential to discharge" and had to apply for an NPDES permit. Id. at 7266-67. However, an option built into the Rule permitted a CAFO to request from the EPA a "no potential to discharge" determination. Id. If the CAFO proved that it did not have the potential to discharge, the CAFO was not required to seek a permit. Id. The 2003 Rule also expanded the definition of exempt "agricultural stormwater discharge" to include land application discharge, if the land application comported with appropriate site-specific nutrient management practices. Id. at 7198. However, if the land application was not in compliance with those practices, the land application discharge would be an unpermitted discharge in violation of the CWA. Id. at 7197.
Furthermore, the 2003 Rule created a mandatory duty for all CAFOs, applying for a permit, to develop and implement a site-specific Nutrient Management Plan (NMP). Id. at 7176. An NMP required a CAFO to establish "best management practices" (BMPs). Id. at 7213-14. The BMPs were designed to ensure adequate storage of manure and wastewater, proper management of mortalities and chemicals, and appropriate site-specific protocols for land application. Id. at 7176. The BMPs were neither reviewed by the EPA nor were they included in the terms of a CAFO's permit to discharge.
In Waterkeeper, the Environmental Petitioners (Waterkeeper Alliance, Inc., Sierra Club, Natural Resources Defense Council, Inc., and the American Littoral Society) and the Farm Petitioners (American Farm Bureau Federation, National Chicken Council, and the National Pork Producers Council), many of whom are petitioners or intervenors in the present matter, challenged the 2003 Rule on several grounds. 399 F.3d at 497. Specifically, the petitioners challenged the 2003 Rule's duty to apply and the type of discharges subject to regulation. Id. at 504.
The Farm Petitioners asked the Second Circuit to vacate the 2003 Rule's "duty to apply" because it was outside of the EPA's authority. The court agreed and held that the EPA cannot require CAFOs to apply for a permit based on a "potential to discharge." Id. at 504-06. The Second Circuit explained that the plain language of the CWA "gives the EPA jurisdiction to regulate and control only actual discharges—not potential discharges, and certainly not point sources themselves." Id. at 505. In sum, the Second Circuit held that the CWA "on its face, prevents the EPA from imposing, upon CAFOs, the obligation to
The Environmental Petitioners took issue with the 2003 Rule's exclusion of agricultural stormwater discharge, resulting from land application, from the definition of "point source discharge." They argued that the CWA requires that all discharges from a CAFO are point source discharges, "notwithstanding the fact that agricultural stormwater discharges are otherwise deemed exempt from regulation." Id. at 507. The Second Circuit disagreed. The court explained that the CWA is "ambiguous as to whether CAFO discharges can ever constitute agricultural stormwater." Id. Thus, the court examined whether the exemption for certain land application discharges was grounded in a permissible construction of the CWA. Id. The Second Circuit determined that congressional intent and its precedent supported the EPA's exclusion of agricultural stormwater discharge, resulting from land application, from designation as a point source. Id. at 507-09.
The Environmental Petitioners also argued that the 2003 Rule was unlawful because "(1) it empowers NPDES authorities to issue permits to . . . CAFOs in the absence of any meaningful review of the [NMPs] those CAFOs have developed; and (2) it fails to require that the terms of the [NMPs] be included in the NPDES permits." Id. at 498. The Second Circuit agreed and held that by failing to provide for EPA review of the NMPs, the 2003 Rule violated the statutory commandments that the permitting agency must assure compliance with applicable effluent or discharge limitations. Id. at 502-03.
The parties also disputed "whether the terms of the [NMPs], themselves, constitute effluent limitations that must be included in the NPDES permits." Id. at 502. The Second Circuit held that because the 2003 Rule failed to require that the terms of NMPs be included in NPDES permits, the 2003 Rule violated the CWA. The court explained that the CWA defined effluent limitation as "`any restriction established by a State or the Administrator on quantities, rates, and concentrations of chemical, physical, biological, and other constituents which are discharged from point sources . . .'" Id. at 502 (quoting 33 U.S.C. § 1362(11)). Thus, because "the requirement to develop [an NMP] constitutes a restriction on land application discharges only to the extent that the [NMP] actually imposes restrictions on land application discharges[,]" the CWA's definition of effluent limitations encompassed an NMP. Waterkeeper, 399 F.3d at 502.
At issue here is the 2008 Rule, the EPA's response to the Second Circuit's decision in Waterkeeper. See 71 Fed.Reg. 37,744 (June 30, 2006). Also at issue are three guidance letters issued by the EPA in response to questions raised by members of the United States Congress and a farm executive about the 2008 Rule. Below, we discuss in further detail the 2008 Rule and the Farm Petitioners' and Poultry Petitioners' challenges to the 2008 Rule, as well as the Poultry Petitioners' challenge to the EPA's issuance of the guidance letters.
As required by the Administrative Procedures Act (APA),
The EPA received several hundred responses to the Proposed Rule. 73 Fed.Reg. 12,321-02, 12,324 (Mar. 7, 2008). Many of the comments asked the EPA to specify when a CAFO "proposes" to discharge. Id. In response, on March 7, 2008, the EPA published a supplemental notice of proposed rulemaking (hereinafter the Supplemental Proposed Rule). See generally 73 Fed.Reg. 12,321-02. The Supplemental Proposed Rule provided that a CAFO does not discharge or propose to discharge if "based on an objective assessment of the conditions at the CAFO, that the CAFO is designed, constructed, operated, and maintained in a manner such that the CAFO will not discharge." Id. at 12,339. Furthermore, if a CAFO operator makes this showing, the operator can apply for voluntary certification. Id. The benefit of voluntary certification is that, in the event of a discharge, an unpermitted CAFO will not be liable "for violation of the duty to apply," but will still be in violation of the CWA's prohibition against unpermitted discharges. Id.
On November 20, 2008, the EPA published the 2008 Rule, which incorporates the proposed regulations in the Proposed Rule and the Supplemental Proposed Rule. See 73 Fed.Reg. 70,418 (Nov. 20, 2008). In sum, the 2008 Rule clarifies the "duty to apply" liability scheme. Id. at 70,423. It reiterates that CAFOs "propose to discharge" if they are "designed, constructed, operated, or maintained such that a discharge would occur." Id. Furthermore, each CAFO operator is required to make an objective case-by-case assessment of whether it discharges or proposes to discharge, considering, among other things, climate, hydrology, topology, and the man-made aspects of the CAFO. Id. at 70,424. It further clarifies that a CAFO can be held liable for failing to apply for a permit, in addition to being held liable for the discharge itself. Id. at 70,426. The 2008 Rule also reiterates that certification is voluntary, but if a CAFO does not certify, in an enforcement proceeding for failing to apply for a permit, the CAFO would have the burden of proving that it did not propose to discharge. Id. Finally, with regard to NMPs, the 2008 Rule restates that
On December 4, 2008, the 2008 Rule became final for purposes of seeking judicial review. 73 Fed.Reg. at 70,418. As required by 33 U.S.C. § 1369(b),
Because an agency is required to notify the Judicial Panel on Multi-district Litigation (JPML) if two or more petitions for review are filed that challenge an agency's promulgation of regulations, the EPA notified the JPML of the various challenges. 28 U.S.C. § 2112(a)(3). Subsequently, per section 2112, this court was randomly selected by the JPML, from the courts of appeals in which petitions for review were filed, to address the parties' challenges. Id. Accordingly, the petitions were consolidated and transferred to this court from our sister circuits.
On appeal, the Farm Petitioners primarily challenge the EPA's "duty to apply" for an NPDES permit, imposition of liability for failing to apply for a permit, and the EPA's regulation of a permitted CAFO's land application.
Shortly after the EPA issued the 2008 Rule, it issued three guidance letters, a common practice following the issuance of complex regulations. See generally Appalachian Power Co. v. Envtl. Prot. Agency, 208 F.3d 1015, 1020 (D.C.Cir.2000). On
The guidance letters sent to the Delaware Congress members were in response to their joint letter to the EPA concerning "the status of EPA's authorization of Delaware's [state-run CAFO] program." Grumbles explained that Delaware's CAFO program was denied status because it did not comply with the CWA. Notably, the Delaware program requires a permit only if "a CAFO meets the numerical animal limit, has a discharge into waters of the state, and is in non-compliance with Delaware Nutrient Management Regulations." The guidance letters further explained the EPA's requirements for a state-run CAFO program and that these requirements were the national floor for these programs. They also stated that the CWA prohibits the discharge of all pollutants by a CAFO. Moreover, "[t]he term pollutant is defined very broadly in the CWA. . . . Potential sources of such pollutants at a CAFO could include . . . litter released through confinement house ventilation fans." The guidance letters further explained that "any point source discharge of stormwater that comes into contact with these materials and reaches waters of the United States is a violation of the CWA unless authorized by a [permit]."
The letter sent by Giattina was in response to questions posed by Smith, regarding Smith's concern that certain EPA field offices were incorrectly interpreting the 2008 Rule. Relevant here, Smith asked whether operators of dry litter farms need to apply for a permit "because of potential runoff from the production area[, and if] so, are there examples of dry poultry litter operations having a discharge?" The letter explained that all CAFOs must have permits prior to discharging pollutants and that "pollutant" is defined broadly by the CWA and the regulations could include litter released through confinement house ventilation fans. The letter also discussed the agricultural stormwater exemption, explaining that it "applies only to precipitation-related discharges from land application areas. . . where application of manure, litter, or process wastewater is in accordance with appropriate nutrient management practices," and not to "discharges from the CAFO production area."
As required by the APA, on April 12, 2009, within 120 days of the issuance of the guidance letters, the Poultry Petitioners filed their petition for review, challenging the EPA Letters. The Poultry Petitioners argue that the EPA Letters constitute final agency actions subject to judicial review and, among other things, were required to have undergone notice and comment per the rulemaking procedures articulated in the APA. See 5 U.S.C. § 553. The EPA subsequently filed a motion to dismiss the Poultry Petitioners' claim, arguing that we do not have jurisdiction to hear challenges to guidance letters that are merely articulations of current rules and regulations.
Our analysis of the Farm Petitioners' claims and Poultry Petitioners' claims proceeds as follows. Part II is divided into two parts. In subpart A, we discuss the Farm Petitioners' challenges. We GRANT the petition in part and DENY the petition in part. In subpart B, we address the Poultry Petitioners' challenge to the EPA Letters. We DISMISS their
The Farm Petitioners' challenges to the 2008 Rule can be sub-divided into two parts. First, they effectively challenge the "duty to apply" liability scheme. Second, they challenge the Rule's regulation of CAFO land application discharges. Below we address each of these challenges in turn.
The duty-to-apply liability scheme has three parts. To begin, the 2008 Rule requires CAFOs that discharge or propose to discharge to apply for an NPDES permit—the duty to apply. If a CAFO discharges and does not have a permit, the CAFO will not only be liable for discharging without a permit, but also prosecuted for failing to apply for a permit—failure to apply liability. However, a CAFO can circumvent this liability if the CAFO operator can establish that the CAFO was designed, constructed, operated, and maintained in a manner such that the CAFO will not discharge. The Farm Petitioners argue that certain parts of the liability scheme are in excess of the EPA's statutory authority and other parts are violations of the APA.
Our review of the Farm Petitioners' challenges rests, for the most part, on the Second Circuit's determination in Waterkeeper and whether the EPA's actions are within the scope of its statutory authority. As such, our analysis is guided by the principles enunciated in Chevron U.S.A., Inc. v. Natural Resources Defense Council, Inc., 467 U.S. 837, 104 S.Ct. 2778, 81 L.Ed.2d 694 (1984). If Congress has "directly spoken to the precise question at issue" and "the intent of Congress is clear, that is the end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress." Chevron, 467 U.S. at 842-43, 104 S.Ct. 2778 (footnote omitted). If the court determines that the statute is silent or ambiguous with respect to the specific question at issue, then we consider "whether the agency's answer is based on a permissible construction of the statute." Id. at 843, 104 S.Ct. 2778. We use the traditional tools of statutory construction to determine whether Congress has spoken to the precise point at issue. Tex. Sav. & Cmty. Bankers Ass'n v. Fed. Hous. Bd., 201 F.3d 551, 554 (5th Cir.2000).
We conclude that the CWA provides a comprehensive liability scheme, and the EPA's attempt to supplement this scheme is in excess of its statutory authority.
The 2003 Rule's "duty to apply" required all CAFOs to apply for an NPDES permit or demonstrate that they do not have the potential to discharge. 68 Fed. Reg. at 7266. In Waterkeeper, the Second Circuit held that the 2003 Rule's "duty to apply" was ultra vires because the EPA exceeded its statutory authority. Waterkeeper, 399 F.3d at 504. The court explained that the CWA is clear that the EPA can only regulate the discharge of pollutants. To support its interpretation, the Second Circuit examined the text of the Act. The court noted: (1) 33 U.S.C. § 1311(a) of the CWA "provides . . . [that] the discharge of any pollutant by any person shall be unlawful," (2) section 1311(e) of the CWA provides that "[e]ffluent limitations . . . shall be applied to all point sources of discharge of pollutants," and (3) section 1342 of the Act gives "NPDES authorities the power to issue permits authorizing the discharge of any pollutant or combination of pollutants."
Id. at 505. The Second Circuit's decision is clear: without a discharge, the EPA has no authority and there can be no duty to apply for a permit.
The EPA's response to this part of the Waterkeeper analysis is the 2008 Rule's requirement that CAFOs that discharge and CAFOs that "propose" to discharge apply for a permit. We address the latter category first.
Because the issues presented in Waterkeeper are similar to the issues presented here, we find the Second Circuit's analysis to be instructive and persuasive. Accordingly, we decline to uphold the EPA's requirement that CAFOs that propose to discharge apply for an NPDES permit.
At first blush it seems that the EPA, by regulating CAFOs that "propose" to discharge, is regulating CAFOs that want to discharge. However, as the Farm Petitioners' counsel explained at oral argument, the EPA's use of the term "propose" is not the same as the common understanding of the term—"to form or declare a plan or intention." WEBSTER'S THIRD NEW INTERNATIONAL DICTIONARY 1819 (8th ed.1993). Instead, the EPA's definition of a CAFO that "proposes" to discharge is a CAFO designed, constructed, operated, and maintained in a manner such that the CAFO will discharge. Pursuant to this definition, CAFOs propose to discharge regardless of whether the operator wants to discharge or is presently discharging. This definition thus requires CAFO operators whose facilities are not discharging to apply for a permit and, as such, runs afoul of Waterkeeper, as well as Supreme Court and other well-established precedent.
Specifically, the Supreme Court explained:
S.D. Warren Co. v. Maine Bd. of Envtl. Protection, 547 U.S. 370, 380-81, 126 S.Ct. 1843, 164 L.Ed.2d 625 (2006). Likewise, several circuit courts have held that the scope of the EPA's authority under the CWA is strictly limited to the discharge of pollutants into navigable waters.
Notably, in the seminal case Natural Resources Defense Council, Inc. v. Environmental Protection Agency, 859 F.2d 156 (D.C.Cir.1988), the D.C. Circuit explained more than 20 years ago that the CWA "does not empower the agency to regulate point sources themselves; rather, EPA's jurisdiction under the operative statute is limited to regulating the discharge of pollutants." Id. at 170. In Waterkeeper, the Second Circuit echoed this interpretation of the CWA and explained that "unless there is a discharge of any pollutant, there is no violation of the Act. . . ." 399 F.3d at 504. More recently, in Service Oil, Inc. v. Environmental Protection Agency, 590 F.3d 545 (8th Cir. 2009), the Eighth Circuit reiterated the
These cases leave no doubt that there must be an actual discharge into navigable waters to trigger the CWA's requirements and the EPA's authority. Accordingly, the EPA's authority is limited to the regulation of CAFOs that discharge. Any attempt to do otherwise exceeds the EPA's statutory authority. Accordingly, we conclude that the EPA's requirement that CAFOs that "propose" to discharge apply for an NPDES permit is ultra vires and cannot be upheld.
Although the CWA forecloses the EPA's regulation of a CAFO before there is a discharge, the question remains: Can the EPA require discharging CAFOs to apply for an NPDES permit? This analysis necessitates application of Chevrons two-step inquiry. Chevron step one requires the court to determine, if Congress, through the CWA, has spoken directly on the issue of whether the EPA can require a discharging CAFO to apply for a permit. Chevron, 467 U.S. at 842-43, 104 S.Ct. 2778. As there is no language in the CWA that creates a "duty to apply" for an NPDES permit, our analysis centers on Chevron step two—whether the regulation "is based on a permissible construction of the statute." Id.
We accord "deference to agencies under Chevron because of a presumption that Congress, when it left ambiguity in a statute meant for implementation by an agency, understood that the ambiguity would be resolved, first and foremost, by the agency, and desired the agency (rather than the courts) to possess whatever degree of discretion the ambiguity allows." Tex. Clinical Labs, Inc. v. Sebelius, 612 F.3d 771, 775 (5th Cir.2010). However, a Chevron step two analysis depends on "a number of factors. These include: the consistency of the interpretation and the length of adherence to it, undisturbed by Congress; the explicitness of the congressional grant of authority to the agency, with greater deference in cases of more specific delegation; and the degree of agency expertise necessarily drawn upon in reaching its interpretation." Quarles v. St. Clair, 711 F.2d 691, 706-07 (5th Cir. 1983).
The primary purpose of the NPDES permitting scheme is to control pollution through the regulation of discharges into navigable waters. See 33 U.S.C. § 1342. Therefore, it would be counter to congressional intent for the court to hold that requiring a discharging CAFO to obtain a permit is an unreasonable construction of the Act. In fact, the text of the Act indicates that a discharging CAFO must have a permit. The CWA explains that discharging without a permit is unlawful, 33 U.S.C. § 1311, and punishes such discharge with civil and criminal penalties, 33 U.S.C. § 1319. This has been the wellestablished statutory mandate since 1972. It logically follows that, at base, a discharging CAFO has a duty to apply for a permit.
In summary, we conclude that the EPA cannot impose a duty to apply for a permit on a CAFO that "proposes to discharge" or any CAFO before there is an actual discharge. However, it is within the EPA's province, as contemplated by the CWA, to impose a duty to apply on CAFOs that are discharging.
The 2008 Rule provides that a CAFO can be held liable for failing to apply for a permit. The Farm Petitioners
Moreover, section 1319 is the only provision in the Act to provide for penalties. Assuming that the punishment for failing to apply for a permit are section 1319's penalties, the EPA still runs up against the CWA's clear articulation that only certain violations of the Act can be enforced using section 1319's penalties. See 33 U.S.C. § 1319; see, e.g., Serv. Oil, Inc., 590 F.3d at 550 ("Congress in § 1319(g)(1) granted EPA limited authority to assess administrative monetary penalties for violations of specific statutory provisions related to the core prohibition against discharging without a permit, or contrary to the terms of a permit."); Colt Indus., Inc. v. United States, 880 F.2d 1311, 1314 (Fed. Cir.1989) ("EPA is not authorized under either the Clean Air or Clean Water [A]cts to seek compensatory damages; it is limited to injunctive relief and the maximum monetary penalties prescribed by 42 U.S.C. § 7413(b), and 33 U.S.C. § 1319, respectively."). Accordingly, the imposition of "failure to apply" liability is outside the bounds of the CWA's mandate.
The Eighth Circuit's analysis in Service Oil is instructive. In that case, the court examined whether the EPA can assess administrative penalties for failing to apply for an NPDES permit. As the EPA argues here, it also argued in Service Oil that section 1318, which gives the EPA its information-gathering authority, also gives the EPA power to impose liability for failing to apply for an NPDES permit. 590 F.3d at 550. The Eighth Circuit rejected this argument. In concluding that the EPA cannot assess such penalties, the court commented on the scope of the EPA's regulatory authority. The court explained that "the agency's authority to assess
For more than 40 years, the EPA's regulation of CAFOs was limited to CAFOs that discharge. The 2003 Rule marked the first time that the EPA sought to regulate CAFOs that do not discharge. This attempt was wholly rejected by the Second Circuit in Waterkeeper. 399 F.3d at 504. Again, with the 2008 Rule, the EPA not only attempts to regulate CAFOs that do not discharge, but also to impose liability that is in excess of its statutory authority. Although Chevron makes clear that we must give deference to the agency's interpretation of a statute, "courts are not obliged to stand aside and rubberstamp their affirmance of administrative decisions that they deem inconsistent with the statutory mandate or that frustrate the congressional policy underlying a statute." Tex. Power & Light Co. v. FCC, 784 F.2d 1265, 1269 (5th Cir.1986) (citations and internal quotation marks omitted); see also Buffalo Crushed Stone, Inc. v. Surface Transp. Bd., 194 F.3d 125, 128-29 (D.C.Cir.1999) ("[D]eference is not without limit. We will reject an agency's interpretation if an alternative reading is compelled by the regulations' plain language. . . ." (citation and internal quotation marks omitted)).
To this end, the Supreme Court has explained: "Agencies may play the sorcerer's apprentice but not the sorcerer himself." Alexander v. Sandoval, 532 U.S. 275, 292, 121 S.Ct. 1511, 149 L.Ed.2d 517 (2001). In other words, an agency's authority is limited to what has been authorized by Congress. See id. Here, the "duty to apply", as it applies to CAFOs that have not discharged, and the imposition of failure to apply liability is an attempt by the EPA to create from whole cloth new liability provisions. The CWA simply does not authorize this type of supplementation to its comprehensive liability scheme. Nor has Congress been compelled, since the creation of the NPDES permit program, to make any changes to the CWA, requiring a non-discharging CAFO to apply for an NPDES permit or imposing failure to apply liability. Thus, we echo the sentiments of the Second Circuit in Waterkeeper:
Waterkeeper, 399 F.3d at 505 (citations and internal quotation marks omitted).
The Farm Petitioners argue that the EPA's requirement that all NMPs address protocols for land application exceeds the EPA's statutory authority.
In Waterkeeper, the parties disputed "whether the terms of the [NMPs], themselves, constitute effluent limitations that must be included in the NPDES permits." 399 F.3d at 502. The Second Circuit held that because the 2003 Rule failed to require that the terms of NMPs be included in NPDES permits, the 2003 Rule violated the CWA. The court explained that the CWA defined effluent limitation as "`any restriction established by a State or the Administrator on quantities, rates, and concentrations of chemical, physical, biological, and other constituents which are discharged from point sources . . .'" Id. (citing 33 U.S.C. § 1362(11)). Because "the requirement to develop [an NMP] constitutes a restriction on land application discharges," the court held, there was no doubt that the CWA's definition of effluent limitation encompassed an NMP. Waterkeeper, 399 F.3d at 502 (emphasis added). Thus, the Second Circuit concluded that the EPA must incorporate CAFOs' site-specific NMPs into their permits.
Accordingly, the 2008 Rule requires that "[a] permit issued to a CAFO must include a requirement . . . to develop and implement" an NMP. 73 Fed.Reg. at 70,437. The Farm Petitioners argue that the EPA's response to the Second Circuit's mandate is impermissible because it allows CAFOs to regulate all land application, even if the land application is applied pursuant to an NMP. They further contend that, in violation of the CWA's jurisdictional limits and Waterkeeper, the EPA requires CAFOs that seek permit coverage only for production area discharges to apply also for coverage for land application areas.
The Farm Petitioners' arguments are problematic because they are challenging a requirement promulgated in the 2003 Rule. Thus, the Farm Petitioners' arguments had to be made within the 120-day time period for challenging rules promulgated by an agency. 33 U.S.C. § 1369(b)(1). The 120-day time limit is well-established, and this court has explained that the limitation is strictly enforced. See Tex. Mun. Power Agency v. Envtl. Prot. Agency, 799 F.2d 173, 175 (5th Cir.1986). The only exception to this limitation is if the grounds for the challenge arose after the 120-day time period. Id. It is clear that the grounds for the challenges made by the Farm Petitioners did not arise after the 120-day time period. Notably, the Farm Petitioners, many of whom were parties in Waterkeeper, had the opportunity to respond to arguments made by other petitioners in that case, advocating that the NMP terms be included in a CAFO's permit. They did not. Thus, the Farm Petitioners' arguments, regarding NMPs and the protocols for land application, brought almost six years after they were promulgated, are time barred.
As previously noted, after the EPA issued the 2008 Rule, it issued three guidance letters. Identical letters were sent to Senator Carper and Representative Castle. The third letter was sent to a farm executive. The Poultry Petitioners' claims center on the substance of the EPA
The CWA establishes a bifurcated jurisdictional scheme whereby courts of appeals have jurisdiction over some categories of challenges to EPA action, and the district courts retain jurisdiction over other types of complaints. Chem. Mfrs. Ass'n v. Envtl. Prot. Agency, 870 F.2d 177, 265 (5th Cir.1989). Specifically, 33 U.S.C. § 1369(b)(1) authorizes original jurisdiction to courts of appeals to review certain agency "final actions."
As a threshold matter, in order for this court to have jurisdiction, the guidance letters must constitute an agency final action. The Supreme Court explained in Bennett v. Spear, 520 U.S. 154, 117 S.Ct. 1154, 137 L.Ed.2d 281 (1997), that an agency action is final only if it meets two criteria. Id. at 177-78, 117 S.Ct. 1154. First, the action must mark the "consummation" of the agency's decision-making process; it cannot be tentative or interlocutory. Id. Second, the action must be one by which "rights or obligations have been determined" or from which "legal consequences will flow." Id.
In regard to the first Bennett prong, we note that guidance letters can mark the "consummation" of an agency's decision-making process. See Her Majesty the Queen in Right of Ontario v. Envtl. Prot. Agency, 912 F.2d 1525, 1532 (D.C.Cir.1990) (holding that the EPA's guidance letters constitute final agency actions because they "serve[d] to confirm a definitive position that has a direct and immediate impact on the parties. . . ."); Ciba-Geigy Corp. v. Envtl. Prot. Agency, 801 F.2d 430, 437 (D.C.Cir.1986) (finding that the EPA's guidance letters constituted final agency actions because there was "no reason to believe that the EPA Director of Pesticide Programs lack[ed] authority to speak for EPA on th[e] issue or
To meet the second Bennett prong, the guidance letters must affect the Poultry Petitioners' rights or obligations or create new legal consequences. Id. Although the guidance letters do, as the Poultry Petitioners note, obligate them to obtain a permit if they discharge manure or litter through ventilation fans or face legal consequences, the EPA Letters neither create new legal consequences nor affect their rights or obligations. Here, the guidance letters merely restate section 1342's prohibition against discharging pollutants without an NPDES permit. Agency actions that have no effect on a party's rights or obligations are not reviewable final actions. Fairbanks N. Star Borough v. U.S. Army Corps of Eng'rs, 543 F.3d 586, 593-94 (9th Cir.2008) (explaining that the second Bennett prong was not met where "rights and obligations remain unchanged."); Nat'l Ass'n of Home Builders v. Norton, 415 F.3d 8, 15 (D.C.Cir.2005) ("[I]f the practical effect of the agency action is not a certain change in the legal obligations of a party, the action is non-final for the purpose of judicial review."). Moreover, an agency's actions are not reviewable when they merely reiterate what has already been established. See, e.g., Am. Paper Inst. v. Envtl. Prot. Agency, 882 F.2d 287, 289 (7th Cir.1989) (a policy statement providing the EPA's views concerning tolerances for dioxin in permits for paper mills was not a final action, because "telegraphing your punches is not the same as delivering them"); S. Holland Metal Finishing Co. v. Browner, 97 F.3d 932, 935-37 (7th Cir.1996) (interpretative ruling, construing regulations, was not final action); City of San Diego v. Whitman, 242 F.3d 1097, 1101-02 (9th Cir.2001) (letter indicating that the Ocean Pollution Reduction Act of 1994, Pub.L. No. 103-431 §§ 1-2, 108 Stat. 4396-97 (1994), would apply to a city's as-yet-unfiled application to renew its NPDES permit was not a final action). The EPA Letters do not change any rights or obligations and only reiterate what has been well-established since the enactment of the CWA—CAFOs are prohibited from discharging pollutants without a permit. Thus, they do not meet the two-part Bennett test and are not reviewable, final agency decisions.
Accordingly, we grant the EPA's motion to dismiss because we lack jurisdiction to consider the Poultry Petitioners' challenge to the EPA Letters.
For the foregoing reasons, the petitions are granted in part, denied in part, and dismissed in part. We hereby vacate those provisions of the 2008 Rule that require CAFOs that propose to discharge to apply for an NPDES permit, but we uphold the provisions of the 2008 Rule that impose a duty to apply on CAFOs that are discharging. We vacate those provisions of the 2008 Rule that create liability for failing to apply for an NPDES permit. Additionally, we uphold the provisions of the 2008 Rule that allow permitting authorities to regulate a permitted CAFO's land application and include these requirements in a CAFO's NPDES permit. Finally, we dismiss the Poultry Petitioners'
Id. § 553(c).
33 U.S.C. § 1369(b) (emphasis added).