M. SMITH, Circuit Judge:
Petitioners Native Village of Kivalina IRA Council, Native Village of Point Hope IRA Council, Alaska Community Action on Toxics, and Northern Alaska Environmental Center (collectively, Kivalina) appeal the United States Environmental Protection Agency Environmental Appeals Board's (the EAB) order denying review of their challenges to a permit authorizing Intervenor Teck Alaska, Inc. (Teck) to discharge wastewater caused by the operation of the Red Dog Mine. The EAB concluded that Kivalina had not satisfied the procedural requirements to obtain review under 40 C.F.R. § 124.19(a) because it did not demonstrate why the United States Environmental Protection Agency's (the EPA) responses to comments were clearly erroneous or otherwise warranted review. We agree that Kivalina did not meet the requirements of § 124.19, and we deny Kivalina's petition for review.
The Red Dog Mine is an open pit zinc and lead mine in northwestern Alaska, operated by Teck in partnership with Intervenor NANA Regional Corporation. The mine's operations produce wastewater contaminated with metals through contact with mined materials and surfaces. After being treated, the wastewater eventually enters the Wulik River, which flows into the Chukchi Sea near the Native Village of Kivalina.
On December 5, 2008, the EPA proposed to re-issue a National Pollutant Discharge Elimination System (NPDES) permit to the Red Dog Mine and issued a draft permit for public comment. Contemporaneously, the Alaska Department of Environmental Conservation certified that the proposed activity and resulting discharges would comply with section 401 of the Clean Water Act (CWA) and Alaska Water Quality Standards.
In October 2009, the EPA completed a Final Supplemental Environmental Impact Statement and issued responses to public comments in December 2009. On January 8, 2010, the EPA issued its record of decision and final NPDES permit (the 2010 Permit.)
On February 15, 2010, Kivalina filed an administrative petition for review with the EAB, challenging many conditions of the 2010 Permit. After Kivalina filed its petition, the EPA withdrew those portions of the 2010 Permit to which most of Kivalina's objections were addressed. The EAB concluded that the EPA's withdrawal of certain effluent limitations in the 2010 Permit rendered moot the challenges to those limitations in sections II.C.1, II.C.2, and II.C.4 of Kivalina's petition, and dismissed those sections of the petition. As a result, only section II.C.3 of Kivalina's petition remained pending before the EAB.
On November 18, 2010, the EAB handed down an order denying review of the remaining portion of Kivalina's petition. In its order, the EAB observed that section II.C.3 of Kivalina's petition consisted of only slightly more than two pages, and that Kivalina had not set forth sufficient
On December 8, 2010, the EPA issued a final permit decision. Kivalina filed a timely petition for review on March 18, 2011.
"Final agency action is reviewed under the Administrative Procedure Act, 5 U.S.C. § 706(2), and can be set aside only if it is `arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law ... [or] without observance of procedure required by law.'" Anaheim Mem'l Hosp. v. Shalala, 130 F.3d 845, 849 (9th Cir.1997) (citation omitted). Thus, we review the EAB's procedural default ruling under the deferential standard of 5 U.S.C. § 706(2). See id.; see also City of Pittsfield v. U.S. EPA, 614 F.3d 7, 10 (1st Cir.2010); Mich. Dep't of Envtl. Quality v. U.S. EPA, 318 F.3d 705, 707 (6th Cir. 2003).
We have jurisdiction pursuant to 33 U.S.C. § 1369(b)(1)(F).
"The [EAB]'s analysis of NPDES permits is guided by the preamble to the permitting regulations, which states that the Board's power of review `should be only sparingly exercised.'" In re Chukchansi Gold Resort, NPDES Appeal Nos. 08-02, 08-03, 08-04, 08-05, 2009 WL 152741, at *5 (EAB Jan. 14, 2009).
Under 40 C.F.R. § 124.19(a), a petition to the EAB for review of any condition of a permit decision must satisfy the following requirements:
40 C.F.R. § 124.19(a). The petitioner bears the burden of demonstrating that review is warranted. See Citizens for Clean Air v. U.S. EPA, 959 F.2d 839, 845 (9th Cir.1992); In re Cherry Berry B1-25 SWD, UIC Appeal No. 09-02, 2010 WL 3258139, at *1 n. 2 (EAB Aug. 13, 2010); In re New England Plating Co., 9 E.A.D. 726, 2001 WL 328213, at *3 (EAB 2001).
"Section 124.19(a) is admittedly not the most pellucid of regulations...." City of Pittsfield, 614 F.3d at 12. However, "the EAB has consistently interpreted the regulation as requiring that the petitioner set forth an argument in its petition as to why the permit condition it is challenging is either based on a clearly erroneous finding of fact or conclusion of law or raises an important policy consideration." Id. at 11; see In re Chukchansi Gold Resort, 2009 WL 152741, at *5. "The [EAB] has interpreted this requirement as mandating two things: `(1) clear identification of the conditions in the permit at issue, and (2) argument that the conditions warrant review.'" In re Chukchansi Gold Resort, 2009 WL 152741, at *7 (citation omitted). "Additionally, the[EAB] has repeatedly stated that the petitioner must explain why the challenged conditions merit review." City of Pittsfield, 614 F.3d at 11.
Kivalina does not challenge the EPA's interpretation of § 124.19(a) but rather argues that its petition meets the requirements of § 124.19(a) as the EPA interprets it. Specifically, Kivalina claims its petition sufficiently challenged three monitoring conditions in the 2010 Permit: (1) the reduction in monitoring requirements, (2) the removal of biomonitoring provisions, and (3) the EPA's failure to require third-party monitoring. We address in turn the sufficiency of each challenge under the requirements of § 124.19(a).
The portion of Kivalina's petition challenging the alleged reduction in monitoring requirements consisted of the following four sentences:
Nowhere in this paragraph does Kivalina mention the EPA's responses to public comments.
In its response to public comments, the EPA (1) addressed a comment arguing that the EPA should require monitoring of additional constituents; (2) said that the 2010 Permit included all of the effluent and ambient monitoring necessary to determine compliance with permit limits; (3) noted that the Red Dog Mine had to meet certain limitations that account for toxic effects of parameters that were not necessarily limited in the 2010 Permit, and that influent monitoring was not required or necessary because such monitoring was irrelevant to determining permit compliance and effects on receiving waters; (4) stated that monitoring performed to date provided a long-term record of the background conditions throughout the watershed, and that ceasing monitoring in tributaries would not affect water quality in the streams downstream of the mine's discharge; and (5) explained that it changed a monitoring location to the boundary of the mixing zone in the main stem of Red Dog Creek.
As the EAB found, the EPA's responses provide a rationale for the monitoring requirements.
We do not judge a petition based merely on its length or discourage brevity. However, § 124.19(a) clearly requires more than Kivalina provided. Its four unresponsive, conclusory sentences did not satisfy the requirements of § 124.19(a). Because Kivalina did not engage the EPA's responses to public comments, it did not meet its burden of showing that EAB review of the alleged reduction in monitoring requirements was warranted. See City of Pittsfield, 614 F.3d at 11; Mich. Dep't of Envtl. Quality, 318 F.3d at 708. Thus, we hold that the EAB did not err in declining to review Kivalina's challenge to the reduction in monitoring requirements.
Kivalina's petition also challenged the alleged removal of biomonitoring provisions, as follows:
In its response to public comments, the EPA addressed concerns that biomonitoring and bioassessment requirements would be removed from the 2010 Permit. The EPA explained that (1) certain bioassessment monitoring requirements were initially required by the state in a 1998 certification, but were not required by the state's current certification and (2) the bioassessment requirements in the 2010 Permit were consistent with the state's certification, and were intended to assure that the conditions of the 2010 Permit protect aquatic life. The EPA indicated that it was appropriate to follow the state's recommendations because the state initially included bioassessment requirements in the certification of the 1998 permit and has had the primary responsibility for reviewing the bioassessment data collected to date. The EPA also observed that bioassessment requirements that are included in the 2010 Permit remain enforceable under both the 2010 Permit and the CWA and explained why it had allocated the ambient biomonitoring requirements to the state.
The EAB correctly found that Kivalina did not sufficiently engage the EPA's response to public comments concerning biomonitoring requirements. Kivalina never argued that allocating biomonitoring to the state was inappropriate, or that the state's bioassessment requirements were inadequate. Kivalina's argument that the EPA has authority to ensure that the mine complies with water quality standards is irrelevant. The relevant issue is not whether the EPA has authority — the EPA never denied that it did — but whether the EPA properly exercised its authority in setting the 2010 Permit's biomonitoring requirements. The EPA thoroughly explained the reasons behind the 2010 Permit's biomonitoring requirements. Kivalina never challenged those reasons.
Kivalina also attempted to require third-party monitoring, as follows:
In its response to public comments, the EPA addressed whether the final permit should require "some competent, independent party" to conduct additional water quality monitoring, stream sediment sampling, flow measurement, and toxicity testing. It stated that (1) the CWA requires that permits contain self-monitoring requirements; (2) that it supplements monitoring data through inspections, but that it had no authority to require independent parties to monitor for compliance with a permit; (3) that the permittee is required to certify the validity of its sampling results; and (4) that the EPA and the state conduct periodic NPDES compliance inspections at the site. The EPA also acknowledged Teck's past violations and the EPA's enforcement actions.
The EAB correctly found that Kivalina did not adequately address the EPA's responses about the sufficiency of self-monitoring coupled with periodic inspections. Kivalina never addressed the EPA's explanation that self-monitoring and periodic inspections by federal and state authorities would be sufficient to ensure permit compliance by Teck, despite the EPA's awareness of Teck's checkered compliance history. Because Kivalina did not do so, it did not explain how the EPA's conclusion that self-monitoring was appropriate was wrong. Thus, the EAB properly declined to review Kivalina's challenge to the permit's failure to require third-party monitoring. See City of Pittsfield, 614 F.3d at 11; Mich. Dep't of Envtl. Quality, 318 F.3d at 708; In re Cherry Berry B1-25 SWD, 2010 WL 3258139, at *1 n. 2.
For the foregoing reasons, we deny Kivalina's petition for review.