Defendant and respondent State Lands Commission (Lands Commission) approved a 30-year lease renewal allowing real party in interest and respondent Chevron U.S.A. Inc. (Chevron) to continue operating a marine terminal in San Francisco Bay waters, near the company's refinery in Richmond, California. Plaintiffs and Appellants Citizens for East Shore Parks and Daniel P. Doellstedt contend that in approving the lease renewal, the Lands Commission failed to comply with the California Environmental Quality Act (CEQA; Pub. Resources Code, § 21000 et seq.) and also violated
The Long Wharf marine terminal and nearby Richmond refinery have been in existence since 1902. Standard Oil, Chevron's predecessor, bought the refinery and began operating it and the terminal in 1905.
The marine terminal is a T-shaped, concrete docking structure approximately 3,440 feet long. Ships can dock at four deep-water outer berths and several inner berths. Ships off-load crude oil at the terminal for processing at the refinery and take on refined products which they transport to national and international markets. The marine terminal has been modified over the years. In 1946, the original wooden structure gave way to the present concrete one. Alterations in 1974 allowed for larger vessels. Since then, Chevron has added new platforms, breasting dolphins, and a vapor control system. In 2000 and 2004, the company completed a major seismic upgrade and electrical system revamp.
While Chevron's refinery sits on private land beyond tidal reach, the marine terminal sits in the San Francisco Bay on submerged land owned by the state and subject to a public trust servitude and the control of the Lands Commission. The refinery and terminal are linked by a causeway which supports a pipeline system that transfers oil and petroleum products between the two facilities. The causeway largely stands atop private land, most of which is submerged or partially submerged and therefore is also subject to a public trust servitude.
In August 1947, the Lands Commission granted Standard Oil a 50-year lease for the marine terminal. Chevron assumed the lease in 1976, and the lease expired in 1997. Since then, Chevron has operated the terminal on a holdover basis, until the Lands Commission approved the 30-year renewal on January 29, 2009.
Before the Lands Commission approved the lease renewal, it considered what actions it needed to take to comply with CEQA. The 1902 terminal predates CEQA by nearly 70 years. Thus, no CEQA study examined its construction or ensuing operation. The Lands Commission concluded future
In 1999, at the beginning of the review process, the Lands Commission determined the EIR should assess environmental impacts of the lease renewal against a baseline that assumed no terminal operations but the terminal structure remaining physically intact. Over the years, the Lands Commission changed its view as to the appropriate baseline. Accordingly, the draft and final EIR's defined the lease renewal project as allowing Chevron to "continue its existing Long Wharf operations" and used the existing, actual condition of the marine terminal, which included off-loading and on-loading operations, as the baseline by which to assess potential environmental impacts. Using this baseline, the EIR's concluded the lease renewal could result in significant environmental impacts due to potential oil spills.
The Lands Commission held public hearings on December 3, 2008, and January 29, 2009, at which it discussed and ultimately approved the final EIR. Plaintiffs appeared at the hearings and challenged the sufficiency of the EIR, claiming it omitted consideration of other significant impacts of the terminal's operation, especially in conjunction with the refinery, causeway, and pipelines. In approving the final EIR on January 29, 2009, the Lands Commission adopted a statement of overriding consideration that the lease should be renewed despite the fact oil spill risks could not be wholly mitigated.
During the review process there was also discussion about how lease renewal would affect recreational activities on not only the submerged and tidal lands over which the terminal and part of the causeway sit, but also on the "upland" area where plaintiffs want a portion of the Bay Trail (a hiking and biking trail that will encircle San Francisco Bay) constructed. Chevron met with proponents of the trail and officials of the City of Richmond and entered into a community benefits agreement with the city. This agreement,
Although prepared to vote on the lease renewal at the December 3, 2008, hearing, the Lands Commission postponed the vote until January 29, 2009, to provide Chevron and interested government agencies a further opportunity to discuss additional resources for the Bay Trail and make progress on several other issues of public concern. By the January 29 meeting, Chevron agreed to provide a second mile-long easement on its "upland" property for the trail, and also agreed to a plan to reduce nighttime glare from terminal lighting and to report on ship air emissions, which may be subject to future regulation. Plaintiffs wanted Chevron to provide an additional $5 million to actually build the trail. The Lands Commission declined to impose such a condition or to delay the review process further, and approved the final EIR and the lease renewal.
On March 5, 2009, plaintiffs filed a combined petition for writ of mandate (under Code Civ. Proc., §§ 1085 and 1094.5 and Pub. Resources Code, §§ 21168 and 21168.5) and complaint for declaratory relief. They filed an amended petition and complaint on March 27, alleging two causes of action against the Lands Commission: one for violation of CEQA and one for violation of the public trust doctrine. Plaintiffs sought a writ directing the Lands Commission to decertify the EIR and vacate its approval of the lease renewal, and a declaration the commission had violated CEQA and the public trust doctrine. The trial court denied plaintiffs' writ petition and dismissed their complaint for associated declaratory relief on July 19, 2010, and entered judgment in favor of the Lands Commission on September 8, 2010.
On appeal from a writ of administrative mandate in a CEQA case, this court, just as the trial court, reviews the administrative record for "a prejudicial abuse of discretion." (Pub. Resources Code, § 21168.5;
As we have discussed, the Lands Commission initially indicated the appropriate baseline should exclude current operations at the marine terminal and consider only its physical structure. However, ultimately, the Lands Commission concluded the baseline should reflect the current, operative condition of the terminal. Plaintiffs contend the Lands Commission had it right initially, and the baseline should have excluded any operational use of the terminal. They assert the Lands Commission's chosen baseline was contrary to law and, alternatively, unsupported by the evidence. The Lands Commission and Chevron maintain the California Supreme Court has made it clear the baseline for a CEQA analysis must reflect current conditions at a project site, and the baseline selected by the commission was both legally proper and supported by substantial evidence. We agree with the Lands Commission and Chevron.
The Supreme Court addressed the selection of CEQA baselines at length in Communities, supra, 48 Cal.4th 310. In that case, ConocoPhillips sought permits to modify or replace existing refinery equipment in order to produce a new, low-sulfur diesel fuel. (Id. at p. 317.) Although the modified or new equipment would release more NOx (nitrogen oxide) gas than was currently being released at the site, the heightened emission level would still be within that allowed by existing permits. (Id. at p. 318.) The air quality district therefore treated the permitted emission level as part of the baseline, even though the actual emissions at the site had not reached that level. (Ibid.) Measured against this baseline, the district concluded the low-sulfur fuel project would not have significant environmental impacts and did not prepare an EIR. (Ibid.) The Court of Appeal reversed. The Supreme Court affirmed the appellate court, holding the baseline did not reflect "a realistic description of the existing conditions without the Diesel Project." (Id. at p. 322.)
The Supreme Court observed the "CEQA Guidelines" (Cal. Code Regs., tit. 14, § 15000 et seq.) provide: "`An EIR must include a description of the physical environmental conditions in the vicinity of the project, as they exist at the time the notice of preparation is published, or if no notice of preparation is published, at the time environmental analysis is commenced, from both a local and regional perspective. This environmental setting will normally constitute the baseline physical conditions by which a lead agency determines whether an impact is significant.'" (Communities, supra, 48 Cal.4th at p. 320, quoting CEQA Guidelines, § 15125, subd. (a).) Accordingly, the "normal" rule is that the baseline must reflect the "physical conditions existing at the time [the] environmental analysis" begins. (Communities, at pp. 320, 323; see also In re Bay-Delta etc. (2008) 43 Cal.4th 1143, 1167-1168 [77 Cal.Rptr.3d 578, 184 P.3d 709] (In re Bay-Delta) [preexisting environmental problems in the Bay Delta were part of the
The court further observed a "long line of Court of Appeal decisions holds, in similar terms [to the Guidelines], that the impacts of a proposed project are ordinarily to be compared to the actual environmental conditions existing at the time of CEQA analysis, rather than to allowable conditions defined by a plan or regulatory framework." (Communities, supra, 48 Cal.4th at p. 321.) Moreover, these cases reached this result even when the actual conditions were in violation of current regulatory provisions. (Ibid. & fn. 7.)
For example, in Riverwatch v. County of San Diego (1999) 76 Cal.App.4th 1428 [91 Cal.Rptr.2d 322] (Riverwatch), the appellate court rejected the county's chosen baseline, which did not include illegal development that had occurred at a mining operation seeking a use permit. The county could not, said the court, essentially turn back the clock and use a baseline that excluded existing conditions. (Id. at pp. 1452-1453.) How present conditions come to exist may interest enforcement agencies, but that is irrelevant to CEQA baseline determinations—even if it means preexisting development will escape environmental review under CEQA. (Riverwatch, at pp. 1452-1453.) In Fat, supra, 97 Cal.App.4th 1270, the appellate court upheld the county's choice of a baseline reflecting present-day conditions to evaluate the impact of a proposed airport expansion. Even though "the Airport developed over a period of nearly 30 years without County authorization, there was evidence of environmental damage during that period, and the Airport had been the subject of at least two zoning enforcement actions ...," the county acted within its discretion using current airport operations as the baseline for CEQA review. (Fat, at pp. 1280-1281.) Similarly, in Eureka Citizens for Responsible Government v. City of Eureka (2007) 147 Cal.App.4th 357 [54 Cal.Rptr.3d 485], the Court of Appeal upheld a project description for CEQA purposes that took into account an existing playground built contrary to code. "While any alleged code violations in the construction of the playground may have been relevant to the City's consideration of the variance requested, it was not a CEQA consideration." (Eureka, at p. 371, italics omitted; see also Fairview Neighbors v. County of Ventura (1999) 70 Cal.App.4th 238, 242-243 [82 Cal.Rptr.2d 436] [EIR prepared in conjunction for application to expand mining operation "properly discussed the existing physical condition of the affected area as including the long-operating mine"]; Bloom v. McGurk (1994) 26 Cal.App.4th 1307, 1312-1316 & fn. 3 [31 Cal.Rptr.2d 914] (Bloom) ["`existing facility'" for categorical exemption purposes means a facility "as it exists at the time of the agency's determination, rather than ... at the time
Accordingly, in Communities, the Supreme Court affirmed the Court of Appeal's directive that writ relief be granted and the matter be sent back to the air quality district to identify an appropriate baseline and reassess the environmental impacts of the proposed low-sulfur fuel project. (Communities, supra, 48 Cal.4th at pp. 327-329.)
Despite the foregoing authorities, plaintiffs assert the baseline for a renewal project must exclude current conditions because the approving agency can eliminate them by refusing the renewal. Thus, plaintiffs maintain the baseline here should exclude, at a minimum, use of the marine terminal and, possibly, the physical structure, itself.
However, neither the statute, nor any CEQA case, supports plaintiffs' revisionist approach to the baseline. To the contrary, the CEQA Guidelines require a "description of the physical environmental conditions in the vicinity of the project, as they exist at the time the notice of preparation [of an EIR] is published" and specify "[t]his environmental setting will normally constitute the baseline...." (CEQA Guidelines, § 15125, subd. (a), italics added.) The cases further make clear the baseline must include existing conditions, even when those conditions have never been reviewed and are unlawful. (See Fat,
To state the converse of what the court observed in Bloom, the rule that the baseline should normally reflect "the environment as it exists when a project is approved," is consistent with the categorical exemption in CEQA for "existing facilities," meaning "a facility as it exists at the time of the agency's determination," not at the time (now several decades ago) when CEQA was enacted. (Bloom, supra, 26 Cal.App.4th at p. 1315 & fn. 3, italics added.) "We presume that thousands of permits are renewed each year for the ongoing operation of regulated facilities, and we discern no legislative or regulatory directive to make each such renewal an occasion to examine past CEQA compliance ...." (26 Cal.App.4th at p. 1315.) Indeed, such a result would contravene the regulatory language and prospective character of the statute and, when applicable, also contravene limitations periods. (See ibid.)
Ultimately, plaintiffs rely principally on League to Save Lake Tahoe v. Tahoe Regional Planning Agency (E.D.Cal. 2010) 739 F.Supp.2d 1260 (Tahoe I). In that case, the Tahoe Regional Planning Agency sought to increase the number of authorized mooring buoys on Lake Tahoe. There were already numerous, unauthorized buoys on the lake, and as to them, the agency either had to issue permits to allow their continued use, or deny permits and require their removal. (Id. at p. 1272.) The agency included all existing buoys, including those that were not authorized, in its environmental assessment baseline. (Id. at p. 1273.) The federal district court ruled this was an abuse of discretion— the agency could not treat the existing but unauthorized buoys "as a fait accompli incorporated into an environmental baseline." (Id. at p. 1276.)
However, as the federal district court, itself, explained in denying a motion for reconsideration based on the California Supreme Court's then newly issued decision in Communities, it was concerned with the environmental provisions of the Tahoe Regional Planning Compact, an agreement between California and Nevada, and not with CEQA. (League to Save Lake Tahoe v. Tahoe Regional Planning Agency (E.D.Cal. 2010) 739 F.Supp.2d 1260, 1293, 1294-1295 (Tahoe II).) The compact's environmental provisions "go further than those of CEQA." (Ibid.) Accordingly, Communities was not on point, said the district court, and did not counsel a different baseline analysis under the planning compact. (Tahoe II, at pp. 1294-1295; see also Tahoe I, at p. 1275 [stating Fat, supra, 97 Cal.App.4th 1270, was not relevant because it was
Plaintiffs do not dispute that the baseline ultimately utilized by the Lands Commission reflected the then current conditions at the Long Wharf terminal. Indeed, the record shows the Lands Commission selected the baseline looking solely at, and accurately describing, the "physical environmental conditions in the vicinity of the project, as they exist[ed] at the time the notice of preparation [was] published." (CEQA Guidelines, § 15125, subd. (a).)
Rather, pointing to the Lands Commission's initial statement made in 1999 that the baseline should exclude operational use of the terminal and reflect only its structural presence, plaintiffs claim there is no support in the record for the commission's decision to modify the baseline to reflect the actual conditions at the terminal. Plaintiffs claim the fact the Lands Commission initially selected a baseline that excluded use of the terminal established that a "no-lease" baseline was "more appropriate."
To begin with, plaintiffs cite no authority supporting the implied premise of their argument—that the Lands Commission could not revisit the baseline during the environmental review process and modify it as the commission
The record also reveals a sound basis for the Lands Commission's adjustment of the baseline. Chevron presented the commission with information about other baseline determinations being made for proposed San Francisco Bay Area projects, and urged it to take the same approach so there would be uniformity in the environmental review process. In addition, the case law in the area was being developed through decisions such as Fat, supra, 97 Cal.App.4th at pages 1277-1281, which endorsed and followed Riverwatch, supra, 76 Cal.App.4th 1428. Thus, as the Lands Commission explained, its view of the appropriate baseline evolved over time, ultimately leading to modification of the baseline in the 2003-2004 timeframe, some four years before it completed the environmental review process.
In sum, the Lands Commission did not abuse its discretion in defining the baseline used to assess environmental impacts of the proposed marine terminal lease renewal. The baseline was not contrary to the law, and it was based on substantial evidence.
"An EIR need not consider every conceivable alternative to a project." (CEQA Guidelines, § 15126.6, subd. (a).) Moreover, "alternatives shall be
The same analysis applies here. The final EIR identified potential significant impacts due to oil spills, but not due to impediment of recreation. Accordingly, the EIR did not need to address the causeway removal and buried pipeline alternative urged by plaintiffs, since it was directed at an asserted impact not identified in the EIR. Furthermore, given that the baseline properly reflected existing conditions, which included the causeway and pipelines supported thereby, the final EIR correctly concluded the asserted impact on recreational uses was not a potential significant impact of the lease renewal project.
However, the only approval at issue is the Lands Commission's renewal of the lease for continued use of the marine terminal on submerged land owned by the state and controlled by the commission. The refinery, in contrast, sits on private property presently owned by Chevron and requires no approvals by the commission for continued operations.
The cases cited by plaintiffs in support of their broader project description argument are inapposite. Both Tuolumne County Citizens for Responsible
However, the final EIR did consider the cumulative impact of water discharges from the terminal and the refinery into the bay. Page 4.2-5 of the draft EIR discusses discharges from the refinery, and page 4.2-55 discusses cumulative impacts of that discharge and discharges from the terminal. Moreover, consideration of these water discharges was not required here. As we have discussed, the baseline for assessing the environmental impacts of the lease renewal project properly reflected the marine terminal's then current operative condition, which included the water discharges. Accordingly, the EIR did not need to consider the cumulative impact of these discharges
The San Francisco Bay Area Water Trail Act (Gov. Code, §§ 66690-66694) provides for the future creation of a water trail for recreational boating around the San Francisco Bay. Plaintiffs complain the final EIR failed to identify renewal of the marine terminal lease as "inconsistent" with the act. We need not and do not decide whether the act is merely enabling legislation (as the Lands Commission and Chevron maintain), or a regional "plan" requiring attention and discussion in a CEQA review. Nor do we need to decide whether the terminal's presence in the bay truly obstructs such a water trail. Again, as we have discussed, the baseline for assessing the environmental impacts of the lease renewal project properly reflected the marine terminal's then current operative condition, which included its physical structure. Accordingly, the EIR did not need to consider impacts of that existing structure on the water trail because they were not "effects of [the] individual project" under consideration. (See § 21083, subd. (b)(2).)
Local and regional plans call for construction of the Bay Trail, a multipurpose, land-based recreational trail around the San Francisco Bay. Plaintiffs complain the Lands Commission also failed to acknowledge "inconsistency" between the terminal lease renewal and Bay Trail plans.
However, the draft EIR clearly considered the issue at pages 4.5-15 to 4.5-16. It concluded the Bay Trail, if built to plan, would run through the privately owned "upland" area containing supporting facilities for the terminal—land not considered to be subject to a public trust easement and the Lands Commission's control, and land not involved in the marine terminal lease renewal project at issue here. Accordingly, the Lands Commission believed it had no authority to impose trail conditions in connection with renewal of the terminal lease. Nevertheless, the Lands Commission urged the interested parties to discuss the issue and see if they could reach some agreement to facilitate development of the trail. It thus deferred final approval of the EIR and lease renewal for a month, and the parties voluntarily entered into a side agreement whereby Chevron agreed to provide two easements across its refinery property and $2 million toward security along that portion of the trail once it is constructed.
In any case, as we have discussed, the baseline for assessing the environmental impacts of the lease renewal project properly reflected the conditions
Citing sections 21080.4, subdivision (a), and 21104, plaintiffs contend the Lands Commission failed to "consult" with the State Coastal Conservancy (Conservancy) and California's Department of Fish and Game (Department) about the marine terminal lease renewal project.
Section 21104 requires "the state lead agency [to] consult with, and obtain comments from, each responsible agency, trustee agency, any public agency that has jurisdiction by law with respect to the project ...." (§ 21104.) The notice the Lands Commission sent to the Conservancy and Department asked for comments within 45 days as provided for by CEQA and its guidelines. (§ 21091, subd. (a); CEQA Guidelines, § 15105, subd. (a).) Neither the Conservancy nor the Department provided comments. CEQA Guidelines anticipate there may be no response, and therefore provide if "any public agency or person who is consulted with regard to an EIR ... fails to comment within a reasonable time as specified by the lead agency, it shall be assumed, absent a request for a specific extension of time, that such agency or person has no comment to make." (CEQA Guidelines, § 15207.) Accordingly, there was no failure by the Lands Commission to consult with trustee agencies.
To begin with, both the draft EIR (in §§ 4.5.1 and 4.5.4) and responses to comments addressed recreational and Bay Trail issues. In any case, as we have explained, these were existing conditions and not impacts the EIR for the marine terminal lease renewal project was required to discuss. Accordingly, no response to these comments was required. (See Environmental Protection Information Center v. California Dept. of Forestry & Fire Protection (2008) 44 Cal.4th 459, 487 [80 Cal.Rptr.3d 28, 187 P.3d 888] [failure to respond to "patently irrelevant" comments not prejudicial error].)
Finally, plaintiffs assert the Lands Commission's statement of findings and overriding considerations, adopted when it approved the lease renewal, was not supported by substantial evidence.
Plaintiffs' argument that the Lands Commission's statement of findings and overriding considerations is inadequate is a recycled medley of their separate challenges to the final EIR, each of which we have already addressed and rejected. We therefore do not revisit these issues here. As we have discussed,
In addition to their CEQA challenge, plaintiffs contend the Lands Commission violated the public trust doctrine when it renewed the marine terminal lease. Plaintiffs do not dispute that the maintenance and operation of the terminal is a permissible public trust use. Nor do they dispute that the Lands Commission may, in its capacity as acting trustee of the public trust for the state, lease out the marine terminal facilities. Rather, plaintiffs claim that before approving the lease renewal, the Lands Commission was required to consider other public trust uses of the property, specifically recreational uses, and to mitigate impacts on those uses to the greatest extent possible. In other words, plaintiffs maintain the CEQA environmental review process was insufficient, and the Lands Commission was required, under the public trust doctrine, to undertake an additional review process and impose additional mitigation conditions. As we explain, in this case, where the Lands Commission continued a permissible and long-standing trust use and conducted adequate review under CEQA, there was no violation of the public trust doctrine.
Accordingly, the "traditional triad" of public trust uses includes navigation, commerce, and fishing on navigable waters. (National Audubon, supra, 33 Cal.3d at p. 434.) Commercial uses consistent with the trust include "wharves or docks and other structures in aid of commerce." (City of Berkeley, supra, 26 Cal.3d at p. 522.) The Lands Commission, in turn, acting on behalf of the state, can lease tidelands and submerged lands for such uses consistent with the trust. (Western Oil & Gas Assn. v. State Lands Com. (1980) 105 Cal.App.3d 554, 563 [164 Cal.Rptr. 468].) Recreation and environmental preservation are also permissible public trust uses. (National Audubon, at pp. 434-435.)
The parties dispute the standard by which we should review the Lands Commission's action. Plaintiffs focus on the commission's renewal of the marine terminal lease, maintain the renewal was a quasi-adjudicatory decision, and therefore the commission's determination to continue the existing public trust use of the bay land and waters should be reviewed under the abuse of discretion standard set forth in Code of Civil Procedure section 1094.5. That section, which provides for, and specifies the scope of judicial review in, administrative mandamus actions, applies when the underlying administrative proceeding is one "in which by law a hearing is required to be
The scope of judicial review of such an adjudicatory or quasi-adjudicatory decision is set forth by the statute: "The inquiry in such a case shall extend to the questions whether the respondent has proceeded without, or in excess of, jurisdiction; whether there was a fair trial; and whether there was any prejudicial abuse of discretion. Abuse of discretion is established if the respondent has not proceeded in the manner required by law, the order or decision is not supported by the findings, or the findings are not supported by the evidence." (Code Civ. Proc., § 1094.5, subd. (b).) On appeal, the Court of Appeal applies the same standard of judicial review as the trial court. (See Ryan v. California Interscholastic Federation-San Diego Section (2001) 94 Cal.App.4th 1048, 1077 [114 Cal.Rptr.2d 798] ["[o]n appeal, our function is identical to that of the trial court ..."]; Schmitt v. City of Rialto (1985) 164 Cal.App.3d 494, 501 [210 Cal.Rptr. 788] ["the appellate court reviews the administrative determination, not that of the superior court, by the same standard as was appropriate in the superior court"].)
Chevron focuses on the Lands Commission's decision to continue the existing public trust use, namely the maintenance and use of a marine terminal. Chevron contends the commission's choice of this trust use, rather than another, is a quasi-legislative determination subject to judicial review under the traditional mandamus statute, Code of Civil Procedure section 1085. (See Western States, supra, 9 Cal.4th at pp. 567-568 [quasi-legislative actions are properly challenged in traditional mandamus action under § 1085, even when agency is required to hold a hearing and take evidence]; Langsam, supra, 190 Cal.App.3d at p. 879 ["where an agency is exercising a quasi-legislative function, judicial review must proceed under ordinary or traditional mandamus"].)
Judicial review of agency actions that are quasi-legislative in character is under a more deferential, arbitrary and capricious standard. (See San Francisco Fire Fighters Local 798 v. City and County of San Francisco (2006) 38 Cal.4th 653, 667 [42 Cal.Rptr.3d 868, 133 P.3d 1028] [applying arbitrary and capricious standard to quasi-legislative action]; Western States, supra, 9
We need not decide whether the Lands Commission's decision to continue a long-standing public trust use is adjudicatory or legislative in character. (But see, e.g., Zack's, supra, 165 Cal.App.4th at p. 1178 ["`administration of the trust by the state is committed to the Legislature, and a determination of that branch of government made within the scope of its powers is conclusive in the absence of clear evidence that its effect will be to impair the power of succeeding legislatures to administer the trust ...'"].) Both the "[a]buse of discretion standard" applicable in administrative mandamus under Code of Civil Procedure section 1094.5, and the arbitrary or capricious standard applicable in traditional mandamus proceedings under Code of Civil Procedure section 1085, embrace review for legal error, including procedural irregularity. Here, plaintiffs contend the Lands Commission failed to consider other public trust uses and to impose conditions mitigating impacts on those uses to the greatest extent possible—in other words, plaintiffs claim the Lands Commission failed to comply with asserted procedural requirements of the public trust doctrine. This is a legal issue subject to de novo review under both Code of Civil Procedure sections 1085 and 1094.5. (See Vineyard, supra, 40 Cal.4th at pp. 427 & fn. 4, 435 [concluding "we determine de novo
Plaintiffs contend National Audubon, supra, 33 Cal.3d at page 425, imposes the procedural requirements the Lands Commission assertedly failed to heed—considering other public trust uses and imposing conditions mitigating impacts on those uses to the greatest extent possible. In National Audubon, the Supreme Court sought to harmonize two separate bodies of law affecting water use: California's appropriative water rights system and the public trust doctrine. The Los Angeles Department of Water and Power had purchased the private water rights in several nonnavigable streams flowing into Mono Lake and obtained permits from the State Water Resources Control Board to divert the water for public consumption in the Los Angeles basin. (Id. at pp. 425-429.) The department's acquisition of the private water rights and transfer and sale of the stream water, itself, was viewed as strictly a commercial use and not treated as public trust use. (See id. at pp. 436-437 [diversions from a nonnavigable tributary can impair the public trust "in a downstream [navigable] river or lake"], 452 [human and environmental uses of Mono Lake (navigable and downstream from the tributaries) are uses protected by the public trust doctrine], 437, fn. 19 [court did not need to consider whether the public trust "extends for some purposes" to nonnavigable streams].) Nor did the water resources board believe, in any case, that the public trust doctrine had any application in the context of administering and granting permit approvals in connection with appropriative water rights. (Id. at pp. 428, 452.)
The Supreme Court observed, "the public trust doctrine and the appropriative water rights system ... developed independently of each other" and "[e]ach developed comprehensive rules and principles which, if applied to the full extent of their scope, would occupy the field of allocation of stream waters to the exclusion of any competing system of legal thought." (National Audubon, supra, 33 Cal.3d at p. 445.) The court concluded both systems of law were of vital importance to the public and thus sought to reach "an
"[D]rawing upon the history of the public trust [doctrine] and the [appropriative] water rights system, the body of judicial precedent, and the views of expert commentators," the court arrived at several guiding principles, including that "[t]he state has an affirmative duty to take the public trust into account in the planning and allocation of water resources, and to protect public trust uses whenever feasible." (National Audubon, supra, 33 Cal.3d at pp. 445-446.) The court also noted that while the state may "prefer one trust use over another," it may not simply "abrogate the public trust merely by authorizing a use inconsistent with the trust." (Id. at pp. 439, fn. 21, 440.) The court thus concluded the water resources agency could not recognize private water rights in nonnavigable streams to the complete derogation of public trust uses in downstream, navigable waters. Rather, the agency had both the authority and obligation to consider harm to the public trust when making such water allocation decisions. (Id. at pp. 447-448.)
Plaintiffs also rely heavily on Carstens v. California Coastal Com. (1986) 182 Cal.App.3d 277, 288 [227 Cal.Rptr. 135] (Carstens). In that case, the California Coastal Commission amended beach access conditions of a permit issued to the operators of a nuclear powerplant, including Southern California Edison (SCE), so the plant would meet safety conditions imposed by the federal Nuclear Regulatory Commission. The amendment allowed SCE to exclude the public from beach areas near the plant. (Id. at pp. 283-285.) The utility was also required to pay $3 million for construction of campsites at a nearby state beach park and convey to the state two nearby oceanfront parcels. (Id. at p. 284.) Carstens claimed the "amendment limiting access to the tidelands violat[ed] the public trust doctrine." (Id. at p. 288, fn. omitted.)
The Court of Appeal concluded "the Commission [had] properly exercised its duty ... to consider the various uses of tidelands under the public trust doctrine in reaching its decision to grant the amendment." (Carstens, supra, 182 Cal.App.3d at p. 288.) The court explained the doctrine "does not prevent the state from preferring one trust use over another." (Id. at p. 289.) Further, nothing precluded "the Commission from considering commerce as well as recreational and environmental needs in carrying out the public trust doctrine." (Ibid.) The court pointed out the California Coastal Act of 1976 (§§ 30000-30900), itself, makes both "specific reference to the public trust doctrine and emphasizes the need to consider public safety and private property interests." (Carstens, at p. 290.) The act further recognizes "`conflicts may occur between one or more policies of the [act]'" and the Legislature has "`therefore declare[d] that in carrying out the provisions of
"The administrative record demonstrate[ed] the [coastal c]ommission considered the conflicting policy concerns and fashioned a compromise to address the practical realities." (Carstens, supra, 182 Cal.App.3d at p. 290.) No facts, said the court, supported Carstens's "claim the Commission in balancing the policy issues placed protection of coastal resources at the bottom of the list of priorities." (Ibid.) Rather, the coastal commission had recognized both the significance of the closure of the beach area (which markedly diminished public access and recreational use of 12 acres of beach, bluffs and canyons) and "`the reality,'" i.e., the need for and cost of the nearly completed powerplant. (Id. at p. 291.) The coastal commission had also required mitigation it determined was "adequate" and made findings the plant served important public energy needs. (Ibid.) Accordingly, there was "`no violation'" of the public trust doctrine or the coastal act. (182 Cal.App.3d at p. 291.)
National Audubon and Carstens are distinctly different from the case at hand. In National Audubon, supra, 33 Cal.3d 419, the water resources board had approved a nonpublic trust use of tributary streams (the exercise of private water rights), without any consideration of, and in derogation of, public trust uses of Mono Lake. The Supreme Court was thus called upon to craft an analytical accommodation between two competing and equally important bodies of law, the appropriative water rights system and the public trust doctrine. As part of that accommodation, the court recognized the authority of the water resources board to consider, and required the board to consider, the impact of the exercise of private water rights on downstream, navigable bodies of water subject to a public trust servitude. In Carstens, supra, 182 Cal.App.3d 277, the coastal commission changed the public trust uses to which the ocean shoreline had been put, from recreational/environmental to commerce/public health and safety. Moreover, it did so acting under the coastal act, which recognizes the coastal commission will be confronted with choosing between conflicting polices furthered by the act and directs the commission to resolve such conflicts in a way "which on balance is the most protective of significant coastal resources." (Carstens, at p. 290.)
Here, in contrast, the Lands Commission did not approve a nonpublic trust use in derogation of public trust uses (let alone balance the policies and dictates of the appropriative water rights system and the public trust doctrine), as was the case in National Audubon. Nor did the commission change public trust uses, as was the case in Carstens. (See also Zack's, supra, 165 Cal.App.4th at pp. 1179-1180 & fn. 8, 1182-1183 [discussing the "complexity" of choosing between sometimes conflicting public trust uses, observing
Rather, the Lands Commission simply continued the existing, longstanding public trust use of the navigable waters and submerged and partially submerged lands in question. "Ordinarily, a public trustee's decision that trust land shall be used for a specific purpose ... stands ... until the trustee decides to reallocate the land to some other public purpose or to dispose of it if that is congenial to the interests protected by the trust." (Zack's, supra, 165 Cal.App.4th at pp. 1182-1183.) Accordingly, we do not read National Audubon or Carstens as imposing on the Lands Commission, here, an obligation to evaluate the other public trust uses urged by plaintiffs, particularly since those recreational uses are essentially incompatible with the trust use to which the navigable waters and submerged and partially submerged lands in question here have been put for over a century. (Cf. Colberg, Inc. v. State of California ex. rel. Dept. Pub. Wks. (1967) 67 Cal.2d 408, 419 [62 Cal.Rptr. 401, 432 P.2d 3] [upholding power of the state to "deal with its navigable waters in any manner consistent" with its public trust interest and rejecting claims by riparian owners that bridges would significantly impact their use of the waterway].)
But even assuming some obligation to "consider" other public trust uses, neither National Audubon nor Carstens impress into the public trust doctrine any kind of procedural matrix. Yet, under plaintiffs' construction of the doctrine, the Lands Commission was required to (a) identify "other" public trust uses, (b) analyze the impact of maintaining the existing public trust use on those other uses, and (c) determine and require measures to mitigate those impacts to the greatest extent possible. No case discussing the public trust doctrine alludes to such procedural requirements. Indeed, imposing such procedural constraints would be inconsistent with the recognition that the state is free to choose between public trust uses and that selecting one trust use "in preference to ... [an]other cannot reasonably be said to be an abuse of ... discretion." (Higgins v. City of Santa Monica (1964) 62 Cal.2d 24, 30 [41 Cal.Rptr. 9, 396 P.2d 41].)
Further, National Audubon and Carstens indicate evaluating project impacts within a regulatory scheme like CEQA is sufficient "consideration" for public trust purposes. In National Audubon, for example, the Supreme Court observed: "Amendments to the Water Code enacted in 1955 and subsequent years codify in part the duty of the Water Board to consider public trust uses of stream water. [Citation.] The requirements of the California Environmental
In Carstens, as we have observed, the Court of Appeal discussed the public trust doctrine in the context of the regulatory scheme established by the coastal act. The court pointed out that act (like CEQA) expressly makes reference to the public trust doctrine, and the court essentially made no distinction between compliance with the act and the public trust doctrine. (See Carstens, supra, 182 Cal.App.3d at pp. 289-291.)
Center for Biological Diversity, Inc v. FPL Group, Inc. (2008) 166 Cal.App.4th 1349 [83 Cal.Rptr.3d 588], also reflects sensitivity to the interplay between environmental review in the regulatory approval process and the mandate of the public trust doctrine. Although the court concluded a member of the public can bring suit against an agency that has allegedly acted in violation of the public trust doctrine, it also concluded abstention would have been warranted in the case before it because the agency (which had been asked to approve permits for the operation and expansion of wind farms) had been proceeding with the environmental review process required under CEQA. "Intervention by the courts [through a separate lawsuit under the public trust doctrine], other than by exercising oversight over the administrative process and ensuring that proper standards are applied, not only would threaten duplication of effort and inconsistency of results, but would require courts to perform an ongoing regulatory role as technology evolves and conditions change." (166 Cal.App.4th at p. 1371.) In short, the plaintiffs' stand-alone public trust doctrine claim could have negatively impacted the county's "ability ... to accomplish its policy objectives" and would have risked "the pronouncement of inconsistent standards and conditions for the operation of [wind] turbines." (Id. at p. 1372.) The court further concluded the plaintiffs could have, and should have, challenged the county's issuance of the conditional permit. They had not done so, and it was too late to hale the county into court to litigate issues addressed in the permitting and
Here, the Lands Commission duly and properly engaged in the environmental review process required by CEQA. In invoking the public trust doctrine, plaintiffs are essentially trying to override significant provisions of that act, namely those pertaining to the baseline used to assess the environmental impacts of a proposed project, and those pertaining to project alternatives and mitigation measures. Plaintiffs have cited no case, and we are aware of none, that suggests that where no change is being made to a public trust use and there has been compliance with CEQA, the public trust doctrine independently imposes an additional impact analysis requirement and requires the consideration of additional project alternatives and mitigation measures in connection with other public trust uses.
Moreover, the CEQA review process here encompassed discussion of other public trust uses. For example, section 4.5 and comment response 4.2 of the draft EIR discussed impacts to recreational boating and other water recreational uses at and around the marine terminal and concluded the lease renewal would not have significant new impacts. During the Lands Commission's public hearings on the lease renewal on December 3, 2008, and January 29, 2009, commission representatives and members of the public also discussed these issues.
The Lands Commission also facilitated discussions in connection with plaintiffs' desire to secure significant concessions from Chevron with respect to the Bay Trail. Even though the Lands Commission did not believe it had authority to impose mitigation measures on Chevron's upland private property, over which there was no public trust servitude, the commission encouraged discussions between Chevron, the proponents of the trail and officials of the City of Richmond. These efforts resulted in Chevron agreeing to provide two mile-long easements across its upland property, and $2 million for any security measures necessary to keep trail users out of sensitive refinery areas. Accordingly, we need not decide the extent of the Lands Commission's authority. Even if it had such authority, there was no violation of the public trust doctrine. Indeed, the accommodations Chevron made in this case for the Bay Trail are similar to the mitigation measures required of the operator of the nuclear powerplant in Carstens. There, SCE offered $3 million to address loss of beach access. The coastal commission additionally required dedication of two other beachfront parcels. (Carstens, supra, 182 Cal.App.3d at p. 284.) The Court of Appeal called the coastal commission's approval of the project an appropriate "compromise" that reflected "practical realities" and satisfied the public trust doctrine. (Id. at p. 290.) We reach the same conclusion here.
The judgment is affirmed.
Marchiano, P.J., and Margulies, J., concurred.