GOMES, Acting P. J.—
Leonard Goddard (Goddard) drowned in the Tuolumne River downstream from the remnant of what was once known as the Dennett Dam. His adult children, Keith Goddard and Kristy Monroe (plaintiffs), sued the State of California (State) and several other public entities claiming they were liable for Goddard's death under Government Code section 835
On October 22, 2009, 56-year-old Goddard drowned in the Tuolumne River allegedly after getting caught in the current over a breach in the remnant of Dennett Dam. On that day, Erasmo Ramirez, who was working in a friend's junkyard on the south side of the Tuolumne River near the 9th Street Bridge and dam remnant, heard someone yelling for help, ran to the junkyard fence, and saw Goddard hanging off some metal in the dam remnant in the middle of the river. Ramirez did not know how Goddard got there. On a photograph of the dam remnant, which depicts lines of wooden poles standing upright on the left and right sides of the river and a small "waterfall" in the middle, Ramirez identified the spot in the middle of the "waterfall" where he saw Goddard.
The City of Modesto (the City) originally constructed Dennett Dam (the dam) in 1933 and never transferred its ownership interest to another party or entity. In its application to DWR to construct the dam, the City listed itself as the owner and stated the dam was a timber, collapsible weir, the purpose of which was to increase river depth for boating, swimming and river sports. The City contracted with a company to construct the dam, and paid for its construction. The DWR issued to the City a certificate of approval for the dam in July 1934.
From 1934 to 1962, the City maintained, repaired, and made alterations to the dam, while the DWR issued the City certifications of approval for alterations to the dam and periodically inspected it. In 1936, the City applied to DWR to repair or alter the dam to drive a 65-foot width of steel sheet piling 20 feet into the riverbed, which eventually would go completely across the river. The project was completed and the DWR issued its certificate of approval in December 1937. In August 1947, during a DWR inspection, a
From 1948 to 1956, DWR periodically inspected and photographed the dam. DWR and the City communicated about repairs, the City's lack of budgeted funds to plan and effect repairs, the continued deterioration of the dam structure, and ongoing cessation of water impoundment. In December 1953, DWR found on inspection that the dam was still out of service due to the need for extensive repairs or reconstruction; while DWR was considering ruling that the structure was no longer within its jurisdiction, DWR agreed to defer this decision to allow the City an opportunity to investigate the feasibility of reconstruction.
In February 1956, Stanislaus County submitted an application to approve plans to repair or alter the dam, which listed the City as the dam owner and stated that the repair would be a joint project of the county and City. The work contemplated, which would be put out to bid, included moving a fish ladder designed under DFW requirements from the north side of the river to the south side. In May 1959, Stanislaus County provided DWR with the bids to rebuild the dam and advised that the project was "momentarily stopped" because the City had rejected all of them. In 1960 and 1962, DWR inspected the dam to verify it remained out of service.
In October 1962, DWR advised the City: The dam had been carried on its roster of dams within the State's jurisdiction for supervision as to safety pursuant to division 3 of the Water Code; since 1947, the "structure" had been out of service due to disrepair, and as of 1962, was incapable of storing water safely; the dam was never reconstructed despite several attempts by the City and Stanislaus County to do so; the "structure" no longer qualified as a dam as defined by division 3 of the Water Code because it was incapable of storing 50 acre-feet or more of water and was less than six feet high, and
Once the dam was taken out of DWR's jurisdiction, the City did not need to seek the DSOD's permission to breach the dam remnant; DSOD had no statutory authority to request anything on the dam or require permission from anyone to do anything to it. DWR's file on the dam ended in 1962, was marked for archives, and there was nothing to indicate the dam was ever repaired back to jurisdiction.
In 1995, an advisory council and action team established by Assembly Bill 3603 (1989-1990 Reg. Sess.) issued the San Joaquin River Management Plan (management plan), which was prepared for the State's Resources Agency. The management plan was prepared as a consensus effort by a wide range of federal, State and local agencies and private interests, and included the part of the Tuolumne River through the City where the dam remnant is located. The management plan included a recommended study of the removal of the dam remnant as a possible impediment to adult salmon migration and increased vulnerability to poaching and predation of juvenile salmon. The management plan noted: The footing of the dam still remained on the Tuolumne River; the DFW had made a mid-channel breach to facilitate fish passage at low flow; a fish ladder was installed at one time, but had washed away; and DFW had done "some preliminary scoping" of removal of the remaining structure.
In June 2005, bulletin 250, entitled "Fish Passage Improvement," was issued as an element of CALFED's "Ecosystem Restoration Program," a joint effort of federal and State agencies. The bulletin addressed the problem of fewer salmon and steelhead in the Central Valley, including the Tuolumne River, and the location of the dam remnant. The bulletin related the dam's history. It stated that the City built the dam, a low, concrete structure, in 1933 for recreation; it created a swimming and fishing lake on the river. At one time, there were fish ladders at each end of the dam, and in the 1940's, there was a counting station for salmon. The dam fell into disuse and the concrete was eroding. Later, the top portion of the dam was removed, but the footing remained, potentially creating a passage barrier to juvenile and migrating fish, as well as a hazard to recreational boaters. In the 1970's, DFW made a
The bulletin further explained that the City had targeted the dam for removal as part of a master plan for development of the Gateway portion of the Tuolumne River Regional Park (TRRP) system. In 2002, DWR saw an opportunity to remove the dam sooner in conjunction with the replacement of the 9th Street Bridge, which sits directly over the dam, and approached the City with this proposal. There was not enough time left in the planning schedule, however, to alter the documents to include the dam removal and stay on schedule for the spring 2002 construction start.
In April 2010, plaintiffs filed a government claim for wrongful death and survivor damages for Goddard's drowning, in which they alleged the DFW and DWR, and/or another unnamed State agency, were responsible for the design, construction and maintenance of the dam.
In October 2010, plaintiffs filed their complaint for damages against the State and several other public entities, in which they alleged a single cause of action for government tort liability for alleged dangerous conditions of public property pursuant to sections 815.2, 815.4, 820, 830.8, 835 and 840.2. Specifically, they alleged that a breach in the dam, which had been present since the 1970's, caused a strong current over the dam remnant. They further alleged that Goddard, while lawfully in the gateway parcel of the TRRP at or near the dam, got swept up in the current, went over the breach, got caught under the rush of water, and drowned.
Plaintiffs alleged there were "dangerous conditions of public property owned, operated, possessed, used, constructed, built, controlled, repaired and maintained" by the State and the other public entity defendants, which (1) existed at the time of the accident, (2) were the legal causes of the alleged injuries and damages, and (3) created a substantial and reasonably foreseeable risk of the kind of injuries, harm and losses described in their complaint. Plaintiffs alleged that the dangerous conditions were created by the negligent
Because plaintiffs specifically alleged in their government claim that DWR and DFW had ownership or control of the dam, when the State filed its answer to the complaint in December 2010, it did so acting by and through DWR and DFW.
In October 2013, the DWR and DFW filed a joint motion for summary judgment. They pointed out that as separate and distinct departments, each was entitled to its own summary judgment. They argued summary judgment should be granted because (1) DWR did not own or control the dam or its remnant; (2) DFW did not own the dam or its remnant, and did not have control over the remnant as it did not have the authority, and was not obligated, to remove the dam remnant or maintain the fish ladder in the breach; (3) both DWR and DFW are immune from liability for the dam's failure under Water Code section 6028; and (4) both DWR and DFW are immune under the natural conditions immunity of Government Code sections 831.2 and 831.21.
In their opposition, plaintiffs argued summary judgment should be denied because (1) the State failed to carry its burden of showing it did not own the river and evidence plaintiffs submitted shows the State owns the riverbed of all navigable rivers; (2) the natural-condition immunity is inapplicable because the dam remnant is not a natural condition of public property; (3) the Water Code section 6028 immunity does not apply because plaintiffs do not contend the dangerous condition resulted from the dam's partial or total failure; (4) there is a triable issue of material fact regarding the DWR's ability to exercise control over the land where the dangerous condition is located, as the State did not submit any evidence that the DWR cannot exercise control over either the land or the dam; and (5) there is a triable issue of material fact regarding the DFW's ability to exercise control over the dam.
In addition to filing a document responding to the DWR's and DFW's separate statement of undisputed material facts, plaintiffs filed a separate document containing their "Separate Statement of Additional Undisputed Material Facts." In their reply brief, the DWR and DFW urged the trial court to reject plaintiffs' separate statement and exhibits because it was not an authorized pleading in opposition to a summary judgment motion under Code of Civil Procedure section 437c or the applicable rules of court.
The attorney for DWR and DFW asked for an articulation of the ruling under Code of Civil Procedure section 437c, subdivision (g). The trial court responded that based on the facts, there were material issues of disputed fact as to what "Water Code section 6028 means about the ownership of the property" and whether the fact the State owns the navigable waterways and has the right to control them means the State would have some type of liability under a dangerous condition theory. The State's attorney then asked about DFW's liability. The trial court asked plaintiffs' counsel if he had an argument for DFW "other than something that happened in the 1970's?" Plaintiffs' counsel responded that there was a material issue in dispute because DFW actually exercised control over the structure and there is nothing to show they could not exercise control again. The trial court stated it had not heard anything other than what DFW did in 1970, it did not see any triable issue of fact as to what DFW did, and since it was a separate entity, it would grant DFW's summary judgment motion. The trial court found the evidence presented showed there was no triable issue of fact that DFW had any responsibility or control, and "had nothing to do with it," and the Fish and Game Code "immunity section" was sufficient to grant immunity. Accordingly, the trial court granted the motion for DFW, but denied it for DWR.
To prevail on its summary judgment motion, DFW was required to establish without material factual dispute either that a necessary element of plaintiffs' case could not be proved or that DFW had a complete defense. (Code Civ. Proc., § 437c, subds. (a), (p)(2); Aguilar v. Atlantic Richfield Co. (2001) 25 Cal.4th 826, 849 [107 Cal.Rptr.2d 841, 24 P.3d 493].) To negate an element of plaintiffs' case, DFW asserted it did not own or control the dam or the dam remnant. Alternatively, to establish a complete defense, DFW argued it was entitled to immunity under Water Code section 6028 (which prohibits actions against the State for damages caused by the partial or total failure of any dam or reservoir) or Government Code section 831.2 (which provides immunity against claims for injuries caused by a natural condition of any unimproved public property).
The trial court granted summary judgment to DFW on the ground it did not own or control the river, dam or the dam remnant. On appeal, plaintiffs address each of the grounds DFW asserted below and contend summary judgment should have been denied because none of them was established. Contrary to plaintiffs' position, we conclude that DFW established without triable issue of material fact that it was entitled to natural-condition immunity under section 831.2. While section 831.2 provides a complete defense, we also conclude, in the alternative, that the DFW established without triable issue of material fact that did not own or control the river, dam or dam remnant.
On appeal from a summary judgment, our task is to independently determine whether an issue of material fact exists and whether the moving party is entitled to summary judgment as a matter of law. (Brantley v. Pisaro (1996) 42 Cal.App.4th 1591, 1601 [50 Cal.Rptr.2d 431].) "We independently review the parties' papers supporting and opposing the motion, using the same method of analysis as the trial court. Essentially, we assume the role of the trial court and apply the same rules and standards." (Kline v. Turner (2001) 87 Cal.App.4th 1369, 1373 [105 Cal.Rptr.2d 699].) We apply the same three-step analysis required of the trial court. First, we identify the issues framed by the operative complaint and answer since it is these allegations to which the motion must respond. Second, we determine whether the moving party's showing has established facts which negate the opponent's claim and justify a judgment in the moving party's favor. When a summary judgment motion prima facie justifies a judgment, the third and final step is to determine whether the opposition demonstrates the existence of a triable issue of material fact. (Hamburg v. Wal-Mart Stores, Inc. (2004) 116 Cal.App.4th 497, 503 [10 Cal.Rptr.3d 568]; Chevron U.S.A., Inc. v. Superior Court (1992) 4 Cal.App.4th 544, 548 [5 Cal.Rptr.2d 674], disapproved on another point in Camargo v. Tjaarda Dairy (2001) 25 Cal.4th 1235, 1245 [108 Cal.Rptr.2d 617, 25 P.3d 1096].)
In so doing, we view the evidence in the light most favorable to the party opposing the motion; we liberally construe the opposing party's evidence, strictly construe the moving party's evidence, and resolve all doubts in favor of the opposing party. (Johnson v. American Standard, Inc. (2008) 43 Cal.4th 56, 64 [74 Cal.Rptr.3d 108, 179 P.3d 905]; Saelzler v. Advanced Group 400 (2001) 25 Cal.4th 763, 768 [107 Cal.Rptr.2d 617, 23 P.3d 1143].)
The Knight case is instructive. There, a bodysurfer was gravely injured when wave action abruptly hurled him against a hard sand bottom in the ocean. (Knight, supra, 4 Cal.App.4th at p. 923.) The bodysurfer sued three public entities, including the City of Capitola, for a dangerous condition of public property under section 835, relying on the fact that one or more of the entities had rebuilt the beach 17 years before the accident by depositing a large quantity of imported sand at the beach site and constructing a large rock "groin" jetty that protruded into the ocean at right angles to the beach line, the purpose of which was to alter the wave action to establish an equilibrium between natural removal and replacement of the beach sand. No other work was done to the beach after 1970 and the beach essentially remained intact. (Knight, supra, 4 Cal.App.4th at pp. 924-925.)
The bodysurfer appealed from the trial court's grant of the city's summary judgment motion. (Knight, supra, 4 Cal.App.4th at p. 923.) The appellate court affirmed on the ground that that the city was entitled to natural-condition immunity under section 831.2. (Knight, supra, 4 Cal.App.4th at p. 926.) The court rejected the bodysurfer's arguments that there were triable issues of fact as to whether the public property was unimproved and whether
The court noted that while the question of whether the interaction between the beach and the waves was a "`natural condition'" in light of the beach's reconstruction and addition of the rock groin "might be more difficult in the abstract," "`[i]t is now generally settled that human-altered conditions, especially those that have existed for some years, which merely duplicate models common to nature are still "natural conditions" as a matter of law for the purposes of . . . section 831.2.'" (Knight, supra, 4 Cal.App.4th at p. 928.) The court concluded, based on the evidence before it, that it could be inferred that the condition of the beach, even if artificially created, occurred in nature. (Id. at pp. 928-929.)
In so holding, the court explained: "In sum it appears as a matter of law that at most a combination of human activities and natural forces created the condition which resulted in [the bodysurfer's] tragic injuries. Such a combination of forces, particularly where it produces, over a long period of time, a condition similar to those which occur in nature, has repeatedly been held to come within the immunity provided by section 831.2." (Knight, supra, 4 Cal.App.4th at p. 929.)
Applying these principles here, the issue is whether Goddard's drowning was caused by a natural condition of the Tuolumne River. Plaintiffs argue it was not because the "human-altered, artificial, abandoned and condemned Dam remnant cannot be considered a duplicate model common to the natural condition of the river or riverbed. The man-made, artificial structure is not part of a natural element like a beach or shoreline. The structure is unnatural and has created a `drowning machine.'"
As in Knight, it appears here that a combination of human activities and natural forces created the condition which resulted in Goddard's death. This combination of forces produced over a long period of time a condition similar to that which occurs in nature, and therefore it comes within the immunity provided by section 831.2. (Knight, supra, 4 Cal.App.4th at p. 929.)
As we have already stated, a public entity may not be held liable under section 835 for the dangerous condition of property that it does not own or control. (Aaitui, supra, 29 Cal.App.4th at pp. 1374-1377.) The trial court granted summary judgment to DFW after apparently finding it could not be liable because it did not own or control the dam remnant.
Plaintiffs first argue that the trial court should have denied the motion because DFW failed to show it did not own the land on which the remnant is located and asserts "[t]he State of California owns the land where the dangerous condition is located." The argument fails because plaintiffs based their complaint on allegations of ownership and control of the dam and the dam remnant, not the land on which they are located. The property identified in the complaint is the dam, which plaintiffs allege was dangerous due to the breach that had been present in the dam since the 1970's that caused "a strong current over the center of the remnants of the dam." Plaintiffs do not allege that the property that is dangerous is the riverbed itself. The pleadings in a summary judgment motion delimit the scope of the issues and frame the issues; the burden of a defendant moving for summary judgment only
DFW is not the State agency that has jurisdiction over the riverbed. DFW, formerly named the Department of Fish and Game, is part of the State's Natural Resources Agency; its director is appointed by the governor. (Fish & G. Code, §§ 700, 701.) DFW's duties include enforcing the Fish and Game Code through regulations it adopts. (Fish & G. Code, § 702.) DFW "manages wildlife, fish, and plant resources to protect their ecological, commercial, recreational and scientific value. Among its duties are issuing hunting and fishing licenses; reviewing environmental impact reports; enforcing hunting and fishing regulations; and developing waterway management plans." (9 Witkin, Cal. Procedure (5th ed. 2008) Administrative Proceedings, § 185, p. 1301.) Plaintiffs do not point to any authority to show that DFW has any jurisdiction over the beds of navigable rivers.
On appeal, plaintiffs argue there is no evidence that the dangerous condition was created when the fish ladder washed away, and the mere fact DFW created the breach in 1974 shows it is able to exercise control over the dangerous condition. DFW responds that the undisputed evidence shows that it did not simply create the breach; it created the breach and occupied it with a fish ladder, which later washed away. DFW asserts it is a matter of common sense that the dangerous condition was created when the fish ladder washed away, as that was when the breach was exposed. We agree that such an inference can be made from the evidence presented.
Plaintiffs argue this section is inapplicable because a dam did not exist at the time of the accident, as DWR determined in 1962 that the dam remnant was no longer a dam. But, as DFW points out, the word "dam" in Fish and Game Code section 5935 is defined in Fish and Game Code section 5900, subdivision (a), as including "all artificial obstructions." Certainly the dam remnant qualifies as an artificial obstruction. The fact that DWR determined the dam no longer fell within its jurisdiction because it did not qualify as a dam as defined in Water Code section 6002
Finally, plaintiffs contend that because DFW exercised control over the dam remnant by breaching the dam in 1974 and did not present any evidence to show it could not presently continue to exercise control over the remnant,
As DFW points out, before governmental tort liability may be imposed for a dangerous condition, the public entity must either own or control the public property at issue at the time of the injury. (Longfellow v. County of San Luis Obispo (1983) 144 Cal.App.3d 379, 383 [192 Cal.Rptr. 580].) Therefore, the mere fact that DFW took part in breaching the dam and installing the fish ladder in 1974 does not mean it had the power to remedy the dangerous condition, by either repairing the breach or removing the dam remnant, when Goddard drowned in 2009. To the contrary, DFW exists to enforce the Fish and Game Code (Fish & G. Code, § 702), not to exercise control over dams or their remnants. Instead, the evidence showed that the City, as the dam's owner, not the DFW, had the ability to remove the dam remnant. At best, DFW exercised a regulatory role with respect to the dam remnant. But, as DFW points out, that does not equate to control. (See Public Utilities Com. v. Superior Court (2010) 181 Cal.App.4th 364, 375-376 [105 Cal.Rptr.3d 234] [Although Public Utilities Commission had authority to regulate railroad crossing and order others to correct dangerous condition, it lacked control over the crossing because it had no authority to correct the dangerous condition itself.].)
In sum, DFW did not have jurisdiction over the riverbed, and therefore did not "own" it for purposes of liability under section 835. It also did not control the dam remnant, as it did not have the power to repair the breach or remove the remnant. Accordingly, we affirm the grant of summary judgment in DFW's favor on plaintiffs' claim for dangerous condition of public property.
The judgment in DFW's favor is affirmed. Costs on appeal are awarded to DFW.
Detjen, J., and Smith, J., concurred.