As part of its ongoing effort to limit the emission of greenhouse gases, the Environmental Protection Agency issued a rule deferring regulation of "biogenic" carbon dioxide — non-fossil-fuel carbon dioxide sources such as ethanol — for three years. Citing scientific uncertainty over how to account for biogenic carbon dioxide's unique role in the carbon cycle, EPA justified this "Deferral Rule" on the basis of the de minimis, one-step-at-a-time, and administrative necessity doctrines. Several environmental groups now petition for review, arguing that EPA's invocation of these doctrines was arbitrary and capricious. For the reasons set forth below, we vacate the Deferral Rule.
Under the Clean Air Act, if EPA determines that an "air pollutant ... may reasonably be anticipated to endanger public health or welfare," 42 U.S.C. § 7521(a)(1), it must regulate that air pollutant under the Prevention of Significant Deterioration of Air Quality (PSD) and Title V permitting programs. See Coalition for Responsible Regulation, Inc. v. EPA, 684 F.3d 102, 132-44 (D.C.Cir.2012) (per curiam). The PSD program, which applies to areas of the country that are classified as in "attainment" or "unclassifiable" for any national ambient air quality standard, 42 U.S.C. §§ 7407(d)(1)(A), 7471, requires certain specified "major emitting facilit[ies]," such as iron and steel mills, to obtain state-issued construction permits if they have the potential to emit over 100 tons per year (tpy) of "any air pollutant," and all other sources to obtain such permits if they have the potential to emit over 250 tpy, id. §§ 7475, 7479(1). Under the PSD program, sources need permits before starting a construction or modification project. See id. §§ 7411(a)(4), 7475, 7479(2)(C). To obtain a PSD permit, covered sources must install the "best available control technology" (BACT) for all regulated air pollutants — even for air pollutants whose emissions levels are insufficient to trigger the PSD permitting requirement. Id. § 7475(a)(4). In other words, if a source emits two regulated air pollutants — say sulfur dioxide and particulate matter — but triggers the PSD permitting requirement only because it emits 500 tpy of sulfur dioxide, it must install BACT for both. The Title V program requires operational permits for stationary sources that have the potential to emit at least 100 tpy of any regulated air pollutant. See id. §§ 7661-7661f.
In response to the Supreme Court's decision in Massachusetts v. EPA, 549 U.S. 497, 127 S.Ct. 1438, 167 L.Ed.2d 248 (2007), EPA published an Endangerment Finding for greenhouse gases — a "well-mixed" and "aggregate" group of six gases, including carbon dioxide (CO2). Endangerment and Cause or Contribute Findings for Greenhouse Gases Under Section 202(a) of the Clean Air Act ("Endangerment Finding"), 74 Fed.Reg. 66,496, 66,499 (Dec. 15, 2009). Based on that finding, EPA issued a "cascading series of greenhouse gas-related rules and regulations." Coalition for Responsible Regulation, 684 F.3d at 114. Partnering with the National Highway Traffic Safety Administration, EPA first promulgated the Tailpipe Rule, which established motor-vehicle emissions standards for greenhouse gases. See Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards; Final Rule, 75 Fed.Reg. 25,324 (May 7, 2010). Because the "Tailpipe Rule automatically triggered regulation of stationary greenhouse gas emitters under" the PSD and Title V permitting programs, EPA then issued two rules "phasing in stationary
This case involves biogenic carbon dioxide emissions, which EPA defines as carbon dioxide emissions "directly resulting from the combustion or decomposition of biologically-based materials other than fossil fuels and mineral sources of carbon." Deferral for CO2 Emissions from Bioenergy and Other Biogenic Sources Under the Prevention of Significant Deterioration (PSD) and Title V Programs ("Deferral Rule"), 76 Fed.Reg. 43,490, 43,493 (July 20, 2011). Biogenic carbon dioxide emissions are generated from, among other things, "the biological decomposition of waste in landfills, wastewater treatment[,] or manure management processes," "fermentation during ethanol production," and the "combustion of biological material, including all types of wood and wood waste, forest residue, and agricultural material." Id. To use a familiar example, power plants running on coal emit fossil-fuel carbon dioxide whereas power plants burning feedstocks emit biogenic carbon dioxide.
Unlike fossil fuels that emit greenhouse gases only through human-induced combustion, biogenic sources emit carbon dioxide via both natural and anthropogenic processes. A forest fire, for example, will emit biogenic carbon dioxide regardless of whether it was sparked by lightning or as part of a clear-cutting operation. Dead trees emit carbon dioxide as part of the decomposition process. See Deferral for CO2 Emissions From Bioenergy and Other Biogenic Sources Under the Prevention of Significant Deterioration (PSD) and Title V Programs: Proposed Rule ("Proposed Deferral Rule"), 76 Fed.Reg. 15,249, 15,252-54 (Mar. 21, 2011).
In the Tailoring Rule, EPA acknowledged that "biomass or biogenic fuels and feedstocks could play [a role] in reducing anthropogenic [greenhouse gas] emissions." Tailoring Rule, 75 Fed.Reg. at 31,590-91. Yet responding to numerous requests that the Tailoring Rule exempt biogenic carbon dioxide emissions, EPA stated that because it "ha[d] not analyzed the administrative burden of permitting projects that specifically involve biogenic CO2 emissions," it would not take a "final position" on whether an exemption or "different treatment of biomass combustion" was warranted. Id. at 31,591. As a result, the Timing and Tailoring Rules require biogenic carbon dioxide sources to obtain PSD and Title V permits.
Shortly after promulgating the Tailoring Rule, EPA issued a Call for Information seeking technical and scientific information to "evaluat[e] different accounting approaches" for measuring biogenic carbon dioxide emissions. Call for Information: Information on Greenhouse Gas Emissions Associated with Bioenergy an Other Biogenic Sources, 75 Fed.Reg. 41,173, 41,174 (July 15, 2010). Specifically, EPA sought information about how to treat biogenic carbon dioxide sources differently for purposes of measuring the emissions that trigger the PSD and Title V permitting programs. For example, EPA requested comments on how to "determin[e] the net impact on the atmosphere of CO2 emissions" and the "appropriate spatial/geographic scale for conducting this determination." Id. at 41,176. Then in March 2011, EPA, citing its ongoing efforts to understand the unique characteristics of biogenic carbon dioxide, issued a notice of proposed rulemaking seeking comment on whether it should defer regulation of these sources for a three-year period. See Proposed Deferral Rule, 76 Fed.Reg. at 15,251. Simultaneously, it published a guidance document for determining BACT for biogenic carbon dioxide emissions from "anyway" sources that were regulated under the PSD permitting program at Step One of the Tailoring Rule. See Office of Air and Radiation, U.S. EPA, Guidance for Determining Best Available Control Technology for Reducing Carbon Dioxide Emissions from Bioenergy Production (Mar.2011).
Id. at 43,496. To dispel these uncertainties, EPA announced that "[d]uring the three-year deferral period" it would "conduct a detailed examination of the science associated with biogenic CO2 emissions from stationary sources." Id. at 43,492. EPA justified the Deferral Rule by invoking three principles of administrative law: the de minimis, one-step-at-a-time, and administrative necessity doctrines. See id. at 43,496-99. For instance, EPA reasoned that it would be a waste of resources to regulate a biogenic carbon dioxide source that has a de minimis impact on the net carbon cycle. See id. at 43,499.
The Deferral Rule exempts from regulation biogenic carbon dioxide sources that trigger the PSD and Title V permitting programs at Step Two of the Tailoring Rule. The rule accomplishes this by amending the regulatory definition of "greenhouse gases" to exclude biogenic carbon dioxide. Thus, biogenic carbon dioxide sources that have the potential to emit over the statutory thresholds, as modified by the Tailoring Rule, need not obtain a PSD or Title V permit. See id. at 43,493. The so-called "anyway" sources that obtained PSD and Title V permits during Step One of the Tailoring Rule, however, must still install BACT for their biogenic carbon dioxide emissions. See id. at 43,500-01.
The Deferral Rule contains a sunset provision: absent further agency action, on July 21, 2014, biogenic carbon dioxide will be regulated under the PSD and Title V programs, as modified by the Tailoring Rule. See id. at 43,490, 43,507. Although the Deferral Rule is a temporary regulation, it functions, in effect, as a permanent exemption from the PSD permitting requirement for any biogenic carbon dioxide source constructed during the three-year deferral period. See id. at 43,499. Exempted sources would have to obtain PSD permits only if they undertake a modification project after the deferral period ends. See id. The Deferral Rule is also voluntary. "Each state may decide if it wishes to adopt the deferral and proceed accordingly." Id. at 43,502. At least one State, Massachusetts, is currently regulating biogenic carbon dioxide sources at Step Two of the Tailoring Rule. See Oral Arg. Tr. 3-4.
Before considering the merits of petitioners' challenge, we must determine whether this case is ripe for review. See In re Aiken County, 645 F.3d 428, 434 (D.C.Cir.2011) (explaining that the "ripeness doctrine, even in its prudential aspect, is a threshold inquiry"). Under the prudential ripeness doctrine, invoked by our dissenting colleague, see dissenting op. at 419-20, courts look at two factors in deciding whether to stay their hand: the "fitness of the issues for judicial decision" and "the extent to which withholding a decision will cause hardship to the parties." American Petroleum Institute v. EPA, 683 F.3d 382, 387 (D.C.Cir.2012) (internal quotation marks omitted).
The Deferral Rule satisfies the first factor because it functions as an exemption from the PSD permit requirement for those sources constructed during the deferral period. See supra at 407; Oral Arg. Tr. 13 (EPA conceding that the Deferral Rule permanently exempts sources constructed between July 2011 and July 2014). To be sure, once the deferral period ends, these sources' "biogenic CO2 emissions would have to be appropriately considered in any applicability determinations ... conduct[ed] for future stationary source permitting purposes." Deferral Rule, 76 Fed.Reg. at 43,499 (emphasis added). But under the PSD program, a source would be required to obtain a permit only for "a major modification determination." Id. Given this, the question before us is whether EPA may exempt certain biogenic carbon dioxide sources — not just the air pollutant itself — from the PSD program. This is the type of "purely legal" and "sufficiently final" issue that is "fit[] ... for judicial decision" and can be resolved without resort to the prudential ripeness doctrine. American Petroleum Institute, 683 F.3d at 387 (internal quotation marks omitted).
Regarding the second factor, the parties will suffer hardship if we decline to decide this issue. We know from oral argument that a biogenic carbon dioxide source in Allendale, South Carolina, has been constructed without a PSD permit, meaning that it has emitted more pollution than it otherwise would have but for the Deferral Rule. See Oral Arg. Tr. 5-6, 10. There may well be other such sources. Our dissenting colleague principally relies on a March 2012 declaration for the proposition that the number of sources impacted by the Deferral Rule is negligible. But we have no idea how many biogenic carbon dioxide sources have been constructed since March 2012, nor do we have any basis for predicting how many biogenic carbon dioxide sources will be constructed during the next year. Because the Deferral Rule authorizes certain sources to emit more pollutants than they would otherwise be allowed to under the Tailoring Rule, this dispute is ripe for review.
Petitioners argue that the Deferral Rule violates the Clean Air Act's plain language. They rely on the statute's definition
We can easily reject EPA's use of the de minimis doctrine, which allows agencies to grant regulatory "exemption[s] when the burdens of regulation yield a gain of trivial or no value." Alabama Power Co. v. Costle, 636 F.2d 323, 360-61 (D.C.Cir.1979). In the Deferral Rule, EPA stated that it had authority to exempt biogenic carbon dioxide sources that have "a negligible or positive impact on the carbon cycle and net atmospheric CO2 levels." Deferral Rule, 76 Fed.Reg. at 43,499. In its appellate brief, however, EPA expressly disavows this doctrine, explaining that the Deferral Rule has a three-year sunset provision whereas the de minimis doctrine "is used to establish permanent exemptions." Respondent's Br. 35. Given this concession, the Deferral Rule cannot be sustained under the de minimis doctrine.
The one-step-at-a-time doctrine, which EPA does defend, authorizes agencies to promulgate regulations in a piecemeal fashion. EPA explains that it is proceeding one-step-at-a-time — that is, postponing regulation of biogenic carbon dioxide for three years-in order to give it time to study the science underlying these sources and determine its precise regulatory approach. See Deferral Rule, 76 Fed.Reg. at 43,497 ("EPA has ... deferr[ed] the applicability of PSD and Title V to biogenic emissions of CO2 from stationary sources for only as long as necessary for EPA to complete the needed scientific study of these emissions, develop an accounting framework, and as appropriate conduct rulemaking specific to the unique nature and characteristics of these emission sources."). According to petitioners, however, federal agencies have no authority to invoke the one-step-at-a-time doctrine "to diverge from [a] clear statutory mandate," and here, they argue, the Clean Air Act unambiguously requires regulation of all carbon dioxide from whatever source. Petitioners' Br. 56. But we need not decide whether the one-step-at-a-time doctrine can justify an agency's non-compliance with a clear statutory mandate or whether the Clean Air Act unambiguously requires the regulation of all carbon dioxide from whatever source because, as we shall explain, EPA's invocation of the one-step-at-a-time doctrine was arbitrary and capricious.
The one-step-at-a-time doctrine rests on the notion that "[s]ince agencies have great discretion to treat a problem partially, we [sh]ould not strike down [a regulation] if it [is] a first step toward a complete solution." City of Las Vegas v. Lujan, 891 F.2d 927, 935 (D.C.Cir.1989). Eschewing a precise doctrinal test for invoking the doctrine, we have remarked that the one-step-at-a-time inquiry "is in essence a pragmatic one." National Association of Broadcasters v. FCC, 740 F.2d 1190, 1210 (D.C.Cir.1984). We have observed that incremental regulation is especially appropriate in response to evolving economic and technological conditions. See id. at 1210-11. We have also imposed outer limits on the one-step-at-a-time doctrine: "it would be arbitrary and capricious for an agency simply to thumb its nose at Congress and say — without any explanation — that it simply does not intend to achieve a congressional goal on any timetable at all." Grand Canyon Air Tour Coalition, 154 F.3d at 477. Although the "circumstances under which [an] agency may defer [regulation] ... are [in]capable of being captured in a single doctrine," National Association of Broadcasters, 740 F.2d at 1210, an agency invoking the one-step-at-a-time doctrine must, at a minimum, articulate (1) what it believes the statute requires and (2) how it intends to achieve that goal. Otherwise, reviewing courts will have no basis for evaluating whether the agency is in fact taking "a first step toward a complete solution." City of Las Vegas, 891 F.2d at 935. EPA itself put it well: "Courts will accept an initial step towards full compliance with a statutory mandate, as long as the agency is headed towards full compliance." Deferral Rule, 76 Fed.Reg. at 43,498.
In this case, however, EPA failed to explain in the Deferral Rule what "full compliance" with the "statutory mandate" means. Specifically, although the Deferral Rule spends pages explaining the scientific uncertainty about biogenic carbon dioxide sources, the additional research EPA plans to undertake, and why three more years of study are warranted, the rule — as opposed to EPA's brief here — nowhere offers an interpretation of the Clean Air Act that would allow the agency to treat biogenic carbon dioxide sources differently. This deficiency is not merely the result of scientific uncertainty. For example, this would be a very different case had the Deferral Rule interpreted the Clean Air Act as requiring permits only for biogenic carbon dioxide sources with an adverse impact on the net carbon cycle and explained that the agency had deferred regulation due to scientific uncertainty over which sources meet that standard. Under those circumstances, we could have determined whether EPA had correctly interpreted the statute and properly invoked the one-step-at-a-time doctrine. Here, by contrast, we simply have no idea what EPA believes constitutes "full compliance" with the statute. In other words, the Deferral Rule is one step towards ... what? Without a clear answer to that question, EPA has no basis for invoking the one-step-at-a-time doctrine.
EPA next invokes the administrative necessity doctrine, which permits an agency to "avoid implementing a statute... by showing that attainment of the statutory objectives is impossible." Sierra Club v. EPA, 719 F.2d 436, 463 (D.C.Cir. 1983). Under this doctrine, the agency must also adopt the narrowest feasible exemption. See id. (criticizing the agency
Emphasizing both the possibility that biogenic carbon dioxide sources might have a negligible impact on the net carbon cycle and the "extensive workload of processing permit applications," EPA found that requiring permits for these sources "would frustrate the goals ... sought to [be] accomplish[ed] in the Tailoring Rule." Deferral Rule, 76 Fed.Reg. at 43,496. In doing so, EPA rejected a proposed middle-ground option: requiring biogenic carbon dioxide sources to obtain permits but only if they fail to make "any effort to take into account net carbon cycle impacts." Id. Under this approach, all biogenic carbon dioxide sources that would have triggered the modified statutory thresholds would have had to take some steps to reduce their emissions, either voluntarily to avoid the PSD permit requirement or by installing BACT as a condition of obtaining a permit. EPA rejected this approach because it "could result in regulation of sources with trivial or positive impacts on the net carbon cycle." Id.
Without deciding whether the middle-ground option could pass muster under the statute, we agree with petitioners that EPA's rejection of that option was arbitrary and capricious. EPA has conceded "the possibility ... that more detailed examination of the science of biogenic CO2 will demonstrate that ... some biogenic feedstocks ... have a significant impact on the net carbon cycle." Id. at 43,498 (emphasis added). As to these sources, the middle-ground option would have had the practical effect of reducing their emissions; by contrast, the Deferral Rule, which functions as a permanent exemption, does not. EPA's reason for rejecting the middle-ground option — that it would regulate biogenic sources with a trivial impact — though perhaps accurate, is thus non-responsive. Given EPA's obligation to adopt the narrowest exemption possible, it should have explained why it rejected an option that would have reduced emissions from sources the Deferral Rule permanently exempts. See Sierra Club, 719 F.2d at 464 (remanding regulation because there was "no evidence that EPA ha[d] adequately explored ... regulatory alternatives").
This omission is especially troublesome because EPA has demonstrated that, notwithstanding the scientific uncertainty about measuring biogenic carbon dioxide emissions at the PSD applicability stage, the unique characteristics of these sources can be factored in at the BACT stage. The Deferral Rule still requires "anyway" sources that obtained PSD permits under Step One of the Tailoring Rule to regulate biogenic carbon dioxide emissions. To assist those sources and permitting authorities in developing BACT standards, EPA issued a detailed thirty-three page report on biogenic carbon dioxide. Presumably, permitting authorities are able to handle the scientific complexity of regulating biogenic carbon dioxide as to these "anyway" sources. Furthermore, since the Deferral Rule is voluntary, States may regulate biogenic carbon dioxide sources under Step Two of the Tailoring Rule. Indeed, Massachusetts is currently doing just that.
Finally, for the first time in its brief, EPA relies on the absurd results doctrine, which embodies "the long-standing rule that a statute should not be construed to produce an absurd result." Mova Pharmaceutical Corp. v. Shalala, 140 F.3d 1060, 1068 (D.C.Cir.1998). As EPA sees it, because "emissions of CO2 derived from certain forms of biomass may not only fail to endanger public health and welfare, but in fact may benefit the public by reducing the net emissions of CO2," Respondent's Br. 59, it would run
Because the Deferral Rule cannot be justified under any of the administrative law doctrines relied on by EPA, this opinion, contrary to our dissenting colleague's suggestion, see dissenting op. at 419, leaves for another day the question whether the agency has authority under the Clean Air Act to permanently exempt biogenic carbon dioxide sources from the PSD permitting program. If and when EPA adopts a permanent exemption for some or all biogenic carbon dioxide sources, we will have the benefit of three years of scientific study, as well as fully briefed and contextualized arguments about EPA's authority under the Clean Air Act.
For the foregoing reasons, we grant the petitions for review and vacate the Deferral Rule.
So ordered.
KAVANAUGH, Circuit Judge, concurring:
Under this Court's recent precedent in Coalition for Responsible Regulation, Inc. v. EPA, this should be an easy case. The primary question presented is whether EPA has statutory authority to issue the Deferral Rule and thereby temporarily exempt biogenic carbon dioxide from the PSD and Title V permitting programs. In my view, the answer is no. This Court has ruled that the statute requires pre-construction and operating permits for stationary sources that emit or have the potential to emit certain specified amounts of an air pollutant, including carbon dioxide. There is zero basis in the text of the Clean Air Act for EPA to distinguish biogenic carbon dioxide from other sources of carbon dioxide that EPA is required (under our precedent) to regulate for purposes of the PSD and Title V permitting programs. See Coalition for Responsible Regulation, Inc. v. EPA, 684 F.3d 102, 132-44 (D.C.Cir.2012).
EPA cites three administrative law doctrines that, according to EPA, give it authority to grant the temporary exemption. But in addition to the reasons given in Judge Tatel's opinion for the Court, which I join in full, I would say that none of those doctrines applies in this case for an even more fundamental reason: The doctrines do not trump the fact that EPA simply lacks statutory authority to distinguish biogenic carbon dioxide from other forms of carbon dioxide for purposes of the PSD and Title V permitting programs.
First, EPA relies on the one-step-at-a-time doctrine, which allows an agency to take incremental steps toward achieving a statutory mandate if taking incremental steps is consistent with the statutory text. See Grand Canyon Air Tour Coalition v. FAA, 154 F.3d 455, 477-78 (D.C.Cir.1998) (rule not arbitrary and capricious because it would achieve statutory mandate in conjunction with other proposed rules within a reasonable timeframe). An agency typically invokes that doctrine in response to a claim that an agency is exercising its statutory discretion in an arbitrary and capricious manner.
But EPA has no such statutory discretion here. Under the statute as this Court has interpreted it, EPA must regulate carbon dioxide under the PSD and Title V permitting programs. Coalition for Responsible Regulation, 684 F.3d at 144 (Clean Air Act "requires PSD and Title V permits for major emitters of greenhouse gases"). And there is no basis in the statute for distinguishing biogenic carbon dioxide from other forms of carbon dioxide.
Second, EPA cites the administrative necessity doctrine, which can excuse agency non-compliance with a statute if the agency lacks sufficient funds or resources. See Alabama Power Co. v. Costle, 636 F.2d 323, 359 (D.C.Cir.1979) (shortage of funds, of "time, or of the technical personnel needed to administer a program" grants agency authority "to cope with the administrative impossibility of applying the commands of the substantive statute"). But EPA has the funds and resources to apply the PSD and Title V programs to biogenic carbon dioxide. Indeed, in the Deferral Rule, EPA acknowledged that it has the resources to "apply PSD and Title V to all facilities with biogenic CO2 emissions that emit at or above the Tailoring Rule thresholds." 76 Fed.Reg. 43,490, 43,496 (July 20, 2011).
EPA decided against that option, however, because EPA thought it might be bad policy. Specifically, EPA said that "it is conceivable that as a result of the scientific examination of biogenic CO2 emissions, [EPA] could conclude that the net carbon cycle impact for some biomass feedstocks is trivial, negative, or positive." Id. EPA reached that conclusion because it thinks that regrowth of plant life — and the resulting
Relatedly, EPA suggests that it has appropriately balanced the costs and benefits of regulating biogenic carbon dioxide under the PSD and Title V programs. But EPA is not permitted to substitute its view of the costs and benefits of regulation for Congress's view of the costs and benefits of regulation. See Sierra Club v. EPA, 719 F.2d 436, 462 (D.C.Cir.1983) (EPA not permitted to create exemption "based upon its perceptions of the costs and benefits of enforcing the law"); Alabama Power Co., 636 F.2d at 357 ("[T]here exists no general administrative power to create exemptions to statutory requirements based upon the agency's perceptions of costs and benefits."). Allowing an agency to substitute its own policy choices for Congress's policy choices in this manner would undermine core separation of powers principles. The Constitution gives Congress the legislative power to set policy in the first instance, and agencies then must act within those statutory boundaries — even if the agency believes it possesses expertise or policy views superior to Congress's. See Federal Power Commission v. Texaco, 417 U.S. 380, 400, 94 S.Ct. 2315, 41 L.Ed.2d 141 (1974) (agencies cannot use administrative necessity "to overturn congressional assumptions embedded into the framework of regulation" by Congress); Natural Resources Defense Council, Inc. v. Costle, 568 F.2d 1369, 1377 (D.C.Cir.1977) (doctrine not a "revisory power" granting agency authority to act "inconsistent with the clear intent of the relevant statute").
Third, EPA has also invoked the absurd results doctrine. The crux of EPA's position is that it would be absurd to interpret the Clean Air Act in a way that would require EPA to regulate biogenic carbon dioxide. But with EPA having already applied the PSD and Title V programs to carbon dioxide (and with this Court having agreed with that interpretation of the statute), there is certainly nothing absurd about applying those programs to biogenic carbon dioxide. It is hardly absurd for Congress to tackle the problem of emissions from the smokestack in the first instance. And the fact that an exemption for biogenic carbon dioxide would be better policy (in EPA's view) does not make it absurd to apply the statute to biogenic carbon dioxide. See Landstar Express America, Inc. v. Federal Maritime Commission, 569 F.3d 493, 498 (D.C.Cir.2009) ("A statutory outcome is absurd if it defies rationality."). If it would be better overall to exempt biogenic carbon dioxide from these permitting programs, EPA can always recommend that Congress do so.
In saying that, I do not want to diminish EPA's vital public objectives in addressing global warming. The task of dealing with global warming is urgent and important at the national and international level. My concern about EPA's approach does not stem from policy beliefs (courts don't have the authority or the expertise to assess policy well anyway) but rather from separation of powers principles.
But EPA's broad interpretation of the statute was upheld by this Court in Coalition for Responsible Regulation. Although I respectfully think the case was wrongly decided on this issue, that's water over the dam in this Court. We are bound to apply that precedent. Under that case's interpretation of the governing statute, EPA is required to regulate carbon dioxide under the PSD and Title V permitting programs. There is no statutory basis for exempting biogenic carbon dioxide.
KAREN LECRAFT HENDERSON, Circuit Judge, dissenting:
We must decide whether the Environmental Protection Agency (EPA) may temporarily defer regulation of biogenic carbon dioxide (CO2) emissions against a backdrop of uncertain but expanding scientific knowledge and rapid regulatory changes. Deferral for CO2 Emissions from Bioenergy, 76 Fed.Reg. 43,490 (July 20, 2011) (Deferral Rule). I believe EPA can — and should — defer regulation until it has the time it says it needs to study and resolve the issue it is charged with regulating.
The Deferral Rule delays for three years — from July 20, 2011 until July 21, 2014 — the EPA's factoring in of biogenic CO2 emissions "when determining whether a stationary source meets the" emissions thresholds for permitting under the Prevention of Significant Deterioration (PSD) and Title V permitting systems of the Clean Air Act (CAA), 42 U.S.C. §§ 7401 et seq. See Deferral Rule, 76 Fed.Reg. at 43,492. In so deferring, EPA has used, correctly, I believe, the long-recognized step-at-a-time regulatory procedure. This procedure recognizes the reality and complexity of administrative regulation. "In an ideal world ... agencies would act only after comprehensive consideration of how all available alternatives comported with a well-defined policy objective...." Nat'l Ass'n of Broadcasters v. FCC, 740 F.2d 1190, 1210 (D.C.Cir.1984). Nonetheless, "administrative action generally occurs against a shifting background in which facts, predictions, and policies are in flux and in which an agency would be paralyzed if all the necessary answers had to be in before any action at all could be taken." Id. Thus, "agencies have great discretion to treat a problem partially" and we will "not strike down [a regulation] if it [is] a first step toward a complete solution, even if we thought it `should'" have been finished. City of Las Vegas v. Lujan, 891 F.2d 927, 935 (D.C.Cir.1989). Moreover, "nothing in the [Administrative Procedure Act] precludes an agency from collecting data and monitoring real-world experience with regulatory standards before adopting new standards governing periods of time far into the future — especially in cases, as here, that involve unpredictable technological change. Indeed, gathering evidence before making a long-term decision is eminently sensible." Pub. Citizen, Inc. v. Nat'l Highway Traffic Safety Admin., 374 F.3d 1251, 1263 (D.C.Cir.2004); see also id. at 1262-63 (agency's temporarily declining to make crash test requirements stricter was not arbitrary and capricious because it "offered rational reasons for adopting an `interim final rule' establishing the unbelted crash test speed through August 2006 only" while it undertook "multi-year effort to obtain additional data").
The Deferral Rule must be read in light of the fact that EPA did not regulate greenhouse gases (GHGs) under the CAA at all until the end of 2009, see Endangerment and Cause or Contribute Findings for Greenhouse Gases, 74 Fed.Reg. 66,496 (Dec. 15, 2009), and did not regulate them under PSD and Title V until 2011, see Prevention of Significant Deterioration and Title V Greenhouse Gas Tailoring Rule, 75 Fed.Reg. 31,514, 31,521 (June 3, 2010) (Tailoring Rule). By postponing regulation of biogenic CO2 emissions under PSD and Title V, the Deferral Rule simply keeps in place the pre-2011 status quo. The question, then, is whether the petitioners can compel EPA to act before July 21, 2014.
EPA has reasonably attempted to balance its acknowledged CAA duty to regulate GHGs with the reality that both EPA itself as well as other permitting authorities have limited resources and experience in this area. The Tailoring Rule, which EPA promulgated in 2010, created a phase-in process whereby, at first, only the largest GHG emitters would be subject to PSD and Title V on the basis of GHG emissions. Tailoring Rule, 75 Fed.Reg. at 31,516. The phase-in was necessary both to alleviate high costs to permitting authorities, id. at 31,533, and to give EPA time to decide how to permanently implement GHG regulation, id. at 31,526. EPA promulgated the Deferral Rule because of similar cost and scientific uncertainty. Specifically, EPA did not know in 2011 which, if any, biofuel feedstocks cause a net increase in atmospheric CO2 levels when used as fuel for a stationary source. Deferral Rule, 76 Fed.Reg. at 43,492. EPA was concerned that, if it regulated all sources' biogenic CO2 emissions without taking net increase vel non into account, its regulation of the sources could result in high cost but negligible benefit.
My colleagues attack the Deferral Rule because it "nowhere offers an interpretation of the Clean Air Act that would allow the agency to treat biogenic carbon dioxide sources differently." Maj. Op. 409-10. But EPA is not permanently treating biogenic CO2 emissions differently. As the Deferral Rule explains, EPA believes, based on the evidence currently in its possession, that further study may support a decision to give special treatment to some biogenic emissions. Deferral Rule, 76 Fed.Reg. 43,496; see also id. at 43,499 ("EPA believes based on information currently before the Agency that at least some biomass feedstocks ... have a negligible impact on the net carbon cycle, or possibly even a positive net effect."). If further study does not bear this out, EPA has implicitly acknowledged that it will treat biogenic CO2 emissions as it does other CO2 emissions. Cf. id. at 43,498 ("[EPA] will be using the three-year deferral period to better understand the science associated with biogenic CO2 emissions and to explore whether or not a Permanent exemption is permissible...." (emphasis added)).
The necessary implication of the majority opinion is that, no matter the results of EPA's study, EPA lacks authority to treat biogenic CO2 emissions differently from other emissions. The CAA defines a major emitting source (i.e., a source subject to PSD and Title V permitting requirements) as a source that "emit[s] or [has] the potential to emit" above-threshold amounts of a regulated pollutant "from" the source. 42 U.S.C. § 7479(1). The petitioners believe, and my colleagues apparently agree, this language precludes EPA from considering "off-site" factors, such as the carbon cycle of the biomass used as a source's fuel, in determining whether the source is subject to PSD. But the language has not precluded EPA from recognizing de minimis exceptions from the statute. Under the de minimis doctrine, "[c]ourts should be reluctant to apply the literal terms of a statute to mandate pointless expenditures of effort." Ala. Power, 636 F.2d at 360. Unless the Congress has been "extraordinarily rigid," we will uphold an exemption from the statute's literal terms "when the burdens of regulation
In sum, EPA's decision to stop and think before regulating in a complex — and changing — area is eminently reasonable.
Alternatively, under the prudential ripeness doctrine, I believe we should not have reached the merits of this case. The ripeness doctrine prevents the court from prematurely adjudicating a dispute. Abbott Labs. v. Gardner, 387 U.S. 136, 148-49, 87 S.Ct. 1507, 18 L.Ed.2d 681 (1967). The doctrine comes "from Article III limitations on judicial power and from prudential reasons for refusing to exercise jurisdiction." Reno v. Catholic Soc. Servs., Inc., 509 U.S. 43, 57 n. 18, 113 S.Ct. 2485, 125 L.Ed.2d 38 (1993). "The ripeness doctrine, even in its prudential aspect, is a threshold inquiry...." In re Aiken Cnty., 645 F.3d 428, 434 (D.C.Cir.2011). The court stays its hand so the "administrative process [can] run its course before binding parties to a judicial decision." Am. Petroleum Inst. v. EPA, 683 F.3d 382, 386 (D.C.Cir. 2012) (challenge to EPA rule continuing to regulate certain materials held unripe because EPA subsequently issued NPRM significantly changing regulatory scheme). This doctrine gives "the challenging party [time] to convince the agency to alter a tentative position," "provides the agency an opportunity to correct its own mistakes and to apply its expertise," narrows the legal and factual issues at play and "comports with our theoretical role as the governmental branch of last resort." Id. at 386-87 (quotation marks omitted). It thus "ensures that Article III courts make decisions only when they have to, and then, only once." Id. at 387.
We consider two factors in assessing prudential ripeness: (1) the "fitness of the issues for judicial decision" and (2) "the
The first factor — fitness — is "meant to protect the agency's interest in crystallizing its policy before that policy is subjected to judicial review and the court's interests in avoiding unnecessary adjudication and in deciding issues in a concrete setting." Id. (quotation marks omitted). We must consider, inter alia, "whether [the issue] is purely legal, whether consideration of the issue would benefit from a more concrete setting, and whether the agency's action is sufficiently final." Id. (quotation marks omitted). An issue is particularly unfit for review if, by staying our hand temporarily, we need never address it. See Nat'l Treasury Emps. Union v. United States, 101 F.3d 1423, 1431 (D.C.Cir.1996). We
Am. Petroleum Inst., 683 F.3d at 387 (quoting Pub. Citizen Health Research Grp. v. Comm'r, FDA, 740 F.2d 21, 31 (D.C.Cir.1984)).
The Deferral Rule — a temporary rule that expires or will be replaced by July 21, 2014 — is not fit for review. First, by staying our hand, we would give the petitioners an opportunity to convince EPA to promulgate a rule more to their liking. If EPA promulgated such a rule, or simply allowed the Deferral Rule to expire on July 21, 2014, the petitioners' challenge could be resolved. See also Tex. Indep. Producers & Royalty Owners Ass'n v. EPA, 413 F.3d 479, 483 (5th Cir.2005) (EPA decision to defer permit requirements for certain oil and gas construction sites unripe because "[g]iven that EPA has specifically stated its intent to examine, during the Deferral Period, the issue of how best to resolve questions ... regarding section 402(l)(2) of the Clean Water Act, any interpretation we would provide would necessarily prematurely cut off EPA's interpretive process" (quotation marks omitted)).
Second, even assuming EPA issues a superseding rule to which the petitioners object, the Deferral Rule will crystallize the issues raised by their challenge. See, e.g., Am. Petroleum Inst., 683 F.3d at 388 ("In the ongoing rulemaking, EPA could change its mind and keep the transfer-based exclusion, in which case the issue goes away; or, if EPA stays the course and abolishes the transfer-based exclusion, the dispute will become concrete and straightforward."); Nat'l Treasury, 101 F.3d at 1431 ("[W]hile the broad legal theory advanced by appellants may be as complete as it ever will, the facts upon which its resolution may depend are not `fully crystallized'...."). The current dispute is whether EPA may postpone regulatory action based on insufficient information. If EPA promulgated a superseding rule exempting biogenic CO2 from regulation, the dispute would be whether EPA may promulgate a permanent (or at least more crystallized) exemption. See Deferral Rule, 76 Fed.Reg. at 43,492-93; see also Am. Petroleum Inst., 683 F.3d at 387 (finding lack of ripeness when "EPA responds that the pyrophoric properties of
To be sure, "an agency can[not] stave off judicial review of a challenged rule simply by initiating a new proposed rulemaking that would amend the rule in a significant way." Am. Petroleum Inst., 683 F.3d at 388. While EPA has not yet proposed a final rule, it has also not engaged in a "thinly veiled attempt to evade review," id., but instead committed itself to act by a date certain — July 21, 2014. See Oral Arg. Tr. 28-29 (Apr. 8, 2013) (EPA's Science Advisory Board has issued final report now being analyzed); see also Wheaton Coll. v. Sebelius, 703 F.3d 551, 552 (D.C.Cir.2012) ("We take the government at its word and will hold it to it.").
For the foregoing reasons, I believe the Deferral Rule is not fit for review at this time.
"To outweigh the[ ] institutional interests in the deferral of review, any hardship caused by that deferral must be immediate and significant. Considerations of hardship that might result from delaying review will rarely overcome the ... fitness problems inherent in attempts to review tentative positions." Am. Petroleum Inst., 683 F.3d at 389 (emphases added) (quotation marks omitted).
The petitioners argue, and my colleagues agree, Maj. Op. 407-08, that the hardship caused by the Deferral Rule is especially serious because the Deferral Rule could result in a "permanent" exemption from PSD permitting. Specifically, a stationary source constructed during the deferral period without obtaining a PSD permit (because of its temporary biogenic CO2 exemption) could, in theory, escape permitting forever because a PSD permit would then be required only if the source is modified. See 42 U.S.C. § 7475(a). It is possible, then, that even if EPA decides to regulate biogenic CO2 emissions like all other CO2 emissions, a source constructed during the deferral period would never need to obtain a PSD permit if it remains unmodified.
The Deferral Rule does not open the floodgates as the petitioners and my colleagues fear. It allows a source to avoid PSD permitting only if (1) it has the potential to emit CO2 as a result of biogenic emissions; (2) its potential to emit biogenic CO2 exceeds Tailoring Rule thresholds; (3) it is not otherwise subject to PSD permitting based on its potential to emit other pollutants or non-biogenic CO2 emissions; and (4) it is able to obtain a minor source (non-PSD) permit and commence construction
To sum up, not only is this case unfit for review but the hardship of which the petitioners complain is hyperbolically overblown. The Deferral Rule does not deregulate scores of polluters.