SCHALL, Circuit Judge.
This is the second time this case has been before us. In Otay Mesa Property, L.P. v. United States, 670 F.3d 1358 (Fed. Cir.2012) ("Otay Mesa I"), we held that the United States was liable to plaintiffs Otay Mesa Property, L.P., Rancho Vista Del Mar, Otay International, LLC, OMC Property, LLC, D & D Landholdings, LP, and International Industrial Park, Inc. (collectively, "Otay Mesa") for the taking of property owned by them.
On remand, the Court of Federal Claims held (1) that Otay Mesa was entitled to no damages for the taking of an easement over land that could be developed for industrial use ("the development property"); (2) that it was entitled to damages in the amount of $455,520 for the taking of an easement over land that could be used for environmental mitigation purposes ("the mitigation property"); and (3) that interest on the $455,520 damages award should run from August 28, 2008, the date the court found Otay Mesa became aware of the taking as a result of the filing of a stipulation of liability by the government. Otay Mesa Prop., L.P. v. United States, 110 Fed.Cl. 732, 743-47 (2013) ("Otay Mesa II") (interest on the damages award was initially deemed to run from October 16, 2008, but the date was adjusted following a motion for reconsideration, 111 Fed.Cl. 422, 424 (2013) ("Reconsideration Decision")).
Otay Mesa appeals the decision of the Court of Federal Claims denying damages for the taking of an easement over the development property. It also appeals the decision of the court to compute interest on the $455,520 damages award from August 28, 2008, rather than from the dates sensors were first installed on the parcels containing the mitigation property, as stated in the government's stipulation of liability. For its part, the government cross-appeals the damages award for the taking of an easement over the mitigation property.
For the reasons set forth below, we affirm the decision of the Court of Federal
The facts of the case are set forth in Otay Mesa I and in the several decisions of the Court of Federal Claims. We recite here the facts pertinent to the issues now before us.
Otay Mesa owns eleven contiguous parcels of largely undeveloped land adjacent to the Mexican border in the Otay Mesa area of San Diego County. Otay Mesa I, 670 F.3d at 1360. Five of those parcels, Nos. 1, 3, 4, 5, and 10, are at issue in this case. Beginning in April 1999 and continuing through November 2005, the Border Patrol placed a total of fourteen motion sensors on those parcels in order to detect illegal immigrants entering the United States from Mexico. The motion sensors are approximately one cubic foot in size and are buried underground, except for a one foot antenna that remains above the surface of the soil. Joint Appendix ("J.A.") 1792 at ¶ 3; see also Otay Mesa II, 110 Fed.Cl. at 734.
In 2006, Otay Mesa filed suit in the Court of Federal Claims alleging, inter alia, that the installation of the sensors constituted a taking of Otay Mesa's property, entitling it to "just compensation" under the Fifth Amendment's Takings Clause. Otay Mesa Prop., L.P. v. United States, 86 Fed.Cl. 774, 775 (2009) ("Liability Decision").
J.A. 1794 at ¶ 7; see also Otay Mesa I, 670 F.3d at 1361-62.
Based on the government's stipulation, the Court of Federal Claims held that the government was liable for the physical taking of a temporary easement over the five parcels for the purpose of installing and operating the sensors. The court reserved the determination of damages for subsequent proceedings. Otay Mesa I, 670 F.3d at 1362. Following a trial on damages, the court determined that Otay Mesa was entitled to compensation in the amount of $3,043,051, plus interest for the taking of the easement. Id.
The government appealed the decision of the Court of Federal Claims. According to the government, the trial court incorrectly ruled that the taking of the easement was temporary rather than permanent. That ruling, the government contended, led the court to use the fair market rental value method of determining compensation, rather than the before-and-after method, which resulted in an erroneous calculation of Otay Mesa's damages.
In Otay Mesa I, we held that the Border Patrol's blanket easement to install, maintain, and service sensors on Otay Mesa's property constituted a permanent physical taking. Id. at 1365. We thus remanded the case to the Court of Federal Claims for a redetermination of damages. We stated that, "[o]n remand, the court should determine damages based upon the Border Patrol having taken a permanent blanket easement over Otay Mesa's property, as set forth in the stipulation." Id. at 1368. We agreed with the government that the Court of Federal Claims erred in ruling that the Border Patrol had temporarily taken Otay Mesa's property. We did not, however, endorse the government's view that Otay Mesa's damages should be determined based upon a before-and-after methodology. Id. at 1369. Rather, we stated:
Id.
We thus instructed that, on remand, the Court of Federal Claims "will have discretion
Turning to Otay Mesa's cross-appeal, we concluded that the Court of Federal Claims had not clearly erred when it limited the scope of the taking to the parcels of land and the period of time identified in the government's stipulation. Id. at 1370. Accordingly, we affirmed-in-part and vacated-in-part the decision of the Court of Federal Claims. We remanded the case to the court for further proceedings consistent with our opinion. Id.
On remand, the Court of Federal Claims approached the damages issue by considering the two types of land that make up parcels 1, 3, 4, 5, and 10. The court determined, and the parties generally agree, that of the 897 acres of land at issue, approximately 278 acres are suitable for development (the development property), while approximately 619 acres are suitable for environmental mitigation purposes (the mitigation property).
The Court of Federal Claims determined, however, that Otay Mesa was entitled to $455,520 in damages for the taking of an easement over the mitigation property. This figure represented five percent of the $9,110,400 fair market value appraisal for the mitigation property. Id. at 747. Faced, on the one hand, with Otay Mesa's argument that the placement of the sensors on the mitigation property had reduced the value of the property by forty percent, and on the other, by the government's contention that the sensor placement had not had any effect on the value of the property, the court stated:
Id. at 746-47.
In its decision, the Court of Federal Claims awarded Otay Mesa interest from October 16, 2008, "the date," the court stated, "on which [Otay Mesa] became aware of the taking through the Government's filing of the stipulation." Id. at 747. Otay Mesa moved for reconsideration on the issue of interest. It argued that interest should run from April 1999, when the first sensor was installed on its property, not from the date when the government filed its stipulation of liability in 2008, which, in any event, was August 28, 2008, not October 16, 2008. The court granted the motion for the limited purpose of setting August 28, 2008, as the starting date for the computation of interest. Reconsideration Decision, 111 Fed.Cl. at 424. In all other respects it denied it. The court acknowledged "the existence of ample case law holding that interest in a Fifth Amendment taking should run from the date of the taking." Id. at 423. It determined, though, that that proposition did not apply in this case. The court pointed out that, in arriving at its $455,520 damages award, it had ascribed a value (five percent) to the risk Otay Mesa assumed in having its property subjected to the government's easement. Pointing to August 28, 2008, the court stated that, before that date, "only the Government knew that the sensors were in use on Otay Mesa's property." Id. at 424. The court reasoned, "[i]f no person or entity outside of the Government was aware of the sensors until the disclosure date in 2008, the risk on which the Court's damages award is based did not exist until 2008." Id.
On July 22, 2013, the Court of Federal Claims entered judgment awarding Otay Mesa damages in the amount of $455,520, with interest computed on that amount from August 28, 2008. Otay Mesa's current appeal and the government's cross-appeal followed. We have jurisdiction pursuant to 28 U.S.C. § 1295(a)(3).
Following a damages trial, we review the Court of Federal Claims' legal conclusions de novo and its factual findings for clear error. Ind. Mich. Power Co. v. United States, 422 F.3d 1369, 1373 (Fed. Cir.2005); Am. Pelagic Fishing Co. v. United States, 379 F.3d 1363, 1371 (Fed. Cir.2004). "A finding is `clearly erroneous' when although there is evidence to support it, the reviewing court on the entire evidence is left with the definite and firm conviction that a mistake has been committed." Renda Marine, Inc. v. United States, 509 F.3d 1372, 1378 (Fed.Cir.2007) (quoting United States v. U.S. Gypsum Co., 333 U.S. 364, 395, 68 S.Ct. 525, 92 L.Ed. 746 (1948)).
As noted above, Otay Mesa appeals the denial of damages for the taking of an easement over the development property. The government cross-appeals the award of damages for the taking of an easement over the mitigation property. And Otay Mesa appeals the court's decision not to award interest from the date sensors were first installed on the parcels containing mitigation property.
The Court of Federal Claims found that the "Border Patrol's sensor easement would have no material effect on the developable land" and denied damages for the government's easement over that portion of Otay Mesa's property. Otay Mesa II, 110 F.3d at 734. While Otay Mesa's expert witness testified that the easement caused a ten percent diminution in the value of the development property, the court found much of that evidence to be "minimally persuasive," and instead credited the government's evidence to the contrary. After weighing the competing evidence, the court ultimately held that Otay Mesa "failed to prove actual damages with respect to a diminution in value of developable land." Id.
On appeal, Otay Mesa contends that it met its burden of showing a fair and reasonable approximation of damages as to the development property. See Ark. Game & Fish Comm'n v. United States, 736 F.3d 1364, 1379 (Fed.Cir.2013); Precision Pine & Timber Inc. v. United States, 596 F.3d 817, 833 (Fed.Cir.2010). It argues that all that was required to prove its damages case was "reasonable certainty," not absolute precision. Otay Mesa states that, in addition to its diminution in value theory, it presented evidence showing that other parties, such as utility companies and the Border Patrol itself, paid relatively large sums for easements over the development property in question and other nearby land owned by Otay Mesa. It points to testimony suggesting that the very existence of the easement could negatively affect the ability to receive project approvals. Otay Mesa argues that the court ignored much of this evidence and, thus, its decision to deny damages was clearly erroneous. It contends that the court's holding amounts to a conclusion that Otay Mesa would have conveyed the easement to the government for no consideration at all.
In response, the government contends that Otay Mesa's evidence was not ignored, but, rather, was considered and found to be insufficient, or was not probative of damages. The government points out that the Court of Federal Claims discounted Otay Mesa's expert witness's valuation as being premised on faulty assumptions. The government also states that evidence relating to prior easements over Otay Mesa's property was not presented during the remand trial and that, in any event, those easements were not probative of damages because they were not examples of the "minimally invasive" or "unilaterally terminable" easements at issue here. Unlike the prior easements, the government points out, the sensor easements require the Border Patrol to remove or redeploy the sensors upon thirty days written notice. The government reasons that, because Otay Mesa failed to provide reliable expert witness evidence or to produce any comparable easement sales, the court's decision to credit the government's valuation and to deny damages was not clearly erroneous.
We conclude that the Court of Federal Claims' decision to deny damages for the easement over 278 acres of development property was not clear error. As an initial matter, the fact that a taking occurred does not itself establish what compensation should be awarded. What is critical in the determination of just compensation is not the gain to the government from the taking, but the actual loss to the landowner. United States ex rel. Tenn. Valley Auth. v. Powelson, 319 U.S. 266,
During the trial on remand, Otay Mesa presented just one expert, Randy Tagg. Mr. Tagg, who is an appraiser, testified as to the damages resulting from the taking of an easement over the development property. Mr. Tagg's assertion that there was a ten percent diminution in the value of the development property was based on the prior testimony of a witness from the 2009 trial and on the results of a telephonic market survey. Otay Mesa II, 110 Fed. Cl. at 743. In weighting the credibility of Mr. Tagg's damages assessment, the Court of Federal Claims found that the prior testimony contained "pervasive generalities" and was based on the "mistaken assumption" that the easement does not limit the number of sensors. Id. The court also found that Mr. Tagg's telephonic market survey of land developers was "casual, undocumented, and narrow," consisting of only seven telephone calls and four responses. Id. at 744. Two of the responsive participants, the court noted, refused to provide any estimate of diminution of value, while the other two responses were "minimally persuasive," as they were also premised on the erroneous assumption that the easement does not limit the number of sensors allowed on the property. Id. Mr. Tagg, the court stated, "exchanged no written correspondence with these developers, and his work files [did] not contain any notes of his conversations with them." Id. at 739. It was the judgment of the court that, considering foundational flaws of Mr. Tagg's valuation, a "ten percent reduction in value [was] dubious." Id. at 744.
On the other hand, the Court of Federal Claims found the testimony of the government's expert witness — who testified that the easement would have no impact on the development property — to be "much more instructive." Id. The government's expert, Stephen Roach, an appraiser in San Diego, based his valuation on the wording of the easement itself. First, Mr. Roach concluded that the easement was limited to no more than fourteen sensors. Id. at 740. Second, he found that the language stating that, "should the landowner desire to develop any portion ..., the sensor will be removed or redeployed upon 30 days written notice that a grading permit has been issued by the County of San Diego" meant there could be no measurable effect on the suitability of the development property for future development. Id. That conclusion was buttressed by the prior testimony of Richard Shick, one of the government's experts from the 2009 trial. Mr. Shick, who is project manager for the County of San Diego Department of Public Works, was designated as the most knowledgeable in his department on the impact of easements on the process of receiving grading permits for the development of land. Id. His work responsibilities included issuing grading permits for development of land within the central and southern regions of San Diego County, where Otay Mesa's property lies. J.A. 889. His opinion in 2009 was that the easement would likely
We agree with the Court of Federal Claims that the government's position on the development property is much more persuasive than that of Otay Mesa. Otay Mesa presents no persuasive argument why, in view of the language of the stipulation, it was clear error for the court to credit the government's zero-damage valuation over its own clearly flawed ten-percent-diminution valuation. The Court of Federal Claims properly exercised its judgment in its role as the trier of fact by weighting the credibility of the respective witnesses and their before-and-after valuations of the land.
Otay Mesa's contention that the Court of Federal Claims ignored relevant evidence stems from its belief that the trial court was required to construct a damages valuation from evidence presented during the 2009 trial, despite such evidence never being formally presented during the remand trial. Although we believe the trial court was properly within its discretion in denying damages based on the evidence presented during the trial on remand, we nevertheless address Otay Mesa's argument.
Specifically, although Otay Mesa concedes that it was unable to find any "comparable" easements sales, it urges that the Court of Federal Claims should have used prior, tangentially-related easement sales to create its own valuation of the property. The prior easements identified by Otay Mesa are easements that it sold for underground pipelines for sewer, water, gas, and electricity; they also are easements for roads and overhead power lines. While those sales may show that substantial value has been paid for easements over the subject land, we are unpersuaded that the mere existence of easements that are neither "minimally invasive" nor "unilaterally terminable" provides a basis for determining that the Court of Federal Claims committed clear error in accepting the government's zero-damages valuation. Unassisted by expert reports or trial testimony on how those utility and road easements relate to the permanent sensor easements at issue here, the court was left to speculate as to how those easements would factor into a supposedly proper "just compensation" calculation. The court was not obligated to construct a damages award for Otay Mesa when it had substantial, credible evidence before it indicating that no actual loss was suffered. Vaizburd v. United States, 384 F.3d 1278, 1284-85 (Fed.Cir.2004) (rejecting the "proposition that a court may not adopt one party's credible appraisal over the other party's less credible appraisal" and holding that the taking "did not diminish the market value of the [landowner's] property").
In Precision Pine, we concluded that a trial court is not necessarily stuck with the "stark choice" of accepting or rejecting a party's valuation, but it did not foreclose that option. 596 F.3d at 832. "As the fact finder in the bench trial, the judge is responsible for deciding what evidence to credit or reject and what result to reach," which is precisely what the trial judge did here. Id. at 833. As we explained in Precision Pine, while we may know more on an appeal from a bench trial than from a jury trial as a result of a written opinion, it "does not alter th[e] judge's discretion to weigh evidence or our standard of review." Id. Similarly, in Yaist v. United States, the court noted that, where comparable sales data is lacking, it is permissible to fashion a damages award from "other evidence," so long as it is
Finally, Otay Mesa calls it a "paradox" and "irreconcilable" that, as a temporary easement, the encumbrance had substantial value, yet as a permanent easement it was denied damages. But as we explained in Otay Mesa I, the prior valuation was based exclusively on the rental value of the property for skydiving and parachute training. 670 F.3d at 1368. That rental market methodology was erroneous. Id. Indeed, we explicitly instructed the Court of Federal Claims on remand not to "overlook exactly what has been taken by the Border Patrol — a minimally invasive permanent easement to use undeveloped land that is unilaterally terminable by Otay Mesa." Id. We reminded the court that, "should Otay Mesa wish to develop any portion of the property, any affected sensor will be removed or redeployed upon 30 days written notice" of a grading permit issuance. Id. at 1369. And, we gave the court great leeway "to fashion an appropriate measure of compensation." Id. In our view, considering the whole record before the court, it was not clear error to accept the government's position and to deny damages for the development property.
Following the damages trial on remand, the Court of Federal Claims rejected the government's zero-percent diminution valuation of the mitigation property, as well as Otay Mesa's forty-percent-diminution valuation. Otay Mesa II, 110 Fed. Cl. at 746. The court then exercised its discretion in formulating a damages award that it believed accounted for the real, but minimal, risk that the property would be rejected for mitigation use due to the sensor easement over it. Id. at 747. It awarded $455,520 for the taking of a permanent easement over Otay Mesa's mitigation property — an award of five percent of the property's $9,110,400 fair market value. Id.
The government now cross-appeals that award. It argues that the damages award is based on clearly erroneous factual findings and that it is inconsistent with other conclusions in the Court of Federal Claims' damages decision. Specifically, the government contends that the court found that the easement would not affect the biological resources of the mitigation land. See id. at 745. In addition, it notes that the court found that, even after the sensors were placed on its property, Otay Mesa used portions of the property for mitigation purposes. Reconsideration Decision, 111 Fed.Cl. at 424. It further points out that evidence was presented during the 2009 trial indicating that the sensors would have no measurable impact on the use of Otay Mesa's land for mitigation purposes. Otay Mesa II, 110 Fed.Cl. at 737. The government, in other words, argues that there is no credible evidence from which the Court of Federal Claims could conclude that there was a five percent risk that the property would not be approved for mitigation use.
Otay Mesa responds that, even though the Court of Federal Claims arrived at a damages award that neither party suggested, it was well within its broad discretion to do so. It argues that the court had ample evidence from which it could conclude that Otay Mesa's land might not be approved for mitigation use. It contends that its appraiser, Mr. Tagg, as well as its
We conclude that the Court of Federal Claims properly exercised its discretion in shaping an award that accounted for the potential that the mitigation property might not be approved for mitigation use. As noted above, we explicitly instructed that "on remand the Court of Federal Claims will have discretion in identifying a methodology that fulfills the goal of awarding Otay Mesa just compensation." Otay Mesa I, 670 F.3d at 1369. During the damages trial on remand, the court was confronted with conflicting evidence and relatively extreme valuations for the mitigation property — proposals of zero percent or forty percent diminution in value. Recognizing that the "Plaintiffs undeniably face a risk that their environmentally sensitive property will not be approved for mitigation use," but that the risk was not "anywhere near the 40 percent [diminution in value] level advocated by Mr. Tagg," the court chose its own valuation that captured what it perceived as the risk of a "potential denial of a mitigation request." Otay Mesa II, 110 Fed.Cl. at 734, 746. It explained that, "[e]ven if this outcome never occurs, Plaintiffs' assumption of the risk should be ascribed some value." Id. at 746. It found that Otay Mesa would not have willingly assumed that risk for its mitigation property without some, albeit minimal, consideration. Id.
We detect nothing inappropriate with the Court of Federal Claims looking at the evidence as a whole and using its own methodology to calculate a damages award. Contrary to the government's assertion, the court's decision to ascribe its own valuation to the damages associated with the mitigation land is consistent with both our instruction on remand and our case law. In Precision Pine, discussed above, we made clear that a trial court need not accept either party's damages position. 596 F.3d at 832-33. We explained that it is both correct and important for a trial court to use its flexibility to tailor a fair and reasonable result based on the evidence it credits or rejects. Id.; see also Seravalli v. United States, 845 F.2d 1571, 1575 (Fed.Cir.1988) ("[Trial] courts necessarily must have considerable discretion to select the method of valuation that is most appropriate in the light of the facts of the particular case."). Here, where the parties took divergent and extreme positions, and the court believed that the landowner was in a worse position after the taking, the court had few options in determining a just compensation award other than creating its own valuation.
Last, we address Otay Mesa's appeal with respect to the date from which interest on its damages award should be calculated. Following the trial on remand, the Court of Federal Claims awarded compound interest from October 16, 2008, the date on which it believed Otay Mesa first became aware of the taking through the government's stipulation. Otay Mesa II, 110 Fed.Cl. at 747. On reconsideration, the trial court "acknowledge[d] the existence of ample case law holding that interest in a Fifth Amendment taking should run from the date of the taking," but declined to adjust the date beyond granting a change from October to August 2008, when the government's stipulation was first filed. Reconsideration Decision, 111 Fed. Cl. at 423. The court believed that "[i]f no person or entity outside of the Government was aware of the sensors until the disclosure date in 2008, the risk on which the Court's damages award is based did not exist until 2008." Id.
On appeal, Otay Mesa argues that the case law is unequivocal that interest must be calculated from the date of the taking. And it argues that the date of the taking cannot be disputed, as the government expressly listed the dates that each sensor was first installed on the subject property in its 2008 stipulation. In response, the government defends the Court of Federal Claims' decision. It does so, not by arguing that the case law allows for interest to be computed from some other point in time other than the date of the taking, but, rather, by contending that, since no damage occurred before 2008, the court essentially applied an interest rate on zero damages from the date of the taking until the date of the government's stipulation. It argues that before the stipulation Otay Mesa did not know about the sensors and therefore could not have suffered any damages on which interest could be compounded. Awarding Otay Mesa interest from a date prior to the 2008 stipulation, the government contends, would place it in a better position than if the taking had never occurred.
We hold, as a matter of law, that interest on Otay Mesa's damages award must be calculated from the date sensors first encumbered Otay Mesa's property. The Supreme Court has long held that "just compensation" includes interest compounded from the date of a taking when payment for the taking does not coincide with the taking itself. Phelps v. United States, 274 U.S. 341, 344, 47 S.Ct. 611, 71 L.Ed. 1083 (1927); Seaboard Air Line Ry. Co. v. United States, 261 U.S. 299, 306, 43 S.Ct. 354, 67 L.Ed. 664 (1923). In Phelps, the Court recognized that the "Plaintiffs' property
Thus, "if disbursement of the award is delayed, the owner is entitled to interest thereon sufficient to ensure that he is placed in as good a position pecuniarily as he would have occupied if the payment had coincided with the appropriation." Kirby Forest Indus., Inc. v. United States, 467 U.S. 1, 10, 104 S.Ct. 2187, 81 L.Ed.2d 1 (1984) (citing Phelps, 274 U.S. at 344, 47 S.Ct. 611 and Seaboard, 261 U.S. at 306, 43 S.Ct. 354). In order for an owner to be placed in "as good a position pecuniarily," interest must be added to the damages award in order to compensate for the time value of money and the potential opportunity the owner has lost to earn income on its damages award as a result of the taking. It is now axiomatic that "the Fifth Amendment's reference to `just compensation' entitles the property owner to receive interest from the date of the taking to the date of payment as a part of his just compensation." United States v. Thayer-W. Point Hotel Co., 329 U.S. 585, 588, 107 Ct.Cl. 714, 67 S.Ct. 398, 91 L.Ed. 521 (1947); see also Jacobs v. United States, 290 U.S. 13, 17, 54 S.Ct. 26, 78 L.Ed. 142 (1933) ("[J]ust compensation is comprehensive, and includes all elements, `and no specific command to include interest is necessary when interest is part of such compensation.'").
Here, as in Kirby Forest, the government stipulated to the precise date of its taking. It conceded in its 2008 stipulation that "by virtue of its placement of the 14 sensors specified above on the listed parcels of land, it has taken a property interest in the nature of an easement." J.A. 1793 at ¶ 6 (emphasis added). It stipulated that the "easement shall be deemed to have commenced on the date the sensor is listed as having been installed." J.A. 1794 at ¶ 7. The stipulation also enumerates the dates that each sensor was first installed: dates ranging from April 1999 to November 2005. J.A. 1793 at ¶ 5. Because the government's payment of consideration for its taking was not paid contemporaneously with the taking, Otay Mesa is now entitled to interest "sufficient to ensure that [it] is placed in as good a position pecuniarily as [it] would have occupied if the payment had coincided with the appropriation." Kirby Forest, 467 U.S. at 10, 104 S.Ct. 2187.
We are not persuaded by the Court of Federal Claims' and the government's justifications for why interest should not begin to run until the date of the government's stipulation. To begin with, delaying the running of interest until Otay Mesa supposedly first knew about the taking would be contrary to the established precedent just discussed. Moreover, if the government's easement created a risk that Otay Mesa's mitigation land might be denied approval for mitigation use as of 2008, then the sensor easement would have also created the same risk when the land was first encumbered. Otay Mesa's knowledge of the easement is irrelevant to whether the easement objectively created that risk. Finally, if interest is not computed from the date of the taking, but instead from the date a landowner is first made aware of the taking, the government is presented with an incentive to delay disclosure of physical invasion for as long as possible. We see no logic in creating such an incentive.
For the foregoing reasons, we affirm-in-part and vacate-in-part the decision of the Court of Federal Claims. The case is remanded to the court for further proceedings consistent with this opinion.
Each party shall bear its own costs.