WIGGINS, J.
¶ 1 We must decide whether the city of Bothell assumed responsibility for maintaining a drainage pipe installed in Crystal Ridge, a residential subdivision in Snohomish County. Crystal Ridge was developed from two residential plats that Snohomish County approved in 1987. The area became incorporated into the city of Bothell (City) in 1992. One of the plats contained a drainage easement within a tract owned by the Crystal Ridge Homeowners Association (HOA). The plat dedicated that drainage easement to Snohomish County. Ordinarily, approval of a plat by a county constitutes acceptance by the county of any easements dedicated therein. The City, however, argues that the disputed drainage pipe is outside the scope of the drainage easement that the City inherited from Snohomish County.
¶ 2 We disagree and hold that the only reasonable interpretation of the Crystal Ridge plat is that Snohomish County — and therefore the City — assumed responsibility for maintaining the drainage pipe. We therefore affirm the trial court's grant of summary judgment in favor of respondents.
¶ 3 In 1987, Snohomish County approved development of two residential plats collectively called Crystal Ridge. At the time, the area encompassing Crystal Ridge was part of unincorporated Snohomish County (County). In 1992, five years after the Crystal Ridge plats were approved, the area became incorporated into the City.
¶ 4 Naturally occurring wet soil conditions posed a substantial challenge to the development of Crystal Ridge. In his decision approving the Crystal Ridge plats, the County's hearing examiner, John E. Galt, noted three potential sources for the saturated soil in his findings: (1) "subsurface water," or groundwater, that "has been stored in porous soil layers upslope of the site," (2) "septic tank drainfields in the development upslope," and (3) "leakage from storm drains or water lines." Decision of Hr'g Exam'r at 3. To alleviate these wet soil conditions, consulting geotechnical engineer Dr. Gordon Denby stated in his report to the hearing examiner that "an interceptor trench or trenches along the west property line would be necessary in order to intercept the groundwater flow and dewater the site so that residential construction could occur." Id. The trench would have to be "as much as 12 feet deep in order to accomplish the desired purpose." Id. The hearing examiner included the following conclusion in his decision:
Id. at 7.
¶ 5 To this end, the hearing examiner required the developer to install an underground pipe to intercept and divert water away from the site. The interceptor pipe was placed 11 feet underground in an area labeled "Tract 999" on the plat. Groundwater captured by the interceptor pipe was directed to a pond on adjacent private property.
¶ 6 The recorded plat showed that Tract 999 would be owned by the HOA subject to an easement described as a "25' sanitary sewer (A.W.D.) and drainage easement." The plat further provided that "drainage easements designated on this plat are hereby
¶ 7 In 2010, the HOA and several individual homeowners (respondents) sued the City, alleging that the interceptor pipe had failed and damaged several properties within the development.
¶ 8 Dedications of land to public entities like the County and the City are controlled by chapter 58.17 RCW (subdivision act), which governs plats, subdivisions, and dedications. The legislature enacted the current iteration of the subdivision act in 1969.
RCW 58.17.010 (emphasis added).
¶ 9 The subdivision act also sets forth the requirements for a statutory dedication:
RCW 58.17.020(3).
¶ 10 The parties do not dispute that such a statutory dedication of Tract 999's drainage easement occurred,
¶ 11 The remaining issue, whether the drainage easement includes the interceptor pipe, is essentially a matter of plat interpretation. Specifically, the City argues that the interceptor pipe does not fall within the scope of the drainage easement and that the interceptor pipe therefore was not dedicated to the County. Consequently, the City claims neither the County nor the City ever accepted responsibility for maintaining the interceptor pipe. We disagree and hold that the County — and therefore the City — assumed responsibility for maintaining the interceptor pipe as part of Tract 999's drainage easement.
¶ 12 A "plat" is "[a] map describing a piece of land and its features, such as boundaries, lots, roads, and easements." BLACK'S LAW DICTIONARY 1337 (10th ed.2014). In construing easements in a plat, the dedicator's intent controls. Roeder Co. v. Burlington N., Inc. 105 Wn.2d 269, 273, 714 P.2d 1170 (1986). We determine intent from the marks and lines on the plat itself. Id. If the plat is ambiguous as to the dedicator's intent, courts may consider surrounding circumstances, id., including extrinsic evidence. Rainier View Court Homeowners Ass'n v. Zenker, 157 Wn.App. 710, 720, 238 P.3d 1217 (2010). Here, no ambiguity surrounds the easement in question. Moreover, even if we were to read the plat as ambiguous and consider extrinsic evidence, the City's attempts to disclaim responsibility for the interceptor pipe would fail.
¶ 13 The intrinsic evidence unambiguously demonstrates that the drainage easement contained on the plat includes the interceptor pipe. The plat shows that Tract 999 contains a "25' sanitary sewer (A.W.D.) and drainage easement." Three of the plat's four pages include the following text in bolded letters: "Drainage easements designated on this plat are hereby reserved for and granted to Snohomish County for the right of ingress and egress for the purpose of maintaining and operating stormwater facilities." This comports with the general rule that the burden of maintaining an easement lies with the holder of that easement rather than the owner of the servient property. E.g., Camus v. Culpepper, noted at 157 Wn.App. 1046, 2010 WL 3420379, at *5 ("Generally, the duty to maintain an easement is on the owner of the dominant estate.").
¶ 15 The City seizes on two words in the plat — "stormwater facilities" — to argue that the plat drew a distinction between "stormwater facilities" and "groundwater facilities." According to the City, the County assumed responsibility for maintaining only "stormwater facilities" while maintenance of "groundwater facilities" remained the duty of the HOA. We will not read the City's proposed distinction into the Crystal Ridge plat. Nothing in the plat indicates that the HOA reserved the right to maintain groundwater facilities, and a stormwater/groundwater distinction appears neither in the plat nor in the contemporaneous documents in the appellate record. We will not read a distinction into the plat where the record is completely devoid of evidence suggesting that the plat's drafters contemplated the distinction. Cf. Hollis v. Garwall, Inc., 137 Wn.2d 683, 696-97, 974 P.2d 836 (1999) (rejecting a party's interpretation of a restrictive covenant contained in a plat because adopting the interpretation "would require this court to redraft or add to the language of the covenant").
¶ 16 Even assuming for the sake of argument, however, that the plat is ambiguous regarding whether the easement includes "groundwater" facilities, the extrinsic evidence contradicts the City's argument. The Snohomish County Code (SCC) at the time of the dedication specifically provided that drainage facilities "shall" be dedicated to the county where private maintenance would be inadequate. Here, the engineers' unrefuted declarations confirm that private maintenance of such a pipe would likely be inadequate and undesirable. Indeed, Theodore Trepanier, one of the engineers who worked on the platting of Crystal Ridge, stated in his declaration:
¶ 17 Given the likely inadequacy of private maintenance, adopting the City's narrow construction of the easement would defeat the
¶ 18 The City's disclaimer of the interceptor pipe as a groundwater facility also fails for practical reasons. The record shows that the interceptor pipe was not designed to drain solely groundwater or stormwater, nor did it exist in a vacuum that permitted it to collect only "groundwater" without "stormwater." Dr. Denby, the supervising geotechnical engineer who surveyed the property in 1984, testified that the purpose of the pipe was to drain both groundwater and stormwater runoff from west of the development. The hearing examiner's decision recognized that the "most critical issue involved in the instant proposal is subsurface and surface drainage." Decision of Hr'g Exam'r at 7 (emphasis added).
¶ 19 Geotechnical reports adopted by the hearing examiner likewise recognize that the drainage issues stemmed not only from groundwater, but also from infiltrating rainwater and leaking municipal storm drains from upslope properties. In making recommendations to the developer, the supervising geotechnical engineer referred to an "efficient comprehensive drainage system" to deal with wet site conditions from all sources. Thus, regardless of whether one can conceptually distinguish "stormwater" from "groundwater," the fact remains that the disputed interceptor pipe would be collecting both, and the City fails to cite any evidence in the record showing that any of the individuals involved in the initial development of Crystal Ridge contemplated such a distinction.
¶ 20 The "Drainage Disclosure" dated November 9, 1987 does not alter this result. That document requires subsequent owners of the individual lots in Crystal Ridge to be notified that "[s]ubstantial surface and subsurface drainage controls have been necessary in the development of the subject property and that special and/or extraordinary drainage controls may be necessary on individual lots." The City urges us to read this disclosure as warning subsequent Crystal Ridge homeowners that they were responsible, as members of the HOA, for maintaining the interceptor pipe in Tract 999. This is incorrect. The disclosure notifies individual future homeowners that they may have to take extraordinary drainage precautions on their own lots to supplement existing drainage facilities, not that they were responsible for maintaining drainage facilities that had already been placed. As with the original plat, adopting the City's interpretation of the disclosure document would both run counter to the document's plain meaning and read Tract 999's drainage easement out of the Crystal Ridge plat.
¶ 21 The City also notes that the relevant portions of the SCC list several prerequisites that must be met before the County accepts responsibility for maintaining a drainage system and that those requirements were never met at Crystal Ridge. But the SCC also mandates additional steps if the County is not going to maintain a drainage system,
¶ 22 The County accepted, via the signatures of several of its public officials including the director of public works, that "drainage easements designated on this plat are hereby reserved for and granted to Snohomish County for the right of ingress and egress for the purpose of maintaining and operating stormwater facilities." Regardless of whether we limit our inquiry to the contents of the plat or examine extrinsic evidence, the only reasonable interpretation of the plat is that the drainage easement in Tract 999 includes the interceptor pipe.
¶ 23 The City argues that were it required to maintain the interceptor pipe, the resulting expenditure would constitute the gifting of public money to private parties in violation of article VIII, section 7 of the Washington Constitution. We will not reach the merits of this argument because the City failed to raise it prior to filing its petition for review. The City did not mention article VIII, section 7 in its cross motion for summary judgment before the superior court. Indeed, aside from a single passing remark in its opening Court of Appeals brief, the City never once raised this issue before either the superior court or the Court of Appeals. This court generally does not consider issues, even constitutional ones, raised first in a petition for review, State v. Benn, 161 Wn.2d 256, 262 n. 1, 165 P.3d 1232 (2007), and we decline to do so now.
¶ 24 Before it sought review with this court, the City's only reference to article VIII, section 7 appeared in the section of its Court of Appeals brief discussing whether a common-law dedication of the pipe occurred. The City argued that because it never accepted a common-law dedication of the pipe, the City never assumed responsibility for the pipe's maintenance. The City referenced article VIII, section 7 not as part of an independent argument, but only as support for its assertion that because the interceptor pipe benefited private parties, the City could never have accepted a dedication of the pipe under common law.
¶ 25 "`[N]aked castings into the constitutional sea are not sufficient to command judicial consideration and discussion.'" In re Rosier, 105 Wn.2d 606, 616, 717 P.2d 1353 (1986) (quoting United States v. Phillips, 433 F.2d 1364, 1366 (8th Cir.1970)). Because the City failed to raise this issue below, we decline to address it now.
¶ 26 For the reasons stated above, we agree with the superior court and the Court of Appeals that the City is responsible for maintaining the interceptor pipe. We therefore affirm.
WE CONCUR: JOHNSON, OWENS, FAIRHURST, STEPHENS and GONZÁLEZ, JJ.
GORDON McCLOUD, J. (dissenting).
¶ 27 The developer here dedicated a 25-foot easement to Snohomish County (County) "for the right of ingress and egress for the purpose of maintaining and operating stormwater facilities." Clerk's Papers (CP) at 46-48 (emphasis omitted). The city of Bothell (City) accepted this dedication, along with its obligations. CP at 45. The question that we must resolve here is the scope of this dedication "of ingress and egress": specifically, whether or not this dedication included an obligation to maintain the interceptor pipe that the hearing examiner in 1984 required the developer to install 11 feet underground as a condition of development.
¶ 28 The majority concludes as a matter of law that the scope of this dedication to the City includes the obligation to maintain the interceptor pipe. I agree with the majority that the plat language unambiguously gives the City access to whatever the easement contains. But I disagree with the majority's conclusion that the plat language and undisputed evidence unambiguously demonstrate that the developer intended to impose a duty on the City to maintain the interceptor pipe at issue and that that is what the City accepted. Instead, neither the plat nor any other evidence shows that the City at any time affirmatively assumed a duty to maintain this pipe, and I find no basis to infer such a duty. I would therefore reverse. I respectfully dissent.
¶ 29 We review a summary judgment order de novo. LaCoursiere v. Camwest Dev., Inc., 181 Wn.2d 734, 740, 339 P.3d 963 (2014). Summary judgment is appropriate when, viewing the facts in the light most favorable to the nonmoving party and drawing all reasonable inferences in that party's favor, no genuine issue of material fact exists and the moving party is entitled to judgment as a matter of law. Id.
¶ 30 A statutory dedication operates by way of grant. Kiely v. Graves, 173 Wn.2d 926, 932, 271 P.3d 226 (2012). A dedication of an easement occurs when the grant specifies
RCW 58.08.015.
¶ 31 Matters of plat interpretation depend on the donor's intent. See Roeder Co. v. Burlington N., Inc., 105 Wn.2d 269, 273, 714 P.2d 1170 (1986). The court generally determines donor's intent from the face of the dedication; Washington courts do not consider extrinsic evidence to determine donor intent if a plat's plain language is unambiguous. Sunnyside Valley Irrig. Dist. v. Dickie, 149 Wn.2d 873, 880, 73 P.3d 369 (2003) (citing Zobrist v. Culp, 95 Wn.2d 556, 560, 627 P.2d 1308 (1981)). If the plat's language is ambiguous, however, then the court may consider extrinsic evidence to ascertain the parties' intent at the time that they executed the plat: "If ambiguity exists, extrinsic evidence is allowed to show the intentions of the original parties, the circumstances of the property when the easement was conveyed, and the practical interpretation given the parties' prior conduct or admissions." Id. (citing City of Seattle v. Nazarenus, 60 Wn.2d 657, 665, 374 P.2d 1014 (1962)).
¶ 32 The homeowners sought a declaratory judgment that based on the recorded plat's plain language, the City, "`upon annexing the area of the Crystal Ridge development from Snohomish County, assumed responsibility for inspecting and maintaining the drainage system, including the interceptor trench between the Brentwood Heights and Crystal Ridge developments.'" CP at 637, 837. They prevailed in the trial court and on appeal. Crystal Ridge Homeowners Ass'n v. City of Bothell, noted at 175 Wn.App. 1047, 2013 WL 3872223 (2013).
¶ 33 The majority affirms, reasoning that "no ambiguity surrounds the easement in question," majority at 748, and holding that "the only reasonable interpretation of the Crystal Ridge plat is that the County — and therefore the City — assumed responsibility for maintaining the drainage pipe." Majority at 748. The heart of the majority's analysis is "[b]ecause the County assumed responsibility for maintaining the Tract 999 drainage easement, it necessarily follows that if the interceptor pipe falls within the scope of that easement, the City — as successor in interest of the County — has responsibility for maintaining the interceptor pipe." Majority at 750.
¶ 34 I agree with the majority's premises but not with its conclusion. To be sure, there is no dispute that the interceptor pipe is located within the 25-foot easement. CP at 324. And, surely, the plat states, "`DRAINAGE EASEMENTS DESIGNATED ON THIS PLAT ARE HEREBY RESERVED FOR AND GRANTED TO SNOHOMISH COUNTY FOR THE RIGHT OF INGRESS AND EGRESS FOR THE PURPOSE OF MAINTAINING AND OPERATING STORMWATER FACILITIES.'" CP at 640.
¶ 35 But all that this language unambiguously shows is that when the City accepted the dedication, it received "the right of ingress and egress," meaning the right to access stormwater facilities located within all the easements on the plat. "Ingress and egress" is followed by the language "for the purpose of maintaining and operating stormwater facilities." That latter phrase is descriptive, not prescriptive; that is, it describes the scope of the City's right but imposes no additional duty. "`[W]hen the intention of the owner to dedicate is clear, manifest, and unequivocal, ... it becomes effective for that purpose.'" City of Spokane v. Catholic Bishop of Spokane, 33 Wn.2d 496, 503, 206 P.2d 277 (1949) (quoting Corning v. Aldo, 185 Wn. 570, 576, 55 P.2d 1093
¶ 36 The majority seems to assume that access would be irrelevant if the City did not also have a duty to maintain. Majority at 749. That might be true. But it does not necessarily follow that we can therefore infer from the plat itself, as opposed to some other source, the duty to maintain. Instead, as discussed in Part IV below, there were specific steps that the law prescribes to impose such a duty — steps that no party took.
¶ 37 Because the plat language does not unambiguously answer the question of whether the donor intended to convey, and the County intended to accept, the duty to maintain the interceptor pipe, we may consider extrinsic evidence about "the intentions of the original parties, the circumstances of the property when the easement was conveyed, and the practical interpretation given the parties' prior conduct or admissions." Sunnyside Valley, 149 Wash.2d at 880, 73 P.3d 369 (citing Nazarenus, 60 Wash.2d at 665, 374 P.2d 1014).
¶ 38 The City points to the following evidence extrinsic to the plat to try to show that the homeowners, not the City, are responsible for maintaining the interceptor pipe:
CP at 315. We address each in turn.
¶ 39 To support its first contention, the City points to the plat's language and argues that "the interceptor trench does not meet the definition of `stormwater facility' under any applicable code or regulation." CP at 324. But this argument depends on reading the plat's language to impose on the City an obligation to maintain "stormwater facilities." As discussed above, the plat's language imposes no duty to maintain. Thus, this argument is not sufficient to support summary judgment in the City's favor.
¶ 40 To support the City's second argument, that it never maintained or inspected the pipe, the City cites the "Drainage Disclosure" and also the requirements in the former Snohomish County Code (SCC) for assuming responsibility for maintaining the interceptor pipe.
¶ 41 I agree with the majority that the "Drainage Disclosure" imposes no duty on the homeowners to maintain the interceptor pipe. Majority at 752. But I disagree with the majority's application of the SCC.
¶ 42 Both state law and the SCC contain requirements for a dedication. See RCW 58.17.020(3); former SCC 24.28.040 (1983). We apply the ordinances and law in effect at the time that a party files an application for a preliminary plat.
¶ 43 As the majority explains, the parties do not dispute that the County accepted a statutory dedication of the easement. Majority at 749. I agree with the majority that no evidence shows that the County, at the time of dedication, fulfilled either the requirements to accept responsibility to maintain the interceptor pipe or the requirements to decline responsibility to maintain the pipe. Majority at 753; see former SCC 24.28.040,.080 (1983). And, as discussed above, the recorded plat does not show that the City accepted the pipe as its property as part of the dedication — it accepted only a right of access. None of the evidence extrinsic to the plat that the City cites demonstrates conclusively that it intended, or did not intend, to accept responsibility for maintaining the pipe as part of the dedication.
¶ 44 The majority cites former SCC 24.28.040 and Trepainer's declaration to conclude that because private maintenance of the pipe "would likely be inadequate and undesirable," the drainage facilities were dedicated to the County. Majority at 751. Once again, I agree with the majority's premise — here, that the City submitted evidence showing that private maintenance would be a bad policy — but not with its conclusion that we can therefore infer a dedication to the City from a silent plat.
¶ 45 The majority's analysis of this issue turns on the notion that former SCC 24.28.040 requires County maintenance where private maintenance would likely be inadequate. Former SCC 24.28.040 does say that, but only as an introduction to the mandatory prerequisites to the County undertaking that responsibility. Former SCC 24.28.040, in its entirety, states,
CP at 687.
¶ 46 We apply the same rules of statutory construction "to municipal ordinances [that we apply] to state statutes." World Wide Video, Inc. v. City of Tukwila, 117 Wn.2d 382, 392, 816 P.2d 18 (1991) (quoting City of Spokane v. Fischer, 110 Wn.2d 541, 542, 754 P.2d 1241 (1988)). To interpret a statutory provision's plain meaning, we look to the provision's text, in addition to "the context of the statute in which that provision is found, related provisions, and the statutory scheme as a whole." Christensen v. Ellsworth, 162 Wn.2d 365, 373, 173 P.3d 228 (2007) (quoting Dep't of Ecology v. Campbell & Gwinn, LLC, 146 Wn.2d 1, 9-12, 43 P.3d 4 (2002)).
¶ 47 The majority focuses on the first paragraph of former SCC 24.28.040 to the exclusion of the rest of the provision. That first
¶ 48 For the City's third argument, that the pipe aids only private property owners, the City cites a 1977 City ordinance stating, "`The City will not assume responsibility for maintenance of retention/detention facilities on private property.'" CP at 337, 567 (emphasis omitted). But, as the City acknowledges, the pipe is not a retention/detention facility and this ordinance does not address drainage facilities. CP at 337. Therefore, it provides no support for summary judgment in the City's favor.
¶ 49 In Kiely, we explained that absent of intent an dedicate a particular property interest, we would not imply meaning from the face of the plat:
173 Wash.2d at 934-35, 271 P.3d 226.
¶ 50 Here, the face of the plat shows no intent to dedicate a property interest in the contents of the drainage easement to the County or the City for maintenance purposes. And none of the evidence presented clearly leads us to interpret the plat to impose a duty on the City to maintain the interceptor pipe. The extrinsic evidence presented relies primarily on the plat's reference to "stormwater facilities" as opposed to "groundwater facilities." This evidence is unconvincing because the plat's plain language indicates that the easement's scope does not include the duty to maintain the pipe. And the County met neither of the SCC's requirements to accept or not to accept responsibility. Absent evidence demonstrating that the dedication included the duty to maintain the easement's contents, this court should decline to imply such meaning. Thus, summary judgment in favor of the homeowners was improper; instead, summary judgment in the City's favor was appropriate.
¶ 51 As matter of law, absent an express dedication to maintain the contents of the drainage easement — or any other action by the municipality to accept the duty to maintain the contents — we cannot impose a duty on the City to operate and maintain what is inside the drainage easement. Because the trial court should have denied the homeowners' motion for summary judgment and granted the City's motion for summary judgment, I would reverse the Court of Appeals. I therefore respectfully dissent.
BARBARA A. MADSEN, C.J., and MARY I. YU, J.
Former SCC 25.02.080 (1983) (emphasis added). The emphasized text above illustrates the breadth of the meaning of "stormwater" in the SCC. A "surplus" is "the amount that remains when use or need is satisfied." WEBSTER'S THIRD NEW INTERNATIONAL DICTIONARY 2301 (2002). If this provision were meant to apply only to "surface water" as opposed to "groundwater," then it would not have to include the additional references to "storm," "surplus," and other waters "wherever located." Under the SCC, then, a pipe that controls excess water qualifies as a stormwater facility wherever that water is located, including underground.
These concerns are misplaced. The City is not responsible for maintaining the interceptor pipe "just because it exists;" they are responsible for maintaining it because that is the only reasonable interpretation of the disputed plat. The plat clearly shows a drainage easement within Tract 999, and the record contains no indication that Tract 999 contains any drainage facility of any type aside from the interceptor pipe and the A.W.D. sanitary sewer pipe. If we were to exclude the interceptor pipe from the scope of the easement, we would effectively be reading the "drainage easement" out of the plat. Moreover, the City — as successor in interest to the County — did have knowledge of the interceptor pipe through the record before the hearing examiner. Finally, our holding is narrower than WSAMA fears. We do not hold that plats cannot distinguish between stormwater and groundwater facilities; we simply hold that this particular plat did not make that distinction and that reading such a distinction into this plat would be inappropriate under the particular circumstances of this case.
We construe the City's second motion to strike, challenging portions of respondents' answer to the City's first motion to strike, as a reply in support of its first motion to strike. The challenged portions of the respondents' answer played no role in our determination of the merits of this case, and we need not address it. To the extent the second motion to strike is considered pending, it is denied.