Mar 26 200? 10:47
Fax sent by : 8585218521 FL BOARD 63-26-87 69:35 Py:
#
STATE OF FLORIDA
' FLORIDA BOARD OF PROFESSIONAL ENGINEERS
FLORIDA ENGINEERS
MANAGEMENT CORPORATION,
Petitioner,
v. FEMC Case No. 2006067898
ANDREW J. MORGAN, P-E.,
Respondent. :
4
H
ADMINISTRATIVE COMPLAINT |
COMES NOW‘ the Florida Engineers Management Corporation, hereinatt referred to as
“Petitioner,” and files this Administrative Complaint before the Board of Professional Engineers
against Andrew J. Morgan, P.E., hereinafter referred to as “Respondent”. ‘This: iAdministrative
Complaint is issued pursuant to Sections 120.60 and 471.038, Florida Statutes. Any proceeding
conceming this complaint shall be conducted pursuant to Section 120.57, Floi ida Statutes, ~ In
support of this complaint, Petitioner alleges the following: |
i. Petitioner’ is charged with providing administrative, investigative, and
prosecutorial services to the Board of Professional Engineers pursuant to Section 471.938,
Florida Statutes (1997). The Board of Professional Engineers is charged witty ‘regulating the
practice of engineering pursuant to Chapter 455, Florida Statutes. |
2. Respondent is, and has been at all times material hereto, a licensed professional
engineer in the State of Florida, having been issued license number PE $7171. Réspondent’s last
known address is 713. Nighthawk Way, North Palm Beach, FL 33408.
vide atm hea AUR NE UM TREN
2/12
3
Mar 26 200? 10:47
Fax sent by : 9585218521 FL BOARD 63-26-87 69:36 Py:
@ S
3. In ‘a: Final Order Approving Settlement Stipulation dated July " 2005, FEMC
Case Number 2004038064, The Respondent agreed to submit to the Board for consultant
review, a list of all projects completed by the Respondent at six (6) and cightden (18) month
intervals from the date that the Final Order adopting the Stipulation was filed. |
4, Pursuant: fo the Final Order, a Board consultant selected and reviewed the
i
Respondent’s Golden Bear Plaza North Tower Tenant Improvement ("Goldeh Bear Plaza”)
project.
COUNT ONE
5, Petitioner tealleges and incorporates paragraphs one (1) trough four (4) as if
fully set forth in this Count One. |
6. On July 20, 2005, a Final Order approving Settlement Stipilation in case
2004038064 was filed. As part of the stipulation, the Respondent, Andrew. i Morgan, P-E.,
submitted a set of calculations and plan drawings for the Golden Bear Plaza project, one of two
job submissions for his First Project Review. Board Consultant Michael Dristol, PLE. noted
deficiencies in beth the calculations and drawings, including but not limited to: |
a. A service load of 6.55 k. was used for the design of the chmponents. The
American Institute of Steel Construction, Load and Resistance Factor
Design Specification A4-2, states the ultimate factored bbad of 9.5 kips
mo
b. The % inch plate thickness indicated for the beam support bracket. is
should be used in all bolt connector design calculations.
inadequate. A bending analysis of this bracket shows that: the plate should
1
bea minimum of % inch thick. |
$
H
{
i
i
FEMC v Andrew Morgan, PLE. 2 1
Case No, 2006067898
seg NCARBRELS 1 vs oy cr
3412
Mar 26 200? 10:47
Fax sent by : 9585218521 FL BOARD 63-26-87 69:36 Pg: 4/712
*
c. The tength used to calculate the moment deriving the tensibn load on the
concrete anchors is 7 itches which is indicated on the! sketch as: the
distance: between the A325 bolts. The actual length between the concrete
‘anchors as given on the fabrication drawing is 8 inches.
d. No callout was found on the drawings referring to the torque to be applied
to. the’ % inch diameter bolts used. In lieu of a specifis torque, bolts
tightened only to the snug tight condition should be clearly identified on
design and erection drawings. | |
e There is no indication of how the beam support bracket is attached to the
shear plate. .
f. There: isa dimension missing that would located the bots in the shear
plate. |
g. ‘There is no indication in the calculations or installation deowing, to show
| that the torsion has been addressed. An analysis shows it the induced
torque exceeds the torque capacity of an unreinforced concete beam.
7, Based‘ on’ the foregoing, Respondent is charged with vidloting Section
471.033(1)(g), Florida Statutes, by engaging in negligence in the practice of cing
WHEREFORE, the Petitioner respectfully requests the Board of Professional Engineers
to enter an order imposing one or more of the following penalties: permanet revocation or
suspension of the Respondent’s license, restriction of the Respondent's practice, imposition of an
administrative fine, issuance of a reprimand, placement of the Respondent ol probation, the
assessment of costs related to the investigation and prosecution of this case, other than costs
|
associated with an atfonicy’s time, as provided for in Section 455.227(3), Florida Statutes, and/or
FEMC v Andrew Moigan, PE. 3
Case No. 2006067898
Mar 26 2007 10:48
Fax sent by : 9585218521 FL BOARD 63-26-87 69:36 Pg: 5/412
@ oe
>
any other relief that the Board deems appropriate.
SIGNED ihis om day of Danan , 2007.
Y: Patrick Creehani
f Prosecuting Attorney
COUNSEL FOR FEMC: |
Patrick Creehan F { L E p
Chief Prosecuting Attorney Oopartinent of Busine
Florida Engineers Management Corporation prc Yount min
2507 Callaway Road, Suite 200
Tallahassee, Florida 32303: crn Leer
Florida Bar No. 0063540 MM Reichods
PCijt DATE ~ [=~
PCP: January 18, 2007
PCP Members: Matthews, Seckinger, and Hogenkamp
FEMC y Andrew Morgan, PE. 4
Case No, 2006067898 4
Docket for Case No: 07-001421PL
Issue Date |
Proceedings |
May 14, 2007 |
Order Closing File. CASE CLOSED.
|
May 10, 2007 |
Motion to Relinquish Jurisdiction filed.
|
May 03, 2007 |
Parties Prehearing Stipulation filed.
|
Apr. 04, 2007 |
Order of Pre-hearing Instructions.
|
Apr. 04, 2007 |
Notice of Hearing by Video Teleconference (hearing set for May 18, 2007; 9:30 a.m.; West Palm Beach and Tallahassee, FL).
|
Apr. 02, 2007 |
Joint Response to Initial Order filed.
|
Mar. 26, 2007 |
Initial Order.
|
Mar. 26, 2007 |
Election of Rights filed.
|
Mar. 26, 2007 |
Respondent`s Petition in Conformance with Rule 28-106.201, Fla. Admin. Code and Request for Formal Evidentiary Hearing filed.
|
Mar. 26, 2007 |
Administrative Complaint filed.
|
Mar. 26, 2007 |
Agency referral filed.
|