Petitioner: CITY OF MIAMI, INC.
Respondent: SOUTH FLORIDA WATER MANAGEMENT DISTRICT AND FLORIDA POWER AND LIGHT
Judges: BRAM D. E. CANTER
Agency: Water Management Districts
Locations: Miami, Florida
Filed: May 19, 2015
Status: Closed
Settled and/or Dismissed prior to entry of RO/FO on Thursday, June 4, 2015.
Latest Update: Dec. 23, 2024
BEFORE THE GOVERNING BOARD OF THE = 8°10 2015 19: 10 AR
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
SFWMD No. 2018-020-DA0.WU SOURIC
In re: ne
AUTHORIZATION OF SHORT-TERM
WATER WITHDRAWALS BY FLORIDA
POWER AND LIGHT FROM THE
L-31E CANAL SYSTEM IN MIAMI-DADE
COUNTY, FLORIDA
FINAL ORDER
The Governing Board of the South Florida Water Management District (“District’),
pursuant to Sections 373.083, 373.085, 373.086, and 373.171, Florida Statutes (Fila.
Stat.), after considering the recommendations of District staff and being otherwise fully
appraised of the matter, issues the following Final Order containing Findings of Fact,
Ultimate Facts and Conclusions of Law:
FINDINGS OF FACT
1. The District is a public corporation of the State of Florida, existing
pursuant to Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter
373, Fla. Stat., and Title 40E, Florida Administrative Code (Fla. Admin. Code’), as a
multi-purpose water management district with its principal office at 3301 Gun Club
Road, West Palm Beach, Florida. The District has the power and duty to protect
Florida’s water resources and to administer and enforce the provisions of Chapter 373,
Fla. Stat., and the rules promulgated there under, Title 40E, Fla. Admin. Code. The
District has jurisdiction over the matters addressed in this Order.
1 Exhibit "A"
2. Florida Power and Light (“FPL”) is a subsidiary of NextEra Energy, Inc. As
a regulated utility, FPL is granted an exclusive franchise by the Public Service
Commission to provide reliable and cost-effective electric service to customers,
including critical infrastructure, within its service territory in Florida. FPL’s service
territory covers all or parts of 35 Florida counties and serves approximately nine million
customers.
3. The customers particularly at issue in this matter are those residing in
Miami-Dade and Broward counties. In these counties, FPL provides electrical service to
two million customer accounts, including critical infrastructure.
4. FPL owns and operates the electric power generating facility known as the
Turkey Point Power Plant (“Turkey Point’) that is the subject of this request.
5. Turkey Point is located in unincorporated southeast Miami-Dade County,
east of Florida City and the City of Homestead. The Turkey Point site covers
approximately 11,000 acres. Turkey Point is located approximately 25 miles south of
Miami and about nine miles east of Florida City. Properties adjacent to the facility are
almost exclusively undeveloped land. Turkey Point is bordered to the east by Biscayne
Bay, Biscayne National Park, and Card Sound. A Turkey Point location map is attached
hereto as Exhibit A.
6. Turkey Point consists of five steam electric generating units: three fossil
fuel-fired units (Units 1, 2, and 5) and two nuclear units (Units 3 and 4). Units 1 and 2
constructed in the late 1960s each have a continuous generating capacity of
approximately 404 megawatts (MW). Operations of units 1 and 2 are on a standby
basis and not routinely in service. Unit 5 has a continuous generating capacity of
approximately 1150 MW. Units 3 and 4 each have continuous generating capacity of
approximately 820 MW.
7. Units 3, 4, and 5 are certified under Florida’s Power Plant Siting Act
("PPSA’). Units 1 and 2 pre-date the PPSA and are not certified.
8. FPL owns and operates a cooling canal system (“CCS”), an approximately
5,900-acre network of unlined canals at Turkey Point, to provide cooling water.
Construction of the CCS was completed in 1973. The CCS is closed from the surface
waters of both Biscayne Bay and Card Sound. The CCS facilities pre-date the PPSA
and are not certified. Under routine operations, there are no active surface water
inflows utilized to maintain CCS water levels, temperature, or salinity.
9. The L-31E Canal System is of particular importance to FPL's request.
The L-31E Canal System is part of the Central and Southern Florida Flood Control -
Project ("C&SF Project’) for which the District is the designated local sponsor pursuant
to Section 373.1501, Fla. Stat. As local sponsor, the District operates C&SF Project
components, including the L-31E Canal system and the surface water flow to tide from
the associated basins, consistent with the guidance provided in the United States Army
Corps of Engineers Master Water Control Manual, East Coast Canals, Volume 5.
10. The L-31E Canal System is a borrow canal and levee system that
stretches north ~ south, intercepting water as it flows eastward to tide in southeast Dade
County and providing storm surge protection. A map depicting the L-31E Canal System
is attached hereto as Exhibit B. The L-31E Canal runs parallel to the South Central
Biscayne Bay and across several drainage basins, six of which are named for the
associated major east-west canals: Canal 100 (C-100), C-1, C-102, C-103, North Canal
and Florida City Canal. This canal network and coastal levee system is operated for
several C&SF Project purposes, including reducing the potential for flood and storm
surge damage as well as limiting saline water intrusion. Water from the L-31E is
discharged to Biscayne Bay at several coastal structures as depicted on Exhibit B.
11. Operation of the C&SF Project coastal structure gates in this canal
network discharge excess water when rainfall causes stages to rise above the control
levels and close in order to maintain sufficient water to prevent salt water intrusion
among other Project purposes. Overall, these surface water inflows comprise the
largest input of fresh water to Biscayne Bay and Biscayne National Park in this area.
12. In the 1990's the U.S. Army Corps of Engineers and the District developed
the Comprehensive Everglades Restoration Program (“CERP”) which was approved by
Congress in the Water Resources Development Act of 2000 ("WRDA 2000”). A
component of CERP includes the Biscayne Bay Coastal Wetlands Phase 1 Project.
This project component aims to restore the overland sheetflow in an area of up to
11,000 acres, and to improve the ecology of Biscayne Bay, including its freshwater and
saltwater wetlands, nearshore bay habitat, marine nursery habitat, and the oyster reef
community.
13. Implementation of the Biscayne Bay Coastal Wetlands Phase 1 Project
will impound and redistribute freshwater runoff from the existing cana! discharges into
the coastal wetlands adjoining Biscayne Bay to provide a more natural and historical
overland flow pattern through existing coastal wetlands and tidal creeks. This
redistribution of freshwater runoff will improve the temporal and spatial distribution of
inflows to Biscayne Bay.
14. The WRDA 2000 requires that water be reserved from allocation as an
assurance that each CERP project component will meet its goals and objectives. Water
is to be reserved consistent with the objectives and information contained within the
Central and Southern Florida Project Comprehensive Everglades Restoration Plan
Biscayne Bay Coastal Wetlands Project Phase | Final Integrated Project Implementation
Report and Environmental Impact Statement (“PIR”) and other sources of information,
15. To this end, the District conducted technical studies identifying water to be
reserved for the protection of fish and wildlife within the western near-shore portion of
Central Biscayne Bay, engaged in rule development, and adopted the Nearshore
Central Biscayne Bay reservation rule and associated implementation rules. The
reservation rules and consumptive use implementing criteria is attached hereto as
Exhibit C. The location of the Nearshore Central Biscayne Bay and the associated
Project canal system is depicted in Figure 3-1 of Exhibit C.
16. The determination of the amount of water needed for protection of fish and
wildlife in the Nearshore Central Biscayne Bay reservation rule is based on meeting a
year-round salinity target for the nearshore area of central Biscayne Bay of 20 (practical
salinity scale) given in the PIR. More detailed analyses were performed to determine
the locations and quantities of surface water for the reservation rules. This information
is contained in the District's Technical Document to Support a Water Reservation Rule
for the Comprehensive Everglades Restoration Plan Biscayne Bay Coastal Wetlands
Project (July 2013). .
17. Rule 40E-10.061, Fla. Admin. Code, is the water reservation rule for the
Nearshore Central Biscayne Bay. Pursuant to this rule, a Target Flow to the Bay of 504
acre-feet per day, of surface water is reserved from allocation. Appendix 3, Figure 3-1
of Chapter 40E-10, Fla. Admin. Code, depicts the Nearshore Central Biscayne Bay
Reservation Water Body and Protected Canal Reaches; Figures 3-4A and 3-4B depict
surface water flow from the C-102 + Military + C-103 Canal through S-21A + S-20G + Ss.
20F into Biscayne Bay during the wet and dry seasons. (Ex. C.)
18. Water levels in the L-31E Canal System, the proposed water supply
source, are influenced by the operation of coastal canal structures. Operation of the S-
20F, S-20G, and S-21A are performed consistent with guidance from the United States
Army Corps of Engineers regulation schedule and Master Water Control Manual, East
Coast Canals, Volume 5. Under normal operating conditions for April 30 - October 15
the S-20F, S-20G, and S-21A structures are operated in the “high range” meaning
discharges: to tide are conditionally made when stages upstream of the structure
including stages within the L-31E Canal are 2.2 fl. NGVD or higher and the gates are
closed when headwater stages drop to 1.8 ft. NGVD. During the agriculture drawdown
season (October 15" through April 30"), S-21A, $-20G, and S-20F are set to operate
with open and close ranges (Open/Close) of 1.4/1.0, 2.2/1.8, and 1.4/1.0 feet NGVD,
respectively.
19. From 1993 to 2013, the District's operational records show the combined
average daily flow from the C-102, Military, and C-103 canals through Structures $-21A,
S-20G, and S-20F, respectively, into this portion of Biscayne Bay are 987 acre-feet.per
day from May 1° to October 14", with daily combined flows ranging from 0 acre-feet per
day to more than 5,500 acre-feet per day during these months. From 1993 to 2013, the
District's operational records show the combined average daily flow from the C-102,
Military, and C-103 canals through Structures S-21A, S-20G, and S-20F, respectively,
into this portion of Biscayne Bay are 492 acre-feet per day from October 15" to April
30", with daily combined flows ranging from 0 acre-feet per day to more than 3,500
acre-feet per day during these months.
20. The combined reserved target flow for structures S-21A, S-20G, and S-
20F is 504 acre feet suggesting that there is a reasonable expectation that daily flows
exceeding the reservation target flows will occur during the months of June through mid-
October, and potentially even through the month of November if conservative
operational criteria for identifying and quantifying the amount of excess water are used,
21. Beginning in late spring, water temperatures within the CCS usually rise
with temperatures at the plant intake often approaching 100°F by late spring. FPL’s
operating license from the Nuclear Regulatory; Commission ("NRC") includes a
requirement prohibiting the intake side of Units 3 & 4 from exceeding 104°F.
22. In order to prevent Units 3 & 4 from being required to shut down, thereby
impacting grid reliability, FPL requested authorization from the District to use water from
the L-31E Canal System to reduce the salinity and temperature of the water within the
CCS. After consideration of water resource constraints, such as the Nearshore Central
Biscayne Bay water reservation, the District issued an Emergency Order authorizing the
withdrawal of water from the L-31E Canal System above what is needed to meet the
reservation subject to various identified conditions, including an operational protocol.
The Emergency Order was issued on August 28, 2014. The Governing Board
concurred with the Executive Director's Emergency Order on September 11, 2014. The
fall 2014 Emergency Order terminated on October 15, 2014.
23. — Pursuant to the limitations defined in the Fall 2014 Emergency Order, FPL
pumped a limited number of days and volumes. These withdrawals, when allowed,
ranged from 1 to 103 million gallons per day (“mgd”). FPL withdrew a total of 1,135
million gallons (“mg”) of water pursuant to the Fall 2014 Emergency Order. During the
same time the fall 2014 Emergency Order was in effect and FPL was authorized to
pump, the District also released a combined average flow of 601 acre-feet per day of
freshwater to Biscayne Bay through S-21A, S-20G, and S-20F, or 97 acre-feet per day
above the target reservation flow.
24. During the term of the Fall 2014 Emergency Order, the temperature of the
water in the CCS dropped 3.5°F. The salinity of the water within the CCS also dropped
from 87.4 parts per thousand (‘ppt’) to 75.4 ppt. There is a strong correlation between
the drop in CCS water temperature and salinity from the addition of surface water.
25. FPL submitted an application to modify its site certification, requesting, in
part, authorization to construct additional wells into the Floridan aquifer system ("FAS")
and authorization to withdraw 14 mgd from said wells in order to provide water to the
CCS. The District understands that the FAS is FPL’s intended long-term solution to
reduce temperatures and salinity of the water within the CCS.
26. The Florida Department of Environmental Protection ("FDEP”) received
several objections to FPL's request. (DOAH Case No. 15-1559). A hearing date certain
has been set for July 13-17, 2015. As such, the objections and final agency action on
FPL's request has not yet been determined.
27. As a temporary, interim step, FPL seeks this authorization to provide
water to cool water in the CCS and reduce salinity.
28. On January 26, 2015, FPL submitted a consumptive use permit
application, seeking authorization to divert and use non-reserved water from the L-31E
Canal System. The purpose of the diversion is to help reduce high temperature and
salinities occurring in the water in the CCS.
29. Specifically, FPL seeks to divert surface water that is available, above the
water reserved by Rule 40E-10.061, Fla. Admin. Code, which would otherwise be
discharged to Biscayne Bay via the S-20F, S-20G and S-21A coastal structures for the
limited duration defined in this Order.
30. In support of their request, FPL provided a water/salt budget model for the
Turkey Point CCS developed to quantify the volume of water and mass of salt entering
and exiting the CCS over time and to evaluate changes in hydrodynamics associated
with operational alternatives. A copy of the water/salt budget model is attached hereto
as Exhibit D. The water/salt budget model ran two scenarios at multiple withdrawal
rates. The first scenario simulated average weather conditions and the second scenario
simulated drier than normal conditions. Each scenario was run four times under
different pumping scenarios- no pumping, 30 mgd, 60 mgd, and 100 mgd and for a two
(2) year timeframe. In each scenario, the results of the modeling showed that the
greater the volume of water pumped into the CCS, the greater the drop in salinity of the
water in the CCS.
31. As of March 24, 2015, the salinity of the water in the CCS was 85.76 ppt.
The temperature of the water within the CCS was 90.45°F. These water temperatures
are projected to increase during warm spring, summer, and fall months when air
temperatures are high and daylight duration is at its height. The CCS water
temperatures become more manageable when cooler weather and shortened days
occur during south Florida’s winter and spring months.
32. District staff reviewed and considered FPL's request, historic data, District
statutory authorizations and rules, and the potential water availability. District staff also
met with representatives of FPL and other stakeholders to discuss this matter.
Therefore, FPL has indicated its intent to withdraw application No. 150126-17, upon
execution of this Order and expiration of the time to challenge the same.
ULTIMATE FACTS AND CONCLUSIONS OF LAW
33. The District is authorized to regulate connections and use of the District's
rights of way, use of water, construction of new diversion facilities, initiation of new
water uses, diversion and withdrawal facilities pursuant to a variety of statutes. (e.g.:
§§373.083, 373.085, 373.086, 373.1501, 373.171, 373.219, Fla. Stat.)
34. The Governing Board may ‘“[iJssue orders to implement or enforce any
provisions of th[e] chapter or regulations.” § 373.083(2), Fla. Stat. (2014).
35. The Governing Board is authorized to issue orders affecting the use of
water, as conditions warrant, and forbidding the construction of new diversion facilities
or wells, the initiation of new water uses, or the modification of any existing uses,
diversion facilities, or storage facilities within the affected area. § 373.171(1), Fla. Stat.
(2014).
36. Pursuant to Sections 373.085, 373.086 and 373.1501, Fla. Stat., the
District is authorized to act as local sponsor and operate the C&SF Project, including
those structures that are part of the L-31E Canal System and relevant to the subject
reservation.
10
37. Rule 40E-10.061, Fla. Admin. Code, reserves water for protection of fish
and wildlife in the Nearshore Biscayne Bay. Seasonal target flows are stated in this
rule. Operation of the C&SF Project frequently involves discharge of water from the
subject structures to tide in excess of those reserved such that water is periodically
available for use.
38. FPL’s Turkey Point CCS has recently experienced heightened
temperatures and salinity. The CCS temperatures, if sufficiently high, can result in an
emergency involving potential to shutting down ail or part of power production at Turkey
Point.
39. Addition of water from an external source can reduce CCS temperatures.
40. To avoid an emergency and better manage heightened CCS temperatures
and salinity, FPL seeks a short-term approval authorizing withdraw of available surface
water from the L-31E Canal System as it develops long-term water supply and other
options to manage CCS temperatures and salinity.
41. Based on FPL’s request and the above-described facts, the District has
considered this matter and finds that the requested use, as conditioned by the below
stated withdrawal limitations and monitoring requirements, will not use water reserved
for protection of fish and wildlife as defined in Rule 40E-10.061, Fla. Admin. Code, and
will not cause to harm the water resources of the District.
ORDER
Based upon the Findings of Fact, Ultimate Facts and Conclusions of Law, the
Governing Board orders that FPL is authorized to undertake the following, temporary
actions in accordance with the conditions stated herein:
11
42, Short-Term Water Withdrawal Authorization
a. Water Availability Restriction: FPL is prohibited from withdrawing
and using water from the L-31E Canal System that is reserved for fish and wildlife by
Rule 40E-10.061, Fla. Admin. Code, for the Nearshore Central Biscayne Bay. The only
water available for the purpose of this Order is that water which would otherwise be
discharged to tide through the S-20F, S-20G, and S-21A structures and is sufficiently in
excess of the flows reserved for protection of fish and wildlife in Rule 40E-10.061, Fla.
Admin. Code. This available surface water may, for the duration of this Order, be
withdrawn and used within FPL’s cooling canal system in accordance with the
conditions as set forth below. There are no assurances provided by this Order that
water will be available for FPL's withdrawal and use on any given day. Water availability
is determined by a two-step process: Step 1) satisfaction of the calendar constraint
criteria; and Step 2) the delivery of 504 acre-feet per day to the Nearshore Central
Biscyane Bay from S-21A, S-20G, and S-20F each day prior to the daily withdrawal of
excess water from the C-103 Basin.
b. Step 1 - Calendar Constraint: FPL may potentially withdraw water
from June 1 to November 30 (Calendar Constraint’). No withdrawals are authorized from
December 1* through May 31® by this Order.
c. Step 2 - Withdrawal of Excess Water from the L-31E Canal
System: If the Calendar Constraint (Step 1) is met, the following procedure shall be
used to identify when FPL can withdraw water from the L-31E Canal System:
i. Part 1 — All pumps start each day off.
12
ii. Part 2 — All pumps remain off until the combined discharge
from S-21A, S-20G, and S-20F equals or exceeds 504 acre-feet. FPL shall monitor a
data feed (i.e., web page) maintained by the District that provides real time estimates of
the discharges from S-21A, S-20G, and S-20F. The data populating this site will be
collected by the District SCADA system and communication in the normal time frames
(e.g., updates ranging in frequency from 15 minutes to an hour).
iii. Part 3 — Once the data feed confirms that the combined
discharge from S-21A, S-20G, and S20F equals or exceeds 504 acre-feet, FPL may
withdraw water from the L-31E Canal System for the remainder of the day at up to the
maximum capacity provided that the Criterion to Prevent Over-Withdrawal or Hydraulic
Slope Impact is met.
iV. Part 4 — End of the Day. By the end of the Day (11:59 p.m.),
FPL shall turn off all pumps. Once the pumps are secured for the day, FPL shall record
the daily flow totalizer for each pump.
43. Criterion to Prevent Over-Withdrawal or Hydraulic Slope Impact: FPL
shall maintain a volume within the L-31E that is sufficient to ensure that there is no net
withdrawal based on the expected measurement uncertainty of the flow totalizers.
a. FPL shall calculate the daily volume pumped from the C-103 Basin
into the L-31E as well as the daily volume pumped from the L-31E into the CCS. The
volume of water pumped from the C-103 Basin into L-31E must exceed the daily volume
pumped from the L-31E into the CCS. The difference in volume shall account for any
calibration errors between the two flowmeters.
13
b. The pumps withdrawing water from the C-103 Basin and
discharging into the L-31E Canal (North Pumps) shall always be started at least five
minutes before the pumps withdrawing water from the L-31E and discharging into the
CCS (South Pumps). At the close of pumping for the day, the South Pumps shall be
stopped at least 5 minutes before the North Pumps. In addition to this proactive
measure, FPL shall evaluate the stage response of the L-31E for drawdowns due to a
net withdrawal or hydraulic slope or a combination of both and reduce the L-31E
withdrawals as required to eliminate any drawdowns caused by FPL pumping.
44. Communication of Water Availability Determination: Data on the daily
discharges from S-20F, S-21A, S-20G will be available on a web page for FPL to
determine when it can pump excess water from the L-31E Canal System between June 1
and November 30 each calendar year. In the event the District's real-time or specific web
page are inoperable on a given day or time period, FPL shall contact the District's
Operation Control Center at: 561-682-6116 and occ@sfwmd.gov to report that the
information is not updating so that the SFWMD can issue a remedy ticket to diagnose and
correct the problem. FPL may not commence any daily withdrawal operations until the
District's data feed is operable or FPL receives written (e.g., e-mail) approval to pump.
The District will provide written approval only for extended (multi-day) outages of the data
feed. FPL will be solely responsible for accessing the District's data and FPL own data
(e.g., pumping rates) to perform the calculations required to assess the criteria and
calculate the correct pumping rates and durations.
45. Monitoring and Reporting: FPL shall monitor and report the amount of
water diverted from the L-31E Canal System to its cooling canal system on a Weekly
basis.
a. When FPL withdraws water, FPL shall generate a daily report that
includes the following detailed information:
i. The water availability determination for each day based on
the data from the District-provided web page;
ii, Identification of which pump(s) were used over the course of
the day;
iii. The time on and time off, per pump;
iv. The RPM setting, per purnp, if variable;
Vv. The calculated volume of water pumped, per pump; and,
vi. The cumulative log flows at each pump station.
vii. FPL shall collect temperature and salinity data prior to
initiation of pumping pursuant to this Order and once a week thereafter for the duration
of this Order during the operational period. These samples shall be collected at
monitoring station TPSWCCS-1 and TPSWCCS-2 in the CCS, and the results
submitted to the District by noon on the following Tuesday after their collection.
b. FPL shall prepare a weekly report which summarizes the daily
reports for the preceding week (Monday at midnight through Sunday at 11:59 p.m.) and
includes the following additional information:
15
i, Hourly stage data for the L-31E Canal measured at TPSWy-1
and TPSW-2 for the weekly reporting period, whether or not the pumps operated. The
report shall include a table of the weekly data and a graph of the stages.
ii, The weekly report shall include a table and graph of the
hourly staff gage readings from SG-N (North of Palm Drive), SG-S (South of Paim
Drive), and SG-PSS (South Pump Station).
iit, The weekly report shall be submitted by noon on the
following Tuesday of each week
C. The reports shall be e-mailed to Simon Sunderland, P.G.,
Consulting Hydrogeologist at ssunder@sfwmd.gov or Maria Clemente, P.E., Bureau
Chief at mclement@sfwmd.gov. Both reports shall reference this Final Order. Upon
District review of the daily and weekly reports, conference calls may be required.
d. Additionally, the District may request available monitoring data at
any time and FPL shall provide the same within two hours of the District's request.
46. Special Pump Station Criteria:
a. The District may require FPL to terminate pumping at any time.
Upon receipt of any oral or written request from the District to terminate pumping, FPL
must cease pumping within two (2) hours.
b. FPL shall coordinate the pumping at both stations to assure that,
from a non-flow condition, the north station pumps shall be started first. The south
station pumps shall be started within five (5) minutes of the north station pumps start,
with an equivalent flow. Similarly, when pump operation ceases, the south station
pumps shall cease first and the north station pumps shall cease within 5 minutes.
16
C. FPL shall prepare a storm/huricane contingency plan that includes
securing the pump stations and ancillary equipment during a major weather event, plans
to empty all fuel lines from the storage tanks to the pumps. A copy of the plan should
be available for the District to review, if requested. FPL is required to monitor the
weather and hurricane forecasts and make the appropriate timely preparations.
47. Pump Requirements:
a. The pump stations shall be staffed on a 24-hour basis.
b. Pump Discharge Curves: Pump discharge curves used in
determining rates of discharge while pumps are operating, as deployed in the field, shall
be provided to the District prior to pump operation for the purpose of caiculating flow
rates and volumes.
Cc. Totalizing Hour Meters: FPL shall install totalizing flow meters at
each pump authorized by this Order and such meters shall be available for periodic
District inspection and verification. Documentation of an up-to-date and accurate
calibration for each of the totalizers shall be provided before pumping commences.
48. This Order authorizes FPL to take actions under Chapter 373, Fla. Stat.,
as provided herein. This Order does not relieve FPL from the requirements to obtain
any other federal, state, or local authorizations.
49. This Order does not constitute a water use or right-of-way permit or grant
any legal right to water as set forth in Chapter 373, Fla. Stat., and associated District
rules and regulations over the water intercepted and stored under this Order.
50. This Order does not convey any property right to FPL, nor any rights and
privileges other than those specified in this Order. This Order shall not be construed as
17
an abandonment or any other such impairment or disposition of the District's property
rights.
51. This Order shall not be construed as a substitute for, or waiver of, any right-
of-way, surface water management, water use, or other permits required of FPL under the
District's rules and regulations.
52. FPL shall insure that harmful impacts to the water resources, off-site land
uses, or existing legal uses of water do not occur as a result of this Order. In the event
such harmful impacts result from actions authorized by this Order, FPL shall implement all
actions, as directed by the District, to cease such harmful impacts and, if necessary, to
mitigate such impacts. Failure to comply with this requirement shall be considered a
violation of this Order.
53. Failure to comply with the terms of this Order shall constitute a violation of a
District Order under Chapter 373, Fla. Stat., and enforcement proceedings may be brought
in any appropriate administrative or judicial forum.
54. The District reserves the right to initiate appropriate legal action, to impose
civil penalties, and collect attorney's fees and costs to enforce the terms of this Order.
55. This Order may be modified or amended at any time, as appropriate for
the protection of the public health, safety, and welfare and the water resources of south
Florida by the Governing Board, Executive Director, or Executive Director's designee,
56. The Executive Director or Executive Director's designee may require FPL
to cease withdrawal and/or use activities under this Order at any time.
57. Failure to comply with the conditions contained within this Order shall
constitute a violation of a District Order under Chapter 373, Florida Statutes, and
18
enforcement proceedings may be brought in any appropriate administrative or juciicial
forum.
58. If the District petitions or sues for enforcement of the terms of this Order,
the District reserves the right to initiate appropriate legal action, to impose civil penalties
and collect attorney’s fees and costs.
59. This Order shall terminate on November 30, 2016 at 11:59 p.m. or upon
written notice from the District’s Executive Director or the Executive Director's designee,
whichever occurs first.
60. A Notice of Rights attached hereto as Exhibit E.
DONE AND SO ORDERED in West Palm Beach, Florida, on this 9th day of April,
2015.
SOUTH FLORIDA WATER
MANAGEMENT DISTRICT
xOUNUtt ny, By its Governing Board
oy GLORIA yn . 8
ES ww Mirsin, - eE 2?
s$ Sp eG a
FS 4,
2 ey 22 Blake C. Guillory; P-E.
ao Re Executive Director
4B SE
4 @ SF
‘ly Si
Attested: MOD 2 As Legal Form Approved:
Tati
‘er D. Brown, Esq.
District Clerk/Secreta
April /@_, 2015
19
(740) 0007 a
AVEXZZ) OOF =
dVW ALINIOIA
———_ wav onrriooy
ma ae
WAY) SRNOOSOL—"
CLA Raypepaicrnon:
~ MLELSAS FOUVHOSL | |
~. :
s WwAVO GS) g1e7
NW1d TOHLNOS NOISOYS
STIVLG ONY Nvid 300tHs adic
WANS HOLDSOUSLNI
YBAO ONISSOUD Adid WALSAS SDYVHOSIO
S3WsOUd NBLSAS 3DAVHOSIC
ONISSOND S3A31 ONY dWNd N3LSAS SOYVHOSIO
NW1d ALIS WALSAS SOUVHOSIC
ONISSOYD GVOY YBONN ONV dINNd NSLSAS ANVLNI
Nid BLIS WELSAS SNVINI
NGIAUBAO LOSrOud
SBLON NOLLONULSNOD
433HS YSAOD
XAGNI ONIMVYG
da
VINO 1s ‘ALNNOS S0VC-INVIN
“SLN
dvW NOILV901
NOLLVS07 LOarodd
FOUVHOSY YSLVMHSSYS IWNV9 ONIIOOO LNIOd AANeNL IdS
EXHIBIT A
EXHIBIT B
CHAPTER 46E-10
WATER RESERVATIONS
40E-10.01t — Policy and Purpose
A0E-10.021 Definitions
40E-10.03l Water Reservations Implementation
40E-10.061 — Water Reservation Areas: Lower East Coast Planning Area
40E-10.011 Policy and Purpose.
The purpose of this chapter is to define the quantity, location and timing of waters reserved ftom allocation for the protection of fish
and wildlife pursuant to Section 373.223(4), F.S., for specified water bodies. Water reservations are implemented in the water use
program pursuant to Chapter 40E-2, F.A.C.
Rulemaking Authority 373.044, 373.113, 373.171 FS. Law Implemented 373.016, 373.026, 373.036, 373.1501, 373.1502, 373.219, 373.223,
373.4592, 373.4595, 373.470 FS. History-New 7-2-09, Amended 7-14-14.
40E-10.621 Definitions.
(1) Fakahatchee Estuary — The area within the Ten Thousand [slands region including the following river/bay systems, from
west to east: Blackwater River/Blackwater Bay, Whitney River/Buttonwood Bay, Pumpkin River/Pumpkin Bay, Wood River, Little
Wood River and Faka Union Canal/Faka Union Bay, and Fakahatchee Bay as depicted in Figure 1-3 Fakahatchee Estuary,
(2) Picayune Strand — The area located southwest of the Florida Panther National Wildlife Refuge, north of the Ten Thousand
Islands NWR, east of the South Belle Meade State Conservation and Recreation Lands (CARL) Project, west of the Fakahatchee
Strand Preserve State Park, and northeast of Collier-Seminole State Park as depicted in Figure [-2 Picayune Strand. The legal
description of the Picayune Strand is contained in Appendix 1.
(3) North Fork of the St. Lucie River — The area that extends from the Gordy Road structure (state plane coordinates,
x851212.831, y1116105.7470), to the confluence of the North Fork of the St. Lucie River and the C-24 canal (state plane
coordinates, x873,712.20, y1064,390.41) as depicted in Appendix 2, Figure2-1.
(4) Nearshore Central Biscayne Bay - The area within Biscayne Bay up to 1640 feet (500 meters) from the shoréline beginning
south of Shoal Point extending southward to north of Turkey Point as depicted in Figure 3-1.
(5) Caloosahatchee River - The surface waters that flow through the S-79 structure, combined with tributary contributions
below S-79 that collectively flow southwest to San Carlos Bay, as defined in subsection 40E-8.021(2), F.A.C.
(6) Caloosahatchee River (C-43) West Basin Storage Reservoir — A reservoir located in Hendry County, Florida, west of the
City of LaBelle on the east side of the Townsend Canal and south of SR 80s described in Appendix 1-12, and depicted in Figure 1-
13 (also known as the ‘C-43 Reservoir’).
Rulemaking Authority 373.044, 373113, 373.171 FS. Law Implemented 373.016, 373.026, 373.036, 373.1501, 373.1502, 373.219, 373.223.
373.4592, 373.4595, 373.470 FS. History-New 7-2-09, Amended 3-18-10, 7-21-13, 7-16-14.
40E-10.031 Water Reservations Implementation.
(1) Applicants for consumptive use permits shall meet the requirements of this rule by providing reasonable assurances that
Rule 40E-2.301, F.A.C., and Section 3.11 of the “Applicant's Handbook for Water Use Permit Applications within the South Florida
Water Management District,” incorporated by reference in Rules 40E-2.091, ¥.A.C., are met.
(2) Water reserved for the protection of fish and wildtife contained within the Picayune Strand and Fakahatchee Estuary is
defined in subsections 40E-10.041(1)-(2), F.A.C.
(3) Water reserved for the protection of fish and wildlife contained within the North Fork of the St. Lucie River is defined in
subsection 40E-10.051(1), F.A.C.
(4) Water reserved for the protection of fish and wildlife contained within Nearshore Central Biscayne Bay is defined in
subsections 40E-10,061(1)-(2), F.A.C.
(5) Water reserved for (he protection of fish and wildlife contained within and released, via operation, from the Caloosahatchee
River (C-43} west Basin Storage Reservoir is defined in subsection 40E-10.041(3), F.A.C.
Rulemaking Authority 373.044, 373.113, 373.171 FS. Law Implemented 373.016, 373.026, 373.036, 373.1501, 373.1502. 373.219, 373,223,
373.4592. 373.4595, 373.470 FS. History-Now 7-2-09, Amended 3-18-10, 7-21-13, 7-14-14, 7-16-14.
EXHIBIT C
40E-10.061 Water Reservation Areas: Lower East Coast Planning Area.
(1) Nearshore Central Biscayne Bay as defined in subsection 40B-10.021(6), F.A.C.:
All surface water contained within Nearshore Central Biscayne Bay is reserved from allocation (see Figure 3-1).
(2) Surface water flowing into Nearshore Central Biscayne Bay as identified below is reserved from allocation:
(a) Surface water flows depicted on Figures 3-2.A and 3-2.B through S-123 derived from the following contributing canal
reaches:
|. The C-100A canal upstream of S-123 to S-120 including all integrated conveyance canals.
2. The C-100C canal upstream of S-123 to S-119 including all integrated conveyance canals.
3. The C-100B canal upstream of S-123 to S-122 including all integrated conveyance canals.
4. The C-100 canal upstream of S-123 to S-118 including all integrated conveyance canals.
(b) Surface water flows depicted on Figures 3-3.A and 3-3.B through S-21 derived from the following contributing canal
reaches:
1, The L-31E borrow canal upstream of S-21 to the canal terminus.
2. The C-1 canal upstream of S-21 to S-122 and S-149 including all integrated conveyance canals.
3. The C-1 canal upstream of S-21 to the C-1W canal and S-338 including all integrated conveyance canals.
(c) Surface water flows depicted on Figures 3-4.A and 3-4.B which is the combined flow through S-21A, S-20G, and S-20F as
derived from the following contributing canal reaches:
1. The C-102 canal connecting to the C-102 N canal upstream of S-21A to S-195.
2. The C-102 canal upstream of $-21A to 8-165,
3. The L-31E borrow canal upstream of S-21A to its terminus near S-21 including the Gould’s Canal.
4. The L-3 1E borrow canal upstream of $-21A south to $-20G.
5, The Military canal upstream of S-20G.
6. The C-103 canal upstream of S-20F to S-179.
7. The L-31E borrow canal upstream of S-20F to S-20G including all integrated conveyance canals.
8. The L-31E borrow canat from S-20F south to the North Canal.
9. The North Canal.
10. The L-31E borrow canal from S-20F south to the Florida City Canal.
11. The Florida City Canal from Southwest 107th Avenue to its confluence with the L-31E borrow canal.
Notwithstanding the above, presently existing legal uses for the duration ofa permit existing on July 18, 2013, are determined to be
not contrary to the public interest pursuant to Section 373.223(4), F.S.
Reservations contained in the section shall be reviewed in light of changed conditions or new information.
Rulemaking Authority 373.044, 373.113, 373.171 FS. Law Implemented 373.016, 373.026, 373.036, 373.1501, 373.1502, 373.219, 373.223,
373.4592, 373.4595, 373.470 FS. History. New 7-21-13.
APPENDIX 3: LOWER EAST COAST PLANNING AREA
Figure 3-1 Nearshore Central Biscayne Bay Reservation Water Body and Protected Canal Reaches
Shoal
Point
Turkey
Point
Figure 3-2. Surface Walar Flow from the C-100 canal through S-123 into
Biscayne Bay during the Wet Saason (June-Octobsr) (1988-201 4)
“y
Flow Rate {acre-day)
Tanget Flow to tre Blayel4d acce-tiény
a F) 0 & 0 100
Porcantags Tima Equaled of Exceedad
Figure 3-2,8 Surface Wales Flow from the C-100 canal through S-123 Into
Biscayne Bay during the Dry Season (Novembsr-May) {1986-201 1)
“y
gel
Water Reserved
2000
Flow Rate (acre-Riay)
1900
Target Flow fo the Bay>344 coakny
0 F 0 6 Cy) 100
Porcentage Time Equated or Exceeded
Figure 3-3.A Surface Wailer Flow from the C-1 canal through S-21 into
Biscayne Bay during the Wet Season (Juna-Oclaber)} (1986-2011)
Flow Rate (scre-futdzy)
Terget Flow tothe Bay=672 acroaMay
o 20 40 oO C) 109
Percentage Tima Equaled or Exceated
Figure 3-3.B Surface Waler Flow from the C-1 canal through 8-21 Into
Biscayne Bay during the Dry Season (November-May) (1988-2011)
ony
Flow Rate (acre-Miday)
Target Flow to tho Baye672 screNiday
9 20 40 0 Cy 190
Percamtago Timo Equaled or Exceeded
Figure 3-4. Surface Water Flow from the C-{02+Military+C-103 Canal
through $-21A+S-20G+S-20F inlo Biscayne Bay during thaWal Season
(June-Cctober) (1986-2041)
12009 v
3000,
_ BZIAMG-206+5-20F
; Tosget
CSE Wali Resened
$ 200
g
z
é
i 1000
Paroantage Time Equalsd or Exceeded
Figure 3-4.B Surface Water Flow from the C-102+Milllary#C-103 Canal
through 8-21A+S-20G+S-20F Into Biscayne Bay during the Dry Season
(November-May) (1986-2041)
TAIS-208 +8-20F
gol
Welor Reserved
Targot Frew (o tho BayobOsatcadvs
Percentage Time Equaled of Exceaded
40E-2.301 Conditions for Issuance of Permits.
(1) In order to obtain a permit, permit renewal, or permit modification under this chapter, an applicant must give reasonable
assurances that the proposed water use at the time the permit application is deemed complete:
(a) Will not cause harmful saline water intrusion;
(b) Witl not harm offsite land uses;
(c) Will not cause harm to wetlands or other surface waters;
(d) Will not cause pollution of the water resources;
(e) Is otherwise a reasonable-beneficial use as defined in Section 373,019(13), F.S., with consideration given to the factors set
forth in Rule 62-40.4 10, F.A.C.;
(f) Will not interfere with presently existing legal uses;
(g) Is in accordance with Section 373.2295, F.S., concerning interdistrict transfer of groundwater and Section 373.223(3), F.S.,
concerning water transport and use of groundwater or surface water across county boundaries.
(h) For uses with a recommended maximum allocation which exceeds 100,000 gallons per day or uses within a mandatory reuse
zone, makes use of a reclaimed water source in accordance with the criteria contained in the “Applicant’s Handbook for Water Use
Permit Applications within the South Florida Water Management District,” incorporated by reference in Rule 40E-2.09 1, F.A.C,
(i) Is in accordance with any minimum flow or level and implementation strategy established pursuant to Sections 373.042 and
373.0421, F.S.; and
G) Is consistent with Sections 373.016 and 373.036, F.S., and otherwise is consistent with the public interest as prescribed by
Chapter 373, F.S., and this chapter.
(k) Will not withdraw water reserved under Chapter 40E-10, F.A.C.
(2) tn order to satisfy the conditions for permit issuance in subsection (1), the permit applicant must provide reasonable
assurances that the criteria in the “Applicant’s Handbook for Water Use Permit Applications within the South Florida Water
Management District,” incorporated by reference in Rule 40E-2,091, F.A.C., are met.
Rulemaking Authority 373.044, 373.113, 373.118, 373.171 FS. Law Implemented 373.036, 373.042, 373.083, 373.103(4), 373.1501, 373.1502,
373.223, 373.229, 373.2295, 373.470 FS. History-New 8-14-02, Amended 8-31-03, 4-23-07, 2-13-08, 7-2-09, 7-14-14.
APPLICANT'S HANDBOOK FOR WATER USE PERMIT APPLICATIONS (07-16-2014)
3.11.3 Nearshore Central Biscayne Bay
A permit applicant shall provide reasonable assurances that the proposed use will not
withdraw water reserved under subsection 40E-10.061(1), F.A.C. Compliance with the
following criteria constitutes reasonable assurances that water reserved in Rule 40E-
10.061, F.A.C., will not be withdrawn. Water not reserved under Rule 40E-10.061,
F.A.C., shall be allocated pursuant to this Subsection.
For this section, the following definitions apply:
Direct withdrawal: Withdrawal of surface water from facility intakes physically
located within the surface water column of Nearshore Central Biscayne Bay as
depicted on Figure 3-1 in Chapter 40E-10, F.A.C. No direct withdrawals shall be
authorized pursuant to this rule.
Indirect withdrawal: Withdrawal of surface water from facility intakes physically
located within the surface water column of any canal reach identified in Figure 3-
1 in Chapter 40E-10, F.A.C.
The following uses do not withdraw reserved water:
A. Withdrawals of groundwater;
B. Withdrawals authorized by Rules 40E- 2.061 (General Permits by Rule) and
dewatering operations that 1) will not exceed a maximum of ten 10) mgd, with a
maximum of 1,800 mg total pumpage; and 2) will not exceed a total duration of
one year for the entire project;
C. —_ Renewals of indirect withdrawals authorized by a permit existing on July 21,
2013;
D. A permit modification involving an indirect withdrawal authorized by a permit
existing on July 21, 2013 that does not change the source, increase the
allocation or change withdrawal locations, such as replacement of existing
WU AH - 91
PLICANT’S HANDBOOK FOR W. RMIT APPLICATIO! -16-201
surface water pumps or intakes, crop changes that do not change the allocation
or timing of use, or decrease in allocation:
A new indirect withdrawal with no greater allocation and impact, including
changes in timing, than a terminated or reduced permit that was existing on Juty
21, 2013 and occurs upstream of the same coastal structure; and,
Indirect withdrawals which do not withdraw reserved water as defined in Rule
40&-10.061 F.A.C.
WU AH - 92
| TETRA TECH
TECHNICAL MEMORANDUM
From: Peter F. Andersen and James L. Ross, Tetta Tech
To: Stacy Foster and Scott Burns, Florida Power & Light Company
Date: March 13, 2015
Subject: Evaluation of L-31E Water Addition Impacts on CCS Salinity Reduction
Introduction
This technical memorandum describes water and salt balance modeling of the addition of L-3 1B
water as a salinity reduction measure in the Florida Power & Light (FPL) Cooling Canal System
(CCS), located at the Turkey Point Nuclear Power Plant. The modeling was conducted to provide
an assessnent of the effects of adding L-31E water to the CCS between June | and November 30
in 2015 and 2016 in an effort to teduce the salinity of the CCS, Knowledge of the effects of adding
this water will help to identify how effective it is at reducing CCS salinity under different
assumptions of water availability and maximum daily withdrawals.
A spreadsheet-based water and salt balance model was employed for this analysis. This mede]
was developed as a part of the Turkey Point Uprate monitoring program. The South Florida Water
Management District has reviewed the model at vatious stages of its development and application.
The version of this model employed for the predictive analysis is transient and calibrated to 45
months of hydrologic and water quality data collected within the CCS and in the surrounding
environment (Ecology and Environment, 2014). This model was modified and executed to provide
estimates of the effect of adding various amounts of L-31B water in an effort to attain reductions
in CCS salinity.
Background
The CCS is a constructed surface water body that receives heated water from Turkey Point
Power-Generating Units 1, 3, and 4. As the heated water travels southward along the discharge
canals and northward back to the plant along return canals, it is cooled by evaporation and
mixing with inflowing water from the Biscayne Aquifer. Due to the evaporative process, which
is facilitated by the elevated temperature of the water, a portion of the water from the CCS is lost
to the atmosphere, leaving dissolved solids behind in the CCS and producing hypersaline
conditions in the CCS, Hypersaline water exhibits salinities greater than that of seawater, which
has a salinity of approximately 35 PSU. Over the 10 years prior to 2014, salinity in the CCS has
ranged between 42 and 69 PSU. During 2014, salinity in the CCS increased to a maximum daily
average of approximately 99 PSU (monitoring station TPSWCCS-4, September 9, 2014),
Subsequent to that peak, salinities reduced and varied between 65 and 75 PSU in the fall of 2014,
Part of this salinity reduction is attributable to measures undertaken by FPL that included
addition of L-31E water and groundwater from a Floridan well associated with Unit 5.
{n order to mitigate the contribution of hypersaline water to the underlying Biscayne Aquifer,
and return the CCS to equilibrium consistent with pre-2014 conditions, FPL is evaluating
remedial measures to moderate CCS salinities and prevent significant increases in the neat
future. In the course of prior evaluations conducted to investigate the response of CCS salinity to
TETRA TECH EXHIBIT D
Page
the addition of less saline water, an inspection of monitoring data between 2010 and 2012
revealed a correlation between daily rainfall on the CCS and CCS salinity, where rainfall events
were generally followed by short term reductions in CCS salinity, Two phenomena were evident
in this review of CCS monitoring data: 1) CCS salinities generally reduce dusing rainy months
(May through October); 2) significant rainfall events produce notable reductions in CCS salinity.
The latter phenomenon is effectively illustrated by a large (> 7 inches) rainfall event in late-
September 2010 that induced an approximate 10 PSU drop in the average CCS salinity,
Because precipitation events are simply freshwater inflows to the CCS, they effectively dilute the
water and reduce salinity, Based on the effectiveness of such low-salinity inflows in reducing
salinity, the addition of L-31E water to the CCS was proposed during times when such water was
available, The water and salt balanee model mentioned shove was reconfigured to evaluate this
salinity reduction measure with respect to its effectivenéss-in mitigating high CCS salinity in the
near future. These evaluations and associated results aid conclusions are discussed below.
Reconfiguration of Water Balance to Represent Future Predictions
Calibrated Water and Salt Balance Model
Based on monitoring data in and outside of the CCS, Tetra Tech constructed a transient water
and salt balance model of the CCS and calibrated it to 45 months of hydrologic and salinity data
collected from the CCS between September 1, 2010 and May 31, 2014 (Ecology and
Environment, 2014). This model calculates inflows to the CCS (c.g. precipitation, seepage from
groundwater) and outflows from the CCS (¢.g. evaporation, seepage to groundwater) onadaily .
timestep using hydrologic, water quality, and meteotological data, These data were collected at
intervals ranging fiom 15-minute to 1-day throughout Biscayne Aquifer, Biscayne Bay, the CCS,
and nearby canals. The model uses the calenlated daily inflows and outflows to effectively
simulate daily changes in CCS water and salt storage. These changes in storage are then
employed to calenlate daily changes in CCS water levels and salinity,
This model was later revised to incorporate data and simulate conditions through October 2014,
Because this timestame witnessed significant stresses on the CCS, including elevated evaporative
losses from the CCS, relatively low precipitation-based inflows, and the influx of pumped L-318
water, it was determined that a model calibrated tothe extended timeframe would be robust and
a better predictive tool, With minor changes to model paameter values, the calibrated 45-month
model was extended and re-calibrated to effectively simulate the 50-month timeframe through
October 2014. The quality of the model is illustrated by the reasonably aecurate simulation of
daily changes in average CCS water Jevels and salinity over the 50-month period (Figure 1). It
should be noted that the model correctly simulates reductions in salinity that result ftom both
latge rainfall events (c.g. October 1, 2010) and the addition of L-31E water (late September
through mid-October 2014). The ability to match the response of salinity to the addition ofa
known quantity and quality of water provides confidence that the model is able to predict
changes in CCS salinity due to prescribed CCS salinity reduction measures.
Predictive Water and Salt Balance Model
in order to predict future changes in CCS water level and salinity, the approach used to calculate
CCS inflows and outflows was changed relative to that employed for the historical timeframe in
the following manner. During the 50-month historical period (September 2010 through October
TETRA TECH
Page
2014), the calculation of water and salt exchanges between the CCS and the surrounding
environment relied on measured CCS water levels and salinities, Because future CCS conditions
are unknown, predicted CCS inflows and outflows are calculated using sinuilated CCS water
levels and salinities,
As previously mentioned, the calibrated water and salt balance model simulates daily changes in
CCS water level and salinity through October 31, 2014. As such, the predictive simulation
commences on November 1, 2014; this simulation extends over 2 years through November 30,
2016, The initial predictive water levels throughout the CCS are based on CCS water levels
observed on October 31, 2014 and the change-in water level due to the balance of water flows
caleulated for that day. In other words, the siitilated Noveniber 1, 2014 water levels throughout
the CCS are the sum of the measured CCS water:levels on October 31 and the caleulated change
in water level due to the caleulated CCS inflows and outflows for that day. The initial salinity
conditions for the predictive model are calculated in an analogous manuier; the simulated
salinities throughout the CCS on November 1 are the sun of the average observed CCS salinities
on October 31 and the caleulated change in salinity duc to-the balance of salt flows calenlated for
that day. The daily exchanges of water and salt between the CCS and the surrounding
environment for November | are determined using the calenlated initial water levels and
salinities throughout the CCS. The balance of these flows informs the predieted CCS water level
and salinity, respectively, for the next day, The model cortinues step-wise calculations of water
levels ard salinity in this manner throughout the 25-month predictive simulation.
Predigtt ve Scenarios
In order to represent conditions outside of the CCS, observed data from the historical period was
repeater! and acted as a surrogate for future hydrologic, water quality, and meteorological
conditions in Biscayne Aquifer, Biscayne Bay, nearby canals, and the atmosphere. Additionally,
the mociel does not currently evaluate a CCS thermal balance, so CCS water temperatures
observed during the historical period were employed to. represent future thermal conditions,
Because external conditions and, especially, CCS water temperatures play a large role in
inducing changes to CCS water levels and salinity, two baseline predictive scenarios were
evaluated; each scenario is distinct in what historical data were used to represent fiture
conditions. Predictive Scenario A assumes future conditions mimie those observed between
November 1, 2010 and October 31, 2012. Conditions during this timeframe reflected normal
weather patterns and were conducive to moderating CCS salinity. Predictive Scevatio B assumes
future conditions mimic those observed between November 1, 2013 and October 31, 2014, a
time during which environmental conditions (¢.g. precipitation, CCS water temperatures)
reflected dry weather patterns and produced dramatic incteases in CCS salinity, This 1-year
timeframe was repeated to produce a 2-year predictive simulation. in both scenarios, the
conditions observed during the first November (2010, 2013) were repeated to create surrogate
conditions for the last month (November 2016) of the 25-month predictive simulation.
Predicted water levels and salinities simulated by Scenatio A are shown in Figure 2; Scenario B
predictions are illustrated in Figure 3. Comparison of these figures reveals differences in how the
CCS would respond to assumed future conditions. Predicted CCS salinity generally decreases
over the 2-year timeframe under Scenario A, whereas CCS salinity generally rises during the 2-
year predictive simulation under Scenario B, The reason for the disparity between these two
predictive scenarios with respect to simulated salinity and water levels is, as previously
TETRA TECH
Page
mentioned, the different historically observed external conditions and CCS water temperatures
assumed to persist over the next two years; Scenario A assumes conditions consistent with those
observed between November 2010 and October 2012, whereas Scenario B assuunes conditions
consistent with the November 2013 through October 2014 timeframe occurring twice
sequentially. Between November 2010 and October 2012, observed CCS salinities averaged 54.3
PSU and peaked at 68.2 PSU (at station TPSWCCS-6), Between November 2013 and October
2014, salinity in the CCS averaged 79.8 PSU and reached a peak of approximately 98.5 PSU (at
station TPSWCCS-4), Water levels between November 2010 and October 2012 were generally
higher than those between November 2013 and October 2014, Itis clear from this comparison
that environmental conditions during the first two year period were more effective at modetating
CCS salinity than those conditions observed between November 2013 and October 2014.
Thus, construction and simulation of two predictive scenarios is predicated on two motivations,
First, predicted CCS water levels and salinity made with model Scenarios A and B will provide a
range of anticipated conditions in the-CCS in the neat future. Predictions made with Scenario A
will reflect environmental conditions that are conducive to relatively low and stable salinities in
the CCS, whereas predictions made with Scenatio B will reflect the deleterious conditions that
can coeree the CCS into a new equilibrium with higher salinity and lower water levels. Second,
the two predictive scenarios will help to elucidate the relative effectiveness of L-31E water
additions under different environmental conditions. Predictions with both scenarios will help to
provide a realistic range of CCS salinity changes duc to the proposed remedial measures. These
salinity reduction measures and their respective outcomes are discussed below.
Simulation of L-31E Water
Determination of Available Water
In order to provide an estimate of potentially available water in L-31E consistent with the two
predictive scenarios, daily combined stormwater discharge volumes through $-21A, 8-20G, and
8-20F into L-31£ were determined for the historieal périods that inform both Scenario A
(November 2010 through October 2012) and Scenario B (November 2013 through October
2014), The daily reservation flow volume (254 efs) was then subtracted from the combined daily
discharge. The resulting daily L-318 flow voluines represent water that oan potentially be added
to the CCS as a salinity reduction measure. On days Between June | and November 30 where the
reservation flow exceeded combined daily discharge, it was assumed that no L-31E water was
available for allocation to the CCS, in addition to using historical L-31E stormwater discharge
volumes, L-31E salinities observed during the two historical timeframes were used fo define the
assumed future salinity of L-31E water added to the CCS.
In order to evaluate the effect of adding the excess L-31E stormwater water under different
assumptions of availability, feasibility, and permitted allocations, three constraint criteria were
applied to the excess flow volumes. These additional constraints defined a maximum daily
volume of available L-31E water that could be allocated to the CCS; the three constraint volumes
evaluated are 30 MGD, 60 MGD, and 100 MGD. The 100 MGD constraint reflects a situation in
which the volume of L-31E that can be allocated to the CCS is limited only by the withdrawal
pump capacity. Of the three flow constraints, the 100 MGD constraint results in the greatest
volume of water added to the CCS from L-31E. Excess daily stormwater discharges to L~31E for
the two historical periods evaluated, constrained to a maximum of 100 MGD, are plotted in
TETRA TECH
Page
Figure 4.
Simulation Results
The addition of L-31E flow volumes were modeled by the predictive water and salt balance
models (both Scenario A and Scenario B). The modeled actions comprising the added water, and
associated changes to simulated CCS conditions, were represented by incorporating the
additional prescribed flow and associated mass into the daily water and salt balance equations,
respectively. These modeled actions changed the sisnulated CCS water levels and salinities from.
the base model results in Figures 2 and 3, in general, simulated CCS water levels increased and
simulated CCS salinitics decreased relative to the base case predictive simulations.
The simulated water levels in each of the three added water assusaptions, as well as the simulated
water levels for the base ease, for predictive Scenario A ate plotted in. Figure 5. The water levels
associated with predictive Scenaido B are plotted i Figure 6. Both figures demonstrate that L.-
31E water added to the CCS results in an increase in. thhéCCS stage. Table | provides the average
CCS water levels over the 25-month predictive thnefranie for the base (no action) case and
constrained L-318 flow assumptions under both averageand dry environmental conditions.
These results show that the average CCS stage increases by a maximum of 0.22 feet and 0.18
feet for Scenarios A and B, respectively (both for the 100 MGD maximum L-31 allocation).
Note that these averages are taken over the entire 25-month period and deviations in stage
relative to the base case are mote pronounced between June | and November 30 when L-318
water is permitted to be added to the CCS, as evident in Figures 5 and 6,
Table 1, 25-month averaged CCS water levels under different assumptions of L-318 additions
(in feet, NAVD88)
Environmental Base Case Maximum of | Maximumof | Maximum of
Conditions (No Action) 30 MGD 60 MGD 100 MGD
Scenario B
(dr
0,52
Simulated CCS salinities in response to the added L-318 water, as well as the simulated salinities
for the base case, for predictive Scenario A are plotted in Figure 7. The predicted salinities for
Scenario B are plotted in Figure 8, Both figures demonstrate that more L-31E water added to the
CCS results in a greater deerease in salinity. Table 2 provides the average CCS salinities over the
25-month predictive timefiame for the base (no action) case and the constrained L-31E flow
assumptions under both average and dry environmental conditions. The greatest decrease in
average salinity occurs when the L-31E water added tothe CCS is constrained only by the
withdrawal pump capacity (maximum of 100 MGD). In this remedial case, the 25-mnonth average
salinity reduces by 28.7 PSU relative to the base case for Scenario A and by 61 PSU relative to
the base case for Scenario B. As in the ease of additional stage, these salinities are averaged over
the entire 25-month predictive timeframe. The impact of added water on salinity is most
TETRA TECH
Page
pronounced when the L-31E water is assumed to be added to the CCS (between June | and
November 30).
Table 2. 25-month averaged CCS salinity under different assumptions of L-31B additions (in
PSU)
Environmental Base Case
Conditions (No Action)
Maximum of
100 MGD
Maximum of
60 MGD
Scenario A
49.8 43.2
Scenario B
_ ry)
Stunmary
This analysis evaluates the effectiveness of L-31E discharge-based salinity reduction measures
for the Tuckey Point CCS. The transient water and salt balance developed for the Uprate Project
was used in a predictive, forward looking, sense. Bach remedial measure was modeled using two
different assumptions for future conditions. The two seenarios provide a bound on expected
responses and show any differences in effectiveness that result from using different future
baekgroiind conditions, Details regarding the reconfiguration of the model to simulate the two
future conditions are presented in the memorandum. —
This analysis suggests that the addition of L-31B watero the CCS is an effective means of
reducing CCS salinities over the predictive 2-year timeframe in light of both average and dry
environmental conditions, One of the key reasons that L-31B water Is so effective at ameliorating
elevated CCS salinities is the fact that the addition of this water compensates for evaporative
losses from the CCS, Because evaporation removes freshwater (and leaves suspended solids in
the CCS), this outflow of water increases the salinity ofthe CCS. The addition of L-31E water
can help to replace freshwater lost to evaporation and keep salinity relatively low. This is
particularly true during dry conditions where precipitation is low and freshwater inflows are
more critical. The pronounced effect of L-318 additions during dry conditions is illustrated in
Figure 8 and Table 2.
References
Ecology and Environment, 2014, Turkey Point Plan Comprehensive Post-Uprate Monitoring
Report: Unit 3 & 4 Uprate Project, Prepared for Plorida Power & Light, August 2014.
TETRA TECH
HOF. Vall
japour asuejeq pererqies yyuour-g¢ sur Aq paanpord (a1on0q) Ayraryes pue (doz) spaaay rare SD parenurIs pus poaresde ‘T amatt
36 G P : Sf ror I LP:
SLD GEE LIO SITS Bee eee De S Re aie
ee
aratatataararafarararararer: iii ttethbefareramerarmrarsarararen +f
roa re L OF
= os 4
Mm oo Gi
L og =
Log S|
os =
: oot &
(ifs) UoRenuasusD painsesIy = + OL
I
Ga} ucweRuequoy payenuns —— r oct
“ocr |
ER IT A ROIS Fgoes 5 RR EE: Ne SEES On
Ss MeN tS wie YS Ss RBCS: < S <3 nes = SIs gS ot & O,
ES SEES EE ERS SE ROSE Se EBM
Pa a a rT TY OD TO ce ag
& a: od
- ST 8
t-
. =
sO2a
' a 5 > oe
i 0
—}-— | 1
I
\
Oot
aa
(nsd) Anuyes
ooc
goseg
HOAL Watt
G OUEUSIG JApOUL JOF (m0y10q) FeAo] eM pue (doy) Apurpes Jo SUOTHIIPSI_ “€ omstt
9T-ACN gT-Sny gt-Aen 9t-qad | GT-ACN gT-any ST-ARI ST-q34 YT-AON
i—
1
- SO-
(a8QAWNN '23) [aAe7 AEM
— -! t
QT-AON oT-sny 9T-AeIAL QT-qad GT-AQN sT-Sny ST-ABi ST-q4 T-AON
7
ii
i)
4 i
; : L— P
i yw os =
; : oot =
Ga8eg
HOAL WU.LaL
“SIOZ SUNG [HUN SdUSUMEOS 0} Pauunsse ou are suoHRooT2 MOL at YsNOY! “pIOZ JaquIsAcN UI sujgeq wonEuits
aanotperd ayy, :s10Nt “(toN0q) g oLreusag pur (dor) yw openaog Joy a@reqosip Iaremmnnors FL E-T s[qeiesoyye uray, “> OMSL T
(aw) @81eyasyg ate-7 s899K3
OL a8eg
v
Ss
<3 Ss s
Se
F&F oF of
Sd 3
FL LS KH KF SF
: . :
HOsSL VULAL
suoeaoTe? TI E~“T poureysuas ay} puw asvo aseq Y¥ oLrenaag saroipaid Iog speary 512m SOD pores “¢ smart
7 ST
1 :
Lp
4 3 b. '
i: |
t
a
ga-g |
F ~:
2°
i ' a
Fé i 3.
ARIAL 9t-Ga4 ey-any ST-ABIAL ST-934 vEpoN 2 |
_ 1 fos x _—_ a <=
/ 5
: Si
i
ASIA OOT X21 ———— |
| : SIA 09 xe — i :
GOIN OE Xe | #0 :
| : uanay ON |
$ {
|
| |
| ZTO? “90 02 OLOZ “ACN - OLeuads Jay ean [EUION T |
i
If adeg
HOAL VULIL
SwOTEIOL[E FT E-T peureysuos ay} pue asea aseq g OLmaog SAtoIpaid IOF S[BAT] 191eM GOD PSelUaAHTS “9 aMsty
T sT-
a
1
+ FOr
oT-Aeiy ST-qas
GT-ARIN ST-qa4 Pes
: ie]
(BBOAWN ‘14) 227 Jae
GODIN OT XIN
DIAL 09 XeIAi ———
GOW OF xe
uonay ON
PLOZ ‘20 92 €T0Z ‘ACN - OeUaIS Jeyeary AiG
TI a8eg
HO4dL VaLaL
suoneoole JT ¢~T pautensuoo ofp pur aseo aseq y oLmeUINg aato;pard 10} SoMMMTeS SOD paremaAs “L omByy
QT-AON 9T-sny gT-Aeiy 9T-qe4 ST-AON gt-Sny ST-Aein ST-9e4 VI-AON
1 1 L +O |
— 1 __ ——
oz
oF
- 09 i
ag
8
el
(1/8) Anuuyes
OIA COT XE
|
{
GON 09 x21 = p ove
: SIN OE X21 --=-+ i
j i
YORI ON — p gat
1
|
+ Oat
'
|
ZEQZ “PO 02 OTOZ “AON - OLeUaas yea feUON|
___
pom tree
€1 a8eq
pl aseg
smONBoOT[e FTE~T PatpeHsuoo ayy puw aseo aseq qf OPEUSIS JAHD
HOdL VaLaL
QT-AON
QT-sny
QT-ABIAL 9T-qa4 0 ST-AON gr-sny ST-Aein
ST-qad YT-AON
4
—t
i i
PTOZ “90 93 ET0Z “AON - OLeuarg Jayzeamy Aig
COIN COT Xe
COIL 89 XB ===
CISIAL OS XPIAI «+--+
uogay oN——
G
az
or
a9
ag
oot
(1/8) Ayes
ozT
+ OT
Ost
Ost
00g
rpaxd 10 SoUMMIES SOO porepnurs *g SIU T
CERTIFICATION
The work documented in this memorandum has been performed by or under the direct
supervision of the undersigned Florida Registered Profesional Engineer. Either [ or engineering
staff working under my supervision completed alf work described herein and | have expertise in
the discipline used in the production of this document. This report has been prepared in
accordance with commonly accepted procedures consistent with applicable standards of practice,
and is not a guaranty or warranty, either expressed or implied.
Peter F. Andersen
Principal Engineer
Registered Professional Engineer
Florida License No. 62133
Date: 312/20 Ss
NOTICE OF RIGHTS
As required by Sections 120.569(1), and 120.60(3), Fla. Stat, the following is notice of the opportunities
which may be available for administrative hearing or judicial review when the substantial interests of a party
ate determined by an agency. Please note that this Notice of Rights is not intended to provide legal advice,
Not all the legal proceedings detailed below may be an applicable or appropriate remedy. You may wish to
consult an attorney regarding your legal rights.
RIGHT TO REQUEST ADMINISTRATIVE HEARING
A person whose substantial interests are or may be-affacted by the South Florida Water Management
District's (SFWMD or District) action fias the right to request an administrative hearing on that action
pursuant {0 Sections 120.560 and 120.57, Fla, Stat. Persons seeking a hearing on.a SFWMD decision
which does or may affect their substantial inlerests shall filea petition for heating with the Disttict Clerk
within 21 days of receipt of written notice of the decision, unless one of the following shotter time-perlods
apply: 1) within 14 days of the notice of consolidated intent to grant or dany concurrently: reviewed
applications for environmental resource permits arid use of sovérelgn submerged lands pursuant to Section
373.427, Fla. Stat.; or 2) within 14 days of service of'an Administrative Order pursuant to Subsection
373.119(1), Fla. Stat. "Recalpt of wittan notice of agancy decision" means receipt of elther-written notice
through mail, electronic mail, or posting that thie SFWMD has or intends to take final agency action, or
publication of notice that the SFWMD has or intends to take final agency action, Any person who receives
written notice of a SFWMD decision and fails to file a writen request for hearing within the timeframe
described above walves the right to request a hearing on that decision.
FILING INSTRUCTIONS
The Petition must be filed with the Office of the Distrlet Clark of the SFWMD, Filings with the District Clerk
may be made by mali, hand-delivery, or e-mail. Filings by-feesimile will not he accepted after October
1, 2014, A palition for adminisirative hearing or other document is:deemed filed upon receipt during normal
business hours by the District Clark at SFWMO headquarters in West Palm Beach, Florida. Any document
recelved by the office of the District Clerk after'5:00:p.m. shall be filed as of 8:00 a.m. on the next regular
business day. Additional fling instructions are as follows:
¢ Filings by mail must be addressed to the Office of tie District Clark, P.O. Box 24680, West Palm
Beach, Florida 32416.
e Filings by hand-delivery must be-delivered to the Office of the District Clesk. Delivery of a patition
to the SFWMD's sacurlly desk does not coristitute filing. To ensura proper filing, it will be
nacessaty to request the SFWMD's saciirity officer to contact the Clerk's office. An
employee of the SFWMD's Clerk's office will recalve and file the petition,
© Filings by e-mail-must be transmitted to the District Clerk's Office at clerk@sfwmd.gov. The fling
date for a document transmitted by electronic mail shall be the date the District Clerk receives the
complete document. A parly who files a documient by e-mail shall (1) reprasenit that the original
physically signed document will be retained by that party for the duration of the proceeding and of
any subsequent appeal or subsequent proceeding in that cause and that the party shall producg it
upon the request of other parties; and (2) be responsible for any delay, disruption, or interruption of
the electronic signals and accepts the full risk that the document may not be properly filed.
Rev.05/01/14 { EXHIBIT E
INITIATION OF AN ADMINISTRATIVE HEARING
Pursuant fo Rules 28-106,201 and 28-106.301, Fla. Admin, Code, initiation of an administrative hearing
shall be made by written petition to he SFWMO in legible fom and on 8 and 1/2 by 14 inch white paper,
All petitions shall contain:
1, Identification of the action being contested, including the permit number, application number,
SFWMD file number ar any other SFWMD identification number, if known,
The name, address and talephone nuinber.of the -petlioner and. petitioner’s representative, if any.
An explanation of how the petitioner's substantial interests will be affected by the agency decision,
A statement of when and how the palitio eived notice of the SFWMD's decision,
A stalement of all disputed issues of - {there are none; the pelition must so indicate,
A concise statement of the ullimaté facls @ alleged, jncluding the specific facts the petitioner
contends warrant favarsal or modification of the SFWMD's proposed action.
7. Avstatement of the specific rules of stalules the pelitimer contends require reversal or modification
of the SFWMD's proposed action.
8. If disputed Issues of material fact exist, the statement must also Include an explanation of how the
alleged facts relate to the ‘Specific rules.or statutes,
9. A statement of the relief sought by the petitioner, staing precisely the action the petitioner wishes
the SFWIMD to take with respect to the SFWMD's proposed action.
PaPTon
Aperson may file a request for an extension of time for filing a pelilon. The SFWMD may, for good cause,
grant the raquest, Requests for extension of time must-be fied with the SFWMD prior to.the deadline for
filing a petition for hearing. Such requests for extension shall coritain a certificate that thie moving parly has
consulted with all other parties conceming the extansion.and iat the SFWMD and any other parlies agree
fo or oppose the extension, A timely request for extansion of fme shall toll the running of the time parlod for
filing a petition until the request is acted upon.
if the SFWMD takes action with substantially differént impacts on water resources from the notice of
intended agency decision, the parsons who may be suibstanlally affected ehall have an additional point of
entry pursuant to Rule 28-106,111, Fla. Admin. Code, unless olherwise provided by law.
MEDIATION
The procedures for pursuing mediation are set forth In Section 120.673, Fla. Stat, and Rules 28-106.114
and 28-106.401-.405, Fla, Admin. Code. The SFWMD is not proposing mediation for this agency action
urder Section 120.573, Fla. Stat., at this {ime.
RIGHT TO SEEK JUDICIAL REVIEW
Pursuant fo Sections 120.60(3) and 120.68, Fla. Stat,, a parly who is adversely affected by final SFWMD action
may seek judicial review of the SFWMD's final decision by filing a notice of appeal pursuant to Florida Rule of
Appellate Procedure 9.110 in the Fourth District Court of Appeal or in the appellate district where a party
resides and filing a second copy of the notice with the District Clerk within 30 days of rendering of the final
SFWMD action.
Rev.05/01/14 2
Docket for Case No: 15-002771
Issue Date |
Proceedings |
Jun. 04, 2015 |
Order Closing File and Relinquishing Jurisdiction. CASE CLOSED.
|
Jun. 04, 2015 |
South Florida Water Management District's Motion to Close the Case and Relinquish Jurisdiction filed.
|
Jun. 04, 2015 |
Order (parties shall file available dates for hearing on or before August 23, 2015).
|
Jun. 03, 2015 |
Notice of Appearance (Peter C. Cunningham) filed.
|
Jun. 02, 2015 |
Revised Joint Response to Initial Order filed.
|
Jun. 01, 2015 |
Joint Response to Initial Order filed.
|
May 19, 2015 |
Initial Order.
|
May 19, 2015 |
Notice of Rights filed.
|
May 19, 2015 |
City of Miami's Petition for Formal Administrative Hearing filed.
|
May 19, 2015 |
Final Order filed.
|
May 19, 2015 |
Order on Petition's Compliance with Requisite Rules, Authorizing Transmittal to the Division of Administrative Hearings, and Notice of Preservation of Record filed.
|
May 19, 2015 |
Agency referral filed.
|