AMY TOTENBERG, District Judge.
This matter is before the Court on Defendant Lockheed Martin Corporation's ("Lockheed") motion to dismiss, [Doc. 56], Relator James Michael Harris' first amended complaint, [Doc. 44]. Relator Harris filed a motion to strike Defendant Lockheed's reply brief, [Doc. 61], and Defendant Lockheed has filed a motion seeking leave to file a surreply, [Doc. 72]. Mr. Harris has sued Defendant Lockheed as a relator in this qui tam action, alleging that Defendant Lockheed fraudulently billed the United States for nearly thirty years for airplane parts Lockheed did not produce, for labor that Lockheed did not expend, and for overpriced materials used in airplanes the United States contracted with Lockheed to build for all branches of the American military.
This Court may dismiss a pleading for "failure to state a claim upon which relief can be granted." Fed.R.Civ.P. 12(b)(6). A pleading fails to state a claim if it does not contain allegations that support recovery under any recognizable legal theory. 5 CHARLES ALAN WRIGHT & ARTHUR R. MILLER, FEDERAL PRACTICE & PROCEDURE § 1216 (3d ed. 2002); see also Ashcroft v. Iqbal, 556 U.S. 662, 129 S.Ct. 1937, 1949, 173 L.Ed.2d 868 (2009). In considering a Rule 12(b)(6) motion, the court construes the pleading in the non-movant's favor and accepts the allegations of facts therein as true. See Duke v. Cleland, 5 F.3d 1399, 1402 (11th Cir.1993). The pleader need not have provided "detailed factual allegations" to survive dismissal, but the "obligation to provide the `grounds' of his `entitlement' to relief requires more than labels and conclusions, and a formulaic recitation of the elements of a cause of action will not do." Bell Atlantic Corp. v. Twombly, 550 U.S. 544, 555, 127 S.Ct. 1955, 167 L.Ed.2d 929 (2007). In essence, the pleading "must contain sufficient factual matter, accepted as true, to `state a claim to relief that is plausible on its face.'" Iqbal, 129 S.Ct. at 1949 (quoting Twombly, 550 U.S. at 570, 127 S.Ct. 1955).
"[As] an amended pleading supersedes the former pleading[,] the original pleading is abandoned by the amendment, and [the original pleading] is no longer a part of the pleader's averments against his adversary." Pintando v. Miami-Dade Housing Agency, 501 F.3d 1241, 1243 (11th Cir.2007). Accordingly, the Court here does not assess the viability of Plaintiffs claims based on a comparative analysis of his original and amended complaint, as Defendant urges.
The Court also concludes that it would be improper to consider the web site information that Defendant refers the Court to in its briefing, because in ruling upon a motion to dismiss, "the district court may consider an extrinsic document if it is (1) central to the plaintiff's claim, and (2) its authenticity is not challenged." Speaker v. U.S. Department of Health & Human Services, 623 F.3d 1371, 1379 (11th Cir.2010). The web site information Defendant referenced does not meet these standards. Finally, for the same reason, the Court will not consider evidence extrinsic to the Amended Complaint that addresses particularized information regarding the deactivation of specific Lockheed computer systems. For this reason, the Court
Keeping in mind that at the motion to dismiss stage the Court must construe the allegations in the Amended Complaint in
He and other employees in the department with whom he was familiar were responsible on an individual basis for logging the nature and length of their labor in the company's detailed, internal time-tracking software system.
Lockheed Martin's contracts with the United States involved two types of pricing. "Fixed-price contracts" involve a negotiated fee for the product regardless of the manufacturer's actual costs. (Id. at ¶¶ 18-19.) "Cost-plus contracts" involve a fee up to a negotiated ceiling for the product with a fixed fee for costs exceeding the ceiling. (Id. at ¶ 20.) Lockheed's contract for the C-130 was a fixed-price contract. (Id. at ¶ 22.) The F-22 Raptor fighter jet contract was a cost-plus contract during the initial production phase, but became fixed-price contracts in later production phases. (Id. at ¶ 24.) Lockheed's contracts for the C-5 military transport plane, the P-3 Orion fighter jet, spare parts for planes the National Guard bought from other branches of the military, and replacement trim parts for various planes were cost-plus contracts. (Id. at ¶¶ 23, 25-26, 29.)
The alleged scam involved supervisors directing employees, including Mr. Harris, to bill time spent on trim pieces for fixed-price contract planes to cost-plus contract planes or to bill for unnecessary trim work, allowing Lockheed to recoup losses or increase profits otherwise prohibited by its government contracts. For example, Lockheed's internal tracking system listed unnecessary tasks and erroneous completion times for various trim parts of the plane. (Id. at ¶¶ 32-34, 42.) When employees ran out of billable time on a fixed-price contract plane, they billed additional time spent working on the fixed-price contract plane to an unnecessary task or one with remaining allotted time on a cost-plus contract plane. (Id. at ¶¶ 38-40, 42, 44-47.) While Lockheed's internal tracking system revealed evidence of the scheme to
These practices created the appearance that Lockheed was able to meet its obligations under its fixed-price contracts, while concealing increased profits via fraudulent bills for its cost-plus contracts. (Id. at ¶¶ 53-54.) But Mr. Harris, with access to the company's internal labor and time management system, observed that Lockheed billed the government for labor in connection with cost-plus contract trim parts at costs several times what those same parts cost under a fixed-price contract due to the company's padded billing scheme. (Id. at ¶ 61.) The scheme also laid the foundation for Lockheed to set higher prices for fixed-price contracts based on data from inflated cost-plus contracts. (Id. at ¶ 57.)
Beginning in 1998, Mr. Harris complained about the fraudulent billing practices he was observing. (Id. at 131.) He complained to colleagues, supervisors, managers, and union officials. (Id. at ¶¶ 130-40.) No one made any changes to correct Lockheed's billing practices. In 2006, Mr. Harris injured his knee while working at Lockheed. (Id. at ¶ 143.) After the injury, the company moved him from a cost-plus project, where he had access to evidence of the billing scheme, to a fixed-price project. (Id. at ¶¶ 143-45.) Mr. Harris protested that he could still perform the tasks in his original position, to which the company responded by temporarily moving Mr. Harris to a job away from all documents and billing records. (Id. at ¶¶ 146-49.)
In 2007, Mr. Harris wrote a letter requesting a meeting with the Director of Aircraft Operations, Mike O'Brien, for the C-130 plane to discuss Mr. Harris' concerns about Lockheed's billing practices. (Id. at ¶¶ 150-52.) An administrator from the Human Resources department attended Mr. Harris' meeting with Mr. O'Brien and "threatened that if Mr. Harris continued to complain about false billing records, it would be grounds for termination." (Id. at ¶ 152.) On March 1, 2007, Lockheed suspended Mr. Harris, informing him that the "false allegations" and accusations he had made about billing and "falsification of documents" led to his suspension and ultimately, his termination in late March 2007. (Id. at ¶¶ 153-54.)
After having provided the information above to the Air Force Office of Special Investigations and an unspecified United States Attorney's Office, Mr. Harris filed this suit on December 17, 2008. (Doc. 1.) His Amended Complaint alleges False Claims Act violations under 31 U.S.C. § 3729(a)(1)-(2), a conspiracy under the False Claims Act in violation of 31 U.S.C. § 3729(a)(3), and retaliation after Mr. Harris engaged in protected activity under 31 U.S.C. § 3730(h).
Lockheed has moved to dismiss Relator Harris' complaint on several grounds. First, Lockheed argues that Mr. Harris' claims under the False Claims Act are barred by the Act's first-to-file rule in 31 U.S.C. § 3730(b)(5). Second, Lockheed argues that Mr. Harris' claims under the False Claims Act are barred by the Act's exclusion under 31 U.S.C. § 3730(e)(4) of cases based on facts previously publically disclosed. Third, Lockheed argues that Mr. Harris has failed to plead his claims with particularity under Federal Rule of Civil Procedure 9(b). Fourth, Lockheed argues that Mr. Harris' conspiracy claim fails according to the intracorporate conspiracy doctrine. Fifth, Lockheed argues that Mr. Harris has not pled sufficient facts to show that Lockheed terminated him because he was engaging in protected activity. Finally, Lockheed argues that Mr. Harris' retaliation claim is blocked by the False Claims Act's six-year statute of limitations. The Court addresses each argument in turn.
Lockheed first argues that the first-to-file rule set forth in the False Claims Act bars Mr. Harris from bringing this suit under the Act because another qui tam suit arising from the Marietta, Georgia facility is pending in the Southern District of Ohio against Defendant Lockheed. (Doc. 56-1 at 9-15.) The first-to-file rule states: "When a person brings an action under this subsection, no person other than the Government may intervene or bring a related action based on the facts underlying the pending action." 31 U.S.C. § 3730(b)(5). To support its argument, Lockheed has submitted as an attachment to its motion to dismiss a copy of the Second Amended and Consolidated Complaint in Howard v. Lockheed Martin Corp., No. 1:99-CV-285 (S.D.Ohio May 13, 2005).
The qui tam relator in the Howard case has alleged that at its facility in Marietta, Georgia, Defendant Lockheed made tools used in F-22 Raptor fighter jets and C-130J cargo planes that did not meet the planes' specifications. (Doc. 56-2 at ¶¶ 1-2, 81.) Once built, these tools were used to make and assemble the parts that composed the planes Lockheed built for the government. (Id. at ¶¶ 40-41.) The airplane contracts required Lockheed to make the tools within a given, limited tolerance according to the planes' specifications. (Id. at ¶ 43.) Lockheed and its outside vendors involved in making these tools routinely made non-conforming tools and failed to inspect the tools for non-conformance. (Id. at ¶¶ 69-73.) This practice caused Lockheed workers to have to rework the non-conforming tools, scrap the non-conforming tool and start anew, or use the non-conforming tool in the plane. (Id. at ¶ 86.)
Lockheed allegedly charged these extra steps to the government by billing for the scrapped tools and the replacement tools or by charging the government without charging the vendor for the rework. (Id. at ¶¶ 116-17, 121.) Lockheed hid these surplus charges from the government. (Id. at ¶¶ 251-57, 292, 326, 328-29.) When Lockheed personnel reworked a tool,
Except that the Howard case also involves a fraudulent billing scheme Lockheed Martin allegedly perpetrated at its aircraft production facility in Marietta, Georgia against the United States government, the rest of the details of that scheme are entirely different than the details of the scheme that Mr. Harris alleges. See United States ex rel. Lujan v. Hughes Aircraft Co., 243 F.3d 1181, 1189 (9th Cir. 2001) (collecting cases and finding that first-to-file rule "bars later-filed actions alleging the same material elements of fraud described in an earlier suit, regardless of whether the allegations incorporate somewhat different details") (emphasis added); Cooper v. Blue Cross & Blue Shield of Fla., Inc., 19 F.3d 562, 567 (11th Cir.1994) ("once one suit has been filed by a relator or by the government, all other suits against the same defendant based on the same kind of conduct would be barred") (emphasis added). See also United States ex rel. Capella v. United Technologies Corp., No. 3:94-CV-2063 (EBB), 1999 WL 464536, at *10-11 (D.Conn.1999) (finding that allegations of "false billing depreciation costs on fixed assets in Drake did not put the government on notice that the defendants falsely billed insurance costs, as alleged in Capella"; collecting cases not barred by first-to-file rule where nature of schemes at issue were different).
The fraudulent tool production alleged in the Howard case did not put the government on notice of the type of billing scheme in the trim department that Mr. Harris has alleged. United States ex rel. Duxbury v. Ortho Biotech Products, L.P., 579 F.3d 13, 32 (1st Cir.2009) (collecting cases and observing that the goal behind the first-to-file rule is to promptly alert the government to the essential facts of the fraud alleged). Thus, the Court
Lockheed next argues that the False Claims Act's bar against suits based on facts already known in the public sphere frustrates Mr. Harris' claims here. The public disclosure bar states:
31 U.S.C. § 3730(e)(4)(A) (2008). A person is an "original source" if he "has direct and independent knowledge of the information on which the allegations are based and has voluntarily provided the information to the Government before filing an action under this section which is based on the information." 31 U.S.C. § 3730(e)(4)(B) (2008).
Clearly, the filing of the Howard case itself is a public disclosure. McElmurray v. Consolidated Gov't of Augusta-Richmond Co., 501 F.3d 1244, 1252 (11th Cir.2007) (observing that documents filed with the court are public disclosures under the False Claims Act). But, the bar operates to preclude only those claims based on the facts publicly disclosed. Id.; Cooper, 19 F.3d at 567. As discussed above, apart from the location and company involved, the scheme alleged in the Howard case and the one Mr. Harris sets forth here have markedly different bases in fact and origin. Because of these foundational differences, the prior existence of the Howard case does not bar under 31 U.S.C. § 3730(e)(4)(A) Mr. Harris' claims.
Even if the public disclosure bar applied to Mr. Harris' claims, however, he is an original source under 31 U.S.C. § 3730(e)(4)(B) (2008). Mr. Harris bases his claims on his own observations while an employee for over twenty-seven years in the trim department at Lockheed's Marietta, Georgia facility. He has alleged that supervisors instructed him to engage in the time billing practices in the trim department as he describes in his Amended Complaint. He has alleged that supervisors and managers made it clear to him that he must participate in the scheme or risk losing his job. These allegations sufficiently establish that Mr. Harris had direct and independent knowledge of the facts he asserts. Cooper, 19 F.3d at 568 (finding that relator who had worked directly with material forming basis of fraud for three years was an original source.) Thus, the Court
Lockheed next argues that Mr. Harris has failed to plead his fraud claims with particularity under Federal Rule of Civil Procedure 9(b). Under Rule 9(b), the complaint must set forth facts as to the who, what, when, where, and how of the fraud. Hopper v. Solvay Pharmaceuticals, Inc., 588 F.3d 1318, 1324 (11th Cir. 2009); United States ex rel. Matheny v. Medco Health Solutions, Inc., 671 F.3d 1217, 1222 (11th Cir.2012). In contrast to the particularized standard a complainant must use in alleging the mechanics of the fraud, a complainant may plead the scienter portion of fraud generally. Id. at 1224; Fed.R.Civ.P. 9(b) (providing that at the pleading stage, "knowledge, and other conditions of a person's mind may be alleged generally").
Defendant contends that Relator's Amended Complaint has not presented particularized factual support for his contention that Defendant actually presented to the government false claims for payment or related supporting records in violation of 31 U.S.C. § 3729(a)(1)-(2). Thus, Defendant argues, that Relator's allegations cannot survive dismissal under the principles of pleading that the Eleventh Circuit set forth in United States ex rel. Clausen v. Lab. Corp. of Am., 290 F.3d 1301, 1308-1312 (11th Cir.2002) and its progeny. See, e.g., United States ex rel. Atkins v. McInteer, 470 F.3d 1350 (11th Cir.2006); Hopper, 588 F.3d 1318.
In Clausen, the Eleventh Circuit held that Rule 9(b)'s particularity requirement applies to both the details of the false claim and the presentment of that claim to the United States for payment. "Rule 9(b)'s directive ... does not permit a False Claims Act plaintiff merely to describe a private scheme in detail but then to allege simply and without any stated reason for his belief that claims requesting illegal payments must have been submitted, were
The Eleventh Circuit's subsequent cases make clear, however, that a somewhat more flexible, case-by-case approach to Clausen's principles may be properly applied where the relator's complaint provides other "indicia of reliability" that support the relator's belief and allegations that the defendant submitted actual fraudulent claims to the government. See generally Cade v. Progressive Community Healthcare, Inc., No. 1:09-CV-3522-WSD, 2011 WL 2837648, at *3-7 (N.D.Ga. July 14, 2011) (Duffey, J.) (collecting and synthesizing Eleventh Circuit qui tam pleading cases). Thus, in United States ex rel. Walker v. R & F Properties of Lake County, Inc., 433 F.3d 1349, 1359-60 (11th Cir. 2005), the court found that the relator nurse practitioner's complaint properly survived dismissal where the plaintiff's allegations were based on her personal employment experience within defendant's medical practice and her conversations with the office administrator regarding the billing procedures at issue. See also United States ex rel. Matheny, 671 F.3d at 1230 ("As Defendants recognize, we are more tolerant toward complaints that leave out some particularities of the submissions of a false claim if the complaint also alleges personal knowledge or participation in the fraudulent conduct."); Hill v. Morehouse Medical Associates, Inc., No. 02-14429, 2003 WL 22019936, at *3, 5 (11th Cir. Aug. 15, 2003) (observing that "Rule 9(b)'s heightened pleading standard may be applied less stringently ... when specific `factual information [about the fraud] is peculiarly within the defendant's knowledge or control'" and where plaintiff pled sufficient facts as an employee based on her first hand witnessing of the fraudulent conduct to provide "the indicia of reliability that is necessary in a complaint alleging a fraudulent billing scheme"); Clausen, 290 F.3d at 1314 n. 25 (recognizing that Rule 9(b) standard may be relaxed in "appropriate circumstances to aid those alleging prolonged multi-act schemes" provided the relator alleges "at least some examples of actual false claims to lay a complete foundation" for the rest of his complaint); United States ex rel. King v. DSE, Inc., No. 8:08-CV-2416-T-23EAJ, 2011 WL 1884012, at *1-3 (M.D.Fla. May 17, 2011) (Merryday, J.) (finding that where relator's knowledge of the falsity of the defendant's certification that defendant's manufactured items complied with contract specifications was based upon his own knowledge and involvement in the manufacturing process, complaint allegations were deemed to afford the requisite reliability to support the relator's False Claims Act claims).
These allegations provide detailed factual indicia of reliability to plausibly support
Additionally, when Mr. Harris relayed his concerns to his Lockheed supervisors, these management representatives appeared to indicate in their responses an acknowledgement of the billing issues Harris had raised. (Id. at ¶¶ 130-54.) For instance, after "[Mr.] Harris raised these concerns with his longtime supervisor, Johnny Bryson[,] Mr. Bryson told Mr. Harris, `If you are concerned about it, don't do it, but it will get done.'" (Id. at ¶ 132.) Mr. Harris plausibly alleges that he understood this conversation to mean that "if he did not personally enter his time fraudulently, someone else would go in and enter the time spent for him, either under his name or their own. Either way, the false charges would be entered." (Id.)
Relator has pled sufficient facts of the false claims and use of false records relating to the trim department in Lockheed's Marietta facility to support his claims and to put the Defendant on clear notice of the specific nature and scope of his claims. The plausibility and reliability of Relator's allegations are supported by the concrete examples Relator provided in combination with Relator's allegations of his personal involvement and communications with Lockheed management representatives regarding the time management/billing practices at issue. Thus, the Court
Lockheed next argues that the intracorporate conspiracy doctrine bars Mr. Harris' claim under 31 U.S.C. § 3729. The premise of the intracorporate conspiracy doctrine is that because a corporation is composed of its agents, a corporation cannot conspire with its agents and they cannot conspire amongst themselves as long as they are acting within the scope of their employment. McAndrew v. Lockheed Martin Corp., 206 F.3d 1031, 1036 (11th Cir.2000).
There is a well-recognized exception to the intracorporate conspiracy doctrine, however, for intracorporate criminal conspiracies under 18 U.S.C. § 371 (prohibiting two or more persons from conspiring to defraud the United States). McAndrew, 206 F.3d at 1038-39. This is exactly what Mr. Harris has alleged — that Lockheed Martin conspired through its officers, agents, and employees to defraud the United States. (Doc. 44 ¶¶ 161-62.) These allegations plainly describe conduct that, if true, would be violative of both the civil liability provisions of 31 U.S.C. § 3729(a)
Lockheed next argues that Mr. Harris has not sufficiently alleged that he engaged in protected activity or that Lockheed Martin terminated him because of his engagement in a protected activity under 31 U.S.C. § 3730(h) (2008). Section 3730(h) protects any employee who "is discharged, demoted, suspended, threatened, harassed, or in any other manner discriminated against" by his employer because of lawful acts the employee made, "including investigation for, initiation of, testimony for, or assistance in an action filed or to be filed under this section...."
The Eleventh Circuit in United States ex rel. Sanchez v. Lymphatx, Inc., 596 F.3d 1300 (11th Cir.2010), addressed such an argument to dismiss a retaliation claim based on facts very similar to those alleged here. In Sanchez, the relator "complained again and again about the unlawful actions of the Defendants" and "told them that they were all incurring significant criminal and civil liability." Id. at 1303. The Sanchez court compared several cases from other circuits that discussed the general rule that reporting wrongdoing to a supervisor was not sufficient behavior to provide the basis for a retaliation claim under the False Claims Act. Id. at 1304. The Sanchez court went on to state:
Id. (internal citations omitted). The relator's assertions of her repeated complaints about her employer's illegal behavior and her subsequent termination "successfully stated a claim for retaliatory discharge under § 3730(h)." Id.
This is exactly the type of reporting that Mr. Harris has alleged. As discussed above in Section III.C., Mr. Harris repeatedly related his concerns about Lockheed fraudulently billing the United States to supervisors and managers. (Doc. 44 ¶¶ 130-54.) During these conversations, according to Mr. Harris' allegations, these supervisors and managers indicated in their responses an acknowledgment of Lockheed's false time management and related billing practices. (Id.)
When Mr. Harris injured himself at work, Lockheed took that opportunity to move Mr. Harris to a job where he did not have access to evidence showing the scheme. Moreover, according to Mr. Harris' allegations, a human resources department representative threatened him that if he continued to complain about false billing records, this would be grounds for his termination. (Id. at ¶ 153). The Court finds that Mr. Harris' complaints to Lockheed were sufficient to cause it to fear that Mr. Harris would report Lockheed to the government or sue in a qui tam action. Thus, the Court
Lockheed argues that Mr. Harris' retaliation claim is barred by the
The Court finds that § 49-4-168.5 does not provide the most analogous limitations provision in the context of the facts of this case. That provision applies solely to whistleblower protection relief where false Medicaid claims are at stake. The instant case relates to claims of a defense contractor's false time keeping and related billing practices. Accordingly, the two-year statute of limitation provided under § 9-3-22 is the most closely analogous Georgia state statute of limitation.
Lockheed terminated Mr. Harris in March 2007. (Doc. 44 ¶ 154.) Mr. Harris brought this case on December 17, 2008. (Doc. 1.) Mr. Harris' retaliation claim still clearly falls within the two-year statute of limitations. While other adverse actions Defendant took against Mr. Harris may fall outside the statute of limitations, they may be considered relevant evidence in proving his retaliation claim. Thus, the Court
Lockheed contends that a six-year statute of limitations under 31 U.S.C. § 3731(b) applies to Relator's other False Claims Act claims because the United States has not intervened in this matter. Based upon the reasoning contained in Chief Judge Carnes' decision in United States ex rel. Olsen v. Lockheed Martin Corp., No. 1:09-cv-3083, slip op. at 12-13 (N.D.Ga. Sept. 17, 2010), the Court concludes that in the current posture of the case, the six-year statute of limitations under 31 U.S.C. § 3731(b)(1) applies here rather than the ten-year provision contained in 31 U.S.C. § 3731(b)(2). See also United States ex rel. Sanders v. N. Am. Bus. Indus., Inc., 546 F.3d 288, 294 (4th Cir.2008) ("Section 3731(b)(2) makes sense only when read to extend the FCA's limitations period in actions brought or joined by the United States."); United States ex rel. Sikkenga v. Regence Bluecross Blueshield of Utah, 472 F.3d 702, 725 (10th Cir. 2006). But see United States ex rel. Hyatt v. Northrop Corp., 91 F.3d 1211, 1216 (9th Cir.1996) (observing that tolling provision applicable to United States also applicable to private qui tam plaintiffs where United States has not intervened because private relators stand in the place of the United States government in a qui tam action).
As discussed above, the Court
The Court
It is