PHILIP P. SIMON, Chief Judge.
The Environmental Protection Agency and three similar state entities from Indiana, Michigan, and Illinois initiated this action against U.S. Steel in an 18-count complaint. (For simplicity's sake, I will refer to the Plaintiffs in this case collectively as the EPA). The EPA alleges that three of U.S. Steel's plants — one in each of the three states — are and have been violating the Clean Air Act. U.S. Steel says its done no such thing, but the merits of the case will be decided later. The only thing presently before me is whether Count 1 and parts of Count 3 are barred by the applicable statute of limitations and must therefore be immediately dismissed. As explained in detail below, I only buy half of that argument. U.S. Steel's Motion to Dismiss will therefore be granted in part and denied in part.
In 1990, U.S. Steel performed a "reline" of its No. 4 furnace at its Gary Works facility in Gary, Indiana. A reline is the process whereby the furnace is completely shut down and the interior lining is updated. The legal issues raised in U.S. Steel's motion to dismiss all really emanate from this 1990 relining. One might reasonably wonder why a court in the year 2013 is dealing with actions taken by a company some 23 years earlier; U.S. Steel is wondering the same thing. In all events, U.S. Steel believes it could do the relining of the furnace without a permit, but the EPA disagrees. To understand the parameters of this disagreement, we have to dive into obscure world of the Clean Air Act ("CAA"), its regulations, and the myriad of acronyms that flow from them.
Here's a broad outline of the parts of the CAA applicable to this case. The CAA establishes two types of air permits: construction permits and operating permits. Both types of permits are at issue in this case. The construction permitting program emerged from the 1977 amendments to the CAA which required all new "sources" — factories, power plants, refineries, etc. — to undergo a "New Source Review"
Under the NSR program, the new source must obtain a pre-construction permit from the EPA, demonstrate that the construction will not increase emissions above a certain threshold, and show that facility operations are in continuous compliance with the best available control technology (BACT). The NSR permit then specifies what construction is allowed, what emission limits must be met, and how often the emissions source must be operated.
In addition to these construction permits, most sources also have to obtain operating permits, which are known as Title V permits. A Title V permit grants a source permission to operate, and it includes all air pollution requirements that apply to the source, including emissions limits and monitoring, record keeping, and reporting requirements.
Most of this CAA permitting — both NSR and Title V — is actually done at the state level. The EPA establishes the basic requirements for the CAA, and states can then take those minimum thresholds and develop their own unique requirements and procedures in what is called a State Implementation Plan ("SIP"). Indiana has codified its SIP at Titles 326 and 327 of the Indiana Administrative Code. Indiana's SIP generally seems to mirror the federal requirements, including requirements that new sources must obtain a pre-construction NSR permit and install BACT.
All of this applies to new sources, those built after 1977. The Gary Works plant, however, has a lot of dust on it; steel production began there in the early part of the last century. That doesn't take the plant out of the regulatory woods, however, because the CAA says that even pre-1977 plants must comply with the NSR permitting program any time a "major modification" is made to them. Enter the 1990 relining project. U.S. Steel concluded that the reline wasn't a major modification, so it didn't bother seeking a preconstruction NSR permit. Then, in 1996, U.S. Steel applied for a Title V operating permit, which was eventually issued by the state of Indiana. The EPA now argues that the 1990 reline was a major modification, that U.S. Steel thus should have sought a preconstruction NSR permit, and that consequently the Title V permit was improperly granted and should be invalidated. More specifically, the EPA alleges in Count 1 that U.S. Steel performed a major modification, which violated the CAA and Indiana's SIP by operating Gary Works without an NSR permit and without BACT. In Count 3, the EPA alleges that U.S. Steel is operating Gary Works in violation of the Title V permitting program under the CAA and Indiana's SIP.
Whether or not the 1990 reline was a major modification is likely to be a difficult question to answer. See, e.g., U.S. v. Midwest Generation, LLC, 720 F.3d 644, 645 (7th Cir.2013) ("The question `how much repair or change requires a permit?' has been contentious and difficult."). But that substantive question is not yet at issue here. Instead, the key question in U.S. Steel's motion to dismiss is procedural: Did the EPA blow the statute of limitations by waiting until 2012 to file a lawsuit about the 1990 reline?
A motion to dismiss pursuant to Rule 12(b)(6) "challenges the sufficiency of the complaint to state a claim upon which relief may be granted." Hallinan v. Fraternal Order of Police of Chi. Lodge No. 7, 570 F.3d 811, 820 (7th Cir.2009). A plaintiff's failure to adhere to a statute of limitations is an affirmative defense and "is rarely a good reason to dismiss under Rule 12(b)(6)." Reiser v. Residential Funding Corp., 380 F.3d 1027, 1030 (7th Cir.2004). At the motion to dismiss stage, "the question is only whether there is any set of facts that if proven would establish a defense to the statute of limitations[.]" Clark v. City of Braidwood, 318 F.3d 764, 768 (7th Cir.2003). A plaintiff need not anticipate affirmative defenses in his complaint in order to survive a motion to dismiss. United States v. Lewis, 411 F.3d 838, 842 (7th Cir.2005) (citing Gomez v. Toledo, 446 U.S. 635, 640, 100 S.Ct. 1920, 64 L.Ed.2d 572 (1980)); see also Indep. Trust Corp. v. Stewart Info. Serv. Corp., 665 F.3d 930, 935 (7th Cir.2012). "The exception occurs where ... the allegations of the complaint itself set forth everything necessary to satisfy the affirmative defense, such as when a complaint plainly reveals that an action is untimely under the governing statute of limitations." Lewis, 411 F.3d at 842 (citing Leavell v. Kieffer, 189 F.3d 492, 495 (7th Cir.1999)).
The applicable statute of limitations here is 28 U.S.C. § 2462, which states:
Count 1 and Count 3 of the Complaint seek both injunctive relief and civil penalties. Section 2462 explicitly applies to the latter remedy, but it is less clear whether it applies to the former. As explained in detail below, I ultimately conclude that Section 2462 does not apply to claims for injunctive relief, but does apply to claims for civil penalties. I'll start by analyzing the question of civil penalties, and then turn to the more difficult issue of injunctive relief.
Before moving to this analysis, however, I need to clear up one issue with respect to how Counts 1 and 3 are interrelated. The EPA argues that the Counts should be independently analyzed: "Regardless of how the Court decides the issue of whether NSR violations are ongoing, as Plaintiffs urge, or one-time past violations, as Defendant argues, the Court should deny Defendant's Motion with regard to Plaintiffs' Third Claim." [DE 20 at 38.]
I disagree, and will instead analyze both Counts in the same way here. Here's why. The main focus of the motion to dismiss really has to do with Count 1 of the Complaint, which is entirely centered on the NSR permitting process related to the 1990 reline. Count 3 deals with the Title V permitting process. The 1990 reline is only one part of Count 3, and U.S. Steel has only moved to dismiss the paragraphs in Count 3 that deal specifically with the 1990 reline (not all of Count 3). The central conceit of Count 3 is that U.S. Steel's Title V permit has numerous deficiencies, one of which is that U.S. Steel's application for the permit lacked information about the 1990 reline. More specifically, Count 3 asserts that since U.S. Steel did not have an NSR preconstruction permit for its 1990 reline, its 1996 application for its Title V permit was deficient.
The issue of whether the EPA is barred from bringing claims for civil penalties based on the 1990 reline is fairly straightforward. Section 2462 clearly applies to claims for civil penalties, which means all such claims must be brought within 5 years of their accrual. U.S. Steel argue that since the permitting violations are alleged to have occurred in 1990, the government had to bring any civil penalty claims by 1995. Any claims brought thereafter are barred by the statute of limitations.
The logic of this is simple and undoubtedly correct. The EPA, nevertheless, has grasped for various statute-of-limitations straws that would extend their time to file suit beyond five years. First, they argued that the discovery rule extends the limitations period, but they have now rightly abandoned that argument in the face of the Supreme Court's recent decision in Gabelli et al. v. Securities and Exchange Commission, ___ U.S. ___, 133 S.Ct. 1216, 185 L.Ed.2d 297 (2013).
The EPA also argues that the statute of limitations was extended beyond 1995 because there was not just one violation in 1990, but rather a series of ongoing and continuous violations. The theory is that there is a new violation (and thus a new 5-year limitations period) every day since 1990 that U.S. Steel was out of compliance with the federal NSR permitting requirements and the Indiana SIP permitting requirements. This "continuing violation" argument is a somewhat more complicated question as various circuit and district courts have split on the issue. But the question got a whole lot easier to answer (for me, at least) a few weeks ago, as the Seventh Circuit addressed this very issue in U.S. v. Midwest Generation, LLC, 720 F.3d 644 (7th Cir.2013).
Given Midwest Generation, it is clear that the EPA's civil penalty claims based on federal law (i.e., 42 U.S.C. § 7475) are barred by the statute of limitations. Nevertheless, Midwest Generation did leave one small door open — whether U.S. Steel violated Indiana's state regulations (the aforementioned "SIP"). Midwest Generation explicitly left this question for the district court to figure out. Here's how the Seventh Circuit explained the issue:
Id. at 647. Take this directive, substitute "Indiana" for "Illinois," and it is now clearly left to me in this case to decide, "in the first instance," whether the Indiana regulations at issue here work "the same way as the Tennessee requirements that the sixth circuit considered" in National Parks. Id.
With these marching orders, I have to comb the depths of Tennessee environmental law and see how it compares with Indiana. But before getting there it's worth pointing out that the Sixth Circuit's decision in National Parks is clearly an outlier.
So the Sixth Circuit's decision in National Parks is now the one case where a circuit court upheld the continuing violation theory. How did it get there? Under the Sixth Circuit's reasoning, two provisions of Tennessee law dictated its result.
National Parks, 480 F.3d at 419. So because this specific provision of Tennessee's SIP required ongoing NSR permitting requirements, rather than just preconstruction requirements, the violation of Tennessee's SIP was ongoing.
The Eighth and Eleventh Circuits agreed with this reading of Tennessee's SIP, but also contrasted it to the other state SIPs that did not contain similar provisions. As the Eighth Circuit explained:
Sierra Club, 615 F.3d at 1017. In its National Parks decision, the Eleventh Circuit reached an identical conclusion with respect to Alabama law. National Parks, 502 F.3d at 1325. Just as in those cases, the EPA here has pointed to no similar rule in Indiana's SIP that requires ongoing NSR permitting. Thus, the Sixth Circuit's line of reasoning is not applicable here and there is no "continuing violation" under Indiana's SIP.
The Sixth Circuit believed it had another, independent reason for applying the continuing violation doctrine to Tennessee's SIP, however. The court pointed to this provision: "A major modification shall apply best available control technology for any pollutant for which it would result in a significant net emissions increase at the source." Tenn. Comp. R. & Regs. § 1200-3-9-.01(4)(j)(3). The Sixth Circuit found that "[t]his provision, by its own terms, creates an ongoing obligation to apply BACT, regardless of what terms a preconstruction permit may or may not contain." National Parks, 480 F.3d at 418. As a result, the defendant had no statute-of-limitations defense because "failing to apply BACT is actionable, and this cause of action manifests itself anew each day a plant operates without BACT limits on emissions." Id. at 419.
Indiana's SIP has a nearly identical "shall apply" provision. Indiana's provision states: "A major modification shall apply best available control technology for each regulated NSR pollutant for which the modification would result in a significant net emissions increase at the source. This requirement applies to each proposed emissions unit at which a net emissions increase of the pollutant would occur as a result of a physical change or change in the method of operation in the unit." 326
The Sixth's Circuit's reasoning on this point, however, was heavily criticized by both the Eighth and Eleventh Circuit. The Eighth Circuit, for instance, had this detailed analysis:
Sierra Club, 615 F.3d at 1016-17.
Similarly, the Eleventh Circuit also disagreed with the Sixth Circuit's reasoning:
National Parks, 502 F.3d at 1325.
I find the analysis of the Eighth and Eleventh Circuits much more persuasive than the Sixth Circuit approach. The "shall apply" language in Indiana's SIP can only sensibly be read to be tied to the construction process because it applies to "each proposed emissions unit." 326 IAC 2-2-3. What this means is that if a company is contemplating building a new facility or making a major modification to an existing facility — i.e. a "proposed" emission unit — it must apply the best available control techniques. It doesn't mean that there is an ongoing duty to apply the BACT limits independent of the permitting process. Sierra Club, 615 F.3d at 1017. Thus, since "the duty to obtain a[NSR] permit and the duty to apply BACT are most sensibly construed as going hand in hand," id., the failure to apply BACT is not a new violation each day the plant operates. Rather, it is a one-time violation,
This conclusion is also consistent with the Seventh Circuit's general holding that NSR permitting violations — including the failure to install BACT — all relate to the one-time construction (in this case, the modification) and not to the continuous operation:
Midwest Generation, 720 F.3d at 647.
In sum, I find that the five-year statute of limitations bars any claims for damages under either federal law or Indiana state law for U.S. Steel's alleged failure to obtain the proper NSR pre-construction permit and to install the best available control techniques. Consequently, Plaintiffs' claims for damages in its Count 1, and the paragraphs in Count 3 related to the NSR permitting (¶¶ 122-127), are time-barred and will be dismissed.
That leaves the issue of whether Section 2462's five-year time limit applies to the EPA's claim for injunctive relief. Just like the civil penalties analysis above, the analysis here would seem to be relatively straightforward: Section 2462 only explicitly applies to fines and penalties, so its five-year limitations period does not apply to equitable claims.
Of course, since every successful claim for injunctive relief penalizes the defendant in some way by forcing it to do what it otherwise wouldn't have done, it can always be argued that an injunction functions as some sort of "penalty" and should thus be subject to Section 2462's limitations period. Numerous courts have addressed this issue, and they have converged on a relatively simple analysis. Section 2462's limitations period does not apply to injunctive relief if the injunction is actually remedial — i.e., if it "seeks to undo prior damage or protect the public from future harm." S.E.C. v. Wyly, 950 F.Supp.2d 547, 558, 2013 WL 2450545 at *6 (S.D.N.Y. June 6, 2013). On the other hand, Section 2462 does bar injunctive relief if it is really just a facade for a penalty or a forfeiture — i.e., "where the injunctive relief sought is punitive in nature." Id. See also SEC v. Bartek, 484 Fed.Appx 949, 957 (5th Cir.2012); Coghlan v. NTSB, 470 F.3d 1300, 1304-06 (11th Cir.2006); United States v. Telluride, 146 F.3d 1241, 1245-46 (10th Cir.1998); Johnson v. SEC, 87 F.3d 484, 486-92 (D.C.Cir.1996).
This structure of analysis makes some intuitive sense. If a defendant is simply not complying with a law, perhaps the government should always have the right to at least bring a suit demanding that it come into compliance. It would make little sense if a defendant could strategically comply with some CAA regulations for five years and then immediately stop doing so on the theory that it would be immune from suit. On the other hand, it also makes sense that the government can't get
So is the injunctive relief sought by the EPA here really a remedial injunction or a penalty? The Tenth Circuit's analysis of the Clean Water Act in United States v. Telluride Co., 146 F.3d 1241 (10th Cir. 1998) is helpful in analyzing this question. Telluride holds that an injunction that "remedies damage caused by the defendant is not a penalty for purposes of § 2462 even though it is imposed by the government." Id. at 1246. The Tenth Circuit held in that case that the injunctive relief sought by the government — enjoining the defendant from discharging additional pollutants and requiring it to restore damaged wetlands to their prior condition or create new wetlands to replace those that could not be restored — was not a penalty: "Consistent with our definition [of penalty], the restorative injunction in this case is not a penalty because it seeks to restore only the wetlands damaged by Telco's acts to the status quo or to create new wetlands for those that cannot be restored.... [W]e do not consider the Government's request for injunctive relief an action for `civil penalties' barred by § 2462." Telluride, 146 F.3d 1241 at 1246.
The same is true here: the government is attempting to remedy the damage that U.S. Steel is alleged to have caused by being out of compliance with the Clean Air Act. It is thus clear that the EPA is not barred by Section 2462 from bringing its claim for injunctive relief. U.S. Steel has two arguments as to why the claims for injunctive relief are barred: 1) it says that this case is different and the injunction is actually a penalty/forfeiture; and 2) the concurrent-remedy doctrine applies. I will consider each of these arguments in turn.
First, U.S. Steel argues that the injunction is, in truth, a penalty or a forfeiture and thus subject to the five-year limitations period. If an injunction were to be entered it would force U.S. Steel to apply for an NSR permit, install and operate BACT, and demonstrate compliance with the CAA. U.S. Steel says this amounts to a penalty:
[DE 14-1 at 14.]
I disagree that the injunctive relief sought here functions solely as a penalty. If a factual determination is made in the course of this case that the 1990 reline was a major modification such that U.S. Steel should have gone through the NSR permitting process and installed BACT, then it may very well be that the proper remedy would be an order forcing U.S. Steel to install BACT and/or to reapply for a new Title V operating permit. Any such order would be "remedial" in that its effect
U.S. Steel similarly argues that the injunctive relief is actually a forfeiture because it could involve the revocation of its Title V operating permit. U.S. Steel points to Article II Gun Shop, Inc. v. Gonzales, 441 F.3d 492 (7th Cir.2006) as applicable on this point. U.S. Steel argues that the Seventh Circuit held in that case that Section 2462 bars any attempt by the government to revoke a store owner's gun license for violations more than five years old, and that the Plaintiffs here are similarly barred from injunctive relief that would essentially revoke U.S. Steel's Title V operating permit.
I disagree that Article II Gun Shop is applicable here. First, the "holding" U. S Steel teases out of that case is actually just very weak dicta. The true holding of that case was that the government's revocation of the gun shop's license was timely because it was brought within five years of violations that occurred in 2000. Article II Gun Shop, 441 F.3d at 496-97. It is true that, in dicta, the court indicated that it agreed with the government that it would not have been timely to bring a revocation action for violations that occurred in 1981, but this is far from the holding in the case. Moreover, even if it were the holding of Article II Gun Shop, I don't see that it would be particularly germane to this case. That case was entirely about revocation: the government sought to revoke the gun shop's federal license to sell firearms. By contrast, in this case any "revocation" of U.S. Steel's Title V operating permit would be essentially a collateral effect of finding that U.S. Steel had violated the CAA and now had to come into compliance with it.
Thus, I find that the injunctive relief sought here is neither a penalty nor a forfeiture, and it is therefore not barred by Section 2462's five-year limitations period.
U.S. Steel also argues that the injunctive relief claims must be dismissed because the "concurrent remedy doctrine" applies. The concurrent remedy rule provides that when legal and equitable relief are available "concurrently" (i.e., when an action at law or equity could be brought on the same facts), "equity will withhold its relief in such a case where the applicable statute of limitations would bar the concurrent legal remedy." Cope v. Anderson, 331 U.S. 461, 464, 67 S.Ct. 1340, 91 L.Ed. 1602 (1947). So, according to U.S. Steel, since the statute of limitations bars the "legal remedy" here, I must "withhold" the equitable relief as well.
The problem with this argument, however, is that courts have uniformly held that the "concurrent remedy rule" does not apply to "a suit by the United States in its governmental capacity." Telluride, 146 F.3d at 1248. See also United States v. Banks, 115 F.3d 916, 919 (11th Cir.1997) (citing the E.I. du Pont de Nemours & Co. v. Davis, 264 U.S. 456, 462, 44 S.Ct. 364, 68 L.Ed. 788 (1924)); Sierra Club v. Duke Energy Indiana, Inc., 2010 WL 3667002 at * 10, n. 18 (S.D.Ind.2010) ("It is well-established that the concurrent remedy doctrine does not apply to suits brought by the United States in its official enforcement capacity."); New York v. Am. Elec. Power Serv. Corp., 2006 WL 1331543 at *8-9 (S.D.Ohio Mar. 21, 2006); United States v. Cinergy Corp., 397 F.Supp.2d 1025, 1031 (S.D.Ind.2005); United States v. Am. Elec. Power Serv. Corp., 136 F.Supp.2d 808, 811 (S.D.Ohio 2001); United States v. Murphy Oil U.S.A, Inc., 143 F.Supp.2d 1054, 1086-87 (W.D.Wis.2001); U.S. ex rel. Zissler v. Regents of the Univ. of Minnesota, 992 F.Supp. 1097, 1110 (D.Minn.1998).
Let me explain. First, the idea that the concurrent remedy rule doesn't apply to the government comes initially from the Eleventh Circuit's decision in Banks and its analysis of E.I. du Pont. The district court cases cited above generally just cite to Banks and/or E.I. du Pont, as does the Tenth Circuit's decision in Telluride. Most of these cases more or less just cite Banks without actually engaging in any independent analysis of the issue, which is understandable, given how decisive Banks is on the topic.
Nevertheless, on a close read, I think the analysis in Banks is deeply flawed. I'll get to those flaws in a moment, but first let's get a better handle on what the concurrent remedy doctrine actually is. Here's the basic principle: "when the jurisdiction of the federal court is concurrent with that at law, or the suit is brought in aid of a legal right, equity will withhold its remedy if the legal right is barred by the local statute of limitations." Russell v. Todd, 309 U.S. 280, 289, 60 S.Ct. 527, 84 L.Ed. 754 (1940). See also Cope, 331 U.S. at 464, 67 S.Ct. 1340 ("And equity will withhold its relief in such a case where the applicable statute of limitations would bar the concurrent legal remedy."). The rule emerged out of the old distinction between courts of law and courts of equity, and it is entirely about the limited availability of equitable remedies. Equitable remedies are available only in two instances: (1) when equity is the exclusive mode for seeking a particular remedy or (2) when legal and equitable remedies are both available and the statute of limitations on the legal remedy has not yet expired. When there is both a legal and equitable remedy available and the statute of limitations on the legal remedy has expired, however, then the equitable remedy is no longer available. That's the concurrent remedy rule in a nutshell.
Thus, an important distinction to keep at the forefront here is that the concurrent remedy doctrine is not a statute of limitations rule; rather, it's a general rule about the scope of equity's reach. The doctrine has nothing to do with whether the applicable statute of limitations (here, Section 2642) applies to equitable remedies, which is a question I've already addressed above. Rather, the question here is whether a separate principle of equity — the concurrent remedy doctrine — independently bars the EPA's equitable claims for relief here.
But what does it actually mean for legal and equitable remedies to be "concurrent"? In the context of litigation like this, where the EPA seeks to enforce alleged NSR violations under the CAA, one might argue that the remedies here are not really "concurrent" at all: the civil penalties sought here would likely serve a completely different purpose than the injunctive relief being sought. Indeed, that was the conclusion of at least one district court in this circuit:
Cinergy, 397 F.Supp.2d at 1032 (citation omitted). See also New Jersey v. Reliant Energy Mid-Atl. Power Holdings, LLC, 2009 WL 3234438 at *12 (E.D.Pa. Sept. 30, 2009) (concluding that legal and equitable remedies are not concurrent in the context of NSR violations).
As superficially intuitive as that reasoning might seem, however, it's hard to square it with the Seventh Circuit's decision in Nemkov v. O'Hare Chicago Corp., 592 F.2d 351 (7th Cir.1979). The court held in Nemkov that where "the sole remedy is not in equity and an action at law can be brought on the same facts, the remedies are concurrent for purposes of the [concurrent remedy doctrine] even though more effective relief would be available in equity." Id. at 355. Thus, under this precedent, when a legal remedy is based "on the same facts" as the equitable remedy — clearly true in this case — the concurrent remedy doctrine applies.
In fact, when concerned citizen groups (rather than the government) have alleged NSR violations just like in this case, courts have not hesitated to find that legal and equitable claims are concurrent such that the concurrent remedy doctrine bars the plaintiffs' claims for injunctive relief. See Otter Tail, 615 F.3d at 1019 ("Following [the concurrent remedy] principle, we conclude that because Sierra Club's [NSR] civil penalty claims are barred by the statute of limitations, the equitable remedies it seeks under those causes of action are barred as well."); National Parks, 502 F.3d at 1327; Duke Energy, 2010 WL 3667002 at *10, n. 18. In fact, each of these decisions explicitly rejected the aforementioned conclusion from Cinergy. For example:
Id.
It's thus clear that claims for civil penalties and injunctive relief based on NSR violations are indeed "concurrent." Therefore, for the concurrent remedy doctrine not to apply here, it has to be because there is something special about the government being the plaintiff. This is where we return to Banks, which concluded that there is in fact something special about that fact.
Banks definitively states that "the concurrent remedy rule cannot properly be
Id. (footnotes omitted).
On a close read of this analysis, its flaws become manifest: what starts out as ostensibly an analysis of the concurrent remedy doctrine quickly changes into an assessment of how the statute of limitations applies to equitable claims — an entirely separate (and already answered) question. Indeed, Banks' citation to E.I. du Pont belies its flaws and underscores my point. E.I. du Pont has nothing to do with the
Nevertheless, while Banks and the other courts that have parroted its analysis leave me wanting for logic, I am still reluctant to find that the concurrent remedy doctrine bars governmental action. This hesitancy derives from two sources. First, I have not been able to uncover a single instance where the concurrent remedy doctrine has been used to bar governmental action. U.S. Steel points me to Federal Election Commission v. Williams, 104 F.3d 237 (9th Cir.1996) and Reichelt v. United States Army Corps of Eng'rs, 969 F.Supp. 519, 521 (N.D.Ind.1996), but neither of these cases is persuasive. The analysis of the issue in Williams could not be more cursory (literally just three sentences), and it manages to be just as confusing as Banks in the way it conflates the concurrent remedy doctrine with the analysis of whether Section 2462 applies to claims for equitable relief. Reichelt's discussion of the issue is similarly sparse and is, moreover, complete dicta.
My second source of reluctance is this: Can some creaky, esoteric doctrine of equity really prevent the government from enforcing basic public policy? At a minimum, shouldn't the government always be able to bring an equitable action to bring a defendant into compliance with the law? Counseling in favor of this intuition is the fact that the most prominent equitable doctrine related to limitations periods — laches — does not apply to government action for this very reason. As the Supreme Court has explained:
Guaranty Trust Co. of N.Y. v. United States, 304 U.S. 126, 132, 58 S.Ct. 785, 82 L.Ed. 1224 (1938). Other courts have also come to the same conclusion — that laches does not apply to equitable claims brought by the government. Bostwick Irrigation Dist. v. United States, 900 F.2d 1285, 1291 (8th Cir.1990); Goodman v. McDonnell Douglas, 606 F.2d 800, 804 (8th Cir.1979); U.S. v. American Electric Power Service Corp., 218 F.Supp.2d 931, 937 (S.D.Ohio 2002); S.E.C. v. McCaskey, 56 F.Supp.2d 323, 327 (S.D.N.Y.1999).
What is animating all of these cases in the end is the fundamental public policy principle expressed by the Supreme Court — that "the sovereign is exempt from the consequences of its laches" — because the government has to have enforcement power to enjoin violations of the law. Guaranty Trust, 304 U.S. at 132, 58 S.Ct. 785. And for that reason, I have arrived at the same substantive conclusion as Banks, but I have gotten there by a slightly different path: as a matter of public policy, the government must be allowed to bring violators into compliance with its laws, and therefore "the concurrent remedy rule cannot properly be invoked against the government when it seeks equitable relief in its official enforcement capacity." Banks, 115 F.3d at 919.
For the reasons explained above, U.S. Steel's Motion to Dismiss [DE 14] is