SARAH EVANS BARKER, District Judge.
Plaintiff James Tsareff, as a trustee of Indiana Electrical Workers Pension Benefit Fund ("the Plan"), filed this action pursuant to 29 U.S.C. § 1301(a)(10) to collect on the withdrawal liability allegedly owed by Defendants Tiernan & Hoover and ManWeb Services Inc. ("ManWeb"), as authorized by Section 502(a)(3), (e)(1) and (f) of the Employment Retirement Income Security Act ("ERISA"), Section 301(a) of the Labor Management Relations Act of
The facts pertinent to our resolution of the parties' motions are largely undisputed. However, where necessary, we note the parties' varying interpretations of the facts presented to the Court.
The Plan is a multiemployer pension plan that provides retirement benefits to employees under a collective bargaining agreement ("CBA"). Jason Haltom and James Tsareff are trustees of the Plan and have brought this lawsuit on its behalf.
Tiernan & Hoover was a privately owned company based in the Indianapolis area that performed engineering, construction, and service for cold storage facilities. Tiernan & Hoover was established in 1997 when the company purchased the assets of William F. Freije, Inc. Both William F. Freije, Inc. and Tiernan & Hoover did business under the name "The Freije Company." Michael Hoover was the President of Tiernan & Hoover in August 2009. Greg Taylor was a Vice President and partial owner of the company.
ManWeb is an Indianapolis-based company founded in 2003 by Charles Mandrell and Michael Webster. The company performs engineering, construction, installation, and other services. Over the course of its existence, ManWeb employed between 100 and 450 employees. During the time relevant to this lawsuit, ManWeb's address was 9211 Castlegate Drive, Indianapolis, Indiana 46256. ManWeb was and is a non-union affiliated employer who never made contributions to the Plan. The company did business as Enterprise Electrical and Mechanical Company until the latter half of 2010. In July 2010, ManWeb underwent a reorganization transferring its construction business to a newly formed subsidiary. At the same time, what remained of the company began doing business as "Freije Engineered Solutions."
Sometime in early 2009, Webster and Mandrell on behalf of ManWeb entered into negotiations with Hoover for the purchase of selected assets of Tiernan & Hoover. One reason ManWeb chose to pursue Tiernan & Hoover was because of that company's position in the industrial refrigeration market. Webster and Mandrell were aware that Tiernan & Hoover was a union-affiliated employer. Mandrell testified that there were numerous discussions regarding Tiernan & Hoover's union obligations, specifically with regard to the possibility of "underfunded pension liability," prior to the asset purchase and that he was concerned about potential liabilities stemming from those obligations. Webster concurred that discussions regarding Tiernan & Hoover's "unfunded pension" occurred as a part of their negotiations of the asset purchase but that he was never aware of any withdrawal liability obligation on the part of Tiernan & Hoover. Webster Dep. at 66-69. Mandrell testified that he was aware of the concept of withdrawal liability based on his former work as a union contractor. Mandrell Dep. at 57. However, he also testified that he was unclear on the difference between withdrawal liability and "an under-funded portion of the pension fund." Id. at 59.
In August 2009, Tiernan & Hoover entered into an Asset Purchase Agreement (the "Agreement") with ManWeb pursuant to which ManWeb purchased "all of the assets, rights and properties owned, used or held for use by [Tiernan & Hoover] at the Closing in connection with the Business."
The Agreement detailed a "wind down" process providing that, after closing, Tiernan & Hoover was to "wind down its business operations and carry out an orderly disposition of all of its remaining assets as quickly as commercially reasonable." Pursuant to the Agreement, Tiernan & Hoover agreed to use the funds generated from these "Wind Down Activities" to "pay its outstanding financial obligations." Following the sale of its assets, Tiernan & Hoover ceased operations entirely.
After acquiring these assets, ManWeb performed industrial service and construction, industrial refrigeration, engineering, HVAC, refrigeration, plumbing and electrical work, taking over Tiernan & Hoover's work in progress and warranties pursuant to the Agreement. Several of Tiernan & Hoover's former customers became ManWeb customers. The Plan asserts that ManWeb "continued to do the same type of work" as Tiernan & Hoover, but ManWeb maintains that it provides a far broader range of services than Tiernan & Hoover ever did.
Following the asset purchase, ManWeb filed a Certificate of Assumed Business Name with the Indiana Secretary of State stating that ManWeb would "be doing business under the assumed business name(s) of: The Freije Company." Pl.'s Ex. 14. Webster, however, testified that ManWeb has never done business as the Freije Company. Webster Aff. ¶ 20. ManWeb also began using Tiernan & Hoover's website which received visits coming to www.freijecompany.com and linked them to ManWeb's own website. These web links continued until the latter half of 2010, when ManWeb reorganized. ManWeb utilized both its own logo as well as The Freije Company's on company letterhead for a period of time following the asset purchase.
Hoover, Taylor, and Dick Freije, another of Tiernan & Hoover's original owners and a Mechanical/Refrigeration Engineer, worked for ManWeb following the asset purchase. Hoover testified that his position at ManWeb was "as a salesperson, account manager, and engineer with a primary focus on the industrial refrigeration market." Hoover Aff. ¶ 1. Taylor testified that he was the "direct owner business development manager" at ManWeb. Taylor Aff. ¶ 1-2. Freije worked as a Refrigeration Engineer at ManWeb.
On February 24, 2010, a letter from counsel for the Plan addressed to "The Freije Company," the business trade name of Tiernan & Hoover, was sent to that company's former address, 6450 Guion Road.
Tiernan & Hoover and ManWeb do contend, however, that no ManWeb employee was ever authorized to receive mail addressed either to Tiernan & Hoover or The Freije Company. No explanation has been provided to us regarding the process for forwarding mail delivered to Tiernan & Hoover's Guion Road address or for handling the Letter after it was signed for by Ms. Giles. Regardless, both Hoover and Taylor have testified under oath that neither was aware of the Letter until the Complaint in this litigation was filed and the Plan does not dispute this fact.
The Letter, as previously noted, informed The Freije Company that based on its withdrawal from the Plan in August 2009, the Plan had assessed Tiernan & Hoover's "unfunded vested liability" to be the amount of $661,978.00. The demand specified that payment must commence within 60 days of the Letter's receipt.
No payments have ever been made to satisfy this liability; further, Tiernan & Hoover never sought a review of the assessed withdrawal liability or initiated arbitration or otherwise challenged the assessment. The first indication of such a challenge to the assessment came in Tiernan & Hoover's Answer to this lawsuit, filed pro se, which provided as follows:
As noted above, the Plan and ManWeb have filed cross motions for summary judgment. Summary judgment is appropriate when the record shows that there is "no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law." Fed. R.Civ.P. 56(c); Celotex Corp. v. Catrett, 477 U.S. 317, 322, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). In deciding whether genuine issues of material fact exist, the court construes all facts in a light most favorable to the non-moving party and draws all reasonable inferences in favor of the non-moving party. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986). Because these are cross-motions for summary judgment regarding which the same Rule 56 standards apply, our review of the record requires us to draw all inferences in favor of the party against whom a particular issue in the motion under consideration is asserted. See O'Regan v. Arbitration Forums, Inc., 246 F.3d 975, 983 (7th Cir. 2001) (citing Hendricks-Robinson v. Excel Corp., 154 F.3d 685, 692 (7th Cir.1998)).
The Plan contends that it is entitled to summary judgment against Tiernan & Hoover because it has established that Tiernan & Hoover effectuated a complete withdrawal, that withdrawal liability was properly assessed, and that Tiernan & Hoover is no longer entitled to initiate arbitration or to put forth any other defenses to withdrawal liability. The Plan also contends that it is entitled to summary judgment against ManWeb because ManWeb is a successor to Tiernan & Hoover. Both Tiernan & Hoover and ManWeb oppose the Plan's Motion and, indeed, ManWeb requests summary judgment in its own favor.
As an initial matter, some background related to withdrawal liability and its purpose within the ERISA framework seems worthwhile. The Seventh Circuit has provided the following guidance with regard to actions by multi-employer pension plans, such as the Plan in this case, to collect withdrawal liability from employers:
Chicago Truck Drivers v. El Paso CGP Co., 525 F.3d 591, 595-596 (7th Cir.2008). The employer is not without recourse, but if the employer does elect to challenge the plan sponsor's assessment of its liability, it must request a review and initiate arbitration. Id. Failure to do so in accordance with the statutory deadlines results in the assessment becoming immediately "due and owing." Id. (quoting 29 U.S.C. § 1401(b)(1)).
In light of the statutory requirement that the employer initiate arbitration, all that the Plan must show to prevail on its claim against Tiernan & Hoover at this point is that: (1) the Plan was a multiemployer pension plan, pursuant to the MPPAA, and Tiernan & Hoover was an employer for the purposes of ERISA; (2) the Plan notified Tiernan & Hoover of its assessed withdrawal liability; and (3) Tiernan & Hoover failed to timely initiate arbitration. Hancock v. Cook County Waste & Recycling, Inc., No. 09-cv-212, 2010 WL 1416978, at *7, 2010 U.S. Dist. LEXIS 33351, at *19 (N.D.Ill. Apr. 5, 2010) (citing El Paso CGP Co., 525 F.3d at 598). There is no dispute that the Plan is a multiemployer pension plan to which the MPPAA applies, that Tiernan & Hoover was an employer pursuant to ERISA, or that Tiernan & Hoover never initiated arbitration to challenge the plan sponsor's assessment of its withdrawal liability. Thus, our discussion focuses simply on the sufficiency and timing of the notice provided to Tiernan & Hoover of its assessed liability.
Pursuant to 29 U.S.C. § 1382, the plan sponsor is to determine the amount of the employer's withdrawal liability, notify that employer, and collect the amount of withdrawal liability from the employer. "In order to satisfy the statutory requirements, a notice and demand must include the amount of the liability, a schedule of payments and a demand for payment; it must also be sent `to the employer.'" El Paso CGP Co., 525 F.3d at 598 (citing 29 U.S.C. § 1399(b)).
Tiernan & Hoover maintains that the February 26, 2010 correspondence did not provide adequate notice of its liability because the company was no longer doing business at that address and both Hoover and Taylor deny having received that correspondence prior to the filing of this lawsuit. Taylor Dep. at 31-32; Hoover Aff. ¶ 14. The Plan proffers no evidence to dispute that contention.
The parties have cited no case law addressing whether the MPPAA requires that a pension fund provide actual notice to the employer of its liability as opposed to providing constructive notice by sending notification to the employer's last address of record. We note that 29 U.S.C. § 1399(b)(2)(A) uses the word "receives" to mark the beginning of the period during which an employer must challenge the assessment. Furthermore, the Seventh Circuit has questioned the fairness of finding constructive notice sufficient for purposes of notifying a former owner who is no longer a member of the business "control group" referenced above. El Paso CGP Co., 525 F.3d at 600 ("We question the equity of denying a former owner the right to contest liability because it failed to respond to a notice sent to a company from which it was already separated.")
Even if we assume the insufficiency of the initial notice, however, Tiernan & Hoover has conceded that it did in fact receive notice of the assessment as of the time the Plan filed its Complaint. Dkt. No. 132 at 5. That Complaint included allegations as to both the notice and the amount of the withdrawal liability claimed, to wit, $661,978.00.
The Plan also seeks to hold ManWeb liable for the withdrawal liability assessed against Tiernan & Hoover under the equitable doctrine of successor liability. "[T]he entire notion of "successor liability" in the ERISA withdrawal context [is to give] employee benefit funds a second and added source to look to if and to the extent that the statutory liability of the withdrawing employer would otherwise leave the fund holding the bag." Cent. States v. King Chrysler Jeep, Inc., No. 09 C 7474, 2010 WL 1197368, at *1, 2010 U.S. Dist. LEXIS 26176, at *4 (N.D.Ill. Mar. 19, 2010). The Seventh Circuit has described the successorship doctrine in a case brought to recover delinquent pension fund payments and impose ERISA withdrawal liability, as follows:
Chicago Truck Drivers, Helpers & Warehouse Workers Union (Indep.) Pension Fund v. Tasemkin, Inc., 59 F.3d 48, 49 (7th Cir.1995) (internal citations omitted).
As noted above, a successor must have notice of its predecessor's liability in order for that liability to be imposed on the successor. Tasemkin, Inc., 59 F.3d at 49; Upholsterers' Int'l Union Pension Fund v. Artistic Furniture of Pontiac, 920 F.2d 1323, 1329 (7th Cir.1990). "Notice can be proven not only by pointing to facts that conclusively demonstrate actual knowledge, but also by presenting evidence that allows the fact finder to imply knowledge from the circumstances." 920 F.2d at 1329. "When the successor company knows about its predecessor's liability, knows the precise extent of that liability, and knows that the predecessor itself would not be able to pay a judgment obtained against it, the presumption should
However, the Seventh Circuit has characterized the element of prior notice to an alleged successor as "critical," noting "it would be grossly unfair, except in the most exceptional circumstances, to impose successor liability on an innocent purchaser... when the successor did not have the opportunity to protect itself by an indemnification clause in the acquisition agreement or a lower purchase price." Musikiwamba v. ESSI, Inc., 760 F.2d 740, 750 (7th Cir.1985). The economic rationale for successor liability goes as follows: "The successor, if he knows of his potential liability, will demand compensation in the form of a lower price for the assets, and in this way the burden of liability will be shifted back to the owners of those assets, where it belongs." Artistic Furniture, 920 F.2d at 1327 (quoting Vucitech, 842 F.2d at 945).
Here, the asset purchase whereby ManWeb acquired the assets from Tiernan & Hoover occurred several months prior to Tiernan & Hoover's receipt of the notice of withdrawal liability. Thus, we have serious doubts regarding the extent to which ManWeb could have had notice of the withdrawal liability prior to that acquisition. The parties argue extensively over this point. The Court in Tasemkin expressly stated that the successor must have had notice of the claim "before the acquisition" in order to impose liability upon it. 59 F.3d 48, 49. Because Tiernan & Hoover did not withdraw or incur withdrawal liability until after the asset purchase, ManWeb's position is that it is impossible for it to have had notice of an existing liability in advance of the closing on the asset purchase. Trustees of Chicago Plastering Institute Pension Trust v. Elite Plastering Co., 603 F.Supp.2d 1143 (N.D.Ill.2009). We agree with ManWeb on this point. The cases cited by the Plan for its position that the notice element encompasses both existing and potential liabilities involve situations in which a claim was at least pending against the predecessor, Golden State Bottling Co., Inc. v. NLRB, 414 U.S. 168, 185, 94 S.Ct. 414, 38 L.Ed.2d 388 (1973) (acknowledging a successor's potential liability stemming from a pending unfair labor practice charge); Musikiwamba, 760 F.2d at 751; Goodpaster v. ECP Am. Steel, LLC, 2012 WL 5267971, *1, 2012 U.S. Dist. LEXIS 152593, *2-3 (N.D.Ind. Oct. 24, 2012), or discuss potential liability on the part of a buyer, not the seller. Artistic Furniture, 920 F.2d at 1327; Vucitech, 842 F.2d at 945.
Even if we assumed that the Plan was correct, however, with regard to imposing liability on a successor based on its knowledge of a hypothetical, potential claim against the predecessor, this would not be a case in which imposing such liability would be equitable. As discussed above, Tiernan & Hoover waived all defenses that would otherwise have been available to it by failing to initiate arbitration within the applicable statutory period. Thus, pursuant to 29 U.S.C. § 1401(b)(1), the assessment is now "due and owing" regardless of any merits-based defense that might have been available to Tiernan & Hoover. However, if Tiernan & Hoover's waiver of its defenses is the only basis upon which it is liable for the withdrawal, then instead of establishing ManWeb's notice of Tiernan & Hoover's withdrawal liability based on the merits, the Plan would have to establish notice of the events that led to Tiernan & Hoover's waiver and only then resulting liability —
Putting aside the issue of waiver, the Plan bases its substantive claim of entitlement to withdrawal liability on Tiernan & Hoover's complete withdrawal pursuant to 29 U.S.C. § 1383(b). In general, a complete withdrawal occurs when an employer — (1) permanently ceases to have an obligation to contribute under the plan, or (2) permanently ceases all covered operations under the plan. 29 U.S.C. § 1383(a). However, the statute provides a partial exemption for employers in the building and construction industry. Specifically, 29 U.S.C. § 1383(b) states that an employer in the construction industry effectuates a complete withdrawal (and, thus, incurs withdrawal liability) only when:
All of the parties agree that Tiernan & Hoover is an employer in the construction industry, Tiernan & Hoover and thus subject to § 1383(b). Further, all agree that Tiernan & Hoover ceased to have an obligation to contribute to the Plan when the asset sale occurred and once it ceased operations. However, the parties do not agree on the issue of whether a complete withdrawal occurred pursuant to SubPart (B), supra. The Plan argues that ManWeb's continued performance of work of the type for which contributions were previously required of Tiernan & Hoover serves to impose withdrawal liability on Tiernan & Hoover. We disagree.
Rather than citing cases construing 29 U.S.C. § 1383(b), the Plan bases its argument on a test for successor liability as laid out in Fall River Dyeing & Finishing Corp. v. NLRB, 482 U.S. 27, 43, 107 S.Ct. 2225, 96 L.Ed.2d 22 (1987). The Court endorsed that test, referred to as the "substantial continuity" approach, as a method to determine "whether a new company was indeed the successor to the old." Id. The Plan's reliance on the doctrine of successor liability in support of this conclusion ignores the fact that no successor liability exists without a prior determination that Tiernan & Hoover is liable to the Plan. See Richland Industries, Ltd. v. Robbins, 617 F.Supp. 639, 642 (N.D.Ill.1985) (acknowledging that no derivative liability could be imposed upon a successor without first establishing the predecessor's statutory liability for withdrawal payments).
The plain language of the statute does not support the Plan's argument that ManWeb's continuation of certain work must or should be imputed to Tiernan & Hoover in determining whether Tiernan & Hoover effectuated a complete withdrawal. SubPart B uses the article "the" to identify the employer, clearly referring to the same employer referenced in SubPart A who "ceas[ed] to have an obligation to contribute
Other portions of the MPPAA support our conclusion that "the employer," as referred to in SubPart B, does not include a successor. As Judge Shadur wrote in Richland Industries, Ltd., a case in which the claimant argued that a seller and purchaser of assets should be considered a single employer for purposes of computing the liability of the purchaser: "There are explicit statutory provisions defining when successive employers can be considered a single "employer" for purposes of calculating withdrawal liability." 617 F.Supp. at 644. He continued:
Id.
For these reasons, we find that Tiernan & Hoover did not effectuate a complete withdrawal pursuant to § 1383(b) and thus, apart from its waiver of the defenses available to it, it would not be subject to withdrawal liability. Accordingly, prior to the asset purchase, ManWeb had no notice of Tiernan & Hoover's eventual failure to challenge the assessment or the resulting liability. There being no genuine issue of material fact that ManWeb lacked notice of Tiernan & Hoover's withdrawal liability, it is not liable under the doctrine of successor liability. The Plan's Motion for Summary Judgment is thus DENIED with regard to its claim against ManWeb, and ManWeb's Motion for Judgment as a Matter of Law is GRANTED.
For the reasons detailed herein, Defendant ManWeb Services, Inc.'s Motion for Judgment as a Matter of Law [Dkt. No. 104] is GRANTED. Plaintiffs' Motion for Summary Judgment against All Defendants [Dkt. No. 95] is GRANTED IN PART AND DENIED IN PART. Specifically, the Plan's Motion is GRANTED with regard to its claim against Tiernan & Hoover, and DENIED with regard to its claim against ManWeb. As noted above, in addition to the $661,978.00 in assessed withdrawal liability against Tiernan & Hoover, the Plan is entitled to payment of interest, liquidated damages, reasonable attorney's fees and costs in accordance with 29 U.S.C. § 1132(g)(2). The Plan shall submit a proposed computation of these amounts to Tiernan & Hoover within 30 days from the date of this Order. We urge the parties to attempt to resolve informally any differences they may have relating to the computation, but, if such resolution is not possible, Tiernan & Hoover is directed to file its objections to the Plan's computation within fifteen days of the parties' declared impasse.
IT IS SO ORDERED.