VICTORY, J.
We granted writ applications in this oilfield contamination "legacy litigation"
This suit involves two pieces of property in St. Mary Parish upon which Exxon, or its predecessors,
Pursuant to the Marin, CBT, and Surface Leases, Exxon installed and operated oil and gas facilities and a landing/dock
By 1958, sugarcane farmers on the Marin Property were aware that sugarcane growth was affected on and near former unused pit sites. In the 1980s, plaintiffs were concerned that sugarcane would not grow properly in the pit areas. E.F. Marin, Sr.'s son-in-law, Clyde Breaux, acted as the "family representative" on matters involving Exxon and demanded that Exxon clean the fields and make them usable for cane farming. Breaux characterized the problems they saw as follows:
Between 1988-1990, Breaux made numerous demands upon Exxon to clean up the property so that they could continue to grow sugarcane, including that "every bit of contamination [be] removed from the site and new dirt hauled in."
At about the same time, in 1986, the Louisiana Department of Natural Resources ("DNR") amended Statewide Order 29-B to require the registration and closure of existing unlined oilfield pits. The amended regulations also required that various enumerated contaminants in the soil be remediated to certain standards. Between 1987 and 1991, Exxon closed all of the remaining pits on the Breaux and Marin properties and represented that it was remediating the pit areas to Statewide Order 29-B standards. During the pit closure process, Breaux routinely communicated with Exxon employees regarding the remediation work. The last efforts to remediate the pits occurred in 1991. On September 4, 1991, Exxon instructed Breaux that in order to have his land returned to him for farming, he would have to sign a release, which he did.
On February 23, 2003, this Court issued its decision in Corbello v. Iowa Production, 02-0826 (La.2/25/03), 850 So.2d 686.
On November 26, 2003, the plaintiffs filed suit against Exxon asserting claims for remediation of the soil and groundwater and other damages arising out of Exxon's oil and gas activities. Plaintiffs alleged that Exxon knowingly disposed of oilfield wastes in unlined earthen pits and/or released the waste directly into waterways, resulting in contamination to their property. Plaintiffs alleged that the oilfield wastes deposited into these pits and water bodies contained naturally occurring radioactive material ("NORM"), produced water, drilling fluids, chlorides, hydrocarbons, heavy metals and other toxic substances. Plaintiffs claims were in tort and breach of contract including: negligence under La. C.C. art. 2315; strict liability under La. C.C. arts. 667, 2317 and 2322; continuing nuisance and trespass; breach of oil, gas and mineral leases, breach of the Mineral Code; breach of the obligation to restore the property to its original condition under La. C.C. arts. 2719 and 2720; punitive damages under La. C.C. art. 2315.3; injunctive relief; and liability under La. C.C. art. 486 for fruits of continuing trespass and unjust enrichment.
At trial, plaintiffs produced evidence of extensive contamination of soil and groundwater arising out of Exxon's operations on the plaintiffs' property, primarily caused by Exxon's use of unlined earthen pits to store and dispose of produced water and other oilfield wastes. The evidence showed that although it was the common industry practice, Exxon knew as early as the 1930s that environmental damage, particularly saltwater seepage, resulted from the use of unlined earthen pits. By 1970, Exxon knew of "chronic pit pollution problems" on plaintiffs' property but continued to use the unlined pits to handle produced water and drilling water for decades and ignored best industry practices for handling this waste. Exxon's test results from 1987 showed salt contamination from a depth of 4-20 feet. Further, the evidence showed that Exxon was discharging vast amounts of saltwater into a freshwater canal, Leopard Bayou, pursuant to a permit that was issued based on misrepresentations made by Humble to obtain the permit. This permit was granted in 1942 based on Humble's representations that Leopard Bayou was a saltwater environment and that they were producing 31 barrels per day. In 1966, an internal memo revealed that they were actually producing 70,953 barrels per day, but would not report this to the state "as an adverse ruling could prove costly to Humble." In that same memo, Humble rejected the idea of installing a saltwater injection
In addition, by 1986, Exxon knew that produced water contained NORM radiation and by at least 1993, learned that NORM radiation existed in the area of its pipe cleaning facility on the Marin property. Plaintiffs' expert testified that NORM "comes up with the produced water in small quantities, but it concentrates in the scale in the pipes." Exxon never notified the state of this NORM contamination, as required by the self-reporting provisions. When the DEQ learned of the NORM radiation in pipes, it ordered the oil industry not to remove the pipes before cleaning the contamination and testing the pipes. This occurred prior to 1993 but Exxon did not comply with this order.
Further, after the government ordered the pits closed by 29B, Exxon's remediation and closure did not meet 29B requirements and the property remains contaminated today. In addition, Exxon did environmental assessments of the properties in 1993 and 2001 for internal purposes which showed the properties were contaminated with salts, heavy metals, and radiation, all in excess of regulatory limits, yet did not tell plaintiffs of these findings. Plaintiffs presented expert testimony regarding the costs to remediate the property to 29B standards and the costs to remediate the property to its original pre-lease condition. Finally, plaintiffs presented evidence that the contamination had reached the groundwater underneath plaintiffs' property, and argued that this property was a Class II aquifer which was required to be cleaned pursuant to the Groundwater Act, La. R.S. 30:2015.
After a five-day bench trial, the trial court found that continuous contamination of various chemicals deposited by Exxon on the Breaux and Marin Properties was unreasonable and constituted negligent operations by Exxon, resulting in breach of contract and negligence. The trial court found that Exxon had knowledge since the 1930s and 1940s that unlined pits could leak and were the potential for significant damage to soil conditions, that Exxon's pits leaked into the soil resulting in "outrageous levels" of chemicals in the soil, and that Exxon was given ample opportunity to remediate this site but failed to do so. In addition, the trial court found this conduct was "unreasonable and constitutes negligent operations by the lessee," resulting in breach of contract and negligence. The trial court rejected Exxon's claims that the plaintiffs' action had prescribed, finding that the doctrine of contra non valentem applied such that prescription did not begin to run until 2003, when plaintiffs received an expert report delineating the scope and magnitude of the damage. The trial court reasoned that even though plaintiffs knew there were some problems associated with the pits and that cane would not grow in pit areas, the average person would have no knowledge of whether a pit was properly cleaned or the extent of any damage, and further, that plaintiffs relied on Exxon's assertions in 1991 that it had remediated the pits in compliance with state regulations. The court found the release signed by the Breauxs in 1991 was obtained by Exxon by fraud and misrepresentation, because Exxon deceived Breaux with misleading lab results. The trial court terminated the Surface Lease, finding that the Surface Lease provided the lessors had the right to immediately terminate the lease upon any violation of any
The judgment was affirmed on appeal. Marin v. Exxon Mobil Corporation, 08-1724 (La.App. 1 Cir. 9/30/09), 2009 WL 7004332 (unpublished). The appellate court found that that the doctrine of contra non valentem applied to suspend the running of prescription because plaintiffs lacked sufficient knowledge of the nature or extent of the damages or contamination to commence the running of prescription until they received an expert report in 2003. The court further found that Exxon lulled plaintiffs into inaction by misrepresentation.
We granted Exxon's writ application, which assigned as error that the lower courts (1) committed legal error in holding that plaintiffs' claims survived prescription under contra non valentem; (2) erred in awarding punitive damages under repealed Civil Code article 2315.3, and (3) erred in allowing the Breauxs to sue for property damage that occurred before they bought the land. Marin v. Exxon Mobil Corp., 09-2368 (La.2/26/10), 28 So.3d 262. We granted plaintiffs' writ application to consider whether Exxon has an obligation to restore the soil to its original condition as existed at the time the leases were executed and whether Exxon is liable for damages for remediation of the groundwater. Marin v. Exxon Mobil Corp., 09-2371 (La.2/26/10), 28 So.3d 262. The writs were consolidated.
Exxon urges that plaintiffs' tort claims have prescribed because plaintiffs were aware that the pits were contaminated and sugarcane would not grow on the area around the pits sites by at least 1991, yet they did not file suit until 2003.
"Delictual actions are subject to a liberative prescription of one year" and for damage caused to immovable property, "the one year prescription commences to run from the day the owner of the immovable acquired, or should have acquired, knowledge of the damage." La. C.C. arts. 3492, 3493. A trial court's findings of fact on the issue of prescription are subject to the manifest error-clearly wrong standard of review. London Towne Condominium
Although La. C.C. art. 3467 provides that "prescription runs against all persons unless exception is established by legislation," this Court has applied the jurisprudential doctrine of contra non valentem as an exception to this statutory rule. We have recognized four factual situations in which contra non valentem prevents the running of liberative prescription:
Plaquemines Parish Com'n Council v. Delta Development Co., Inc., 502 So.2d 1034 (La.1987). In cases involving property damage, the fourth category of contra non valentem, otherwise known as the "discovery rule," is encompassed in the prescriptive period proscribed by La. C.C. art. 3493, as both essentially suspend prescription until the plaintiff knew, or reasonably should have known of the damage.
Here, both lower courts found plaintiffs' claims had not prescribed based on the discovery rule, finding the average person would have no way of knowing whether an oilfield pit was properly cleaned because contaminants are not readily discernable by visual inspection and the plaintiffs reasonably relied on Exxon's assurances that the pits were cleaned to the applicable state standards. The lower courts recognized that although plaintiffs had some knowledge of problems with the pits, prescription did not begin to run until they "gained knowledge of the nature and extent of the damages as set forth in the initial report of their expert, Greg Miller." Marin v. Exxon, Slip Op. at p. 12, 2009 WL 7004332. The trial court went further and found that "prescription does not begin to run until the plaintiffs had full knowledge of the extent of damage" as reported by Miller.
The lower courts have interpreted the fourth category of contra non valentem too broadly. As we have stated, "the doctrine of contra non valentem only applies in `exceptional circumstances.'" Renfroe v. State ex rel. Dept. of Transp. and Development, 01-1646 (La.2/26/02), 809 So.2d 947, 953 (citing La. C.C. art. 3467, Official Revision Comment (d); State Through Div. of Admin. v. McInnis Bros. Const., 97-0742 (La.10/21/97), 701 So.2d 937, 940). When this jurisprudential doctrine
Specifically regarding property damage claims, knowledge sufficient to start the running of prescription "is the acquisition of sufficient information, which, if pursued, will lead to the true condition of things." Young v. International Paper Co., 179 La. 803, 155 So. 231 (La.1934). This date has been found to be the date the damage becomes apparent. South Central Bell Telephone Co. v. Texaco, Inc., 418 So.2d 531, 532 (La.1982) ("Generally, the prescriptive period for damage to adjacent land commences when the damage becomes apparent and the injured party discovers who or what caused it"); Dean v. Hercules, 328 So.2d 69 (La.1976) ("[D]amages from industrial emissions and the like may not became apparent until some years after the occurrence . . . [a]dditionally, it might be impossible for the injured party to know what or who caused the damage, until an investigation can be made after the damage in fact becomes apparent"); Yiannapoloulos, Louisiana Civil Law Treatise: Predial Servitudes, Vol. 4, § 63 (discussing obligations of vicinage) ("In accordance with Article 3493 of the Civil Code, prescription begins to run from the day the injured party acquired, or should have acquired, knowledge of the injury and other pertinent facts, namely, from the day the damage becomes apparent.").
Between 1987 and 1991, either because of Breaux's complaints or because of Statewide Order 29-B, Exxon ceased using its remaining pits, and closed them after purportedly remediating them to the appropriate statewide standards. In connection with these activities, Exxon hired Bayou Sale Contractors to perform pit closure work. Breaux testified that in September of 1988, he saw Stanley Boudreaux, Bayou Sale Contractors' employee, covering up a pit on the Marin Property. This pit was the biggest pit on either the Marin or Breaux properties. Breaux noticed that the pit still had sludge in the bottom of it and asked the Exxon supervisor to have the operations stopped because of the remaining sludge. Later, Exxon closed the pits with the remaining sludge still there, telling Breaux that they could not solve the problem and that it would cost too much to clean it up. Breaux testified that he and Engsfeld Marin went to the bottom of the pit 15-20 feet deep and scooped up some of the sludge and put the sludge in two canning jars in his shed, because "now if they don't close the pit up or if they cover this up, I can at least show somebody what's in the bottom of it." Engsfeld Marin testified that they took the samples because they knew the contamination was going to "come back up." He also testified that he didn't file suit for 20 years because he couldn't find a lawyer. Exxon told Breaux they had to have the pits cleaned by 1989 so they were going to come back and do it legally, and that he should to try and grow cane on the area.
At some point thereafter, but prior to 1991, Breaux complained that his tractor had sunk into a closed pit area on his land and requested that Exxon remedy that problem. After a second attempt to remediate the pits in 1991 by Tetra Resources, Inc., Mike Hluza of Exxon sent Breaux a letter on April 4, 1991 attaching the results of tests from James Laboratory which Hluza represented showed that all parameters, including salt, were well below accepted standards and state regulations. At trial, Breaux testified he "had to believe that Exxon didn't lie, and if they told me it was in full compliance, I had to believe them." In his deposition, he testified he questioned those results when he received them because he was suspicious of where they took the samples.
Breaux testified that he only agreed to sign the release after being assured by Exxon that he was not waiving any environmental claims and the remediation of his property was compatible with applicable statewide standards.
Thus, the evidence is clear that plaintiffs knew by 1991 that sugarcane would not grow properly in the pit areas and had made demand on Exxon to clean and close the pits so that they could grow sugarcane. They knew that some of the pits were closed with sludge remaining at the bottom of the pits after the first attempt at closure, and they kept samples of the contents of this sludge. They knew that the pits contained some oilfield wastes (barites/drilling mud). They knew that certain of the pit areas were not stable enough to support farm equipment. They knew that Exxon was having trouble cleaning and closing the pits sufficiently to meet the applicable statewide standards. Although Exxon assured plaintiffs that they were in compliance in 1991, they remained suspicious of Exxon's assurances that the pits were remediated to statewide regulatory standards. After the attempted remediation in 1991, plaintiffs had the opportunity to observe that a healthy sugarcane crop was still not growing in spite of Exxon's efforts. Further, no new damage became apparent that was not already apparent in 1991; in fact, the pit areas still will not support healthy cane growth.
Thus, under the applicable law, the question is whether knowledge of these facts constitutes "the acquisition of sufficient information, which, if pursued, will lead to the true condition of things." Young, supra. Put another way, should the knowledge of these facts have put the plaintiffs on notice that further inquiry and investigation was necessary, and would further inquiry have led to knowledge that the land was contaminated with oilfield wastes? As plaintiffs took no further action upon learning that sugarcane would
We recently discussed the constructive knowledge requirement in a soil and groundwater contamination case in Hogg v. Chevron USA, Inc., 09-2632 c/w 09-2635 (La.7/6/10), 45 So.3d 991. There, although damage was not apparent on plaintiffs' property, they received two letters from the DEQ informing them that leaking underground storage tanks at a neighboring Chevron station had contaminated the subsurface soil and groundwater in the area, that the direction of groundwater flow was toward plaintiffs' property, that water samples taken from a stream on the plaintiffs' property contained gasoline constituents, and that gasoline constituents had been detected on the property in such concentrations that it was recommended that plaintiffs limit the time spent in the area. The plaintiffs did not file suit until five years later upon receiving a letter from a company with which LDEQ had contracted seeking permission to enter their property to conduct remediation. Plaintiffs contended that the letters from the LDEQ provided no definitive evidence of contamination or whether the contamination exceeded allowable limits and that the information was vague and indicated the investigation was ongoing. Therefore, they argued it was reasonable for them to await further notice before taking action. We rejected this argument, finding that although the letters may not have specifically informed plaintiffs that their property was contaminated, it was "beyond peradventure that [the letters] provide[d] sufficient information to excite attention and put plaintiffs on guard and call for inquiry." 45 So.3d at 1001. We pointed out case law establishing that prescription runs from the date a person "first suffers actual and appreciable damages, even though he may thereafter come to a more precise realization of the damages he has incurred or incur further damage as a result of the completed tortious act," Id. (Citing Harvey v. Dixie Graphics, Inc., supra). And, we stressed that "[w]hile prescription will not begin to run at the earliest possible indication that a plaintiff may have suffered some wrong, and should not be used to force a person who believes he may have been damaged in some way to rush to file suit, a plaintiff is responsible to seek out those whom he believes may be responsible for a specific injury." Id., 45 So.3d at 1001 (citing Jordan v. Employee Transfer Corp., 509 So.2d 420, 423 (La.1987)). The fact that the allegations in the plaintiffs' 2007 petition for damages were based on the same information contained in the 2001 and 2002 letters was important to our finding that the letters gave the plaintiffs sufficient knowledge to afford them a reasonable basis to pursue a claim for damages and that their inaction, in light of these letters, was unreasonable. Id., 45 So.3d at 1001.
While the information contained in these letters is far more detailed than the information the Marins and Breauxs had, they had knowledge of damage that was apparent, i.e., dying sugarcane. Even though
Here, the trial court relied on Hazelwood Farm, Inc. v. Liberty Oil and Gas Corp., 02-266 (La.App. 3 Cir. 4/2/03), 844 So.2d 380, writs denied, 03-1585, 03-1624 (La.10/31/03), 857 So.2d 476, to hold that "the doctrine of contra non valentem applies to this case and prescription does not begin to run until the plaintiffs had full knowledge of the extent of damage as reported by the initial report of Greg Miller, plaintiff's expert." The court of appeal found no manifest error in this ruling. Marin v. Exxon, Slip Op. at p. 12, 2009 WL 7004332. However, the lower courts committed an error of law based on the above jurisprudence. Under the fourth category of contra non valentem, prescription is not interrupted/suspended until a plaintiff has "full knowledge of the extent of damage." Prescription begins to run when the plaintiff should have acquired knowledge of the damage to their property. Further, as stated above, "prescription runs from the date on which [a plaintiff] first suffered actual and appreciable damage, . . . even though he may thereafter come to a more precise realization of the damages he has already incurred or incur further damage as a result of the completed tortious act." Harvey, supra at 354.
The First Circuit additionally found that the third category of contra non valentem applied to prevent prescription from running. This category encompasses the situation where the debtor himself has done some act effectually to prevent the creditor from availing himself of his cause of action. Corsey, supra at 1321-22. This category has been applied to cases wherein defendant has concealed the fact of the offense or has committed acts (including concealment, fraud, misrepresentation, or other "ill practices") which tend to hinder, impede, or prevent
We find the First Circuit erred in applying the third category of contra non valentem because more is needed to invoke that doctrine. This category is implicated only when (1) the defendant engages in conduct which rises to the level of concealment, misrepresentation, fraud or ill practice, Fontenot, supra at 963; (2) the defendant's actions effectually prevented the plaintiff from pursuing a cause of action, Hendrick v. ABC Ins. Co., 00-2403, 00-2349 (La.5/15/01), 787 So.2d 283, 290, 293; and (3) the plaintiff must have been reasonable in his or her inaction, Jordan, supra at 423. See also Allstate Ins. Co. v. Fred's Inc., 09-2275 (La.1/29/10), 25 So.3d 821 (granting writ and holding that where the manufacturer failed to identify itself as the manufacturer on the label of its product, the court of appeal erred in holding that the third and fourth categories of contra non valentem applied because the plaintiff's lack of due diligence to ascertain the identity of the manufacturer precluded the application of contra non valentem).
In this case, plaintiffs argue that not only did Exxon represent to plaintiffs that their 1991 remediation was successful, but in both 1993 and 2001, Exxon conducted assessments of the land for internal purposes and did not tell plaintiffs that these assessments indicated that the land was in fact contaminated beyond allowable standards. After receiving the 1993 report, Exxon decided that "we would have Mr. Breaux inform us when his final year was and we would go in and take care of the situation . . . I know that was our intent," evidencing Exxon's intent to wait until some future event, which according to plaintiffs was the final year of Breaux's four-year crop rotation, to repair any contamination. Further, throughout this time period, Exxon was responsive to plaintiffs' concerns regarding the sugarcane and even paid them to compensate them for their sugarcane losses, all the while knowing that the land was contaminated beyond regulatory standards. We find that this conduct, while less than acceptable, does not meet the requirements necessary under the third category of contra non valentem. In the context of "lulling," while Exxon may have preferred the plaintiffs not file any type of lawsuit, Exxon was certainly not trying to prevent plaintiffs from filing a multi-million dollar Corbello-type suit as Louisiana courts had yet to recognize such damages. Further, plaintiffs had little reason to sue as they were being compensated for their losses in the form of sugarcane damages and that was their chief concern. While Exxon misled plaintiffs by not disclosing the extent of the contamination when they learned of it, they certainly did nothing to prevent plaintiffs from investigating the cause of the sugarcane loss for themselves. Further, while it may have been reasonable to wait a few years after 1991 to sue, it was unreasonable for plaintiffs to wait 12 years thinking that Exxon was going to come
In the alternative, plaintiffs argue their delictual actions are not prescribed because Exxon's pollution of their land constitutes a continuing tort upon which prescription does not begin to run, regardless of their knowledge of the damage, until the contamination is removed from their property. Plaintiffs claim that Exxon's pollution continues to migrate causing successive, ongoing and cumulatively increasing deterioration of their property. Exxon argues that for the continuous tort doctrine to apply, the operating cause of the injury must be a continuous one, and that where the damage-causing conduct ceases, the tort is no longer continuing. Here, Exxon argues that the damage-causing conduct was the deposit of the oilfield waste into the unlined pits, and this conduct ceased by at least 1989, more than a decade before suit was filed.
After this case was argued, we issued our opinion in Hogg, supra, which fully explained the parameters of the continuous tort doctrine. In Hogg, plaintiffs' land was contaminated as a result of the migration of gasoline from formerly leaking underground storage tanks located on neighboring property. At the time of suit, the gasoline remained on the property, but the cause of the contamination, i.e., leaking underground storage tanks, had been removed ten years prior. The Hoggs argued that the presence of the gasoline on their property constituted a continuing trespass and, as a result, prescription would not begin to run until the trespass was abated by the removal of the gasoline from the property. We disagreed.
After discussing the law relevant to continuous torts, see 45 So.3d at 1002-1003, we set out the following test to be used in making this determination: "the court must look to the operating cause of the injury sued upon and determine whether it is a continuous one giving rise to successive damages, or whether it is discontinuous and terminates, even though the damage persists and may progressively worsen." 45 So.3d at 1003. Relying on our prior opinion in South Central Bell, supra, we held that the operating cause of the damages was the leaking underground storage tanks and that when the tanks were replaced and thus the leaking stopped, prescription began to run. We likewise cited our opinion in Crump, supra, wherein we held that "[a] continuing tort is occasioned by unlawful acts, not the continuation of the ill effects of an original, wrongful act." In Crump, the digging of a canal caused the continuing diversion of water from an ox-bow lake on plaintiff's property, and we held that the continued presence of the canal and the consequent diversion of water from the ox-bow were "simply the continuing ill effects arising from a single tortious act." 737 So.2d at 728. Likewise, we held in Hogg that "[a]s in Crump, the presence of the gasoline in the soil and subsurface is simply the continued ill effect of the original tortious incident—the leaking of gasoline, which ceased in 1997 when the tanks were replaced." 45 So.3d at 1006.
In Hogg, we also rejected the plaintiffs' argument that the failure to contain or properly remediate the leakage constituted a continuing wrong as the failure to remediate was not the operating cause of
Arguably, one difference between this case and the Hogg case is that in Hogg, there was no evidence or argument that gasoline continued to leak after the tanks were replaced, whereas here, plaintiffs assert that "the evidence shows that Exxon's pollution continues to (1) migrate, (2) cause successive damage, and (3) cause ongoing and cumulatively increasing deterioration of Plaintiff's property." However, evidence of any seeping or migration was scant at trial as this was not a heavily litigated factual issue. The evidence cited for this proposition was testimony from plaintiffs' expert, Greg Miller, relating to groundwater contamination. He testified as follows:
However, this scant evidence does not change our view that Exxon's conduct does not constitute a continuing tort. The operating cause of plaintiffs' injury was still the actual disposal or storage of the oilfield waste in unlined pits on plaintiffs' property. See Lejeune Bros., Inc. v. Goodrich Petroleum Co., L.L.C., 06-1557 (La.App. 3 Cir. 11/28/07), 981 So.2d 23, writ denied, 08-298 (La.4/4/08), 978 So.2d 327, and Mouton v. State of Louisiana, 525 So.2d 1136 (La.App. 1 Cir.1988), writ denied, 526 So.2d 1112 (La.1988) (both holding that the operating cause of plaintiffs' injury was the disposal or storage of oilfield waste in plaintiffs' property even though the damage caused by this conduct was continuous). When the pits were closed, the conduct ceased. Simply because the contaminants may have continued to dissolve into, or move with, the groundwater with the passage of time does not turn this into a continuing tort. As we held in In re Medical Review Panel for Claim of Moses, 00-2643 (La.5/25/01), 788 So.2d 1173, 1183, "[w]hen a defendant's damage-causing act is completed, the existence of continuing damages to the plaintiff, even progressively worsening damages, does not present successive causes of action accruing because of a continuing tort." Any continued dissolution into the groundwater is the continuation of the harm caused by the previous, but terminated conduct, and falls under the category of "progressively worsening damages," not damage-causing conduct. Further, this migration is distinguishable from the leaking underground storage tanks in South Central Bell Telephone and Hogg, because in those cases, the damage-causing
Accordingly, we find that the operating cause of the injury sued upon was the deposit and storage of oilfield wastes into unlined pits which conduct terminated when the pits were closed. Any dissolution of this contamination unto and into plaintiffs' property is the resulting damage of the damage-causing conduct, and does not give rise to a continuing tort pursuant to our previous holdings. Therefore, we hold that plaintiffs' delictual actions have prescribed.
Regarding the contract claims, the Marin Lease and the Surface Lease, as novated, were still in effect at the time of trial. The CBT Lease, under which the Breaux's purport to sue, was not in effect at the time of trial. Plaintiffs argue that as a lessee, Exxon has continuing obligations under both the mineral and surface lease that cannot prescribe as a matter of law. Exxon argues that any restoration obligations it may have under these leases do not go into effect until the lease is terminated, making any such claims premature. The plaintiffs' position is correct.
A lessee's obligations under a mineral lease are governed by the Mineral Code and the Louisiana Civil Code. La. R.S. 31:2 (providing that the provisions of the Mineral Code are supplementary to the Civil Code and when the Mineral Code does not expressly or impliedly provide for a particular situation, the Civil Code or other laws are applicable).
La. R.S. 31:122 provides:
The Civil Code lease provisions require the mineral lessee to perform certain restoration obligations during the lease term, and these obligations are governed by Civil Code articles 2683, 2686, 2687, and 2692.
La. C.C. art. 2686 provides "[i]f the lessee uses the thing for a purpose other than that for which it was leased or in a manner that may cause damage to the thing, the lessor may obtain injunctive relief, dissolution of the lease, and any damages he may have sustained." La. C.C. art. 2687 directs that "[t]he lessee is liable for damage to the thing caused by his fault or that of a person who, with his consent, is on the premises or uses the thing." Finally, La. C.C. art. 2692 provides "[t]he lessee is bound to repair damage to the thing caused by his fault . . . and to repair any deterioration resulting from his . . . use to the extent it exceeds the normal or agreed use of the thing."
While La. C.C. art. 2683 contains obligations that only arise at the end of the lease, i.e., "to return the thing at the end of the lease in a condition . . .," there is absolutely no language to suggest that the other obligations imposed by these codal provisions are not operational until termination of the lease. These provisions continue throughout the term of the lease and a lessor need not wait until the end of the lease to sue a lessee for damage to his property. The damage in this case is the contamination of the soil and groundwater caused by Exxon's oil and gas operations on the leased property. Because the Marin Lease and the Surface Lease as novated were still in effect at the time of trial, the Marin plaintiffs' claims for damage to their property have not prescribed.
The situation with the Breaux plaintiffs is different. Although it is unclear when the CBT Lease expired, the parties in brief indicate that this lease is no longer in effect and was not in effect at the time the suit was filed. It evidently was in effect at the time the Breauxs purchased their property, but there has been no evidence presented that the Breauxs were third party beneficiaries of the CBT Lease. Further, even assuming the Breauxs had a right to sue Exxon under the lease, this contractual action has prescribed. The prescriptive period on a personal action, such as an action for breach of a lease contract, is 10 years. La. C.C. art. 3499. As this contract claim has prescribed on its face, plaintiffs had the burden of proving it had not prescribed, and they failed to do so.
Because plaintiffs' tort claims have prescribed, they are not entitled to punitive damages under former Article 2315.3. Corbello, supra at 708 (damages under 2315.5 are recoverable on a derivative basis where a plaintiff is entitled to recover tort damages, not for breach of contract claims).
The damages that remain intact under the above rulings are the following compensatory
On the other hand, plaintiffs argue the compensatory awards were too low, and should have been based on the amount necessary to restore the land to its original condition, as existed at the time the parties entered into the leases, not merely an amount sufficient to restore the land to statewide regulatory standards. They base this argument on Terrebonne Parish School Bd. v. Castex Energy, Inc., 04-0968 (La.1/19/05), 893 So.2d 789, 801, wherein this Court held that "in the absence of an express lease provision, Mineral Code article 122 does not impose an implied duty to restore the surface to its original, pre-lease condition absent proof that the lessee has exercised his rights under the lease unreasonably or excessively."
Plaintiffs also argue that the express terms of the Surface Lease require that the property be restored to its original condition. Addressing this argument first, we note that the Marin Lease (the mineral lease) did not contain any restoration provisions. The Surface Lease, entered into on August 5, 1941, between E.F. Marin and Humble granted to Humble "a servitude and right to the use of the surface of the land [therein described] for any and all purposes which Humble Oil . . . may deem necessary or advantageous in connection with its business ..." This servitude covered approximately 20 acres that was used to build a landing/dock area, terminal and related facilities for the production of oil and gas. This 1941 servitude also provided that "in no case shall Humble Oil . . ., its successors and assigns, be obligated to remove such property or to restore the premises to the condition in which they now are but may abandon and surrender the same in the condition in which they may be at such time and shall not be liable in any manner for damages to said land caused by its use of said premises." On May 18, 1994, the Marins and Exxon entered into an agreement regarding this surface area which was "intended to be a novation" of the 1941 servitude. The 1994
The trial court accepted this as a settlement of the Marin's sugar cane crop loss, and not as a settlement of any environmental claims, and found any release obtained by Exxon was obtained as a result of fraud and misrepresentation.
"Contracts have the effect of law for the parties" and the "[i]nterpretation of a contract is the determination of the common intent of the parties." La. C.C. arts. 1983 and 2045. In Corbello, supra, this Court held that the following surface lease provision obligated the lessee to restore the property to its pre-lease condition:
While the above provision and the provision in the 1994 novation of the Surface Lease are similar, the "present condition" in the Corbello surface lease was the condition of the property at the time the lease was entered into, 1961. In the case of the Marin lease, the "present condition" is the condition at the time of the 1994 novation, not the time of the original Surface Lease,
Next, we address plaintiffs' argument that under Castex that they are entitled to restoration to the original pre-lease condition because Exxon "exercised [its] rights under the lease unreasonably or excessively." Castex, supra at 801. The trial court found that "the continued contamination of the various chemicals documented by [plaintiffs' expert] and deposited by Exxon [on] the Marin and Breaux properties is unreasonable and constitutes negligent operations by the lessee." Both lower courts essentially held that even where unreasonable or excessive use are proven, courts must still take into account normal wear and tear in calculating the appropriate cost for remediation, and that remediation to 29B standards would account for normal wear and tear. However, plaintiffs argue in light of the trial court's finding that Exxon was unreasonable in its operations, the lower courts erred in not awarding the costs of restoration to the original condition under Castex.
Exxon argues that the language regarding unreasonable or excessive use in Castex was dicta because there was no allegation that the lessee had unreasonably or excessively exercised its rights under the lease. Further, there was no effort made in Castex to determine what degree of remediation would be required by a lessee who had used the property unreasonably or excessively. An award sufficient to restore the property to 29B standards would put the plaintiffs in the same position they would have been in but for the breach. Further, under current law as provided by Act 312 of 2006, property must only be remediated to applicable regulatory standards following a site-specific, defendant-funded, court-approved, and court-supervised remediation plan. See La. R.S. 30:29, et seq. The goal of the new legislation is not "perfect restoration," and the reasonableness or unreasonableness of a defendant is not a factor in determining the cleanup standard. Id.
The situation in Castex was somewhat different than the situation we are presented with today. In Castex, the lessee dredged canals through the marshes without backfilling them, which led to significant coastal erosion. Restoring the surface to its original condition would have meant coming back in and filling the canals. In Castex, the dredging of the canals was found to constitute necessary "wear and tear," as the landowners had expressly consented to the dredging. Unlike this case, there was no issue in Castex over how much restoration was required as the wear and tear, i.e., the dredged canals, was obvious, and no regulatory standards were applicable; the issue was simply whether the lessee had a duty to restore at all. In this case, because of the trial court's finding that Exxon conducted its operations unreasonably or excessively, and the certainty that plaintiffs would not have consented to the disposal and storage of oilfield wastes into pits known to be environmentally unsound, there is no doubt that Exxon has a duty to restore, the question is simply to what standard.
In our view, the duty to remediate oilfield contamination exists under the prudent operator standard of the Mineral Code by virtue of our holding in Castex, and it certainly exists under the
Plaintiffs make two arguments in support of their claim that Exxon is liable for groundwater remediation. First, they argue that the Exxon's operations have contaminated a Class II aquifer, and as such, the Groundwater Act applies pursuant to which Exxon must deposit $199,129,592.00 into the registry of the court to be used exclusively to remediate the usable groundwater.
The Groundwater Act applies to "usable groundwater." La. R.S. 30:2015.1 J(1). In order to qualify as usable groundwater, the groundwater must be classified as a Class II aquifer. "Usable" groundwater is defined as a Groundwater Classification I (an aquifer that is a primary drinking water source or is directly connected with a drinking water source) or a Groundwater Classification II (an aquifer that is an agricultural supply, domestic supply, or any other supply source). La. R.S. 30:2015.1 J(1); La. Dep't of Envtl. Quality RECAP Regulations § 2.10 at 49-51 (Oct. 20, 2003). A Groundwater Classification III aquifer is an aquifer with a maximum sustainable yield of less than 800 gallons per day and is considered non-usable. After considering extensive expert witness testimony, the trial court found that the "groundwater bearing zone beneath the Marin and Breaux properties is a Class III aquifer." In this case, the expert testimony was conflicting, with plaintiffs' experts testifying that it was a Class II aquifer, and defendant's experts testifying it was a Class III aquifer. The trial court accepted the testimony of Dr. David Angle that the aquifer was a Class III aquifer. Dr. Angle testified that, after a review of studies done by plaintiffs' expert, the water bearing zone beneath plaintiffs' property was a confined aquifer that was 24 feet thick, and that the soil was not very permeable. He further testified that plaintiffs' experts pump test established that it was not scientifically possible for the aquifer's maximum sustainable yield to equal or exceed 800 gallons per day and that the well ran dry after 65 minutes. Based on the above, Dr. Angle testified that it was a Class III aquifer. The trial court's reliance on this testimony to find it was a Class III aquifer was not manifestly erroneous. Findings of fact are subject to the manifest error standard of review, and where the finder of fact credited one witness's testimony over another, that finding can never be manifestly wrong.
The trial court further found that even though the contained aquifer underneath plaintiffs' property was contaminated and some remediation may be warranted, the plaintiffs failed to prove the necessary remediation to be performed on a Class III aquifer or the costs of such remediation. The court of appeal affirmed the trial court's findings regarding the groundwater claim.
Plaintiffs' expert testified that the concerns with a Class III aquifer were the effects of the contamination on the nearest receiving water and that subsurface soil contamination was the source of the groundwater contamination. The trial court already awarded plaintiffs $2,408,868 for contamination of the canal. Further, if the soil contamination is remediated, presumably the source of the groundwater contamination will be removed. In addition, witnesses testified that there are no written DNR groundwater remediation standards for non-drinkable groundwater. Austin Arabie, plaintiffs' expert on this subject, did not testify regarding cleanup of a Class III aquifer, nor the costs associated with such cleanup. In our view, it seems illogical to award the landowner money to remediate unusable groundwater, with no oversight by the DNR, when the statute enacted to classify and protect groundwater does not require a cleanup. Further, it is unclear from the record
In this oilfield contamination case, we find that the plaintiffs' tort claims against Exxon have prescribed because they did not file suit within one year of the date they should have known of the damage to their property. Damage became apparent when they were unable to grow sugarcane on certain areas around the former pits after Exxon closed, and purportedly remediated, the pits in 1991. As they knew Exxon's activities were contaminating their land and sugarcane still would not grow despite Exxon's 1991 remediation attempts, they were put on notice that further investigation was necessary, even though they did not know the full extent of the contamination at that time. Further, while Exxon misled them about the extent of the contamination, Exxon did nothing to prevent them from finding out the full extent of the damage and filing suit. While plaintiffs were not required to file suit at the first possible indication that they had suffered some wrong, it was unreasonable to wait so many years to investigate the problem and file suit, particularly where the only thing that finally put them on notice to investigate was this Court's recognition of the value of oilfield contamination damages in another case. Therefore, the lower courts erred in finding that prescription on a claim for oilfield contamination remediation damages does not begin to run until a landowner receives notice of the full extent of his damages in the form of an expert's report. Further, the contamination in this case does not constitute a continuing tort as the damage-causing conduct was the disposal and storage of oilfield waste in unlined pits and the discharge of this waste into a freshwater environment, which conduct stopped by at latest 1989. The continuous presence of this waste in the subsoil is the continuation of the ill effects of the damage-causing act.
As plaintiffs' tort claims have prescribed, they are not entitled to punitive damages. However, the Marins are entitled to compensatory damages for breach of existing leases on their property. The trial court's award of the amount necessary to restore the land to regulatory standards, rather than to its original condition, is appropriate. Further, the trial court's finding that the groundwater beneath the plaintiffs' property is not a Class I or II aquifer was not manifestly erroneous and therefore, Exxon is not liable for cleanup under the Groundwater Act. Finally, plaintiffs did not prove they were entitled to damages for contamination of an unusable aquifer, nor the amount that would be necessary and appropriate to clean an unusable aquifer. Therefore, plaintiffs are not entitled to damages for groundwater remediation.
For the reasons stated herein, the judgment of the court of appeal is reversed in part and affirmed in part and the matter is remanded to the trial court to enter an order consistent with this opinion.
KNOLL, J., dissents in part and concurs in part and assigns reasons.
WEIMER, J., dissents and assigns reasons.
KNOLL, J., concurring in part and dissenting in part.
I concur only with the portion of the majority opinion affirming judgment in favor of the Marin plaintiffs on their contract claims. The remainder of the majority opinion contains serious and fundamental errors which have the potential to do great damage to the jurisprudence of this state. Accordingly, I respectfully dissent.
First, the majority misapplies the continuing tort doctrine, which prevents a tort claim from prescribing as long as the operating cause of injury continues. It is undisputed that, to this day, additional oilfield waste continues to seep from defendants' unlined pits into plaintiffs' property. As additional waste products enter the land, plaintiffs suffer additional and increasing damages. Incredibly, the majority holds prescription began to run from the moment the pits were closed. This exceedingly narrow interpretation of the continuing tort doctrine means that, no matter how much additional waste continues to seep onto the property in the future, plaintiffs will be left without a remedy.
Second, the majority errs in its discussion of contra non valentem. We have long held contra non valentem tolls prescription where the "debtor himself has done some act effectually to prevent the creditor from availing himself of his cause of action." Hyman v. Hibernia Bank & Trust Co., 139 La. 411, 71 So. 598, 604 (1916). The trial court found that, beginning in 1991, Exxon provided plaintiffs with documents purporting to show the remediation was complete and the pits were cleaned in accordance with state regulations. These representations were objectively false and misleading. The trial court made a factual determination and found the plaintiffs believed Exxon and "detrimentally relied on these disclosures." The majority admits that Exxon's blatant factual misrepresentation were "less than acceptable," yet inexplicably concludes these lies are insufficient to trigger contra non valentem. We should affirm the trial court, as the record demonstrates Exxon purposefully misled plaintiffs into believing their land was properly remediated, lulling them into a false sense of security and fraudulently discouraging them from timely filing suit. This is a textbook case of contra non valentem. The majority effectively encourages polluters to commit fraud in order to prevent plaintiffs from bringing meritorious suits.
Moreover, the majority breaches the manifest error doctrine and fails to give due deference to the trial court's finding of fact that plaintiffs had no actual or constructive knowledge of the contamination. After conducting two separate site visits and hearing testimony from witnesses for both sides, the trial court found plaintiffs were unable to determine the property was contaminated until they obtained an expert report. Given the underground nature of the contamination and the fraud on the part of Exxon, there was nothing unreasonable about the court's factual findings, and the majority errs in overturning it absent manifest error.
The majority opinion undermines the continuing tort doctrine, which tolls prescription
The continuing tort doctrine has been applied by Louisiana courts for nearly eighty years. We most recently considered the doctrine in Hogg v. Chevron, 2009-2632 (La.7/6/2010), 45 So.3d 991. In Hogg, plaintiff landowners sued a service station owner whose underground tanks had leaked, spilling chemicals which contaminated plaintiffs' land. Id. at 994. Although the leaking tanks were replaced in 1997, the chemicals were not remediated and continued migrating from defendant's land towards plaintiffs' land and into their stream. Despite the continuously increasing nature of this contamination, this Court nonetheless found the operating cause of injury was the leaking tanks, not the contamination itself. Prescription therefore began to run the day the tanks were replaced. Id.
In my view, Hogg was wrongfully decided. See Id. at 1007 (Knoll, J., dissenting). The majority artificially limited the continuing tort doctrine even where the injury-causing activity (i.e., the contamination) remained under plaintiffs' land, causing additional damages. As long as harmful chemicals remain under plaintiffs' land, the trespass continues, and prescription cannot begin while the wrongful conduct is still ongoing. Id. at 1003. This rationale applies equally in the case currently before us, and I dissent for the same reasons set forth in Hogg.
Arguendo, even if Hogg were a correct statement of law, the majority opinion misapplies Hogg and expands its holding well beyond its facts. The primary question in any continuing tort case is whether "the operating cause of injury is a continuous one." Crump v. Sabine River Authority, 98-2326, p. 7 (La.6/29/99), 737 So.2d 720, 726. In Hogg, after the leaking gas tanks were removed, no additional chemicals entered the land.
Here, through faulty analysis, and despite overwhelming evidence to the contrary, the majority somehow concludes that the continued leakage from the pits does not constitute a continuing tort. Instead, it holds the "operating cause of injury" was "the actual disposal or storage of the oilfield waste in unlined pits on plaintiffs' property." This is untenable. There is nothing inherently injurious about a mineral lease operator disposing of oilfield wastes pursuant to the parties' lease. Put
A simple hypothetical will demonstrate the flaw in the majority's position. Assume the pits dug by Exxon in the 1940s were properly lined, and the contaminants were safely stored. However, over the years the lining began to deteriorate. In 1991, for the first time, contaminants began to escape from the pits and enter plaintiffs' land. If, as the majority holds, the wrongful "conduct terminated when the pits were closed," plaintiffs' claim would have prescribed when the pit was closed in the 1940s, many years before any contaminants entered the property. Plaintiffs would be precluded from seeking any relief for any contamination, no matter how serious, resulting from the oilfield operations. The majority's position is inequitable, contrary to established law, and creates bad policy.
The majority opinion also errs in its consideration of the contra non valentem doctrine. Contra non valentem is an "equitable doctrine of Roman origin, with roots in both civil and common law," designed to avoid the harshness of applying prescription where the plaintiff has been prevented from timely filing suit. Carter v. Haygood, 2004-0646 (La.1/19/05), 892 So.2d 1261, 1268. Without citation to any authority, the majority claims contra non valentem requires "extraordinary circumstances." We have never held the application of contra non valentem requires "extraordinary circumstances," and it is regularly applied by Louisiana courts.
There are four circumstances where contra non valentem applies:
Id.
The trial court found the last two categories were met. Exxon purposefully misled plaintiffs into believing their land had been properly remediated, thereby preventing plaintiffs from timely availing themselves of the cause of action. The court also held that determining whether the property was contaminated requires scientific analysis beyond the abilities of a normal person, so an "average person would have no knowledge of whether a pit was properly cleaned or not." As detailed below, these findings by the trial court are well-supported by the record and should not be disturbed.
First, there is ample evidence in the record to support the trial court's finding that Exxon misled plaintiffs into believing the waste pits had been cleaned in conformance with regulatory standards. Prior to 1991, Claude Breaux, acting on behalf of both the Marin plaintiffs and the Breaux plaintiffs, repeatedly asked Exxon to close the pits and conduct necessary remediation. Exxon's attempted remediation ceased in 1991.
It is well settled that contra non valentem applies in cases involving "acts of fraud and misrepresentation intentionally committed by defendants (or their representative) designed to hinder, impede or prevent plaintiffs from asserting their cause of action or lull them into a false sense of security." Plaquemines Parish Commission Council v. Delta Development Co., Inc., 502 So.2d 1034, 1056-57 (La.1987); Nathan v. Carter, 372 So.2d 560, 563 (La.1979).
This species of contra non valentem is simply a specific example of the general legal principle that a party cannot "take advantage of his own wrongful act." Nathan, 372 So.2d at 562. Yet that is precisely what the majority opinion allows Exxon to do. Over a period of several years, Exxon repeatedly told plaintiffs the property was cleaned up within regulatory standards. In 1991, Exxon sent a letter stating "You will find that all parameters including salt are well below accepted standards and state regulations." Plaintiffs, perhaps naively, trusted Exxon's representations and chose not to sue. Exxon, a highly sophisticated party, was in a far better position than the plaintiffs to assess the level of contamination, and knew that plaintiffs relied on it to perform the relevant testing and remediation. Exxon used its superior position to mislead plaintiffs and prevent them from timely filing suit. This is precisely the kind of fraudulent activity which triggers the application of contra non valentem.
Exxon also misled the plaintiffs by repeatedly telling them it would fix any issues on the property, then failing to do so. As Claude Breaux testified, Exxon employees "said we will address [the remediation issues] and get back to you. That stopped until—even when suit was filed, I was reluctant to file suit because Exxon had convinced me they were still coming back. I still thought Exxon was coming back to fix my pit sites" (Emphasis added). This is the very definition of "lulling" a plaintiff into a false sense of security to prevent him from filing suit.
The majority's holding would be bad enough if this Court were acting as the finder of fact with discretion to make judgment calls and weigh the evidence. We are not. Instead, we are required to give great deference to the trial court's factual findings, and may upset its ruling only upon a finding of manifest error. Stobart v. State Dept. of Transportation and Development, 617 So.2d 880, 882 (La.1993). Incredibly, the majority opinion simply skims past the manifest error doctrine, which is a fundamental precept of appellate review.
The majority opinion admits "Exxon misled plaintiffs by not disclosing the extent of the contamination," but excuses this fraud by noting Exxon "did nothing to prevent plaintiffs from investigating the cause of the sugarcane loss for themselves." In essence, the majority does not castigate Exxon for lying, but finds fault with plaintiffs for believing the lies. Permitting Exxon to profit from its own misrepresentations is both extraordinarily inequitable and contrary to established law.
Contra non valentem also applies where the "cause of action is not known or reasonably knowable by the plaintiff." Carter v. Haygood, 2004-0646 (La.1/19/05), 892 So.2d 1261, 1268. This particularly applies where specific scientific or technical knowledge is necessary to discover the injury. For instance, where a plaintiff suffers injury as a result of asbestos exposure, but was not diagnosed for several years, prescription does not begin to run until diagnosis. Owens v. Martin, 449 So.2d 448, 451 n. 4 (La.1984).
Here, the underground contamination of plaintiffs' property is not immediately noticeable. As evidenced by the mountain of specialized expert testimony introduced at trial, it takes a significant amount of training to determine the nature and scope of such contamination. The majority cites South Central Bell Telephone Co. v. Texaco, Inc., 418 So.2d 531, 532 (La.1982), which holds "the prescriptive period for damage to adjacent land commences when the damage becomes apparent and the injured party discovers who or what caused it." However, there is no evidence that the contamination beneath plaintiffs' land was "apparent." The noxious substances —highly concentrated saltwater, heavy metals, and radioactive material
The manifest error doctrine is particularly applicable in this situation. The trial court presided over the case for three years, listened to several days of witness and expert testimony, viewed dozens of exhibits, and had firsthand knowledge of the condition of the property from two site visits. This Court, viewing a cold record, is simply not in a position to second guess the trial court's considered factual findings and conclude plaintiffs "should have known" the property was contaminated based solely on the fact that some, but not all, of the sugarcane planted on the property had stunted growth. The majority implies plaintiff Claude Breaux's prior employment for Exxon gives him insight into soil contamination and remediation. However, Breaux worked in fuel delivery, and there is no evidence that he or any of the other plaintiffs had the specialized scientific knowledge necessary to determine whether the land was contaminated. Indeed, Breaux testified with respect to the pits "I did not know it was hazardous. I have no reason to know." Later, he testified "Did I know those pits had hazardous chemicals? No sir, I did not. I thought it might have been water." The trial court judged his testimony credible, and we must defer to the court's credibility determination.
The majority's citation to Hogg v. Chevron, 2009-2632 (La.7/6/2010), 45 So.3d 991, is again inapposite. In Hogg, plaintiffs received two official written notices from the Louisiana Department of Environmental Quality stating their stream was contaminated by gasoline which had leaked from defendant's tanks. This is sufficient to put any reasonable plaintiff on direct notice of contamination. Neither the Marins nor the Breauxs ever received any such direct notice, and plaintiffs had no proof of the contamination until they took it upon themselves to hire an expert to perform tests in 2003. The majority faults the plaintiffs for not hiring an expert sooner. However, plaintiffs relied on Exxon's representations that the contamination had been adequately cleaned up. Plaintiffs had no reason to suspect Exxon was lying to them, and thus no reason to hire their own expert.
In my view, the majority opinion misapplies the law and fails to give proper deference to the trial court's findings of fact. The majority opinion is a classical example of a court substituting its opinion for that of the finder of fact. This is a violation of the manifest error doctrine we frequently cite in reversing appellate opinions which overrule a trial court's factual findings.
This case overwhelming supports a reasonable basis for the finder of fact's conclusion. This is not our function. We function as a reviewing court, not a court of first impression, which is the pivotal impetus of the manifest error doctrine. The majority's opinion reversing the trial court's factual findings is an aberration of the manifest error doctrine; thus I cannot agree.
WEIMER, J., dissenting.
While I agree that the Marin plaintiffs are entitled to judgment in their favor, I respectfully dissent from that portion of the opinion which holds that the plaintiffs' tort claims have prescribed.
The prescriptive period applicable to the plaintiffs' tort claims is the one-year liberative prescription of LSA-C.C. art. 3493. Pursuant to this codal provision, the one-year period "commences to run from the day the owner of the immovable acquired, or should have acquired, knowledge of the damage." LSA-C.C. art. 3493. In other
After trying this case for three years, hearing the testimony, and viewing the property on two separate occasions, the district court concluded the plaintiffs did not have knowledge of damage, actual or constructive, sufficient to commence the running of prescription until they were apprised of the extensive contamination on the property. The district court's conclusion was based on a number of factual considerations. In particular, the district court was persuaded by the fact that while the plaintiffs did have knowledge of some problems associated with the pits, they also received assurances from Exxon that the pits had been cleaned to standards determined to be acceptable by state regulations. Noting that the average person would not possess the knowledge sufficient to counter or even question such an assurance from Exxon, the court ultimately concluded that the plaintiffs' forbearance was reasonable under the circumstances, and that prescription did not commence until an expert report revealed the truth regarding the sub-surface contamination.
As the majority opinion concedes, the ultimate issue to be resolved in determining whether a plaintiff had constructive knowledge sufficient to commence a prescriptive period is "the reasonableness of the plaintiff's action or inaction in light of his education, intelligence, and the nature of the defendant's conduct." (Emphasis added.) Slip op. at p. 246, citing Campo v. Correa, 01-2707 (La.6/21/02), 828 So.2d 502, and Griffin v. Kinberger, 507 So.2d 821 (La.1987). This determination of reasonableness is a factual one, subject to review for manifest error. Harvey v. Dixie Graphics, Inc., 593 So.2d 351, 354-355 (La.1992); see also Braud v. Cenac, 03-1696 (La.App. 3 Cir. 7/14/04), 879 So.2d 896, writ denied, 04-2101 (La.11/15/04), 887 So.2d 484.
In the present case, the district court weighed each of the relevant factors— plaintiffs' education and intelligence, as well as the nature of defendant's conduct— and concluded that the plaintiffs did not have knowledge, actual or constructive, sufficient to commence the running of prescription until they received the expert report. Without finding manifest error in the district court's factual determinations, the majority opinion rejects this conclusion, citing to the recent decision in Hogg v. Chevron USA, Inc., 09-2632 c/w 09-2635 (La.7/6/10), 45 So.3d 991, as support for its independent determination that the plaintiffs had constructive knowledge of the contamination of their property more than one year prior to the institution of this lawsuit.
However, Hogg is readily distinguishable from the instant case. As the majority opinion concedes, the information in the hands of the Hogg plaintiffs "is far more detailed than the information the Marins and Breauxs had." Slip op. at 249. Not
The situation in this case is much different. Here, the plaintiffs were told by the defendant, Exxon, that remediation was complete. Whether Exxon intentionally misrepresented this fact or simply did not know better, despite its battery of experts, the fact remains that conduct by Exxon in the form of affirmative assertions that the property had been cleaned up in accordance with all applicable regulatory standards led the plaintiffs to believe that any problems were cured. The district court determined that the plaintiffs were reasonable in relying upon these representations from Exxon. The fact that problems persisted in the surface area surrounding the pits did not undermine the reasonableness of the plaintiffs' reliance, as plaintiffs were obligated to tolerate some degree of ordinary, customary, and necessary wear and tear on the property attributable to Exxon's operations. See, Rohner v. Austral Oil Exploration Company, 104 So.2d 253, 256 (La.App. 1 Cir.1958) (Infertility of three acres of land used for pits, and clay and drilling operations was due to ordinary, customary, and necessary acts of drilling company; landowner could not recover for crop loss.).
The majority opinion fully documents the actions of Exxon which convinced the district court that Exxon's conduct prevented the plaintiffs from acquiring the requisite knowledge to commence the running of prescription more than one year prior to the date suit was filed, and those actions will not be repeated here. Suffice it to say that insofar as discovery of the contamination is concerned, either Exxon misrepresented the true facts or Exxon believed it had remedied the problem, and now, along with the majority opinion, would hold plaintiffs to a higher standard than Exxon holds itself. In effect, the argument in this case, and the one adopted by the majority, is to the effect that, "We (Exxon) told plaintiffs we had remediated the contamination; they were unreasonable to believe anything we said."
The district court rejected this argument, and there is ample evidence in the record to support the conclusion that prescription did not begin to run until plaintiffs received the report of their expert. In other words, given Exxon's representations, it was reasonable for the plaintiffs to delay filing suit until they received the report of an independent expert as to the actual state of the contamination. As the court of appeal correctly recognized, the record fully supports the district court's conclusion that the plaintiffs, along with many of the Exxon personnel involved, lacked sufficient knowledge of the nature or extent of the damage or contamination to commence the running of prescription on that basis. This factual determination of the district court is not manifestly erroneous, and should not have been disturbed.
Slip Op. at 12-13, 2009 WL 7004332.
Campo v. Correa, 01-2707 (La.6/21/02), 828 So.2d 502, 510-11 (cites omitted).
A major difference in the Kling case, at least as to the Marin Plaintiffs, is that the lease in Kling had also expired 30 years before the plaintiffs brought their suit. As will be discussed later, the Marin Lease and Surface Lease were still in effect at the time suit was filed.
Another difference between this case and the Kling case is that in Kling, while the plaintiffs alleged that Chevron misled them about the kind and extent of contamination, the court found no evidence in the record that Chevron knew of any increased contamination or otherwise after the parties entered into the release and settlement. In this case, the trial court found that Exxon misled the plaintiffs about the extent of contamination on their land by providing incomplete reports showing that the land met the applicable standards. This issue is relevant to whether the plaintiffs were lulled into inaction under the third category of contra non valentem.
Former Article 2720 provided:
Relying on Castex, a majority of this Court held that claims for remediation and restoration were not encompassed in the duty to "develop and operate the property leased as a prudent operator," under La. R.S. 30:122, therefore, no pre-suit notice was necessary.
Nonetheless, they now argue Exxon is responsible for groundwater clean up under that statute.