GUIDRY, J.
Dale Braud d/b/a Dale's Builders and Remodeling (Braud) appeals from a trial court judgment awarding Patrick and Brenda O'Connell damages pursuant to the New Home Warranty Act, La. R.S. 9:3141, et seq. For the reasons that follow, we affirm.
Patrick and Brenda O'Connell entered into a builder's contract with Braud on February 28, 2000, to construct a new home along the Amite River in Maurepas, Louisiana. Because of the location of the home, it was designed to be raised approximately eight feet off of the ground and to sit on concrete piers. Construction of the home was completed in November 2000, and the O'Connells moved into the home immediately thereafter.
In 2003, the O'Connells began experiencing water intrusion at the French doors leading to the balcony on the north side of the home. The O'Connells contacted Braud, who made repairs to the home. Thereafter, the O'Connells also began experiencing problems with the screened porch on the west side of the home, which was holding water in the middle of the porch floor. The O'Connells contacted Braud, who adjusted the pitch of the porch and installed a drain and drainage system.
In November 2007, after noticing debris behind a loose soffit panel on the underside of where the screened porch met the deck, the O'Connells contacted Brett Lukehart, a contractor. Upon removing all of the soffit panels along the west side of the home, Lukehart discovered extensive damage to the beams supporting the porch and deck. Thereafter, the O'Connells contacted Braud by telephone several times, informing him of the beam damage. Braud, however, failed to respond to the O'Connells' requests to examine the damage. In late November or December 2007, Lukehart began making repairs to the home.
On March 11, 2008, counsel for the O'Connells sent a letter to Braud, notifying Braud of the alleged deficiencies in the home. When Braud failed to respond to the letter, the O'Connells filed a petition for damages against Braud on August 29, 2008, asserting that there were deficiencies in the home, which included, but were not limited to: (1) water penetration into the home on the west side of the home causing damage to the outer beam and cantilever beam, which could have been prevented if treated lumber had been used for the beams; (2) beam supporting screened porch and balcony/deck on main floor was rotten and deteriorated, putting the structure in danger of collapse, due to the failure to use treated lumber as required; (3) beam supporting porch and running across the outer perimeter of the kitchen called for treated lumber, but untreated lumber was used, resulting in total deterioration of that beam and sagging of the porch, which would have led to its collapse. The O'Connells asserted that Braud was liable in fraud for all damages suffered and attorney's fees, and that he was also liable for the deficiencies pursuant to the terms and conditions of the New Home Warranty Act (NHWA). The O'Connells claimed that they incurred actual repair expenses totaling $97,582.30 as a result of the deficiencies and prayed for judgment in their favor in an amount reasonable under the premises, plus attorney's fees and costs, as well as for all general and equitable relief
Thereafter, Braud filed an exception raising the objections of no cause of action and prescription. Braud asserted that the O'Connells' claims were governed exclusively by the NHWA, which exclusivity precluded the O'Connells from having a cause of action against Braud for fraud, and that their claims had prescribed. By Judgment dated January 13, 2009, the trial court denied Braud's exception raising the objection of no cause of action, and partially granted the exception raising the objection of prescription with regard to all claims except those claims arising from damages related to the porch-area beams and other beams under points three and four of paragraph five of the O'Connells' petition (i.e., claims related to the beams supporting the porch), which were referred to the merits.
Following a bench trial, the trial court signed a judgment on May 13, 2010, in favor of the O'Connells in the amount of $57,214.00, plus attorney's fees, to be fixed at a later date.
The trial court's factual findings in cases involving the NHWA are subject to manifest error review.
The NHWA provides the exclusive remedies, warranties, and prescriptive periods as between builder and owner relative to construction defects in new homes. La. R.S. 9:3150.
Louisiana Revised Statute 9:3143(5) defines a "major structural defect" as:
(Emphasis added.)
Braud contends that the trial court erred in finding that the O'Connells' claims for damages with regard to the rotten, wooden beams supporting the porch arise from a "major structural defect" as that term is defined in La. R.S. 9:3143(5) and, therefore, are subject to a ten-year prescriptive period. Rather, Braud asserts that the O'Connells' claims are for defective workmanship for Braud's alleged improper flashing and waterproofing of the home, which claims are subject to a one-year prescriptive period, and therefore, are prescribed.
However, from our review of the record, we find no error in the trial court's determination. Brett Lukehart, the contractor who performed the repairs to the O'Connells' home, tesfified that, upon removing all the soffit panels on the underside of the porch, he immediately noticed a tremendous amount of damage to the beams. Lukehart stated that the beams were devoid of any structural integrity, that the porch floor was sagging approximately 1¼ to 1½ inches, and that collapse of the porch was imminent. According to Lukehart, the damage to the beams was the result of water penetration, caused by the lack of flashing and waterproofing and the lack of transition between the interior and exterior framing of the house. Further, Lukehart stated that though the plans specifically required all wood coming in contact with masonry to be treated, the beams at issue, which rested directly on concrete piers, were not constructed out of treated lumber. Finally, Lukehart stated that if these beams, which were crucial to the overall structural integrity of the home, would have been made from treated lumber, they would not have suffered damage from rot.
Additionally, Harry Huey, an Ascension Parish building official who inspected the O'Connells' home, stated that the Ascension Parish Building Code requires treated lumber to be used when located within 18 inches of contact with the ground, but that the Code does not otherwise state that lumber has to be treated, unless it is specified in the building plans itself.
The building contract and building plans were admitted into evidence at the trial. The building plans state that "all wood members in contact with concrete shall be treated." Additionally, the building contract states that "The Contractor agrees to... erect, build, finish and deliver ... a custom home as shown on the drawings and described in the specifications ... which said drawings and specifications are by reference made a part thereof, and together with this agreement, form the contract."
After reviewing the record in its entirety, we find that the record reasonably supports the determination that the beams are load-bearing, and that the failure of the beams due to their rotten condition affected their load-bearing functions to the extent that the home was unsafe, thereby constituting a major structural defect. Further, the evidence also reasonably establishes that the existence of this major structural defect was due to noncompliance with the building standards, by failing to use treated lumber as agreed to and required by the building plans,
Further, we find no merit to Brand's argument that the defects are excluded from the builder's warranty because they are "caused by ... materials or work supplied by anyone other than the builder, or any employee, agent, or subcontractor of the builder."
However, from our review of the record we find no error in the trial court's determination that this exclusion does not apply in the instant case. The building contract at issue provides that "[t]he Contractor agrees to furnish all materials ... as shown on the drawings and described in the specifications." Further, according to Braud's own testimony, he brought the building plans and specifications to Purper Lumber Company and got a breakdown on the house. When he was ready, he called Purpera and told them to send out different packages, i.e., plumbing, flooring, etc. Therefore, not only did Braud have a contractual obligation to supply the materials, but he acted in furtherance of the contract by facilitating the acquisition of the materials. The fact that the O'Connells paid Purpera directly, pursuant to the terms of the cost plus contract, is of no moment. Therefore, we find no error in the trial court's determination that the exclusion in La. R.S. 9:3144(B)(6) does not apply.
Louisiana Revised Statute 9:3149(A) provides:
In an action on a contract to build, the appropriate measure of damages resulting from the contractor's breach of the implied warranty of good workmanship is generally the cost of repairs when the thing can be repaired.
At trial, the O'Connells admitted several documents into evidence to show the costs to the repair the home as a result of the defects, including a spreadsheet prepared by Brenda O'Connell detailing the expenses Incurred in the repair of the home, as well as the invoices to support those expenses. Additionally, Lukehart testified regarding the invoices for materials and his invoices for the labor performed in effectuating the repairs to the home, and identified the amounts specifically related to repair and/or replacement of the beams.
For the foregoing reasons, we affirm the judgment of the trial court. All costs of this appeal are assessed to the defendant. Dale Braud d/b/a Dale's Builders and Remodeling.
After reviewing the matter, we find that the apparent defect was cured when the trial court rendered the August 18, 2010 judgment adjudicating the remaining claim between the parties, i.e. fixing the amount of attorney's fees.