PAUL A. BONIN, Judge.
According to Baraki Tsegaye, a taxi cab driver, a light pole fell on him while he was waiting for a fare outside the W Hotel on Poydras Street in New Orleans. He was injured and sued Royal Engineers & Consultants, L.L.C., among others. Royal Engineers had contractually undertaken certain obligations respecting this and other light poles owned by the City of New Orleans. Arguing that it had no notice of a defect in the particular light pole, Royal Engineers filed a motion for summary judgment, which if successful would result in its dismissal with prejudice from the lawsuit. Although the trial judge granted the partial summary judgment, the judgment did not contain any decretal language.
At the time of moving to appeal the judgment, Mr. Tsegaye obtained a "certification" by the trial judge that the summary judgment was "final for the purposes of La. C.C.P. art. 1915." We, however, without prompting by the parties, issued a rule to show cause why the appeal should not be dismissed because of the absence of decretal language. The parties responded. Because we do not have appellate jurisdiction arising from this summary judgment, we dismiss the appeal, but, as we explain later in this opinion, we convert the appeal to an application for supervisory relief and exercise our supervisory jurisdiction to review the granting of the summary judgment.
Following our de novo review of the summary judgment, we find that the trial judge was legally correct in his decision that there were no genuine issues of material fact which precluded summary judgment. We amend the judgment, however, to supply the necessary decretal language, including dismissing with prejudice Mr. Tsegaye's suit against Royal Engineers.
We explain our decisions in greater detail in the following Parts.
We begin by explaining why we cannot exercise our appellate jurisdiction in this matter but are choosing to exercise our supervisory jurisdiction.
The Louisiana Constitution of 1974 provides for our appellate jurisdiction and for our supervisory jurisdiction of cases. See La. Const. Art. V, § 10(A). There is a distinction with a difference. As we have observed, the difference is that our appellate jurisdiction is "invocable by the litigant as a matter of right." Livingston Downs Racing Ass'n, Inc. v. Louisiana State Racing Com'n, 96-1215, p. 3 (La.App. 4 Cir. 6/5/96), 675 So.2d 1214, 1216. See also La. C.C.P. art. 2082 ("Appeal is the exercise of the right of a party to have a judgment of the trial court revised, modified, set aside, or reversed by an appellate court."). But, importantly, our supervisory jurisdiction is "discretionary on the part of the appellate court...." Livingston Downs Racing Ass'n, Inc., 96-1215, p. 3, 675 So.2d at 1216. See also La. C.C.P. art. 2201 ("Supervisory writs may be applied for and granted in accordance with the constitution and rules of the supreme
We cannot, however, determine the merits of an appeal unless our jurisdiction is properly invoked by a valid final judgment. See Board of Supervisors of La. State Univ. and Agric. And Mech. Coll. v. Mid City Holdings, L.L.C., 14-0506, p. 2 (La.App. 4 Cir. 10/15/14), 151 So.3d 908, 910; Delta Staff Leasing, LLC v. South Coast Solar, LLC, 14-1328, p. 1 (La.App. 4 Cir. 9/23/15), 176 So.3d 668.
For a judgment to be "a valid final judgment," it must contain "decretal language." Mid City Holdings, L.L.C., 14-0506, p. 2, 151 So.3d at 910. The absence of necessary decretal language means that the judgment is not final and appealable. Id., 14-0506, p. 3, 151 So.3d at 910. Importantly, for the language of a judgment to be considered "decretal," it "must name the party in favor of whom the ruling is ordered, the party against whom the ruling is ordered, and the relief that is granted or denied." Id. (emphasis added). And we must be able to determine from the judgment itself—without any reference to an extrinsic source—the specific relief granted. See id.
Here, the judgment which Mr. Tsegaye wishes to appeal merely provides, in relevant part, that "IT IS ORDERED ADJUDGED AND DECREED that Royal Engineers and Consultants, LLC's Motion For Summary Judgment was GRANTED...." The judgment itself identifies Royal Engineers as the successful party. But neither the identity of the losing party nor the dispositive relief granted is specified in the judgment; they are only determinable from reference to the motion for summary judgment itself. The relief to which Royal Engineers is entitled as a result of the trial judge granting summary judgment in this case would be dismissal with prejudice. See La. C.C.P. arts. 968, 1673, 1844. And it is precisely that relief—dismissal with prejudice—that must be specified in the judgment in order for the judgment to be considered as a final appealable judgment. See Mid City Holdings, L.L.C., 14-0506, p. 2, 151 So.3d at 910 ("Although the district court judgment properly maintained the exception of prescription, it failed to decree the dismissal with prejudice of the plaintiff's claim for additional compensation.").
We acknowledge that the trial judge "certified as final [the judgment appealed from] for the purposes of La. C.C.P. art. 1915" in the order granting Mr. Tsegaye's appeal. Mr. Tsegaye, citing to a third circuit decision, argues that this "certification" of finality suffices.
At the same time that the trial judge granted Royal Engineers's motion for summary judgment, he denied the motion filed by the remaining defendant, the City of New Orleans.
And, therefore, we find that we do not have appellate jurisdiction to review this judgment because our appellate jurisdiction has not been properly invoked.
In appropriate cases, when confronted with the lack of appellate jurisdiction, we have, however, converted the party's appeal to an application for us to exercise our discretionary supervisory jurisdiction and then granted the application. See, e.g., Lalla v. Calamar, N.V., 08-0952, p. 6 (La.App. 4 Cir. 2/11/09), 5 So.3d 927, 931.
Here we find it appropriate to exercise our supervisory jurisdiction because, as we explain in Part V-A, post, there are no genuine issues of material fact, and our review will terminate the action at least as to one of the parties. Cf. Whitney Nat. Bank v. Rockwell, 94-3049, p. 6 (La. 10/16/95), 661 So.2d 1325, 1329 n. 3 ("when (1) there is no dispute of material fact, (2) the ruling of the trial court appears incorrect, and (3) a reversal would terminate the litigation as to at least one party, the intermediate court should review the merits of the application for supervisory writs"); cf. also Herlitz Const. Co., Inc. v. Hotel Investors of New Iberia, Inc., 396 So.2d 878 (La.1981) (holding, "judicial efficiency and fundamental fairness to the litigants dictates that the merits of the application for supervisory writs should be decided" when the judgment is arguably incorrect, a reversal will terminate the litigation, and there is no factual dispute to be resolved).
Typically, in the context of a motion for summary judgment, we are evaluating an application for supervisory review under the Herlitz factors because a trial court denied summary judgment, and the applicant is arguing that the interlocutory judgment is incorrect. See, e.g., Ludlow v. Crescent City Connection Marine Division, unpub., 14-1359, p. 7 (La.App. 4 Cir. 9/23/15), 2015 WL 5609999 (on remand) (Bonin, J., dissenting), rev'd 15-1808 (La. 11/16/15), ___ So.3d ___, 2015 WL 9492258; Hooper v. Brown, 15-0339 (La. App. 4 Cir. 5/22/15), 171 So.3d 995. Here, however, because of the way in which the partial summary judgment has arrived, we need not focus on the "arguably incorrect" Herlitz factor, but rather focus on the termination-of-the-litigation factor, which is, of course, present in this case.
Therefore, under these circumstances, we conclude that judicial efficiency and fundamental fairness dictate that we exercise our supervisory jurisdiction and, accordingly, we convert the appeal to an application for supervisory writ and grant the application.
We now examine this matter's procedural history. Claiming damages after a light pole fell on him, Mr. Tsegaye filed suit on June 20, 2011, against the City of New Orleans (the pole's owner), Royal Engineers (which was contractually tasked by the City with inspecting its poles and issuing work orders for repairs to the poles), and All Star Electric, Inc. (which was contractually tasked by the City with responding to Royal Engineers's repair orders). Invoking the doctrine of res ipsa loquitur, Mr. Tsegaye's petition asserts that the City, Royal Engineers, and All Star are liable to him under the provisions of Articles 2217 and 2317.1 of the Louisiana Civil Code, which impose strict liability, under certain circumstances, upon persons for defective things within their custody. See Davis v. Riverside Court Condominium Ass'n Phase II, Inc., 14-0023, pp. 5-6 (La. App. 4 Cir. 11/12/14), 154 So.3d 643, 647. He amended his petition on September 20, 2011, to add as a defendant Utility Construction Services, L.L.C., who, like All Star, had a contract with the City to repair light poles pursuant to Royal Engineers's repair orders. He also asserted a claim for punitive damages arising from the defendants alleged spoliation/removal of the fallen light pole and pole base at issue before it could be examined in connection with his lawsuit. The defendants subsequently answered Mr. Tsegaye's petitions.
The parties then conducted discovery and engaged in motion practice. Notably, the trial judge granted in part the City's motion for summary judgment and dismissed with prejudice Mr. Tsegaye's spoliation claim against the City. The City sought supervisory review of the trial court's denial of the remainder of its motion. We declined to exercise our supervisory jurisdiction. See Tsegaye v. City of New Orleans, unpub., 13-862 (La.App. 4 Cir. 9/17/13) (Bonin, J., concurring). The trial judge also granted two other motions for summary judgment, dismissing with
Royal Engineers, subsequently, filed a motion for summary judgment, in which it argued that the trial court should dismiss Mr. Tsegaye's claims against it because he cannot establish at trial at least one element of his strict liability claim—that Royal Engineers knew or should have known at the time of the accident that the fallen pole was allegedly defective. The City, subsequently, filed a motion in which it explicitly adopted Royal Engineers's arguments and asked the trial judge to again summarily dismiss Mr. Tsegaye's claims against it. Mr. Tsegaye filed an opposition memorandum in which he opposed the two motions. The parties argued the merits of the two motions before the trial judge, who, at the close of the hearing, granted Royal Engineers's motion but denied the City's. Mr. Tsegaye, subsequently, sought review of the trial judge's December 15, 2014 judgment.
Here we examine the codal law and jurisprudence governing Mr. Tsegaye's strict liability claim against Royal Engineers, and the applicable standard of review.
Mr. Tsegaye's petition alleges that Royal Engineers is liable for damages because it was negligent in maintaining the light pole pursuant to Article 2315 of the Louisiana Civil Code, and is liable pursuant to Articles 2317 and 2317.1 for damages caused by the ruin of a thing over which it allegedly had custody.
We apply a de novo standard of review in examining trial court rulings on summary judgment motions. See Rapalo-Alfaro v. Lee, 15-0209, p. 8 (La.App. 4 Cir. 8/12/15), 173 So.3d 1174, 1179. Appellate courts review summary judgments de novo under the same criteria that govern the trial court's consideration of whether summary judgment is appropriate: whether there is a genuine issue of material fact and whether the mover is entitled to judgment as a matter of law. Id. A court must grant a motion for summary judgment if the pleadings, depositions, answers to interrogatories, and admissions, together with the affidavits, if any, show that there is no genuine issue as to material fact, and that the mover is entitled to judgment as a matter of law. See La. C.C.P. art. 966 B; Rapalo-Alfaro, 15-0209, p. 8, 173 So.3d at 1179.
On a motion for summary judgment, the burden of proof remains with the movant.
In light of the issues before us, and the nature of summary judgment proceedings, we think it important to next briefly establish the parties' respective burdens of proof in the event this case were to proceed to trial. Simply put, before a defendant can be cast in judgment under Article 2317, "the plaintiff must prove that: 1) the thing which caused damage was in the defendant's custody and control (garde); 2) the thing had a vice or defect which created an unreasonable risk of harm; and 3) the injuries were caused by a defect." Chaplain v. Dimitri, 14-1081, p. 6 (La. App. 4 Cir. 8/5/15), 174 So.3d 222, 226. Additionally, Article 2317.1 "adds the requirement that the injured plaintiff prove that the owner/custodian knew or, in the exercise of reasonable care, should have known of the unreasonable risk of harm, and that the damage could have been prevented by the exercise of reasonable care, and that [the owner/custodian] failed to exercise such reasonable care." Id. (internal quotations omitted).
We turn next to examine the evidence presented to the trial judge in connection with Royal Engineers's motion, which argued that Mr. Tsegaye cannot prove that it either knew, or should have known, that the light pole at issue was defective. In support of this argument, Royal Engineers introduced copies of Mr. Tsegaye's original and amending petitions, a copy of the contract for street light management services between the City and Royal Engineers, a copy of the contract for street light maintenance services between the City and All Star, a copy of All Star's sub-contract with Utility, and excerpts from several depositions taken in this case.
Notably, the City's contract with Royal Engineers obligates it "to manage street light operations." Specifically, the contract obliges Royal Engineers to develop several maintenance tracking systems and tasks it with conducting periodic patrols of the streetlight system. As for its development responsibilities, Royal Engineers is required by the contract to "supply, operate, and maintain a geographical information system (GIS) based work order system" to "track and assign all work to the city designated streetlight repair contractor," which was All Star and Utility, its sub-contractor. Royal Engineers, additionally, is required to create and maintain geographical information system-based maps of the individual streetlights and the underground circuits. The contract also obligates Royal Engineers to develop and maintain a web and telephone based system for the public reporting of street light complaints, and to coordinate all third-party activities "affecting street light repair and operations."
As for Royal Engineers's patrolling requirements, the contract obliges Royal Engineers to conduct weekly nighttime inspections of the entire streetlight system in order to ensure "proper nighttime operation." The patrols are to take place "Sunday through Thursday one hour after sunset to one hour before sunrise." In
Royal Engineers is also tasked with conducting a yearly daytime survey of the streetlight system. This survey requires Royal Engineers to "verify existing information in the street light inventory," record the GPS position of each streetlight, and record the visual condition of the pole, base, hand hole cover, support arm, luminaire, and refractor. After completing the survey, the contract obliged Royal Engineers to submit a report to the City that shows the "condition of every streetlight, along with a summary of findings, a cost estimate for repairs, and an updated inventory list of all streetlights." Royal Engineers's contract with the City, therefore, called upon it to develop and manage systems for the monitoring of the City's streetlights, the reception of complaints concerning streetlight outages, and the coordination of streetlight repairs with the City's selected maintenance contractor. Pointedly, it did not call upon Royal Engineers to physically maintain the City's streetlights.
As for the remainder of the exhibits introduced in connection with its motion, Royal Engineers also introduced extracts from the deposition of Michael L. Pugh, it's Executive Vice President, wherein he discussed the terms of Royal Engineers's contract with the City for streetlight management services. Mr. Pugh also executed an affidavit, which Royal Engineers introduced, in which he stated that he had conducted a search of Royal Engineers's call logs and that prior to the accident at suit Royal Engineers: 1) received no notice of any alleged defects in the light pole in question; 2) received no complaints about the light pole at issue; or 3) issue any work orders with respect to the pole at suit. Mr. Pugh further stated that Royal Engineers: 1) did not remove or dispose of the light pole and base in question; 2) did not cause any other entity to remove the light pole and base in question; and 3) at no time had exclusive care, custody, or control over New Orleans' streetlight system.
Additionally, Royal Engineers introduced selections from the deposition transcript of Arthur E. Westbrook, an All Star representative, who testified to Royal Engineers's management of the streetlight program and issuance of work orders to All Star. Royal Engineers also relied upon excerpts from the deposition of Mark Jernigan, director of the City's Department of Public Works, who explained that under the City's system a call regarding a streetlight outage would come into Royal Engineers's call center, which would then log the complaint, and create a work order to be issued to All Star, who was tasked with making the repair. Mr. Jernigan also testified that Royal Engineers was not obligated under terms of the contract "to dismantle the base of each of the 50,000 light poles in the City to determine the condition of the baseplate under each light pole."
In his opposition, Mr. Tsegaye argued that there are sufficient facts in the record from which to draw the reasonable inference that Royal Engineers had constructive notice of the light pole's defective nature. Mr. Tsegaye introduced numerous exhibits in support of this contention. He first introduced extracts from the
Mr. Tsegaye also introduced several black and white photographs. Some purport to reflect Mr. Tsegaye on the day of the accident and the injury to his hand caused by the falling light pole. Others purport to show a light pole and base, although it is not clear from the record whether these photos are of the actual pole and base at suit, or one similar to the pole and base at issue. Mr. Tsegaye also relied upon copies of the City's contract with Royal Engineers for streetlight management services. And, like Royal Engineers, Mr. Tsegaye also introduced extracts from the depositions of Mr. Pugh, Mr. Westbrook, and Mr. Jernigan.
Mr. Tsegaye additionally introduced an affidavit from Edward Johnson, an employee at the Loews Hotel, which is located across the street from the accident site. Mr. Johnson stated that he was working at Loews sometime in February or March 2011 when a light pole fell onto a co-worker's vehicle in front of the hotel. He also stated that other co-workers called the City to come and remove the fallen pole, but that it took one week for workers to arrive. This light pole, he stated, fell two to three months before the one that fell on Mr. Tsegaye.
Mr. Tsegaye also introduced excerpts from the deposition transcript of Michael Threeton, Security Director for the Loews Hotel, who testified that he recalled when the light pole at suit collapsed. Like Mr. Johnson, Mr. Threeton also recalled the light pole which collapsed in front of Loews and damaged a co-worker's vehicle. He stated that Loews' employees called the City's Department of Public Works in order to have the fallen pole removed, but that it stayed on the sidewalk until later retrieved by the same work crew which also picked up the pole that fell on Mr. Tsegaye. And Mr. Tsegaye introduced excerpts from the deposition of Kevin Clark, another Loews' employee, whose deposition testimony echoed Mr. Threeton's.
Lastly, Mr. Tsegaye introduced an affidavit from Dr. Claude R. Mount, his expert metallurgist, who stated that the light pole at issue most likely failed due to internal corrosion. Although he did not have access to the light pole that fell on Mr. Tsegaye, or any rust flakes from the pole's base, Dr. Mount analyzed rust flakes from an unspecified "failed pole." Based on the perceived similarity of factors between the analyzed rust flakes and environmental factors found at the actual accident site, Dr. Mount concluded that the pole which fell on Mr. Tsegaye must have collapsed because of internal corrosion. He noted that visual inspection of the pole would not have revealed the internal corrosion: "Unless the shroud covering the base was removed, visual inspection of the lamp pole could not assess the condition of the very critical base attachment." Dr. Mount
We now discuss Mr. Tsegaye's assignments of error in light of the "field of evidence properly subject to the Court's consideration" and the controlling law. Rand v. City of New Orleans, 14-2506, p. 5 (La. 6/30/15), 173 So.3d 1148, 1151. As he did in the trial court, Mr. Tsegaye argues that summary judgment in favor of Royal Engineers is unwarranted because there are sufficient facts in the record from which to draw the reasonable inference that Royal Engineers had constructive notice of the light pole's defective nature. He also argues that the trial judge should have relied upon the doctrine of res ipsa loquitur in order to infer Royal Engineers's negligence and deny its motion. Lastly, Mr. Tsegaye asserts that the trial judge should have employed the spoliation doctrine in order to presume the defective nature of the fallen light pole.
We first address Mr. Tsegaye's contention that there are sufficient facts in the record from which to infer Royal Engineers's constructive knowledge of the light pole's defective nature.
Although we are instructed when reviewing a motion for summary judgment to view the record, and to draw all reasonable inferences that may be drawn from it, in the light most favorable to a non-movant, the facts to which Mr.
In this case, there are no facts in the record from which to infer the temporal element in Article 2317.1's constructive notice requirement. Pointing to the contract's inspection provisions, Mr. Tsegaye asserts that Royal Engineers failed to conduct either daytime or nighttime inspections and that it would have discovered the allegedly defective nature of the pole had it done so. There is, however, no evidence in the record to support the assertion that Royal Engineers failed to carry out either the yearly daytime inspections or the weekly nighttime inspections. Although he alleges that Royal Engineers failed to live up to its contractual inspection obligations, it does not appear that Mr. Tsegaye ever attempted to discover whether such inspections had taken place, or the date of the last inspection preceding his accident. The contract called upon Royal Engineers to equip its inspection vehicles with location systems and provide the City with the results of its inspections so that the City could audit its compliance with the contract. Such information, if available, would arguably show the dates, times, and details of those daytime and nighttime inspections immediately preceding Mr. Tsegaye's accident. Although such information is, presumably, discoverable, it does not appear that Mr. Tsegaye sought to locate these records. Absent such information, it is impossible to tell whether the pole's allegedly defective nature existed for such a period of time that Royal Engineers should have discovered it through the inspections.
Mr. Tsegaye also argues that "numerous calls" made by Loews' employees concerning the pole that fell in front of its establishment should have alerted Royal Engineers to the defective nature of the poles in the vicinity of the accident. It is not clear from the record, however, which entity was called by the employees. Michael Threeton, Loews' Director of Security, testified in his deposition that "[w]e called the Department of Public Works." Edward Johnson stated in his affidavit that he "called the City of New Orleans" to complain about the pole in front of Loews. Kevin Clark testified at his deposition that he did not think that he called "the City" about the fallen pole, though he thought that Mr. Threeton might have. One cannot infer from these statements that Loews' employees notified Royal Engineers of the fallen pole or that the City agencies contacted by them subsequently passed on the information to Royal Engineers.
And we observe that there is no evidence in the record with which to infer the cause of the pole's failure. Based upon Dr. Mount's examination of another light pole and base, Mr. Tsegaye argues that internal corrosion must have caused the pole to fall on him. This assertion, however, is pure speculation. Indeed, there is
We next address briefly Mr. Tsegaye's contention that the trial judge erred by failing to rely upon the doctrine of res ipsa loquitur in order to infer Royal Engineers's negligence and deny its motion. "The principle of res ipsa loquitur is a rule of circumstantial evidence that infers negligence on the part of defendants because the facts of the case indicate that the negligence of the defendant is the probable cause of the accident, in the absence of other equally probable explanations offered by credible witnesses." Tsegaye, 13-1412, p. 7, 140 So.3d at 207, citing Montgomery v. Opelousas Gen. Hosp., 540 So.2d 312, 319 (La.1989). It must, as "a qualification of the general rule that negligence is not to be presumed," be sparingly applied. See Spott v. Otis Elevator Co., 601 So.2d 1355, 1362 (La.1992).
Generally, it can be employed when three requirements are met: 1) the circumstances surrounding the event are such they would not normally occur in the absence of negligence on someone's part; 2) the instrumentality was in the exclusive control of the defendant; and, 3) the negligence falls within the duty of care owed the plaintiff. See Zumpe v. Zara's Little Giant Super Mkt., Inc., 09-1255, p. 5 (La. App. 4 Cir. 3/24/10), 35 So.3d 1158, 1161 n. 1. "The second requirement, that the defendant have exclusive control over the thing, has not, in our jurisprudence, been strictly applied." Spott, 601 So.2d at 1362. It is satisfied, however, if the circumstances indicate that it is more probable than not that the defendant caused the accident and other plausible explanations do not appear to be the probable cause of the accident. Id. The plaintiff, of course, bears the initial burden of proof. Id.
We do not find that the trial judge erred by refusing to apply res ipsa to the facts of this case. Mr. Tsegaye has put forth no evidence with which to infer that Royal Engineers had exclusive control or custody over the light pole at issue. It is also clear that Mr. Tsegaye can offer nothing save possibilities and speculation in order to establish the cause of the light pole's failure. He, therefore, has produced no factual support sufficient to establish that he will be able to satisfy his burden of proving that the circumstances of his accident indicate that it is more probable than not that it was caused by Royal Engineers. The trial judge, accordingly, did not err in refusing to apply res ipsa to the facts of this case.
We lastly address Mr. Tsegaye's contention that the trial judge erred by refusing to apply the spoliation doctrine in order to presume the defective nature of the fallen light pole. The theory of spoliation of evidence refers to the "intentional destruction of the evidence for the purpose of depriving the opposing parties of its use." Quinn v. RISO Investments, Inc., 03-0903, p. 5 (La.App. 4 Cir. 3/3/04), 869 So.2d 922, 926-927. A court may "either exclude the spoiled evidence or allow the jury to infer that the party spoiled the evidence because the evidence was unfavorable
"[T]he party having control over the evidence must have had an obligation to preserve it at the time it was destroyed" before a trial judge may exclude spoiled evidence or allow for the adverse inference. Everhardt, 07-0981, p. 7, 978 So.2d at 1044, citing Kronisch v. U.S., 150 F.3d 112, 126 (2d Cir.1998). Such a duty "arises when the party has notice that the evidence is relevant to the litigation." Id. Once a court concludes that a party was obliged to preserve the evidence, it must then consider whether the evidence was intentionally destroyed and the likely contents of that evidence. See Everhardt, 07-0981, p. 7, 978 So.2d at 1044, citing Kronisch, 150 F.3d at 126.
The trial judge, in our view, correctly dismissed Mr. Tsegaye's spoliation claim. Simply put, Mr. Tsegaye has failed to establish that he will be able to meet his burden of proving that Royal Engineers was on notice that the fallen light pole was relevant to Mr. Tsegaye's lawsuit. The record establishes that Mr. Tsegaye's accident occurred on April 15, 2011. Utility's workers removed the fallen light pole and base on July 28, 2011.
We dismiss the appeal, but convert the motion for appeal to an application for supervisory writ, which we grant. We affirm the trial court's granting of the partial summary judgment and, accordingly, render judgment herein in favor of Royal Engineers & Consultants, L.L.C., and against Baraki Tsegaye, dismissing with prejudice his suit against Royal Engineers. All costs of the appeal are taxed to the appellant. See La. C.C.P. art. 2164.