DEBORAH K. CHASANOW, District Judge.
Presently pending and ready for resolution in this contract case are cross motions for partial summary judgment filed by Plaintiffs and/or Counterdefendants the Hellenic Ministry of National Defense, the Hellenic Armed Forces, and the Hellenic Air Force Procurement Service (collectively, "HAF" or "Plaintiffs") (ECF No. 30) and Defendant and/or Counterplaintiff Eagle Van Lines, Inc. ("EVL" or "Defendant") (ECF Nos. 35 & 36). The issues have been fully briefed, and the court now rules, no hearing being deemed necessary. Local Rule 105.6. For the following reasons, Plaintiffs' motion will be granted in part. Defendant's motion will be denied.
Unless otherwise noted, the following facts are undisputed. Plaintiffs are units of the Greek government. The Hellenic Ministry of National Defense is a government cabinet department responsible for managing the armed forces for the Hellenic Republic. The Hellenic Armed Forces are the combined military forces of Greece. Hellenic Air Force Procurement Service is a government agency that engages vendors to transport and store military goods for the Hellenic Ministry of National Defense. (ECF No. 3 ¶¶ 1-3). EVL is a freight forwarding company based in Maryland. (ECF No. 3 ¶ 4).
George Georgakopoulos is the President of EVL. He explained:
(Id. ¶ 7). "Throughout the time that EVL acted as freight forwarder for the Armed Forces, EVL would be paid for its services with respect to a given item only after that item had been received by the contractually determined Unit of each Armed Forces' Branch in Greece, in accordance with the payment terms of the contracts and Hellenic Legislation." (ECF No. 30-4 ¶ 5).
In early 2009, Plaintiffs and EVL entered into Contract No. 100/09, which covered EVL's provision of freight-forwarding services from March 1, 2009 through November 30, 2009.
(ECF No. 30-6, at 6). Under Article 4.5.1.4 of Contract 100/09, Defendant's obligations included forwarding the materials within three (3) days from their arrival to their final recipient within the U.S. (Id. at 9). Article 8.3. of Contract No. 100/09 states:
(Id. at 19) (emphasis added). Contract No. 100/09 was set to expire on September 30, 2009, "but the contract provided that EVL was obligated to continue to receive and forward materials for two months after that expiration date, under the same terms and conditions." (Id.) (emphasis added). Thus, Contract No. 100/09 was in effect until November 30, 2009.
On August 18, 2009, EVL lost the procurement for freight-forwarding services for the period after November 30, 2009. (ECF No. 30-4 ¶ 8). The new contract was awarded to EVL's competitor, Imperio-Argo Group. (Id.). George Georgakopoulos testified during his deposition that "in 2009[,] there was a xprocurement for freight forwarding services [] that permitted a number of freight forwarding companies to make a bid on [] Contract 05/09." (ECF No. 30-26, at 5). EVL submitted a bid, but the Greek government awarded the contract to Imperio-Argo. (Id.). EVL objected to the procurement award by filing an appeal to the State Legal Council of the Hellenic Republic, which suspended the commencement of the new contract with Imperio Argo until the appeal could be resolved. (ECF No. 3 ¶ 13).
In order to service Plaintiffs' transport requirements after November 30, 2009 and during the pendency of the procurement appeal, Plaintiffs engaged in negotiations with EVL regarding the terms of a contract that would govern from December 1, 2009 until the activation of a new contact with Imperio-Argo. (ECF No. 30-4 ¶ 10). The parties continued to negotiate a draft contract — Contract No. 47/10. Mr. Georgakopoulos stated that "[a] draft for negotiations only of a working document referred to as 47/10 had been initialed by representatives of the parties in January 2010. There were additional issues and discussions that remained unresolved which discussions never resumed." (ECF No. 35-2, at 6) (emphases added). The parties disagree whether they were governed by the terms of Contract No. 47/10 after Contract No. 100/09 terminated on November 30, 2009. George Georgakopoulos gave the following testimony during his deposition:
(ECF No. 30-26, at 7). Mr. Georgakopoulos also testified:
(ECF No. 30-26, at 5).
Plaintiffs assert that on January 25, 2010, they learned that "EVL had included a counterfeit document (a `Letter of Guarantee' that had supposedly been issued by Eagle Bank) in its unsuccessful application during the procurement for the contract that had been awarded to [Imperio Argo]." (Id. ¶ 14). Plaintiffs maintain that as a result of that discovery, they terminated EVL's services as freight forwarder. (Id. ¶ 15). Specifically, Plaintiffs provide as an exhibit to their motion a decision from Evangelos Venizelos, the Minister of National Defense, dated February 12, 2010, which states:
(ECF No. 30-11, at 4) (emphasis added). EVL contends that it received Plaintiffs' February 12, 2010 letter terminating its services on February 24, 2010. (ECF No. 35-2, ¶ 13, declaration of George Georgakopoulos) ("On February 24, 2010, I received by hand delivery and by email the letter from the Minister of National Defense from Mr. Nikolasos Klothakis who was the liaison officer placed in the offices of Eagle Van Lines by the Hellenic Air Force as a direct attache authorized to approve transportation and resolve issues that might arise under the freight forwarding contracts.")). EVL also denies submitting a fraudulent letter of guarantee. (See ECF No. 35-2 ¶ 10 ("Eagle Van Lines did not author nor submit an alleged letter of credit purporting to be from Eagle Bank bearing a date of April 11, 2009.")).
There is some disagreement between the parties about the chain of events following the termination of EVL's services. Plaintiffs contend that they "instructed EVL that all unclassified goods in its possession belonging to the Hellenic Armed Forces were to be forwarded to another contractual freight forwarder of the Ministry of Defense, Stellar Maritime." (ECF No. 30-4 ¶ 17). According to Plaintiffs, "EVL refused to comply with that instruction unless the Armed Forces first paid on all EVL invoices that EVL claimed it was owed and storage fees charged by EVL since February 12, 2010." (Id.). On February 24, 2010, George Georgakopoulos wrote the following letter to Nikolaos Klothakis, Wing Commander for the Hellenic Air Force:
(ECF No. 30-31, at 2) (emphasis added). According to Defendant, "Eagle Van Lines began to receive solicitations from several individuals claiming to have the ability to affect Eagle's receipt of its outstanding invoices demanding money for the invoices to be paid." (ECF No. 35-2 ¶ 11). In other words, EVL contends that certain Greek officials attempted to solicit bribes as a condition to paying the outstanding invoices owed to EVL.
According to Plaintiffs, "[a]fter terminating EVL's services as freight forwarder, [they] took steps to ensure that goods would no longer be shipped to EVL. Those steps included notifying the U.S. agency that oversees the [Foreign Military Sales] program and various commercial vendors." (ECF No. 30-4 ¶ 18). EVL, on the other hand, maintains that "the Greek government did not act to alter the name of Eagle Van Lines as its freight forwarder until such time on or after March 15, 2010. The shipments to Eagle Van Lines continued until approximately May 10, 2010 again, without [their] solicitation or involvement, in causing the items to be forwarded to [EVL's] warehouse." (ECF No. 35-2 ¶ 13). Plaintiffs believe that EVL wrongfully continued to accept goods on behalf of the Hellenic Armed Forces and refused to turn them over to Stellar Maritime without first receiving compensation on all unpaid invoices and storage fees. EVL holds a different view, stating that it "remained on the government['s] Military Assistance Programs Address Directory (MAPAC) for some period of time up to March 15, 2010, if not later, which resulted in the shipment to Eagle Van Lines of items for the Greek government. Many of those items were shipped Code 4, meaning the freight charges had to be paid on delivery." (ECF No. 35-3 ¶ 10).
EVL continues to store many items in its warehouse that it received during varying time periods. Defendant maintains that as of May 5, 2014, "Eagle Van Lines is owed $1,697,233.90 in total unpaid invoices of which $1,577,430.70 is due under Contract 100/09 and for the period between December 1, 2009 to February 24, 2010, together with interest, storage, freight charges and carrier charges." (ECF No. 35-2 ¶ 18). According to Plaintiffs, the military goods and equipment held by EVL include: military transport airplanes; military helicopters; training aircrafts for pilot officers; aircraft spare parts; and ground support equipment. (ECF No. 3 ¶ 32).
Plaintiffs filed a complaint on March 18, 2013. (ECF No. 1). They filed an amended complaint on June 14, 2013, asserting the following causes of action: (1) conversion (count I); and (2) breach of contract (count II). Plaintiffs seek declaratory judgment and injunctive relief, which they designate as counts III and IV of the amended complaint. (ECF No. 3). Defendant answered the complaint (ECF No. 7), and counterclaimed against Plaintiffs for breach of contract (ECF No. 8). Defendant requests a declaratory judgment and punitive damages, which relief it includes as separate causes of action. (ECF No. 8, at 5-6). Plaintiffs answered the counterclaim on August 9, 2013. (ECF No. 12).
Plaintiffs moved for partial summary judgment on April 15, 2014. (ECF No. 30). Defendant opposed the motion and also cross-moved for partial summary judgment. (ECF Nos. 35 & 36). Plaintiffs filed a reply in further support of their motion for partial summary judgment in which they opposed Defendant's cross-motion. (ECF No. 37).
Both parties request partial summary judgment. Rule 56(a) of the Federal Rules of Civil Procedure, permits a party to move for summary judgment or partial summary judgment by identifying "each claim or defense — or the part of each claim or defense — on which summary judgment is sought." (emphasis added). "[P]artial summary judgment is merely a pretrial adjudication that certain issues shall be deemed established for the trial of the case. This adjudication . . . serves the purpose of speeding up litigation by" narrowing the issues for trial to those over which there is a genuine dispute of material fact. Rotorex Co. v. Kingsbury Corp., 42 F.Supp.2d 563, 571 (D.Md. 1999) (internal quotation marks omitted) (noting that "numerous courts have entertained and decided motions for partial summary judgment addressing particular issues").
A motion for summary judgment will be granted only if there exists no genuine dispute as to any material fact and the moving party is entitled to judgment as a matter of law. See Fed.R.Civ.P. 56(a); Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986); Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 250 (1986). Once a properly supported motion for summary judgment is filed, the nonmoving party is required to make a sufficient showing on an essential element of that party's claim as to which that party would have the burden of proof to avoid summary judgment. Celotex, 477 U.S. at 322-23.
Summary judgment is appropriate under Federal Rule of Civil Procedure Rule 56(a) when there is no genuine dispute as to any material fact, and the moving party is plainly entitled to judgment in its favor as a matter of law. In Anderson v. Liberty Lobby, Inc., 477 U.S. at 249 (1986), the Supreme Court explained that, in considering a motion for summary judgment, the "judge's function is not himself to weigh the evidence and determine the truth of the matter but to determine whether there is a genuine issue for trial." A dispute about a material fact is genuine "if the evidence is such that a reasonable jury could return a verdict for the nonmoving party." Id. at 248. Thus, "the judge must ask himself not whether he thinks the evidence unmistakably favors one side or the other but whether a fair-minded jury could return a verdict for the [nonmoving party] on the evidence presented." Id. at 252.
In undertaking this inquiry, a court must view the facts and the reasonable inferences drawn therefrom "in the light most favorable to the party opposing the motion." Matsushita Elec. Indus. Co. Ltd. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986) (quoting United States v. Diebold, Inc., 369 U.S. 654, 655 (1962)); see also EEOC v. Navy Fed. Credit Union, 424 F.3d 397, 405 (4th Cir. 2005). The mere existence of a "scintilla" of evidence in support of the non-moving party's case is not sufficient to preclude an order granting summary judgment. See Anderson, 477 U.S. at 252.
A "party cannot create a genuine dispute of material fact through mere speculation or compilation of inferences." Shin v. Shalala, 166 F.Supp.2d 373, 375 (D.Md. 2001) (citation omitted). Indeed, this court has an affirmative obligation to prevent factually unsupported claims and defenses from going to trial. See Drewitt v. Pratt, 999 F.2d 774, 778-79 (4
Plaintiffs argue that they are "entitled to summary judgment on [their] claim to recover the goods held by EVL and to summary judgment as to liability on [their] claims for damages." (ECF No. 30-1, at 15) (emphases added). Plaintiffs' amended complaint essentially contains claims for breach of contract and conversion; Plaintiffs also request injunctive and declaratory relief as separate counts in the amended complaint. (ECF No. 3, at 6-8). Plaintiffs seek the return of their property that they allege was converted, but do not clearly reference the legal mechanism for obtaining such relief. Plaintiffs' motion states:
(ECF No. 30-1, at 25) (emphasis added). Plaintiffs have not supplied any authority for the proposition that the court can direct the return of property irrespective of whether they have instituted a replevin action. Indeed, in Wallander v. Barnes, 341 Md. 553, 561 (1996) — a case cited by Plaintiffs — the court commented that "[t]he issue of the proper measure of damages necessarily involves classifying the cause of action, at least as to whether it is replevin, and, if so, the extent to which damages are awardable in replevin."
Judge Blake explained in Sprint Nextel Corp. v. Simple Cell, Inc., Civ. No. CCB-13-617, 2013 WL 3776933, at *8 (D.Md. July 17, 2013):
Importantly, "[t]he measure of damages in an action for conversion of personal property [generally] is the fair market value of the property at the time of conversion, with legal interest thereon to the date of the verdict." Transpacific Tire & Wheel, Inc. v. Orteck Intern., Inc., Civ. Action No. DKC 2006-0187, 2010 WL 1375292, at *12 (D.Md. Mar. 30, 2010) (quoting Keys v. Chrysler Credit Corp., 303 Md. 397, 415 (1985)). "When [] the value of the property detained is the same upon its return, [] damages are measured by the loss of use of the property." Postelle v. McWhite, 115 Md.App. 721, 728 (1997). An action for replevin, on the other hand, "is designed to obtain possession of personal property that is wrongfully detained by the defendant." Ganter, 69 Md.App. at 100;
Assuming Plaintiffs could obtain the requested relief (e.g., release of goods held by EVL) via a conversion claim, they must show that Defendant's detention of the property is wrongful. "[T]he gist of a conversion is not the acquisition of the property by the wrongdoer, but the wrongful deprivation of a person of property to the possession of which he is entitled." Baltimore & O.R. Co. v. Equitable Bank, N.A., 77 Md.App. 320, 325 (1988). Plaintiffs argue:
(ECF No. 30-1, at 15) (emphasis added).
It is undisputed that Contract No. 100/09 covered Defendant's provision of freight-forwarding services from March 1, 2009 through November 30, 2009. (ECF No. 30-4 ¶ 6). The contract expired on September 30, 2009, but obligated EVL to continue to receive and forward materials for two months after the expiration date under the same terms and condition, thus Contract No. 100/09 terminated on November 30, 2009. (Id.). Plaintiffs are correct that Contract No. 100/09 did not condition Defendant's delivery of goods on Plaintiffs' satisfaction of their payment obligations under the contract. Article 4.5.1.4 of Contract No. 100/09 states that EVL's obligations include "forwarding of the materials in the U.S.A. within three days from their arrival to their final recipient within the U.S. [] by air or by road depending on the orders of the Hellenic Armed Forces." (ECF No. 30-6, at 9) (emphasis added). Similarly, Article 16.1 of Contract No. 100/09 states:
(Id. at 25) (emphasis added). The payment terms in Contract No. 100/09, on the other hand, require Plaintiffs to repay EVL within two (2) months from receiving an invoice and all supporting documentation. Specifically, Article 8.3 states:
(ECF No. 30-6, at 19) (emphasis added). Mr. Georgakopoulos, EVL's President, also testified that Contract No. 100/09 did not permit any fees for storage and did not allow EVL to "withhold goods and not forward them on." (ECF No. 30-26, at 5, 9).
Defendant appears to argue that its retention of goods received during the period when the parties were governed by Contract No. 100/09 is justified by way of two statutory liens: a warehouseman's lien and carrier's lien. It states, "EVL has the right to exercise both a [w]arehouse[man's] lien and a [c]arrier's lien for its pre-payment of transportation and other associated charges in fulfillment of its duties under the parties['] contract and post contract actions." (ECF No. 35-1, at 12) (emphasis added). Defendant contends that "a statutory warehouseman's lien can be created on goods covered by a bill of lading, which were shipped to EVL." (Id. at 13). Defendant also asserts that as a freight forwarder, EVL "had to be involved in the storage of goods. . . . There can be no question that EVL['s] duties include holding and safekeeping the goods and its work in this capacity includes storing." (ECF No. 35-1, at 13-14). Thus, Defendant seems to take the position that because it performed certain storing functions under the contract, it could withhold goods in storage (that it received during the time period when Contract No. 100/09 governed the parties' relationship) until Plaintiffs paid outstanding invoices.
Plaintiffs disagree that any lien applied during the period when the parties' dealings were governed by Contract No. 100/09. As Plaintiffs contend, "[g]iven how quickly EVL was supposed to forward goods after receiving them, its intended role as a forwarder was by its nature inconsistent with any suggestion that it has been retained to provide storage services." (ECF No. 30-1, at 24). Indeed, EVL's President testified during his deposition that there was "no storage involved" under the terms of Contract No. 100/09. Even if EVL performed storage functions in its capacity as freight forwarder generally, under the terms of Contract No. 100/09, it was obligated to forward goods it received within three (3) business days; nothing in the contract suggests that it could condition the release of goods it was required to forward within three (3) business days on payment of outstanding invoices by Plaintiffs. Indeed, Article 4.5.1.1 of Contract No. 100/09 states that EVL's obligations included:
(ECF No. 30-6, at 8) (emphasis added). Similarly, Article 4.5.2.3 of Contract No. 100/09 states that EVL:
(Id. at 9) (emphasis added). Any storage functions performed by EVL were built into the express terms of the contract, but did not entitle EVL to withhold goods received during the contract period until Plaintiffs paid outstanding invoices. The idea that EVL could assert any lien on the goods it received during the effective period of Contract No. 100/09 is inconsistent with its obligations to forward such goods within three (3) business days under the terms of its express contract with Plaintiffs. See, e.g., Clark Bros & Co. v. Pou, 20 F.2d 74, 76 (4
Insofar as Defendant holds goods in storage that were received during the effective period of Contract No. 100/09 — from March 1, 2009 until November 30, 2009 — Plaintiffs are entitled to the release of such goods. A dispute remains, however, regarding what goods were received during this time period and when they were received, which precludes the court from ordering any property released at this stage.
The next issue is how the parties' relationship was governed after the termination of Contract No. 100/09. Konstantinos Katirtzidis,
(Id. ¶ 11) (emphasis added). EVL contends, however, that it initialed a draft of Contract No. 47/10 only for purposes of submitting it to Plaintiffs for further negotiation. Mr. Georgakopoulos of EVL stated:
(ECF No. 30-26, at 7) (emphases added). Plaintiffs reference portions of Mr. Georgakopoulos's testimony stating that the terms of Contract No. 47/10 were offered by EVL to HAF for acceptance, and that such terms were accepted because HAF took the benefit of the offer. (ECF No. 30-1, at 18). In his deposition testimony, however, Mr. Georgakopoulos stated that the terms offered would have been renegotiated and would not have comprised the final, binding contract:
(ECF No. 30-26, at 8-9) (emphases added).
The parties dispute whether Contract No. 47/10 was finally executed by both sides, but this disagreement does not create a genuine dispute of material fact with respect to whether EVL's detention of goods received during this time period was wrongful. Even if Contract No. 47/10 was not in effect, the parties continued to operate under the same terms as Contract No. 100/09 with respect to shipment of goods and payment for freight-forwarding services by Plaintiffs. Indeed, Mr. Georgakopoulos testified during his deposition that from December 1, 2009 until February 24, 2010, EVL continued to ship goods "with no issues until the [termination] decision [from] Mr. Venizelos [the Minister of National Defense] came up." (ECF No. 30-26, at 12). Mr. Georgakopoulos further testified that EVL continued billing under the terms of Contract No. 100/09. (Id.). Regardless of whether the parties' dealings were governed by Contract No. 100/09 or 47/10 during this time period, neither contract allowed EVL to condition the release of goods received from December 1, 2009 until February 24, 2010 on payment of all outstanding invoices by Plaintiffs. Much like in Contract No. 100/09, the terms of Contract No. 47/10 required EVL to forward the goods within three (3) business days, and Plaintiffs had to pay within two (2) months from receiving all supporting documentation. (See Articles 3.3 and 9.5.a(4) of Contract No. 47/10). Thus, the same reasons discussed above for why Defendant cannot assert a statutory lien during the parties' contractual period also apply for the period from December 1, 2009 through February 24, 2010.
Based on the foregoing, Plaintiffs have a right to the release of goods received from December 1, 2009 to February 24, 2010. Insofar as the parties agree on the goods that EVL received prior to February 24, 2010, those goods should be released, but the court will not order any goods released until the exact items held by EVL that were received during this time period can be ascertained. A telephone conference will be held with the parties to determine whether they can agree on the exact goods to be released.
Plaintiffs argue that for the time period following the termination of Defendant's services, EVL was not authorized to accept shipment of goods and had no right to condition release of the goods on payment of outstanding invoices by Plaintiffs. (ECF No. 30-1, at 19).
Captain Katirtzidis declared that "[a]fter terminating EVL's services as freight forwarder, [Plaintiffs] took steps to ensure that goods would no longer be shipped to EVL. Those steps included notifying the U.S. agency that oversees the FMS program and various commercial vendors. But despite those steps, some goods continue to be shipped to EVL." (ECF No. 30-4 ¶ 18) (emphasis added). Captain Katirtzidis also states that after February 12, 2010, "EVL no longer had any authority to accept goods on behalf of the Hellenic Armed Forces," but nevertheless continued to receive the goods and refused to turn them over to Plaintiffs unless it first was paid on all outstanding invoices. (ECF No. 30-4 ¶ 19). Defendant tells a different story. Mr. Georgakopoulos, EVL's President, states that on February 24, 2010, by hand delivery and by email, he received the letter from Plaintiffs terminating their relationship. (ECF No. 35-2 ¶ 13). He states that after the termination, EVL still continued "to receive shipments of military goods, freight collect, meaning we paid on the delivery on behalf of the Hellenic Armed Forces." (Id.). Mr. Georgakopoulos further avers:
(Id.) (emphasis added). Stephanie Bo, an international coordinator for Eagle Van Lines, also declares:
(ECF No. 35-3 ¶ 10). Thus, there is a genuine dispute regarding whether EVL could have or should have rejected the goods it received after February 24, 2010 and whether EVL's continued acceptance of the goods after the termination of its relationship with Plaintiffs is attributable to Plaintiffs' own failure to ensure that the goods would be forwarded elsewhere.
Plaintiffs contend that "even if one assumes that EVL had a valid excuse for continuing to accept delivery of goods addressed to [Plaintiffs] after its services were terminated, and even if it has a claim against [Plaintiffs] for freight-collect payments with respect to those deliveries, it would not follow that EVL was entitled to retain the goods in the face of [Plaintiffs'] instructions that they be forwarded to Stellar Maritime." (ECF No. 30-1, at 20). Plaintiffs cite T.R. Ltd. v. Lee, 55 Md.App. 629 (1983), in support of their argument that even if HAF was indebted to EVL for unpaid invoices, Defendant had to release the goods once Plaintiffs demanded that they be forwarded to Stellar Maritime. In Lee, a stolen tractor-trailer ran off a ramp connecting two interstate highways. A Maryland State police officer directed T.R. Ltd., trading as Raley's Emergency Road Services, to unload, right, tow and store the vehicle. Agent of the owner and lessor of the tractor-trailer made a demand for its return, but Raley's refused such demand until all assessed towing and storage charges were paid. The Court of Special Appeals of Maryland held that "[i]n the absence of some common law or statutory lien authorizing it to retain possession of the property until its charges were paid, [the towing company] was obliged to restore the property to its owner when demand was made for its return on November 25, 1980, and there was no right to charge for storage of the property beyond that date."
Plaintiffs argue that EVL could not retain possession of the goods absent a valid lien. EVL counters that it had a warehouseman's and carrier's lien, which entitled it to hold the goods until Plaintiffs satisfied their unpaid invoices. (ECF No. 35-1, at 13-24). Plaintiffs dispute the applicability of both types of liens.
In Maryland, a warehouseman's statutory lien is conferred by Md. Code Ann., Com. Law § 7-209. Section 7-209(a) states, in relevant part:
(emphasis added). Plaintiffs assert that the goods at issue are not covered by either a warehouseman's receipt or a storage agreement, "and therefore the essential predicate of a warehouseman's lien is missing." (ECF No. 30-1, at 21).
It is undisputed that after February 24, 2010 — when EVL received Plaintiffs' February 12, 2010 letter terminating its services — the parties' relationship was not governed by any contract or agreement. Thus, EVL's contention that it could retain the goods received after February 24, 2010 pursuant to a warehouseman's lien turns on whether the goods are covered by a "warehouse receipt."
It is far from certain whether the document reproduced in Defendant's opposition brief purporting to be a warehouseman's receipt actually qualifies as such. (See ECF No. 35-1, at 15). The date of such receipt is not readily apparent from the reproduction, and it does not appear to provide any identification of the goods to which it pertains. Moreover, Plaintiffs provide documents which their attorney declares Mr. Georgakopoulos identified "as being a representative sample of EVL's warehouse receipt." (ECF No. 30-19 ¶ 6 & ECF No. 30-24). According to Plaintiffs, Exhibits D5 and E6
Defendant asserts, however, that "attached to each receipt [] are [r]equisition and [i]nvoice/[s]hipping [d]ocuments," and "the OMB form which supplies specific details and codes for the FMS." (ECF No. 35-1, at 15-16). Defendant does not supply legible copies of these documents, however, but contends that "such documentation is more than adequate to constitute a warehouse receipt." (Id. at 16). Plaintiffs dispute that the requisition and invoice/shipping documents or the OMB form were issued by EVL or that such documents qualify as warehouse receipts.
The only evidence on the record which suggests — albeit obliquely — that EVL issued warehouse receipts is deposition testimony from Mr. Georgakopoulos:
(ECF No. 30-26, at 12-13) (emphases added). Plaintiffs dispute that EVL ever sent warehouse receipts to them for the goods it is holding, however, including goods received after February 24, 2010. Plaintiffs supply a declaration from Andreas Nikomanis, Captain in the Hellenic Armed Forces, stating that "EVL has never submitted to HAF any documents purporting to be warehouse receipts or bills of lading with respect to the goods belonging to HAF that are in EVL's possession." (ECF No. 37-3 ¶ 4). Captain Nikomanis further avers that "[w]ith respect to the goods belonging to HAF that are in EVL's possession, EVL has never submitted to HAF any documents of the type reproduced on pages 15, 16,
Plaintiffs argue in their reply memorandum that "[a]ssuming EVL has a lien, as to any given item the lien extends only to charges associated with that item; it does not also secure the payment of charges associated with different items." (ECF No. 37, at 13). Md. Code Ann., Com. Law § 7-209(a) states, in relevant part:
(emphases added). The comments to the statute explain the distinction between a specific and general lien under the statute:
Id. cmt. 1 (emphases added). Plaintiffs believe that EVL must be asserting a general lien "since it is withholding goods to secure the payment of charges associated with goods that it had previously delivered to HAF." (ECF No. 37, at 13).
A specific lien entitles the warehouseman to fees relating specifically to goods remaining in the warehouse for which warehouse receipts had been issued. A general lien attaches to any goods in the warehouseman's possession, regardless of whether the charges asserted relate to those goods, but whether a general lien exists depends on the language in the warehouse receipt. See, e.g., In re Julien Co., 141 B.R. 359, 368 (Bkrtcy.W.D.Tenn. 1992) ("Clearly, the terms of UCC § 7-209(1), when ascribed their ordinary natural meanings, dictate that warehousemen may in fact assert a lien on goods in their possession for like charges or expenses in relation to other goods received from the same depositor if a warehouse receipt was issued and if [] it is stated in the receipt that a lien is claimed for charges and expenses in relation to other goods whether or not the other goods have been delivered elsewhere." (internal quotation marks omitted)).
The parties' memoranda leave much to be desired with respect to the impact of a specific or general lien and whether EVL can condition release of goods received after February 24, 2010 on Plaintiffs' satisfaction of invoices issued in connection with pre-February 24, 2010 goods on which there was no lien. At this juncture, it cannot be said as a matter of law that Defendant does not have a warehouseman's lien on goods received after February 24, 2010.
Defendant also asserts that a carrier's lien, Md. Code Ann., Com. Law § 7-307, entitles it to retain the goods it received after February 24, 2010. (ECF No. 35-1, at 22). In their reply, Plaintiffs preliminarily argue that EVL only proposed its carrier's lien theory for the first time at the summary judgment stage and that this theory should be rejected. There is no indication that EVL discovered for the first time at the summary judgment stage that a basis existed to assert a carrier's lien defense, but, nevertheless, Plaintiffs have had an opportunity to respond to the merits of this theory in their reply.
Md. Code Ann., Com. Law § 7-307 covers carrier's lien:
(emphasis added). A "bill of lading" means "a document evidencing the receipt of goods for shipment issued by a person engaged in the business of transporting or forwarding goods." Md.Com.Law Code Ann. § 1-201(b)(6). The comments to Section 7-307 explain:
Md.Com.Law Code Ann. § 7-307, cmts. 1, 3 (emphases added).
Darby v. Baltimore & O.R. Co., 259 Md. 493, 498 (1970), explained:
Defendant argues that "[i]n this case[,] there were goods that EVL paid for transportation and in some cases provided the transportation, pursuant to a bill of [lading]." (ECF No. 35-1, at 22). In its opposition, Defendant reproduces a copy of what it purports to be a bill of lading, but does not produce specific evidence that establishes EVL's entitlement to a carrier's lien. (Id. at 23). In cases where EVL paid for transportation costs of another carrier, "it was the carrier that issued the bill of lading and provided the transportation that had a lien, and that carrier gave up the lien when it delivered the goods." (ECF No. 37, at 12). As for situations where EVL "provided the transportation," again, EVL does not offer any specific information as to what goods it transported, when, and whether it issued a bill of lading for such goods. A carrier's lien is specific, thus EVL needed to have issued a bill of lading for all the goods received after February 24, 2010. Defendant has supplied no evidence that any bills of lading were issued with respect to the items EVL is holding. See, e.g., Lee, 55 Md.App. at 636 ("It appears, however, that the tractor-trailer was not covered by a bill of lading, as is required to establish a carrier's lien. Bills submitted to the owner for towing and storage costs to date, cannot, we think, be considered bills of lading; there is no evidence that the bills dated at least six weeks after the vehicle was towed purported to be an acknowledgement of receipt of the vehicle, a contract of carriage, or a document of title."). Accordingly, Defendant has not established a carrier's lien.
Finally, Plaintiffs contend that "EVL is also liable for damages due to its wrongful detention of the property." (ECF No. 30-1, at 25). Plaintiffs state that they do not "seek in this motion to have [their] damages quantified, but merely ask[] for a finding that EVL is liable for damages in an amount to be proved at trial." (Id. at 26). As discussed above, however, there are genuine disputes of material fact regarding whether Defendant's retention of goods received after February 24, 2010 is wrongful. Moreover, insofar as Plaintiffs seek a ruling on Defendant's liability for damages, their motion is overly broad. Plaintiffs do not specify on what cause of action EVL is liable for damages. They also do not spend any time in their papers explaining how they have proven Defendant's liability for damages on any particular cause of action.
With regard to EVL's counterclaims, Plaintiffs contend that the court should enter partial summary judgment in their favor on: (1) EVL's claim for storage fees; (2) EVL's claim with respect to those invoices received by HAF before January 23, 2010; and (3) on EVL's claim for punitive damages. (ECF No. 30-1, at 26).
Both parties' memoranda regarding EVL's counterclaims are problematic. Again, the parties' arguments are framed in terms of the requested relief and not the causes of action pursuant to which the respective relief is sought. For instance, Plaintiffs assert that they "have shown that EVL had no right to retain the goods and any cost that it has incurred in storing them constitute a self-inflicted wound." (Id.). For the reasons discussed above, there is a genuine dispute of material fact regarding whether EVL's retention of the goods was wrongful after February 24, 2010. Accordingly, Plaintiffs' contention that Defendant is not entitled to storage fees as a matter of law is unavailing.
Plaintiffs assert that "[w]ith regard to most of its invoices, EVL's claim is barred by the statute of limitations." (ECF No. 30-1, at 26) (emphasis added). Plaintiffs contend that EVL filed counterclaims on July 16, 2013, and the statute of limitations was tolled for 115 days by agreement of the parties. (See ECF Nos. 30-20, 30-21, 30-22). Plaintiffs take the position that "EVL's counterclaim is time-barred to the extent it accrued more than three years and 115 days before the filing of the counterclaim on July 16, 2013 — i.e., insofar as it accrued before March 23, 2010." (Id.) (emphasis added).
The statute of limitations is an affirmative defense that ordinarily must be pleaded and proven by the party asserting it. See Newell v. Richards, 323 Md. 717, 725 (1991) ("As a general rule, the party raising a statute of limitations defense has the burden of proving that the cause of action accrued prior to the statutory time limit for filing the suit."). The burden is on Plaintiffs to show that the statute of limitations has run. See, e.g., Clifton D. Mayhew, Inc. v. Blake Const. Co., Inc., 482 F.2d 1260, 1262 (4
Presumably, Plaintiffs lodge the statute of limitations argument with respect to the breach of contract counterclaim. In support of their breach of contract counterclaim, EVL asserts that "[u]nder the terms of Contract No. 100/09[, Plaintiffs] had a duty to pay the outstanding fees due to EVL on a monthly basis but, in fact, often failed to make its payments in a timely manner under the contract and currently has obligation due to EVL in the amount of $2.18 million and without justification is refusing to make payment of the invoices." (ECF No. 8 ¶ 23).
Plaintiffs believe that the statute of limitations bars EVL's claims with respect to any invoices that were received by the appropriate branch of the Hellenic Armed Forces before January 22, 2010, which would have made payment due within sixty days — March 23, 2010. Plaintiffs argue that timeliness should be measured as to each invoice that Defendant sues on, analogizing to the rule that when a debt is payable in installments, the statute of limitations runs separately on each installment that is not paid when it comes due. Plaintiffs believe that any payments made by them during the limitations period pertaining to a specific invoice did not toll the running of the statute as to other unpaid invoices.
"A civil action at law shall be filed within three years from the date it accrues unless another provision of the Code provides a different period of time within which an action shall be commenced." Md. Code Ann., Cts. & Jud. Proc. § 5-101. In contract cases, the statute of limitations generally "begins to run from the date of the breach, for it is then that the cause of action accrues and becomes enforc[ea]ble." Mayor and Council of Federalsburg v. Allied Contractors, Inc., 275 Md. 151, 157 (1975). Plaintiffs cite Avery v. Weitz, 44 Md.App. 152, 154-155 (1979), for the proposition that with a contract requiring payment in installments, the statute of limitations begins to run on each payment when that particular installment is due. Avery involved a promissory note requiring monthly payments in installments.
Plaintiffs incorrectly argue that the situation here is akin to a note payable in installments. A note payable in installments involves an overall contract requiring fixed incremental payments to fulfill a total obligation due under the note. Here, however, there was no overall contract that required Plaintiffs to pay a fixed sum to fulfill an overall obligation due under the contract. Instead, the amount Plaintiffs had to pay on each invoice depended on the items received. Plaintiffs contend that "[e]ach invoice represented a separate demand for payment that was independent of the other invoices, and any time an invoice was not paid by the time payment came due, a claim accrued for that amount." (ECF No. 30-1, at 27). Defendant maintains, however, that Plaintiffs were chronically late in paying the invoices, and did not abide by the payment obligations set forth in Contract No. 100/09. Mr. Georgakopoulos stated in his affidavit that "[f]rom prior to Contract 100/09 and continuing through May of 2010[,] Eagle Van Lines would often have to wait for unexplained long delays in the processing of its invoices and on several occasions included [] actual travel to Greece in an effort to have invoices processed and paid that had been long overdue." (ECF No. 35-2 ¶ 9). Ngai Siu, the accounting manager for Eagle Van Lines, also testified during her deposition that the Greek government would pay only parts of invoices in some cases. (See ECF No. 35-13, at 9). Moreover, the declaration from Captain Nikomanis in the Hellenic Air Force indicates that Plaintiffs fulfilled outstanding invoices for a time period long after the termination of their dealings on February 24, 2010. He states: "[d]espite EVL's refusal to turn over to HAF the goods belonging to HAF that were in its possession, HAF continued for several months to make payments to EVL on its outstanding invoices." (ECF No. 30-17 ¶ 5). His affidavit suggests that Plaintiffs continued to make payments until September 2010, for invoices that became due much earlier. (Id. ¶ 6).
Thus, the obligation to pay within two (2) months may have been altered by the parties' course of conduct, making it unclear when the obligation to pay by Plaintiffs became due (and consequently, when any cause of action for breach of contract accrued on each invoice). Although applying Virginia law to the issue of the statute of limitations on a contract claim, the analysis in Clifton D. Mayhew, Inc. v. Blake Const. Co., Inc., 482 F.2d 1260, 1262-63 (4
(emphasis added); see also Government of United Kingdom of Great Britain and Northern Ireland v. Northstar Services, Inc., 1 F.Supp.2d 521, 524 (D.Md. 1998) ("A general principle of contract law allows for the parties' course of dealing to `give meaning to' the terms of a contract.") (quoting Restatement (Second) of Contracts § 223). Here, each invoice constituted a separate bill for payment, but it is unclear when each bill became due considering the parties' course of dealings. Thus, Plaintiffs have not established that any of Defendant's claims for payment of invoices are time barred.
In their motion for partial summary judgment, Plaintiffs argue that Defendant's claim for punitive damages is barred as a matter of law. First, Plaintiffs contend that they are immune from liability for punitive damages under the Foreign Sovereign Immunity Act ("FSIA"). (ECF No. 30-1, at 28). They cite to 28 U.S.C. § 1606, which states that "a foreign state except for an agency or instrumentality thereof shall not be liable for punitive damages." Plaintiffs state that a foreign state's armed forces constitute political subdivisions of the foreign state, not agencies or instrumentalities. (Id. at 29). Alternatively, Plaintiffs argue that EVL may not recover punitive damages for the types of counterclaims asserted, namely breach of contract. (Id. ("In the absence of an underlying tort claim, EVL cannot possibly recover punitive damages.")). In response, EVL argues that FSIA is inapplicable because the statute only applies where the district court's jurisdiction is premised on the FSIA and not where, as here, subject matter jurisdiction is based on diversity. (ECF No. 35-1, at 30). Although acknowledging the general rule in Maryland that punitive damages may not be recoverable for breach of contract actions, Defendant maintains that it may seek punitive damages here under the principle that such damages are available for torts arising out of a contractual relationship. (Id. at 31-32).
Because punitive damages are not recoverable for breach of contract claims, the court need not determine the applicability of FSIA. See, e.g., Wiggins v. North American Equitable Life Assur. Co., 644 F.2d 1014, 1017 (4
(ECF No. 35-1, at 32) (emphasis added). As an initial matter, under the circumstances, Defendant may not amend the complaint to add a claim for tortious interference with contract at this stage of the proceedings, when the deadlines for amendment of pleadings has long passed and the case is ready to proceed to trial. Moreover, it does not appear that a claim for tortious interference with contract can be made against Plaintiffs considering that they are parties to Contract No. 100/09. See, e.g., Dunnaville v. McCormick & Co., Inc., 21 F.Supp.2d 527, 536 (D.Md. 1998) ("Maryland courts have never permitted recovery for the tort of intentional interference with a contract when both the defendant and the plaintiff were parties to the contract." (quoting Bleich v. Florence Crittenton Servs., 98 Md.App. 123 (1993)); Macklin v. Robert Logan Assocs., 334 Md. 287, 297 (1994) (noting that tortious interference with an economic relationship "is committed when a third party's intentional interference with another in his or her business or occupation induces a breach of an existing contract or, absent an existing contract, maliciously or wrongfully infringes upon an economic relationship."). Accordingly, Defendant may not recover punitive damages from Plaintiffs.
Defendant also moves for partial summary judgment, although the basis for the motion is unclear. (See ECF No. 35-1, at 32-33). First, Defendant seemingly wants the court to rule that Contract No. 47/10 cannot be a binding contract as a matter of law. Defendant states that "[w]hile the ruling on this issue is negligible to the ultimate findings, [] it nevertheless is important in that [Plaintiffs] claim [their] contractual terms eliminate its exposure to the storage [charges] of EVL." (Id.) (emphasis added). As explained above, there is some inconsistency on the record as to whether Contract No. 47/10 ever became a binding contract or whether the parties continued to operate under the terms of Contract No. 100/09 from December 1, 2009 until February 24, 2010.
Second, Defendant argues that Plaintiffs are not entitled to set off the amounts of previous alleged overpayments against amounts that Plaintiffs owe on separate invoices. The issue of Plaintiffs' liability as to breach of contract (and payment of invoices) has not been finally resolved. Indeed, Defendant did not move for summary judgment on its breach of contract claim against Plaintiffs. Accordingly, it is premature at this juncture to determine whether Plaintiffs are entitled to a setoff or reduction in damages before determining whether Defendant is even entitled to damages and on what basis.
For the foregoing reasons, Plaintiffs' motion for partial summary judgment will be granted in part. Defendant's cross motion for partial summary judgment will be denied. A separate order will follow.
(ECF No. 35-2 ¶ 10).
Defendant further argues that "limitation was tolled by judicial exception." (ECF No. 35-1, at 28). EVL suggests that in some cases, the statute of limitations can be tolled by the filing of a claim in the wrong forum. (Id. at 28-30). Although neither party has provided the full procedural posture of this case prior to its inception in this court, Defendant maintains that "[t]he case in Greece was instituted in June 2010 and did not conclude until June 2011." (Id. at 30). Defendant cites to an excerpt from Mr. Georgakopoulos's deposition, in which he states that a witness testified in the case in Greece in 2010 that the invoices were not paid by Plaintiffs. (ECF No. 35-1, at 29-30). Defendant does not argue, however, that EVL asserted its counterclaims in the Greek lawsuit. Plaintiffs confirm that EVL did not assert its own claims against Plaintiffs in the case filed in Greece. (ECF No. 37-7 ¶ 5). Accordingly, the proceeding in Greece initiated by Plaintiffs does not toll the statute of limitations on claims asserted by EVL against Plaintiffs in the instant matter.
The burden to prove statute of limitations, an affirmative defense, is on Plaintiffs, however.