ELLEN LIPTON HOLLANDER, District Judge.
This case arises from a dispute concerning the Baltimore Red Line Project, a proposed east-west mass transit line to serve Baltimore City and Baltimore County ("Red Line Project" or "Project"). See generally ECF 1 ("Complaint").
Plaintiff John Cutonilli, who is self-represented, has sued the Federal Transit Administration ("FTA") and the Maryland Transit Administration ("MTA") (collectively "Agencies"), defendants, alleging that they failed to comply with "federal environmental laws" in regard to the Project. ECF 1, Complaint. He complains that defendants improperly rejected his proposed alternative for the Project.
According to plaintiff, "no single mode" of transit is appropriate. Id. ¶ 13, Complaint. Among other things, plaintiff claims his proposal made "extensive reuse of existing transit corridors," id. ¶ 22, and "uses an existing transit corridor rather than forcing the route through a dense section of the city. . . ." Id. ¶ 21. Moreover, plaintiff alleges that defendants have, inter alia, failed to "rigorously explor[e] and objectively evaluat[e] all reasonable alternatives" prior to making their selection as to the Preferred Alternative for the Project, id. ¶ 29, in violation of the National Environmental Policy Act ("NEPA"), 42 U.S.C. § 4321 et seq., and its implementing regulations, at 40 C.F.R. § 1500 et seq.
Plaintiff also contends that defendants "failed to insure the professional integrity, including scientific integrity" of the Project's environmental impact statement,
Plaintiff seeks, inter alia, (1) a declaratory judgment that defendants' environmental impact statement in connection with the Project is "legally inadequate"; and (2) an injunction directing defendants to withdraw the ROD, which approved the Preferred Alternative, and to prepare a supplemental environmental impact statement "that includes all reasonable alternatives." See id. at 9 (Prayer for Relief).
The central issues in this dispute focus on whether the Agencies' process for selecting the Preferred Alternative and preparing an environmental impact statement for the Project complied with NEPA. These issues implicate plaintiff's claim that his proposal was not adequately considered or addressed. Notably, this is not an action to "derail" the entire Project. Indeed, the practicality, economic feasibility, or wisdom of the Red Line Project are not issues before this Court.
Both defendants have moved for summary judgment. The MTA's motion (ECF 44) is supported by a memorandum of law (ECF 44-2, "MTA Memo."). I shall refer to ECF 44 and ECF 44-1 collectively as the "MTA Motion." The FTA's motion is at ECF 45, and is also supported by a memorandum of law (ECF 45-1, "FTA Memo."). I shall refer to ECF 45 and ECF 45-1 collectively as the "FTA Motion." And, I will refer to the MTA Motion and the FTA Motion collectively as the "Motions." Plaintiff filed a "Motion in Opposition to the Motions for Summary Judgment" (ECF 47), supported by a "Memorandum" (ECF 47-1) (collectively, "Opposition"). Both defendants filed replies. See ECF 50 ("MTA Reply"); ECF 51 ("FTA Reply").
The parties' submissions focus primarily on the Administrative Record. It was compiled and submitted by the FTA, and consists of nineteen DVD's that contain over 145,000 pages of documents.
The Motions have been fully briefed, and no hearing is necessary to resolve them. See Local Rule 105.6. For the reasons that follow, I will grant the Motions.
The factual background is drawn primarily from the Administrative Record. The documents in the Administrative Record span more than ten years. Due to the size of the Administrative Record—more than 145,000 pages—it does not appear electronically on the Court's CM/ECF system. ECF 38 ("Notice of Lodging Administrative Record"); ECF 42 ("Notice of Lodging Supplemental Administrative Record").
Cutonilli is a professional engineer who resides in Baltimore. ECF 1 ¶ 5, Complaint. He lives within the corridor to be served by the Red Line Project. Id.
The Maryland Transit Administration is an agency of the Maryland Department of Transportation. Id. ¶ 7. It served as the Project sponsor. AR_000001, ROD. In that capacity, the MTA assisted in the alternatives screening process, and it prepared various technical analyses for inclusion in the environmental impact statement ("EIS"), discussed infra. Id. at ARI_000002.
The Federal Transit Administration is an agency within the United States Department of Transportation. ECF 1 ¶ 6, Complaint. It served as the "lead federal agency" in the environmental review of the Project. AR_000001, ROD. In its capacity as lead agency, the FTA was responsible for supervising the preparation and issuance of the Project's EIS, in compliance with NEPA. 40 C.F.R. § 1501.5(a).
Title 40 of the Code of Federal Regulations is titled "Protection of Environment." Chapter V concerns the "Council on Environmental Quality" ("CEQ"). The CEQ is "the executive agency responsible for promulgating regulations that implement NEPA." Defender of Wildlife v. N.C. Dep't of Transportation, 762 F.3d 374, 393 n.12 (4th Cir. 2014); see 42 U.S.C. § 4342; 42 Fed. Reg. 26967 (May 25, 1977).
Prior to taking any "action[ ] with effects that may be major and which are potentially subject to Federal control and responsibility," 40 C.F.R. § 1508.18, an agency is required to prepare an EIS, both in draft and in final form. Id. § 1502.4; see §§ 1502.09; 1502.10. Actions considered major are "new and continuing activities, including projects and programs entirely or partly financed, assisted, conducted, regulated, or approved by federal agencies. . . ." Id. § 1508.18(a).
An EIS is a decision-making tool that, inter alia, must provide a "full and fair discussion of significant environmental impacts" of the proposed federal action, and "shall inform decisionmakers and the public of the reasonable alternatives which would avoid or minimize adverse impacts or enhance the quality of the human environment." Id. § 1502.1. Among other things, the EIS must include a statement that "briefly specif[ies] the underlying purpose and need to which the agency is responding . . ." through the proposed federal action. Id. § 1502.13.
The preparation and publication of the EIS are completed in four stages: a notice of intent that an EIS will be prepared and considered; a draft EIS; a final EIS; and a record of decision. Id. §§ 1501.7; 1502.9; 1505.2. The notice of intent is published in the Federal Register. Id. § 1501.7. Its publication signals the initiation of the scoping phase. During the scoping phase, public outreach is performed to identify the major issues implicated by a project and to be analyzed in depth by the EIS. Id. The draft EIS provides a detailed description of the project proposal, a statement of the purpose and needs of the project, reasonable alternatives, and the affected environment. Id. §§ 1502.9; 1502.10. It also presents analysis of the anticipated beneficial and adverse environmental effects of the alternatives. Id. § 1502.10.
Following a formal comment period with respect to the draft EIS, the final EIS is developed and issued. Id. § 1502.9(b). The final EIS "shall respond to comments", id., received with respect to the draft EIS. § 1502.9(a); see also § 1503 (pertaining to comments). The final EIS shall also identify, based on information and analysis, the agency's "preferred alternative or alternatives" for the project. Id. § 1502.14(e). Section 1502.14 states that this analysis of alternatives is "the heart" of the EIS.
The final step of the EIS process is the publication of the record of decision. The ROD sets forth an agency's final selection of a plan for a project. Id. § 1505.2(a). It alsoidentifies, inter alia, the "environmentally preferable" alternative for the proposed federal action. Id. § 1505.2(b). In addition, the record of decision shall identify all alternatives that were considered by the agency in reaching its decision, an explanation of practicable mitigation measures to ameliorate detrimental environmental effects identified in the scoping process, and a program to implement any mitigation measures. Id. § 1505.2(b)-(c).
"An agency may discuss preferences among alternatives based on relevant factors including economic and technical considerations. . . ." 40 C.F.R. § 1505.2(b). In selecting a project plan, "[i]f the adverse environmental effects of the proposed action are adequately identified and evaluated [in the EIS], the agency is not constrained by NEPA from deciding that other values outweigh the environmental costs." Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350 (1989) (citations omitted).
As noted, the FTA issued the ROD on February 28, 2013. It approved the Agencies' Preferred Alternative for the Red Line Project. AR1_000001-001230, ROD. Pursuant to a CEQ regulation entitled "Mandate," 40 C.F.R. § 1500.3, "[i]t is the [CEQ's] intention that judicial review of agency compliance with these regulations not occur before an agency has filed the final environmental impact statement, or has made a final finding of no significant impact. . . . Furthermore, it is the Council's intention that any trivial violation of these regulations not give rise to any independent cause of action."
The FTA and the MTA jointly developed the Project to improve public transit efficiency in the "project study corridor," which extends at its western terminus from the vicinity of the Centers for Medicare and Medicaid Services in Baltimore County eastward to the Johns Hopkins Bayview Medical Center campus in Baltimore City" ("Study Corridor" or "Corridor").
As to the objective of the Project, the statement of purpose as listed in the Record of Decision provides, AR1_000003, ROD:
The Project's statement of needs as stated in the Record of Decision provides, AR1_000003, ROD:
The development of the Red Line Project began in 2002, when the Baltimore Region Rail System Plan Advisory Committee issued its Baltimore Region Rail System Plan. Id. at AR1_000004. The plan recommended expansion of the existing rail service system and prioritized the development of the Red Line as the "first east-west rail transit line in Baltimore." Id. Shortly thereafter, the Baltimore Region Transportation Board ("BRTB"), the official Metropolitan Planning Organization for the Baltimore region, incorporated an east-west rail transit line into its Long-Range Transportation Plan.
Since the inception of the Project, a key criterion of the analysis of viable alternatives is whether the plan would qualify for funding under the federal New Starts program. New Starts is a discretionary, federal funding program that supports locally planned and operated transit projects. AR1_001307, FEIS; see 49 U.S.C. § 5309(b). To qualify for New Starts funding, a project must be "cost effective," an FTA measure of the "long-term benefits of the proposed project compared to the capital and operating costs of the project." AR1_006668, FEIS, Appendix G, Heavy Rail Technical Memorandum dated February 2008 ("Heavy Rail Technical Report").
On April 11, 2003, the FTA and the MTA published a Notice of Intent ("Notice") to prepare a draft environmental impact statement ("DEIS")
The publication of the Notice launched the Project's scoping phase, an "ongoing public outreach process" that lasted for years, during which the Agencies sought public feedback on issues implicated by the Project. AR1_001307, FEIS; see AR1_001839, FEIS; AR1_009392, AA/DEIS. Scoping meetings for the Project were held throughout the Corridor in May and June 2003, including a regulatory agency meeting at the Baltimore Metropolitan Council and five public meetings at various locations. AR1_000016, ROD. The scoping process generated over 150 written comments from the public, elected officials, and federal, state, and local regulatory agencies. See AR2_100638-100646, Scoping Process Report dated October 2004. The scoping process also "identified initial alignments and transit modes to consider for the Red Line." AR1_001307, FEIS.
According to the MTA, "[o]ver the next few years, the public outreach process continued." ECF 44-2 at 4, MTA Memo. In its motion, MTA elaborates on the Agencies' efforts to encourage public participation, stating, id. (citations to the Administrative Record omitted):
Between 2005 and 2007, the FTA and the MTA performed "an alternatives screening process which identified a range of alternatives for detailed study in the AA/DEIS. . . ." AR1_000002, ROD. Throughout the screening process, when assessing the viability of various alternatives for the Project, the FTA and the MTA measured the proposals against the following criteria, AR1_001308, FEIS (internal reference omitted):
According to the FEIS, based on a preliminary screening, two modes of transportation— commuter rail and heavy rail—"were considered, but eliminated" from further study early in the screening process. AR1_001307, FEIS. The FEIS describes commuter rail as best suited for longer distances from suburban and rural communities to more densely populated employment centers. Id. As a result, the Agencies determined that commuter rail was not a reasonable alternative because the Corridor did not encompass the distances for which it is best suited. AR1_000004, ROD.
Heavy rail is akin to the Metro rail system in Baltimore (i.e., the subway system). AR1_001305, FEIS. The FEIS indicated that there was strong public interest in that particular mode of transportation. AR1_001309, FEIS. Due to the strong public interest in a heavy rail alternative, the Agencies analyzed the option in detail. AR1_001309-AR1_001310, FEIS; AR1_006655-AR1_00688, FEIS, Appendix G, Heavy Rail Technical Report. Nevertheless, the Agencies ultimately concluded that heavy rail is not a reasonable alternative, AR1_000004-AR1_000005, ROD, because of concerns related to technical feasibility and capital costs. AR1_001309, FEIS. The FEIS explains that a heavy rail transit system "must be physically separated from its surrounding environment" due to it its power source, an electrified third rail. Id. As a result, construction of a heavy rail system would require substantial tunnel and bridge construction to ensure total separation of the power source from the surrounding environment. Id. The capital costs of such construction are significant as compared to light rail and bus line alternatives. Id.
Additional study by the MTA of two heavy rail options confirmed its substantial cost. The first option examined by the MTA was 14.3 miles of heavy rail from the Social Security Administration in Woodlawn, Baltimore County to "Greektown" in east Baltimore City. AR1_001309, FEIS. The estimated cost was $759 million more than the Preferred Alternative ($3.334 billion compared to $2.575 billion). Id. The second alternative of heavy rail combined three modes of transportation—heavy rail, light rail, and streetcar. Id. at AR1_001310. This hybrid model that was analyzed is described in the FEIS as follows, id.:
This hybrid alternative, incorporating heavy rail, was projected to cost $2.518 billion, a cost comparable to the Preferred Alternative according to the Agencies. Id. Nonetheless, as explained by the Agencies in the FEIS, the hybrid alternative was not pursued for three reasons, id.:
After the elimination of commuter rail and heavy rail, the four alternatives carried forward by the Agencies for detailed study in the AA/DEIS were: (1) No-Build, (2) Transportation System Management ("TSM"), (3) Bus Rapid Transit ("BRT"), and (4) Light Rail Transit ("LRT"). AR1_000005-AR1_000006, ROD; AR1_009302, AA/DEIS. The ROD and several reports prepared during the EIS process offer descriptions of each of these four alternatives.
The ROD describes Alternative 1, "No-Build," as "represent[ing] the future conditions of transportation facilities and services if the Red Line is not built." AR1_000006, ROD. It adds: "The No-Build Alternative did not meet the purpose and needs [of the Project], but was advanced for detailed study, as required by NEPA. It provides a point of comparison for assessing the benefits and impacts of the other alternatives." Id.
With respect to Alternative 2, "TSM," the ROD explains that it would consist of "upgrades to existing transit service" in the Corridor, but would not include construction of a new transit line. AR1_000006, ROD; see AR2_100636, Scoping Process Report dated October 2004. The Agencies concluded: "The TSM Alternative did not meet the purpose and needs [of the Project], but was advanced for detailed study in the AA/DEIS because consideration of a TSM Alternative was required by FTA as part of an Alternatives Analysis under the New Starts funding program." AR1_000006, ROD.
As to Alternative 3, "BRT," the FEIS characterized it as a "faster and more efficient version of traditional bus service," in which buses operate on exclusive rights-of-way or on roadways that permit buses to bypass congestion through traffic signal prioritization. AR1_009284, FEIS; see AR2_100636, Scoping Process Report dated October 2004. Six "representative combinations of alignments" for BRT were studied by the Agencies in detail in the AA/DEIS, AR1_000006, ROD:
Finally, the Scoping Process Report dated October 2004 explains Alternative 4, "LRT," as an "electric railway system," which can operate "single cars or short trains" along fixed tracks on aerial structures and at ground level in mixed traffic or in dedicated traffic lanes. AR2_100636, Scoping Process Report dated October 2004. According to the FEIS, LRT is powered by overhead lines, as opposed to an electrified third rail, which is necessary for heavy rail transit. AR1_009284, FEIS. Four "representative combinations of alignments" for LRT were studied in detail by the Agencies, AR1_000006, ROD:
The detailed evaluation of these twelve variations of the four alternatives culminated in the issuance of the AA/DEIS in September 2008. AR1_009243-009525, AA/DEIS. "The AA/DEIS provided information about the trade-offs among the alternatives, but did not identify a preferred alternative." AR1_001311, FEIS. From October 3, 2008, to January 5, 2009, the AA/DEIS was "circulated for public and agency comment. . . ." AR1_000002, ROD; see AR1_001871, FEIS. More than 500 citizens attended four public hearings held at various locations in the Corridor. AR1_000016, ROD. During this process, the Agencies received 729 comments on the AA/DEIS from individuals and organizations, including six petitions and recorded testimony. AR1_001312, FEIS.
With support found in the Administrative Record, the MTA summarizes its public outreach following the issuance of the AA/DEIS, ECF 44-2 at 6, MTA Memo. (internal citations to the Administrative Record omitted):
Several agencies submitted comments concerning the AA/DEIS. They included the United States Environmental Protection Agency, the Maryland Department of Planning, the Baltimore City Health Department, and the Baltimore City Department of Transportation. AR1_001884, FEIS.
The FTA's New Starts program requires the local project sponsor to identify the Locally Preferred Alternative ("LPA"), as part of the application for funding. AR1_000006, ROD. In August 2009, after review of the public and agency comments concerning the AA/DEIS, the Governor of Maryland, ECF 44-2 at 6, MTA Memo., with agreement from Baltimore City and Baltimore County, announced the LPA. Id. at AR1_000002.
The LPA is "an approximately 14-mile LRT alignment from CMS in Baltimore County to Johns Hopkins Bayview Medical Center campus in Baltimore City, with tunnel alignments under Cooks Lane and through downtown from Martin Luther King, Jr. (MLK Jr.) Boulevard to Boston Street." Id. at AR1_000002. The LPA is a modification of Alternative 4C in the AA/DEIS—an LRT alternative with "downtown tunnel + Cooks Lane tunnel + dedicated surface" set forth in the AA/DEIS. Id. at AR1_000006. But, it "included several design refinements to address public comments, optimize cost effectiveness, and meet engineering and transit operation requirements." Id. at AR1_000007.
Ultimately, LRT was selected as the LPA over BRT for several reasons set forth in detail in the FEIS. AR1_001312, AR1_001316, FEIS. According to the Agencies, some of the advantages of LRT over BRT include greater projected ridership, faster travel times, stronger public support for LRT, cost-effectiveness under the New Starts criteria, and greater potential to attract new transit riders. AR1_001312, AR1_0011316, FEIS.
The FTA asserts, ECF 45-1 at 12, FTA Memo. (internal citations to the Administrative Record omitted):
After the announcement of the LPA, the MTA performed further research and solicited additional public comment to refine its analysis of the alternatives. ROD, AR1_000002. As the ROD explains, id.:
The results of the technical studies, public input on the LPA, and the definition of the Preferred Alternative were presented in the FEIS.
Statement and Draft Section 4(f) Evaluation.
As noted, the FEIS carried forward two options for further study: the Preferred Alternative and the No-Build Alternative. FEIS, AR1_001326. The No-Build Alternative is the "foundation for comparing all of the other alternatives." AR2_1006386, Scoping Process Report dated October 2004. It "consist[s] of existing and programmed transit and roadway improvements." Id. The Preferred Alternative is characterized by the Agencies as the product of several refinements to the LPA. AR1_001303, FEIS. It is described in further detail in the FEIS, as follows, id. at AR1_001329:
The MTA explains, ECF 44-2 at 11, Motion:
Of the Preferred Alternative's nineteen stations, fourteen would be surface stations and five would be underground. AR1_001333, FEIS.
The Agencies' projected cost of Preferred Alternative, "based on the construction schedule, escalation, and inflation while the Red Line is being constructed," is $2.223 billion "in 2012 dollars." AR1_001360, FEIS. "The cost estimate at the start of Red Line service in 2021 is $2.575 billion in year of expenditure dollars." Id.
In the FEIS, the Agencies presented analyses as to the Project's potential impacts on affected environmental resources. They used a variety of scientific methodologies to evaluate various aspects of the Project, including air quality and natural resources. AR_006124-008864, FEIS, Technical Reports.
The FEIS Notice of Availability was published in the Federal Register on December 14, 2012, initiating a 45-day period for public comment. 77 Fed. Reg. 74479. During this period, the Agencies received 243 written comments concerning the FEIS. AR1_000017, ROD. Many of the comments were submitted from individuals, organizations, and businesses in the Canton area of Baltimore City, part of the Corridor. Id. As discussed, infra, the ROD provided a summary of the primary concerns raised by these comments.
On February 28, 2013, the FTA issued the final phase of the EIS, its ROD, AR1_000001-000023, plus attachments. See AR1_000024-001230. The ROD approved the Preferred Alternative set forth in the FEIS as in compliance with "relevant environmental requirements." AR1_000001, ROD. In particular, the FTA stated that, pursuant to NEPA, the FTA had determined that "the requirements of the National Environmental Policy Act of 1969 (NEPA) have been satisfied for the Red Line project." Id.
With respect to comments received on the FEIS, the ROD offered this summary, AR1_000017, ROD:
The ROD identified common themes and provided responses to these common themes in an attachment to the ROD. AR1_000119-AR1_000120, ROD. To illustrate, in response to several comments concerning the effects upon businesses located on Boston Street during the construction of the Project, the ROD provided this explanation, AR1_000121-AR1_000122, ROD (italics in ROD):
With respect to the remaining comments, the ROD explained that a "matrix" was created which includes all the FEIS comments and the Agencies' responses thereto. AR1_000017, ROD. According to the ROD, the matrix "identifies the commenter name or affiliation, the issues raised by each commenter, and an associated comment code. Each comment included in the table has been categorized based on the main point of the comment. A total of 45 different comment categories have been identified." Id.
Notwithstanding comments as to the FEIS, the ROD approved the Preferred Alternative as proposed in the FEIS. AR1_000001, ROD.
Mr. Cutonilli has been a very active participant in various phases of the EIS process.
Plaintiff submitted numerous comments concerning the Project to the Agencies, and received several responses from the Agencies. In addition to comments submitted to the MTA and the FTA, see note 24, Mr. Cutonilli also communicated with other agencies that were involved, in some way, with the Red Line Project. See, e.g., AR2_054359-054364, Letter from Regina Aris, Acting Director, Baltimore Metropolitan Council, Transportation Planning Division, to Mr. Cutonilli dated November 18, 2009.
On October 26, 2004,
Cutonilli attended another Public Open House on November 13, 2007. Id. He contends that at this meeting he became aware of other alternatives that were not being evaluated in detail, including heavy rail transit. Id. Therefore, plaintiff joined "certain transit advocacy groups." Id. He began to attend the Red Line Citizen's Advisory Council ("CAC") meetings to learn more about the process. CAC Member Attendance Sheet dated December 13, 2007, AR2_074760; ECF 47-1 at 28, Opposition. At these meetings, the Agencies presented more detailed information about their progress on the Project. ECF 47-1 at 28, Opposition. Members of the public also spoke to the Agencies about issues regarding the various alternatives under consideration. Id.
On November 6, 2008, Mr. Cutonilli testified at a public hearing about the DEIS. AR1_002388-002389, Public Hearing Testimony of Mr. Cutonilli on the DEIS dated November 6, 2008 ("Oral DEIS Comment").
As set forth in plaintiff's detailed Written DEIS Comment, Cutonilli's BRT segment would use "existing infrastructure in the [MARC] Penn Line,
To formulate cost projections for his alternative, Mr. Cutonilli used "gross estimates of costs obtained from the DEIS." Id. According to Mr. Cutonilli, the total cost for his alternative would be approximately $1.135 billion. Id. Mr. Cutonilli assured the Agencies in his Written DEIS Comment that his alternative "will probably meet the FTA cost effectiveness guidelines if additional analysis is conducted." Id.
The MTA and the FTA responded to plaintiff's proposal and their response is included in the FEIS, issued on December 4, 2012. AR1_002388-002390, FEIS ("Agencies' Response"). In the Agencies' Response, they indicated that Mr. Cutonilli's proposal was "infeasible from a capital cost standpoint" because the "BRT portion of [Mr. Cutonilli's] alternative would require a very expensive, 45-foot diameter tunnel under Cooks Lane and would also require all passengers to transfer from BRT to heavy rail, increasing transit travel times and decreasing ridership." Id. at AR1_002388.
The Agencies also noted that much of the proposed heavy rail portion of Mr. Cutonilli's alternative was considered as part of the heavy rail alternative analyzed for both the DEIS and in the heavy rail technical analysis. Id. They also explained that the other parts of Mr. Cutonilli's alternative were considered and determined not to meet the purpose and needs for the Project. Id. In particular, among other things, the Agencies challenged the proposed alternative as cost prohibitive and expressed concern about the need for travelers to transfer, given the dual modes of transportation. Id. at AR1_002388-AR1_2390.
In addition to the formal response to plaintiff's comment published in the FEIS, the MTA wrote to Mr. Cutonilli personally. In a letter from Diane Ratcliff, MTA Director of Planning, dated January 7, 2009, she explained to Mr. Cutonilli, AR2_061957-061958:
The MTA also pointed out to plaintiff that it did "not see any beneficial financial implications with this idea." Id. at AR2_061958. Further, the letter stated that Mr. Cutonilli's cost projections for his proposed alternative were "based on estimates, some from early Red Line analyses that has [sic] since been enhanced, and do not reflect an alternative that would be better than the selected LPA." Id.
As noted, the FEIS was issued years later, on December 4, 2012. It announced the Agencies' Preferred Alternative. In response, Mr. Cutonilli submitted to the Agencies a written comment on the FEIS dated January 28, 2013. AR1_000889-000895 ("FEIS Comment). In the FEIS Comment, Mr. Cutonilli complained that his proposed alternative was not evaluated adequately. Id. at AR1_000889. He asserted that although his alternative shared certain characteristics with other alternatives studied in detail by the Agencies, it warranted individual consideration because "it differs in more ways than it is similar." Id.
Further, Mr. Cutonilli claimed that although heavy rail was eliminated as a viable alternative for the Project, due to its capital costs, it should be reconsidered because capital could be obtained from "highway funds." Id. Mr. Cutonilli explained, id.:
In addition, plaintiff provided further details about his proposal, id. at AR1_000892:
Mr. Cutonilli also suggested that his proposal is capable of several variations that could "optimize" outcomes. Id. In explaining the malleability of his proposal, he asserted, id.:
In response, Henry Kay, MTA Executive Director for Transit Development and Delivery, sent Mr. Cutonilli an email on May 24, 2013. AR2_000001-000004 ("MTA Emails of May 24, 2013"). Mr. Kay identified several issues with respect to Mr. Cutonilli's proposal, including its cost, the extent to which it would require riders to transfer in light of the two modes of transportation, and the operational challenges. AR2_000001-000004. Regarding the operational challenges, Mr. Kay wrote, AR3_000002 (internal citation omitted):
Nonetheless, plaintiff insists that none of the responses he received from the Agencies adequately addressed his proposal and, in particular, his suggestion as to the use of highway funds or particular railway cars. ECF 47-1 at 8, Opposition. Plaintiff alleges: "[T]he defendants appear to have rejected the plaintiffs [sic] proposal based on other proposals that were more dissimilar than they were similar. They have also lost comments and have provided unsubstantiated responses." Complaint ¶ 29, ECF 1. In plaintiff's view, "[t]hese responses violated 40 C.F.R. 1503.4." Id. In this respect, according to plaintiff, "[t]he Defendants failed to insure the professional integrity, including scientific integrity, of the discussions and analyses in [the] environmental and impact statements (40 C.F.R. 1502.24). This prevented the defendants from rigorously exploring and objectively evaluating all reasonable alternatives including reasonable alternatives not within the jurisdiction of the lead agency. (40 C.F.R. 1502.14)." Id. Plaintiff contends that he "tried on numerous occasions to raise issues with the process and determine if sufficient technical basis could be substantiated. Issues with the public participation process (40 C.F.R. 1506.6) contributed to the failure." Id.
In defendants' Motions, they argue that they have complied with the requirements of NEPA and the applicable federal regulations, and have adequately evaluated and responded to plaintiff's comments in connection with the Red Line Project.
Additional facts are included in the Discussion.
Claims brought under NEPA do not provide a private cause of action. Lujan v. Nat'l Wildlife Fed., 497 U.S. 871, 882 (1990). Rather, the Administrative Procedure Act ("APA," 5 U.S.C. § 701 et seq.) provides for judicial review of a final agency action. See Friends of Back Bay v. U.S. Army Corps of Eng'rs, 681 F.3d 581, 586 (4th Cir. 2012); Lee v. U.S. Citizenship & Immigration Servs., 592 F.3d 612, 619 (4th Cir. 2010); Ohio Valley Envtl. Coal v. Aracoma Coal Co., 556 F.3d 177, 192 (4th Cir. 2009). Notably, "claims brought under the APA are adjudicated without a trial or discovery, on the basis of an existing administrative record. . . ." Audubon Naturalist Soc'y of the Cent. Atl. States, Inc. v. U.S. Dep't of Transp., 524 F.Supp.2d 642, 660 (D. Md. 2007) (citing Citizens for the Scenic Severn River Bridge, Inc. v. Skinner, 802 F.Supp. 1325, 1332 (D. Md. 1991), aff'd, 1992 WL 180138, (4th Cir. July 29, 1992)). Thus, "such claims are properly decided on summary judgment." Audubon, 524 F. Supp. 2d at 660 (citation omitted); see 10B Wright and Miller, Federal Practice and Procedure § 2733 (3d ed. 2007). In this context, "review of the administrative record is primarily a legal question. . . ." Skinner, supra, 802 F. Supp. at 1332.
"The APA provides that a reviewing court is bound to `hold unlawful and set aside agency action' for certain specified reasons, including whenever the challenged act is `arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.'" Friends of Back Bay, 681 F.3d at 586-87 (quoting 5 U.S.C. § 706(2)(A)); see United States v. Bean, 537 U.S. 71, 77 (2002); Camp v. Pitts, 411 U.S. 138, 142 (1973) (per curiam); N. Carolina Growers' Ass'n, Inc. v. United Farm Workers, 702 F.3d 755, 763 (4th Cir. 2012) (quoting 5 U.S.C. § 706(2)). Review under the APA is highly deferential, however, and the agency action enjoys a presumption of validity and regularity. Citizens to Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 415 (1971), abrogated on other grounds, Califano v. Sanders, 430 U.S. 99 (1977); Ohio Valley Envtl Coal. v. Aracoma Coal Co., 556 F.3d 177, 192 (4th Cir. 2009) (citing Natural Res. Def. Council, Inc. v. EPA, 16 F.3d 1395, 1400 (4th Cir. 1993)). The party challenging an agency decision has the burden to demonstrate that the agency action was arbitrary or capricious. Sierra Club v. Marita, 46 F.3d 606, 619 (7th Cir. 1995).
Notably, "[t]he scope of review under the `arbitrary and capricious' standard is narrow and a court is not to substitute its judgment for that of the agency. . . ." Motor Vehicle Mfrs. Ass'n of the United States v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983). In assessing an agency decision, "the reviewing court `must consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.'" Marsh v. Oregon Natural Res. Council, 490 U.S. 360, 378 (1989) (quoting Volpe, 401 U.S. at 416). "Deference is due where the agency has examined the relevant data and provided an explanation of its decision that includes `a rational connection between the facts found and the choice made.'" Ohio Valley Envtl. Coal, 556 F.3d at 192 (quoting Motor Vehicle Mfrs. Ass'n, 463 U.S. at 43); see Trinity Am. Corp. v. U.S. EPA, 150 F.3d 389, 395 (4th Cir. 1998); Clevepak Corp. v. U.S. EPA, 708 F.2d 137, 141 (4th Cir. 1983). However, "[t]he `arbitrary and capricious' standard is not meant to reduce judicial review to a `rubber-stamp' of agency action." Ohio Valley Envtl. Coal, 556 F.3d at 192 (quoting Ethyl Corp. v. Envtl. Prot. Agency, 541 F.2d 1, 34 (D.C. Cir. 1976).
This case involves highly technical issues. Significantly, a court does "not sit as a scientific body, meticulously reviewing all data under a laboratory microscope," and it does not "undertake comparative evaluations of conflicting scientific evidence." Manufactured. Hous. Inst. v. EPA, 467 F.3d 391, 399 (4th Cir. 2006) (internal quotations omitted). As noted, the question is whether the agency followed the proper procedures and provided a rational basis for its decision.
Moreover, "the focal point for judicial review should be the administrative record already in existence, not some new record made initially in the reviewing court." Camp, 411 U.S. at 142. "[C]ourts are to decide, on the basis of the record the agency provides, whether the action passes muster under the appropriate APA standard of review." Fla. Power & Light Co. v. Lorion, 470 U.S. 729, 744 (1985).
As to the court's role in a challenge pursuant to NEPA, the Fourth Circuit decision in Webster v. U.S. Dep't of Agric., 685 F.3d 411 (4th Cir. 2012), is instructive. There, the Court said, id. at 421 (alterations in Webster):
Under Rule 56(a) of the Federal Rules of Civil Procedure, summary judgment is appropriate only "if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." See Celotex Corp. v. Catrett, 477 U.S. 317, 322-24 (1986). The non-moving party must demonstrate that there are disputes of material fact so as to preclude the award of summary judgment as a matter of law. Matsushita Elec. Indus. Co. v. Zenith, Radio Corp., 475 U.S. 574, 586 (1986). As discussed, infra, the parties disagree as to whether summary judgment is appropriate here.
The Supreme Court has clarified that not every factual dispute will defeat the motion. "By its very terms, this standard provides that the mere existence of some alleged factual dispute between the parties will not defeat an otherwise properly supported motion for summary judgment; the requirement is that there be no genuine issue of material fact." Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-48 (1986) (emphasis in original). A fact is "material" if it "might affect the outcome of the suit under the governing law." Id. There is a genuine issue as to material fact "if the evidence is such that a reasonable jury could return a verdict for the nonmoving party." Id.; see Dulaney v. Packaging Corp. of Am., 673 F.3d 323, 330 (4th Cir. 2012).
"A party opposing a properly supported motion for summary judgment `may not rest upon the mere allegations or denials of [its] pleadings,' but rather must `set forth specific facts' showing that there is a genuine issue for trial." Bouchat v. Baltimore Ravens Football Club, Inc., 346 F.3d 514, 522 (4th Cir. 2003) (quoting former Fed. R. Civ. P. 56(e)), cert. denied, 514 U.S. 1042 (2004); see also Celotex, 477 U.S. at 322-24. In resolving a summary judgment motion, a court must view all of the facts, including reasonable inferences to be drawn from them, in the light most favorable to the non-moving party. See Matsushita Elec. Indus. Co., 475 U.S. at 587; see also Greater Baltimore Ctr. for Pregnancy Concerns, Inc. v. Mayor and City Council of Baltimore, 721 F.3d 264, 283 (4th Cir. 2013); FDIC v. Cashion, 720 F.3d 169, 173 (4th Cir. 2013). The "judge's function" in reviewing a motion for summary judgment is not "to weigh the evidence and determine the truth of the matter but to determine whether there is a genuine issue for trial." Anderson, 477 U.S. at 249.
If "the evidence is such that a reasonable jury could return a verdict for the nonmoving party," then a dispute of material fact precludes summary judgment. Id. at 248; see Libertarian Party of Va. v. Judd, 718 F.3d 308, 313 (4th Cir. 2013). On the other hand, summary judgment is appropriate if the evidence "is so one-sided that one party must prevail as a matter of law." Anderson, 477 U.S. at 252. And, "the mere existence of a scintilla of evidence in support of the plaintiff's position will be insufficient; there must be evidence on which the jury could reasonably find for the plaintiff." Id.
Notably, in considering a summary judgment motion, the court may not make credibility determinations. Jacobs v. N.C. Administrative Office of the Courts, ___ F.3d ____, No. 13-2212, 2015 WL 1062673, at *4 (4th Cir. Mar. 12, 2015); Mercantile Peninsula Bank v. French, 499 F.3d 345, 352 (4th Cir. 2007); Black v. Decker Corp. v. United States, 436 F.3d 431, 442 (4th Cir. 2006); Dennis v. Columbia Colleton Med. Ctr., Inc., 290 F.3d 639, 644-45 (4th Cir. 2002). Therefore, in the face of conflicting evidence, such as competing affidavits, summary judgment ordinarily is not appropriate, because it is the function of the fact-finder to resolve factual disputes, including matters of witness credibility. See, e.g., Boone v. Stallings, 583 F. App'x 174, 176 (4th Cir. Sept. 11, 2014) (per curiam).
The National Environmental Policy Act of 1969, 42 U.S.C. §§ 4321-4370(e), "establishes a `national policy [to] encourage productive and enjoyable harmony between man and his environment,' and was intended to reduce or eliminate environmental damage" and to protect "`natural resources important to' the United States." Dep't of Transp. v. Public Citizen, 541 U.S. 752, 756 (2004) (quoting 42 U.S.C. § 4321); see Hughes River Watershed Conservancy v. Glickman, 81 F.3d 437, 443 (4th Cir. 1996) ("NEPA declares a national policy of protecting and promoting environmental quality.") (citing 42 U.S.C. §§ 4321, 4331(a); Robertson v. Methow Valley Citizens Council, supra, 490 U.S. at 348). It is intended to foster better decision-making and informed public participation for actions that affect both people and the natural environment. See 42 U.S.C. § 4321; 40 C.F.R. § 1500.1(c).
As the Court observed in Webster, supra, 685 F.3d at 417, "`NEPA is a procedural statute' that `sets forth a regulatory scheme for major federal actions that may significantly affect the natural environment.'" (Quoting Audubon, supra, 422 F.3d at 184). Projects that are financed or assisted, in whole or in part, by a federal agency must comply with NEPA and follow the procedures established by the CEQ. Defenders of Wildlife v. No. Car. Dep't of Transportation, supra, 762 F.3d at 393 (citing 40 C.F.R. § 1508.18); Webster, 685 F.3d at 417.
To that end, NEPA and the regulatory scheme establish procedures by which federal agencies must assess environmental impact prior to undertaking any "proposed action," "proposal," or "project," so as to ensure the environmental consequences of a proposed course of action are evaluated adequately. Robertson, supra, 490 U.S. at 350. The process ensures that "the public has access to the relevant information about the proposed action so that it can participate in the decisionmaking process." Webster, 685 F.3d at 617; see Hodges v. Abraham, 300 F.3d 432, 438 (4th Cir. 2002).
Once "the adverse environmental effects of the proposed action are adequately identified and evaluated," a federal agency is entitled to "decid[e] that other values outweigh the environmental costs." Id. Notably, although "environmental quality [is] a substantive goal" under NEPA, Glickman, 81 F.3d at 443, NEPA "does not mandate particular results, but simply prescribes the necessary process." Robertson, 490 U.S. at 350; see Glickman, 81 F.3d at 443. Thus, NEPA "merely prohibits uninformed—rather than unwise—agency action." Robertson, 490 U.S. at 351. In this way, "NEPA emphasizes the importance of coherent and comprehensive up-front environmental analysis to ensure informed decision making to the end that the agency will not act on incomplete information, only to regret its decision after it is too late to correct." Ctr. for Biological Diversity v. U.S. Forest Service, 349 F.3d 1157, 1166 (9th Cir. 2003) (internal citation and quotations omitted).
As stated, there are four phases of the procedural process: a Notice of Intent; a draft EIS; a final EIS; and a ROD. 40 C.F.R. §§ 1501-1502.
"Under NEPA, for every `major Federal action[ ] significantly affecting the quality of the human environment,' the agency involved must prepare `a detailed statement' that discloses and evaluates, among other things, `the environmental impact of the proposed action,' unavoidable adverse effects of the proposed action, and `alternatives to the proposed action.'" Defenders of Wildlife, 762 F.3d at 393-94 (quoting 42 U.S.C. § 4332(2)(C)) (alterations in Defenders of Wildlife); see Glickman, 81 F.3d at 443. This detailed statement—referred to as an environmental impact statement or EIS—must `"provide full and fair discussion of significant environmental impacts' arising from the reasonable alternatives." Defenders of Wildlife, 762 F.3d at 394 (quoting 40 C.F.R. § 1502.1).
As indicated, the purpose of public issuance of an environmental impact statement is to "`provid[e] a springboard for public comment' in the agency decisionmaking process itself. . . ." Dep't of Transp. v. Pub. Citizen, 541 U.S. at 768 (citation omitted) (alteration in Public Citizen). The preparation of an EIS "serves the national policy of protecting and promoting environmental quality" because "it ensures that an agency . . . will carefully consider . . . the project's environmental effects." Glickman, 81 F.3d at 443. In addition, the preparation of an EIS "ensures that relevant information about a proposed project will be made available to members of the public so that they may play a role in both the decisionmaking process and the implementation of the decision." Id. (citing Robertson, 490 U.S. at 349).
A federal agency's obligations under NEPA do not terminate with the preparation of an EIS, however. Even after the FEIS is prepared, NEPA requires agencies "to take a hard look at the environmental consequences of their proposed projects. . . ." Glickman, 81 F.3d at 443 (citing Marsh, 490 U.S. at 374); see Webster, 685 F.3d at 418. In the event of "`new circumstances or information relevant to environmental concerns'" as to the proposed action, an agency "must prepare a supplemental EIS. . . ." Glickman, 81 F.3d at 443 (citations omitted). The Supreme Court has observed: "It would be incongruous with [NEPA's] approach to environmental protection . . . for the blinders to adverse environmental effects, once unequivocally removed, to be restored prior to completion of agency action simply because the relevant proposal has received initial approval." Marsh, supra, 490 U.S. at 371. The CEQ regulations mandate that a federal agency prepare a supplemental environmental impact statement if "[t]he agency makes substantial changes in the proposed action that are relevant to environmental concerns," or if "[t]here are significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts." 40 C.F.R. § 1502.9(c)(1)(i)-(ii). The failure to prepare a supplemental EIS requires the reviewing court to "determine whether the agency took a hard look at the proffered new information" and "whether the agency's decision not to prepare a supplemental EIS was arbitrary or capricious." Glickman, 81 F.3d at 443 (citations omitted).
With this framework in mind, I turn to the contentions of the parties.
As a preliminary matter, in his Opposition plaintiff provides a numbered list of twenty-one matters that he characterizes as "Disputes of Material Facts," which he alleges should preclude summary judgment. ECF 47-1 at 1-5, ¶¶ 1-21, Opposition. To illustrate, plaintiff contends that the list of letters and communications related to the Project included in the Agencies' briefs is not comprehensive. Id. at 1 ¶ 2. He also challenges "defendants['] claim that the public involvement process of NEPA were [sic] satisfied. . . ." id. at 4 ¶ 18. In addition, he contests "defendants['] claim that they analyzed a reasonable range of alternatives," id. at 4 ¶ 20, as well as "defendants['] claims that they [met NEPA's] requirements of scientific integrity. . . ." Id. at 4 ¶ 21.
In response to these contentions, the FTA submitted Appendix A to the FTA Reply, which addresses each of plaintiff's alleged disputes of fact point-by-point. ECF 51 at 19-23 ¶¶ 1-21. In sum, the FTA argues that plaintiff's complaints concern immaterial facts or amount to conclusory statements of law. Id.
As noted, summary judgment is appropriate when there is no genuine issue of material fact and the moving party is entitled to judgment as a matter of law. See Fed. R. Civ. P. 56(c); Celotex, supra, 477 U.S. at 322-23. Despite plaintiff's characterization of these disagreements as "[d]isputes of [m]aterial [f]acts," he admits some of the examples he highlights are merely "improper references" made by defendants. ECF 47-1 at 1, Opposition. Such minor discrepancies would not bar summary judgment in this case. "Only disputes over facts that might affect the outcome of the suit under the governing law will properly preclude the entry of summary judgment." Anderson, supra, 477 U.S. at 248. Plaintiff's remaining concerns contemplate the ultimate legal conclusion in this case—whether defendants complied with NEPA—and are thus disputes of law appropriately decided by the court. For these reasons, plaintiff's argument that issues of fact preclude summary judgment must fail.
Plaintiff complains that, in preparing the EIS, the Agencies failed to evaluate all reasonable alternatives, as required by 40 C.F.R. 1502.14. ECF 1 ¶¶ 2, 29, Complaint; ECF 47-1 at 5, Opposition. In particular, plaintiff challenges the Agencies' decision not to select his proposed alternative for more detailed study. ECF 47-1 at 5-6, Opposition.
In response, the FTA and the MTA lodge two significant arguments. First, they contend that plaintiff's proposal did not warrant further study because it was unreasonable. ECF 44-2 at 18, MTA Memo.; ECF 45-1 at 23-24, FTA Memo. In the alternative, they posit that further study of Mr. Cutonilli's proposal was not necessary because his alternative was within the spectrum of alternatives that were evaluated in detail. ECF 44-2 at 16-17, MTA Motion; ECF 45-1 at 18, FTA Memo.
I will address each of these arguments, in turn. Before doing so, I note that, as a preliminary matter, NEPA does not require that every alternative be subject to detailed consideration. Rather, an EIS must only "[r]igorously explore and objectively evaluate all reasonable alternatives. . . ." 40 C.F.R. § 1502.14(a) (emphasis added). With respect to the choice of alternatives analyzed and the extent to which each option warrants further analysis, the "`rule of reason'" governs. Citizens Against Burlington, Inc. v. Busey, 938 F.2d 190, 195 (D.C. Cir. 1991) (quoting Natural Resources Defense Council, Inc. v. Morton, 458 F.2d 827, 834, 837 (D.C. Cir. 1972)). In this way, the EIS need not consider every imaginable alternative; rather, only reasonable alternatives are subject to review. 40 C.F.R. § 1502.14(a).
Moreover, and of significance here, when an agency is presented with "a very large number of alternatives, only a reasonable number of examples, covering the full spectrum of alternatives, must be analyzed and compared in the EIS." Forty Most Asked Questions Concerning CEQ's National Environmental Policy Act Regulations, 46 Fed. Reg. 18026 (Mar. 23, 1981), response to Question 1b
An agency may begin with a wide spectrum of alternatives that it whittles down over time to a select few options to be explored in detail. Notably, "NEPA does not impose any minimum number of alternatives that must be evaluated." Citizens for Smart Growth v. Sec'y of Dep't of Transp., 669 F.3d 1203, 1212 (11th Cir. 2012) (citation omitted).
Mr. Cutonilli's proposed hybrid alternative incorporated heavy rail and bus rapid transit. AR2_066106, Written DEIS Comment. The Agencies argue that plaintiff's proposal did not necessitate detailed consideration because, as proposed, it was not reasonable and did not warrant more in-depth consideration. ECF 44-2 at 18, MTA Memo; ECF 45-1 at 23-24, FTA Memo.
The MTA and the FTA included a response to plaintiff's proposal in the FEIS, published on December 4, 2012. AR1_002388-002390, FEIS. In the Agencies' Response, they indicated that Mr. Cutonilli's proposal was "infeasible from a capital cost standpoint" because the "BRT portion of [Mr. Cutonilli's] alternative would require a very expensive, 45-foot diameter tunnel under Cooks Lane and would also require all passengers to transfer from BRT to heavy rail, increasing transit travel times and decreasing ridership." Id. at AR1_002388.
In addition, the Agencies noted that much of the proposed heavy rail portion of Mr. Cutonilli's alternative was considered as part of the heavy rail alternative analyzed in the AA/DEIS. Id. They also explained that the other parts of Mr. Cutonilli's alternative were considered and determined not to meet the purpose and needs for the Project. Id. Among other things, the Agencies determined that the proposed alternative was cost prohibitive, and, given the dual modes of transportation that the proposal involved, they expressed concern about the need for passengers to transfer from one mode of transportation to another. Id. at AR1_002388-AR1_2390.
Also, in the MTA Letter of January 7, 2009, Diane Ratcliff, MTA Director of Planning, explained to Mr. Cutonilli, AR2_061957-061958:
Ms. Ratcliff added that the MTA did not see any "beneficial financial implications" with regard to plaintiff's proposal. Id. at AR2_061958. She also noted that Mr. Cutonilli's estimate of costs for his proposed alternative are "based on estimates, some from early Red Line analyses that has [sic] since been enhanced, and do not reflect an alternative that would be better than the selected LPA." Id. The Agencies were entitled to make this determination, as it was sufficiently tied to a primary objective that the Project remain cost-effective under the FTA's New Starts criteria. See AR1_001308, FEIS. Moreover, the MTA Letter of January 7, 2009, identified legitimate operational limitations as to Mr. Cutonilli's proposal. See Webster, 685 F.3d at 427 (holding that the agency properly eliminated alternatives from detailed study for "reasons related to technical feasibility, pecuniary costs, and effectiveness in achieving the purposes of the action").
Among other issues, the ROD addressed the heavy rail alternative. The MTA summarizes, ECF 44-2 at 10-11, MTA Motion:
The Ninth Circuit's decision in Laguna Greenbelt, Inc. v. U.S. Dep't of Transp., 42 F.3d 517 (9th Cir. 1994) (per curiam), as amended on denial of reh'g (Dec. 20, 1994), provides guidance. There, the plaintiffs, four non-profit community organizations, appealed the grant of summary judgment in favor of the U.S. Department of Transportation ("DOT"), the Federal Highway Administration ("FHA"), and San Joaquin Hills Transportation Corridor Agency ("TCA"), defendants, in regard to approval of a tollroad project, a proposed 17.5 mile highway. Id. at 521-22. The purpose of the project was "to relieve traffic congestion and high levels of air emissions" in south Orange County, California. Id. at 521.
Among other allegations, the plaintiffs contended that the EIS violated NEPA by discussing only three alternatives for the project: the agencies' preferred 17.5 mile highway option with six general use lanes plus two high occupancy lanes; a second "build" alternative with the same lane configuration as the preferred highway option; and the "no-build" alternative. Id. at 523-24, 524 n.5. In addition to these three options carried forward for detailed study, the EIS discussed "six categories of alternatives that were evaluated in earlier environmental documents" but were eliminated as viable options earlier in the process. Id. at 524.
In their suit, the plaintiffs maintained that the agencies failed to comply with NEPA because "the EIS ignored a smaller, four-lane alternative that included special pricing mechanisms to reduce traffic congestion. . . ." Id. at 524. This four-lane alternative was proposed during the EIS comment period by plaintiffs' expert. Id. The agencies included their response to the four-lane proposal in the EIS, explaining that "a four lane highway would not meet the project's goal of reducing traffic congestion. . . ." Id.
In reviewing the agencies' choice not to carry the reduced-lane proposal forward for detailed study, the Ninth Circuit ruled that the plaintiffs' "proposal was properly rejected as not reasonably related to the purposes of the project." Id. at 525. The court noted that the basis for the rejection was set forth in the EIS, which was sufficient to comply with NEPA. Id. at 524-25. It also noted that the EIS had considered and rejected another "down-sized" highway proposal, and the proposed tollroad incorporated a reduced number of lanes in response to the DEIS, suggesting that further study of the plaintiffs' alternative was not warranted. Id. at 525 n.7.
Notably, as to other alternatives, the court said: "[W]hile Laguna points to some alternatives that might have been considered or discussed more fully, the detailed statement of alternatives cannot be found wanting simply because the agency failed to include every alternative device and thought conceivable." Id. at 525 (citation and internal quotation marks omitted).
The same rationale governs here. As in Laguana Greenbelt, Inc., the record reflects that "the EIS contains a reasonably thorough discussion of alternatives satisfying the goals of the project." Id. And, as to plaintiff's proposal in particular, the Agencies were not arbitrary and capricious in determining that Mr. Cutonilli's proposed alternative was infeasible.
In the alternative, defendants argue that even if Mr. Cutonilli's alternative were reasonable, it did not warrant separate analysis because it was substantially similar to other alternatives considered in the preparation of the EIS. ECF 44-2 at 18-19, MTA Memo.; ECF 45-1 at 20-21, FTA Memo. Indeed, under NEPA, an agency need not perform a separate analysis of an alternative that is not "significantly distinguishable from alternatives actually considered, or which have substantially similar consequences." Westlands Water Dist. v. U.S. Dep't of Interior, 376 F.3d 853, 868 (9th Cir. 2004) (citations and quotations omitted). In the Agencies' view, plaintiff's alternative was within the spectrum of alternatives studied in detail.
Based on the Administrative Record, I conclude that the Agencies did not commit clear error by failing to consider plaintiff's proposal in greater depth, for the reasons advanced by defendants. I explain below.
Throughout the Project's history, spanning more than a decade, the Agencies studied and considered numerous alignments and possible modes of transportation. AR1_000006, ROD. In particular, the 2008 AA/DEIS carried forward twelve possible alignments across four different alternatives for technical study. Id. Although heavy rail, AR1_001309, FEIS, and commuter rail, id. at AR1_001306, were not carried through for detailed study, the record shows that these modes were adequately considered and then eliminated from further study for appropriate reasons, including, as indicated, concerns related to technical feasibility and financial costs. See, e.g., AR1_000004, ROD; AR1_001309-AR1_001310, FEIS
As to plaintiff's hybrid proposal in particular, which incorporated both BRT and heavy rail technology, a similar hybrid alternative with a heavy rail component was analyzed and reasonably rejected. ECF 44-2 at 18, MTA Memo; ECF 45-1 at 20-21, FTA Memo. After due consideration, the Agencies concluded that the hybrid method was not viable due, inter alia, to: 1) "the increased travel time and decreased ridership resulting from the need to transfer to different modes for a single trip" and 2) "the need for additional maintenance facilities to handle the different modes of transportation used in the alternative." ECF 44-2, MTA Memo.; see ECF 45-1 at 20-22, FTA Memo.; AR1_001309-AR1_001310, FEIS. The Agencies' conclusion that Mr. Cutonilli's proposed hybrid alternative would suffer from the same limitations, given its use of multiple modes of transportation, does not suggest clear error.
Moreover, in addition to considering and then eliminating a similar hybrid proposal with a heavy rail component as an option, the individual components of Mr. Cutonilli's hybrid alternative—heavy rail and BRT—were studied individually. As noted, given the popularity of heavy rail, its advantages and disadvantages were fleshed out at length in the FEIS and the related technical report. See AR1_006655-688, FEIS, Appendix G, Heavy Rail Technical Report. The other component of Mr. Cutonilli's alternative, BRT, was carried forward for technical study in the AA/DEIS and rejected. See AR1_006248-AR1_006426, Alternatives Technical Report, Appendix D: Screening of Preliminary Alternative. Because the two components of plaintiff's proposal were evaluated separately, the Agencies concluded that a separate analysis of these two modes of transportation as part of Mr. Cutonilli's alternative was not required. ECF 44-2 at 16-17, MTA Motion; ECF 45-1 at 18, FTA Memo.; see Westlands, supra, 376 F.3d at 868.
Plaintiff concedes that there are similarities between his alternative and those that were considered in detail. AR1_000889, FEIS Comment. But, he argues that his proposal "differs in more ways than it is similar." Id. In his Opposition, plaintiff highlights five aspects of his alternative that, in his view, differentiate it from other alternatives that were evaluated by the Agencies. He claims, in sum: 1) his alternative better addresses transit needs across the Baltimore region beyond the Corridor; 2) his alternative incorporates a "quickway" model of BRT,
First, plaintiff seems to suggest that a critical shortcoming of the LPA
This line of argument amounts to an attempt to redefine the purpose of the Project. As noted, an EIS begins with a brief statement "specify[ing] the underlying purpose and need to which an agency is responding in proposing the alternatives including the proposed action." 40 C.F.R. § 1502.13; see Alliance for Legal Action v. FAA, 69 Fed. Appx. 617, 621-622 (4th Cir. 2003). If that statement is reasonable, a court defers to the agency's expertise and discretion in deciding the proposed action's objectives. Alliance, 69 Fed. Appx. at 622; Audubon, 524 F. Supp. 2d at 662. Here, in the statement of the Project's purpose and needs, the Agencies reasonably limited the scope of the Project to improving public transit within the Corridor, AR1_000003, ROD (noting, inter alia, that the purpose of the Project is to "increase transit accessibility in the corridor" and to "[p]rovide transportation choices for east-west commuters in the corridor . . .") (emphasis supplied). In this regard, even if, as Mr. Cutonilli contends, there are public transit deficiencies beyond the designated Corridor, the Agencies' decision to limit the geographic scope of the Project is entitled to deference. NEPA "does not substantively constrain an agency's choice of objectives[.]" City of Alexandria, Va. v. Slater, 198 F.3d 862, 867 (D.C. Cir. 1999); cf. Kleppe v. Sierra Club, 427 U.S. 390, 412 (1976) ("The determination of the region, if any, with respect to which a comprehensive statement is necessary requires the weighing of a number of relevant factors, including the extent of the interrelationship among proposed actions and practical considerations of feasibility. Resolving these issues requires a high level of technical expertise and is properly left to the informed discretion of the responsible federal agencies.") (citation omitted).
In a similar vein, plaintiff argues that his quickway model of BRT "would allow buses to access the areas where 70% of the ridership is forecasted to originate," outside the Corridor. ECF 47-1 at 5-6, Opposition. In this way, he maintains that his alternative is superior to the other BRT alternatives considered because they were "confined to the corridor, which forces transfers for the majority of riders." Id. at 6. As with plaintiff's first argument, I reject his second argument on similar grounds. The Agencies' decision to limit the Project's purpose to addressing needs within the Corridor is entitled to deference, and the Administrative Record does not suggest the statement of purpose was arbitrary and capricious.
Third, plaintiff contends his alternative warrants further consideration because it overlaps BRT and heavy rail modalities, minimizing the need for passengers to transfer between different modes of transportation. ECF 47-1 at 6, Opposition. The potential effect a need to transfer has on ridership is one of the primary concerns that the Agencies identified with respect to hybrid models. See AR1_001310, FEIS.
As indicated, MTA performed a technical analysis of heavy rail as a modal alternative in the Project corridor. See AR2_100638, Scoping Process Report dated October 2004. One of the two heavy rail alternatives analyzed was a hybrid model, which combined three modes of transportation—heavy rail, light rail, and streetcar. AR1_001310, FEIS. Plaintiff proposes that his alternative is distinguishable from the hybrid analyzed, given the overlay of modes of transportation in his plan. In his design, "[h]eavy rail occurs over the eastern half of the line from the West Baltimore MARC station, through downtown to Canton. . . ." AR1_000890, FEIS Comment. Mr. Cutonilli explains: "BRT occurs over three quarters of the line from Social Security, through the West Baltimore MARC station, and ending downtown." Id. Although in this respect plaintiff's proposal is not identical to the hybrid model that was studied, a variation of one of the alternatives discussed in an EIS does not necessarily warrant further study or a separate cost-benefit analysis. See, e.g., Sierra Club v. Van Antwerp, 526 F.3d 1353, 1360 (11th Cir. 2008) ("When the change to the proposed action is a `minimizing measure,' . . . the agency `is not automatically required to redo the entire environmental analysis' . . . because a minimizing measure's effects on the environment will usually fall within the scope of the original NEPA analysis") (quoting Sierra Club v. U.S. Army Corps of Eng'rs, 295 F.3d 1209, 1221 (11th Cir. 2002)).
In my view, the manner in which plaintiff attempts to differentiate his model from the heavy rail hybrid model previously studied does not warrant further study of his model because, as stated, BRT and heavy rail were studied in depth, independently and at great length, and were reasonably eliminated. Thus, plaintiff's proposal remains within the range of alternatives examined.
Fourth, plaintiff insists his alternative is distinguishable because, unlike other BRT models analyzed, his plan does not require underground stations. ECF 47-1 at 6, Opposition. In promoting his alternative, plaintiff argued, AR1_000893, FEIS Comment of January 28, 2013:
Five of the Preferred Alternative's nineteen stations are to be located underground. AR1_001333, FEIS. Acknowledging this difference between plaintiff's proposal and the Preferred Alternative, the FTA argues: "While it is true that Plaintiff's proposal did not include underground stations, Plaintiff fails to acknowledge that his proposal would require construction of an extremely large, expensive tunnel in order to allow for the stations to be constructed on the surface." ECF 51 at 9, FTA Reply. In making this argument, the FTA suggests that any benefit from the lack of underground stations in plaintiff's alternative is diminished by the need to construct the Cooks Lane tunnel.
According to the MTA's correspondence with Mr. Cutonilli, included in the Administrative Record, construction of the 54-foot wide tunnel under Cooks Lane, necessary for plaintiff's model, would require acquisition and demolition of a large number of private commercial and residential properties, and would require shutting down the Metro from service for a year or more. AR2_000001, MTA Emails of May 24, 2013. In addition, construction of the tunnel, as proposed by plaintiff, does not appear to be a technically easy feat. According to the MTA, it would be one of the largest tunnels of its kind ever constructed, and it would result in a substantial increase in the amount of excavated material, with a corresponding significant increase in the cost of disposal. Id. at AR2_000001-000002.
The parties' contentions as to the benefits of various tunnel and station configurations aside, I emphasize that it is not the court's role when reviewing a NEPA challenge to assess the virtue of such technical decisions, especially when plaintiff does not argue that in choosing to include underground stations the Agencies failed to examine the environmental consequences of their decision. See Webster, supra, 685 F.3d at 425-26 (the court will not "intrude into [an agency's] decisionmaking prerogative" where inadequacies identified are trivial) (citation omitted). The issue before the Court is not whether plaintiff's proposal was better than the Preferred Alternative, but rather whether it was materially different than other alternatives considered such that further study of the proposal was required under NEPA's implementation regulations. Notwithstanding the exclusion of underground stations in plaintiff's plan, I conclude that given the prior analysis of a hybrid model and detailed consideration of various alignments over the course of ten years, the Agencies' decision not to examine his proposal further was not arbitrary and capricious.
Finally, plaintiff argues that, even if his alternative were unreasonable as proposed, his alternative had several potential variations, such as "deleting the highway portion" in order to "address the defendants [sic] issues with the cost of the alternative." ECF 47-1 at 6, Opposition. Plaintiff suggests that, based on variations to his alternative, the Agencies could have created a satisfactory iteration of his proposal. Id. In this respect, plaintiff mischaracterizes an agency's obligations under NEPA.
NEPA does not require that agencies fashion a plan out of unfeasible alternatives or incomplete information. Friends of the Earth v. Coleman, 513 F.2d 295, 298 (9th Cir. 1975) (holding that EIS did not have to consider alternative sites where plaintiffs failed to allege specific evidentiary facts showing that the alternative sites were reasonable and viable). Indeed, as noted, the CEQ regulations require only that the an agency evaluate the reasonable alternatives presented to it and "briefly discuss" the reasons for eliminating proposed alternatives from detailed study. 40 C.F.R. § 1502.14(a). The Agencies have satisfied their obligation in this respect. Even if another decisionmaker might have reached a contrary result, it surely was not "a clear error of judgment" for the Agencies not to select plaintiff's alternative for detailed study in light of the cost of the variation presented to them and given the spectrum of alternatives that were evaluated in detail. Friends of Back Bay, supra, 681 F.3d at 587.
Moreover, "[i]n determining whether NEPA has been violated, [the court] must look to the ultimate harm NEPA seeks to prevent: the risk of damage to the environment that results if the agency fails to properly and thoroughly evaluate the environmental impacts of a proposed project." Laguna, supra, 42 F.3d at 527 (citation omitted). "Thus, even where there is a violation of NEPA's procedural requirements, relief will not be granted if the decision-maker was otherwise fully informed as to the environmental consequences and NEPA's goals were met." Id. (citation omitted).
On this score, I emphasize that plaintiff does not suggest that the environmental consequences of the Project were not considered adequately. Nor does plaintiff allege that the Agencies, as the decision makers, were not fully informed as to the impact of the Project on the environment. For the foregoing reasons, plaintiff's claims as to the Agencies' inadequate evaluation of alternatives, including his, must fail.
Plaintiff contends that, pursuant to 40 C.F.R. § 1502.24, "[t]he Defendants failed to insure the professional integrity, including scientific integrity of the discussions and analyses in environmental impact statements. . . ." ECF 1 ¶ 2, Complaint. His primary challenge to the EIS methodology appears to be that defendants failed to have their analysis reviewed by professional engineers. ECF 47-1 at 7.
CEQ regulation 40 C.F.R. § 1502.24, upon which plaintiff relies, provides:
In my view, Mr. Cutonilli's challenge to the underlying science of the EIS appears to be a veiled attempt to challenge the ultimate selection of a Preferred Alternative. As noted, the APA does not mandate a particular outcome. Robertson, supra, 490 U.S. at 351. It is a procedural statute, and the rationale for deference to the agency's discretion is particularly strong when it is deciding an issue within its realm of its technical expertise. See Webster, supra, 685 F.3d at 425-26; Am. Wildlands v. Kempthorne, 530 F.3d 991, 1000 (D.C. Cir. 2008) ("The rationale for deference is particularly strong when the [agency] is evaluating scientific data within its technical expertise. . . .") (citation omitted and alteration in Kempthorne).
Moreover, the Administrative Record is replete with technical studies and analyses upon which defendants relied in preparing the EIS. For example, the EIS reflects the Agencies' reliance on an examination of various issues, including ridership, regional travel patterns, air quality, and cost projections, to name a few. See AR1_001258-001295, FEIS; AR1_009247-009254, AA/DEIS. Moreover, with respect to engineers, the list of preparers for the EIS includes several licensed members of the profession. AR1_003051-003055, FEIS, Appendix B, List of Preparers.
Plaintiff's vague contentions on the subject of scientific integrity serve to underscore the extent to which his criticisms of defendants' analysis are technical, methodological disagreements. "The mere fact that [a plaintiff] disagrees with [an agency's] methodology does not constitute a NEPA violation." Native Ecosystems Council v. Weldon, 697 F.3d 1043, 1053 (9th Cir. 2012). When faced with a technical or scientific disagreement, a court "may not insert [its] opinions in the place of those of [the experts]." Id. To the contrary, the court is "required to apply the highest level of deference in [its] review of the [agency's] scientific judgments in selecting [a given] methodology." Id. (citation omitted). Put another way, it is "not [my] role to weigh competing" expert analyses. Ecology Ctr. v. Castaneda, 574 F.3d 652, 659 (9th Cir. 2009); see id. at 658-59 ("We grant considerable discretion to agencies on matters `requir[ing] a high level of technical expertise.'") (citation omitted); see Baltimore Gas & Elec. Co. v. Natural Res. Def. Council, Inc., 462 U.S. 87, 103 (1983) (stating that a court is "most deferential" when the agency is "making predictions, within its area of special expertise, at the frontiers of science"); EarthLink, Inc. v. FCC, 462 F.3d 1, 12 (D.C. Cir. 2006) (noting that courts should conduct a `"particularly deferential review"' of an `"agency's predictive judgments about areas that are within the agency's field of discretion and expertise . . . as long as they are reasonable"') (quoting FCC v. WNCN Listeners Guild, 450 U.S. 582, 594 (1981)); Forest Guardians v. U.S. Forest Serv., 329 F.3d 1089, 1099 (9th Cir. 2003) (citations omitted).
Accordingly, I conclude that plaintiff's vague challenge to the professional integrity of the EIS is not supported by the Administrative Record, nor does it render the Agencies' methodology arbitrary or capricious.
To the extent plaintiff argues supplementation to the EIS was required based on refinements to his proposed alternative submitted to the Agencies for consideration, this contention is without merit. See ECF 47-1 at 9-10, Opposition. "Federal agencies are not obligated to restart the NEPA process every time new information becomes available." Audubon, supra, 524 F. Supp. 2d at 674 (citation omitted). Indeed, "an administrative process can never come to an end if the process must begin again every time new information is available." Piedmont Heights Civic Club, Inc. v. Moreland, 637 F.2d 430, 442 (5th Cir. 1981). Accordingly, the CEQ regulations only mandate that a federal agency prepare a supplemental environmental impact statement if "[t]he agency makes substantial changes in the proposed action that are relevant to environmental concerns," or if "[t]here are significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts." 40 C.F.R. § 1502.9(c)(1)(i)-(ii); see N.C. Alliance for Transp. Reform, Inc. v. U.S. Dep't of Transp., 151 F.Supp.2d 661, 698 (M.D.N.C. 2001) (stating if circumstances or information arise that "present a seriously different picture of the environmental impact of the proposed project from what was previously envisioned," an agency must supplement its environmental impact statement) (internal quotes and citation omitted).
Here, beyond minor refinements to his proposed alternative, Mr. Cutonilli did not submit "significant new circumstances or information relevant to environmental concerns" that would require supplemental environmental analysis. See 40 C.F.R. § 1502.9(c)(1); Webster, supra, 685 F.3d at 418; Hodges v. Abraham, 300 F.3d 432, 438-39 (4th Cir. 2002). Therefore, this claim must fail.
Plaintiff argues that in several ways the Agencies violated NEPA's public participation requirements. His primary contentions appear to be that (a) the Agencies failed to respond adequately to his comments on the EIS; (b) the Agencies failed to publish his written comment on DEIS in the FEIS; and (c) the Agencies failed to provide certain documentation in response to his requests for information. ECF 47-1 at 7-8, Opposition.
Mr. Cutonilli seems to take issue with how or whether the Agencies replied to his comments as to the EIS. He alleges that the Agencies failed to provide sufficient detail or reference the supporting analysis upon which they relied in determining not to evaluate further his proposed alternative. ECF 47-1 at 7-8, Opposition. He also questions whether defendants "even evaluated the plaintiff's comments [on the FEIS rather than] simply reiterat[ing]" the same response to his comments on the DEIS. ECF 1 ¶ 28, Complaint.
To be sure, "In preparing the final EIS, the agency must `discuss at appropriate points . . . any responsible opposing view which was not adequately discussed in the draft statement and [must] indicate the agency's response to the issue raised.'" Robertson, 490 U.S. at 350 n.13 (quoting 40 C.F.R. § 1502.9(b)) (alterations in original); 40 C.F.R. § 1503.4(a) ("An agency preparing a final environmental impact statement shall assess and consider comments both individually and collectively, and shall respond . . . in the final statement."). Notwithstanding this obligation, the mere presence of expert disagreement does not mandate a response in the final EIS or the record of decision.
Under 40 C.F.R. § 1503.4, the agency has a variety of options in how to respond appropriately to a comment received pm the EIS. The agency may, 40 C.F.R. § 1503.4(a):
In correspondence to Mr. Cutonilli, the MTA explained why it deemed his alternative not feasible and why further analysis was not required. See, e.g., AR2_000001-000004, MTA Emails of May 24, 2013; AR2_052061, Email Correspondence dated July 29, 2010, between Lorenzo Bryant, Project Manager, MTA Office of Planning, and Mr. Cutonilli. Although the MTA did not cite to particular authorities, it did articulate with clarity the basis for its decision not to carry forward Mr. Cutonilli's alternative for further study—namely, the projected cost of the alternative, its operational challenges, and the effect on ridership resulting from the need with his plan to transfer between modes of transportation. See e.g., AR2_000001-000004, MTA Emails of May 24, 2013. An articulation of supporting reasons without a citation to any scientific authority is satisfactory under 40 C.F.R. § 1503.4 (noting an agency shall "explain why the comments do not warrant further agency response, citing the sources, authorities, or reasons which support the agency's position. . .").,
Plaintiff also complains that although his Oral DEIS Comment was included in the FEIS, his Written DEIS Comment, submitted on November 6, 2008, was not published in the FEIS. ECF 47-1 at 8, Opposition; see AR2_066106-066110, Written DEIS Comment; AR1_002388-002389, Oral DEIS Comment (included in the FEIS). There is no merit to this complaint.
NEPA does not require an agency to publish "every comment . . . in the final EIS. Nor must an agency set forth at full length the views with which it disagrees." California v. Block, 690 F.2d 753, 773 (9th Cir. 1982) (internal citations omitted). Rather, 40 C.F.R. § 1503.4 provides: "All substantive comments received on the draft statement (or summaries thereof where the response has been exceptionally voluminous), should be attached to the final statement whether or not the comment is thought to merit individual discussion by the agency in the text of the statement." (Emphasis supplied).
Although Mr. Cutonilli's Written DEIS Comment, submitted on November 6, 2008, does not appear in the FEIS, as noted, Mr. Cutonilli's Oral DEIS Comment, made on the same date, November 6, 2008, was included. It could reasonably be construed as a summary of all of his comments that day. Compare AR2_066106-066110, Written DEIS Comment with AR1_002388-002389, Oral DEIS Comment (included in the FEIS).
Summaries of comments have been deemed appropriate under NEPA. To illustrate, in WildWest Inst. v. Bull, 547 F.3d 1162, 1170 (9th Cir. 2008), the Ninth Circuit determined that a final EIS responded appropriately to public comment when it summarized the nature of the comments it had received and the primary concerns that were raised. The final EIS also "provided specific substantive responses to such concerns and included a six and a half page list of the commenters." Id. The WildWest Court ruled that this was sufficient to satisfy NEPA. Id.
In view of the foregoing, defendants have acted accordingly. Mr. Cutonilli's Oral DEIS Comment was included in the FEIS. AR1_002388-002390, FEIS. The Agencies also included in the FEIS their response to plaintiff's proposed alternative. Id. In their response, the Agencies informed Mr. Cutonilli that his option was "infeasible from a capital cost standpoint" because the "BRT portion of [Mr. Cutonilli's] alternative would require a very expensive 45-foot diameter tunnel under Cooks Lane and would also require all passengers to transfer from BRT to heavy rail, increasing transit travel times and decreasing ridership." AR1_002388, FEIS.
That the Agencies did not include in the FEIS Mr. Cutonilli's Written DEIS Comment of November 6, 2008, supplementing his oral testimony, is of no moment because the thrust of Mr. Cutonilli's proposed alternative is captured in the oral testimony. And, summaries of comments are adequate when the primary concerns raised by the comments are addressed. Moreover, as previously noted, "[i]n conducting this review, we may not flyspeck [the] agency's environmental analysis, looking for any deficiency, no matter how minor." Webster, 685 F.3d at 421 (quotation omitted). As a result, the Agencies' decision not to include in the FEIS Mr. Cutonilli's written comment of November 6, 2008, was not arbitrary, capricious, or clearly erroneous.
Finally, plaintiff seems to suggest that some of his correspondence amounted to public requests for information, to which the Agencies failed to respond. He explains: "The plaintiff contacted the MTA for additional information they [sic] had on their analysis of [his] proposal, but was ignored by the MTA. The plaintiff then filed a public information act request for information." ECF 1 ¶ 18, Complaint. Plaintiff contends: "The public information act did not produce any documents that demonstrated that the MTA actually evaluated my proposal. They produced some emails that the plaintiff had sent them, an analysis of a heavy rail alternative, and an evaluation of sharing the existing metro downtown tunnel with a potential light rail alternative." Id. ¶ 19.
Yet, in the Complaint, plaintiff does not suggest that the MTA failed to respond or was untimely. Rather, he seems to challenge only that he was dissatisfied with the materials MTA sent to him—"some emails" but no evidence of the MTA's evaluation of his proposal. Id. In his view, the Agencies' response was inadequate. Id.
To supplement his information request claims, in his Opposition, plaintiff supplies additional detail on these claims. He explains, ECF 47-1 at 9-10, Opposition:
Notably plaintiff does not explicitly mention the Freedom of Information Act or the Maryland Public Information Act. However, he does refer to 40 C.F.R. § 1506.6(f), which provides that agencies must:
Plaintiff's claims in connection with his public information requests must fail because in his Complaint, he does not allege that the Agencies failed to provide him with "environmental impact statements, the comments received, and any underlying documents. . . ." Id. Moreover, in his Complaint, he does not allege the Agencies failed to respond timely fashion. Rather, his Complaint indicates only his dissatisfaction that no response from the Agencies afforded him the relief he desired—a detailed analysis of his proposed alternative. As the MTA suggests, a technical analysis of plaintiff's proposal appears to be Mr. Cutonilli's "singular end." ECF 50 at 19, MTA Reply. Notwithstanding the zeal with which Mr. Cutonilli pursued a detailed analysis of his alternative or an in-depth explanation from the Agencies for their refusal to perform such an analysis, the CEQ regulations require only that an agency "briefly discuss" the reasons for eliminating proposed alternatives from detailed study. 40 C.F.R. § 1502.14(a). The Agencies have fulfilled this requirement.
In sum, the Agencies have satisfied their obligations under NEPA as to Mr. Cutonilli's proposed alternative and the comments he submitted to the EIS. Even if another decisionmaker might have reached a contrary result, it surely was not a clear error of judgment, or arbitrary and capricious, for the Agencies not to select plaintiff's alternative for detailed study or to decline to respond to Mr. Cutonilli's proposed alternative in greater detail. In conclusion, I emphasize that this decision does not serve as an affirmation of the wisdom of the Red Line Project, as that issue was not before the Court. An Order follows, consistent with this Memorandum Opinion.
The fourth category of documents, AR4, was submitted as a supplement to the Administrative Record. See generally ECF 42. In a second affidavit dated June 26, 2014, Ms. Hynes-Cherin describes the documents in AR4 as "additional FTA documents," including "a set of notes, two letters, and one email." ECF 42-1 ¶ 5.
Although the Project is intended to improve transit efficiency in the Corridor, the precise parameters of the Corridor are not material to this Opinion.
The BRTB considered the Red Line an integral part of its LRTP and envisioned it as a transit line with the following layout, AR1_009283, AA/DEIS:
In particular, Section 4(f) permits a federal project "requiring the use of publicly owned land of a public park, recreation area, or wildlife and waterfowl refuge of national, State, or local significance, or land of an historic site" to be approved only if "(1) there is no prudent and feasible alternative to using that land; and (2) the program or project includes all possible planning to minimize harm to the park, recreation area, wildlife and waterfowl refuge, or historic site resulting from the use." 49 U.S.C. § 303(c).
Plaintiff does not contend that defendants failed to comply with Section 4(f).