ROBERT N. HUNTER, JR., Judge.
Andrea Morrell ("Andrea"), G. Pony Morrell ("Morrell"), and The Pasta Wench, Inc. ("The Pasta Wench") (collectively "Plaintiffs") appeal the 27 April 2016 order by Judge William Coward granting summary judgment in favor of Hardin Creek, Inc. ("Hardin Creek"), John Sidney Greene ("S. Greene"), and Hardin Creek Timberframe and Millwork, Inc. ("Timberframe") (collectively "Defendants"), and dismissing Plaintiff's third party complaint against John Ellis Greene ("E. Greene") with prejudice. After review, we reverse the trial court's order and remand for further proceedings.
Plaintiffs' forecast of the evidence tends to show the following. Andrea and Morrell are the founders and officers of The Pasta Wench. The Pasta Wench manufactures and distributes "specialty food products including homemade, organic raviolis and other pasta products." Hardin Creek is a commercial landlord. Timberframe is a timber manufacturing and construction company that builds and remodels residential and commercial buildings. S. Greene is the president of Hardin Creek, and the general contractor for Timberframe. E. Greene is S. Greene's father and owner of the property in question.
Andrea and Morrell started The Pasta Wench in April 2010. After experiencing success in local markets in Boone, North Carolina, Plaintiffs expanded to distribute their product across western North Carolina. Plaintiffs later contracted with Harris Teeter for regional distribution across North and South Carolina.
On 2 February 2011, Plaintiffs entered into a commercial lease ("the lease") with Hardin Creek for two units of a steel building located in Boone ("the premises"). Plaintiffs operated their business from the premises, and used the units as a kitchen and a pasta drying room. The lease contained several provisions concerning Plaintiffs' responsibility to obtain liability and property insurance and to indemnify Hardin Creek for damages. The relevant lease paragraphs are as follows:
Despite the opening paragraph's language, Paragraph 8 contains no subparagraph (c).
In early 2012, the North Carolina Department of Agriculture and Consumer Services ("NCDA&CS") inspected the premises. The NCDA&CS determined the interior required modification to accommodate food production. The NCDA&CS particularly required "the open layout of the kitchen in Unit B — four conventionally framed walls exposed to the domed, steel roof trusses and insulation approximately 25 feet above—to be enclosed with an interior kitchen ceiling."
Plaintiffs and Hardin Creek agreed to extend the lease by five years. As part of this agreement, S. Greene agreed to modify the premises consistent with the NCDA&CS's requirements.
On 7 January 2014, the temperature in Boone dropped into the single digits. The cold temperature froze the water in Plaintiffs' sprinkler system. Plaintiffs alleged the pipes froze because Defendants "created two separate heating zones between the newly enclosed kitchen and the open area above it, rendering the HVAC thermostat in the kitchen useless for regulating air temperature above the kitchen ceiling where the fire sprinkler system pipes were located." Plaintiffs also alleged Defendants' workers negligently left a vent near the apex of the roof open after performing repairs in December 2013.
Plaintiffs sought monetary damages for negligence and breach of the implied warranty of workmanlike performance against all Defendants. Plaintiffs also sought monetary damages for constructive eviction and breach of the covenant of quiet enjoyment against Hardin Creek, Inc. Finally, Plaintiffs alleged unfair and deceptive trade practices against S. Greene and Hardin Creek, Inc. Plaintiffs additionally sought treble damages and attorneys' fees under the unfair and deceptive trade practices claim, and sought punitive damages "as a result of Defendants' willful and wanton conduct and indifference to [Plaintiffs'] rights." Plaintiffs attached copies of the lease and the lease extension agreement to their complaint.
On 2 March 2015, Defendants answered Plaintiffs' complaint as moving to dismiss Plaintiffs' claims. Defendants contended the lease was only between Hardin Creek and Plaintiffs. Defendants therefore asked the trial court to dismiss Plaintiffs' claims
In an order filed on 15 October 2015, the trial court set a case management conference and a discovery scheduling order ("scheduling order"). Both parties consented to the scheduling order which set the discovery deadline for 15 April 2015. The parties consented to an amended scheduling order on 25 January 2016. This amended scheduling order required the trial court to hear all dispositive motions not more than thirty days before the trial date, which the trial court set for the session beginning 6 June 2016.
On 8 March 2016, Defendants amended their answer and filed two counterclaims. First, Defendants alleged Plaintiffs negligently left the roof vent open and breached their duty to maintain the premises. Second, Defendants claimed breach of contract. Under this second claim, Defendants alleged the lease obligated Plaintiffs to pay for repairs or damage due to Plaintiffs' negligence. Defendants sought monetary damages for each of these claims.
On 14 April 2016, Defendants moved for summary judgment.
On 15 April 2016, Plaintiffs filed a motion to amend their complaint to add E. Greene as a party defendant. Plaintiffs alleged negligence and breach of the implied warranty of workmanlike performance. Plaintiffs also alleged they learned through discovery E. Greene "operated and oversaw property management and supervised the construction activities on the property that [gave] rise to this lawsuit."
Also on 15 April 2016, Plaintiffs filed a motion to continue the hearings and to enlarge the scheduling order deadlines. Plaintiffs alleged Defendants purposely delayed discovery, and Plaintiffs were still taking depositions and reviewing transcripts. Plaintiffs contended Defendants' motion for summary judgment was "premature and prejudicial," and requested more time "to prepare and present their case" before the trial court heard arguments on the dispositive motions.
On 22 April 2016, Plaintiffs filed a third party complaint against E. Greene. This brought all five claims Plaintiffs alleged in their original complaint against E. Greene. On 25 April 2016, the trial court heard Plaintiffs' and Defendants' motions, as well as Plaintiffs' third party complaint. On 27 April 2016, the trial court granted summary judgment in favor of Defendants. The trial court found Plaintiffs presented "no plausible reasons why further discovery would shed any light on paragraph 5(b) in the Lease[.]" The
On 20 May 2016, Plaintiffs filed notice of appeal. Plaintiffs appealed the trial court's 27 April 2016 order and "all rulings and statements of the trial court that contributed to, served as predicate for, or were encompassed by the foregoing Order, including all statements and rulings made in Court during the hearing held April 25, 2016, and decision communicated April 27, 2016, to not hold further hearings." Pursuant to Rule 10(c) of the Rules of Appellate Procedure, Defendants notified Plaintiffs and this Court of its intent to appeal the trial court's grant of summary judgment in favor of Plaintiffs on the counterclaim in the event this Court reverses the trial court's grant of summary judgment in favor of Defendants.
Plaintiffs appeal a superior court's order in a civil action disposing of all the parties' issues. Therefore, this Court has jurisdiction pursuant to N.C. Gen. Stat. §§ 1-277(a) and 7A-27(b) (2016).
This Court reviews the trial court's grant of summary judgment de novo. In re Will of Jones, 362 N.C. 569, 573, 669 S.E.2d 572, 576 (2008). This Court must review the record in the light most favorable to the non-movant and draw all inferences in the non-movant's favor. Dobson v. Harris, 352 N.C. 77, 83, 530 S.E.2d 829, 835 (2000). See also Caldwell v. Deese, 288 N.C. 375, 378, 218 S.E.2d 379, 381 (1975).
Summary judgment is proper "if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that any party is entitled to a judgment as a matter of law." N.C. Gen. Stat. § 1A-1, Rule 56(c) (2016). A party opposing a motion for summary judgment must only establish the existence of a genuine issue of material fact, and it need not show it would prevail on the issue at trial. In re Will of Edgerton, 29 N.C. App. 60, 63, 223 S.E.2d 524, 526 (1976).
"Appellate review of a trial court's determination of whether a contract is ambiguous is de novo." Barrett Kays & Assoc., P.A. v. Colonial Bldg. Co., Inc. of Raleigh, 129 N.C. App. 525, 528, 500 S.E.2d 108, 111 (1998).
Plaintiffs contend the trial court erred in granting summary judgment in favor of Defendants because the language of Paragraph 5(b) of the Lease is ambiguous. We agree.
This Court interprets the terms of a lease as it would any contract. Martin v. Ray Lackey Enterprises, Inc., 100 N.C. App. 349, 354, 396 S.E.2d 327, 330 (1990) (citation omitted). "Interpreting a contract requires the court to examine the language of the contract itself for indications of the parties' intent at the moment of execution." State v. Philip Morris USA, Inc., 363 N.C. 623, 631, 685 S.E.2d 85, 90 (2009) (quoting Lane v. Scarborough, 284 N.C. 407, 409-10, 200 S.E.2d 622, 624 (1973)). "If the plain language of a contract is clear, the intention of the parties is inferred from the words of the contract." Walton v. City of Raleigh, 342 N.C. 879, 881, 467 S.E.2d 410, 411 (1996). This Court derives the intent of the parties from the contract as a whole, rather than from any particular term or paragraph. Jones v. Casstevens, 222 N.C. 411, 413-14, 23 S.E.2d 303, 305 (1942) ("Since the object of construction is to ascertain the intent of the parties, the contract must be considered as an entirety.") (citation and internal quotation marks omitted). "[I]f there is uncertainty as to what the agreement is between the parties, a contract is ambiguous." Schenkel & Shultz, Inc. v. Hermon F. Fox & Assocs., 362 N.C. 269, 273, 658 S.E.2d 918, 921 (2008). "When an agreement is ambiguous and the intention of the parties is unclear, interpretation of the contract is for the jury." International Paper Co. v. Corporex Constructors,
Here, in granting summary judgment in favor of Defendants, the trial court exclusively relied on the lease's language. Specifically, the trial court found Paragraph 5(b) was unambiguous and functioned as a complete defense to Plaintiffs' claims. However, we conclude the text of the lease, when considered in its entirety, fails to clearly state the parties' intentions and is ambiguous.
Paragraph 5(b) states the landlord and tenant discharge each other from "all claims and liabilities arising from or caused by any hazard covered by insurance . . . regardless of the cause of the damage or loss, provided that such cause does not prevent payment of insurance proceeds to Landlord under the provisions of the applicable policy." Paragraph 8 then purports to define the type and amount of insurance Defendants required Plaintiffs to carry. Paragraph 8 also includes the terms under which Plaintiffs would indemnify Defendants for damages covered by insurance. However, Paragraph 8 is incomplete. The opening sentence of Paragraph 8 states "Tenant shall maintain insurance in accordance with the provisions of subparagraphs (a) and (b) of this paragraph, and Tenant shall indemnify Landlord in accordance with the provisions of sub-paragraph (c)." The text of subparagraphs (a) and (b) follow this sentence. Subparagraph 8(a), titled "Property Insurance," contains indemnification language and states Plaintiffs hold Hardin Creek harmless for damages or losses caused by fire to Plaintiffs' furniture, fixtures, and equipment. Subparagraph 8(b), titled "Liability Insurance," defines the types and amounts of liability insurance Defendants required Plaintiffs to carry. There is not a Subparagraph 8(c).
Both Subparagraph 5(b) and Paragraph 8 refer to limits on Hardin Creek's liability under the lease. The incomplete construction of Paragraph 8 creates an ambiguity as to the type and amount of insurance Hardin Creek required of Plaintiffs. The incomplete construction of Paragraph 8 also creates an ambiguity relating to the scope of Subparagraph 5(b). The language the trial court relied on in Subparagraph 5(b) refers to any "hazard covered by insurance on the leased premises." However, when Subparagraph 5(b) is read in connection with Paragraph 8, the exact meaning of the term "covered by insurance" is ambiguous. It is unclear whether that term refers to hazards covered only by insurance coverage as required by the lease, or whether that term is modified by the language in the missing subparagraph on indemnification.
Because the lease is ambiguous, and because the interpretation of an ambiguous lease is a question for the jury, the trial court erred in granting summary judgment in favor of Defendant Hardin Creek, Inc.
Even if this Court concluded the lease was unambiguous, the trial court still incorrectly found Paragraph 5(b) served as a complete release from liability. Generally, parties may contract to "bind themselves as they see fit" unless the contract violates the law or is against public policy. Lexington Ins. Co. v. Tires Into Recycled Energy and Supplies, Inc., 136 N.C. App. 223, 225, 522 S.E.2d 798, 800 (1999) (quoting Hall v. Sinclair Refining Co., 242 N.C. 707, 709-10, 89 S.E.2d 396 (1955)). "However, contracts which attempt to relieve a party from liability for damages incurred through personal negligence are discouraged and narrowly construed[.]" Id. at 225, 522 S.E.2d at 800 (citation omitted). "The contract will never be so interpreted [to exempt liability for negligence] in the absence of clear and explicit words that such was the intent of the parties." Winkler v. Appalachian Amusement Co., 238 N.C. 589, 596, 79 S.E.2d 185, 190 (1953).
Here, the trial court ruled Paragraph 5(b) of the lease meant both parties intended to waive claims relating to any matter covered by insurance. Plaintiffs concede their insurance covered up to $60,000 for damages resulting from the flood. However, Plaintiffs contend they did not intend to waive claims for business losses not covered by insurance and caused by Defendants' negligence.
In William F. Freeman, Inc. v. Alderman Photo Co. this Court held a lease which only addresses insurance coverage and subrogation rights will not extend to exempt the
This Court later distinguished the lease in Freeman in Lexington at 226, 522 S.E.2d at 800 (1999). In Lexington, this Court concluded the terms of the lease contained an explicit waiver by each party of its right to recover against the other for loss covered by insurance. Lexington at 226, 522 S.E.2d at 801. Additionally, this Court concluded the lease "clearly and explicitly evidences the intent of each of the parties to relieve the other from all liability . . . including liability for negligence." Id. at 227, 522 S.E.2d at 801.
Even though the lease in the instant case states the parties "agree and discharge each other from all claims and liabilities arising from or caused by any hazard covered by insurance," the lease does not explicitly state the parties contemplated to waive claims stemming from negligence. This Court will not infer the parties intended to exempt each other from liability for negligence where the lease does not contain specific language indicating the parties' intent to do so. See Freeman at 76, 365 S.E.2d at 185. Therefore, the trial court erred in interpreting Paragraph 5(b) as a complete release from all liability when that Paragraph did not contain language explicitly covering negligence.
In negligence cases, granting summary judgment is rare. Here the facts support a violation of a safety statute to wit: The pertinent provision of the North Carolina State Building Code states "[a]ll areas used for commercial or institutional food preparation and storage facilities adjacent thereto shall be provided with an automatic sprinkler system." N.C. Gen. Stat. § 143-138(m)(2) (2017). "[T]he [North Carolina State Building] Code imposes liability on any person who constructs, supervises construction, or designs a building or alteration thereto, and violates the [Building] Code such that the violation proximately causes injury or damage." Lassiter v. Cecil, 145 N.C. App. 679, 684, 551 S.E.2d 220, 223 (2001) (quoting Olympic Products Co. v. Roof Systems, Inc., 88 N.C. App. 315, 329, 363 S.E.2d 367, 375 (1988)). "[A] violation of the North Carolina Building Code constitutes negligence per se because the Code is a statute to promote the safety of others." Id. at 684, 551 S.E.2d at 223. The owner of a building is not negligent per se for a violation of the North Carolina Building Code unless: "(1) the owner knew or should have known of the [Building] Code violation; (2) the owner failed to take reasonable steps to remedy the violation; and (3) the violation proximately caused injury or damage." Lamm v. Bissette Realty, Inc., 327 N.C. 412, 415, 395 S.E.2d 112, 114 (1990).
Here, Plaintiffs alleged Defendants owed a duty to Plaintiffs "to inspect, construct, and alter the Premises in a workmanlike manner such that it would be . . . in accordance with local building codes, building plans, and industry standards." Plaintiffs also alleged "Defendants were warned that the insulation in the building was inadequate to properly protect the sprinkler systems during cold weather[.]" Finally, Plaintiffs alleged they suffered damages as a "direct and proximate cause" of Defendants' negligence. Based on our review of these pleadings, along with the provisions of the North Carolina Building Code, we conclude Plaintiffs sufficiently alleged negligence to survive Defendants' motion for summary judgment.
We now address this case's procedural posture in light of our ruling. First, we reverse the trial court's grant of summary judgment in favor of all Defendants as to Plaintiffs' negligence claims. "Negligence claims are rarely susceptible of summary adjudication, and should ordinarily be resolved by trial of the issues." Lamb v. Wedgewood South Corp., 308 N.C. 419, 425, 302 S.E.2d 868, 871 (1983). We cannot review or resolve the issue of the various Defendants' degree of involvement in modifying
Also, the trial court denied Plaintiffs' motion to amend their complaint to add E. Greene as a party defendant as a consequence of its order granting summary judgment in Defendants' favor. Because we reverse the trial court's order granting summary judgment as to Defendants, it follows the trial court should resolve and reconsider Plaintiffs' motion to add E. Greene as add a defendant to this action.
As to Defendants' counterclaims against Plaintiffs, Defendants' brief summarily addresses this issue as follows:
Defendants fail to cite any legal authority or otherwise argue this issue.
Under our Rules of Appellate Procedure, "[t]he function of all briefs required or permitted by these rules is to define clearly the issues presented to the reviewing court and to present the arguments and authorities upon which the parties rely in support of their respective positions thereon." N.C. R. App. P. 28(a) (2017). "It is not the duty of this Court to supplement [a party's] brief with legal authority or arguments not contained therein." Eaton v. Campbell, 220 N.C. App. 521, 522, 725 S.E.2d 893, 894 (2012) (quoting Goodson v. P.H. Glatfelter Co., 171 N.C. App. 596, 606, 615 S.E.2d 350, 358 (2005)). "Issues not presented and discussed in a party's brief are deemed abandoned." N.C. R. App. P. 28(a) (2017).
Here, Defendants fail to argue this issue and do not present this Court with a reason to disturb the trial court's order granting summary judgment in favor of Plaintiffs as to Defendants' counterclaims. Defendants have abandoned this issue on appeal, and we consequently affirm the trial court's ruling as to Defendants' counterclaims.
Finally, the trial court denied Plaintiffs' motion to continue and to enlarge discovery deadlines because the trial court found "no plausible reasons why further discovery would shed any light on paragraph 5(b) in the Lease." However, because this Court disagrees with the trial court's interpretation of Paragraph 5(b), the trial court should, on remand, consider setting a new discovery schedule pursuant to Rule 26 to allow the parties to complete their discovery.
Based on the foregoing, we reverse the trial court's order of summary judgment and remand this action with instructions for the trial court to proceed consistently with this opinion.
REVERSED AND REMANDED.
Judge CALABRIA concur.
Judge BERGER dissents in a separate opinion.
BERGER, Judge, dissenting in separate opinion.
I respectfully dissent from the majority's opinion reversing the trial court's order and remanding for further proceedings. The trial court properly granted summary judgment in favor of Defendants as Paragraph 5(b) (the "Exculpatory Clause") of the lease is unambiguous and operates as a complete defense to the claims raised by Plaintiffs.
"[W]hen the language of a contract is plain and unambiguous, construction of the language is a matter of law for the court." Mountain Fed. Land Bank v. First Union Nat. Bank, 98 N.C. App. 195, 200, 390 S.E.2d 679, 682 (1990) (citation omitted). "The heart of a contract is the intention of the parties, which is to be ascertained from the expressions used, the subject matter, the end in view, the purpose sought, and the situation of the parties at the time." Gould Morris Elec. Co. v. Atl. Fire Ins. Co., 229 N.C. 518, 520, 50 S.E.2d 295, 297 (1948) (citation omitted). "[W]hen the language of the contract and the intent of the parties are clearly exculpatory, the contract will be upheld." Gibbs v. Carolina Power & Light Co., 265 N.C. 459, 467,
Lexington Ins. Co. v. Tires Into Recycled Energy & Supplies, Inc., 136 N.C. App. 223, 225, 522 S.E.2d 798, 800 (1999) (citation omitted).
In Winkler v. Appalachian Amusement Co., 238 N.C. 589, 79 S.E.2d 185 (1953), the defendant contended it was relieved of liability for negligence pursuant to the terms of a commercial real estate lease with the plaintiff that provided, in relevant part:
Id. at 592, 79 S.E.2d at 188 (internal quotation marks omitted).
Similarly, as the majority here correctly states, this Court found no such clear, explicit waiver of liability for negligence in William F. Freeman, Inc. v. Alderman Photo Co., 89 N.C. App. 73, 365 S.E.2d 183 (1988). The lease at issue in Freeman contained the following relevant language:
Id. at 75, 365 S.E.2d at 185 (internal quotation marks omitted). This Court stated that
However, this Court previously enforced a commercial real estate lease which included a broad exculpatory clause to prevent substantial damages. See Hyatt v. Mini Storage on the Green, 236 N.C. App. 278, 763 S.E.2d 166 (2014) (enforcing an exculpatory clause that protected against "any personal injuries" sustained on landlord's premises).
Id. at 282, 763 S.E.2d at 169 (brackets omitted). This Court found this language constituted an exculpatory clause which "clearly and explicitly provides that [defendant] would not be liable for personal injuries sustained on the premises." Id. at 282-83, 763 S.E.2d at 170.
Further, in Lexington, this Court enforced a clause requiring the lessee to maintain insurance and waiving their rights to recovery. Lexington, 136 N.C. App. at 227, 522 S.E.2d at 801. In Lexington, the subrogation agreement stated:
Id. at 223-24, 522 S.E.2d at 799 (emphasis added). This Court found the subrogation clause "plain and unambiguous" as both parties "agreed to include a subrogation waiver clause in any insurance policies . . . which covered the leased premises." Id. at 226-27, 522 S.E.2d at 801.
Conversely, in Winkler, the parties lacked contractual intent while the lease lacked a subrogation clause, and Freeman only required the parties to protect against damages to their own property. Commercial real estate leases which "clearly and explicitly evidence[] the intent of each of the parties to relieve the other from all liability for damages otherwise covered by insurance, including liability for negligence" are enforceable. Lexington, 136 N.C. App. at 227, 522 S.E.2d at 801.
In the case sub judice, the parties clearly and explicitly waived all claims, including claims for negligence. The relevant portion of the Exculpatory Clause reads:
(Emphasis added).
The Exculpatory Clause shields Defendants from liability for "all claims and liabilities arising from or caused by any hazard covered by insurance on the leased premises. . . regardless of the cause of the damage or loss." Similar to Lexington, the Exculpatory Clause clearly and explicitly operates as a waiver of negligence for any liability on the leased premises.
Additionally, Paragraph 8 of the lease required Plaintiffs to possess both property and liability insurance in clear and unambiguous
It is not within this Court's discretion to redraft a private commercial real estate lease that is not contrary to public policy. Because the clear and unambiguous language of this commercial lease precludes recovery by Plaintiffs, I would affirm the trial court's entry of summary judgment.