SIMON, District Judge.
This action arises from a dispute at Terminal 6 at the Port of Portland concerning the work of plugging in, unplugging, and monitoring refrigerated shipping containers (the "reefer work"). The International Longshore and Warehouse Union ("ILWU") and the Pacific Maritime Association ("PMA") contend that their collective bargaining agreement — the Pacific Coast Longshore Contract Document ("PCLCD") — requires ICTSI Oregon, Inc. ("ICTSI"), the operator of Terminal 6 and a PMA member, to assign the reefer work to ILWU members. ICTSI, the Port of Portland (the "Port"), and the International Brotherhood of Electrical Workers ("IBEW") Local 48 contend that other contracts — including the Terminal 6 Lease Agreement between the Port and ICTSI and the District Council of Trade Unions Agreement between the Port and IBEW — require that the reefer work be assigned to IBEW members. On August 13, 2012, a three-member panel of the National Labor Relations Board (the "NLRB") issued a decision pursuant to § 10(k) of the National Labor Relations Act ("NLRA"), 29 U.S.C. § 160(k), concluding that employees represented by IBEW are entitled to perform the reefer work. Int'l Bhd. of Elec. Workers, 358 NLRB No. 102, 2012 WL 3306478 (Aug. 13, 2012).
Several shipping companies that call on the Port of Portland (the "Carriers") are members of PMA, and, as such, are parties to the PCLCD. Notwithstanding the NLRB's § 10(k) decision, ILWU, ILWU Local 8, and ILWU Local 40 (collectively "Respondents") have continued to file and process lost work opportunity grievances against the Carriers, seeking lost wages for reefer work assigned to IBEW members. In addition, ILWU has not withdrawn its claim made under § 301 of the Labor-Management Relations Act against ICTSI in Int'l Longshore & Warehouse Union v. ICTSI Oregon, Inc., Case No. 3:12-cv-01058-SI (D.Or.) (the "§ 301 claim"), a related action pending in this Court. In its § 301 claim, ILWU asks this Court to confirm arbitration awards made pursuant to the PCLCD that require ICTSI to assign the reefer work to ILWU members.
In response to Respondents' refusal to withdraw their § 301 claim and their continued
Before the Court is Petitioner's petition for a preliminary injunction pursuant to § 10(l) of the NLRA, 29 U.S.C. § 160(l). Dkt. 1. Petitioner seeks to enjoin Respondents from pursuing grievances against ICTSI and the Carriers and maintaining their § 301 claim against ICTSI pending the NLRB's final decision on Petitioner's unfair labor practice charges. For the reasons discussed below, the Court finds that Petitioner has satisfied the criteria for a preliminary injunction. Accordingly, as described more fully below, the Court preliminarily enjoins Respondents from filing lost work opportunity grievances against ICTSI or the Carriers pending the NLRB's final decision.
PMA is a multi-employer collective bargaining association whose members include stevedoring companies, terminal operators, and shipping companies. Dkt. 2-2 at 136-37. The Carriers, who are members of PMA, include Cosco North America, Inc., Hamburg Sud North America, Inc., Hanjin Shipping America, LLC, Hapag Lloyd America, Inc., "K" Line America, Inc., and Yang Ming America Corporation. See, e.g., Dkt. 2-2 at 18 and 60; Dkt. 2-3 at ¶ 5. Respondents are labor organizations. Dkt. 2-2 at 136.
ILWU and PMA are party to a collective bargaining agreement known as the PCLCD.
The Port is not a member of PMA and is not party to the PCLCD. IBEW is also not a party to the PCLCD. The Port and IBEW, however, are parties to their own collective bargaining agreement, known as the District Council of Trade Unions Agreement ("DCTU Agreement"). Under the DCTU Agreement, IBEW-represented employees are entitled to perform the reefer work at Terminal 6 and have done so since 1974. Int'l Bhd. of Elec. Workers, 2012 WL 3306478, at *1.
ICTSI is a cargo handling company. Petition for Preliminary Injunctive Relief ("Pet.") at ¶ 8(a) (Dkt. 1). In 2011, ICTSI entered into a 25-year lease with the Port to operate Terminal 6 at the Port of Portland. Int'l Bhd. of Elec. Workers, 2012 WL 3306478, at *1. Although ICTSI is not a signatory to the DCTU Agreement, the Terminal 6 Lease provides that ICTSI may not "undertake any action that would cause the Port to be in violation of the terms of the DCTU Agreement." Id. at *2 (quoting Terminal 6 Lease Agreement). Shortly after ICTSI entered into the Terminal 6 Lease, it joined PMA. As a member of PMA, ICTSI became bound by the PCLCD. Id. Even though ICTSI is party to the PCLCD, the Port, IBEW, and ICTSI contend that the DCTU Agreement and the Terminal 6 Lease require ICTSI to use IBEW-represented employees to perform the reefer work on Terminal 6. When it began operating Terminal 6, ICTSI used IBEW members to perform reefer work on Terminal 6.
In early 2012, pursuant to the PCLCD's grievance procedures, Respondents began to file "lost work opportunity" grievances against ICTSI and the Carriers. See, e.g., Dkt. 2-2 at 9, 12-20. These grievances allege that ICTSI and the Carriers are inappropriately contracting non-ILWU members (i.e., IBEW members) to perform the reefer work, in violation of Section 1 of the PCLCD. In June, pursuant to the PCLCD's arbitration provisions, an arbitrator issued two decisions directing ICTSI to assign the reefer work to ELWU members. Dkt. 2-2 at 191, 196-97. Section 301 of the Labor Management Relations Act, 29 U.S.C. § 185, provides United States District Courts with jurisdiction to enforce final and binding arbitration awards. Gen. Drivers, Warehousemen & Helpers, Local Union No. 89 v. Riss & Co., 372 U.S. 517, 519, 83 S.Ct. 789, 9 L.Ed.2d 918 (1963) (per curiam). ILWU brought an action pursuant to § 301 — the "§ 301 claim," described above — to enforce these arbitration awards. Dkt. 2-2 at 135-47; Int'l Longshore & Warehouse Union v. ICTSI Oregon, Inc., Case No. 3:12-cv-01058-SI (D.Or.).
In response to Respondents' grievances, in May 2012, IBEW threatened to picket if ICTSI assigned the reefer work to ILWU members. Int'l Bhd. of Elec. Workers, 2012 WL 3306478, at *4. ICTSI filed unfair labor practice charges against IBEW with the NLRB. Id. at *1. ILWU Local 8 intervened in the case, and the NLRB held a § 10(k) proceeding. "A § 10(k) proceeding is a hearing conducted by the NLRB subsequent to a § 8(b)(4)(ii)(D) claim to determine which union has the superior claim to `work in dispute.'" Miron Constr. Co., Inc. v. Int'l Union of Operating
On August 13, 2012, the NLRB issued a § 10(k) decision that awarded the reefer work to the members of IBEW. In its decision, the NLRB noted that both "IBEW and ILWU are party to collective-bargaining agreements that cover the disputed work." Id. at *5. Under the PCLCD, ICTSI is bound to assign the reefer work to ILWU members. Id. Under the DCTU Agreement, the Port is bound to assign the reefer work to IBEW members. Id. After considering a variety of factors, including the provisions of the applicable collective bargaining agreements, employer preference, past practice, area and industry practice, relative skills and training, and economy and efficiency of operations, the NLRB concluded "that employees represented by IBEW are entitled to perform the work in dispute." Id. at *7.
The NLRB's § 10(k) decision awarded the reefer work to IBEW members. Nonetheless, according to Petitioner, Respondents have engaged in three courses of conduct since the § 10(k) decision that are unfair labor practices in violation of the NLRA. First, ILWU has continued to maintain its § 301 claim in Int'l Longshore & Warehouse Union v. ICTSI Oregon, Inc., Case No. 3:12-cv-01058-SI (D.Or.). Pet. at ¶ 8(s). Second, Respondents have filed dozens of lost work opportunity grievances against the Carriers.
On August 17 and 22, 2012, ICTSI filed two new charges with Petitioner, alleging that Respondents are engaging in additional unfair labor practices. Pet. at ¶ 3. Petitioner consolidated the charges and issued an administrative complaint with the NLRB against Respondents, alleging that Respondents are violating §§ 8(b)(4)(ii)(B) and (D) of the NLRA. Dkt. 2-3; see also 29 C.F.R. § 101.8 (governing issuance of unfair labor practice complaints). Pursuant to the NLRA and the NLRB's rules and regulations, an administrative law judge ("ALJ") will hold a hearing on Petitioner's administrative complaint and issue a decision. 29 C.F.R. §§ 101.10 and 101.11. Petitioner, ICTSI, and Respondents will have an opportunity to appeal the ALJ's decision to the members of the NLRB. Id. at § 101.12. If any party disagrees with the NLRB's decision, that party may appeal the NLRB's decision to the United State Court of Appeals for the Ninth Circuit or the District of Columbia Circuit. Id. at § 101.14; 29 U.S.C. § 160(f). This Court does not have jurisdiction to hear Petitioner's administrative complaint and will not ultimately decide any of the unfair labor practice claims raised in the administrative complaint. This Court also will not review the NLRB's decision. Walsh v. Int'l Longshoremen's
A preliminary injunction is an "extraordinary remedy that may only be awarded upon a clear showing that the plaintiff is entitled to such relief." Winter v. Natural Res. Def. Council, 555 U.S. 7, 22, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008). A plaintiff seeking a preliminary injunction must show: (1) that he is likely to succeed on the merits; (2) that he is likely to suffer irreparable harm in the absence of preliminary relief; (3) that the balance of equities tips in his favor; and (4) that an injunction is in the public interest. Id. at 20, 129 S.Ct. 365. A district court in the Ninth Circuit must apply the Winter elements to requests for § 10(l) preliminary injunctions. Small v. Operative Plasterers' & Cement Masons' Int'l Ass'n Local 200, AFL-CIO, 611 F.3d 483, 489-90 (9th Cir. 2010).
The Supreme Court's decision in Winter, however, did not entirely displace the Ninth Circuit's "sliding scale" approach to preliminary injunctions. Alliance for the Wild Rockies v. Cottrell, 632 F.3d 1127, 1131 (9th Cir.2011). Under this approach, "a stronger showing of one element may offset a weaker showing of another." Id. Thus, a preliminary injunction may be granted "if there is a likelihood of irreparable injury to plaintiff; there are serious questions going to the merits; the balance of hardships tips sharply in favor of the plaintiff; and the injunction is in the public interest." M.R. v. Dreyfus, 663 F.3d 1100, 1108 (9th Cir.2011) (emphasis added); see also Alliance for the Wild Rockies, 632 F.3d at 1132.
Petitioner seeks a § 10(l) preliminary injunction enjoining "Respondents from: (a) threatening or coercing ICTSI and others; (b) filing, maintaining and/or processing grievances against ICTSI that seek any relief inconsistent with the 10(k) Award; and (c) maintaining their legal action in ILWU and PMA v. ICTSI Oregon, Inc., Case No. 3:12-cv-01058-SI, in each case with the dual objects of forcing the assignment of certain work to Respondent Local 8 and/or Respondent Local 40, in violation of § 8(b)(4)(ii)(B) and § 8(b)(4)(ii)(D) of the Act." Mem. of P. & A. at 9 (Dkt. 2). As discussed below, the Court finds that Petitioner meets each of the four Winter elements.
The first Winter element requires Petitioner to demonstrate that he is likely to succeed on the merits of his claims. Petitioner's administrative complaint raises two claims. First, Petitioner alleges that Respondents have violated § 8(b)(4)(ii)(B) of the NLRA by unlawfully attempting to cause ICTSI and the Carriers to cease doing business with the Port. Dkt. 2-3 at ¶¶ 12, 14. Second, Petitioner alleges that Respondents have violated § 8(b)(4)(ii)(D) of the NLRA by unlawfully attempting to cause the Port and ICTSI to re-assign the reefer work to their members, in contravention to the NLRB's August 13, 2012, § 10(k) decision awarding the reefer work to IBEW members. Dkt. 2-3 at ¶¶ 13-14. Because the Court finds that analysis of Petitioner's § 8(b)(4)(ii)(D) claim bears on
Congress "intended to make the section 10(k) proceeding the peaceful and binding final determination of a disputed work assignment[.]" Int'l Longshoremen's & Warehousemen's Union, Local 32 v. Pac. Mar. Ass'n, 773 F.2d 1012, 1020 (9th Cir. 1985) (internal quotation marks and citation omitted). As such, Section 10(k) awards "take precedence" over inconsistent arbitration awards. Carey v. Westinghouse Elec. Corp., 375 U.S. 261, 272, 84 S.Ct. 401, 11 L.Ed.2d 320 (1964). "To effectuate the purposes of [§] 10(k), it is essential that once an NLRB order becomes final, no court — state or federal — be permitted to impair compliance with it." Associated Gen. Contractors of Am., Inc., Oregon-Columbia Chapter v. Int'l Union of Operating Eng'rs, Local 701, 529 F.2d 1395, 1397 (9th Cir.1976).
Section 8(b)(4)(ii)(D) provides that it is an unfair labor practice for a union to "threaten, coerce, or restrain any person engaged in commerce" with the object of forcing or requiring "any employer to assign particular work to employees in a particular labor organization ... rather than to employees in another labor organization[.]" 29 U.S.C. § 158(b)(4)(ii)(D). After the NLRB has issued a § 10(k) decision resolving a disputed work assignment, it is a violation of § 8(b)(4)(ii)(D) for the losing union to file lost work opportunity grievances or § 301 claims that have the object of undermining the § 10(k) award. Int'l Longshoremen's & Warehousemen's Union, Local 32, 773 F.2d at 1015 ("The union's attempt to obtain payment for work to which it is not entitled would, if successful, completely undermine the section 10(k) work assignment."); Local 30, United Slate, Tile & Composition Roofers, Damp & Waterproof Workers Ass'n, AFL-CIO v. N.L.R.B., 1 F.3d 1419, 1426 (3d Cir. 1993) ("the pursuit of a section 301 breach of contract suit that directly conflicts with a section 10(k) determination has an illegal objective and is enjoinable as an unfair labor practice under section 8(b)(4)(ii)(D)"); Sheet Metal Workers Int'l Assoc., 357 NLRB No. 131, 2011 WL 6120725 (Dec. 8, 2011) ("It is well established that a union's lawsuit to obtain work awarded by the NLRB under Section 10(k) to a different group of employees, or monetary damages in lieu of the work, has an illegal objective ... and violates Section 8(b)(4)(ii)(D).").
Given this well-established precedent, the NLRB is likely to determine that Respondents' claims against ICTSI — both the § 301 claim and any pending lost work opportunity grievances made under the PCLCD — violate § 8(b)(4)(ii)(D). With respect to the § 301 claim, the NLRB's § 10(k) decision awarding the reefer work to IBEW-represented employees takes precedence over the conflicting arbitration awards requiring ICTSI to assign the reefer work to ILWU-represented employees. Accordingly, the NLRB is likely to find that Respondents have violated § 8(b)(4)(ii)(D) by refusing to withdraw the § 301 claim. Respondents do not disagree.
Respondents' grievances against the Carriers present a more difficult question. Respondents argue that their grievances against the Carriers do not violate § 8(b)(4)(ii)(D) because they do not undermine the § 10(k) award. Respondents contend that the grievances against the Carriers seek "money damages ... for subcontracting out the reefer work to non-unit personnel[.]" Opp'n to Pet. at 11. As such, Respondents contend, their grievances against the Carriers do "not conflict with the NLRB's § 10(k) award[.]" Id.
Respondents' argument is grounded in a line of cases beginning with Associated General Contractors of America, Inc., Oregon-Columbia Chapter v. International Union of Operating Engineers, Local 701, 529 F.2d 1395 (9th Cir.1976) ("AGC"). Associated General Contractors ("AGC") was a multi-employer collective bargaining association. AGC and the International Union of Operating Engineers, Local 701 ("Local 701") were parties to a collective bargaining agreement ("CBA"). The CBA provided that AGC-member companies were to use Local 701 members to operate concrete pumps. The CBA also provided that AGC members were prohibited from subcontracting any work to a subcontractor that was not also a party to the AGC-Local 701 CBA.
Pump-con was a concrete pumping company. Pump-con was not a member of AGC or a signatory to the AGC-Local 701 CBA. Pump-con was, however, a member of another multi-employer group known as the Northwest Concrete Pumping Association ("Northwest"). Northwest was party to a different CBA with the Teamsters Union. The Northwest-Teamsters CBA provided that the operation of concrete pumps was to be performed by members of the Teamsters.
An AGC member, Western-Pacific, subcontracted a concrete pumping job to Pump-con. Pump-con then employed a Teamster member to operate a concrete pump. In response, Local 701 filed a grievance, pursuant to the AGC-Local 701 CBA. A "Board of Adjustment, as provided in the AGC-Local 701 agreement, heard the grievance and ruled that the disputed work was to be performed by a member of Local 701." Id. at 1396. The Teamsters threatened to strike, and Western-Pacific filed an unfair labor practice charge with the NLRB.
The Ninth Circuit agreed with Local 701 that despite the § 10(k) award, they could pursue their grievances against AGC members who subcontracted pumping work to companies that were not party to the AGC-Local 701 CBA. The Ninth Circuit noted that Local 701's grievances did not seek to compel Northwest to use Local 701 members to operate the concrete pumps. Instead, Local 701's grievances sought money damages from AGC members who breached the subcontracting clause in the AGC-Local 701 CBA. The Ninth Circuit explained:
Id. at 1397 (internal citations omitted). Local 701's grievances, however, avoided those problems. AGC members could comply with both the § 10(k) decision and the AGC-Local 701 CBA by subcontracting only to employers who were parties to the AGC-Local 701 CBA. Thus, Local 701's grievances did not place AGC members "between the devil and the deep blue":
Id. at 1398.
Several other courts and the NLRB itself have applied this reasoning in similar circumstances. See Hutter Constr. Co. v. Int'l Union of Operating Eng'rs, Local 139, AFL-CIO, 862 F.2d 641, 642 (7th Cir.1988); Miron Constr. Co., Inc. v. Int'l Union of Operating Eng'rs, Local 139, 44 F.3d 558, 563 (7th Cir.1995); Carpenters Local 33 (AGC of Mass.), 289 NLRB No. 167, 1988 WL 213975 (July 29, 1988). Each of these cases shares three crucial characteristics. First, in each case, the complaining union was party to a CBA with a general contractor. That CBA contained a clause that proscribed the general contractor from subcontracting work to employers that were not also parties to the CBA. Second, in each case, the general
Respondents argue that AGC contains "a fact pattern virtually identical to the present matter." Opp'n to Pet. at 6. First, Respondents argue that the Carriers are general contractors and the PCLCD forbids the Carriers from subcontracting reefer work to "non-bargaining unit personnel." Opp'n to Pet. at 5, 13, 15-16. Second, they suggest that the Carriers have violated the PCLCD by subcontracting the reefer work to "non-bargaining unit personnel." Third, Respondents suggest that their grievances against the Carriers are intended to obtain only contract-based money damages from the Carriers, not to force the Port and ICTSI to reassign the reefer work to ILWU members. Id. at 21-22.
The Court, however, is unconvinced. Respondents fail to identify any specific provision of the PCLCD that the Carriers allegedly breached by supposedly subcontracting the reefer work. Accordingly, the Court cannot conclude that Respondents have valid breach-of-contract money damage claims against the Carriers that are independent of the § 10(k) decision.
Moreover, even if the PCLCD did contain a subcontracting provision similar to provisions present in the CBAs in AGC, Hutter, Miron, and Carpenters Local 33, the circumstances here would still not be analogous to the circumstances in the AGC line of cases. Here, the Carriers subcontracted with ICTSI to perform the reefer work. Unlike the subcontractors in the AGC line of cases, however, ICTSI (the subcontractor) is a party to the CBA (the PCLCD) between the general contractor (the Carriers) and the complaining union (Respondents). Thus, even assuming that the PCLCD forbids the Carriers from subcontracting work to non-signatories to the PCLCD, the Carriers could not have breached that provision by contracting with ICTSI because ICTSI is party to the PCLCD.
Simply put, Respondents have failed to establish that their lost work opportunity grievances against the Carriers are based on a plausible breach-of-contract theory similar to the unions' breach-of-contract claims in the AGC line of cases. In the absence of a plausible breach-of-contract claim against the Carriers that is independent of the § 10(k) decision, it appears that Respondents' grievances against the Carriers are simply (or at least primarily) intended indirectly to pressure the Port and ICTSI to assign the reefer work to ILWU members. In fact, in response to Respondents' grievances, one carrier, Hanjin, sent an email to ICTSI and the Port demanding that they use ILWU members to perform reefer work. Dkt. 2-2 at 218-19. Section 8(b)(4)(ii)(D) is intended to prohibit this sort of conduct.
The Court recognizes that the legal principles developed in AGC, Hutter, Miron, and Carpenters Local 33 are complex and nuanced. Moreover, the peculiar circumstances of this case may warrant either expansion or contraction of those principles. This Court, however, does not have jurisdiction to enter a final decision on whether Respondents' grievances against the Carriers violate § 8(b)(4)(ii)(D). That decision belongs to the NLRB. In the present decision, the Court must simply determine whether Petitioner is likely to succeed on the merits of his claims. The Court concludes that Petitioner is likely to succeed on his § 8(b)(4)(ii)(D) claim.
Section 8(b)(4)(ii)(B) provides that it is an unfair labor practice for a union "to threaten, coerce, or restrain any person engaged in commerce" where an object of the union's conduct is to force or require "any person to ... cease doing business with any other person." 29 U.S.C. 158(b)(4)(ii)(B). Section (b)(4)(ii)(B) "only prohibits ... so-called `secondary' activity, not primary activity." John B. Cruz Constr. Co., Inc. v. United Bhd. of Carpenters & Joiners of Am., Local 33, 907 F.2d 1228, 1230 (1st Cir.1990). The "distinction between primary and secondary activity depends upon the object of the union's picketing. If the object of the union's conduct is to put direct pressure on the employer with whom the union has a dispute, the conduct is primary and lawful. If, on the other hand, the primary object of the union's conduct, taken as a whole, is to bring indirect pressure on the primary employer by involving a neutral or secondary employer in the dispute, the conduct is secondary and prohibited." Id.; see also Prod. Workers Union of Chicago & Vicinity, Local 707 v. N.L.R.B., 793 F.2d 323, 330 (D.C.Cir.1986) ("secondary activity under Section 8(b)(4)(B) refers only to pressure on a neutral third party").
In National Woodwork Manufacturers Association v. N.L.R.B., 386 U.S. 612, 87 S.Ct. 1250, 18 L.Ed.2d 357 (1967), the Supreme Court carved out an exception to the prohibition on secondary activity. This exception is often called the "work preservation" doctrine. Under the work preservation doctrine, a union's activity that is "conducted for the sole purpose of preserving traditional unit work and directed at an immediate employer [is] not violative of section 8(b)(4)[ii](B) in spite of ancillary secondary effects." Local 644, United Bhd. of Carpenters & Joiners of Am., AFL-CIO v. N.L.R.B., 533 F.2d 1136, 1147 (D.C.Cir.1975). To qualify as lawful work preservation, the union's conduct must satisfy two tests:
N.L.R.B. v. Int'l Longshoremen's Ass'n, AFL-CIO, 447 U.S. 490, 504-05, 100 S.Ct. 2305, 65 L.Ed.2d 289 (1980). Thus, under the second prong, the "right of control" test, a union's activity performed with the object of preserving the union's work may nevertheless "violate § 8(b)(4)[ii](B) if the primary employer `does not have control over the assignment of the work sought by the union.'"
Petitioner alleges that Respondents' pursuit of the § 301 claim and grievances against the Carriers violates § 8(b)(4)(ii)(B) because ICTSI and the
The Court concludes that Petitioner is likely to prevail before the NLRB on the claim that Respondents' grievances against the Carriers violate § 8(b)(4)(ii)(B). Contrary to Respondents' argument, the Court finds that the NLRB is likely to conclude that Respondents' grievances are not lawful pursuant to the work preservation doctrine. The NLRB has already found, in its § 10(k) decision, that Respondents do not have a work preservation claim to the reefer work. The NLRB explained that "IBEW-represented electricians have been performing the disputed work since 1974. Where, as here, a union is claiming work for employees who have not previously performed it, the objective is not work preservation, but work acquisition." Int'l Bhd. of Elec. Workers, 2012 WL 3306478, at *4.
Even assuming, however, that Respondents' activity has as its objective the preservation of work traditionally performed by ILWU members, thereby satisfying the first test required under the work preservation doctrine, Respondents would still fail to satisfy the right of control test. The question of which party in the present dispute has the right to control the reefer work has been decided twice before. In Hooks v. Int'l Longshore & Warehouse Union, Local 8, Case No. 3:12-cv-01088-SI (D.Or.), this Court determined that the Port of Portland controlled the reefer work. In addition, in its § 10(k) decision, the NLRB determined that the Port controls the reefer work. Int'l Bhd. of Elec. Workers, 2012 WL 3306478, at *6 ("the Port is the employer in control of the work in dispute").
Notwithstanding these decisions, Respondents cite to case law and e-mails sent from the Carriers to the Port and ICTSI and argues that the Carriers have the right to control the reefer work. Neither the case law nor the e-mails cited by Respondents warrant revisiting the conclusions already reached by this Court and by the NLRB that the Port, not the Carriers, controls the assignment of the reefer work. The principal case cited by Respondents is N.L.R.B. v. Int'l Longshoremen's Ass'n, AFL-CIO, 473 U.S. 61, 105 S.Ct. 3045, 87 L.Ed.2d 47 (1985) ("ILA"). Opp'n to Pet. at 15. In that case, the Supreme Court noted that "the longshoremen's employers, marine shipping companies, have the `right to control' container loading and unloading work by virtue of their ownership or leasing control of the containers." Id. at 74 n. 20, 105 S.Ct. 3045. On the facts before the Supreme Court in that case, this may well have been true. ILA, however, was decided more than 25 years ago and on the basis of contractual agreements that have long since been superseded. This Court cannot rely on a statement in a 25-year-old case that was made on the basis of different facts and different contracts to determine that the Carriers here have the right to control the reefer work at Terminal 6 today.
Because the Carriers lack the authority to assign the reefer work to ILWU members, Respondents' grievances against the Carriers cannot compel the Carriers to assign the reefer work to ILWU members. The "commonsense inference" to be drawn from this evidence is that, because the Carriers have no power to assign the reefer work to ILWU members, Respondents' grievances are tactically calculated to pressure the Carriers to cease doing business with the Port. United Food & Commercial Workers Union Local No. 367, 333 NLRB No. 84, 2001 WL 345201 (Apr. 4, 2001) ("The `commonsense inference' to be drawn from all the record evidence is that, because QFC has no power to assign the work in controversy, the Respondent's grievance-arbitration was not addressed to the labor relations of the contracting Employer QFC vis-a-vis its own employees, but was calculated to satisfy union objectives elsewhere vis-a-vis Cinnabon."). Section 8(b)(4)(ii)(B) makes it an unlawful trade practice for a union to coerce, threaten, or restrain a neutral employer where the object of the union's conduct is to force or require the that neutral employer to cease doing business with another employer. The NLRB is likely to find, therefore, that Respondents have violated § 8(b)(4)(ii)(B) by filing lost work opportunity grievances against the Carriers.
Permitting an "allegedly unfair labor practice to reach fruition and thereby render meaningless the NLRB's remedial authority is irreparable harm." Small, 611 F.3d at 494 (internal quotation marks and citation omitted). In this case, Respondents' § 301 claim against ICTSI is continuing to cost ICTSI legal fees. In addition, Carrier Hanjin has threatened to pass along the cost of its legal fees defending Respondents' grievances to ICTSI. Dkt. 202 at 218-19. ICTSI states that if the Carriers hold ICTSI responsible for Respondents' grievances against the Carriers, ICTSI would "be forced, by economic necessity, to suspend or drastically curtail operations at the Terminal." Affidavit of Elvis Ganda, Dkt. 19-2 at 41. Respondents' grievances against the Carriers could also cause the Carriers to make the decision to bypass the Port of Portland.
The balance of the equities tips sharply in Petitioner's favor. The only hardship Respondents face is delay in prosecuting a lawsuit that the NLRB will likely conclude is unlawful and delay in pursuing grievances seeking money damages against the Carriers that the NLRB will likely find to be unwarranted. Even if the NLRB were to conclude that Respondents' grievances against the Carriers are lawful, the delay pending the NLRB's decision will not "irreparably harm" Respondents. Respondents' grievances against the Carriers seek only money damages. If the NLRB were to decide that Respondents may pursue those grievances, the delay will not deprive Respondents of the ability ultimately to obtain the money damages they seek. As described above, the hardships faced by Petitioner are significantly more severe. ICTSI faces the possibility of no longer being able to operate at Terminal 6.
Further, a decision by the Carriers to bypass the Port of Portland would likely injure the local and regional economies and deprive many employees at Terminal 6 of the opportunity to work. In light of all of these potential consequences, the balance of equities and public interest sharply favors the granting of a preliminary injunction. See Small, 611 F.3d at 494-95 (union's delay in prosecuting lawsuit did not outweigh potential "disruption of industrial peace" caused by reassigning disputed work from one union to another).
The Court concludes that Petitioner has satisfied each of the four Winter elements required for the granting of a § 10(l) preliminary injunction. Moreover, even if Petitioner did not fully demonstrate that he was likely to succeed on the merits of his claims, the Court concludes that Petitioner has raised serious questions going to the merits of his claims and the balance of equities tips sharply in his favor. Thus, Petitioner has established that the Court should issue a preliminary injunction pursuant to both the traditional Winter test and the Ninth Circuit's "serious questions" variation of that test. The Court, therefore,
Pending final adjudication by the NLRB of the pending administrative action above:
IT IS SO ORDERED.