EDUARDO C. ROBRENO, District Judge.
Before the Court is Defendant's motion for summary judgment as to Plaintiffs' bad
On February 17, 2009, Plaintiffs 3039 B Street Associates, Inc. and Gianni Bignetti ("Plaintiffs") initiated this action against Defendant Lexington Insurance Company ("Defendant"),
On May 21, 2009, the Court, after applying Pennsylvania choice of law rules, denied Defendant's motion to compel appraisal and to dismiss/stay litigation. There, the Court determined that, under both Pennsylvania and New York law, where an insurance policy breach has been alleged, appraisal is pre-mature "prior to the admission of liability."
On August 14, 2009, Defendant filed a motion for summary judgment, now pending before the Court. Therein, Defendant requests that Plaintiffs' bad faith claims and the additional cause for relief in the form of punitive damages be dismissed.
On August 27, 2009, Plaintiffs filed a first amended complaint alleging three counts under Pennsylvania law: (1) the Appraisal, wherein parties will make additional submissions to this Court should differences in valuation exist regarding the balance of damages; (2) the 3039 Bad Faith Action; and (3) the Pignetti Bad Faith Action.
On September 19, 2009, Plaintiffs filed a supplemental response in opposition to Defendant's cross-motion for summary judgment and an amended motion to modify the scheduling order. Therein, Plaintiffs, assuming Pennsylvania law controls, provided statutory and case law in support of their bad faith claims.
Following a hearing before the Court, on November 23, 2009, Defendant filed its omnibus reply and, on December 8, 2009, Plaintiffs filed their omnibus sur-reply. Defendant's motion for summary judgment is now ripe for adjudication.
Summary judgment is appropriate if there are no genuine issues of material fact and the moving party is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(c). The "mere existence" of disputed facts will not result in denial of a motion for summary judgment; rather there must be "a genuine issue of material fact." Am. Eagle Outfitters v. Lyle & Scott Ltd., 584 F.3d 575, 581 (3d Cir.2009) (quoting Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247-248, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986)). A fact is "material" if proof of its existence or non-existence might affect the outcome of the litigation and a dispute is "genuine" if "the evidence is such that a reasonable jury could return a verdict for the nonmoving party." Liberty Lobby, 477 U.S. at 248, 106 S.Ct. 2505.
"After making all reasonable inferences in the nonmoving party's favor, there is a genuine issue of material fact if a reasonable jury could find for the nonmoving party." Pignataro v. Port Authority of N.Y. and N.J., 593 F.3d 265, 268 (3d Cir. 2010) (citing Reliance Ins. Co. v. Moessner, 121 F.3d 895, 900 (3d Cir.1997)). While the moving party bears the initial burden of showing the absence of a genuine issue of material fact, the non-moving party "may not rely merely on allegations or denials in its own pleading; rather its response must—by affidavits or as otherwise provided in [Rule 56]—set out specific facts showing a genuine issue for trial." Fed. R. Civ. P. 56(e)(2).
In the case at bar, Defendant argues that the Court should determine that New York law applies to a claim of bad faith concerning an insurance policy issued in New York (the "Policy"). Plaintiff, however, argues Pennsylvania law controls because the Policy was signed by the insureds and the location of the insured real property is in Pennsylvania. The Court must first determine whether Pennsylvania or New York law applies to this case.
The conflict of laws rules of the forum state apply when a federal court exercises diversity jurisdiction. Kaneff v. Del. Title Loans, Inc., 587 F.3d 616, 621 (3d Cir.2009) (internal citations omitted). Therefore, as this Court sits in Pennsylvania, it will apply Pennsylvania's choice of law rules.
Pennsylvania employs a two-step hybrid framework to choice of law questions. See Atl. Pier Assocs., LLC v. Boardakan Rest. Partners, 647 F.Supp.2d 474, 486-87 (E.D.Pa.2009) (Robreno, J.) (discussing Pennsylvania's approach to conflict of laws issue) (internal citation omitted). Under the first step of this analysis, the Court must determine whether a real conflict exists between the respective laws. Hammersmith v. TIG Ins. Co., 480 F.3d 220, 230 (3d Cir.2007). Where a conflict exists, a court must proceed to the second step of the conflict inquiry to determine whether the conflict is "true," "false," or "unprovided for." Id. at 230.
A real conflict exists only where the application of each state's substantive law produces a contrary result. Id. If the same result would ensue under the laws of the forum state and those of the foreign jurisdiction, then no conflict exists and the court may avoid the choice of law question altogether. Id.; see Berg Chilling Sys., Inc. v. Hull Corp., 435 F.3d 455, 462 (3d Cir.2006) (finding that where applying the laws of both jurisdictions would produce an identical result, a court should not engage in a choice of law analysis) (citing Williams v. Stone, 109 F.3d 890, 893 (3d Cir.1997)).
Defendant (the insurer) contends the Court should apply New York law to a claim of bad faith concerning an insurance policy issued in New York, even though the Policy covers property in Pennsylvania.
New York law does not recognize the tort of bad faith denial of insurance coverage. See Core-Mark Int'l Corp. v. Commonwealth Ins. Co., 2005 WL 1676704, at *3 2005 U.S. Dist. LEXIS 14312, at *9 (S.D.N.Y. July 19, 2005) (citing Polidoro v. Chubb Corp., 354 F.Supp.2d 349, 352 (S.D.N.Y.2005) ("Plaintiff's claim for bad-faith conduct in handling insurance claims is not legally-cognizable under New York law.")); USAlliance Fed. Credit Union v. CUMIS Ins. Soc'y, Inc., 346 F.Supp.2d 468, 470 (S.D.N.Y. 2004) ("Plaintiff's claim for bad faith denial of coverage is crafted as an independent cause of action in its complaint but, as the Defendant correctly points out, an independent tort action for bad faith denial of insurance coverage is not recognized in New York."); (Cont'l Info. Sys. Corp. v. Fed. Ins. Co., 2003 WL 145561, at *1, 2003 U.S. Dist. LEXIS 682, at *3 (S.D.N.Y. Jan. 17, 2003)).
Pennsylvania law, however, provides a private cause of action for bad faith insurance disputes under 42 Pa.C.S. § 8371. Section 8371 provides a private plaintiff with remedies "if the court finds that the insurer has acted in bad faith toward the insured." 42 Pa.C.S. § 8371.
Therefore, where New York does not recognize a bad faith insurance claim and Pennsylvania law does, a real conflict exists. The Court must next determine whether the conflict is classified as true, false or unprovided for.
A "true" conflict exists where both states have a cognizable interest in applying their own law. Hammersmith, 480 F.3d at 230. A "false" conflict exists when only one state has an actual interest in applying its law. Id. The situation is "unprovided for" when neither state has an interest in applying its own law. Id. at n.9. Where a false conflict or "unprovided for" situation exists, the Court's inquiry is at an end and the law of the forum applies. It is only necessary to proceed to a "deeper" choice of law analysis where a true conflict exists, i.e., the interests of both of the respective states would be impaired by application of the other's law. Id. at 230 (citing Cipolla v. Shaposka, 439 Pa. 563, 267 A.2d 854, 856 (1970) (emphasis in original)).
Here, Pennsylvania has asserted an interest in having its law applied by providing for a private statutory cause of action under § 8371. Pennsylvania affords its citizens a legal remedy following bad faith insurance disputes. New York, in failing to recognize bad faith insurance contract disputes and the resulting damages, is at least neutral with regards to application of its own law.
Where Pennsylvania law controls, the Court must determine whether Plaintiffs may bring their claims pursuant to either Pennsylvania's Unfair Insurance Practices Act ("UIPA"), 40 P.S. § 1171.1, or Pennsylvania's statutory "bad faith" standard, 42 Pa.C.S. § 8317.
The UIPA prohibits a person from engaging in an unfair method of competition or an unfair or deceptive act or practice in the insurance business. 40 P.S. § 1171.1. However, a private party cannot assert a bad faith claim under UIPA as no private right of action exists. See Atiyeh v. Nat'l Fire Ins. Co. of Hartford, 2008 U.S. Dist. LEXIS 76770 (citing Sabo v. Metro. Life Ins. Comp., 137 F.3d 185, 192 (3d Cir.1998)).
Therefore, Plaintiffs have no private right of action for a bad faith claim under UIPA.
To establish a claim of bad faith under 42 Pa.C.S. § 8371, Plaintiffs must establish that the insurer (1) lacked a reasonable basis for denying benefits, and (2) knew or recklessly disregarded its lack of a reasonable basis. Klinger v. State Farm Mut. Auto. Ins. Co., 115 F.3d 230, 233 (3d Cir.1997); Toy v. Metro. Life Ins. Comp., 593 Pa. 20, 928 A.2d 186, 193 (2007). "In the insurance context, the term `bad faith' has acquired a peculiar and universally acknowledged meaning:
Polselli v. Nationwide Mut. Fire Ins. Co., 23 F.3d 747, 751 (3d Cir.1994) (quoting Black's Law Dictionary 139 (6th ed. 1990)); Terletsky v. Prudential Prop. and Cas. Ins. Co., 437 Pa.Super. 108, 649 A.2d 680, 688 (1994) ("Mere negligence or bad judgment on the part of the insurer is not bad faith.") (internal quotation omitted). Reckless disregard occurs where "a defendant knows, or has reason to know, of facts which create a high degree of risk of physical harm to another, and deliberately proceeds to act in conscious disregard of, or indifference to that risk." Polselli, 23 F.3d at 751 (citing Martin v. Johns-Manville Corp., 508 Pa. 154, 494 A.2d 1088, 1097 (1985)).
This case involves a property insurance contract, the Policy, that insured Plaintiffs' commercial real estate, which suffered damage from flooding after a sprinkler pipe burst. The central issue is whether Defendant engaged in bad faith conduct, delaying payment on Plaintiffs' claim by conducting a long-term investigation into whether Plaintiff failed to heat the premises, which may have caused or contributed to the pipe burst.
Plaintiffs allege Defendant withheld payment on the Policy (1) for an unreasonable length of time; and (2) for knowingly and recklessly disregarded a reasonable basis to pay after frozen water caused the sprinkler pipe to explode in their commercial real estate property, damaging both the real and personal property. See Pls.' Opp'n to Def.'s Mot. Summ. J. (listing twenty-two facts of record in support of Defendant's alleged failure to timely investigate whether the premises were heated); see also Klinger, 115 F.3d at 233 (noting that § 8371 "does not require a plaintiff to prove that the insurer consciously acted pursuant to such a motive or interest; it is enough if the insurer recklessly disregarded the lack of a reasonable basis in denying benefits.").
In response, Defendant asserts that Plaintiffs cannot prove a successful claim because (1) Defendant's investigation to determine whether Plaintiffs contributed to the loss was "reasonable," (2) Defendant's investigation into the value of Plaintiff's claim upon submission of conflicting evidence and late submitted proof of loss was "reasonable," and (3) any investigatory delay was self-inflicted based on Plaintiff's failure to provide requested documents. See Def.'s Mot. Summ. J. 2.
Under § 8371, the Court must first determine whether Defendant "lacked a reasonable basis" for delaying a payout to Plaintiffs for damages allegedly covered by the Policy and, if so, whether Defendant "knew or recklessly disregarded" that reasonable basis.
The Policy between Plaintiffs and Defendant laid out the basic adjusting procedure for claims. The Policy stated that, within 30 days of the submitted claims, the insured (Plaintiffs) would submit an "estimate of damages and submit a proof of
To accurately determine whether Defendant was reasonable in its investigation, an analysis of the relationship between the parties, in chronological order, is useful. This analysis can best be understood by a review of the correspondence between the parties over the relevant time period:
(1) On January 6, 2008, Plaintiffs discovered that pipes in their commercial building had burst, flooding the basement and damaging both real and personal property. See Pls.' Supp. Resp. Ex. P-26.
(2) On January 11, 2008, five days after the loss, Mr. Robert H. Thompson ("Thompson"), Defendant's first adjuster, and Mr. Marc Grossman ("Grossman"), Plaintiffs' adjuster, conducted an initial inspection of Plaintiffs' damaged property. See Pls. Sur-Reply P-28 at "2".
(3) On January 18, 2008, Thompson and Grossman met again to "detail the damage." See Pls.' Supp. Resp. Ex. P-26.
(4) Throughout February 2008, Plaintiffs worked with a separate adjuster from the policyholder, HMI, to get independent estimates of the damage. See Pls. Sur-Reply P-28 at "2".
(5) On March 3, 2008, Thompson wrote to Plaintiffs, stating that the submitted documentation regarding the heat fuel for the basement was insufficient because Plaintiffs had sent bills as proof of heat that did not cover the relevant time period. Id. (noting the bills for oil Plaintiffs submitted to Defendant were from one year prior to the loss and months after the loss). Therein, Thompson specifically listed twelve questions regarding whether the premises were in fact heated so as to move the claim forward. See Pls. Sur-Reply P-28 at "2".
(6) On March 5, 2008, Grossman responded, stating that there were still questions regarding the damaged inventory and whether the premises were heated. Id. at "4".
(7) On March 24, 2008, Thompson notified Grossman that Mr. Kyle Cheney ("Cheney"), Defendant's second adjuster, would be taking over as Defendant's adjuster. Id. Thereafter, all correspondence over Plaintiffs' claim continued between Grossman and Cheney.
(8) On April 3, 2008, Grossman wrote to Cheney, stating that an electrician would be reviewing the exterior of the building and to request a $150,000 advance to begin repairs. See id. at "7".
(9) On April 8, 2008, Cheney informed Grossman that a calculated loss was not stated on the proof of loss form, which was required within thirty days following submission of a claim. See id. at "10, 15".
(10) On April 10, 2008, Cheney stated that he would forward Plaintiffs' advance payment request to Defendant and that Plaintiffs' statement of loss of $681,173.81 was subject to investigation. See id. at "16".
(12) On May 13, 2008, following Pierro's estimation, Cheney submitted its official estimate of the loss, four months after the flood and just over one month from the date Plaintiffs submitted a proof of loss. See Pls.' Sur-Reply 3. That same day, Cheney wrote a letter to Grossman, stating that the investigation was ongoing and that Plaintiffs' submitted proof of loss had been rejected as Plaintiffs failed to file the necessary documentation. See Pls. Sur-Reply P-28 at "46".
(13) In June 2008, Grossman gave Cheney the phone number of Plaintiffs' building manager, Mr. Branch ("Branch"), who was employed by Plaintiffs through an oral contract. See Pls.' Supp. Resp. Ex. P-26b (averring Defendant's first adjuster, Thompson, was notified that Branch was Plaintiffs' premises manager on March 5, 2008, thus the onus was on Defendant to contact Branch in order to properly investigate).
(14) Through the summer of 2008, Cheney continued to request documentation from Grossman regarding heating of the premises. Id.
(15) In October 2008, Plaintiff Pignetti's deposition was taken regarding submission of the insurance claim. Id.
(16) In December 2008, Mr. Thomas Brown, Defendant's Director, informed Mr. Begier, Plaintiffs' counsel, that the "final proof of loss" was rejected for discrepancies as to the cause of the flood. See id. Ex. P-28 at "78" (stating that Plaintiffs first claimed flooding was the cause of damage, then claimed "vandalism" was a contributing factor).
(17) On February 17, 2009, Plaintiffs initiated this action. See Pls.' Compl. 1.
(18) On July 7, 2009, upon completion of the investigation, Defendant sent Plaintiffs a payment for $78,511.84, the amount of the undisputed loss. See Buckley Aff., doc. no. 53, Ex. 44.
In determining whether Defendant had a reasonable basis upon which to continue investigating the claim, Polselli is instructive. 126 F.3d at 530 (finding the defendant insurer acted in bad faith by delaying payment and, ultimately, refusing to pay damages under an insurance policy where it had knowledge the cause of the loss was an accident).
In Polselli, a fire destroyed the plaintiff's home on January 1, 1991. 1992 WL 247271, 1992 U.S. Dist. LEXIS 14494 (E.D.Pa. Sept. 23, 1992). The plaintiff filed a proof of loss with the defendant insurer on January 28, 1991, within one month of the fire. Id. at *2-3, 1992 U.S. Dist. LEXIS 14494, at *6. After conducting a two-month investigation in March 1991, the defendant insurer discovered that the fire was caused by accident. Id. at *2-3, 1992 U.S. Dist. LEXIS 14494, at *6. Still, by July 17, 1991, the defendant insurer refused to advance any money to the plaintiff, even with knowledge that the plaintiff was destitute. Further, there was proof that the defendant's adjusters, upon investigating the cause of fire and on strict instructions not to touch the property, removed personal property from the scene of the fire. Upon those facts, the district court found, by a preponderance of the
The defendant insurer appealed the ruling to the Third Circuit. On appeal, the Third Circuit remanded the case finding that a plaintiff must demonstrate bad faith by "clear and convincing evidence." Polselli, 23 F.3d at 752 (finding that the evidence must be "so clear, direct, weighty, and convincing' so as to enable the court to make its decision with `a clear conviction'").
On remand, the district court reaffirmed its holding, that the defendant insurer had acted in bad faith although this time under the "clear and convincing evidence" standard. Polselli, 1995 WL 430571, 1995 U.S. Dist. LEXIS 10173 (E.D.Pa. July 20, 1995), rev'd in part on other grounds. The district court also identified certain factors a court may refer to in determining whether the delay in insurance policy investigations rose to the level of bad faith. Id. (noting factors that militate for or against finding bad faith include: (1) "whether Nationwide's [defendant's] delay in responding to communications from Polselli [plaintiff], [ (2) ] its poor response time in engaging an investigator and in conducting the investigation, and [ (3) ] its handling of settlement negotiations suggested that Nationwide `did not accord the interest of its insured the same faithful consideration it gives its own interest'") (internal citation omitted).
Applying the factors espoused in Polselli, Plaintiffs' case is distinguishable for the reasons set forth below.
From the date of the loss until payment of the claim, Defendant engaged in frequent and regular communications with Plaintiffs. These communications consisted of either requests for specific information needed to adjust and/or estimate the claim or advising Plaintiffs as to the state of the claim. See supra 679-80 at ¶¶ 5, 6, 9, 10, 12, 14, 15.
Defendant retained an initial adjuster, who conducted an initial inspection on January 11, 2008, only five days after the loss occurred. Defendant's adjuster and Plaintiffs'
During the investigatory process, the parties agree that no settlement discussions occurred inter se. As such, this factor is not applicable here.
Not listed as a Polselli factor, but relevant in this case, is Plaintiffs' failure to fully provide Defendant with information material to satisfaction of their claim.
Here, Plaintiffs did not file a proof of loss within the thirty days following the submission of their claim on January 6, 2008. See Def.'s Mot. Summ. J. 17, Ex. 5, Cheney Aff., dated 4/8/09 (testifying that Plaintiffs failed to submit timely proof of loss and Plaintiffs' adjuster failed to provide documentation after three separate requests were made as to whether premises were heated). In fact, Plaintiffs did not file a sworn proof of loss until April 3, 2008. See id. 19 (noting that Plaintiffs proof of loss estimated $671,173.81 in damages). In response, on May 13, 2008, Cheney, Defendant's new adjuster, submitted the official estimate of the loss, just over one month from the date Plaintiffs submitted a proof of loss and four months after Plaintiffs first submitted their claim. See Pls.' Sur-Reply 3.
Further, despite attempts by Defendant to obtain necessary documentation confirming that the premises were heated, Plaintiffs either failed to provide the requisite information or provided deficient and/or conflicting documentation. See Pls.' Opp'n Ex. P-28 at "4", Pls.' Ltr to Thompson, dated 3/24/08 (identifying that Plaintiffs first stated the claim for damages was based on flooding, yet later filed a claim due to vandalism, and then again reverted back to filing a claim for damages due to flooding).
Based on the factors set forth above, Plaintiffs have not demonstrated "by clear, direct, weighty, and convincing evidence" that Defendant acted without a reasonable basis in continuing to investigate whether the premises were heated, which may have caused or contributed to the ruptured water pipe. See Williams v. Hartford Cas. Ins. Co., 83 F.Supp.2d 567, 572 (E.D.Pa. 2000) (citing Klinger, 115 F.3d at 234) (holding that "if delay is attributable to the need to investigate further or even to simple negligence, no bad faith has occurred"); Quaciari v. Allstate Ins. Co., 998 F.Supp. 578, 582-83 (E.D.Pa.1998), aff'd without opinion, 172 F.3d 860 (3d Cir.1998) (holding that even if all delay were attributable to the insurer, a period of approximately thirteen months between notification of UIM claim and resolution of the claim through arbitration would not, without more, be sufficient to establish bad faith).
Since Plaintiffs cannot demonstrate that Defendant lacked a reasonable basis in conducting the ongoing investigation, the Court need not reach the second prong of § 8371, whether Defendant knew or recklessly disregarded the reasonable basis.
For the reasons set forth above, summary judgment will be granted in favor of Defendant.
An appropriate order follows.
On April 29, 2009, pursuant to the IPTC, Defendant filed a motion to compel appraisal and to dismiss/stay litigation. Defendants raised a choice of law argument, contending that New York law governs this insurance policy dispute, whereas Plaintiffs opposed, advocating application of Pennsylvania law.
On May 21, 2009, this Court denied Plaintiffs' motion for partial summary judgment as inappropriate where, after a thorough review of the parties' submissions and a hearing on the merits of Plaintiffs' motion, genuine issues of material fact existed, including, but not limited to: (1) whether Plaintiffs breached the terms of the policy by failing to maintain heat on the premises, (2) whether Plaintiff Bignetti actually owned the personal property, which he alleges was damaged in the flood, (3) whether Plaintiff Bignetti is an insured under the terms of the policy, and (4) how much of the damage, if any, was pre-existing.
On November 9, 2009, the Court held a hearing in which the parties averred that the necessary deposition of Plaintiffs' bad faith witness had already been taken. See Court Order, dated 11/9/09, doc. no. 58. Thus, in regards to Defendant's pending motion for summary judgment, the Court ordered that Defendant file an omnibus reply and Plaintiffs file an omnibus sur-reply. Id. As such and pursuant to 56(f), all pleadings submitted will be considered by the Court in its determination of Defendant's motion for summary judgment.
In the alternative, under Pennsylvania law, Defendant argues that Plaintiffs' claims cannot be meritorious because the Defendant undertook a reasonable investigation of Plaintiffs' claims.