BESOSA, District Judge.
Two Puerto Rican municipalities passed ordinances restricting the use of ash derived from coal combustion within their territorial borders. AES Puerto Rico, L.P. ("AES-PR"), a coal-fired power plant owner, filed suit against the municipalities to challenge the legality of the ordinances. (Docket No. 1.)
Currently before the Court are AES-PR's motion for partial summary judgment on its preemption claims, (Docket No. 29), which defendants oppose, (Docket No. 40), as well as AES-PR's unopposed requests for judicial notice, (Docket No. 32; Docket No. 49 at p. 9). Also before the Court is defendants' motion for judgment on the pleadings on justiciability grounds, (Docket No. 37), which AES-PR opposes, (Docket No. 45).
For the reasons below, the Court
Plaintiff AES-PR owns and operates a coal-fired power plant in Guayama, Puerto Rico (the "Guayama facility"). (Docket No. 31 at ¶ 2.) The Guayama facility imports coal from outside of Puerto Rico, primarily from Colombia, which it burns to generate electricity. (Docket No. 1 at ¶¶ 20, 25.) AES-PR sells this electricity to the Puerto Rico Electric Power Authority ("PREPA"). Id. at ¶¶ 22-23. Pursuant to its arrangement with PREPA, AES-PR satisfies approximately fifteen percent of Puerto Rico's total electric power needs. Id. at ¶ 21.
The combustion of coal produces two types of ashes: bottom ash and fly ash,
AES-PR uses the CCRs from the Guayama facility to produce coal combustion products ("CCPs"), including a manufactured aggregate product (sometimes referred to as "rock ash"), which AES-PR markets under the trade name AGREMAXO ("Agremax"). See Docket No. 1 at ¶¶ 30-31; Docket No. 31 at ¶ 4.
AES-PR currently has contracts with landfills in Puerto Rico to provide Agremax for use as an alternative daily cover. (Docket No. 31 at ¶ 20.) For example, AES-PR has agreements with El Coqui Landfill Company LLC ("Coqui Waste"), Ecosystems, Inc. ("Ecosystems Waste"), and Peñuelas Valley Landfill Company, Inc. ("PV Waste") to provide CCPs — including Agremax — for beneficial use at El Coqui Landfill (the "Coqui Landfill") in Humacao, Ecosystems Landfill in Peñuelas,
Two municipalities in Puerto Rico enacted ordinances restricting the use of coal ash within their territorial borders. These
(Docket No. 32-2 at p. 8, § 1 (emphasis added).)
On February 10, 2014, the Municipality of Humacao adopted Ordinance Number 21, Series 2013-2014 (the "Humacao Ordinance"), which provides:
(Docket No. 32-1 at p. 9, § 1 (emphasis added).)
Violators of either ordinance are subject to administrative fines up to $5,000. Id. at p. 10, § 6; Docket No. 32-2 at p. 8, § 1.
Both Ordinances are aimed specifically at curbing AES-PR's use of coal ash. They each discuss AES-PR's extensive use of coal ash on the island of Puerto Rico over the past few years, noting that coal ashes have been used in various municipal projects, from rural and agricultural lands to residential roads, and that in many of these places, coal ashes were deposited near aquifers. See Docket No. 32-1 at p. 8; Docket No. 32-2 at p. 7. They each express concern over the implications of this pervasive use, describing the findings of a 2010 study in which samples of CCR filler taken from the Parque Gabriela Development of Salinas showed high concentrations of carcinogenic and toxic metals, including arsenic and lead, and excessive radiation levels.
Since the enactment of the Ordinances, the Municipality of Peñuelas and the Municipality of Humacao have each filed lawsuits in Commonwealth Court against parties with which AES-PR has ongoing contracts. See Docket No. 49 at p. 9. In August 2014, the Municipality of Peñuelas brought suit against Ecosystems Waste seeking to enjoin the use of Agremax in the construction of the Ecosystems Landfill in Peñuelas. (Docket No. 49-3.) The Peñuelas complaint alleges that Ecosystems Waste used Agremax in the construction of the landfill's access road and, in doing so, violated the Peñuelas Ordinance by "disposing of and/or depositing" the filler material on the ground. Id. at p. 4. Similarly, in October 2014, the Municipality of Humacao filed suit against Coqui Waste seeking a permanent cease and desist order to prevent the deposit of AES-PR's coal ash material in the Coqui Landfill. (Docket No. 49-2.)
Shortly thereafter, AES-PR initiated this action.
On October 16, 2014, AES-PR filed suit in this Court against the Municipality of Peñuelas, its Mayor, Walter Torres-Maldonado ("Mayor Torres") (collectively, the "Peñuelas defendants"), the Municipality of Humacao, and its Mayor, Marcelo Trujillo-Panisse ("Mayor Trujillo") (collectively, the "Humacao defendants"), challenging the municipal restrictions on CCRs in Peñuelas and Humacao. (Docket No. 1.) Among other things, AES-PR contends that the Environmental Protection Agency (the "EPA"), pursuant to the Resource Conservation and Recovery Act, 42 U.S.C. §§ 6901 et seq. ("RCRA"), and Puerto Rico's Environmental Quality Board (the "EQB"), pursuant to parallel Commonwealth law, P.R. Laws Ann. tit. 12 §§ 8001 et seq., authorize and encourage the beneficial use of CCRs. See id. at pp. 11-15. AES-PR contends that because the Ordinances conflict with this authority, the Ordinances violate the federal Supremacy Clause, are void and ultra vires under Puerto Rico law, and are preempted by Puerto Rico law. See id. at ¶¶ 102-12 (federal preemption), ¶¶ 133-39 (void and ultra vires), ¶¶ 140-47 (state preemption).
On January 2, 2015, defendants answered the complaint. (Docket No. 22.) In their answer, they admit that the Humacao and Peñuelas Ordinances both "ban[ ] the use of ash resulting from the burning of coal anywhere within the territorial limits" of Humacao and Peñuelas. Id. at ¶¶ 16, 21.
On May 15, 2015, AES-PR moved for summary judgment on its federal and state preemption claims. (Docket No. 29.)
On May 26, 2015, defendants moved for judgment on the pleadings. (Docket No. 37.) Defendants argue that AES-PR lacks standing to challenge the legality of the Ordinances and that AES-PR's claims against the Peñuelas defendants are unripe and untimely. Id. AES-PR opposed defendants' motion. (Docket No. 45.)
On June 3, 2015, defendants opposed AES-PR's motion for partial summary judgment, (Docket No. 40), to which AES-PR replied on June 17, 2015. (Docket No. 49.) On June 30, 2015, AES-PR then filed a motion to supplement the summary judgment record and to request expedited consideration or hearing. (Docket No. 51.) AES-PR informed the Court that on June 26, 2015 the Peñuelas defendants, citing the Peñuelas Ordinance, "prevented the lawful delivery of [Agremax]" to the PV Landfill. Id. at p. 1.
AES-PR requests that the Court take judicial notice of various documents attached as exhibits to its motion for partial summary judgment. (Docket No. 32.) The documents include: (1) the Humacao Ordinance (Docket No. 32-1); (2) the Peñuelas Ordinance (Docket No. 32-2); (3) the Puerto Rico Planning Board's May 1, 1996, Resolution (Docket No. 32-3); (4) the Guayama facility's updated EQB Operating Permit (Docket No. 32-5); (5) the Coqui Landfill's Operating and Contingency Plan for Nonhazardous Waste (Docket No. 32-6); (6) the Coqui Landfill's EQB Permit to Operate a Facility for Final Disposal of Non-Hazardous Solid Waste (Docket No. 32-7); (7) the EQB's August 27, 2014, Resolution (Docket No. 32-8); and (8) the EQB's March 26, 2015 letter to Coqui Waste (Docket No. 32-9.)
In its reply brief, AES-PR also requests that the Court take judicial notice of two complaints filed in the Commonwealth Courts. See Docket No. 49 at p. 9. AES-PR requests judicial notice of: (1) the Humacao Complaint, Case No. HSC-120-1401009 (P.R.Super.Ct. Oct. 2, 2014), (Docket No. 49-2); and (2) the Peñuelas Complaint, Case No. JPE-2014-0457 (P.R.Super.Ct. Aug. 18, 2014), (Docket No. 49-3). Defendants do not challenge AES-PR's requests for judicial notice.
Federal Rule of Evidence 201 permits a court to take judicial notice of a fact "not subject to reasonable dispute" because the fact "can be accurately and readily determined from sources whose accuracy cannot reasonably be questioned." Fed.R.Evid. 201(b)(2). Provided that their authenticity or accuracy is not disputed, documents contained in the public record, including the records and reports of administrative bodies, are proper subjects of judicial notice. See, e.g., Torrens v. Lockheed Martin Servs. Grp., Inc., 396 F.3d 468, 473 (1st Cir.2005) ("We are free ourselves to take judicial notice of the existence of government records."); United States v. 14.02 Acres of Land More or Less in Fresno Cnty., 547 F.3d 943, 955 (9th Cir.2008) (finding judicial notice appropriate for records and reports of administrative bodies); Catholic League for Religious & Civil Rights v. City & Cnty. of S.F., 464 F.Supp.2d 938, 941 (N.D.Cal. 2006) (taking judicial notice of city board of supervisors resolutions). Similarly, documents on file in federal or state courts are proper subjects of judicial notice. Harris v. Cnty. of Orange, 682 F.3d 1126, 1132 (9th Cir.2012); see Global Network Commc'ns, Inc. v. City of New York, 458 F.3d 150, 157 (2d Cir.2006) ("A court may take judicial notice of a document filed in another court not for the truth of the matters asserted in the other litigation, but rather to establish the fact of such litigation and related filings."); MVM Inc. v. Rodriguez, 568 F.Supp.2d 158, 164 (D.P.R.2008) (Besosa, J.) (permitting judicial notice of another court's order as a fact that another proceeding took place).
Accordingly, the Court finds the above documents appropriate for judicial notice. AES-PR's requests for judicial notice, (Docket No. 32; Docket No. 49 at p. 9), are
Defendants seek a judgment on the pleadings, arguing that AES-PR lacks
When considering a Rule 12(b)(1) motion, the court must credit the plaintiff's well-pled factual allegations and draw all reasonable inferences in its favor. See Valentin, 254 F.3d at 365. The reviewing court need not confine its jurisdictional inquiry to the pleadings, but may consider other materials. See Gonzalez v. United States, 284 F.3d 281, 288 (1st Cir.2002). "The party invoking federal jurisdiction has the burden of establishing that it exists." Mangual v. Rotger-Sabat, 317 F.3d 45, 56 (1st Cir.2003).
Defendants first contend that dismissal of the complaint is warranted because AES-PR lacks standing to challenge the legality of the Ordinances. (Docket No. 37 at pp. 8-9.) The doctrine of standing is rooted in Article III of the Constitution, which confines federal courts to the adjudication of actual cases and controversies. See U.S. Const. art. III, § 2, cl. 1; Lujan v. Defenders of Wildlife, 504 U.S. 555, 560, 112 S.Ct. 2130, 119 L.Ed.2d 351 (1992) ("[T]he core component of standing is an essential and unchanging part of the case-or-controversy requirement of Article III."). An actual "case or controversy" exists when "the party seeking to invoke the court's jurisdiction (normally, the plaintiff) has a `personal stake in the out-come' of the claim asserted." Pagan v. Calderon, 448 F.3d 16, 27 (1st Cir.2006) (quoting Baker v. Carr, 369 U.S. 186, 204, 82 S.Ct. 691, 7 L.Ed.2d 663 (1962)). To satisfy the personal stake requirement, "a plaintiff must establish each part of a familiar triad: injury, causation, and redressability." Katz v. Pershing, LLC, 672 F.3d 64, 71 (1st Cir.2012); accord Van Wagner Boston, LLC v. Davey, 770 F.3d 33, 36 (1st Cir.2014) ("The `irreducible constitutional minimum of standing' requires that the plaintiff has suffered an injury in fact, that this injury was caused by the conduct complained of, and that the relief sought is likely to redress the injury suffered." (quoting Lujan, 504 U.S. at 560-61, 112 S.Ct. 2130)). The standing inquiry is claim-specific: the reviewing court must determine whether "[the] plaintiff is entitled to have a federal court adjudicate each
In challenging AES-PR's standing, defendants only dispute the first element — that is, whether AES-PR sufficiently alleges an "injury in fact." See Docket No. 37 at pp. 8-9. Defendants argue that AES-PR, who is in the business of generating energy and selling CCPs, "is not in any imminent danger of being fined" because the Ordinances, which "do not prohibit the sale of CCPs," do not apply to AES-PR's business activities. Id. (emphasis added). Defendants thus contend that AES-PR suffers no "direct injury" as a result the Ordinances. Id. at p. 9.
In response, AES-PR contends that enforcement of the Ordinances impairs its ability to perform existing contracts with third parties to provide CCRs, including Agremax, for beneficial use in Humacao and Peñuelas. (Docket No. 45 at pp. 13-14.) AES-PR further argues that the Ordinances, which specifically target AES-PR and its Agremax, prevent AES-PR from entering into such contracts in the future. Id. at pp. 14-15. AES-PR points out that defendants have filed lawsuits in Puerto Rico courts against the parties with which AES-PR contracts seeking to enjoin the use of Agremax in their respective jurisdictions. Id. at p. 10.
To satisfy the "injury in fact" element, a plaintiff must adequately allege "an invasion of a legally protected interest," Lujan, 504 U.S. at 560, 112 S.Ct. 2130, that is "concrete and particularized," on one hand, and "actual or imminent (as opposed to conjectural or hypothetical)," on the other, Pagan, 448 F.3d at 27. In this case, AES-PR suffers injury because it wants to distribute its Agremax product to landfills in Humacao and Peñuelas but is "constrained from doing so by the strictures of the Ordinance[s]." See Merit Const. Alliance v. City of Quincy, 759 F.3d 122, 127 (1st Cir.2014). The alleged injury is particularized — the Ordinances are expressly aimed at curtaining the use of AES-PR's aggregate product — and non-hypothetical — in practice, through litigation and other methods, defendants have relied upon the Ordinances to prevent landfills in Humacao and Peñuelas from receiving Agremax, burdening AES-PR's existing contractual arrangements with those landfills.
With respect to the Peñuelas Ordinance, which has since been enforced against AES-PR, the injury to AES-PR is particularly clear. The record reveals that on June 26, 2015, approximately one month after defendants moved for dismissal, the Peñuelas defendants, allegedly citing the Peñuelas Ordinance, prevented AES-PR from delivering Agremax to the PV Landfill. See Docket No. 51. AES-PR maintains that, as a result, it was unable to fulfill its contract with PV Waste, which contemplates the provision of Agremax for use as daily cover to the PV Landfill. See id. at pp. 6-7. In addition to the sunk costs attendant to hiring truckers to deliver CCRs to the PV Landfill unsuccessfully, AES-PR claims that it will incur additional costs and hardship to dispose of its CCRs properly. Id. at pp. 7-8. "It is a bedrock proposition that `a relatively small economic loss — even an identifiable trifle — is enough to confer standing.'" Katz, 672 F.3d at 76 (quoting Adams v. Watson, 10 F.3d 915,
In sum, the Court finds that AES-PR adequately pleads an injury sufficient to confer standing.
Defendants also argue that AES-PR's claims against the Peñuelas defendants are not ripe. (Docket No. 37 at pp. 10-14.) The ripeness and standing inquiries generally overlap. See McInnis-Misenor v. Maine Med. Ctr., 319 F.3d 63, 69 (1st Cir.2003). Like standing, the ripeness doctrine "has roots in both the Article III case or controversy requirement and in prudential considerations." Mangual, 317 F.3d at 59. "Whereas standing asks `who' may bring a claim, ripeness concerns `when' a claim may be brought." Nulankeyutmonen Nkihtaqmikon v. Impson, 503 F.3d 18, 32 (1st Cir.2007). The ripeness doctrine protects against "premature adjudication" so that courts do not "entangl[e] themselves in abstract disagreements." Roman Catholic Bishop of Springfield v. City of Springfield, 724 F.3d 78, 89 (1st Cir.2013) (quoting Abbott Labs. v. Gardner, 387 U.S. 136, 148, 87 S.Ct. 1507, 18 L.Ed.2d 681 (1967)).
In analyzing ripeness, courts ask whether "there is a substantial controversy, between parties having adverse legal interests, of sufficient immediacy and reality to warrant the issuance of a declaratory judgment." McInnis-Misenor, 319 F.3d at 70 (quoting Lake Carriers' Ass'n v. MacMullan, 406 U.S. 498, 506, 92 S.Ct. 1749, 32 L.Ed.2d 257 (1972)). This determination ordinarily involves a formalistic evaluation of (1) the fitness of the issues for judicial decision, and (2) the hardship to the parties of withholding court consideration. Id. The "fitness" inquiry concerns "whether the necessary factual predicate is sufficiently matured to allow a court to resolve the issue presented." Gastronomical Workers Union Local 610 & Metro. Hotel Ass'n Pension Fund v. Dorado Beach Hotel Corp., 617 F.3d 54, 61 (1st Cir.2010); see also Ernst & Young v. Depositors Econ. Prot. Corp., 45 F.3d 530, 536 (1st Cir.1995) ("[T]he critical question concerning fitness for review is whether the claim involves uncertain and contingent events that may not occur as anticipated or may not occur at all." (quoting Massachusetts Ass'n of Afro-American Police, Inc. v. Boston Police Dep't, 973 F.2d 18, 20 (1st Cir.1992))). The "hardship" inquiry asks whether the challenged action creates a "direct and immediate dilemma" for the parties. Id.
Defendants argue that judicial intervention as to the Peñuelas Ordinance is premature because the Ecosystems Landfill in Peñuelas, where AES-PR alleges that Agremax will be used, is still under construction and is thus neither permitted nor operational. See Docket No. 37 at pp. 10-14. Defendants argue that AES-PR is requesting a remedy based on a "hypothetical scenario that the Ecosystems Landfill in Peñuelas will obtain a permit from the EQB." Id. at p. 14. Even assuming that the Peñuelas Ordinance is not yet applicable to the pre-operational Ecosystems Landfill,
The Court finds that the claims against the Peñuelas defendants are ripe. Because the basis of defendants' ripeness challenge was the lack of enforcement of a law that has since been enforced, the Court need not belabor the analysis. AES-PR's claims against the Peñuelas defendants involve non-hypothetical acts, so the controversy is fit for adjudication. The application of the Peñuelas Ordinance has already financially harmed AES-PR, whose existing contracts languish due to regulatory constraints, and withholding judicial review would serve only to delay the vindication of that injury. See Gastronomical Workers, 617 F.3d at 61.
Thus, the claims against the Peñuelas defendants are ripe for adjudication.
Finally, defendants argue that AES-PR's claims against the Peñuelas defendants are not timely. (Docket No. 37 at pp. 15-16.) Defendants correctly assert that in Puerto Rico, the statute of limitations for claims brought pursuant to 42 U.S.C. § 1983 is one year. See id. at p. 15; Morales-Tañon v. P.R. Elec. Power Auth., 524 F.3d 15, 18 (1st Cir.2008). Because the Peñuelas Ordinance was enacted on April 10, 2013, more than one year before AES-PR filed the complaint on October 16, 2014, defendants argue that the claims against the Peñuelas defendants should be dismissed as time-barred. (Docket No. 37 at pp. 15-16.)
In opposition, AES-PR contends, among other things, that the statute-of-limitations clock began to run upon enforcement, not enactment, of the Peñuelas Ordinance. See Docket No. 45 at pp. 19-22. According to AES-PR, the limitations period was not triggered until "the Peñuelas defendants sought to enforce the [Peñuelas] Ordinance to preclude the use of AES-PR's CCRs at the Ecosystems Landfill." Id. at p. 20. Specifically, AES-PR refers to the suit that the Peñuelas defendants filed against Ecosystems Waste on August 18, 2014, which sought to enjoin the use of Agremax at the construction-phase Ecosystems Landfill. See id.
Federal law, which governs the date of accrual for a section 1983 action, provides that the limitations period begins to run when the party knows or should know of the injury on which the action is based. See Asociacion de Suscripcion Conjunta del Seguro de Responsabilidad Obligatorio v. Juarbe-Jimenez, 659 F.3d 42, 50 (1st Cir.2011); see also Gilbert v. City of Cambridge, 932 F.2d 51, 57 (1st Cir.1991) ("The limitation period begins to run upon the invasion of the plaintiffs' interests."). In determining the date of accrual, courts first identify the actual injury on which the plaintiff rests the cause of action. See, e.g., Marrero-Gutierrez v. Molina, 491 F.3d 1, 5 (1st Cir.2007).
Here, the injury of which AES-PR complains centers on the application of the Ordinances to landfills with which AES-PR contracts. In Peñuelas, the restriction on AES-PR's CCRs did not occur until at least August 18, 2014, when the Municipality filed suit against Ecosystems Waste. Defendants provide no reason to believe that AES-PR knew or should have known of the facts constituting the violations of its rights any sooner. Because AES-PR filed suit on October 16, 2014, (Docket No. 1),
In sum, for these reasons, defendants' motion to dismiss, (Docket No. 37), is
AES-PR moves for summary judgment on its federal and state preemption claims. (Docket No. 29.) A court will grant summary judgment if the moving party shows, based on the materials in the record, "that there is no genuine dispute as to any material fact and [it] is entitled to judgment as a matter of law." Fed.R.Civ.P. 56(a). A fact is "material" if it potentially affects the outcome of the case. Calero-Cerezo v. U.S. Dep't of Justice, 355 F.3d 6, 19 (1st Cir.2004). A factual dispute is "genuine" if its resolution could favor either party at trial. Id. At the summary judgment stage, a court must construe the entire record in a light most hospitable to the nonmoving party and draw all reasonable inferences in its favor. DePoutot v. Raffaelly, 424 F.3d 112, 117 (1st Cir.2005).
A federal preemption inquiry begins with the Supremacy Clause, which requires that federal law be "the supreme Law of the Land." U.S. Const., Art. VI, cl. 2. "Any state law that contravenes a federal law is null and void." Tobin v. Fed. Exp. Corp., 775 F.3d 448, 452 (1st Cir. 2014).
Federal law may preempt state law either "expressly or by implication." Grant's Dairy, 232 F.3d at 15. "Express preemption" occurs when "a federal statute explicitly confirms Congress's intention to preempt state law." Id. In the absence of an express preemption provision, courts look to "the structure and purpose of the statute" to determine whether Congress intended preemption to occur. Antilles, 670 F.3d at 323. "Implied preemption" takes two forms: "field preemption" and "conflict preemption." Grant's Dairy, 232 F.3d at 15. "Field preemption" occurs when Congress creates a federal regulatory scheme that is "so pervasive" as to evidence its intent to occupy the regulated field without state supplementation. See id. "Conflict preemption" occurs either when "compliance with both state and federal regulations is impossible" or when "state law interposes an obstacle to the achievement of Congress's discernible objectives." Id.
Preemption is a "strong medicine," that is "not casually to be dispensed." Id. at 18. A presumption against preemption applies, particularly in cases where Congress has legislated in a field which the states have traditionally occupied. Rice v. Santa Fe Elevator Corp., 331 U.S. 218, 230, 67 S.Ct. 1146, 91 L.Ed. 1447 (1947). In those cases, courts "start with the assumption that the historic
According to AES-PR, this case is one of conflict-obstacle preemption. See Docket No. 30 at p. 17.
The Resource Conservation and Recovery Act of 1976 ("RCRA"), 42 U.S.C. §§ 6901 et seq., is a "comprehensive environmental statute that governs the treatment, storage, and disposal of solid and hazardous waste." Meghrig v. KFC W., Inc., 516 U.S. 479, 483, 116 S.Ct. 1251, 134 L.Ed.2d 121 (1996). When it enacted RCRA, Congress was primarily concerned with establishing the framework for a national system to ensure "the safe management of hazardous waste." Am. Min. Cong. v. E.P.A., 824 F.2d 1177, 1179 (D.C.Cir.1987).
RCRA delineates a bifurcated approach to the regulation of solid waste: Subtitle C, 42 U.S.C. §§ 6921-6939e, deals with "hazardous waste", while Subtitle D, 42 U.S.C. §§ 6941-6949a, deals with "nonhazardous waste." Subtitle C contemplates a "cradle to grave" federal regulatory system governing the generation, transportation, treatment, storage, and disposal of "hazardous wastes." See City of Chicago v. Envtl. Def. Fund, 511 U.S. 328, 332, 114 S.Ct. 1588, 128 L.Ed.2d 302 (1994). "Nonhazardous wastes," meanwhile, "are regulated much more loosely under Subtitle
When the EPA missed its statutory deadline to complete the Bevill study and report, all mining wastes remained exempt from Subtitle C regulation for many years. Solite Corp. v. U.S. E.P.A., 952 F.2d 473, 478 (D.C.Cir.1991). After various interest groups brought suit to force compliance, the EPA commenced and completed regulatory determinations in 1993 and 2000. Appalachian Voices, 989 F.Supp.2d at 40; see 58 Fed.Reg. 42,466 (Aug. 9, 1993) (the "August 1993 Regulatory Determination"); 65 Fed.Reg. 32,214 (May 22, 2000) (the "May 2000 Regulatory Determination"). On each occasion, the EPA concluded that regulation of coal ash as "hazardous waste" under Subtitle C was inappropriate, while indicating that it would continue to assess the need for increased regulation. Appalachian Voices, 989 F.Supp.2d at 40.
In the May 2000 Regulatory Determination, the EPA first addressed the "beneficial use" of coal combustion wastes. See, e.g., 65 Fed.Reg. at 32,229-30. The EPA listed a number of ways to repurpose coal combustion wastes beneficially, including waste stabilization and use in construction products. Id. at 32,229. The Agency announced its determination that "national regulation under Subtitle C or Subtitle D is not warranted" for coal combustion wastes used for beneficial purposes, explaining:
Id. at 32,221.
In 2010, the issue of coal ash regulation resurfaced. The EPA announced that it was considering whether to govern CCRs as a "hazardous waste" pursuant to Subtitle
On April 17, 2015, the EPA published a final rule addressing the disposal of CCRs, which the Agency decided to regulate pursuant to Subtitle D. See 80 Fed.Reg. 21,302 (April 17, 2015) (the "April 2015 Rule"). Among other things, the April 2015 Rule establishes the EPA's new minimum national requirements for landfills receiving CCRs for disposal ("CCR landfills"), including location restrictions, liner design criteria, and structural integrity requirements. See id. at 21,304-08. The April 2015 Rule provides that "these are minimum requirements only, and without preemptive effect; states may therefore impose more stringent requirements, including the requirement that CCR facilities obtain a permit." Id. at 21,332. Indeed, the EPA noted that many states had already elected to develop their own beneficial use programs and found that state regulatory oversight may provide "an additional level of assurance" in addressing site-specific risks. Id. at 21,330.
The April 2015 Rule expressly does not apply to "practices that meet the definition of a beneficial use of CCR" or "municipal solid waste landfills (MSWLFs) that receive CCRs for disposal or use as daily cover." Id. at 21,302. With respect to the MSWLF exemption, the EPA recognized that there are MSWLFs that either accept CCRs for disposal, use CCRs as daily cover, or both. Id. at 21,341. According to the EPA, the new requirements governing CCR landfills "are modeled" after the existing standards for MSWLFs, found at 40 C.F.R. ch. 258, so disposal of CCRs in MSWLFs is "as protective" as disposal in a CCR landfill. Id. Thus, the EPA concluded that permitted MSWLFs should not be subject to the April 2015 Rule. Id.
With respect to the beneficial-use exemption, the EPA reaffirmed its position in the May 2000 Regulatory Determination that, for the most part, beneficial uses of coal combustion wastes do not present a significant risk to human health and the environment. Id. at 21,327. The EPA noted that the beneficial use of CCRs is "a primary alternative to current disposal methods," which offers "significant environmental benefits," including "greenhouse gas reduction, energy conservation, reduction in land disposal" and "reduction in the need to mine and process virgin materials and the associated environmental impacts." Id. at 21,329. The EPA concluded that, on balance, regulation of beneficially used CCRs is not warranted. Id.
In doing so, the EPA acknowledged, however, that not all beneficial uses are created equally. In its discussion of potential risks, the EPA distinguished "encapsulated" uses of CCRs from "unencapsulated" uses. See id. at 21,327. An
As an example of a case in which "large quantities of unencapsulated CCR were placed on the land in a manner that presented significant concerns," the EPA discussed AES-PR's use of Agremax in Puerto Rico:
Id. at 21,328. While lacking sufficient information to determine whether this practice caused groundwater contamination, the EPA noted that "the available facts illustrate several of the significant concerns associated with unencapsulated uses." Id. at 21,328-29. AES-PR had applied Agremax "without appropriate engineering controls," "in volumes that far exceeded the amounts necessary for the engineering use of the materials," and in some cases "in residential areas" and "to environmentally vulnerable areas, including areas close to wetlands and surface waters and over shallow, sole-source drinking water aquifers." Id. at 21,329. The EPA concluded that those practices would not constitute "beneficial use," but rather "waste management that would be subject to the requirements of the [April 2015 Rule]." Id. at 21,329.
To ensure that inappropriate uses, which often occur "under the guise of `beneficial use,'" are regulated as disposal, see id. at 21,330, the April 2015 Rule establishes criteria to distinguish "beneficial use" from "disposal," see id. at 21,349.
As the above authority makes clear, RCRA provides varying levels of federal oversight in an area traditionally left to state and local governance. Although the statute contemplates greater federal involvement in the regulation of hazardous wastes, "Congress appears to have adopted a markedly more circumspect approach to the problem of non-hazardous solid waste disposal." City of Gallatin v. Cherokee Cnty., 563 F.Supp. 940, 943 (E.D.Tex.1983). RCRA's guidelines for the disposal of non-hazardous waste are in general not mandatory upon the states, though states do have certain compliance incentives. See id.
While states are afforded considerable leeway in governing solid waste disposal, principles of conflict preemption prevent local laws from imperiling RCRA's federal goals. See Blue Circle, 27 F.3d at 1506. Accordingly, federal courts have consistently found that a state or local ordinance that "amount[s] to an explicit or de facto total ban of an activity that is otherwise encouraged by RCRA will ordinarily be preempted by RCRA." See id. at 1508; cf. City of Los Angeles v. Cnty. of Kern, Civ. No. 06-5094(GAF) (VBKX), 2006 WL 3073172, at *10 (C.D.Cal. Oct. 24, 2006) ("Even where a federal statute allows more stringent state and local regulations, state and local regulations are ordinarily still preempted if they constitute a ban on an activity that Congress has encouraged, because in such cases the local ban impedes a federal objective.").
Based on this authority, AES-PR argues that the Ordinances are preempted because they impose flat bans on the beneficial use of CCRs. See Docket No. 30 at pp. 15-20. As discussed below, the Court finds that the language of neither law is so broad as to encompass all beneficial uses of CCRs. AES-PR contends, however, that even if the Ordinances allow certain uses of CCRs, they are nevertheless preempted because they ban the use of CCRs as daily cover in landfills. (Docket No. 49 at pp. 9-10.) But AES-PR presupposes that the beneficial use of CCRs — particularly, as daily cover in landfills — is a RCRA-encouraged activity. See Docket No. 49 at pp. 9-10. The Court finds that while RCRA generally seeks to promote the beneficial use of CCRs, it does not do so to an extent that a ban on that activity is preempted. See, e.g., City of Los Angeles, 2006 WL 3073172, at *10; Welch v. Bd. of Sup'rs of Rappahannock Cnty., Va., 888 F.Supp. 753, 757 (W.D.Va.1995).
To be sure, the EPA has steadfastly opted against regulating the beneficial use of CCRs, in an apparent effort to encourage and destigmatize such practices. In the EPA's opinion, beneficial use is, for the most part, environmentally and economically sensible. An agency's "mere preference," however, "is vastly different from legislation forcing states and localities to permit [beneficial use]," especially when "no such preference for [beneficial use] appears in the statute itself." See Welch, 888 F.Supp. at 758; accord Constr. Materials Recycling Ass'n Issues & Educ. Fund, Inc. v. Burack, Civ. No. 08-CV-376 (JD), 2009 WL 205054, at *6 (D.N.H. Jan. 27, 2009) ("General expressions of policy in federal law, however, are unlikely to support conflict preemption."). While the EPA may wish to encourage companies like AES-PR to find ways to repurpose their coal combustion waste in an environmentally sound manner, RCRA in no way mandates this outcome. Indeed, the Act
In this regard, this case is distinguishable from the RCRA preemption cases upon which AES-PR relies in its briefs. For example, AES-PR cites to Blue Circle Cement, Inc. v. Bd. of Cnty. Comm'rs of Cnty. of Rogers, 27 F.3d 1499 (10th Cir. 1994), and Ogden Envtl. Servs. v. City of San Diego, 687 F.Supp. 1436 (S.D.Cal. 1988), which struck down local laws effectively banning the treatment or recycling of hazardous waste as preempted by RCRA. Relevant to those cases, RCRA sets a national policy requiring the treatment, storage, and disposal of hazardous waste in a manner that "minimize[s] the present and future threat to human health and the environment." 42 U.S.C. § 6902. The Act expressly states that its objective will be advanced by reducing land disposal of hazardous waste while encouraging recycling and treatment. Id. § 6902(a)(6). Indeed, land disposal is even prohibited in certain instances absent EPA approval. See, e.g., id. § 6924(e).
Here, the Court finds no manifest statutory preference for beneficial use, let alone one for daily cover. Nowhere in RCRA or its accompanying regulations does the EPA indicate that it favors one type of beneficial use (such as daily cover) over any other. This lack of directive is especially significant here, where defendants have not completely banned CCRs within their boundaries; they simply have banned one of several possible methods of use or disposal. See Welch, 888 F.Supp. at 757 (finding EPA's regulatory preference for land application of sewage sludge insufficient to preempt local ordinance that simply banned one of three possible methods of use or disposal).
Although agency regulations may preempt local laws, see Hillsborough Cnty. v. Automated Med. Lab., Inc., 471 U.S. 707, 713, 105 S.Ct. 2371, 85 L.Ed.2d 714 (1985), in such a case the challenged law presumptively is not preempted, see Welch, 888 F.Supp. at 758 ("Regulations generally do not preempt state and local laws absent an express statement by the agency that it intends to do so."). As the First Circuit Court of Appeals has noted, "[c]onflict preemption is particularly difficult to show when the most that can be said about the state law is that the direction in which state law pushes [behavior] is in general tension with broad or abstract goals" of the federal law. See Fitzgerald v. Harris, 549 F.3d 46, 53 (1st Cir.2008) (internal quotation marks omitted). Here, although AES-PR "chants the conventional `obstacle to accomplishment' mantra, it does not point to the kind of clear conflict that would warrant such a finding, or even to a genuine issue of material fact concerning that point." See Grant's Dairy, 232 F.3d at 18.
Even if the Court were to find that the beneficial use of CCRs is a RCRA-encouraged activity, the Court disagrees with AES-PR that the Ordinances impose a total ban on that activity. By its terms, the Peñuelas Ordinance forbids only the use of CCRs as "landfill material" and is primarily directed at preventing the deposit of CCRs on land. See Docket No. 32-2 at p. 8, § 1. The Humacao Ordinance, though arguably broader in reach, bans only the use of CCRs as "filler material." See Docket No. 32-1 at p. 9, § 1. According to the EPA's various statements on the matter, which are rife with examples of beneficial uses, the Ordinances do not scratch the surface of a wholesale prohibition. See, e.g., 80 Fed. Reg. at 21,328 (non-exhaustive list of encapsulated beneficial uses); id. at 21,353
AES-PR contends that defendants' own admissions establish the "complete" scope of the bans. See, e.g., Docket No. 30 at p. 15. When faced with AES-PR's allegation that the Ordinances "ban[ ] any and all beneficial uses of `ash' resulting from the burning of coal," see Docket No. 1 at ¶¶ 69, 74, defendants' answer admitted that the Ordinances "ban the use of ash resulting from the burning of coal anywhere within the territorial limits" of Humacao and Peñuelas, see Docket No. 22 at ¶¶ 16, 21. (Docket No. 49 at pp. 8-9.) Because an answer is a "pleading," pursuant to Federal Rule of Civil Procedure 7(a), AES-PR argues that this admission is binding on defendants for purposes of summary judgment. Id. at p. 8.
AES-PR is correct that "a pleading admitting a fact alleged in an antecedent pleading is [ordinarily] treated as a binding judicial admission," but "there are limits to what parties can admit." Harrington v. City of Nashua, 610 F.3d 24, 31 (1st Cir.2010). The Court is not obligated to accept as binding judicial admissions statements that are "legal conclusions" or that are "unclear." See id.; accord Commercial Money Ctr., Inc. v. Ill. Union Ins. Co., 508 F.3d 327, 336 (6th Cir.2007) ("Judicial admissions of fact must be deliberate and clear, while legal conclusions are rarely considered to be binding judicial admissions."); In re Teleglobe Commc'ns Corp., 493 F.3d 345, 377 (3d Cir.2007) ("To be binding, admissions must be unequivocal. Similarly, they must be statements of fact that require evidentiary proof, not statements of legal theories." (internal citations omitted)).
Here, defendants' supposed admission that the Ordinances "ban the use of ash resulting from the burning of coal," see Docket No. 22 at ¶¶ 16, 21, cannot in good faith be understood as an unequivocal statement regarding the scope of the Ordinances, particularly considering that defendants' answer is much broader than AES-PR's contention that the Ordinances ban "all beneficial uses" of such ash, see Docket No. 1 at ¶¶ 69, 74 (emphasis added). Even construing defendants' answer as acquiescence, the Court "is not obliged to accept a proposition of law simply because one party elects not to contest it." See Harrington, 610 F.3d at 31. The question of whether a local law operates as a total or de facto prohibition on a RCRA-encouraged activity is for the Court to decide. See, e.g., Blue Circle Cement, Inc. v. Bd. of Cnty. Comm'rs of Cnty. of Rogers, 917 F.Supp. 1514, 1519 (N.D.Okla. 1995) ("The Court must next determine whether the Ordinance amounts to an `explicit or de facto total ban' on the burning of [hazardous waste fuels]."); Ogden, 687 F.Supp. at 1446-47 (examining whether conditional use permit scheme amounted to a de facto ban on conducting hazardous waste incineration testing).
For these reasons, the Court finds that the Ordinances are not complete bans on the beneficial use of CCRs and that, in any event, RCRA does not encourage the beneficial use of CCRs to an extent sufficient to preempt local laws restricting this activity. As such, the Ordinances do not frustrate the purposes of RCRA and are, therefore, not preempted. AES-PR's motion
AES-PR also moves for summary judgment on its claim that the Ordinances are preempted by Puerto Rico law. (Docket No. 29.) AES-PR argues that "a municipal ordinance may not be enforced if it conflicts with legislation enacted by the Legislative Assembly of Puerto Rico." (Docket No. 30 at p. 20.)
The Commonwealth has designated the EQB as the agency with the authority to "exercise, execute, receive and administer delegation, establish regulations, and implement a permit system in connection with" RCRA. P.R. Laws Ann. tit. 12 § 8002g. With respect to solid waste management, transportation, and disposal, the EQB has the authority to "adopt, promulgate, amend and repeal rules and regulations for solid waste disposal" and to "establish the sites and methods to dispose of such solid waste." Id. § 8002c(b)(4)(A).
AES-PR contends that EQB authority authorizes the beneficial use of CCRs, including as an alternative daily cover in permitted landfills. (Docket No. 30 at pp. 21-22.) On May 15, 2014, AES-PR asked the EQB for authorization to dispose of CCRs in sanitary landfill systems ("SLSs") that comply with Subtitle D of RCRA. (Docket No. 32-8 at p. 11.) In August 2014, the EQB issued Resolution R-14-27-20 (the "August 2014 Resolution"), which delineated the only circumstances in which CCRs generated at the Guayama Facility (including Agremax) may be deposited, including as daily cover material in sanitary landfills that are "authorized to operate by the EQB with composite or geosynthetic liner and [that] comply with the design and operation criteria laid down in [40 C.F.R. § 258]," pursuant to Subtitle D of RCRA and parallel Commonwealth law. See Docket No. 55-1 at p. 17. The EQB instructs that any landfill seeking to receive CCRs for use as daily cover must first request an amendment of its operating permit from the EQB and submit an amended operating and emergency plan to the EQB for approval. Id. AES-PR avers that the EQB approved an updated operating plan for the Coqui Landfill in Humacao authorizing the use of Agremax (identified as "rock ash") as an alternative daily cover. (Docket No. 30 at p. 22.)
Defendants do not dispute these events, but instead argue that they acted within their delegated authority in passing laws restricting the use of CCRs. See Docket No. 40. Indeed, as defendants point out, Puerto Rico law permits municipalities to "regulate the solid waste collection management in harmony with the environmental policy" of the Commonwealth. See id. at pp. 6-7 (quoting P.R. Laws Ann. tit. 21 § 4055).
While conceding that the Puerto Rico legislature granted municipalities the authority to regulate solid waste disposal, AES-PR argues that the Ordinances are not "in harmony with" Commonwealth law. See Docket No. 30 at p. 23; Docket No. 49 at p. 11. In support of this argument, AES-PR contends that this case is analogous to Liberty Cablevision of P.R. v. Municipality of Caguas, 417 F.3d 216 (1st Cir.2005). At issue in Liberty Cablevision was the federal Cable Act, which empowered state governments to designate a "franchising authority" to negotiate with cable operators seeking to use public "rights-of-way." See id. at 219-20. Pursuant to the Cable Act, the designated "franchising authority" was authorized to grant franchises to cable companies and to collect a maximum of five percent of gross revenues as "franchise fees" in exchange for use of the public "rights-of-way." Id.
After announcing its holding, the First Circuit Court of Appeals went on to address the municipality's flawed arguments for upholding their fee ordinances. For example, the municipalities had argued that they were entitled to compensation as "owners" of these rights-of-way. In rejecting this argument, the court noted that municipalities possess no inherent powers, but derive them from the state. Id. The court further noted that, pursuant to Puerto Rico law, municipal ordinances must be "in harmony with" Commonwealth law and that Commonwealth law prevails in cases of conflict. Id. at 222. There, because Puerto Rico had created the TRB as its "sole franchising authority," the court found that "the municipalities' attempts to regulate cable companies by charging franchise fees ... conflict with Puerto Rico legislation and necessarily fail." Id. (emphasis added). The Court pointed out that the Commonwealth had not, during the relevant time period, enacted legislation enabling the municipalities to assess fees for use of the public "rights-of-way." Id. at 222-23 & n. 8.
The Court finds that Liberty Cablevision is distinguishable and unavailing for AES-PR. In Liberty Cablevision, the municipalities lacked state-granted authority, whereas here, Puerto Rico's Legislative Assembly has specifically permitted municipalities to regulate in the arena of solid waste management. In any event, the relied-upon language of Liberty Cablevision is dicta, because the case was decided on federal preemption grounds. Its holding does not support AES-PR's argument that municipal ordinances restricting certain uses of CCRs are necessarily preempted by a state agency's delineation of the conditions under which CCRs may be properly disposed.
Without further support or elaboration, the Court declines to strike down the Ordinances as out of "harmony" with Commonwealth law, particularly because Commonwealth law permits both the EQB and municipalities to regulate in this arena.
In sum, for the above reasons, the Court finds that neither federal nor Commonwealth law preempt the Ordinances. AES-PR's motion for partial summary judgment, (Docket No. 29), is therefore
For the above reasons, the Court
"Unencapsulated" uses involving "placement on the land of 12,400 tons or more in non-roadway applications" must meet an additional criterion: (4) "the user must demonstrate and keep records, and provide such documentation upon request, that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use." Id.