Elawyers Elawyers
Ohio| Change

Dyncorp International LLC v. United States, 19-1133 (2020)

Court: United States Court of Federal Claims Number: 19-1133 Visitors: 9
Filed: Jun. 08, 2020
Latest Update: Jun. 08, 2020
Summary: In the United States Court of Federal Claims No. 19-1133 Filed: May 21, 2020 Reissued: June 8, 20201 ) DYNCORP INTERNATIONAL LLC, ) ) Plaintiff, ) ) v. ) Post-Award Bid Protest; Judgment on the ) Administrative Record; RCFC 52.1; THE UNITED STATES, ) Technical/Management Approach; Labor ) Staffing Model; Indefinite-Delivery Defendant, ) Indefinite-Quantity Contract; Task Order ) Contract; Firm-Fixed Price; and ) Cost-Plus-Fixed-Fee; Administrative ) Procedure Act; Arbitrary and Capricious; KELLO
More
           In the United States Court of Federal Claims
                                        No. 19-1133
                                    Filed: May 21, 2020
                                   Reissued: June 8, 20201

                                             )
    DYNCORP INTERNATIONAL LLC,               )
                                             )
                   Plaintiff,                )
                                             )
    v.                                       )      Post-Award Bid Protest; Judgment on the
                                             )      Administrative Record; RCFC 52.1;
    THE UNITED STATES,                       )      Technical/Management Approach; Labor
                                             )      Staffing Model; Indefinite-Delivery
                   Defendant,                )      Indefinite-Quantity Contract; Task Order
                                             )      Contract; Firm-Fixed Price;
                   and                       )      Cost-Plus-Fixed-Fee; Administrative
                                             )      Procedure Act; Arbitrary and Capricious;
    KELLOGG, BROWN & ROOT                    )      Price Reasonableness; FAR 15.404-1(b);
    SERVICES, INC., VECTRUS SYSTEMS          )      Value Analysis; FAR 15.404-1(b)(4);
    CORPORATION, FLUOR                       )      Cost Realism; FAR 15.404-1(d); Unequal
    INTERCONTINENTAL, INC., and              )      Discussions; Past Performance; Prejudice.
    PAE-PARSONS GLOBAL LOGISTICS             )
    SERVICES, LLC,                           )
                                             )
                   Defendant-Intervenors.    )
                                             )


Lawrence Philip Block, Reed Smith LLP, Washington, DC, for plaintiff.

William Porter Rayel, U.S. Department of Justice, Civil Division, Washington, DC, for
defendant.

Andrew Emil Shipley, Wilmer Cutler, et al., LLP, Washington, DC, for defendant-intervenor,
Fluor Intercontinental, Inc. Anuj Vohra, Crowell & Moring LLP, Washington, DC, for
defendant-intervenor, PAE-Parsons Global Logistics Services, LLC. Kevin Patrick Mullen,
Morrison & Foerster, LLP, Washington, DC, for defendant-intervenor, Vectrus Systems
Corporation. Lee Paul Curtis, Perkins Coie, Washington, DC, for defendant-intervenor,
Kellogg, Brown & Root Services, Inc.


1
        An unredacted version of this Opinion and Order was issued under seal on May 21, 2020.
The parties were given an opportunity to propose redactions, and those redactions are reflected
herein.
                                   OPINION AND ORDER

SMITH, Senior Judge


        This post-award bid protest comes before the Court on the parties’ Cross-Motions for
Judgment on the Administrative Record. Plaintiff, DynCorp International LLC (“DynCorp”),
challenges the decision by the United States Department of the Army (“Army” or “Agency”) to
award four Indefinite-Delivery Indefinite-Quantity (“IDIQ”) contracts for logistics support
services to defendant-intervenors, Kellogg, Brown & Root Services, Inc. (“KBR”), Fluor
Intercontinental, Inc. (“Fluor”), Vectrus Systems Corporation (“Vectrus”), and PAE-Parsons
Global Logistics Services, LLC (“P2GLS”), under Request for Proposal No. W52P1J-16-R-0001
(“RFP” or “Solicitation”). See generally Plaintiff’s Memorandum of Points and Authorities in
Support of Plaintiff’s Motion for Judgment on the Administrative Record (hereinafter “Pl.’s
MJAR”). Plaintiff alleges the following: (1) the Administrative Record fails to document a
rational evaluation and decision-making process; (2) the record suggests that DynCorp was
treated unfairly and disparately; and (3) the evaluation ratings are materially divorced from the
underlying facts.
Id. at 1.
For the reasons set forth below, plaintiff’s Motion for Judgment on
the Administrative Record is granted-in-part and denied-in-part, and defendant and
defendant-intervenors’ Cross-Motions for Judgment on the Administrative Record are
granted-in-part and denied-in-part.


  I.    Background

       On November 20, 2017, the Army issued the Solicitation for the Logistics Civil
Augmentation Program (“LOGCAP”) V procurement for logistics support services.
Administrative Record (hereinafter “AR”) 2510–11. The Solicitation stated that the Army would
award between four and six IDIQ contracts to cover the six Geographic Combatant Commands
(“COCOM”) and Afghanistan. AR 2511. The IDIQ contracts were divided into three
Operational Priority Groupings, listed in descending order of priority as follows: (1) European
Command (“EUCOM”) and Pacific Command (“PACOM”); (2) Central Command
(“CENTCOM”), Northern Command (“NORTHCOM”), African Command (“AFRICOM”), and
Southern Command (“SOUTHCOM”); and (3) Afghanistan. AR 2624. IDIQ contracts were to
be awarded concurrently with the task orders for each COCOM and Afghanistan. AR 2511,
2624.

        The Solicitation directed the Agency to award each contract on a best-value basis
according to the following four factors, listed in descending order of importance: (1)
Technical/Management; (2) Past Performance; (3) Small Business Participation; and (4)
Cost/Price. AR 2624. When combined, the three non-price factors were significantly more
important than Cost/Price. AR 2624. Under the Technical/Management Factor, the Army
evaluated offerors’ regional capabilities, management approach, key initiatives, and Labor
Staffing Models (“LSMs”). AR 2626–27. Offerors were given discretion in creating their base

                                                   2
LSMs, but they were required to submit proposals that could predict labor staffing mix, types,
and quantities necessary to accomplish the Solicitation’s requirements. AR 2627. When
assigning Technical/Management ratings, the Agency considered the impact of each offeror’s
approach in the following LOGCAP V risk areas: responsiveness, affordability, predictability,
capability, accountability, and flexibility. AR 2626.

       In evaluating an offeror’s past performance, the Army looked to an offeror’s
demonstrated record of recent and relevant past performance in “assess[ing] the degree of
confidence it ha[d] that the Offeror [could] successfully complete the Solicitation requirements.”
AR 2627–28. Under the Cost/Price Factor, the Solicitation directed the Army to separately
evaluate the reasonableness of each offeror’s Firm-Fixed-Price (“FFP”) contract line item
numbers (“CLINs”) and Cost-Plus-Fixed-Fee (“CPFF”) CLINs, and, additionally, to evaluate the
realism of the CPFF cost elements in each offeror’s proposal. AR 2629–30.

        On February 26, 2018, six offerors submitted proposals for the LOGCAP V procurement,
all of which were included in the competitive range; each offeror participated in multiple rounds
of discussions.2 AR 70612. Interim proposals were submitted on July 18, 2018 and on October
21, 2018. AR 70849. Final proposal revisions (“FPRs”) were submitted on December 21, 2018,
and on February 6, 2019.
Id. DynCorp received
over one hundred evaluation notices (“ENs”),
of which thirty-nine related to Cost/Price and over forty-five of which concerned DynCorp’s
LSM. See generally AR 70859–63. After receiving offerors’ second interim proposals, the
Contracting Officer (“CO”) determined that DynCorp provided the highest cost proposals in five
of the regions. AR 124863–64. She did not engage in discussions related to price at that time, as
the Army did not consider DynCorp’s prices to be “too high.” AR 124863–64. Moreover, the
CO believed DynCorp’s prices were not unreasonable given DynCorp’s acceptable technical
approach. AR 124864.

        The Army evaluated each offeror’s proposal; the Cost/Price Factor Chair completed a
Final Cost/Price Evaluation Report for each offeror in every COCOM and Afghanistan, the
Source Selection Evaluation Board (“SSEB”) issued an Evaluation Report regarding non-price
factors, the Source Selection Advisory Council (“SSAC”) issued a Comparative Analysis Report,
the Source Selection Authority (“SSA”) issued a Source Selection Decision Document
(“SSDD”), and the CO completed separate Determinations of Price Reasonableness for each
COCOM and Afghanistan. See generally AR 68247–9865, 70031–175, 70305–479, 70609–34,
73819–32. On April 12, 2019, the Army concurrently awarded four IDIQ contracts and related
task orders for the corresponding regions as follows: (1) KBR received EUCOM, NORTHCOM,
and Afghanistan; (2) Vectrus received PACOM and CENTCOM; (3) Fluor received AFRICOM;
and (4) P2GLS received SOUTHCOM. AR 70776–82. In each region, DynCorp proposed
higher prices and/or received inferior ratings under the non-price factors as compared to the
awardee. See generally AR 70619–32.

    DynCorp received a “Good” rating for its Technical/Management proposal in all six
COCOMs, and an “Acceptable” rating in Afghanistan. AR 749160–61. The Agency determined


2
      The six offerors were DynCorp, KBR, Vectrus, Fluor, P2GLS, and AECOM
Management Services, Inc. (“AECOM”).
                                                    3
that DynCorp’s LSM was “feasible and capable of being used to successfully meet the
requirements,” and expressed confidence in DynCorp’s LSM being “consistent, scalable, and
adjustable.” AR 68276. The Army did not find any weaknesses or deficiencies in DynCorp’s
LSM, but the Agency did determine that the LSM was “generic and simplistic.”
Id. The Agency
also found that DynCorp failed to mitigate risks with transparency, affordability, and
predictability, and thus was not worthy of a receiving a strength for either its LSM or Labor
Staffing Approach. See AR 68276, 2626.

        On April 22, 2019, DynCorp filed a protest with the Government Accountability Office
(“GAO”). AR 843. In a July 31, 2019 Opinion, the GAO denied DynCorp’s protest, finding that
the Army engaged in meaningful discussions regarding DynCorp’s LSM, and that the Army was
not required to address DynCorp’s high prices. AR 749157. The GAO also found that the Army
did not engage in unequal discussions regarding cost issues with other offerors, and that there
was no merit to the price reasonableness evaluation errors DynCorp specifically alleged in its
GAO protest. See generally AR 749157–71.

        On August 5, 2019, plaintiff filed its Complaint with this Court, arguing that its “bid
protest is the result of the Army’s violation of law and undeniably arbitrary and capricious action
and irrational disparate treatment.” Complaint at 2. On August 16, 2019, plaintiff filed an
amended complaint, and on October 7, 2019, it filed its Motion for Judgment on the
Administrative Record. See generally Amended Complaint; Pl.’s MJAR. Defendant filed its
Cross-Motion for Judgment on the Administrative Record and Response on October 22, 2019.
See generally Defendant’s Cross-Motion for Judgment on the Administrative Record and
Response to Plaintiff’s Motion for Judgment on the Administrative Record (hereinafter “Def.’s
CMJAR”). That same day, defendant-intervenors filed their respective Cross-Motions for
Judgment on the Administrative Record and Responses. See generally Vectrus’s Cross-Motion
for Judgment on the Administrative Record and Response in Opposition to DynCorp’s Motion;
Fluor Intercontinental, Inc.’s Cross-Motion for Judgment on the Administrative Record and
Response to DynCorp’s Motion for Judgment on the Administrative Record; Kellogg, Brown &
Root Services, Inc.’s Cross-Motion for Judgment on the Administrative Record; PAE-Parsons
Global Logistics Services, LLC’s Response to DynCorp International LLC’s Motion for
Judgment on the Administrative Record and Cross-Motion for Judgment on the Administrative
Record.

        On November 4, 2019, plaintiff filed its Response and Reply. See generally DynCorp
International LLC Reply in Support of Motion for Judgment on the Administrative Record and
Opposition to Defendant and Intervenors’ Cross-Motions for Judgment on the Administrative
Record (hereinafter “Pl.’s Reply”). Defendant and defendant-intervenors filed their Replies on
November 14, 2019. See generally Defendant’s Reply to Plaintiff’s Response to Defendant’s
Cross-Motion for Judgment on the Administrative Record (hereinafter “Def.’s Reply”);
Vectrus’s Reply in Opposition to DynCorp’s Response; Fluor Intercontinental, Inc.’s Reply in
Support of Cross-Motion for Judgment on the Administrative Record; Kellogg, Brown & Root
Services, Inc.’s Reply in Support of Its Cross-Motion for Judgment on the Administrative
Record; PAE-Parsons Global Logistics Services, LLC’s Reply in Support of Its Cross-Motion
for Judgment on the Administrative Record. The Court held oral argument on November 25,
2019. This case is fully briefed and ripe for review.

                                                    4
    II.   Standard of Review

         This Court’s jurisdictional grant is found primarily in the Tucker Act, which gives the
Court the power “to render judgment on an action by an interested party objecting to a
solicitation by a Federal agency . . . or to a proposed award or the award of a contract or any
alleged violation of statute or regulation in connection with a procurement or a proposed
procurement.” 28 U.S.C. § 1491(b)(1) (2018).3 In a bid protest, this Court “may award any
relief that the court considers proper, including declaratory and injunctive relief.” § 1491(b)(2).

         This Court evaluates bid protests under the Administrative Procedure Act’s standard of
review for agency actions. See Bannum, Inc. v. United States, 
404 F.3d 1346
, 1351 (Fed. Cir.
2005) (citing 28 U.S.C. § 1491(b)(4); Impresa Construzioni Geom. Domenico Garufi v. United
States, 
238 F.3d 1324
, 1332 (Fed. Cir. 2001)). Thus, agency procurement actions may only be
set aside when they are “arbitrary, capricious, an abuse of discretion, or otherwise not in
accordance with the law.” 5 U.S.C. § 706 (2018) (incorporated in 28 U.S.C. § 1491(b)(4)). The
“arbitrary and capricious standard applicable [in bid protests] is highly deferential.” Advanced
Data Concepts, Inc. v. United States, 
216 F.3d 1054
, 1058 (Fed. Cir. 2000). Agencies and their
“[c]ontracting officers are ‘entitled to exercise discretion upon a broad range of issues
confronting them’ in the procurement process.” 
Impresa, 238 F.3d at 1332
(quoting Latecoere
Int’l, Inc. v. U.S. Dep’t of Navy, 
19 F.3d 1342
, 1356 (11th Cir. 1994)); see also Savantage Fin.
Servs. v. United States, 
595 F.3d 1282
, 1286 (Fed. Cir. 2010).

        Pursuant to Rule 52.1 of the Rules of the Court of Federal Claims (“RCFC”), a party may
file a motion for judgment on the administrative record for the Court to determine whether an
administrative body, given all disputed and undisputed facts in the record, acted in compliance
with the legal standards governing the decision under review. RCFC 52.1; see also Supreme
Foodservice GmbH v. United States, 
109 Fed. Cl. 369
, 382 (2013) (citing Fort Carson Support
Servs. v. United States, 
71 Fed. Cl. 571
, 585 (2006)). On such a motion, the parties are limited to
the Administrative Record, and the Court must make findings of fact as if it were conducting a

3
        Neither defendant nor defendant-intervenors requested that the Court dismiss plaintiff’s
claims concerning the Afghanistan region. Pursuant to Rules 12(b)(1) and 12(h)(3), however,
the Court must dismiss any claims over which it lacks subject-matter jurisdiction. RCFC
12(b)(1); RCFC 12(h)(3) (“If the court determines at any time that it lacks subject-matter
jurisdiction, the court must dismiss the action.”). The Federal Streamlining Act (“FASA”) limits
this Court’s jurisdiction by excepting from it protests that are “in connection with the issuance or
proposed issuance of a task or delivery order except for . . . a protest on the ground that the order
increases the scope, period, or maximum value of the contract under which the order is issued.”
10 U.S.C. § 2304c(e) (2018). As award of the Afghanistan region by itself could not have
triggered the award of a Multiple Award Task Order Contract, the Afghanistan award is a true
task order award. See AR 2511–12, 2625. As such, the FASA bars this Court’s review of any
arguments exclusively related to the Afghanistan region. See Fluor Intercontinental, Inc. v.
United States, No. 19-1580, ECF No. 52; PAE-Parsons Global Logistics Services, LLC v. United
States, No. 19-1205, ECF No. 78.
                                                     5
trial on a paper record. RCFC 52.1; 
Bannum, 404 F.3d at 1354
. Looking to the Administrative
Record, the Court must determine whether a party has met its burden of proof based on the
evidence in the record. 
Bannum, 404 F.3d at 1355
.

        When a protestor claims that an agency’s decision violates a statute, regulation, or
procedure, the protestor must show that such alleged violation was “clear and prejudicial,” as the
Court will “interfere with the government procurement process ‘only in extremely limited
circumstances.’” EP Prods., Inc. v. United States, 
63 Fed. Cl. 220
, 223 (2005) (quoting CACI,
Inc.-Fed. v. United States, 
719 F.2d 1567
, 1581 (Fed. Cir. 1989)). “If the [C]ourt finds a
reasonable basis for [an] agency’s action, the [C]ourt should stay its hand even though it might,
as an original proposition, have reached a different conclusion as to the proper administration
and application of the procurement regulations.” Honeywell, Inc. v. United States, 
870 F.2d 644
,
648 (Fed. Cir. 1989) (quoting M. Steinthal & Co. v. Seamans, 
455 F.2d 1289
, 1301 (D.C. Cir.
1971)). The Court cannot substitute its judgment for that of an agency, even if reasonable minds
could reach differing conclusions. Bowman Transp., Inc. v. Ark.-Best Freight Sys., Inc., 
419 U.S. 281
, 285–86 (1974) (quoting Citizens to Preserve Overton Park, Inc. v. Volpe, 
401 U.S. 402
, 416 (1971)).


III.    Discussion

         In its Motion for Judgement on the Administrative Record, plaintiff claims that the Army
acted irrationally, arbitrarily, and capriciously as follows: (1) failing to provide adequate support
or documentation for KBR’s Past Performance ratings; (2) conducting “misleading and disparate
discussions,” thereby depriving plaintiff of an opportunity to address the Army’s concerns; and
(3) failing to conduct proper cost realism and price reasonableness analyses by not following the
requirements set forth in the Solicitation and the FAR. See generally Pl.’s MJAR at 3–4, 14, 22,
25. The Court will address each of these claims in turn.

       A. Past Performance

         Plaintiff alleges that in awarding KBR a “Substantial Confidence” Past Performance
rating, the Army “whitewash[ed]” KBR’s past performance record by ignoring issues with
                 and                        . See Pl.’s MJAR at 25. Specifically, plaintiff claims
that the Army failed to adequately document the reasons behind its assignment of a “Substantial
Confidence” rating. See
id. at 29–34.
In its Response, defendant argues that the Army
“considered KBR’s recent adverse past performance information” and rationally assigned KBR a
“Substantial Confidence” rating. See Def.’s CMJAR at 40–41.

        The RFP required that an offeror’s past performance record be “evaluated as a predictor
of future contract performance.” AR 2627. The RFP further indicated that an offeror’s issues
with resolving problems under prior contracts or a lack of relevant performance history would be
considered in the Army’s Past Performance evaluation. AR 2628. Additionally, any “negative
finding” related to an offeror’s past performance could result in “an overall lower confidence
assessment rating.” AR 2628. A rating of “Substantial Confidence” was only appropriate where
the Army has a “high expectation” of successful performance.
Id. 6 Agencies
are afforded broad discretion in evaluating an offeror’s past performance
record, and the Court’s review of an Agency’s Past Performance evaluation is “limited to
determining whether the evaluation was reasonable, consistent with stated evaluation criteria and
complied with relevant statutory and regulatory requirements.” See Westech Int’l, Inc. v. United
States, 
79 Fed. Cl. 272
, 293 (2007) (quoting JWK Int’l Corp. v. United States, 
52 Fed. Cl. 650
,
659 (2002)). A Past Performance evaluation will be found reasonable when the Agency gave
“meaningful consideration” to any possible adverse Past Performance information documented
in the offeror’s record. Vanguard Recovery Assistance, Joint Venture v. United States, 99 Fed.
Cl. 81, 95 (2011).

        The Administrative Record indicates that KBR has had issues involving
                                                                    and noncompliance with
                       requirements under LOGCAP IV. See generally AR 125729–40,
223874–88. However, when the record is looked at holistically, the plaintiff’s Past Performance
allegations are unsupported. While the plaintiff focuses on adverse past performance ratings and
non-conformance reports (“NCR”) issued during LOGCAP IV, those performance issues only
make up a discrete portion of what the Agency actually reviewed. The record indicates that the
Agency’s past performance analysis included the review of over sixteen relevant past projects.
See generally AR 68826–67, 68831. As defendant points out, KBR began reporting all
                                                                         while performing under
the LOGCAP IV contract. Def.’s CMJAR at 45 (citing AR 10687). Furthermore, while KBR
had past issues related to                      , defendant explained that those issues only
affected a small percentage of the over $85 million worth of                        that KBR
managed.
Id. at 44
(citing AR 10688). Finally, KBR responded to its “Unsatisfactory” ratings
and NCRs with corrective action plans to ensure those issues did not reoccur, AR 10687, and the
record demonstrates that the Agency analyzed those corrective action plans as part of its Past
Performance evaluation. AR 68833.

         The Administrative Record clearly indicates that the Past Performance Evaluation
Team meaningfully considered KBR’s Past Performance, and the record as a whole supports the
Army’s assignment of a “Substantial Confidence” rating to the same. See generally AR
68805–69; see also Vanguard 
Recovery, 99 Fed. Cl. at 95
. As such, where, as here, the Agency
gives meaningful consideration to Past Performance, and its evaluation thereof is reasonable, the
Court will not infringe upon the Agency’s decisionmaking. See Glenn Def. Marine Asia v.
United States, 
105 Fed. Cl. 541
, 564 (2012). Accordingly, the Court finds that the Army
appropriately evaluated and rated KBR’s Past Performance.

       B. Discussions

       Plaintiff alleges that the Army engaged in misleading and disparate discussions as
follows: (1) failing to conduct meaningful discussions regarding plaintiff’s allegedly
“unreasonably high” prices; (2) conducting unequal discussions regarding plaintiff’s cost/price
volume and LSM; and (3) misleading plaintiff into unnecessarily amending its prices to its
disadvantage. See Pl.’s MJAR at 4–10. This Court reviews each claim in turn.


                                                    7
           1. High Prices

        In addition to its Cost/Price arguments, which the Court addresses below, plaintiff claims
that the Army was required to advise DynCorp that its Cost/Price proposal was “unreasonably
high” during discussions. Pl.’s MJAR at 4. While it is true that an agency must hold discussions
when an offeror’s Cost/Price is determined to be “unreasonably high,” an agency need not hold
discussions if the offeror’s prices are merely “too high.” See WorldTravelService v. United
States, 
49 Fed. Cl. 431
, 439 (2001); see also 48 C.F.R. § 15.306(e)(3) (2019); DMS All-Star
Joint Venture v. United States, 
90 Fed. Cl. 653
, 669 (2010). Moreover, an agency cannot reveal
that an offeror’s prices are higher than other offeror’s prices without the latter’s permission. See
§ 15.306(e)(3). For the reasons explained infra, the Court has determined that the Agency’s
price reasonableness evaluations were flawed. As the Agency must reevaluate price proposals,
that reevaluation could impact the Agency’s assessment of DynCorp’s prices. However, the
Court cannot evaluate whether the absence of discussions that could potentially stem from such a
failure was arbitrary and capricious absent speculation on the outcome of the forthcoming proper
price reasonableness analyses. As such, the Court will not endeavor to make such a
speculation-based determination.

           2. Cost/Price and LSM

        Plaintiff next alleges that the Army failed to conduct meaningful discussions regarding
DynCorp’s Cost/Price volume and LSM in violation of Federal Acquisition Regulation (“FAR”)
1.602 and FAR 15.306(d). Pl.’s MJAR at 4. Specifically, plaintiff claims that the Army
conducted unequal discussions in violation of FAR 1.602-2 and FAR 15.306 by affording only
some awardees the opportunity to respond to the Agency’s concerns related to the offerors’
respective Cost/Price proposals.
Id. at 8.
In support of that argument, plaintiff points to the
CO’s December Memorandum, in which the Army allegedly documented its concerns with
DynCorp’s price proposal.
Id. Plaintiff further
posits that the Army violated FAR 15.306(d) and
1.602-2 by failing to hold discussions regarding allegedly significant weaknesses in DynCorp’s
LSM.
Id. at 10.
Plaintiff argues that these “significant weaknesses” downgraded its
Technical/Management rating from “Outstanding” to “Good,” which adversely impacted its
chance of award.
Id. at 10–11.
        In response, defendant claims that the Agency had no “open concerns” with DynCorp’s
price proposal and that DynCorp’s alleged price concerns are uniquely different than the
concerns that gave rise to the Cost/Price discussions the Agency held with other offerors. Def.’s
CMJAR at 18–19. The government also argues that it was not required to hold discussions
related to DynCorp’s LSM approach, as it contained no deficiencies or “significant weaknesses.”
Id. at 21.
Additionally, defendant alleges that, even if the Army was required to discuss
DynCorp’s allegedly too-high prices, failing to do so was nonprejudicial because “DynCorp’s
proposal was inferior to each awardee on the combined non-price factors.”
Id. at 19
(emphasis
omitted).

        The FAR requires COs to discuss any “deficiencies, significant weaknesses, and adverse
past performance information” with each offeror still in consideration for award that has not yet
been afforded an opportunity to respond. 48 C.F.R. § 15.306(d)(3). That requirement notably

                                                     8
does not extend to “every area where the [offeror’s] proposal could be improved.”
Id. Additionally, this
Court has also explained that when conducting discussions with offerors in the
competitive range, the government cannot favor one offeror over another. See Kerr Contractors,
Inc. v. United States, 
89 Fed. Cl. 312
, 329 (2009), aff'd, 374 F. App’x 979 (Fed. Cir. 2010).
Discussions are unequal when “a crucial advantageous piece of information is withheld from
some but not all offerors remaining in the competition.” See Kerr Contractors, 
Inc., 89 Fed. Cl. at 329
.

        After receiving offerors’ FPRs, the Army reopened discussions with four offerors. AR
73898. The Army did not, however, reopen discussions with DynCorp, as the Army had no
“open concerns” with DynCorp’s prices. AR 73898. The Agency’s discussions with other
offerors related to specific proposal flaws, such as P2GLS’s fee on non-fee bearing costs in
AFRICOM, Vectrus’s unrealistic fringe rate, and KBR’s failure to convert Euros to U.S. Dollars.
See generally AR 73894–902. As the Agency never determined that DynCorp’s prices were too
high, and as DynCorp’s proposal did not contain any specific flaws that would trigger
discussions, the Agency was not required to hold discussions. Moreover, the Army’s decision to
only hold discussions with offerors that submitted flawed proposals does not constitute disparate
or unequal discussions related to Cost/Price. While the Agency considered DynCorp’s LSM
approach to be simplistic, the Technical/Management Evaluation Team ultimately determined
that DynCorp’s LSM was consistent, scalable, adjustable, and sufficient to successfully meet the
requirements. AR 68275 –80. The Agency did not, however, consider DynCorp’s simplistic
approach to be a significant weakness. AR 68276–80. As such, the Agency was not required to
open discussions with DynCorp regarding its LSM approach, and its failure to do so did not
constitute a violation of the FAR.

           3. Misleading Discussions

         Finally, plaintiff alleges that the Army misled DynCorp by suggesting that it needed to
raise its prices. Pl.’s MJAR at 12. Plaintiff argues that by failing to advise DynCorp that the
adjustment was unnecessary, DynCorp significantly and unnecessarily increased its prices. Pl.’s
MJAR at 12. During discussions, the Army instructed DynCorp to “provide further
documentation to support the approximate           normalization factor, including recent sample
payroll records to support that DynCorp has hired at the proposed rates for similar work.” AR
71214. Plaintiff interpreted this request as a requirement that it “change its reliance on market
surveys to actual historical wages,” and, as a result, DynCorp revised its prices to reflect
historical wage rates. Pl.’s MJAR at 12–13. In effect, plaintiff’s argument is essentially that the
Agency should have realized that a misunderstanding arose based on DynCorp’s responses to the
EN, and when unambiguous language results in a misunderstanding, the Agency is required to
address that misunderstanding. See
id. at 14.
Plaintiff’s interpretation is incorrect.

         This Court has consistently held that an error in communicating weaknesses that results
in an offeror revising its proposal is “quintessentially a misleading discussion.” E.g., Caddell
Constr. Co. v. United States, 
125 Fed. Cl. 30
, 45 (2016). Though agencies have considerable
discretion in how to conduct discussions, that discretion does not permit an agency to mislead an
offeror. Gentex Corp. v. United States, 
58 Fed. Cl. 634
, 653 (2003). Here, plaintiff alleges that
it revised its proposal and provided higher prices as a direct result of its discussions with the

                                                    9
Agency. Pl.’s MJAR at 13. In response, defendant correctly points out that the ENs did not
require that DynCorp revise its prices, but rather only required that DynCorp “support the
specific ‘normalization factor’ it used when basing its labor rates on
data.” Def.’s CMJAR at 26 (citing AR 71214). The Court concludes that while this might
suggest misleading discussions occurred, the revision actually appears to be due to DynCorp’s
own misinterpretation of the EN. In fact, contrary to plaintiff’s understanding, the Solicitation
did not merely limit supporting documents for labor rates to historic wage rates and payrolls, but
it actually allowed for the inclusion of labor surveys as well. AR 3831; see also Pl.’s MJAR at
14 (citing 
Gentex, 58 Fed. Cl. at 653
(2003)). This indicates that plaintiff misinterpreted the
Solicitation’s basic requirements. As a misinterpretation is distinctly different from misleading
discussions, the Court concludes that the Agency did not engage in misleading discussions with
DynCorp.

       C. Cost/Price

        Next, plaintiff alleges that the Army violated both the RFP and FAR 15.404-1 when
conducting its price reasonableness and cost realism analyses. See generally Pl.’ s MJAR at
14–25. Relevantly, plaintiff argues the following: (1) the Army did not properly conduct a cost
realism analysis; (2) the price reasonableness analysis did not comport with FAR
15.404-1(b)–(c); (3) the Army arbitrarily limited its price reasonableness evaluation to the lowest
priced offeror in each COCOM. See generally
id. at 14–25.
           1. Price Reasonableness

       In addition to its cost realism arguments, plaintiff argues that the Agency’s price
reasonableness evaluation “was materially flawed.” See Pl.’s MJAR at 14. In support of that
argument, plaintiff asserts that the Agency “failed to employ any of the proposal analysis
techniques set forth in FAR 15.404-1(b) and (c) to evaluate cost/price reasonableness,” and that
the Agency only evaluated “whether the lowest-price offeror’s, not the awardee’s, cost/price was
reasonable for each [COCOM] region.” Pl.’s MJAR at 14–15. For the reasons set forth below,
the Court sustains most—but not all—of plaintiff’s price reasonableness protest grounds.

         The Agency employed FAR Part 15 evaluation methods in this procurement. AR 2629.
Specifically, the Solicitation stated that the “Government will evaluate the realism of the offerors
[sic] proposed cost for the cost reimbursable effort through cost realism analysis [in accordance
with] FAR 15.404-1(d). The Government will evaluate price reasonableness for the fixed priced
effort [in accordance with] FAR 15.404-1(b).”
Id. As the
Solicitation did not require the
Agency to “evaluate cost/price reasonableness” in accordance with FAR 15.404-1(c),4 which
plaintiff argues the Agency failed to do, the Court denies that specific protest ground. Compare
AR 2629–30, with Pl.’s MJAR at 15–18.

       The Solicitation also established the following:

4
       The Court reiterates that the Agency elected to employ certain FAR Part 15 procurement
evaluation methods for evaluating IDIQ contract awards, which, as a general matter, are
governed by FAR Part 16.
                                                    10
       To be considered for award, the total proposed [CPFF] for the [CPFF] CLINs
       (including any [Most Probable Costs] pursuant to (iv)(b) above[]), and the total
       proposed price for the [FFP] CLIN[s] must separately be found reasonable. A
       determination that either one is unreasonable will render the offeror ineligible for
       an award in that [COCOM] or Afghanistan.

AR 2630. In reviewing plaintiff’s remaining claims, the Court interprets the Solicitation in a
manner that “harmonizes and gives reasonable meaning to all of its provisions.” See Banknote
Corp., 365 F.3d at 1353
. As such, the Court concludes that, in addition to evaluating the realism
of the CPFF efforts, the Agency also had to evaluate each offeror’s CPFF and FFP CLINs
separately for reasonableness in determining whether each offeror would be “considered for
award.” See AR 2630; see also Banknote 
Corp., 365 F.3d at 1353
. The following language from
the SSDD supports this interpretation: “[o]f the remaining eligible offerors, the Government will
make an award . . . to the responsible Offeror determined to provide the best value.” AR 70613
(emphasis added).5 Read together, the Agency clearly “considered for award” all “remaining
eligible offerors” when determining each COCOM awardee, and, therefore, obligated itself to
evaluate each of those offeror’s price proposals for reasonableness. See AR 2630, 70613.

        Plaintiff contends that the Agency failed to meaningfully evaluate offerors’ Cost/Price
proposals in accordance with the Solicitation’s required evaluation scheme, as the Army merely
“listed each offerors’ FFP and CPFF pricing [] in descending order,” and, “[w]ithout performing
any other analysis,” concluded that each awardee’s prices were fair and reasonable. Pl.’s MJAR
at 16. or a FAR 15.404-1(b)(2) analysis “to be meaningful,” the Agency “must compare the
prices of offerors to each other, or to the average price, or to the independent government cost
estimate, or to the prices under other similar contracts, and must explain the reasons for any
significant variations in prices.”
Id. at 15–16
(emphases in original) (citing Technatomy Corp. v.
United States, 
144 Fed. Cl. 388
, 390 (2019)). Additionally, plaintiff alleges that the “wide
disparity” in proposed prices should have informed the Agency that its reliance on “the mere
existence of competition” was “insufficient to establish that an awardee’s proposed prices are
reasonable.”
Id. at 16–17
(citing Serco, Inc. v. United States, 
81 Fed. Cl. 463
, 494 (2008)); Pl.’s
Reply at 7–8. Finally, plaintiff argues that the price reasonableness evaluations were flawed both
“because [the Agency] only evaluated the reasonableness of the lowest-price offeror, rather than
the awardee,” and because the Administrative Record “lacks any evidence that either the
cost/price evaluators or the SSA evaluated whether the awardee’s proposed cost/price was
unreasonably high per FAR 15.404-1(b) or (c).”
Id. Plaintiff claims
this is significant because
the “SSA’s Determinations reveal that in six out of seven of the [regions], the awardee’s price is
substantially higher than the lowest-price offeror,” the implications of which are made worse by
the absence of “any evaluation of whether the awardee’s higher price is reasonable.”
Id. at 19
–20 (emphasis in original).

      In response, defendant contends that the Agency’s price reasonableness evaluation
comported with FAR 15.404-1(b) requirements, as “the Cost/Price Factor Chair determined that


5
       It is not disputed that the Agency considered DynCorp an “eligible offeror.” See
generally AR 70609–34 (SSDD).
                                                    11
adequate price competition existed, such that the lowest total evaluated price [(‘TEP’)] of each
region was fair and reasonable, as were the lowest [FFP] and [CPFF] proposed price[s] for each
[COCOM].” Def.’s CMJAR at 28. Defendant further argues that the CO “documented
price-reasonableness determinations for each of the awardees” based on adequate price
competition, and that the CO “found no basis to conclude that the awardee’s [TEP] was
unreasonable.”
Id. at 28–29.
Defendant claims that, in addition to concluding that the awardees’
TEPS were reasonable based on adequate price competition, the CO also performed a value
analysis, ultimately finding that “the awardees’ prices were reasonable based upon the value
provided by their non-price proposals.”
Id. at 30–31.
Finally, defendant alleges that “the [CO]
necessarily relied upon the comparison of the offerors’ proposals in the SSAC’s Comparative
Analysis Report and the [SSA’s] decision document” in analyzing offerors and reaching those
conclusions.
Id. at 31
(citations omitted).

        As a general matter, “[t]he contracting officer is responsible for evaluating the
reasonableness of the offered prices.” 48 C.F.R. § 15.404-1(a). Pursuant to FAR 15.404-1(b),
an agency may utilize various price analysis techniques and procedures to determine price
reasonableness. The “preferred techniques” include comparing offerors’ proposed prices against
each other or comparing offerors’ proposed prices to the historical prices paid for similar items.
§ 15.404-1(b)(2)(i)–(ii), (b)(3). The Solicitation indicated the Agency’s intent to employ
adequate price competition to compare offerors’ prices and establish that those prices were fair
and reasonable. See § 15.404-1(b)(2)(i); see also, e.g., AR 73825–26. FAR 15.403-1(c)(1)(i)
dictates that adequate price competition exists when the following occurs: (1) “[t]wo or more
responsible offerors, competing independently, submit priced offers that satisfy the
Government’s expressed requirement”; (2) “[a]ward will be made to the offeror whose proposal
represents the best value (see 2.101) where price is a substantial factor in source selection”; and
(3) “[t]here is no finding that the price of the otherwise successful offeror is unreasonable.”

         When executing one of the price analysis techniques enumerated in FAR 15.404-1(b)(2),
agencies may also employ a value analysis. See 48 C.F.R. § 15.404-1(b)(4). If the agency elects
to conduct a value analysis, as the Agency did here, FAR 15.404-1(b)(4) dictates the following:
“[v]alue analysis can give insight into the relative worth of a product and the Government may
use it in conjunction with the price analysis techniques listed in paragraph (b)(2) of this section.”
(emphasis added). Thus, as the Agency elected to conduct a value analysis as part of its price
reasonableness evaluation, that value analysis should have been completed in conjunction with
the Agency’s determination that adequate price competition existed. See
id. For the
reasons set
forth below, the Court concludes that the Agency failed to conduct its price reasonableness
evaluations in accordance with the requirements set forth in the Solicitation, and that the Agency
failed to conduct a proper value analysis in accordance with the FAR.

         The Administrative Record contains several memoranda in which the Cost/Price Factor
Chair found each awardee’s prices to be reasonable based on adequate price competition, as well
as determinations in each COCOM that the lowest proposed TEPs, FFP CLINs, and CPFF
CLINs were fair and reasonable. See generally AR 69866–95. To document the existence of
adequate price competition, the Cost/Price Factor Chair created three charts for each COCOM
that listed each offeror in ascending order of price. See, e.g., AR 69876–77 (CENTCOM). The
first chart was based on the offeror’s TEP, the second on the offeror’s total FFP, and the third on

                                                     12
the offeror’s total CPFF. See, e.g.,
id. Each chart
also included a finding, as a percentage, of
every offeror’s “Difference from Low.” See, e.g.,
id. Beneath each
respective chart, the
Cost/Price Factor Chair simply expressed that, based on a comparison of the TEP, FFP, or CPFF,
the lowest-priced offeror’s prices “appears fair and reasonable.” See, e.g.,
id. The Cost/Price
Factor Chair failed to evaluate the reasonableness of each offeror’s CPFF
and FFP CLINs in violation of the terms of the Solicitation, as the Cost/Price Factor Chair only
evaluated the reasonableness of the lowest-priced offeror in each COCOM. Compare, e.g., AR
2630, with AR 69876-77 (CENTCOM). This evaluation error is particularly egregious given
that some offerors proposed prices 1,000–2,000% higher than those of the lowest-price offerors,
and the CO never addressed those price differences. See e.g., AR 69876. This lack of analysis is
problematic, as price consistency, not inconsistency, demonstrates price reasonableness, and the
Solicitation clearly required that the Agency separately evaluate each offeror’s CPFF and FFP
CLINs. See, e.g., AR 2630; see also, e.g., Serco, 
Inc., 81 Fed. Cl. at 494
. Thus, the Court
concludes that both the Cost/Price Factor Chair’s failure to conduct a complete price
reasonableness assessment for offerors and the CO’s ultimate reliance on that error violated the
Solicitation and FAR 15.404-1(b).

        While the Cost/Price Factor Chair’s failure to comprehensively evaluate price
reasonableness is not in itself a violation of either the Solicitation or the FAR, the CO’s
near-exclusive reliance on those flawed analyses in reaching her own price reasonableness
determinations resulted in a violation of both. Like the Cost/Price Factor Chair, the CO failed to
separately determine whether each offeror’s CPFF and FFP CLINs were reasonable. Compare,
e.g., AR 2630, with AR 73825–26 (EUCOM). Instead, the CO performed combined price
reasonableness assessments, as evidenced by the following statement from the CO’s April 9,
2019 Fair and Reasonable Price Determination:

       Also, due to the inherent link of the [FFP] effort, Setting the Theater, which was
       also the guaranteed minimum obligation for each contract award, the
       cost-reimbursable efforts were considered with the [FFP] efforts. The awards for
       both the Setting the Theater and Performance Task Orders are inseparable for all
       award decisions with the exception of Afghanistan, which did not have an
       associated Setting the Theater Task Order.

AR 73825–26. In addition to those procedural evaluation errors, the substance of the CO’s price
reasonableness determinations proved to be equally flawed. The CO appeared to rely on the
Cost/Price Factor Chair’s incomplete price reasonableness assessments while evaluating prices,
and she failed to include any meaningful analysis beyond a recitation of the percentage
difference between each offeror and the “difference from low” and “difference from next low.”
See generally AR 73823–32. Such a bare comparison of percentage differentials, without further
analysis, is an inadequate means of determining price reasonableness, particularly as the record
lacks any evidence of comprehensive price reasonableness evaluations for the COCOM
awardees’ proposed prices. See Technatomy Corp. v. United States, 
144 Fed. Cl. 388
, 390
(2019) (“[The agency] conducted a meaningful price reasonableness analysis, in compliance with
48 C.F.R. § 15.404-1(b)(2), by comparing the prices of offerors to each other’s, to the average
price, to the independent government cost estimate, and to the prices under other contracts, and

                                                   13
by explaining that variations were due to differing risk preferences and technical approaches.”
(emphasis added)); see also, e.g., AR 73829. Moreover, the Court concludes that, because the
Army did not conduct a proper price reasonableness analysis in accordance with the Solicitation
and the FAR, the Agency could not have accurately determined whether DynCorp’s price was
“unreasonably high.” This is significant because, as more fully 
explained supra
, even where
price reasonableness is sufficiently analyzed, the Agency is still required to hold discussions with
an offeror that proposed an “unreasonably high” price, as an “unreasonably high” price
constitutes a “significant weakness.” See WorldTravelService v. United States, 
49 Fed. Cl. 431
,
439 (2001), see also DMS All-Star Joint Venture v. United States, 
90 Fed. Cl. 653
, 669 (2010).

         Additionally, contrary to defendant’s assertions that the CO relied upon the SSAC’s
Comparative Analysis Report and the SSDD’s value analysis, the CO seemingly relied solely on
the Cost/Price Factor Chair’s flawed price reasonableness analyses in conducting her value
analysis. See generally, e.g., AR 73825–26 (EUCOM); see also Def.’s CMJAR at 30–31.6 In
fact, a deeper review of the record unearthed even greater flaws with the Agency’s overall price
evaluations. See Def.’s CMJAR at 30–31. In addition to the existing issues stemming from the
CO’s faulty reliance on incomplete price reasonableness assessments, the Court found that the
Agency failed to meet the requirements set forth under FAR 15.404-1(b)(4). That failure is
made evident by the CO’s Determination of Fair and Reasonable Price memoranda in several
COCOMs, in which she stated the following:

       The Cost/Price Factor Chair evaluated price reasonableness for the LOGCAP V
       EUCOM award decision. This evaluation resulted in a determination that Vectrus
       Systems Corporation’s [TEP] is fair and reasonable based on competition. The
       Cost/Price Factor Chair also stated that other offerors may be able to be determined
       fair and reasonable based on a tradeoff with non-price factors. The value derived
       from the non-price factors renders the value of the cost-reimbursable prices for the
       performance task orders reasonable for the identified best[-]value award decisions
       in accordance with FAR 15.404-1(c) and (d).

E.g., AR 73825 (EUCOM). This excerpt reveals that the CO failed to concurrently perform a
value analysis and price competition determination as required by the FAR. Compare 48 C.F.R.
§ 15.404-1(b)(4), with, e.g., AR 73825. FAR 15.404-1(b)(4) requires that the CO conduct a
value analysis “in conjunction with” the selected price analysis technique. By failing to examine
adequate price competition concurrently with the value analysis, the Agency failed to meet the
requirements set forth under FAR 15.404-1(b)(4). As such, the Agency’s price reasonableness


6
        The CO’s Determination of Fair and Reasonable Price memoranda clearly demonstrate
that the CO relied upon the Cost/Price Factor Chair’s price reasonableness evaluations in
conducting her value analysis. See, e.g. AR 73825–26 (EUCOM). A review of the Cost/Price
Factor Chair’s Determination of Price Reasonableness memoranda reveals that the Cost/Price
Factor Chair neither mentioned nor included substantive discussions on the findings in the
SSAC’s Comparative Analysis Report or the SSDD. See, e.g., AR 69879–82 (EUCOM).
Therefore, even if the Court inferred that the CO relied upon the SSAC’s Comparative Analysis
Report and the SSDD in conducting a value analysis for each COCOM, the CO’s value analysis
was still flawed.
                                                    14
awardee’s proposed prices “significantly understated” the number of hours necessary to perform
the Solicitation’s requirements.
Id. Moreover, plaintiff
contends that those disparities could not
have been adequately analyzed or interpreted unless the Agency conducted a proper cost realism
analysis.
Id. at 24.
In response, defendant alleges that the Agency did, in fact, conduct a proper
cost analysis and cites to multiple instances throughout the record where the Agency allegedly
documented its cost realism evaluations. Def.’s CMJAR at 36 (citing, e.g., AR 69374–75,
69483–86, 69593–96, 69709–14, 69832–37). Defendant also contends that the broad discretion
afforded to offerors in creating their LSMs necessarily resulted in a variety of staffing estimates,
including the proposed number of hours necessary to meet the requirements. See AR 2616–17.

        The Court agrees with defendant’s understanding of the record. The Solicitation granted
offerors a great deal of discretion in creating their LSMs. See
id. As such,
it is not implausible
that offerors’ proposals included unique approaches with noticeable differences in the various
data points included therein. Moreover, the Administrative Record as a whole reflects that the
Army conducted a lengthy cost realism analysis, which included an evaluation of whether
proposed labor hours for certain tasks were too low. See, e.g., AR 68288–90, 68297–98, 68393,
68398, 68449, 68452, 68504–05, 68525, 68582–83.

        Plaintiff further contends that Fluor—the AFRICOM awardee—failed to include
overtime in its pricing. Pl.’s MJAR at 25. Specifically, plaintiff alleges that Fluor failed to
account for local overtime laws, and that, had Fluor accurately accounted for overtime hours,
Fluor’s price for AFRICOM would have been $8.2–14.5 million higher.7
Id. Due to
this error,
plaintiff argues that any cost realism analysis of Fluor’s AFRICOM proposal must necessarily be
flawed.
Id. The Court
does not agree with plaintiff’s assertions. The record shows that Fluor
provided an “affirmative statement that [it] understands and will fully comply with current host
nation laws, including labor laws,” and that “[a]ll costs proposed are consistent with current host
nation laws.” AR 3799, 21964. Moreover, as defendant points out, Fluor is the incumbent
contractor for the AFRICOM region and presumably has a good understanding of the local labor
laws. See Def.’s CMJAR at 40. Accordingly, the Court defers to the Agency’s decision that
such an “affirmative statement” warranted confidence in Fluor’s Cost/Price proposal. The Court
also finds that the Army rationally completed its cost realism analysis for AFRICOM, and that,
even if Fluor had miscalculated its hours, the Agency should still be afforded its due deference,
as such an error is not “critical miscalculation.” See, e.g., OMV Med., 
Inc., 219 F.3d at 1344
.



7
        DynCorp and Fluor relied upon consultant declarations in making their arguments.
Neither declaration was previously approved by the Court on Motions to Supplement the
Administrative Record. Generally, the Court will not consider materials outside the
Administrative Record in determining the merits of a protest unless those materials are necessary
for judicial review. See, e.g., Axiom Resource Mgmt., Inc. v. United States, 
564 F.3d 1374
,
1379–81 (Fed. Cir. 2009). Although defendant seemingly objected to the use of DynCorp’s
consultant in its Cross-Motion for Judgment on the Administrative Record, see Def.’s CMJAR at
39, no party filed a Motion to Strike. As such, the Court hereby incorporates both DynCorp and
Fluor’s consultant reports into the Administrative Record.
                                                     16
       D. Prejudice

        Plaintiff alleges that it was prejudiced by the Agency’s actions, arguing that “[b]ut for the
[A]gency’s errors in the evaluation, [DynCorp] stood a reasonable chance of award.” Pl.’s
MJAR at 36. Plaintiff contends that a “substantial chance” of award does not mean it
“absolutely would have received a contract.” Pl.’s MJAR at 37 (citing CSE Constr. Co., Inc. v.
United States, 
58 Fed. Cl. 230
, 258–59 (2003)). In response, defendant argues that “in each of
the six regions where an IDIQ contract could have been awarded based upon the best-value
determination, DynCorp’s total evaluated price was more than 30 percent higher than the
awardee’s price, and DynCorp’s proposal was inferior to each awardee on the combined
non-price factors.” Def.’s Reply at 7. While defendant concedes that “DynCorp does not need
to demonstrate that it definitely would have won a contract in the absence of the alleged errors,”
defendant maintains that “a ‘reasonable possibility’ of an award is not sufficient to establish
prejudice.” Def.’s Reply at 9 (citing Data Gen. Corp. v. Johnson, 
78 F.3d 1556
, 1593 (Fed. Cir.
1996)).

        As the Court has determined that the Agency failed to properly conduct a price
reasonableness determination in accordance with both FAR 15.404-1 and the terms of the
Solicitation, the Court next must determine whether such a violation prejudices the plaintiff. In
determining whether prejudice exists, the Court applies a different test depending on whether the
procurement violated a regulation, or the Agency arbitrarily and capriciously violated the terms
of the Solicitation. See Caddell Constr. Co. v. United States, 
125 Fed. Cl. 30
, 50 (2016). Here,
the Court looks to both tests as the Agency violated both the terms of the Solicitation and
procurement regulations.

         The Federal Circuit has held that, “[u]nder the APA standard . . . , ‘a bid award may be
set aside if either (1) the procurement official’s decision lacked a rational basis; or (2) the
procurement procedure involved a violation of regulation or procedure.’” Banknote 
Corp., 365 F.3d at 1351
(quoting 
Impresa, 238 F.3d at 1332
). In a bid protest, this Court has previously
held that “when an irrational or arbitrary and capricious agency action has occurred, prejudice is
presumed.” Caddell Constr. 
Co., 125 Fed. Cl. at 50
(citing Centech Grp., Inc. v. United States,
554 F.3d 1029
, 1037 (Fed. Cir. 2009)). As the Court has already determined that the Agency’s
failure to conduct the price reasonableness evaluation required by the Solicitation was arbitrary
and capricious, prejudice is presumed for that argument. See id.; see also Textron, Inc., 74 Fed.
Cl. at 283–84 (“If the court finds that the Government has acted arbitrarily and capriciously, the
analysis stops at that finding. There should be no need to continue to prejudice, because a
finding that the Government acted arbitrarily and capriciously necessarily invalidates the
procurement.”).

        When a “violation of statute or regulation has occurred, there must be a separate showing
of prejudice.” Caddell Constr. 
Co., 125 Fed. Cl. at 50
(citing 
Centech, 554 F.3d at 1037
). To
establish prejudice, a protestor must “show[]a ‘substantial chance’ that it would have received
the award if the error was corrected.” Info. Scis. Corp. v. United States, 
73 Fed. Cl. 70
, 93
(2006) (citing 
Bannum, 404 F.3d at 1358
). In Textron, this Court explained that, “[s]ince 1990,
the substantial-chance requirement has been construed as requiring everything from a greater

                                                     17
than insubstantial chance of success on the merits, to a reasonable likelihood of receiving the
award but for the alleged error, to allowing only protest by the second lowest bidder.” 74 Fed.
Cl. at 283–84 (citations omitted). Since Textron was issued, the inconsistent application of the
“substantial chance” standard has yet to be remedied. While the Court will not attempt to
remedy it now, based on the nature of the violation in this case, the Court employs the approach
advanced in Textron, which assesses “whether the procurement violation was significant to the
protestor’s chance of being awarded the 
contract.” 74 Fed. Cl. at 329
.

        Here, the Agency’s failure to conduct an adequate price reasonableness evaluation and a
proper value analysis in accordance with FAR 15.404-1(b) and FAR 15.404-1(b)(4),
respectively, was necessarily “significant to the protestor’s chance of being awarded the
contract” given that the Agency based its award decisions on those flawed analyses. See
id. While the
Court finds that the Agency did not perform a price reasonableness analysis in
accordance with FAR 15.404-1, even if the Court was to accept defendant’s argument that the
Agency conducted price reasonableness evaluations, such flawed evaluations were only
conducted for the lowest priced offeror in each COCOM. See AR 73823–24, 70615, 70620,
70623, 70626, 70630–31, 70677; see also AR 73825–26, 73829–30. This failure directly affects
plaintiff’s chance of being awarded certain contracts given the Agency’s sequential award
scheme and failure to conduct a complete price reasonableness determination for the awardee in
several COCOM regions. AR 2624–25.

        As the Army failed to conduct an adequate price reasonableness evaluation and a proper
value analysis in accordance with the Solicitation, FAR 15.404-1(b), and FAR 15.404-1(b)(4),
the Agency’s determination that DynCorp’s prices were not unreasonably high is necessarily
flawed. Only completion of a proper price reasonableness analysis for all offerors, including a
determination of whether DynCorp’s prices were unreasonably high, could inform the Court of
whether DynCorp was next in line for an award. While the Court will not speculate as to the
outcome of such an analysis, the Court believes that the Agency could have made different
award decisions had it completed price reasonableness analyses along with concurrent value
analyses. In evaluating cost and price, the Agency’s action—or more accurately, inaction—was
clearly “significant to the protestor’s chance of being awarded the contract.” See 
Textron, 74 Fed. Cl. at 329
. That flawed analysis, standing alone, sufficiently demonstrates that plaintiff—as
well as all other offerors—was prejudiced by the Agency’s violations of FAR 15.404-1(b).


 IV.    Corrective Action

         For the reasons set forth above, plaintiff demonstrated success on the merits. Consistent
with discussions held during a December 3, 2019 status conference, the Army filed a status
report on December 9, 2019, notifying the Court of its intention to take corrective action with
respect to the Army’s price reasonableness determinations. See generally Defendant’s Status
Report Regarding Corrective Action and Motion to Stay Proceedings. On December 17, 2019,
the Court issued an Order staying and remanding the case to the Agency for a period of
forty-five days—up to and including January 31, 2020—for the Agency to conduct corrective
action. Order Remanding Case to Army. In that Order, the Court also directed the defendant to
file a status report on or before February 7, 2020, “apprising this Court of the results of the

                                                    18
Agency’s corrective action and providing the Court with the Agency’s new price reasonableness
determinations.”
Id. at 2.
        On February 5, 2020, defendant filed a status report regarding the Agency’s corrective
action along with over 1,000 pages of supporting documentation. See Defendant’s Status Report
Regarding Corrective Action; see also Associated Documents. For the reasons enumerated in
the Court’s forthcoming Opinion and Order on Corrective Action, the Court finds that, on
corrective action, the Agency adequately evaluated price reasonableness in accordance with the
Solicitation and the FAR. As such, the Court need not address the parties’ injunctive relief
arguments. Additionally, as the Agency adequately evaluated price reasonableness through
corrective action, defendant is now entitled to judgment in its favor.


 V.    Conclusion

      For the reasons set forth above, plaintiff’s MOTION for Judgment on the Administrative
Record is GRANTED in part and DENIED in part. Defendant and defendant-intervenors’
CROSS-MOTIONS for Judgment on the Administrative Record are GRANTED in part and
DENIED in part.

       IT IS SO ORDERED.


                                                s/   Loren A. Smith
                                                Loren A. Smith,
                                                Senior Judge




                                                 19

Source:  CourtListener

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer