JAMES L. ROBART, District Judge.
Before the court is Defendant LTK Consulting Services, Inc.'s ("LTK") motion for summary judgment (Dkt. #172). Two of the arguments LTK raises in its present motion are variations of arguments that LTK has previously raised, including that (1) the factual allegations in that Plaintiff Affiliated FM Insurance Co.'s ("AFM") complaint are false, and (2) AFM's claims are barred by the statute of limitations. (Compare Mot. (Dkt. #172) with 5/1/12 Mot. (Dkt. #80).) The remaining arguments LTK raises on summary judgment are that AFM failed to mitigate its damages and assumed the risk at issue. (Mot. at 21-24.) The court has reviewed LTK's motion, all submissions filed in support of and opposition thereto, the balance of the record, and the applicable law.
This action arises out of a fire that occurred on May 31, 2004, that damaged the Blue and Red Trains of the Seattle Monorail as the Blue Train was leaving the Seattle Center Station. (See Not. of Rem. (Dkt. #1) at 7-11 (Compl. ¶¶ 1.1, 3.2).) Plaintiff Affiliated FM Insurance Company ("AFM") paid its insured, Seattle Monorail System ("SMS"), $3,267,861.00 for damages resulting from the fire. (Id. ¶ 5. 1.) AFM, as the equitable and contractual subrogee of SMS, brings this action against LTK, which provided certain engineer services related to the Monorail, to recover damages associated with the May 31, 2004, fire. (Id.) In its complaint, AFM alleges:
(Id. ¶ 3. 1.) AFM further alleges that "[t]he electrical ground fault responsible for causing the fire in the Blue Train on May 31, 2004 would have been avoided if the electrical grounding system for the Blue Train had not been changed at the direction of LTK ... in 2002." (Id. ¶ 3.3.)
AFM provides evidence that the original 1961 design of the Monorail employed a "floating" grounding system, which is a system in which the ground is not actually connected to the earth or another circuit
During the course of discovery in this action, AFM responded to a contention interrogatory from LTK by indicating that the City of Seattle had contracted with LTK in 1997 to provide engineering services related to the SMS. (See 3/30/12 Wahtola Decl. (Dkt. #52, 62) ¶ 25, Ex. 5 (attaching AFM's Ans. to Int. No. 4).) In addition, despite the allegations in its complaint that LTK recommended changing the Monorail's grounding system in 2002, AFM stated in its discovery response and elsewhere that it was during the course of this earlier project in 1997 or 1998 that LTK initially redesigned the Monorail's grounding system from a floating to a "body ground to negative rail" grounding system, also known as a "grounded" or "bonded" grounding system. (See id. ¶ 25, Ex. 5; 5/21/12 Way Decl. ¶ 7(c).)
Part of the evidence at issue arises out of the 2005 insurance coverage suit between AFM and SMS. The insurance coverage lawsuit arose out of a dispute over certain costs SMS claimed were related to the fire and covered by its insurance through AFM. (See id. ¶ 18.) During the course of the coverage suit, counsel for AFM deposed the manager of operations and maintenance for SMS, Mr. Glenn Barney.
LTK points out that AFM filed the present complaint within approximately one year of Mr. Barney's deposition in the insurance coverage lawsuit. (Mot. at 3.) LTK emphasizes that the sole basis for AFM's claim against LTK is the allegation that LTK recommended changing the grounding system for the Blue Train pursuant to LTK's 2001 contract to refurbish the Monorail and that the fire would not have occurred if LTK's recommended "change" to the grounding system had not been implemented in 2002. (Id. (citing Compl. ¶¶ 3.1, 3.3, 4.2).) LTK complains that the allegations in the complaint are contrary to the testimony of Mr. Barney in both the underlying insurance coverage lawsuit referenced above and more recently in the present lawsuit that LTK did not recommend a change in the Monorail's grounding system in 2002. (Mot. at 3-4 (citing 4/20/12 Wahtola Decl. (Dkt. #76) Ex. 1 (attaching 4/10/12 Barney Dep. at 59:19-60:25); 196:1-197:3 (explaining that the Monorail's grounding system could not have been changed in 2002 from a floating to a bonded system based on LTK's recommendation because it was already bonded at that time)).)
In late 1998 or early 1999, Mr. Barney became aware that members of the SMS maintenance staff were experiencing electrical shocks while working on the Monorail and there had been instances of electrical "arcing" occurring between the
SMS was required to "maintain" and "repair" the Monorail pursuant to its Concession Agreement with the City of Seattle. (See id. at 40:15-41:18, 92:19-93:5.) On October 6, 2000, LTK issued a proposal to the City of Seattle to provide services in connection with a Monorail renovation project that included a survey of the Monorail vehicles to document the existing grounding system. (Id. at 49:10-51:11.) SMS was to provide the funds to pay for LTK's services. (Id. at 47:22-51:11.) The City accepted LTK's proposal. (See 5/1/12 Wahtola Decl. Ex. 3.) Mr. Barney, however, voiced concerns about whether the work LTK proposed to perform was appropriate to correct the problems previously identified by SMS relating to the electrical grounding systems. (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep. at 52:7-54:7).)
On June 29, 2001, the Blue Train lost power after experiencing an incident of electrical "arcing." (Id. at 91:4-93:5.) In addition, the Blue Train suffered property damage in the form a one-inch by three-inch hole that was burned through the body of the car. (Id. at 90:21-91:10; 91:24-92:9.) Shortly following the June 29, 2001, incident, Mr. Barney wrote an incident investigation report. (Id. at 90:7-91:19.) In his report, Mr. Barney identified, as a contributing factor to the incident, the fact that the electrical grounding system of the SMS had been altered at some point in the past from a floating to a bonded system. (See id. at 93:6-25.)
On August 31, 2001, LTK issued a draft copy of its "Grounding and High Voltage Auxiliary Survey" to Mr. Barney. (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep. at 94:8 — 95:19).) In the survey, LTK specifically states that it is not recommending that the existing bonded grounding system be returned to the original floating design. (See 5/1/12 Wahtola Decl. Ex. 8 at 3 ("We are not recommending the reinstallation of the original grounding system.").) AFM asserts that LTK documented the 1997 change in the Monorail's grounding system in this survey without expressly acknowledging LTK's role in the 1997 design change. (See 3/30/12 Wahtola Decl. ¶ 25, Ex. 5.) Instead, LTK recommended replacing the multiple points of connection in which the Monorail car bodies were bonded to the high voltage negative return systems with a "single point of contact." (5/1/12 Wahtola Decl. Ex. 8 at 3; See id. Ex. 10.) LTK rerouted all of the grounding connections on the Monorail, and reorganized the grounding system, so that all of the grounded connections were run through a newly designed terminal board. (Way Decl. (Dkt. #95) ¶ 10.) This reorganization retained the bonded grounding system, which LTK redesigned from its original configuration in 1998. (Id.) Thus, although LTK apparently reorganized the grounding system in 2001, the Monorail's grounding system started out as "bonded" or "grounded" prior to LTK's 2001 recommendations and remained so after LTK's recommendations were implemented. (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep. at 196:1-197:3 ("[I]t was grounded starting the project and it was grounded at the end of the project.")).)
On June 25, 2002, Mr. Barney wrote a letter to Ms. Stephanie Van Dyke of the City of Seattle. (Id. Ex. 17.) In this letter, Mr. Barney stated that he did not believe that LTK's services with respect to the Monorail's grounding system were performed adequately. (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep. at 140:25-141:23).) In particular, Mr. Barney explained that he did not believe that the bonded grounding system as designed by LTK would prevent electrical "arcing" from burning holes in the Monorail's car bodies or prevent electrical shocks to passengers or SMS technicians. (See id. at 141:24-142:25; see also 5/1/12 Wahtola Decl. Ex. 17.) He also stated that he believed that LTK had "misrepresented" what its design for the Monorail grounding system would accomplish. (5/1/12 Wahtola Decl. Ex. 17 ("While LTK may have performed the specific requirements of the Task Force for this project, it should be noted for the future that LTK has fallen far short of meeting expectations that were clearly presented by SMS, and misrepresented what it would achieve throughout the course of the project.").)
On July 15, 2002, Mr. Barney, representing SMS, attended a meeting convened by the City of Seattle for the specific purpose of discussing the Monorail's grounding system as designed by LTK. (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep. at 146:13-147:15).) At this meeting, Mr. Barney, on behalf of SMS, advocated for a floating grounding system, while representatives of LTK and another electrical engineering firm argued that the grounded or bonded system LTK had designed for the Monorail should remain. (Id. at 147:5-149:17; 152:22-153:4.) As a result of the meeting, the City of Seattle determined that the bonded grounding system designed by LTK would remain in place. (See id. at 156:18-157:16; 151:23-25.)
After the meeting on the same day, Mr. Barney issued a memorandum to the City of Seattle, entitled "Notice of Agreement Termination," in which he stated that he was terminating SMS's agreement to reimburse the City of Seattle for LTK's services. (See 5/1/12 Wahtola Decl. Ex. 27; (4/20/12 Wahtola Decl. Ex. 1 (attaching 4/10/12 Barney Dep.) at 160:19-163:3).) Mr. Barney did not believe that SMS should be obligated to pay for services that it deemed unacceptable. (Id.) He also believed that he should not have to pay for LTK's services because the grounding system it recommended posed a safety hazard to passengers and maintenance staff and would result in additional instances of electrical arcing causing property damage to vehicles. (Id.)
Despite Mr. Barney's July 15, 2002, "Notice of Agreement Termination" letter to the City of Seattle, SMS eventually reimbursed the City of Seattle for the work performed by LTK. (See 2/13/14 Wahtola Decl. (Dkt. #173) Ex. 53 (attaching letter from Mr. Barney stating that "SMS is forwarding ... final payment ... based on recognition that all work on this project ... has now been completed.").) SMS ultimately reimbursed the City of Seattle for LTK's work despite SMS's belief
LTK contends, based on the facts recited above, that it is entitle to summary judgment on three grounds: (1) that the facts alleged in the complaint are false (Mot. at 14-19), (2) that AFM's claims are barred by the statute of limitations (id. at 19-21), and (3) that SMS failed to mitigate its damages and assumed the risks relating to the Monorail grounding system (id. at 21-24). The court addressed each argument in turn.
Federal Rule of Civil Procedure 56 permits a court to grant summary judgment where the moving party demonstrates (1) the absence of a genuine issue of material fact and (2) entitlement to judgment as a matter of law. See Fed.R.Civ.P. 56; Celotex Corp. v. Catrett, 477 U.S. 317, 322, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986); see also Galen v. Cnty. of L.A., 477 F.3d 652, 658 (9th Cir.2007). The moving party bears the initial burden of production of showing an absence of a genuine issue of material fact. Celotex, 477 U.S. at 323, 106 S.Ct. 2548. If the moving party does not bear the ultimate burden of persuasion at trial, it can show an absence of issue of material fact in two ways: (1) by producing evidence negating an essential element of the nonmoving party's case, or, (2) showing that the nonmoving party lacks evidence of an essential element of its claim or defense. Nissan Fire & Marine Ins. Co., Ltd., v. Fritz Cos., Inc., 210 F.3d 1099, 1106 (9th Cir.2000).
If the moving party meets its burden of production, the burden shifts to the nonmoving party to designate specific facts demonstrating the existence of genuine issues for trial. Celotex, 477 U.S. at 324, 106 S.Ct. 2548. The "mere existence of a scintilla of evidence in support of the plaintiff's position will be insufficient; there must be evidence on which the jury could reasonably find for the plaintiff." Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 252, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986). In determining whether the factfinder could reasonably find in the nonmoving party's favor, "the court must draw all reasonable inferences in favor of the nonmoving party, and it may not make credibility determinations or weigh the evidence." Reeves v. Sanderson Plumbing Prods., Inc., 530 U.S. 133, 150, 120 S.Ct. 2097, 147 L.Ed.2d 105 (2000).
LTK's first argument for summary judgment is one that is familiar to the court. The gravamen of LTK's argument can be summarized as follows: AFM alleged in its complaint that LTK negligently recommended changing the grounding system for the Monorail during the 2001/2002 timeframe (Compl. ¶¶ 3.1, 3.3, 4.2). The evidence produced during discovery, however, demonstrates that this allegation is incorrect. During discovery, the evidence revealed that (1) LTK initially changed in the Monorail's grounding system from a "floating" to a "bonded" or "grounded" system in the 1997/1998 timeframe, and (2) when asked to reevaluate the grounding system in the 2001/2002 timeframe, LTK recommended maintaining and reconfiguring the already "bonded" grounded system, but declined to recommend changing it back to a "floating" design. Thus, LTK asserts that because it did not recommend changing the fundamental
This is the fourth time that LTK has advanced this argument to the court. The court rejected the argument the first two times that LTK raised it in the context of discovery motions. (See 5/1/12 Order (Dkt. #82) at 9-10; 5/25/12 Order (Dkt. #96) at 9-10.) LTK raised the argument a third time in a previous motion for summary judgment. (2d SJ Mot. (Dkt. #80) at 17-21.) The court opted not to rule on the issue in the context of LTK's previous summary judgment motion because the court disposed of the motion on other grounds. (6/14/12 Order (Dkt. #103) at 9-10.) Now, LTK has raised the issue for a fourth time in its present motion for summary judgment. To quote Yogi Berra: "It's like déjà vu all over again." This time, however, the court reaches the issue on summary judgment, and its twice-stated previous conclusion that the argument is not well stated endures.
LTK relies primarily on Cline v. Industrial Maintenance Engineering & Contracting Co., 200 F.3d 1223 (9th Cir.2000). Cline, however, is easily distinguishable. Cline involved a purported class action lawsuit in which the critical issue was whether the subject employee benefit plan qualified as an individual retirement account ("IRA") plan under the Employee Retirement Income Security Act ("ERISA"), 29 U.S.C. § 1001 et seq. See Cline, 200 F.3d at 1231. Plaintiffs alleged in their initial complaint, which was dismissed, that the plan was IRA qualified. Id. at 1228. Plaintiffs subsequently filed an amended complaint in which they alleged that the plan was not IRA qualified. Id. In affirming summary judgment, the Cline court stated that "[plaintiffs] could not contradict their earlier allegations in an effort to survive summary judgment." Id. at 1232.
Unlike the plaintiffs in Cline, AFM has not contradicted the allegations in its complaint. It has alleged that the LTK recommended a change to the grounding system for the Blue and Red Trains. (Compl. ¶ 3.1.) It has also alleged that "[t]he electrical ground fault responsible for the fire in the Blue Train on May 31, 2004[,] would have been avoided if the electrical grounding system for the Blue Train had not been changed at the direction of LTK...." (Id. ¶ 3.3.) As both AFM and this court has previously noted, the Ninth Circuit has characterized the salient allegations in AFM's complaint as "alleg[ing] that the fire [on the Monorail] was a result of LTK's negligent design." Affiliated FM Ins. Co. v. LTK Consulting Servs., Inc., 556 F.3d 920, 920 (9th Cir.2009). The Washington Supreme Court characterized the gravamen of AFM's complaint as "claiming that LTK was negligent in changing the electrical ground system for the Blue and Red Trains." Affiliated FM Ins. Co. v. LTK Consulting Servs., Inc., 170 Wn.2d 442, 243 P.3d 521, 524 (2010). Unlike the plaintiffs in Cline, AFM has not abandoned this fundamental allegation concerning LTK's negligence nor contradicted it.
The present dispute is not about the gravamen of AFM's claims concerning LTK's alleged negligence. Rather, it is all about timing. In its complaint, AFM alleges that LTK's negligence in recommending a change in the grounding system for the Red and Blue Trains occurred in 2001 or 2002. (See Compl. ¶¶ 3.3, 4.2.) However, in its December 7, 2011, responses to LTK's interrogatories, AFM stated that during 1997 "LTK approved the modification of the train grounding scheme from a `floating body' design to a `body grounded
In any event, LTK's argument is inconsistent with modern pleading practice. Prior to the modern era of notice pleading, "pleading requirements were strict and variances of proof were not generally tolerated." See Health Care & Retirement Corp. of Am. v. St. Paul & Marine Ins. Co., 621 F.Supp. 155, 162 (S.D.W.Va.1985). A complaint under modern rules, however, is required only to put the defendant on notice of a claim showing that the pleader is entitled to relief or to have "facial plausibility." Fed.R.Civ.P. 8; Ashcroft v. Iqbal, 556 U.S. 662, 672, 129 S.Ct. 1937, 173 L.Ed.2d 868 (2009). AFM's complaint meets this standard. Nevertheless, there is no doubt that under modern pleading rules a fact alleged in a complaint "may be a poor measure of what is to follow." Health Care, 621 F.Supp. at 162. The gravamen of AFM's complaint is that LTK was negligent with regard to its work on the Monorail's grounding system. (See generally Compl.) The fact that the dates in AFM's complaint are off or that AFM's description of LTK's negligence has been refined through discovery does not render AFM's present position to be an irredeemable contravention of its prior allegations. This is the very type of refinement to the parties' positions, whether claims or defenses, that one anticipates will occur during discovery, particularly in light of our modern pleading rules.
Even prior to the modern era of notice pleading, however, courts did not consider even large discrepancies in dates or timing to be fatal variances between pleading and proof. See, e.g., United States v. Le Baron, 71 U.S. 642, 648, 4 Wall. 642, 18 L.Ed. 309 (1866) (stating that allegations of time need not be proven with precision, but that a very large departure therefrom is allowable); Hollweg v. Schaefer Brokerage Co., 197 F. 689, 694-95 (6th Cir.1912) (holding that in an action for breach of employment contract alleged to have been made in February and modified in October, there was no fatal variance, although the proof was of a contract made in April and modified in November). If courts permitted large departures in the timing prior to the
Most importantly, LTK has asserted no prejudice with respect to any discrepancies concerning timing or dates in AFM's complaint (see generally Mot. at 14-19), nor can it. LTK has been aware of AFM's refined theory of liability since at least December 2011, when AFM responded to LTK's interrogatories. (See 3/30/12 Wahtola Decl. ¶ 22, 25-26, Exs. 3, 5.) Thus, LTK has had ample opportunity to prepare with respect to AFM's claims, including a period of time when discovery was reopened following remand from the Ninth Circuit Court of Appeals. (See Dkt. ##150, 153, 167.)
Finally, in response to LTK's motion, AFM presents an August 25, 2001, draft report, prepared by LTK's engineers, which provides some evidence that LTK did recommend a change in the Monorail's grounding system in the 2001/2002 timeframe. The draft report states, in part:
(Pierson Decl. (Dkt. #189) ¶ 3, Ex. A at ¶ 2.1). AFM is correct that this evidence is sufficient to raise an issue of fact concerning whether LTK recommended a change to the Monorail's grounding system in 2001/2002 timeframe (see Resp. at 12-13) as alleged in AFM's complaint (see Compl. ¶¶ 3.1, 3.3, 4.2).
LTK's second ground for summary judgment is also a variation on LTK's prior argument that AFM's claim is barred by the statute of limitations. (Compare Mot. at 19-21 with 5/1/12 SJ Mot. (Dkt. #80) at 21-24.) On June 14, 2012, the court granted LTK's motion for summary judgment with respect to the statute of limitations. (See generally 6/14/12 Order (Dkt. #102).) The court found that Mr. Barney knew all the salient facts necessary for SMS to assert a claim against LTK based on LTK's alleged negligent redesign of the Monorail by at least July 15, 2002. (Id. at 13.) Specifically, the court found that Mr. Barney knew that SMS technicians and Monorail passengers were receiving electrical shocks and electrical arcing was burning holes thought the bodies of Monorail cars. (Id.) The court concluded that, because SMS knew that it had been injured as a result of LTK's alleged negligent redesign of the Monorail's grounding system as of the above date, the statute of limitations on the cause of action against LTK began to run on that date. (Id. at 17.) Because AFM, as SMS's subrogee, had not filed suit until more than three years after July 15, 2002, the court ruled that AFM's action was time barred. (Id.)
The Ninth Circuit reversed. The Ninth Circuit held that "[t]o the extent that [AFM] claims that the fire was caused by LTK's alleged negligence in changing from a floating to a bonded grounding system in 1998, the district court correctly concluded that [AFM's] claim is time-barred." (9th Cir. Mem. Disp. at 3.) The Ninth Circuit noted, however, that AFM's theory, at least in part, was that negligence occurred
(Id. at 4.)
This time around, following remand from the Ninth Circuit, LTK argues that the statute of limitations began to run on October 30, 2002, when SMS paid thousands of dollars to reimburse the City of Seattle for LTK's electrical engineering services related to the Monorail grounding system that SMS deemed to have been improperly and negligently performed. (Mot. at 20.) LTK argues that "this payment constitutes actual and appreciable harm on the part of SMS thereby resolving the only question of fact identified by the Ninth Circuit in its Memorandum." (Id. at 20-21.) Because AFM did not file suit until more than three years after October 30, 2002, LTK once again asserts that AFM's suit is barred by the statute of limitations.
In Washington, the discovery rule states that the statute of limitations starts to run on a negligence claim when the plaintiff discovers, or in the exercise of reasonable diligence should have discovered, facts giving rise to the cause of action. See Hipple v. McFadden, 161 Wn.App. 550, 255 P.3d 730, 735 (2011) (citing Peters v. Simmons, 87 Wn.2d 400, 552 P.2d 1053, 1056 (1976)); 1000 Va. Ltd. P'ship, 158 Wn.2d 566, 146 P.3d 423, 428 (2006) (stating that under the "discovery rule of accrual, ... a cause of action accrues when the plaintiff discovers, or in the reasonable exercise of diligence should discover, the elements of a cause of action."). LTK fundamentally misapprehends that nature of the harm that SMS must have discovered in order to initiate the running of the limitations period. In the context of this case, the Washington Supreme Court has stated that "[a]n injury is remediable in tort if it traces back to the breach of a tort duty arising independently of the terms of the contract." Affiliated FM Ins. Co. v. LTK Consulting Servs., Inc., 170 Wn.2d 442, 243 P.3d 521, 526 (2010) (quoting Eastwood v. Horse Harbor Found., 170 Wn.2d 380, 241 P.3d 1256, 1262 (2010)). Payment of the contract price to the City of Seattle did not put SMS on notice of its cause of action in negligence against LTK in such a manner as to start the limitations period running. Although, as LTK argues, this expenditure may count as part of AFM's alleged damages, the simple act of paying LTK's contract price would not lead Mr. Barney to discover SMS's negligence
Instead, it was SMS's alleged continuing problems with the electrical and/or grounding systems of the Monorail about which Mr. Barney complains at length in the course of his July 15, 2002, letter that arguably placed SMS on notice of its claim. (See Wahtola Decl. (Dkt. #173) Ex. A at 100.) Those issues included "mild electrical shocks to staff and passengers, and electrical arcing and burning of the train car bodies." (Id.) The Ninth Circuit, however, has already ruled that "[t]he record is unclear about the extent, significance, and cause of the alleged post-[terminal board]-installation incidents and, indeed whether they actually occurred post-installation." (9th Cir. Mem. Disp. at 4.) Because the Ninth Circuit has concluded that "[c]onflicting inferences may be drawn from the monorail manager's correspondence and testimony about the events" (id.), the court must deny LTK's second motion for summary judgment based on expiration of the statute of limitations. At its core, LTK's second motion for summary judgment based on the statute of limitations is nothing more than a poor rehash of its first motion. The Ninth Circuit has firmly rejected the notion that this issue can be resolved on summary judgment. (See id.) Thus, LTK's statute of limitations defense remains an issue for the jury to decide at trial.
LTK asserts that it is entitled to summary judgment because SMS failed to mitigate its damages and assumed the risk of the Monorail's bonded grounding system. (Mot. at 21-24.)
The doctrine of mitigation of damages, or avoidable consequences, prevents an injured party from recovering damages that the injured party could have avoided if it had taken reasonable efforts after the wrong was committed. TransAlta Centralia Generation LLC v. Sicklesteel Cranes, Inc., 134 Wn.App. 819, 142 P.3d 209, 212 (2006); see Young v. Whidbey Island Bd. of Realtors, 96 Wn.2d 729, 638 P.2d 1235, 1238 (1982). A person who has been injured by another's wrongdoing is given wide latitude and is only required to act reasonably in mitigating his or her damages. Hogland v. Klein, 49 Wn.2d 216, 298 P.2d 1099, 1102 (1956); TransAlta Centralia, 142 P.3d at 212. Thus, whether a party properly mitigates his or her damages turns on a determination of reasonableness, and an issue about which reasonable minds could differ is a question for the jury. Id.
In Washington, the doctrine of assumption of risk has four facets: (1) express assumption of risk, (2) implied primary assumption of risk, (3) implied reasonable assumption of risk, and (4) implied unreasonable assumption of risk. Tincani v. Inland Empire Zoological Soc'y, 124 Wn.2d 121, 875 P.2d 621, 633 (1994). The third and fourth aspects of assumption of risk are simply alternative names for contributory negligence, Scott v. Pacific West Mountain Resort, 119 Wn.2d 484, 834 P.2d 6, 13 (1992), and LTK has placed neither at issue in the present motion (see generally Mot. at 21-24). Neither has LTK asserted that SMS expressly assumed the risk of LTK's work with respect to the Monorail's bonded grounding system. (Id.) Instead, LTK asserts that it is entitled to summary judgment with respect to AFM's claims under implied primary assumption of risk. (Mot. at 22 ("Of particular importance to the present case, `Implied primary assumption of risk is a complete bar to recovery....'") (quoting Gregoire v. City of Oak Harbor, 170 Wn.2d 628, 244 P.3d 924, 928 (2010).))
Because implied primary assumption of risk is a complete bar to recovery, courts construe the doctrine narrowly. Lascheid v. City of Kennewick, 137 Wn.App. 633, 154 P.3d 307, 310 (2008). To invoke the doctrine, LTK must show that SMS "knowingly and voluntarily chose to encounter the risk." Home, 965 P.2d at 1119. The evidence must show that SMS (1) had full subjective understanding (2) of the presence and nature of the specific risk, and (3) voluntarily chose to encounter it. Id. Whether a plaintiff decides knowingly to encounter a risk turns on whether the plaintiff, at the time of decision, actually and subjectively knew all facts that a reasonable person in the defendant's shoes would know and disclose, or concomitantly, all facts that a reasonable person in the plaintiff's shoes would want to know and consider. Id. Knowledge and voluntariness are questions of fact for the jury, except when reasonable minds could not differ. Id.; Wirtz v. Gillogly, 152 Wn.App. 1, 216 P.3d 416, 420 (2009).
LTK argues that despite SMS's stated concerns about LTK's engineering with respect to the Monorail's grounding system and continued electrical arcing in the system, SMS continued to operate and maintain the Monorail with a bonded grounding system in place and even reimbursed the City of Seattle for LTK's work. (See Mot. at 24.) Thus, according to LTK, SMS (and therefore also AFM as SMS's subrogee) knew of the dangers that were purportedly inherent in LTK's work, but nevertheless assumed those risks or failed to mitigate its damages by continuing to operate the system. (Id.)
Here, however, there is evidence that in the face of SMS's doubts about LTK's engineering regarding the Monorail's grounding system, LTK issued assurances of safety to SMS. For example in an email August 27, 2002, Mr. Barney stated:
(3/3/14 Pierson Decl. (Dkt. #189) Ex. E.)
These reassurances from LTK regarding the safety of the grounding system in the face of SMS's doubts raise an issue of fact both with respect to LTK's defense of mitigation of damages as well as assumption of risk. Whether it was reasonable for SMS to rely on these assurances of safety from LTK engineers and move forward with payment to the City of Seattle for LTK's services and continued operation of the Monorail or whether based on its own apparent substantial doubts SMS should have refused to pay the City of Seattle for LTK's services or taken other actions to mitigate its damages is an issue of fact reserved for the jury. Likewise, whether SMS was entitled to surrender its
Based on the foregoing, the court DENIES LTK's motion for summary judgment (Dkt. #172), and this matter will proceed to trial.