CAROLE C. POPE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 03-003861RU (2003)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 17, 2003 Number: 03-003861RU Latest Update: Nov. 24, 2003

The Issue Whether Florida Administrative Code Rule 62B- 33.008(4)(d) should be determined to be an invalid exercise of delegated legislative authority? The Rule requires that an application for a permit for construction seaward of a coastal construction control line ("CCCL") contain "written evidence, provided by the appropriate local government agency . . ., that the proposed activity . . . does not contravene local setback requirements, zoning, or building codes and is consistent with the State approved Local Comprehensive Plan." Whether a statement alleged to have been made by an employee of the Bureau of Beaches and Wetland Resources in the Department of Environmental Protection ("DEP" or "the Department") violated Section 120.54(1)(a), Florida Statutes? The alleged statement is to the effect that in determining if structures littoral to the coast have established a continuous construction line closer to the mean high water line than the CCCL, the Department uses a 1000-foot distance to structures on either side of the proposed project.

Findings Of Fact The CCCL and Continuous Lines of Construction The CCCL The Legislature has declared it in the public interest to preserve and protect Florida's beaches and the coastal barrier dunes adjacent to them. See § 161.053(1)(a), Fla. Stat. In furtherance of this intent, the Department is empowered to "establish coastal construction control lines on a county basis along the sand beaches of the state fronting the Atlantic Ocean . . .". id., "after it has been determined from a comprehensive engineering study and topographic study that the establishment of such control lines is necessary for the protection of upland properties and the control of beach erosion." § 161.053(2)(a), Fla. Stat. The Department defines "Coastal Construction Control Line" or "CCCL" as "the line established pursuant to the provisions of Section 161.053, F.S., and recorded in the official records of the county, which [delineates] that portion of the beach-dune system subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions." Fla. Admin. Code R. 62B-33.002(12). Brevard County's CCCL bisects property along the Atlantic Ocean owned by Petitioner and her husband. Continuous Lines of Construction The Department is mandated to exempt from some regulation certain construction that is seaward of a CCCL. See, e.g., Section 161.053(2)(b)1., Florida Statutes, which relates to construction landward of beach armoring. In addition, the Department is granted discretion to permit construction seaward of a CCCL in other instances. One such instance relates to construction landward of "a reasonably continuous and uniform construction line," Section 161.053(5)(b), Florida Statutes (a "Continuous Line of Construction") that is seaward of the CCCL. Subsection 161.053(5)(b): (5) Except in those areas where local zoning and building codes have been established pursuant to sub-section (4), a permit to alter, excavate, or construct on property seaward of established coastal construction control lines may be granted by the department as follows: * * * (b) If in the immediate contiguous or adjacent area a number of existing structures have established a reasonably continuous and uniform construction line closer to the line of mean high water than the foregoing [the coastal construction control lines], and if the existing structures have not been unduly affected by erosion, a proposed structure may, at the discretion of the department, be permitted along such line on written authorization from the department. However, the department shall not contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than, those requirements provided herein . . . This proceeding involves a permit for construction seaward of the CCCL and landward or on a Continuous Line of Construction. The lines are in Brevard County where property is owned by both Petitioner and Intervenors, who, together with DEP, comprise the parties to this proceeding. The Parties Petitioner Carol C. Pope resides part-time in a duplex along Wilson Avenue on Cape Canaveral in Brevard County. She owns this oceanfront property, littoral to the Atlantic Ocean, with her husband James M. Pope. Although the property has a Cocoa Beach mailing address, it is not within the city limits of Cocoa Beach. The pre-hearing stipulation filed by all of the parties offers this account of the property's location: "The Pope's property is Lot 11, Block 101, Avon by the Sea, as described in Plat Book 3 page 7, [presumably in the Official Records of Brevard County] and east to Ocean, except the west 13 feet of Lot 11." Ms. Pope is the Petitioner in both of the consolidated cases that comprise this proceeding. The Department Among many duties related to environmental protection, the Department of Environmental Protection is responsible for the administration of Chapter 161, Florida Statutes, Parts I and II, the "Beach and Shore Preservation Act." § 161.011, Fla. Stat. The Act confers on the Department the authority "to adopt rules related to the following provisions of this section [§ 161.053]: establishment of coastal construction control lines; activities seaward of the coastal construction control line; exemptions; property owner agreements; delegation of the program; permitting programs; and violations and penalties." § 161.053(21), Fla. Stat. Pursuant to its rule-making authority in Section 161.053 (together with other specific authority), the Department promulgated Rule Chapter 62B-33: "Office of Beaches and Coastal Systems - Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-Foot Setback)." Two employees of the Department Tony McNeal, P.E., and Srivinas Tammisetti, P.E., testified at hearing. Both are engineers and both are involved with the Coastal Construction Control Line Program. Mr. McNeal is the program administrator. Mr. Tammisetti is a Professional Engineer II with the Department's Bureau of Beaches and Wetland Resources (the "Bureau"). He is responsible for "coastal armoring projects for the entire state" (tr. 52) and he is the head engineer for Lee County. In his capacity with the Bureau, Mr. Tammisetti reviews applications for activities seaward of the coastal construction control line. The Rays Clifford and Maria Ray are the owners of the property adjacent to Petitioner's property and the holders of Permit No. BE-1083 (the "Permit") issued by the Department in its order filed September 19, 2003. The Permit is the subject of the administrative proceeding initiated by Ms. Pope in DOAH Case No. 03-3981. Events Preceding the Permit's Issuance The Rays applied to DEP for a permit to conduct activities seaward of the CCCL, including construction of an eight-story, multi-family dwelling, a swimming pool and deck, a wooden beach/dune walkway, a parking area, masonry walls, and an exfiltration system. The Department approved the application. The Department's order issuing the Permit is titled "Permit for Construction or Other Activities Pursuant to Section 161.053, Florida Statutes." Intervenor's Ex. 1, Tab 6, pg. 1. The Permit acknowledges the application is for "authorization to conduct . . . activities seaward of the coastal construction line" and describes the location of the proposed project as "landward of the 30-year erosion projection and the existing line of construction established by major structures in the immediate area [the Continuous Line of Construction]." Id. While the application was pending before DEP, Ms. Pope visited the offices of the Department in Tallahassee several times. During the first visit (June 23, 2003), Ms. Pope reviewed the permit file and met with Mr. Tamisetti. At one point in the meeting, Ms. Pope asked Mr. Tamisetti how he determines the existence of Continuous Construction Lines. Ms. Pope testified at hearing that Mr. Tamisetti's answer was to the effect that "we look at a thousand feet on either side of the proposed structure." (Tr. 20). These were not necessarily Mr. Tamisetti's exact words but it is clear from the record that the substance of Ms. Pope's claim of what was said is correct; Mr. Tamisetti told Ms. Pope that the Department uses a thousand-foot distance on either side of a proposed structure in order to determine whether existing structures have established a Continuous Line of Construction seaward of the CCCL. The Rule Among the rules in the chapter for which Section 161.053 served as the sole specific authority is Rule 62B-33.008 (the "Rule"). It bears the catchline "Permit Application Requirements and Procedures." The Petition of Ms. Pope in Case No. 03-3860RX challenges subsection (d) of Section (4) of the Rule: (4) Any person desiring to obtain a permit for construction seaward of the coastal construction control line (CCCL) . . . from the Department . . . shall submit two copies of a completed application form. * * * The application form shall contain the following specific information: * * * (d) Written evidence, provided by the appropriate local governmental agency having jurisdiction over the activity, that the proposed activity, as submitted to the Office, does not contravene local setback requirements, zoning, or building codes and is consistent with the state approved Local Comprehensive Plan. Fla. Admin. Code R. 62B-33.008(4)(d). The Rule implements Section 161.052, "Coastal construction and excavation; regulation" as well as Section 161.053. Petitioner contends that the quoted portion of the Rule should be determined to be invalid because, while the statute directs that DEP in issuing permits of the kind obtained by the Rays "shall not contravene" local setbacks and building and zoning codes, it does not authorize DEP "to rely upon a letter mailed to an applicant from someone employed by an "appropriate" local government to prove that an activity would comply with the statutory directive." Proposed Final Order submitted by Petitioner, p. 18. As pointed out by Ms. Pope in her Proposed Final Order, DEP does not maintain nor does it require applicants for permits related to activity seaward of a CCCL to submit comprehensive land use plans, local setback requirements, zoning or building codes of counties and municipalities along Florida's coast. Instead, as sanctioned (in fact, required) by the Rule, DEP allows applicants to submit written evidence provided by the local government that the proposed activity does not contravene the enumerated regulations and is consistent with the local comprehensive plan. The parties have stipulated that the Department has not delegated its permitting authority under Chapter 161, Florida Statutes, to Brevard County. The Statement The statement made by Mr. Tamisetti (the "Statement") is similar to one he has made many times over the course of his employment with the Department. Without reservation, Mr. Tamisetti testified as much at hearing. The Statement has been interpreted as DEP's common method of prescribing lines of continuous construction by at least one member of the public. A professional engineer who conducts coastal engineering analysis, opined in writing to one of his clients that: The DEP has commonly prescribed the "line of continuous construction" by the line established by the average seaward limits of the foundations of the structures within 1000? feet north and 1000? feet south of the subject property or the seaward limits of the most seaward structures within 1000? feet north and south of the subject property Petitioner's Ex. 14, p. 1 following the cover letter. Mr. Tamisetti maintained at hearing, however, that the statement he made to Ms. Pope was not a common method for determining a Continuous Construction Line. Rather, the Statement constituted a starting point for those who inquired about how such lines were determined to exist. The Department does not contend otherwise. In the Pre-hearing Stipulation executed by all parties, the Department's position with regard to the Statement of Mr. Tamisetti is found on page 4: "The statement [that DEP uses a 1000-foot distance on either side of a proposed structure to establish a Continuous Line of Construction] is merely a guideline to allow applicants and their engineers a starting place for providing the Department information regarding the line of construction." The reason for the Statement was discussed by Mr. Tamisetti in his testimony. When a concerned party poses the question of how DEP would determine a Continuous Line of Construction as to a certain site, the question can only be definitively answered by asking questions of that party, in turn, and requesting sufficient data. Responding might entail costs prohibitive to the party. "A thousand feet" is offered as "a starting point . . . to give them something" (tr. 61) as an estimate for whether to pursue the effort to have such a line established. In one project, Mr. Tamisetti offered, the distance from a proposed structure to an existing structure might be "500 feet"; in another "2000 feet." (Tr. 61, 62). Ultimately, Mr. Tamisetti insisted the determination is site specific and cannot be made across the board on the basis of a measurement of 1000 feet. The Permit's Relationship to the Statement Ms. Pope produced evidence of the location of a Continuous Line of Construction determined by DEP to exist for purposes of the Ray's permit, DEP Permit No. BE-1083. She concludes in her proposed final order: [T]he line that DEP depicted approximates the line that would be derived by drawing a line from existing structures within 1000 feet on either side of the structure proposed in BE-1083. (citation to record omitted) The derivation of the line of continuous construction can only be a result of using the foundations of building within 1000-feet on either side of the proposed Michelina Condominium, as readily seen on the DEP April 2002 aerial photograph . . . Proposed Final Order, submitted by Petitioner, p. 8. Furthermore, Ms. Pope points out DEP has two rules relevant to the interrelationship between the permit and her claim that the Statement is a rule in violation of Section 120.54(1)(a), Florida Statutes. Florida Administrative Code Rule 62B-33.005(4), in her view, requires that applications for permits to conduct activity seaward of a CCCL "be 'clearly justified' by the applicant." Id. "Secondly," she asserts, DEP has an existing rule that requires applications to include surveys that depict accurate dimensions and locations of the foundation outlines of any existing structures in the immediate contiguous or adjacent areas that the applicant contends have established a reasonably continuous and uniform construction line. Rule 62B- 33.008(4)(f)15, F.A.C. Id., at 8-9. These rules relate, obviously, to the Permit Case. Coupled with the location of the Continuous Line of Construction determined by DEP with regard to the Rays' application for purpose of the un-promulgated rule challenge, however, they do not overcome other evidence as to how the Bureau determines the existence of Continuous Lines of Construction seaward of CCCLs. That evidence is the testimony of Mr. McNeal, the head of DEP's Coastal Construction Control Line Program. The Testimony of Mr. McNeal Ms. Pope's claim that the only credible evidence in the case demonstrates that the Statement is an un-promulgated rule overlooks convincing credible evidence provided by Mr. McNeal. Mr. McNeal's testimony shows that the Statement is not reflective of a policy followed by DEP that creates rights or imposes duties upon the regulated. It is not reflective of a policy of the Bureau of Beaches and Wetland Resources that does so either. Nor is it reflective of such a policy of the Bureau's Coastal Construction Control Line Program. As explained by Mr. McNeal, if an applicant would like to build on a Continuous Construction Line seaward of the CCCL, the applicant typically must demonstrate that the Continuous Construction Line exists by data provided with the application. Petitioner's Exhibit 7, entitled "Request for Additional Information" was identified by Mr. McNeal at hearing as "a template for our standard information package that comes with the application." (Tr. 40). "The items of information listed [on the request] are numbered to correspond with the item numbers on the application form." Petitioner's Ex. 7, p. 1. The following appears under Item 9: Two copies of a topographic survey drawing of the subject property. The topographic information depicted in the drawing shall be from field survey work performed not more than six months prior to the date of application. The topographic survey drawing shall include the following specific information: * * * - Accurate dimensions and locations of the foundation outlines of any existing structures in the immediate contiguous or adjacent areas that the applicant contends have established a reasonably continuous and uniform construction line if the permit is requested under the provisions of 161.053(5)(b), . . . Florida Statutes . . . (Id., pps. 2-3). There is no reference to the "1000 feet" measurement in the Bureau's Request for Additional Information. Furthermore, when an application is submitted that is incomplete with regard to the location of existing structures, the Department does not always resort to a request for additional information. The Department has an extensive database that includes aerial photographs, GIS images, and topographic information collected with regard to DEP reference monuments spaced along the shoreline. On occasion, the DEP database is sufficient to determine whether such a line exists without additional information provided by the applicant. When a determination of a Continuous Line of Construction is made by DEP, it is made specific to the site of proposed construction on the basis of the information submitted by the applicant or on the basis of publicly held data. The determination is not made on the basis of Mr. Tamisetti's statement to Ms. Pope or on the basis of unwritten policy related to existing structures within 1000 feet of the proposed structures. A Rule of Thumb for Prospective Applicants Mr. McNeal's testimony sheds direct light on the actual practice of DEP and the Bureau of Beaches and Wetland Resources in determining the existence and location of Continuous Lines of Construction. When the Petitioner's case is measured against the Department's, the best for Petitioner that can be said of the Statement is that it is precisely what Mr. Tamisetti claims. It is a "rule of thumb," and a rough one at that, for whether it is worthwhile for a party to pursue the establishment of a Continuous Construction Line in order to conduct activity, including construction, seaward of an established CCCL. It does not constitute an agency statement of general applicability that meets the definition of a "rule" in the Administrative Procedure Act and that is subject to the Act's rule-making requirements.

Florida Laws (7) 120.52120.54120.56120.68161.011161.052161.053
# 2
COLONEL AND MRS. G. A. P. HAYNES, ET AL. vs. WILLIAM A. ROBERTS AND DEPARTMENT OF NATURAL RESOURCES, 81-001791 (1981)
Division of Administrative Hearings, Florida Number: 81-001791 Latest Update: May 25, 1982

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: By application dated March 9, 1981, and received by the DNR's Bureau of Beaches and Shores on March 13, 1981, respondent sought a permit to construct five single-family dwellings on five 64-foot-wide parcels of land located seaward of the established coastal construction control line (CCCL) on Grayton Beach. Attached to the application were site plans, an affidavit of ownership and a warranty deed showing respondent Roberts to be the owner of the subject property. (DNR Exhibit 1) Question number 5 on the permit application required the "specific reasons the applicant feels that the permit should be approved and why construction seaward of the control line . . . is considered necessary for reasonable use of the property." The answer provided by the applicant to this question was "the landward property line is located 150 feet seaward of the control line. Therefore, no upland property is available on the site for development." (DNR Exhibit 1) By form letter dated March 16, 1981, DNR notified respondent Roberts that his application for a permit was incomplete and that two further items of information were necessary before his application could be considered. One item was written evidence that the proposed project would not contravene local setback requirements or zoning or building codes. The other item was detailed site, grading, drainage and structural plans and specifications for the proposed structure. These plans were to be certified by a registered Florida engineer or architect. (DNR Exhibit 2) On or about March 31, 1981, the DNR received the certified architectural plans from the project architect, who is registered in the State of Florida. These plans, as well as the site plans submitted by the engineer, contained the signature and seal of the architect and the engineer. They each intended their signature and seal to constitute a certification that, in their opinion, the drawings or plans were in compliance with all statutes, rules, local ordinances and/or other regulations which govern the project. A certification of documents by the placement of signature and seal of an engineer or architect is the commonly accepted practice and usage in those professions. It is not the policy of DNR to require an itemized certification reciting every requirement of the DNR rules. By form letter dated April 6, 1981, the DNR notified the applicant that written evidence of compliance with local government regulations was still lacking. (DNR Exhibit 4) On April 13, 1981, DNR received a letter dated April 9, 1981 from the Walton County Attorney advising that "The Board of County Commissioners of Walton County has no local setback requirements or zoning or building requirements which would prohibit the proposed activity as submitted to the Bureau." (DNR Exhibit 5) This letter satisfied the requirement of Rule 16B-33.08(1)(c), Florida Administrative Code, that the proposed project would not contravene local setback requirements or zoning or building codes. Full scale copies of topographic and site plans were received by the Bureau of Beaches and Shores on April 15, 1981. The application for a permit was deemed complete as of April 15, 1981, (DNR Exhibit 7), and respondent Roberts' agent was notified by letter dated June 23, 1981 that the DNR Executive Director had recommended to the Governor and Cabinet (the agency head of the DNR) approval of the application. (DNR Exhibit 10) The completed application reflects that the five single-family dwellings are to be supported by treated timber pilings with an underside minimum elevation of +14 feet (NGVD). The Federal Base Flooding Elevation for Grayton Beach is +9 feet (NGVD). The architect has certified that the proposed dwelling units are designed to withstand 140 mile per hour winds. The seaward- most dwelling of the five is a maximum of 263 feet seaward of the coastal construction control line, and the applicant's entire parcel of land is located over 150 feet seaward of the control line. The project is located approximately 230 feet from the mean high water line. The project also includes the construction of a private road, septic tanks and drainfields. The dune system in front of the proposed structure will offer substantial protection to the structure against storm and wave action. The excavation proposed includes that necessary for the placement of the pilings, the septic tanks and the drainfields, and the construction of the proposed driveway. The proposed drainfields will extend partially above existing grade and fill material i11 be placed over them. The driveway consists of a 16-foot asphalt paved road located landward of the proposed dwellings. The dunes will be reduced in height where the driveway is to be constructed. It is not clear from the testimony or the documentary evidence adduced at the hearing where the parking of vehicles belonging to residents or guests of the five units is to occur. While there was testimony from Mr. Truitt to the effect that no net loss of sand will occur and that the project will involve more of a balancing of grade as opposed to excavation, the engineering plans submitted with the application illustrate at least nine rather large areas of cut and fill associated with the driveway, septic tanks and drainfields. The project engineer had considered no studies on the topography or littoral trends of this specific site, had no knowledge of engineering data regarding adjacent properties and had not reviewed any data regarding major storms on the subject project site. The engineering plans submitted as a part of the application contain a diagram illustrating five separate 750 gallon septic tank systems, one for each dwelling unit, with the "drainfield [for each unit] to be constructed in accordance with Chapter 10D-6, F.A.C." (DNR Exhibit 1) The larger scale engineer's drawing submitted to DNR on April 15, 1981, gives more specific information regarding the location and depth of the below grade drainfields on the seaward side of the structures. A DNR interoffice memorandum dated June 1, 1981, reflects that the applicant's agent agreed in a telephone conversation that, "if possible, he would move the septic tank (750 gal) and related drainfields to the landward side of the buildings." (Joint Exhibit 1) The Cabinet agenda item dated later in time, however, notes that the "septic tanks (750 gallon) and drainfields will extend an additional 50 feet seaward of each dwelling." (DNR Exhibit 8) The exact proposed location of the septic tanks and drainfields was not clarified at the final hearing, nor was sufficient evidence adduced concerning the justification for the proposed discharge system. Evidence concerning the availability of any existing alternatives to the system proposed by the applicant was not adduced, nor was evidence presented concerning storm water discharge. As of the time of the hearing in this matter, the applicant had no plans for heating or cooling the five dwelling units. When asked at the hearing what "justification" the Bureau of Beaches and Shores received for the proposed waste water discharge system, Mr. Clifford Truitt, the Bureau's chief engineer and the person responsible for review of this application, replied in two ways. First, he stated that the fact that the property was located entirely seaward of the CCCL was justification for the discharge system. However, he admitted that a "dry sanitary system" would be a better alternative. Later, Mr. Truitt stated that "justification" for the domestic waste system is only required when there is a beach level discharge. Mr. Truitt was accepted as an expert witness in the area of coastal engineering. His opinions regarding the proposed project were based upon his review of aerial photography of the Grayton Beach area and comparison of topographic profiles of the area, his review of the engineering and topographic information submitted with the application itself and his familiarity with the project location. No evidence was adduced that engineering data concerning storm tides related to shoreline topography was considered by Mr. Truitt or anyone else. No specific studies exist regarding the stability, littoral trends or the erosional history of the proposed site and surrounding area. The project site has been the subject of other permit applications considered by the DNR, and Mr. Truitt was of the opinion that a mitigating feature of the present application was that "the present proposal has the lowest density and least extension seaward of the control line of any proposal to date." (DNR Exhibit 8) It was Mr. Truitt's opinion that the dwelling unit structures were adequately elevated and designed to adequately resist the natural forces associated with a 100-year return interval storm event and would not increase the threat of damage or danger to nearby structures. Factual evidence concerning the 100-year storm event was not presented at the hearing. Mr. Truitt further opined, without the aid of engineering data or the studies mentioned above, that the proposed construction would not affect the natural shoreline fluctuations or the stability of the dunes in the area. Such an opinion contains no factual basis in the record of this proceeding, and thus is not sufficient evidence upon which to make a similar finding of fact. On various sporadic occasions, a waterway or pass connecting Western Lake to the Gulf of Mexico runs in a westerly direction in the vicinity of the applicant's property. At times, this watercourse has been wide and deep enough to allow swimming, diving and the passage of small boats. The witnesses who testified about this watercourse were not qualified as surveyors or experts in estimating or calculating the exact location of that watercourse relative to the proposed site, and there was no testimony that such an event had occurred within the past twenty years. At least two witnesses testified that the last time they could recall the watercourse or pass traversing or abutting the applicant's property was in the late 1950s. The proposed project site has been covered with storm waters on at least two occasions in the past seven years. No evidence was adduced at the hearing concerning the substantial interests in this permit application of named petitioners Colonel G. A. P. Haynes, Mr. and Mrs. Roy Cawthon, Mrs. Kate Florence, Mrs. Burton Murray, Colonel and Mrs. Lee Fry, Mrs. Laney Ellis and Mrs. Randall Jones. Mrs. G. A. P. Haynes, one of the petitioners in this proceeding, owns and resides on property immediately adjacent to the project site, and presently entertains an unbroken view of the beachfront. She is concerned with potential sewage problems and damage to her residence from flying debris caused by wind or storm should the proposed construction be approved. Mrs. Haynes was also concerned about the potential adverse effect of the proposed construction on the value of her adjacent property. Petitioner Burton Murray lives to the north of the project site, at least several hundred feet away. His prime concern was that no structure could survive at that location and that the project would therefore be a waste of money. Petitioner Elizabeth Hayes Jones (named as Ms. Lisbeth Haas in the petition) lives across the street and to the east of the project site. Her residence was completely destroyed by hurricane and has since been rebuilt at the same site. She feels that the applicant's project site is not safe for construction, and fears storm damage to her home from the buildings if constructed.

Recommendation Based upon the findings of fact and conclusions of law recited herein it is RECOMMENDED that the application for a coastal construction control line permit to construct five single-family dwellings on Grayton Beach be DENIED. Respectfully submitted and entered this 25th day of May, 1982. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of May, 1982. COPIES FURNISHED: Jerry W. Gerde, Esquire Davenport, Johnston, Harris, Gerde & Harrison, P. A. 406 Magnolia Avenue Panama City, Florida 32401 W. Paul Thompson, Esquire Thompson and Adkinson P. O. Drawer 608 DeFuniak Springs, Florida 32433 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Douglas Building, Suite 1003 Tallahassee, Florida 32303 Dr. Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.052161.053
# 4
ROBERT W. DODT vs. DNR & NANNETTE K. SCOGGINS, 84-003997 (1984)
Division of Administrative Hearings, Florida Number: 84-003997 Latest Update: Sep. 11, 1985

Findings Of Fact Nannette K. Scoggins is the owner of the real property located at 5622 Gulf Drive, Holmes Beach, Florida in Manatee County. Nannette K. Scoggins' property, the petitioner's property, 5624 Gulf Drive, and the other adjacent property, 5620 Gulf Drive, are zoned as "A-1 Hotel-Motel" under the City of Holmes Beach Zoning Ordinance. On November 13, 1983, Mrs. Scoggins submitted to DNR an application for a permit for construction seaward of the coastal construction control line (control line). The proposed project, known as Jansea Place, would consist of two multifamily dwellings, four units to a building, divided by a swimming pool. A portion of the most seaward building would extend a maximum of 57 feet seaward of the control line. By letter dated July 11, 1984, DNR notified petitioner that the department was considering the permit application. The petitioner responded by letter dated July 18, 1984, objecting to any construction seaward of the control line. On October 1, 1984, petitioner received notification that DNR intended to recommend approval of the permit. The permit was scheduled for a vote by the Governor and Cabinet on October 16, 1984. The staff of DNR recommended approval of the permit. By telegram dated October 15, 1984, the petitioner requested an administrative hearing, and on October 22, 1984, petitioner filed a petition for a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The application for permit No. ME-89 is a complete application for permit to construct seaward of the coastal construction control line. On October 5, 1983, the Superintendent of Public Works of the City of Holmes Beach certified that this project does not violate any ordinance of the City of Holmes Beach. The plans for the proposed project are signed and sealed by an architect registered in the State of Florida, and the submitted plans comply with the design standards established in Rule 16B-33.07, Florida Administrative Code to resist adequately the natural forces associated with a 100-year return interval storm event. The plans, specifications, drawings and other information submitted to DNR with the application for permit to construct seaward of the coastal construction control line are complete and accurate, and meet the requirements of DNR for that purpose. Under the provisions of Rule 16B-33, Florida Administrative Code, the application was determined to be complete on August 6, 1984. The proposed construction is located landward of an existing vertical concrete bulkhead. The seawall was built jointly by the Scoggins and Mr. McLean, who owns the property immediately to the south of the Scoggins' property. The seawall was built after the hurricane of 1972 because the existing dune system had been destroyed. Since that time, the mean high water line has continued to encroach landward to the point where it is now east of the wall. However, the seawall is not necessary for the protection of the proposed building. Although the seawall would fail under the direct impact of a major hurricane, the proposed building is adequately designed to withstand the impact erosion, the wave loads, the winds, and the water forces associated with a major hurricane. The necessity and justification for the project's location in relation to the control line is stated in the application, and petitioner has not challenged the necessity or justification. The City of Holmes Beach Zoning Ordinance requires that the buildings be separated by a minimum of 30 feet. Since the proposed buildings are separated by 30 feet, the proposed seaward building is located as far landward as possible without violating the zoning ordinance. Erosion and structural damage occurred as a result of Hurricane Agnes in 1972 and the "No Name" storm in 1982 in the area between 1,000 feet south of the Scoggins' property and 500 feet north of the Scoggins' property. Although the beach was fairly stable from 1974 to 1979, the beach began to erode in 1980. When the seawall was built in 1974, the dune line was even with the seawall. However, as can be seen from a comparison of the photographs taken in June of 1979 with those taken in early 1985, the beach has eroded since June of 1979 and the dune line is now several feet landward of the seawall. The DNR recommendation for approval of the Scoggin's permit application was based upon historical erosion data for the period between 1940 and 1974, which was the most recent data available that could be used to review the project. Mr. Clark stated that the application was recommended for approval based on the design of the proposed building and its alignment with existing structures built seaward of the control line. The proposed project is located landward of a line of existing structures. Although the adjacent properties have been affected by erosion, there was no evidence presented to show that the existing structures located seaward of the control line have been unduly affected by erosion. In 1974, when the seawall was being constructed, the worker building the seawall dug up part of the petitioner's property and destroyed the sea oats he had planted. However, the proposed project has a driveway encircling the building which would provide vehicular access to the seawall if necessary. The proposed project will partially obstruct petitioner's view to the southwest. However, there was no evidence presented that petitioner's property or the other adjacent property, would be adversely affected in any other way by the proposed project. There was no evidence presented that the proposed project would be affected by, or have an effect on, beach or coastal erosion. The proposed project would have no effect on the beach dune system.

Recommendation Upon consideration of the foregoing, it is recommended that DNR issue Permit Number ME-89 to Nannette K. Scoggins. DONE and ENTERED this 28th day of June, 1985, in Tallahassee Leon County Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1985.

Florida Laws (3) 120.57161.0536.04
# 6
FLORIDA EAST COAST RAILWAY COMPANY, ET AL. vs. DEPARTMENT OF TRANSPORTATION, 75-001328 (1975)
Division of Administrative Hearings, Florida Number: 75-001328 Latest Update: Feb. 27, 1976

The Issue Whether the at-grade crossing in the vicinity of Lincoln Avenue and Florida East Coast Railway Company Mile Post 104 + 172' in Ormond Beach, Florida should be closed.

Findings Of Fact By application the Florida East Coast Railway Company seeks a permit to close an existing at-grade public railroad crossing located in Volusia County, Florida, at Florida East Coast Railway Company Mile Post 104 + 172' in the vicinity of Lincoln Avenue. There exists a standard cross buck sign or fixed sign at the subject crossing and there is a vehicular stop sign on each side of the crossing. There is a total of sixteen freight rail movements and a total of two local freight rail movements crossing each day. In addition to these scheduled moves there are a few unscheduled movements such as work trains. The speed limit for this area is 35 m.p.h. A 24-hour traffic survey was set up on Lincoln Avenue just west of the railroad-tracks where the number of vehicles counted was 567. The 24-hour period started at 11:00 a.m. on November 18, 1975, and continued until 11:00 a.m. on November 19, 1975. There is no sight problem from south to north but from north to south there is a curve that bears to the right coming into Lincoln Avenue which gives a railroad sight problem. For vehicles there is a sight problem going from west to east, but no sight problem going from east to west. There have been four documented accidents at the crossing: one in 1962, one in 1965, and two in 1973. There has been expansion of the city to the areas particularly west of the railroad tracks and north of the crossing at State Road Lincoln Avenue is the only crossing between State Road 40 and State Road 5A. It is approximately 1.5 miles. There is a need for a railroad crossing in the area as an alternate to the crossing on State Road 40. The railroad suggests bells, flashing lights and gates, in the event this application to close is not permitted. The Department of Transportation recommends flashing lights and bells, suggesting that gates would be better, but such signalization adequate. The City did not recommend a type of signalization but did recommend that the permit to close be denied. The Hearing Officer further finds: The permit should be denied inasmuch as there is a need for the crossing; The crossing should be signalized to make it less hazardess; Signalization without gates is adequate.

# 7
HARDEE COUNTY AND MITCHELL HOPE vs. SEABOARD COASTLINE RAILROAD COMPANY AND DEPARTMENT OF TRANSPORTATION, 76-001703 (1976)
Division of Administrative Hearings, Florida Number: 76-001703 Latest Update: Jan. 27, 1977

The Issue Whether a permit should be granted for a public at-grade crossing over Seaboard Coast Line Railroad tracts near its Milepost AX-892.

Findings Of Fact Mr. Mitchell Hope and Hardee County, Florida, by application to the Department of Transportation, sought to open a public railroad-highway grade crossing at a location where a proposed road would intersect the tracks and right of way of Seaboard Coast Line Railroad Company near its Milepost AX-892. The property to be reached by the proposed at-grade crossing is owned by Applicant Hope and other private individuals. Other access to the property would be by crossing the Peace River to the south and east, or industrial property to the north, or by a grade separation over the railroad. The property consists of approximately 77 acres, of which 25 acres could be developed for residential purposes consisting of one-acre plots. The nearest crossing to the south is a public crossing in Zolfo Springs, approximately one-half mile; the nearest crossing to the north is a private crossing, approximately one mile. The scheduled train speed is thirty-five (35) miles per hour. Two freight trains each weekday and one each weekend day are scheduled to pass the proposed crossing. Applicant Hope is willing to close the crossing to the public by means of a gate. The Board of County Commissioners of Hardee County is willing to accept the road and crossing into the County Road System provided the road meets engineering standards. Representatives of both Applicants are unwilling to provide or maintain automatic grade crossing traffic control devices. The roadway approaches to the proposed crossing are as follows: From the west the sight distances between the roadway and the tracks are good provided the foliage and underbrush are kept cut near the ground. From the east the sight distance to the northeast quadrant is obstructed by trees and underbrush and complicated by the track curvature to the northeast; the sight distance to the southeast quadrant is somewhat less obscured but could be blocked by the growth of trees and underbrush. The track approaches to the proposed crossing from the north are complicated by the curvature of the track which tends to prevent a view of the crossing until the train is within one-third of a mile from the crossing; the track view of the northeast quadrant is blocked by trees. The track approaches from the south are good. The Department of Transportation has recommended the installation of automatic grade crossing traffic control devices consisting of flashing lights, bells and gates at such location if a crossing is found to be necessary.

Recommendation Dismiss the application to open a public railroad-highway grade crossing at a location near Seaboard Coast Line Railroad Milepost AX-892, but retain jurisdiction for some future time when the facts may indicate the necessity for the crossing at which time the type of traffic control devices can be determined. Hold each of the other proposed findings of fact and requests to be without merit. DONE and ORDERED this 10th day of January, 1977 in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Philip S. Bennett, Esquire Department of Transportation Haydon Burns Building Tallahassee, Florida 32304 Brian J. Pappas, Esquire Attorney at Law 305 North Sixth Avenue Wauchula, Florida 33873 G. S. Burlesen, Sr. Assistant State Utility Engr. (RRS) Haydon Burns Building Tallahassee, Florida 32304 R. Earl Collins, Esquire Attorney, Hardee County Wauchula, Florida 33873 Eugene R. Buzard, Esquire Seaboard Coastline Railroad Co. 500 Water Street Jacksonville, Florida 32207

Florida Laws (3) 334.03335.01336.01
# 8
GREG HILL vs. DEPARTMENT OF NATURAL RESOURCES, 85-002814RX (1985)
Division of Administrative Hearings, Florida Number: 85-002814RX Latest Update: Oct. 15, 1985

Findings Of Fact After DNR issued a cease and desist order to Petitioner, forbidding further construction on his Walton County lot seaward of the coastal construction control line, he applied for an after-the-fact permit authorizing work to go forward on a three-story ten-unit condominium, which would occupy some 95 percent of the width of his lot, and extend 34 feet seaward of the coastal construction control line. Petitioner's Exhibit No. 1. DNR staff stated the following, in recommending denial: There presently exists over 160 feet of property located landward of the control line in which the proposed structure could be sited. The staff is concerned that the proposed encroachment is not justified, nor considered necessary for reasonable use of the property. In addition, staff is concerned about the potential cumulative effects of siting major structures seaward of the control line along this section of the coast, which contains a number of undeveloped lots, as well as redevelopable lots. The cumulative impact of such construction will result in significant disturbance and damage to well-established, mature vegetation and eventual destabilization of the coastal barrier dune ridge. Also, the proposed encroachment and shore-parallel site coverage will have an adverse impact on the natural recovery processes of the beach/dune system following the impact of a major storm event. The proposed building is not designed in accordance with the standards set forth in Subsections 16B-33.05(6) and 16B-33.07(1) and (2), Florida Administrative Code. File number WL-183 ATF has been assigned. . . . RECOMMENDED DENIAL, ASSESMENT OF A CIVIL FINE OF FIVE THOUSAND DOLLARS ($5,000) AND REQUIRING REMOVAL OF THE EXISTING UNAUTHORIZED CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE. Petitioner's Exhibit No. 1. The "reference [to] the extensive site coverage was not only the shore parallel site coverage, but also included the proposed encroachment seaward of the control line." (T. 18). DNR staff opposes construction on Mr. Hill's lot of a habitable structure seaward of the control line. (T. 19, Petitioner's Exhibit No. 2, pp. 12 and 13). Petitioner Hill timely instituted formal proceedings on his application, WL-183 ATF, and Case No. 85-2455 is still pending. Shore Parallel Site Coverage Since October of 1983, in processing coastal construction permit applications, DNR has taken into account "shore parallel site coverage," i.e., DNR staff have considered the relationship between lot width and the width of any structure proposed to be built fronting the water, seaward of a coastal construction control line. A succession of waterfront buildings stretching the entire width of their respective lots walls off the foreshore from more landward dunes. "[I]f you cover an extensive portion of the beach in the shore parallel direction, you tend to she[a]r off the upland area from the beach area and limit and inhibit the natural recovery processes of the dune system." (T. 15) With respect to Petitioner's proposed project and any other of this size and shape planned this far down on a similarly platted, developed and configured beach, DNR engineers put the maximum acceptable width of the structure at 50 to 60 percent of the lot's gulf frontage. Petitioner's Exhibit No. 2, p. 23; T. 20, 22, 32, 35. DNR has no written policy limiting the width of structures built seaward of the coastal construction control line. Although DNR endeavors to treat similar sites similarly, sites vary significantly and different widths may be allowed on similar sites when structures with different depths are planned. Petitioner's Exhibit No. 3, pp. 9-13. In its post-hearing memorandum in support of Petitioner's rule challenge to DNR's non-rule policy regarding side setbacks, Petitioner quotes the following: Q: Would you generally recommend this 50 to 60 percent shore-parallel site coverage for other types of similarily situated lots, either on the same beach or on other beaches in Florida? A: The reference 50 to 60 percent is something we would feel comfortable with in certain areas of the beach that have similar characteristics and existing--similar situations regarding existing development, potential for redevelopment, stability of the dune area, and things of that nature. It certainly wouldn't apply--those figures wouldn't apply to all areas of the Florida coastline. [Deposition of Brett Moore, September 10, 1985, pp. 16-17.] Q: But for, say, a similarly situated beach, maybe you would try to get people to move toward that time of width without specifically telling them that that's the width of coverage that you desire. A: For the two areas I mentioned, I feel that something in the vicinity of 60 percent site coverage would be acceptable to the staff, and that's what I would tell people if someone proposed a project in that area today. [Deposition of Brett Moore, p. 27.] A: Given that amount of encroachment on the dune, I feel that a reasonably acceptable shore-parallel coverage, given that shore- normal coverage, that would not have a significant adverse impact, would probably be between zero percent coverage and thirty percent coverage. In terms of what we would recommend, generally, in what kind of dune encroachment of a major structure, approximately a thirty-foot width, or about fifty percent coverage would probably be acceptable in terms of the impact to the dune and the recovery potential following a major storm event. Q: Okay. Did you--so fifty percent would probably be okay by your lights; is that a fair characterization of that statement you just made? A: Yeah, I could recommend a fifty percent coverage there, . . . In terms of what I would recommend for a site like that with that kind of encroachment with a major structure on the dune, I would recommend approximately fifty percent coverage. Q: What about for a similar type of beach, not one down in Charlotte County or any place like that, but let's just say a similar type of beach somewhere in the panhandle, same relative dimensions, topography and the like? A: So for the same---for the same site, I would recommend the same. [Deposition of Ralph Clark, pp. 10-11.] At 2-3. Neither this evidence nor any other adduced at hearing proved the existence of an agency statement of general, statewide application purporting in and of itself to have the direct and consistent effect of law. It is DNR's policy to treat similarly situated landowners similarly and to consider cumulative impact. The parties proposed orders contain proposed findings of fact which are addressed by number in an appendix to this final order.

Florida Laws (4) 120.52120.54120.68161.053