MAC A. GRECO, JR.; JOSEPHINE GRECO; ET AL. vs. WEST COAST REGIONAL WATER SUPPLY AUTHORITY AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 89-003187 (1989)
Division of Administrative Hearings, Florida Number: 89-003187 Latest Update: Apr. 19, 1990

The Issue The issue at this stage of the proceeding is whether jurisdiction should be relinquished to the Southwest Florida Water Management District based upon the withdrawal of Petitions filed herein on behalf of the Petitioners, and the filing of a stipulation and settlement agreement executed on behalf of the Petitioners and Respondents.

Findings Of Fact By Notices of Referral dated June 7, 1989, and filed June 1 6, 1989, the Southwest Florida Water Management District (District) transmitted to the Division of Administrative Hearings (DOAH) certain Petitions filed on behalf of Petitioners which opposed the issuance of a consumptive use permit numbered 208426 by the District to the West Coast Regional Water Supply Authority (Authority). These Petitions were assigned Case Numbers 89-3187 through 89-3189 by DOAH, and were consolidated for all further proceedings. On August 18, 1989, Chilpub, Inc. (Chilpub), filed a Petition to Intervene, which was granted by Order entered on September 6, 1989. On October 20, 1989, Wiregrass Ranch, Inc. (Wiregrass), filed a Petition to Intervene, which was granted by Order entered on October 31, 1989. The Petitions filed on behalf of Chilpub and Wiregrass were filed at DOAH, and specifically sought leave to intervene in Cases Numbered 89-3187 through 89-3189 in order to oppose the issuance of permit number 208426 to the Authority. Following the granting of these Petitions, Chilpub and Wiregrass have participated in this proceeding as Intervenors On or about November 8, 1989, the Authority provided Wiregrass with a copy of the Notice of Proposed Agency Action which is the subject of this proceeding, pursuant to Rule 40D-2.101, Florida Administrative Code. However, subsequent to receiving this Notice of Proposed Agency Action, Wiregrass failed to file with the District any Petition in its own right seeking to initiate a proceeding under Section 120.57(1), Florida Statutes, to challenge the issuance of permit number 208426 to the Authority. Notices of Withdrawal of Petitions for Formal Hearing were filed on behalf of the Petitioners in Cases Numbered 89-3187 through 89-3189 on April 4, 1990, and on that same date, the Petitioners and Respondents filed their Joint Motion to Relinquish Jurisdiction. A copy of the Stipulation and Settlement Agreement executed by the Petitioners and Respondents was filed on April 9, 1990.

Recommendation Based upon the foregoing, it is recommended that the District enter a Final Order dismissing the Petitions filed herein, and issuing permit number 208426 to the Authority. DONE AND ENTERED this 19 day of April, 1990 in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The DeSoto Building 120 Apalachee Parkway Tallahassee, Florida 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 19 day of April, 1990. COPIES FURNISHED: David L. Smith, Esquire Jeffrey A. Aman, Esquire 712 South Oregon Avenue Tampa, FL 33606 Edward P. de la Parte, Jr., Esquire Barbara B. Levin, Esquire 705 East Kennedy Blvd. Tampa, FL 33602 Bram Canter, Esquire 306 North Monroe Street Tallahassee, FL 32302 Enola T. Brown, Esquire P. O. Box 3350 Tampa, FL 33601-3350 James S. Moody, Jr., Esquire P. O. Box TT Plant City, FL 33564-9040 Peter G. Hubbell Executive Director SWFWMD 2379 Broad Street Brooksville, FL 34609-6899

Florida Laws (1) 120.57 Florida Administrative Code (1) 40D-2.101
# 1
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs WILLIAM D. GOING, 20-005557 (2020)
Division of Administrative Hearings, Florida Filed:Pinellas Park, Florida Dec. 28, 2020 Number: 20-005557 Latest Update: Apr. 17, 2025

The Issue Did Respondent, William D. Going, willfully and intentionally violate Florida Statutes and Southwest Florida Water Management District (District) rules regulating well construction? If he did, what corrective action is appropriate?

Findings Of Fact William Going is a licensed water well contractor. He has held License Number 1564 since 2007. Mr. Going is a managing member of Going Irrigation, Inc., and conducts business under that name. Mr. Going constructed four sand point irrigation wells at a residential property in St. Petersburg, Florida. He did not have and had not applied for a Well Construction Permit (WCP). 1 All citations to Florida Statutes are to the 2020 codification unless noted otherwise. 2 The findings are based upon the evidence admitted at the hearing and the stipulations of the parties. Mr. Going did not call or otherwise contact the District to request a WCP. The District operates an online permitting system called the Water Management Information System (WMIS). The District will issue a WCP based upon a telephone call, an application on its website, a faxed application, a mailed application, or a hand-delivered application. The District routinely issues permits within two hours of receiving an application, often within ten minutes to half an hour. The District's application system operates from 7:00 a.m. to 10:00 p.m. It is infrequently offline for a few hours. While quick, the process reviews significant information. It verifies that the well location is sufficiently distant from septic systems, verifies construction methods and materials, and verifies, if the well is for drinking water, that the well is not too close to a contamination site. Mr. Going is a registered and experienced user of WMIS. The District learned of the unpermitted wells on April 28, 2020, when it received an anonymous complaint. On May 5, 2020, approximately ten days after he constructed the wells, Mr. Going submitted WCP Application 889173 for construction of the four already completed sand point irrigation wells. He did not disclose that they were already completed. He falsely represented them as proposed. The District approved the application on May 6, 2020, and issued WCP 889173 to Mr. Going. On June 11, 2020, Mr. Going submitted four Well Completion Reports for the wells, falsely representing that each was completed on May 7, 2020. This was more than 30 days after Mr. Going completed the wells. Mr. Going claimed at the hearing that he tried to apply for a WCP for four or five days before constructing the wells but was locked out of the WMIS. Mr. Going said that his son usually obtained permits online for the company. He also claimed that he tried to apply online on April 24 and 25, 2019. His claims are not persuasive. There is no question that Mr. Going knew the requirements for obtaining a permit and reporting completion. In 2009, in Order No. SWF 09- 017, the District imposed a $500.00 fine and assessed five points against his license for an almost identical offense. In that case, Mr. Going also constructed a well without a permit from the District or applying for a permit. In that case, like this one, he sought to excuse failure to apply for a permit by claiming difficulties with the website. In that case he blamed his wife's unfamiliarity with computers, rather than his own, for failure to apply. In that case, like this one, he applied for and obtained a permit after constructing the well. Mr. Going knowingly and willfully constructed four unpermitted wells, filed a WCP application more than thirty days after he completed the wells, and misrepresented the dates of completion in the WCP completion reports that he filed with the District. Mr. Going tries to characterize his after-the-fact misrepresentations as mitigation. But they were not. Mitigation would have been contacting the District to advise it of the wells' unpermitted construction and the asserted justification for it. Furthermore, his misrepresentations deprived the District of the chance to prevent construction of the wells using improper materials or near a septic tank or contaminated location.

Florida Laws (4) 120.569120.57120.574120.68 Florida Administrative Code (4) 40D-3.04140D-3.41162-531.30062-531.450 DOAH Case (1) 20-5557
# 2
BARBARA HEINE vs ALICO WEST FUND, LLC, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 15-001049 (2015)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Feb. 26, 2015 Number: 15-001049 Latest Update: Jan. 06, 2016
USC (1) 16 U.S.C 668 Florida Laws (26) 120.54120.569120.57120.573120.60120.6820.33126.52267.06135.01373.069373.119373.413373.4131373.4135373.4136373.414373.416373.421373.427380.06403.81359.29704.06768.28872.05 Florida Administrative Code (10) 28-106.11128-106.20128-106.30162-330.09062-330.20162-330.31062-330.31562-330.34062-40.43262-621.300
# 3
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AUBREY VARNUM; AND T. DANIEL FARNSWORTH vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND VILLAGES OF LAKE-SUMTER, INC., 02-001123 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001123 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 4
J. C. UTILITIES, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 76-001007 (1976)
Division of Administrative Hearings, Florida Number: 76-001007 Latest Update: Jun. 15, 1977

Findings Of Fact This application is a request for a consumptive use permit for two wells located in Pasco County, Florida, within the Pithlachascotee Basin. The subject wells are also located in that area wherein the Board of Governors of the Southwest Florida Water Management District declared a water shortage in Order No. 76-3D, Southwest Florida Water Management District. The application seeks an average daily withdrawal of 95,000 gallons with a maximum daily withdrawal of 360,000 gallons. The use of this water is for public supply involving effluent disposal by on-site percolation and ponding. This-use was existing prior to January 1, 1975 with am average daily withdrawal for 1974 of 74,000 gallons. The testimony presented by staff members of the Southwest Florida Water Management District establishes that the consumptive use for which a permit is sought will not violate any of the criteria set forth in Subsections 163- 2.11(2)(3) or (4), Florida Administrative Code, except that the use may significantly induce salt water encroachment. No evidence was presented showing that the sought for consumptive use will, in fact, significantly induce salt water encroachment. In the twelve month period ending October, 1975, applicant's highest average daily withdrawal was 81,000 gallons. This time frame corresponds to that time frame referred to in paragraph 1 of Water Shortage Order No. 76-3D, Southwest Florida Water Management District. In view of Water Shortage Order No. 76-3D, Southwest Florida Water Management District, the staff recommends granting of the permit for an average daily withdrawal of 81,000 gallons and a maximum daily withdrawal of four times that figure or 234,000 gallons. The staff further recommends imposition of the following conditions: That the permittee shall install totalizer flow meters of the propeller driven type on all withdrawal points covered by the permit with the exception of those wells which are currently ganged together using a single meter. That the permittee shall submit to the District a record of his pumpage for each meter, said pumpage to be read on a monthly basis and submitted quarterly to the District on April 15, July 15, October 15, and January 15 for each preceding calendar quarter. That all individual connections to the system be metered. That the permittee have water samples from all wells permitted analyzed for chloride on a monthly basis and results submitted to the District by April 15, July 15, October 15, and January 15 for each preceding calendar year.

# 5
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, INC.; KENNETH ROOP; AND AUBREY VARNUM vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND NORTH SUMTER UTILITY COMPANY, 02-001122 (2002)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 20, 2002 Number: 02-001122 Latest Update: Aug. 12, 2002

The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).

Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.

Florida Laws (5) 120.569120.57373.203380.06403.412
# 6
GROVELAND DEVELOPMENTS, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-001064 (1975)
Division of Administrative Hearings, Florida Number: 75-001064 Latest Update: Jun. 18, 1992

Findings Of Fact Application No. 7500050 requested water from one (1) withdrawal point. Said withdrawal is for public supply. This application is for an existing use. The center of withdrawals will be located at Latitude 28 degrees 07' 49" North, Longitude 82 degrees 26' 22" West in Hillsborough County, Florida. Total continuous acreage is 59.4 acres. The use is for not more than 29,000,000 gallons of water per year and not more than 91,650 gallons of water during any single day to be drawn from the Floridian Aquifer. Notice was published in a newspaper of general circulation, to-wit: The Tampa Tribune in the issues of May 28 and June 4, 1975, pursuant to Section 373.146, Florida Statutes. Notices of said public hearing were duly sent by certified mail as required by law. The application and map of the premises, the legal description, the receipt of certified nail, the copy of the Notice and the affidavit of publication were received without objection and marked Exhibit 1. Copy of the franchise application to the Health Department regarding the laboratory analysis on the public water supply was introduced into evidence and received without objection and marked Exhibit 2. The parties agreed to file a joint stipulation as follows: The agreement that a flow meter be installed. That monthly readings be submitted to the District staff at the Headquarters office. That applicant supply evidence that the individual lots will be restricted from having private wells. A copy of the joint stipulation was received by the Division of Administrative Hearings on July 14, 1975. Said stipulation encompassed the following: That applicant, Groveland Developments, Inc. install a flow meter of the propeller type on the well; take monthly readings, and send them into the District monthly. Said stipulation did not encompass the third (3rd) condition agreed to at the hearing, to-wit: That evidence would be supplied that individual lots to be developed in conjunction with this application be restricted from having private wells thereon. Witnesses were duly sworn and agreement was reached on each point enumerated as required by Rule 16J-2.11, Rules of the Southwest Florida Water Management District and Chapter 373, Florida Statutes.

Recommendation Grant Application No. 7500050 for a consumptive-us permit for the quantities of water applied for conditioned upon the items enumerated in the joint stipulation and further conditioned upon the submission by the applicant evidence showing that the individual lots will be restricted from having private wells thereon. August 22, 1975 DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: T. Ahern, Esquire Staff Attorney southwest Florida Water Management District Post Office Box 457 Brooksville, Florida 33512 Mr. George Szell, Hydrologist Permit Section Southwest Florida Water Management District Post Office Box 457 Brooksville, Florida 33512 Groveland Developments, Inc. Post Office Box 578 Lutz, Florida 33549 Mr. Frank Ripa Housel & Martinez, Inc. Consulting Engineers and Land Surveyors Post Office Box 9215 Tampa, Florida 33674 Attachment to the Recommended Order STATE OF FLORIDA

Florida Laws (1) 373.146
# 7
WYATT S. BISHOP, JR. vs HI HAT CATTLE AND GROVES AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 90-007734 (1990)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Dec. 06, 1990 Number: 90-007734 Latest Update: May 17, 1991

The Issue The issue for consideration in this case is whether the Respondent, Hi Hat Cattle and Grove, should be issued water use permit 204387.03, to withdraw groundwater from the wells on its property, and if so, in what amount and under what conditions.

Findings Of Fact At all times pertinent to the issues herein, the Respondent, District, was the state agency responsible for the permitting of consumptive water use within its area of geographical jurisdiction. The Respondent, Hi Hat, is a family owned farming and ranching operation in eastern Sarasota County with water wells on its property. The Intervenor, City of Sarasota, is a municipality in Sarasota County which operates wells in the general area of those operated by Hi Hat, and which has an agreement with Hi Hat for the latter's use of treated wastewater pumped from the city's treatment plant to Hi Hat Ranch. The Petitioner, Wyatt S. Bishop, Jr., is a property owner and resident of Sarasota County whose property is located near the Hi Hat Ranch, and whose potable water is drawn from a well on his property which utilizes both the surficial and intermediate aquifers which are penetrated by the wells on Hi Hat Ranch. Hi Hat Ranch consists of 11,000 acres owned by Hi Hat Cattle and Grove, the family owned business which operates it, and an additional 3,227 acres leased from the City of Sarasota. Agricultural operations, including citrus farming, truck farming, sod farming, and grazing have been conducted on the ranch since the mid 1940's. In February, 1990, Hi Hat applied to the District for a permit to withdraw and use water from some 14 wells located on its property. It requested an annual average of 6,267,000 gallons per day, (gpd), and a peak monthly rate of 32, 668,000 gpd. Upon receipt by the District, the application was assigned a number, (204387.03), and was submitted for evaluation by the District staff for conformity with applicable District rules and policies. When the staff evaluation was completed, the District issued a staff report and proposed staff agency action in which it indicated its intention to issue a permit authorizing water to be drawn from the wells at a rate of 6,570,000 gpd, average annual, a peak monthly rate of 14,300,000 gpd, and a maximum daily rate of 5,210,000 gpd. In conducting its evaluation, the District staff relied upon the District's Basis of Review For Water Use Permit Applications which contains within it the provision for use of a "water use model" in assessing the need and appropriateness of water withdrawal amounts. This model, known as the Blaney- Criddle Model considers numerous factors in the evaluation, including rainfall, soil characteristics, irrigation methods used, and proposed crop types, all in an effort to determine a reasonable estimate of the applicant's supplemental water needs. Hi Hat's application was evaluated primarily by Marie Jackson, a Hydrologist III employed by the District, and an expert in hydrology, who has, over the years, reviewed between 350 and 400 permit applications, of which approximately 90 percent have been for agriculture. She is, therefore, quite familiar with the specifics of agricultural water use needs. Her evaluation of Hi Hat's application was done in the same manner as the others she has done and utilized the same tests, measurements and factors for consideration in arriving at her conclusion. In its application, a renewal with modification sought to increase average annual quantities due to a change in crop plans, Hi Hat indicated that its criteria for water use was based on certain agricultural uses and application rates. These included: low volume under tree spray irrigation of 778 acres of citrus at an application rate of 17.2 inches/year plus one inch/year for frost and freeze protection. open ditch irrigation of 135 acres of sod at an application rate of 30 inches/year. open ditch irrigation of 1,367 acres of improved pasture at an average application rate of 26.6 inches/year. overhead spray irrigation of 1,200 acres of improved pasture at an application rate of 20.3 inches/year. open ditch irrigation of 110 acres of spring peppers at an application rate of 30.0 inches/crop, and open ditch irrigation of 110 acres of fall peppers at an application rate of 45.2 inches/crop. Applicant also stipulated that the peak monthly quantities that it requested would be utilized for pasture, sod and citrus irrigation during the month of May. The proposed maximum quantities were for frost and freeze protection of citrus only. In January, 1989, Hi Hat entered into a contract with the City of Sarasota under which the City was obligated to deliver reclaimed water from its wastewater treatment plant to a "header" located on the ranch which thereafter distributes the water through pipes to "turnouts" located at various high points on the property. From these, the water is then discharged into a system of ridges and furrows for distribution of the water across the needed area. The reclaimed water is used to irrigate approximately 5,403 acres of ranchland. The Contract provides for minimum and maximum amounts of water to be delivered as well as for water quality standards which must be met. In periods of adequate rainfall, when irrigation is not required, any treated wastewater which is not needed is stored in a 185 million gallon holding pond on City property located adjacent to the ranch. When needed, water can be fed into the wastewater distribution system described above from the holding pond. This reclaimed water, whether from the pond or direct from the header, can also be utilized to irrigate citrus crops, but this requires a filter system which has not yet been able to operate properly. Therefore, no reclaimed water has yet to be utilized for citrus irrigation on the ranch. At an average annual flow of 6.2 million gallons per day, the pond has the capacity to hold enough treated water for almost 30 days. Not all wells on Hi Hat Ranch are active wells. Several of the wells are classified as standby wells which are intended to be used only to back up the reclaimed water delivery system and are located, normally, beside the "turnouts." In the event the reclaimed water is not available from the city, the standby wells can be utilized to provide water to the ridge and furrow system used to irrigate pasture land. The standby wells are numbers 1, 6, 7, 11, 13, 14, and 15. Well number 5, also identified as a standby well in the staff report and in the draft permit was mistakenly so identified. The draft permit contains several special conditions which impact on the drawing of water under the terms of the permit. Significant among these is Special Condition 33 which prohibits the withdrawal of water from any of the standby wells unless the reclaimed water supply from the city is interrupted. Special Condition 27 requires the installation of a flow meter on any standby well that becomes active as a result of permanent discontinuance of the reclaimed water supply. With regard to flow meters, Special Condition 22 requires flow meters on all of Hi Hat's wells. Ms. Jackson, however, indicated this was in error and has recommended that the standby wells be deleted from that Special Condition. When that is done, only those wells actively producing water on a regular basis would require the installation of flow meters. In its analysis of the application for permit, the District staff considered several factors pertinent to the impact the well would have on the water supply in the area and its effect on other users. These factors include hydrologic impacts, well condition, the history of water use at the ranch, the reliability of the reclaimed water system and its ability to provide a uniform source, and the city's water reuse policy. Addressing each individually, and starting with the hydrologic impact of the withdrawal of the requested amounts, the District considered the nature of the existing wells and how they are constructed and maintained. The District assumed, because the data regarding the construction of the existing wells was incomplete and insufficient to properly disclose the status of casing on each well, that they were shallow cased. As a result, the calculations incorporating this assumption indicate a situation that would occur in its most aggravated form. The parties agreed that Hi Hat's wells are shallow cased and probably go no deeper than 90 feet. To determine, as much as possible, the projected drawdowns in the surficial and intermediate aquifers that might be expected if Hi Hat withdrew the amounts of water proposed, the District utilized the "MODFLOW" computer model which factors in simultaneous peak withdrawals from all 14 of the wells along with a 90 day no rainfall drought condition. This, too, contributes to a worst case scenario, and the resultant figures are considered to be conservative estimates of the hydrologic impact of the water withdrawal. Notwithstanding, the application of this computer model resulted in the indication that, as to the surficial aquifer, the drawdown at Mr. Bishop's property located approximately one half mile from the ranch border, would be no more than .055 feet. Since normal fluctuations in the surficial aquifer during the course of the year can be as much as 6 feet, the projected drawdown as a result of Hi Hat's withdrawals was considered insignificant. Applying the same assumptions and utilizing the same computer model as it relates to the intermediate aquifer resulted in an indication of a drawdown of no more than 2.3 feet at Mr. Bishop's property. Since annual fluctuation in the intermediate aquifer can range from 15 to 20 feet normally, the District considers that any reduction of less than five feet in the intermediate aquifer is insignificant. The permit held by Hi hat currently allows for the withdrawal of more water than would be withdrawn under the proposed permit as conditioned and is consistent with the proposed reduction in allowable withdrawals. Considering that factor, as well as the prohibition against withdrawals from standby wells as long as reclaimed water is available, the actual impact of the water withdrawals consistent with the proposed permit would be substantially less than the computed prediction which includes production from all wells. Drawdown contours are defined across the entire effected area. One of the levels is a 4 foot contour, and when a computer simulation indicates that the 4 foot contour includes a withdrawal previously or otherwise permitted, the District will generally conduct a cumulative impact analysis. In this case, however, since there was only one golf course well within the area circumscribed by the 4 foot contour line, and since this withdrawal was too small to have effected an evaluation, it was not done. The condition of the wells on the Hi Hat Ranch has some bearing on whether or not the application for additional withdrawal of water should be granted. These wells are almost 30 years old, having been drilled in the 1960's. As a result, there is little information available regarding their construction detail. This is not necessarily unusual for agricultural wells, and there is evidence that there are many similar wells in use within the District. The reason for this is that at the time the wells were drilled, information regarding their depth, casing and other matters were not required to be kept or reported. However, there is no indication the wells are in any way violative of well construction criteria and their use has been authorized continuously since 1977. When he prepared Hi Hat's application, Mr. Turner included much the same information regarding the wells as pertains as to depth and diameter which he had previously submitted in earlier applications and which had been accepted. In each case, casing depths had been reported as unknown. Notwithstanding the information contained in some old well logs relative to only a few of Hi Hat's wells, this information is in no way definitive and it is difficult to describe anything specific with the majority of these wells. Nonetheless, as already found, it is stipulated that most are approximately 90 feet deep. It is reasonable to assume that the existing wells, however, are cased only to a shallow depth, and that in many cases, the existing casings have corroded away, either totally or in part. This can cause an intermixing of water from the separate aquifers, but whether this is in fact happening depends upon factors specific to that particular well. Petitioner did not present any evidence to show that as a result of the condition of Hi Hat's wells, any degradation is occurring in the more potable, surficial aquifer as a result of intermixing with water from the intermediate aquifer on or around the Hi Hat Ranch. In Ms. Jackson's opinion, and there appears to be no evidence to contradict it, the amount of drawdown which would occur as a result of maximum pumping at Hi Hat Ranch would not be sufficient to cause poorer quality water from the Floridan aquifer to percolate upward (upcone) into the better quality water of the two upper aquifers even during drought conditions. By the same token, there is no evidence that drawdown would encourage or permit salt water intrusion. Petitioner attempted to show by the records kept on the various Hi Hat wells that many of them have been abandoned and are no longer operative and should not be allowed to fall within the parameters of this permit. He testified clearly that over the years, the level of water in his potable water well has lowered and presumed that this was the result of increased water usage by other entities which draw from the aquifer into which his well is sunk. Water level, however, depends upon numerous factors, of which usage is only one. Others include recharging of the aquifer and the amount of rainfall and other recharge sources not only in the immediate area but across the large area which feeds the aquifer. Mr. Bishop did not present any evidence showing a causal connection between the lowering of the water in his well, or the degradation in water quality he claims to have experienced, and either the drawdown caused by Hi Hat's operation or by aquifer intermixing. He indicated, and it is not disputed, that within the past year, he has had to take measures to improve the water quality in his potable well, but, again, he has not presented any evidence to show this was caused by Hi Hat's ground water withdrawals. In its long range planning, the District intends to implement a program to rehabilitate old wells, and when that program is implemented, almost every agricultural well within the District may require recasing or redrilling. This program will not be implemented for several years, however. In an effort, however, to insure that all reasonable precautions are taken to see that approval of any petition for withdrawal does not have an unacceptable adverse impact on the water needs of the surrounding community, in its analysis of this application, and in all cases, the District makes certain assumptions when adequate empirical data is not available. In this case, pertaining to the unavailability of information regarding Hi Hat's wells, the District assumed that all wells were shallow cased, and this placed the application in the worst possible light. Shallow cased wells allow more upconing and aquifer intermixing. Nonetheless, the amount of water permitted to Hi Hat, even if not used, could impact on Mr. Bishop and other adjoining owner's use of additional water as a result of a possible change to their permitted quantities. However, to compensate for this, the District has also included a special condition, (#26), which requires Hi Hat to log all 14 of its wells within the term of the permit, (7 years), which will require at least 2 wells be done each year. The cost of that action will be between $800 and $2500 per well. Another condition, (#31), requires Hi Hat to look into any complaint from adjacent property owners regarding adverse impacts due to water withdrawal, to report the results of its inquiry to the District, and to mitigate, as much as possible, all adverse impacts due to its withdrawal. Mr. Bishop claimed, and introduced evidence purporting to demonstrate, that many of the wells on the Hi Hat Ranch, which are covered by the permit applied for here, are no longer in use and have been abandoned. In response, Mr. Turner, who has been actively engaged in the ranch's operations for at least the past four years, indicates from his personal knowledge, that all 14 wells included in the permit applied for have been operated within the past two years, and all are capable of producing water. It is so found. Not all wells, however, have been operated at all times. Crop rotation and a varying need for groundwater has resulted in some wells not being used at some times. This is, of course, commonplace in agriculture and to be expected as a result of crop planning programs. Admittedly, an accurate figure for the amount of water which has been withdrawn from the 14 wells cannot be established because these wells do not have, and were not required to have, flow meters. Two of the wells were fitted with hour meters in January, 1989, but because the capacity of the pumps on those wells is variable, a precise estimate of volume pumped cannot be determined. The meters measured only the number of hours the pumps were in operation and not the amount of water passed through the pumps. Evidence was presented, however, to show that wells have been utilized at the ranch since the 1960's, and in 1977, some 14 years ago, following District implementation of a consumptive water use permit program, the ranch first applied for water withdrawal permits. These permits have been renewed as required and all water usage since the implementation of the program has been permitted. Turning to the reclaimed water supply, the delivery system, incorporating a program to pump reclaimed water from the treatment plant all the way back out to the ranch site, is subject to material failure and operator error, and either one can occur at any number of places along the system route. Each could result in interruption of the delivery of the reclaimed water to the ranch. The system is far more complex than would be the use of on-site wells for delivery of ground water. One two week shutdown in the system was occasioned by a major pipe failure as a result of pressure building up in the pipes. Were it not for the fact that a contractor was already at the ranch with replacement parts on hand to effect expeditious repair of the system, the shutdown could have lasted considerably longer than it did. This is not the only interruption, however. Several main line leaks and valve problems have caused the system to be shut down on several occasions for short periods of time. The filter system required for the water destined for the citrus area is problematical, and so far this area of the ranch has not received any reclaimed water in the 10 months the system has been in operation. Mr. Bishop argues that the wet weather holding pond is a solution to the reliability problems with the pipe line, but the pond has had problems of its own. Sand in the water, which comes from the holding pond, has been the primary difficulty in the filter system for the citrus area, and algae growth in that pond has the potential to create other filter problems. Delivery of the water from the pond is not accomplished by a gravity system, but instead, requires the use of pumps powered by an electric motor. In the event of a power failure, this source would be unavailable. Discounting all of the above, however, and assuming, arguendo, that all systems were in top operating condition, the fact remains that the delivery system from the pond to the distribution system is not adequate to supply the amount of water that would be necessary to have an effective freeze protection program. In any case, the reclaimed water supply is not the panacea for all water shortage problems experienced at Hi Hat Ranch. In the first place, the quality of the reclaimed water is generally lower than that of the groundwater which would come from wells on the ranch. Also, the City's treatment process does not remove from the water all the pollutants that are of concern to the farm operators. For one thing, total dissolved solids in the reclaimed water are considerably higher than in the ground water, and high dissolved solid levels can be harmful to citrus crops. In fact, the Institute of Food and Agricultural Sciences recommends that citrus irrigation water not exceed total dissolved solid ranges of from 1000 to 1500 milligrams per liter, (mpl). Testing done on the reclaimed water delivered to Hi Hat Ranch showed it averaged between 1200 and 1500 mpl. Though within recommended parameters, it was toward the high end. Further, reclaimed water is not totally interchangeable with ground water for all agricultural purposes. It cannot, by law, be applied to certain types of ground crops such as melons, nor can it be used for overhead citrus irrigation. There is also a restriction on the use of reclaimed water for pastures on which dairy cattle will be grazed. This all results in a restriction on the options available to the farmer who chooses to use reclaimed water in his irrigation plan. As a result, many farmers try not to use reclaimed water if they have access to adequate amounts of groundwater from on- site wells. Notwithstanding all the above, the parties agree that the use of reclaimed water for irrigation purposed is in the public interest. The District encourages it but nonetheless concedes that even with the availability of reclaimed water, a farmer should have access to wells on his property, in a standby capacity, as an alternative source of water to support his farming activities. Not only that, the agreement between the City and Hi Hat provides for Hi Hat to maintain its water use permit even while receiving reclaimed water from the City. Hi Hat is not the only farm operation with whom the City has negotiated in a effort to expand its wastewater distribution program. It has found in those negotiations, that most farm producers are not willing to rely totally on reclaimed water for all their irrigation needs, and it has concluded that were it mandatory that a farmer give up his on-site ground water withdrawals in order to utilize reclaimed water for a part of his needs, most would be reluctant to use it at all. This would seriously interfere with the City's ability to dispose of its surplus reclaimed water consistent with its policy. Even though Hi Hat's property lies within the Eastern Tampa Bay Water Use Cautionary Area, the rule pertaining thereto is inapplicable to Hi Hat because Hi Hat filed its application for permit, which was deemed complete, prior to the adoption of the rule. Nonetheless, water use officials agree that the proposed permit is consistent with the rule emphasis on the use and reuse of reclaimed water, and the District does not object to backup wells being permitted as supportive of the District's desire to keep ground water within the ground.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that Hi Hat Cattle and Grove be issued water use permit No. 204387.03, within the limits of the authorized quantities as indicated in the intent to issue, subject to conditions contained therein; except that the permit be amended to show well No. 5 as a non-standby well, and to delete standby wells from the terms and requirements of Special Condition 22. RECOMMENDED this 17th day of May, 1991, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of May, 1991. APPENDIX TO RECOMMENDED ORDER The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: Accepted Accepted and incorporated herein. Accepted and incorporated herein. - 6. Accepted and incorporated herein. 7. - 11. Accepted. - 15. Accepted and incorporated herein. Accepted. Accepted. & 19. Accepted and incorporated herein. - 22. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 28. Accepted and incorporated herein. Accepted and incorporated herein. Rejected. She testified that Condition 28 of the permit provides this. Accepted. Accepted. Accepted and incorporated herein. Accepted. & 36. Accepted. Rejected as not supported by the evidence except that the method permitted was the method being used. - 40. Accepted. Ms. Jackson indicated she "assumed" some wells were drilled into the Florida aquifer. Rejected. Accepted as qualified by the comment, "depending on the respective potentiometric heads." - 47. Accepted. Accepted but incomplete. This is because they did not feel it was necessary under the circumstances. - 51. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted and incorporated herein. Accepted. Redundant. - 61. Accepted. - 66. Accepted and incorporated herein. Accepted. More a restatement of testimony than a Finding of Fact Accepted and incorporated herein. & 71. Accepted and incorporated herein. - 74. Accepted. Accepted. First sentence accepted. Second portion rejected since cited case involves active wells versus standby, as here. The comparison made is accepted. The conclusion drawn as to validity is rejected. & 79. Accepted. FOR THE RESPONDENTS AND INTERVENOR: & 2. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 6. Accepted and incorporated herein. 7. - 10. Accepted and incorporated herein. 11. - 13. Accepted and incorporated herein. - 17. Accepted and incorporated herein. Accepted. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. & 23. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Not a Finding of Fact but a comment on the evidence. 27. Accepted. 28. & 29. Accepted and incorporated herein. 30. - 33. Accepted and incorporated herein. 34. - 37. Accepted and incorporated herein. 38. Accepted. 39. Accepted. 40. - 42. Accepted and incorporated herein. Accepted and incorporated herein, & 45. Accepted. 46. & 47. Accepted and incorporated herein. COPIES FURNISHED: Wyatt S. Bishop 5153 Tucumcari Trail Sarasota, Florida 34241 Bram D.E. Canter, Esquire Haben, Culpepper, Dunbar & French, P.A. 306 N. Monroe Street Tallahassee, Florida 32301 Edward B. Helvenston, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Barbara B. Levin, Esquire de la Parte & Gilbert 705 East Kennedy Blvd. Tampa, Florida 33602 Peter G. Hubbell Executive Director SWFWMD 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (2) 120.57373.303 Florida Administrative Code (3) 40D-2.04140D-2.09140D-2.301
# 8
AMERICAN ORANGE CORPORATION vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-001578 (1975)
Division of Administrative Hearings, Florida Number: 75-001578 Latest Update: Oct. 29, 1990

The Issue Whether a consumptive use permit for the quantities of water as applied for should be granted.

Findings Of Fact Application No. 7500112 requested water from three (3) wells for the purpose of industrial use. This application is for a new use. The center of withdrawals will be located at Latitude 27 degrees 38' 58" North, Longitude 81 degrees 48' 21" West, in Hardee County, Florida. The application is for the use of not more than 470 million gallons of water per year and not more than 2,592,000 gallons of water during any single day to be withdrawn from the Florida Aquifer. Application received as Exhibit 1. Notice was published in a newspaper of general circulation, to-wit: The Herald Advocate, published weekly in Wauchula, Florida, on August 7 and 14, 1975, pursuant to Section 373.146, Florida Statutes. Notices of said public hearing were duly sent by certified mail as required by law. The affidavit of publication was received without objection and entered into evidence as Exhibit 2. Letters of objection were received from the following: Mr. Joseph F. Smith, Route 1, Box 238, Wauchula, Florida 33273. Mr. Smith states that in his opinion such withdrawal of water will severely damage his property. He is developing a mobile home park on eight (8) acres and is fearful that the amount of water requested in this application will diminish his supply of water for his project. A letter from Mr. and Mrs. A. H. Van Dyck, written on August 16, 1975, Route 2, Box 657, Wauchula, Florida 33873. They are fearful that the large amount of water American Orange Corporation proposes to pump each day will affect their shallow well which provides water for their home. They would like to see some type of agreement whereby American Orange Corporation would be willing to pay for replacement of the well if the corporation should cause their well to go dry. Mr. Stanley H. Beck, Counselor at Law, wrote a letter in behalf of his client, Harold Beck, requesting information as to the applicable statutes and regulations which affect the matter of the consumptive use permit. A telegram was sent by Harold Beck of Suite 1021, Rivergate Plaza, Miami 33131, stating that he objected to the application of American Orange Corporation's withdrawal of water or the reason that it would reduce the property value. The witness for the permittee is Barbara Boatwright, hydrologist, who was duly sworn and agreement was reached on each point enumerated as required by Rule 16J-2.11, Rules of the Southwest Florida Water Management District and Chapter 373, Florida Statutes. The staff hydrologist recommended that the permit be granted with two (2) conditions. One was that each of the wells be metered and two, that the District receive monthly reports from each meter. The applicant has consented.

Florida Laws (1) 373.146
# 9
ROSE ANN DE VITO vs JOHN FALKNER, CHRISTOPHER FALKNER, AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 95-005763 (1995)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Nov. 27, 1995 Number: 95-005763 Latest Update: Jun. 03, 1996

The Issue The issue in this case is whether the application of Respondents Falkner to transfer and modify a Water Use Permit should be approved.

Findings Of Fact The Southwest Florida Water Management District (District) is responsible for regulation and protection of water resources in the geographic area involved in this proceeding. Since 1994, John Falkner has owned the property in Hillsborough County which is the subject of this proceeding. The Falkner property is farmed by Christopher Falkner, the owner's brother. Prior to purchasing the land, the Falkners farmed the property, also known as the Rogers farm, through a lease arrangement with the previous owner. Rose Ann DeVito owns property to the south of the Falkner property. In the time since Ms. DeVito purchased the property, the elevation of Sumner Road has been raised and culverts were replaced. A fish farm was constructed in close proximity to her property. The result of this and other development has been to direct all the water flow from the surrounding area into the stream adjacent to the DeVito property. Drainage patterns in the area of Ms. DeVito's property have been altered since she first occupied the property. A ditch along Sumner Road which used to handle runoff from her property has been blocked by a neighbor's driveway. Maintenance on the ditch, allegedly a county responsibility, is described as poor. The ditch at the rear of Ms. DeVito's property handled water flow to Bullfrog Creek until the water flow became blocked, and the water diverted onto her property. The effect is that Ms. DeVito's property often contains a large amount of water. A substantial amount of sand is visible on her property, allegedly deposited by water flow. According to Ms. DeVito, both the county and the District have blamed the Falkner farm for the water-deposited sand. Charles and Diana Booth own property adjacent and to the south of the Falkner property. From 1992 to 1994, the Booths suffered from water running off the Falkner/Rogers farm and flooding the Booth property. A flood of the Booth property in the Fall of 1994 was not caused by irrigation but was related to a ten inch rainfall event at the Falkner farm. A ten inch rainfall exceeds a 25 year storm event and would likely result in widespread flooding. The Booths' pasture, top soil and driveway were eroded by the flooding. During the two years of flooding, Mr. Booth complained on several occasions about the flooding to the Falkners' foreman, "Cleo." The complaints were not relayed to Mr. Falkner. In October 1994, Mr. Booth reported the problem to the Southwest Florida Water Management District. Soon after the complaint was made, a representative of the District inspected the property and determined that a ditch needed maintenance. Shortly thereafter, the ditch was cleaned and a berm was installed to redirect runoff away from the Booth property. There has been no further flooding of the Booth property. In October 1995, Mr. Booth became concerned that a ditch was filling with sand and would not continue to handle the runoff. After voicing his concern, a water diverter was installed in the ditch and appears to have remedied the situation. At the time the Falkners began to lease the Rogers property, an existing water use permit, numbered 206938.01, had been issued and was valid for the farm. The Falkners have applied to transfer the existing water use permit from the previous property owner. The Falkners also seek to modify the permit, increasing the total quantities which can be pumped by transferring previously approved quantities from another permit the Falkners currently hold. All of the relevant wells are within the District's Most Impacted Area (MIA) of the Tampa Bay Water Use Caution Area. The District allows a permit holder within the MIA to increase withdrawals from a well by transferring the quantities from another permitted well within the MIA. The other Falkner farm (the "301 farm") from which the quantities would be transferred is located approximately one-half mile to the south of the Rogers farm and is within the MIA. The District reviewed the application and, on September 29, 1995, issued its Proposed Agency Action to Issue Water Use Permit No. 206938.03. The proposed permit includes special conditions requiring monthly pumping reports, water quality reports, adherence to District irrigation allotments (irrigation levels established by the AGMOD computer model) and crop reporting. In reviewing the application the District utilized the criteria set forth in Florida Administrative Code, and the Basis of Review, incorporated into the code by reference. In order to obtain a Water Use Permit, an applicant must demonstrate that the water use is reasonable and beneficial, is in the public interest, and will not interfere with any existing legal use of water. Additionally, the applicant must provide reasonable assurances that the water use: will not cause quantity or quality changes which adversely impact the water resources, including both surface and ground waters; will not adversely impact offsite land uses existing at the time of the application; will not cause water to go to waste; and will not otherwise be harmful to the water resources within the District. The uncontroverted evidence establishes that the water use is reasonable, beneficial and is in the public interest. The Falkners irrigate farmland to produce agricultural products. The production of food is in the public interest. The proposed use is reasonable and beneficial. Further, uncontradicted evidence and opinions of expert witnesses establish that the proposed use will not interfere with any existing legal use of water. The applicant must provide reasonable assurances that the water use will not cause quantity or quality changes which adversely impact the water resources, including both surface and ground waters. The evidence establishes that pumping from the Falkner wells will not adversely affect the quality of water within the aquifers from which the water is drawn. Mr. Booth asserted that he is having water quality problems, specifically with rust in his well. The Booth well is approximately 25 years old. There is no evidence that the rust is related to the Falkner pumping. The DeVito and Booth wells draw from the Intermediate aquifer. Review of the potentiometric surface map of the intermediate aquifer indicates that there is a water level variation of 17 feet between the rainy and dry seasons. The result of the variance can be "dry" wells. There are two wells on the Falkner/Rogers property relevant to this proceeding. The first (District ID number 1) is 770 feet deep, is cased to a depth of 160 feet, and opens to the Floridan aquifer. The second (District ID number 2) is 1100 feet deep, is cased to a depth of 140 feet, and opens to the Intermediate and the Floridan aquifers. A cased well does not withdraw water from the formations through which the casing is placed. For example, a well cased to a depth of 160 feet draws no water from the top of the casing (at approximately ground level) to the bottom of the casing at 160 feet. The Intermediate aquifer releases water at a much slower rate than the Floridan aquifer. Based on the type and location of the Falkner wells, the vast majority of the water pumped by the Falkners comes from the Floridan aquifer. Impacts on existing wells are calculated through computer modeling. The "MOD" flow model demonstrates impacts that will occur after 90 days of pumping at peak month levels with no recharge to the aquifer. The MOD flow model results in a conservative "worst case" projection. The MOD flow model calculation projects the drawdown at Falkner well number 1 to be approximately .9 feet. The MOD flow model calculation projects the drawdown at Falkner well number 2 to be approximately 1.4 feet. The MOD flow model calculation projects the drawdown at the Booth well to be approximately one-half foot. The impact on the DeVito well will not exceed that projected at the Booth well. District permitting criteria allow for projected MOD flow model drawdown impacts of less than five feet at existing wells. The impact possible after approval of this application falls well within the District's guidelines. The impact of pumping if the application at issue in this proceeding is approved will result in a maximum variation of one-half foot at the Booth well. The evidence fails to establish that any problems related to water quantity encountered by the Booths are related to agricultural pumping at the Falkner farms. The evidence also establishes that, based on the existing retention and drainage system, the proposed use will not adversely impact surrounding surface water bodies. A system of swales and ditches is utilized to retain the water on the farm property. The evidence fails to establish that runoff from the Falkner/Rogers farm will adversely impact surrounding surface waters if this application is approved. The applicant has provided reasonable assurances that the water use will not adversely impact offsite land uses existing at the time of the application. The evidence establishes that the runoff from the Falkner farm does not discharge directly to the stream at the rear of the DeVito property. Other agricultural property discharges into the stream adjacent to the DeVito property. There is a steady waterflow through the stream at all times, whether or not the Falkner pumps are operating. Ms. DeVito's property consists of Myakka soil, which has little capacity to absorb rainfall and generates large amounts of runoff. The altered drainage patterns in the area have resulted in substantial water on her property. The evidence in insufficient to establish that the Falkner farm pumping has resulted in flooding on Ms. DeVito's property. The evidence fails to establish that approval of the application at issue in this proceeding will cause adverse impact to the DeVito property or will result in water quality or quantity problems. The Booths are concerned that the existing drainage system will not be maintained and that increased pumping will result in their land being flooded again. The evidence fails to establish a substantial likelihood that the Falkner farm drainage system will not be maintained. The applicant has provided reasonable assurances that the water use will not cause water to go to waste. The Falkners use a semi-enclosed seep irrigation system at the Rogers farm. Irrigation is only used when necessary. Mushroom compost, humates, and plastic mulch retain moisture in the soil. A special condition of the permit requires the Falkners investigate the feasibility of tail water recovery and reuse. The applicant has provided reasonable assurances that the use will not otherwise be harmful to the water resources within the District. The permit application results in no increased withdrawal of water than is allowed under the existing permits for the Rogers and the "301" farms.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Southwest Florida Water Management District enter a Final Order granting the Falkner application and issuing permit number 206938.03. DONE and ENTERED this 26th day of April, 1996 in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1996. APPENDIX TO RECOMMENDED ORDER, CASES NO. 95-5763 and 95-5764 To comply with the requirements of Section 120.59(2), Florida Statutes, the following constitute rulings on proposed findings of facts submitted by the parties. Petitioners Booth The Petitioners Booth proposed findings of fact fail to comply with the requirements of Rule 60Q-2.031(3), Florida Administrative Code, which requires citations to the record of hearing. The proposed findings are rejected as irrelevant or not supported by the greater weight of the evidence except where they are consistent with the Findings of Fact set forth herein. Respondents The Respondents' joint proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 15. Rejected, cumulative. 28-29. Rejected, subordinate. 33. Rejected, subordinate. COPIES FURNISHED: Rose Ann DeVito, pro se 11001 Sumner Road Wimauma, Florida 33598 Diana P. and Charles B. Booth, pro se 10812 Sumner Road Wimauma, Florida 33598 Patricia Petruff, Esquire Dye and Scott, P.A. 1111 Third Avenue West Bradenton, Florida 34206 Martin Hernandez, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Peter G. Hubbell, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (1) 120.57 Florida Administrative Code (1) 40D-2.301