Findings Of Fact At all times material hereto, the Respondent was licensed as a certified building contractor, having been issued license number CB C012964 by the State of Florida. At all times material hereto, the Respondent was licensed as an individual only. On or about April 14, 1982, Cedar Homes of Pinellas, Inc., entered into a contract with Mary Fedico to enclose the carport on her home, which was located at 2085 Victory Avenue, Largo, Florida. The contract price was $5,000.00. Mike Fredricks acted as the saleman for this contract on behalf of Cedar Homes of Pinellas, Inc. At all times material hereto, Cedar Homes of Pinellas, Inc., was owned by Kenneth Larrow. The only employees of this corporation were Kenneth Larrow and his son. Cedar Homes of Pinellas, Inc., was formed in January of 1982 for the purpose of performing room additions and other types of construction. On April 14, 1982, the sole officer of Cedar Homes of Pinellas, Inc., was Kenneth Larrow, who also served as a director. An attorney John L. Riley, was the registered agent. At all times pertinent hereto, Kenneth Larrow was not licensed to engage in the business of contracting in the State of Florida. On or about April 16, 1982, Kenneth Larrow and his salesman, Mike Fredricks, went to the City of Largo Building Department to obtain a construction permit for the enclosure of Mary Fedico's carport. Neither of these persons wash qualified, or licensed, to engage in the business of contracting in the City of Largo. Therefore, the Largo Building Department refused to issue a permit for this construction. When Kenneth Larrow and Mike Fredricks were unable to obtain a permit for the construction of the addition to Mary Fedico's home, they informed the Largo Building Department that the qualifier for Cedar Homes of Pinellas, Inc., was Barry L. Critoph, the Respondent. The Largo Building Department informed Mr. Larrow and Mr. Fredricks that the Respondent had to sign the permit application in order for a permit to be issued for the construction to be performed on Mary Fedico's home. On or about April 16, 1982, the Respondent applied for and obtained a construction permit for the enclosure of Mary Fedico's carport. This permit was issued to Cedar Homes of Pinellas, Inc., with the Respondent as the qualifying contractor. At all times relevant hereto, the Respondent did not qualify Cedar Homes of Pinellas, Inc., with the Construction Industry Licensing Board. At all pertinent times, the Respondent did not have in his possession a certificate issued by the Construction Industry Licensing Board with the notation "Cedar Homes of Pinellas Inc." thereon. Moreover, the Respondent admitted he was not positive that he had properly qualified Cedar Homes of Pinellas Inc., when he obtained the permit for the enclosure of Mary Fedico's carport. On or about May 5, 1982, Cedar Homes of Pinellas, Inc., entered into a second contract with Mary Fedico to finish the interior of the carport which was to be enclosed by Cedar Homes of Pinellas, Inc., pursuant to the prior contract, for a price of $710. Kenneth Larrow began to perform the work required under the terms of the two contracts. Mary Fedico never saw the Respondent at the project site. Mr. Larrow hired all subcontractors and was responsible for paying them. He was also responsible for supervision of the construction of the carport enclosure. The Respondent did not know that there was a second contract for interior work in Mary Fedico's carport enclosure, and the Respondent performed no work on the project. He did drive his car by the site three times, but he never entered onto the project, and he simply viewed the construction being performed from the street. The Respondent had no knowledge as to who the subcontractors were on the Fedico project, and he had no responsibility for hiring them. He had no knowledge of the money that was being obtained from this project, and he did not know whether or not the subcontractors were being paid. At a time uncertain, construction of the carport enclosure addition to the Fedico home began to slow down. When Mary Fedico began to receive notices from subcontractors that they were not being paid, she contacted Kenneth Larrow about problems with the construction. However, when Mr. Larrow was unable to satisfactorily respond to Mary Fedico's questions regarding the work, she and her son-in-law took over the project, completed it, and paid all the subcontractors. The cost of completion was between $2,000 and $2,500 more than the contract price had been. As a result of the Fedico contracts noted above, Kenneth Larrow was charged with using the designation of "contractor" without a license, in two counts. Kenneth Larrow plead nolo contendere to these charges, and he was sentenced to pay a fine of $250 plus court costs. Mary Fedico first became aware that the Respondent had some involvement with the construction of the addition to her home when she was subpoenaed to appear at this court proceeding. Prior thereto, she had not been notified by either the Respondent or Mr. Larrow, that the Respondent had any connection with her carport project. The Respondent's involvement with Cedar Homes of Pinellas Inc., was limited to obtaining permits and "supervision". As compensation therefor, the Respondent was to received two percent of the gross sales of the company. He was supposed to check jobs and verify construction, but this supervision was to consist of checking the projects contracted for by Cedar Homes of Pinellas Inc., at his own convenience, to determine if these projects were "okay". The Respondent was not connected with the financial operation of Cedar Homes of Pinellas Inc., he had no financial control over the operations of the corporation, and he could not sign checks. All subcontractors were hired and paid by Kenneth Larrow. Mr. Larrow and his salesmen actually entered into the contracts, and the Respondent had no involvement with the contracts except to determine if work contracted for was structurally sound. Kenneth Larrow actually supervised all of the construction projects of Cedar Homes of Pinellas Inc., on a daily basis, and the Respondent was not aware of all the projects entered into by the corporation. Kenneth Larrow eventually made restitution to Mary Fedico in the amount of $1,250 for the problems which occurred in connection with the carport enclosure work on her home.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that license number CB C012964 held by the Respondent, Barry L. Critoph, be suspended for two years. THIS RECOMMENDED ORDER entered this 2nd day of December, 1983. WILLIAM B. THOMAS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of December, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire 130 North Monroe Street Tallahassee, Florida 32301 John J. Fogarty, Esquire 327 South Garden Avenue Clearwater, Florida 33517 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201
Findings Of Fact At all times pertinent to the issues presented, Respondent was a registered residential contractor under license number RR 0024559, issued to Kenneth Rowland qualifying Phoenix Construction Services, Inc., issued in April 1975. On May 12, 1977, Angela Close entered into a contract with C & C Roofing Company of Longwood, Florida, to enclose and make a room of the carport on her home located at 215 Ulysses Drive, Apopka, Florida. The contract, which detailed the work to be done, called for a contract price of $2,500 and stipulated the work was to be completed in approximately three weeks from start date. The amount of $1,150 was to be paid when the job was started, and the balance was to be paid upon completion and acceptance. This agreement was signed by Angela Close and J. D. Carver. Ms. Close had given the contract to Carver because she worked with his wife at Seminole Community College and had been advised by her that Carver was in financial difficulty and needed the work. The contract was signed at Close's house, where Carver came with his wife, bringing the contract to be signed. Carver did the preliminary measuring work, but when actual construction began, Respondent was present and accomplished the majority of the work. On May 26, 1977, 14 days after the contract was signed, Respondent pulled a building permit #99146 to accomplish the work called for in the contract, from the Orange County Building Department. Several weeks after the work was started, Respondent asked Ms. Close for some additional progress payments on the job. Since she had already paid Carver in full according to the terms of the contract with him, she refused to pay Respondent, telling him she had paid all that was called for under the terms of her contract with Carver. When she said this, Respondent appeared quite surprised to learn of the contract and angry as well. On June 30, 1977, Respondent wrote a letter to the Orange County Building Department notifying that office that he had stopped work on that project because of nonpayment and requesting his name and license number be removed from the permit. As a result, the permit was cancelled on July 7, 1977. In an interview with Bobby J. Hunter, Sr., an investigator for the Department of Professional Regulation (DPR) several years later, Respondent indicated he agreed to do the job in question for Ms. Close, a friend of Carver, for $3,500. He pulled the permit and commenced work without ever talking to Ms. Close or without having a contract from her to do it, relying on the word of Carver that it was proper to do so. He received several payments from Ms. Close, transmitted through Carver. Two were in cash, and one was a check. When Respondent found out that Ms. Close had a contract with Carver for $2,500 and had paid him in full, he realized he would not receive funds to satisfy the work he had put in on the job, and he ceased work. The investigative report prepared by Mr. Hunter includes summaries of the interviews with both Carver and Respondent which state that Carver and Respondent were partners. Rowland, in his testimony at the hearing, denied any partnership relation. In light of the fact that these summaries are second-hand hearsay, contradicted by sworn testimony of the Respondent that he was not a partner of Carver, I resolve that dispute in favor of the Respondent and find that he was not a partner of Carver. Respondent contends under oath, and I so find, that he pulled the permit to do the work without knowledge of the prior contract between Close and Carver, as a favor to Carver who was reportedly a friend of Close. It was his understanding that, though Carver made the arrangements, it was his, Respondent's contract with Close for the figure he had quoted to Carver after his first survey of the job site, $3,500. He had been told by Carver not to talk with Close, as she did not speak English well, and he admitted to having made a grand mistake in proceeding without a contract from the owner Close. Carver's reliability is not the best. Mr. Hunter, investigator for DPR, indicated that Carver made some false statements to him in other cases. As a result, though Carver alleges he and Respondent were partners, and even Respondent's statement to Hunter seems to so indicate, there was, in reality, no partnership requiring Respondent to qualify C & C Roofing on his license, though there was plans to do so in the future.
Recommendation Based on the foregoing, it is RECOMMENDED That Petitioner enter a final order dismissing the Administrative Complaint. RECOMMENDED this 19th day of August, 1983, in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of August, 1983 COPIES FURNISHED: Douglas A. Shropshire, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Kenneth Rowland 4403 North Powers Drive Orlando, Florida 32808 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. James Linnan, Executive Director Construction Industry Licensing Board Department of professional Regulation Post Office Box 2 Jacksonville, Florida 32202
The Issue The Florida Construction Industry Licensing Board, Petitioner, seeks to revoke the registered contractor's license of Stephen J. Borovina, Respondent, based on allegations, which will be set forth in detail hereafter, that he engaged in conduct violative of Chapter 468, Florida Statutes. The issue presented is whether or not the Respondent aided or abetted and/or knowingly combined or conspired with Mr. Howard North, an uncertified or unregistered contractor, to evade the provisions of Chapter 468.112(2)(b), and (c), Florida Statutes, by allowing North to use his certificate of registration without having any active participation in the operations, management, or control of North's operations. Based on the testimony adduced during the hearing and the exhibits received into evidence, I make the following:
Findings Of Fact The Respondent is a certified general contractor who holds license no. CGC007016, which is current and active. On or about July 25, 1976, Mr. and Mrs. Julius Csobor entered into a contract with Mr. and Mrs. Howard North for the construction of a home in Martin County, Florida, for a total price of $35,990. Neither Mr. or Mrs. North are certified or registered contractors in the State of Florida. (Petitioner's Composite Exhibit #2). Respondent applied for and was issued a permit by the Martin County Building Department to construct a residence for the Csobors at the same address stipulated in the contract between the Csobors and the Norths, i.e., Northwest 16th Street, Palm Lake Park, Florida. (Petitioner's Composite Exhibit #1). Howard North, a licensed masonry contractor for approximately nine (9) years was contacted by the Csobors through a sales representative from a local real estate firm. It appears from the evidence that North had previously constructed a "spec" house which the local realtor had sold and thus put the Csobors in contact with Mr. North when they were shown the "spec" house built by North. Evidence reveals that North contacted Borovina who agreed to pull the permit "if he could get some work from the job and could supervise the project". Having reached an agreement on this point, North purchased the lot to build the home for the Csobors and he orally contracted with the Respondent to, among other things, pull the permit, supervise construction, layout the home and do trim and carpentry work. North paid Respondent approximately $200 to layout the home for the Csobors. By the time that North had poured the slab and erected the subfloor, the Csobors became dissatisfied with his (North's) work and demanded that he leave the project. According to North, Respondent checked the progress of construction periodically. Prior to this hearing, the Csobors had never dealt with Respondent in any manner whatsoever. According to Csobor, North held himself out as a reputable building contractor. A contractor is defined in relevant part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. . . . real estate for others. . . Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended that the complaint filed herein be dismissed in its entirety. RECOMMENDED this 4th day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Stephen J. Borovina 2347 Southeast Monroe Street Stuart, Florida 33494 J. Hoskinson, Jr. Chief Investigator Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 STEPHEN J. BOROVINA, CG C007016, 2347 S. E. Monroe Street, Stuart, Florida 33494, Respondent. / This cause came before the FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD at its regular meeting on February 10, 1978. Respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did not appear The FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD on February 10, 1978, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded voted to revoke the certified general contractor's license of STEPHEN J. BOROVINA. It is therefore, ORDERED that the certification of respondent STEPHEN J. BOROVINA, Number CG C007016, be and is hereby revoked. Respondent is hereby notified that he has 30 days after the date of this final order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. DATED this 13th day of February, 1978. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President ================================================================= SECOND AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD STEPHEN J. BOROVINA, CG C007016, Respondent/Appellant, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner/Appellee. / This cause came before the Florida Construction Industry Licensing Board at its regular meeting on August 3, 1979. The respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did appear. The Florida Construction Industry Licensing Board, on August 3, 1979, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded, voted to revoke the certified general contractor's license of Stephen J. Borovina, No. CG C007016. On February 13, 1978, the certification of respondent, Stephen J. Borovina, No. CG C007016, was revoked by order of the Florida Construction Industry Licensing Board. On April 25, 1979, the District Court of Appeal of the State of Florida, Fourth District, in Case Number: 78-527, reversed the final order of the Florida Construction Industry Licensing Board. That Court remanded the above captioned case to the Board to further consider the matter and enter such order as it may be advised in conformity with Section 120.57(1)(b)(9), Florida Statutes (1977). In accordance with the decision of the Florida District Court of Appeal, Fourth District, the Board has reconsidered the above captioned matter and finds as follows: The Board rejects the recommended order as the agency's final order. The Board adopts the first paragraph of the hearing officer's finding of fact. The Board, however, rejects the findings of fact found in the second paragraph of the hearing officer's findings. The second paragraph states as follows: A contractor is defined in relevent(sic) part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. real estate for others...Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety. The findings of fact found in the above-quoted paragraph were not based upon competent substantial evidence. The competent substantial evidence supports a finding that the respondent, Stephen J. Borovina, did not supervise the project and that Borovina evaded the provisions of Chapter 468, Florida Statutes. The following evidence supports the Board's position: There was no written agreement entered into between Howard North and the respondent which indicated that the respondent was to supervise the construction of the Csobors' house (T- 14); It was conceded at the hearing that the only subcontractors or draftmen who worked on the Csobors' house were contracted solely by Howard North and they had no contract whatsoever with the respondent (T-19, 25); The respondent never advised or informed Mr. and Mrs. Csobor that he was the contractor on the job. (T-51); At all times during the act of construction of the house, Mr. and Mrs. Csobor were under the impression that Howard North was the contractor (T-44-51). It is, therefore, ORDERED: That the certification of respondent, Stephen J. Borovina, Number CG 0007016, be and is hereby revoked. Respondent is hereby notified that he has thirty (30) days after the date of the Final Order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. Dated this 3rd day of August, 1979. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President
The Issue Whether Respondent's registration as a general contractor should be suspended or revoked, or the respondent otherwise disciplined, for alleged violations of Sections 468.112 (2)(a), (2)(g), and (2)(h), Florida Statutes, as set forth in the Administrative Complaint.
Findings Of Fact Petitioner Phillip H. Bare, Ocala, Florida, is registered with Respondent as a general contractor under the provisions of Chapter 468, Florida Statutes, and was so registered throughout the year of 1977. He operates under the name of American General Corporation of Florida, but that firm has not been qualified to engage in the contracting business in Florida, pursuant to Section 468.107, Florida Statutes. (Petitioner's Exhibits 1, 2, Stipulation, Testimony of Cherry) On August 15, 1977, Respondent, as president of American General Corporation of Florida, entered into a Home Improvement Installment Contract and Note with Joe Wheeler and wife, who reside at Route 2, Box 63, Live Oak, Florida. The contract provided that for a price of $4,250 Respondent would make the following property improvements on the Wheeler residence: Build 12 X 20 Room Addition and finish with paneling, ceiling tile, & all trim. Build 6 X 14 porch with top. Replace all Rotten sills. Replace all Rotten siding. Paint house with latex paint. Repair floor joist. The Wheelers made a down payment of $350 leaving an unpaid balance of $3,900. The promissory note provided for a total financed cost of $6,629.28 payable in monthly payments over a period of seven years. On August 29, 1977, the parties entered into another such contract for additional work to the residence for the price of $1,600 as follows: Install ceiling tile in (2) bed rooms and bathroom complete with trim. Install paneling in (2) bed rooms complete. Install paneling and tile board in bath. Remove old shingles and install new 235lb asphalt shingles. Install 54" kitchen sink complete and hook to water. The Wheelers paid $100 as a down payment on the work and financed the remainder with a total deferred price of $2,100 payable in 48 consecutive monthly installments. (Petitioner's Exhibits 5, 6, Testimony of E. Wheeler, J. Wheeler) Respondent subcontracted the work on the Wheeler residence to one John Compton. Respondent did not secure a Suwannee County Building Permit for the work, nor was he licensed in that county to act in the capacity of a contractor. (Testimony of Respondent, Wilson) On September 12, 1977, Mr. Wheeler signed a Customer's Completion Certificate" wherein he acknowledged that the contract work had been satisfactorily completed. Although Respondent testified that he explained the contents of the document to Wheeler at the time it was executed, Wheeler denied the same and testified that he had not read its contents prior to signing it. (Testimony of Respondent, J. Wheeler, Respondent's Exhibit 1) Prior to completion of the work, the Wheelers noted that certain deficiencies in the work existed, including a floor that "shaked" in the new addition, looseness of wall paneling, failure to replace rotten siding and lower sills, and failure to install ceiling tile in one bedroom. They spoke to workmen on the job who said that they would return and finish the work. However, nothing further was done in spite of the fact that Respondent told Mrs. Wheeler in a telephone conversation that he would be back to complete the job. As a result, Mrs. Wheeler made a complaint to Derl W. Wilson, the building official for Suwannee County. (Testimony of E. Wheeler, J. Wheeler, Wilson) Pursuant to Mrs. Wheeler's complaint, Wilson inspected the premises at some time during the month of September, 1977, and observed that the accomplished work was of a substandard nature involving various violations of the Southern Standard Building Code which had been adopted by Suwannee County in 1975. These violations, which Respondent acknowledged at the hearing to have been committed, included the following: concrete foundation blocks improperly aligned and unsupported by required concrete pad; improper spacing of floor joists at 24 inch rather required 16 inch intervals; use of one-ply instead of two-ply flooring material; failure to extend vent stack for plumbing system in kitchen to a height of 6 inches above the roof line; failure to provide a shutoff valve for cold water line under kitchen sink; failure to cover and protect splices in wiring of ceiling light fixture; failure to install ridge board for support of roof rafters; improperly installing two inch by four inch wood braces in attic; failure to connect sewer line to septic tank. Additionally, Wilson observed various instances of poor workmanship in installation of an electric wall receptacle and connection of the roof of the new addition to the existing building. Further, he noted that due to the improper spacing of floor joists, the substandard plywood flooring was not firm and constituted a safety hazard. (Testimony of Wilson, Petitioner's Composite Exhibit 3) After his inspection, Wilson wrote a letter to Respondent, dated October 18, 1977, pointing out the deficiencies in construction and advising that a complaint would be filed against him unless a building permit was obtained within ten days and the necessary corrections of deficiencies were made. Although Wilson testified that he did not hear from Respondent as a result of the letter, Respondent made several telephone calls to Wilson's office and was informed that he was on vacation. (Testimony of Wilson, Respondent, Respondent's Exhibit 7) On June 14, 1978, Respondent entered a plea of guilty in the County Court of Suwannee County, Florida to a charge of improper construction arising out of the Wheeler contract, and the Court withheld adjudication of guilt in the matter. (Petitioner's Exhibit 9) Respondent was previously convicted in the County Court of Putnam County, Florida, on August 13, 1974 of engaging in the business or acting in capacity of a contractor without being duly registered in the county pursuant to Section 468.105(2), Florida Statutes. On June 16, 1975, Respondent pleaded nolo contendere in the County Court of Alachua County, Florida to a charge arising out of his activities as a home improvement contractor. The Court withheld adjudication of guilt and placed the Respondent on probation for a period of six months and required that he "make necessary repairs to home of victim to satisfaction of Consumer Protection Section of State Attorney's Office, Eighth Judicial Circuit." (Petitioner's Exhibits 7-9) Petitioner has been a building contractor for twelve years. He testified that his subcontractor for the Wheeler job had been competent in the past and he relied on this fact in not closely inspecting the work under the Wheeler contracts. For this reason, he was unaware that the building code violations had occurred until after he had sold the Wheeler contracts and mortgages to a third party who was contacted by the Wheelers regarding the deficiencies. Respondent denied that he abandoned the work because he thought it had been completed until subsequent notification of the Wheeler complaint. He has since made attempts through Counsel to resolve the complaint by having the work performed by a contractor licensed in Suwannee County or by means of a monetary settlement. He further testified that he had inquired of Petitioner's office as to the necessity for obtaining a Suwannee County license prior to commencing the Wheeler contracts and was informed that his registration was valid for work in that county. He acknowledged that he made a "mistake" in not obtaining a building permit and in failing to supervise his subcontractor properly, but stated that the licensing rules in the various counties were "confusing." As to his prior difficulties in Putnam and Alachua Counties, Respondent testified that the Alachua matter involved a complaint raised four or five years after construction regarding quality of workmanship and that he had taken care of the matter. As to the Putnam County case, he testified that he was unaware that a building permit was necessary at the time he did the work for which he was subsequently prosecuted. It is found that Respondent's exculpatory testimony regarding his failure to obtain a building permit or county licensing, and lack of knowledge of code violations with respect to the work performed at the Wheeler residence is not credible. (Testimony of Respondent, Respondent's Exhibits 2-6)
Recommendation That Respondent's registration as a general contractor be suspended for a period of one year and that an administrative penalty in the amount of $500 be imposed, for violation of Section 468.112(2)(a), Florida Statutes. DONE and ENTERED this 23rd day of March, 1979, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of March, 1979. COPIES FURNISHED: Barry Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 C. Valentine Bates, Esquire 726 NW 8th Avenue - Suite B Gainesville, Florida J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621
Findings Of Fact In General: Respondent is, and was at all times material to the Administrative Complaint, a certified general contractor, having been issued license no. CG C016774 by the Florida Construction Industry Licensing Board. At no time material to the Administrative Complaint was Stephen Karlan licensed, registered or certified by the Florida Construction Industry Licensing Board. As to Counts I--III: There is no evidence, direct or indirect, to tie any participation by Stephen Karlan to any event at the Reyes' home (Administrative Complaint Counts I--III). Mrs. Carolyn Reyes is the wife of Augustin Reyes, both of whom have resided at 9355 Southwest 180th Street, Miami, Florida, for approximately 12 years. They first met with Respondent Gomez sometime in July of 1983, and after a series of discussions concerning the work which the Reyes' desired, their budget restrictions, and charges proposed by Respondent, a contract was prepared by Respondent on Respondent's stationery. (P-3) The contracted work included: completely remodeling the kitchen and living room; the installation of central air conditioning and heating; the construction of a swimming pool; and the construction of a covered patio. The Reyes provided Respondent with a check in the amount of $4,227.40, representing a twenty percent down payment on the contract price of $24,237.00. Although signed by Mr. Reyes, who did not testify, Mr. Reyes' signature was identified by Mrs. Reyes on the contract and on the September 20, 1983 check. She was present at the execution of the contract and tendering of the check on the Reyes' joint bank account to Respondent Reyes on September 20, 1983. Existence of this contract and its terms is not disputed by Respondent. Subsequently, approximately $3,100.00 was deducted from the total contract price by way of a change order. This amount represented the cost of installing a roof over the patio and brought the new contract price to $21,137.00. (P-3 and P-6) A change order, prepared by Respondent, and signed by Mrs. Reyes, was agreed to approximately October 18, 1983, for installation of more expensive bronze-tone sliding glass doors in the family room and $250.00 was paid additionally by the Reyes. From September through November, 1983, Respondent performed construction work at the Reyes' residence. Under the terms of the contract, the Reyes provided Respondent with the following amounts, mostly by checks drawn on their joint account and issued over Mrs. Reyes' signature. DATES AMOUNTS September 20, 1983 $ 4,227.40 (20 percent down payment) October 5, 1983 $ 1,056.85 (installation of kitchen cabinets) October 13, 1983 $ 3,170.55 (pool framing inspection) October 24, 1983 $ 250.00 (change order--glass doors) October 25, 1983 $ 2,137.00 (air conditioning equipment) October 28, 1983 $ 2,137.00 (pool gunnited) November 3, 1983 $ 1,056.85 (kitchen remodeling) November 4, 1983 $ 1,056.85 (plumbing payment) November 21, 1983 $ 2,000.00 (kitchen and den) November 23, 1983 $ 1,000.00 (kitchen and den) November 28, 1983 $ 982.00 December 6, 1983 $ 2,137.00 (pool decking) $21,211.50 TOTAL (P-6) All of these checks were cashed by Respondent. During October and November, 1983, work was localized in the kitchen. Mrs. Reyes recalled not being able to use her kitchen for Thanksgiving, 1983. Except for recurring problems of improperly installed tiles, cabinets and appliances, related infra., Respondent completed the bulk of the kitchen remodeling in early December, 1983. Also in early December, 1983, the swimming pool was dug and gunnite was sprayed for the pool. Gunnite is a base of a spray used for installing the concrete bottom of a swimming pool prior to installing further marble-type finishing material, tile, and accouterments. In this same time period, the overhang above the anticipated patio was torn off the existing house by Respondent with the apparent goal of tying the existing roof beams into the new roof. After December 6, 1983, Respondent failed to perform any actual construction at the Reyes' residence until May, 1984. 2/ His crew only worked there one day in December of 1983. Approximately December 20, renegotiation of pool costs and kitchen tile costs were indulged-in by the the participants. The final result was that the Reyes would pay $80.00 more for kitchen tiles and $106.00 more for pool tiles and would be permitted by Respondent to deduct $246.00 from the total owed on the contract to him. Mrs. Reyes purchased the pool materials and paid cash for them rather than turning over any monies to Respondent but she stored them on her property so that the work could go forward. Respondent testified that shortly before that point in time, he realized that he had underestimated the cost of doing the Reyes' job by $6,000.00 to $7,000.00 and attempted to explain to them that having received approximately 90 percent of the contract price, but having not completed that much of the work contracted-for, he would have to do the work as he was able between other jobs in order to stay afloat financially. Respondent's proposal was not initially acceptable to the Reyes and they hired a lawyer who thereafter prohibited Respondent making direct contact with the Reyes. At that time, the following items remained to be completed at the Reyes' residence. The pool tile had not been installed; the pool equipment had not been purchased or installed; the living room windows had not been installed; and the patio roof had not been completed. There were also numerous problems with the quality of the workmanship of the completed items. The kitchen cabinets and the dishwasher were both initially improperly installed. As a result of the Reyes complaining to the Metropolitan Dade County Building and Zoning Department, one of that agency's code enforcement officers, John Delaney, inspected the Reyes' home on April 20, 1984. At that time, Mr. Delaney noted all of the items listed in Paragraph 8 as needing completion and also noted that the patio roof overhang was still exposed to the elements and that the air conditioning unit was only balanced on a concrete slab. Mr. Delaney estimated that at that time the contract work was approximately 55 percent to 60 percent complete. Upon investigation and a record search, Mr. Delaney determined that Respondent had obtained an approved building permit for the construction of the swimming pool and the open beamed porch. (P-13) The building permit did not specify installation of the pool's piping. Likewise the building permit did not specify that Respondent might perform the interior remodeling work. This permit which Respondent did obtain lists, and Respondent's signature acknowledges, that Respondent knew that "unless specifically covered by this permit" separate permits must also be obtained for electrical, plumbing, roofing, and paving and pool, among other items. Upon concluding his investigation, Mr. Delaney felt sufficient evidence existed to charge Respondent with violation of Section 10-22 of the Metropolitan Dade County Code and forwarded his investigative report to the official for the appropriate unincorporated municipality. This report indicates that Respondent also pulled permits for mechanical air conditioning and heating and an electrical permit for the swimming pool. To Mr. Delaney's knowledge, no charges were ever filed by that official against Respondent. 3/ Mr. Delaney conceded that a state certified general contractor such as Respondent can legitimately do pool piping and that the only failure of Respondent was in not pulling the county permit. He indicated that the kitchen work in the Reyes' home would require a special permit because there is electrical and plumbing work in replacing old appliances with new. However, as to the kitchen cabinets he felt it would be permissible for either the general contractor to pull a general permit or for a subcontractor to pull a specialty cabinet permit. By questions on cross-examination of Mr. Delaney, Respondent asserted that no electrical work was done, no switches were moved and his only work was replacement of kitchen cabinets, floor, and acoustical tile but this is in the form of his questions and not sworn testimony. Respondent eventually came back to the Reyes job. He finished the pool in July, 1984. He finished the open beamed roof in October 1984. Respondent's carpenters or subcontracting cabinetmakers Carlos and Hector eventually fixed a kitchen door drawer Mrs. Reyes had complained about. (It was never established what these workers' status was/is.) Despite her general dissatisfaction with the tiles in her kitchen, despite a chipped sink, and despite personally having to explain to the plumber (again the tile setter and plumber's contract or employment relationship with Respondent is unclear) how to install the dishwasher, Mrs. Reyes currently feels 95 percent of the contract work has been completed by Respondent. 4/ She acknowledged that Respondent has provided additional bronze fixtures in her family room by way of mitigation. As to Counts IV--VII: In March, 1982, June Mildred Cooper contracted with one Steve Karlan for the construction of a bathroom addition on a residence located at 4835 Westwood Lakes Drive, Miami, Florida. The contract price was $6,700.00. Steve Karlan is not registered, certified, or otherwise licensed by the Florida Construction Industry Licensing Board. See supra. All oral representations made by Karlan to Mrs. Cooper are total hearsay and excludable, but it is clear that Respondent was never mentioned or otherwise identified during the contract negotiation of Cooper and Karlan. Cooper submitted contract payments directly to Karlan and never paid anything to Respondent. Cooper found Respondent on the job one day and thinks he said something to her like, "I'm the boss," but her memory of the exact language, if any, is vague. Cooper was admittedly not on the premises most of the time the construction was in progress because she repeatedly visited her other residence in Indianapolis for several months at a time. Respondent admits he was approached by Steve Karlan to give an estimate for the bathroom job and they thereafter agreed that Respondent should do the work. Respondent admits Karlan later gave him a piece of paper, probably a tax assessment, showing June Cooper's name as the owner, which Respondent used as the basis for filling out the building permit application which he applied for and received covering the portion of the construction work he did at her Florida residence. At the conclusion of his job, Respondent also executed a waiver-of- mechanic-lien affidavit which did not specify any owner and gave it to Karlan. Gomez never inquired into the relationship between Karlan and Cooper and just assumed Karlan was a relative, probably a son, living at the same address, and initially assumed Karlan had authority to authorize the work because Karlan opened the door to him the first time Respondent came to do the requested estimate. At the time Karlan opened the door to Respondent, some construction was already in progress in the house. Respondent represents that this scenario of obtaining a construction job is so customary in the trade that he never questioned Karlan's statement until Mrs. Cooper ultimately complained about the construction after completion. He recalls meeting her at the house twice during construction, but does not think he told her he was the boss. In mitigation, he represents that he made good on Mrs. Cooper's complaints. Respondent admits he later entered a contract with Steve Karlan as a "salesman" after satisfying Mrs. Cooper but that contract had nothing to do with the Cooper job.
Recommendation Accordingly, upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the Florida Construction Industry Licensing Board enter a final order requiring Respondent to pay a penalty of $1,000.00 and monitoring his license for one year in a probationary status. DONE and ORDERED this 18th day of July, 1985, in Tallahassee, Florida. ELLA JANE P. DAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of July, 1985.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: At all times relevant to this proceeding, respondent Ruben S. Ares was a certified general contractor in the State of Florida holding license number CG CO 14769. Sentinel Building Company of Central Florida, Inc. was engaged in the business of building residential homes for sale. It was the practice of Sentinel Building to buy the land, engage the services of a general contractor to obtain a building permit and help in the supervision and consultation on construction and sell the hones built to others. The contractors were paid a fee of between $250 and $500 per residence for obtaining permits and providing consultation and services. The Vice-President of Sentinel Building was responsible for hiring and paying subcontractors and suppliers. Sentinel Building was not a Florida licensed general contractor, nor was it qualified by respondent or other Florida registered or certified licensee to engage in the business or contracting in Florida. Respondent Ares was not an officer, stockholder, member of the board of directors or employee of Sentinel Building Company. In 1980, respondent entered into an agreement with Sentinel Building to act as the general contractor for the con- struction of at least four residences. His responsibilities were to supervise the construction of the hones and obtain all necessary permits, including the original building permit and the final certificate of occupancy. The responsibility for engaging subcontractors and ordering and purchasing materials and supplies remained with Sentinel Building Company. Respondent was paid a fixed fee of $350 per house. During the period of time in which four residences in Seminole County were constructed, respondent held another full time job with a building company for which he worked 43 to 44 hours per week. His activity with Sentinel Building consisted of obtaining permits and periodic checks on the construction work. According to respondent, his inspections on construction activity occurred once every three to ten days and consumed approximately too to four hours of respondent's time per week. In 1980 and 1981, respondent applied for and obtained building permits for four single-family residences in Delmar Estates, Seminole County. The applications and permits listed Sentinel Building as the owner of the property and respondent Ruben S. Ares as the contractor. At least one of the four homes was under a contract of sale prior to construction. Three of the four purchasers were under the impression that the homes were built by Sentinel Building. None of the three had ever met respondent Ares, nor were they aware that he was the general contractor.
Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that respondent be found guilty of violating Section 489.129(1)(e) and (f), Florida Statutes, that an administrative fine in the amount of $1500 be imposed against respondent and that the remaining charges of the Administrative Complaint be dismissed. Respectfully submitted and entered this 22nd day of June, 1984, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of June, 1984. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Aldo Icardi, Esquire P.O. Box 879 990 Lewis Drive Winter Park, Florida 32790 James Linnan Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202
Findings Of Fact At all times relevant hereto, Respondent, Larry F. Hoffman, held certified general contractor license number CG C019686 and certified residential contractor license number CR C018801 issued by Petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. He operates a general contracting firm at 3060 Indian Trail, Lantana, Florida. On or about November 18, 1983, Hoffman entered into a contract with Maurino Palmieri to add a screened porch addition to Palmieri's residence located at 6227 Hitching Post Way, Delray Beach, Florida. The contract generally required Hoffman to construct a screen enclosure with a flat roof to the existing structure for a price of $2,500. The contract reflected that the contractor on the project was Hoffman Construction, a name under which Respondent has not qualified to do business. Hoffman is not licensed to construct flat roofs in Palm Beach County. Because of this, he subcontracted the roofing work to American Roofing and Supply Association (American) in Delray Beach. According to Hoffman, American completed only one-half of the job and then filed for bankruptcy. Although Hoffman was not licensed to do the roof work, he finished the roof on the project. The project was completed on February 1, 1984 and Palmieri paid Hoffman the full amount due. At that time, Hoffman warranted the roof "to be free of leaks one year" and provided a written warranty to evidence this representation. About three weeks later, a heavy rain occurred and leaks developed in the new room. After calling Hoffman to complain, Hoffman placed a tar composition on certain parts of the new roof in an effort to stop the leaks. The leaks continued to persist whenever it rained and Hoffman sent a helper to Palmieri's residence on two occasions. Both efforts to fix the roof were unsuccessful. Thereafter, Palmieri telephoned Hoffman's residence on many occasions but was unable to personally speak with Hoffman. Hoffman never returned his calls. Palmieri eventually hired another roofer in October, 1984, to fix the leaks and discovered that flashing was missing in several areas. The repairs cost him $750. He has had no problem with his roof since that time. Hoffman denied that he had failed to put all necessary flashing in the roof. He attributed the leak to the gable in the original structure rather than any defect in the roof on the new room. However, this contention is rejected as not being credible. Hoffman also acknowledged that he finished the roof even though he was not licensed to do so, but did so since he could not find another roofing company within a reasonable period of time, and knew Palmieri desired the project to be completed as soon as possible. Finally, he concedes that he did not qualify "Hoffman Construction" with the Construction Industry Licensing Board, but contended he was unaware of this requirement. He now understands the law and represents he will not violate this requirement in the future.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent be found guilty of violating Subsections 489.115(1)(b) and 489.119(2) and (3), Florida Statutes, that he be given a $500 administrative fine, and his license suspended for ninety days. In the event Hoffman makes restitution to Palmieri, and furnishes evidence of the same to the Board, the suspension should be lifted. The remaining charge should be dismissed. DONE and ORDERED this 1st day of July, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, FL 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of July, 1985.