LANIGER ENTERPRISES OF AMERICA, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 06-001245EF (2006)
Division of Administrative Hearings, Florida Filed:Stuart, Florida Apr. 12, 2006 Number: 06-001245EF Latest Update: Sep. 19, 2006

The Issue The issue in this case is whether Respondent Laniger Enterprises of America, Inc. (Laniger), is liable to Petitioner Department of Environmental Protection (Department) for penalties and costs for the violations alleged in the Department's Notice of Violation, Orders for Corrective Action, and Administrative Penalty Assessment (NOV).

Findings Of Fact The Parties The Department is the administrative agency of the State of Florida having the power and duty to protect Florida's air and water resources and to administer and enforce the provisions of Chapter 403, Florida Statutes, and the rules promulgated in Florida Administrative Code Title 62. Laniger is a Florida corporation that owns and operates the WWTP that is the subject of this case, located at 1662 Northeast Dixie Highway, Jensen Beach, Martin County, Florida. The WWTP is referred to in the Department permit documents as the Beacon 21 WWTP. The WWTP Laniger acquired the WWTP in 1988 in a foreclosure action. At that time, the WWTP was in a "dilapidated" condition and was operating under a consent order with the Department. After acquiring the WWTP, Laniger brought it into compliance with the Department's requirements. Laniger's WWTP is commonly referred to as a "package plant."3 The WWTP's treatment processes are extended aeration, chlorination, and effluent disposal to percolation ponds. The WWTP does not have a direct discharge to surface water. It was permitted to treat 99,000 gallons per day (gpd) of wastewater. Its average daily flow during the past year was about 56,000 gallons. The east side of the WWTP site is adjacent to Warner Creek. On the north side of the WWTP site, an earthen berm separates the WWTP's percolation ponds from a drainage ditch that connects to Warner Creek. Warner Creek is a tributary to the St. Lucie River. The St. Lucie River is part of the Indian River Lagoon System. The Indian River Lagoon Act In 1989, the St. Johns River Water Management District and the South Florida Water Management District jointly produced a Surface Water Improvement and Management (SWIM) Plan for the Indian River Lagoon System ("the lagoon system"). For the purpose of the planning effort, the lagoon system was defined as composed of Mosquito Lagoon, Indian River Lagoon, and Banana River Lagoon. It extends from Ponce de Leon Inlet in Volusia County to Jupiter Inlet in Palm Beach County, a distance of 155 miles. The SWIM Plan identified high levels of nutrients as a major problem affecting the water quality of the lagoon system. Domestic wastewater was identified as the major source of the nutrients. The SWIM Plan designated 12 problem areas within the lagoon system and targeted these areas for "research, restoration and conservation projects under the SWIM programs." Department Exhibit 2 at 11-13. Neither Warner Creek nor the St. Lucie River area near Laniger's WWTP is within any of the 12 problem areas identified in the SWIM Plan. With regard to package plants, the SWIM Plan stated: There are numerous, privately operated, "package" domestic WWTPs which discharge indirectly or directly to the lagoon. These facilities are a continual threat to water quality because of intermittent treatment process failure, seepage to the lagoon from effluent containment areas, or overflow to the lagoon during storm events. Additionally, because of the large number of "package" plants and the lack of enforcement staff, these facilities are not inspected or monitored as regularly as they should be. Where possible, such plants should be phased out and replaced with centralized sewage collection and treatment facilities. Department Exhibit 2, at 64. In 1990, the Legislature passed the Indian River Lagoon Act, Chapter 90-262, Laws of Florida. Section 1 of the Act defined the Indian River Lagoon System as including the same water bodies as described in the SWIM Plan, and their tributaries. Section 4 of the Act provided: Before July 1, 1991, the Department of Environmental Regulation shall identify areas served by package sewage treatment plants which are considered a threat to the water quality of the Indian River Lagoon System. In response to this legislative directive, the Department issued a report in July 1991, entitled "Indian River Lagoon System: Water Quality Threats from Package Wastewater Treatment Plants." The 1991 report found 322 package plants operating within the lagoon system and identified 155 plants as threats to water quality. The 1991 report described the criteria the Department used to determine which package plants were threats: Facilities that have direct discharges to the system were considered threats. Facilities with percolation ponds, absorption fields, or other sub-surface disposal; systems located within 100 feet of the shoreline or within 100 feet of any canal or drainage ditch that discharges or may discharge to the lagoon system during wet periods were considered threats. * * * Facilities with percolation ponds, absorption fields, or other sub-surface disposal systems located more than 100 feet from surface water bodies in the system were evaluated case-by-case based on [operating history, inspection reports, level of treatment, and facility reliability]. Laniger's package plant was listed in the 1991 report as a threat to the water quality of the lagoon system because it was within 100 feet of Warner Creek and the drainage ditch that connects to Warner Creek. The Department notified Laniger that its WWTP was listed as a threat to the water quality of the lagoon system soon after the 1991 report was issued. The Department's 1991 report concluded that the solution for package plants threats was to replace them with centralized sewage collection and treatment facilities. To date, over 90 of the package plants identified in the Department's 1991 report as threats to the water quality of the lagoon system have been connected to centralized sewage collection and treatment systems. The 1999 Permit and Administrative Order On August 26, 1999, the Department issued Domestic Wastewater Facility Permit No. FLA013879 to Laniger for the operation of its WWTP. Attached to and incorporated into Laniger's 1999 permit was Administrative Order No. AO 99-008- DW43SED. The administrative order indicates it was issued pursuant to Section 403.088(2)(f), Florida Statutes. That statute pertains to discharges that "will not meet permit conditions or applicable statutes and rules" and requires that the permit for such a discharge be accompanied by an order establishing a schedule for achieving compliance. The administrative order contains a finding that the Beacon 21 WWTP is a threat to the water quality of the lagoon system and that the WWTP "has not provided reasonable assurance . . . that operation of the facility will not cause pollution in contravention of chapter 403, F.S., and Chapter [sic] 62-610.850 of the Florida Administrative Code." The cited rule provides that "land application projects shall not cause or contribute to violations of water quality standards in surface waters." Most of the parties' evidence and argument was directed to the following requirements of the administrative order: Beacon 21 WWTP shall connect to the centralized wastewater collection and treatment within 150 days of its availability and properly abandoned facility [sic] or provide reasonable assurance in accordance with Chapter 62-620.320(1) of the Florida Administrative Code that continued operation of the wastewater facility is not a threat to the water quality of the Indian River Lagoon System and will not cause pollution in contravention of chapter 403, F.S. and Chapter 62-610.850 of the Florida Administrative Code. * * * (3) Beacon 21 WWTP shall provide this office with semi annual reports outlining progress toward compliance with the time frames specified in paragraph 1 of this section, beginning on the issuance date of permit number FLA013879-002-DW3P. The administrative order contained a "Notice of Rights" which informed Laniger of the procedures that had to be followed to challenge the administrative order. Laniger did not challenge the administrative order. As a result of an unrelated enforcement action taken by the Department against Martin County, and in lieu of a monetary penalty, Martin County agreed to extend a force main from its centralized sewage collection and treatment facility so that the Laniger WWTP could be connected. The extension of the force main was completed in April 2003. The force main was not extended to the boundary of the Laniger WWTP site. The force main terminates approximately 150 feet north of the Laniger WWTP site and is separated from the WWTP site by a railroad. Correspondence Regarding Compliance Issues On August 21, 2001, following an inspection of the Laniger WWTP, the Department sent Laniger a letter that identified some deficiencies, one of which was Laniger's failure to submit the semi-annual progress reports required by the administrative order. Reginald Burge, president of Laniger and owner of the WWTP, responded by letter to William Thiel of the Department, stating that, "All reports were sent to the West Palm Beach office. Copies are attached." Mr. Thiel testified that the progress reports were not attached to Laniger's letter and he informed Laniger that the reports were not attached. Mr. Burge testified that he subsequently hand-delivered the reports. At the hearing, it was disclosed that Laniger believed its semi-annual groundwater monitoring reports satisfied the requirement for progress reports and it was the monitoring reports that Mr. Burge was referring to in his correspondence and which he hand-delivered to the Department. Laniger's position in this regard, however, was not made clear in its correspondence to the Department and the Department apparently never understood Laniger's position until after issuance of the NOV. On April 10, 2003, the Department notified Laniger by letter that a centralized wastewater collection and treatment system "is now available for the connection of Beacon 21." In the notification letter, the Department reminded Laniger of the requirement of the administrative order to connect within 150 days of availability. On May 9, 2003, the Department received a response from Laniger's attorney, stating that the administrative order allowed Laniger, as an alternative to connecting to the centralized wastewater collection and treatment system, to provide reasonable assurance that the WWTP was not a threat to the water quality of the lagoon system, and Laniger had provided such reasonable assurance. It was also stated in the letter from Laniger's attorney that "due to the location of Martin County's wastewater facilities, such facilities are not available as that term is defined in the [administrative] Order."4 On May 29, 2003, the Department replied, pointing out that the administrative order had found that reasonable assurance was not provided at the time of the issuance of the permit in 1999, and Laniger had made no "improvements or upgrades to the facility." The Department also reiterated that the progress reports had not been submitted. On September 29, 2003, the Department issued a formal Warning Letter to Laniger for failure to connect to the Martin County force main and for not providing reasonable assurance that the WWTP will not cause pollution in contravention of Chapter 403, Florida Statutes. The progress reports were not mentioned in the Warning Letter. The Department took no further formal action until it issued the NOV in August 2005. Count I: Failure to Timely File for Permit Renewal and Operating Without a Permit Count I of the NOV alleges that Laniger failed to submit its permit renewal application at least 180 days prior to the expiration of the 1999 permit, failed to obtain renewal of its permit, and is operating the WWTP without a valid permit. The date that was 180 days before the expiration of the 1999 permit was on or about February 27, 2004. Laniger did not submit its permit renewal application until February 15, 2005. In an "enforcement meeting" between Laniger and the Department following the issuance of the warning letter in September 2003, the Department told Laniger that it would not renew Laniger's WWTP permit. It was not established in the record whether this enforcement meeting took place before or after February 27, 2004. When Laniger filed its permit renewal application in February 2005, the Department offered to send the application back so Laniger would not "waste" the filing fee, because the Department knew it was not going to approve the application. Laniger requested that the Department to act on the permit application, and the Department denied the application on April 6, 2005. The Department's Notice of Permit Denial stated that the permit was denied because Laniger had not connected to the available centralized wastewater collection and treatment system nor provided reasonable assurance that the WWTP "is not impacting water quality within the Indian River Lagoon System." Laniger filed a petition challenging the permit denial and that petition is the subject of DOAH Case 05-1599, which was consolidated for hearing with this enforcement case. Laniger's permit expired on August 25, 2004. Laniger has operated the plant continuously since the permit expired. Count II: Failure to Submit Progress Reports Count II of the NOV alleges that Laniger failed to comply with the requirement of the administrative order to provide the Department with semi-annual reports of Laniger's progress toward connecting to a centralized sewage collection and treatment facility or providing reasonable assurances that continued operation of the WWTP would not be a threat to the water quality of the lagoon system. Laniger maintains that its groundwater monitoring reports satisfied the requirement for the semi-annual progress reports because they showed that the WWTP was meeting applicable water quality standards. The requirement for groundwater monitoring reports was set forth in a separate section of Laniger's permit from the requirement to provide the semi-annual progress reports. The monitoring reports were for the purpose of demonstrating whether the WWTP was violating drinking water quality standards in the groundwater beneath the WWTP site. They served a different purpose than the progress reports, which were to describe steps taken by Laniger to connect to a centralized sewage collection and treatment facility. Laniger's submittal of the groundwater monitoring reports did not satisfy the requirement for submitting semi-annual progress reports. There was testimony presented by the Department to suggest that it believed the semi-annual progress reports were also applicable to Laniger's demonstration of reasonable assurances that the WWTP was not a threat to the water quality of the lagoon system. However, the progress reports were for the express purpose of "outlining progress toward compliance with the time frames specified in paragraph 1." (emphasis added) The only time frame mentioned in paragraph 1 of the administrative order is connection to an available centralized wastewater collection and treatment facility "within 150 days of its availability." There is no reasonable construction of the wording of this condition that would require Laniger to submit semi-annual progress reports related to reasonable assurances that the WWTP is not a threat to the water quality of the lagoon system. Count III: Department Costs In Count III of the NOV, the Department demands $1,000.00 for its reasonable costs incurred in this case. Laniger did not dispute the Department's costs.

Florida Laws (5) 120.569120.68403.088403.121403.161
# 1
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs BALM ASSOCIATES, INC., 02-001116 (2002)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Mar. 19, 2002 Number: 02-001116 Latest Update: Dec. 16, 2002

The Issue The issue is whether Respondents should be subject to civil penalties and required to submit a Compliance Plan for the reasons stated in the Administrative Complaint and Order filed on January 8, 2002.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this enforcement action, Petitioner, Southwest Florida Water Management District (District), proposes to assess civil penalties against, and require a compliance plan from, Respondents, Balm Associates, Inc. (Balm) and Goodson Farms, Inc. (Goodson), on the grounds that from March 1999 through July 2001 they made water withdrawals from certain property in Hillsborough County, Florida, without a water use permit, and after a permit was obtained in August 2001, they continued to exceed the annual average daily withdrawals authorized under the permit through the month of November 2001, or just prior to the preparation and issuance of the Administrative Complaint and Order (Complaint).1 While not denying that excessive pumpages may have occurred, and that a permit was not obtained until August 2001, Balm points out that it is the owner-lessor of the property and not the consumptive user of the water, and contends that the District has no authority to enforce its rules against, and recover civil penalties from, the non-user of the water. In its request for a hearing, Goodson did not specifically dispute the allegation that it consumed water without a permit, or exceeded the withdrawal limits under the new permit, but contended instead that the limits were unrealistic and should be modified. At the final hearing, however, Goodson disputed the accuracy of the water consumption figures used in the Complaint. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries and to administer and enforce Chapter 373, Florida Statutes. Balm is a corporation registered to do business in the State of Florida. Its mailing address is 2101 Huntington Avenue, Sarasota, Florida 34232. It owns approximately 220 acres of land in Section 28, Township 31 South, Range 21 East, in Hillsborough County, Florida, which is the site of the alleged wrongdoing. Goodson is a corporation registered to do business in the State of Florida. Its mailing address is Post Office Box 246, Balm, Florida 33503. Goodson is in the farming business and operates a total of 13 farms, including the farm at issue in this proceeding. Permit Requirements Under Rule 40D-2.041(1), Florida Administrative Code, a water use permit is required whenever total withdrawal capacity from any source or combined sources is greater than or equal to 1,000,000 gallons per day (gpd); annual average withdrawal from any source or combined sources is greater than or equal to 100,000 gpd; or withdrawal is from a well having an outside diameter of 6 inches or more at the surface. Rule 40D-2.351(1), Florida Administrative Code, provides that a permittee must notify the District within 30 days of the sale or conveyance of permitted water withdrawal facilities or the land on which the facilities are located. The same rule also provides that where a permit has been issued to a party whose ownership or legal control of the permitted water withdrawal facilities subsequently ends, the party who assumes control over the facilities may apply to transfer the permit to himself or herself up to the renewal date of the transferor's permit. Finally, Rule 40D-2.351(2), Florida Administrative Code, provides that until a permit is transferred or a new permit is obtained, the party subsequently controlling the permitted water withdrawal facilities will be in violation of District rules for making withdrawals without the required permit. History of Permits on the Property On September 29, 1989, the District issued Water Use Permit No. 207135.001 (the .001 permit) to James Brown (Brown) and B & T Growers Partnership (B & T) for water withdrawals from one well for agricultural purposes on Balm's property. The .001 permit authorized annual average withdrawals of 102,000 gpd of groundwater for agricultural irrigation. On August 29, 1990, the District adopted new rules applicable to District permits within the Eastern Tampa Bay Water Use Caution Area (ETBWUCA). The .001 permit was within the ETBWUCA, and Brown and B & T were provided with a Notice of Permit Modification and new Permit Conditions. The new conditions became effective November 15, 1990. New Condition No. 5 provided that By July 31, 1995, all permitted withdrawal points shall be equipped with totalizing flow meters or other measuring devices as approved in writing by the Director, Resource Regulation Department. Such devices shall have and maintain accuracy within five percent of the actual flow installed. On December 14, 1992, the District approved the transfer of the .001 permit from Brown and B & T to B. Kenda Produce. The Unpermitted Water Withdrawals On June 30, 1997, Goodson entered into a two-year agricultural lease with Balm to use a portion of the property, including acreage previously used by B. Kendra Produce. At the time the lease was entered into, neither Respondent applied to the District to have the .001 permit transferred from B. Kendra Produce. It can be reasonably inferred from the evidence that after the first lease expired, the parties continued to execute new lease agreements at least through the time of the hearing. The portion of the property which Goodson leased and farmed is referred to as the "Sweat Loop Farm" and consists of approximately 100 acres. There is one well with an outside diameter of 10 inches at the surface located on the Sweat Loop Farm. The well's total withdrawal capacity is approximately 1,500 gallons per minute (gpm), which is over 1,000,000 gpd. Thus, withdrawals from the well required a water use permit. As noted earlier, Goodson operates a total of 13 farms on approximately 2,500 acres of land. There are approximately 15 wells on all 13 farms, including the Sweat Loop Farm. Michael E. Hare, an irrigation supervisor who is responsible for the irrigation of all 13 of Goodson's farms, installed a total of approximately 8 meters on the farms, including the meter on the Sweat Loop Farm. A totalizing flow meter, which was made by MiCrometer, was installed at the Sweat Loop Farm in June 1997. Mr. Hare acknowledged that he was familiar with MiCrometer meters and would be aware if the MiCrometer flow meter on the Sweat Loop Farm was not functioning properly. Whenever metering devices on the various Goodson farms have malfunctioned in the past, Mr. Hare has taken the malfunctioning meter to a metering company to be fixed. Goodson began irrigating the Sweat Loop Farm in June 1997. Since that time, Goodson has been the sole water user of the well on the farm. In March 1999, Goodson began submitting to the District monthly pumpage reports for the groundwater withdrawals on the Sweat Loop Farm. Although some unmeasured withdrawals presumably occurred prior to March 1999, the Complaint does not identify these as being a violation. Mr. Hare and other supervisors are responsible for collecting the meter readings which go on the monthly pumpage reports and providing them to the District. The information on the reports includes the permit number; the last month's meter reading; the current month's meter reading; the total gallons of water pumped for the current month; the meter total; and the meter factor. To determine the average daily withdrawal on the Sweat Loop Farm, the District relied upon the calculations provided by Goodson as to the total gallons of water pumped for the month and divided this number by 30 days. From March 1999 through July 2001, these quantities were as follows: MONTH/YEAR AVERAGE DAILY PUMPAGE March 1999 April 1999 531,487 No data available May 1999 364,930 June 1999 0 July 1999 0 August 1999 57,410 September 1999 49,563 October 1999 222,667 November 1999 250,667 December 1999 755,003 January 2000 689,433 February 2000 695,073 March 2000 544,427 April 2000 305,153 May 2000 597,720 June 2000 0 July 2000 62,120 August 2000 86,370 September 2000 123,233 October 2000 602,020 November 2000 409,550 December 2000 145,823 January 2001 957,690 February 2001 890,213 March 2001 391,280 April 2001 467,640 May 2001 617,177 June 2001 0 July 2001 0 Under Rule 40D-2.041(1)(a)-(c), Florida Administrative Code, a water use permit was required for Goodson's withdrawals since the well's total withdrawal capacity is approximately 1,500 gpm, which is greater than 1,000,000 gpd; the annual average withdrawals exceeded 100,000 gpd; and the well has an outside diameter of 10 inches at the surface. The withdrawals on the Sweat Loop Farm were not authorized by the .001 permit since neither Goodson or Balm was a permittee under the permit. Even if Goodson could rely on the permit, which it cannot, pumpage data provided by Goodson reflects that the water withdrawals (except for nine months) were in excess of that authorized by the permit. On June 16, 2000, the District mailed a Notice of Non-Compliance for excessive water withdrawals to Goodson. The Notice indicated that if the pumpage values submitted by Goodson were incorrect, Goodson was to explain the error and provide corrected quantities. On June 26, 2000, the District received a written response to the Notice of Non-Compliance from the superintendent of the Sweat Loop Farm who indicated that the pumpage values were correct, and that the excess usage was due to a "serious drought condition" which had caused a "significant financial hardship on [the] farm." The response also indicated that Goodson would contact Mr. Haftel, owner of Balm, to request that he "revise the water use permit for spring crops." On November 22, 2000, the District mailed Goodson a Notice of Violation indicating that the quantities authorized by the .001 permit were still being exceeded and that the District might seek monetary penalties if Goodson failed to come into compliance within 30 days. Despite the foregoing Notice, Goodson continued to make withdrawals without a permit and in excess of the quantities formerly authorized under the .001 permit until August 2001 when a new permit was finally obtained. Issuance of a New Water Use Permit On January 2, 2001, the District received an application for a General Water Use Permit seeking to modify the .001 permit to increase the withdrawal quantities and to transfer the permit from B. Kendra Produce to Balm. "Seymour Haftel/ Balm Associates, Inc." was listed as the applicant, and "Donn Goodson" from " Goodson Farms" was listed as the contact or consultant. Mr. Haftel signed the application on behalf of Balm. Goodson assisted Balm in securing the permit for the Sweat Loop Farm because Goodson wanted more water for irrigation purposes. Section 2.1 of the Basis of Review for Water Use Permit Application, adopted and incorporated by reference by Rule 40D-2.091, Florida Administrative Code, provides that "[a]pplications for leased property, except property leased from the District, must be either a joint application in the name of the lessee and the property owner(s) or be only in the name of the property owner(s)." In a Request for Additional Information mailed to Balm on January 29, 2001, the District asked whether Goodson should be listed as co-applicant on the application. On April 27, 2001, Balm submitted a response which indicated that Goodson should not be listed as co-applicant. On August 6, 2001, the District issued Water Use Permit No. 200007135.002 (the .002 permit) to Seymour Haftel/Balm Associates, Inc. authorizing an increase in the annual average withdrawals to 224,300 gpd. The permit had an expiration date of September 29, 2009. The permit contained a number of special conditions, none of which were challenged by Balm. Unauthorized Withdrawals Under the .002 Permit Special Condition No. 2 of the .002 permit requires in part that the permittee: continue to maintain and operate the existing non-resettable, totalizing flow meter(s), or other flow measuring device(s) as approved by the Regulation Department Director, Resource Regulation, for District ID No(s), Permittee ID No(s)[,] G-1. Such device(s) shall maintain an accuracy within five percent of the actual flow as installed. Total withdrawal and meter readings from each metered withdrawal shall be recorded on a monthly basis and reported to the Permit Data Section, Records and Data Department, (using District forms) on or before the tenth day of the following month. In the event a permittee chooses not to use a totalizing flow meter, as required by Special Condition No. 2, the District will review information provided by the measuring device's manufacturer to determine if the measuring device would maintain a five percent accuracy as required by the Condition. The meters have to be monitored and calibrated periodically for accuracy. It is the permittee's responsibility to comply with the conditions of the permit, including Special Condition No. 2, which requires the submittal of accurate pumpage reports. Goodson submitted the meter readings on behalf of Balm beginning in September 2001, which covered the withdrawals for the month of August 2001. The District relied on the meter readings submitted by Goodson to determine the annual average daily pumpage calculation for the .002 permit. The calculation is a running 12-month average, whereby each month the annual average daily quantity is recalculated based on the previous 12-month pumpage. The running annual average daily pumpage and percentage of pumpage which exceeded the .002 permit from August 2001 through May 2002 are as follows: MONTH/YEAR ANNUAL AVERAGE DAILY PUMPAGE PERCENTAGE OVERPUMPED August 2001 378,462 69 percent September 2001 382,622 71 percent October 2001 376,687 68 percent November 2001 383,008 71 percent December 2001 379,212 69 percent January 2002 327,343 46 percent February 2002 321,530 43 percent March 2002 350,701 56 percent April 2002 356,013 59 percent May 2002 338,131 51 percent As the foregoing data reflects, the withdrawals from the Sweat Loop Farm were in excess of that authorized by the .002 permit from August 2001 through May 2002.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order determining that Respondents are guilty of the charges in its Administrative Complaint and Order except as concluded in paragraph 48 above and endnote 2 below; that Respondents be required to submit an acceptable written plan (Compliance Plan) to the District for its consideration and approval within fourteen days after entry of the final order; that the Compliance Plan describe how Respondents shall achieve full compliance with the .002 permit; that the Compliance Plan include reductions in withdrawals, water conservation measures, and development and utilization of alternative resources; that the Compliance Plan establish deadlines for implementation and completion of corrective actions; that full compliance be achieved within 120 days after entry of the final order; and that any failure of Respondents to comply with any provision of the Compliance Plan shall constitute a violation of the final order. DONE AND ENTERED this 30th day of July, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 2002.

Florida Laws (5) 120.56120.569120.57373.119373.219
# 2
TRANS/CIRCUITS, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-003676 (1983)
Division of Administrative Hearings, Florida Number: 83-003676 Latest Update: Sep. 19, 1984

Findings Of Fact Trans/Circuits is a manufacturer of electronic printed circuit boards located at 210 Newman Way, Lake Park, Florida. Trans/Circuits' manufacturing operation involves the deposition of copper on plastic boards and the use of a lead or tin etch resist in order to create an electrically conducting circuit board. In the course of the manufacturing process, rinsewaters are used which become contaminated with copper and lead from the manufacturing process. These rinsewaters undergo chemical treatment to remove the metals and other contaminants, and are then discharged into an unlined percolation pond located behind Trans/Circuits' facility. About 36,000 gallons of effluent are discharged into the pond every day. The percolation pond discharges into ground water underlying Trans/Circuits' facility which groundwaters contain less than 3000 milligrams per liter (mg/l) of total dissolved solids. Trans/Circuits uses a Havviland brand wastewater treatment system. The system at present does not provide treatment sufficient to remove copper, fluoride, and lead from the wastewater effluent in compliance with the DER class G-II groundwater standards for these metals, i.e., 1.0 mg/l of copper, 1.5 mg/l of fluoride, and .05 mg/l of lead. Trans/Circuits has exceeded the effluent limitations for copper and lead at almost all times since at least June 1984. Trans/Circuits is not likely to comply with those standards for at least six months, by Trans/Circuits' own admission. The Operating Permit Application, Case No. 83-3676 Trans/Circuits requested a hearing to contest the DER Notice of Intent to Deny the application for an operating permit. The burden of proof and burden of going forward is therefore on Trans/Circuits to show that it is entitled to issuance of the operating permit. In this regard, Trans/Circuits did not introduce into the case any evidence relating to the operating permit application and did not introduce the application, itself. Further, Trans/Circuits did not present any evidence that its installation will abate or prevent pollution, or that it can provide reasonable assurances that the system which it seeks to operate will not discharge, emit or cause pollution. The Trans/Circuits facility has never been in compliance with DER standards and cannot provide assurances that it will be in compliance at anytime in the foreseeable future. Further Trans/Circuits has been operating without an operating permit at least since October 1983. The Month-to-Month Authorization, Case No. 84-0191 On September 17, 1982, DER issued a Notice of Violation and Orders for Corrective Action (NOV) to Trans/Circuits. The NOV alleged that Trans/Circuits violated provisions of Chapter 403, Florida Statutes, and DER rules in operation of its industrial waste water treatment and disposal system. Trans/Circuits requested and received an informal conference to discuss the allegations of the NOV, which conference was held on October 20, 1982. At the informal conference, DER and Trans/Circuits reached agreement on a resolution of the issues raised by the NOV. On November 4, 1982, a Consent Order was issued by DER, setting forth the parties' agreement and requiring Trans/Circuits to perform certain corrective actions. In the consent order, Trans/Circuits agreed not to discharge industrial wastewaters into waters of the state "without an appropriate and valid permit authorizing such discharge or having otherwise obtained Department authorization." At the time the consent order was issued, Trans/Circuits was operating pursuant to a DER construction permit which was issued for the purpose of allowing Trans/Circuits to make certain modifications to its treatment system to bring the system into compliance with DER effluent standards. The construction permit expired in January 1983, but Trans/Circuits continued to operate. About one month after the construction permit expired, DER notified Trans/Circuits that it was violating the consent order by operating without DER authorization. The parties met to discuss the matter, and agreed that Trans/Circuits would cease operation for one week to conduct bench-scale testing to identify problem areas and possible corrective actions. Trans/Circuits did cease operation and conduct the testing as agreed. Trans/Circuits presented the data resulting from their bench scale testing to DER, and represented that it had identified problem areas that needed correction. DER evaluated the data and agreed to allow Trans/Circuits to operate for a limited time to gather plant effluent quality data which would form the basis for DER's decision whether to allow operation to continue. DER did not take enforcement action to have Trans/Circuits cease operation at that time because DER wanted to give Trans/Circuits time to show that it could comply with the effluent standards as it claimed it could. On March 23, 1983, DER notified Trans/Circuits that there had been a significant improvement in the plant's ability to produce effluent of acceptable quality, and DER authorized Trans/Circuits to make modifications in order to improve effluent quality. DER at that time gave Trans/Circuits authorization to operate for an indefinite period, with the condition that DER would rescind its approval if the program of sampling and system approval did not continue. Trans/Circuits accepted the authorization on DER's terms. On April 12, 1983, DER granted Trans/Circuits' month-to-month authorization to operate ". . . provided continued improvement is made in your system's operation and the Department can reasonably anticipate system compliance." This authorization was in response to a request from Trans/Circuits for 90-day temporary operating approval in order to demonstrate that the system could comply with state standards. By letter dated October 5, 1983, DER withdrew its authorization for month-to-month operation of Trans/Cirouits' facility because it believed that compliance with state standards could no longer be reasonably anticipated. Despite Trans/Circuits' best efforts, the facility was not in compliance and DER had no assurance that continued operation would bring the facility into compliance within a reasonable amount of time. Trans/Circuits has never ceased operation since DER withdrew its month-to-month operating approval. Trans/Circuits has not had a DER permit for construction or operation of the facility since the expiration of their last construction permit in January, 1983. At a meeting on December 1, 1983, Trans/Circuits' general manager admitted that he was aware that Trans/Circuits' was in violation of the terms of the consent order by continuing to operate without DER authorization. Analysis of Trans/Circuits' plant effluent for April 1983, shows that average lead levels were 0.21 parts per million (ppm) (or mg/l), average fluoride levels were 2.45 ppm, while average copper levels were 0.51 ppm. These were the effluent levels existing when Trans/Circuits was granted its month-to- month approval for operation. Since the month-to-month authorization was granted, the majority of Trans/Circuits' effluent samples have not complied with the DER standards for lead, copper, and fluoride. Since April 16, 1984, five percent or less of Trans/Circuits' effluent samples have complied with the effluent standards for lead and copper. In the week or two prior to hearing, the majority of effluent samples contained lead at a concentration of 0.2 to 0-5 ppm (with some higher), and contained copper at a concentration of between 2 and 3.5 ppm (with some higher). The most recent data available indicate that Trans/Circuits is not in compliance with the effluent standards for lead, copper and fluoride. Daily average effluent concentrations for lead and copper are significantly greater now than they were when DER issued its month-to-month authorization. Groundwater samples just outside Trans/Circuits' property show violations of the DER standards for lead. The evidence shows that Trans/Circuits effluent quality has not improved since April 1983. Effluent concentrations of lead and copper have actually increased significantly since October 1983, when DER withdraw its month-to-month authorization. Trans/Circuits does not even expect to know before December 1984, whether its present system can attain compliance with effluent standards. The Construction Permit Application On March 8, 1984, Trans/Circuits applied to DER for a permit to construct modifications and improvements to the existing Havviland wastewater treatment system. Although the stated purpose of the requested construction was to upgrade the system to achieve compliance with the Riviera Beach Sewer Use Code so as to allow a sewer tie-in, Trans/Circuits had abandoned that purpose by the time of the hearing. Trans/Circuits now seeks to upgrade the systems so that the effluent can comply with the applicable standards for discharge to ground water. When DER received the application, it was reviewed by a DER engineer to see if it was complete. The engineer determined it was not complete, and notified Trans/Circuits on April 6, 1984, that additional information was needed to complete the review process, all of which information was necessary to determine whether a permit should be issued for the requested construction. Trans/Circuits' general manager objected to the request for additional information, claiming that all the requested information was not necessary to review the application. However, at the request of Trans/Circuits' counsel, a meeting was held between representatives of Trans/Circuits and DER to discuss the request for information that was needed for review of the application. Trans/Circuits thereafter, withdrew their objections, and agreed to provide the requested information. Trans/Circuits responded to DER's request for additional information on June 27, 1984, at 3:30 P.M. the day prior to hearing. Trans/Circuits delivered a packet of information to DER at that time that purported to be the requested information. Also at that time, however, Trans/Circuits told DER that it had already performed some of the construction for which a permit was sought, and that it was not sure what, if any, of the remaining construction would be undertaken. The information that was submitted to DER was not all of the information requested by DER. No flow diagram was submitted and waste effluent analysis was lacking. Without this information, it is impossible to determine whether or not reasonable assurance has been provided by Trans/Circuits that DER standards will be met. Even if all of the requested information had been submitted, DER could not issue a construction permit to Trans/Circuits because its future construction plans are now only speculative. Trans/Circuits does not know what modifications it intends to construct, or when exactly such modifications will be made. All that is certain is that Trans/Circuits does not intend any longer to construct the modifications for which it made application. DER evaluates applications to determines whether all proposed modifications works as a system. Trans/Circuits is the applicant for this permit and has the burden of showing that it is entitled to issuance of the permit. Here Trans/Circuits failed to present any evidence of what construction it actually plans to do, let alone that the purposed construction meets the criteria and that it is entitled to the permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered by the State of Florida Department of Environmental Regulation: Denying Trans/Circuits application for an operation permit; Denying Trans/Circuits application for a construction permit; and Withdrawing the month-to-month authorization for Trams/Circuits' operation. DONE and ENTERED this 19th day of September, 1984, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 1984.

Florida Laws (3) 120.57403.031403.088
# 3
GRADY PARKER vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-004411 (1997)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 19, 1997 Number: 97-004411 Latest Update: Oct. 30, 1998

The Issue Whether the costs incurred by the Department of Environmental Protection, Bureau of Emergency Response (Department) in connection with its response to Incident Number 95-SE-0371 may be recovered from Petitioner pursuant to Chapter 376, Florida Statutes.

Findings Of Fact Based upon the evidence adduced at hearing and the record as a whole, the following findings of fact are made: The Department is a state regulatory agency charged with the responsibility of administering and enforcing the provisions of Chapters 376, Florida Statutes. At all times material to the instant case, Petitioner has been the owner of a fenced and gated parcel of land, approximately one acre in size, located at 960 Old South Dixie Highway in an industrial area of Jupiter, Florida (Petitioner's Property or Property). Before the incident which is the subject of the instant proceeding (Incident), Petitioner had used the Property to store equipment used in his asphalt paving business. Petitioner removed the equipment from the property in December of 1989, when he moved his business operations to a new location in west Jupiter. Underground tanks that Petitioner had installed on the Property to store diesel fuel used in his asphalt paving business were also removed when Petitioner's business relocated. Groundwater tests were conducted in May of 1990, after the tanks were removed. The results of these tests revealed the absence of any pollutants. Following the relocation of his business to west Jupiter, Petitioner began renting the Property to Schmidt's Auto Body (Schmidt's), an automobile repair business located next to the Property. The rental agreement (which was not in writing), at Petitioner's insistence, included the requirement that Schmidt's maintain the Property and keep it clean. Schmidt's used the Property to store vehicles that needed to be repaired or towed elsewhere. To allow it easier access to Petitioner's Property, Schmidt's built a gate in the fence separating its business from the Property. After Petitioner relinquished possession of the Property to Schmidt's, the Property was used by others, acting without Petitioner's approval or authorization, as a dumping ground for abandoned personal property. Petitioner is now, and has been at all times material to the instant case, legally blind and in failing health. Due to his blindness and poor health, Petitioner had been, prior to the Incident (and he has remained), unable to personally inspect the Property to ascertain Schmidt's compliance with the rental agreement's requirement that it maintain the Property and keep it clean. Petitioner's wife passed by the Property each month when she visited Schmidt's to collect rent for Petitioner, but she did not closely inspect the Property on these visits. There is no evidence that Petitioner was made aware, by his wife or anyone else, that his Property (which was fenced) was being used as a dumping ground. On September 8, 1995, the day of the Incident, the Jupiter area experienced an unusually heavy rain event and resultant flooding and ponding of water in some spots, including locations on and around Petitioner's Property. Depressions in portions of Petitioner's Property contained standing water, although the entire property was not flooded. At approximately 10:30 a.m. on September 8, 1995, Ann Meador, an Emergency Response Coordinator with the Department, received a report (from Palm Beach County Risk Management) of two 55-gallon drums leaking asphalt sealant on Petitioner's Property. Meador was initially told that the "situation was being handled" by Palm Beach County Risk Management, but she was later advised otherwise. Meador arrived on the scene at approximately 3:00 p.m. that same day (September 8, 1995) and served as the Department's on-scene coordinator. Upon arriving on the scene, Meador observed two 55-gallon drums which had unsecured lids and were rusted and in otherwise poor condition. One of the drums was labelled "asphalt sealant.“ (Although Petitioner was in the asphalt paving business, he did not use asphalt sealant for any of the work he performed.) Petitioner was not in any way responsible for the drums being on the Property. In fact, at no time prior to the Incident, did he even know that the drums were there. The heavy rains had caused the contents of the drums (product) to overflow. Approximately 85 gallons of product, mixed with water, had spilled onto the ground. Stormwater runoff had carried some of the product to a depression in an unpaved road adjacent to the Property and near a storm drain. Meador reasonably believed that the drums and the spilled product should be removed immediately to avoid the possibility that, with additional rainfall, the product would spread to other areas. After having learned that Petitioner was the owner of the property on which the drums were located and having obtained his telephone number, Meador called the number to inform Petitioner of the leaking drums on his Property. The person to whom Meador spoke identified himself as Petitioner. He told Meador, upon being advised that the drums and product needed to be removed from the Property, that he was not "going to do anything." Following this telephone conversation, Meador hired OHM Remediation Services, Inc. (OHM), a qualified emergency response contractor with whom the Department had a contract, to remove the drums and product (as well as the water and soil the product had contaminated) from the Property and to properly dispose of these items. OHM, in turn, contracted with Magnum Environmental Services (Magnum) to perform these services (as a subcontractor). Magnum personnel responded to the scene and performed these removal and disposal services. To determine the most appropriate means of disposal, samples of the product were collected and analyzed. The analysis revealed that the product was a petroleum derivative. Magnum properly disposed of the drums based upon the results of its analysis. The Department paid OHM $12,033.03 from the Water Quality Assurance Trust Fund for the services Magnum performed (as OHM's subcontractor). In requesting that these services be performed and in paying $12,033.03 for the performance of these services, the Department acted reasonably and prudently. The Department reasonably incurred other expenses (also paid from the Water Quality Assurance Trust Fund) totaling $461.91 in connection with its response to the Incident. The total amount the Department paid from the Water Quality Assurance Trust Fund to have the leaking drums and product (as well as the water and soil the product had contaminated) properly removed from Petitioner's Property and disposed of was $12,497.94. 2/ The Department is requesting that Petitioner reimburse the Department for these costs.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered by the Department finding that Petitioner is not liable for the costs the Department incurred in responding to Incident Number 95-SE-0371. DONE AND ENTERED this 28th day of August, 1998, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 28th day of August, 1998.

Florida Laws (9) 120.57373.308376.21376.30376.301376.307376.308377.1995.11
# 4
GLORIA S. ELDER vs CARGILL FERTILIZER, INC.; FORT MEADE MINE; AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 92-006215 (1992)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Oct. 16, 1992 Number: 92-006215 Latest Update: Jul. 22, 1993

Findings Of Fact At all times pertinent to the issues herein, Respondent, Cargill, a Delaware corporation authorized to do business in Florida which owned and operated a phosphate mine near Fort Meade, located in Polk County Florida. Petitioner, Gloria Elder, owns residential property adjoining the Fort Meade Mine on which she maintains an individual water well for domestic and other purposes. The Respondent, District, has the responsibility for regulating the consumption and conservation of ground and surface water within its jurisdictional limits, including the well in question. For a period prior to December, 1990, Cargill had been operating under consumptive use permit No. 202297.04, issued by the District, which provided for average daily withdrawals of 12.0 MGD from wells on its property. In addition to the 12.0 MGD, Cargill also was utilizing an additional 3.3 MGD for mine pit and surficial aquifer dewatering activities which did not have to be reflected in the permit but which were lawful uses. In December, 1990, Cargill submitted its application to renew the existing water use permit with a modification including the 3.3 MGD previously being used but not officially permitted. No additional water would be drawn from the permitted wells as the newly applied for 15.3 MGD was the total of the 12 MGD and 3.3 MGD previously permitted and lawfully used. After reviewing the additional information requested of Cargill pertaining to this application, the District published its Notice of Proposed Agency Action for approval of the permit. The proposed permit authorizes withdrawal of the amount requested in the application, 15.3 MGD, the exact same amount actually withdrawn under the prior permit. As a part of the proposed permit the District imposed two special conditions. These conditions, 12 and 13, require Cargill to conduct its dewatering activities no closer than 1,500 feet to any property boundary, wetlands, or water body that will not be mined or, in the alternative, to mitigate pursuant to conditions 12 and 13 any activities conducted within the 1,500 foot setback. There are no reasonable alternatives to Cargill's request. The mining process in use here utilizes a water wash of gravel-size phosphate ore particles out of accompanying sand and clay. The water used for this purpose is recycled and returned to the washer for reuse. The resulting phosphate ore mix, matrix, is transported with water in slurry form to the refining plant. This system in the standard for phosphate mining in the United States. Once at the plant, the slurry is passed through an amine flotation process where the sand and phosphates are separated. This process requires clean water with a constant Ph balance and temperature which can be retrieved only from deep wells. Even though the permit applied for here calls for an average daily withdrawal of 15.3 MGD, typically the Cargill operation requires about 10.08 MGD from deep wells. This is a relatively standard figure within the industry. Approximately 92 percent of the water used at the site in issue is recycled. However, recycled water is not an acceptable substitute for deep well water because it contains matters which interfere with the ability of the chemical reagents utilized in the process to react with the phosphate rock. Therefore, the quantity sought is necessary and will support a reasonable, complete mining operation at the site. The Cargill operation is accompanied by a strenuous reclamation operation. Land previously mined near the Petitioner's property has been reclaimed, contoured, re-grassed and re-vegetated. This project was completed in 1990. No evidence was introduced showing that Cargill's operation had any adverse effect on the Elders' well. Water samples were taken from that well at the Petitioner's request in May, 1991 in conjunction with the investigation into a previous, unrelated complaint. These samples were submitted to an independent laboratory for analysis which clearly demonstrated that the minerals and other compounds in the water from the Petitioner's well were in amounts well below the detection level for each. Only the iron level appeared elevated, and this might be the result of deterioration of the 18 year old black iron pipe casing in the well. Another possible explanation is the fact that iron is a common compound in that part of the state. In any case, the installation of a water softener would remove the iron, and there is no indication the water would have any unacceptable ecological or environmental impacts in the area either on or off the site. No other residents in the area have complained of water quality problems. Petitioner claims not only that Cargill's operation would demean her water quality but also that its withdrawal will cause a draw down in the water level in her well. This second matter was tested by the District using the McDonald-Haurbaugh MODFLOW model which is well recognized and accepted within the groundwater community. The model was applied to the surficial, intermediate, and upper Floridan aquifers and indicated the draw down at the property boundary would be less than one foot in the surficial aquifer and less than four feet in the intermediate aquifer. The model also showed the draw down at the Petitioner's well would be less than three feet, which is well within the five foot criteria for issuance of a consumptive use permit under the appropriate District rules. This evidence was not contradicted by any evidence of record by Petitioner. All indications are that the water use proposed is both reasonable and beneficial, is consistent with the public interest, and will not interfere with any existing legal use of water.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore recommended that WUP Permit No. 202297.05 be renewed as modified to reflect approval of 15.3 MGD average daily withdrawal. Jurisdiction will remain with the Hearing Officer for the limited purpose of evaluating the propriety of an assessment of attorney's fees and costs against the Petitioner and the amount thereof. RECOMMENDED this 29th day of April, 1993, in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of April, 1993. COPIES FURNISHED: Joseph N. Baron, Esquire 3375-A U.S. Highway 98 South Lakeland, Florida 33803 Rory C. Ryan, Esquire 200 South Orange Avenue Suite 2600 Post office Box 1526 Orlando, Florida 32801 Martin D. Hernandez, Esquire Richard Tschantz, Esquire 2379 Broad Street Brooksville, Florida 34609 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (3) 120.57120.68373.223 Florida Administrative Code (1) 40D-2.301
# 5
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs GOODSON FARMS, INC., 02-001117 (2002)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Mar. 19, 2002 Number: 02-001117 Latest Update: Dec. 16, 2002

The Issue The issue is whether Respondents should be subject to civil penalties and required to submit a Compliance Plan for the reasons stated in the Administrative Complaint and Order filed on January 8, 2002.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this enforcement action, Petitioner, Southwest Florida Water Management District (District), proposes to assess civil penalties against, and require a compliance plan from, Respondents, Balm Associates, Inc. (Balm) and Goodson Farms, Inc. (Goodson), on the grounds that from March 1999 through July 2001 they made water withdrawals from certain property in Hillsborough County, Florida, without a water use permit, and after a permit was obtained in August 2001, they continued to exceed the annual average daily withdrawals authorized under the permit through the month of November 2001, or just prior to the preparation and issuance of the Administrative Complaint and Order (Complaint).1 While not denying that excessive pumpages may have occurred, and that a permit was not obtained until August 2001, Balm points out that it is the owner-lessor of the property and not the consumptive user of the water, and contends that the District has no authority to enforce its rules against, and recover civil penalties from, the non-user of the water. In its request for a hearing, Goodson did not specifically dispute the allegation that it consumed water without a permit, or exceeded the withdrawal limits under the new permit, but contended instead that the limits were unrealistic and should be modified. At the final hearing, however, Goodson disputed the accuracy of the water consumption figures used in the Complaint. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries and to administer and enforce Chapter 373, Florida Statutes. Balm is a corporation registered to do business in the State of Florida. Its mailing address is 2101 Huntington Avenue, Sarasota, Florida 34232. It owns approximately 220 acres of land in Section 28, Township 31 South, Range 21 East, in Hillsborough County, Florida, which is the site of the alleged wrongdoing. Goodson is a corporation registered to do business in the State of Florida. Its mailing address is Post Office Box 246, Balm, Florida 33503. Goodson is in the farming business and operates a total of 13 farms, including the farm at issue in this proceeding. Permit Requirements Under Rule 40D-2.041(1), Florida Administrative Code, a water use permit is required whenever total withdrawal capacity from any source or combined sources is greater than or equal to 1,000,000 gallons per day (gpd); annual average withdrawal from any source or combined sources is greater than or equal to 100,000 gpd; or withdrawal is from a well having an outside diameter of 6 inches or more at the surface. Rule 40D-2.351(1), Florida Administrative Code, provides that a permittee must notify the District within 30 days of the sale or conveyance of permitted water withdrawal facilities or the land on which the facilities are located. The same rule also provides that where a permit has been issued to a party whose ownership or legal control of the permitted water withdrawal facilities subsequently ends, the party who assumes control over the facilities may apply to transfer the permit to himself or herself up to the renewal date of the transferor's permit. Finally, Rule 40D-2.351(2), Florida Administrative Code, provides that until a permit is transferred or a new permit is obtained, the party subsequently controlling the permitted water withdrawal facilities will be in violation of District rules for making withdrawals without the required permit. History of Permits on the Property On September 29, 1989, the District issued Water Use Permit No. 207135.001 (the .001 permit) to James Brown (Brown) and B & T Growers Partnership (B & T) for water withdrawals from one well for agricultural purposes on Balm's property. The .001 permit authorized annual average withdrawals of 102,000 gpd of groundwater for agricultural irrigation. On August 29, 1990, the District adopted new rules applicable to District permits within the Eastern Tampa Bay Water Use Caution Area (ETBWUCA). The .001 permit was within the ETBWUCA, and Brown and B & T were provided with a Notice of Permit Modification and new Permit Conditions. The new conditions became effective November 15, 1990. New Condition No. 5 provided that By July 31, 1995, all permitted withdrawal points shall be equipped with totalizing flow meters or other measuring devices as approved in writing by the Director, Resource Regulation Department. Such devices shall have and maintain accuracy within five percent of the actual flow installed. On December 14, 1992, the District approved the transfer of the .001 permit from Brown and B & T to B. Kenda Produce. The Unpermitted Water Withdrawals On June 30, 1997, Goodson entered into a two-year agricultural lease with Balm to use a portion of the property, including acreage previously used by B. Kendra Produce. At the time the lease was entered into, neither Respondent applied to the District to have the .001 permit transferred from B. Kendra Produce. It can be reasonably inferred from the evidence that after the first lease expired, the parties continued to execute new lease agreements at least through the time of the hearing. The portion of the property which Goodson leased and farmed is referred to as the "Sweat Loop Farm" and consists of approximately 100 acres. There is one well with an outside diameter of 10 inches at the surface located on the Sweat Loop Farm. The well's total withdrawal capacity is approximately 1,500 gallons per minute (gpm), which is over 1,000,000 gpd. Thus, withdrawals from the well required a water use permit. As noted earlier, Goodson operates a total of 13 farms on approximately 2,500 acres of land. There are approximately 15 wells on all 13 farms, including the Sweat Loop Farm. Michael E. Hare, an irrigation supervisor who is responsible for the irrigation of all 13 of Goodson's farms, installed a total of approximately 8 meters on the farms, including the meter on the Sweat Loop Farm. A totalizing flow meter, which was made by MiCrometer, was installed at the Sweat Loop Farm in June 1997. Mr. Hare acknowledged that he was familiar with MiCrometer meters and would be aware if the MiCrometer flow meter on the Sweat Loop Farm was not functioning properly. Whenever metering devices on the various Goodson farms have malfunctioned in the past, Mr. Hare has taken the malfunctioning meter to a metering company to be fixed. Goodson began irrigating the Sweat Loop Farm in June 1997. Since that time, Goodson has been the sole water user of the well on the farm. In March 1999, Goodson began submitting to the District monthly pumpage reports for the groundwater withdrawals on the Sweat Loop Farm. Although some unmeasured withdrawals presumably occurred prior to March 1999, the Complaint does not identify these as being a violation. Mr. Hare and other supervisors are responsible for collecting the meter readings which go on the monthly pumpage reports and providing them to the District. The information on the reports includes the permit number; the last month's meter reading; the current month's meter reading; the total gallons of water pumped for the current month; the meter total; and the meter factor. To determine the average daily withdrawal on the Sweat Loop Farm, the District relied upon the calculations provided by Goodson as to the total gallons of water pumped for the month and divided this number by 30 days. From March 1999 through July 2001, these quantities were as follows: MONTH/YEAR AVERAGE DAILY PUMPAGE March 1999 April 1999 531,487 No data available May 1999 364,930 June 1999 0 July 1999 0 August 1999 57,410 September 1999 49,563 October 1999 222,667 November 1999 250,667 December 1999 755,003 January 2000 689,433 February 2000 695,073 March 2000 544,427 April 2000 305,153 May 2000 597,720 June 2000 0 July 2000 62,120 August 2000 86,370 September 2000 123,233 October 2000 602,020 November 2000 409,550 December 2000 145,823 January 2001 957,690 February 2001 890,213 March 2001 391,280 April 2001 467,640 May 2001 617,177 June 2001 0 July 2001 0 Under Rule 40D-2.041(1)(a)-(c), Florida Administrative Code, a water use permit was required for Goodson's withdrawals since the well's total withdrawal capacity is approximately 1,500 gpm, which is greater than 1,000,000 gpd; the annual average withdrawals exceeded 100,000 gpd; and the well has an outside diameter of 10 inches at the surface. The withdrawals on the Sweat Loop Farm were not authorized by the .001 permit since neither Goodson or Balm was a permittee under the permit. Even if Goodson could rely on the permit, which it cannot, pumpage data provided by Goodson reflects that the water withdrawals (except for nine months) were in excess of that authorized by the permit. On June 16, 2000, the District mailed a Notice of Non-Compliance for excessive water withdrawals to Goodson. The Notice indicated that if the pumpage values submitted by Goodson were incorrect, Goodson was to explain the error and provide corrected quantities. On June 26, 2000, the District received a written response to the Notice of Non-Compliance from the superintendent of the Sweat Loop Farm who indicated that the pumpage values were correct, and that the excess usage was due to a "serious drought condition" which had caused a "significant financial hardship on [the] farm." The response also indicated that Goodson would contact Mr. Haftel, owner of Balm, to request that he "revise the water use permit for spring crops." On November 22, 2000, the District mailed Goodson a Notice of Violation indicating that the quantities authorized by the .001 permit were still being exceeded and that the District might seek monetary penalties if Goodson failed to come into compliance within 30 days. Despite the foregoing Notice, Goodson continued to make withdrawals without a permit and in excess of the quantities formerly authorized under the .001 permit until August 2001 when a new permit was finally obtained. Issuance of a New Water Use Permit On January 2, 2001, the District received an application for a General Water Use Permit seeking to modify the .001 permit to increase the withdrawal quantities and to transfer the permit from B. Kendra Produce to Balm. "Seymour Haftel/ Balm Associates, Inc." was listed as the applicant, and "Donn Goodson" from " Goodson Farms" was listed as the contact or consultant. Mr. Haftel signed the application on behalf of Balm. Goodson assisted Balm in securing the permit for the Sweat Loop Farm because Goodson wanted more water for irrigation purposes. Section 2.1 of the Basis of Review for Water Use Permit Application, adopted and incorporated by reference by Rule 40D-2.091, Florida Administrative Code, provides that "[a]pplications for leased property, except property leased from the District, must be either a joint application in the name of the lessee and the property owner(s) or be only in the name of the property owner(s)." In a Request for Additional Information mailed to Balm on January 29, 2001, the District asked whether Goodson should be listed as co-applicant on the application. On April 27, 2001, Balm submitted a response which indicated that Goodson should not be listed as co-applicant. On August 6, 2001, the District issued Water Use Permit No. 200007135.002 (the .002 permit) to Seymour Haftel/Balm Associates, Inc. authorizing an increase in the annual average withdrawals to 224,300 gpd. The permit had an expiration date of September 29, 2009. The permit contained a number of special conditions, none of which were challenged by Balm. Unauthorized Withdrawals Under the .002 Permit Special Condition No. 2 of the .002 permit requires in part that the permittee: continue to maintain and operate the existing non-resettable, totalizing flow meter(s), or other flow measuring device(s) as approved by the Regulation Department Director, Resource Regulation, for District ID No(s), Permittee ID No(s)[,] G-1. Such device(s) shall maintain an accuracy within five percent of the actual flow as installed. Total withdrawal and meter readings from each metered withdrawal shall be recorded on a monthly basis and reported to the Permit Data Section, Records and Data Department, (using District forms) on or before the tenth day of the following month. In the event a permittee chooses not to use a totalizing flow meter, as required by Special Condition No. 2, the District will review information provided by the measuring device's manufacturer to determine if the measuring device would maintain a five percent accuracy as required by the Condition. The meters have to be monitored and calibrated periodically for accuracy. It is the permittee's responsibility to comply with the conditions of the permit, including Special Condition No. 2, which requires the submittal of accurate pumpage reports. Goodson submitted the meter readings on behalf of Balm beginning in September 2001, which covered the withdrawals for the month of August 2001. The District relied on the meter readings submitted by Goodson to determine the annual average daily pumpage calculation for the .002 permit. The calculation is a running 12-month average, whereby each month the annual average daily quantity is recalculated based on the previous 12-month pumpage. The running annual average daily pumpage and percentage of pumpage which exceeded the .002 permit from August 2001 through May 2002 are as follows: MONTH/YEAR ANNUAL AVERAGE DAILY PUMPAGE PERCENTAGE OVERPUMPED August 2001 378,462 69 percent September 2001 382,622 71 percent October 2001 376,687 68 percent November 2001 383,008 71 percent December 2001 379,212 69 percent January 2002 327,343 46 percent February 2002 321,530 43 percent March 2002 350,701 56 percent April 2002 356,013 59 percent May 2002 338,131 51 percent As the foregoing data reflects, the withdrawals from the Sweat Loop Farm were in excess of that authorized by the .002 permit from August 2001 through May 2002.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order determining that Respondents are guilty of the charges in its Administrative Complaint and Order except as concluded in paragraph 48 above and endnote 2 below; that Respondents be required to submit an acceptable written plan (Compliance Plan) to the District for its consideration and approval within fourteen days after entry of the final order; that the Compliance Plan describe how Respondents shall achieve full compliance with the .002 permit; that the Compliance Plan include reductions in withdrawals, water conservation measures, and development and utilization of alternative resources; that the Compliance Plan establish deadlines for implementation and completion of corrective actions; that full compliance be achieved within 120 days after entry of the final order; and that any failure of Respondents to comply with any provision of the Compliance Plan shall constitute a violation of the final order. DONE AND ENTERED this 30th day of July, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 2002.

Florida Laws (5) 120.56120.569120.57373.119373.219
# 6
J. P. WARD vs. OKALOOSA COUNTY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-005147 (1988)
Division of Administrative Hearings, Florida Number: 88-005147 Latest Update: Jun. 01, 1989

The Issue Whether Okaloosa County has provided reasonable assurances that its proposed sewage treatment plant and an associated reclaimed water reuse system will not cause pollution significantly degrading the waters of the unnamed stream on the project site and/or the Santa Rosa Sound and that therefore the County's application for a permit to construct such facilities should be granted on the basis of assurances of compliance with applicable rule and statutory criteria.

Findings Of Fact On October 16, 1987, Respondent, Okaloosa County, submitted an application to Respondent, Department of Environmental Regulation, to construct a wastewater treatment plant and related reclaimed water reuse facilities on a site located in southwestern Okaloosa County. The Petitioner is an individual citizen residing in Okaloosa County, Florida. He is the owner of real property which adjoins the northern boundary of the proposed project site. Mr. Ward has used this property as his principal residence for approximately 8 years. The proposed project site is located in southwest Okaloosa County contiguous to the western boundary of the County. The site comprises approximately 45 acres of land bounded on the west by Rosewood Drive and on the south by State Highway 98. The areas to the north and east are residential construction. The site is currently a densely wooded area vegetated with a variety of flora indigenous to the area. The site is essentially bisected by a small fresh water stream system which enters the site at the northwestern corner and runs diagonally to the southeastern corner where it flows through a series of culverts under State Highway 98. The stream system constitutes waters of the state subject to the Department's regulatory jurisdiction. In addition, there is an isolated wetland area of variable size in the northwestern section of the project site. The wetland area is not subject to the Department's regulatory authority. The stream system mentioned above intersects with another larger stream approximately 1000 feet southeast of the project site. These combined streams then meander into a tidal basin which empties into the Santa Rosa Sound approximately 2500 feet south of the project site. The Santa Rosa Sound has been designated as Class II waters of the state. The unnamed stream system on site, as well as the larger stream that it joins south of the site, are designated as Class III waters of the State. Southern Okaloosa County occupies a region of moderate elevation (0-70 feet above sea level) extending along a strip 10 or 15 miles wide along the coast of the Gulf of Mexico. Soils in this area are predominately fine sands low in organic matter. When dry, most of the soils have rapid internal drainage characteristics. The Plant The proposed plant is intended to treat sewage generated by the County's Western subregional service area. Initially, it will treat the flow currently handled by approximately 1400 septic tank systems and 9 package treatment plants within the area. The collection system which will transport the wastewater will be comprised of approximately 98,500 linear feet of 8 to 12 inch diameter gravity sewers. The transmission facilities to convey the raw wastewater from the new collection system will include the construction of approximately 29,400 linear feet of 4 to 10 inch diameter force main, 14 pump stations and approximately 32,100 linear feet of 8 to 12 inch diameter gravity interceptors. By the end of its first year of operation, the proposed facility is projected to receive and treat approximately 750,000 gallons per day ("GPD"). The projected flow through the wastewater facility in the year 2007 is 1,000,000 GPD. The proposed facility is best described as a 1,000,000 GPD capacity oxidation ditch treatment plant with nitrification and denitrification facilities. Reclaimed water reuse will be accomplished by a rapid infiltration basin system (RIB). Sludge from the system will be dewatered by a mechanical belt press system and disposed of at the County landfill. In order to address the question of potential odors which result from the operation of the plant, the facility was located as near the center of the property as possible in order to give as much buffer area as possible between the facility and the surrounding residential area. In addition, the design of the treatment facility incorporates a preprocess aeration tank equipped with an activated carbon airstripper system which is specifically designed to remove the odor from the wastewater influent. The treatment facility was also located near the center of the property in order to keep any noise resulting from the operation of the plant as far away from the surrounding area as possible. The plant utilizes noiseless gravity flow techniques and does not incorporate any blower or pump technology which usually cause a significant amount of noise in wastewater treatment plants. It is expected that the noise level from the operation of this facility would be less than the noise level generated from the traffic on State Highway 98 nearby. The plant is designed to minimize the adverse effects resulting from odors, noise, aerosol drift and lighting. The entire facility is enclosed by a fence. The facility is designed and does comply with the Florida Administrative Code requirements for protection from flooding. The proposed site is at a higher elevation than the established 100 year flood elevation for the area. The plant is designed so that every operational component of the plant has a backup system. The plant is equipped with an emergency generator capable of supplying sufficient power to operate the plant in the event of a power failure. The design of the plant complies with the standards provided by the Environmental Protection Agency for mechanical reliability. The information submitted for the Department's review in relation to the County's construction permit application addressed all the information required in Rule 17-6.037(10), Florida Administrative Code. The proposed plant facility is designed to leave a buffer zone approximately 200 feet wide between the reclaimed water reuse system and the stream system located on the project site. The construction plan prohibits any construction activities and/or clearing within the buffer area. This buffer area contains all the jurisdictional areas which are related to the stream system. The Treatment Process The waste treatment process proposed for this facility consists of secondary treatment, basic disinfection and pH control as defined in Rule 17- 6.060(1)(a)3, (c) and (d). The basic treatment process technology used in the proposed plant is described as a carousel activated sludge process. This process is a superior method of wastewater treatment because of its inherent stability, its reaction to shock and toxic loadings and the degree of process control that is available to the operator. The effluent limitations that the Department has established for this facility require that the effluent, after disinfection, contain not more than 20 mg/1 Biological Oxygen Demand ("BOD") and 20 mg/1 Total Suspended Solids ("TSS"). In addition, effluent standards require a basic level of disinfection which shall result in not more than 200 fecal coliform values per 100 ml of effluent sample. The chlorine residual in recovered water shall be maintained at 0.5 mg/1 minimum, after 15 minutes contact time at peak flow. The pH level in the effluent must be maintained in a range between 6.0 Q and 8.5. The County will be required to retain a Class B operator certified under the provisions of Chapter 17-16, Florida Administrative Code for day-to- day maintenance and operation of the treatment facilities. In addition, the facility must be staffed for a minimum of 16 hours per day, seven days a week by at least a Class C operator certified under the same provisions. A Class B operator shall be on call during all periods that the plant is unattended. At a minimum, the facility must produce reclaimed water which complies with water quality standards provided in Rule 17- 3.404, Florida Administrative Code, as it interacts with groundwater in the established zone of discharge ("ZOD"). The estimated ZOD is an area defined by the boundaries of the facility. These standards are essentially equal to drinking water standards provided in Rule 17-22, Florida Administrative Code. Because the soils under the site are rapid sands, the Department does not rely on them to significantly reduce total nitrogen in the reclaimed water through interaction with the soils and the groundwater table under the rapid infiltration basins. As a result, the proposed facility is limited to a Total Nitrogen limitation of 7 mg/1. This limitation is significantly less than the Department's rapid rate land application treatment standard for Total Nitrogen which is 12 mg/1 in the effluent, with no more than 10 mg/1 in the ground. The proposed plant is capable of producing the 7 mg/1 level under all flow conditions. The Rabid Infiltration Basins In conjunction with the County's application for a construction permit for the wastewater treatment plant itself, the County submitted an application for a reclaimed water reuse system construction permit for a system designed to handle the maximum plant discharge of 1,000,000 gallons of reclaimed water per day. The system is composed of a series of five rapid infiltration basins (RIB's) or percolation ponds designed to receive the daily reclaimed water loads from the operation of the plant and allow the water to percolate into the groundwater beneath the project site. The ponds are proposed to be used so that not all the ponds are working at the same time. On any given day, there will be 3 ponds receiving effluent from the plant and 2 ponds receiving no effluent. The proposed system of rapid infiltration basins is the best approach to effluent disposal on this particular site in consideration of a variety of site specific criteria. While the Department's adopted guidance standards for percolation pond location specifies that areas with average depths to the groundwater table of 10 feet or more are desirable, the guidance document provides that areas with lesser depths may be acceptable. Computer models using highest projected groundwater levels and highest reasonably projected mounding effects related to the effluent disposal system indicate that while at times there may be less than 3 feet of vertical separation between the top of the groundwater mounds beneath any one of the percolation ponds and the floor of those ponds, it is not expected that the groundwater level will intersect the bottoms of the infiltration basin and that an acceptable margin will be maintained. Initially, there was some dispute among Department staff concerning the suitability of the project site to handle the hydraulic loading rates proposed for the facility's pond system. After a significant amount of analysis of the relevant factors affecting site suitability in this regard and after Department staff managed to get the computer program which analyzes this data working properly, the relevant data indicates that the site is suitable for the proposed wastewater treatment plant as designed. Surface and Ground Water Impact The proposed facility is designed to meet applicable Department water quality standards necessary to prevent unacceptable degradation of the water quality in both the unnamed stream system on site and the Santa Rosa Sound. At the Department's request, the County had an independent study performed to assure that the operation of the facility would not have the effect of degrading nearby surface waters. This study, done by Larry Jacobs and Associates, supports the County consultant's projections that, under worst case conditions (highest observed groundwater levels plus maximum effluent loading), approximately 32,000 additional gallons per day of groundwater may enter the stream system as a result of operation of the RIB system. These studies were conducted to address the Department's concern about the potential for increased nitrogen loading into both the stream system and the Santa Rosa Sound as a result of increased groundwater contributions to the stream system on site. The effluent disposal study submitted by the County as part of its application concludes that, discounting any possible reduction of Total Nitrogen content of the effluent as it travels through the ground before its discharged into the stream system, the Total Nitrogen concentration of the groundwater predicted to reach the stream should be diluted at the lowest observed flow volumes in the system to a concentration of less than 1 mg/1 when it reaches the confluence of the two streams approximately 1,000 feet south of the project site. The projection is an improvement in surface water conditions when compared with currently observed average concentrations of Total Nitrogen in the stream system and Santa Rosa Sound of 1.24 mg/1. The performance of existing package plants in the area is generally poor. In fact, one treatment plant was ordered to close, forcing the relocation of residents in its service area. Another plant has continuing groundwater nitrate violations. In addition, the evidence shows that the performance of the septic tank systems in the area is not acceptable to the Environmental Protection Agency. The majority of the population is served by septic systems that fail under high groundwater conditions. The Director of the Okaloosa County Health Department has certified that 60% of the residents in the County West Service Area have failed septic tanks and that the remaining 40% have septic tanks in imminent danger of failing. Three of the eight existing treatment plants are under either Court or Consent orders to cease operations. The United States Environmental Protection Agency has found that the County West area has an immediate need to provide collection, transmission, and treatment facilities to protect surface and groundwaters and eliminate a public hazard. Existing concentration of Total Nitrogen in Santa Rosa Sound and the waterways on and adjacent to the site are attributed to discharge of inadequately treated wastewater from existing septic tanks, existing wastewater treatment plants and stormwater runoff in the area. It is unlikely that the nitrogen concentration in the Santa Rosa Sound will increase as a result of the operation of the proposed facility since whatever wastewater treated at the facility will be eliminated from discharging into the affected waterbodies from other, less efficient treatment facilities. The proposed facility design incorporates a total of seventeen monitoring wells or stations on and around the site. Two wells will monitor background groundwater quality upgradient from the percolation pond system. Twelve wells will monitor groundwater quality down gradient from the percolation pond system as it leaves the established zone of discharge. Two more stations will monitor surface water quality in the on-site system above and below the site. In addition, there is one intermediate monitoring well within the zone of discharge. Samples from these wells will be used to provide quarterly data reports to the Department indicating status of the following parameters in the ground water; water level, pH, BODs, Fecal Coliform, Total Nitrogen, Nitrate/Nitrate and Chloride. The surface water monitoring will provide annual data reports to the Department on the following parameters: Chemical/Physical - Total Nitrogen, Nitrate/Nitrate, Total Phosphorus, Dissolved Oxygen, Temperature and pH Biological Assessment - macroinvertebrate population per species, species diversity per square meter. These data reports will be submitted regularly to the Department in conjunction with operational monitoring data from the treatment plant to allow assessment of the impact of the plant operation on the environment and compliance with permit conditions. Clearly the County has provided reasonable assurances that the proposed plant and related facilities will not cause pollution significantly degrading the waters of the State.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order Granting the application of Okaloosa County to construct a wastewater treatment facility and related reclaimed water reuse system at the proposed site in southwestern Okaloosa County, Florida, and issuing permits in accordance with the conditions as set forth in the Department's Intent to Issue and draft permit dated August 1, 1988. DONE and ENTERED this 1st day of June, 1989, in Tallahassee, Florida. DIANNE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of June, 1989. APPENDIX Petitioner's paragraph 1 of his Proposed Findings of Facts (titled Closing Statement) did not contain any factual statements. The facts contained in paragraph 2 of Petitioner's Proposed Findings of Facts are subordinate. All the evidence contrary to the suitability of the Project site was explained by other more credible evidence. The facts contained in paragraphs 1-29 of Respondent's Proposed Findings of Facts are adopted in substance, in so far as material. COPIES FURNISHED: Ron Ward Qualified Representative For J. P. Ward 10 Rosewood Drive Mary Esther, Florida 32569 John R. Dowd, Esquire Representing Okaloosa County P. O. Box 404 Shalimar, Florida 32579 Steven K. Hall, Esquire Assistant General Counsel Representing the Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 (A Dale H. Twachtmann, Secretary State of Florida Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.57403.021403.086
# 7
GRADY PARKER LANDSCAPING AND PAVING, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-001646 (1989)
Division of Administrative Hearings, Florida Number: 89-001646 Latest Update: Jul. 06, 1989

The Issue Whether the Petitioner's request for variance should be granted.

Findings Of Fact Petitioner owns a parcel of land in Palm Beach, County on which is housed Petitioner's paving and landscapping business and which is zoned for industrial use. Petitioner intends to install a manufactured building for use as an office. To provide sewage treatment for the bathroom of the office, Petitioner had a septic tank designed and applied for a septic tank permit which was denied as was its variance request. As a result of a complaint, Petitioner was inspected in August, 1988, by the Palm Beach County Department of Environmental Resources Management and by the Florida Department of Environmental Regulation. Both inspections yielded citiations for soil contamination by oil and other hazardous waste. Petitioner represented that most of the infractions had been rectified by the date of the hearing in this matter and pledged full cooperation with the County and State rules. To oversee the operation of the business and assure that no further problems arose, Petitioner decided to establish its office on site. The closest sewage treatment plant is at full capacity and does not intend to provide service to the parcel in the near future. The adjoining properties are serviced by septic tanks. As such, the proof did not demonstrate that alternative methods of waste disposal were available to the site However, as part of its business operation, Petitioner does minor repair of its equipment on site and may include oil changes and other such services. Although Petitioner does not intend to pollute the groundwater and intends to use the proposed septic tank for office use only, the proof demonstrated that waste disposal into a septic tank from the maintenance and repair of its equipment could result in the disposition of prohibited hazardous waste into the groundwater. Further, the proof failed to demonstrate that the septic tank would be protected from use by those who handled the hazardous waste. Although the hardship, if any, caused by the denial of the variance was not caused by Petitioner and the proof failed to demonstrate reasonable alternatives of waste disposal, the potential for an adverse affect of the operation to the groundwater is great. Additionally, the proof failed to establish the ameliorating conditions of soil, water table or setback conditions or whether the property was platted prior to 1972. Accordingly, the denial of the variance was proper.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered denying the variance. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 6th day of July 1989. JANE C. HAYMAN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of July 1989. COPIES FURNISHED: Hattie Parker 160 Toneypenna Drive Jupiter, Florida 33468 Peggy G. Miller, Esquire Department of Health and Rehabilitative Services 111 Georgia Avenue Third Floor West Palm Beach, Florida 33401 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

# 8
DAVIS REFINING CORPORATION vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-005140 (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 14, 1991 Number: 91-005140 Latest Update: Sep. 09, 1993

The Issue Whether the Petitioner's applications for (1) a general permit to operate a used oil refining facility and 2) an operation permit to operate an industrial waste water treatment system, at the same facility, in conjunction with the used oil refining operation, should be granted.

Findings Of Fact Sometime in the 1950's George Davis, the owner and operator of Davis Refining Corporation, became interested in used oil recycling and refining. From that time on, Mr. Davis worked towards his dream of operating a used oil recycling and refining center by gradually accumulating the land and equipment to operate such a facility. In order to further his goal, Mr. Davis acquired property located at 2606 Springhill Road in Tallahassee, Florida. Eventually, Mr. Davis applied for a permit to construct an industrial waste water treatment system in conjunction with a used oil refining facility on the Springhill Road property. On January 21, 1986, the Department issued a construction permit to the Petitioner to modify and construct an industrial waste water treatment system. The construction permit was subsequently extended on three different occasions. The last extension, granted May 30, 1989, extended the construction permit to its full statutory limit of five (5) years. The final expiration date of the construction permit was January 20, 1991. Petitioner was notified of the expiration date by the Department. During the time of the construction permit, Mr. Davis constructed an industrial waste water treatment system and an oil recycling and refining facility on his property on Springhill Road. Less than sixty days prior to expiration of the construction permit for the industrial waste water treatment system, the Petitioner submitted an application for renewal of an operation permit. The Department received the application on January 10, 1991. Unfortunately, the application for renewal of an operation permit was not the correct form since the Petitioner never had an operation permit. The application was rejected by the Department because it was the incorrect form and did not have the required permit fee. In March of 1991, after the expiration of Petitioner's industrial waste water treatment construction permit, Petitioner filed the correct application for an industrial waste water treatment operation permit and submitted the required fee. The industrial waste water operation permit application was denied by the Department because it was incomplete and lacked the required reasonable assurances that the system would not be a source of pollution in violation of water quality standards or contrary to the public interest. On October 29, 1990, Petitioner submitted a Used Oil Recycling Facility General Permit Notification to the Department. By letter dated November 28, 1992, the Department timely denied use of a general permit to operate a Used Oil Recycling Facility because the application lacked the requisite reasonable assurances that the proposed operation of the facility would not discharge, emit, or cause pollution so as to violate water quality standards or be contrary to the public interest. Even though the construction permit has expired and no additional permits have been issued by the Department the Petitioner continues to accept used oil and oily industrial waste water from outside sources for treatment. Currently, the facility consists of a used oil refining plant, industrial waste water treatment system, and separator (coalescer) system and water treatment pond. Munson Slough separates the facility into two parts. The used oil refining portion of the facility together with the industrial waste water treatment system input and separator (coalescer) system are located on the east side of Munson Slough. The refining portion of the facility is immediately adjacent to the slough. The industrial waste water treatment pond is located on the west side of Munson Slough. The industrial waste water treatment pond is likewise immediately adjacent to the slough. The industrial waste water treatment system is an integral part of the used oil recycling operation. Used oil and oily waste water are accepted from outside sources and are put through the separator system to separate the oil from the water and other contaminants. The separated oil is then re-refined at the refinery. The remaining industrial wastewater contains oily materials, solids, and volatiles. The separated water is pumped through a pipe underneath Munson Slough to the industrial waste water treatment pond. Additionally, the surface and stormwater runoff from the refining facility on the east side of Munson Slough also goes through the same industrial waste water treatment system and is pumped into the waste water treatment pond. Runoff from the refinery contains various pollutants as well as pollutants from any spills occurring at the refinery. Both the general permit for the refining facility and the operation permit for the industrial waste water treatment system depend on the ability of the waste water treatment system and pond to adequately handle the waste water and runoff water from the refining facility without permitting leaks of the wastewater into the environment. The industrial waste water treatment pond is lined with soil cement. Soil-cement is not a common material used in the construction of industrial waste water pond liners and the Department's personnel is not familiar with the material and its ability to function as an adequate liner for an industrial waste water pond. The soil-cement is a sand-cement mix (10 percent). The sand-cement was intended to be layered to a depth of six inches on the sides and bottom of the pond. The evidence showed that portions of the liner achieve a six inch depth. However, the evidence did not show that the soil-cement's depth is consistent throughout the liner since no as-built plans or certification for the facility were submitted to the Department and the engineer for the project at the time of its construction was not called to testify on whether the pond was constructed according to the construction plans. The sand cement liner overlays a high clay content pond bottom. The estimated (not established) permeability rate of the sand-cement pond liner is 1/100,000,000 centimeters per second and is within the Department's parameters for the adequacy of a lining material if that material is shown to actually have such a permeability rate by the time the operation permit is applied for. No materials data was submitted to the Department which demonstrated that the sand- cement liner of the pond actually achieved the permeability rate of 1/100,000,000 centimeters per second or the deterioration rate of such a liner. Likewise, no expert witness was called to establish such facts. The small amount of information given the Department on the sand-cement liner in Petitioner's application for its construction permit for the facility is inadequate to establish the actual performance of the sand-cement liner for purposes of the operation permit. Water from the industrial waste water treatment pond is discharged to the City of Tallahassee's waste water treatment system. The City of Tallahassee requires the industrial waste water treatment pond water to be tested for water quality prior to discharge to the City's waste water treatment system. The City requires that the waste water pond be aerated for approximately four (4) hours before discharge to the City waste water treatment system. One function of the aeration is to "blow off" the volatile contaminants from a used oil refining operation which might be present in the ponds water prior to aeration. However, the results of one water quality test indicated the presence of volatile substances and nonvolatile substances consistent with petroleum product contamination. Unfortunately, the results of only one water quality test were presented at the hearing. No conclusions either for or against the Petitioner can be drawn from the results of one testing period. Therefore, such test results cannot be used to affirmatively establish reasonable assurances that the pond is not leaking. In an unprecedented effort to aid the Petitioner in getting approval of his applications, the Department agreed to accept Petitioner's submittals and assertions regarding the integrity of the pond's liner as reasonable assurance if several soil borings and their subsequent analyses did not reveal any indication of contamination from the pond to soil or ground water. One soil boring was obtained by Dr. Nayak and six soil borings were obtained jointly by Dr. Nayak and the Department from locations around the industrial waste water treatment pond for chemical analysis. Unfortunately, chemical analysis of the soil borings revealed the presence of contaminants consistent with contamination parameters for waste oil recyclers. Therefore leakage or improper discharge from the pond could not be ruled out and it fell to the Petitioner to demonstrate that the contamination found in the soil was not the result of leaks or discharge from the pond. Petitioner points to the fact that the pond is supposedly setting on an impermeable layer of clay. However, it is not unusual for the geological features of a site such as the one upon which the treatment pond is located to vary within the limited site area. The different sites of the soil borings around the pond revealed that the substrata differed between the bore sites. The Department's geological expert testified that, based upon his observation at the site, including observing and participating in the taking of soil samples from the borings, that groundwater contamination was likely. In short, it is impossible to determine the geological composition of the entire site by the one soil boring taken by Dr. Nayak or even by the six borings performed jointly by the parties. Dr. Nayak's testimony that he is able to determine the geological features of the pond site with one boring is not credible nor is Dr. Nayak qualified to make such an assessment even if such were an acceptable scientific method for making such determinations. Therefore, the evidence failed to demonstrate that the waste water pond is sited over an impermeable layer of clay. Moreover, even if it were, then any contaminated water improperly discharging through the bottom layer of the pond would migrate along the top of the clay until it reached Munson Slough and still be a pollution problem for water quality purposes. The Petitioner has not, at any time prior to or during the hearing, obtained any environmental background of the site. Nor was any such information introduced at the hearing. The on-site observation of the taking of soil bores, visual inspection of the site, and the chemical analysis of the soil samples taken from the borings are consistent with petroleum contamination resulting from the industrial waste water pond. There are procedures and courses of action which the Petitioner can pursue to address the apparent contamination problems and to demonstrate the reasonable assurances necessary to qualify for the required Department permit to operate the used oil recycling facility. The Department has made many suggestions to the Petitioner as to various methodologies that the Petitioner might employ in order to endeavor to provide reasonable assurances that the waste water treatment pond does not leak. These suggestions include emptying the pond and examining the liner, performing a materials balance calculation, or performing more soil borings sampling and testing, together with assembling additional hydrological data. However, other than chemical analysis of the soil borings, the Petitioner has not opted to pursue any suggested procedure for obtaining the desired permit and did not submit sufficient competent, substantial evidence of any credible or scientifically reasonable alternative explanations for the presence of indicator chemicals in the soil borings. In short, The Petitioner has not submitted sufficient evidence nor provided any reasonable assurance that the operation of the used oil recycling facility will not discharge, emit or cause pollution. The Petitioner also has not provided reasonable assurance that the operation of the used oil recycling facility will not violate water quality standards or be contrary to the public interest. Similarly, there was insufficient evidence and no reasonable assurance submitted or offered by the Petitioner that the industrial waste water treatment system could be operated without violating water quality standards or being contrary to the public interest. Therefore Petitioner is not entitled to either a general permit for a used oil recycling facility or an operation permit for the industrial waste water treatment system used in conjunction with the used oil facility.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is accordingly, RECOMMENDED that a Final Order be entered denying the Petitioner both the general permit to operate a used oil recycling facility and the operation permit for the industrial waste water treatment system without prejudice to reapplying for such permits. DONE and ENTERED this 9th day of September, 1993, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of September, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-5140 and 92-1560 The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 28, and 29 of Respondent's Proposed Findings of Fact are adopted in substance insofar as material. The facts contained in paragraphs 11, 15, 27 and 30 of Respondent's Proposed Findings of Fact are subordinate. The facts contained in paragraph 10 of Respondent's Proposed Findings of Fact were not shown by the evidence. Paragraphs 1 and 2 of the Petitioner's Proposed Findings of Fact were introductory and did not contain any factual matters. The facts contained in the 1st, 2nd and 7th sentences of paragraph 4 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. The facts contained in the 4th, 5th, 6th and 7th sentences of paragraph 5 of Petitioner's Proposed Findings of Fact are subordinate. The remainder of the paragraph was not shown by the evidence. The facts contained in paragraphs 3, 6, 7, 10, 12 and 13 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The facts contained in the 3rd and 5th sentences of paragraph 8 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. The facts contained in the last sentence of paragraph 11 of Petitioner's Proposed Findings of Fact were not shown by the evidence. The remainder of the paragraph is subordinate. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dr. S. K. Nayak 3512 Shirley Drive Tallahassee, Florida 32301 Candi Culbreath, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (4) 120.57120.68403.021403.087
# 9
JOHN E. PILCHER, PHYLLIS REPPEN, ET AL. vs BAY COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 90-000254 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 16, 1990 Number: 90-000254 Latest Update: Jan. 10, 1992

Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.

Florida Laws (5) 120.57120.68403.087403.088403.201