VENICE HOSPITAL, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-002738 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 02, 1990 Number: 90-002738 Latest Update: Aug. 30, 1990

Findings Of Fact Venice Hospital, a general acute care hospital offering 342 medical/surgical beds and 30 bed's for general psychiatric care, services a population of approximately 110,000 people in Southern Sarasota and Northern Charlotte Counties. Approximately 80% of its patients are covered by Medicare. This figure being higher than average, puts it somewhere in the top 5% of Medicare providers in Florida. The hospital's services are concentrated on geriatric patients and it is developing several programs devoted to that type of patient. It has recently received approval for nursing home development and operates a home health agency. Missing from the geriatric spectrum of services is the hospital based skilled nursing facility, (SNF), which is the subject of this action. Sarasota County currently has four med/surg hospitals, including Petitioner which is the only hospital in the Venice area. Petitioner has a licensed psychiatric unit which operates under separate rules and which is licensed separately but within the hospital cycle. The patients which are treated in that unit are of a different demographic make up than those treated in the med/surg beds and the staff which treats them is different. Petitioner completed a study of the potential need for SNF beds in the hospital which led to the conclusion being drawn by it that this service should be established. Mr. Bebee's review of the applicable rules and statutes indicated to him that the hospital could elect to designate a special care unit within the hospital without even having to go through Certificate of Need, (CON), review. A letter was submitted by the hospital to the Department on February 8, 1990, asking for an exemption from CON review for that project. Because no response to that letter was forthcoming, and because the hospital review cycle was fast coming up, on February 22, 1990, Mr. Bebee submitted a LOI to the Department seeking to convert 42 med/surg beds to a hospital based SNF facility at a cost of $310,000.00. After the LOI was sent, on February 26, 1990, Ms. Gordon-Girvin, on behalf of the Department, responded by letter to Bebee's inquiry letter, indicating the CON review process was a necessary part of the process for Petitioner's facility, but that the LOI and application should be filed in the next nursing home batching cycle by April 30, 1990. Shortly thereafter, by letter dated March 13, 1990, Ms. Gordon-Girvin rejected the LOI which Petitioner had submitted in the hospital cycle since, according to the Department, it was properly "reviewable under the nursing home review cycle rather than the hospital review cycle." Notwithstanding that rejection, and understanding the Department's position as to which cycle was appropriate, on March 26, 1990, Petitioner submitted its CON application for this project, modified to seek only 36 beds. By undated letter, the envelope for which was postmarked April 16, 1990, Ms. Gordon-Girvin declined to accept that application for the same reason she had rejected the LOI. Petitioner has since filed a CON application for the same project in the current nursing home cycle, on a nursing home application form. It did this to keep its options open but considers that action as being without prejudice to the application at issue. Though numerical bed need is not in issue in this proceeding, a brief discussion of general need is pertinent to an understanding of why Petitioner has applied for approval of this project. Petitioner is of the opinion that SNF beds within the hospital setting will provide better care for the patients than could be provided in a nursing home. Many of the patients in issue are receiving intravenous applications of medicines; taking antibiotics; require orthopedic therapy; or are in respiratory distress calling for ventilator or other pulmonary procedures. These patients need a continuing level of nursing care on a 24 hour basis but no longer qualify for a hospital continued length of stay. Petitioner currently has and is taking care of such patients in the facility, but would like to do so in a more organized, systematic manner which could be accomplished in a hospital based SNF. In addition, reimbursement rules dictate that patients no longer needing full hospital care but who remain in the hospital, become, in part, a cost to the hospital because no meaningful reimbursement is received for thatlevel of care. They would qualify for Medicare reimbursement, however, if the unit were designated and certified as a SNF. Medicaid does not recognize these beds as reimbursable because they are in a hospital. Certification for the hospital based SNF would be through the Health Care Financing Administration, (HCFA), and the Medicare program. To secure this certification, the hospital based unit would have to be a distinct part of the facility and not merely consist of beds scattered throughout the facility. Once certified, the unit is not referred to as a nursing home by HCFA or Medicare, but is classified as a hospital based unit. Because Petitioner sees this as a hospital project - a service that the hospital would be providing under its license, it chose to file for the approval in the hospital cycle rather than in the nursing home cycle. Bebee is familiar with the certification process for both hospitals and nursing homes. The latter is a lengthier process and is substantially different from that used for hospitals. In his opinion, it does not give the hospital based applicant the opportunity to properly justify the approval of a hospital based SNF since it deals more with the requirements of a community based facility. The nursing home form is highly structured whereas the hospital form makes it easier to identify and supply the appropriate supporting information for the project applied for. Further, Bebee does not consider the hospital based SNF bed in the same context as a community nursing home bed. The type of patient is not the same nor are the resources required to treat that patient. Petitioner has purchased a CON to construct a 120 bed community nursing home within the Venice area which will have some SNF beds in it. Nonetheless, because of the basic difference between the services, it still plans to pursue the hospital based SNF. A Florida Hospital Association study concluded that SNF in hospitals are different and there is a lack of this type of service in the hospitals throughout the state. This study, dated May, 1989, at Page 5 reads: Conversion of hospital beds to nursing home beds could improve the financial viability of hospitals, reduce purchasers' and consumers' health costs, and improve access to care for patients requiring higher levels of nursing care, [if they are needed and meet quality care requirements]. Bebee also points out that if this project is considered in the nursing home cycle rather than in the hospital cycle, it would result in a hospital competing with nursing homes which are seeking a different type of bed - community versus SNF. Current community nursing home bed need is set at 0. Petitioner's nursing home cycle application was filed under the "not normal circumstances" provision, but there may still be substantial contest. This type of litigation, he believes, adds unreasonably and unnecessarily costs and is a resultant financial burden to the hospital. Mr. Balzano, a health care consultant and Petitioner's other expert, confirmed and amplified the substance of Mr. Bebee's thesis. He compared hospital based SNFs with those in community nursing homes and found notable differences aside from the statutes and rules governing each. Petitioner's current beds are controlled under Chapter 395, Florida Statutes, and Rule 10D- 28, F.A.C. If some were converted to SNF beds under the pending application, they would still fall under the purview of that statute and rule. On the other hand, community nursing home SNF beds would be controlled by the provisions of Chapter 400, Florida Statutes, and Rule 10D-29, F.A.C. There is a substantial difference between them. Other differences are: Patients in hospital based SNF beds generally have greater nursing requirements than those in SNF beds in community nursing homes. Staffing in hospital based SNF is generally higher than in free standing nursing homes. The average stay is shorter in a hospital based SNF. Patients are not there for continuing care but for restorative care. The size of a hospital based SNF unit is generally smaller than that in a free standing unit. Costs are usually greater in a hospital based SNF unit reflecting the greater needs of the patient. Therefore, reimbursement is generally higher. Health services in the different systems are different and a comparative review would be difficult. The questions in the different application forms reflect a different approach and in the nursing home application, relate to residential type care. This is not the case in the hospital form. Costs relating to the use of an existing facility would be cheaper for the hospital based unit when compared with building a new nursing home facility. However, the costs of hospital construction are usually higher than nursing home construction though the quality of construction is generally better. The operating costs for the more complex services provided in a hospital based unit are higher and Petitioner would have trouble competing if reimbursement were based on the classification as a nursing home. Higher staffing levels and higher staffing costs in a hospital based facility would act in disfavor of that facility. The state generally looks with greater favor on projects for Medicaid patients. Hospital based units are not oriented toward that group and would, therefore, not be given the same consideration, as would be a nursing home which catered to Medicaid patients. The type of patient, (residential vs. subacute) has an impact. The hospital based unit provides treatment to the more acutely ill patient. SNF patients who need that higher degree of care would get it better at a hospital based facility which has greater resources to meet patient needs. Mr. Balzano feels it is unfair to compare the two types of properties. The differences in the programs would have an impact on the issue of need when comparative review is done. A SNF in the hospital setting is different but would be compared, if the nursing home cycle were used, against the total pool of community nursing home beds even though the patients are different and their need for services are different. Need methodology looks at historical utilization. Hospital based SNF patients turn over more frequently than do community nursing home patients and the occupancy level is not as high in the hospital based setting. This would bring the average occupancy rate in an area down and could affect the need for community beds across the board. It is also noted that hospital based SNF beds would not be appropriate to house community nursing home patients who could not be accommodated in a nursing home, and vice-versa. SNF patients could normally not be appropriately treated in a community nursing home because of their greater needs. If compared in a batched review, however, they would be considered together without that distinction being made. Since all other hospital services are reviewed under the provisions of Chapter 395 parameters as hospitals, Balzano sees it as inconsistent to review hospital based SNF beds under the nursing home criteria. He can find no statutory or rule provision requiring this. The Department has drafted a proposed rule on the subject but that proposal is presently under challenge. Further, Medicare considers hospital based SNF beds and community nursing home based SNF beds as different entities with the hospital based beds earning a higher reimbursement ceiling due to the increased services and the different type of patient. According to Mr. Balzano, in Florida, hospital based SNF beds account for 1/2 of 1% of all hospital beds. Nationwide the figure is 4%. Balzano feels this is because in Florida there is no criteria to judge need against and therefore these beds are compared to all nursing home beds. He considers this wrong, especially in a state where there is such a high percentage of elderly patients. It is, in his opinion, poor health planning, and when compared against other nursing homes, the hospital based SNF unit will always be at a disadvantage. The testimony of Ms. Sharon Gordon-Girvin, Director of the Department's Office of Community Health Services and Facilities, reveals the Department's rationale in its rejection of the Petitioner's LOI for the instant project and the subsequent return of its application. The application was rejected because there was no underlying LOI for the project. The LOI was initially rejected as having been filed in an inappropriate cycle, (hospital). The Department's policy, calling for applications for all extended care or hospital based skilled nursing facility beds to be filed in a nursing home batching cycle has been in place for an extended period going back before 1984. The Department looks at extended care beds and SNF beds as somewhat equivalent but different. The designation of extended care facility beds initially used by HCFA, (Medicare), in hospital situations is no longer applicable. Now, Medicare recognizes SNF beds in hospitals, but does not distinguish them from other types of hospital based beds. The service is considered the same and the patients must meet identical admissions criteria. The reasons relied upon by the Department, from a health planning standpoint, for reviewing applications for hospital based SNF beds in the nursing home cycle are: Medicare conditions of service and admission criteria are the same, and The State nursing home formula rule projects a need for all nursing home beds, (SNF and ICF) , and does not differentiate between type. Providers compete for the beds, not where they will be used or under what conditions. The mere need for special treatment such as ventilators or intravenous antibiotics is not controlling. If the patient does not need the acute care provided to hospital acute care patients, since a "subacute" status is no longer recognized by the state, it is the Department's position that that patient should be in intermediate care status. This position is incorporated in the Departments proposed rule which is currently under challenge. It had been elucidated, however, in both the 1988 and 1990 editions of HRSM 235-1, relating to Certificates of Need, where at section 9-5 in both editions the text reads: 9-5 Skilled Nursing Unite in Hospitals. Beds in skilled nursing units located in hospitals will be counted in the nursing home bed inventory, even though they retain their licensure as general medical surgical beds. In addition, the Florida State Health Plan for 1989 and for each year since 1984, has counted hospital based SNF beds in the nursing home bed inventory. The parties stipulated to that point. Ms. Gordon-Girvin admits that it is sometimes difficult for an applicant to apply for hospital based SNF beds on a nursing home application for, but claims that is as it should be. She asserts that the patients are the same, (disputed), and since, she claims, a hospital cannot provide the same services that a full service nursing home could provide, the applicants should be differentiated on the basis of services rather than patient category to justify the additional cost inherent in the hospital based setting. In short, she believes the current situation is appropriate since it requires the applicant, a hospital, to look more carefully at the terms and conditions of the services to be provided. In so far as this results in health care cost savings, her position is accepted. She also contends that the Florida Hospital Association study relied upon by Petitioner to support its position that hospital based SNF bed applications for distinct units cannot compete fairly against nursing homes in a comparative CON review, is not pertinent here considering it was prepared to examine an excess of hospital bed inventory and possible alternative uses as income sources. Regardless of the purpose of the study, absent a showing that it is unreasonably slanted or biased, its conclusions have not been successfully rebutted. Ms. Gordon-Girvin also contends that the low percentage of hospital based SNF beds as compared to total hospital beds is a positive result of the state's efforts to reduce costly services in favor of less costly alternatives. The Department has the exclusive charter to determine which services are to be reviewed and how the review is to be conducted. Even if the proposed rule formalizing the procedure questioned here is stricken, the policy currently being utilized by the Department would still be valid and appropriate. Psychiatric, substance abuse, and rehabilitation beds in hospital inventories are considered distinct from acute care beds, but are still classified as hospital beds because there are no reasonable alternatives for treatment of those conditions. With regard to those patients using hospital based SNF beds, however, the Department claims there is an alternative, the community nursing home based SNF beds. In further support of the Department's position, Amy M. Jones, the Department's Assistant Secretary for Health Care Facilities and an expert in facility licensing and certification in Florida, pointed our that the Department treats hospital based SNF beds and community nursing home SNF beds the same because: conditions of participation are the same and the Department wants to look at and compare similar activities in the same cycle, and pertinent statutes and rules both provide for comparison of similar beds and similar services. Section 395.003(4), Florida Statutes, defines the various types of hospital beds as psychiatric, rehabilitative, and general medical/surgical acute care beds regardless of how they are used. The HCFA Conditions of Participation call for certification of SNF beds as either a distinct part of another facility or as a free standing facility. The agency regulations, as outlined in The Federal Register for February 2, 1989, outlines the requirement that SNF beds in a hospital be surveyed just as are community nursing home SNF beds. Taken as a whole, it would appear that both federal and state regulatory agencies look at SNF beds, regardless of where located, as an integral part of a nursing home operation as opposed to a hospital operation.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered by the Department affirming its rejection of the Petitioner's Letter of Intent and CON application for the conversion of medical/surgical beds to SNF beds filed in the hospital batching cycle. RECOMMENDED this 30th day of August, 1990, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of August, 1990. APPENDIX TO RECOMMENDED ORDER IN CASES NOS. 90-2738 & 90-3575 The following constituted my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: Not a proper Finding of Fact. Accepted and incorporated herein as it relates to Petitioner's filing of the LOI and the CON application. The balance is background information and is not a proper Finding of Fact. 3.-6. Accepted and incorporated herein. Not a proper Finding of Fact but a statement of party position. Accepted and incorporated herein except for first sentence. Accepted and incorporated herein. Accepted. Accepted. &13. Accepted and incorporated herein. 14.&15. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. 18.-21. Accepted. Not a Finding of Fact but merely a restatement of the testimony. Accepted and incorporated herein. Accepted and incorporated herein. &26. Accepted and incorporated herein. Accepted. &29. Not a Finding of Fact but argument and a restatement of testimony. Not a Finding of Fact but argument. Not a Finding of Fact but a comment on the evidence. Accepted. Recitation of the witnesses testimony is accurate, but the conclusion drawn does not necessarily follow. Frequency of use does not necesarily determine the finality of the policy. Not a Finding of Fact but a comment on the evidence. Accepted as a presentation of the contents of the document. Accepted. Accepted as represented. 38.-40. Accepted and incorporated herein. 41. Accepted as a restatement of testimony. 42.&43. Accepted. Accepted. &46. Accepted. Accepted. Accepted. FOR THE RESPONDENT: 1.&2. Accepted and incorporated herein. 3. Accepted. 4.-6. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. COPIES FURNISHED: Richard A. Patterson, Esquire Department of Health and Rehabilitative Services 2727 Mahan Drive - Suite 103 Tallahassee, Florida 32308 Jeffery A. Boone, Esquire Post Office Box 1596 Venice, Florida 34284 Linda K. HarSris General Counsel DHRS 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power Agency Clerk DHRS 1323 Winewood Blvd. Tallahassee, Florida 32399-0700

Florida Laws (2) 120.57395.003
# 1
HEALTH CARE ASSOCIATES, INC., D/B/A SURREY PLACE OF MARION COUNTY vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-000691 (1987)
Division of Administrative Hearings, Florida Number: 87-000691 Latest Update: Jan. 08, 1988

Findings Of Fact By Stipulation it was agreed and it is found that Petitioner's Petition for Administrative Hearing to contest Respondent's initial decision to deny its application was timely filed. On July 15, 1986, Petitioner submitted a Certificate of Need application to construct a 60 bed community nursing home in Collier County, Florida. In December, 1986, this application was denied by the Respondent because of its determination that there was insufficient numeric need according to the rule bed need methodology and because of the low utilization rate of existing facilities in Collier County. The initial intent to deny was appealed by Petitioner which filed a request for formal administrative hearing. Before the matter could be heard, however, Intervenor, Lakeside, filed a Petition for Intervention which was granted by the former Hearing Officer. After the case was set for hearing, Respondent, DHRS, and Petitioner, Surrey, entered into a stipulation and agreement in which DHRS agreed to reverse its position and support Surrey's application at the final hearing and, pursuant to that agreement, on May 14, 1987, DHRS filed a Notice of Change of Agency Position. Health Care Associates was formed in May, 1977, by Dr. John A. McCoy, PhD, in conjunction with an associate, Stanford L. Hoye, each of whom owns 50 percent of the business. This company which, upon approval, will develop and manage the Surrey project, has been involved in the development of several nursing homes in Florida, all but two of which have been managed by the corporation upon development. At the present time, in addition to the instant project, Petitioner is developing three other nursing home projects in Florida at Live Oak, Bradenton, and Crystal River. Dr. McCoy was instrumental in obtaining Certificates of Need for nine of the nursing homes developed by his company. Two of those have not yet been licensed and of the seven remaining facilities, five have been sold by the corporation to other unrelated organizations. In each case, Dr. McCoy personally realized a profit on the sale. Petitioner proposes to build a 60 bed skilled nursing facility in Collier County at a projected project cost of $1,600,000.00. Approximately $250,000.00 of that figure will be utilized for land acquisition and site costs; $150,000.00 for furniture, fixtures, and equipment; $100,000.00 for architectural fees; and $1,100,000.00 for construction costs, insurance, non- movable equipment, and other items. The initial state agency action report on the application, rendered in late November, 1986, recommended the project be denied on the basis there was insufficient bed need shown and because of the low utilization of currently licensed and operating facilities. Nonetheless, on May 6, 1987, the Department changed its position and entered into a stipulation and agreement with the Petitioner, in which it agreed that no CON approved nursing home beds exist in Collier County; the District Health Plan indicates a need for an additional 143 beds in that county in the applicable planning horizon; the bed to population ratio in Collier County for the 65 and older population is the lowest in the Health Care District; and the age 75 and over population is expected to increase by 24 percent within the next three years. On the basis of these factors and others outlined in the stipulation, the Department concluded, inter alia, that Petitioner proposed the lowest total project cost and the highest Medicare and Medicaid commitment, and determined that Petitioner's application should be approved. Petitioner has identified two potential sites for construction of the facility, both located in North Naples. Both sites carry an asking price substantially in excess of the land acquisition estimates outlined in the application, and neither is currently zoned for the operation of a nursing home. Zoning changes or variances are available, but the cost of securing them may be high and time consuming. Albeit each site would be utilized for construction of not only the proposed nursing home facility but also its related personal care unit, Petitioner estimates that 60 percent of the cost of land acquisition would be apportioned to the nursing home component and 40 percent to the personal care unit. That being the case, one of the parcels would fall within the proposed land acquisition figure cited. DHRS District VIII has been divided into subdistricts for the purposes of planning for community nursing home beds. Subdistrict 2 of District VIII consists of Collier County, Florida. The methodology used by DHRS to determine the need for community nursing home beds in Florida is found in Rule-10-5.011, F.A.C. and it provides, among other things, that the need for proposed new community nursing home beds is to be determined based on a planning horizon three years in the future from date of application. In this case, the appropriate planning horizon is July, 1989, three years after Petitioner's application was filed. The population figures relied upon by DHRS for ages 65 through 74 and ages 75 and above for the period July, 1986 and July, 1989 as of the date of the filing of the application were: 131,642 and 79,661 as well as 148, 229 and 96,142, respectively. The need formula contained in the F.A.C. also requires that the application submitted for July batching cycles be based upon the number of licensed beds in the District as of the preceding June 1. On June 1, 1986, District VIII showed 4,600 licensed community nursing home beds of which there were 473 licensed community nursing home beds in Subdistrict 2. As of November 26, 1986, however, there were no approved community nursing home beds in Collier County, a portion of Subdistrict 2. Another factor to be considered in the methodology is the occupancy rate within the district. As of the application period, the occupancy rate in Collier County was 84.44 percent including the occupancy data for Moorings Park. Petitioner and DHRS urge that it is DHRS policy to utilize at the de novo hearing the latest population figures available at the time of the initial application. These figures, cited above, reflect a 55 bed need in Collier county for the period July, 1989. There is, in addition, a factor which Petitioner urges relating to the licensure report submitted by Americana Nursing Home, located in Collier County, which indicates that a number of that facility's semiprivate rooms were converted to private rooms, thereby reducing the number of beds available for use in District VIII during the relevant time period. When this factor is incorporated into the calculations, a higher occupancy rate is indicated which results in a bed need of 66 rather than 55. Intervenor contests any adjustment made on the basis of Americana's conversion of some of its rooms from semiprivate to private rooms and a resultant decrease in the bed inventory thereby. It points out, and properly so, that former semiprivate rooms can be reconstituted as such in a very short period of time if needed and though the beds may not be set up when the room is a single room, the facility is capable of providing those additional beds without further approval when necessary. The removal of those beds, therefore, from the inventory, as a result of a temporary conversion is not an appropriate methodology. It has not been followed by DHRS in the past nor is it provided for in the rule and it should not be done here. Turning to the question of the population estimates and projections appropriate to make the proper calculation of numeric need for the area at the proper time, Intervenor objects to Petitioner's and DHRS' use of the pertinent population projections existing at the time of application on the basis that at a de novo hearing, the proper and most appropriate approach to bed need analysis and calculation would require the use of the most current available statistics. Utilizing the most current population projections for the July, 1989 planning horizon results in a net numeric need for July, 1989 of 21 beds with an error possible to 22 beds. In addition, the occupancy rate would be reduced and in that regard, evidence indicates that occupancy rates in Collier County have been low since 1982. However, there has been a steady and continuous rise in that figure since that time and as of July, 1987, it was 91.1 percent. The date upon which licensed beds are to be counted is provided for specifically in the rule defining need methodology, but the date upon which approved beds are to be counted is not stated in the rule. Similarly, the times for which population data are to be considered is contained in the rule methodology, but the release date of official estimates and projections to be utilized is not specified. Likewise, though the time period for which occupancy rates of existing facilities are to be considered is specifically set out, the input to be utilized when calculating "average occupancy rate" within that time period is not specifically established. In any case, the average occupancy rate as stipulated in the rule methodology for the area has been, until recently, consistently lower than 90 percent which is the figure identified in the rule methodology. Based on all the above, then, it must be found that the more accurate and pragmatic calculation of need utilizing the most current projections and discounting the agency policy for which the agency has not established any firm rationale or justifiable basis, indicates no numeric need for additional beds in the District during the period set forth in the planning horizon. Even if use of the rule methodology does not result in a mathematical showing of bed need sufficient to justify award of a certificate of need, nonetheless such a certificate can be awarded if other conditions and other circumstances establish a need that requires satisfaction within the area and the planning horizon. There was some dispute regarding poverty rates within Collier County and evidence presented at the hearing tends to indicate that the poverty rate in Collier County for the 65 and older population group is generally the lowest in the state. Low poverty rates among the elderly generally coincide with low nursing home utilization since wealthier patients generally have available to them alternatives to inpatient nursing home care. Intervenor urges, and there is no evidence to contradict it, that there are currently available alternatives to nursing home care for wealthy patients not only in Collier County but within District VIII as a whole. The Health Services and Facilities consultant for DHRS who initially reviewed Petitioner's application felt approval was not appropriate at the time he did his analysis. However, since that time additional information has caused him to conclude the application should be granted. He has subsequently learned that two of the four nursing homes in Collier County, which account for more than 50 percent of the beds licensed, have "conditional" quality ratings and there are currently no beds approved for construction in the county even though the county is one of the fastest growing counties in Florida. On the basis of this information, he now agrees with the agency's determination to approve a certificate of need for 60 beds for Petitioner. Based on what Mr. May knows of the three applicants, in his opinion Petitioner is the most appropriate applicant to receive the award. In the Stipulation entered into between Petitioner and the agency, the parties adopted the District VIII Health Council projection of 143 beds needed for Collier County for the 1986 planning horizon. The quarterly nursing home report for the period April through June, 1987, reflects the status of previously issued certificate of needs and includes all reported approved beds up to the date of issuance. This report shows that as of June 30, 1987, two applicants from prior batches received a total of 81 beds which, when subtracted from the 143 identified bed need, still leaves a 62 bed net need. Turning from the question of numeric need to other considerations regarding the applicant in issue, there can be little doubt that the estimates for the design of the proposed facility and construction are appropriate. The figures in Tables 18 and 19 of the application are also appropriate and reasonable. The costs for the project appear to be accurate and appropriate and the completion forecast timetable appears to be more than ample. Mr. Philips, the Vice President in charge of construction lending for the mortgage company which proposes to finance construction of the facility, is familiar with not only the applicant's corporate financial statement, but also those of the two principals, Dr. McCoy and Mr. Hoye. In his opinion, both are capable of providing the initial financing and their operations statements show a history of successful business operation. The 11 percent proposed as an interest rate for the loan supporting the construction is reasonable if not liberal, and the 25 year duration of the loan is also reasonable as is the loan origination fee of two points. If the certificate of need is approved, the lender is ready, willing, and able to lend the applicant sufficient funds to complete construction. Intervenor's expert in nursing home budgeting and financial feasibility analysis, testifying in contravention of Petitioner's experts, believes that approval of Petitioner's operation would have a severe financial impact on the Intervenor's operation as a current provider resulting in a first year bottom line loss of approximately $235,000 and a second year bottom line loss of almost $300,000. It should be noted here, however, that these are not actual operating losses but a projected reduction in profit. These estimates are based on August, 1987 figures adjusted forward for inflation. In short, while the opening of Petitioner's facility may have a negative impact on existing facilities, it would not necessarily result in a deficit operation for any existing provider. This expert also has some difficulty with Petitioner's projections of financial feasibility in its own facility. For example, he questions the 15 percent census of Medicare patients based on the fact that currently Intervenor does not have any Medicare patients though it does accept them. He also considers the estimate of a 96 percent occupancy by the end of six months to be unreasonable, especially in Collier County. He believes Petitioner's proposed expenses are understated and there are inconsistencies between the staffing table and labor costs in that the nursing expense is understated and the hourly rates projected to be paid are much too low. He believes that the projected cash flow is overstated since there is no provision for a reduction of principal. There are, also, other possible negative aspects to approval of Petitioner's application. Intervenor's regional director, who is an expert in nursing home administration, believes that approval of Petitioner's application will have a direct adverse reaction on Intervenor's Lakeside operation in regard to services provided, staffing, and its own financial feasibility. With regard to staffing, there is currently a critical shortage of nurses in Collier County and this factor was confirmed by a representative of another facility in the area. Approval of Petitioner's facility might well worsen the problem. Other service personnel are also in short supply and approval of Petitioner's application will worsen this as well. If these personnel shortages materialize, it may result in a reduction of quality of care, but this is speculative and there is no direct evidence that this would happen. Lakeside's current license is rated as "standard" as opposed to "superior" and this is claimed to be directly related to the nursing shortage which resulted in the facility's inability to attract sufficient nursing personnel to merit a "superior" rating. The witness identified other apparent deficiencies in applicant's submission, but these are either of a minor nature or the subject of opinion or conjecture. In short, the only substantive objection sustainable is the prospective adverse effect on the cost of attracting qualified nursing personnel. Certain other projections by the applicant are considered to be unreasonable by Americana's Director of Operations, such as the 15 percent projection for Medicare patients. Currently Americana, which generally has between 13 and 23 beds open at any time, has 2 Medicare patients and this witness also feels that a 96 per cent fill up rate in 6 months is unreasonable. Based on his experience, Collier County had even a slower than normal fill up rate when compared to other areas of the state. Notwithstanding the negative testimony, there can be little question, and it is so found, that Petitioner would be able to provide quality care if its application were approved. Turning to the question of the relationship of this application to State and Local health plans, the bed need calculation has already been discussed above. That calculation is based on the state methodology. However, the state methodology may be substantially different than a need developed by reference to the local health plan. The local plan looks at need from the county/subdistrict basis whereas the state looks at the district as a whole for establishment of need and then distributes beds on the basis of current bed census. When the smaller counties with fewer existing beds grow faster than the larger counties with a greater number of existing beds, they tend to be caught in a squeeze in that they get fewer beds because they are smaller, while their actual need may be greater than that of the larger county which, by virtue of its size, gets the larger number of beds. This state need rule, which calls for a 90 percent occupancy rate is felt by some to be less valid and less accurate a basis for evaluating the need in reality. As to the question of alternatives, there appear to be none for the vast majority of people in the county. Hospices or internal acute care bed or ambulatory facilities are not truly alternatives to nursing homes. In summary, Petitioner's expert believes that the Department's projected need for 43 beds could justifiably result in an approval of an application for 60 beds because: There were no approved beds at review time, Population trends, growth, and utilization trends indicate a need for new beds, The bed to population ratio in the county is one of the lowest in the district and in the state, (16 or 17/1,000 vs 27/1,000 normal for 65 plus) and the situation has not changed, Although the 65 plus population is used to determine need, the greatest use of nursing home facilities comes from the 75 plus population which is expected to increase in Collier County by July, 1989 by 32 percent, double the statewide average, At the time of application review, no existing facility was rated "superior" (there are now), showing a need for options. The applicant has a record of "superior" ratings statewide, The district health plan shows a bed need exceeding 60 beds for Collier County, The granting of a 60 bed nursing home is not inconsistent with previous actions by the Department when a mathematical need less a bed showed than 60 number. The project also is consistent with the rule criteria as well as statutory criteria, and Given DHRS's methodology and considering the adjustments due to Americana's change, there can be shown a mathematical need greater than the 43 shown by DHRS. Whether the need is 43 or 66 is really not important. The need is there. There is much to be said for these conclusions and they are adopted as findings herein.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered by the Respondent, Department of Health and Rehabilitative Services, approving Petitioner, Health Care Associates, Inc., d/b/a Surrey Place of Collier County' application for a certificate of Need to establish and operated a 60 bed skilled nursing facility in Collier County, Florida. RECOMMENDED this 8th day of January, 1988, at Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of January, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-0691 The following constitutes my specifics rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER AND RESPONDENT JOINT SUBMISSION 1 - 5. Accepted and incorporated herein. 6 - 8. Accepted and incorporated herein. 9. Accepted and incorporated herein. 10 - 15. Accepted and incorporated herein. 16. Accepted as a statement of DHRS policy and the resultant figures determined thereunder but rejected as the appropriate source of information. 17 - 19. Accepted and incorporated herein. Accepted as Petitioner's and Respondent's calculation but rejected as bearing in the Issue of bed need. Rejected as not reducing the number of available beds. Rejected. Accepted and incorporated herein. 24 - 29. Accepted and incorporated herein. Irrelevant. Accepted and incorporated herein. 32 - 34. Accepted. 35 - 50. Accepted. Accepted. Accepted. 53 - 54. Accepted and incorporated herein. 55 - 56. Accepted. 57. Accepted. 58 - 59. Accepted. 60. Accepted. 61 - 65. Accepted and incorporated herein. 66 - 69. Accepted and incorporated herein. 70. Accepted. FOR INTERVENOR 1 - 6. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Irrelevant. Accepted and incorporated herein. Accepted and incorporated herein. Irrelevant. Accepted. Accepted and incorporated herein in substance. First sentence is rejected. Occupancy rates of other local facilities are not necessarily determinative of the expected occupancy rates of Petitioner in the absence of a showing of similarity of other factors. 16 - 19. Rejected as based on other than the best evidence. No original source was presented. 20. Accepted. 21 - 25. Accepted and incorporated herein. 26 - 27. Accepted. 28 - 29(b). Accepted. 30 - 31. Accepted and incorporated herein. 32. Accepted and incorporated herein. 33 - 34. Accepted and incorporated herein - except for that portion of paragraph 34 indicating the approval of Petitioner's application would be inconsistent with local health plan. Accepted but not determinative. Accepted but not determinative. First sentence rejected as argumentative. Remainder accepted. Rejected as contrary to the weight of the evidence. Rejected. 40-42. Accepted except for the last sentence of paragraph 40 which is rejected. Rejected as not proven. Rejected as not proven. Mr. May was unaware of possible charges during lag time. Accepted. Accepted. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted. Rejected as argument rather than fact. 52 - 53. Irrelevant in light of 53. which is accepted. 54 - 55. Irrelevant in light of Intervenors' paragraph 55 which is accepted. 56 - 58. Accepted and incorporated herein. 59. Accepted. 60 - 64. Accepted. Accepted. Rejected as biased. Accepted. Accepted as to the fact that a reduction in Lakeside's income might occur, but rejected as to its severity. Intervenor presents a "worst case" picture based on speculation and conjecture. Accepted that Petitioner's projected site is near that of Intervenor. Remainder rejected as conjecture. 70 - 71. Accepted. COPIES FURNISHED: Philip F. Blank, Esquire Reynold Meyer, Esquire 204-B South Monroe Street Tallahassee, Florida 32301 Richard A. Patterson, Esquire Asst. General Counsel 1323 Winewood Blvd. Building One, Room 407 Tallahassee, Florida 32399-0700 W. David Watkins, Esquire Oertel & Hoffman, P.A. 2700 Blair Stone Road Suite C Post Office Box 6507 Tallahassee, Florida 32314-6507 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 R. S. Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (1) 120.57
# 2
HEALTH CARE MANAGEMENT, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 83-001668 (1983)
Division of Administrative Hearings, Florida Number: 83-001668 Latest Update: Sep. 12, 1984

Findings Of Fact On or about January 7, 1981, HCM was issued CON No. 1616, authorizing construction of a 78-bed nursing home facility to be located in Lee County, Florida. HCM has commenced construction of this project on a 120-bed frame. Subsequently, HCM applied to HRS for a CON for an additional 42 nursing home beds to be added to the above-described project. By letter dated April 28, 1983, HRS informed HCM of its intent to deny HCM's application for the additional 42 nursing home beds on the grounds that the proposed project was not consistent with the nursing home bed need methodology contained in Rule 10-5.11(21), Florida Administrative Code. Lee County has been established as a specific subdistrict of HRS District VIII for determination of nursing home bed need. Rule 10-5.11(21)(c), Florida Administrative Code. The record in this cause establishes a percentage of 8.61 of elderly living in poverty in Lee County, as compared to a percentage of 12.70 statewide. There exists a statewide bed need of 27 community nursing home beds per 1,000 population age 65 years and older. Finally, a population of 65,703 is projected for Lee County in 1986. When these factors are combined in accordance with the need methodology formula contained in Rule 10-5.11(21)(b), a need of 1,203 community nursing home beds is established for Lee County in 1986. When this same calculation is made districtwide, using a projected 1986 population for District VIII of 201,392 age 65 and older, a need for 3,686 community nursing home beds results. At the time of final hearing in this cause, there were 748 existing licensed community nursing home beds in Lee County, and an additional 222 such beds which had previously been approved by HRS. When the total of 970 existing and approved beds are subtracted from the 1986 projected bed need in Lee County, a net bed need of 233 beds results for 1986. At the time of final hearing in this cause, there were 3,335 existing licensed community nursing home beds in District VIII, and an additional 1,337 which had been approved. The total of 4,512 existing and approved community nursing home beds in District VIII exceeds the need in District VIII according to the requirements of Rule 10-5.11(21) by 824 beds. Where, as here, the evidence establishes that a subdistrict indicates a need for additional bed capacity, but the district as a whole shows no additional need, Rule 10- 5.11(21)(f)2, Florida Administrative Code, establishes a current utilization threshold of 90 percent or higher in the subdistrict. In this case, the evidence establishes that the appropriate current utilization rate for Lee County is 91.5 percent. In addition, Rule 10-5.11(21)(h)2, Florida Administrative Code, requires a prospective base rate of utilization of 80 percent when the need methodology indicates a subdistrict need and the lack of need in the district as a whole. The evidence in this cause establishes an average Lee County patient census of 684, and 970 currently licensed and approved community nursing home beds which must be factored together with HCM's request for an additional 42 beds. When the formula contained in Rule 10-5.11(21)(g) is applied to this data, the prospective utilization rate is 67.6 percent, which fails to meet the threshold 80 percent requirement contained in Rule 10-5.11(21)(h)2. HCM apparently does not contest the results of the application of the bed need methodology contained in Rule 10-5.11(21), but instead argues that the results of the formulae should not be applied to its application because of the existence of exceptional circumstances in Lee County. In this regard, HCM adduced testimony attempting to establish an historical imbalance between the number of community nursing home beds located in Lee and Sarasota Counties, purportedly necessitating the placement of Lee County residents receiving Medicaid or assistance from the Veterans Administration 70 to 100 miles from their families, or continuing hospitalization of those patients in a more costly acute care facility. It is specifically concluded, that the record in this cause fails to contain any competent, credible evidence to establish that Medicaid and VA recipients in Lee County have been so historically underserved as to merit the granting of the 42 additional nursing home beds requested by HCM. Further, even if this were not the case, HCM has failed to establish that the 222 additional community nursing home beds approved for Lee County will not adequately serve the interests of Medicaid and VA recipients in Lee County in 1986. Rule 10-5.11(21) purports on its face to account for the needs of the elderly over 65 years of age living in poverty, and this record contains no showing that the rule in any way underestimates that need.

Florida Laws (1) 120.57
# 3
HEALTH QUEST CORPORATION (SARASOTA COUNTY) vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES AND TRECOR, INC., D/B/A BURZENSKI NURSING HOME, 88-001945 (1988)
Division of Administrative Hearings, Florida Number: 88-001945 Latest Update: Mar. 14, 1989

The Issue Whether a certificate of need for an additional 60 nursing home beds to be located in Sarasota County, Florida, in July, 1990, should be granted to any of the four competing certificate of need applicants in these proceedings?

Findings Of Fact Procedural. Arbor, Health Quest, HCR, Trecor and fourteen other applicants filed certificate of need applications with the Department in the October, 1987, nursing home bed certificate of need review cycle of the Department for Sarasota County. Each of the applicants involved in these cases filed a letter of intent with the Department within the time required for the filing of letters of intent for the October, 1987, nursing home bed certificate of need review cycle. Each of the applicants involved in these cases filed their certificate of need application within the time required for the filing of certificate of need applications for the October, 1987, nursing home bed certificate of need review cycle. The applications were deemed complete by the Department. The Department completed its State Agency Action Report for the October, 1987, nursing home bed review cycle on February 19, 1988. The State Agency Action Report relevant to these cases was published by the Department in the Florida Administrative Weekly on March 4, 1988. The Department proposed to approve the certificate of need application filed by Trecor and to deny all other applications. Eleven of the applicants whose certificate of need applications were denied by the Department filed Petitions pursuant to Section 120.57(1), Florida Statutes, challenging the Department's proposed action. All of the Petitioner's except the three Petitioners in these cases withdrew their Petitions. The Parties. The Department. The Department is the agency responsible for reviewing certificate of need applications for or nursing home beds to be located in Sarasota County, Florida. Arbor. Arbor is a nursing home company that designs, develops, constructs and operates nursing homes. Arbor's corporate headquarters are located in Lima, Ohio. Arbor owns and operates eighteen nursing home and adult congregate living facilities comprising approximately 2,218 beds. In Florida, Arbor owns Lake Highlands Nursing and Retirement Center in Clermont, The Village at Brandon, and The Village at Countryside. In Florida, Arbor is currently developing certificate of need approved facilities in Clay, Orange, Polk, Pinellas and Sarasota Counties. Arbor formed Sarasota Health Center, Inc., to hold the certificate of need it is seeking in this proceeding. Although this corporation is in form the applicant, Arbor is in substance the applicant in these proceedings. Health Quest. Health Quest is an Indiana corporation which has been in the business of constructing and operating nursing homes and retirement housing facilities for approximately twenty years. Health Quest currently operates eleven nursing centers and three retirement housing developments. In Florida, Health Quest operates three nursing centers and two retirement housing developments. The nursing centers are located in Sarasota, Jacksonville and Boca Raton, Florida. The Jacksonville center is located adjacent to, and is operated in conjunction with, a retirement facility. The facility located in Sarasota is Regents Park of Sarasota (hereinafter referred to as "Regents Park"), a 53-bed sheltered nursing center. Regents Park is located at Lake Pointe Woods, a Health Quest retirement community, which includes 212 independent living apartments and 110 assisted living apartments. The assisted living apartments qualify as an adult congregate living facility. The 53 sheltered nursing home beds are authorized as part of a living care complex pursuant to Chapter 651, Florida Statutes. Health Quest has received approval from the Department to locate 60 nursing home beds, which Health Quest has received as part of a certificate of need for 180 nursing home beds, at Regents Park. The other 120 approved nursing home beds will be located at another facility to be constructed in Sarasota County by Health Quest. Health Quest also has two other projects under construction in Florida: a new facility in Winter Park, Florida, and a new facility in Sunrise, Florida. HCR. HCR is a corporation engaging in the business of designing, developing, constructing and operating nursing homes and related facilities. HCR is a wholly-owned subsidiary of Owens Illinois Corporation. HCR operates approximately 125 facilities with approximately 16,000 beds. HCR has designed and built over 200 nursing homes and related health care facilities. 24 HCR owns and operates ten nursing homes in Florida, including Kensington Manor, a 147-bed nursing center located in Sarasota County, Florida. HCR also has ten other projects being developed in Florida. Trecor. Trecor is a Florida corporation formed to engage in the business of developing and operating facilities within the full spectrum of the health care industry. Trecor was founded in 1985 when it acquired Burzenski Nursing Home (hereinafter referred to as "Burzenski"). Trecor does not own or operate any other health care facility. Burzenski is an existing nursing home with 60 dually certified beds located in the City of Sarasota. The facility was built in 1955 as a private residence. An addition to the facility was constructed in 1962. The Proposals. Arbor's Proposal. Pursuant to a stipulation with the Department dated September 9, 1987, Arbor received certificate of need 4182. Certificate of need 4182 authorizes Arbor to construct a 60-bed nursing home in Sarasota County. 20. Arbor's approved 60-bed nursing home facility will consist of 18,000 gross square feet. Costs of $2,200,000.00 have been approved by the Department in the certificate of need issued for the facility. Arbor intends to develop certificate of need 4182 by building a facility large enough for 120 beds. This facility will house the approved 60 nursing home beds and, if Arbor's application in this case is not approved, an additional 60 beds, licensed as adult congregate living facility beds. In this proceeding Arbor is requesting approval of a proposed conversion of the 60 adult congregate living facility beds to 60 nursing home beds. Arbor has proposed the construction of an additional 18,000 gross square feet to house the additional 60 nursing home beds sought in this proceeding. The proposed cost of the proposal is $2,380,000.00. The total cost of 120 bed facility will be $4,580,000.00. Health Quest's Proposal. Health Quest is seeking approval to convert its 53 sheltered nursing center beds at Regents Park to nursing home beds and to add 7 nursing home beds. The 60 nursing home beds are to be housed in the new community nursing home facility at Regents Park. The beds will be housed in 30,945 square foot of the Regents Park facility. Health Quest also intends to add 60 nursing home beds, which have already been approved by the Department, to Regents Park. The certificate of need application filed by Health Quest indicates that its proposal involves no capital costs. This is incorrect. There will be minimal costs associated with the addition of the 7 additional nursing home beds being sought by Health Quest which it has failed to include in its proposal. Health Quest did not present evidence concerning the total cost of the facility it plans to use to house the proposed 60 beds or the cost of the 60 beds already approved by the Department which it plans to add to Regents Park. HCR's Proposal. HCR is seeking approval to construct a new, freestanding 60-bed nursing home in Sarasota County. HCR's proposal also includes a 31-bed adult congregate living facility. The nursing home component will consist of 25,600 gross square feet (including 2,300 square feet to be used for adult day care). The total facility will consist of 43,000 gross square feet. Total capital cost for the nursing home component is estimated to be $2,519,000.00. The total cost, including the costs attributable to proposed adult day care services, is $2,657,000.00. The cost of the 31-bed adult congregate living portion of the project will be $1,800,000.00. The total cost of HCR's planned facility is $4,457,000.00. Trecor's Proposal. Trecor is seeking approval to construct a 60-bed addition to the Burzenski 60-bed nursing home. Burzenski is located at 4450 Eighth Street, Sarasota, Florida. The building in which the existing 60 nursing home beds are housed will be replaced by Trecor with a new building. The existing Burzenski building has out-lived its useful life and contains several structural deficiencies. Operations are severely restricted and inefficient. Existing three and four bed wards limit the placement of residents. The existing building does not comply with all current licensure requirements. The noncompliance, however, was "grandfathered" in. In order to replace its existing building with a modern building which meets all current licensure requirements, Trecor applied for a certificate of need in 1985 to build a replacement facility on an adjoining parcel of real estate for which Trecor held an option to purchase at the time. This application was approved on December 4, 1985. After an error by Trecor caused the time established for exercising the certificate of need to pass and a requested six-month extension of the certificate of need was denied by the Department, the certificate of need to construct the replacement facility lapsed. Another application for a replacement facility was filed in January, 1987. This application was approved by the Department in May, 1987. The replacement facility was not, however, constructed. Subsequently, in April and May, 1988, the Department determined that replacement of the existing building was exempt from certificate of need review. Trecor now proposes to add 60 nursing home beds at the same time that it builds its replacement facility for its existing 60 nursing home beds. The new nursing home beds will be housed on a second floor to be built on the replacement facility. In Trecor's application for (30 additional nursing home beds, Trecor has proposed the addition of 12,061 gross square feet to its replacement facility and a project cost of $885,210.00. The cost of Trecor's replacement facility will be $1,303,424.00 plus a $1,400,000.00 debt on the existing building. The total cost of Trecor's 120 bed facility will be $3,588,634.00. Section 381.705(1)(a), Florida Statutes. Numeric Need. Pursuant to the need methodology of Rule 10- 5.011(1)(k)(2), Florida Administrative Code, there is a need for an additional 75 community nursing home beds for Sarasota County for July, 1990, the planning horizon applicable in these cases. All of the applicants have agreed with the Department's determination of the need for additional nursing home beds for Sarasota County. All of the applicants are seeking to provide 60 of the needed nursing home beds. The District Health Plan. The district health plan for the Department's District 8, which includes Sarasota County, provides certain standards and criteria to be considered in determining community nursing home care need. The policy guidelines and their application, if applicable to the applicants in this proceeding, are as follows: Community nursing home services should be available to the residents of each county within District Eight. Sarasota County is a separate planning subdistrict for community nursing home beds. Therefore, this guideline should be applied to Sarasota County. All of the applicants will increase the availability of nursing home services to the residents of Sarasota County. Community nursing home beds should be geographically distributed throughout the counties of District Eight to promote optimal availability and accessibility. The 2,264 existing licensed and 283 approved community nursing home beds located, or to be located in Sarasota County, are already geographically distributed throughout Sarasota County. All of the applicants will increase geographic distribution of beds throughout Sarasota County, regardless of where they may be located. At a minimum, community nursing home facilities should make available, in addition to minimum statutory regulation, in the facility or under contractual arrangements, the following services: pharmacy g. occupational therapy laboratory h. physical therapy x-ray i. speech therapy dental care j. mental health counseling visual care k. social services diet therapy l. medical services All of the applicants will meet thin guideline. New and existing community nursing home bed developments should dedicate 33-1/3 percent of their beds to use for Medicaid patients. The applicants have proposed to provide the following percentage of care to Medicaid patients: Arbor: 45% Health Quest: 16.7% HCR: 42% Burzenski: 59% 1st Year; 60% 2d Year. All of the applicants except Health Quest comply with this guideline. Community nursing home facilities in District Eight should expand their financial base to include as many reimbursement mechanisms as are available to them including Medicare, Medicaid, Champus, VA, and other third-party payers, and private pay. This guideline applies to existing facilities. None of the applicants are proposing to "expand their financial bases" in the manner suggested in this guideline. Community nursing home (skilled and intermediate care) facilities in each county should maintain an occupancy rate of at least 90 percent. This guideline has been filled. New community nursing home facilities may be considered for approval when existing facilities servicing comparable services areas cannot reasonably, economically, or geographically provide adequate service to these service areas. Existing facilities cannot reasonably meet the need for the 75 additional nursing home beds in Sarasota County for July, 1990. No new community nursing home facility should be constructed having less than 60 beds. However, less than 60 beds may be approved as part of an established acute care hospital facility. All of the applicants meets this guideline. Expansion of existing facilities to 120 beds should be given priority over construction of new facilities in the health service area. The proposals of Arbor, Health Quest and Trecor meet this guideline. The proposal of HCR does not meet this guideline. Each nursing home facility should have a patient transfer agreement with one or more hospitals within an hour's travel time, or the nearest hospital within the same community. All of the applicants meet, or will meet, this guideline. The proposed project should have a formal discharge planning program as well as some type of patient follow-up service with discharge/transfer made available seven days a week. All of the applicants meet this guideline. Nursing home services should be within at least one hour typical travel time by automobile for at least 95 percent of all residents of District Eight. This guideline is not applicable. Community nursing homes should be accessible to residents throughout District Eight regardless of their ability to pay. All of the applicants meet this guideline. Health Quest meets this guideline less than the other applicants because of its minimal Medicaid commitment. All community nursing homes and applicants for community nursing homes should document their history of participation in Medicaid and medicare programs, and provide data on an ongoing basis to the District Eight Local Health Council as requested. All of the applicants meet this guideline. Health Quest has not, however, provided Medicaid care at Regents Park. Health Quest does provide Medicaid at all its other nursing centers and will obtain Medicaid certification at Regents Park if its application for a certificate of need in this case is approved. Medicare is not provided at Burzenski at this time. Burzenski will, however, provide Medicare at its proposed facility. Failure of a holder of a certificate of need to substantially comply with statements of intent made in the application and relied upon the Department of Health and Rehabilitative Services as set forth in the Certificate shall be cause for the Department to initiate an action for specific performance, fines as specified in s. 381.495(3), or injunctive relief. This guideline is not applicable. Need for Services. HCR conducted a "non-numeric community need survey" in Sarasota County. Based upon this survey, HCR has suggested that there is an unmet need for 1,600 nursing home beds for Sarasota County for Alzheimer patients and other dementia patients. HCR's conclusions concerning unmet need for services for Sarasota County are unrealistic. HCR failed to prove that any need in Sarasota County for services for Alzheimer patients and others is not being met adequately. Services for Alzheimer patients are currently being provided by Trecor and Health Quest. HCR and Trecor have proposed to dedicate 30 of their proposed nursing home beds to the care of Alzheimer patients and patients with other forms of dementia. All of the applicants propose to provide a full range of services to their residents, including sub-acute care. Other Considerations. Health Quest's avowed purpose for the proposed conversion of its 53 sheltered beds is to insure that Regents Park remains available for use by the general public. Florida law allows sheltered nursing home beds to be used by persons other than residents of an adult congregate living facility for five years from the issuance of a license for the sheltered nursing home beds. Regents Park received its license in November, 1986. Therefore, its sheltered nursing home beds can remain available for use by the general public until November, 1991. Health Quest has received a certificate of need for 180 nursing home beds for Sarasota. Health Quest intends on placing 60 of those beds at Regents Park. The other 120 beds will be placed at another facility to be constructed in Sarasota County. Health Quest may be able to use some of its 180 approved nursing home beds to avoid the closing of Regents Park to the general public. Health Quest has not, however, explored this alternative. Health Quest's decision not to pursue this course of action is based in part on its decision that the 43% Medicaid care required for its certificate of need for 180 nursing home beds is not acceptable at Regents Park. Health Quest has failed to prove that its proposal is needed because of its desire to convert its sheltered beds to community nursing home beds. Section 381.705(1)(b), Florida Statutes. The evidence in this case failed to prove that like and existing health care services in Sarasota County are not available, efficient, appropriate, accessible, adequate or providing quality of care except to the extent that existing services cannot meet the need for 75 additional nursing home beds in Sarasota County. Section 381.705(1)(c), Florida Statutes. Arbor. Two of Arbor's three licensed facilities in Florida are currently rated superior. The other facility is rated standard. Arbor's proposal may qualify it for a superior rating at its proposed facility. Arbor proposes to provide sufficient services, safeguards and staff. Arbor should be able to provide adequate quality of care in its proposed facility. Health Quest. Health Quest has a corporate policy of emphasizing quality of care. It attempts to obtain the highest quality rating in every community it serves. Health Quest's facilities in Jacksonville and Boca Raton have been rated superior. Health Quest's Sarasota facility has not been in operation long enough to qualify for a superior rating. Health Quest's Sarasota facility offers a high level of staffing, including a Human Resources Director, who is responsible for personnel administration and training, a full time social activities director and an activities coordinator. It also has a high nursing ratio. Health Quest is proposing the highest level of staffing of the applicants in this proceeding. Extensive training and development of staff at Health Quest's Sarasota facility is provided. Orientation training and in-service training on an on- going basis will be provided. Health Quest proposes to provide sufficient services, safeguards and staff. Health Quest should be able to provide adequate quality of care in its proposed facility. HCR. HCR's existing Sarasota nursing home has received a license with a standard rating. Other HCR facilities have received standard ratings, including some facilities which were acquired by HCR with superior ratings. HCR also has facilities which have been rated superior. HCR will enhance the quality of care available by providing a full range of services, from the least intensive level (adult day care) to the most intensive levels (i.e., sub- acute care). HCR's proposal to provide adult day care, a dedicated Alzheimer's unit, sub-acute care and respite care, and its adult congregate living facility will enhance quality of care in Sarasota County. HCR adheres to extensive quality assurance standards and guidelines. HCR provides adequate training, exceeding state minimum requirements, for its staff. HCR proposes to provide sufficient services, safeguards and staff. HCR should be able to provide adequate quality of care in its proposed facility. Trecor. Trecor has contracted with Central Care, Inc., a Florida corporation providing a full spectrum of health care and retirement living services, to manage its facility. Trecor provides education and training for its staff on an ongoing basis. Even though Trecor is operating in an inadequate building, Trecor received a superior rating in 1986-1987 and 1987-1988. Trecor proposes to provide sufficient services, safeguards and staff. Trecor should be able to provide adequate quality of care in its proposed facility. Section 381.705(1)(e), Florida Statutes. None of the applicants provided sufficient proof to conclude that they will provide joint, cooperative or shared health care resources sufficient to provide them with an advantage over the other applicants. Section 381.705(1)(f), Florida Statutes. None of the applicants proved that there is any need in the service district for special equipment or services which are not reasonably and economically accessible in adjoining areas. Section 381.705(1)(g), Florida Statutes. None of the applicants proved that this criterion applies in this proceeding. Section 381.705(1)(h), Florida Statutes. All of the applicants' proposals will be accessible to all residents of the service district. Health Quest will, however, provide less access to Medicaid residents than the other applicants. Trecor will attempt to initiate internship and training programs for area nursing and allied health programs, and provide clinical placements. Health Quest participates in training programs for nurses from Sarasota Vocational/Technical school. A certified nursing aide program is also offered by Health Quest through Sarasota Vocational/Technical School. All of the applicants will be able to attract and maintain the staff necessary to operate their proposed facilities. HCR is proposing to provide the highest salaries and benefits for staff. Health Quest already has staff for its existing 53 beds. Health Quest is adding, however, 60 nursing home beds to Regents Park. HCR failed to prove that all of the existing staff will be used to staff the proposed 60 nursing home beds and not the already approved 60 nursing home beds. Section 381.705(1)(i), Florida Statutes. Immediate Financial Feasibility. Short-term financial feasibility is the ability of an applicant to finance a project. Arbor. The total projected cost of Arbor's proposed 60-bed addition is $2,380,000.00. The total cost for its 120-bed facility is $4,580,000.00. Arbor's projected costs are reasonable. Arbor is proposing to contribute 10% of the cost of its proposal and finance the remaining 90%. Arbor has $39,000,000.00 in bank lines of credit, of which $34,000,000.00 remain available for development of Arbor's proposed project. Arbor also has sufficient money market funds to meet its projected equity contribution of 10%. Arbor has demonstrated immediate financial feasibility of its proposed project. Health Quest. Health Quest indicated in its application that there were no capital costs associated with its proposal. This is not correct. It will have some minor costs for the addition of the seven new nursing home beds it is seeking. Health Quest's proposal is the lowest in terms of additional capital costs which must be incurred. Most of the capital costs associated with the 53 nursing home beds it is seeking were already incurred when it built Regents Park. Health Quest did not provide proof of the cost of Regents Park. The unaudited financial statements of Health Quest indicate that it experienced a loss of $3,200,000.00 in 1986 and a loss of $5,000,000.00 in 1987. Health Quest has net worth and equity of $300,000.00 on over $200,000,000.00 in assets. The losses Health Quest has been experiencing have been the result of Health Quest's development activities. Health Quest can finance its project with internal funds. The evidence failed to prove that Health Quest must liquidate assets to generate operating funds. Health Quest demonstrated immediate financial feasibility of its proposed project. HCR. HCR's total estimated project costs for its 60-bed facility is $2,657,000.00. This amount includes the cost of the portion of the project to be used for adult day care ($138,000.00). The costs to be incurred for the adult congregate living facility is $1,800,000.00. HCR's projected costs are reasonable. HCR intends to contribute 25% of the total project costs and finance the remaining 75%. HCR has sufficient funds on hand to fund 25% of its project costs. In fact, HCR has the ability to contribute 100% of the total project costs. HCR has lines of credit with banks and other sources of obtaining financing for the project, including a loan from its parent corporation. HCR has demonstrated immediate financial feasibility of its proposed project. Trecor. The total cost of Trecor's proposed 60-bed nursing home addition is $885,210.00. The total cost of replacing the existing Burzenski building is projected as $3,588,634.00 ($885,210.00 for the proposed addition; $1,400,000.00 debt on the existing building; and $1,303,424.00 for the replacement of the existing building). Trecor is proposing to contribute 10% of the proposed project costs, or $88,521.00, and to finance the remaining 90%. To finance the entire project will require an equity contribution of over $300,000.00. Trecor has experienced operating losses in 1986 and 1987 and has a negative net worth of $259,000.00. Trecor has a positive cash flow, however. Trecor does not have sufficient equity to contribute 10% of the proposed project costs. The Board of Directors of Trecor has, however, adopted a resolution indicating Trecor's intent to provide the necessary contribution. Trecor can obtain the necessary funds from its owners if necessary. NCNB has expressed an interest in financing the rest of the project. Although NCNB has not legally committed to such an arrangement, it is reasonable to conclude that a satisfactory loan agreement can be reached with NCNB or Barnett Bank. Trecor has demonstrated immediate financial feasibility of its proposed project. Long-Term Financial Feasibility. Long-term financial feasibility is the ability of an applicant to operate a project at a profit, generally measured at the end of the second year of operation. Arbor. At the formal hearing Arbor presented an updated pro forma. Arbor suggested that the purpose of the updated pro forma was to reflect increased personnel costs and reduced utilization from 97% to 95%. According to Arbor, the changes reflect changes caused by inflation and "actual experience." The updated pro forma submitted by Arbor includes substantial increases in salary expense ranging from 10% to 30% (and one increase of 50%). The updated pro forma also includes at least one position not included in the original pro forma filed with Arbor's application. Arbor's original pro forma understated salary expenses. The updated salary expenses were foreseeable, and should have been foreseen, when Arbor filed its application. The updated pro forma was accepted into evidence over objection. In the updated pro forma, Arbor has projected a loss of $347,043.00 from revenue of $2,034,837.00 for the first year of operation and a profit of $41,833.00 from revenue of $3,016,512.00 for the second year of operation. Arbor has projected a payor mix of 45% Medicaid, 5% Medicare and 50% private pay. These projections are reasonable. Arbor's projected fill-up rate is reasonable. Arbor's projected charges are reasonable. The evidence failed to prove that Arbor's projected revenue and expenses as contained in its original application are reasonable. The evidence also failed to prove that Arbor's projected expenses as contained in its updated pro forma are reasonable either. Arbor has failed to prove that its project is feasible in the long term. Health Quest. Health Quest is operating at close to capacity at Regents Park and is already charging close to its projected patient charges. The facility has been operating at a loss. The facility experienced a profit only during its latest month of operation. The addition of Medicaid beds will erode Health Quest's revenues to some extent. Health Quest has projected a profit of $16,663.00 from revenue of $1,771,303.00 for the first year of operation and a profit of $40,698.00 from revenue of $1,850,156.00 for the second year of operation. Health Quest is projecting a payor mix of 16.7% Medicaid, 4.2% medicare and 79.2% private pay. These projections are reasonable. Regents Park opened in November, 1986, and filled up rapidly. It has been operating at full occupancy and with a waiting list. Health Quest's estimated fill up rate is reasonable in light of this fact. Health Quest has failed to prove that its project is feasible in the long term. HCR. HCR has projected a loss of $267,436.00 on $1,068,427.00 of revenue for its first year of operation and a profit of $62,729.00 on $1,772,399.00 of revenue for its second year of operation. HCR has projected a payor mix of 42% Medicaid, 4% medicare and 54% private pay. These projections are reasonable. HCR's projected fill-up rate to 95% occupancy is reasonable. HCR's projected patient charges are reasonable. HCR's projected revenue and expenses are reasonable. HCR's project is feasible in the long term. (4). Trecor. Trecor has projected a profit of $77,458.00 on revenue of $2,481,229.00 for the first year of operation and a profit of $367,896.00 on revenue of $3,106,152.00 for the second year of operation. The pro forma submitted by Trecor is for the 120-bed nursing home facility and not just the proposed 60-bed project. Trecor has a negative net worth and Trecor has been operating at a loss. Trecor has projected a payor mix of 59% Medicaid, 3.5% medicare, 34% private pay and 3.5% V.A. These projections are reasonable. Trecor has estimated it will achieve 50% occupancy in the first month of operation and an occupancy of 96% by the seventh month. This is a fill up rate of 2 residents a week. Arbor and HCR have projected fill up rates of 2 residents a month. Trecor does not expect to lose any patients during construction of its facility. Trecor is currently at full occupancy and has a waiting list. Trecor's projected fill up rate is achievable. Trecor's projected patient charges are reasonable. They are the lowest of the competing applicants. Trecor has failed to include some expenses in its projections. Trecor left $50,000.00 of administrative salaries out of its projections and FICA is underestimated because Trecor used the old rate. When these expenses are taken into account, Trecor's project is still financially feasible. Trecor's projected revenue and expenses, except as noted above, are reasonable. Trecor's project is feasible in the long term. Section 381.705(1)(1), Florida Statutes. Based upon the projected rates for nursing home services to be charged by the applicants, Arbor and Trecor will have the least adverse impact on patient charges, followed by HCR. Health Quest will have the greatest adverse impact on patient charges. Generally, all of the applicants will enhance competition if their projects are approved. Section 381.705(1)(m), Florida Statutes. Arbor. Arbor's building will contain 36,000 gross square feet, with 18,000 gross square feet attributable to the 60 nursing home beds it is seeking in this proceeding. The cost of Arbor's proposed 60-bed addition is $2,380,000.00 ($132.22 per square foot) and the cost of its entire project is $4,580,000.00. The projected cost of construction is $1,228,000.00, a cost of $68.22 per square foot. Arbor's projected costs are reasonable. Arbor's proposed building will provide 300 square feet per bed. Arbor plans to build its prototype 120-bed nursing home facility. It has used its 120-bed nursing home plans for other Florida projects. These plans have been approved by the Department's Office of Licensure and Certification. Arbors' building will comply with all code and regulatory requirements. The building will be constructed on a 6.5 acre site which is appropriately zoned and of sufficient size. The design of Arbor's proposed building and the proposed methods of construction are reasonable. Health Quest. Health Quest has already constructed the building in which its proposed 60 nursing home beds dire to be located. The building is already licensed. The building complies witch all code and regulatory requirements. A total of 30,945 square feat will be devoted to the nursing home portion of Regents Park. This is the largest of the proposed facilities. The proposed building will have 515 square feet per bed. There are no construction costs to be incurred for Health Quest's proposal. Construction costs have already been incurred to construct the facility in which Health Quest's proposed beds will be housed. Health Quest's building design is of the highest quality. HCR. HCR is proposing to construct a 60-bed nursing home. Additional space for 31 adult congregate living beds and for an additional 60 nursing home beds will also be built. The facility will include a dedicated 30-bed Alzheimer's unit. The inclusion of this unit requires more space. The proposed HCR building will consist of 25,600 square feet for the 60-bed nursing home. This includes the $138,240.00 cost and the 2,300 square feet of the adult day care unit. The projected cost of HCR's project is $2,657,000.00 or $103.79 per square foot. The projected cost of constructing HCR's proposed building is $1,536,000.00 or $60.00 a square foot. HCR's projected costs are reasonable. 166. HCR's facility will consist of 426 square feet per bed. 167. HCR's facility will comply with code and regulatory requirements. 168. HCR's design and methods of construction are reasonable. 169. HCR's facility will incorporate energy conservation measures. Trecor. The Trecor proposal entails the addition of a 60-bed patient wing on the second floor of a two-story building. The first floor of the building will be constructed by Trecor to replace its existing building. Approval of the replacement facility is not part Trecor's proposal at issue in this proceeding. The plans for the replacement building and the addition thereto have been developed together. The plans can be modified to insure that all of the proposed services can be accommodated in the building. The proposed Trecor building will be constructed in phases. First, the portion of the new building which will house the 120 nursing home beds will be constructed. Patients will then be transferred to the newly constructed facility. All of the existing building except the kitchen and administration facilities will then be demolished. Patients will be fed out of the existing kitchen and the administrative functions will be handled form the old administrative facilities. The new kitchen, dining and administrative offices will then be constructed. When this portion of the building is completed, the old kitchen and administrative offices will be demolished. Although inconvenient, Trecor should be able to continue to provide quality of care during the construction period. The other applicants have raised a number of issues concerning the Trecor building. The issues do not, however, involve violations of code or regulatory requirements for nursing home facilities. Trecor's building will contain a total of 31,398 square feet. This total includes 19,337 square feet attributable to the existing 60 nursing home beds and 12,061 square feet attributable to the 60 nursing home beds at issue in this proceeding. The proposed building is relatively small. Trecor's architect did a very good job of properly using the relatively small parcel of real estate he had to work with. The small size of the building, however, accounts for the lower cost of the Trecor proposal. The evidence failed to prove that Trecor cannot provide adequate care, despite the building's size. The cost of Trecor's proposed 60-bed addition is $885,210.00 ($73.39 per square foot) and the cost of its replacement facility is $1,303,424.00. The projected cost of construction for Trecor's proposed 60-bed addition is $592,500.00, a cost of $49.13 per square foot. Questions have been raised concerning the project development costs and the estimated architecture/engineer fees for Trecor's project. Trecor did not include all of the expenses for these items in the projected costs of its proposed 60-bed addition because the costs were included as part of building the replacement facility. Some of those costs could have been included as part of the cost of the proposal being reviewed in this proceeding. If those costs had been included, their inclusion would not affect the conclusions reached in this proceeding concerning the reasonableness of Trecor's project. Trecor's projected costs are reasonable. Trecor's proposed building will provide 201 square feet for the proposed 60 nursing home beds, 322 square feet for the existing 60 nursing home beds and 261 square feet for the total 120 nursing home beds. Trecor's building will comply with all code and regulatory requirements. The Trecor facility will be located on 1.97 acres. The design of the Trecor building and the proposed methods of construction are reasonable. Trecor's facility will incorporate energy conservation measures. Section 381.705(1)(n), Florida Statutes. All of the applicants have a history of providing care to Medicaid patients. Health Quest, however, does not provide care to Medicaid patients at Regents Park. If Health Quest's application is approved, Regents Park will become Medicaid certified. The projected Medicaid of the applicants is as follows: Arbor: 45% Health Quest 16.7% HCR 42% Burzenski 59% first year; 60% second year All of the applicants except Health Quest are proposing to provide at least 42% Medicaid, which is the average Medicaid provided in Sarasota County.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a Final Order granting Trecor's application for certificate of need number 5443 and denying Arbor's application for certificate of need number 5841, Health Quest's application for certificate of need number 5442 and HCR's application for certificate of need number 5437. DONE and ENTERED this 14th day of March, 1989, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of March, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 88-1945; 88-1949; 88-1950 The parties have submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Arbor's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 10-13. 2 1 and 29-33. 3 15-21 and hereby accepted. 4 19-20, 34 and 36. 5 22-25. 6 37-40. 7 26-27. 28, 41 and 44-47. Trecor applied for a certificate of need in January, 1987, not May, 1987. Hereby accepted. Not all of the applicants in this proceeding, however, have met the minimum criteria for the issuance of a certificate of need. Not supported by the weight of the evidence and a statement concerning the proceedings. 51. The last two sentences are argument. 51. The fifth through ninth sentences are argument. The evidence proved that Health Quest is adding 60 nursing home beds to its existing facility. Therefore, if its application in this case is approved it will have a 120-bed nursing home facility. 51. The last five sentences are statements of law and argument. Statement of law or not supported by the weight of the evidence. 15 64-66. 16 67-69 and 73. 74 and hereby accepted. The last two sentences are not supported by the weight of the evidence. 43 and 81. The fifth, sixth and eighth sentences are not supported by the weight of the evidence. The third, fourth and seventh sentences are hereby accepted. Although this proposed finding of fact, except the last sentence, is generally correct, this is not the only factor to consider in determining whether an applicant can provide quality of care. Argument, not relevant to this proceeding or not supported by the weight of the evidence. 52-55 and hereby accepted. The last sentence, except the reference to the state health plan, is hereby accepted. The second, sixth, ninth, tenth and eleventh sentences are not supported by the weight of the evidence or are argument. See 52-56. Argument. 56 and hereby accepted. 85, 87-88 and hereby accepted. The last sentence is not supported by the weight of the evidence. 51, 60-61 and 86. The second, third, sixth, eighth, ninth and tenth sentences are not relevant to this proceeding, not supported by the weight of the evidence or argument. 26 92 and 114. 27 95-97 and 106-107. 28 98 and 100. 109-111. The last five sentences are argument and not supported by the weight of the evidence. See 111-113. 97 and 107. Short-term financial feasibility of Health Quest is not moot and Trecor can finance its project with the assistance of its shareholders. Hereby accepted. The last sentence is not supported by the weight of the evidence. 115 and 118. The last four sentences are not supported by the weight of the evidence or are argument. 119-120. The last two sentences are not relevant to this proceeding or are not supported by the weight of the evidence. See 123. 34 130 and 134. 125, 127 and 132. The fifth sentence is not supported by the weight of the evidence. Not supported by the weight of the evidence. The last sentence is hereby accepted. 136-137 and 143. The first and last sentences are not supported by the weight of the evidence. 38-39 Not supported by the weight of the evidence, argument, not relevant to these proceedings or taken into account in determining the weight to be accorded to testimony. 40 Hereby accepted. The first and last sentences are not supported by the weight of the evidence. 41 139-141. 42 See 97, 103, 107, 113, 124, 129, 135 and 145. Arbor has not proven that it is financially feasible in the long term. The last three sentences are not supported by the weight of the evidence. 43, 46 and 56 Statements of law. 146 and hereby accepted. Hereby accepted. 47 148 and 153-155. 48 157-158, 160 and 175. 49 161-163 and 175. 171, 175, 180 and hereby accepted. The sixth, ninth and tenth sentences are not supported by the weight of the evidence. 171. The last sentence is not supported by the weight of the evidence. 52-54 Not supported by the weight of the evidence, argument or not relevant to this proceeding. 55 185 and 187-188. The last sentence is argument. 57-58 These proposed findings of fact are contrary to the stipulation of the parties. The parties stipulated prior to commencement of the formal hearing in this case that the criteria to be considered in determining which applicant was entitled to a certificate of need were contained in Section 381.705, Florida Statutes. Additionally, the Department accepted all of the applicants' certificate of need applications as being complete. It would not be proper for the Department to now disqualify an applicant on the grounds that its application is not complete. Health Quest's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 1. 2 32, 34, 37 and 41. 3 2. 4 3. 4 and 6. 7. Not all of the applicants filed petitions. 7 48. 8 15-16. 9 67-68. 10 17-19. 11 21. 12 19. 13 58-59. See 57. The weight of the evidence did not prove that Regents Park will be closed to the public "unless Health Quest's application for conversion to community status is approved." 14-15 Not supported by the weight of the evidence and not relevant to this proceeding. 16 See 36. Not supported by the weight of the evidence. 17-19 Not supported by the weight of the evidence or not relevant to this proceeding. 20 70 and hereby accepted. 21, 24, 27, 30-48, 52, 54-57, 61, 64, 70, 77, 88-89, 93, 95, 97, 107-108, 110-111, 113, 118, 124, 126, 128-129, 132, 135-136 and 138-139. Hereby accepted. 22 Hereby accepted and summary of testimony. The last two sentences are not supported by the weight of the evidence. See 91. 23 72. 25-26 88 and hereby accepted. 56 and hereby accepted. Not relevant to this proceeding. 49 Hereby accepted. The last two sentences are not relevant to this proceeding, are based upon hearsay and constitute opinion testimony from a nonexpert witness. 50 69. 51 Not relevant to this proceeding or based upon hearsay. 53 126 and 128. 58 Hereby accepted. The last sentence is not supported by the weight of the evidence. 59 157. 60, 65-67, 71, 91, 112, 114-116, 121-122 and 125 Not supported by the weight of the evidence. 62 Not relevant to this proceeding. 63 51 and 185-186. 68 100-101. 69 102. 72 51. The last sentence is rejected. The parties stipulated prior to commencement of the formal hearing in this case that the criteria to be considered in determining which applicant was entitled to a certificate of need were contained in Section 381.705, Florida Statutes. The parties did not indicate that Section 381.703(1)(b)1, Florida Statutes, was at issue in this proceeding or that Section 381.705(1)(a), Florida Statutes, does not apply. 73-76 Not relevant to this proceeding. The issue is not just whether nursing home services are available to all residents of the service area. Also at issue is whether each applicant is proposing to serve all of the residents of the service area. Health Quest's proposal does indicate Health Quest intends on serving a significant portion of Sarasota County's Medicaid population. 78 60-61. The portion of this proposed finding of fact prior to subparagraph a, the portion of subparagraph a appearing on page 19 of the proposed recommended order and subparagraphs b-d are rejected as argument, statements of law or as not being supported by the weight of the evidence. 79-82 Although generally correct, these proposed findings of fact are argument. 83 Not relevant to this proceeding. 84-86 Summary of testimony and argument. 87 Hereby accepted. The last sentence is not relevant to this proceeding or supported by the weight of the evidence. 90, 92 Not relevant to this proceeding. 94 Summary of testimony and argument. 96 Hereby accepted. The last sentence and the last half of the second sentence are rejected as not being relevant to this proceeding. 98-106 These proposed findings of fact were taken into account in determining the weight to be given testimony and other evidence. 109 Although the first sentence is correct, the rest of the proposed finding of fact is not relevant to this proceeding or not supported by the weight of the evidence. 117, 119-120 Not relevant to this proceeding. 123 108. The portion of this proposed finding of fact contained on page 30 of the proposed recommended order is primarily argument and not supported by the weight of the evidence. 127 143. 130-131 and 133-134 Not supported by the weight of the evidence, cumulative or not relevant to this proceeding. 137 The first sentence is hereby accepted. The rest of the proposed finding of fact is not supported by the weight of the evidence, argument or not relevant to this proceeding. Summary of testimony. Not supported by the weight of the evidence. The first two sentences are hereby accepted. The rest of the proposed finding of fact is argument and not supported by the weight of the evidence. HCR's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 48. 2, 4-9, 13-14, 16, 19-20, 22-23, 27, 30-32, 35, 41-42, 45, 47, 49-51, 53, 63-67, 71 and 75 Hereby accepted. 3, 15 and 33 Not supported by the weight of the evidence. Hereby accepted. The last sentence, as it applies to Sarasota County, is not supported by the weight of the evidence. Although generally true, this proposed finding of fact, as it applies to Sarasota County, is not supported by the weight of the evidence. 12 55. 17 37-4 and 55. 18 Hereby accepted, except that the first sentence is not supported by the weight of the evidence. 21 51 and 86. 24 51. The parties stipulated that the state health plan has been met by all of the applicants. 25 22-25. 26 76-78 and hereby accepted. 77 and hereby accepted. 78 and hereby accepted. 34 106-107. 36 Although generally true, the evidence failed to prove that HCR would provide these benefits without cost to its proposed Sarasota facility. 37 131-132. 38 133. 39 134-135. 40 89-90. 43 39-40, 163-164 and 166. 44 152, 167-170, and 180. 46 169-170. 48 165-166. 52 Hereby accepted. The weight of the evidence failed to prove that appropriate services for "AD patients" are not adequately available. 54 The parties stipulated that the state health plan has been met by all of the applicants. 55 2-3. 56-58 These proposed findings of fact are contrary to the stipulation of the parties. The parties stipulated prior to commencement of the formal hearing in this case that the criteria to be considered in determining which applicant was entitled to a certificate of need were contained in Section 381.705, Florida Statutes. Additionally, the Department accepted all of the applicants' certificate of need applications as being complete. It would not be proper for the Department to now disqualify an applicant on the grounds that its application is not complete. 59 148-149. 60 Taken into account in determining the weight to be given to testimony. Not supported by the weight of the evidence. 61 123. 62 Hereby accepted except the last two sentences which are not supported by the weight of the evidence. 68-69 115-117. 70 Not relevant to this proceeding. 72 41, 45-47, 175-176, 180 and hereby accepted. Hereby accepted except the third through fifth sentences are not supported by the weight of the evidence. Not supported by the weight of the evidence and not relevant to this proceeding. Hereby accepted except the last sentence is not supported by the weight of the evidence. The first sentence is hereby accepted. The rest of the proposed finding of fact is not supported by the weight of the evidence. Taken into account in determining the weight to be given testimony and other evidence. Not relevant to this proceeding. 80-81 Not supported by the weight of the evidence. 109-110. The last three sentences are not relevant to this proceeding. Hereby accepted, except for the first two sentences, which are not supported by the weight of the evidence. Hereby accepted except the third and last sentences are not supported by the weight of the evidence. Not supported by the weight of the evidence. See 136. Not relevant to this proceeding. Trecor's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1-6, 20-24, 27, 29-32, 35, 37-39 and 56. Hereby accepted. 7 28 and 41-42. 8 41, 43 and 81. 9 26-27. 10 41, 44 and 81. 11 44-45. 12 46 and 171. 13 173. 14 46, 171-172 and 174. 15-16 173. The last sentence of proposed finding of fact 16 is not supported by the weight of the evidence. 17 181. 18 54-55 and hereby accepted. 19 79. 25 40, 47, 109, 111-112 and hereby accepted. 26 175 and 177. 28 178 and hereby accepted. 33 184 and hereby accepted. 34 138 and 142. 36 139-141. 40 50. 41 51. 42 51. The last three sentences are not supported by the weight of the evidence. Although the Arbor site was not disclosed, the weight of the evidence supports a conclusion that Arbor's proposal meets this portion of the district plan. 43-47 51. 48 51. The last sentence is not supported by the weight of the evidence. 49-50 51 and hereby accepted. 51 51 and hereby accepted. The last sentence is not supported by the weight of the evidence. 52-53 51. Argument. 51 and hereby accepted. The Department's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 48. 2-3 49. 4 Not relevant to this proceeding. 5-6 Conclusions of law. Not supported by the weight of the evidence. Contrary to a stipulation of the parties that all of the parties meet the state health plan to the extent that it is applicable. See 63. 10, 13, 15 and 17 Hereby accepted. 11 See 64-84 concerning Section 381.705(1)(c), Florida Statutes. The parties stipulated that Section 381.705(1)(d), Florida Statutes, had been met or did not apply. 12 86 and 129. 14 Not relevant in this de novo proceeding and not supported by the weight of the evidence. 16 See 60-62. COPIES FURNISHED: Steven W. Huss, Esquire 1017 Thomasville Road, Suite C Tallahassee, Florida 32303 Charles M. Loeser Assistant General Counsel Health Quest Corporation 315 West Jefferson Boulevard South Bend, Indiana 46601 James M. Barclay, Esquire 231 A East Virginia Street Tallahassee, Florida 32301 Alfred W. Clark, Esquire Post Office Box 623 Tallahassee, Florida 32308 Jay Adams, Esquire Jay Adams, P.A. 1519 Big Sky Way Tallahassee, Florida 32301 Theodore E. Mack Assistant General Counsel Department of Health and Rehabilitative Services 2727 Mahan Drive Fort Knox Executive Center Tallahassee, Florida 32308 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (1) 120.57
# 4
FLORIDA LIVING CARE, INC. (MOUNT DORA) vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 84-000228 (1984)
Division of Administrative Hearings, Florida Number: 84-000228 Latest Update: Oct. 31, 1984

Findings Of Fact Lake and Sumter Counties comprise a subdistrict of District III. Both the district and subdistrict have a sufficiently high occupancy rate of nursing homes to indicate a need for additional bed capacity considering both licensed and approved beds. This subdistrict has an above average percentage of elderly (over age 65) living in poverty and thereby qualifying for Medicaid. This increases the bed need ratio from 27 per 1,000 to 35.6 per 1,000 in this subdistrict. Applying the provisions of Rule 10-5.11(21), Florida Administrative Code, to the projected population over age 65 of this subdistrict results in a need for 1,522 beds in 1987. There are 931 licensed and approved beds in this subdistrict including the 15 beds approved for Eustis Limited Partnership in June, 1984. Since the current utilization of nursing home beds in the subdistrict exceeds 85 percent and both subdistrict and district indicate a need for additional bed capacity, the prospective base rate of utilization is 80 percent. From January through March, 1984, there were 684 licensed nursing home beds in this subdistrict. From April through June, this number increased by 120 to 804 licensed beds. In July 35 licensed beds were added and in August an additional 17 licensed beds were added. From these undisputed figures Respondent contends there is no need for additional beds, although its witness testified to a need for 41 additional beds when the bed need methodology of Rule 10-5.21 was applied to the latest data available (TR. Vol. II, page 253, 270) , and Petitioners contend that the application of this formula indicates a need from 41 to 85 additional beds. The formula in the rule which is used to determine prospective utilization and number of additional beds needed is: Up = PC where: Eb + Pb Up is prospective utilization of community nursing home beds (in this case not less than 80 percent) PC is the average patient census within the area during the T.est recent six months' period prior to the filing of the CON application(s) under consideration for which the Department has data available. Eb is the current number of licensed and approved community nursing home beds within the area (here 931). Pb is the number of additional beds being pro posed. (Pb must be low enough to keep Up at or above 0.80). Nursing homes submit monthly census reports to DHRS showing the number of patients in the nursing home on the first day of the month. A summary of those reports for this subdistrict is shown in Exhibit 30. The only factor in the formula on which there is any dispute is PC, the average census for the preceding six months. At the hearing DHRS contended that the definition in the rule respecting the census during the most recent six- month period prior to the filing of the CON application was controlling in this case; however, this position has now been abandoned by DHRS as not consistent with the concept of de novo proceedings and their customary practice of using the latest six-month data available prior to the hearing. If we use the latest six months data of patient census in this subdistrict available to DHRS to determine the average patient census for this period, those figures are shown on Exhibit 30 for 1/1/84 through 6/1/84. The average patient census for these six months is 4289 divided by 6 or 715. Since the latest nursing home beds approved in this subdistrict was the 15 approved in June, 1984, these 15 should be deducted from the 931 beds currently licensed and approved because they were authorized after this six-month period for which the average patient census is determined. Therefore, when using this average census figure, the beds licensed and authorized should be 916. Applying these figures to the prospective utilization formula in Finding of Fact No. 6 above, we have .80 = 715 916 + Pb Pb = 893-916 = 0 If, as proposed by Petitioners, we use the average patient census for the six-month period for which Petitioners submitted data, viz., 3/1/84 through 8/1/84, the average patient census is 4556 divided by 6 or 759. When this figure for PC is used in the utilization formula, we have .80 = 759 931 + Pb Pb = 949-931 = 18 Although it does not affect the total number of beds licensed and approved, during the month of July, 1984, 35 more beds were licensed and in August, 1984, an additional 17 beds were licensed. Petitioners obtain a different number for Pb by ignoring the definition of PC as given in Rule 10-5.11(21). To determine PC they would take the latest number of licensed beds, here 856, and multiply this by the occupancy rate of 93.3 percent to arrive at a patient census of 799 which, by reason of the arithmetic used to get the percentage of licensed beds occupied, is exactly equal to the patient census submitted by Petitioner for August 1, 1984. Applying this one-month patient census to the prospective utilization formula, they would show 67 additional beds are needed as follows: .80 = 799 931 + Pb Pb = 998.75 - 931 = 67 The methodology used by DHRS's witness to obtain a bed need of 41 from the data available to DHRS was not shown. However, during the six-month period January-June 1984, the occupancy rate in this subdistrict was 96 percent. If the average census for the six-month period can be determined by taking 96 percent of the 804 licensed beds, this number (PC) is 772. Applying a PC of 772 to the prospective utilization formula we have .80 = 772 916 + Pb Pb = 965 - 916 = 49 (Again, 916 is used instead of 931 because the additional 15 beds were not authorized until after June 1, 1984.) QUALIFICATIONS OF PETITIONERS Although no need for additional beds has been shown, the following facts are found respecting the Petitioners' qualifications. Both FLC and HCR are qualified to provide the proposed service. FLC is a management company owned by six individuals comprising two groups, each of which own one-half. FLC is a Subchapter S corporation which means all earnings flow to the shareholders and are taxable to these shareholders. Each nursing home built to be operated by FLC is also a Subchapter S corporation owned by the owners of FLC. Construction of nursing homes to be managed by Florida is done by Living Care Constructors, a partnership comprised of the same six investors. FLC plans to finance construction of the proposed facility by conventional financing from Barnett Bank or through industrial revenue bonds. Barnett Bank will provide the necessary financing. The net worth of the six investors is in excess of $37 million dollars. Four of the six investors are Harold Puckett and his three sons, Hal, Thomas, and James. Each of these own 12-1/2 percent of the nursing homes operated by FLC in Florida while John Cather and E.R.N. Kuzendorf own the other 50 percent. FLC currently operates 10 nursing homes in Florida all of which were constructed by Living Care Contructors. The Puckett family owns some 20 nursing homes in states other than Florida which they have operated for many years. FLC has received citations and has been fined by DHRS for violations of various regulations at the nursing homes it operates in Florida. FLC has also received superior ratings for the nursing homes it operates in Florida. FLC estimated total cost of construction for the 60-bed facility proposed is $1,342,000. Both FLC and HCR propose to have a patient mix comprising approximately 50 percent Medicaid. HCR is a public corporation which, for many years before going public, constructed nursing homes in Indiana, Ohio, Missouri, and West Virginia before moving some operations to Florida. Most of those were built for others or sold to others after construction. HCR currently has three nursing homes under construction in Florida but, to date, none is operational. HCR plans to finance the proposed facility with industrial development bonds. No evidence was presented relative to alternate financing if industrial revenue bonds are not available although evidence was presented that, if desired, HCR is sufficiently liquid to finance these construction costs. HCR's estimated costs to construct and furnish the proposed nursing home is $1,645,000. Its pro forma estimated interest costs are 12 percent. Most of the nursing homes built by HCR were built for or sold to others. Those nursing homes presently under construction by HCR in Florida are intended to be operated by HCR. HCR has several other applications pending for certificates of need to construct nursing homes in Florida. Some of these, if approved, may be sold by HCR rather than be operated by HCR. HCR presented witnesses who extolled the virtues of HCR's program for training personnel and the operating procedures to be followed by HCR in operating the proposed nursing home. However, HCR has no track record in Florida and the management of HCR is certainly no more, and probably less, qualified by experience to operate nursing homes than is the management of FLC.

# 5
COMMUNITY HEALTH ASSOCIATION, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, OFFICE OF HEALTH PLANNING & DEVELOPMENT, 83-000615 (1983)
Division of Administrative Hearings, Florida Number: 83-000615 Latest Update: Sep. 26, 1983

Findings Of Fact Petitioner is a nonprofit corporation located in Lehigh Acres, Lee County, Florida, with a membership of approximately 900 persons. The association's goals are to insure that quality health care services, including, but not limited to, long-term care services, are available to that community. The Community Health Association, Inc., was preceded by a non-profit corporation known as Lehigh Acres General Hospital, Inc. This corporation managed and operated the Lehigh Acres General Hospital, located in Lehigh Acres, Florida. In June, 1981, the corporation sold its license to operate this acute care hospital to Hospital Corporation of America (HCA). HCA took over management of the facility July 1, 1981. HCA is currently leasing the facility from Community Health Association, Inc. HCA applied for and received a Certificate of Need to construct a new hospital in Lehigh Acres, Florida. Construction of this hospital is underway and is to be completed on or about January 1, 1984, at which time HCA will turn the old hospital facility back to Community Health Association. At the time of the licensure sale by Community Health Association (Lehigh Acres General Hospital, Inc.) to HCA, the Lehigh Acres General Hospital operated an 88-bed acute care facility which had utilized, since 1970, 20 of the 88 beds as nursing home beds. In July, 1981, Community Health Association, Inc., filed a letter of intent with Respondent for a 60-bed nursing home to be operated in Lehigh Acres, Florida. Respondent advised Community Health Association, Inc., that its application for a CON was premature due to the pending CON issued to HCA to construct a hospital in Lehigh Acres. In early 1982, Community Health Association, Inc., employed Herman Smith & Associates, of Chicago, Illinois, health care consultants, to perform a long-term study concerning need for a nursing home or nursing home beds in the Lehigh Acres area. On the basis of its study, Herman Smith & Associates recommended that Petitioner seek authority to provide 110 nursing home beds in two phases. The first phase of the project would involve converting the 1970 wing of the previous hospital building for use as a 50-bed nursing unit at a cost of approximately $350,000. The second phase consisting of construction of a 60-bed addition, costing $1,380,000 for 15,527 square feet, would be completed in early 1985. The sale of the license to HCA brought Petitioner $1,000,000. These funds will cover the first phase and part of the second phase costs. Petitioner's prior experience in health care delivery and its community support, along with these financial resources, will enable it to construct and operate the proposed nursing facility. There are no existing or approved nursing homes or nursing home beds to be located in Lehigh Acres, Florida. Except as noted below, all existing and approved nursing home beds are located in western Lee County in Ft. Myers, Cape Coral or in other communities located approximately 30 minutes or more by automobile from Lehigh Acres. Upon completion of construction and abandonment of the old Lehigh Acres hospital building by HCA, the new hospital will discontinue the 20 nursing home beds currently operated. Approximately 75 percent of this hospital's patients are Lehigh Acres residents, with few if any patients from Ft. Myers or western Lee County. All the nursing home referrals from the new hospital will be required to leave Lehigh Acres unless Petitioner's proposed nursing home is constructed. Petitioner filed a letter of intent with Respondent, followed by an application for a CON on or about October 1, 1982, proposing the project as recommended by Herman Smith & Associates. Following the submission of the instant application, Respondent adopted Rule 10-5.11(21), Florida Administrative Code (F.A.C.), which became effective on November 9, 1982. That rule establishes the "Methodology to Determine and Calculate the Need for Community Nursing Home Beds" in a service district. About January 29, 1983, Respondent advised Petitioner that its application for a 110-bed nursing home in Lehigh Acres was denied as not consistent with the Section 10-5.11, F.A.C., nursing home bed need methodology. Respondent's State Agency Action Report stated that "A need does not exist to add nursing home beds in Lee County through 1985. There are 347 approved but not constructed beds in the county. The bed need methodology produces an excess of 494 nursing home beds in the county through 1985." The State Agency Action Report reflected 970 existing and approved nursing home beds in Lee County. The report also projected a need for 1,400 community nursing home beds for the year 1985 in Lee County. The testimony of its author established that the same portion of the rule applied to 1986 protected population figures would yield a need for 1,522 beds in Lee County in 1986. At the time Petitioner's application was evaluated by Respondent, nursing homes in Lee County had an average 95.8 percent occupancy rate. Based on the application of the current utilization formula contained in Chapter 10-5.11(21), F.A.C., Respondent calculated that 494 excess nursing home beds in Lee County are licensed or approved. Projected population of persons age 65 and over living in Lee County in 1985 is 60,463 and ir 1986 is 65,708. The application of these population figures to the formula contained in Ch. 10-5.11(21)(b), F.A.C., yields a nursing home bed need in Lee County for 1985 of 1,400 and for 1986 of 1,522. As noted above, there are currently 970 licensed and approved nursing home beds in Lee County. The "Nursing Home Plan Component" of the Local Health Plan of the District Eight Health Council of Sarasota, Florida, of which Lee County is a portion, adopted June 29, 1983, indicates a need for 501 additional beds in Lee County for the year 1986. In applying Rule 10-5.11(21), F.A.C., Respondent's determination was subject to two errors. The first, a mathematical error, caused a miscalculation of beds which could be added in Lee County using current patient count data and avoid falling below the desired 80 percent occupancy rate. The formula, properly applied, indicates there would be 239 excess beds rather than the 494 shown in the State Agency Action Report. The second error concerns Respondent's failure to reconcile and compare the determinations made under the need methodology contained in paragraph (b) of the rule and other portions of the rule, particularly the current utilization sections contained in subparagraphs (d) and (f). Section 10-5.11(21)(f), F.A.C., stated that "consideration of applications for additional nursing home beds will be premised on both the projected need for new bed capacity and current utilization." (emphasis added) The requirement for additional nursing home beds based on the projected need for new bed capacity, as well as current utilization, establishes a need for the 110 beds proposed by Petitioner. Further, the proposed location is consistent with the goal of accessibility and community need in Lehigh Acres.

Recommendation Based on the foregoing, it is RECOMMENDED that Respondent enter a Final Order granting Petitioner's application. DONE and ENTERED this 26th day of September, 1983, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of September, 1983. COPIES FURNISHED: Ronald A. Labasky, Esquire Robert S. Cohen, Esquire 318 N. Monroe Street Tallahassee, Florida 32302 James M. Barclay, Esquire DeparLment of Health and Rehabilitative Services 1317 Winewood Blvd., Suite 256 Tallahassee, Florida 32301 David H. Pingree, Secretary Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32301

# 6
CLEARWATER LAND COMPANY, D/B/A REGENCY OAKS NURSING CENTER vs BEVERLY SAVANA CAY MANOR, INC., 94-002404CON (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 03, 1994 Number: 94-002404CON Latest Update: Sep. 08, 1995

Findings Of Fact The Parties The Agency For Health Care Administration (AHCA) is responsible for administration of the certificate of need (CON) program pursuant to section 408.034, Florida Statutes. Clearwater Land Company (CLC) is a Florida corporation which owns, operates, and is the license holder of the Regency Oaks Continuing Care Retirement Community (Retirement Community) and Regency Oaks Nursing Center (Regency Oaks) located in Clearwater, Florida. The Johnson Ezell Corporation is a closely held private corporation owned by two shareholders who are also shareholders of CLC. Johnson Ezell provides management, financial services, data processing services, collective purchasing, and other aspects of management for CLC. CLC and Johnson Ezell Corporation are affiliates; two shareholders of Johnson Ezell comprise two out of the four shareholders of CLC. Johnson Ezell is also the contract manager of CLC. Three of the four shareholders of CLC own 100 percent of two other large continuing care retirement communities (CCRC) in Florida. One of these communities, located in Port Charlotte, is known as South Port Square. A second retirement community, Lake Port Square, is in the mid-development stage in Leesburg, Lake County, Florida. Typically, CCRCs offer a broad spectrum of services or a continuum of care ranging from independent living apartments, to assisted living, to skilled nursing which often includes home health care. South Port Square has 440 independent living apartments in which the holders of continuing care agreements reside. South Port also has a 120-bed community skilled nursing facility, originally CON approved in 1984. There are 140 additional units of assisted living. The first phase of the 240 independent living units opened in October of 1987, and the second and final phase of 200 continuing care apartments opened in October of 1990. Lake Port Square currently has 200 continuing care apartments with 205 additional apartments currently under construction. Lake Port also has a 60-bed skilled nursing facility which was originally licensed as a sheltered nursing home facility. It is now a licensed community nursing home. Lake Port also has 35 units of assisted living. Beverly Savana Cay Manor, Inc., is a wholly-owned subsidiary of Beverly Enterprises-Florida, Inc., which is a wholly owned subsidiary of Beverly Enterprises, Inc. The Beverly family of companies operates 838 nursing homes in 48 states. It is the largest provider of long-term care services in the country. Beverly Savana Cay Manor will receive substantial financial, managerial, operational and program support from Beverly Enterprises Florida's regional office. These are specific services which will be available to Beverly's proposed project from its parent's Florida regional office: A nurse consultant who is a former director of nursing will monitor the overall performance of the nursing staff and will assist in maintaining quality assurance and proper staffing patterns; a registered dietician will provide consulting dietary services; and a financial consultant will monitor and assist with the orientation of staff on all financial matters, including implementation of the billing system for Medicare and Medicaid. An area manager who is a licensed nursing home administrator will coordinate the support services. Other consulting services available through the Florida regional office include: an activities consultant, a trained social services consultant, a rehabilitation program coordinator, a rehabilitation clinical coordinator, an accounting-finance department, and a quality assurance department that conducts inspections and reviews the facility's compliance with governmental requirements. The regional maintenance department will oversee the care and maintenance of the physical plant. The regional purchasing department coordinates purchases of food, chemicals, and other items more economically purchased in large volumes. The human resources department assists in the implementation of uniform personnel and wage policies, the training of supervisory and managerial personnel, and the monitoring of facility participation in government programs. CLC Project: Regency Oaks CLC filed two CON applications: In CON Application No. 7503 (now withdrawn), it requested approval of a new 120-bed community nursing home through the conversion of 60 sheltered nursing home beds and the addition of 60 community nursing home beds. CLC also filed CON Application No. 7503P, the subject of this de novo review, to convert Regency Oaks Nursing Center's 60 sheltered nursing home beds to 60 community nursing home beds. CLC's project calls for a reclassification of existing services and assets. There is no capital required, no renovation costs, and no new equipment. The project basically involves moving from one state classification category to another, i.e., sheltered nursing home beds to community nursing home beds. The project under consideration involves Regency Oaks Nursing Center, a 60-bed facility which commenced operations and was licensed in August of 1991. Regency Oaks is a part of a 40-acre campus. The Regency Oaks Retirement Community has approximately 200 units located in a separate five-story structure which also commenced operations in August or September of 1991. There are an additional 201 independent living units in a separate phase that is also located in a separate five-story structure on the campus that is currently under construction. When fully developed, the retirement community's independent living units will be roughly equivalent in size and substantially the same as the operations at its sister communities at Lake Port and South Port. Sheltered nursing home beds are often located in a CCRC. A continuing care provider is authorized to provide a certain number of sheltered nursing home beds based upon the number of independent living apartments that are being constructed, operated and licensed pursuant to Chapter 651, Florida Statutes. Chapter 651 first authorized CCRC's to apply for and receive sheltered nursing home beds in 1986. A CCRC is regulated by statute and markets and provides services pursuant to a continuing care agreement in which the continuing care resident is provided with shelter, food, and some element of health care in exchange for a specified lump sum payment of money and the payment of a monthly maintenance or service fee. The business was largely unregulated until major revisions were incorporated into Chapter 651. Pursuant to section 651.118(4), Florida Statutes, Regency Oaks originally applied for and was granted a CON to construct a 60-bed sheltered nursing home based upon the ratio of one sheltered nursing home bed for every four residential units in the retirement community. The prevailing wisdom in the early 1980's, when Chapter 651 was enacted, held that the 1:4 ratio was appropriate. The underlying assumption was the utilization of the sheltered nursing homes by the residents in the retirement community on a 1:4 ratio should result in a fully occupied and financially feasible nursing center. The ratio also ensured that residents could gain access to nursing home care. In the last half of the 1980's the prevailing wisdom held that the 1:4 ratio was still appropriate but only after allowing for several years of "aging in place" by the residents of the retirement community. To provide needed occupancy during the initial years of operation, subsection 651.118(7) allows the sheltered nursing home to admit residents from outside the resident community for a period of up to five years from the date of the issuance of the original license. For the first five years of operation, the nursing home beds are available to residents and nonresidents of the senior living community. However, at the end of the five year period, the nursing home is not allowed to accept any additional patients from outside the senior living facility because residents alone are expected to need the beds. In 1986, CLC had no intention of converting its CON approved beds to community nursing home beds. For several reasons, including the general health of retirement community residents and their willingness to pay for home health services in order to stay in their own apartment, the 1:4 ratio is no longer a reasonable projection of sheltered nursing home bed need. In the last two years at Regency Oaks, there was an average daily census of 3.5 to 5 patients in Regency Oaks originating from the independent living facility. Of the 200 units, an average daily census of 5 patients converts to a 1:40 ratio rather than the 1:4 ratio that was included in the sheltered bed model. Currently over 90 percent of Regency Oaks' patient days are patients who do not live in the senior housing facility. Without the approval of this project, by September 1996, Regency Oaks will no longer be able to admit outside community residents. Based upon current and projected ratios, this will have an impact on the ability of Regency Oaks to continue to operate in an economical and financially feasible manner. CLC's experience at South Port Square illustrates this problem. The first phase of South Port's independent living apartments has been in operation for 7.5 years. Phase Two has been in operation more than 4.5 years. The demographics of the population area served by Regency Oaks and South Port are almost identical. The South Port community has had 7.5 years to "age in place." For the first ten months of South Port's 1994 fiscal year, 27 percent of the patient days of the South Port's 120-bed skilled nursing center were attributable to contractual requirements of residents of the independent living apartments. Twenty-three percent of the patient days were attributable to campus residents (non- contractual) who were either private pay or some other source of payment. At the top end of the scale, Regency Oaks expects to experience between 25 percent to 30 percent, and up to 40 percent, of its admissions from independent living apartments on campus. CLC does not intend to apply for new sheltered nursing home beds to complement the additional 201 independent living units now under construction. According to its qualified health care planning expert, Mark Richardson, at full build-out, CLC will need to hold (at the high end of the range) 30 beds to fulfill its contractual obligations to its life care residents. (Transcript, pp. 332-3) At full build-out, the approximately 400 independent living units will house 550 to 600 residents, all eligible for nursing home care, when needed, under their continuing care agreements. Beverly's Project: New Crown Beverly proposes a new, 120-bed community nursing home in the Seminole Park area of Pinellas County (New Crown) using 66 beds from the fixed need pool and 54 beds made available from the delicensure of its existing Crown Nursing Center (Old Crown). Granted by CON No. 7505, Old Crown originally was constructed as a motel in the 1940's and has been a nursing home since the 1960's. Although Old Crown currently holds a superior license, the facility is outmoded and is reaching the end of its useful life as a nursing home. There is no room to expand or renovate the existing physical plant, and it is perpetually in need of costly repairs. It is not in compliance with modern building codes and is allowed to continue to operate only by virtue of grandfather clauses. Resident rooms are undersized, and corridors are only 5.5 feet wide rather than the 8 feet currently required. Room doors are narrower than those required in new facilities and will not accommodate moveable beds. Bathroom doors will not accommodate wheelchairs, and there is no central air conditioning. The floor plan also is inconsistent with modern nursing home standards. The building is multistory with outside stairs. This configuration is highly undesirable because it restricts the freedom of movement of residents who are physically impaired, makes it difficult to monitor resident movement, requires extra nursing stations, and slows evacuation in an emergency. Old Crown has one four-bed ward and eight three-bed wards. Space limitations at times require that men and women reside in the same ward. There is no room for specialized services such as adult day care, subacute services or separate Alzheimer's care. Nursing stations are undersized and medical/chemical supplies must be kept in an outdoor shed. Laundry space is inadequate, and linens must be stored outside and in hallways. One room serves as the employee break room, the uniform storage room and the beauty parlor. The kitchen is too small and there is inadequate food storage. The dining area is located in the old motel lobby. Outdoor activities must be conducted in the back parking lot and there is no outdoor ambulation/recreation space. There is only one small space for physical, occupational and speech therapy, requiring that therapies sometimes be administered in hallways or bedside. This arrangement is particularly undesirable for residents receiving speech therapy, as they tend to be self- conscious about their inability to speak, eat and swallow. There is only one activities room, and it is located on the second floor. The second floor contains asbestos, and removal would require the evacuation of the entire second floor. In contrast, New Crown will meet or exceed all existing licensure requirements for construction and safety codes. It will contain 53,310 square feet of space on a single story, and is designed to optimize operational efficiency, minimize institutional effects, and emphasize a home-like atmosphere. All areas within the facility will meet federal guidelines for handicapped accessibility and use. Corridors will be 8 feet wide, and the doors to resident rooms will accommodate moveable beds. These features will eliminate the movement, monitoring and safety shortcomings inherent in Old Crown's two- story motel floor plan. There will be plenty of storage, a modern kitchen and laundry facility. Residents at New Crown will reside only in private and double occupancy semi-private rooms. Each room will feature private toilets, telephone, cable T.V., and individual thermostat controls. Homelike furnishings will be used throughout the facility. There will be two large day rooms adjacent to the nursing stations with access to three enclosed outdoor courtyards, a large restaurant-like dining area, a secured patio and an activity room. The day rooms will have aquariums, large screen televisions and VCRs. A large solarium/greenhouse will be located adjacent to the dining area. AHCA's approval of Beverly's application for New Crown is expressly contingent on the approval of expedited CON application 7505 to delicense Old Crown. This CON has been granted. Beverly will not allow operation of the two facilities to overlap. Old Crown will remain fully operational until New Crown is operational and placement is made for every Old Crown resident. Beverly will transfer Old Crown residents to New Crown, and will assist residents who choose not to move to New Crown in making whatever other arrangements the resident chooses. No resident will be "put out on the street." Compliance With The Local Health Plan The Health Council of West Central Florida, Inc. has identified three preferences, the first of which is a preference to new nursing homes which commit to serve Medicaid patients in proportion to the average number of Medicaid residents in existing nursing homes in the "health service area." That relevant average (subdistrict) is 55.32 percent. Beverly commits to 56 percent total Medicaid days for New Crown; Old Crown is at 59.24 percent; and other Beverly facilities have a high record of Medicaid services (nationally at 68.5 percent, and in Florida an average of 66 percent). CLC commits to 31.58 percent, which is a reasonable expectation since the Medicaid days will be generated primarily, if not exclusively, from patients drawn from the community at large and not from the independent living facility. CLC's Regency Oaks market is dominated by residents and potential residents from a narrow service area with higher financial resources than the southern end of Pinellas County. The second allocation factor gives a preference to applicants who propose specialized services, including adult day care, to meet identified needs. Beverly has conditioned its application on the provision of a wide range of specialized services. New Crown will provide distinct subacute care in a 20-bed Medicare certified subacute unit with four ventilator-dependent beds, and comprehensive rehabilitation in a 3,404 square foot physical therapy site with physical therapy gym, hydrotherapy area, "activities of daily living" room and outdoor ambulation court. It also will provide adult day care services in a 987-square foot Adult Day Care Center, Alzheimer's care in an 18-bed Alzheimer's wing that includes separate dining/activity areas and an enclosed courtyard, respite care services, care to individuals with mental disorders, care to individuals who are HIV+ or who have AIDS, and hospice care. Beverly also will make a $10,000 grant to Florida State University School of Nursing for research into gerontological issues in the nursing home environment and will make its facility available to nursing students for clinical rotations. CLC proposes intensive rehabilitation services, respite care, subacute care, hospice care and care to mental health patients. Its current facility has not provided respite care and it does not propose a separate unit for Alzheimer's patients. The third local health plan allocation factor gives preference to applicants who demonstrate an intent to serve HIV-infected patients. Both applicants commit to provide AIDS and HIV-positive health care. Beverly has documented its experience with these patients at its Old Crown and other facilities. CLC simply has stated that it does not discriminate in admissions of these patients; it also asserts that it has no idea which, if any, of its patients have been HIV-positive or AIDS patients since that information is not disclosed by the patient. Compliance With The State Health Plan The State Health Plan contains twelve allocation factors. Factor 1 gives preference to applicants locating in areas within subdistricts with occupancy rates exceeding 90 percent. Pinellas County's occupancy rate of 90.23 percent qualifies both Beverly and CLC. Allocation Factor 2 gives preference to applicants who propose to serve Medicaid residents at the subdistrict Medicaid average. Exceptions are considered for applicants who propose the development of multi-level care systems. The applicants' Medicaid commitments are addressed above in paragraphs 23 and 24. The applicants' experts disagree on whether the Regency Oaks facility is truly "multi-level," as contemplated by the exception. The availability of different levels of care: independent living, assisted living and nursing home, on a single campus does represent a "multi-level" care system. State Health Plan Allocation Factor 3 gives preference to applicants proposing specialized services to special needs residents, including AIDS and Alzheimer's residents and the mentally ill. Both applicants, as discussed in paragraphs 26-28, above, have described in detail their proposals for specialized services. Beverly's experience in the past and specific plans for discrete subacute, ventilator-dependent and Alzheimer's units lend credibility to its commitment to those specialized services. CLC's commitment is more general. Its proposed staffing is too low to provide the level of care proposed for New Crown's subacute unit, but its staffing would be increased as needed by the patient population. Regency Oaks has 12 Medicare certified skilled nursing beds in the general nursing home population. None can accommodate a ventilator- dependent patient. Allocation 4 encourages a continuum of services, including adult day care and respite care. Both applicants propose to meet this requirement of the State Health Plan. Again, Beverly's commitment is evidenced by a specific description of discrete programs, while CLC's plans are more general. CLC contends that there is "insufficient demand" in the area to support adult day care; Beverly proposes a 987 square foot "Adult Day Care Center" with its own staff, staff office and storage, to accommodate up to 8 guests, 8 a.m. to 6 p.m., five days a week. Day care guests will have an individual care plan prepared by professional staff and will have access to the full facility and its recreational, therapeutic and social services. Beverly will implement a respite program at New Crown and has such programs at its other facilities. CLC offers respite care but has never had a respite care patient. Allocation Factor 5 gives preference to applicants proposing facilities which provide maximum comfort and quality of care. Both applicants qualify for this preference with outstanding designs and programs. Both applicants propose therapeutic programs consistent with Allocation Factor 6. Specialized rehabilitation, restorative care and normalizing training are described in both applications and are committed to by the applicants. Both propose a more aggressive, intensive rehabilitation than other nursing homes in the area. The highest Medicaid per diem rate in Pinellas County is $100.74 (January, 1994). Inflated forward to 1996, the planning horizon, that rate becomes $113.00. New Crown's proposed rate of $100.14, and Regency Oaks' proposed rate of $102.75 (for 1995) do not exceed that highest rate (even when Regency Oaks' rate is inflated 5 percent for 1996). Both applicants are entitled to the preference in Allocation Factor 7. Both applicants qualify for the preference under Allocation Factor 8, as both enjoy the highest (superior) rating. Three of Beverly's four facilities, including Old Crown, currently hold superior licenses, and the fourth has been recommended for a superior license. Regency Oaks was eligible for a superior license shortly after issuance of its original license and actually received the superior license, after some logistical mix-up, in December of 1994. State Health Plan Allocation Factor 9 gives preference to applicants proposing staffing levels which exceed the minimum staffing standards contained in licensure administrative rules. As a well-run existing facility Regency Oaks maintains appropriate staffing levels. The staffing proposed in its application omits one certified nurse assistant (CNA) on the 11:00 to 7:00 shift. The director of nursing monitors the patient population to assure that staff is added when needed. Beverly's proposed staffing plainly meets or exceeds standards, including statutory and regulatory requirements at all levels. Both Beverly and CLC use professionals from a variety of disciplines and both are entitled to the preference described in State Health Plan Allocation Factor 10. Likewise, both applications describe, and the applicants' experience bears out, a respect for residents' rights and privacy and a well- designed quality assurance and discharge planning program, as required in Allocation Factor 11. State Health Plan Allocation Factor 12 gives preference to applicants proposing lower administrative costs and higher resident care costs than the average nursing home costs in the district. As conceded by Beverly's expert health care planner, both applicants meet this preference criteria; however, Beverly's proposed administrative costs are lower, and patient costs are higher, than CLC's. Need and the Availability of Alternatives Nursing home occupancy rates in District V, subdistrict 2, Pinellas County, currently exceed 90 percent, and the need for 68 more nursing home beds in this district is undisputed. Evidence in this proceeding also established the need for such specialized services as subacute care (sometimes referred to as "step down" care), adult day care, HIV/AIDS care, Alzheimer's care and mental health care. Both applicants propose to meet a portion of the numerical need: Beverly with 66 new beds; and CLC with 60 beds converted from sheltered to community beds. Beverly's project more closely meets the numerical need; CLC concedes that some, and perhaps as many as 30, of its beds will be utilized by the residents of its independent living community. Both applicants propose outstanding programs for subacute care and other specialized services. As discussed above, Beverly's actual experience lends greater credibility to its commitment. Maintenance of the status quo in either case is not a viable alternative. Old Crown is only 54 beds; as of 1996, none of Regency Oaks' sheltered beds will be available for new community admissions. Without approval of one application or the other, the 68 bed need will remain wholly unmet. Availability of Resources, Including Staffing and Short-Term Funds Regency Oaks maintains a recruitment and staff development program designed to attract pools of qualified applicants for each personnel vacancy which occurs at the facility. This program has been effective in the recruitment and retention of high quality nurses and other professionals. Regency Oaks also maintains effective staff training and competency enhancement programs. The facility has a solid core staff in place. The parties have stipulated that Beverly will be able to hire the staff it needs at the proposed salaries and that Beverly's proposed recruitment plan career ladder, incentives and opportunities for advancement and efforts to recruit disciplines in short supply are reasonable and capable of being accomplished by the applicant. New Crown has the advantage of access to a statewide network of consultants who will draw from the expertise and resources of the Beverly companies. Since Regency Oaks is already built and in place, very little additional financial resources are needed in the short-term. The incremental project costs of $22,000 filing fee and $15,000 in consulting fees have already been expended. Whether it is a "zero cost" project or whether its cost should include the construction of the facility in 1991 for $2,634,441, as suggested by Beverly, CLC has the financial resources for short-term support of the project. Beverly likewise will be able to finance its total project cost of $6,361,751. Beverly's parent company has committed its substantial resources, including $80 million cash on hand, to finance the project. An issue arose in this proceeding regarding Beverly's failure to include on Schedule 2 of its application three nursing home facilities which it acquired on January 13, 1994. Two facilities, Old Crown and Beach Convalescent Center, were transferred to Beverly from its sister corporation, Petersen Health Care, Inc. The third facility, Clewiston Health Care Center, was transferred to Beverly from its "grandparent," Beverly California Corporation. Change of ownership applications addressing the transfers were filed with AHCA on October 15, 1993. CLC contends that these inter-company transfers involved expenditures that were "capital projects" within the meaning of section 408.037(2)(a), Florida Statutes, and therefore, Beverly should have included them on its Schedule 2. CLC introduced a closing statement and two deeds from the Beach and Old Crown change of ownership files in an attempt to suggest that Beverly had purchased the facilities in exchange for cash payments. Beverly established, however, that it gave no value of any kind in exchange for the transfers, which were accomplished simply by changing the corporate name on each facility's general ledger. Beverly prepared the documents in question only after the AHCA indicated that it would not approve the change of ownership applications until it received closing statements and deeds. No long-term debt was transferred, and each transferred facility had a positive asset value net of accumulated depreciation and amortization. Consequently, the transfers resulted in permanent additions to Beverly's equity (i.e. plant, property and equipment) valued at $3,882,033. Future Beverly audited financial statements will reflect the transfers as additions to paid-in capital. The operational assets of each facility far exceeded the operational liabilities (e.g. accounts payable) of each facility, and Beverly received net working capital in the total amount of $600,116. For reimbursement purposes, the transfers were treated as "related party transfers" and did not result in any change in Medicare or Medicaid reimbursement rates. Beverly California Corporation paid all the incidental expenses associated with the transfers such as application and legal fees. Beverly would not capitalize these expenses. Contrary to CLC's contention, Financial Accounting Standards Board (FASB) statements 11 and 14 do not require that these transfers be treated as "capital expenditures." FASB Statement 11 deals with accounting for contingencies, and does not offer any insight into the proper characterization of the intercompany transfers at issue here. FASB Statement 14 requires that financial statements of a business enterprise include information about its "segments," i.e., operations representing at least 10 percent of the company's total revenues. There is no evidence that Beverly is a "segment," nor does FASB 14 define "expenditure" or "capital expenditure." FASB Statement 14 mentions capital expenditures only once. Paragraph 27 is titled "Other Related Disclosures." Paragraph 27(b) requires that "information for reportable segments shall be made as follows: . . . Disclosure shall be made of the amount of each reportable segment's capital expenditures, i.e., additions to its property, plant and equipment." (Transcript, pp. 623) This passing reference does not define capital expenditures for all purposes, or require that all additions to plant property and equipment be characterized as capital expenditures. Paragraph 27(b) of FASB Statement 14 merely advises accountants that the financial statement of a company must disclose the capital expenditures --- as opposed to expense items --- that a reportable segment of the company has made. Read in context, the reference to additions to plant, property and equipment is meant only as an example of transactions that, under circumstances not defined in FASB 14, might involve a capital expenditure. In the universe of additions to plant property and equipment, some may involve capital expenditures. However, the transfers here at issue demonstrate that a company can obtain additions to plant, property and equipment without incurring any expenditure at all. FASB Statement 6, at paragraph 66, provides that an increase in the equity of a business entity resulting from the transfer to it of something of value to obtain or increase an equity interest in the entity is considered an investment by owners, not an expenditure by the receiving entity. Health Care Financial Management Association Principles and Practices Board Statement No. 12 similarly would characterize the transfers at issue as equity investments by affiliated companies, not expenditures. This is the proper characterization of the transactions between Beverly and its affiliated companies. The equity contributions of its affiliated companies made Beverly a financially stronger and wealthier entity that was more capable of undertaking the proposed project, and did not involve an expenditure of any kind on the part of Beverly, and therefore cannot be characterized as "capital projects" according to credible, competent expert opinion. AHCA's sample Schedule 2 form does not provide a place to list the receipt of equity, but rather asks only for "expenditures." Had Beverly incorrectly included the transfers as "expenditures" in its Schedule 2, it would have had to show them as negative expenditures, thereby reducing the total amount of reported capital projects and improving Beverly's reported financial position. Upon inquiry, AHCA properly advised Beverly that since the transfers did not involve any expenditures by the applicant, it should not disclose them. Accessibility To All Residents of the Service District Regency Oaks has never turned away a Medicaid or other patient based on payor status and affirmatively accepts patients regardless of ability to pay. Regency Oaks also accepts AIDS/HIV patients, Alzheimer's and other specialty needs patients. Beverly also has this type of "open door" policy. Its experience, however, as discussed above, has been more successful in attracting and serving Medicaid patients and patients with special needs. As an integral part of a beautifully designed, upscale retirement community, Regency Oaks has not drawn the payor mix that Old Crown and its sister facilities have served. As the residents of the independent living units age in place and increase in number with completion of the additional units, accessibility to all residents of the service district is diminished, not enhanced, if the conversion from sheltered to community beds is approved for Regency Oaks. Long Term Financial Feasibility Review of financial feasibility of Regency Oaks is simplified by the fact that it has actual operating experience to support its projections. Opened in Fall 1991, the nursing home, as typically expected, showed losses for the first few years. It turned a profit in 1993. Regency Oaks has the necessary resources to continue to operate the continuing care apartments as well as the nursing home with net operating income, including net operating income from the completion and opening of the new 200 independent living units and further supplemented by the resources of the shareholders of CLC. The four CLC shareholders are personal guarantors on the mortgage indebtedness of all the property at Regency Oaks. Their net worth is in excess of $60 million and cash reserve is greater than $10 million. If the CON is approved and Regency Oaks is permitted to accept community bed patients it will be financially healthy. If, however, the facility is restricted in 1996 and the beds will be filled only from its continuing care units, the nursing home will become financially stressed. Neil Ezell, the corporate representative of CLC and chief financial officer for the Johnson Ezell Corporation, acknowledges the difficulty in making a profit in a smaller 60-bed nursing home because of the high fixed administrative costs. If the high-end estimate that 30 beds will be filled from the continuing care facility is accurate, Regency Oaks will be operating at 50 percent capacity in 1996 or shortly thereafter. The contractual obligations to Regency Oaks residents would still be honored in some fashion, but with substantial difficulty. Absent CON approval, Regency Oaks' cost per patient day will increase and will negatively impact Medicare since Medicare is a cost-based reimbursement system for skilled nursing facilities. Beverly's proposal for a new 120-bed facility at New Crown is financially more efficient than either Regency Oaks or the existing 54-bed Old Crown facility, even considering the $6,361,751.00 total project cost. The old facility is too dated and too small to be efficiently operated much longer. The 120-bed proposal meets the need for new beds and effectively puts to rest the old well-used beds. The patients at New Crown will come from the community at large and will also be transferred from the existing Crown facility. The projected utilization is reasonable and the projected pre-tax net income of approximately $299,000.00 at the end of the second year is likewise realistic. The proposal is financially feasible. SUMMARY OF FINDINGS AND BALANCING THE CRITERIA Both applicants presented outstanding proposals. There is no question that they have provided, and will continue to provide, superior quality of care in attractive, well-equipped and well-staffed facilities. Beverly's proposal enjoys the financial "economies of scale" advantage of a larger facility; CLC's proposal is financially appealing because it requires little or no additional start-up expenditures. Beverly effectively countered CLC's assertions that the application was defective for failure to include the three recently-acquired facilities as "capital expenditures". Beverly also appropriately addressed CLC's claim that it failed to consider the transfer of Old Crown residents in its projected utilization of beds at the new 120-bed facility. Approval of Beverly's application for 120 beds will not result in approval of an excess of beds left in the fixed need pool. Approval is conditioned on approval of delicensure. The old and new facilities will not be concurrently licensed. It strains common sense to find that the concurrent approval and delicensure process should somehow result in creating a need in some future planning horizon, rather than the immediate planning horizon. Both applicants avow their commitment to serve Medicaid and specialty needs population and to remain accessible to persons regardless of ability to pay. Beverly's commitment is underscored with an existing record of service and with its willingness to accept conditions of approval. More troubling than the Medicaid and special needs accessibility issue, however, is the concern that CLC's existing 60-bed facility at Regency Oaks will, upon conversion, fall substantially short of meeting the need for 68 beds. Its continuing care community is expanding and the demand for nursing home beds by that population will increase. Somewhere between 10 and 30 beds will be filled, leaving only 30 to 50 beds available to the population at large. CLC's financial dilemma is the result of a considered decision to build 60 sheltered nursing home beds to support a 200 unit continuing care facility. The only explanation in the record for exceeding the 1:4 ratio is that initially the plan was for 240 units. Even with 50, rather than 60 sheltered beds, the facility would have problems, since the prevailing wisdom based on actual utilization experience is that far fewer sheltered beds are needed. Although the anticipated financial dilemma will have some impact on Medicare reimbursement in the Regency Oaks' facility, there is no major health care planning impact from denial of the conversion. The impact is facility- specific and was at least partially foreseeable five years ago. That is, the statute, then as now, provided a fixed 5-year period for the use of sheltered care beds by the community at large. Balancing of the criteria and weighing the evidence results in a finding that Beverly's, rather than CLC's, application should be approved.

Recommendation Based on the foregoing it is hereby RECOMMENDED: That the agency enter its Final Order denying Clearwater Land Company's application for CON #7503P and approving Beverly Savana Cay, Inc.'s application for CON #7508, conditioned upon 56 percent of patient days of care to Medicaid residents, and appropriate specific conditions for a ventilator-dependent unit, respite care, adult day care, Alzheimer's unit, and AIDS/HIV+ care. DONE and ORDERED this 30th day of June, 1995, in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 1995. APPENDIX The following constitute specific rulings on the findings of fact proposed by the parties. Clearwater Land Company's Proposed Findings 1. and 2. Adopted in paragraph 2. Adopted in paragraph 3. and 5. Adopted in paragraph 4. 6. and 7. Adopted in paragraph 5. Adopted in paragraph 9. and 10. Rejected as unnecessary. Adopted in paragraph 24. Adopted in paragraph 9. Adopted in paragraph 72. Adopted in substance in paragraph 24. Adopted in paragraph 10. Adopted in paragraph 11. - 19. Adopted in paragraph 12. Adopted in substance in paragraph 13. Adopted in substance in paragraph 14. Rejected as unnecessary. and 24. Adopted in paragraph 15. Adopted in paragraph 64. and 27. Adopted in substance in paragraph 13. Covered in Preliminary Statement. Covered in Conclusions of Law, paragraph 79. and 31. Rejected as unnecessary. Rejected as contrary to the evidence and law. Rejected as contrary to the greater weight of evidence. and 35. Adopted in substance in paragraphs 17 and 22. Adopted in substance in paragraphs 23 and 24. Adopted in substance in paragraph 27. Adopted in substance in paragraph 28. and 40. Adopted in paragraph 29. Adopted in paragraph 30. Adopted in paragraph 31. Adopted in substance in paragraph 32. Adopted in paragraph 33. Adopted in paragraph 34. Adopted in paragraph 35. Adopted in paragraph 36. Adopted in substance in paragraph 37. and 50. Adopted in paragraph 38. Adopted in paragraph 39. - 55. Rejected as cumulative and unnecessary. 56. and 57. Adopted in substance in paragraphs 47 and 64. 58. and 59. Rejected as unnecessary. Rejected as contrary to the weight of evidence. Rejected, as to the comparative conclusion; otherwise accepted generally. - 64. Rejected as unnecessary and cumulative. Adopted in paragraph 62. - 71. Rejected as unnecessary. Adopted in substance in paragraph 64. Adopted in substance in paragraph 64, except as to the impact if Beverly is approved. That finding is rejected as unsupported by the evidence. and 75. Adopted generally in paragraphs 64 and 65. Accepted, as to no impact on existing providers; rejected, as to impact by Beverly. Adopted in paragraph 67 (as to Beverly's cost). - 82. Rejected generally as contrary to the greater weight of evidence. Adopted in paragraph 10. - 86. Rejected as unnecessary. Rejected as contrary to the greater weight of evidence. - 94. Rejected as unnecessary or cumulative. Findings regarding the high quality of care and range of services are addressed above. 95. and 96. Adopted in part in paragraph 37; the one staffing omission was conceded by CLC's director of nursing. 97. - 99. Adopted in substance in paragraph 45. 100. - 117. Rejected as unnecessary or cumulative. 118. Addressed in Preliminary Statement. Beverly's Proposed Findings Addressed in Preliminary Statement. and 3. Rejected as unnecessary. Adopted in paragraph 17. Adopted in paragraph 18. and 7. Adopted in paragraph 19. Adopted in paragraph 20. Adopted in paragraph 21. Adopted in paragraph 26. Adopted in paragraph 22. Adopted in substance in paragraphs 9 and 12. Adopted in paragraph 6. Adopted in paragraph 7. Adopted in paragraph 8. and 17. Rejected as unnecessary. Adopted in summary in paragraph 70. Adopted in paragraph 50. Adopted in paragraph 51. Adopted in paragraph 52. Adopted in substance in paragraph 53, although the testimony was related to both Medicare and Medicaid reimbursement. and 24. Adopted in paragraph 54. Adopted in paragraph 55. Adopted in paragraph 56. Adopted in paragraph 57. and 29. Rejected as unnecessary. Adopted generally in paragraph 24. Adopted generally in paragraph 26. Adopted generally in paragraph 27. Adopted generally in paragraph 28. Rejected as unnecessary. Adopted in paragraph 28. Adopted in paragraph 29. Adopted generally in paragraph 30, although "multi-level" was not defined, and CLC's assertion that it is a "multi-level" facility is generally accepted. Adopted in paragraph 31. - 64. Rejected as cumulative and unnecessary. Rejected as to the characterization of CLC's rate; otherwise adopted in substance in paragraph 35. Adopted in paragraph 36. and 68. Rejected as cumulative and unnecessary. 69. and 70. Adopted in paragraph 38, except as to the conclusion that CLC does not meet the preference. 71. and 72. Adopted in part; rejected in part in paragraph 39. Adopted in paragraphs 40 and 75. - 100. Rejected as cumulative or unnecessary. 101. Adopted generally in paragraphs 72 and 73. COPIES FURNISHED: Robert Griffin, Esq. Charles A. Stampelos, Esq. MCFARLAIN, WILEY, CASSEDY & JONES, P.A. 215 S. Monroe Street, Ste. 600 Tallahassee, FL 32301 Douglas L. Mannheimer, Esq. Michael Manthei, Esq. BROAD & CASSEL 215 S. Monroe Street, Ste. 400 Tallahassee, FL 32302 Samuel D. Bunton, Esq. Agency for Health Care Administration The Atrium Building, Ste. 301 325 John Knox Road Tallahassee, FL 32303 Douglas M. Cook, Director Agency for Health Care Administration 2727 Mahan Drive Tallahassee, FL 32308 Jerome W. Hoffman, General Counsel Agency for Health Care Administration 2727 Mahan Drive Tallahassee, FL 32309 Sam Power, Agency Clerk Agency for Health Care Administration Fort Knox Bldg. 3, Ste. 3431 2727 Mahan Drive Tallahassee, FL 32308-5403

Florida Laws (8) 120.57408.034408.035408.037408.039651.021651.022651.118 Florida Administrative Code (3) 59C-1.00259C-1.00859C-1.036
# 7
FORUM GROUP, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-000670 (1987)
Division of Administrative Hearings, Florida Number: 87-000670 Latest Update: Jun. 30, 1988

Findings Of Fact The controversy Forum Group, Inc. (Forum Group), Hillsborough Healthcare, Ltd. (Hillsborough Healthcare), Health Quest Corporation (Health Quest), and Careage House Healthcare Center (Careage) filed applications for certificates of need for community nursing homes in Hillsborough County, which is a subdistrict of HRS district VI. The applications were filed in the July, 1986, batching cycle, for need in July, 1989, known as the planning horizon. As amended prior to being deemed complete by HRS, Hillsborough Healthcare and Careage sought 120 beds, Health Quest sought 88 beds, and Forum Group sought 60 beds. All of the applications satisfy and are consistent with state and local health plans. The Department's free form preliminary action Ordinarily, the Department's preliminary decision on these applications would have been issued in November or December of 1986. In these cases, the parties were orally advised of the Department's preliminary action in January, 1987, but the state agency action report containing that preliminary decision was not issued until August, 1987. The delay in decision making in this case occurred due to the altered process of free form decision making that was used in this case. Careage filed a number of applications in the July, 1986, batching cycle, in a number of subdistricts. The preliminary review conducted by HRS determined there to be bed need in four of the counties in which Careage had applications: Hillsborough, Polk, Pinellas, and Lee. During free form agency decision making on the applications in this batching cycle, Ms. Marta Hardy was the Deputy Assistant of Regulation and Health Facilities for the Department. T. 1024. Her duties included responsibility to oversee the issuance of certificates of need and develop health planning policies. Id. Ms. Hardy was the direct supervisor of Robert Maryanski, who was the head of the office of community medical facilities, and Robert Sharp, who was the head of the office of comprehensive health planning. T. 1024. Mr. Maryanski was the direct supervisor of Mr. Reid Jaffe who reviewed the applications in Hillsborough county. Preliminary decisions on the applications in this batch were normally due in November, 1986. It was the normal procedure at the Department to review applications for certificates of need in the following manner. First, an employee in the position entitled "medical facilities consultant" reviewed all applications in the batching cycle for a particular district or subdistrict and made recommendations on each application. These recommendations were then reviewed by his supervisor, the medical facilities consultant supervisor. The recommendations of the medical facilities consultant supervisor upon each application then went to Mr. Maryanski. In Hillsborough, Polk, Pinellas, and Lee Counties in the July, 1986, batching cycle, all reviewers found there to be a bed need. In the normal course of business, all reviewers forwarded through Mr. Maryanski and to Ms. Hardy recommendations that did not recommend the award of a certificate of need to Careage in any of these four counties. T. 1057, 1055, 1281-82. Mr. Maryanski told Mr. Jaffe to "find a way" to approve the Careage application in Pinellas County. T. 1283-84. The time of this communication is not in the record. At about the time that Careage applied for certificates of need (August or September, 1986), Ms. Hardy had dinner with the owner of Careage, Mr. Gene Lynn, Mr. Lynn's wife, and Mr. Ralph Haben. T. 1040. At that meeting, the representatives of Careage told Ms. Hardy that Careage operated nursing homes in other states in which care of good quality was provided. T. 1060. Mr. Haben is an attorney, and was then representing Careage. T. 1059. Mr. Haben and Ms. Hardy had been friends since the late 1970's, and in August and September, 1986, they had had lunch or dinner together socially four or five times. T. 1041- 49. In December, 1986, after Departmental staff had preliminarily recommended that Careage's applications be disapproved in the four counties in which was there was need, Ms. Hardy determined to ask Robert Sharp to review applications in the four counties. The result of Mr. Sharp's review was to recommend approval of the Careage application in the four counties. That recommendation was approved by Ms. Hardy. Mr. Sharp was responsible for health planning. He normally had nothing to do with review of certificate of need applications, although he had reviewed some hospital applications in the past. T. 1054. Ms. Hardy had come to the conclusion that Careage provided care of good quality. T. 1063. At the time she formed that opinion, Careage did not operate any nursing homes, and had not done so since 1982. Mr. Sharp understood that Ms. Hardy was impressed with Careage, but did not know the basis for such favorable impression. T. 940. Ms. Hardy told Mr. Sharp that she did not believe that the current method of comparative review of applications was adequate, and used Careage as an example of a best qualified applicant that was overlooked by the current method. T. 940. Mr. Sharp developed a method for comparative review of the applications in the batch for Hillsborough County and the other counties. The method has been referred to in the record as a matrix. Mr. Sharp simply selected certain aspects of the applications for comparison. Two types of information were selected: numerically quantified information, and "program characteristics," which called for a determination whether the selected item existed or did not exist in the proposal. The "matrix" also had a narrative for some of the applicants. Mr. Sharp used Careage as the standard of comparison for all other applicants in the comments section. There was no evidence that the items selected by Mr. Sharp were unreasonable or unfair. The items selected appear to be reasonably related to the task of comparing the virtues of the applicants. The items, for the most part, simply are based on information required by the Department in the application form. The matrix was found in September, 1987, to contain numerous factual errors, and the Department issued a revision. H.Q. Ex. 27. Need pursuant to rule 10-5.011(1)(k) Licensed beds in the district (LB) The number of licensed beds in the district (LB) as of June 1, 1986, was at least 5,964. T. 1706. This figure is derived by adding the 5,557 licensed beds shown on the August 25, 1986, semi-annual nursing home census report, H.Q. Ex. 16, to the 407 additional community nursing home beds that has been erroneously classified as sheltered nursing home beds. None of the other testimony credibly establishes this base figure. There is a dispute as to whether 96 additional beds at the Home Association should be considered licensed community nursing home beds as of June 1, 1986. The Home Association was founded in 1899. It is officially recognized that there was no certificate of need requirement in 1899. The Home Association has never received a certificate of need. Thus, it is inferred that the Home Association was never "issued" beds for "nonrestrictive use." At the time that the Home Association was licensed, there was no license category of "sheltered bed. Prior to 1982, there was no statute defining a "sheltered bed." T 1721-22. Thus, prior to 1979, the Home Association was not 1,issued" beds as "sheltered beds" or "for restrictive use". The Home Association is in the district and in the subdistrict, Hillsborough County. The Home Association had 96 beds in 1972, and had the same number on June 1, 1986. On or about August 20, 1986, HRS sent a letter to the Home Association. HQ Ex. 9. The letter stated that HRS records currently identified the Home Association as a "sheltered nursing home/continuing care facility licensed under Chapter 651, F. S.," but that HRS records did not indicate the date of the initial CON. The letter stated that the specific number of beds allocated to community and sheltered nursing home beds were listed below. At the bottom of the letter, HRS listed 96 beds in the column and line identified as current number of sheltered nursing home beds. The Home Association was told to review the data and make changes and return the letter to HRS. It further stated that a failure to respond would be interpreted as approval of the HRS listed bed allocations. The letter then provided four blanks for the Home Association to respond. The first two provided places to show the "corrected number of beds" both on a line identifying such beds as "community nursing home beds," and a line identify such beds as "sheltered nursing home beds." The Home Association left these lines blank. The third blank asked for the certificate of need number and date. The Home Association typed in: "The Home was founded in 1899; no certificate of need was issued." The fourth blank stated: "Sign Here if Corrections Requested." Initials appear in handwriting in that blank. H.Q. Ex. 9. The response of the Home Association was ambiguous. Having signed the fourth blank, thus seemingly communicating a desire to "correct" the form, the Home Association failed to tell HRS whether it wanted to correct the number of beds or the classification of the beds, or some combination thereof. HRS's need expert admitted that the only way one could settle the question would be to call the Home Association. T. 1724. The problem is further compounded by the way in which the letter from HRS was drafted. The letter did not ask the Home Association to provide information concerning the "historical utilization" of the 96 beds at the Home Association, and thus did not collect any information as to "historical utilization." See the last sentence of section 651.118(8), Fla. Stat. (1987). Instead, it told the Home Association that HRS records identified the Home Association as a sheltered nursing home/continuing care facility licensed under chapter 651. It also told the Home Association that "any nursing home bed located in a continuing care facility and not approved specifically as a sheltered nursing home bed and any nursing home bed located in a life care facility prior to 1979 shall be classified as a community nursing home bed." And the letter appeared to allow the Home Association an opportunity to request a "change in status" only if it had been issued a certificate of need as a community nursing home bed after 1979 and before 1982. It may be that when the Home Association wrote back that it had no certificate of need issued, and that it had been in existence since 1899, the Home Association was simply telling HRS that its beds fell in the category of automatically being community nursing home beds because "located in a life care facility prior to 1979." If the Home Association beds are counted as community nursing home beds, then those 96 beds are added to 5,964, and LB is 6,060. Licensed beds in the subdistrict (LBD) On June 1, 1986, there were 2,612 licensed beds (LBD) in the subdistrict, Hillsborough County. If the 96 beds at the Home Association are counted as community nursing home beds, then LBD is 2,708. Current populations (POPC and POPD) Whether POPC and POPD are the populations on January 1, 1986, or July 1, 1986 HRS divides the regulatory function with respect to certificates of need into two program offices. The office of comprehensive health planning (OCMF) is ordinarily responsible for writing the rules and developing the methodologies for the certificate of need program. It is also responsible for writing the state health plan. The office of community medical facilities (OCMF), which is now called the office of community health services and facilities, is normally responsible for making decisions upon applications for certificates of need. T. 929 (The transcript is in error on line 11; it should read OCMF), 930, 936, 1748, 1251. There are exceptions. T. 937 From 1984 through 1986, the office of comprehensive health planning routinely issued semiannual reports in which it calculated the need for community nursing home beds. H.Q. Exs. 12-18. T. 970-971, 1251. In each of these reports, bed need was projected for an established date. In each of these reports, the "current populations" (the base populations from which the need projection was made) were 3.5 years earlier than the date upon which need was projected. H.Q. Exs. 12-18; T. 1253. From 1984 through 1986, notwithstanding the fact that the semiannual report was based upon a 3.5 year period of need projection, the office of community medical facilities sometimes used a 3.0 year period of projection to actually issue certificates of need. T. 1254. That practice was not uniform within the office of community medical facilities. A number of certificate of need applications were issued based upon the calculations of need in the semiannual nursing home report, which used a 3.5 year period of projection. T. 560-561. It is officially recognized that several formal administrative hearings were settled using a 3.5 year period of projection of need. Health Quest Realty d/b/a Regents Park of Sarasota v. Department of Health and Rehabilitative Services, Final Order issued October 25, 1985 (CON number 3278), DOAH case number 84-3389, which was an exhibit in DOAH case number 86-0050, both cases which were before this Hearing Officer; Health Quest Corporation d/b/a Regents Park of Broward v. Department of Health and Rehabilitative Services, 8 F.A.L.R. 2485, DOAH case number 84- 3297. But even that deviation was not uniform. It is officially recognized that in Manor Care of Hillsborough County v. Department of Health and Rehabilitative Services, 9 F.A.L.R. 1102, DOAH case number 86-0051, HRS proposed at the formal administrative hearing to use a 2 year period of projection, using 1986 populations as "current" populations, although the applications were filed in 1985, and need was being projected in 1988. See paragraph 18, findings of fact, of that recommended order, which was written by this Hearing Officer. See also T. 1290. It is also officially recognized that in Forum Group, Inc., et al. v. Department of Health and Rehabilitative Services, et al., 8 F.A.L.R. 5438, 5445, para. 15, the Department used January 1986, as the starting date for a projection to July, 1987, an 18 month period of projection. It would serve no useful purpose to review all the other orders in the files of the Division of Administrative Hearings. It may be concluded from the foregoing that the way in which HRS has interpreted the meaning of "current" populations in its nursing home rule in the period from 1984 to 1986 was inconsistent. In fact HRS did not uniformly use a 3.5 year period of projection as now urged by the Petitioners. Since it has been concluded as a matter of law that the values of POPC and POPD must be determined as of July 1, 1986, no findings of fact will be made as to the populations on January 1, 1986. Whether POPC and POPD are determined from the July 1, 1986, or the May 12, 1987 release of Governor's estimates and projections The Governor's estimates and projections of population are prepared by the Bureau of Economic and Business Research and the University of Florida. T. 240. The Governor's estimates are released twice a year. T. 241. A population estimate, such as POPC or POPD, is an educated guess as to current population size. T. 239. A population projection, such as POPA or POPB, is a mathematical prediction of what a future population size will be. T. 240. The Governor's population estimates are based primarily upon actual data collected with respect to residential electric hookups combined with local information about housing mixes and national data about household size, persons per household, and institutional or group populations. T. 240, 242. The information is gathered each year. T. 242. The Governor's population projections are based upon the most recent population estimate projected forward using assumptions about future migration, mortality, and fertility. T. 240, 242. The May 12, 1987, Governor's population estimates and projections were the official Governor's release on the date of the formal administrative hearing, and were then the most current release. T. 241. The May 12, 1987, Governor's population estimates and projections for July 1, 1986, and July 1, 1989, were more accurate than the release by the Governor on July 1, 1986 for the following reasons: The May 12, 1987, projection of populations on July 1, 1989, is more accurate because the projection only attempts to project two years into the future. The July 1, 1986, release tries to project three years into the future. Extrapolation is more accurate over a shorter period of time because the underlying assumptions upon which the extrapolation is based will be assumed to remain constant for a shorter period of time. Stated another way, fewer things typically go wrong with the assumption that assumptions will remain constant over a short period of time rather than a longer period of time. T. 243-244. The May 12, 1987, projection of populations on July 1, 1989, are based upon actual hard data (electric hookups) for July 1, 1986, projected forward. The July 1, 1986, projection of populations for July 1, 1989, was not based upon a population estimate, but was based upon a population projection as to the population on July 1, 1986, which itself was based upon electric hookup data from an earlier period. T. 244. (This is also the reason that the May 12, 1987, estimate of July 1, 1986, populations, is more accurate than the projection of that population released on July 1, 1986.) The May 12, 1987, projection of populations on July 1, 1989, are based more current (actual 1986) figures upon which the extrapolation is made: actual levels of fertility, mortality, and migration for 1986, as well as 1980 through 1985. The July 1, 1986, release did not have this better data available, and had to rely on figures for only 1980 through 1985. T. 244. The district has grown at about 2.9 percent a year from 1980 to 1986. The July 1, 1986, release projects a rate of growth in each year from July 1, 1986, to July 1, 1989 of only 1.6 percent, or only one-half of the actual observed rate. There is no basis to conclude that the district growth rate in the period 1986-1989 will be one-half the rate observed in the prior six years. T. 245. The July 1, 1986, release bases its projection of July 1, 1989, populations upon an extrapolation based in part upon mortality rates from 1980 mortality tables. However, the mortality rates for the age groups involved, ages 65-74 and 75+, have substantially declined since the 1980 tables were compiled. T. 247-248. Elfie Stamm is Supervisor of the HRS Health Care Facilities and Services office. That office is responsible for all HRS health planning activities, including development of regulations for the certificate of need program, issuance of health policies governing the certificate of need program, and development of the state health plan. Ms. Stamm thought that the May 12, 1987, release of Governor's estimates and projections of populations was more accurate than the July 1, 1986, release because it was based on more up-to-date data. F.G. Ex. 15. The effect of selecting the May 12, 1987, release of populations, rather than the July 1, 1986, release upon the net need projected for the subdistrict in July, 1989, by HRS's rule is exceptionally dramatic: if the July 1, 1986, release is used, the net bed need is 143, and if the May 12, 1987, release is used, the net bed need is 300, assuming other factors are held constant (the projection period and the Home Association beds). HQ Ex. 4. Thus, use of the May 12, 1987, release of populations reveals 100 percent more bed need in 1989 than use of the July 1, 1986, release. HRS presented only one justification or basis for its policy of using the July 1, 1986, release of population estimates and projections: those were the most current estimates and projections at the time the applicants filed their applications and subsequently when the agency conducted its review of the applications in the batching cycle and developed its proposed agency action. T. 1709. The July 1, 1986, release of population estimates and projections was not available, however, when the applicants in this batch had to file their letters of intent. T. 1286. Based upon the Governor's estimates of population released on May 12, 1987, the estimated population on July 1, 1986, for age 65-74 (POPC) was 134,968, and for age 75+ (POPD) was 94,402. H.H. Ex. 6. Projected populations on July 1, 1989, POPA and POPB Based upon the Governor's projections of population released on May l2, 1987, the projected population on July 1, 1989, for age 65-74 (POPA) was 149,771, and for age 75+ (POPB) was 108,400. H.H. Ex. 6. The occupancy rate The occupancy rate for the 2,612 licensed community nursing homes within the subdistrict for October, 1985, through March, 1986, was 94.18 percent. T. 1707. If the 96 nursing home beds at the Home Association are counted as licensed community nursing home beds within the subdistrict, the occupancy rate within the subdistrict for October, 1985, through March, 1986, was 94.29 percent for these 2,708 beds. This is derived by averaging the occupancy rate of the Home Association for the six month period, which is 97.225 percent, see T. 1725, and then factoring the two rates together as follows: (97.225 X 96/2708)) + (94.18 X 2612/2708)= 94.29. The date for determining licensed beds and approved beds for purposes of determining net need in the final calculation The number of approved beds was 368 whether one relies upon the date that the supervisor signed the state agency action report, T. 1708, or August 25, 1986, which is the date of the semiannual nursing home census report and bed need allocations, H.Q. Ex. 16. It appears that all parties agree to use of 368 for AB in the formula. See T. 1708, 437; F.G. Ex. 8. Since that is the case, the following findings of fact are made in the event that the Hearing Officer has overlooked evidence on this point in this voluminous record. HRS relies again on incipient policy for the date of determination of the number of approved beds. That policy is to determine the number of approved beds in the subdistrict on the date that the supervisor signs the state agency action report, a date different from the date that licensed beds are determined. T. 1708, 1716. Pursuant to this policy, the date for determining approved beds will vary, but will always be later than the date of determining licensed beds. T. 1291. The basis for this incipient policy was not explained in this record. T. 1698-1711, 1711-1728, 1291-1295, 1746-1764. Mr. Jaffe, the supervisor in this case, first signed the state agency action report in mid-November, 1986. T. 1295. Subsequently, however there were several superseding state agency action reports, and the report signed originally by Mr. Jaffe was never issued. As a result, the last state agency action report in this case was not issued until August 18, 1987, over one year after the initial applications were filed. This was an irregular procedure, and not the way state agency action reports normally are issued. T. 1714. Moreover, the state agency action report issued in August, 1987, did not have a line or signature for the supervisor, Mr. Jaffe, to sign. T. 1292; F.G. Ex. 5. Changes to the application of Forum Group Forum Group's original application for certificate of need in this case is F.G. Ex. 3. It should be noted that this exhibit contains some revisions to tables that were filed by Forum Group before HRS deemed application to be complete, and thus superseded earlier tables in the same exhibit. At the formal administrative hearing, Forum Group submitted an "update" of its application for certificate of need which was prepared about a year after the initial application, as amended, was filed. The update is F.G. Ex. 6. T. 43. Table 7 of both applications contains Forum Group's plan for utilization by class of pay. Table 7 in the original application was for the first year of operation. Table 7 of the update is for the second year of operation. Table 8 of the application is a list of projected patient charges by reimbursement or charge type. Table 8 of the update is significantly different from the original application. Table 8 of the original application, F.G. Ex. 3, listed charges that were consistent with then current charges at other Forum Group facilities. T. 185. The update is for an effective date two years later. Although Forum Group presented evidence that the charges in the updated table 8 were reasonable, T. 189, it claimed that the above increases were solely due to the two year difference in the tables. T. 195. There is also evidence that the revised charges in table 8 was based upon a telephone survey conducted of subdistrict nursing homes three months prior to the formal administrative hearing. Forum Group was unable to provide any evidence as to whether the charges in the updated table 8 were based upon data that was not available to Forum Group when the original table 8 was prepared; moreover, Forum Group did not prove that the data was such that Forum Group could not, and reasonably should not, have been expected to have gathered for its original application. T. 198. The revisions of table 8 were not based upon ordinary inflation. Forum Group assumed in both the original table 8 and the revised table 8 that the inflation rate impact on charges between the first and second year of operation would be only 3.5 percent, T. 199. Forum Group's expert on charges was of the opinion that the inflation rate for expenses would be about 3.5 percent. T. 200-201. The increases in charges shown on table 8 of the update are much greater than expected inflation. For example, the charge for Medicaid ICF semiprivate rooms increased from $50 to $63, an increase of 26 percent. The charge for private pay ICF private rooms increased from $75 to $115, an increase of 53 percent. Table 10 of the application is a projection of patient days and occupancy percentages for each month over the first two years of occupancy. The revision to table 10, F.G. Ex. 6, were prompted by the delay in the case, resulting in an initial opening date two years later. The revisions to table 10 in the update were also based upon the prior experience of Forum Group and a telephone survey of subdistrict nursing homes to obtain more current fillup and occupancy rates. T. 39, 79-80, 84-87. The telephone survey was conducted after the initial application was deemed to be complete. Table 11 of the application sets forth the "manpower" requirements, specifying full time equivalents and annual salaries. Revised table 11 in F.G. Ex. 6 contains changes both in annual salary levels and in FTE's. The dietary supervisor and maintenance supervisor are new positions in the revised table 11, and would be shared with the retirement living facility. These positions could have been reported in the original table 11. T. 164; F.G. Ex. 6. The revised table 11 reports positions for utility workers, positions not in the original application but which could have been reported in the original table 11. T. 166. The revised table 11 has fewer registered nurses and licensed practical nurses than the original application. This change was based upon Forum Group's decision that this new staffing pattern would be more efficient. While the testimony attributed this to a difference in projected occupancy in the first year (95 percent instead of 74.4 percent), this is not a plausible reason for changing the number of RN FTE's from 5.3 to 4.3, or the number of LPN FTE'S from 3.6 to 2.8, since one would expect a need for more nursing at higher occupancy. The revised staffing pattern could have been contained in the original application. T. 166, 170. The increases in salaries reported in the revised table 11 were caused in part by inflation (a later opening date). T. 161-62. The revision in salaries was based upon a survey of salaries conducted a year after the application was filed, T. 162. Considered in the new survey was new information concerning federal requirements for professionals that was estimated to make the professional hiring shortage even worse. Id. It is concluded that the basis for the revisions to the salaries was market data that could not have been available to Forum Group when it filed its original application. Table 25 of the application covers estimated project costs. Revised table 25, F.G. Ex. 6, contains changes of two types: shifts of costs from one accounting line to another, and new estimates of costs based upon a later date of construction. T. 66-67, 91-94. The new estimates of costs were based upon inflation and the current construction experience off Forum Group, both of which would not have been available to Forum Group when it filed its initial application. T. 66-67. The shifts in costs by accounting line (even though one shift was to operating costs), considered alone, did not substantially change the total project cost. T. 91-94. The construction costs contained in the revised table 25, F.G. Ex. 6, are projected to be $1,654,826, which is 12 percent greater than the $1,466,500 originally projected. This new estimate is based upon inflation, current construction experience, and a decision to reduce some less essential space to lower costs. T. 66-67, 1461-65. The inflation rate is estimated to be higher than 3.5 percent in 1990, and the date of commencement of construction is inferred to be two years later than the date assumed in the original application. The revised projection is also more conservative, based upon Forum Group's analysis of current market data. The revised construction cost is thus adequately based upon new data that was not available to Forum Group when it filed its original application. As a result of inflation, Forum Group decided to reduce some space that was less essential. The reduction of space is reflected in revised tables 17 through 20 of F.G. Ex. 6. Forum Group's initial application (F.G. Ex. 3) did not mention or discuss patient treatment plans, patient rights, patient councils, or Alzheimer's programs. It did, however, list 10 special areas of nursing that it would provide, many of which are in the subacute area. See, e.g., ventilator care and compare T. 150. The revised pro forma of operating expenses projects total operating expenses in the first year of $923,153 and $1,256,991 in the second year. F.G. Ex. 6. The original application, as revised before deemed complete, reported total operating expenses of $659,900 and $740,693, respectively, for these same projected years. The new information in the revised pro forma was explained as based upon a projection of higher use by private pay patients and faster fillup, as well as some inflation. T. 202. The change clearly is not explained as a simple matter of inflation, since the increases are about 50 percent in each of the years. T. 201-202. Changes to the application of Health Quest The original Health Quest application is H.Q. Ex. 1, as amended by H.Q. Ex. 2, and is for an 88 bed community nursing home facility. Health Quest submitted a revised application for 60 beds dated a year later, in September, 1987. H.Q. Ex. 3. Table 8 of the application is the list of projected charges by patient type. The revised application, H.Q. Ex. 3, increased charges from 25 to 34 percent. This new information was not based solely upon inflation assumptions, but was based upon increased assumptions about operating costs, and a decision to make a more conservative projection. T. 629, 690-91. Health Quest did not prove that these assumptions were based upon data not available when the original application was filed. Table 11 of the application lists manpower by position and projected annual salary. The revised table 11, H.Q. Ex. 3, increases the numbers of registered nurses and licensed practical nurses from the original application. The new data is based upon the experience of Health Quest in the year following the filing of the original application. T. 630. The testimony on pages 688-89 of the transcript is not inconsistent with the testimony on page 630. It is evident that a change in planning took place, and that the change in planning was based upon new experience. Table 17 of the revised Health Quest application, H.Q. Ex. 3, does not have six 3 bed rooms which had been planned for the facility in table 17 of the original application, as amended, H.Q. Ex. 2. This new information was not caused by the reduction of the application from 88 beds to 60 beds. Health Quest did not credibly prove that its decision to delete 3 bed rooms from its project was based upon data that it could not have had when it filed its original application. T. 630-31. Table 18 of the revised application, H.Q. Ex. 3, changes the square footage of 1 bed rooms from 150 to 216. Health Quest did not credibly prove that its decision to make this change was based upon data that it could not have obtained when it filed its original application. T. 632-33. Changes to the application of Careage Careage presented new information at the hearing which consisted of Careage Exhibits 18-22 and 24-25. The changes to these exhibits were based solely upon a small (3 percent) inflation rate or a different starting date. T. 1570-85. There was also a decrease in utility rates of an apparent few thousand dollars. Compare C. Ex 25 to C. Ex. 3, attachment 12. T. 1583-85. The new projection of utility rates was shown to be based upon new information from the utility company, and new heating and cooling technology. T. 1584. Changes to the application of Hillsborough Healthcare Hillsborough Healthcare did not submit any changes to its application. The merits of the Careage application Credibility of the Careage application Credibility of Mr. Gentle Russell Gentle is Careage's Vice President for nursing home operations, and is responsible for development of the nursing home at issue in this case, and operation of the facility after it opens, as well as development and operations of other Careage nursing homes. T. 1487. The application filed by Careage in this case was prepared by Mr. Gentle, with the exception of the section on need. T. 1491. Mr. Gentle was called as an expert witness for Careage to provide opinion testimony to substantiate the Careage application and to prove the nature of the facility that Careage states it would build and operate if granted a certificate of need. T. 1491-93. Mr. Gentle testified twice that he had a bachelor's degree with a major in accounting from the Alaska Methodist University. T. 1487, 1493. This testimony was presented in order to have Mr. Gentle qualified as an expert witness. Mr. Gentle was tendered as an expert in several areas, including nursing home finance. T. 1493. Upon voir dire examination, and after it became obvious that counsel conducting the examination had investigated Mr. Gentle's academic credentials, 1493, Mr. Gentle admitted that he did not have a degree in accounting, but that his degree had been in science. T. 1496. A motion was made to have Mr. Gentle precluded from testifying as a witness due to his untruthful testimony. T. 1497-98. The motion for the sanction of preclusion of testimony was denied, but the tender of expertise was denied for lack of credible evidence in the record as to expert credentials. T. 1499, 1504, 1512-13, 1514-16. Since the witness had intentionally lied about his college education, a matter of importance in determining expertise, the remainder of the witness's testimony as to his experience and expert credentials was tainted and not credible. There was no independent evidence of the training and experience of the witness, other than from his own testimony. The tender of expertise thus was denied for lack of credible evidence of expertise in the record. If Mr. Gentle's testimony concerning his experience in nursing home development had been credible, the evidence of such experience was not sufficient to qualify Mr. Gentle as an expert in nursing home development. Since 1985, he had been fully responsible for development of only two nursing homes, and assisted in the development of five others. T. 1509, 1489, 1514-15. If Mr. Gentle's testimony concerning his experience in nursing home operation and administration had been credible, the evidence of such experience was not sufficiently detailed to qualify him as an expert in nursing home operation and administration. T. 1513-15. Mr. Gentle had never served as a nursing home administrator. T. 1494. Mr. Gentle testified that in 1972 he went to work for the State of Alaska as an auditor in the Department of Health and Social Services. He further testified that he worked his way up through the sections and became chief Medicaid auditor for the state of Alaska. T. 1487. The employment record for Mr. Gentle, however, from the State of Alaska was admitted into evidence without objection. H.H. Ex. 33. That record shows a starting date of work in 1973, not 1972. More important, it does not show continuous employment consistent with the claim of having worked "up through the sections." The record shows no employment of Mr. Gentle by the State of Alaska for 2 and 1/2 years, from July, 1973, through March, 1976, and the only employment is in temporary positions, not in permanent positions expected to have been in the "sections" Mr. Gentle "worked up through." Finally, the employment record only shows Mr. Gentle in a position as an accountant IV (temporary) for a 9 month period in 1976. Mr. Gentle's testimony that he obtained the position of chief Medicaid auditor for the State of Alaska after working his way up through the sections is not credible. Mr. Gentle testified that C. Ex. 15 was an excerpt from the magazine "Contemporary Long-Term Care," and that this excerpt was the section of the magazine that included an award. T. 1541-42. He testified that all of the narrative in the exhibit was part of the magazine and the award. T. 1542. This is testimony was incorrect. The last page of the exhibit contains narrative that is advertisement prepared by Careage. The typeset is identical to that in the interior pages as well. Thus, pages 2-4 of the exhibit are not excerpts from the magazine. Mr. Gentle did not choose his words with care as he testified. Table 11 (projected salaries and FTE's) is a part she original application filed with HRS in July of 1986. Mr. Gentle testified that in part the projected salaries were based upon salaries that "Careage is paying to its existing staff." T. 1557. At that time, Careage did not operate any nursing home. Mr. Gentle could have meant that these were salaries in nursing homes leased out by Careage, but his choice of words was misleading. Whether Careage will operate the facility Careage was started in 1962, and since that time it has constructed more than 270 new hospitals, nursing homes, and related facilities. Generally, Careage has built facilities for others to operate. T. 1516-17. A few of these (seven were named, T. 1520) may have been operated by Careage, but the vast majority were not. T. 1591-1520. In 1982, Careage ceased all nursing home operations. T. 1592. From 1982 through 1985, Careage did nothing but hospital development. T. 1519. In 1985, Careage decided to build and operate nursing homes, and in March 1985, hired Mr. Gentle to set up the operating arm of the corporation with respect to nursing homes. T 1513, 1518. In July, 1986, when Careage filed its application for a certificate of need, Careage did not operate any nursing homes in the country. T. 1595. It appears that the first nursing home now operated by Careage was opened in December, 1986. T. 1610. At the time of the formal hearing, Careage operated and managed three nursing homes on its own, and jointly managed three others. (Another was said to be "jointly operated by others.") T. 1519-20. All of these facilities are in western states. In the letter of intent, Gene D. Lynn, the proposed owner of the proposed facility, and the sole owner of Careage, stated his intent to operate the proposed nursing home in Hillsborough County. C. Ex. 3, attachment 8. The application, C. Ex. 3, asserts on page 4-24: Each community and situation is unique. There are times in which we operate directly through Healthco Management (a wholly owned subsidiary). In all cases, we establish the operating procedures and pro forma and closely monitor each facility. This strategy has generated such a successful program that, in twenty-four years of business, we can boast at never having missed a debt service payment nor have we had a single incident of governmental intervention into our operations. (E.S.) The clearly intended implication of the foregoing portion of the application is that for 24 years, Careage has either operated its nursing homes (which in the majority of cases was untrue) or, if it did not operate its nursing homes, it "closely monitored each facility." The statement in the application that Careage closely monitors each facility is not true, at least with respect to currently leased facilities. Mr. Gentle, who is in charge of nursing home operations for Careage, does not routinely review state licensure survey reports for leased facilities. T. 1842. Leased facility reports may be reviewed by the Careage leasing section, which is separate from nursing home operations. T. 1842. The only monitoring that Careage does with respect to leased facilities is to step in if there is government intervention. T. 1843. Careage has retained the contractual right to intervene in the operations of a leased facility only "in cases of severe problems in a facility." (E.S.) T. 1518. The statement in the application, P. 4-24, concerning the history of Careage as to operation or supervision of nursing homes is misleading. As will be discussed ahead, Careage representatives were either confused about the operation of nursing homes by Careage (Dr. Etten) or used words in a manner that misrepresented the operational status of Careage (Mr. Gentle and representatives of Careage at a dinner meeting with Ms. Hardy). These misleading statements, coupled with the prior history generally of not operating nursing homes, lead to the conclusion that Careage has not proved that it will operate the proposed nursing home in Hillsborough County by a preponderance of the credible evidence. Substantive aspects of the application General provisions Careage's original application proposed to construct 120 beds, 10 of which would be a subacute unit, 21 of which would be an Alzheimer's unit, and the remaining 89 beds would be general SNC/ICF (skilled/intermediate) nursing care beds. C. Ex. 3, P. 2-1. Four of the ten subacute unit beds would be designated for neonates and technology dependent children. C. Ex. 3, P. 3-6; T. 1522. The 10 bed subacute unit is proposed to provide 24 hour nursing care patients who are recovering from strokes, craniotomy patients, comatose victims of accidents, and others suffering serious chronic maladies. T. 1212. Nursing services to be provided include tube feedings, ventilators, tracheostomies, continuous intravenous infusion, hyperalimentation, total parenteral nutritional care, and inhalation therapy. T. 1213. The program proposed by Careage conforms to professional standards for such a program. Id. The 21 bed Alzheimer's disease unit is designed and intended to provide an environment adapted for the special needs of those patients. The design and program emphasizes low stimulation, safe ambulation, and simplicity to minimize confusion. The design is considerably more therapeutic for such patients than commingling such patients among other patients in an ordinary nursing home setting. T. 1206-12, 1432, 1474-75. The precise number of skilled and intermediate care nursing beds is unclear. At least 39 beds will be skilled nursing, and 21 beds for the Alzheimer's patients. T. 1136. Careage intends to concentrate on skilled nursing care rather than intermediate care. T. 1523, 1678. Careage does not intend to serve the market for intermediate care. Id.; C. Ex. 3, attachment 8. Careage did not include adult day care in its application, T. 1142, 1592, because it takes the position that adult day care does not require a certificate of need. T. 1592. Careage in fact will not offer adult day care. T. 1192. Careage intends to provide respite care at the facility. T. 1531. Careage estimates that 37 percent of its patients will be Medicaid patients. T. 1361. Quality assurance The nursing quality assurance programs described in the application of Careage are adequate, and would be adequate if implemented by Careage. T. 1221. Dr. Etten testified for Careage concerning her visit to two nursing homes owned by Careage. She did not express an opinion that the Careage quality assurance program in fact would be implemented based upon these visits. She did not describe the current operation of any Careage quality assurance program. She simply stated that she was favorably impressed by the physical environment in those two nursing homes. T. 1221-26. One of the facilities was in Salt Lake City, Utah, and there is no evidence in the record that Careage operates that facility. See T. 1519-20. Indeed, Dr. Etten later admitted on cross examination that she knew the Utah facility was not operated by Careage. T. 1234. Throughout the application process, Careage tended to misrepresent its status as an existing operator of nursing homes providing care of good quality. As discussed above, in the meeting in August or September, 1986, attended by Mr. and Mrs. Lynn, Mr. Haben, and Ms. Hardy, Careage's representatives told Ms. Hardy that Careage operated nursing homes in other states in which care of good quality was provided. T. 1060. The application, at page 4-24, appeared to assert that Careage had 24 years of experience operating nursing homes. Mr. Gentle represented that proposed salaries were based upon salaries in nursing homes currently operated by Careage. These statements were not true. Careage leased facilities, but did not operate any facilities at that time of the application, and its history had been primarily in the development of health care facilities for operation by others. Careage did not exercise close operational control of the leased facilities. And Dr. Etten seemed unconcerned as to what entity was operating the Utah nursing home that she visited. Her failure to do so caused her testimony to appear to be representative of the quality of care actually provided at Careage operated nursing homes. For these reasons, Careage did not prove by a preponderance of the credible evidence that it has had a history of operation of nursing homes, that it has had a significant history of providing nursing care of good quality, that it has had substantial experience in management of quality assurance programs, or that it would in fact implement the quality assurance program reviewed by Dr. Etten. Staffing Staffing, particularly nursing staffing, is established based upon the assumption that most of the beds at the Careage facility will be at least skilled nursing care beds, and some will be Alzheimer's disease beds or subacute beds, including beds for technology dependent children. Attachment 14, Ex. 3. The nursing staffing proposed by Careage is adequate. T. 1216. Other staffing proposed by Careage is based upon staffing at other facilities owned by Careage and standards in HRS rules. T. 1557, 1559. It is concluded that other staffing is adequate. The projected annual salaries for staff are reasonable. T. 1648, 1656, 1680-81. The objection to this testimony, taken under advisement, was overruled. T. 1687. The witness amply demonstrated expertise with regard salary levels. Construction and facility design The building proposed by Careage would be one story and have 45,500 square feet for 120 residents, or a total of 379.17 gross square feet per bed. T. 1133. The application represents that the net square foot area for living space in 2 bed (semiprivate) rooms is 283 to 295 square feet. C. Ex. 3, table This was an exaggeration. The actual square footage was shown to be substantially less upon cross examination: 213.75 square feet of living space for semiprivate rooms. This figure is based upon the fact revealed upon cross examination that the length of the room for purposes of calculating gross square feet is 23.5 feet instead of 24 feet, 4 inches. This correction reduces gross living square footage for the living area to 305.5, and net to 213.75. The floor plan, site plan, and space programs in the proposed design are adequate and will meet or exceed all requirements of Florida law. T. 1137. The nursing home floor plan does not include a space for adult day care. T. 1142. Careage projects that construction costs will be $56.77 per square foot. This estimate is in line with estimates of other applicants and is reasonable. T. 1176-78. Construction costs equate to $21,526 per bed. Careage did not include an estimate of costs for equipment for technology dependent children, but plans to cover this with funds estimated for contingencies. T. 1195. The amount of such costs is not in evidence. Id. The estimate of overall project costs, table 25 of the application, Ex. 3, is reasonable. T. 1171-76. Total project costs are estimated to be $4,150,000, or $34,583 per bed. The project cost includes $515,000 for 3 to 5 acres of land. T. 1546. The adequacy and appropriateness of the proposed equipment for the facility was not established by expert testimony. See T. 1179. Availability of resources Gene D. Lynn has an extensive history in successfully financing and constructing health care facilities, including nursing homes. T. 1516-17. Gene D. Lynn has more than adequate lines of credit to obtain complete financing for this project. T. 157 6- /7 Existing lines of credit, including SeaFirst, are available up to at least $9 million. T. 1576. The objection as to hearsay, which was sustained, was sustained only as to what unnamed persons with Washington Mutual "indicated." The remainder is not hearsay. It is testimony of the existing state of facts within the personal knowledge of the witness. The foregoing findings of fact are based upon testimony of Mr. Gentle, whose credibility as a witness was partially impeached as discussed in findings of fact above. Mr. Gentle's credibility problems, however, are not sufficient to compel the disregard of his testimony as to the general financial condition of the Lynns and Careage. Mr. Gentle demonstrated that his testimony as to his own expert qualifications was unworthy of belief, and he demonstrated that some portions of his testimony concerning the features of the proposed facility were exaggerated or incorrect. But this is not sufficient evidence to conclude that his testimony as to general financial resources of Careage is an untruth. It is noted that there is no evidence in this record to suggest in any manner that Gene Lynn does not have the net worth set presented in his unaudited financial statement. That net worth is over $45 million. If this were a substantial untruth, surely one of these highly competitive applicants would have presented evidence on the point. Financial feasibility The proposed project is financially feasible in the short term. T. 1632-39, 1686. Careage's projections as to patient mix (by payor type) and expected fillup (utilization) are reasonable. T. 1640- 42 The charges proposed by Careage are reasonable. T. 1642-45. Careage's projections as to operating expenses are reasonable. T. 1648, 1656-57. The proposed project is financially feasible in the long term. T. 1647, 1649-50, 1686. The Forum Group application General provisions Forum Group is a national company which owns and operates 11 retirement living centers and 22 nursing homes in a number of states. The retirement living centers are independent rental apartments which do not require entry fees. T. 20; F.G. Ex. 3. The Forum Group proposal is to construct and operate a 60 bed community nursing home in conjunction with a retirement living facility of 120 apartments and an adult congregate living facility of 30 units. F.G. Ex. 3, attachment 1. The community nursing home section would offer all services required for provision of skilled nursing care, intermediate nursing care, respite care, and adult daycare. T. 27. Forum Group does not propose to provide a separate Alzheimer's disease unit. The estimated total cost of the nursing home portion of the project is $2,673,084. F.G. Ex. 6, table 25. This is $44,551 per nursing bed. Forum Group will accept Medicare and Medicaid patients. T. 27, 210. Quality assurance Forum Group has never had a license denied, revoked, or suspended, and it has never had one of its facilities placed into receivership. T. 158. The proposed facility would provide 24 hour supervision by either a registered nurse or a licensed practical nurse, or by both. T. 140. The staffing levels proposed in the original application are adequate. T. 153. Staffing levels would vary according to the needs of the residents. T. 134. Medications would be distributed by unit dose. T. 139. Forum Group would implement an adequate plan for quality assurance audits. T. 141-43. The plan is in writing, is in use in other Forum Group nursing homes, and covers all aspects of the operation of the nursing home that are relevant to the quality of care received by nursing home residents. Forum Group would check staff qualifications prior to employment and would provide ongoing staff training. T. 149. Forum Group would provide residents with written statements of patients' rights upon admission to the facility, and would have an independent patients' rights council. T. 147- 48 Forum Group provides reasonably adequate nursing care in its existing nursing homes, and would do so in the proposed nursing home. T. 31-32, 158. Staffing The staffing proposed for the facility, and projected salaries, are reasonable and adequate. T. 151-154. Forum Group reviews the qualifications of applicants to insure that applicants are qualified for the job. T. 149. Construction and facility design Forum Group's community nursing home facility will have about 24,500 square feet. This is reduced from the original 27,000 due to inflation in costs. Patient room areas were not changed. T. 1453. This is 408 total gross square feet per bed. The net living area square footage allocated to semiprivate 2 bed rooms is 228 square feet. F.G. Ex. 3. The square footage allocated in both versions is reasonable. T. 1445, 1453. The building would be wood frame with brick veneer. It would have heavy roof insulation, double glazed windows, and a heat pump to conserve energy and to operate with less utility expense. T. 1454. The construction costs, including equipment costs, estimated for the revised project, F.G. Ex. 6, table 25, paragraph d., are reasonable. T. 1453. The costs as originally projected were also reasonable. T. 1446. The proposed facility would comply with state and federal standards for construction. T. 1456. The 60 bed community nursing home would require two to three acres of land. T. 1455. The $400,000 estimated to be needed to acquire a suitable site is reasonable for location in the northwest portion of Hillsborough County. T. 54, 59. Availability of resources Forum Group will attract suitable health care professionals, despite the shortage in Hillsborough County, by offering attractive fringe benefits, including attractive work schedules and continuing education. T. 156-57. Forum Group has the financial resources to construct and begin the initial operation of the facility. T. 182-84. Financial feasibility The project is financially feasible in the short term. T. 182-84. Due to its corporate size and current operation of a number of nursing facilities, as well as the size of the combined planned facility in Hillsborough County, Forum Group will be able to purchase supplies and other operational necessities at a favorable low cost, thus saving on operational expenses. T. 156. The estimated fillup rate in the original application was about 75 percent occupancy after the first year and about 86 percent occupancy after the second year. T. 37. Given the recent experience in Hillsborough County of occupancy around 95 percent and very fast fillup rates for new nursing homes, T. 116-18, a projection of 86 percent occupancy in the second year is probably too low. For purposes of determining financial feasibility, it is reasonable but conservative. T. 37. The project is financially feasible in the long term based upon the pro forma contained in the original application. T. 186-88; F.G. Ex. 3. The merits of the Hillsborough Healthcare application General provisions Hillsborough Healthcare, Ltd., is a Georgia limited partnership owned by Stiles A. Kellett, Jr. and Samuel B. Kellett. Hillsborough Healthcare, Ltd., would own the proposed facility. T. 419. The facility would be managed by Convalescent Services, Inc., (CSI) which is also owned by Stiles A. Kellett, Jr. and Samuel B. Kellett. CSI was formed in 1978 to own and operate extended care facilities owned or controlled by the Kelletts. T. 420. CSI currently operates 21 nursing homes and 3 retirement homes in 7 states. Six of the nursing homes and 2 retirement centers are in Florida. Id. Centralized management is provided by regional offices in Sarasota, Houston, Texas, and Huntsville, Alabama. T. 420. The long range plan of CSI is to acquire and develop nursing facilities in locations where CSI already has a management structure nearby. T. 421. Hillsborough Healthcare proposes to construct and operate a single story combination nursing home, consisting of 120 beds, and an adult congregate living facility, consisting of 60 beds. H.H. Ex. 1; T. 423. The 120 nursing beds would consist of 60 skilled nursing beds and 60 intermediate care beds. The 60 skilled nursing beds includes a distinct 24 bed unit for Alzheimer's disease patients. Id. The application estimates the total project cost to be $5,032,475, with $3,367,668 of that cost attributed to the nursing facility portion of the project. H.H. Ex. 1. This is $28,063.90 per nursing bed for 120 beds. The facility would have a rehabilitation program, activities, and social services programs. T. 423. The Hillsborough Healthcare facility intends to make its facility available as a training facility for medical and nursing schools. T. 461. The facility would participate in both the Medicare and Medicaid programs, and estimates about 30 percent Medicaid utilization. T. 423. Hillsborough Healthcare would accept partial approval of only 60 nursing home beds. T. 490. In that event, the 60 bed nursing facility (combined with the 60 bed adult congregate living facility) would offer the same services, including the 24 bed Alzheimer's disease unit. T. 390, 473. Access as a patient to the facility will be on an equal basis, without distinction as to race, religion, or sex. The facility will be constructed to provide handicapped access. T. 462-63. At least 30 percent of the patients served by the Hillsborough Healthcare facility would be Medicaid patients, and the percentage may well be higher. Currently, 17 of the 21 CSI nursing homes participate in state Medicaid programs, and all of the Florida nursing homes have Medicaid patients. All new nursing homes developed by CSI participate in both Medicaid and Medicare. Many of the 17 nursing homes were not Medicaid certified prior to acquisition by Hillsborough Healthcare, but are now certified and participate. CSI has never decertified one of its nursing homes as a Medicaid provider. T. 424. Existing CSI managed facilities in Florida are currently experiencing a 40 percent Medicaid utilization, which includes at least one in Hillsborough County. T. 1798. B. Quality assurance Sixteen of the 21 CSI managed nursing homes are in states that use a licensure rating system, and of these, 14 are have achieved the highest rating. T. 422. No CSI facility has ever had its licensed revoked or has ever been fined. Id. One-half (three) of CSI managed Florida facilities are rated superior. T. 319. Centralized management and location of facilities so that management resources can be shared should enhance the quality of care at the proposed nursing facility. The quality assurance program will be guided by a lengthy policies and procedures manual that is in use in other Florida CSI managed nursing homes. H.H. Ex. 11; T. 313. CSI employs a full time Florida registered nurse to make visits at least once a month to CSI facilities in Florida as a part of the quality assurance program. T. 316. The nurse conducts quality of care inspections, using measuring instruments developed by the CSI quality assurance program, and teaches new methods to improve the quality of health care. T. 317. Hillsborough Healthcare will have an adequate quality assurance program. T. 310. C. Services and programs CSI would provide programs for care of Alzheimer's disease patients, respite care, and adult day care. Respite care is temporary nursing care, for 16 days or less, to give the family a temporary rest from home care, and to improve the condition of the patient. T. 300. Adult day care is care only during the day to enable a family member to work. T. 301. Both types of care provide an opportunity for the elderly patient to receive nursing services, including the programs and medical care available at the nursing home, while giving home care providers a rest or needed free time. The Alzheimer's disease unit of 24 intensive care nursing beds would have operational and design features to meet the special needs of those patient. The medical director is to be board certified with a specialty in geriatrics and training with respect to Alzheimer's disease. Activities will be altered to accommodate the limitations of those patients. Staffing will be at a higher level, and staff will be specially trained to meet the needs of those patients. The facility will be designed with a secure courtyard, special dining room, and wander guard, to allow movement without physical or chemical intervention or restraints. T. 299, 289. CSI varies the activities programs at its facilities to match the needs of patients. T. 270. Activities for Alzheimer's patients, adult day care and respite care residents are designed within the limitations of those patients. T. 289-90. CSI typically provides activities that provide small and large group interaction, socialization, mental and physical activity, recreation, and religious activities. T. 270. The activities that have been implemented or suggested for CSI facilities are innovative, varied, and appear to be the result of much thoughtful work. T. 273-74; H.H. Ex. 1, pp. 115-123 H.H. Ex. 8. Some of CSI staff involved in activities have received awards for their work. T. 288. The proposed facility would provide activities similar to the activities provided at other CSI facilities. T. 274. CSI has employed an expert in community relations and activities programming to coordinate community relations, activities, and the volunteer program at all CSI nursing homes, including the proposed facility. That expert is the author of pp. 114-121 of the application, H.H. Ex. 1. The expert would recruit and train activities and community relations directors at the proposed facility. T. 287. CSI publishes a newsletter containing an exchange of program information, and encourages each nursing home to publish its own newsletter. Some do. H.H. Ex. 10; T. 284-85. Volunteers are encouraged to participate in nursing home activities. 272. CSI has compiled a package of volunteer information for use in development of a volunteer program at each nursing home. H.H. Ex. 9. Volunteers increase resident participation in programs, bring fresh ideas, and causes there to be a greater variety of activities and programs for residents. T. 281. Association of the nursing facility with an adult congregate living facility is a useful way to provide continuity of care and lessens the trauma to the resident of the initial move into a nursing facility. In some cases, a spouse may live in the adult congregate living facility and thus be closer to the spouse who must be in a nursing facility. CSI currently manages Sun Terrace Nursing Center, a 120 bed nursing home, and Lake Towers Retirement Center, both in Hillsborough County. Consequently, CSI has already in existence a network of relationships that would benefit residents at the proposed facility. Existing relationships include a system for patient referrals from local hospitals, transfer agreements with local hospitals for acute and emergency care, and agreements with local providers for ancillary services, such as physical therapy, diet therapy, occupational therapy, speech therapy, opthalmology, dental care, podiatry, x- ray, and pharmacy services. T. 302-304. Similar agreements for the proposed facility could be established. Such agreements are cost effective because used only as needed. T. 304. CSI would provide all the ancillary services listed in figure 1, page 14, H.H. Ex. 1. T. 304. Staffing The proposed staffing of the facility, including the 24 bed Alzheimer's disease unit, is adequate. T. 308. The proposed salaries are reasonable and adequate. T. 309. Hillsborough Healthcare will be able to recruit adequate staff. T. 309. Hillsborough Healthcare will provide a reasonable staff development program. T. 309. This program will aid in the retention of staff. T. 310. Construction and facility design The 120 bed nursing section is designed to include 4 private rooms and 58 semiprivate (double occupancy) 4 rooms. T. 355. The design includes the services and departments listed on table 12 of H.H. Ex. 1. It is proposed that the total gross square feet will be 33,996, or 283 square feet per bed. H.H. Ex. 1 The square footage allocated by the design to net living space in patient bedrooms and gross area of the nursing unit, tables 18 and 19, H.H. Ex 1, are reasonable. T. 355. Semiprivate (2 bed) rooms would have 185 net square feet of living space. The Hillsborough Healthcare design has several cost saving features. Sharing ancillary services and spaces (kitchen, administrative areas, and laundry) with the adult congregate living facility of 60 beds reduces the overall construction and equipment cost and operational cost per bed. Use of a modular "T" configuration, with straight line walls and corridors for units, results in a savings in construction cost. T. 360-61. The compact design, accompanied by extensive roof over hangs and insulating materials, will reduce energy requirements. T. 357 The floor plan could easily be altered by alteration of the arrangement of the modular wings to fit on different sites. T. 358. Nurses' stations are located in the middle of wings, giving good visibility down corridors, but no visibility into rooms. The nurses' station is 7 rooms from the most distant room on any wing. H.H. Ex. 1, p. 103. The Alzheimer's disease unit is in a separate portion of one wing, and is contiguous to an interior space that will be fenced to make a secure courtyard. T. 357; H.H. Ex. 1, p. 103. The construction cost includes additional wheelchairs and walkers, and includes $4,500 for a wander guard system for the 24 bed Alzheimer's disease unit. T. 364. The projected construction cost includes fixed equipment. T. 356. The construction cost of $2,331,418 is reasonable. T. 356. All of the costs estimated in table 25, H.H. Ex. 1, p. 33 (estimated project costs) are reasonable. T. 345-466, 356, 455-56. Availability of resources Through available equity and long term debt, adequate resources exist for Hillsborough Healthcare to construct and initially operate the proposed facility. T. 396-402. Financial feasibility The proposed facility is financially feasible in the short term. T. 396-402; H.H. Exs. 15, 16, 1. The projected charge rates, table 8, H.H. Ex. 1, are reasonable. T. 379-80, 400, 452. The projected percentages of patient utilization by payor class, table 7, H.H. Ex. 1, are reasonable. T. 450, 393. The projected number of expected patient days in the first two years of operation, tables 10 and 7, H.H. Ex. 1, reasonable. T. 488-49. The projections of total revenue, table 7, H.H. Ex. 1, are reasonable. T. 400-01. The projections of expenses and net income for the first two years of operation are reasonable. H.H. Ex. 1, pp. 100-01; T. 401-02. The 120 community nursing home bed version of Hillsborough Healthcare's application is financially feasible in the long term. T. 402. If the Department partially approves the Hillsborough Healthcare application for 60 beds, to be operated in conjunction with the 60 bed adult congregate living facility, the projection will be financially feasible in both the short and long term. T. 402. The project would be financially feasible with a higher Medicaid participation. T. 424. The merits of the Health Quest application General provisions Since critical portions of the 60 bed application, H.Q. Ex. 3, were impermissible changes to the 88 bed application, and thus not admitted into evidence, only the 88 bed application will be discussed. Health Quest proposes to construct and operate 88 community nursing home beds in conjunction with an adult congregate living facility of 124 units. H.Q. Ex. 2. The total cost of the nursing portion of the facility is estimated to be $3,054,466, or $34,719 per bed. H.Q. Ex. 2. Health Quest has entered into an agreement with a group of 129 physicians, organized as the University Community Physicians Association of Tampa. That association comprises the bulk of the physicians who practice at University Community Hospital in northern Tampa. T. 585. The agreement is that Health Quest would build and manage the nursing home, and the physicians would provide medical oversight and referrals. T. 579. The physicians would contribute to equity and share in operating profits and losses. T. 624. The share is 25 percent. T. 694-95. Other details are not in evidence. The negotiations for the agreement with the University Community Physicians Association of Tampa took several months, and the agreement itself did not come into being until August, 1987. T. 581. The University Community Physicians Association of Tampa is not named as an applicant in the original application since the agreement came into being after the application was filed. Health Quest intends to construct the proposed nursing home and adult congregate living facility near the present location of the University Community Hospital. T. 583. Health Quest intends to serve approximately 30 percent Medicaid patients. T. 841, 1102. Quality Assurance Health Quest has nursing homes in Florida, Indiana, and Illinois. Health Quest has a reputation in Indiana and Illinois for providing good health care. T. 599-609. Health Quest has three nursing homes in Florida. Of those three, two had been open long enough at the time of the hearing to have received a Florida rating. Both were rated superior. T. 610. Health Quest has a nursing home in Jacksonville, Florida, and the quality assurance program and services at that facility are representative of the type of care and services at other Health Quest facilities, as well as what is intended for the proposed Health Quest facility in Hillsborough County. T. 1077, 1102. All findings of fact which follow that reference the quality of care or scope and nature of services at the Jacksonville facility are thus also findings of fact that these quality assurance programs and services are intended to exist at the Hillsborough facility. The Jacksonville facility maintains a resident care plan on each resident. Health Quest would provide health care of good quality at its proposed facility. Services and programs The Jacksonville facility provides a number of services that require skilled nursing or arguably fall within the category of "subacute" care. The term "subacute" care is not a formal definition, and there is no Florida licensure category for that phrase. The Jacksonville facility provides intravenous therapy, parenteral nutrition, and tracheostomy care. T. 848-51. It also provides care for comatose patients (accident or stroke victims) regardless of age, and care of post-craniotomy patients. T. 851-53, 855-56. Health Quest does not intend to care for neonates (sick infants less than two weeks old). Neonates require care that is distinct from the care required for the elderly, thus requiring staff with different training. Neonates also can be at substantial risk from respiratory and urinary infections commonly present among the elderly in a nursing home. T. 859-61. The Jacksonville facility provides physical therapy, speech therapy, and occupational therapy. The physical therapist is a full time position. T. 871. The Jacksonville facility provides counseling to residents and families with a full time social worker on staff. T. 864. The Jacksonville facility provides music therapy, outside trips, and other activities, such as family night, the artist in residence program, and use of the facility for community programs. T. 866, 888, 892. Some of these programs are conducted jointly with the adult congregate living facility. Volunteers are used in the activities programs as well. T. 869. The quality of the activities program is directly related to the numbers of staff persons involved in the program. T. 871. The Jacksonville facility provides respite care of about two weeks in duration, although it could be longer. T 872. The adult congregate living facility that would be a part of the Health Quest facility would have tee same beneficial consequences as the adult congregate living facility proposed by Hillsborough Healthcare. T. 902-04. The Jacksonville facility is often used as a place for continuing nursing education for high schools or the local nursing association. T. 906-07. Staffing Health Quest proposes a total of 59.75 FTE's or .679 FTE per bed. H.Q. Ex. 2, table 11. Health Quest acknowledged that the staffing proposed for the 88 bed facility was adequate in 1986 when prepared, but by 1987, it was experiencing the need for more licensed personnel, and that it would increase licensed personnel for the 88 bed facility now. T. 630. No evidence was presented as to the specific changes that would be made. T. 632. Construction and facility design Health Quest proposed in its application to construct 34 two bed rooms, 6 three bed rooms, and 2 one bed rooms. H.Q. Ex. 2, table 17. Health Quest wants to change its design, if built, to make the three bed rooms into two bed rooms. T. 631. Health Quest proposes to provide 240 square feet of net living space for semiprivate two bed rooms. H.Q. Ex. 2. Health Quest proposes to provide a total of 37,263 square feet for the 88 bed facility, or 423 square feet per bed. H.Q. Ex. 2. Health Quest estimates that the project will need 3 to 4 acres of land, and projects that it can acquire the land for about $320,000. H.Q. Ex. 2; 634. This estimate is reasonable in comparison to the estimates of all other applicants. Health Quest has constructed three nursing homes in Florida, and others in Indiana and Illinois, and thus has substantial experience in construction. Photographs of the nursing homes constructed and now operated by Health Quest show that those nursing homes are reasonably attractive and appear to be hospitable places in which to live. H.Q. Ex. 22. Availability of resources Health Quest has access to sufficient funds to construct the project and initially operate it. T. 586-87. Financial feasibility The Health Quest proposal is financially feasible in the short term and the long term. T. 593 Summary of comparative data The space and costs associated with the four proposals may be compared as follows: Appl. Cost/Bed NetFt/Bed TotFt/bed Cost/NetFtBed Cost/TotFtBed Careage $34,583 214 306 $162 $113 Forum $44,551 228 408 $195 $109 HealthQ $34,719 240 423 $147 $ 82 HillsH $28,063 185 283 $152 $ 99 The proposed staffing of the four proposals may be compared as follows: Applicant Total FTE RN FTE LPN FTE RN Asst FTE No. Beds Careage 96.0 11.9 7.4 42.1 120 Forum 37.6 5.3 3.6 14.00 60 HealthQ 60.75 4.8 2.2 25.00 88 HillsH 64.65 2.92 8.78 36.61 120 Staffing per proposed bed may further be compared as follows: TotalFTE Applicant Per Bed PN FTE Per Bed RN & LPN FTE Per Bed Total Nursing FTE Per Bed Careage .80 .10 .16 .51 Forum .63 .08 .15 .38 HealthQ .69 .05 .08 .36 HillsH .54 .02 .10 .40 Comparison of the Careage staffing to other applicants is difficult because Careage proposes primarily to serve patients needing skilled nursing care who thus require more nursing staff per bed. Forum Group, Hillsborough Healthcare, and Health Quest are relatively the same with respect to anticipated efficiencies and continuity of care due to the association of adult congregate living facility beds with the proposed nursing home. Forum Group plans only 30 ACLF beds, but also plans 120 independent living apartments. Hillsborough proposes to provide 60 ACLF beds, and Health Quest proposes to have 124 ACLF beds. There is no evidence in the record to determine the optimum mix of ACLF beds to nursing home beds. Conclusions of Law The Division of Administrative hearings has jurisdiction of the parties and subject matter of this proceeding. The Department's free form preliminary decision The free form decision of the agency is ordinarily not dispositive since a formal administrative hearing is intended to formulate agency action, and is not intended to review prior action. McDonald v. Department of Banking and Finance, 346 So.2d 569, 584 (Fla. 1st DCA 1977). The reasoning of the agency in its free form decision, however, ordinarily is a significant matter to be considered in the formal hearing. Findings of fact with respect to the free form decision-making upon the applications in this batching cycle have been made for two reasons: the assertion that the free form decision was influenced by considerations other than objective merit of the applications, and therefore not entitled to any persuasive effect upon this formal hearing, and representations in the free form stage made by Careage relevant to evaluation of the application of Careage. The free form decision in this case had the appearance of having been influenced in part by considerations other than the objective merit of the applications. For this reason, the free form decision with respect to these applicants has been disregarded as having no persuasive weight. Need calculated pursuant to rule 10-5.001(1)(k)2 Need for community nursing home beds is calculated pursuant to the need methodology set forth in rule 10- 5.011(1)(k)2, Fla. Admin. Code. The text of the rule is not in evidence, but comparison of the text of the rule referenced in proposed recommended orders indicates that the parties appear to agree that the rule promulgated on November 24, 1986, should govern this case. It is that rule that will be used in this recommended order. All parties agree that July 1, 1989, is the date upon which subdistrict need for community nursing home beds is to be determined. The first step in the need calculation pursuant to the rule is to determine BA. BA is defined by subparagraph 2a of the rule as the estimated bed rate for the population age 65-74 years in the relevant district. Subparagraph 2b of the rule provides: BA= LB/(POPC + (6 X POPD)) Where: LB is the number of licensed community nursing home beds in the relevant district. POPC is the current population age 65-74 years. POPD is the current population age 75 years and over. LB is at least 5,964, and is 6,060 if the 96 beds at the Home Association are, on this record, classified as community nursing home beds. Section 651.118(8), Fla. Stat. (1987) provides in part: This section shall not preclude a continuing care provider form applying to the Department of Health and Rehabilitative Services for a certificate of need for community nursing home beds or a combination of community and sheltered nursing home beds. Any nursing home bed located in a continuing care facility that is or has been issued for nonrestrictive use shall retain its legal status as a community nursing home bed unless the provider requests a change in status. Any nursing home bed located in a continuing care facility and not issued as a sheltered nursing home bed prior to 1979 shall be classified as a community bed. The Department of Health and Rehabilitative Services may require continuing care facilities to submit bed utilization reports for the purpose of determining community and sheltered nursing home bed inventories based on historical utilization by residents and nonresidents. (E.S.) The first sentence of this statutory section does not apply to the Home Association because it has not applied for a certificate of need. The second sentence does not apply because there is no evidence in the record that the nursing home beds at the Home Association were "issued" by anyone. The third sentence applies because the 96 nursing home beds at the Home Association were "not issued as a sheltered nursing home bed prior to 1979." The Home Association has existed since 1899 with its 96 nursing home beds, and never had a certificate of need. There was no statutory authority or definition for the issuance of a "sheltered nursing home" prior to 1979. By operation of law (the third sentence quoted above), the 96 beds are community nursing home beds. The fourth sentence appears to be directly in conflict with the third sentence. The fourth sentence states that HRS can conduct a study of historical utilization "for the purpose of determining community and sheltered nursing home bed inventories based on historical utilization by residents and nonresidents." The third sentence automatically confers community nursing home bed status upon certain beds based solely upon three criteria (located in a continuing care facility, located there before 1979, and not "issued" as a sheltered nursing home bed). Community nursing home bed status is thus conferred solely upon the three criteria, and historical utilization is irrelevant to the third sentence. If that is so, the fourth sentence, which allows HRS to "determine" community nursing home status based only upon historical utilization, is in direct conflict with the third sentence. This seemingly irreconcilable dilemma is not at issue in this case, however, because there is insufficient credible evidence in the record as to the "historical utilization" of the 96 beds at the Home Association. As discussed in the findings of fact, there is no credible evidence in this record as to how the 96 beds at the Home Association have in fact been "utilized" since 1899. Indeed, the only logical inference on this ambiguous record is that the Home Association has not felt itself constrained by any definitional categories, given its longevity in the Tampa Bay area. It thus is concluded as a matter of law, pursuant to the third sentence of section 651.118(8), Fla. Stat. (1987), that the 96 beds at the Home Association are community nursing home beds, and thus should be counted in the licensed beds in the district and subdistrict, LB and LBD. Thus, the correct value for LB in this case as of June 1, 1986, is 6,060. Next, the values of POPC and POPD must be determined Two issues arise with respect to ascertainment of the values of POPC and POPD. The first is whether the values of POPC and POPD should be determined on January 1, 1986, or on July 1, 1986. The second is whether the values of POPC and POPD should be determined based upon the Governor's estimates and projections of populations released on July 1, 1986, or on May 12, 1987. The first issue is governed by the clear language of the existing rule. The second issue has no clear guidance in the existing rule, and thus depends upon analysis of the record basis of the agency's incipient policy. With respect to the first issue, the parties urge that POPC and POPD are the populations on January 1, 1986, rather than on July 1, 1986. The basis of this argument is the inconsistent behavior of HRS over the last three years and in the January, 1987, batching cycle, wherein the values of POPC and POPD were often effectively determined on a date six months prior to the commencement of the batching cycle, a date which was the midpoint in the occupancy rate months. Notwithstanding the inconsistent manner in which HRS has interpreted its rules, a fundamental principle of law is that if the rule is clear, the agency must follow it. Kearse v. Department of Health and Rehabilitative Services, 474 So.2d 819, 820 (Fla. 1st DCA 1985); Woodley v. Department of Health and Rehabilitative Services, 505 So.2d 676, 678 (Fla. 1st DCA 1987);. There is no deference to the agency's interpretation of law (in this case, the conflicting interpretation of the office of comprehensive health planning) where the construction is based upon common meanings. Schoettle v. State of Florida, Department of Administration, Division of Retirement, 513 So.2d 1299, 1301 (Fla. 1st DCA 1987); Roberts v. Department of Professional Regulation, Construction Industry Licensing Board, 509 So.2d 1227 (Fla. 1st DCA 1987). In this case the Department has elected to follow the clear mandate of its own rule. This is not an occasion where the inconsistency of the agency with respect to incipient policy implicates questions of fairness to those regulated. Here, despite the arguable unfairness to the applicants in this batching cycle, the agency should follow its own clear rules. The populations POPC and POPD are clearly intended by the rule to be determined as of the date of the applications for certificate of need and the date of commencement of the batching cycle. The rule unequivocally calls for a projection of need "three years" into the future. T. 1254, 1250. There is no disagreement that the end date of that projection is July 1, 1989. What ends must have had a beginning. A three year period that ends on June 1, 1989, begins on July 1, 1986. Moreover, the rule clearly establishes the value of LB, licensed beds, as of June 1, 1986. The bedrate, the driving force in determining need, is the ratio of licensed beds as of June 1, 1986, to POPC and POPD, populations of elderly persons assumed to be using the beds. If LB was determined on June 1, 1986, but POPC and POPD determined on January 1, 1986, the ratio would be incongruent. The Department undoubtedly intended there to be a correlation between beds and people in existence at the same time since the result is supposed to be a model of need. Selection of the numerator from one date and the denominator for another date results in a fractured reality having little bearing upon the issue of whether the elderly in Hillsborough County will have enough or too may nursing home beds in July, 1989. Finally, the definition "current" populations POPC and POPD was established by the final order in Manor Care of Hillsborough County v. Department of Health and Rehabilitative Services, 9 F.A.L.R. 1102, DOAH case number 86-0051. The final order in that case, entered on February 7, 1987, determined that POPC and POPD must be the populations current on the date of application for the certificate of need. For these reasons, POPC and POPD should be the populations on July 1, 1986. The next issue is the source of those population estimates. HRS argues that POPC and POPD must be derived from the July 1, 1986, release of the Governor's estimates and projections of populations. HRS has failed to establish guidance in this area by rule, and instead has chosen to rely upon evolving agency policy as the basis for selecting the source off POPC and POPD. An agency need not adopt all policy as a rule, but to the extent that it relies upon non-rule incipient policy as a basis for decision and that decision is challenged in a formal administrative hearing, the agency has the burden to establish in the record "adequate support for its decision." Florida Cities Water Company v. Florida Public Service Commission, 384 So.2d 1280, 1281 (Fla. 1980); Baxter's Asphalt and Concrete, Inc. v. Department of Transportation, et al., 475 So.2d 1284, 1286 (Fla. 1st DCA 1985); McDonald v. Department of Banking and Finance, 346 So.2d 569, 582-584 (Fla. 1st DCA 1977). The only support offered by HRS for its incipient policy to use population releases available at the time of certificate of need application was that those releases were the only ones available at such time, and thus necessarily the agency's preliminary decision had to be based upon the earlier release. This may be a permissible construction of the enabling statutes, and might pass muster as an agency rule, but HRS has in this case elected to defend its policy on a case by case basis. On this record, it is clear that the policy has not been adequately supported and is unreasonable. While reliance upon the population release available at this time of preliminary agency action is obviously reasonable at that time, since it is then the most current release, the mere fact that it is the only release-then available is an inadequate reason for continuing to use that release at the de novo formal administrative hearing that follows. McDonald v. Department of Banking and Finance, 346 So.2d 569, 584 (Fla. 1st DCA 1977). Moreover, the inadequacy of HRS's basis for its incipient policy has been demonstrated in this record. The May 12, 1987, release is substantially more accurate than the release a year earlier. The May 12, 1987, release is much closer to observed population growth in the subdistrict than the earlier release. These facts were not rebutted. To underscore the inadequacy of HRS's incipient policy, it bears repeating that use of the July 1, 1986, population release underestimates the net need for community nursing home beds in Hillsborough County in July, 1989, by 100 percent. This indicates that something is dramatically wrong with the incipient policy. For these reasons, the values of POPC and POPD should be taken from the May 12, 1987, release of population estimates. POPC is 134,968 and POPD is 94,402. The calculation of the bed rate, BA, thus is as follows: BA= LB/(POPC + (6 X POPD)) BA= 6,060/134,968 + (6 X 94,402)) BA= 0.0086401 The next step in the calculation is to calculate BB, which is defined as the estimated bed rate for the population age 75 years and over in the relevant district. The calculation is provided in subparagraph 2c of the rule: BB= 6 X BA BB= 6 X 0.0086401 BB= 0.0518406 Subparagraph 2a of the rule then requires calculation of A, which is gross need for the horizon year: A= (POPA X BA) + (POPB X BB) Where: A is the district's projected age-adjusted total number of community nursing home beds for the review cycle for which a projection is being made. POPA is the population age 65-74 years in the relevant departmental district projected three years into the future. POPB is the population age 75 years and older in the relevant departmental district projected three years into the future. For the reasons discussed with respect to selection of the date of the proper release of Governor's population estimates and projections with respect to POPC and POPD, POPA and POPB should be obtained from the May 12, 1987, Governor's release. POPA is 149,771 and POPB is 108,400. Therefore, continuing the calculation: A= (POPA X BA) + (POPB X BB) A= (149,771 X 0.0086401) + (108,400 X 0.0518406) A= 1,294.0364 + 5,619.521 A= 6,913.5574 The next step is to calculate SA, which is the preliminary subdistrict allocation of community nursing home beds pursuant to paragraph 2d of the rule: SA A X (LBD/LB) x (OR/.90) Where: * * * LBD is the number of licensed community nursing home beds in the relevant subdistrict. OR is the average occupancy rate for all licensed community nursing home beds within the subdistrict of the relevant district. Review of the applications submitted for the July batching cycle shall be based upon occupancy rate data for the months October- March preceding that cycle . . . * * * LBD is 2,708 since the 96 beds at the Home Association were community nursing home beds in Hillsborough County on June 1, 1986. OR is 94.29 Therefore, SA is calculated: SA= A X (LBD/LB) x (OR/.90) SA= 6,913.5574 x (2,708/6,060) x (.9429/.90) SA= 6,913.5574 X 0.4468646 X 1.0476666 SA= 3,236.6863 SA= 3,237 In the last sentence of subparagraph 2 of the rule, the "poverty adjustment" is described as follows: "In districts with a high proportion of elderly residents living in poverty, the methodology specifies a minimum bed rate." In this case, all parties agree that when the numbers are assigned to the values in the formula contained in subparagraph 2e of the rule, the poverty adjustment operates to reduce rather than enlarge the net bed need. Thus, in this case, strict application of the A formula found in subparagraph 2e fails to produce the intended "minimum" bed rate. HRS construes the rule, in this instance, to mean that the poverty adjustment does not apply, T. 1280, and all parties agree. This will be treated as a stipulation by all parties that the poverty adjustment is not an issue in this case. For this reason, the poverty adjustment will not be used in the calculations in this recommended order. The final step in the need calculation is defined by subparagraph 2i of the rule, and that is to calculate the net bed allocation for the subdistrict. Subparagraph 2i provides: The net bed allocation for a subdistrict, which is the number of beds available for Certificate of Need approval, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant departmental subdistrict from the bed allocation determined under subparagraphs through I. unless the subdistrict's average estimated occupancy rate for the most recent six months is less than 80 percent, in which case the net bed allocation is zero. All parties agree that the number of licensed beds within the subdistrict is determined as of June 1, 1986, for this batching cycle. That number for purposes of determining net need is 2,708. The number of approved beds for purposes of determining net need is 368. Net need for community nursing home beds in the subdistrict for July 1, 1989, is thus determined: Net Need = SA - (LBD + (.9 X AB)) Net Need = 3,237 - (2,708 + (.9 X 368)) Net Need = 3,237 - 3,039.2 Net Need = 197.8 Net Need = 198 Thus, on July 1, 1989, the subdistrict, Hillsborough County, will need 198 community nursing home beds. Evidence of "not normal" need Rule 10-5.011(k)2.j. provides criteria for approval of community nursing home certificates of need "in the event that the net bed allocation [pursuant to the rule formula] is zero . . ." The net bed allocation pursuant to the rule method is not zero in this case. Subparagraph 2j thus does not apply. The Petitioners did not present any evidence of need pursuant to the special criteria of subparagraph 2j of the rule. Rule 10-5.011(k)1. Provides: 1. Department Goal. The Department will consider applications for community nursing home beds in context with applicable statutory and rule criteria. The Department will not normally approve applications for new or additional community nursing home beds in any departmental service district if approval of an application would cause the number of community nursing home beds in that departmental service district to exceed the number of community nursing home beds in the subdistricts designated by local health councils. (E.S.) Many other HRS need rules have the same "not normal" loophole, and in all of these other cases, the applicants are thereby given the opportunity to show exceptional circumstances justifying the grant of additional beds by consideration of various aspects of the statutory criteria. Since subparagraph 2j does not apply, the provisions of subparagraph 1 do apply to grant a similar opportunity. The only other credible or competent evidence presented by the Petitioners as to a "not normal" condition of need was evidence concerning the numbers of elderly residents in the subdistrict and the occupancy rates of existing community nursing homes. These factors have already been accounted for in the rule formula, and cannot be counted again. Health Quest Realty, XII v. Department of Health and Rehabilitative Services, 477 So.2d 576, 578-79 (Fla. 1st DCA 1985) Amendment or update of applications Rule 10-5.008(3), Fla. Admin. Code, provides that "[s]ubsequent to an application being deemed complete by the Office of Health Planning and Development, no further information or amendment will be accepted by the Department." (E.S.) The rule states that the Department will accept no information after the application is deemed complete. The words used are not ambiguous or unclear. Thus, if normal rules of construction were to be followed, the conclusion would be drawn that the Department is bound by its own clear rule, and cannot, by interpretation, add exceptions. But an equally valid rule of construction is that absurd results must be avoided. Certificate of need cases, particular ones like the case at bar, are highly competitive and complicated. The review of these applications by HRS was delayed for months beyond the normal review period. Further delay has occurred in discovery and preparation for the lengthy formal administrative hearing. Time changes all, and over this period of time, new data has come to the attention of all parties. It would be absurd `to require the applicants to prove applications that have become erroneous due to the passage of time. It is highly probable that rule 10-5.008(3) was originally drafted with only the free form review of an application for a certificate of need in mind, and that the application (or non-application) of the rule to an administrative hearing a year or more later was not considered by those who drafted the rule. Indeed, prior to August, 1985, the Department and all litigants uniformly followed the McDonald v. Department of Banking and Finance, 346 So.2d 569, 584 (Fla. 1st DCA 1977) principle of Florida administrative law that formal administrative hearings are de novo, and that new information pertaining to the application is admissible. In August, 1985, the case of Gulf Court Nursing Center v. Department of Health and Rehabilitative Services, et al., 483 So.2d 700 (Fla. 1st DCA 1986) was decided. While the Gulf Court decision was concerned only with the competitive status of applicants with respect to bed need, in the aftermath of that decision, the Department elected to construe rule 10- 5.008(3) as forbidding practically all new information, even information that had nothing to do with bed need. This undoubtedly was an overreaction to the Gulf Court decision, but the Department, after all, has always had the authority to establish rules governing the processing of applications for certificates of need, including the number and timing of amendments to such applications. McDonald v. Department of Banking and Finance, 346 So.2d 569, 584 (Fla. 1st DCA 1977). Given the fact that the rule is so clear, the better route would have been to amend the rule. As discussed above, conventional rules of statutory construction could easily support the legal conclusion that the rule must be applied as it is written, without further interpretation. Nonetheless, the Department for this case has chosen the other route, to interpret rather than to amend its rule. While the question is a close one, the Hearing Officer has concluded that it would be better to ignore the clear words of the rule, and attempt to apply the evolving interpretative policy of the Department to avoid an absurd result. The following appear to be the existing final orders of the Department interpreting rule 10-5.008(3), and its predecessor, published in the Florida Administrative Law Reports. Health Care and Retirement Corporation of America, d/b/a Heartland of Palm Beach, 8 F.A.L.R. 4650 (September 24, 1986); Arbor Health Care Company, Inc., d/b/a Martin Health Center, Inc., v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 709 (October 13, 1986); Mease Hospital and Clinic v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 159 (October 13, 1986); Health Care and Retirement Corporation of America, d/b/a Heartland of Collier County v. Department of Health and Rehabilitative Services, 8 F.A.L.R. 5883 (December 8, 1986); Health Care and Retirement Corporation of America, d/b/a Nursing Center of Highlands County, v. Department of Health and Rehabilitative Services, 9 F.A.L.R. 1081 (December 8, 1986); Manatee Mental Health Center, Inc. d/b/a Manatee Crisis Center v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 1430 (February 2, 1987); Health Care and Retirement Corporation of America, d/b/a Heartland of Hillsborough, v. Department of Health and Rehabilitative Services, 9 F.A.L.R. 1630 (February 5, 1987); Manor Care, Inc. v. Department of Health and Rehabilitative Services, 9 F.A.L.R. 1628 (March 2, 1987); Psychiatric Institutes of America, Inc., d/b/a Psychiatric Institute of Orlando v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 1626a (March 5, 1987); Manor Care, Inc. v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 2139 (March 24, 1987); Wuesthoff Health Services, Inc. v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 2110 (April 17, 1987); Hialeah Hospital, Inc. v. Department of Health and Rehabilitative Services, et al., 9 F.A.L.R. 2363 (May 1, 1987); Palms Residential Treatment Center, Inc., d/b/a Manatee Palms Residential Treatment Center v. Department of Health and Rehabilitative Services, et al., 10 F.A.L.R. 1425 (February 15, 1988) These final orders contain the following statements concerning the Department's interpretation of rule 10-5.008(3) and its evolving policy with respect to changes to applications for certificates of need during section proceedings and admissibility of new information not contained in the original applications: Health Care and Retirement, supra, 8 F.A.L.R. at 4651: During 120.57 proceedings, an application may be updated to address facts extrinsic to the application such as interest rates, inflation of construction costs, current occupancies, compliance with new state or local health plans, and changes in bed or service inventories. An applicant is not allowed to update by adding additional services, beds, construction, or other concepts not initially reviewed by HRS. Manatee Mental Health Center, supra, 9 F.A.L.R. at 1431: . . . HRS has authority by statute to issue a CON for an identifiable portion of project. Section 381.494(8)(c), Florida Statutes. MMHC's "amended" proposal reduced the number of beds sought, and was properly considered during the 120.57 proceedings. Manor Care. Inc., supra, 9 F.A.L.R. at 2141-42: The amended applications [amended to address needs of Alzheimer's disease patients] changed the scope and character of the proposed facilities and services and thus, must be reviewed initially at HRS . . . [Gulf Court] . . . limited the de novo concept by requiring that evidence of changed circumstances be considered only if relevant to the application. Hialeah Hospital, Inc., 9 F.A.L.R. at 2366: It is recognized that more than a year may pass between the free form decision by HRS and the final 120.57 hearing and this passage of time may require updating an application by evidence of changed circumstances such as the effect of inflation on interest and construction costs. For the sake of clarity HRS would avoid the use of the word "amendment" to describe such updating. Such evidence of changed circumstances beyond the control of the applicant is relevant to the original application and is admissible at the 120.57 hearing. Taking the easiest first, those items explicitly listed by the Department in the first Health Care and Retirement case, "interest rates, inflation of construction costs, current occupancies, compliance with new state or local health plans, and changes in bed or service inventories," which change after the application is initially filed, are permitted. Not permitted are "additional services, beds, construction, or other concepts not initially reviewed by HRS." The remainder of the Department's incipient policy, as presently articulated, is extremely obscure. The word "extrinsic" without the list of examples is of little guidance. The application is only an idea on paper. Anything new, other than the bare words on the paper as originally filed, is literally "extrinsic" thereto. The concept of whether the new information changes the "scope and character of the facilities and services" originally reviewed in free form action by the Department is similarly of little guidance because the phrase "scope and character" can mean practically anything. Of fundamental difficulty is whether this phrase is intended to select substantial changes to the original application, or all changes. For example, if the original application proposes separate shower stalls and tubs for double rooms, but the amended application proposes a combination shower and tub, has the "scope and character" of the "facilities and services" changed? The phrase "additional services, beds, construction, or other concepts not initially reviewed by HRS" is similarly vague. What is a service or construction or a concept not originally reviewed? Would this include the change in bathing equipment discussed above? The concept of "control" of the applicant over the information that goes into the original application is the only phrase that gives applicants any guidance. The word "control" probably is intended as a "knew or reasonably should have known" standard. If the applicant reasonably should have known about the information and should have provided the Department with the information as a part of its original application, then the new information cannot be considered during the formal administrative hearing. The Hearing Officer will be guided, thus, by the explicit list of items provided by the Department in the Health Care and Retirement case, and by the concept of "control" provided by the Hialeah case. New information submitted by Forum Group Table 7 of the Forum Group update is for the second year of operation. There was no projection of utilization by class of pay for the second year of operation in Forum Group's original application, and Forum Group presented no evidence to explain why its original application did not or could not forecast utilization by class of pay for the second year of operation. Table 7 of the update, F.G. Ex. 6, thus constitutes an attempt to add matters to the original application which could have been a part of the original application as filed. Pursuant to rule 10-5.008(3), Fla. Admin. Code, it is now excluded from evidence because it is irrelevant. Table 8 of the Forum Group update was not proven by Forum Group to be based upon ordinary inflation. It appears that the revised charges in table 8 were based in part upon a telephone survey of subdistrict nursing homes conducted after Forum Group filed its original application. Forum Group did not prove that it could not reasonably have conducted such a telephone survey before it filed its original application. Thus, table 8 of F.G. Ex. 6 contravenes rule 10-5.008(3) and now is excluded from evidence because it is irrelevant to the original application. Table 10 of the Forum Group update was precisely the kind of new information allowed by the incipient policy of the Department. The old table 10 had an opening date of January, 1988, a date that was obviously in error due to the delay in decision in these cases. The new information was simply the old information altered by current occupancy and fillup rates in the subdistrict, data that could not have been acquired when the original application was filed. "Current occupancies" is explicitly listed by HRS as permissible new data in the Health Care and Retirement case, supra. Table 10, F.G. Ex. 6, is admitted into evidence. The revised table 11 contains positions for a dietary supervisor, maintenance supervisor, and utility workers, all of which could have been reported in the original table 11. These portions of table 11 are excluded from evidence. The revised table 11 contains changes in the FTE's for registered nurses and licensed practical nurses. These changes could have been in the original table 11 and are excluded from evidence. The revised table 11 contains changes in salaries that were adequately shown to be the result of inflation and new market data not available at the time the application was deemed complete. These portions of revised table 11 are admitted into evidence. Table 25 of the revised application, F.G. Ex. 6, which summarizes estimated project costs, including construction costs, contains new information permitted by the Department's evolving policy. The new table contains no changes of substance except changes caused by inflation and current construction experience. The bottom line, except to that extent, has not changed in substance. Table 25 of F.G. Ex. 6 is admitted into evidence in its entirety. Revisions to tables 17-20, F.G. Ex. 6, were driven entirely by inflation in construction costs. Surely if the Department allows an applicant to respond to inflation by projections of new costs, the Department's policy would also allow the applicant to respond to inflation by projections of new methods to reduce new costs caused by inflation. These revisions are admitted into evidence. The revised pro forma statement of total operating expenses has not been proven by a preponderance of the evidence. First, the revision was explained as being based upon changes in utilization by class of pay, but that data, table 7 of the revision, was not admitted into evidence. Moreover, the changes in total operating expenses resulted from impermissible changes in the numbers of FTE's which have been excluded from evidence. It is not possible on this record to determine how much of the revised pro forma statement of total operating expenses has been shown to be a credible projection, given the lack of these fundamental sources of the projection. Moreover, the revision to total operating expenses in the revised pro forma, F.G. Ex. 6, has not been credibly shown to be based upon matters that Forum Group could not have known at the time it originally filed its application. This conclusion flows from the fact that the original application did not project utilization by class of pay in year 2. Absent this projection, the revision of total operating expenses must necessarily be based upon data that was absent from the original application. The same is true with respect to changes in FTE's in the revision. For these reasons, the revision to total operating expenses in the revised pro forma, F.G. Ex. 6, constitutes an impermissible offer of new data precluded by rule 10-5.008(3). New information submitted by Health Quest Table 8 of the revised application of Health Quest, H.Q. Ex. 3, was based upon information that Health Quest could have obtained when it filed its original application. Table 8 of H.Q. Ex. 3 is thus excluded from evidence. Table 11 of the revised application was based upon the actual experience acquired after the original application was filed. Table 11 of H.Q. Ex. 3 is admitted into evidence. Table 17 of the original application projected that the facility would have six three-bed rooms, but the revised application deleted all 3 bed rooms. Since Health Quest failed to show that this new information would have been unavailable to it when it filed its original application, the change as to 3 rooms is not admissible. The ineluctable result, therefore, is that all of revised table 17 is inadmissible since the proper mix of beds has not been proven. The change of square footage of 1 bed room to 216 in the revised table 18 is inadmissible because it contravenes rule 10-5.008(3). Evidence as to the agreement with the University Community Physicians Association of Tampa is admissible as matters which did not exist and could not have been a part of the original application. The objections to that testimony, T. 579- 80, are overruled. New information submitted by Careage The changes to the Careage application, C. Exs. 18-23 and 24-25, were shown to be based upon information not reasonably obtainable by Careage when it filed its original application, and thus are admitted into evidence over the objections made that these exhibits were barred by rule 10-5.008(3). New information submitted by Hillsborough Healthcare Hillsborough Healthcare did not submit any changes to its application. Comparative review of the applications Careage failed to prove two essential portions of its application. It did not prove by a preponderance of the credible evidence that it would in fact operate the proposed facility if the certificate of need were granted, and it did not prove by credible evidence that it would provide care of good quality. For these reasons, the Careage application should be denied. The other applicants proved by credible evidence all essential portions of their applications. The only remaining task, therefore, is to determine the proper allocation of the 198 beds needed in July, 1989, among these three applicants. The space and costs associated with the remaining proposals may be compared as follows: Appli Cost/Bed NetFt/Bed TotFt/Bed Cost/NetFtBed Cost/TotFtBed Forum $44,551 228 408 $195 $109 HealthQ $34,719 240 423 $147 $ 82 HillsH $28,063 185 283 $152 $ 99 The cost per net square foot per bed (Cost/NetFtBed) is derived by dividing the cost per bed by the net square feet of living space per bed. Likewise, the cost by total square feet (gross) per bed (Cost/TotFtBed) is derived by the same division. Health Quest is preferable to the other two applicants when these cost and space figures are considered. It provides more space at a lower cost per square foot. The differences between Hillsborough Healthcare and Forum Group are not sufficiently significant to give one preference over the other. Hillsborough Healthcare is the less expensive proposal, but suffers from being the least spacious proposal in comparison to Forum Group. Moreover, the record does not contain guiding policies to determine whether there is a need in Hillsborough County for cheaper, less spacious, nursing homes, or for more expensive, more spacious nursing homes. The proposed staffing of the remaining proposals may be compared as follows: Applicant TotalFTE RN FTE LPN FTE RN Asst FTE No. Bed Forum 37.6 5.3 3.6 14.00 60 HealthQ 60.75 4.8 2.2 25.00 88 HillsH 64.65 2.92 8.78 36.61 120 Staffing per proposed bed may further be compared as follows: Total FTE Applicant Per Bed RN FTE Per Bed RN & LPN FTE Per Bed Total Nursing FTE Per Bed Forum .63 .08 .15 .38 HealthQ .69 .05 .08 .36 HillsH .54 .02 .10 .40 The total nursing FTE per bed for each applicant is relatively equal, with Hillsborough Healthcare having the highest ratio and Health Quest the lowest. Forum Group has significantly more RN's and LPN's per bed than Health Quest, but the overall nursing staffing is comparable. Hillsborough Healthcare is the lowest when only RN's and LPN's are considered, and the lowest total FTE per bed. The differences noted in staffing do not appear to be sufficient to draw meaningful conclusions. Hillsborough Healthcare's facility may be staffed at a less costly level, but whether this is due to substitution of nursing assistants for RN's and LPN's, or a result of efficiencies due to the larger number of beds (120), or reflects less than optimum staffing cannot be determined on this record. Hillsborough did not present evidence as to staffing patterns for a 60 bed facility. Other features of the proposals of the three applicants provide little to distinguish or rank them in priority. All three propose to associate the nursing facility with an adult congregate living facility, resulting in cost efficiencies and better continuity of care. All three have a substantial track record in the operation of a nursing homes, and can be expected to provide care of good quality. All three have very substantial resources and prior experience in the development and initial operation of a nursing home. If any distinction were to be made, perhaps it would be to favor the Hillsborough Healthcare application over the Forum Group application. Hillsborough Healthcare plans to serve the needs of Alzheimer's patients, and Forum Group does not. Hillsborough Healthcare's application is, relative to the Forum Group proposal, less expensive. On the other hand, the Alzheimer's disease unit is only a marginal factor since there is no qualified evidence in this record of need for that type of unit in 1989 in Hillsborough County. One can only infer that the need is probably going to be there, and it might be better to prefer Hillsborough over Forum Group for that reason. The "luxury" vs. "austerity" comparison is similarly not of ultimate persuasive weight since, as discussed above, there is no credible evidence in the record as to what the proper mix should be. Of course, it is safe to conclude that the need for less expensive nursing care is greater than the need for care that only a few can afford, but that conclusion does not necessarily result in the total denial of the Forum Group application. In summary, with respect to the question as to which applicant should be favored with approval of the most number of beds from the projected bed need, there is no major issue to adequately distinguish between the three applicants. For this reason, each applicant should be treated as equally as possible consistent with the application it submitted and the evidence it presented in support of that application. The Department appears to have several relatively reasonable ways to allocate bed need among the three applicants. It might simply divide the beds equally among the three. This alternative is less reasonable because it would ignore the detailed proof that has been presented by both Forum Group and Health Quest in support of proposed facilities of 60 beds and 88 beds respectively, and would result in implementation of facilities having staffing and design configuration that would be altered from that proof. A second alternative would be to award partial approval to Health Quest for 78 beds, to award full approval to Hillsborough Healthcare for 120 beds, and to deny the application of Forum Group. A third alternative would be to award partial approval to Health Quest for 78 beds, to award partial approval to Hillsborough Healthcare for 60 beds, and to award full approval to Forum Group for 60 beds. This third alternative is more reasonable and will be recommended by this order. This alternative has the advantage of fostering the most future competition in Hillsborough County by approving three competitors rather than two. Of the three applicants, Health Quest proposed the most space, relatively speaking, for the least cost. The staffing proposed by Health Quest is reasonable in comparison to the other two applicants. Reduction of the Health Quest proposal to 78 beds from 88 beds is a relatively minor reduction; stated another way, the proof provided by Health Quest as to the specifics of an 88 bed facility is likely to be changed only slightly for a 78 bed facility. Forum Group proved all of the details of its 60 bed proposal, and thus approval of those beds would be entirely consistent with its application and proof in this record. Hillsborough Healthcare did not prove the specifics of a 60 bed partially approved facility except that such a facility would contain the full sized Alzheimer's patient unit proposed in its 120 bed facility. It would be fairer to approve Hillsborough for that 60 bed facility than to approve Hillsborough for 120 beds, leaving Forum Group with denial of its application, given the lack of a compelling clear choice between the two applicants. Recommendation It is therefore recommended that the Department of Health and Rehabilitative Services enter its final order partially granting the application of Health Quest for 78 community nursing home beds, partially granting the application of Hillsborough Healthcare for 60 community nursing home beds, fully granting the application of Forum Group for 60 community nursing home beds, and denying the application of Careage. DONE and ORDERED this 30th day of June, 1988, in Tallahassee, Florida. WILLIAM C. SHERRILL, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 1988. APPENDIX TO RECOMMENDED ORDER IN CASE NOS. 87-0670, 87-0671, and 87-0774 The following are rulings upon proposed findings of fact which have either been rejected or which have been adopted by reference. The numbers used are the numbers used by the parties. Statements of fact contained in this appendix are adopted as findings of fact. Findings of fact proposed by HRS: 1-2. These proposed findings of fact are' subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. The classification of the Home Association beds has been thoroughly discussed in the findings of fact and conclusions of law. The correct population figures are discussed in the findings of fact. 9-13. These are matters of law, and thus not appropriate as proposed findings of fact. 15. The changes to table 7 were not the result of a telephone survey. T. 51. 17. Defining "extrinsic circumstances" as not inclusive of economic or market changes that occurred after the original application was deemed to have been complete, or otherwise not reasonably obtainable or knowable by the applicant when the original application was filed, is contrary to HRS policy embodied in final orders, sketchy as it may be. 18, 23-25. Rejected as explained in the findings of fact. 26, 28. Rejected with respect to table 11 as explained in the findings of fact. 30. This finding of fact, while true, is not made because Health Quest made no such change to its 88 bed application. Rule 10-5.008(1) simply states that the application for a certificate of need must be filed on form 1455. Table 12 of the form has no instructions for what must be contained therein. Since HRS has not demonstrated on this record that table 12 in the original application was supposed to have listed these items, it cannot be said that the listing of these items in the new table 12 is a change. It is noted that spaces to take showers, baths, store linen, and for nursing stations would be assumed for any nursing home, and ought not be presumed to have been excluded by the failure of an applicant to list them. Moreover, it is further noted that from a review of the original application H.Q. Ex. 1 that table 12 does include nursing administrative space, patient lounges, a central supply space, general storage, housekeeping, and laundry. Moreover, the amendment, H.Q. Ex. 2, shows the following spaces on the space diagram: laundry, shower, patient lounge, and medication room (med). Any bed room could be used for isolation. Table 20 does include a chapel. H.Q. Ex. 1. Not supported by the record cited. Findings of fact proposed by Forum Group: 1-4, 9, 13. These are matters of law, and thus not appropriate as proposed findings of fact. 5. LB of 5,964, as proposed by the Department, is most credible as the beginning figure, without considering the beds at the Home Association. 7-8, 10. Incorrect value for LB. 11. OR should be 94.29 with the Home Association beds. 18. Incorrect values for LB and OR. 21. The denial occurred orally in January, 1987. The update has been discussed in findings of fact and conclusions of law. These are matters of law, and thus not appropriate as proposed findings of fact. It is true that there is need and the need must be satisfied. 29-33. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 34. The phrase "homelike atmosphere" is too vague to be a finding of fact. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. The record does not contain sufficient evidence to make a finding as to the history of Forum Group with respect to the quality of care provided at Forum Group facilities. 49-50. The update with respect to financial feasibility is not relevant since essential parts of the update with respect to financial feasibility were not admitted into evidence. 60, 65, 67, 68, 74, and 80. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 66. This is not relevant. Ms. Kennedy testified that she had authority from Hillsborough Healthcare to accept a certificate of need for a 60 bed nursing home. There is no credible evidence to contradict this statement under oath. The lack of a written partnership authorization in evidence does not negate this statement. 76. Had there been any credible evidence in theme cases that the amount of need in Hillsborough County was minimal and that, consequently, the pro formas for 60 bed nursing-homes must be closely scrutinized for long term financial feasibility, then it would be relevant that CSI did not explain in detail the pro forma for a 60 bed nursing home. CSI did, however, present expert opinion that a 60 bed nursing home would be financially feasible, and on this record, the opinion is very credible. Forum Group and Health Quest have shown the long term financial feasibility of a 60 bed nursing home, and there is a large amount of need. Moreover, existing nursing homes are experiencing very high occupancy rates and fill up rates. For these reasons, this proposed finding of fact, while true, is not relevant. Hillsborough did show that its design was modular. Scaling down the project simply means deletion of one wing. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. The witness specifically addressed two portions of the state health plan. T. 777. The testimony was competent and substantial evidence. The inference that the certificate of need was "about to expire" is inappropriate since the witness's testimony leads to the inference that Health Quest intends to proceed with that project. T. 641. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 98-99. These proposed findings of fact are true, but insufficient to support a finding that Health Quest lacks the resources to construct and operate this project in the short term. 101, 105-07. These proposed findings of fact are true, but do not lead to the conclusion that the construction cost estimates are unreasonable. See T. 590. Mr. Krisher had sufficient expertise in health planning, nursing home development, and financial feasibility, to testify generally as to these matters. T. 501-516. No party presented any independent evidence to seriously question these estimates. 102. This proposed finding of fact is incorrect since the expected Medicaid rate in Boca Raton is different from the expected rate in Tampa. T. 785. 111. Not supported by the record cited. 114-116, 118-120. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. True, but insufficient to show lack of resources to make the project financially feasible in the short term. Irrelevant. The existence of lines of credit was proved by Mr. Gentle. Irrelevant. The staffing was shown to be reasonable by the testimony of other competent witnesses. 125-27. True, but insufficient to show back of financial feasibility. 129. True, but irrelevant. It would be unreasonable and a waste of health care resources for an applicant to have to buy five expensive acres of urban land to be qualified to apply for a certificate of need. 130-31. Irrelevant. The delay and inflation rates are negligible. Findings of fact proposed by Hillsborough Healthcare: 1. This is subordinate to findings of fact that have been adopted. It is true, however, and is adopted by reference. 5. The phrasing of the first and second sentences is rejected for lack of evidence. 7. The evidence is not sufficient to show actual bias by a preponderance of the evidence. 8-9, 19-20, 22-23. These proposed findings of fact are subordinate to findings of fact that have been adopted. These proposed findings of fact are true, however, and are adopted by reference. 21. Irrelevant. 24. True, but not relevant. These matters are covered by the numeric need rule. 29. The evidence does not show that CSI managed facilities offer "superior" activities. 32, 33 (fifth and sixth sentences), 35 (last sentence), 38(a)-(i), 40,42 (first sentence), 39, 45 (second and third sentences), 46 (all but the first sentence), 49 (first two sentences), 53, 56 (all but the first two sentences), and 60-72. These proposed findings of fact are subordinate to findings of fact that have been adopted. These proposed findings of fact ace true, however, and are adopted by reference. 51. The preponderance of the evidence does not credibly show that the floor plan promotes patient safety and convenience, or that travel distances are minimal. 54. Not supported by the record cited. These proposed findings of fact are irrelevant. A finding of fact that the criminal offense of perjury was committed cannot be made since there is no evidence of a criminal conviction by a court of competent jurisdiction. The testimony of Ms. Etten was not limited to those programs. The documents used in cross examination were never properly authenticated, and are hearsay. Thus, a finding of fact that the documents are in fact surveys of Careage facilities by other agencies in other states cannot be made based upon the documents. For this reason, the remainder of the proposed finding is not relevant. Ms. Etten credibly testified that nursing staffing was generally adequate. Her opinion was not ultimately limited to special programs. T. 1216. The inability of other witnesses to testify on this point is not relevant. The ability of Careage to recruit staff was adequately proved by other parties. There is no credible evidence in this record to believe that any applicant fail to recruit adequate staff. The recruitment plans of Careage appear to be quite reasonable. T. 1562-64. On pages 1686-87 of the transcript, the Hearing Officer ruled that the expert opinion of Ms. Krueger would be allowed even though it was based on hearsay. This was a correct ruling. Section 90.704, Fla. Stat. (1987). The sentence immediately following that ruling is incorrect as stated, and directly contradicts the initial correct ruling. That is, an expert opinion is admissible and may be relied upon even though based upon evidence, such as hearsay, which in itself may not be admissible. Further, the opinion of an expert in an administrative proceeding is a proper basis for a finding of fact even though the opinion is based upon hearsay, and even though hearsay alone in an administrative hearing, absent nonhearsay evidence on the point, is not sufficient as a basis for a finding of fact. The second sentence in the transcript was intended to state that hearsay evidence alone will not be the basis of a finding of fact, setting aside for the moment the issue of expert opinion. For these reasons, these proposed findings of fact are rejected to the extent that they urge that short term financial feasibility was not established because the opinion was premised upon hearsay evidence. With respect to the unaudited financial statement question, Ms. Krueger was not asked whether experts in her field reasonably rely upon unaudited financial statements. She was only asked which type was more worthy of belief and whether her profession feels they can rely on audited statements. She was never asked whether her profession feels it cannot rely upon unaudited statements. Ms. Krueger stated that she was aware of the existence of fraudulent audited statements, implying that the question leads to answers that are not that useful. T. 1652. In fact, Ms. Krueger, who was a thoroughly credible witness, explaining her opinions in a lucid and reasonable manner, relied upon unaudited statements, as well as her conversations with several of the chief executive officers of Careage. Based on this record, a finding cannot be made that experts in this field do not reasonably rely from time to time upon unaudited financial statements. The authenticity of the letter from SeaFirst is irrelevant since that line of credit was established by the direct testimony of Mr. Gentle. T. 1576. Ms. Krueger's lack of personal knowledge as to the existence of a binding commitment for a loan for this project is irrelevant due to Mr. Gentle's direct testimony. The evidence in the record from all parties indicates that land is generally available in Hillsborough County in the 3 to 5 acre range, that 3 to 5 acres is about what is needed for any of the projects, and that the cost is from $300,000 to $600,000. The Careage facility will bring in over $3 million in gross revenue per year in all years beyond the first few. A few hundred thousand dollars can be amortized over the life of a nursing home, and will not be a significant factor in long range financial feasibility. All of the applicants have access to credit to buy land at market rates. There is essentially no reasonable dispute as to land acquisition and cost in this case. The testimony related to equipment , not floor space, for technology dependent children. Those children would be served in the subacute beds. Space for Alzheimer's patients was included in the floor plan and the 45,500 square feet. T. 1136-37. Mr. Cushing testified that the Means reference book might project a cost per square foot in the "60's." He did not adopt that as his opinion. T. 1185-86. Delay in construction for 8 months is not such delay as to necessarily result in substantial increases in construction cost. The last sentence is true but does not account for the fact that Mr. Cushing consulted the Means reference book for labor rates. That is sufficient. The remainder of the reasoning of this proposed finding of fact was rejected in paragraph 85 above. Rejected as described in the preceding paragraphs. Ms. Krueger's expertise with respect to salaries was established perhaps more completely than any other expert witness. She not only had first hand knowledge from her work reviewing salaries in nearby counties, but she consulted expert reference materials. Her inability to remember the name of the book referenced does not seriously undermine her expertise. The ruling at T. 1324 sustained an objection to a question. It was not a ruling upon the admissibility of portions of the document. Ms. Krueger prepared the long range plan section of C. Ex. 3, P. 3-7, and the under served groups section, p. 3-8, in conjunction with Mr. Gentle. T. 1322. This is sufficient predicate for her testimony as to these matters. 91-92. The telephone survey was not a needs survey. It only surveyed existing services. The survey has essentially been discounted because of lack of response and lack of statistical reliability. These proposed findings ace adopted by reference. Since none of this testimony has been relied upon in this recommended order, the proposed findings of fact are irrelevant. These proposed findings of fact are irrelevant. The testimony as to lines of credit and resources of the Lynns was enough to establish the availability of working capital. These proposed findings of fact are irrelevant. Rejected as explained in the findings of fact. These proposed findings of fact are irrelevant. 101. The continuing objection was allowed, not granted. T. 595-96. Otherwise, these proposed findings of fact are true and are adopted by reference. 102-103. These proposed findings of fact are true and are adopted by reference. 104. Essentially irrelevant as explained with respect to proposed findings of fact concerning the land acquisition and preparation costs of other applicants. 105-107. These proposed findings of fact are true and are adopted by reference, except the last clause of the last sentence of proposed finding of fact 105. Absent quantitative data and a study of salaries showing the estimates to be substantially in error, the foregoing proposed findings of fact are not sufficient to show an error affecting financial feasibility. 108-109. These proposed findings of fact are irrelevant since the 60 bed application was not a permissible amendment. These proposed findings of fact are true and are adopted by reference. These proposed findings of fact are irrelevant since these are different health districts having different patient payor mixes. Findings of fact proposed by Health Quest: 4, 5, 7-10. These are matters of law, and thus not appropriate as proposed findings of fact. 11-17. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. The rationality of the OCHP's policy is irrelevant since it conflicts with the rule and other policies are also rational. A finding of a consistent pattern with respect to base date populations in the award of certificates of need cannot be made as discussed in the findings of fact. Mr. Sharp understood his position, and Mr. Jaffe well understood the inconsistencies. 22-23. True but irrelevant. Disadvantage often occurs to some person when the law is correctly applied. 24-28. Rejected as discussed at length elsewhere in this order. 33. Not supported by the record cited. 36.a. Mr. Gentle did not work with Careage in these years and could not be expected to have detailed memory on these points. He named seven such facilities. 38. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 40.b. (ii). There is no evidence that CHP is the same as Careage. 40.c.(v). Health Quest has operated since 1969. 42. Both could be true. 43.a.(ii). Mr. Gentle was not sure because this was not within his area of responsibility. T. 1603. 44. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. Dr. Etten's unfamiliarity with the fact that the Health Quest facility in Jacksonville provides IV therapy and total parenteral nutrition does not demonstrate exaggeration or lack of expertise. The record does not clearly demonstrate that other Health Quest nursing homes provide these specific services. The evidence is only that services are generally the same. T. 1077. The testimony concerning Medicaid patients in the subacute unit was elicited on cross examination, and was not presented by the witness as an intended representation by Careage on direct. Ms. Krueger's understanding simply was wrong, not misleading. T. 1367. The remainder of this proposed finding of fact is similarly a red herring. Careage did not project anything more than 37 percent Medicaid utilization. C. Ex. 3, table 7B. It is one thing to expect 37 percent utilization, and another thing to represent that the facility will not discriminate. A promise to not discriminate inherently contains the caveat that a facility will not pursue that noble goal to bankruptcy. The Hearing Officer would not find that to be the case with respect to Careage any more than with respect to Health Quest. Mr. Gentle did not testify that the number of nurses aides in the Alzheimer's unit would be higher in comparison to other sections of the facility. He testified that the number would be "higher" in comparison to professional licensed staff, which would be lesser. T. 1525. 54. Irrelevant. Mr. Gentle said that day care would probably be at a location nearby. T. 1593. 57. None of the parties addressed site size with the specificity proposed by these findings of fact. Lack of such specificity has no real bearing on credibility. The record cited, T. 1526, does not support the proposed finding that equipment for technology dependent children is "substantial and expensive." Thus, the remainder of these proposed findings are rejected. It is true, however, that the application fails to itemize such equipment, and that the contingency is relied upon. There is no evidence that Careage proposes to employ a gerontological nurse practitioner. C. Ex. 3, table 11. The testimony of Dr. Etten simply describe the skills of that form of nurse practitioner. She was never asked whether such professional would be employed by Careage. T. 1217-19. The failure to tie in the testimony is only a human error, and does not show a lack of credibility. Proposed finding of fact 62.a. is not supported by the record. Dr. Etten was not asked to describe the care given an Alzheimer's patient in an ACLF. She was asked to describe the care given a "resident" of an adult congregate living facility. Her comment about such residents not being "bed patients for any period of time" is not a dodge of a question about an Alzheimer's disease patient. Moreover, she credibly and directly testified that Alzheimer's disease manifests itself so many different ways she could not say whether it would be appropriate to have such patients living in an adult congregate living facility. Next, Mr. Gentle's testimony as to the medical characteristics and needs of Alzheimer's patients is insufficient as a basis for findings of fact because Mr. Gentle was not accepted as a medical expert. Health Quest presented no credible evidence to show that an Alzheimer's patient can be treated either in an adult congregate living facility or a conventional nursing home. Absent such evidence, the failure of other parties to rebut the nonexistent negative, given the clear affirmative evidence that Alzheimer's disease patients greatly benefit from special care, is unpersuasive. These proposed findings of fact are irrelevant. These children would be served as subacute care patients. Precise identification of the area set aside for these children would have been only of marginal relevance. To the extent not adopted elsewhere in this recommended order, these proposed findings are adopted by reference. Careage's expert was clearly aware of the need to review site specific conditions in the preparation of construction plans. T. 1177. He has built nursing homes in many states. His competence to prepare adequate construction plans for Hillsborough County conditions was clearly established in the record. It is true that he had not yet prepared the final construction plans. But no party has presented final construction plans, and thus the lack of such plans is irrelevant on this record. Irrelevant on this record. Irrelevant. The amount of working capital is well within the resources available to Careage. There is no evidence in the record that a variation one way or the other by $100,000 would make the project not financially feasible. Careage's credibility was not discredited by the fact that Ms. Krueger was not aware of the mix of skilled and intermediate beds. True, but irrelevant. There is no evidence that such expenses were not accounted for, or if missing, the amount and importance. The staffing was shown by expert opinion to be adequate. T. 1216. One presumes that adequacy refers to adequate health care since the witness was only qualified in that area of expertise. The Careage design was not unique. The Careage use of the word "unique" to describe its design has been disregarded in this order. 78.c.(i)-(iii). These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 78.c.(vi). Not supported by the record cited. 78.c.(vii). The testimony cited is not competent opinion. There was no predicate for testimony as to the knowledge of Mr. Haben, and the objection to a similar question just preceding was sustained on that basis. 87-96, 100-101, 103-128. These proposed findings of fact are irrelevant for the reasons stated in Health Quest's proposed finding of fact 76. 135. These are matters of law, and thus not appropriate as proposed findings of fact. 146. Not relevant since the 60 bed proposal is not in evidence. 149. Without evidence as to what is included in the definition of "subacute" care, a finding as to "virtually all" cannot be made. 151 and 158. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 166, 169, 170 and 172. Not relevant since the 60 bed proposal is not in evidence. 168. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. Findings of fact proposed by Careage: The first sentence implies that Careage has operated nursing homes for 25 years. Careage has built nursing homes fob that length of time for operation by others, for the most part. The second sentence is true, but subordinate, and is adopted by reference. Mr. Griffin testified that the decision to adhere to the recommendations made by staff before he assumed his duties at HRS was not his decision. T. 705-06, 703. His testimony reflect very little personal participation in the evaluation of the competing applications. T. 697-705. 6. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 8. There was no credible evidence in this record as to how many Alzheimer's patients need specialized services. The evidence was simply that if such patients exist, such patients need specialized services. Thus, the first sentence is rejected. 8 (second sentence) -12. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. A comparison of staffing is not possible since Careage intends to serve primarily persons in need of skilled nursing care, and hence it cannot be determined if Careage in fact has proposed nursing staff that is more generous relative to patient need than Hillsborough. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. Since insufficient credible evidence has been presented to conclude that Careage will operate the proposed facility, this finding of fact is rejected. The proposed finding concerning intent to provide adult day care is not supported by the record cited. 19-20. Irrelevant since insufficient credible evidence has been presented to conclude that Careage will operate the proposed facility. 21. The first sentence is subordinate to findings of fact that have been adopted. It is true, however, and is adopted by reference. 22-23, 25 (all but first sentence), 26, 17 (third, fourth, and seventh sentences), 29. These proposed findings of fact are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 24. It is concluded that associating a nursing home with an adult congregate living facility will in fact result in cost efficiencies. The remainder of this proposed finding of fact, noting the relatively higher costs of Health Quest compared to Careage, is true, but does not disprove the conclusion that cost efficiencies would exist. It is true that the Hillsborough Healthcare Medicare mix projection may be somewhat high, but the fiscal consequences of that conclusion was not demonstrated. The second sentence is rejected because Ms. Krueger was not accepted as an expert with respect to appropriate levels of staffing. T. 1686-88. 31. The second sentence is based upon hearsay. It is also based upon the opinion of Mr. Gentle which was inadmissible. T. 1577. The fourth and fifth sentences are subordinate to findings of fact that have been adopted. They are true, however, and are adopted by reference. 32-33. These portions of the Forum Group amended application, F.G. EX. 6, were not admitted into evidence, and thus these proposed findings of fact are not relevant. 36. Irrelevant since the Health Quest 60 bed application is an impermissible amended application. COPIES FURNISHED: Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, Esquire Acting General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 DEPARTMENT OF HRS Edgar Lee Elzie, Jr., Esquire Guyte P. McCord, III, Esquire McFarlane, Ferguson, Allison & Kelly Post Office Box 82 Tallahassee, Florida 32302 CAREAGE HOUSE HEALTH Robert S. Cohen, Esquire Haben and Associates Post Office Box 10095 Tallahassee, Florida 32302 FORUM GROUP, INC. R. Terry Rigsby, Esquire Post Office Box 11188 Tallahassee, Florida 32302 HILLSBOROUGH HEALTHCARE LTD. W. David Watkins, Esquire Oertel & Hoffman, P. A. Post Office Box 6507 Tallahassee, Florida 32314-6507 HEALTH QUEST CORP. Charles N. Loeser, Esquire Assistant General Counsel 315 W. Jefferson Blvd. South Bend, IN 46601 Steven W. Huss, Esquire 1017 Thomasville Road Suite C Tallahassee, Florida 32303 HEALTH CARE AND RETIREMENT CORPORATION OF AMERICA Alfred W. Clark, Esquire Post Office Box 623 Tallahassee, Florida 32302

Florida Laws (4) 120.57213.75651.11890.704
# 8
INVERNESS HEALTH CARE, A LIMITED PARTNERSHIP vs REGENCY HEALTH CARE CENTERS, INC., 90-000043 (1990)
Division of Administrative Hearings, Florida Filed:Inverness, Florida Jan. 04, 1990 Number: 90-000043 Latest Update: Sep. 19, 1990

The Issue The issues under consideration are those associated with applications filed by the aforementioned private parties seeking certificates of need for skilled nursing home beds based on a fixed need pool of May, 1989, which identified 261 beds for the January, 1992 planning horizon. The beds are available in HRS District III. The applications are for: CON Action No. 5987 Inverness--20 beds; CON Action No. 5912 Suwannee--60 beds; CON Action No. 5913 McCoy-- 60 beds; CON Action No. 5962 Starke--120 or 60 beds; and CON Action N. 5905 Regency--120 beds.

Findings Of Fact Related to the May, 1989 batching cycle HRS has identified a need for 261 nursing home beds in District III. The applicants accept that determination of the pool of beds, that is to say no applicant has sought beds over and above the 261 beds identified by HRS. Further, the parties have expressed their agreement to allow Regency to be granted CON 5905 to construct a new nursing home facility in Lake County, Florida, which will have 120 beds. The written stipulation sets out the parties belief that all applicable criteria for obtaining a certificate of need as set out in Section 381.705, Florida Statutes, have been met. That stipulation is accepted, provided the following conditions are met in issuing the certificate of need: The annual resident population of the facility shall include at least 62% of Medicaid patient days. Two beds shall be dedicated to the care of Alzheimer and respite care residents. The facility shall be a one story design consisting of 43,000 square feet in size. Likewise, the parties have agreed to allow the issuance of CON 5987 to Inverness to add 20 community nursing beds to its existing facility in Inverness, Florida. That written stipulation points out the agreement by the parties concerning the Inverness compliance with all applicable criteria set out in Section 381.705, Florida Statutes as well as any implementing rules set forth in Chapter 10-5, Florida Administrative Code. The arrangement is one by which existing ACLF beds are converted to nursing home beds. That stipulation is accepted, upon condition that Inverness commit to provide a minimum of 75.2% of total patient days for Medicaid patients. The Inverness stipulation which reiterates Inverness' lack of opposition to the grant of a certificate of need to Regency also withdraws its opposition to McCoy, Starke and Suwannee. By the terms of the stipulation's 140 of the 261 beds in the pool are spoken for. This leaves for consideration the applications of Suwannee, Starke and McCoy. In the absence of subdistricting, District III is divided into seven planning areas. The planning areas are as established by the North Central Florida Health Planning Council, Inc. Planning Area l is constituted of Hamilton, Suwannee, Lafayette, Columbia, Union and Bradford counties. Suwannee intends to place its facility in Suwannee County. Starke intends to place its facility in Columbia County. The expansion of the McCoy facility would occur in Marion County which is the sole county in Planning Area 4. By resort to the North Central Florida Health Planning Council District III Health Plan preferences can be seen concerning the allocation of beds among the applicants within the various planning areas. A copy of that plan is HRS Exhibit No. 2. Under this scheme the McCoy application to add 60 additional nursing home beds to its existing facility in Marion County, Florida, is considered a third priority. A third priority would allow the addition of at least 60 beds and no more than 120 beds. The Suwannee and Starke applications are a fourth priority under the local plan which allows for an addition of up to 60 beds. The McCoy application as presented at hearing responds adequately to all applicable criteria set out in Section 381.705, Florida Statutes, to include the State Health Plan and District III Health Plan. McCoy holds a superior license rating at present and has a proposed capital expenditure for this project of $1,568,000. Taking into consideration the proposed allocation of beds set forth in the local health plan, the distance between the McCoy facility and the proposed facilities in Suwannee and Columbia counties by the applicants Suwannee and Starke and absent proof which clearly identifies that Suwannee and Starke are meaningful competitors against McCoy and its attempt to gain a certificate of need calling for expansion of its facility, the McCoy application should be granted. That grant should be conditioned upon a willingness to serve Alzheimer patients in the proposed 14 bed unit and the commitment to provide Medicaid at a 60% level as a minimum commitment. This arrangement would bring the total number of nursing home beds at McCoy to 120, a desirable number when considering economies of scale. What must be resolved by comparative analysis of the applications of Suwannee and Starke, is which of those competitors for 60 beds out of the 61 beds remaining in the pool should be granted a certificate of need, if any. Starke had noticed its intention to apply for 120 beds and made application for 120 beds and in the alternative for 60 beds. The decision to notice its intent to apply for 120 beds was not misleading nor inconsistent with HRS policy in a circumstance where the application was stated in the alternative for 120 beds or 60 beds. The significant point is that Starke explained its alternatives of 120 beds or 60 beds in detail in the course of the application. HRS perceives that the 120 bed notice of intent took into account a lesser number of beds being applied for on the due date for applications and that perception is reasonable. Suwannee noticed the intent to apply for 60 beds and applied for that many. Both Suwannee and Starke met all procedural requirements for consideration of their applications for nursing home beds. In determining the disposition of the 60 nursing home beds needed for Planning Area l within District III, it is noted that Suwannee and Columbia counties are contiguous. Columbia is east of Suwannee. While the main emphasis by these applicants is to serve the needs of residents within the two counties where the facilities would be located, given their contiguity there is a potential for either applicant to serve needs within both counties. Columbia county is the more populous county. However, in the two counties the age cohorts in the 65 and over group and 75 and over group are similar, especially in the 75 and over group. Occupancy rates in the existing nursing homes within the two counties are also similar. The J. Ralph Smith Health Center in Suwannee County has 107 existing beds and 54 beds approved. Those additional 54 beds were designated for residents of the Advent Christian Village exclusively; however, the residents of that village constitute part of the population base in Suwannee county. Therefore this limited utilization of that resource still benefits citizens within Suwannee county. Surrey Place in Suwannee county has 60 beds and the Suwannee Health Care Center has 120 beds with 60 more approved. The 60 additional beds may not be constructed in that the applicant failed to proceed to construction in the time contemplated by CON 3746 and may lose the beds. Columbia County has Tanglewood Care Center with 95 beds. It has Lake City Medical Center with 5 beds associated with a hospital. Palm Garden of Columbia has approval for 60 beds. On balance there would not appear to be an advantage to placing the 60 beds at issue in either Suwannee or Columbia counties when considering the population to be served, present occupancy rates for existing nursing bomes and geographic accessibility to the proposed nursing homes. Suwannee is a wholly owned subsidiary of Santa Fe Health Care, Inc. The parent corporation filed the application with the permission of Suwannee. The 60 bed nursing home facility is part of an overall project which includes the replacement of an existing 60 bed acute care hospital with a 30 bed acute care hospital. If the proposals are accepted the hospital and 60 bed nursing home would be located on a common parcel. HRS has granted CON 6179 to decertify 30 beds. The approved cost of the delicensure and establishment of the new hospital is $6,752,824. The nursing home component of this project is stated to cost $3,408,100 in the way of capital expenditures with an operating equity in the amount of $300,000. The overall health care delivery system contemplated in the hospital and nursing home project includes the replacement hospital, the new nursing home, an out patient diagnostic center, home health care, hospice and adult day care services. Suwannee has the financial backing of its parent corporation which owns a number of health care facilities including six hospitals, two health maintenance organizations and six other health related corporations. Both Suwannee and the parent corporation Santa Fe Health Care, Inc. are not for profit. The Santa Fe operations are in Florida and its hospital holdings include other rural hospitals in addition to Suwannee which is a rural hospital. Before filing the application for the 60 bed nursing home neither Suwannee nor the Santa Fe parent corporation had any involvement in long term health care delivery. Suwannee intends to serve the needs of Alzheimer patients and to provide services to persons needing subacute care. In its present hospital facility in Suwannee County it has 24 swing beds with which it serves patients needing subacute care and which beds are seen as an alternative to nursing home beds. That alternative has limited utility. Although swing beds may serve nursing home patients they are not an alternative for long term care in lieu of community nursing home beds. To the extent that Suwannee Hospital has tried to place patients in nursing homes needing a high level of skilled care, described as subacute care, it has experienced problems. Existing nursing homes in Suwannee County have not accepted the placement of those patients. It is unclear from the record what portion of subacute care needed in the service area will continue to be met in the hospital proper with the advent of delicensure of 30 beds. There was testimony to the affect that the hospital has the option to request swing beds in its remaining 30 bed hospital facility, but it has not been shown that the hospital will avail itself of that opportunity and through the use of the swing beds be able to render subacute care. The description by Suwannee of the subacute patients that it is contemplating serving through its nursing home are those who require a shorter stay in nursing facilities, who are said to have fragile medical condition and require intensive licensed nursing care. In the application, it states that the Medicare patients contemplated as being served by this prospective nursing home would be the principal users of the subacute care. There patients would have an average length of stay of 15 days with 12 patients per month being served. The Medicare per diem charge of $130 for the first year of operation is said to include the cost of care given to these patients who are said to be heavy users of subacute care. That per diem charge reflects ancillaries such as the various therapies as well. Having considered the explanation of this application, it is less than apparent what the difference would be between the subacute care services now being provided by the hospital in its swing beds and those contemplated by its nursing home application. In a similar vein, it is unclear what the distinction would be between the subacute care rendered in the proposed nursing home when contrasted with the subacute care being provided in swing beds that might be available in the 30 bed replacement hospital. If granted a certificate of need Suwannee is committed to serving AIDS patients. Suwannee intends to serve Medicaid patients and it projects a percentage of patient days attributable to Medicaid patients in the first two years of operation to approximate 73%. This is contrasted with experience statewide of 62%, within District III of 75% and within the planning area of 81%. Projected per diem rate for Medicaid reimbursement within the first year of operation is $68. The financial expert presented by Suwannee said that the applicant could charge as much as $10 to $12 more, making the Medicaid rate $78 to $80 per day. This increase contemplates raising the present caps on reimbursement. The record does not support increases in the caps of $10 to $12 in the relevant planning period. In the first year of operation the private room, private pay per diem rate at Suwannee reflects $97 as the charge and $80 as the charge for semiprivate room, private pay. This is as compared to $130 for Medicare per diem. Although it is unacceptable to charge more for Medicare than private pay, Schedule 12 within the application shows the inclusion of ancillaries for the Medicare patient and the exclusion of ancillaries for private pay. Under the circumstances it is difficult to tell whether the Medicare per diem charges exceed the private pay per diem charges as has been contended by Starke. The inclusion of the therapies as ancillary costs is shown on page 39 at Schedule 12 of the application of Suwannee. On Schedule 17 in the first operating year the therapies as ancillary costs are not broken out as individual items such as physical therapy, speech therapy and occupational therapy separate and apart from routine services. Instead an aggregate figure is given. That precludes an understanding of what portion of the per diem charge for Medicare patients is attributable to those ancillary costs. The circumstance is made more bewildering in that the financial expert presented by Suwannee stated that the $130 per diem charge had application to residents who were receiving subacute care. What portion of the per diem charge for Medicare residents is attributable to the subacute care component is not revealed in the application. Neither, is it explained in the testimony. Notwithstanding the assurance of the Suwannee financial planner that the Medicare rate projected for the first year of operation is in keeping with the Hospital Cost Containment Board's data on the average rate structure, that comment and his other explanations failed to establish the reasonableness of that charge. This is especially true when considering the fact that the Medicaid charges, even accepting an adjusted rate of $80 per day, are also indicated at Schedule 12 as including therapies and are far less than the Medicare per diem. Schedule 17 shows the Medicaid without reference to the therapies as an aggregate item in the same fashion as described with the Medicare category of reimbursement. Further, evidence of the fact that private room, private pay, does not exceed the Medicare per diem charge is related at Schedule 12 where it describes the subacute private room, private pay patient as paying $150 and the semiprivate, room private pay as paying $130. Again, in the Suwannee application in the first year of operation for both Medicaid and Medicare therapies are said to be included in the basic charges of $68 and $130 respectively shown at Schedule 12 and carried forward in the aggregate on Schedule 17. From the explanations stated by the financial planner, the projected costs for therapies by those two categories of patients is not reflected in the ancillary cost centers for physical therapy, speech therapy and occupational therapy found at lines 11-13 of Schedule 18. Instead, they are reflected at line 39 under other costs centers in the amount of $80,900. Moreover the $80,900 is said to include subacute services as well as the therapies. Having considered Schedules 12, 17 and 18 for the first operating year, together with the other evidence presented in the course of the hearing, the estimate at line 39 of Schedule 18 of $80,900 is unreliable. The Suwannee project contemplates a facility of approximately 24,370 square feet. The construction cost estimate is $62.44 per square foot. The total project cost per bed is $56,802. That far exceeds the caps for the property cost component related to Medicaid residents which is presently $30,350 per bed. Put another way, that translates to a differential of $11.64 per patient day above present reimbursement levels for Medicaid residents. That differential cannot be made up by resort to payments for ancillary services for that category of resident. The shortfall attributable to the costs per bed differential in the application of $56,802 compared to $30,350 per bed plus ancillaries is not expected to be made up by resort to other revenue sources within this proposal either, nor can it be properly be. This is particularly true when approximately 70% of the patient days are expected to be provided by Medicaid residents. Even if Suwannee were able to obtain reimbursement for the per bed cost of $56,802, this is much more than the Starke cost per bed which is approximately $30,000 as built. The cap that has been mentioned is the one effective July 1, 1990. Nothing in the testimony would suggest that the caps would approach $56,802 within the planning horizon for this review cycle. In summary, the financial feasibility of the Suwannee proposal has not been established. While the parent corporation, Santa Fe Health Care, Inc., is strong financially and able to sustain Suwannee in its nursing home operation in the short term, even with expected losses, the losses will be extraordinary and the long term feasibility has not been demonstrated either. Simply stated, too much money is being expended to establish this facility and it may not be recouped by resort to the reimbursement scheme identified in the application. Under the circumstances, the nursing home is not perceived as a means of promoting the financial well being of the overall project constituted of the nursing home, relocated hospital and associated services. It is not accepted that the manner and quality of care proposed to be delivered by Suwannee is so superior that it justifies the inordinate expense in delivering the care. In other particulars Suwannee has shown that it meets all applicable criteria for granting it a certificate of need, but the overall costs are so exorbitant that they preclude financial success in the project. In addition, even if the project met the criteria its costs compared to the Starke proposal are so much more that the Suwannee proposal should be rejected in favor of the Starke proposal. It is not accepted that a hospital based nursing home is superior to a freestanding nursing home as urged by the presentation made by Suwannee. Starke had applied for a 120 bed nursing home, with a separate request explaining its proposal to construct a 60 bed nursing home. It is that latter proposal that fits the need in Planning Area I of District III. The total capital expenditure for that alternative proposal is $1,882,713. The cost per square foot is approximately $60 in the 22,500 square foot facility. The per bed costs is in the neighborhood of $30,000. In the first year of operation the private room, private pay is $89; the semiprivate room, private pay rate is $79; the Medicaid rate is $69.50 and the Medicare rate is $69.50. These rates do not include ancillary charges for therapies. The Starke proposal will include a unit for Alzheimer, subacute care, adult day care and respite care. Starke will provide 80% of its patient days for Medicaid residents and 10% of its patient days for Medicare residents. The Medicaid performance exceeds that of Suwannee. That rate is consistent with the experience which Starke has in the operation of its Whispering Pines Care Center in Starke, Florida, a 120 bed nursing home facility which has held a superior license rating over the three years preceding the application. Starke as a corporation would own both the Starke, Florida facility and the proposed Lake City, Florida facility. The principals in that corporation with 50% ownership are J. D. Griffis and George R. Grosse, Jr. The subacute care that is to be provided is in patient rooms which are directly adjacent to the nursing station. It is the intention of the applicant to build these rooms to allow support for medical equipment needed in the treatment of those residents. Although some criticism has been directed to the architectural design of the proposed nursing home facility, Starke has committed itself to meet all applicable codes. Under the circumstances it does not appear that this application presents significant problems associated with resident safety or inordinate costs in making necessary adjustments to comply with applicable codes. The Starke application was prepared by Jerry L. Keach, the then administrator for University Nursing Care Center in Gainesville, Florida, operated by Covenant Care Corporation. By the comments found in the application it was contemplated that the Covenant Care group would manage the Starke facility in Lake City, Florida, which would do business as Lake City Care Center. No contract has been executed between Starke and Covenant Care Corporation to allow the latter entity to manage the Lake City facility assuming the grant of the certificate of need to that applicant. At hearing the principals for Starke indicated that Covenant Care together with other unnamed organizations would be considered as management for the nursing home in Lake City. Although this issue of management is unresolved, reservations about the project are overcome in recognition of the success of the Starke corporation in the operation of the Whispering Pines Care Center in Starke, Florida. That suffices as an indication that Starke is capable of installing appropriate personnel to operate the Lake City facility, and provide quality care. The assumptions concerning the various aspects of the proposals set forth in the Starke application are sufficiently explained in the course of the final hearing and those explanations are accepted. It is reasonable to expect that the nursing home could be constructed, staffed and operated in a manner consistent with the explanations found in the application and through testimony at hearing. A successful outcome is anticipated whether the Covenant Care Corporation is employed to operate the facility or not. The favorable impression of the Starke proposal is held notwithstanding the criticism directed to the financial feasibility by remarks offered by Suwannee. In particular the Suwannee Exhibit No. 11 admitted into evidence questioning the assumptions of the Starke applicant concerning income projections for the first two years have been taken into account. Whispering Pines Care Center presently offers care for Alzheimer patients and subacute services. Therefore problems are not anticipated in the provision of those services in the proposed facility. With due regard for the criticisms that have been directed to the financial ability of Starke to maintain its Whispering Pines Nursing Center and the proposed project in Lake City, Florida, it is found that the applicant has the ability to conduct those businesses. As with the matter of financial feasibility, Starke has satisfied all other applicable criteria for the grant of a certificate of need to construct the 60 bed nursing home.

Recommendation Based upon consideration of the facts found and the conclusions of law reached, it is, RECOMMENDED: That a Final Order be entered which requires all CONs granted to be consistent with the applications and in keeping with that intention: Grants CON 5987 to Inverness for the addition of 20 community nursing home beds to its existing facility upon condition that those beds be constituted of a minimum of 75.2% total patient days for Medicaid patients; Grants CON 5962 to Starke for construction of a nursing home in Columbia County, Florida, constituted of a minimum of 80% total patient days for Medicaid patients, that provides Alzheimer services, subacute care, day care and respite care; Grants CON 5910 to McCoy for the addition of 60 beds upon condition that 60% of the patient days be devoted to Medicaid patients; Grants CON 5905 to Regency for construction of a 120 nursing home facility with 62% of its patient dads being devoted to Medicaid patients, 2 beds dedicated to Alzheimer patients, provision of respite care and that the facility shall be a one-story design consisting of 43,000 gross square feet in size; and Denies the application for a 60 bed nursing home in Suwannee County made by Suwannee under CON Action No. 5912. DONE and ENTERED this 19th day of September, 1990, in Tallahassee, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 1990. APPENDIX CASE NOS. 90-0043 and 90-0045 The following discussion is given concerning the proposed facts of the parties: Inverness Paragraphs 1 through 3 are subordinate to facts found. Paragraph 4 is not necessary to the resolution of the dispute. Suwannee Paragraphs 1 through 7 are subordinate to facts found. Paragraph 8 is contrary to facts found in that the Starke application can be advanced without a resort to an affiliation with Covenant Care Corporation. Paragraph 9 is accepted; however, those facts do not cause the rejection of the Starke proposal. Paragraphs 10 and 11 are not necessary to the resolution of the dispute. Paragraph 12 is accepted as factually correct; however, this is not crucial in determining the outcome of this case. Concerning Paragraph 13, while the record reveals that Mr. Keach was responsible at a time moratorium had been placed on admissions into University Nursing Care Center in Gainesville, Florida, the record was not detailed enough to ascertain what influence that might have on his ability to act as an administrator at the Starke facility proposed in this instance or his competence in preparing the application. The representations found in Paragraph 14 do not preclude the consideration of the Starke application. Concerning Paragraph 15, the first sentence is rejected as fact. The second and third sentences are not necessary to the resolution of the dispute. Concerning Paragraph 16, those items which are mentioned did not cause the rejection of the Starke application in that Starke is committed to abide by all applicable codes to insure control over the patients. Paragraphs 17 through 21 are contrary to facts found. Concerning Paragraphs 22-24, the Starke proposal is found to be financially feasible. Paragraph 25-27 are subordinate to facts found. Concerning Paragraph 28, notwithstanding economies of scale they will not overcome the inherent extravagance in the costs associated with bringing the Suwannee project on line. Concerning Paragraph 29, while diversification for rural hospitals is desirable, the present attempt by Suwannee is unacceptable. Paragraph 30 is subordinate to facts found. Concerning Paragraph 31 see comment on Paragraph 29. Paragraph 32 is subordinate to facts found. Paragraph 33 is accepted; however, the principal service area would appear to be Suwannee County. The existence of service over to Hamilton, Madison, Lafayette and Columbia Counties does not change the perception of this case. Paragraph 34 is subordinate to facts found. Paragraph 35 is contrary to facts found as are Paragraphs 36 and 37. Concerning Paragraph 38, the affiliation of Suwannee with the Santa Fe Health Care system does not overcome the lack of financial feasibility. Paragraphs 39 and 40 are subordinate to facts found. Paragraph 41 is contrary to facts found. Paragraph 42 is not necessary to the resolution of the dispute. Paragraph 43 is contrary to facts found. Paragraphs 44 and 45 are subordinate to facts found. Paragraph 46 is contrary to facts found. Paragraphs 47-55 are subordinate to facts found. Paragraph 56 is not necessary to the resolution of the dispute. Paragraphs 57-60 are subordinate to facts found. Paragraph 61 is contrary to facts found. Paragraph 62 is subordinate to facts found. Paragraph 63 is contrary to facts found. Paragraph 64 is subordinate to facts found. Concerning Paragraph 65, notwithstanding these observations they do not justify the rate structure or per diem charges set out in the Suwannee application. Paragraph 66 is subordinate to facts found as are the first two sentences of Paragraph 67. The last sentence to Paragraph 67 is rejected. Paragraphs 68 and 69 are contrary to facts found. The first sentence of Paragraph 70 is subordinate to facts found. The second sentence is not relevant. Paragraphs 71 through the first sentence of Paragraph 73 is contrary to facts found. Concerning the last sentence of Paragraph 73, Starke is found to be financially feasible and Suwannee is not. Paragraph 74 is subordinate to facts found. Paragraphs 75 and 76 have been taken into account in deciding that there are no particular advantages to placing the 60 beds in Columbia County as opposed to Suwannee County. Paragraph 77 in all sentences save the last is accepted. The last sentence is contrary to facts found in that subacute care will be rendered in the Starke facility. Paragraphs 78 through 80 are contrary to facts found. Paragraph 81 is subordinate to facts found. Paragraph 82 is accepted in the premise, but use of Suwannee as the facility to serve this population is rejected based upon the lack of financial feasibility. Paragraph 83 is subordinate to facts found with the exception that the subacute patients would not be best placed with Suwannee. Paragraph 84 and 85 are subordinate to facts found. Paragraph 86 is contrary to facts found. Paragraphs 1-5 with the exception of the last sentence in Paragraph 5 are subordinate to facts found. Concerning that latter sentence it is clear that Suwannee would intend to build the nursing home facility together with the hospital or exclusive of the hospital project. Paragraphs 6-8 are not necessary to the resolution of the dispute. Paragraph 9 is subordinate to facts found. Paragraph 10 is accepted and it is acknowledged that the applicants can approximate that average. Paragraphs 11 and 12 are subordinate to facts found. Concerning Paragraph 13 Suwannee did establish its percentage of commitment to Medicaid through proof at hearing. Paragraphs 14 through 23 are subordinate to facts found. Paragraph 24 is contrary to facts found in that Starke offers no greater enhancement than Suwannee in terms of geographic accessibility and is not really a competitor in this criterion with McCoy. Paragraphs 25 through 27 are subordinate to facts found. Paragraph 28 is contrary to facts found in that Suwannee did identify the programs that it intends to offer. Paragraphs 29 through 36 are subordinate to facts found. Paragraph 37 in the first sentence is subordinate to facts found. The second sentence is not necessary to the resolution of the dispute. Paragraph 38 is subordinate to facts found. Paragraph 39 is not necessary to the resolution of the dispute. Concerning Paragraph 40 while it is agreed that swing beds are skilled level of nursing home care they do not constitute reasonable alternatives to long term care. Paragraph 41 is subordinate to facts found in the first sentence. The second sentence in its suggestion that there is no significance to the lack of provision of these types of services under subacute care in area nursing homes is rejected. Paragraph 42 is rejected. Paragraph 43 is subordinate to facts found. Paragraph 44 is contrary to facts found. Paragraphs 45 through 52 are subordinate to facts found. Paragraph 53 is contrary to facts found. Paragraph 54 is subordinate to facts found with the exception that the reason that the Suwannee project is not found to be financially feasible does not include reference to a higher charge for Medicare patients than the charge to private pay patients. Paragraphs 55 through 60 with the exception of the last sentence in Paragraph 60 are subordinate to facts found. The nursing home is intended to be built whether the replacement hospital is built or not. Paragraphs 61 through 65 are subordinate to facts found. Starke Paragraphs 1 through 5 with the exception of the latter two sentences in Paragraph 5 are subordinate to facts found. Concerning the next to the last sentence, it was made clear that the intentions on the part of Suwannee were to build the nursing home. The last sentence to the extent that it is intended to suggest that this applicant is incapable of offering long term care services is rejected. Paragraphs 6 through 8 are not necessary to the resolution of the dispute. Paragraphs 9 through 11 are subordinate to facts found. Concerning Paragraph 12 to the extent that it suggests that Suwannee is not willing to provide services to Medicaid recipients, it is rejected. Paragraphs 13 through 21 are subordinate to facts found. Paragraph 22 is contrary to facts found in that Starke is not seen as enhancing geographic accessibility to a greater extent than Suwannee its true competitor. Paragraphs 23 and 24 are subordinate to facts found. Paragraph 25 is contrary to facts found ih that Suwannee has identified its special programs. Paragraphs 26 through 33 are subordinate to facts found. Paragraph 34 is subordinate to facts found in the first sentence. The second sentence is not necessary to the resolution of the dispute. Paragraph 35 is subordinate to facts found. Paragraph 36 is not necessary to the resolution of the dispute. Concerning Paragraph 37 while it is agreed that swing beds are skilled level of nursing home care they do not constitute reasonable alternatives to long term care. Paragraph 38 is subordinate to facts found in the first sentence. The second sentence in its suggestion than there is no significance to the lack of provision of these types of services under subacute care in area nursing homes is rejected. Paragraph 39 is rejected. Paragraphs 40 and 41 are subordinate to facts found. Paragraph 42 is contrary to facts found. Paragraphs 43 through 50 are subordinate to facts found. Paragraph 51 is contrary to facts found. Paragraph 52 is subordinate to facts found except as it suggests that the difference in rate between Medicaid patients and private pay patients in the Suwannee proposal forms the basis for the criticism that the Suwannee project is not financially sound. Paragraphs 53 through the first two sentence of Paragraph 59 are subordinate to facts found. Related to the latter sentences in Paragraph 59 it is clear that the schematic pertains to the basic design of the Suwannee facility whether attached to a new hospital or free standing. Paragraphs 60 through 64 are subordinate to facts found. McCoy Paragraph 1 is subordinate to facts found. Paragraphs 2 and 3 are not necessary to the resolution of the dispute. Paragraph 4 is subordinate to facts found. Paragraph 5 is not necessary to the resolution of the dispute. Paragraphs 6 through 83 are subordinate to facts found. Regency Paragraph 1 is subordinate to facts found. Paragraph 2 is not necessary to the resolution of the dispute. Paragraphs 3 through 5 are subordinate to facts found. COPIES FURNISHED: Sam Power, Department Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Elizabeth McArthur, Esquire Jeffrey Frehn, Esquire Aurell, Radey, Hinkle and Thomas 101 North Monroe Street, Suite 1000 Post Office Drawer 11307 Tallahassee, FL 32302 W. David Watkins, Esquire Oertel, Hoffman, Fernandez and Cole, P.A. Post Office Box 6507 2700 Blair Stone Road Tallahasee, FL 32314-6507 Leslie Mendelson, Esquire Department of Health and Rehabilitative Services 2727 Mahan Drive Fort Knox Executive Center Tallahassee, FL 32308 James C. Hauser, Esquire F. Phillip Blank, Esquire R. Terry Rigsby, Esquire Julie Gallagher, Esquire F. Philip Blank, P.A. 204-B South Monroe Street Tallahassee, FL 32301 Grafton B. Wilson, II, Esquire 711 North 23rd Avenue, Suite 4 Post Office Box 1292 Gainesville, FL 32602 R. Bruce McKibben, Esquire Dempsey and Goldsmith, P.A. 307 West Park Avenue Tallahassee, FL 32301

Florida Laws (1) 120.57
# 9
MAPLE LEAF OF LEE COUNTY HEALTH CARE, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-000693 (1987)
Division of Administrative Hearings, Florida Number: 87-000693 Latest Update: Nov. 22, 1988

The Issue Whether the Department of Health and Rehabilitative Services should approve the application for certificate of need (CON) of any one or more of five applicants for community nursing home beds in Lee County for the July 1989 planning horizon.

Findings Of Fact The Applicants Applications for certificates of need (CON) for nursing homes are accepted by the Department of Health and Rehabilitative Services (Department) in batching cycles and are subject to competitive review. The Department comparatively reviewed and analyzed 13 individual applications for proposed nursing services for District VIII, Lee County, in the July, 1986 nursing home batching cycle. Five of those applications are at issue for purposes of this proceeding. Pertinent to this proceeding, petitioner, Maple Leaf of Lee County Health Care, Inc., a wholly owned subsidiary of Health Care and Retirement Corporation of America (HCR filed an application for a 120-bed nursing home (CON 4746), petitioner Forum Group, Inc. (Forum), filed an application for a 60-bed nursing home (CON 4755), petitioner, Health Quest Corporation (Health Quest), filed an application for a 60-bed nursing home (CON 4747), petitioner, Hillhaven, Inc., d/b/a Hillhaven Health Care Center Lee County (Hillhaven) filed an application for a 120-bed nursing home (CON 4756), and respondent, Gene Lynn d/b/a Careage Southwest Healthcare Center (Careage) filed an application for a 120-bed nursing home (CON 4748). Each of these applications was timely filed. The Department's "preliminary" action The Department is the state agency charged with implementing and regulating the CON program for medical facilities and services in Florida. Within the Department, the Office of Community Medical Facilities is responsible for the review of CON applications and provides a recommendation for approval or disapproval after its analysis is concluded. The Department assigned the subject District VIII applications for the July, 1986 hatching cycle to Medical Facilities Consultant Robert May for review. Mr. May was supervised in his work by Elizabeth Dudek, an experienced Medical Facilities Consultant Supervisor, who has reviewed or supervised the review of approximately 1200 CON applications. Robert Nay and Elizabeth Dudek concurred in their evaluations of the applications and recommended that Hillhaven's application be approved for 60 beds in Lee County. This recommendation was forwarded to the Administrator of the Office of Community Medical Facilities, Robert E. Naryanski, who also occurred with the recommendation on or about December 20, 1986, and forwarded the recommendation to Marta Hardy, Deputy Assistant Secretary for Health Planning and Development, for final approval. An unusual set of circumstances evolved from that approximate point in time with respect to the applications at issue. Sometime in late November 1986 Marta Hardy talked to Robert Sharpe, Administrator of the Office of Comprehensive Health Planning, concerning the applications in this batching cycle and stated that she intended to involve him in the review procedure. In late December, she asked Mr. Sharpe to review the applications for four of the counties in the cycle, including Lee County. Mr. Sharpe is in a separate and distinct part of the Department, which reports to the Deputy Assistant Secretary but does not, in the ordinary course of operations, review certificate of need applications. Mr. Sharpe's involvement with reviewing nursing home applications had never occurred before and has not occurred since. However, Mr. Sharpe has been involved on limited occasions with reviewing hospital CON applications in preparation for administrative hearings. Careage had a CON application in each of the four districts that Mr. Sharpe was asked to review. Mr. Sharpe was not asked to review any other districts other than the four districts in which Careage had applications pending. In Mr. Sharpe's conversation with Ms. Hardy, Ms. Hardy specifically mentioned Careage while expressing her concern about the Department's ability to discriminate the best applicants on the basis of quality of care. Ms. Hardy mentioned no other applicant by name. Mr. Sharpe, in all circumstances, recommended Careage for approval. Mr. Sharpe did not attempt to do a complete re-review the applications, and did not redo any part of the review that had been performed by the Office of Community Medical Facilities specifically the need calculations and comparing the applications to the statutory review criteria. Mr. Sharpe did not apply statutory review criteria in his review of the applications because it had been determined that all the applicants were minimally qualified and met the statutory review criteria. Mr. Sharpe felt that the responsibility of his office was simply to do a comparative review to determine the best applicant. Mr. Sharpe placed information in the applications into what has been termed a "matrix." The purpose of the matrix was to present the information in the applications in a format which would facilitate a comparative analysis based on a greater number of factors than had previously been considered. Traditionally, the predominant factors utilized by the Department in reviewing applications were construction costs, Medicaid participation percentages, proposed sites, and charges. The matrix developed by Mr. Sharpe included additional factors which he felt would better address the quality of care to be provided, such as the size of facility, the size of the patient rooms, the amenities available to the patients and their families, the type and level of staffing, availability of special programs, and operating costs. By including a greater number of factors in the matrix, more information was considered in selecting the best applicant. As a result, the factors that traditionally had been considered by the Department were given relatively less weight. There was no notice to the applicants of this change in practice. Further, although all the information considered by Mr. Sharpe was taken from the applications and generally required to be in the application, the applicants reported the information differently, making a direct "apples-to-apples" comparison difficult. Mr. Sharpe's review of the applications spanned approximately five to eight days. Mr. Sharpe's staff in the information on the matrix from the applications, and, although Mr. Sharpe had personally reviewed all the applications, Mr. Sharpe did not personally check the information placed on matrix for accuracy. The Office of Community Medical Facilities' initial review covered a period of approximately six months. There was no evidence that the duties and responsibilities of the Office of Community Medical Facilities were not carried out in a thorough and appropriate manner. Ms. Dudek has more experience in reviewing CON applications than Mr. Sharpe, and she took into account, among other review criteria requirements, the type programs offered by the applicant and the quality of care the applicant had demonstrated and was capable of providing. Mr. Sharpe never talked to Ms. Dudek to find out the basis for her recommendation because he felt his responsibility was to do an independent review. Robert Sharpe reported his findings with regard to Lee County to Marta Hardy who apparently accepted Mr. Sharpe's recommendation on or about January 7, 1987, approving Careage's application for 60 beds and denying all others. On or about January 23, 1987, in the Florida Administrative Weekly, it was published that Careage was approved fob a 120-bed facility in Lee County. Actually HRS approved Careage for a 60-bed facility; the 120-bed figure in the Florida Administrative Weekly was erroneous. As a result of a new administration and Bob Griffin succeeding Ms. Hardy as Deputy Secretary in the Office of Health Planning, and due to his concerns about the unique manner in which these applications were reviewed and a decision made, another review of the applications for Lee County was conducted. The Office of Community Medical Facilities, the office originally responsible for reviewing the applications, was asked to do this review. This third review was conducted during the summer of 1987 by Bob May while this case was pending before the Division of Administrative Hearings. In this third review, a matrix was also used, but not the identical matrix previously used by Mr. Sharpe. Indeed, the Office of Community Medical Facilities was instructed not to look at what Mr. Sharpe's office had done. The review resulted in a decision that HRS would maintain its position of supporting partial approval of the Careage application for 60 beds. By letter dated September 4, 1987, the parties were formally notified of the HRS decision and a Correction Notice was published in the Florida Administrative Weekly indicating that the notice published in January, 1987, stating that Careage had received a CON for 120 beds, should have shown a partial approval of 60 beds, and a denial of 60 beds. HCR, Forum, Health Quest and Hillhaven timely contested initial approval of the Careage application and their own respective denials. Careage and HRS are the respondents. Hillhaven, prior to final hearing, dismissed its case contesting the Careage approval for 60 beds, and in this proceeding contends that Hillhaven should be awarded a certificate of need because there is a bed need in excess of 60 beds in Lee County. Careage did not timely contest the denial of the 120 beds requested in its original application. Health Care and Retirement Corporation of America HCR, through its wholly owned subsidiary, Maple Leaf of Lee County Health Care, Inc., proposes to construct a 120-bed community nursing home in Lee County, Florida. At the time its application was submitted, HCR had not selected a site on the proposed facility, but at hearing proposed to locate it in the Ft. Myers area. Currently, HCR owns and operates 92 nursing homes in 19 different states, including seven within the State of Florida. Its existing Florida facilities are Pasadena Manor Nursing Home (South Pasadena, Florida), Community Convalescent Center (Plant City Florida), Kensington Manor (Sarasota, Florida), Jacaranda Manor (St. Petersburg, Florida) Wakulla Manor (Crawfordville, Florida, Heartland of St. Petersburg (St. Petersburg, Florida, and Rosedale Manor (St. Petersburg, Florida). Each of these facilities received superior ratings on their latest licensure and certification survey with the exception of Heartland and Rosedale, which received a standard and conditional rating respectively. Significantly, the conditional rating assigned to the Rosedale facility occurred less than six months after that facility was acquired by HCR, and all deficiencies were corrected within 19 days of the survey. HCR's current proposal for a 120-bed facility will be a one-story structure containing 40,000 gross square feet, including 2,000 square feet for an ancillary adult day care center. It will have 58 semi-private rooms with half-bath (toilet and sink) and four private rooms with full bath (toilet, sink and shower) located within four patient wings, two nursing stations, two dining rooms, central bathing facilities, beauty- barber shop, quite lounge, physical therapy room, occupational therapy room, multi-purpose rooms, outdoor patio areas and the other standard functional elements required to meet licensure standards. In all, the proposed facility meets or exceeds state requirements for the construction of nursing homes. HCR proposes to dedicate one wing (14 semi-private and 1 private room) of its facility to the care of patients suffering from Alzheimer's Disease and related disorders. Alzheimer's Disease is a brain disorder that results in gradual memory loss and, as such loss progresses, a need for increased personal care. Historically, Alzheimer's patients have been mixed with other patients in nursing homes, often disrupting other patients and presenting problems of control for staff separate Alzheimer's care unit enables the nursing home to utilize special techniques to manage the patient without restraint or sedation, and provides the patient with a smaller, safer and specially designed area with specially trained staff to address the needs of such patients. However, absent fill-up, HCR does not propose to limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders. HCR's Alzheimer's unit is reasonably designed, equipped and minimally staffed for its intended purpose. HCR also proposes to provide, as needed, subacute care at its facility. Due to the impacts of the federal DRG (diagnostically related group) system which encourages hospitals to discharge patients earlier, there has been an increased demand for subacute services in nursing homes. Included within the subacute services HCR proposes to offer are ventilator care, IV therapy, pulmonary aids, tube feeding, hyperalimentation, and percentage and long term rehabilitation. HCR currently provides a wide variety of such subacute services at its existing facilities, and it may reasonably be expected to continue such practice at the proposed facility. As an adjunct to the proposed nursing home, HCR proposes to operate an adult day care unit for 12 Alzheimer's Disease patients. Additionally, HCR will offer respite care within the nursing home when beds available. Adult care and respite care provide alternatives to institutional long-term care in nursing homes, aid in preventing premature rising home admissions, and promote cost containment. As initially reviewed by the Department, HCR's activity would be a single story building containing 40,000 gross square feet, including the day care area, with an estimated total project cost of $3,894,000. As proposed, the total project cost equates to $32,450 per bed, and as designed provides 127 net square feet of living space for private rooms and 166 square feet for semi- private rooms. Construction equipment costs were as follows: Construction costs $2,200,000; costs per square foot $55.00; construct cost per bed 17,417; equipment costs $420,000; and equipment cost per bed $3,500. HCR's estimate of project costs is reasonable. At hearing HCR updated its project costs to account for changes that arose during the delay between initial review and de novo hearing. As updated, the total project cost was $4,375,500, or $36,462 per bed. Construction equipment costs, as updated were as follows: construction costs $2,400,000; cost per square foot $60.00; construction cost per bed $19,000, equipment costs $420,000; and equipment cost per bed $3,500. HCR's updated estimate of cost is reasonable. Staffing at the proposed 120-bed facility is designed to accommodate the needs of the skilled and intermediate care patients, as well as the special needs of the Alzheimer's and subacute patients. HCR will provide 24-hour registered nurse coverage for subacute patients and a higher staffing level in the Alzheimer's unit. The nursing home will provide 3.59 hours per patient in the Alzheimer's unit and 2.73 nursing hours overall, based on the assumption that 50 percent of the Alzheimer's patients will wanderers and that 50 percent of all patients will require skilled care. Precise staffing for subacute patients will be determined by the nature of the subacute services needed. HCR's staffing levels, as originally proposed and as updated, meet or exceed state standards. The salary and benefit estimates provided by HCR in its original application reflect salary and benefit levels current at the time of application, and the salary and benefit projections provided by HCR at bearing reflect current (1987) salaries and benefits inflated to the date of opening. Both estimates are reasonable. HCR's projection of utilization by class of pay as initially proposed was as follows: Private pay 51 percent, Medicaid 46 percent, and Medicare 3 percent. Due to its experience over the intervening 17 months since submittal of its application, HCR updated its assessment of utilization as follows: Private pay 50 percent, Medicaid 46 percent, and Medicare 4 percent. The current Lee County Medicaid experience level is 46 percent, and HCR provides an average 71 percent Medicaid occupancy in its Florida facilities. HCR's projections for payor mix are reasonable. HCR's initial application contained estimates of expenses and revenues current as of the date of application (July 1986) but failed to include an inflation factor to accommodate anticipated increases in expenses and revenues. Initially, T. projected its per diem room charges to be $60 to $85. At hearing, HCR projected its per diem room charges in the year opening (1990) to be $90 for a private room, $75 for a semiprivate room, $76.00 for Medicare patients, and $72 for Medicaid patients. The private, semi-private and Medicare charges were determined by inflating current (1987) Lee County charges forward to the year of opening. The Medicaid charges were based on a calculation of the Medicaid reimbursement formula. These charges, when multiplied by patient days, are a reasonable estimate of the projected revenues of the facility. HCR's estimate of expenses in its initial application was based on its current experience. Intervening events have lent new insight to its evaluation of expenses, as have intervening inflationary factors. While HCR's estimate of expenses and revenues was reasonable in its initial application, its current estimates comport with the reality of a 1990 opening and are reasonable. HCR has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other personnel necessary to staff its facility. Since HCR does not propose to initially limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders, its pro formas are premised on reasonable assumptions, and it has demonstrated the financial feasibility project in both the short term and long term. The proof demonstrates that HCR provides and Bill continue to provide quality care. HCR's corporate standards and guidelines regulate such areas as patient rights, staff development and orientation, physician and nurse services, pharmacy services and medication administration, social services, and infection control. HCR's manager of quality assurance, house professional services consultants, and quality assurance consultants regularly visit each HCR nursing home to implement the quality assurance standards and guidelines. Each HRC nursing home provides a staff development director who is responsible for the orientation of new employees, training new employees, and continuing training for all employees. Forum Group Inc. Forum is a publicly held health services company which owns, develops and operates retirement living centers and nursing homes on a national basis. Currently Forum operates 22 Lang facilities and an additional 11 retirement living centers with attached nursing facilities, including one nursing facility in Florida. Its Florida facility holds a standard rating. Other facilities owned by Forum in Texas, Kentucky and Illinois do, however, hold superior ratings. Pertinent to this case, Forum proposes to develop a retirement living center in Lee County that would consist of its proposed 60-bed skilled and intermediate care nursing home, an adult congregate living facility, and apartments or Independent living. Each of the three components which comprise Forum's retirement living center are physically connected and share some operational functions, such as a central kitchen, laundry, administrative area and heating plant. Such design provides for an efficient operation, as well as an economical distribution costs facility wide. The nursing facility proposed by Forum will be a single story building of wood frame and brick veneer construction containing 27,000 gross square feet. It will include 20 semi- private rooms with half bath, 16 private rooms with half bath, 3 private rooms with full bath, and one isolation room with full bath. Also included are a beauty-barber shop, quite lounge, physical therapy room, occupational therapy room, and exam-treatment room. But for the length of the corridors in the patient wings, discussed infra, the proposed facility meets or exceeds state requirements for the construction of nursing homes. Forum's proposal, as initially reviewed by the Department, would have a total project cost of $2,314,800. This equates to $38,580 per bed, and as designed provides 150 net square feet of living space for private rooms and 228 net square feet for semi-private rooms. Construction equipment costs were as follows: Construction costs $1,377,000; cost per square foot $51.00; construction cost per bed $22,950; equipment costs $200,000; and equipment costs per bed $3,333. Forum's estimate of project cost is reasonable. Forum provided a single-line drawing indicating the general arrangement of spaces for its proposed facility. As proposed, the facility would consist of two patient wings, and a central nurse's station. The corridor lengths in the patient wings exceed state standards by 40 feet. They could, however, be modified to conform to State standards without significantly affecting the cost of construction. The project would have energy conservation features such as heavy duty roof and side insulation, double-glazed windows, and high efficiency heating and air conditioning equipment. The forum facility will offer skilled and intermediate care, and subacute care, including IV therapy, ventilator care, hyperalimentation, pulmonary aids, and short and long term rehabilitation. Forum would contract out for physical therapy, speech therapy, pharmacy consultation and a registered dietician. If needed, Forum would offer respite care when beds are available. The proposed staffing levels and salaries proposed by Forum in its application are reasonable and meet or exceed state standards. Forum has a staff training program, with pre-service and in-service training, and utilizes a prescreening procedure to assure it hires competent staff. Twenty-four hour coverage by registered nurses will be provided, and a staffing ratio of 2.9 will be maintained. The staffing level at the proposed facility is consistent with that experienced at Forum's existing Florida Facility. Forum provides, and will continue to provide, quality care. Forum's application projected its utilization by class of pay as follows: private pay 58.47 percent, Medicaid 37.16 percent, and Medicare 4.37 percent. Currently, Forum experiences a 48 percent Medicaid occupancy rate system-wide, although it only has 2 of 35 beds dedicated to Medicaid care in its present Florida facility. Forum estimated its revenues based on patient charges ranging from $50.64 per day for Medicaid/semi-private room to $75.00 per day for SNF/private pay/private room. Based on such revenues, its pro forma, utilizing a conservative 86.25 percent occupancy rate at the end of the second year of operation, demonstrated the short term and long term financial feasibility of the project as initially reviewed by the Department notwithstanding the fact that it had underestimated its Medicaid and Medicare reimbursement rates. At hearing, Forum sought to demonstrate that its project was currently feasible by offering proof that intervening events had not significantly impacted the financial feasibility of its project. To this end, Forum offered proof that the contingencies and inflation factors it had built into the construction of its initial proposal would substantially offset any increased costs or expenses of construction. Additionally, Forum sought to update its proposal at hearing by offering testimony that included an increase in the administrator's salary from $27,000 to $39,000, a decrease in interest in year one to $187,803, an increase in interest in year two to $250,790, and an increase in revenues based on patient charges ranging from $69.19 per day for Medicaid/semi private room to $90.00 per day for SNF/private pay/private room. Some of the applicants objected to Forum's proof directed at the current financial feasibility of its project because it had not previously provided them with a written update of its application as ordered by the Hearing Officer. The applicants' objection was well founded. Further, the proof was not persuasive that any contingencies and inflation factors it had built into its initial proposal would substantially offset any increased costs or expenses of construction, nor that salaries, benefits and other expenses that would be currently experienced were appropriately considered in addressing the present financial feasibility of Forum's project. While Forum has the available resources, including management personnel and funds for initial capital and operating expenditures, for project accomplishments and operation, and will be able to recruit any other personnel necessary to staff its facility, it has failed to demonstrate that its proposal, as updated, is financially feasible in the long term. Health Quest Corporation Health Quest is a privately held corporation which owns, develops and operates health care facilities and retirement centers on a national basis. Health Quest has been in business for approximately 20 years, and currently operates 11 long-term care facilities and three retirement centers in Indiana, Illinois, and Florida. Its existing Florida facilities are located in Jacksonville, Boca Raton, and Sarasota. It also has facilities under construction in Winter Park and Sunrise, Florida. Health Quest also held a number of other certificates of need to construct nursing facilities in Florida. Recently, however, it decided to transfer or sell 3-4 of those certificates because its initial decision to develop nine new projects simultaneously would have, in its opinion, strained its management staff and commitment to high quality standards. HCR is, however, currently proceeding with several projects in Florida, and anticipates that the proposed Lee County facility will be brought on line thereafter. Pertinent to this case, Health Quest proposes to develop a retirement center in Lee County that would consist of a 60-bed skilled and intermediate care nursing home, and 124 assisted living studio apartments (an ACLF). 4/ The two components which comprise Health Quest's retirement center are physically connected and share some operational functions such as a common kitchen, laundry, therapy areas, maintenance areas, and administrative areas. Such design provides for an efficient operation, as well as an economical distribution of costs facility wide. In addition to providing an economical distribution of costs, the two components of the retirement center are mutually supportive. The nursing care unit supports the ACLF by making sure that health care services are available to the assisted living people. The ACLF supports the nursing unit as a source of referral and as an alternative to nursing home placement. The nursing facility proposed by Health Quest will be a single story building of masonry and concrete construction. It will include 6 private rooms and 27 semi-private rooms with half-bath attached, central nurse's station, central bathing facilities, beauty-barber shop, quite lounge, central dining area, physical and occupational therapy room and outdoor patio The center, itself, will provide patios, walkways and other outdoor features to render the facility pleasant and attractive, and will provide multi-purpose areas to be used for religious services and other activities, an ice cream parlor and gift shop. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Health Quest's proposed facility contained 25,269 gross square feet, with an estimated total project cost of $2,244,505. As proposed, the total project cost equates to $37,408 per bed, and as designed provides 240 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows: Construction costs $1,470,333; cost per square foot $58.19; construction cost per bed $24,506; equipment costs $298,200; and equipment cost per bed $4,970. While the majority of Health Quest's costs are reasonable, its equipment costs are not. These costs are substantially the same as those projected in its original application for a 120-bed facility, which at an equipment cost of $300,000 derived an equipment cost per bed of $2,500. Why the same cost should prevail at this 60-bed facility was not explained by Health Quest, and its equipment cost per bed of $4,970 was not shown to be reasonable. As with most applicants, Health Quest updated its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing. As updated, the estimated project cost is $2,290.331, $38,172 per bed. Construction equipment costs were as follows: Construction costs $1,507,043; cost per square foot $59.64; construction cost per bed $25,117; equipment costs $302,700; and equipment costs per bed $5,045. Again, while the majority of Health Quest's costs are reasonable its equipment costs are, for the reasons heretofore expressed, not shown to be reasonable. The Health Quest facility will offer skilled and intermediate nursing care, and subacute care, including IV therapy, chemotherapy, TPN therapy and tracheostomy care. Also to be offered are respite care as beds are available and, within the complex, adult day care. Health Quest will maintain a nursing staffing ratio of approximately 3.25 hours per patient day for skilled care and 2.5 for intermediate care. As originally reviewed by the Department, Health Quest's staffing levels and expenses were reasonable. At hearing, Health Quest increased its staffing levels to account for an increased demand in labor intensive care, and increased its staffing expenses to account for the intervening changes in the market place. As updated, Health Quest's staffing levels and expenses are reasonable. Health Quest's projection of utilization by class of pay in the application reviewed by the Department was as follows: private pay 51.6 percent, Medicaid 45 percent, and Medicare 3.4 percent. Health Quest's utilization projection, as updated at hearing, was as follows: private pay 50.9 percent, Medicaid 45 percent, and Medicare 4.1 percent. TAB Health Quest currently serves 30 percent Medicaid patients at its Jacksonville facility, 10 percent Medicaid patients at its Boca Raton facility, and no Medicaid patients at its Sarasota facility. It has, however, committed to serve 40 percent and 48 percent Medicaid patients at its Sunrise and Winter Park facilities, respectively. Health Quest's projections of payor are reasonable. Initially, Health Quest projected its per diem room charges to range from $52 for skilled and intermediate care Medicare patients to $57.25 for skilled care-private and Medicare patients. It did not, however, draw any distinction between private and semi-private rooms. At hearing, Health Quest projected its per diem room charges as follows: $90 for SNF/single/private pay; $73 for SNF/double/private pay; $73 for SNF/double/Medicare; $68 for SF/double Medicaid; $68 for ICF/single/private pay; $70.75 for ICF/double/private pay; and $68 for ICF/double/Medicaid. Health Quest's fill-up and occupancy projections, as well as its projections of revenue and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and as updated. During the course of these proceedings, a serious question was raised as to whether Health Quest had demonstrated that it had the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, or that it was committed to the subject project. Within the past three years, Health Quest has sold three of its approved CONS and is considering the sale a fourth due to its inability to handle that number of projects, and the adverse impact it would have on its ability to deliver quality care. Notwithstanding its inability to proceed with approved projects, Health Quest proceeded to hearing in October 1987 and December 1987 for nursing home CONs in Hillsborough County and Lee County (the subject application), and also had nine such applications pending in the January 1987 batching cycle and eight such applications in the October 1987 batching cycle. Health Quest's actions are not logical, nor supportive of the conclusion that it is committed to this project or that it possesses available resources for project accomplishment. Under the circumstances, Health Quest has failed to demonstrate that it has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation. Health Quest's facilities in Jacksonville and Boca Raton currently hold superior ratings from the Department. A superior rating includes consideration of staffing ratios, staff training, the physical environment, physical and restorative therapies, social services, and other professional services. Those facilities are monitored, as would the subject facility, by Health Quest for quality care through a system of quarterly peer review, and provide extensive staff education programs that include orientation training for new staff and on-going education for regular staff. Health Quest has demonstrated that it has provided quality care. However, in light of the strain its current activities have placed on its resources, it is found that Health Quest has failed to demonstrate that it could provide quality care at the proposed facility were its application approved. Hillhaven, Inc. Hillhaven is a wholly owned subsidiary of the Hillhaven Corporation, which is a subsidiary of National Medical Enterprises. The Hillhaven Corporation has been business for almost 30 years, and is currently responsible for the operation of approximately 437 nursing homes and retirement centers nationally, including 15 nursing homes which it owns or operates in the State of Florida. Hillhaven proposes to develop a new 120-bed skilled and intermediate care community nursing home in Fort Myers, Lee County, consisting of 38,323 square feet. It will include 14 private rooms and 53 semi-private rooms, a full bath attached to each room (shower, toilet and sink), central tub rooms, beauty- barber shop, quite lounge, chapel, physical therapy room, occupational therapy room, and outdoor patio areas. In all, Hillhaven's proposed facility meets or exceeds state requirements for the construction of nursing homes. As initially reviewed by the Department, Health Quest's proposed facility would be a single-story building containing 38,323 gross square feet, with an estimated total project cost of $3,544,444. As proposed, the total project cost equates to $29,537 per bed, and as designed provides 217 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows; construction costs $2,146,000; cost per square foot $56.00; construction cost per bed $17,884; equipment costs $442,005; and equipment cost per bed $3,683.38. Hillhaven's project costs are reasonable. As with the other applicants, Hillhaven update its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing, certain oversights in its initial submission, and its decision to proceed with type 4 construction as opposed to type 5 construction as originally proposed. As updated, the estimated project cost is $4,089,639, or $34,155.33 per bed. Construction equipment costs, as updated, were as follows: construction costs $2,446,088; cost per square foot $63.82; construction cost per bed $20,384; equipment costs $521,200; and equipment costs per bed $4,343.33. By far, the biggest factor in the increased construction costs was Hillhaven's decision to proceed with type 4 construction as opposed to type 5 construction. Either type of construction would, however, meet or exceed state standards, and Hillhaven's estimates of construction and equipment costs are reasonable. The Hillhaven facility will offer skilled and intermediate care, occupational therapy, speech therapy, physical therapy, recreational services, restorative nursing services, and social services. Hillhaven does not discriminate on admission, and would admit Alzheimer's and subacute patients as presented. Were sufficient demand experienced, Hillhaven has the ability to provide and would develop a full Alzheimer's unit, and provide day care and respite care. Currently, Hillhaven operates 36 Alzheimer's units at its facilities nation wide, but has experienced no demand for such a special unit or other special care at its existent Lee County facility. As originally reviewed by the Department, Hillhaven's staffing levels an expenses were reasonable. At hearing, Hillhaven increased its staffing levels to account for staff inadvertently omitted from its initial application, and increased its staffing expenses to account or intervening changes in the market place. As updated, Hillhaven's staffing level is 2.5, and its staffing levels and expenses are reasonable. Hillhaven's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 30 percent, Medicaid 60 percent, and Medicare 10 percent. As updated at hearing, Hillhaven's utilization projection was as follows: private pay 44 percent, Medicaid 53 percent, and Medicare 3 percent. Currently, Hillhaven provides, on average, 53 percent Medicaid care at its facilities in Florida. Hillhaven's estimate of payor mix was reasonable and, in light of intervening changes in circumstance, was reasonable as updated. Hillhaven's patient charges for its second year of operation as originally reviewed by the Department ranged from $58.60 to $62.00 per day. As updated, Hillhaven's patient charges ranged from $52.13 to $73.50 per day. Hillhaven's estimated charges were achievable when initially proposed and as updated, and are reasonable. Hillhaven's fill-up and occupancy projections, as well as its projections of revenues and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and comport, as updated, with the current experience in Lee County. Hillhaven has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates are premised on reasonable assumptions, and Hillhaven has demonstrated the short term and long term financial feasibility of its project. Currently, Hillhaven owns or operates 15 facilities in the State of Florida. Of these 15 facilities, two have opened within the past year and are not eligible for ratings. Nine of the 13 eligible facilities are operating with superior licenses. Of the remaining four facilities, two have a standard license and two have a conditional license. The two facilities with conditional ratings have both resolved their deficiencies. Hillhaven has provided and will continue to provide quality care. It ensures that quality care will be maintained within its facilities by drawing upon the professional resources four regional offices comprised of registered nurses, quality assurance monitors, regional dietitians, maintenance supervisors, employee relations specialists, and other administrative support personnel. Regional consultants visit company facilities monthly to plan, organize and monitor operations, and to conduct in-service training workshops. Overall, Hillhaven provides each facility with an in-depth quality assurance program. Gene Lynn d/b/a Careage Southwest Healthcare Center Gene Lynn (Careage) is the president and 100 percent owner of Careage Corporation. Since 1962, Careage has developed approximately 150 nursing homes and retirement centers, as well as 100 medically related facilities, in 22 states and the Virgin Islands. Until December 1986 it did not, however, own or operate any facilities. Currently, Careage operates four nursing homes in the United States (one in the State of Washington, two in the State of California, and one in the State of Arizona) , but none in Florida. The home office of Careage is located in Bellevue, Washington. Careage proposed to develop a new 120-bed skilled and intermediate care nursing home in Lee County with specialty units for subacute and Alzheimer's care, consisting of 45,500 square feet. It would include a patient care unit consisting of 2 isolation rooms and 7 private rooms with full bath and 45 semiprivate rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semiprivate rooms with half bath, central dining area, beauty-barber shop, quiet lounge, chapel, physical therapy room, occupational therapy room, outdoor patio areas, and exam-treatment room. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Careage's proposed facility was a single-story building containing 45,500 gross square feet, with an estimated total project cost of $4,150,000. As proposed, the total project cost equates to 34,583 per bed, and as designed provides 184-227 net square feet of living space for isolation/private rooms, and 227-273 net square feet of living space or semi-private rooms. Construction equipment costs were as follows: construction costs $2,583,125; cost per square foot $56.77; construction cost per bed $21,526; equipment costs $420,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipment costs, are reasonable. The Careage facility would offer skilled and intermediate care, occupational therapy, physical therapy, recreational services and social services. Additionally, the proposal includes a special 21-bed unit dedicated solely to the treatment of Alzheimer's disease patients, and a dedicated 10-bed unit for subacute care which will accommodate technology dependent children care. Among the subacute services to be offered are hyperalimentation, IV therapy, ventilators, heparin flush, and infusion pumps for administration of fluids. Careage will offer respite care as beds are available, and will offer day care in a separate facility. Careage's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 49 percent, Medicaid 40 percent, Medicare 3 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patients charges for its facility were projected as follows: private and VA (room rate only) $63.86, Medicaid (all inclusive rate) $59.23, Medicaid (all inclusive rate) $108.15, and private (other) /subacute (room rate only) $128.75. Careage's fill-up and occupancy projections as well as its projections of revenues and expenses, for its 120-bed facility were not shown to be reasonable. First, in light of the fact that there was no quantifiable demand for a dedicated Alzheimer's unit and subacute care unit, as discussed infra at paragraphs 126-129, no reliable calculation of fill-up and occupancy rates or revenues and expenses could be derived that was, as the Careage application is, dependent on such revenue stream. Second, the Careage pro forma was predicated on average rates experienced in Lee County. Since Careage proposes heavier nursing care than that currently experienced in Lee County, its estimates of patient charges are not credible. At hearing, Careage updated its 120-bed application to account for inflationary factors that had affected the project since it was first reviewed, and to correct two staffing errors. These updates did not substantially change the project. Careage has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates were not, however, premised on reasonable assumptions, and Careage has failed to demonstrate the short term and long term financial feasibility of its 120-bed project. Following the Department's initial review of the applications in this batching cycle, it proposed to award a certificate of need to Careage for a 60- bed facility, premised on its conclusion that there was insufficient numeric need to justify an award of beds exceeding that number, notwithstanding the fact that the application of Careage was for 120 beds and did not request or propose a 60-bed facility. Notably, all financial, staffing, construction, equipment and other projections described in the Careage application were based on a 120- bed facility, and no information was provided regarding a 60- bed facility. Also notable is the fact that the other applicants were not accorded equal consideration. Not surprisingly, the proposed award of a CON for 60-beds to Careage was timely challenged, but Careage did not protest the Department's denial of its application for 120 beds but appeared as a respondent to defend the Department's decision to award it 60 beds. At hearing, Careage offered proof of the reasonableness of its 120- bed proposal over the objection of the other applicants. /5 Careage contends that its proposed 60-bed facility is a scaled down version of its 120-bed proposal Careage proposes to offer the same services in its 60-bed facility as it proposed in its 120-bed facility, including the 21-bed Alzheimer's unit and 10-bed subacute care unit. Its proposed 60- bed facility is not, however, an identifiable portion of its initial project. As proposed, the 60-bed facility would contain 26,900 gross square feet, and meet or exceed state standards. It would include a patient care unit consisting of 1 isolation room and 4 private rooms with full bath, 17 semi- private rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semi-private rooms with half-bath, together with the same amenities offered by the 120-bed facility, but on a reduced scale. As proposed, the total project cost for the 60-bed facility is $2,475,000, which equates to $41,250 per bed. As designed, the facility would provide the same net square footage of living space for private and semi-private rooms as the 120-bed facility. Construction equipment costs would be as follows: construction costs $1,431,750; cost per square foot $53.22; construction cost per bed $23,863; equipment costs $210,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipments costs, are reasonable. Careage's projected utilization by class of pay in its 60-bed facility was as follows: private pay 47 percent, Medicaid 40 percent, Medicare 5 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patient charges for its 60-bed facility were projected as follows: private and VA (room rate only) $66.00, Medicaid (all Inclusive rate) $63.50, Medicare (all inclusive rate) $120.00, private (other)/subacute (room rate only) $130.00. Careage's fill-up and occupancy projections, its projections of revenue and expenses, and its pro forma estimates for its 60-bed facility suffer the same deficiencies as those for its proposed 120-bed facility. Under the circumstances, Careage has failed to demonstrate the short term and long term financial feasibility of its 60-bed facility. While Careage has only owned and operated nursing homes for a short time, the proof demonstrates that it has and will continue to provide quality care for its residents. The Alzheimer's unit and subacute care units are reasonably designed, equipped and staffed for their intended functions. Staffing ratios in the subacute unit will be 6.0, and in the other areas of the facility 3.0. Careage currently utilizes a quality assurance program at each facility which includes a utilization review committee, safety committee, infection control committee, and pharmaceutical committee. Each facility also has a resident advisory council, community advisory council, and employee advisory council. Presently, Careage is developing a company level quality assurance program, and has initiated announced and unannounced site visits by a quality assurance expert to evaluate resident care, operations, maintenance and physical environment. The Department of Health and Rehabilitative Services The opinions expressed by the witnesses offered by the Department were premised on information available to them while these applications underwent "preliminary" review. The information available to them at that time, and represented by the State Agency Action Report (SAAR), was incomplete and inaccurate in many respects, including the services to be provided by some of the applicants and the approved bed inventory and occupancy rates utilized in the need methodology. These witnesses were not made privy to, and expressed no opinions, regarding the relative merits of the applications in light of the facts developed at hearing. Throughout the hearing, counsel for the Department objected to evidence from any applicant regarding "updates" (changes) to their applications as they were deemed complete by the Department prior to its initial review. It was the position of the Department's counsel, but otherwise unexplicated, that the only appropriate evidence of changed conditions after the date the application was deemed complete were those changes which relate to or result from extrinsic circumstances beyond the control of the applicant, such as inflation and other current circumstances external to the application. The majority of the "updated" material offered by the applicants at hearing did result from the effects of inflation, the passage of time between the application preparation and the dates of final hearing, changes in the market place regarding nursing salaries, changes in the Medicaid and Medicare reimbursement system and typographical errors in the application. Some changes in design were offered as a result of the applicant's experience with other construction projects and in order to comply with licensing regulations. There were also some changes which resulted from better information having been secured through more current market surveys. None of the applicants attempted to change their planning horizon, the number of beds proposed, the proposed location of the facility or the services to be offered except Careage. The Department has established by rule the methodology whereby the need for community nursing home beds in a service district shall be determined. Rule 10-5.011(1)(k)(2), Florida Administrative Code; formerly, Rule 10- 5.11(21)(b) Florida Administrative Code. The first step in calculating need pursuant to the rule methodology is to establish a "planning horizon." Subparagraph 2 of the rule provides: Need Methodology... The Department will determine if there is a projected need for new or additional beds 3 years into the future according to the methodology specified under subparagraphs a. through i. The Department interprets subparagraph 2, and the applicants concur, as establishing a "planning horizon" in certificate of need proceedings calculated from the filing deadline for applications established by Department rule. This interpretation is consistent with the numeric methodology prescribed by subparagraph 2, and with the decision in Gulf Court Nursing Center v. Department of Health and Rehabilitative Services, 483 So.2d 700 (Fla. 1st DCA 1986). Applying the Department's interpretation to the facts of this case establishes a "planning horizon" of July 1989. Pertinent to this case, subparagraphs 2a-d provide the methodology for calculating gross bed need for the district/subdistrict in the horizon year. In this case, the applicable district is District 8, and the applicable subdistrict is Lee County. The first step in the calculation of gross need for the horizon year is to derive "BA", the estimated bed rate for the population age group 65-74 in the district. This rate is defined by subparagraph 2b as follows: BA LB/ (POPC + (6 x POPD) Where: LB is the number of licensed community nursing home beds in the relevant district. POPC is the current population age 65-74 years. POPD is the current population age 75 years and over. The parties concur that the district licensed bed figure (LB), as well as the subdistrict licensed bed figure (LBD) is calculated based on the number of community nursing home beds as of June 1, 1986. The Department's Semi-Annual Nursing Home Census Report and Bed Need Allocation prepared for the July 1986 review cycle (July 1989 planning horizon) listed 4,193 licensed community nursing home beds in District 8 and 996 in Lee County. However, that count taken on May 1, 1986, did not include 120 new beds which were licensed in Charlotte County on May 8, 1986. The count also excluded 287 beds at four other facilities in the district, including 60 beds at Calusa Harbor in Lee County, because they were listed as sheltered beds according to Department records at that time. After passage of Section 651.118(8), Florida Statutes, the Department surveyed the facilities and found that the beds at these four facilities were operated as community beds rather than sheltered beds. Under the circumstances, the proof demonstrates that as of June 1, 1986, there were 4,600 licensed community nursing home beds in district 8 (LB) and 1,056 in Lee County (LBD). The formula mandated by the rule methodology or calculating BA requires that the "current population" for the two age groups be utilized. The rule does not, however, prescribe the date on which the "current population" is to be derived. Some of the applicants contend that the current population" for POPC and POPD should correspond to the period for which the average occupancy rate (OR) is calculated or the July batching cycle, OR based upon the occupancy rates of licensed facilities for the months of October through March preceding that cycle. Under this theory, January 1, 1986, as the midpoint of that period, is the appropriate date to calculate "current population" to derive PCPC and POPD. The Department contends that "current population" for POPC and POPD should be calculated as of July 1986, the filing deadline for applications in this review cycle. The Department's position is, however, contrary to its past and current practice. The need reports issued by the Department between December 1984 and December 1986, routinely used a three and one- half year spread between the base population period and the horizon date for "current population." In the January 1987 batching cycle, which cycle immediately followed the cycle at issue in this case, the Department utilized a three and one-half spread between the base population period and the horizon date for "current population" when it awarded beds in that cycle. The Department offered no explanation of why, in this case, it proposed to deviate from its past and current practice. Under the circumstances, January 1, 1986, is the appropriate date on which the "current population" is to be calculated when deriving POPC and POPD. The parties are also in disagreement as to whether population estimates developed after the application deadline can used to establish the current population. Rule 10- 5.011(k)2h, Florida Administrative Code, mandates that population projections shall be based upon the official estimates and projections adopted by the Executive Office of the Governor, but does not limit such proof to any particular estimate. The Department advocates the use of population estimates existent at the application deadline. Accordingly, it would apply the official estimates and projections adopted by the Executive Office of the Governor as of July 1, 1986. Other parties would apply the more recent estimates adopted by the Office of the Governor as of July 1, 1987. In this case, the use of either estimate would have no significant effect on the result reached under the rule methodology; however, since all population estimates and projections are only approximations rather than actual counts, it would be more reasonable from a health planning perspective to use the latest estimates of the 1987 population than the estimates available at the time of application. In this case, this means using July 1, 1987, estimates of January 1986 populations. These estimates are still "current" as of January 1986, since It is still the January 1986 population that is to be measured, and more reliable from a health planning perspective than the prior projection. In the same manner, July 1, 1987, estimates of horizon year 1989 populations (PCPA and POP), infra, would also be used rather than July 1, 1986, estimates of that population. Accordingly, Forum's calculation POPC (128,871), POPD (77,194), POPA (149,645), and POPB (95,748) is appropriate. (Forum Exhibit 10, Appendix A) Application of the methodology prescribed by subparagraph 26 to the facts of this case produces the following calculation: BA 4,600/(128,871 + (6 x 77,194) BA 4,600/(128,871 + 463,164) BA 4,600/592,035 BA .0077698 The second step in the calculation of gross need for the horizon year is to derive "BB", the estimated bed rate for the population age group 75 and over in the district. This methodology is defined by subparagraph 2c, and calculated in this case as follows: BB 6 x BA BB 6 x .0077698 BB .0466188 The third step in the calculation of gross need for the horizon year is to derive "A", the district's age adjusted number of community nursing homes beds" at the horizon year. This methodology is defined by subparagraph 2a as follows: A (POPA x BA) + (POPB x BB) Where: POPA is the population age 65-74 years in the relevant department district projected three years into the future. POPR is the population age 75 years and older in the relevant departmental district projected three years into the future. Application of the methodology prescribed by subparagraph 2a to the facts of this case produces the following calculation: A (149,645 x .0077698) + (95,748 x .0466188) A 1,162.7117 + 4,422.4086 A 5,585.12 The final step in the calculation of gross need in the horizon year is to derive "SA", the preliminary subdistrict allocation of community nursing home beds;" gross need in the case. 7/ This calculation is defined by subparagraphs 2d as follows: SA A x (LBD/LB) x (OR/.90) Where: LBD is the number of licensed community nursing home beds in the relevant subdistrict. OR is the average 6 month occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Occupancy rates established prior to the first batching cycle shall be based upon nursing home patient days for the months of July 1 through December 31; occupancy rates established prior to the second batching cycle shall be based upon nursing home patient days for the months of January 1 through June 30. The batching cycle in which these applications were filed, however, occurred before the Department amended its rule to include the fixed need pool concept contemplated by subparagraph 2d. Accordingly, the parties concur that the six month period on which the average occupancy rate is calculated is not as set forth in subparagraph 2d of the current rule, but, rather, defined by former rule 1C--5. 11(21)(b)4 as follows: OR is the average occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Review of applications submitted for the July batching cycle shall be based upon occupancy data for the months of October through March preceding that cycle... In calculating the occupancy rate (OR) for the licensed community nursing homes in the subdistrict (Lee County) the Department derived a figure of 91.91. The Department arrived at this figure based on the first day of the month patient census of each facility considered to have community beds (LBD=1,056), which included the 60 beds at Shell Point Nursing Pavilion; assumed that such census was maintained throughout the entire month; and then divided such patient days by the actual number of beds available. The Department's methodology is an accepted health planning technique, and comports with its previous practice. Some of the parties disagree with the technique utilized by the Department to calculate OR, and advocate the use of actual patient day occupancy to derive OR. This technique differs from the "first of the month" technique by utilizing the actual number of patient days experienced by the facility, as opposed to assuming a constant census based on first of the month data. This alternative methodology is, likewise, an accepted health planning technique, and if proper assumptions are utilized will yield a more meaningful result than the Department's methodology. In this case, the proponents of the "actual patient day occupancy" methodology, erroneously assumed that 160 beds at Shell Point Nursing Pavilion were community nursing homes beds, as opposed to 60 beds; and, based on an erroneous LBD of 1,156, derived a subdistrict occupancy rate of 92.97. Under such circumstances, these proponents calculations are not reliable, and the subdistrict occupancy rate derived by the Department is accepted. Applying the facts of this case to the methodology prescribed by subparagraph 2d produces the following gross need calculation for the subdistrict: 5A 5,585.12 x (1,056/4,600) x (.9191/.9) SA 5,585.12 x .2295652 x 1.0212222 SA 1309.36 The final step in the numeric need methodology is to derive net need from gross need. According to subparagraph 2i, this need is calculated as follows: The net bed allocation for a subdistrict, which is the number of beds available for Certificate of Need approval, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant department subdistrict from the bed allocation determined under subparagraphs 2.a. through f. unless the subdistrict's average occupancy rate for the most recent six months is less than 80 percent, in which case the net bed allocation is zero. The number of approved and licensed nursing home beds for the second batching cycle in 1987 shall be based on the number of approved and licensed beds as of August 1, 1987, in subsequent nursing home batching cycles, the number of licensed and approved beds to be used in establishing net need for a particular batching cycle shall be determined as of the agency's initial decision for the immediately preceding nursing home batching cycle. While the rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" In the subdistrict from the cross need previously calculated, it is silent as to the date that inventory should be calculated when, as here, the batching cycle at issue predates its enactment. In the face of this dilemma, the parties rely on the provisions of former rule 10-5.11(21)(b) , Florida Administrative Code, which was existent when their applications were filed to resolve their dispute. Under the circumstances, reference to former rule 10-5.11(21)(b), is appropriate. Former rule 10-5.11(21)(b)9 provides: The net bed allocation for a subdistrict, which is the number of beds available, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant departmental subdistrict from the bed allocation determined under subaragraphs 1 through 9 (sic 8).... (Emphasis added) While the former rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" in the subdistrict from the gross need calculated under subparagraphs (b)1-8, it is silent as to the date that inventory should be calculated. The Department asserts that the number of licensed beds should be calculated as of June 1, 1986 (the date established by subparagraph (b)7 of the former rule as the data base for calculating LB and LBD, and the number of approved beds as of December 18, 1986 (the date the Department's supervisory consultant signed the state agency action report). The other parties would likewise calculate licensed beds as of June 1, 1986, but would also calculate approved beds as of that date. The Department offered no reasonable evidentiary basis for its interpretation of the date at which the total number of licensed and approved beds are to be calculated under subparagraph (b)9 of the former rule. As discussed below, the dates used by the Department and the other parties for purposes of calculating net need were facially unreasonable. The Inventory of licensed and approved beds under subparagraph (b)9 of the former rule, as well as subparagraph 2i of the current rule, are inextricably linked. As approved beds are licensed, the approved bed inventory decreases and the licensed bed inventory increases. The Department's interpretation of the dates at which licensed and approved beds are to be counted is neither logical nor rational, since it could result in some beds not being counted as either licensed or approved. For example, if beds were approved and not yet licensed on June 1, 1986, but licensed before the consultant supervisor signed the SAAR (state agency action report), they would not be counted in either inventory. On the other hand, the other parties' approach would ignore all beds licensed or approved from previous batching cycles after June 1, 1986 which beds were intended to serve at least a portion of the future population. The fundamental flaw in the parties' approach to establishing an inventory date under subparagraph (b)9, was the assumption that subparagraph (b)7 of the former rule defined licensed bed inventory for purposes of subparagraph (b)9. The Department's rule must be construed in its entirety, and all parts of the rule must be construed so as to work harmoniously with its other parts. So construed, the only logical conclusion to be drawn, as hereinafter demonstrated, is that subparagraph (b)7 defines LB and LBD ("current" licensed beds) for the cross need calculation under the methodology defined by subparagraphs (b)1-4, and does not presume to define licensed beds for the net need calculation under subparagraph (b)9. Subparagraphs (b)1-4 and 7 of the numeric need methodology prescribed by the former rule is designed to yield a gross bed need for the horizon year. The keys to this methodology are the calculation of a current bed rate (BA) and current occupancy rate (OR) for the current using population, and the projection of those rates on the population to be served in the horizon year. A meaningful calculation of the current bed rate cannot, however, be derived without a current inventory of licensed beds (LB and LBD). Accordingly, the relationship between subparagraph (b)7, which defines the data base (June 1, 1986 in this case) for defining LB and LBD (the "current" licensed bed inventory) to the gross bed need calculation is apparent. The parties' suggestion that subparagraph (b)7 defines licensed bed inventory under subparagraph (b)9 not only ignores the inextricable link between subparagraph (b)7 and the gross bed need methodology, but also the language and purpose of subparagraph (b)9. The purpose of that subparagraph is to derive a realistic estimate of actual (net) bed need in the horizon year. Since all licensed and approved beds from previous batching cycles were intended to serve at least a portion of the horizon population, it would be illogical to ignore any of those beds when calculating net need. Accordingly, it would be unreasonable in this case not to count any beds that were licensed or approved from previous batching cycles between June 1, 1986, and the date a decision is rendered on these applications. Indeed, subparagraph (b)9 speaks to "the total number" of licensed and approved beds, not beds existent on June 1, 1986. In sum, subparagraph (b)7 cannot be read to define licensed bed inventory under subparagraph (b)9, and the parties' suggestion that it can is rejected as contrary to the clear language of the rule methodology. See: Boca Raton Artificial Kidney Center, Inc. v. Department of Health and Rehabilitative Services, 493 So.2d 1055 (Fla. 1st DCA 1986). Since the purpose of subparagraph (b)9 is to calculate a realistic estimate of the net bed need for the horizon year, it is appropriate to use the most current inventory of licensed and approved beds at the point a decision is rendered on an application. This assures to the greatest extent possible that the horizon population will not be over or undeserved. In those circumstances where the SAAR becomes final agency action, the Department's approach of calculating inventory on the date the supervisory consultant signs the SAAR, assuming that inventory includes licensed and approved beds on that date, might be reasonable. However, where, as here, the SAAR constitutes only preliminary agency action, and a de novo review of the application is undertaken, there is no rational basis for subsuming that inventory. The rule methodology considered, the only rational conclusion is that net need be derived on the date of de novo review, and that it be calculated reducing the gross need calculation by the inventory of licensed and approved beds from previous batching cycles existent on that date. As of the date of administrative hearing there were 1,056 licensed beds and 120 approved beds in the subdistrict. Applying the methodology prescribed by subparagraph 2i to the facts of this case calculates a net need of 145 community nursing home beds for the July 1989 planning horizon. Special Circumstances. The Department will not normally approve an application for new or additional nursing home beds in any service district in excess of the number calculated by the aforesaid methodology. Rule 10-5.011(1)(k), Florida Administrative Code. Succinctly, the need for nursing home services, whether they be general or special, is a product of the rule methodology, and not relevant to a calculation of need absent a demonstration of special circumstances. The Department has adopted by rule the methodology to be utilized in demonstrating special circumstances that would warrant a consideration of factors other than the numeric need methodology in deciding the need for nursing home services. That rule, 10-5.011(1)(k)2; Florida Administrative Code, provides: In the event that the net bed allocation is zero the applicant may demonstrate that circumstances exist to justify the approval of additional beds under the other relevant criteria specifically contained at Section 10-5.011. Specifically, the applicant may show that persons using existing and like services are in need of nursing home care but will be unable to access nursing home services currently licensed or approved within the subdistrict. Under the provision, the applicant must demonstrate that those persons with a documented need for nursing home services have been denied access to currently licensed but unoccupied beds or that the number of persons with a documented need exceeds the number of licensed unoccupied and currently approved nursing home beds. Existing and like services shall include the following as defined in statute or rule, adult congregate living facilities, adult foster homes, homes for special 505 home health services, adult day health care, adult day care, community care for the elderly, and home care for the elderly. Patients' need for nursing home care must be documented by the attending physicians' plans of care or orders, assessments performed by staff of the Department of Health and Rehabilitative Services, or equivalent assessments performed by attending physicians indicating need for nursing home care. In the instant case, some of the applicants have proposed special services, including an Alzheimer's unit, subacute care unit, and beds for technology dependent children. They offered, however, no proof that any person with a documented need for such services had been denied access to available beds that the number of persons with a documented need exceeded the number of available beds. Succinctly, there is no credible proof that the need for nursing home services in Lee County exceeds that calculated pursuant to the numeric need methodology. While there are no special circumstances existent in this case that would justify an award of beds in excess of that calculated by the rule methodology, that does not mean that consideration of the Alzheimer's, subacute and technology dependent children services offered by some of the applicants is not relevant to the comparative review of the subject applications. Rather, it means that the need for such services will presumptively be met within the need calculated by the rule methodology. How the applicants propose to address that need is, however, a matter for consideration in a comparative review of their applications. Each of the applicants propose to provide subacute care, with Careage proposing a special 10-bed subacute care unit which would accommodate technology dependent children. HCR and Careage propose special Alzheimer's care units; a 15-bed unit by HCR and a 21-bed unit by Careage. Hillhaven will admit Alzheimer's disease patients as presented, and will develop a dedicated Alzheimer's unit if demand should subsequently develop. The prevalence of Alzheimer's disease and the increased demand for subacute services brought about by DRGs, demonstrates that there will be a demand for such services within existing and proposed facilities. There was, however, no persuasive proof of any demand for technology dependent services in Lee County. While there is a demand for Alzheimer's disease care, and the preferred mode of care is in a separate unit specifically designed, staffed, and equipped to deal with this degenerative disease, there was no persuasive proof that the demand is such as to warrant the creation of a separate unit such as proposed by HCR and Careage. 10/ Absent such quantifiable demand, the application of Hillhaven more realistically addresses the need for Alzheimer's disease patients than does that of the other applicants. With regard to subacute care services, the proof likewise fails to quantify the demand for such services. Under such circumstances, Careage's proposed 10-bed subacute care unit is not objectively warranted, and does not serve to better its proposal to provide such services over the proposals of the other applicants. Consistency with district plan and state plan The District 8 health plan contains the following pertinent standards and criteria: Community nursing home services should be available to the residents of each county, 4 within District Eight. At a minimum, community nursing home facilities should make available, in addition to minimum statutory regulation, in the facility or under contractual arrangements, the following services: a. pharmacy h. occupational therapy b. laboratory i. physical therapy c. x-ray j. speech therapy c. dental care k. mental health counseling e. visual care l. social services f. hearing care m. medial services g. diet therapy New and existing community nursing bed developments should dedicate 33-1/3 percent of their beds to use for Medicaid patients. Community nursing home (skilled and intermediate care) facilities in each county should maintain an occupancy rate of at least 90 percent. No new community nursing home facility should be constructed having less than 60 beds... Each nursing facility should have a patient transfer agreement with one or more hospitals within an hour's travel time, or the nearest hospital within the same county. All community nursing homes and applicants for community nursing homes should document their history of participation in Medicaid and Medicare programs. ... The State Health Plan contains the following pertinent goals: GOAL 1: TO DEVELOP AN ADEQUATE SUPPLY OF LONG TERM CARE SERVICES THROUGHOUT FLORIDA. GOAL 2: TO ENSURE THAT APPROPRIATE LONG TERM, CARE SERVICES ARE ACCESSIBLE TO ALL RESIDENTS OF FLORIDA. Each of the applicants demonstrated that their proposal would conform, at least minimally, with the foregoing provisions of the state and local health plans. Of particular significance to Lee County is, however, an applicant's commitment to Medicaid service. The District 8 Council has reported that hospitals in Lee County are having difficulty placing Medicaid patients in nursing homes due to the unavailability of Medicaid beds. The current Medicaid experience is 46 percent. Therefore, the local council has directed that new and existing community nursing home developments should dedicate at least 33-1/3 percent of their beds for Medicaid patients. While all applicants propose to meet this standard, Hillhaven's proposal to dedicate 53 percent of its beds to Medicaid care is substantially greater than the commitment of the other applicants, and is consistent with its current experience in meeting a community's need for nursing home care. Availability, appropriateness, and extent of utilization of existing health care services Section 381.705(1)(b), Florida Statutes, requires Consideration of the availability, quality of care, efficiency, appropriateness, accessibility, extent of utilization, and adequacy of like and existing health care services in the service district. When the subject applications were filed, there were 1,056 licensed beds in Lee County with an occupancy rate of 91.91 percent. The nursing home bed supply in Lee County is obviously strained, and there exist no reasonable alternatives to the addition of new beds to the subdistrict. To coordinate with existing health facilities, each applicant proposes to establish appropriate transfer agreements and affiliations with local physicians, hospitals, and other health care providers. While some of the applicants have proposed an Alzheimer's unit and subacute care unit, the proof failed to demonstrate any quantitative need for such units in the subdistrict. Some applicants also proposed to provide day care in conjunction with their nursing home. Currently, there exists adequate day care in Lee County at little or no expense to the patient, and there was no persuasive proof of a need for additional day care services. Economies derived from joint health care resources HCR and Hillhaven each proposed 120-bed facilities which would provide for a more efficient and economical operation than a 60-bed facility. The 60-bed facilities proposed by Forum and Health Quest are, however, part of a larger complex which likewise lends itself to an efficient and economical operation. HCR, Hillhaven, Forum and Health Quest are major operators of nursing home facilities, and are thereby able to negotiate and obtain bulk prices for food, medical and nursing supplies. These savings are ultimately passed on to the residents. Additionally, by drawing upon a broad spectrum of expertise existent within their corporate networks, these applicants are best able to maintain and improve the services they offer. The criteria on balance In evaluating the applications at issue in this proceeding, none of the criteria established by Section 381.705, Florida Statutes, or Rule 10- 5.011(k), Florida Administrative Code, have been overlooked. As between the competing applicants, consideration of those criteria demonstrates that Hillhaven is the superior applicant whether it is evaluated on its application as initially reviewed by the Department or as updated at hearing. Among other things, the Hillhaven facility is spacious with large and well appointed patient rooms, its project costs are most reasonable (whether type 5 or type 4 construction), its programmatic proposal and staffing levels are most reasonable in light of existing demand, its provision for Medicaid services is the highest, and its patient charges are the lowest.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered granting Hillhaven's application for a certificate of need to construct a new 20-bed community nursing home in Lee County, and denying the applications of HCR, Forum, Health Quest and Careage. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 22nd day of November, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of November, 1987.

Florida Laws (2) 120.57651.118