VOLUSIA COUNTY vs. PENINSULA UTILITIES, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-003029 (1985)
Division of Administrative Hearings, Florida Number: 85-003029 Latest Update: Apr. 25, 1986

Findings Of Fact On or about October 30, 1984, Lawrence E. Bennett, a consultant engineer for Peninsula, forwarded to DER's domestic waste engineering section an application to construct/operate a domestic wastewater treatment and disposal system along with the appropriate plans and a check for the fee. The package included proposals for construction of a 300,000 gpd splitter box and addition of a 100,000 gpd contact stabilization plant. Thereafter, on May 22, 1985, Mr. Bennett submitted a revised copy of the application pertaining to the 100,000 gpd expansion initially submitted as above. The revised application reflected Peninsula's proposed outfall to the Halifax River which was applied for under separate permit. By application dated October 7, 1983, as revised on May 15, 1985, Peninsula proposed to construct an outfall discharge into the Halifax River from the secondary treatment plant. By letter dated October 29, 1984, Mr. Bennett advised DER, inter alia, that the discharge rate would be an ADF of 1.25 mgd. The application for the additional 100,000 gpd plant and splitter box also provided for a chlorination facility. This expansion was needed because 200,000 gpd capacity is already committed to serve current residents and customers of the utility. The new construction is designed to accommodate established future demand. In Mr. Bennett's opinion, the design of this facility will accommodate all DER criteria and standards. The outfall facility proposed in the second project will be a pvc forced main for a part of the distance with iron pipe for the remainder and a lift station attached to pump the effluent to a point in the river selected where the river is deep enough to meet DER water criteria. The initial permit application on this project called for discharge into a portion of the river which did not meet water quality standards. As a result; DER suggested discharge point closer to the center of the river, and this change is now planned. At this point, the outflow will meet DER standards. Intents to issue the permits, as modified, were issued in August 1985. Peninsula has also filed for permits with the Florida Public Utilities Commission, the United States EPA, and the U.S. Army Corps of Engineers for these projects. The plans are based on the estimated population expansion called for in the next few years. Peninsula is fully capable, financially, of providing and paying for the projected improvements. In the past, it has always provided sufficient funding to do that which is called for under its permits and which is necessary. The waters in question here are Class III waters of the State, mainly recreational. There is no shellfish harvesting in the area because of the pollution of the Halifax River, condition which has existed since at least 1941. Results of tests conducted by experts for Peninsula show the quality of the water presently coming out of the treatment plant is cleaner than that currently existing in the Halifax River. The outfall pipe in question will have the capability of handling approximately 1,200,000 gpd. Latest reports from the water treatment plant indicate that the current average daily flow is 150,000 gpd representing approximately 75% of capacity. The design estimated for this project was based on a 250 gpd per unit use rate multiplied by the estimated number of units presently existing and to be constructed in the period in question. It is estimated however, that within two to three years even this project will be insufficient and Peninsula will have to file an additional request for expansion. Construction will have no detrimental environmental effect on the waters of the Halifax River. Mr. Bennett recommends discharge into the river rather than pumping the effluent backup to Port Orange because the local dissipation rate into the Halifax River, which is called for under these projects, is much quicker than that at Port Orange. Studies run on siting of the outfall pipe location which is close to Daggett Island included studies relating to dilution calculation and water quality of the effluent versus water quality of the river near the outfall. The project was, therefore, sited in such a manner as to provide for the least possible detrimental effect. Those studies, however, were for the original outfall location, not the present location as proposed by DER which is approximately 150 to 200 feet away. In the experts' opinion, however, there is very little difference in the two sites. The Daggett Island site is not unique in any way. It is a mangrove swamp of approximately 3 to 4 acres with nothing on it. Once the pipe is buried, it will be difficult to know that it is there. Even during construction, there would be little detrimental effect or disruption to the river ecology. Mr. Bennett's conclusions are confirmed by Mr. Miller; a DER engineer specializing in wastewater facility permits who has reviewed the plans for expansion of the plant for completeness and adequacy and found that they were both. The approval of the outfall pipe initially was made in Tallahassee based on the original siting. He reviewed it again, however, and determined that both projects are environmentally sound and conform to the DER standards. Rule 17-6, Florida Administrative Code, requires surface water discharge to have secondary treatment activity prior to discharge and the discharge cannot exceed 20% 80D and suspended solids. According to DER studies; the secondary treatment afforded the water at this location was adequate with the caveat that the District might want to require an extension of the outfall to the main channel of the river to promote tidal flushing of the effluent. It was this change which was; in fact, made by the District office. Without the change, the incoming tide would take the wastewater up into Daggett Creek. By moving it as suggested, west of the point of Daggett Island, the tide would go up river rather than into the creek taking the effluent with it. Concern over the creek is due to its limited natural flushing as opposed to the greater natural flushing of the river. It was the intent of all parties to achieve the desired result and move the outfall point; if at all possible, at no increase in cost. Consequently, the pipeline was moved at the same length with a slight possible addition to take the outlet to the same depth and this change became a condition to the issuance of the permit. The Peninsula will also need a dredge and fill permit in order to accomplish the work in question. The outfall plans (both construction and discharge) meet the requirements set forth in the pertinent provisions of Rule 17-6, Florida Administrative Code. DER evaluated post- construction, concluding that the new point source discharge would not violate these standards. However, prior to approval of these projects, DER did not perform a biological, ecological, or hydrographic survey in the area. As a result, it cannot be said that the criteria outlined in Rule 17-4.29(6), Florida Administrative Code, will not be adversely affected by the outfall pipe. Nonetheless, these surveys were not deemed necessary here. EPA denial of the NPDES (National Pollution Discharge Elimination System) permit, would have no impact on DER's intent to issue the instant permits. NPDES permits have no bearing on the state permitting process. If the NPDES permit is denied, the utility cannot discharge its effluent into the river. The state permit merely authorizes the construction. The NPDES permit applies to the outfall portion of the project, not to the treatment plant. Only if it could be shown there was a longstanding adverse effect on the water quality so as to bring it below standards, would this construction not be permitted. The depth of the water in the proposed area of the outfall is five feet. A 12-inch pipe would extend below the soil with an upturn to exit into the bottom of the river. Short term impacts of actual construction are not relevant to the permitting process. If there are any, they would be related to and considered in the dredge and fill permitting process. This conclusion is supported by the testimony of Jan Mandrup-Poulsen, a DER water quality specialist who, in his analysis of the instant projects, first looked at the plans for the outfall just a week before the hearing. By this time, the water quality section of DER had previously considered the project and he is familiar with the suggested change in the outfall location. In November 1985, he spent several days on a boat on the Halifax River in this area collecting data. His inquiry and examination showed that in the area in question, there are no grass beds, oyster beds, or anything significant that would be adversely affected by the location of the pipe and the outlet. The pipe outlet, as suggested, is far enough out into the river to keep it under sufficient water at all times to promote adequate flushing. In his opinion, the proposed discharge will be quickly diluted and will not violate the standards or other criteria set out in Section 17-3.121, Florida Administrative Code. In contrast to the above, Mr. Richard Fernandez, a registered civil engineer with a Master's Degree in environmental engineering, who did a study of these projects for TPI, indicated that the County 201 plan relating to this area, mandated by the federal government, calls for the eventual closing of all independent wastewater treatment plants with ultimate delivery of all wastewater to the Port Orange facility. If implemented, this plan calls for the conversion of the Peninsula facility to a pump station for the transmittal of effluent to Port Orange. In his opinion, the proposed discharge standard, as evaluated here, for the secondary treatment facility, is very high for such a facility. He feels the surface water discharge content of dissolved oxygen and suspended solids should be lower. In addition, he is of the opinion that the degree of treatment of discharged water required by the facilities in question here is too low and lower than typical secondary discharge points elsewhere in the area. Nonetheless, Mr. Fernandez concludes that while the intended facility here would probably not lower the quality of river water below standards, it is not in the public interest to construct it. Having considered the expert testimony on both sides, it is found that the construction requested here would not create sufficient ecological or environmental damage to justify denial. The proposals in the 201 plan calling for the transmittal of all effluent to Port Orange would not be acceptable to DER. The cost of such a project and the ecological damage involved would be so great as to render the project not even permittable. The currently existing percolation ponds used by the facility at Port Orange are not adequate to serve current needs and leech pollutants into the surrounding waterway. While the exact transmission routes called for under the 201 plan are not yet set, there would be substantial ecological problems no matter what routing is selected. There would be substantial damage to bird habitat, mangrove, and other protected living species unless some way were found to get the pipe across the river in an environmentally sound fashion. Consequently, DER has taken the position that the current proposals by Peninsula are superior to any plan to transmit waste to Port Orange.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore RECOMMENDED THAT DER: Enter an order dismissing with prejudice Volusia County's Petition in DOAH Case No. 85-3029 and, Issue permits to Peninsula Utilities, Inc., for the construction of a 100,000 gpd expansion to its existing wastewater treatment plant and to construct a river outfall line as was called for in the amended specifications listed in the application for this project. RECOMMENDED this 25th day of April, 1986, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of April, 1986. COPIES FURNISHED: Martin S. Friedman, Esquire Myers, Kenin, Levinson & Richards 2544 Blairstone Pines Drive Tallahassee, Florida 32301. Deborah Getzoff, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Rd. Tallahassee, Florida 32301 Lester A. Lewis, Esquire Coble, McKinnon, Rothert, Barkin, Gordon, Morris and Lewis, P.A. P. O. Drawer 9670 Daytona Beach, Florida 32020 Ray W. Pennebaker, Esquire Assistant County Attorney P. O. Box 429 Deland, Florida 32720 Victoria Tschinkel Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 APPENDIX The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings Of Fact submitted by the parties to this case. Rulings on Proposed Findings of Fact Submitted by Petitioner, TPI 1-2. Accepted in paragraph 17. 3-4. Rejected as contra to the weight of the evidence. Rulings on Proposed Findings of Fact Submitted by Peninsula 1-13. Accepted in the Findings of Fact of the Recommended Order. Rulings on Proposed Findings of Fact Submitted by Respondent, DER 1. Accepted and incorporated in Finding of Fact 1 and 2. 2-3. Accepted and incorporated in Finding of Fact 5. 4-5. Accepted and incorporated in Finding of Fact 20 and 21. 6. 7. Accepted in Finding of Fact 19. 8. Accepted in Finding of Fact 14. 9. Accepted in Finding of Fact 9. 10. Accepted in Finding of Fact 8 and 21. 11. Accepted in Finding of Fact 14 and 17. 12-13. Accepted in Finding of Fact 14 and 17. 14-15. Rejected as a statement of evidence and not a Finding of Fact. Accepted in Finding of Fact 17. Recitation of Mr. Miller's testimony is not a Finding of Fact. The conclusions of Mr. Mandrup- Poulsen's testimony is not a Finding of Fact. Recitation of Mr. Mandrup-Poulsen's testimony testimony is not a Finding of Fact. Accepted in Finding of Fact 23. Recitation of testimony is rejected as not a Finding of Fact. Conclusions drawn from that testimony accepted in Finding of Fact 24.

Florida Laws (2) 403.87403.88
# 1
TAMARON UTILITIES, INC. vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002968 (1991)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Dec. 16, 1991 Number: 91-002968 Latest Update: Jun. 20, 1994

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Tamaron wastewater treatment facility (facility), located at 3800 Gatewood Drive, Sarasota, Florida, serves the Tamaron residential subdivision which was originally developed by U. S. Homes Corporation in 1976. The subdivision presently consists of 499 homes and was completely built out in the mid-1980's. The facility was originally owned and operated by U. S. Homes Corporation. Tamaron Utilities, a nonprofit entity comprised of the 499 homeowners, acquired the facility in November, 1987. At that time, the facility's existing operating permit was transferred to Tamaron Utilities. The facility is overseen by an elected board of volunteer homeowners. The Department is the agency of the State of Florida that is authorized to regulate domestic wastewater treatment and disposal facilities and permit their construction and operation. It is the successor agency to the Department of Environmental Regulation. By letter dated November 10, 1987, the Department notified Tamaron of the requirements of Chapter 87-303, Laws of Florida (Grizzle-Figg Amendment), which amended Section 403.086, Florida Statutes, and of the Department's intention to modify Tamaron's operating permit to incorporate a schedule of compliance with Section 403.086, Florida Statutes, as amended by Chapter 87-303, Laws of Florida. On August 23, 1988, an operating permit (D058-141783), which contained secondary water treatment requirements, was issued to the facility. Specific condition 7 of the permit required that the facility be in compliance with the Grizzle-Figg Amendment by October, 1990, or eliminate discharge to surface waters. On September 5, 1990, Tamaron filed an application with the Department to renew its domestic waste water treatment and disposal systems operation permit. Tamaron did not consider its facility as discharging waste into one of the specifically named water bodies set forth in the Grizzle-Figg Amendment or to "water tributary thereto" and thereby required to meet the advanced waste treatment criteria set forth in the Grizzle-Figg Amendment. However, in an abundance of caution, Tamaron proceeded to bring its facility into compliance with the advanced waste treatment criteria as set forth in the Grizzle-Figg Amendment. After numerous requests for additional information and several meetings between Tamaron and the Department, the Department issued its Notice of Permit Denial on April 9, 1991, asserting that Tamaron had not provided: (a) reasonable assurance that the requirements of Section 403.086(1)(c), Florida Statutes, mandating advanced waste treatment (AWT) before discharge to certain designated surface waters, would be met and; (b) reasonable assurance that the discharge to those certain designated surface waters would result in minimal negative impact as required by Section 403.086(5)(a), Florida Statutes. The facility continues to operate under its secondary treatment permit No. DO58-141783. The facility consists of a wastewater treatment plant designed for secondary treatment, with tertiary filtration. The design capacity of the facility is 155,000 gallons per day (0.155MGD) with actual flows of slightly over 100,000 gallons per day (0.100MGD+). Three percolation ponds surround the facility comprising the primary effluent disposal method for the facility. The Tamaron subdivision has a series of excavated surface water bodies (stormwater lakes), hydraulically connected, which eventually discharge at the northeast corner of the subdivision into Phillippi Creek. The direct path of surface water flow is from the subdivision's stormwater lakes to Phillippi Creek. These stormwater lakes are in multiple ownership. Under Department policy, stormwater systems permitted by the Department, its predecessor DER, or a water management district solely as stormwater treatment facilities under Chapter 17-25, Florida Administrative Code, are not considered "waters of the State". However, stormwater systems built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, were considered "waters of the State" if they discharge more frequently than a twenty five year, twenty-four hour storm event. See Petitioner's exhibits 13 & 15. Tamaron's stormwater system was built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, and was designed to discharge at a ten year, twenty-four hour storm event which is more frequent than a twenty five year, twenty-four hour storm event. Discharge of water into Phillippi Creek from the subdivision's stormwater lakes is fairly frequent; however, the volume of the discharge is low. Phillippi Creek is a natural surface water which eventually flows into Roberts Bay. Roberts Bay is a specifically named water body in the Grizzle-Figg Amendment (Section 403.086(1)(c), Florida Statutes). Since September, 1989, Tamaron has retained William Murchie, P.E. of AM Engineering, to evaluate the design and operation of the facility in order to comply with appropriate regulatory requirements. The facility provides biological treatment through a contact stabilization utilizing an activated sludge. This process typically provides high quality advanced secondary biological treatment. A chemical feed tank system utilizing ferrous sulfate was added to the facility several years ago to chemically precipitate out total phosphorus to meet the advanced waste treatment requirements. High-level disinfection is achieved in the large chlorine contact chamber and through two tertiary filters. At the design flow of 0.155MGD, the chlorine contact chamber provides nearly 80 minutes of contact time, while actual contact time for existing flows, not including time in filters, is calculated at 110 minutes. Upon leaving the chlorine contact chamber and the biological treatment components of the facility, the chlorinated effluent is directed through two tertiary filters to reduce the biochemical oxygen demand (BOD) and total suspended solids (TSS). After the tertiary filters, the effluent passes through the sample block where it is sampled for TSS, BOD and chlorine and is then piped sequentially into the first, second and third percolation ponds. The percolation ponds span two acres and provide residence time of 35 to 45 days, during which time the effluent is further biologically treated and nitrogen is reduced. From the percolation ponds, the effluent is pumped into a low pressure system which uniformly distributes effluent over two nitrogen reduction filters. The nitrogen reduction filters are located north of the plant and are immediately adjacent to one of the subdivision's stormwater lakes. The nitrogen reduction filters consist of deep sand beds covered with Bermuda grass to provide high nitrogen uptake. The irrigation of the two nitrogen reduction filters is alternated every half day. These nitrogen reduction systems were modified in October/November, 1990, by adding 3 to 3 1/2 feet of clean sand with a permeability rate of 28 feet per day, planting Bermuda grass, and installing an irrigation/distribution system. These filters replaced two sand pits with shallow layers of very coarse sand, after initial testing demonstrated the sand pits to be inadequate in removing nutrients consistent with statutory requirements. In January, 1992, an underdrain system utilizing perforated pipe was installed in the nitrogen reduction filters to create an aerobic zone and to provide a representative sample port after nutrient reduction in the filters. This sample port, used for the biweekly monitoring, consists of a single solid pipe, that collects effluent from the perforated pipes, with a tap to prevent discharge into the adjacent stormwater lake, except during sampling events. The biweekly sampling event results in effluent being discharged from the pipe for approximately 30 minutes to flush the pipe so as to get a proper sample. The underdrain sampling port at the nitrogen reduction filters replaced two earlier monitor wells between the nitrogen reduction filter and the stormwater pond, which proved ineffective because of their location. The perforated underdrains are situated in filter bed sand of medium grain size with a permeability rate 100 feet per day and located below 3 - 3 1/2 feet of clean sand with a permeability rate of 28 feet per day and above very permeable layers of sand, stone and coarse shell. (See Tamaron's exhibit 23 and Department's exhibit 14) The very permeable layers of sand, coarse shell, the perforated pipe and the single solid pipe are all located above the ground water table. Since the perforated pipe and sample port are both located above the ground water level and the surface of the adjacent stormwater lake, it is unlikely that the effluent sample taken from the sample port would be influenced by the ground water or a back flow of water from the adjacent stormwater lake. The coarse shell layer situated below the nitrogen reduction filters extends to the edge of the adjacent stormwater lake. Therefore, the effluent, other than the effluent trapped in the perforated pipe and carried to the sample port, that is irrigated onto the nitrogen reduction filters passes through the sand and into the coarse shell layer. The effluent is then transported laterally through the coarse shell layer to the underground edge of the adjacent stormwater lake where there is a subsurface discharge into the adjacent stormwater lake. Since the discharge to the stormwater lakes is primarily subsurface in nature, the logical compliance point to measure effluent parameters would be the underground sample port which collects the effluent prior to subsurface discharge into the stormwater lake. See Petitioner's exhibit 15. The direction of ground water flow at the facility is towards the north to the adjacent stormwater lakes as evidenced by the hydraulic gradient of the site determined using ground water table elevations. The location for sampling effluent from the facility for compliance with secondary standards was described in Specific Condition 5 of Tamaron's previous permit No. D058-141783 dated August 23, 1988. Specific Condition 5 states that the discharge from the chlorine contact chamber shall be sampled in accordance with Chapter 17-19, Florida Administrative Code, (now Chapter 17-601, Florida Administrative Code), for compliance with the stated secondary limits. The facility's tertiary filters are located after the chlorine contact chamber. Tamaron samples effluent for compliance with secondary standards (BOD,TSS, chlorine) at the sampling box after disinfection and tertiary filtration. Tertiary filtration is designed to achieve a more efficient removal of TSS and BOD. The resulting effluent is usually of higher quality than secondarily treated effluent. A secondary plant with tertiary filtration is referred to as an "advanced secondary treatment" plant. Data presented by Tamaron titled Tamaron 1991-1993 Data On FDER Permit Compliance (Tamaron's exhibit 17, page 1 of 2) shows reported values, sampled after tertiary filtration at the sample box, which suggest that secondary treatment parameters, including fecal coliform, are not being exceeded. The data actually shows a very high removal rate for the parameters sampled. The United States Environmental Protection Agency issued a National Pollutant Discharge Elimination System (NPDES) permit, number FL0042811, to Tamaron for the facility with an effective date of June 1, 1991, which authorized Tamaron to discharge from the facility to the receiving waters named Phillippi Creek to Roberts Bay in accordance with the effluent limitation, monitoring requirements and other conditions set forth in the permit. Since the facility was located in the Grizzle-Figg Amendment area of Florida certain changes were made from the draft permit to the final permit. Those changes appear in the Amendment To The Statement Of Basis At The Time Of Final Permit Issuance which is made a part of the final permit. The amendment provides for changes in Part I, Effluent Limitations and Monitoring Requirements. These changes, among other things, require that the Grizzle-Figg Amendment annual limits of 5 mg/l BOD, 5mg/l TSS, 3mg/l total nitrogen and 1mg/l total phosphorus be added to the effluent limits to adequately maintain water quality standards, and added monitoring requirements and measurement frequency regulations to give the basis for permit limits and conditions in accordance with Chapters 17-302, 17-600 and 17-601, Florida Administrative Code. Data presented by Tamaron titled Tamaron 1991-1993 Data On NPDES Permit Compliance (Tamaron's exhibit 17, page 2 of 2) show reported values sampled after nitrogen reduction filters which suggest that the maximum values for AWT parameters, including fecal coliform, are not being exceeded, particularly after January, 1992, when Tamaron began sampling effluent collected by the perforated underdrains at the sample port. Tamaron has been monitoring and reporting compliance under its final NPDES permit and providing copies to the Department. There was no evidence that Tamaron was ever in violation of its NPDES permit. Tamaron submitted documentation to the Department with its permit application that demonstrated high-level disinfection within the facility was being achieved. However, TSS was being sampled after the application of the disinfectant. Using this procedure, the facility continued to achieve high- level disinfection until the permit denial. After the permit denial, the facility resumed basic disinfection which was required under Tamaron's permit for secondary treatment. This same data indicates that there was compliance with the requirements for fecal coliform. The record is not clear as to the frequency and number of samples taken to provide the data for reporting compliance with the NPDES permit and the data presented in Petitioner's exhibit 17, page 2 of 2. However, there was no evidence, other than sampling for TSS after the disinfectant was added, that Tamaron was not complying with its NPDES Permit that required, among other things, that the monitoring requirements and measurement frequency of the Department's rules and regulations be followed by Tamaron. Tamaron has modified and upgraded the facility in order to achieve a treatment process which will produce effluent of a quality for discharge under the Grizzle-Figg Amendment. Tamaron has provided reasonable assurances, although not absolute assurance, that the facility can comply with the discharge permit requirements of Chapter 403, Florida Statutes, including Section 403.086, Florida Statutes, notwithstanding the testimony of Jay Thabaraj to the contrary concerning Tamaron's sampling technique and its method of obtaining high-level disinfection which can be addressed as a specific condition, if necessary. Studies conducted by the Tamaron's engineer included in Petitioner's exhibit 21 indicates that there was no adverse impact to the stormwater lakes from the facility's wastewater treatment and disposal system. Tamaron has provided reasonable assurances that the point of discharge is a reasonably access point, where such discharge results only in minimal negative impact.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department enter a final order granting Tamaron an operating permit for its facility as secondary treatment facility. In the alternative, that the Department enter a final order granting Tamaron an operating permit for its facility that requires compliance with the advanced waste treatment criteria set forth in Section 403.086(4), Florida Statutes, that, in addition to any general or specific conditions that are normally required, contains specific conditions that: (a) contains specific instructions on sampling technique, sampling frequency and reporting as set forth in Rule 17- 740(1)(b)2., Florida Administrative Code, and (b) sets forth compliance with high-level disinfection, with a time limit for compliance, that accomplishes the intent of the rule, if not the strict letter of the rule, without total redesign of the facility. DONE AND ENTERED this 3rd day of May, 1994, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-2968 The following constitutes my specific rulings, pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Petitioner, Tamaron's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1); 2(2); 3(3); 4(5,6); 5(6); 6(7); 8(12); 10(8); 11-12(13-25,38); 13(31-34); 14(8); 15(13); 16(14); 17-18(15); 19(36); 20(16); 21(17); 22(18); 23(19); 24(20); 25(21);26(22); 32(32,7); 33(33); 34(32,32); 36(31); 39-40(34); 41(36); 42- 43(34); 44(35); 47(4); and 51(10). Proposed findings of fact 27-31, and 35 are conclusions of law rather than findings of fact.. Proposed findings of fact 45, 46, 48-50, 56, 57, 59, and 61-72 are arguments rather than findings of fact. Proposed findings of fact 7, 9, 37, 38, 52-55, 58 and 60 are neither material nor relevant. Respondent, Department's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1,6); 2(2); 3(4,10); 5(9); 6(9,10); 8(11); 9-17(18-27); 18(8); 19(13); 20(5); 21(17); 22(30); 23(31); 24(14); 25(17); 26(18-23); 27(34); and 32(35,38). Proposed finding of fact 4 is neither material nor relevant but see Findings of Fact 18-25. Proposed findings of fact 7, 31 and 33 are arguments rather than findings of fact. Proposed findings of fact 28-30 are conclusions of law rather than findings of fact. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Charles G. Stephens, Esquire C. Robinson Hall, Esquire Enterprise Plaza, Suite 1516 101 E. Kennedy Blvd. Tampa, Florida 33602 Francine Ffolkes, Esquire Office of General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (6) 120.57120.68403.021403.031403.061403.086
# 2
ROBERT FOSTER, FLOY SAWYER, ET AL. vs. SAM RODGERS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-001440 (1980)
Division of Administrative Hearings, Florida Number: 80-001440 Latest Update: Jan. 19, 1981

Findings Of Fact As planned, Phase I of Foxwood Lake Estates will consist of 300 mobile homes, which would require treatment of up to 45,000 gallons of sewage per day. The proposed sewage treatment plant would have a capacity of 46,000 gallons per day and would be capable of expansion. It would discharge treated, chlorinated water into a completely clay-lined polishing pond that has been designed for the whole of Foxwood Lake Estates at build-out; capacity of the polishing pond would be three times the capacity necessary for Phase I by itself. From the polishing pond, water is to flow into one or both of two evaporation-percolation ponds, either of which would be big enough for all the sewage expected from Phase I. The sides of these ponds would be lined with clay and a clay plug would constitute the core of the dike on the downslope side of each pond. According to the uncontroverted evidence, effluent leaving the treatment plant for the polishing pond would have been effectively treated by the latest technology and would already have been sufficiently purified to meet the applicable DER water quality requirements. The applicant proposes to dig the triangular polishing pond in the northwest corner of the Foxwood Lake Estates property, some 400 feet east of the western property line. The evaporation-percolation ponds would lie adjacent to the polishing pond along an axis running northwest to southeast. Their bottoms would be at an elevation of 164.5 feet above mean sea level and they are designed to be three feet deep. The evaporation-percolation ponds would lie some 300 feet east of the western property line at their northerly end and some 400 feet east of the western property line at their southerly end. A berm eight feet wide along the northern edge of the northern evaporation-percolation pond would be 50 feet from the northern boundary of the applicant's property. Forrest Sawyer owns the property directly north of the site proposed for the evaporation-percolation ponds. He has a house within 210 feet of the proposed sewage treatment complex, a well by his house, and another well some 300 feet away next to a barn. Two or three acres in the southwest corner of the Sawyer property are downhill from the site proposed for the ponds. This low area, which extends onto the applicant's property, is extremely wet in times of normal rainfall. Together with his brother and his sister, Charles C. Krug owns 40 acres abutting the applicant's property to the west; their father acquired the property in 1926. They have a shallow well some 100 feet from the applicant's western property boundary, and farm part of the hill that slopes downward southwesterly from high ground on the applicant's property. Sweetgum and bayhead trees in the area are also a money crop. Charles C. Krug, whose chief source of income is from his work as an employee of the telephone company, remembers water emerging from this sloping ground in wet weather. Borings were done in two places near the site proposed for the ponds. An augur boring to a depth of six feet did not hit water. The other soil boring revealed that the water table was 8.8 feet below the ground at that point. The topsoil in the vicinity is a fine, dark gray sand about six inches deep. Below the topsoil lies a layer of fine, yellow-tan sand about 30 inches thick. A layer of coarser sand about a foot thick lies underneath the yellow-tan sand. Beginning four or five feet below the surface, the coarser sand becomes clayey and is mixed with traces of cemented sand. Clayey sand with traces of cemented sand is permeable but water percolates more slowly through this mixture than through the soils above it. The applicant caused a percolation test to be performed in the area proposed for the ponds. A PVC pipe six feet long and eight inches in diameter was driven into the ground to the depth proposed for the evaporation-percolation ponds and 50 gallons of water were poured down the pipe. This procedure was repeated on 14 consecutive days except that, after a few days, the pipe took only 36 gallons, which completely drained into the soil overnight. There was some rain during this 14-day period. Extrapolating from the area of the pipe's cross-section, Vincent Pickett, an engineer retained by the applicant, testified that the percolation rate of the soils was on the order of 103 gallons per square foot per day, as compared to the design assumption for the ponds of 1.83 or 1.87 gallons per square foot per day. Water percolating down through the bottoms of the evaporation- percolation ponds would travel in a southwesterly direction until it mixed with the groundwater under the applicant's property. It is unlikely that the ponds would overflow their berms even under hurricane conditions. Under wet conditions, however, the groundwater table may rise so that water crops out of the hillside higher up than normal. The proposed placement of the ponds makes such outcropping more likely, but it is impossible to quantify this enhanced likelihood in the absence of more precise information about, among other things, the configuration of the groundwater table.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That DER grant the application on the conditions specified in its notice of intent to issue the same. Respectfully submitted and entered this 17th day of December, 1980, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 101, Carlton Building Tallahassee, Florida 32301 Telephone: 904/488-9675 FILED with the Clerk of the Division of Administrative Hearings this 17th day of December, 1980. COPIES FURNISHED: Andrew R. Reilly, Esquire Post Office Box 2039 Haines City, Florida 33844 Walter R. Mattson, Esquire 1240 East Lime Street Lakeland, Florida 33801 David M. Levin, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

# 3
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. JACK VAIL, D/B/A ST. GEORGE INN RESTAURANT, 87-004242 (1987)
Division of Administrative Hearings, Florida Number: 87-004242 Latest Update: Mar. 11, 1988

The Issue Whether Permit No. DO19-101251 issued to Mr. Vail on July 11, 1985 to construct and operate an on-site wastewater treatment and disposal system should be revoked?

Findings Of Fact Mr. Vail is the owner and operator of a business called the St. George Inn and Restaurant (hereinafter referred to as the "Inn"). The Inn is located at the southeast corner of the intersection of Franklin Boulevard and Pine Avenue on St. George Island, Florida. In May of 1984 Mr. Vail spoke with an employee of the Department of Health and Rehabilitative Services about obtaining a permit to construct a septic tank on his property for use by the Inn for the treatment and disposal of wastewater. Mr. Vail was instructed to submit a design of the septic tank for approval. Mr. Vail contracted with McNeill Septic Tank Company for the design and construction of the septic tank. The evidence failed to prove when Mr. Vail applied with the Department of Health and Rehabilitative Services for a permit. As of March, 1985, however, Mr. Vail had not received approval or disapproval of his application from the Department of Health and Rehabilitative Services. Mr. Vail, therefore, went to the Governor's office to seek help in getting a response. Shortly after contacting the Governor's office, the Department of Health and Rehabilitative Services informed Mr. Vail that he needed to obtain a permit from the Department and not from the Department of Health and Rehabilitative Services. On or about March 18, 1985, Mr. Vail filed an Application to Operate/Construct Industrial Wastewater Treatment and Disposal Systems (hereinafter referred to as the "Application"), with the Department. The Application was prepared by Brown and Associates Civil Engineers and Land Surveyors, Inc., Mr. Vail's engineering consultant. The Application was certified by Benjamin E. Brown, Professional Engineer. Mr. Vail signed the Application as "owner" and indicated that he was aware of the contents of the Application. In the Application, "St. George Inn Restaurant" is listed as the "Source Name." Under Part II, A of the Application, the applicant is asked to "[d]escribe the nature and extent of the project." In response to this request, the following answer was given: This project will provide a sewage disposal system for a one hundred and fifty (150) seat restaurant on St. George Island. Sizing of the septic tank system is based on 50 GPD/seat and secondary treatment will be provided by the design proposed. Under Part III, A of the Application, the applicant is asked to provide the following information and the following answers were given: Type of Industry Restaurant . . . . 3. Raw Materials and Chemicals Used Food preparation only. Normal Operation 12 hrs/day 7 days/week . . . . If operation is seasonal, explain This restaurant will be used the most during the summer months which corresponds with ocean/beach recreation & the tourist trade. Nowhere in the Application is it indicated that the permit applied for involved anything other than a restaurant. The Application gives no information from which the Department could have known that the proposed wastewater treatment and disposal system would handle waste from guest rooms or an apartment. In the Application Mr. Vail sought approval of a permit to construct and operate a wastewater treatment and disposal system to serve a 150 seat restaurant. In the Application Mr. Vail sought a permit for a system which was to have a design flow of 7,500 gallons per day based on 50 gallons, per seat, per day water usage. An employee of the Department wrote a memorandum dated May 5, 1985, recommending approval of the Application. The Department determined, however, that the size of the property on which the Inn was to be located was not large enough for the drain field necessary to accommodate a 150 seat restaurant. Therefore, Mr. Brown modified the proposed system and resubmitted application data indicating that a 108 seat restaurant would be constructed. The design flow of the new proposal was 2,160 gallons per day based on 20 gallons per seat per day. Mr. Brown had requested that the Department approve a system based upon the newly submitted design flow. The Department and Mr. Brown both agreed that this design flow was adequate; that it was reasonable to anticipate and provide for the treatment and disposal of a maximum of 2,160 gallons per day design flow. The effect of reducing the design flow and the number of seats was to allow a shortened drain field which could be accommodated by the size of the property the Inn was to be located on. On June 27, 1985, Mr. Vail arranged for a notice to be published in the Apalachicola Times. That notice provided, in pertinent part, the following: State of Florida Department of Environmental Regulation Notice of Proposed Agency Action on Permit Application The department gives notice of its intent to issue a permit to Jack Vail to construct a restaurant and on-site wastewater treatment and disposal system [sic] at Franklin Boulevard and Pine Avenue, St. George Island. The treatment consists of grease trap, septic tank, and sand filter followed by disposal into a drainfield. The project meets applicable standards and will not impair the designated use of the underlying ground water. There is no anticipated impact on surface waters or air quality. . . . . This notice was sent to Mr. Vail by the Department and he made arrangements for it to be published. Nowhere in the notice is it indicated that the system to be approved by the Department is for anything other than a restaurant. On July 11, 1985, less than four months after the Application was filed with the Department, the Department issued Permit Number DO19-101251 (hereinafter referred to as the "Permit"). In the cover letter sent with the Permit the Department indicated that the Permit allowed Mr. Vail "to construct and operate a 2,160 gallon per day, on-site wastewater treatment and disposal system serving St. George Inn Restaurant. . . ." The Department also indicates in the Permit that it is for the "St. George Inn Restaurant." The Permit also provides, in pertinent part, the following with regard to the purpose of the Permit: The above named applicant, hereinafter called Permittee, is hereby authorized to perform the work or operate the facility shown on the application and approved drawing(s), plans, and other documents attached hereto or on file with the department and made a part hereof and specifically described as follows: Construct and operate a 108 seat restaurant with an on-site wastewater treatment and disposal system. Wastewater flows shall be a maximum of 2,160 gallons per day generated by domestic facilities and kitchen wastes . . . Construction shall be in accordance with application dated March 18, 1985 and additional information submitted April 29, 1985, specifications and other supporting documents prepared by Brown and Associates and certified by Benjamin E. Brown, P.E. and submitted to the Department on June 5, June 17, and June 20, 1985. The Permit also contains the following "General Condition" number 2 and "Specific Condition" number 15: . . . . 2. This permit is valid only for the specific processes and operations applied for and indicated in the approved drawings and exhibits. Any unauthorized deviation from the approved drawings, exhibits, specifications, or conditions of this permit may constitute grounds for revocation and enforcement action by the department. . . . . 15. The Department shall be notified and prior approval shall be obtained of any changes or revisions made during construction. . . . . The Permit provides the following with regard to the effect of the conditions of the Permit: The terms, conditions, requirements, limitations, and restrictions set forth herein are "Permit Conditions", and as such are binding upon the permittee and enforceable pursuant to the authority of sections 403.161, 403.727, or 403.859 through 403.861, Florida Statutes. The permittee is hereby placed on notice that the Department will review this permit periodically and may initiate enforcement action for any violation of the "Permit Conditions" by the permittee . . . . During the week after the Permit was issued, Mr. Vail obtained a building permit from Franklin County for the construction of the "inn." In February, 1986, after construction of the Inn had begun, Department inspectors went to the construction site of the Inn. The Permit authorized this inspection and other inspections carried out by the Department. The Department determined that the Inn being constructed by Mr. Vail included a restaurant, an apartment on the third floor of the Inn with two bathrooms, and eight guest rooms on the second floor, each containing a bathroom. This was the first time that the Department knew that Mr. Vail's facility was to include guest rooms and living quarters in addition to containing a 108 seat restaurant. In March of 1986, the Department sent a warning letter to Mr. Vail notifying him of the violation of the General Conditions of his Permit: the use of the approved system for the treatment and disposal of wastewater from the ten bathrooms in the guest rooms and the two bathrooms in the apartment in addition to the 108 seat restaurant. On April 1, 1986, Department personnel met with Mr. Vail and Mr. Brown. The Department reminded Mr. Vail and Mr. Brown that the Permit requested and approved by the Department was for a 108 seat restaurant only. The Department had not authorized a system which was to be used for a 108 seat restaurant and ten additional bathrooms. Pursuant to General Condition 14, the Department informed Mr. Vail that it needed an engineer's evaluation of the ability of the system which had been approved to handle the additional flow which could be expected from the additional ten bathrooms. By letter dated April 1, 1986, the Department memorialized the meeting and indicated that Mr. Vail could operate a 100 seat restaurant and the apartment during the interim. By letter dated May 8, 1986, Mr. Brown asked for additional time to submit the evaluation requested by the Department. The Department approved this request by letter dated May 14, 1986. By letter dated May 16, 1986, Mr. Brown submitted an engineering evaluation which proposed modifications to the approved system to handle the additional ten bathrooms. By letter dated June 13, 1986, the Department indicated that the evaluation was generally acceptable" but requested additional information. In January, 1987, before the additional information was submitted, Mr. Brown died in an airplane accident. No evidence was presented to explain why the information requested by the Department in June of 1986 had not been submitted before January, 1987. In March, 1987, the Department inspected Mr. Vail's facility again. In April, 1987, the Department informed Mr. Vail that the Department would take action to revoke the Permit. Before the Administrative Complaint was issued, the Department requested that certain information be provided on behalf of Mr. Vail by an engineer in an effort to resolve the dispute. Mr. Vail did not, however, obtain the services of an engineer. Instead, Mr. Vail sent the Department information purporting to show the amount of water which had been used at the Inn. That information failed to prove the ability of the system that the Department had approved to handle the maximum wastewater which could be expected from maximum use of the 108 seat restaurant and ten additional bathrooms. At best, the information submitted by Mr. Vail is partial proof that the system is capable of handling the wastewater that has been generated at the Inn for the period of time for which the information relates. No competent substantial proof has been submitted to indicate that the system is capable of handling the maximum wastewater flows which may be experienced or even that the system is adequately handling the current flow. All that has been proved is that there is no apparent problem with the system in handling the current flow. In September, 1987, the Department issued the Administrative Complaint. Pursuant to this Complaint, the Department has sought the revocation of the Permit and prescribed certain orders for corrective action. No application has been submitted by or on behalf of Mr. Vail to the Department to construct and operate a wastewater treatment facility designed to accommodate the sewage flows which may be generated by the Inn as it has been constructed. Although the Department of Health and Rehabilitative Services and other agencies were aware that the Inn includes a restaurant and guest rooms, the Department was never so informed.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a Final Order requiring that Mr. Vail comply with all of the corrective orders, except Paragraph 18, contained in the Administrative Complaint. DONE and ORDERED this 11th day of March, 1988, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of March, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NUMBER 87-4242 The parties have submitted proposed findings of fact. It has been noted below which Proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Department's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact of Acceptance or Reason for Rejection 1 Conclusion of law. 2 1. 3 6. 4 10. 5 12 and 13. 6 14. 7 15. 8 18. 9 19. 10 20. 11-12 16. 13 21. 14 23. 15 24. 16 25. 17 26. 18-19 27. 20 28. 21 29 22 Hereby accepted. Mr. Vail's Proposed Findings of Fact 1A 15. Not supported by the weight of the evidence and irrelevant. Hearsay and irrelevant. Although technically true, this is not the issue in this case. The evidence did not prove that the system "can in actuality handle three times the amount permitted." Not supported by the weight of the evidence and irrelevant. 2A Not supported be the weight of the evidence. Exhibit 6 indicates that the Department was aware that the Inn included "hotel rooms" but not the number. Irrelevant. The evidence did not prove that the Department was aware of the scope of the project. Not supported by the weight of the evidence. 3A Irrelevant. Not supported by the weight of the evidence and irrelevant. Even if this were true, the fact remains that the Department was unaware that the Inn included guest rooms or an apartment. Irrelevant. 4A-B Irrelevant. 5A-B Irrelevant. 6A 2-4. B 5. 6 and 11. Not supported by the weight of the evidence. See 12. 13 and 15. Not supported by the weight of the evidence and irrelevant. Not supported by the weight of the evidence. 7A-C Not supported by the weight of the evidence and irrelevant. 8A-D Not supported by the weight of the evidence and irrelevant. 9A-B Not supported by the weight of the evidence and irrelevant. 10-12 Not supported by the weight of the evidence and irrelevant. COPIES FURNISHED: Richard L. Windsor, Esquire State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. John Vail St. George Inn Post Office Box 222 St. George Island, Florida 32328 Dale Twachtmann, Secretary State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel State of Florida Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (5) 120.57403.121403.161403.859403.861
# 4
J. P. WARD vs. OKALOOSA COUNTY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-005147 (1988)
Division of Administrative Hearings, Florida Number: 88-005147 Latest Update: Jun. 01, 1989

The Issue Whether Okaloosa County has provided reasonable assurances that its proposed sewage treatment plant and an associated reclaimed water reuse system will not cause pollution significantly degrading the waters of the unnamed stream on the project site and/or the Santa Rosa Sound and that therefore the County's application for a permit to construct such facilities should be granted on the basis of assurances of compliance with applicable rule and statutory criteria.

Findings Of Fact On October 16, 1987, Respondent, Okaloosa County, submitted an application to Respondent, Department of Environmental Regulation, to construct a wastewater treatment plant and related reclaimed water reuse facilities on a site located in southwestern Okaloosa County. The Petitioner is an individual citizen residing in Okaloosa County, Florida. He is the owner of real property which adjoins the northern boundary of the proposed project site. Mr. Ward has used this property as his principal residence for approximately 8 years. The proposed project site is located in southwest Okaloosa County contiguous to the western boundary of the County. The site comprises approximately 45 acres of land bounded on the west by Rosewood Drive and on the south by State Highway 98. The areas to the north and east are residential construction. The site is currently a densely wooded area vegetated with a variety of flora indigenous to the area. The site is essentially bisected by a small fresh water stream system which enters the site at the northwestern corner and runs diagonally to the southeastern corner where it flows through a series of culverts under State Highway 98. The stream system constitutes waters of the state subject to the Department's regulatory jurisdiction. In addition, there is an isolated wetland area of variable size in the northwestern section of the project site. The wetland area is not subject to the Department's regulatory authority. The stream system mentioned above intersects with another larger stream approximately 1000 feet southeast of the project site. These combined streams then meander into a tidal basin which empties into the Santa Rosa Sound approximately 2500 feet south of the project site. The Santa Rosa Sound has been designated as Class II waters of the state. The unnamed stream system on site, as well as the larger stream that it joins south of the site, are designated as Class III waters of the State. Southern Okaloosa County occupies a region of moderate elevation (0-70 feet above sea level) extending along a strip 10 or 15 miles wide along the coast of the Gulf of Mexico. Soils in this area are predominately fine sands low in organic matter. When dry, most of the soils have rapid internal drainage characteristics. The Plant The proposed plant is intended to treat sewage generated by the County's Western subregional service area. Initially, it will treat the flow currently handled by approximately 1400 septic tank systems and 9 package treatment plants within the area. The collection system which will transport the wastewater will be comprised of approximately 98,500 linear feet of 8 to 12 inch diameter gravity sewers. The transmission facilities to convey the raw wastewater from the new collection system will include the construction of approximately 29,400 linear feet of 4 to 10 inch diameter force main, 14 pump stations and approximately 32,100 linear feet of 8 to 12 inch diameter gravity interceptors. By the end of its first year of operation, the proposed facility is projected to receive and treat approximately 750,000 gallons per day ("GPD"). The projected flow through the wastewater facility in the year 2007 is 1,000,000 GPD. The proposed facility is best described as a 1,000,000 GPD capacity oxidation ditch treatment plant with nitrification and denitrification facilities. Reclaimed water reuse will be accomplished by a rapid infiltration basin system (RIB). Sludge from the system will be dewatered by a mechanical belt press system and disposed of at the County landfill. In order to address the question of potential odors which result from the operation of the plant, the facility was located as near the center of the property as possible in order to give as much buffer area as possible between the facility and the surrounding residential area. In addition, the design of the treatment facility incorporates a preprocess aeration tank equipped with an activated carbon airstripper system which is specifically designed to remove the odor from the wastewater influent. The treatment facility was also located near the center of the property in order to keep any noise resulting from the operation of the plant as far away from the surrounding area as possible. The plant utilizes noiseless gravity flow techniques and does not incorporate any blower or pump technology which usually cause a significant amount of noise in wastewater treatment plants. It is expected that the noise level from the operation of this facility would be less than the noise level generated from the traffic on State Highway 98 nearby. The plant is designed to minimize the adverse effects resulting from odors, noise, aerosol drift and lighting. The entire facility is enclosed by a fence. The facility is designed and does comply with the Florida Administrative Code requirements for protection from flooding. The proposed site is at a higher elevation than the established 100 year flood elevation for the area. The plant is designed so that every operational component of the plant has a backup system. The plant is equipped with an emergency generator capable of supplying sufficient power to operate the plant in the event of a power failure. The design of the plant complies with the standards provided by the Environmental Protection Agency for mechanical reliability. The information submitted for the Department's review in relation to the County's construction permit application addressed all the information required in Rule 17-6.037(10), Florida Administrative Code. The proposed plant facility is designed to leave a buffer zone approximately 200 feet wide between the reclaimed water reuse system and the stream system located on the project site. The construction plan prohibits any construction activities and/or clearing within the buffer area. This buffer area contains all the jurisdictional areas which are related to the stream system. The Treatment Process The waste treatment process proposed for this facility consists of secondary treatment, basic disinfection and pH control as defined in Rule 17- 6.060(1)(a)3, (c) and (d). The basic treatment process technology used in the proposed plant is described as a carousel activated sludge process. This process is a superior method of wastewater treatment because of its inherent stability, its reaction to shock and toxic loadings and the degree of process control that is available to the operator. The effluent limitations that the Department has established for this facility require that the effluent, after disinfection, contain not more than 20 mg/1 Biological Oxygen Demand ("BOD") and 20 mg/1 Total Suspended Solids ("TSS"). In addition, effluent standards require a basic level of disinfection which shall result in not more than 200 fecal coliform values per 100 ml of effluent sample. The chlorine residual in recovered water shall be maintained at 0.5 mg/1 minimum, after 15 minutes contact time at peak flow. The pH level in the effluent must be maintained in a range between 6.0 Q and 8.5. The County will be required to retain a Class B operator certified under the provisions of Chapter 17-16, Florida Administrative Code for day-to- day maintenance and operation of the treatment facilities. In addition, the facility must be staffed for a minimum of 16 hours per day, seven days a week by at least a Class C operator certified under the same provisions. A Class B operator shall be on call during all periods that the plant is unattended. At a minimum, the facility must produce reclaimed water which complies with water quality standards provided in Rule 17- 3.404, Florida Administrative Code, as it interacts with groundwater in the established zone of discharge ("ZOD"). The estimated ZOD is an area defined by the boundaries of the facility. These standards are essentially equal to drinking water standards provided in Rule 17-22, Florida Administrative Code. Because the soils under the site are rapid sands, the Department does not rely on them to significantly reduce total nitrogen in the reclaimed water through interaction with the soils and the groundwater table under the rapid infiltration basins. As a result, the proposed facility is limited to a Total Nitrogen limitation of 7 mg/1. This limitation is significantly less than the Department's rapid rate land application treatment standard for Total Nitrogen which is 12 mg/1 in the effluent, with no more than 10 mg/1 in the ground. The proposed plant is capable of producing the 7 mg/1 level under all flow conditions. The Rabid Infiltration Basins In conjunction with the County's application for a construction permit for the wastewater treatment plant itself, the County submitted an application for a reclaimed water reuse system construction permit for a system designed to handle the maximum plant discharge of 1,000,000 gallons of reclaimed water per day. The system is composed of a series of five rapid infiltration basins (RIB's) or percolation ponds designed to receive the daily reclaimed water loads from the operation of the plant and allow the water to percolate into the groundwater beneath the project site. The ponds are proposed to be used so that not all the ponds are working at the same time. On any given day, there will be 3 ponds receiving effluent from the plant and 2 ponds receiving no effluent. The proposed system of rapid infiltration basins is the best approach to effluent disposal on this particular site in consideration of a variety of site specific criteria. While the Department's adopted guidance standards for percolation pond location specifies that areas with average depths to the groundwater table of 10 feet or more are desirable, the guidance document provides that areas with lesser depths may be acceptable. Computer models using highest projected groundwater levels and highest reasonably projected mounding effects related to the effluent disposal system indicate that while at times there may be less than 3 feet of vertical separation between the top of the groundwater mounds beneath any one of the percolation ponds and the floor of those ponds, it is not expected that the groundwater level will intersect the bottoms of the infiltration basin and that an acceptable margin will be maintained. Initially, there was some dispute among Department staff concerning the suitability of the project site to handle the hydraulic loading rates proposed for the facility's pond system. After a significant amount of analysis of the relevant factors affecting site suitability in this regard and after Department staff managed to get the computer program which analyzes this data working properly, the relevant data indicates that the site is suitable for the proposed wastewater treatment plant as designed. Surface and Ground Water Impact The proposed facility is designed to meet applicable Department water quality standards necessary to prevent unacceptable degradation of the water quality in both the unnamed stream system on site and the Santa Rosa Sound. At the Department's request, the County had an independent study performed to assure that the operation of the facility would not have the effect of degrading nearby surface waters. This study, done by Larry Jacobs and Associates, supports the County consultant's projections that, under worst case conditions (highest observed groundwater levels plus maximum effluent loading), approximately 32,000 additional gallons per day of groundwater may enter the stream system as a result of operation of the RIB system. These studies were conducted to address the Department's concern about the potential for increased nitrogen loading into both the stream system and the Santa Rosa Sound as a result of increased groundwater contributions to the stream system on site. The effluent disposal study submitted by the County as part of its application concludes that, discounting any possible reduction of Total Nitrogen content of the effluent as it travels through the ground before its discharged into the stream system, the Total Nitrogen concentration of the groundwater predicted to reach the stream should be diluted at the lowest observed flow volumes in the system to a concentration of less than 1 mg/1 when it reaches the confluence of the two streams approximately 1,000 feet south of the project site. The projection is an improvement in surface water conditions when compared with currently observed average concentrations of Total Nitrogen in the stream system and Santa Rosa Sound of 1.24 mg/1. The performance of existing package plants in the area is generally poor. In fact, one treatment plant was ordered to close, forcing the relocation of residents in its service area. Another plant has continuing groundwater nitrate violations. In addition, the evidence shows that the performance of the septic tank systems in the area is not acceptable to the Environmental Protection Agency. The majority of the population is served by septic systems that fail under high groundwater conditions. The Director of the Okaloosa County Health Department has certified that 60% of the residents in the County West Service Area have failed septic tanks and that the remaining 40% have septic tanks in imminent danger of failing. Three of the eight existing treatment plants are under either Court or Consent orders to cease operations. The United States Environmental Protection Agency has found that the County West area has an immediate need to provide collection, transmission, and treatment facilities to protect surface and groundwaters and eliminate a public hazard. Existing concentration of Total Nitrogen in Santa Rosa Sound and the waterways on and adjacent to the site are attributed to discharge of inadequately treated wastewater from existing septic tanks, existing wastewater treatment plants and stormwater runoff in the area. It is unlikely that the nitrogen concentration in the Santa Rosa Sound will increase as a result of the operation of the proposed facility since whatever wastewater treated at the facility will be eliminated from discharging into the affected waterbodies from other, less efficient treatment facilities. The proposed facility design incorporates a total of seventeen monitoring wells or stations on and around the site. Two wells will monitor background groundwater quality upgradient from the percolation pond system. Twelve wells will monitor groundwater quality down gradient from the percolation pond system as it leaves the established zone of discharge. Two more stations will monitor surface water quality in the on-site system above and below the site. In addition, there is one intermediate monitoring well within the zone of discharge. Samples from these wells will be used to provide quarterly data reports to the Department indicating status of the following parameters in the ground water; water level, pH, BODs, Fecal Coliform, Total Nitrogen, Nitrate/Nitrate and Chloride. The surface water monitoring will provide annual data reports to the Department on the following parameters: Chemical/Physical - Total Nitrogen, Nitrate/Nitrate, Total Phosphorus, Dissolved Oxygen, Temperature and pH Biological Assessment - macroinvertebrate population per species, species diversity per square meter. These data reports will be submitted regularly to the Department in conjunction with operational monitoring data from the treatment plant to allow assessment of the impact of the plant operation on the environment and compliance with permit conditions. Clearly the County has provided reasonable assurances that the proposed plant and related facilities will not cause pollution significantly degrading the waters of the State.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order Granting the application of Okaloosa County to construct a wastewater treatment facility and related reclaimed water reuse system at the proposed site in southwestern Okaloosa County, Florida, and issuing permits in accordance with the conditions as set forth in the Department's Intent to Issue and draft permit dated August 1, 1988. DONE and ENTERED this 1st day of June, 1989, in Tallahassee, Florida. DIANNE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of June, 1989. APPENDIX Petitioner's paragraph 1 of his Proposed Findings of Facts (titled Closing Statement) did not contain any factual statements. The facts contained in paragraph 2 of Petitioner's Proposed Findings of Facts are subordinate. All the evidence contrary to the suitability of the Project site was explained by other more credible evidence. The facts contained in paragraphs 1-29 of Respondent's Proposed Findings of Facts are adopted in substance, in so far as material. COPIES FURNISHED: Ron Ward Qualified Representative For J. P. Ward 10 Rosewood Drive Mary Esther, Florida 32569 John R. Dowd, Esquire Representing Okaloosa County P. O. Box 404 Shalimar, Florida 32579 Steven K. Hall, Esquire Assistant General Counsel Representing the Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 (A Dale H. Twachtmann, Secretary State of Florida Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.57403.021403.086
# 5
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. CAST-CRETE CORPORATION OF FLORIDA, 84-001647 (1984)
Division of Administrative Hearings, Florida Number: 84-001647 Latest Update: Aug. 12, 1985

Findings Of Fact Upon consideration of the oral and documentary evidence in the record, as well as the pleadings and joint prehearing stipulation, the following relevant facts are found: Cast-Crete owns and operates a concrete batch plant in Hillsborough County, Florida, and manufactures concrete products such as reinforced beams, lintels, seals and drainage structures on the property. The plant is located on the west side of State Road 579, 3/4 mile north of Interstate 4, Section 28, Township 28 South, Range 20 East. The concrete products are manufactured in various forms which are laid out over a large portion of Cast-Crete's property. Lubricating oils are utilized to facilitate the removal of the product from the confining forms. During this process some of the lubricating oil is spilled onto the ground. Also, cleaning solutions containing degreasers are utilized to wash the concrete trucks eight to ten times per day. This solution ends up on the ground. Aggregate limerock (crushed limestone) is used in the concrete formulation process and is stored in large piles on the property. In order to contain the dust, water is sprayed on the aggregate piles 24 hours a day. The wash water from the continuous process of wetting the aggregate, other waste water and some stormwater is channeled through the property and into a settling pond in the northwest corner of Cast-Crete's property. This pond discharges continuously off the property by way of a concrete flume into a county maintained ditch. Water in the ditch travels in a westerly direction approximately 200 to 300 yards before it passes under Black Dairy Road, where the watercourse deepens and widens. The ditch discharges into a marshy area which drains into Six Mile Creek and other water bodies. The pond at the northwest corner of Cast-Crete's property is equipped with a metal skimming device to remove oils and greases floating on the surface of the pond. Nevertheless, it is estimated that approximately 100 gallons of oil per year are discharged by Cast-Crete. Oil and grease in the outflow water is occasionally above 5 mg/L. Oil and grease layers have been observed on water at both Black Dairy Road and Six Mile Creek, probably resulting from road run- off. Approximately 90 percent of the water discharged from the property is a result of the wetting or washdown of the aggregate piles. The excess water which comes from the aggregate piles is laden with dissolved limestone, lime and limestone particles. This limestone dust raises the pH level of the water. Because of the continued wetting of the aggregate, water flows through the settling ponds and off of Cast-Crete's property at a rate of approximately 4.8 gallons per minute, or 7,200 gallons per day or 2.5 million gallons per year. During a rain event, the flow increases markedly. Except during times of heavy rainfall, water flowing from the respondent's property provides a thin stream of water in the drainage ditch approximately six inches wide and several inches deep. The pH of the wastewater from Cast-Crete's discharge flume is between 10 and 11 units. During high volume flows, the pH remains at or above 11 units. An increase of one unit of pH in the wastewater means that the wastewater has become 10 times more basic, since pH is measured on a logarithmic scale. The natural background of unaffected streams in the area of and in the same watershed as the Cast-Crete property is less than 8.5 units. Specific conductance or conductivity is the measure of free ions in the water. Typical conductivity readings from other water bodies in Hillsborough County range between 50 and 330 micromhos per centimeter. The specific conductance of Cast-Crete's wastewater ranges from 898 to 2000 micromhos per centimeter. This is due to the presence of calcium carbonate and calcium hydroxide in the water. Blue-green algae is the dominant plant species in the ditch between the Cast-Crete discharge flume and the first 150 meters of the ditch. A biological survey of the ditch system indicates that the diversity of species east of Black Dairy Road is low. This is attributable in part to the high pH of the wastewater. The low diversity can also be attributed to the fact that the County maintains the ditch by use of a dragline on an annual basis. Background samples from a site within one mile to the northwest of the Cast-Crete property were taken. The site (a stream passing under Williams Road) is an appropriate place to take background samples because the water there is unaffected by Cast-Crete's discharge or other man-induced conditions. The pH background sample ranged from 4.6 units to 5.1 units. The specific conductance background samples ranged from 70 to 100 micromhos per centimeter. Samples taken from a site potentially impacted by Cast-Crete's discharge showed a pH level of from 6.35 to 7.37 units and specific conductance of from 592 to 670 micromhos per centimeter. Cast-Crete discharges water from its concrete plants operation without a permit from the DER.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that a Final Order be entered requiring respondent to submit a complete application for an industrial wastewater permit within thirty (30) days, and that, if it fails to do so, it cease discharging wastewater from its property until such time as an appropriately valid permit is issued by the DER. Respectfully submitted and entered this 3rd day of May, 1985, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1985. COPIES FURNISHED: David K. Thulman Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building Blairstone Road Tallahassee, FL 32301 W. DeHart Ayala, Jr. 501 E. Jackson Street Suite 200 Tampa, FL 33602 Victoria Tschinkel Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blairstone Road Tallahassee, FL 32301 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION DEPARTMENT OF ENVIRONMENTAL REGULATION, STATE OF FLORIDA, Petitioner, vs. CASE NO. 84-1647 CAST-CRETE CORPORATION OF FLORIDA Respondent. /

Florida Laws (6) 120.52120.57120.68403.031403.0877.37
# 6
ENGLEWOOD WATER DISTRICT vs. RALPH A. HARDIN, D/B/A POLYNESIAN VILLAGE, 84-000810 (1984)
Division of Administrative Hearings, Florida Number: 84-000810 Latest Update: Apr. 09, 1984

Findings Of Fact Respondent owns and operates a waste water treatment facility at Polynesian Village Mobile Home Park, owns the land at this village, leases these lots to mobile home owners, and provides them with waste water treatment. He was last issued an operating permit on January 18, 1983, by Petitioner. Respondent posted an Operational Bond (Exhibit 2) in the amount of $7,500 with Northwestern National Insurance Company as surety to faithfully operate the treatment facility and comply with all Rules and Regulations of the Petitioner. Englewood Water District, petitioner, was established by special act of the Florida Legislature in Chapter 59-931, Florida Statutes, and is given authority in Section 4 thereof to regulate use of sewers, fix rates, enjoin or otherwise prevent violations of the act or any regulation adopted by Petitioner pursuant to the act, and to promulgate regulations to carry out the provisions of the act. Pursuant to this authority, Petitioner promulgated Waste Water Treatment Facilities Design, Construction and Operation Regulations dated June 19, 1980, and revised April 28, 1983. During an inspection of Respondent's waste water treatment facility on October 17, 1983, leaching was observed at both the north and south drain fields with effluent from the system rising to the surface. Samples of this effluent when tested showed a fecal coliform count of 2800/100 ml. The basic level of disinfectant shall result in not more than 200 fecal coliform values per 100 ml of effluent sample (Rule 17-6.060(1)(b)3a, F.A.C.). Following this test, Notice of Violation (Exhibit 4) was served on Respondent. No action was taken by Respondent to correct this condition and on January 6, 1984, a Citation (Exhibit 5) was issued to Respondent scheduling a hearing for January 26, 1984. Following the issuance of that Citation frequent inspections of the facility were conducted by employees of Respondent to ascertain if steps were being taken by Respondent to correct the deficiencies. Additionally, inspections were made by inspectors from Sarasota County Pollution Control. Inspections were conducted January 9, 16, 17, 18, 20, 23, and 31; February 1, 8, 13, 14, 16, 21, 24, 25, 26, 27, 28, and 29; and March 2, 5, 8, and 9, 1984. These inspections revealed what appears to be a "blow-out" in the south drain field where effluent bubbles to the surface and flows onto the adjacent streets and propert (Exhibits 9 and 11). Effluent tested from this source had fecal coliform counts as high as 9440/100 ml. During one of these inspections effluent from the treatment plant was being discharged directly onto the road to a drainage ditch adjacent to the plant (Exhibit 8). The coliform count of a sample taken from this ditch was 13500/100 ml. Respondent was issued a second Citation on March 2, 1984, and this hearing was held on the violations alleged in that Citation, to wit: creating a public nuisance and leaching from drain field. Respondent contends that he is dealing with the Sarasota County Engineer to correct the problems and, after failing in his attempt to get the county to provide drainage from his property, he is now in the process of installing drain pipes. Respondent contends that the natural drainage of surface waters from his land to adjacent land was stopped by development on the adjacent land and the heavy rains this winter has saturated his land and inhibited percolation in the drain fields. Accordingly, the effluent from his plant could not be absorbed by the drain field. Respondent also contends that the drain field worked fine for several years before the drainage problem arose and believes it will again work well when the drainage situation is corrected.

# 7
RAYMOND A. JACKSON, ET AL. vs. INDIAN RIVER COUNTY BOARD OF COUNTY COMMISSIONER, 79-002193 (1979)
Division of Administrative Hearings, Florida Number: 79-002193 Latest Update: Apr. 30, 1980

Findings Of Fact By letter dated August 10, 1979, Indian River County (hereafter "County") submitted to the Department of Environmental Regulation (hereafter "Department" or "DER") applications for construction permits for the Gifford Area sewer treatment plant and collection improvements thereto, a domestic wastewater treatment and disposal system located in the County. (DER Exhibits Nos. 1 & 2). After receiving the permit applications submitted by the County, the Department's Orlando District Office requested additional information to determine whether reasonable assurances were provided that the facility would not discharge, emit or cause pollution in violation of Department standards. (Testimony of William Bostwick; testimony of Chancellor; DER Exhibits Nos. 3, 4, 5, 6, 7 & 8). The County, through its consulting engineers Sverdrup & Parcel and Associates, Inc., responded to the Department's requests for additional information. (DER Exhibits Nos. 3, 4, 5, 6, 7 & 8). The Department presented testimony of two professional engineers in its employ, Mr. William M. Bostwick and Mr. Gerald Chancellor, both of whom were accepted as expert witnesses in the field of sewage treatment technology and the processing and evaluation of permit applications for sewage treatment plants. Both witnesses testified that in their expert and professional opinion, based on their review of all plans, test results and other information submitted by the County, the applicant provided the Department with reasonable assurances that the proposed construction and operation of the sewage treatment facility and its collection system would not discharge, emit or cause pollution in violation of Department standards. (Testimony of Bostwick; testimony of Chancellor). The standards applicable to the subject construction permit applications involve (a) treatment level and (b) ambient standards of the receiving waters. The proposed system provides a minimum of ninety (90) percent treatment to incoming wastewaters. Because of the added features of surge tanks, gas chlorination, and dual blowers and motors, the ninety (90) percent minimum treatment was expected to be exceeded. (Testimony of Bostwick; testimony of Chancellor). The secondarily treated effluent from the proposed sewage treatment plant will be dispersed by spray irrigation. Because the effluent is expected to percolate to area groundwaters, the ambient groundwater standards of Section 17-3.101, Florida Administrative Code are applicable. The discharge from the facility will not cause any violation of the groundwater quality standards of the Florida Administrative Code. (Testimony of Bostwick; testimony of Chancellor; testimony of Aront). Although the design of the plant does not contemplate surfacewater discharge, if it did, it would meet the waste load allocation of Indian River County which permits discharge to surfacewaters. When the treated waste leaves the sprinkler head, it will meet secondary water treatment standards. (Testimony of Bostwick; testimony of Chancellor). In the course of evaluating a permit application for a wastewater treatment plant, the Department considers only Chapter 403, Florida Statutes, and its implementing rules and regulations and does not consider local issues relating to zoning, the propriety of expenditure of public funds or the like. (Testimony of Bostwick). There is presently no state standard regulating permissible levels of viruses in effluent discharged to either surface of groundwaters. Large numbers of viruses exist in the effluent discharged from spray irrigation treatment plants which operate at a ninety (90) percent treatment level. The viruses contained in the discharge remain viable as they percolate through the soil. The greatest concern exists when humans are in physical contact with such discharge. However, the present sewage treatment facility in its existing condition is a greater threat to public health than the proposed spray irrigation system. (Testimony of Dr. Welling, Petitioner's Exhibits Nos. 1, 2 & 3). Research concerning viral standards for effluent discharge is in an experimental stage. The Department is examining this question for possible future rule drafting. Neither the federal government nor any state, with the exception of Maryland, has adopted viral standards. (Testimony of Welling) The design of Use Gifford plant contemplates a series of perimeter monitoring wells through which groundwater samples can be attained and tested for compliance with groundwater standards end the presence of viruses. (Testimony of Aront) The plant will spray irrigate effluent at the rate of one (1) inch per week. Although surface run off is not expected, any that occurs due to heavy rains, etc., will be discharged into a perimeter ditch surrounding the plant. The plant design is formulated to retain effluent on site. (Testimony of Chancellor). There are four (4) different types of soil on the site with a water permeability of moderately rapid to very rapid. These soils have a percolation rate which makes the site suited for the intended purpose provided surface drainage is obtained. On a conservative basis the site could accept up to fourteen (14) inches of water per day or ninety-eight (98) inches per week. (Testimony of Connell; testimony of Eng; DER Exhibit No. 6). The parties stipulated prior to the hearing to the following: The project complies with local zoning laws; and The applicable provisions of law are Sections 403.086, 403.087, 403.088, Florida Statutes, and Rules 17-3.091, 17-4.03, 17-4.07 and 17-4.26, Florida Administrative Code.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the Department issue a construction permit to the County on condition that sample effluent from the monitoring wells on the subject facility be regularly analyzed for compliance with Department rules and the existence of infectious viruses. DONE and ENTERED this 3rd day of March, 1980, at Tallahassee, Florida 32301. SHARYN SMITH Hearing Officer Division of Administrative Hearings 101 Collins Building Tallahassee, Florida 32301 COPIES FURNISHED: Sherman N. Smith, Jr., Esquire Post Office Box 1030 Vero Beach, Florida 32960 George G. Collins, Jr., Esquire Post Office Box 3686 Vero Beach, Florida 32960 Segundo J. Fernandez, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57403.086403.087403.088
# 8
JOHN E. PILCHER, PHYLLIS REPPEN, ET AL. vs BAY COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 90-000254 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 16, 1990 Number: 90-000254 Latest Update: Jan. 10, 1992

Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.

Florida Laws (5) 120.57120.68403.087403.088403.201
# 9
GENERAL DEVELOPMENT CORPORATION vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-000239 (1981)
Division of Administrative Hearings, Florida Number: 81-000239 Latest Update: Dec. 01, 1981

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Several years prior to1978, petitioner General Development Corporation (GDC) applied to the DER for a dredge and fill permit to remove a plug of land between the Ocean Breeze Waterway and the North Fork of the St. Lucie River. During the course of negotiations for this permit, it was discovered that the North Port St. Lucie Sewage Treatment Plant, owned and operated by General Development Utilities, Inc., a wholly-owned subsidiary of the petitioner, was operating without a permit from the DER and discharging effluent into a ditch which flowed into the Ocean Breeze Waterway. In March of 1978, a temporary operating permit was issued for the sewage treatment plant. In July of 1978, petitioner received from the DER Permit No. 253.123- 1031 to dredge an area approximately 800 feet in length, 90 feet in width and 6 feet in depth in order to connect the Ocean Breeze/Sagamore Waterways to the dead end oxbow of the North Fork of the St. Lucie River. The permit application was given special consideration pursuant to Rule 17-4.28(7), Florida Administrative Code. The purpose for obtaining the permit was to create direct navigable access to the North Fork of the St. Lucie River from thee Ocean Breeze Waterway. The Ocean Breeze Waterway was and is currently connected to the North Fork of the St. Lucie River by a narrow, shallow, meandering creek and lake system. However, there is not a large enough opening to allow the type of navigable access desired by the petitioner for the benefit of 118 lots plotted along the Ocean Breeze and Sagamore Waterways. Among the seven particular or special conditions attached to the dredge and fill permit issued to petitioner was that the earthen plug not be removed until such time as a permanent operational permit was issued for the sewage treatment plant owned and operated by General Development Utilities, Inc. More specifically, petitioner agreed to the following special conditions to the issuance of the dredge and fill permit: "(7) The applicant is aware that the GDC Utilities' sewage plant is providing an unknown quantity of discharge into Ocean Breeze Waterway and that this discharge may be a source of pollution to the receiving body of water unless affirmative steps are taken by the Utilities. The sewage treatment plant is currently operating under a Temporary Operating Permit (TP56-4601). In no case shall the plug at Cove Waterway be removed before an Operation Permit for the STP has been issued by the Department of Environmental Regulation." At time of issuance of the dredge and fill permit, DER personnel considered the quoted special condition number 7 to an integral part of the permit in terms of water quality assurances. General Development Utilities, Inc. has not been able to obtain a permanent operational permit from the DER for its sewage treatment plant which discharges into a ditch that flows into the Ocean Breeze Waterway. Therefore, particular condition number 7 has not been satisfied and petitioner has been unable to proceed with the dredging or removing of the plug under the permit. As a result of the delays in removal of the plug, petitioner has had to repurchase some 41 of the 118 plotted lots. The sewage treatment plant was and is still operating under a temporary permit. General Development Utilities, Inc. has requested a permanent operational permit for the sewage treatment plant and DER has issued a letter of intent to deny such a permit. As a result, General Development Utilities has petitioned DER for site specific alternative criteria pursuant to Rule 17-3.031, Florida Administrative Code. This matter is the subject of a separate proceeding currently being held in abeyance pending a determination of alternative criteria. General Development Utilities, Inc. v. Department of Environmental Regulation, DOAH Case No. 81-177. In September of 1980, petitioner sent a letter to DER requesting that special condition number seven be removed from its dredge and fill Permit No. 253.123-1031. It was intended that this request be considered as a minor modification to the dredge and fill permit. In response, DER's Chief of the Bureau of Permitting, Suzanne P. Walker, informed petitioner by letter dated October 15, 1980, that it was the staff's initial reaction, after a review of the original dredge and fill permit file, that the requirement that the sewage treatment plant obtain a permanent operational permit prior to dredging remain as a condition of the dredge and fill permit. Petitioner was informed that if it wished to pursue the matter further, the project must be reevaluated as a major modification to the dredge and fill permit. A major modification to a permit requires a new permit application and fee and is treated and processed as an initial application for a permit, with the applicant being required to provide reasonable assurances that the water quality standards will not be violated. Upon request for a minor modification, DER simply reviews the file and determines whether the request is obviously environmentally insignificant. After receipt of the letter from Mrs. Walker, petitioner supplied DER with additional water quality data. Based upon this additional data, discussions with DER staff who had been involved with the initial dredge and fill permit and the sewage treatment plant permit, and two days of sampling data collected by DER, DER determined that particular condition number seven was an integral part of the affirmative reasonable water quality assurance provided and should remain a condition of the permit. This determination was communicated to petitioner by letter dated January 7, 1981. The sewage treatment plant discharges treated effluent into a drainage ditch known as C-108. Effluent from the plant first goes into holding or retention ponds. Under its current flow, it takes about forty days for the effluent to be discharged from the plant to C-108 and the Ocean Breeze Waterway. C-108 flows into the Ocean Breeze Waterway, an artificial waterway which is presently connected to the North Fork of the St. Lucie River by a narrow, shallow meandering creek and lake system. The sewage treatment plant currently operates at 300,000 gallons per day but has an authorized capacity to operate at two million gallons per day. It currently contributes approximately two percent of the total daily flow to C-108. The Ocean Breeze Waterway and C-108, independent of the sewage treatment plant, drain approximately 4,000 square acres and produce about 35 percent of the water that will flow into the North Fork. The North Fork is tidal, with four one foot tides per day. The tidal action comprises almost 63 percent of the moving water. At a two million gallons per day discharge, the wastewater plant would be contributing about 12 percent of the water that would be going into the North Fork from the Ocean Breeze Waterway system. In comparison with two adjacent drainage systems, the Ocean Breeze system contributes only about three percent of the fresh water which flows into the North Fork. The dissolved oxygen levels of C-108 are chacteristically below the state standard of five milligrams per liter, primarily due to the seepage of ground water into the canal. Due to man-made alterations and to natural phenomena, the North Fork's dissolved oxygen levels also characteristically fall below state standards. The dissolved oxygen level of the Ocean Breeze Waterway is characteristically above state standards. Higher levels of dissolved oxygen coming from the sewage treatment plant improves the dissolved oxygen levels of the existing system. High levels of nitrogen, phosphate and chlorophyll have been found near the point of discharge. The quality of water in the North Fork is better than in the Ocean Breeze Waterway. It was the opinion of petitioner's experts that no change in dissolved oxygen levels would occur in the Ocean Breeze Waterway or the North Fork if the plug of land between these water bodies were removed. Petitioner's witnesses also opined that the Ocean Breeze/C-108 system was not a source of nutrient enrichment to the North Fork, and that the present creek system provided no water quality benefits in the form of nutrient uptake for the North Fork. It was estimated that, if the plug of land were removed pursuant to the permit, a pollutant placed at the upper end of the Ocean Breeze Waterway would be diluted by 98 percent in 26 hours in lieu of the present 39 hours due to increased flushing. These opinions were based upon analyses by petitioner's witnesses of various samplings and data regarding dissolved oxygen, nutrients and phytoplankton. The respondent's witnesses felt that the poor water quality in the Ocean Breeze Waterway was attributable in large part to the sewage treatment plant discharge and, if the plug of land were removed, the water quality problems would be moved to the North Fork and the St. Lucie River. It was felt that the present creek and lake system -- the narrow circuitous connection presently existing between the canal and the river -- reduces the nutrients which otherwise would flow into the river. These conclusions were based upon DER's own survey, a review of the dredge and fill permit file and a review of the additional data supplied by the petitioner General Development Corporation. No data regarding the water quality of the effluent from the sewage treatment plant was submitted by the petitioner at the time of DER's review of the original application for the dredge and fill permit.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the request of General Development Corporation to modify Permit Number 253.123-1031 by removing particular condition number seven be DENIED. Respectfully submitted and entered this 14th day of October, 1981, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1981. COPIES FURNISHED: Valerie Fravel Corporate Counsel General Development Corp. 1111 South Bayshore Drive Miami Florida 33131 Alfred J. Malefatto Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Honorable Victoria Tschinkel Secretary, Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301