Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
VICK GRIFFIN CONSTRUCTION COMPANY vs. LONG CONTRACTORS, INC., AND NORTH FLORIDA JR. COLLEGE, 82-000654 (1982)
Division of Administrative Hearings, Florida Number: 82-000654 Latest Update: Apr. 29, 1982

Findings Of Fact On or about December 29, 1981, the College solicited sealed bids for construction of alterations and additions to the Technical and Gymnasium Buildings located on its campus in Madison, Florida. In response, seven general contractors submitted bids. (P-1, P-2, P-3.) Bids were publicly opened on February 9, 1982. Griffin Construction, with a bid of $536,575, was the apparent low bidder; the second lowest bidder was Long Contractors, with a bid of $539,512. (Testimony of Griffin, Sims, Rutherford; P-3, P-4, P-5.) After the low bid was identified, Tom McClanahan, representing Long Contractors, asked that the subcontractor list accompanying the low bid be opened. Griffin Construction's subcontractor list was then opened. McClanahan asked if the license and charter numbers of the subcontractors were listed. 2/ Upon learning that these numbers were not included on Griffin Construction's subcontractor list, McClanahan protested. (Testimony of Sims, Rutherford, Griffin.) At its February 15, 1982, meeting, the College District Board of Trustees ("Board") rejected the low bid of Griffin Construction on the sole ground that the omission of subcontractor license and charter numbers constituted a failure to comply with the conditions of the bid documents. 3/ The Board then voted to award the contract to Long Contractors, the second lowest bidder, on the ground that it was the lowest bid conforming to the bid documents. In so doing, the Board followed the College president's recommendation--a recommendation based on his belief that the non-complying bid must be rejected, that it did not involve a matter of Board discretion. (Testimony of Sims, Rutherford, Griffin; Stipulation of Parties; P-41.) The bid specifications contain instructions to bidders requiring "each Bidder . . . [to] submit with his proposal a list of the subcontractors who will perform the work . . . as indicated by the `List of Subcontractors' form." (P-1, P-2.) The instructions further provide: The applicable subcontractor license registration or certification number must be noted on the bid opposite his name, and in the event that the subcontractor is a corporation, his State Corporate Charter number shall also be noted. If the subcontractor is an out of state firm, their Charter number with the Secretary of State to do business in the State of Florida should also be noted. The "Listing of Subcontractors" form provided with the specifications contains column headings for the names and addresses of the subcontractors but does not contain a separate heading for the requested license or corporate charter numbers. 4/ The form states that the subcontractor list "is an integral part of the bid." (P-1, P-2.) The bid instructions further require bidders to evaluate and determine the qualifications of their listed subcontractors. The bidder shall have determined to his own complete satisfaction that a listed subcontractor has been successfully engaged in this particular type of business for a reasonable length of time, has successfully completed installations comparable to that which is required by this agreement and is qualified both technically and financially to perform that pertinent phase of the work for which he is listed. (P-1, P-2.) The bid documents expressly reserve to the College the right "to reject any or all bids, and to waive informalities." (P-1 P-2.) No bidder correctly listed the required license and corporate charter numbers on its "Listing of Subcontractors" form. Griffin Construction. Griffin failed to include any license or corporate charter numbers. However, by subsequent letters dated February 9 and February 18, 1982, and at hearing, it supplied the required subcontractor license and charter numbers. Long Contractors. Long listed for its roofing subcontractor a sheet metal registration number, not the required roofing license number. [A sheet metal registration does not qualify a contractor for roofing work. See, 489.105, 489.113, Fla. Stat. (1981).] For its electrical subcontractor, Long omitted the prefix, "ER" from the listed number. For its plumbing subcontractor, Long listed a mechanical registration number instead of the required plumbing certification or registration number. [A mechanical registration does not qualify a contractor to perform plumbing work. See, 489.105, 489.113, supra.] Of the four areas requiring state licenses--roofing, heating and air conditioning, electrical, and plumbing--Long listed correctly only the registration number for its heating and air conditioning subcontractor. Long incorrectly listed No. FO6962 as the corporate number of Gandy Enterprises, its painting subcontractor. This is the number of a related corporation, Industrial Coatings, Inc. Remaining Bidders. Of the five other general contractors submitting bids, two-- Richard Walker Construction Company and GRC Contracting, Inc.--omitted all subcontractor license and charter numbers. The other three bidders failed to completely list all the required numbers. (Testimony of Rutherford; P-11, P-12, P-13, P-14, P-15, P-16, P-17, P-34, P-37, R-1, R-5.) The project architect testified that the submittal of incorrect or incomplete subcontractor license and charter numbers was a deficiency which a bidder should be allowed to cure after bid opening. But the failure to submit any required "number" was a deficiency which, in his opinion, could not be similarly corrected. He failed, however, to supply a reasonable basis for drawing such a distinction. Therefore, his opinion on this question is given little weight. 5/ (Testimony of Rutherford.) Subcontractor license and charter numbers are readily obtainable and can be verified by contacting the pertinent state agency--the Florida Department of Professional Regulation, Construction Industry Licensing Board, or the Florida Department of State. (Testimony of Griffin, Rutherford; P-32, P-33, P- 34, P-35, P-36, P-37.) The project architect, William Rutherford, routinely requires the listing of subcontractor license and charter numbers on bids for public construction projects. The main purpose it serves is that it would enable him to identify the listed contractor, since sometimes subcontractors have similar business names. Although if he was uncertain about the qualifications of a subcontractor, he would ordinarily question the general contractor. (Testimony of Rutherford.) Although Mr. Rutherford has customarily required the listing of subcontractor "numbers" on public projects, he has never made any use of those numbers in the past. (Testimony of Rutherford.) The general contractor who is awarded the contract is responsible to Mr. Rutherford and the College for construction of the project in accordance with the bid specifications. If, after bid opening, a listed subcontractor is unable to perform, Mr. Rutherford would ordinarily arrange for substitution of a new subcontractor acceptable to the general contractor and owner. (Testimony of Rutherford.) Griffin Construction's failure to list the license and charter numbers of its listed subcontractors, and its subsequent curing of that failure, did not affect the amount of its bid 6/ by giving it an advantage or benefit not enjoyed by other bidders. The bid omission did not allow Griffin Construction the opportunity to change any material element of its bid after bid opening. The inclusion or exclusion of subcontractor "numbers" at bid opening does not affect the ability of a contractors to obtain the required bond, the quality of bidding general contractors, the quality of listed subcontractors, the quality of work performed, or any material feature of the competitive bidding process. (Testimony of Griffin, Rutherford.)

Recommendation Based on the foregoing, it is RECOMMENDED: That the construction contract in question be awarded to Vick Griffin Construction Company, the lowest responsible bidder. DONE AND RECOMMENDED this 29th day of April, 1982, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of April, 1982.

Florida Laws (3) 120.5720.15489.105
# 1
CARLTON AND CARLTON, P.A. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 92-004937BID (1992)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Aug. 13, 1992 Number: 92-004937BID Latest Update: Apr. 05, 1993

Findings Of Fact Background The procurement of private legal services by the Department for child support enforcement is exempt from the competitive bidding requirements set forth in Chapter 287, Florida Statutes. In July 1992, the Department published notice that it was soliciting proposals from interested attorneys to provide intrastate and interstate child support legal services in HRS District VI, including Hillsborough, Hardee, Highlands, and Polk Counties. These services were to be provided from October 1, 1992, through June 30, 1993. Separate proposals were solicited for each of the following: the Hillsborough County Interstate Contract, the Hillsborough Intrastate Contract, the Polk County Contract, and the contract for Hardee and Highland Counties. The solicitation package does not incorporate any of the Florida Statutes or the agency's own rules regarding solicitation and award procedures in competitive bidding situations. Instead, the solicitation purports to be a self contained package of reasonably definite specifications with its own evaluation criteria and award procedures. The Petitioners in all four of the consolidated cases timely filed written protests which challenge the contents and requirements of the package. Evaluation Criteria In addition to the evaluation criteria contained in the solicitation package, the Department adopted and distributed to its employees additional criteria to be used in evaluating the proposals submitted. The additional criteria are set forth in the following documents which were entered into evidence as Belveal Exhibit No. 7: Work Sheet for Evaluating Criteria and Determining Relative Value to be Applied to Technical Information, Evaluation Criteria, Scoring Matrix for Structured Interview of Offerers, Work sheet for Scoring Oral Interview, and Questions for Use at Interview. The additional criteria set forth in these documents were intended for use to award points in the evaluation of offers, and to make the award of the contracts. They were not revealed to potential offerers. Such a procedure affords opportunities for favoritism, whether or not any favoritism is actually practiced by the Department. Once the representation is made in a solicitation package that it contains the evaluation criteria, the offerers should not be subjected to an additional evaluation process. Anne Donovan, Assistant Secretary of the Department of Health and Rehabilitative Services, admitted during hearing that the additional criteria which was not included in the solicitation package are intentionally biased to give existing legal services contractors an advantage in obtaining renewal of their contracts. This is contrary to the representation made in the solicitation package which states, "Through this solicitation for offers to provide legal services, the department seeks to obtain the highest possible standard of legal representation... while ensuring free and open competition among prospective offerers." Specifications The proposed contract to be executed at the conclusion of the bid solicitation and contract award process was to provide for compensation to the contractor based on (a) the number of cases referred to the contractor during the contract term, and (b) the number of final orders obtained by the contractor in these cases referred for action. The solicitation package contains a document identified as Attachment VI, which sets fort numbers purporting to be the Department's estimates of the number and type of cases which would be referred to the successful bidder during the course of each of the contracts, the number of payable orders to be expected, and the maximum fees which would be paid for each type of order obtained pursuant to the contract. Separate estimates have been given for the following contracts: Hillsborough County Intrastate, Hillsborough County Interstate, Polk County, and Hardee and Highlands Counties. The actual numbers set forth in each of the four separate contract proposals were estimates made by the field office staff of the Department and compiled by the headquarters office. Rosemary O'Neil, the contract manager in District VI, estimated the number of functions for each of the four contracts in District VI. In identifying the direct cost amount for each individual contract, she used automated and manual statistics or the tracking of functional activities for the past year. During the preparation of her projections, Ms. O'Neil tracked only nine activities, as originally required by the Department. Later, she was required to break these down into twenty-two functions, which may have adversely affected the estimates. Ms. O'Neil and other Department personnel testified that the estimates for District VI might be too low based upon past estimates and current needs. Ms. O'Neil completed the estimates in good faith and in accordance with the Department's stated requirements. Attachment VI also contains a fee schedule based upon a functional cost survey devised and carried out by the Department between April 15, 1991 and March 31, 1992. The survey randomly selected 3,800 cases throughout the state for tracking to determine the average cost the Department paid over the stated time period for each legal activity represented in the survey. During the survey, only 2,100 of these cases were actually tracked. In October 1992, the functional cost survey was changed to include 22 instead of 10 categories of legal service activity. The implementation of the survey was faulty in that different districts tracked attorney time and paralegal time in different ways. In addition, the administrative procedures utilized by judges and hearing officers in different districts directly affected statistics in ways which were not contemplated in the survey. Without uniform procedures, the legal services performed and attorney fees charged in different counties cannot be effectively reviewed on a comparable basis to create a true average cost per function. Many of the fees allocated to different functions in the specifications were illogical. For example: Fees paid for stipulated matters were, in many cases, higher than the fees paid for contested matters of the same type. Fees paid for simple matters, such as contempt hearings, were substantially the same as fees paid for more complex litigation involving the establishment of paternity and support. Certain orders obtained by the attorney, such as bankruptcy matters, required the expenditure of time by the contractor, but did not pay any fee. The functional cost survey used to establish the terms in the solicitations for estimated number of cases, types of cases and the maximum fees to be paid is defective as it relates to District VI. Proposals cannot be comparatively reviewed because the data upon which the proposals are created is inaccurate. After the contract award, it is reasonably anticipated that the Department would be required to make modifications to the contract which would afford opportunities for favoritism.

Recommendation Based upon the foregoing, it is RECOMMENDED: The previously undisclosed evaluation criteria should be included in the solicitation package if the Department intends to use them in the evaluation process. The current specifications on the projected number of cases to be referred in each contract in District VI should be revised to more reasonably and accurately reflect potential referrals within the District. The designated attorney fee for each function should be revised so that the charges are reasonably related to the work expected by the specifications in the proposal. The contents of the functional cost survey should be reevaluated based upon the evidence presented during the protest proceedings. The current specifications should be rejected as they are so flawed as to be arbitrary, in violation of state standards regarding the competitive bidding process. DONE and ENTERED this 22nd day of December, 1992. VERONICAL E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of December, 1992. APPENDIX Petitioner Carlton's proposed findings of fact are addressed as follows: Accepted. Accepted. See HO No. 1. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 5 Accepted. See HO No. 7 Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Irrelevant. Rejected. Irrelevant. Accepted. See HO No. 16. Accepted. See HO No. 19. Accepted. See HO No. 17. Accepted. See HO No. 18. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 20 - No. 21. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Contrary to fact. See HO No. 21. Accepted. See HO No. 21. Accepted. Accepted. See HO No. 12. Accepted. See HO No. 12. Accepted. See HO No. 15. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Contrary to fact. See HO No. 22. Accepted. Accepted. Accepted. Accepted. - 81. Rejected. Without jurisdiction to determine. 82. - 87. Rejected. Beyond the jurisdiction of the Hearing Officer under the Grove-Watkins review standards. 88. - 100. Rejected. Beyond the jurisdiction of the Hearing Officer. Petitioner Redman's proposed findings of fact are addressed as follows: Accepted. Accepted. See HO No. 1. Accepted. Accepted. Accepted. Rejected. Contrary to fact. See HO No. 3. Accepted. Accepted. Accepted. Accepted. See HO No. 7. Accepted. Accepted. See HO No. 8 - No. 9. Accepted. See HO No. 16. Accepted. Accepted. Accepted. Accepted. Rejected. Irrelevant. Rejected. Irrelevant. Accepted. Accepted. See HO No. 20 and No. 22. Accepted. Accepted. See HO No. 17. Accepted. See HO No. 18. Accepted. See HO No. 16. Accepted. Accepted. Accepted. Accepted. See HO No. 19. Accepted. Accepted. Accepted. Accepted. Rejected. Irrelevant. Accepted. Accepted. See HO No. 20. The word "misleading" should be replaced by the "faulty". Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 20 and No. 22. Accepted. Rejected. Speculative. Accepted. See HO No. 21. Accepted. See HO No. 21. Accepted. See HO No. 21. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 22. Accepted. See HO No. 21. Accepted. See HO No. 21. Accepted. Accepted. See HO No. 21. Accepted. See HO No. 21. Accepted. See HO No. 21. Rejected, except for the determination that the specifications are arbitrary. All other allegations were not proved at hearing. Accepted. See HO No. 11. Accepted. See HO No. 12. Rejected. Contrary to fact. See HO No. 13. Accepted. See HO No. 13. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 13. Accepted. See HO No. 13. Accepted. Accepted. - 105. Rejected. Beyond the hearing officer's jurisdiction. Accepted. Rejected. Contrary to findings, except the determination that the specifications were arbitrary and unreliable. Rejected. Beyond subject matter jurisdiction. Rejected. Competency not determined. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 20. Rejected. Contrary to fact. Accepted. Rejected. Contrary to fact. - 128. Rejected. Beyond subject matter jurisdiction. Petitioner Belveal's proposed findings of fact are addressed as follows: Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 1. Accepted. Accepted. Accepted. Accepted. See HO No. 2. Accepted. Accepted. See Preliminary Statement & HO No. 4. Accepted. See HO No. 11. Accepted. See HO No. 3. Accepted. Accepted. See HO No. 5. Accepted. See HO No. 5 - No. 6. Accepted. See HO No. 7. Accepted. See HO No. 10. Accepted. See HO No. 12. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 16. Accepted. Rejected. Irrelevant. Accepted. See HO No. 21. Accepted. Accepted. Accepted. Accepted. Accepted. See HO No. 21. Accepted. Accepted. See Preliminary Statement. COPIES FURNISHED: CHARLES L CARLTON ESQ 2120 LAKELAND HILLS BLVD LAKELAND FL 33805 CECELIA M REDMAN ESQ 2124 W KENNEDY BLVD - STE B TAMPA FL 33606 DONALD W BELVEAL ESQ 100 W KENNEDY BLVD - STE 600 TAMPA FL 33602 JACK EMORY FARLEY ESQ HRS DISTRICT VI LEGAL OFFICE 4000 W DR MARTIN LUTHER KING JR BLVD TAMPA FL 33614 JOHN DAVIS ESQ 1170 NE CAPITAL CIRCLE TALLAHASSEE FL 32308 JOHN SLYE ESQ GENERAL COUNSEL DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES 1323 WINEWOOD BLVD TALLAHASSEE FL 32399 0700

Florida Laws (3) 120.57287.05957.111
# 2
THERMA SEAL ROOF SYSTEMS vs PALM BEACH COUNTY SCHOOL BOARD, 93-003033BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 03, 1993 Number: 93-003033BID Latest Update: Oct. 04, 1993

The Issue The ultimate issue for determination at formal hearing was whether the intended decision by the Palm Beach County School Board to reject all bids on the Gladeview Elementary School project, Project No. 125191702/205840, departs from the essential requirements of law.

Findings Of Fact Palm Beach County School Board (Respondent) issued a request for proposals (RFP), soliciting sealed bids for the reroofing, renovating and replacing the HVAC of Gladeview Elementary School, Project No. 125191702/205840 (Gladeview Elementary Project). The RFP and bid documents for the Gladeview Elementary Project were contained in the "Project Manual." The addendum to the RFP required all bids to be submitted by April 20, 1993 at 2:00 p.m., at which time all bids were to be publicly opened. Pertinent to the case at hand, the RFP further required a bid bond or cashier's check for not less than five percent (5 percent) of the bid and notified bidders that Respondent had the right to reject all bids and waive any informalities. Section 00100 of the "Instruction to Bidders" in the Project Manual is material to the case at hand and provides in pertinent part: BIDDING PROCEDURES: * * * Preparation and Submission of Bid Proposal Form: [P]roposals containing any conditions, omissions, unexplained erasures, alternates, items not called for or irregularities of any kind may be rejected by the Owner. . . (e) Proposal Submittal shall contain the following documents: Section 000443 - Public Entity Crimes Statement Section 00310 - Proposal Form Section 00410 - Bid Bond or otherwise acceptable Bid Guarantee (see Paragraph 3.08). Manufacturer's Letter of Intent to Warranty (See Section 7610) and will be enclosed in a sealed envelope. . . * * * 3.08 Bid Guarantee: Bids shall be accompanied by a bid guarantee of not less than five percent (5 percent) of the amount of the Base Bid, which shall be a Cashier's Check or a Bid Bond (Bid Bond, see Section 00410) made payable to the Owner. * * * 3.10 Subcontractors: At the time of the Bid Opening each Bidder submitting a Bid shall submit a written list of the major Subcontractors; namely, structural steel, membrane roofing, preformed metal roofing & siding, plumbing, HVAC, electrical and general contractor, on Form 00420 (List of Major Subcontractors). The list shall be placed in a "sealed envelope". . . Within five (5) Owner Business days after the Bid Opening, the apparent low Bidder(s) shall submit Form 00430) (List of Subcontractors), completed in full to the Owner ... Failure to submit these lists within the time period specified herein shall result in a non- responsive Bid. * * * REJECTION OF BIDS: 6.01 The Bidder acknowledges the right of the Owner to reject any or all Bids and to waive any informality or irregularity in any Bid received. In addition, the Bidder recognizes the right of the Owner to reject a Bid if the Bidder failed to furnish any required Bid security, or to submit the data required by the Bidding Documents, or if the Bid is any way incomplete or irregular; to reject the Bid of a Bidder who is not in a position to perform the Contract; and to re-advertise for other or further Bid Proposals. SUBMISSION OF POST-BID INFORMATION: * * * 7.02 The selected Bidder shall within eight (8) Owner business days after notification of Board Award submit the following: . . . 6. Photocopies of prime Contractor's certification and/or registration and either state registrations or Palm Beach County Certificate of Competency of all Subcontractors. . . * * * AWARD OF CONTRACT: The Contract, if awarded by the Owner, will be awarded to the lowest bona fide responsible Bidder; provided the Bid is reasonable and it is in the interest of the Owner to accept the Bid. The method of determining the lowest bona fide Bid from Bidders shall be the Base Bid price plus or minus Alternate Prices listed on the Bid Proposal Form which are accepted by the Owner. Alternates will be considered for acceptance by the Owner as set forth in the Alternate section of the Specifications, Division One-General Requirements, Section 01030-Alternates. The bid opening was conducted on April 20, 1993, at which time the bids were tabulated and the Bid Tabulation Form (BTF) was posted. Respondent received bids from Bonner Roofing whose base bid was $869,000, S&S Roofing, Inc. (Petitioner S&S Roofing) whose bid was $693,000, Therma Seal Roofs, Inc. (Petitioner Therma Seal) whose bid was $691,500, Titan Roofing, Inc. (Petitioner Titan Roofing) whose base bid was $689,500, and Trans Coastal Roofing, Inc. (Petitioner Trans Coastal) whose base bid was $884,248. The BTF showed that the rank of the bids, beginning with the apparent lowest bidder to the apparent highest, were (1) Petitioner Titan Roofing, (2) Petitioner Therma Seal, (3) Petitioner S&S Roofing, and (4) Petitioner Trans Coastal. The BTF showed further that Bonner Roofing failed to submit with its bid the Manufacturers Letter of Intent which was a required document. Bonner Roofing's bid was rejected. Within minutes after the bid opening, Respondent's staff discovered that Petitioner Titan Roofing had failed to list its major subcontractors on Form 00420, List of Major Subcontractors, even though it had submitted the form. Respondent's staff contacted Petitioner Titan Roofing by telephone and requested the list. Petitioner Titan Roofing's failure to submit a completed Form 00420 was inadvertent and not intentional. At the time of the bid opening, Respondent's staff had not considered Petitioner Titan Roofing's failure to submit a completed Form 00420 to be a major irregularity, but a minor one. Consequently, Respondent's staff considered the failure to be a waivable irregularity. Unable to discern if it had the original figures submitted by its major subcontractors, Petitioner Titan Roofing telephoned them to verify the figures it had. Within two hours, Petitioner Titan Roofing had faxed to Respondent's staff a completed Form 00420. Respondent's recommendation or intended action was to award the bid to Petitioner Titan Roofing as the apparent lowest bidder. Petitioner Therma Seal, the apparent second lowest bidder, filed a timely protest of Respondent's intended action. Respondent held an informal hearing on the protest, and the recommendation was to reject all bids. In prior bids, a bidder's failure to submit Form 00420 at bid opening has been considered a major irregularity by Respondent. The purpose of Form 00420 is to prevent or guard against bid shopping. Respondent's action has been to routinely reject bids with such a deficiency. Petitioner Therma Seal failed to submit with its bid the required bid bond of 5 percent of its base bid. Failure to submit a required bid bond is considered by Respondent to be a major irregularity. Furthermore, Petitioner Therma Seal was not a licensed general contractor. It listed itself as the general contractor on Form 00420. All bids failed to comply with the roofing warranties and specifications, which Respondent considers to be a major irregularity. Respondent's budget, based upon its architect's construction estimate, for the Gladeview Elementary Project was $652,130. All bids were over budget. Prior to the formal hearing, Respondent Trans Coastal notified the parties that it was not proceeding with its protest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Palm Beach County School Board enter its final order rejecting all bids on the Gladview Elementary School project, Project No. 125191702/205840, and re-advertise. DONE AND ENTERED this 7th day of September 1993 in Tallahassee, Leon County, Florida. ERROLL H. POWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of September, 1993.

Florida Laws (4) 120.53120.576.017.02
# 3
D. E. WALLACE CONSTRUCTION CORPORATION vs ALACHUA COUNTY SCHOOL BOARD, 96-003140BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 05, 1996 Number: 96-003140BID Latest Update: Jan. 21, 1999

The Issue The issues are: (1) whether the Petitioner's notice of bid protest filed on June 5, 1996, was timely under Section 120.53(5), Florida Statutes, and, if not, whether Petitioner has waived its right to participate in bid protest proceedings; and (2) if Petitioner's bid protest was timely filed, whether the Respondent acted fraudulently, arbitrarily, illegally or dishonestly in rejecting the Petitioner's bid.

Findings Of Fact The Petitioner is a general contractor which operates in Alachua County and surrounding areas. The Respondent is the governing body of the school district in Alachua County. In April and May, 1996, the Respondent publicly advertised an Invitation to Bid on the Project which consists of hard courts for basketball, driveway paving and new drainage provisions. Petitioner and three other bidders timely submitted sealed bids to the Respondent at its office located at the E. Manning, Jr. Annex, 1817 East University Avenue, Gainesville, Florida. Petitioner's bid proposal included a Contractor's Qualification Statement setting forth Petitioner's experience and financial qualifications to act as the general contractor for the Project. There is no evidence that Petitioner is disqualified as a responsible bidder because: (a) it colluded with other bidders; (b) it based its proposal on bid prices which were obviously unbalanced; (c) it included any false entry in its bid proposal; or (d) it failed to completely fill out the required list of subcontractors. The Invitation to Bid does not set forth any other specific conditions which would disqualify an otherwise responsible bidder. However, Respondent reserves the right to reject any and all bids when it determines that such rejection is in its interest. Respondent publicly opened the bids and read them aloud at 2:00 P.M. on May 9, 1996 as required by the Invitation to Bid. Petitioner did not attend the opening of the bids. The Invitation to Bid specified that the bids would be "tabulated and evaluated by the Superintendent of Schools of Alachua County or member or members of his staff or other individual or individuals designated by him." Edward Gable is Respondent's Director of Facilities. The Superintendent designated Mr. Gable to evaluate bids received for facility projects and to formulate recommendations to Respondent. The Invitation to Bid does not set forth a time certain in which Respondent will notify bidders of its decision or intended decision. However, it does state as follows: At the next regular or special meeting of the Board or at the designated meeting thereafter, the bids, as so opened, tabulated and evaluated, and the recommend- ation of the Superintendent of Schools of Alachua County regarding them shall be presented to the lowest responsible bidder meeting the requirements of the law and the State Board of Education Regulations. In Section 19.1 of the Instructions to Bidders, Respondent informs bidders that it will award the contract to the lowest bidder as soon as possible provided that the lowest bid is reasonable and in Respondent's best interest. The Invitation to Bid provides bidders with the following notice relative to Respondent's decision or intended decision concerning a contract award: The Board shall provide notice of its decision or intended decision concerning a contract award. Notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statues, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Any person who is affected adversely by the decision or intended decision shall file with the Board a written "Notice of Protest" within seventy-two (72) hours after posting or notification. A formal written protest shall be filed within ten (10) calendar days after filing the 'Notice of Protest.' Section 17.1 of the Instructions to Bidders contains the following language concerning Respondent's decision or intended decision: 17.1 The Board shall provide notice of its decision or intended decision concerning a contract award. For any other decision, notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. Section 18.1 of the Instructions to Bidders provides as follows: Bid tabulations with recommended awards will be posted for review by interested parties at the Planning and Construction Department, 1817 East University Avenue, Gainesville, Florida, following the bid opening, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute as (sic) waiver of proceeding under Chapter 120, Florida Statutes. The Invitation to Bid and the Instructions to Bidders distinguish between a protest concerning a contract award and a protest related to the specifications contained in an invitation to bid or in a request for proposals. In the latter context, a bidder must file a written protest within seventy-two (72) hours after receipt of the project plans and specifications. This case does not involve a protest of a bid solicitation. By virtue of the above referenced provisions in the Invitation to Bid and the Instructions to Bidders, Respondent gave all bidders sufficient and reasonable notice that a posted tabulation together with its recommendation constituted Respondent's intended decision. The bid specifications in the instant case required bidders to submit a bid on a base contract for certain school facility improvements with alternate bids relative to additional improvements in the event Respondent decided to include such features in the Project. Petitioner's base bid was $135,000; it was the lowest bid submitted. The next low bid was from Watson Construction Company, Inc. (Watson) at $133,345. Two additional bids were higher than Watson's bid. On the morning of May 30, 1996 one of Petitioner's employees, Roger "Dave" Williams" phoned Mr. Gable to inquire about the status of the bid award. Mr. Gable was unavailable to take the call. Mr. Williams left a message for Mr. Gable to return the call. Next, at approximately 10:00 a.m. on May 30, 1996, Mr. Williams called a member of Mr. Gable's staff who stated that, as far as he knew, Respondent had not made a decision on the contract. Mr. Gable completed his evaluation and posted the bid tabulation on May 30, 1996 at 3:00 p.m. Included on the bid tabulation was the following statement: RECOMMENDED ACTION: It is recommended that the Board reject the low base bid as submitted by D. E. Wallace Construction Corporation, Alachua, Florida, due to past unsatisfactory contract performance. It is recommended that the Board accept the base bid of $133,345. and award a contract for construction totaling $133,345. to Watson Construction, Gainesville, Florida. Completion of this project shall be within ninety (90) consecutive calendar days from the date indicated in the 'Notice to Proceed.' The bid tabulation clearly notes that "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes." Respondent regularly posts notices of intended decisions concerning bid awards on a bulletin board in the main hallway of the E. D. Manning Annex. A title at the top of the bulletin board identifies it as the location for bid postings. Respondent posts a copy of Section 120.53(5), Florida Statutes, and a copy of the Respondent's Policy DJC--Bidding Requirements below the title of the bulletin board. Respondent has adopted Policy DJC as a rule through a formal rulemaking process. Policy DJC states as follows in pertinent part: The Board shall provide notice of its decision or intended decision concerning a bid solicitation or a contract award. For a bid solicitation, notice of a decision or intended decision shall be given by United States mail or by hand delivery. For any other Board decisions, notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. The notice shall contain the following two paragraphs. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Any person who is affected adversely by the decision or intended decision shall file with the Board a written notice of protest within 72 hours after the posting or notification. A formal written protest shall be filed within 10 calendar days after filing the notice of protest. . . . Failure to file a timely notice of protest or failure to file a timely formal written protest shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Immediately below Policy DJC is a space where Respondent always posts its bid tabulations which include the recommended action on each project and notice that "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes." The bottom of the board, in large letters, contains the following words: "Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes." This permanent bulletin board, read as a whole, contains more than enough information to provide bidders with notice of an intended decision and the time frames within which a disappointed bidder must file a written protest. Although he was not required to do so, Mr. Gable telephoned Petitioner's office on the afternoon of May 30, 1996 to advise its president, D. Wallace, of the recommendation. Petitioner was not available to accept that call. Mr. Gable placed another courtesy telephone call to Petitioner on the morning of May 31, 1996. During that conversation, Mr. Gable informed Mr. Wallace of the recommendation for Respondent to reject Petitioner's bid and accept the next lowest bid. Petitioner's representative inspected the posting board in the afternoon on May 31, 1996. On June 3, 1996, Respondent sent Petitioner by facsimile transmission a copy of the agenda for Respondent's June 4 meeting, items H.1. of which was: H.1. Bid Award for Project SBAC CB436 - Newberry High School Site Improvements. Bids for the construction of this project were received on May 9, 1996. Recommendation will be presented. The seventy-two hour window in which a bidder may file a protest does not include Saturdays, Sundays or holidays. Therefore, the time in which a bidder could have filed a protest of Respondent's intended decision in this case, expired June 4, 1996 at 3:00 p.m. No bidder had filed a written protest at that time. Respondent held a regular meeting on June 4, 1996, at 7:00 p.m. When Respondent considered the bid award for Project SBAC CB 436, Mr. Gable presented the recommendation that the Board reject Petitioner's bid and accept Watson's bid due to Petitioner's past unsatisfactory contract performance. Petitioner's counsel spoke against the recommendation. At that time the Petitioner had not filed any written notice of protest. After discussion, Respondent voted to award the contract to Watson. Respondent and Watson executed a contract for the construction of the Project on June 4, 1996. The next day, on June 5, 1996, at 3:40 p.m., Petitioner filed with Respondent, by facsimile transmission, a Notice of Protest challenging the award of the contract for the Project to Watson. The filing of this protest was untimely. Therefore, Petitioner waived its right to protest Respondent's decision or intended decision on the Project. The basis of Respondent's intended decision and ultimate final decision to reject Petitioner's low bid was due to Petitioner's past unsatisfactory performance. The following facts support a finding that Petitioner was not a responsible bidder. Respondent awarded Petitioner the contract for a previous construction project, Project SBAC CA 149, Additions and Renovations for Terwillegar Elementary School. That project included the construction of a number of school buildings. The contract amount was approximately 5.1 million dollars. The last building in the Terwillegar project became "substantially complete" in September, 1995. In January, 1996, Mr. Gable wrote a letter to Petitioner, informing him of the outstanding punch list items for the Terwillegar project. A contractor must complete punch list items and have them approved prior to "final completion." In the Terwillegar Project, the contract provided for compilation of items on the punch list within thirty (30) days from "substantial completion." As of May 30, 1996, Petitioner had not responded to Mr. Gable's letter about the Terwillegar punch list, nor had it completed the punch list. Many of the items on the list were minor, but some of the items involved the safety or integrity of the building structure. The Terwillegar project contract also contained a project closeout section which listed a variety of documents and other materials that Petitioner had to provide to Respondent as part of the "final completion." Included in the Terwillegar project's closeout were items such as insurance change-over requirements, warranties, workmanship bonds, maintenance agreements, final certifications, a final payment request, consent of surety, maintenance manuals, record drawings, record specifications, record project date, and operating instructions. As of May 30, 1996, Petitioner had not provided any of the Terwillegar project closeout materials to the Respondent. The delay in project closeout, after substantial completion, is completely unacceptable to the Respondent. Prior to the opening of bids in this case, Petitioner filed a civil suit against Respondent seeking approximately $1,500,000 representing the unpaid contract balance, subcontractors' and material suppliers' claims for labor and material, and other delay-related damages on the Terwillegar project. Petitioner's claim that Respondent's intended decision and/or final decision was based on personal animosity and bias against Mr. Wallace is contrary to more persuasive evidence. Specifically, Petitioner's Exhibit 6 is not persuasive evidence of bias. The Petitioner's president, D.E. Wallace, has over 30 years in the construction field, including 22 years as an owner/operator of a general contractor company. He has completed more than 100 projects in north Florida in the past eighteen (18) years, including 30 school board construction projects. Mr. Wallace has worked on approximately nine (9) school board projects in Alachua County. He holds himself out as being "completely familiar and knowledgeable in government and building codes, ordinances, regulations, etc."

Recommendation Based upon the findings of fact and the conclusions of law, it is, RECOMMENDED: That the Respondent enter a final order dismissing the Petitioner's protest as untimely. DONE and ENTERED this 9th day of October, 1996, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of October, 1996. COPIES FURNISHED: David L. Worthy, Esquire 4128 Northwest 13th Street Gainesville, Florida 32609 Thomas L. Wittmer, Esquire 620 East University Avenue Gainesville, Florida 32601 Robert W. Hughes, Superintendent Alachua County School Board 620 East University Avenue Gainesville, Florida 32601-5498 Frank T. Brogan, Commissioner Department of Education The Capitol, Plaza Level 08 Tallahassee, Florida 32399-0400

Florida Laws (3) 120.52120.53120.57
# 4
A. B. DICK PRODUCTS COMPANY OF TALLAHASSEE, INC., vs. BOARD OF MEDICAL EXAMINERS, 88-003418BID (1988)
Division of Administrative Hearings, Florida Number: 88-003418BID Latest Update: Aug. 17, 1988

The Issue Whether the Petitioner was the lowest responsive bidder in Bid No. 88-030, and therefore entitled to the contract award.

Findings Of Fact The invitation to bid in Bid No. 88-030 contains specifications for two separate pieces of equipment which are to be used in the Respondent's print shop. These two items are: a) an offset duplicator with a "swing away," second color printing unit, and b) a camera/platemaker capable of processing silver masters. The Petitioner timely submitted bids on both items. On June 14, 1988, when the bids were opened, the Petitioner was the low bidder upon the equipment. The Petitioner's bids were disqualified by the Respondent, because the equipment offered did not meet the minimum specifications set forth in the bidding documents. A comparison of the minimum specifications for the duplicator and the manufacturer's specifications for the A.B. Dick #9850 duplicator that was bid by the Petitioner reveals the following differences: The specifications require the bidder to provide the Respondent with a duplicator that contains a 1 horsepower, D.C., drive motor. The A. B. Dick #9850 duplicator contains a 3/4 horsepower, A.C., drive motor. A 1/2 horsepower pump motor is required by the specifications. The literature attached to the Petitioner's bid does not reveal whether the A.B. Dick #9850 duplicator contains a pump motor. During the administrative hearing, Charles K. Hill testified that the A. B. Dick #9850 duplicator does have a pump motor. However, the size of the pump motor was not given. The specifications require a conveyor board with a jogging registration system. The A.B. Dick #9850 duplicator does not contain that type of paper feed system. Instead, the Petitioner's duplicator has a direct feed with a registration board. The paper travels only one-half of an inch in the duplicator so a conveyor board and joggers are not needed. Grippers accurately control the paper during the short travel distance. The Respondent specifically chose to require a conveyor board with a jogging registration system on a duplicator because the Respondent wants to have all of the controlling mechanisms it is possible to obtain on a duplicator within a certain price range. The conveyor board with a jogging registration system is a feature that is provided on duplicators in addition to a gripper margin adjustment and feeder bar system. The failure to provide this additional system is an omission as opposed to an alternate provision of a comparable system. The Petitioner submitted a bid upon a duplicator that did not conform in all material respects to the minimum bid specifications. The Petitioner' substituted a less expensive product with fewer features that ran on a different electrical current than the product sought in the invitation to bid. The comparison of the minimum specifications for the camera/platemaker and the A.B. Dick #148 camera manufacturer's specifications reveals the following differences: The specifications state that a reduction range of 60 percent and a magnification range of 125 percent are required. The A. B. Dick #148 camera has a reduction range of 64 percent and a magnification range of 105 percent. The specifications require a copy size of 20 1/2" x 33". The A. B. Dick #148 camera has a copy size of 23 1/2" x 26". The Petitioner submitted a bid upon a camera that did not conform in all material respects to the minimum bid specifications. The Respondent seeks a camera with a greater, and consequently more expensive, resizing range than the one bid upon by the Petitioner. The invitation to bid was liberal enough in its minimum bid specifications to allow competitive responsive bidding on comparable products from various vendors for the equipment and features sought by the Respondent. The bid posted by the Respondent from Standard Graphics, Inc., the apparent responsive low bidder, conforms in all material respects to the invitation to bid.

Florida Laws (4) 120.53120.57287.001287.012
# 5
NELSON P. DAVIS vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003868BID (1988)
Division of Administrative Hearings, Florida Number: 88-003868BID Latest Update: Sep. 28, 1988

Findings Of Fact The Department of Health and Rehabilitative Services currently leases approximately 22,000 square feet of space from Nelson P. Davis. The space is contained in two separate buildings, both located at 417 Racetrack Road, Ft. Walton Beach, Florida. The Department and Davis were involved in a legal dispute involving the currently leased premises, which concluded in 1986 with the entry of judgment in Davis' favor. While some antagonism remains between the parties related to the legal action instituted by Davis, Davis has been an acceptable landlord in all other respects. The current lease expires February 1, 1989. Davis has been aware, since late February or early March of 1988, that the Department would need space in excess of the currently occupied 22,000 square feet, but was not aware of the actual additional space requirements until the issuance of the invitation to bid. In general, the Department's space requirements have increased annually. In response to the anticipated need for additional space, Davis initiated plans for design of a third Racetrack Road building that could meet the additional need, but did not construct the facility. In response to the space requirements of previous years, Davis has constructed additional space. The Department has occupied the additional space in such proportions as to avoid the competitive bidding process, however, the current need for additional space exceeds the maximum which can be leased without competitive bidding. The Department on May 11, 1988, issued an invitation to Bid for approximately 26,165 square feet of space in Ft. Walton Beach, Florida. (HO #1) In response to the invitation, Davis submitted a bid proposal. The Davis proposal, the sole proposal received by the Department, was disqualified by the Department as non-responsive. On June 23, 1988, the sole bid was opened by Joseph Pastucha, HRS District One Facilities Manager, who initially reviewed the Davis bid. Mr. Pastucha identified items of concern related to the responsiveness of the bid and then provided the information to his supervisor, who in turn provided the information to Mr. James Peters. The Department did not contact Davis for further information or to provide the opportunity to correct any defects. James Peters, HRS's District One Manager for Administrative Services has expressed on at least one occasion a desire to avoid entering into business arrangements with Nelson P. Davis. The bases for Peters' opinion is the earlier litigation between the parties. Peters was on the committee which was to have evaluated bids submitted in response to the invitation. However, Peters has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that Peters based his opinion regarding the Davis bid submission solely on the earlier litigation or that any other person involved in the agency's action permitted personal opinions to affect the decisional process. Davis' bid proposal included the two buildings constituting approximately 22,000 square feet located at 417 Racetrack Road which the Department currently occupies, plus a third building of approximately 4,000 square feet. The proposed square footage and lease cost were acceptable. The third building was to be either a planned, unconstructed building located at the 417 Racetrack Road location or an existing building located "7/l0ths of a mile southeast of the present HRS offices," (the off-site building). However, a memorandum attached to Davis' submission stated that he did not intend to use the off-site building for HRS purposes, (HO #2). Further, Davis had previously indicated in conversation with the HRS manager of the 417 Racetrack Road offices that he planned to utilize the off-site space otherwise. On page one of the bid submittal form Davis indicated the address of the proposed location as 417 Racetrack Road. By letter dated July 5, 1988, the Department notified Davis that his bid offering was deemed non-responsive and that the Department expected to readvertise for space in Ft. Walton Beach. The letter made no mention of any opportunity to protest the determination. The statement, "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes," which is required to be included in the notice of agency decision by Section 120.53(5)(a), Florida Statutes, was omitted by the Department. (HO #3) On or about July 7, 1988, Davis contacted the Department of General Services to express his dismay regarding the disqualification of his submittal. A meeting, held on or about July 19, 1988, between Davis and Department representatives, did not alter the Department's position. On or about July 25, 1988, the written notice of protest and request for hearing was filed. The Department forwarded the request to the Division of Administrative Hearings. The letter dated July 5, 1988, advising Davis that his bid was deemed non-responsive enumerated five reasons for the Department's decision. The reasons stated were: No photograph of the proposed facility was submitted as requested; No floor plan of the facility was submitted as requested; A substituted site was submitted Proposed space was not an existing building and was not measurable; Three buildings in bid proposal constitute three locations and are unacceptable. The letter was signed by Chuck Bates, DHRS Deputy District Administrator, District One. The letter was drafted by James Peters. (HO #3) Mr. Bates relied upon Peters and Pastucha to provide information sufficient to justify the disqualification of the bid, and was satisfied that the action was justified prior to signing the letter. Examination of the bid submittal package reveals that Davis failed to acknowledge by initial the requirements of page seven, but that he did, on that page, appropriately respond to questions related to proposed parking spaces being bid. The Department did not base the disqualification of the bid on the failure to acknowledge the page and did not include the failure to initial the page in the stated reasons for deeming the bid non-responsive. Paragraph 9(a) of the bid submittal form requires the submission of a clear photograph of the exterior front of the building. (HO #2) Davis submitted no photographs. Paragraph 9(b) of the bid submittal form requires the submission of a scaled floor plan showing present configurations with measurements. (HO #2) Davis submitted floor plans for the proposed-to-be-constructed building and for the off-site building, but failed to submit floor plans for the two buildings which the Department currently occupies. The bid also failed to include calculations of net rentable square footage related to the omitted floor plans. The letter to Davis stated that an additional reason for disqualification of his bid from further consideration was the submission of a substituted site, (HO #3). The "substituted site" refers to Davis' inclusion of the off-site building not identified in the bid submission other than by the statement that the building was located seven-tenths of a mile southeast of the present HRS office location. No map, street address, legal description, or other identifying information was submitted. The proposal submitted by Davis included plans to construct a third building at 417 Racetrack Road, which was rejected as not measurable. The invitation to bid states that to be considered, the space must be existing, dry and physically measurable, at the time of bid submitted. (HO #1) The proposed third building clearly fails to meet this requirement. While the Department may permit the correction of minor deficiencies, the deficiencies were adjudged by the Department to be more than minor. The proposal's inclusion of nonexisting space (Racetrack Road building #3) or in the alternative a building, the location of which can not be determined from the bid information and which the bidder apparently intends not to provide, is non- responsive to the specifications of the invitation. As to the fifth enumerated reason for disqualification of the bid (three buildings/three locations) the Department and Petitioner presented extensive testimony related to paragraph 3(b) of page 15 of the bid submittal form. Page 15 of the bid submittal form is titled "Evaluation Criteria" and contains a list of weighted factors which were to be used in the evaluation of bids. (HO #2) Paragraph 3(b) states, as one factor for consideration in evaluation, whether the bid provides for the required aggregate square footage in a single building, and continues, "[p]roposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within yards of each other." (HO #2) The space left for the specification of maximum yardage was erroneously left uncompleted by the Department and the Department did not learn of the error until the bid was submitted. The Department's disqualification of the bid on this basis relies on the Department's assertion that the three buildings included in the Davis proposal constitute three locations and that a responsive bid may contain not more than two locations. The Department's position is that "location" and "building" are synonymous and that paragraph 3(b) of the evaluation criteria prohibits consideration of a bid submission including more than two buildings. The Department's position is rejected as arbitrary. The bid package does not state that proposals including more than two buildings will be disqualified. The sole reference to the number of buildings in a responsive bid submission is as stated and contained on the page of "Evaluation Criteria", wherein it is identified with a weighting factor of five percent of total possible points.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-3868BID. DONE and ENTERED this 28th day of September, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3868BID The following constitute rulings on the proposed findings of fact submitted by the parties. Petitioner: Accepted in part. The use of the word "required in the fourth sentence is rejected. The referenced section relates to evaluation factors, not specific requirements. Accepted. Accepted in part. The third building was proposed as either the off-site building or the planned, non-existent space. Accepted. Accepted. Accepted. Rejected as restatement of testimony. Other testimony indicated that Petitioner planned to use the off-site location for non-HRS purposes. Rejected, immaterial. Accepted. Accepted. Accepted as modified. Accepted in part. The use of the word "technical" is rejected. Accepted. Accepted as modified. Accepted as modified. Accepted. Accepted. Accepted. Accepted as modified. Accepted as modified. Accepted as modified. The change between the two invitations to bid was to clarify the obvious confusion related to the use of terms "location" and "building" and was made not to the bid specifications but to evaluation criteria. Rejected as restatement of testimony. Rejected, conclusion of law. Accepted so far as relevant. While the Davis bid was disqualified as non-responsive, the right to reject any and all bids encompasses the disqualification of a bid as non-responsive to the specific requirements of an invitation to bid. Respondent: Rejected, conclusion of law. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Floor plan of the off-site building was submitted showing that the building is essentially a hollow, box-like structure. Accepted. Accepted. Accepted. Rejected, irrelevant. While the usual distance may be 100 yards, the actual bid specifications do not state such. Further the sole reference to the distance between "locations" was contained in evaluation criteria. At no time prior to the June 23, 1988 bid opening did the Department attempt to identify the preferred distance between locations. Accepted. Accepted. Accepted. COPIES FURNISHED: Bruce A. McDonald, Esquire Post Office Box 887, Suite 105 151 Mary Esther Cutoff Mary Esther, Florida 32569 Rodney M. Johnson, Esquire Acting District One Legal Counsel Post Office Box 8420 Pensacola, Florida 32505-8420 Joseph J. Pastucha 3300 North Pace Boulevard Room 109 Town & Country Plaza Pensacola, Florida 32505 Jan Kline 417 Racetrack Road Ft. Walton Beach, Florida 32548 James V. Peters Department of General Services 160 Governmental Center Fourth Floor, Room 412 Pensacola, Florida 32501 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Tom Batchelor Staff Director House HRS Committee The Capitol Tallahassee, Florida 32399-1300

Florida Laws (2) 120.53120.57
# 6
GELCO SPACE vs. LAKE COUNTY SCHOOL BOARD, 89-002968BID (1989)
Division of Administrative Hearings, Florida Number: 89-002968BID Latest Update: Sep. 12, 1989

The Issue The issues in dispute are those associated with the invitation to bid in Project No. 565 by the Respondent as responded to by Petitioner and Intervenor. Among the specific questions to be answered are those concerning Petitioner's allegation that the Respondent allowed the Intervenor to materially alter its bid response to clarify the line item associated with tear down and return delivery for the relocatable classrooms that were being leased under the terms of the bid invitation and that alteration was allowed for the provision of canopies or awnings associated with the entrances to the relocatable classrooms. Questions are raised, first whether the Intervenor's bid response is in compliance with the provisions of Chapter 6A-2, Florida Administrative Code and, second whether the bid response of the Intervenor provides sufficient detail to allow the Respondent to understand the nature of the item, in this instance, the relocatable classroom, which the Intervenor proposed to provide in response to the invitation to bid. Finally, the general question is raised whether the Petitioner or Intervenor is the lowest responsible qualified bidder.

Findings Of Fact On April 28, 1989, Respondent sent out an invitation to bid in Project No. 565. It sought responses from a number of vendors and asked that those vendors on or before July 1, 1989, be prepared to deliver 49 portable classroom units. The arrangement which Respondent contemplated in the invitation was rental of the portable classrooms under a lease for a period of one year. It was intended that the portable classroom units would be delivered to various locations throughout Lake County, Florida. The bid opening was to occur on May 8, 1989, at 2:30 p.m. The request for bids included a lead sheet and in the second paragraph of the instructions on that lead sheet it was stated: All terms and conditions below are a part of this bid request and no bids will be accepted unless all conditions have been complied with. Rights are reserved to reject any and all bids and to waive all technicalities. It was further stated: DIRECTIONS FOR SUBMITTING BIDS ARE AS FOLLOWS: * * * 5. Samples must be submitted with bid where required. On other items descriptive literature with complete manufacturer's specifications in sufficient detail to indicate clearly the item bidder proposes to furnish must accompany the bid. NO BID will be considered without this data. Equipment offered as equivalent to the specific brand must be equivalent in quality of materials, workmanship, effect and corresponding in function and performance When the requirements set out in the preceding paragraph to the Recommended Order are read in the context of all other requirements set forth in the bid invitation, they are found to be consistent with those additional requirements. On the second page of the instructions for the Invitation to Project No. 565 was found a section entitled "Lease/Rental of Portable Classrooms" which stated: The Lake County School Board is requesting bids for Lease/Rental of Portable Classroom units meeting 6A-2 requirements at various locations. Units must meet Florida Code, SBCC Code and 6A-2 Department of Education code for structures of this type. We are requesting prices for 49 units for one-year rental, to be set-up at various locations. Steps, ramps, electrical, water or sewer hooks are not required. This work will be done in- house by Lake County School Board staff. A minimum of three 4' x 8' melaminc marker boards, two 4' x 4' tackboards, one 8 lb. fire extinguisher (2A40 BC) and junction box with stub-out for F/A and pullbox must be installed in each unit. Other provisions within the bid invitation describe the nature of the bid performance security that was incumbent upon each bidder, the need for insurance, nature of the insurance coverage expected and information related to lease provisions, purchase provisions, parts warranties and prices. The bid invitation pointed out that each bid packet furnished by the vendors should provide proof of insurance, a sample lease/rental contract, brochures and specifications of construction materials and contents and a 5 percent bid bond in a separate sealed envelope attached to the outside of the bid. Four vendors offered their responses to this invitation, among them Petitioner and Intervenor. The additional bidders were Diamond Engineered Space and Williams Mobile Offices. The bid opening occurred on May 8, 1989, as advertised. That bid opening was under the auspices, Provisions 6.05(7) and 6.87, Lake County School Board Policies Manual, which describe school construction bid procedures and contemplate awarding contracts to the lowest responsible qualified bidder meeting specifications with regard for the quality of the product being offered by the bidder, its suitability for the needs of the school system, delivery terms, service and past performance of the vendor. Some consideration is given to local vendors, under the provisions, but this has no role to play in this dispute. Rule 6A-2.016, Florida Administrative Code, also speaks to the procedures to be followed by the Respondent in this bid invitation process. The bids were opened, announced and tabulated. It was revealed, in turn that Diamond Engineered Space's price quote was $299,292.92; Petitioner's was $246,563; Intervenor's was $236,166 and Williams Mobile Offices' was $367,420. All vendors had made a timely response to the invitation to bid. In the course of the examination of the bid materials, the price sheet of the Intervenor came into question. This price sheet may be found as part of the Petitioner's Exhibit No. 1 admitted into evidence. In particular, item 3 on the price sheet was debated. In that section, the Intervenor's response stated: 4(b) Tear Down, and Return Delivery $350.00 (50 mile average at $1.50 per side) 4(c) Other ($200.00 Mat'l & Labor)$ NONE Given the parenthetical remarks found within the response, Norma Hale who was the Purchasing Agent for the School Board and in charge of the bid opening asked of Mike Connolly, who was attending the bid opening for the Intervenor, whether the quoted price was a firm price. Herman Kicklighter, the Director of Facilities and Maintenance who attended the bid opening for Respondent also made inquiry concerning whether the tear down charge was a variable or fixed price. These questions were raised against a background circumstance in which some sites may have been further away than is contemplated by the 50 mile average set out in the parenthesis. It was not the intention of the Intervenor to leave the parenthetical information on the bid response and Connolly was caught off guard by this revelation. He had not prepared the bid submission by the Intervenor. Nonetheless, he informed the persons assembled that the price quotation of $350 was a firm price. This information was revealed after the Petitioner's bid had been opened. After some discussion, school officials at the bid opening were convinced that the $350 price was a firm price. Having considered the evidence, the $350 price is found to be a firm price. Moreover, this finding is made recognizing that the Intervenor was never allowed to remove the parenthetical remark from the bid response. That removal would have constituted an alteration of the bid response. If one examines the bid response and multiplies the 50 mile average times $1.50 per side, the amount is $150 plus $200 for material and labor for a total of $350 as reflected in the cost per unit designation. This is not considered to be a variable price quotation. Another topic that was brought up during the course of the bid opening concerned the question of whether the portable classroom units that were to be supplied by Intervenor included awnings or canopies over the door entrances. Petitioner was and is of the opinion that the awnings and canopies are required. It is not clear from a review of Petitioner's Exhibit No. 4 admitted into evidence, which is the Petitioner's bid material, whether Petitioner intended to supply awnings or not. It is clear that the bid material of the Intervenor did not include awnings. Kicklighter asked Connolly if the Intervenor's bid included awnings and the essence of Connolly's response would indicate that the bids did not include awnings. Connolly was allowed to leave the room to make a telephone call to his office to further inquire concerning the response of the Intervenor as it related to awnings. While he was gone, the School Board checked with the Department of Education in Tallahassee on the topic of whether Chapter 6A-2, Florida Administrative Code required awnings in this application. In a conversation with William Moncreath, a certified architect with the Department of Education, Kicklighter was lead to believe that awnings were not needed. Connolly then made this known to the persons in the bid room. Connolly was not present at that time. Connolly then returned and told Kicklighter that the Intervenor would furnish awnings. This comment was met by a remark by Mr. Kicklighter to the effect that it looked like that the Intervenor and the School Board would be doing business. To allow the Intervenor to alter its bid response to include awnings that were not shown in the bid response, would be a material alteration if awnings were required. They are not. Therefore, this discussion concerning the awnings is a moot point. On May 9, 1989, the School Board determined to award the contract to the Intervenor. This met with a timely notice of protest from the Petitioner on May 12, 1989, and in a Formal Written Protest on May 22, 1989. Having been unable to resolve the matter amicably, the case was forwarded to the Division of Administrative Hearings for resolution of the dispute. Notwithstanding the pendency of the case before the Division of Administrative Hearings, based upon a claim of emergency, the lease agreement was entered into between the Respondent and Intervenor on June 15, 1989. In addition to the assertions by the Petitioner concerning whether the quotation for tear down and return delivery was a firm price and whether awnings are required, Petitioner calls into question whether the Intervenor has complied with paragraph 5 on the lead page concerning directions for submitting bids and the third paragraph on the next to the last page of the bid invitation concerning the things that the bid packet must include. Petitioner also questions whether Intervenor has adequately established that it will meet applicable requirements of Chapter 6A-2, Florida Administrative Code. Contrary to the opinion held by the Respondent and Intervenor, paragraph 5 on the lead page to the invitation to bid is a requirement that must be complied with. It is not an item to be ignored, nor it is considered to be superceded by any of the more specific references to requirements that are announced in the subsequent pages to the invitation to bid. The bidders had to make proof of insurance and to offer a sample lease/rental contract and provide a 5 percent bid bond. All bidders complied with those requirements. Petitioner complied with all other requirements as announced in the bid invitation as well. The question is whether Intervenor as a general matter has provided descriptive literature with the complete manufacturer's specifications in sufficient detail to clearly point out what item the bidder is proposing to furnish and whether indeed the item does comply. This is also described as brochures and specifications of construction materials and contents. Additional items that must be provided by Intervenor are those contemplated under Chapter 6A-2, Florida Administrative Code associated with relocatable classroom space and related construction codes made mention in the instructions to bidders under that portion referred to as "Lease/Rental of Portable Classrooms" and the last paragraph of that set of instructions associated with melaminc markerboards. Instead of relying upon clearly delineated information within the response of the Intervenor by way of literature with complete manufacturer's specifications to merely show the nature of the product or item that the Intervenor was proposing to furnish, Respondent, and in particular its principal advisor, Mr. Kicklighter, chose to rely upon certain self-serving statements made by the Intervenor in the course of its bid materials. This refers to an attachment to the sample lease agreement which is a fourth page in that set of materials stating: FLORIDA CODED BUILDING; Built to Comply with the Florida Department of Education's 6" A" .2 Specifications. With prints certified as a Classroom Building which can be located anywhere in Florida. (Zoning permitting). To Kicklighter this means Intervenor'S promises to build the classroom space in accordance with Chapter 6A-2, Florida Administrative Code and to provide certified prints and that provision would overcome any infirmities or paucity of information about the product in his mind. Kicklighter took further solace from correspondence of October 17, 1988, from David Toner, Director of Facilities Planning/Operation of St. Johns County, school Board in Florida which praises the Intervenor's performance in the lease of 28 relocatable classrooms in that county and states that plans and specifications were sent to Tallahassee for approval and installation met Chapter 6A-2, Florida Administrative Code. This is hearsay information and does not establish anything relevant in the matter of whether Intervenor will do as well for the Respondent as it appears to have done for St. Johns County School Board, if Intervenor doesn't first show that it has complied with this invitation to bid. It has not. It is not so much that Kicklighter attached no significance to the substantive information provided by the Intervenor in its response to the invitation, it is the fact that a clear understanding of the impression of Kicklighter concerning that substantiative information is overshadowed by his reliance upon the promise to provide certified prints and the remarks of his counterpart in the St. Johns County School Board as a principal reason for believing that the Intervenor's response was sufficient. That reliance was ill advised. It would be different if certified plans had been provided. They were not. The promise to provide them is outside the bid experience and is unacceptable as a means of compliance with the bid invitation. Looking at what was provided, there is a single sheet entitled Proposed Classroom which gives basic dimensions and information about frame and floor, walls, windows and doors, exterior covering, roof, electrical, A/C and heat, and restrooms. Within this document are found references to a 2600 rpm fan which could well mean 2600 cfm fan, the latter of which would meet requirements and the former which would not. Correction of this item would not be a material alteration. Likewise, correction of the reference of 1" x 4" top plate to 2" x 4" top plate to meet specifications would not be a material correction. in that this 1" x 4" reference as opposed to 2" x 4" reference could well be a typographical error. Within the bid documents by Intervenor there is a sheet referred to as Typical H.C. Toilet Rooms. Toilet Room A relating to Florida and Toilet Room B relating to Georgia. The outside dimensions of the Florida toilet room do not coincide with the Proposed Classroom sheet that has been mentioned. While the outside dimensions of the Georgia toilet room on this document appears the same as in the Proposed Classroom sheet that has been referred to, the configuration in the proposed classroom sheet and that of the sheet related to toilet rooms most recently under discussion are different. Under the circumstances, it is difficult to know what the Intervenor intends by way of toilet room facilities and the response is inadequate to meet the requirements of the bid invitation. This is a material deviation. There are some partial sheets within the bid materials which appear to be the first half of the Classroom Sheet that has been referred to and being duplicates of that information no particular significance is seen in those matters. There is material referred to U.S.G Acoustical Finish. There are further materials related to interior fixture finishes. There is a brochure with pictures showing the outside of a building and the interior of a portable classroom building. This document does not give any specific information as to types of materials, dimensions, etc. There is a document of May 5, 1989, from Descom directed to Mr. Connolly promising to make available replacement parts for 49 classrooms if Descom manufacturers them. There is information provided on the fourth page which is the attachment to the Lease Agreement which makes reference to frames being provided "per code." This page gives certain dimensions and design information related to the floors, walls and petitions and roofs. There is another two page document that shows miscellaneous equipment such as exit signs, melaminc marker boards, tack boards, emergency light with battery and backup and fire extinguisher. These items do not show manufacturer's name. There are references to various provisions within Chapter 6A-2, Florida Administrative Code where Intervenor claims that these items will correspond to. There are comments made on this page about the foundation of the portable classroom that are unclear. On the second page of these materials are found references to plumbing to include plumbing, related to the bathroom dealing with vinyl covered gypsum wall covering, the commode, wall mounted lavoratory, 90 cfm ceiling vent fan and mirrors and accessories. Again, the manufacturer's names are not given. A reference is made under the ceiling vent fan to a rule provision of Chapter 6A-2, Florida Administrative Code. There is reference under electric to two 100 amp load centers with mains and 12/2 copper romex. There is a reference there to 15-440 fluorescent light fixtures. Again, there is the reference to the 2600 rpm through the wall ventilation fan and 2 adequate wall receptacles. HVAC references a three ton Bard wall mount with heat strips and a ceiling supply duct system with STD return air system and a timer for the air conditioner. There is a reference to exterior materials, windows and doors and insulation factors. Again, some of these items under the bathroom, electric and HVAC reference sections within Chapter 6A-2, Florida Administrative Code. Other than the fluorescent light fixtures and HVAC Bard unit, manufacturers names cannot be discerned from this information submitted. The bid invitation calls for buildings of 24' x 36'. The response by Intervenor provides for a building which is 23' x 36', a material deviation from the requirements of the specifications. The light fixture is a Metalux Manufacturing Company surface mounted fixture of four forty watt bulbs. According to Gareuth Eich, an architectural expert whose opinion testimony is accepted, this light fixture does not comply with Rule 6A-2.064, Florida Administrative Code. This is a material deviation. The statement of plans do not show compliance with Rule 6A-2.059, Florida Administrative Code, as to exterior lighting. This is a material deviation from the specifications. The electrical specifications information provided by the Intervenor in the Proposed Classroom sheet shows two 100 amp panels that are separated, whereas specifications shown on the two-page printed informational sheet under electric speak in terms of a 100 amp load center with main disconnect. Regardless, requirements of Lake County are such that a main disconnect panel is required on the exterior of the portable classroom, the installation of which would be the responsibility of the school board. Thus, if two panels were employed inside they would become subpanels and not in conflict with the national electric code as spoken to in Rule 6A-2.065, Florida Administrative Code. On the other hand, it is not clear which alternative in panel design and service Intervenor intends to offer and this is a material deviation from the bid requirements. The information provided concerning the nature of the foundation for the portable classroom units is inadequate. This is a material defect in the response to the bid specifications. Gareuth Eich, Hugh Stump, President of Southern Structure, a company that manufactures portable classroom units and a person who is familiar with bidding procedures associated with those units and Paul Crum, an architect testified on behalf of the Respondent. All questioned the quality of information submitted by the Intervenor in terms of specificity, to meet paragraph 5 on page one of the invitation to bid and particulars that relate to certain requirements of Chapter 6A-2, Florida Administrative Code to this bid invitation. Having considered the remarks and the testimony of others and the exhibits, the Intervenor's response cannot be seen as providing manufacturer's specifications in the necessary detail to indicate clearly the item that bidder proposes to furnish as called for in paragraph 5 of the lead page of the invitation to bid. The response has also failed to meet certain provisions of Chapter 6A-2, Florida Administrative Code in the manner described. The quoted size of the portable building is too small in overall dimension. These are material shortcomings sufficient to cause the rejection of the Intervenor's bid response. Therefore, the Petitioner is in fact the lowest responsible bidder. Although Respondent and Intervenor have contracted for the delivery of the portable classroom units and they are located at the various sites within Lake County, Florida called for in the contract, Petitioner is theoretically prepared to provide classroom units in accordance with the requirements of the specifications.

Recommendation Under authority of Section 120.57(1), Florida Statutes, a formal hearing was held in this case on July 10-11, 1989 in Tavares, Florida. Charles C. Adams was the Hearing Officer.

Florida Laws (5) 120.53120.57120.68120.736.05
# 7
PARTY TIME SPECIALTIES, INC. vs. DEPARTMENT OF LOTTERY, 89-002061BID (1989)
Division of Administrative Hearings, Florida Number: 89-002061BID Latest Update: Jun. 02, 1989

The Issue Whether DOL should accept either the bid Red Enterprises submitted for T- shirts, in response to invitation to bid No. 89- 026-LOT/Ten/A, or the bid submitted by Party Time, or neither?

Findings Of Fact By invitation to bid No. 89-026-LOT/TEN/A (the ITB), petitioner's Exhibit No. 2, the DOL originally solicited bids from suppliers of beach towels, men's caps ("golf style, sewed back") and canvas sport bags. By an addendum dated March 24, 1989, the invitation was expanded to include 10,000 men's T- shirts. Petitioner's Exhibit No. 2. Three bidders responded: Party Time, Red Enterprises and Bagley Advertising. Respondent's Exhibits Nos. 1, 2 and 3. Only Party Time and Red Enterprises bid on the T-Shirts, Respondent's Exhibit No. 3; Petitioner's Exhibit No. 1, and Party Time's bid was low. Petitioner's Exhibit No. 1; Respondent's Exhibit Nos. 1 and 2. Red Enterprises's bid was responsive to the ITB. With the required paperwork, Red Enterprises submitted a sample T-shirt, along with samples of the other items. Although Party Time submitted samples of caps and towels, it did not submit a sample T-shirt. DOL rejected Party Time's bid on T-shirts for this reason, and announced its intention to award the T- shirt contract to Red Enterprises. Petitioner's Exhibit No. 1. ITB Provisions In paragraph 2.1, the ITB states, under the heading "Samples of Products to be submitted with Bid": SECTION 2: ITEMS REQUESTED 2.1 Samples of Products to be Submitted with Bid. Each bidder shall submit with its bid a sample of the product for each item bid. The samples shall be made of the materials to be used in the final product, if the bidder is successful, and shall be product identified. The samples shall be inspected to determine whether they meet the minimum specifications required. Samples of items, when called for, must be furnished free of expense on or before bid opening time and date, and if not destroyed may, upon request, be returned at the bidder's expense. Each individual sample must be labeled with bidder's name, manufacturer's brand name and number, bid number and item reference. The Department reserves the sole right to determine whether the sample meets or exceeds the quality requirements of the specifications. All such determinations made by the Department are final. (emphasis supplied) Later on the ITB lists all items which comprise the bid, without mentioning samples: 3.1.5 Bids should be presented in the following sequence: Identification of Respondent per Section 3.2 of ITB. Authorized representative of Respondent per Section 3.3 of ITB. Bidder's Affidavit (Attachment A) and Registration Form (Attachment B), if applicable, or notation that said Form is already on file with the Department. Price Sheet per Section 3.5 of ITB. (Attachment C). Florida-licensed per Section 3.6 of ITB. Minority Certification per Section 3.9 of ITB. But still later the ITB explicates the importance of complying with requirements which use "shall . . . except to indicate simple futurity": SECTION 4. MANDATORY REQUIREMENTS The Department has established certain mandatory requirements which must be included as part of any submitted bid. The use of "shall", "must" or "will" (except to indicate simple futurity) in this ITB indicates a mandatory requirement or condition. The words "should" or "may" in this ITB indicate desirable attributes or conditions, but are permissive in nature. Deviation from, or omission of, such a desirable feature will not by itself cause rejection of a bid.... Finally, the ITB specifies DOL's intentions, in the event of a bidder's noncompliance with mandatory requirements: Proposal Submission Only bids submitted in the time frame stated herein and with the content required above will be reviewed and considered by the Department. Review Criteria If Respondent's bid does not meet all the mandatory requirements the bid may be rejected by the Department as nonresponsive. The Department seeks to contract for the items described herein with the responding firm who submits the lowest and best bid. Responsive bids will be evaluated and judged by the Department based on cost. In Section 5.3, the ITB refers to "the lowest and best responsive bid," and Attachment C states, "Bid [e]valuation and award of contract will be based solely on the unit price." The ITB put reasonable bidders on notice that DOL expected bidders to furnish samples of items on which they bid. Except for T- shirts, Party Time did submit samples of everything on which it bid.

Recommendation It is, accordingly, RECOMMENDED: That DOL award the contract for 10,000 men's T-shirts to Red Enterprises. DONE AND ENTERED this 2nd day of June, 1989, in Tallahassee, Leon County, Florida. ROBERT T. BENTON, II, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of June, 1989. APPENDIX Petitioner's proposed findings of fact Nos. 1 through 15 have been adopted, in substance, insofar as material, and to the extent they are more than mere argument. Respondent's proposed findings of fact Nos. 1, 2, 4, 5, 6, 7, and 8 have been adopted, in substance, insofar as material. With respect to respondent's proposed finding of fact No. 3, the evidence did not establish that Party Time did not have a sample. COPIES FURNISHED: Rebecca Paul, Secretary Department of Lottery Capitol Complex Tallahassee, FL 32399-4002 Nan Mancha Red Enterprises 1308 High Road Tallahassee, FL 32304 Linda Bagley Wiggs Bagley Advertising 4406 South Florida Avenue Suite 17 Lakeland, FL 33813 Louisa E Hargrett, Esquire Department of Lottery Capitol Complex Tallahassee, FL 32399-4002 John E Fuller Party Time Specialties, Inc. 12-14 East Bay Street, Suite 2101 Jacksonville, FL 32202

Florida Laws (3) 120.53120.57288.702
# 8
M K MECHANICAL, INC. vs PALM BEACH COMMUNITY COLLEGE, 93-000933BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 22, 1993 Number: 93-000933BID Latest Update: Aug. 19, 1993

Findings Of Fact Facts based on stipulation These proceedings concern Petitioner's Bid Protest in connection with that certain project known as Chiller Installation, Glades Campus, Project NO. 9237, PBCC No. 6812. Petitioner has taken all steps necessary to perfect its bid protest in a timely manner and has standing to bring this bid protest. Petitioner and Respondent met and were unsuccessful in an attempt to resolve the bid protest as required by Section 120.53(5), Florida Statutes. M. K. Mechanical, Inc., a Florida corporation, is a State of Florida Certified Mechanical Contractor and as such was a "Qualified Bidder." The original specifications for the subject project contained few electrical specifications and were silent as to how an electrical contractor was to be licensed. The bid was due on Tuesday, January 12, 1993, at 2:00 p.m. On Friday, January 8, 1993, at 3:42 p.m., via facsimile transmission, M. K. Mechanical, Inc., received supplementary electrical specifications, thirty (30) pages in length. Contained in these supplementary specifications, for the first time, was a requirement that the electrical subcontractor had to be "locally" licensed. M. K. Mechanical, Inc.'s, primary place of business is in Edgewater, Volusia County, Florida. M. K. Mechanical, Inc.'s, submitted bid was proper in all respects other than an electrical subcontractor's name was not given, instead "to be determined" was inserted. M. K. Mechanical, Inc., submitted the lowest bid. Electrical subcontractor is a "major" subcontractor on this project. The sole basis for the decision by Respondent that Petitioner's bid was "non-responsive" was the failure to list an electrical subcontractor. Additional facts regarding bid specifications The bid specifications include the requirement that bidders list all "major subcontractors" and that the category of "major subcontractors" includes electrical subcontractors. Section 5.2.1 of the Contract Documents within the Bid Specifications provides as follows: Unless otherwise required by the Contract Documents or the Bidding Documents the Contractor at the bid opening shall furnish to the Owner and Architect Form 00420, a written list of the major Subcontractors; Site Utilities, Structural Concrete, Masonry, Structural Steel & Steel Joists, Plumbing, HVAC, Electrical and Roofing, who he proposes to use on this work.

Recommendation On the basis of all the foregoing, it is RECOMMENDED that Palm Beach Community College enter a Final Order in this case denying the protest of the Petitioner, M. K. Mechanical, Inc., and awarding the contract in Project No. 9237, PBCC No. 6812 to the Intervenor, Hill York Corporation. DONE AND ENTERED this 15th day of July, 1993, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of July, 1993. COPIES FURNISHED: Sid C. Peterson, Jr., Esquire DeLoach & Peterson, P.A. Post Office Box 428 New Smyrna Beach, Florida 33170 James M. Adams, Esquire Gibson & Adams, P.A. Post Office Box 1629 West Palm Beach, Florida 33402 Herbert L. Dell, President Hill York Corporation Post Office Box 350155 Fort Lauderdale, Florida 33335 The District Board of Trustees Palm Beach Community College 4200 Congress Avenue Administration Building Lake Worth, Florida 33461 Attention: Mr. Dick Jones

Florida Laws (2) 120.53255.0515
# 9
NAPLES BUSINESS EQUIPMENT AND SYSTEMS, INC. vs. LEE COUNTY SCHOOL BOARD, 88-000690BID (1988)
Division of Administrative Hearings, Florida Number: 88-000690BID Latest Update: Mar. 30, 1988

The Issue The first issue to be determined is whether the BOARD can reject all bids, with or without cause. The second issue is to determine if the BOARD is required to have cause, was there a sufficient basis for the rejection of all bids in Bid NO. 3996?

Findings Of Fact On December 14, 1987, the BOARD sent invitations to bid to a list of approved vendors in Bid NO. 3996. The purpose of the invitation was to obtain the lowest responsible bid on a purchase of one hundred and fifty typewriters. The bids were to be submitted prior to January 11, 1988 at 2:00 P.M.. They were opened by the BOARD on the same day. OFFICE did not receive an invitation to bid despite its request to be placed on the approved vendor's list in November of 1987. When OFFICE learned of the outstanding invitation to bid, its representative, Mr. Richard Foss, went to the BOARD's Purchasing Department and requested a bid package. The bid documents given to OFFICE mistakenly gave January 14, 1988 at 2:00 P.M. as the deadline for the bid submission. Because of the later date given by the BOARD to OFFICE, the company's bid was received after the opening of the bids. When the results of the bidding were made known at the public bid opening, NAPLES bid was the lowest received. On January 14, 1988, after 10:42 A.M., it was discovered by the BOARD that OFFICE's bid price was lower than the price submitted by NAPLES. At this time, NAPLES bid had not yet been accepted by the BOARD, and no formal announcement had been made awarding the contract to NAPLES. During the BOARD's Purchasing Department's bid analysis, a request was made to reject all bids in Bid NO. 3996. The reason given by Purchasing for the request for rejection was that the specifications were being revised. The bids were rejected on the same date. The written reason sent to the vendors on January 14, 1988 for the bid rejection was that one vendor had been given an incorrect opening date. Attached to the written notice to the vendors was a new bid invitation for Bid NO. 4013. The BOARD explained its mistake was unfair to the one vendor. A new bid opening date was given of February 1, 1988. On January 14, 1988, in addition to the required bid documents, OFFICE submitted a letter which listed additional offerings or incentives that OFFICE would give the BOARD if OFFICE was awarded the contract. These additional purchasing incentives were: wall charts and teacher/student manuals for each typing classroom in the county. OFFICE also informed the BOARD that one of the BOARD's own service personnel was already trained in the servicing of Swintec typewriters. The bid submitted by OFFICE did not meet either the weight or the print wheel specifications as set forth in Bid NO. 3996. The specifications as written in Bid NO. 3996 were not written to eliminate all other typewriters but the Brothers 511-11. Weight specifications required were below the Brother's minimum weight, and at least two other manufacturers provide protected drop-in cassette print wheels in electronic typewriters. The Invitation to Bid contained specific provisions which encouraged the bidding of typewriters other than the Brother 511-11, and set up procedures under which other typewriters, which substantially meet the specifications, could be reviewed on their merits. NAPLES was the lowest responsible bidder for the electronic typewriter contract in the prior school year. The BOARD had rejected all bids at that time because of the decision to consider a different brand of typewriter once bids were opened. A notice of protest was filed by NAPLES, and the BOARD agreed to honor NAPLES bid and award the company the contract. The BOARD revised its bid specifications from last year prior to its solicitations for bids in Bid NO. 3996. The protected drop-in cassette print wheel and the weight requirements were two new technical specifications. During the hearing, the BOARD was unable to determine whether the weight factor or the protected drop-in cassette print wheel requirement will continue to be included in future revisions of the specifications.

Recommendation Based on the foregoing, it is RECOMMENDED: That the BOARD reject the bid submitted by OFFICE as it was nonconforming and sought an advantage not enjoyed by the other bidders. Reinstate the bids which were rejected in Bid NO. 3996, consider the bids, and make an award of the contract to NAPLES. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. VERONICA D. DONNELLY Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: Stephen Emens, President Naples Business Equipment and Systems, Inc. 859 4th Avenue South Naples, Florida 33940 Harry A. Blair, Esquire 2138-40 Hoople Street Ft. Myers, Florida 33901 Richard Foss, Typewriter Sales Manager 8A-Del Prado Boulevard Cape Coral, Florida 33904 Karl Engel, Superintendent Lee County Public Schools The School Board of Lee County 2055 Central Avenue Fort Myers, Florida 33901

Florida Laws (2) 120.53120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer