Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
JAMES D. ENGLISH, JR., AND CYPRESS CREEK PARTNERSHIP vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT AND TELEGRAPH CYPRESS WATER MANAGEMENT DISTRICT, 92-006900 (1992)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 18, 1992 Number: 92-006900 Latest Update: Jul. 10, 1995

The Issue Whether the application of Telegraph Cypress Water Management District to modify an existing surface water management system permit should be granted.

Findings Of Fact The South Florida Water Management District (District) is a public corporation in the State of Florida existing pursuant to Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, Florida Statutes, and Chapter 40E, Florida Administrative Code. The District is a multipurpose water management agency with principal offices in West Palm Beach, Florida. Telegraph Cypress Water Management District (TCWMD) is a water control district organized pursuant to Chapter 298, Florida Statutes. Agricultural operations have been conducted within the TCWMD for more than 30 years by the landowner, Babcock Florida Company. The TCWMD is the permittee of record. James D. English, Jr., owns, along with other members of his family, an orange grove and pasture in Lee County, Florida. The English family has owned the property for approximately 120 years. On November 10, 1992, James D. English, Jr., and the Panacea Timber Company filed a petition for formal administrative hearing challenging the District's intent to issue SWM Permit Modification No. 08-00004-S. Cypress Creek Partnership is a Florida General Partnership of which James D. English, Jr., is a principal. The partnership engages in agricultural activities in Lee County, Florida. The Alva Cemetery, Inc., is a Florida not-for-profit corporation which owns and manages a cemetery facility in Lee County Florida. The cemetery has been in active use for approximately 120 years. In recent years, Alva Cemetery has experienced occasions of excess water encroaching onto the cemetery property. On November 12, 1992, Alva Cemetery, Inc., filed a petition for administrative hearing challenging the District's intent to issue SWM Permit Modification No. 08-00004-S. James D. English, Jr., Cypress Creek Partnership and Alva Cemetery, Inc., are herein referred to as Petitioners. The TCWMD and the Petitioner English share a common property boundary. The Alva Cemetery is surrounded by the English property. All lands involved in this matter historically drain towards the Caloosahatchee River. The TCWMD includes approximately 89,120 acres of land located in Charlotte and Lee Counties, Florida. The land uses within the TCWMD include agricultural, cattle, and timber operations. Generally, the fields have been leased to third party farmers who use the field for several years. When the fields are not actively farmed, they are returned to a fallow state and used as pasture land until fertility is restored at which time they are reactivated for farming. Active farms fields are generally surrounded by a perimeter ditch and dike system. Pumps may be used to water and de-water the fields. When the field is returned to a fallow state, the ditch and dike system are not maintained and become less prominent either by action of weather or by intent. Pumps are not present. All of the TCWMD lies generally north to northwest of the property owned by the Petitioners. Surface waters flow onto the Petitioners' lands from the north. The Telegraph-Cypress system is unique and is the largest of its kind in South Florida Water Management District jurisdiction. The TCWMD system includes storage/detention facilities, control structures, pumping stations and an extensive network of internal canals. There are nine separate water management basins within the TCWMD. The Petitioners asserted that the water management basins identified by the District and the TCWMD are incorrect. The greater weight of the evidence establishes that the District's identification and delineation of the nine basins is based on historical hydrologic characteristics of the TCWMD and is a reasonable determination of basin boundaries. The land encompassed by the instant application for permit modification includes three of the nine basins and encompasses approximately 51,400 acres of the TCWMD. Surface water discharge from the relevant farm fields flows via the internal canal network and sheet flow to the three common detention basins: Telegraph Swamp, North Telegraph Swamp ("Telegraph North") and Curry Lake. The Telegraph North basin lies to the north of and discharges into the Telegraph Swamp basin and includes 13,799 acres of which 4,094 acres are farm fields. The drainage into the Curry Lake basin does not impact either the Telegraph North or Telegraph Swamp basins or the Petitioners' properties. The evidence establishes that as to the Telegraph North and Curry Lake drainage basins, the permit modification meets applicable permitting criteria. There is no credible evidence to the contrary. Telegraph Swamp is the largest of the three relevant detention systems. The Telegraph Swamp basin includes a total of 32,707 acres of which 4,381 acres are farm fields. Telegraph Swamp is a 4,390-acre wetland vegetated by cypress trees and sawgrass, with a base of muck soils, humus, topsoil, leaf litter and other organic material. Located at the south end of Telegraph Swamp are surface water management control structures (the Big Island Dike) built in 1975 and permitted in the original 1980 permit. The structures include three broad-crested weirs and one flash-board weir. Telegraph Swamp has been compared to a "sponge" capable of absorbing vast quantities of surface water discharges within the TCWMD before the control structures at the south end of the swamp are over-topped. Water discharged from the control structures flows through canals and creeks to the Caloosahatchee River. During storm events water is discharged over the control structures and into a swamp area south of Big Island Dike. From there, the water flows southerly, into Telegraph Creek, Big Island Canal and Cypress Creek and then into the Caloosahatchee. The Petitioners expressed concern that TCWMD could inappropriately discharge water from the control gates in the Telegraph Swamp weir. Based on evidence admitted at the hearing, the permit modification should include the following special condition: Discharge structures in the Telegraph Swamp basin shall remain fixed so that discharge cannot be made below the control elevations, except that structure gates and weirs may only be removed during emergency conditions upon notification to and consent by the District's Fort Myers Service Center regulatory area manager or designee. The Basis of Review for Surface Water Management Permit Applications within the South Florida Water Management District--September 1989, incorporated into Chapter 40E, Florida Administrative Code, provides the applicable water quantity permitting criteria relevant to this proceeding. The Petitioners assert that the control gates are required to be locked in accordance with Basis of Review section 3.2.4.1.b, which states: Discharge structures shall be fixed so that discharge cannot be made below the control elevation, except that emergency devices may be installed with secure locking devices. Either the District or an acceptable govern- mental agency will keep the keys for any such devices. The Petitioners are correct. The rule requires secure locking devices. Such condition should be added to the permit The keys may remain with the TCWMD as "an acceptable governmental agency." In 1980, the District issued Surface Water Management Permit No. 08- 00004-S for the TCWMD to operate an existing surface water management system for an existing agricultural operation. The 1980 permit specifically authorizes "[o]peration of a water management system serving 89,120 acres of agricultural lands by a vast network of internal drainage and irrigation canals, a major dike, a major canal and 4 water control structures discharging via small tributary creeks and sloughs into the Caloosahatchee River." Although the permit has been subsequently modified, the authorization to operate the system has not been amended. While District enforcement staff have occasionally noted "performance deficiencies" on the TCWMD property, there have been no permit violations by the permittee. Deficiencies which have been called to the TCWMD's attention have been resolved. Special condition number five to the 1980 permit provides that "[d]ischarges of water onto adjacent lands may be continued to the extent that increased problems are not caused by such discharges." The Petitioners assert that the District has failed to acknowledge that water discharged from the Telegraph Cypress system flows into the Cypress Creek canal and has failed to consider the impact on the Cypress Creek receiving body. However in the staff report to the 1980 permit states as follows: The Telegraph Cypress basin has three major drainage outlets. These are Trout Creek on the west, Telegraph Creek in the center and Cypress Creek to the east. There is a fourth outlet in the northeastern corner of the property known as Jack's Branch, however, this outlet is small compared to the three major ones. Much of Telegraph's southeastern area was previously drained by Spanish Creek and County Line Canal. This historical drainage pattern was blocked when a company which is presently known as Golden Grove constructed a dike across their northern boundary. This dike causes increased flow in a westerly direction around the west end of the dike, thence southerly towards Cypress Creek. This increased flow has caused excess water problems to property owners downstream. In addition, the dike has blocked virtually all flow to Spanish Creek. The evidence fails to establish that, as asserted by the Petitioners, the District has failed to acknowledge the discharge of water to Cypress Creek or to consider the condition of the Cypress Creek receiving body. In the instant case, the condition of the Cypress Creek receiving body was not re- addressed because the permit modification being sought will cause no additional adverse impacts on existing conditions. Although not individually numbered and identified in the original 1980 permit, the evidence establishes that in 1980, all of the farm fields which are subject to this permit modification application were in existence. The applicant seeks no new water control structures. Other than that required to reactivate fallow farm fields, there is no new construction proposed in the instant application. The Petitioners assert that the instant permit modification application will result in construction of new farm fields. The evidence is contrary to the assertion. Proposed permit special condition No. 10 states that the permit does not include the construction of any new farm fields. The farm fields covered in the staff report would be permitted for reactivation from a fallow state without further permitting activity in the future, and without individual retention for each farm field. The modifications to the original 1980 permit have increased the total farm land area. There is no evidence that, except as specifically permitted and approved by the District, there has been alteration of historical discharge rates or routes. There has been considerable confusion regarding the permitting status of the operations as farm fields have been reactivated. Such reactivation entails grading and leveling fields, reconstruction of ditches and dikes and installation of pumping equipment. In order to provide for standardization in farm field reactivation, and to better monitor such activities, the District requested that the TCWMD seek to modify the existing permit. On February 8, 1991, the TCWMD submitted an application to modify the existing permit for the purpose of reactivating the existing farm fields located within the Telegraph North, Telegraph Swamp, and Curry Lake drainage basins. The proposed SWM permit modification authorizes the continued use of the previously permitted surface water management system for existing active and fallow farm fields and allows the reactivation of currently fallow farm fields without further permit modification by the District. Proposed SWM permit special condition No. 16 states that the District requires notification in letter form 30 days prior to all farm field reactivation activities. The proposed modification of the permit will provide the District with an enhanced ability to inspect the reactivated farm fields. Inherent in such reactivation is ditching and diking of the fields. Such operations have been authorized since the 1980 permit was issued. The work associated with field reactivation will be conducted in accordance with existing design criteria as set forth in the application. Based on evidence admitted at the hearing, the permit modification should include the following special condition: Ditches and dikes associated with the farm fields encompassed by this authorization shall be constructed/maintained in conformance with the "Typical Field Layout And Detail Sheet," revised 10/12/93. The evidence establishes that the operations of the TCWMD as proposed by the permit modification application are within the authorization of the existing permit as previously modified. Otherwise stated, the award of this modification will have no substantial impact on the operation of the permitted surface water management system. The modification will result in no additional discharge of surface water from the control structures. The District has established water quantity criteria intended to insure that adverse impacts do not occur due to excess discharge. (Based upon the Hearing Officer's ruling on a District's Motion in Limine, water quality issues were not addressed at hearing.) The criteria are set forth at Chapter 40E-4.301, Florida Administrative Code, and in the Basis of Review. In relevant part, the District criteria require an applicant to provide reasonable assurances that the surface water management system provides adequate flood drainage and protection, that the system will not cause adverse water quantity impacts on receiving waters and adjacent lands, and that the system will not cause adverse impacts on surface and groundwater levels and flows. Modification of a permit must not result in additional adverse off-site impacts. In this case, reasonable assurances have been provided that the proposed modification will not exacerbate the historical and current drainage conditions. The permit modification application at issue does not propose to alter the rates or routes of water currently authorized for discharge from Telegraph Swamp. Reactivation of the farm fields will not impact receiving bodies in any manner different from that which presently exists under previous permits. In providing reasonable assurances, the TCWMD analyzed the water storage capacity available in the detention basins, performed flood routing projections and calculated peak discharge rates for the permit area. As required by the district, the TCWMD utilized a standard hypothetical 25-year/3- day storm event in order to determine whether sufficient capacity was available to handle the resulting stormwater. The projections provide reasonable assurances that the common detention areas have the capacity to provide adequate flood drainage and protection and are accepted. Rule 40E-4.091(1)(a), Florida Administrative Code, incorporates by reference a document identified as the "Basis of Review for Surface Water Management Permit Applications within the South Florida Water Management District--September 1989" Section 3.2.1.2.b requires that: the proposed project modification must meet the allowable discharge rate; and the allowable discharge rate for a previously permitted project is that which was set in the previous permit. The TCWMD prepared and submitted discharge calculations establishing that the post-development discharges will not exceed the discharge rate previously accepted by the District. Since 1984, the District has previously accepted a peak allowable discharge rate of 39 cubic feet per second per square mile (csm). The csm figure is based upon the historical TCWMD discharge rate within the Caloosahatchee River basin. As previously stated, reactivation of the farm fields will not impact the receiving bodies in any manner different from that which presently exists under previous permits. The District asserts that the 39csm discharge rate has been "permitted" since the 1984 modification was approved. The Petitioner asserts that the 39csm discharge rate has never been "permitted" by the District. The evidence establishes that since the 1984 application for permit modification, the discharge rate of 39csm has been utilized by TCWMD and has been accepted by the District, but that the actual permits do not specifically identify the discharge rate as 39csm. In projecting discharge rates, the TCWMD used a time of concentration of one hour. The time of concentration (T.O.C.) is the time in which water would move from the farm fields to the control structure in each sub-watershed. Otherwise stated, a projected T.O.C. of one hour means that the storm water would move from the field to the control structure in one hour. The T.O.C. of one hour is a conservative estimate and likely substantially overestimates the speed at which the water will move. The three basin areas contain a total of more than 80 square miles. Water will travel an average distance of two miles from field to detention basin through ditches, swales and existing low areas. Again conservatively, the TCWMD did not include projected travel time through such conveyances, resulting in a longer T.O.C. and resulting in a higher peak discharge rate than is probable. Although there appeared to be some confusion on the part of the District staff as to the application of the T.O.C. by the TCWMD, the TCWMD engineer who performed the calculation testified at hearing and was qualified as an expert witness in civil engineering, hydrology and surface water management. His testimony and projections are reasonable and are credited. Proposed SWM permit modification special condition No. 11 states that farm field discharge shall be directed to and conveyed via existing ditches, wetlands and/or sheetflow areas per existing site conditions. No new outfall ditches are permitted under this modification. Flood routings were calculated assuming all farm fields would be activated simultaneously and pumping the maximum capacity of 390 gallons per minute per acre (the equivalent of 20-21 inches of surface water pumped from each field daily). It is highly unlikely that all farm fields would be active simultaneously or that stormwater would continue to fall with such velocity to permit continued pumping at maximum capacity for an extended period. Even based on the conservative assumptions utilized by the TCWMD engineers, the projected peak discharge rate at the Telegraph Swamp control structure is 37csm to 38.5csm, within the maximum of 39csm previously accepted by the District. The computer modeling performed by the TCWMD engineer in calculating the peak discharge rate is accepted as reasonable. The TCWMD did not include offsite inflow in its analysis of projected capacity or discharge rates. There is anecdotal evidence that on occasion, water may flow into TCWMD from Jack's Branch or from across roadways to the north and west of the TCWMD; however, given the vast storage capacity of the TCWMD detention areas, there is no evidence that the quantity of offsite inflows is of such significance as to render the TCWMD projections unreasonable. As previously stated, the TCWMD calculations are reasonable and are accepted. The evidence establishes that the peak discharge rate resulting from approval of the instant permit modification will not exceed 39csm. The Petitioners offered their own peak discharge rate calculations, based on a "worst possible case scenario." The assumptions on which the Petitioners' projections are based are unreasonable and are rejected. Based on recommendations received at the hearing, the permit modification should include the following special condition: Pumped discharge from farm fields for which pumps are not currently installed shall be limited to 75 gallons per minute per acre of farmed area. Pumps are currently installed in fields number 7, 8, 9, 10, 12, 14, 15, 24 north and south, 28, east half of 34, 64, 67, 68, 69 and 80. The Petitioners assert that the system is currently causing adverse impacts to their properties in the form of flooding. The greater weight of the evidence establishes that the system presently does not cause adverse water quantity impacts on receiving waters and adjacent lands, and does not cause adverse impacts on surface and groundwater levels and flows. The evidence establishes that award of the application for permit modification will not adversely alter the current operations. It is clear that the Petitioners have been impacted by changes in the historical drainage patterns in the area; however, such changes had substantially occurred by 1980 when the original permit was issued. The greater weight of the credited evidence establishes that such impacts are not the result of the activities authorized in the original 1980 permit and in subsequent modifications, but instead are the result of unrelated actions by third parties not involved in this administrative proceeding. There is no credible evidence that the permit modification sought in the instant proceeding will adversely affect the Petitioners. The 1980 permit addresses existing water quantity problems in the area of the TCWMD project. For example, the construction of the Golden Grove Dike resulted in blockage of historical drainage towards Spanish Creek and the diversion of excess waters into Cypress Creek. During the 1980's the District required that culverts be installed in the Golden Grove Dike which eventually restored some surface water flow through the dike construction and on towards the south, although during some storm events water flow continues around the dike and into Cypress Creek. The Petitioners offered anecdotal evidence as to reduced water flows in some local creeks and increased flows thorough Cypress Creek. The Respondent offered evidence indicating that water flow through Cypress Creek may be less than 30 years ago, due to the digging of a canal between Spanish Creek and Cow Slough and the extension of the Clay Gully Canal's diversion of water into Telegraph Swamp. None of the evidence on this point was persuasive, however it is not relevant. Clearly, the instant permit modification application will not adversely affect the existing situation in the receiving bodies. The Petitioners assert that other receiving waterways have become clogged with vegetation, debris or soil, have accordingly reduced capacities, and are unable to accommodate historical discharge levels. Based on the lack of capacity, the Petitioners suggest that waters move towards the eastern portion of Telegraph Swamp and are discharged, flow towards, into and over the banks of Cypress Creek, and flood their properties. The TCWMD conducted a study of backwater profiles based upon credited field data. The study is found to be reasonable and is credited. Based upon the study, approximately 90 per cent of the water discharged from Telegraph Swamp is conveyed to the Caloosahatchee via Big Island Canal, Telegraph Creek and the swamp area south of the control structure. The remaining 10 per cent of the water enters the Bullhead Strand-Lightered Canal-Cypress Creek watercourse. Water flows from Telegraph Swamp into Cypress Creek via Bullhead Strand and the South Lightered Canal, however, the canal has become so restricted by vegetation that it provides little direct water flow between the strand and the creek and is more properly regarded as an area of enhanced sheet flow. The evidence does not establish that the surface water traveling from Bullhead Strand to Cypress Creek is of significance. Coupled with the existence of the Big Island Canal (which connects Telegraph Swamp to Telegraph Creek) it is unlikely that post-development surface water discharged from the Telegraph Swamp into Cypress Creek exceeds pre-development discharges. The Petitioners claim that two culverts in the Big Island canal restrict the flow of water through the canal and result in increased discharge to the east and to Cypress Creek. The greater weight of the evidence establishes that during period of time when the culverts are unable to accommodate water flow, the water travels into a broad flood plain, around the culverts and returns to the Big Island Canal. The evidence establishes that the proposed modification will not result in additional adverse off-site impacts. The adverse conditions affecting Cypress Creek existed at the time of the 1980 permit and are addressed in the staff report to that permit and to subsequent permit modifications. There is no credible evidence that modification of the permit as sought in this case will result in adverse impacts beyond those which have existed at the time of the award of the original permit. The Petitioners assert that the fields included within the permit modification application lack individual retention areas. The lack of individual detention areas is immaterial in this case where sufficient downstream detention capacity is available through the common detention areas. The Petitioners asserts that the Telegraph Swamp is an "above-ground impoundment" and that as such is fails to comply with requirements related to such water storage systems. The Telegraph Swamp is not a typical "above-ground impoundment" as that term is routinely applied by the District. The regulations addressed by the Petitioners clearly state that they are not intended to be inclusive and are intended to provide guidelines and basic performance criteria for commonly encountered south Florida situations. Telegraph Swamp is not a commonly encountered south Florida situation. There is no evidence that the decision not to apply the "above-ground impoundment" regulations to the Telegraph Swamp is unreasonable. The Petitioner suggest that the TCWMD application for permit modification is deficient and fails to provide information in compliance with the Basis of Review. The Basis of Review is directed towards applications for new construction. The District reasonably does not interpret the all elements of the Basis of Review to apply to existing operations. The original staff report for this permit modification application fails to acknowledge that Cypress Creek is a receiving body. However, as stated previously, the 1980 application and subsequent modifications have clearly addressed the fact that Telegraph Swamp waters discharge to Cypress Creek via intervening waterways. The failure to include the reference in the staff report to this application for modification is irrelevant.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the South Florida Water Management District enter a Final Order issuing Surface Water Management Permit Modification No. 08-00004-S including the additional permit conditions set forth herein, to the Telegraph Cypress Water Management District. DONE and RECOMMENDED this 1st day of April, 1994 in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of April, 1994. APPENDIX TO RECOMMENDED ORDER, CASES NO. 92-6900 and 92-6901 To comply with the requirements of Section 120.59(2), Florida Statutes, the following constitute rulings on proposed findings of facts submitted by the parties. Petitioners James D. English and Cypress Creek Partnership The proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership consist of unnumbered paragraphs. Pages forty-five through fifty-nine of the proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership were stricken as set forth in the Order On Motion To Strike issued March 29, 1994. The paragraphs of pages five through forty-four of the proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership have been consecutively numbered and are accepted as modified and incorporated in the Recommended Order except as follows: 1-2. Rejected, argument, not findings of fact. 7-9. Rejected, argument, not findings of fact. The staff report is not dispositive. 10-12. Rejected. The greater weight of the evidence establishes that, although the 39csm figure is not set forth in the permit, as of the 1984 modification, the TCWMD calculations have been based on a peak discharge rate of 39csm and that the District has accepted the calculations previously. The applicable criteria in the instant case require that the allowable discharge rate for a previously permitted project is that which was set in the previous permit. 13. Rejected, recitation of testimony is not finding of fact. 15-16. Rejected, argument, not finding of fact, irrelevant, cumulative. 17-18. Rejected, recitation of testimony is not finding of fact. 19. Rejected, contrary to the greater weight of credible and persuasive evidence which establishes that 39csm has been the peak discharge rate accepted by the District since 1984. The flow rate projected by the TCWMD does not exceed the accepted peak discharge rate. 24. Rejected, recitation of testimony is not finding of fact. 26-28. Rejected, recitation of testimony is not finding of fact. 29-30. Rejected, argument, not finding of fact. Rejected, irrelevant. Rejected, argument, not finding of fact. Rejected, irrelevant. The greater weight of the credible and persuasive evidence establishes that 39csm has been the District's accepted peak discharge rate and that this modification will not result in peak discharge rates in excess of that which has been previously accepted. Rejected, not supported by the greater weight of credible and persuasive evidence. The assumptions underlying the Petitioners' calculation of theoretical maximum discharge are rejected as unreasonable. Rejected, unnecessary. 36-45. Rejected, irrelevant. The anecdotal evidence fails to establish that offsite inflows are of such quantity as to render the TCWMD projections unreasonable. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 46-52. Rejected, contrary to the greater weight of credible and persuasive evidence. The evidence fails to establishes that the swamp is an "above-ground impoundment" as that term is routinely applied by the District. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 53-67. Rejected, irrelevant. An applicant for a permit modification is not required to supply every item on the checklist. An application for a modification to an existing permit often need not contain all the items described. 69. Rejected, cumulative. 70-71. Rejected, argument, not finding of fact. 72-81. Rejected, not supported by the greater weight of credible and persuasive evidence which establishes that the identification and delineation of the nine basins is based on historical hydrologic characteristics of the TCWMD and is a reasonable determination of basin boundaries. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 82. Rejected, subordinate. 83-85. Rejected, irrelevant. The confusion on the part of District staff as to what T.O.C. was utilized by the TCWMD engineer is irrelevant. This proceeding is not a review of preliminary staff activity. The applicant must establish entitlement to the permit at the hearing. 86-87. Rejected, recitation of testimony is not finding of fact. Rejected. The confusion on the part of District staff as to what T.O.C. was utilized by the TCWMD engineer is irrelevant. Rejected, unnecessary. Rejected, recitation of testimony is not finding of fact. 91-94. Rejected, irrelevant, the discharge projections calculated by the TCWMD as explicated at the hearing are credited. In any event, the evidence establishes that this modification will result in no additional discharge of surface water from the control structures. 95-97. Rejected, irrelevant. The evidence establishes that this modification will result in no additional discharge of surface water from the control structures. Petitioner Alva Cemetery Petitioner Alva Cemetery's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 2. Rejected, not supported by the greater weight of credible and persuasive evidence. 4-5. Rejected, irrelevant. Rejected, irrelevant. This is a de novo hearing, not a review of preliminary staff work. The evidence at hearing establishes that the permit modification will not cause additional adverse affect on existing receiving bodies. Rejected, irrelevant. The evidence fails to establish that Hall Creek and Fichter Creek are receiving bodies of such capacity that their omission from staff report is material. Rejected, irrelevant. Rejected, irrelevant. The evidence fails to establish that offsite inflows are of such quantity as to be relevant. 11. Rejected, not supported by the greater weight of credible and persuasive evidence. The Applicant's analysis is credited. As to T.O.C., even the less conservative T.O.C. projections indicate a peak discharge rate within that previously accepted by the District. 12-13. Rejected, irrelevant. Rejected, irrelevant. Such return overflows are unnecessary in this situation where the detention areas have the capacity to provide adequate flood drainage and protection. Rejected, not supported by the greater weight of credible and persuasive evidence. Rejected, not supported by the greater weight of credible and persuasive evidence. 18-20. Rejected, cumulative. 21. Rejected, immaterial. There is no evidence that this permit modification application will cause additional adverse impact on receiving bodies. The failure to address nonexistent impacts is immaterial. Rejected, errors in staff report are irrelevant. The evidence admitted at hearing is accepted as correct. First paragraph is rejected, cumulative. Second paragraph is rejected, not supported by the greater weight of credible and persuasive evidence. Rejected, anecdotal testimony is not supported by the greater weight of credible and persuasive evidence. Rejected. The greater weight of credible and persuasive evidence establishes that all farm fields affected by this permit modification application were in existence by the 1980 permit. Rejected, not supported by the greater weight of credible and persuasive evidence. The assumptions underlying the Petitioners' calculation of theoretical maximum discharge are rejected as unreasonable. Rejected, irrelevant. The greater weight of credible and persuasive evidence fails to establish that the cemetery flooding is related to actions by the TCWMD. Further, the evidence fails to establish that, even if the flooding was related to the TCWMD, the instant permit modification application will cause additional adverse impacts. Respondent Telegraph Cypress Water Management District Respondent Telegraph Cypress Water Management District's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 18. Rejected, subordinate. 19-20. Rejected, not credited and unnecessary. Rejected as to assertion that the 39csm discharge rate was set in the 1984 permit modification, not supported by the evidence. Review of the document admitted into evidence as the 1984 modification fails to reveal that the figure of 39csm is set forth therein. Rejected, cumulative. Rejected, unnecessary. Respondent South Florida Water Management District Respondent South Florida Water Management District's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 30. Rejected as to assertion that the 39csm discharge rate was set in the 1984 permit modification, not supported by the evidence. Review of the document admitted into evidence as the 1984 modification fails to reveal that the figure of 39csm is set forth therein. Pages 17-19 of the Proposed Recommended Order set forth revisions to the staff report which originally form the basis for the preliminary agency action in this matter. As the hearing is a de novo review of this matter, it is unnecessary for this Recommended Order to address the revision of the staff report, which has limited probative value. COPIES FURNISHED: Tilford C. Creel Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416 Melville G. Brinson, Esquire 1415 Hendry Street Fort Myers, Florida 33902 Frank A. Pavese, Sr. Esquire 1833 Hendry Street Fort Myers, Florida 33902 Scott Barker, Esquire Post Office Box 159 Fort Myers, Florida 33902 John J. Fumero, Esquire Toni M. Leidy, Esquire South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33416

Florida Laws (7) 120.57120.68373.114373.413373.617380.06403.812 Florida Administrative Code (4) 40E-4.09140E-4.10140E-4.30140E-4.331
# 1
DEPARTMENT OF COMMUNITY AFFAIRS vs ROBERT CROWDER AND POLK COUNTY, 92-002959DRI (1992)
Division of Administrative Hearings, Florida Filed:Bartow, Florida May 14, 1992 Number: 92-002959DRI Latest Update: Jun. 06, 1996

The Issue The issue in this case is whether the development order issued by Polk County for Robert Crowder's development known as Paradise Country Estates complies with Chapter 380, Fla. Stat. (1991). The Department of Community Affairs' Petition for Appeal of Development Order (the DCA Petition) alleges that the development order is contrary to Polk County's 1985 comprehensive plan for the following reasons: Paragraph 11 of the DCA Petition alleges that the development order is contrary to the provisions of Policy 9, Objective III, "Natural Resources," of the Land Use Element (LUE) of the 1985 Plan. Policy 9 states: "Structures should be placed in a manner which will not adversely affect the natural flow regime and which will not reduce the recharge capabilities." Paragraph 12 of the DCA Petition alleges that the development order is contrary to the provisions of Policy 10, Objective III, "Natural Resources," of the LUE. Policy 10 states: "Placement of structures shall be consistent with sound flood plain management practices such as compliance with the Flood Disaster Protection Act of 1973." Paragraph 13 of the DCA Petition alleges that the development order is contrary to the provisions of Policy 11, Objective III, "Natural Resources," of the LUE and Policies 9 and 10 of the "Water Resource Objective" of the Conservation Element of the Plan. Respectively, these policies state: 11. Groundwater withdrawal should not exceed the safe yield per acre as determined by Water Management Districts or successor agencies. * * * Minimize the adverse impacts of development on resources of the Floridan Aquifer, wetlands and flood-detention areas. Protect the normal quantity, quality and flow of ground water and surface water which are necessary for the protection of resources of state and regional concern. Paragraph 14 of the DCA Petition alleges that the development order is contrary to a section of Part II of the Conservation Element of the Polk County Comprehensive Plan entitled "Rare and Unique Natural Resources," which describes the Green Swamp as a "rare and unique land area resource for conservation consideration" and also states: The potentiometric high of the Floridan Aquifer lies within this area. . . . The area has a high potential for recreational and natural enjoyment. . . . The Green Swamp area is the largest expanse of forest in Polk County, with abundant water and wooded areas to provide for wildlife habitats. This area has great significance as an area for conservation of land, air, water, open space and wildlife habitats. Paragraph 15 of the DCA Petition alleges that the development order is contrary to the following section on "Density" found in Part IV of the Conservation Element, entitled "Summary of Special Problems, Areas, Issues, and Relationships": The subject of development density is a particular issue of vital importance to the county. Low density development in some areas and high density in other areas is important so that demands for public facilities can be economically and efficiently handled, so that environmental degradation is minimized, and so that land, not suitable for development, can be saved for important natural functions. The present zoning ordinance classifies most of the county in a Rural Conservation (RC) classification that permits low density development without proper regard for those areas that are best suited for development. Portions of the county should be protected from development pressures and appropriate areas should be zoned to accommodate rational densities. The present level of protection, provided by the zoning system is not brought to bear for conservation purposes. Paragraph 16 of the DCA Petition alleges that the development order is contrary to Policy 14 of the "Water Resource Objective" of the Conservation Element of the Plan: "Protect or improve existing ground and surface-water quality." Paragraph 17 of the DCA Petition alleges that the development order is contrary to Policy 2, Objective I, "Agricultural Uses," in Part V of the LUE: Protect, to the maximum extent possible, agricultural lands from encroachment of incompatible land uses and any detrimental effects of development adjacent to agricultural areas. Paragraph 19 1/ of the DCA Petition alleges that the development order is contrary to Policy 2, Objective IV, "Residential Uses," in Part V of the LUE: Promote and encourage new residential development adjacent to established growth centers, to ensure the orderly use of land and the efficient provision of facilities and services. Paragraph 20 of the DCA Petition alleges that the development order is contrary to Section 5-1(6) of Polk County Ordinance 81-28 (the County Flood Protection and Surface Water Management Code). 2/ Article V is entitled "Flood Protection Standards." Section 5-1 provides in pertinent part: GENERAL STANDARDS: The following minimum standards shall apply to new construction and substantial improvements in all areas of special flood hazard, and to any development, other than phosphate mining, within 100 feet of a watercourse: * * * (6) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. Paragraph 21 of the DCA Petition alleges that the development order is contrary to Section 5-2(4) of Polk County Ordinance 81-28. 3/ Section 5-2 provides in pertinent part: SPECIFIC STANDARDS: The following minimum standards shall apply in all areas of special flood hazard where base flood elevation data has been provided: * * * Subdivision Proposals: All subdivision proposals and other proposed developments shall be reviewed by the County Engineer. [I]f the proposal is in an area of special flood hazard, it shall be reviewed to assure that the following standards are met: All such proposals shall be reasonably safe from flood waters resulting from the base flood. All such proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage. Base flood elevation data shall be provided for all such proposals. Roads shall be reasonably safe from flood waters resulting from the base flood. Paragraph 22 of the DCA Petition alleges that the development order is contrary to Section 6-2(3)(a) of Polk County Ordinance 81-28. Article VI of Polk County's Flood Protection and Surface Water Management Code is entitled "Water Management Standards." Section 6-2 provides in pertinent part: GENERAL STANDARDS: The following minimum standards shall apply to all development which occurs within an area of special flood hazard and to any man-made change to improved or unimproved real estate . . .. * * * (3) (a) The amount of site alteration within a wetlands soil association shall be limited to ten percent (10%) of the area of wetlands soil association within any given total site.

Findings Of Fact The Proposed Project and Location. The project site is on Dean Still Road in Polk County, approximately 2 miles west of State Road 33. It is approximately 6 and 1/2 miles from Polk City and 15 miles from the City of Lakeland. The proposed project is comprised of 356 lots on approximately 1280 acres with a gross density of 1 unit per 3.6 acres. Although the average lot size varies, the project was reviewed under the Southwest Florida Water Management District's (SWFWMD) criteria for rural development which requires that at least 90% of the lots be at least 2 acres in size (excluding jurisdictional wetlands), and 10% of the lots be at least 1 acre (excluding jurisdictional wetlands). The site has been zoned Rural Conservation under Polk County's Zoning Code for approximately 12 years. This designation allows a density up to 1 unit per acre. Individual water wells and on-site waste disposal systems (septic tanks) will be utilized for each home. There are no water or sewer extensions proposed for the site or for adjacent areas by any governmental entity. Access to the site from Polk City is along Dean Still Road, which is unpaved at this time. The County has plans to pave it in the near future. Of the 1280 acres comprising the project site, 362 acres have been claimed as jurisdictional wetlands and approximately 642 acres have been mapped within the 100-year floodplain by the Federal Emergency Management Agency (FEMA). 51 of the lots platted in the project are entirely within the FEMA 100- year flood plain. Several other lots contain large portions within FEMA 100- year flood plain. Despite the significant amount of wetlands and floodplains on the site, the project is designed so that no net loss will occur in the floodplains and less than 1% (.59%) of the jurisdictional wetlands will be impacted by development. Impervious conditions on the site will only increase by 2.8% after development. All structures will be set at or above the 100 year flood elevation, as calculated by the project engineers, and will be constructed in accordance with the County's flood protection standards. The project is designed so that post-development runoff is less than pre-development runoff and post-development drainage basins conform to pre-development drainage basins. Existing drainage patterns for the site are designed to be maintained. The property comprising the project has been used through the years for a variety agricultural purposes, including harvesting watermelons, soybeans, corn, and silage. It has been drained and ditched to facilitate these activities. It is currently being used for grazing cattle. A sod farm is located to the south of the property. Additional cattle grazing lands run south from there to Polk City. To the north of the site are ranchlands which run to the border of the Withlacoochee Wildlife Area. Immediately to the west of the site are 20-30 scattered mobile homes and additional ranchlands in a subdivision known as Evans Acres. This subdivision was initially approved by DCA in 1983, and was comprised of 48 lots on approximately 1,290 acres. The original lots ranged in size from 5 to 60 acres. Apparently, individuals have since split their lots and many of the existing lots are 2 to 5 acres in size. A few of the original lots are used for both residential and ranching purposes. Including the large and small lots, there are approximately 163 lots on the property comprising Evans Acres. On the property directly to the east of the site are approximately 16 mobile homes along Melody Lane. These existing homesite numbers are small and scattered when compared to the 356 lots proposed for Paradise Country Estates. Approximately 120 families live in the general vicinity of the proposed project. The Green Swamp. The project is within the Green Swamp Area of Critical State Concern (ACSC). The site is within the drainage basin of the Withlacoochee River, which has been designated an Outstanding Florida Water (OFW) and is approximately three and a half miles to the north. The Green Swamp ACSC was designated by the Legislature. Chapter 79- 73, 380.0551, Florida Statutes (1991). It was the second area to be designated and now is one of only four areas in the State retaining this designation. The Green Swamp was designated because the area's natural resources were considered to be of regional and statewide importance and because of concerns that uncoordinated development could endanger these resources. The Green Swamp is a regionally significant area for recharge of the Floridan Aquifer. The Green Swamp is unique because the top of the Floridan Aquifer is at or near the surface over much of the area. This creates what is known as the potentiometric high of the Floridan Aquifer. The potentiometric high pressurizes the Floridan Aquifer, permitting it to be used for drinking water wells. The Florida Aquifer serves as the principal source of drinking water for central Florida. It supplies the entire State with about 48 percent of its ground water supply. The potentiometric high also serves to hold back salt water intrusion into the Floridan. Recharge is important in maintaining the potentiometric high of the Floridan Aquifer. Although the Green Swamp has been characterized as a recharge area for the Floridan Aquifer, the actual recharge capabilities of the Green Swamp vary considerably throughout the region. Some areas within the Green Swamp, such as the high, dry, sandy ridge on the eastern boundary of the Green Swamp clearly are high recharge areas. In some areas, the Floridan Aquifer rises essentially to the ground surface, with no confining layer above it. In those areas, a considerable amount of surface water filters into the Floridan Aquifer. In other areas, including in the vicinity of the project site, recharge capability is considerably less. See "G. Review under the 1985 Plan and the Flood Protection and Surface Water Management Code, (3) Ground Water Recharge." The head waters of several rivers, including the Withlacoochee River, are in the Green Swamp. Polk County's Comprehensive Plan. Polk County's Comprehensive Plan, as amended by Polk County Ordinance 85-08 (Ordinance 85-08), is referred to as Polk County's 1985 comprehensive plan, or the 1985 plan. It includes a Land Use Element (LUE) and a Conservation Element. The Land Use Element. The 1985 Plan is a "policy plan." As a "policy plan," the LUE does not map land use classifications or densities or intensities of development. The different parts of the plan must be considered together to ascertain their meaning. As stated in the Foreward to the LUE: The Policy Plan is a flexible and realistic guide to future public decisions. Existing conditions are first determined and analyzed. Then, community goals are identified providing a process of finding out where we are and where we want to go. * * * . . .. The challenge is to determine the means of achieving the identified community goals at minimal cost and the least possible hardship on any segment of our society. Under the policies planning process this is accomplished by developing all possible alternative courses of action that will advance the community toward the desire goal. The policies are then a general statement of purpose and outlining broad principles toward which the plan is guided in the implementation stage. A policy plan does not detail specific actions or locations on a map. Rather it provides a broad framework within which day-to-day decisions are made in a consistent manner toward an identified goal. The ultimate product of those community goals will be the heritage of Polk County's future. At 4-2, the LUE discusses the need to give attention to "the proper distribution of population densities in keeping with sound planning practices, the physical capabilities of the land, and the relationship of the population and housing densities to existing or proposed transportation facilities and other community services." It then speaks to "Retention of Open Spaces": A second potential problem to be faced, as urban growth continues, is the potential loss of the open space characteristics that now contribute substantially to its desirability as a community in which to live and visit. To a large extent, the desirable characteristics are provided by extensive agricultural areas. Such uses are compatible with residential and other types of urban land uses and should be encouraged to remain to the maximum extent possible. Desirable open space is also presently provided by . . . wetland areas not suited for urban development. By encouraging such areas to remain in their present condition, a substantial amount of open space can be retained to provide the needed visual relief and openness necessary within a highly urbanized community. At 4-5, discussing "Retention of Unique Agricultural Lands," the LUE states that cattle raising and field crops are subject to potential intrusion by urban development and states: "The development of planning techniques, which will encourage the retention of important agricultural lands and provide for orderly urban development, thus becomes a matter of considerable importance." The Goals, Objectives, and Policies (GOPs) of the LUE starting at 5-1 include the following: General Goal: To maintain productive and mutually compatible use of lands and waters within Polk County in a manner consistent with the economic, physical and social needs, capabilities, and desires of Polk County and its citizens. Objective I - Agricultural Uses: To ensure that a sufficient quantity of appropriate lands are available and protected for productive agricultural uses necessary to a sound economic base. Policies: * * * 2. Protect, to the maximum extent possible, agricultural lands from encroachment of incompatible land uses and any detrimental effects of development adjacent to agricultural areas. * * * 5. Provide all possible incentives for the retention of lands into agricultural production. * * * Objective III - Natural Resources Minimize adverse impacts of development on valuable natural resources including the protection of water quality and quantity in surface and ground waters. Policies: * * * 2. The subdivision and platting of land shall be permitted in accordance with the zoning district applied to the property and in compliance with the Polk County Subdivision Regulations and Flood Protection/Surface Water Management Ordinance. * * * Site alteration should be permitted only when such alteration will not adversely affect the natural flow regime or the natural recharge capabilities of the site. Site alteration should be permitted only when such alteration will not result in the siltation of wetlands or reduce the natural retention and filtering capabilities of wetlands. Site alteration activities should provide for water retention and settling facilities; should maintain an overall site runoff equivalent to the natural flow regime prior to alteration and should maintain a runoff rate which does not cause erosion. * * * Storm water runoff should be released into the wetlands in a manner approximating the natural flow regime. Structures should be placed in a manner which will not adversely affect the natural flow regime and which well not reduce the recharge capabilities. Placement of structures shall be consistent with sound flood plain management practices such as compliance with the Flood Disaster Protection Act of 1973. Groundwater withdrawal should not exceed the safe yield per acre as determined by Water Management Districts or successor agencies. Objective IV - Residential Areas To ensure that an adequate supply of appropriately located lands are available for the development and maintenance of residential areas that can be efficiently and effectively provided with necessary public facilities and services. Policies: Promote and encourage the provision of a wide range of housing opportunities, in appropriate locations, to permit a choice of housing types to suit the particular needs of all citizens. Promote and encourage new residential development adjacent to established growth centers, to ensure the orderly use of land and the efficient provision of facilities and services. * * * Encourage new residential development that can be effectively served by the existing transportation facilities. Promote new residential development in non-urban areas, that is properly designed to combine with future adjacent development, to create a neighborhood of sufficient size to facilitate the efficient and effective provision of all necessary public facilities and services. Part VI of the LUE, entitled "Alternate Approaches," discusses the pros and cons of different concepts for planning and managing of growth. It settles on a "Resource-Responsive Concept" as the preferred growth alternative. This concept holds in part: Wherever possible, future growth should be encouraged to take place in or near established urbanized areas. Scattered growth incapable of functioning as meaningful self-contained communities should be discouraged. And it is preferable that the urbanizing area, as it extends over extensive areas within the County, not be developed in one continuous, monotonous maze of residential, commercial, and industrial uses - but that there be open space provided at appropriate intervals so as to provide visual relief and a sense of scale to the overall urban community. Such open space areas can be productively utilized for agricultural and conservation purposes or recreation areas, public facilities and services required. It is proposed that the most appropriate urban growth concept to meet such guide-lines and the policy statements of this land use plan be a resource-responsive growth concept. Under this concept, urban growth and development will be guided and encouraged with respect to its responsiveness to the natural and human resource capabilities of the County. Within any given area of the County, the resources will be careful evaluated in terms of their capability to support growth, and the physical form and intensity of development will be then shaped to provide the physical form and intensity of development will be then shaped to provide a balance with such resources. Prime resources to be considered are as follows: Natural Resources Topography and soil conditions Vegetation and tree cover Wildlife habitats present Drainage characteristics; relationship to rivers and lakes Natural water supply capabilities General aesthetic qualities Human Resources Transportation facilities (roads, railroads, airports) Available water supply and sewage facilities Community facilities, such as schools, parks, libraries Protective services, such as fire and police Established land uses within the area Economic conditions and potentials. Part VII of the LUE, entitled "Implementation," states: "Initial implementation of a Comprehensive Plan and initiation of the continuing planning process for growth management requires the establishment of principals and standards for measurement of proposed activities against the adopted policies of the community." It includes a section entitled "Principles and Standards for the Control and Distribution of Population Densities and Structural/Development Intensity," which provides in part: All Types of Urban Development: * * * Each new development or land use should follow sound land planning principles to maximize site advantages, avoiding when possible, adverse impacts on the natural resources and hazards to health, safety, or general welfare. * * * Residential Development: Low-density single-family development (1-4 units/acre), other than rural residences related to agricultural operations, shall be located in areas capable of being developed into stable, cohesive neighborhoods. In a section entitled "Legal Requirements of Implementation," it states that "all actions taken by local government, whether in the form of permitting private development to occur or in the provision of public facilities and services, are required to be fully consistent with the adopted Comprehensive Plan. The plan, once adopted, must occupy a central position in the consideration of all proposed development." In another section, entitled "Coordination with Other Plan Elements," it states that the "land use element cannot be implemented alone [but] must be coordinated with the [other elements]." In another section, entitled "Needed Improvements in the Zoning Ordinance," it is recognized that "it will be essential that a thorough review of the zoning ordinance be undertaken and that the ordinance be revised as appropriate to achieve consistency with overall planning objectives." It acknowledges that there were "major identified deficiencies in the current zoning regulations" and advises that "the following needs among others should be addressed as a minimum in making revisions to the zoning ordinance": "Revision of the Density Requirement in Residential Districts." Despite the admonitions in the 1985 Plan, to date there has been no revision of the land use classifications, densities, or intensities in the County's zoning code. As before the 1985 Plan was adopted, zoning in the Green Swamp ACSC remains Rural Conservation (RC) and allows up to one unit per acre residential development. The Conservation Element. Part II of the Conservation Element of the Polk County Comprehensive Plan is a "Summary of Natural Resources." At 2-18, there appears a section entitled "Rare and Unique Natural Resources," which describes the Green Swamp, as well as other natural resources in the County, as a "rare and unique land area resource for conservation consideration." At 2-19, as amended by Ordinance 85-08, this element of the comprehensive plan also states: This area comprises the hydrologic heartland of Central Florida and contains the headwaters of the Withlacoochee, Hillsborough, Peace and Oklawaha Rivers. The potentiometric high of the Floridan Aquifer lies within this area. . . . The area has a high potential for recreational and natural enjoyment. . . . The Green Swamp area is the largest expanse of forest in Polk County, with abundant water and wooded areas to provide for wildlife habitats. This area has great significance as an area for conservation of land, air, water, open space and wildlife habitats. Part IV of the Conservation Element is a "Summary of Special Problems, Areas, Issues, and Relationships." Starting at 4-2, it addresses the following: Displacement . . .. Cities in Polk County have historically developed on the ridges and the urbanized areas are spreading outward rapidly into the prime citrus lands and the "marginal" (flood prone) lands. There is considerable concern about urban development in wetland soils and flood prone areas. The double barreled concern for development in wetland soils and wetland areas is that they might well serve valuable natural functions and the private and public problems created by development subjected to flood damages. This property damage promotes public pressure for drainage in wet areas. The issue in wetland drainage and flood control is the jeopardy of natural functions that wetlands and water fluctuations provide in natural systems and flood damage costs. . . . [C]oncern for the growing demand for uplands development which steadily displaces [good pasture land] . . . relate[s] to the use of good pasture land for development. Density The subject of development density is a particular issue of vital importance to the county. Low density development in some areas and high density in other areas is important so that demands for public facilities can be economically and efficiently handled, so that environmental degradation is minimized, and so that land, not suitable for development, can be saved for important natural functions. The present zoning ordinance classifies most of the county in a Rural Conservation (RC) classification that permits low density development without proper regard for those areas that are best suited for development. Portions of the county should be protected from development pressures and appropriate areas should be zoned to accommodate rational densities. The present level of protection, provided by the zoning system is not brought to bear for conservation purposes. * * * Water * * * Another area of concern relates to the draw down and recha[r]ge of the Floridan Aquifer and is claimed to be a rational concern of an area much larger than Polk County. * * * Pollution Environmental pollution, as it relates to water, is a major local concern. * * * Water pollution is concerned because of its effects on recreation and tourism. Water degradation and the pollution of lakes and rivers tends to remove the intangible value that Polk County enjoys in thee form of its surface water resources. * * * Also, the related cost issues of municipal sewage treatment and disposal, effluent disposal techniques, septic tank useage are environmentally economic choices to be made by the public. Discussing the topic, "Preservation and Management," starting at 4-4, Part IV of the Conservation Element states in part: Many issues relate to what, how, or when something should be conserved. * * * Lakes, rivers and canals of the county are of concern as sources of flooding and as resources for flood control, if properly managed. Flood prone areas surrounding surface water have been identified for much of the county. These water bodies are also legitimate concerns as the habitat for fish and other wildlife that provide a significant value in their own right. The area of these water bodies are also special scenic and recreational values that contribute to tourism and development. Part V of the Conservation Element is where the "Goals, Objectives and Policies" are found. It start with some general observations, including in part: . . .. It can be expected, therefore, that the natural environment of the county will continue to undergo modification of one type or another in response to the needs of people. . . . The inventory of total space will, therefore, diminish as these changes take place, resulting in corresponding losses within particular categories of natural resources. What is important is that no critical loss of impairment of a natural resource take place; that development be managed so as to create minimum disturbance of the remaining natural resource systems; and that there be compensation replenishments of resources wherever possible. It then lists a General Goal and several resource-specific objectives and policies: General Goal: Maintain, protect, develop and utilized the natural resources in a manner that will balance and replenish the natural ecological systems and will best serve and promote the desired quality of life for Polk County resident, present and future. * * * Water Resource Objective: To conserve and protect the quality and quantity of water resources through proper management. * * * 6. Identify and protect significant acquifer [sic] recharge areas for maximum recharge capability and protect the water available for aquifer recharge. * * * Minimize the adverse impacts of development on resources of the Floridan Aquifer, wetlands and flood-detention areas. Protect the normal quantity, quality and flow of ground water and surface water which are necessary for the protection of resources of state and regional concern. Protect the functions of the Potentiometric High of the Floridan Aquifer. Prevent further salt-water intrusion into the Floridan Aquifer. Protect or improve existing ground and surface-water quality. Protect the water retention and biological-filtering capabilities of wetlands. Protect the natural flow regime of drainage basins. Rare and Unique Natural Resource Objective: To conserve and protect, through proper resources management, areas having unique natural characteristics and particularly sensitive environmental balance. * * * Policies: Identify all significant areas in Polk County deemed to have unique natural resource characteristics. Encourage proper management of unique wetland areas of the County as a vital water resource. Encourage a proper system for control of development in flood prone and wetland areas to regulate alternation [sic] of the natural system of water retention and storage during periods of heavy rainfall. Preserve and protect, to the maximum extent possible, all delineated areas having valuable unique resource characteristics. Part V of the Conservation Element concludes with a "Summary," which states in part: The objectives and policies set forth above should not be considered as controls to be rigidly applied in every instance of decision-making dealing with the natural environment. Rather, in dealing with resource conservation issues, guidance is preferable to control. . . . A number of potential implementation actions and programs, presented in the following part, will further assist in establishing the direction and scope of conservation activities in the County. Part VI of the Conservation Element is entitled "Implementation." While acknowledging at 6-1 that Polk County cannot establish an implementation program unilaterally, without regard to the co-responsibilities of other governmental authorities at the regional state and federal levels, it states at 6-2 that Polk County "can and should": Utilize the general objectives and policies established by this Element as considerations in all decision making concerning the use and improvement of land within the County. * * * 3. Utilize, to the fullest extent possible, the policies and implementation controls of other elements of the Polk County Comprehensive Plan, and those of other governmental entities having jurisdiction, to further the conservation of natural resources. Starting at 6-3, Part VI discusses the Conservation Element's "Relationship to Other Plans." At 6-4, after stating that the Conservation Element will be largely implemented through the policies and programs of other comprehensive plan elements, Part VI provides: Land Use Element - This element will provide the overall framework for conservation [sic] potentialities through the manner in which land uses are distributed, arranged, and interrelated throughout Polk County. Policies and implementation programs of this element will determine the degree to which new development is properly related to soil types and capabilities, natural habitats, flood prone areas, wetlands and unique resource areas of the County. Land regulatory controls such as zoning, subdivision regulations and development impact reviews provide the basic tools for implementation of the policies of the Land Use Element. Starting at 6-5, Part VI discusses "Guidelines for Implementation." At 6-5, it points out: The nature of conservation policy, being of such broad application and diversity of interest, requires that its effective implementation utilize many approaches, techniques and procedures. Its application is carried out, for the most part, in an indirect way as a by-product of other more direct decisions and actions relation to the development and growth of the County. It is essential, therefore, that Polk County draw upon all possible alternative mechanisms and techniques which will lead to the effective conservation of its natural resource systems. Among the various approaches which Polk County may utilize to further its conservation objectives are the following. * * * Influence in the allocation of resources to achieve the objectives of the conservation plan. Control of events which determine resources allocation in keeping with the conservation plan. * * * Specific procedures and techniques which may be utilized to facilitate the implementation process include the following. * * * 7. Protect natural water bodies and adjacent wetland areas through the regulation of development densities and proper management of stormwater runoff. This would require a cooperative effort with the Water Management Districts in identifying flood plains for various flood frequencies. Polk County's Flood Protection and Surface Water Management Code. Polk County's Flood Protection and Surface Water Management Code was enacted as Ordinance 81-28 and was amended by Ordinance 85-07. Article V is entitled "Flood Protection Standards." Section 5-1 provides in pertinent part: GENERAL STANDARDS: The following minimum standards shall apply to new construction and substantial improvements in all areas of special flood hazard, and to any development, other than phosphate mining, within 100 feet of a watercourse: * * * (6) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. Section 5-2 provides in pertinent part: SPECIFIC STANDARDS: The following minimum standards shall apply in all areas of special flood hazard where base flood elevation data has been provided: * * * Subdivision Proposals: All subdivision proposals and other proposed developments shall be reviewed by the County Engineer. [I]f the proposal is in an area of special flood hazard, it shall be reviewed to assure that the following standards are met: All such proposals shall be reasonably safe from flood waters resulting from the base flood. All such proposals shall have public utilities and facilities such as sewer, gas electrical and water systems located and constructed to minimize flood damage. Base flood elevation data shall be provided for all such proposals. Roads shall be reasonably safe from flood waters resulting from the base flood. Article VI of Polk County's Flood Protection and Surface Water Management Code is entitled "Water Management Standards." Section 6-2 provides in pertinent part: GENERAL STANDARDS: The following minimum standards shall apply to all development which occurs within an area of special flood hazard and to any man-made change to improved or unimproved real estate . . .. * * * (3) (a) The amount of site alteration within a wetlands soil association shall be limited to ten percent (10%) of the area of wetlands soil association within any given total site. Review under the 1985 Plan and the Flood Protection and Surface Water Management Code. Land Use, Density and Intensity. DCA alleges that the land use, density and intensity of the development Crowder proposes for the site is inconsistent with: (1) the section on "Density" found in Part IV of the Conservation Element, entitled "Summary of Special Problems, Areas, Issues, and Relationships"; (2) a section of Part II of the Conservation Element of the Polk County Comprehensive Plan entitled "Rare and Unique Natural Resources"; (3) Policy 2, Objective I, "Agricultural Uses," in Part V of the LUE; and (4) Policy 2, Objective IV, "Residential Uses," in Part V of the LUE. 6/ As previously stated, the 1985 Plan is a policy plan that does not map land use classifications or densities or intensities of development. Crowder's Paradise Country Estates is consistent with the County's Zoning Code, which has not changed since before the 1985 plan, and Zoning Map. The development was not otherwise reviewed for land use, density or intensity. But it is clear that the 1985 plan does not condone exclusive resort to the zoning code to determine the appropriateness of the land use, density and intensity for development in the Green Swamp ACSC. See, especially, the section entitled "Density" in Part IV of the Conservation Element of the Plan. In the Green Swamp ACSC, especially, reference must also be made to the Plan itself. See Part VII of the LUE, entitled "Implementation." It is not found that all residential use on the Crowder property would be, in itself, inconsistent with the 1985 Plan. But, taking into consideration all of its land use, density and intensity provisions, it must be found that the development order issued in this case, especially at its level of density and intensity and especially in the manner of its issuance, is inconsistent with the 1985 Plan. The crux of the problem with this development, like others in the Green Swamp ACSC already permitted by County development orders, is that, first, the 1985 comprehensive plan and the County zoning regulations in place at the time were inadequate and, second, the steps envisioned in the plan to make them adequate have not been taken. For the plan and the zoning regulations to be adequate, and for a development order for a project in the Green Swamp ACSC in Polk County to be consistent with the 1985 comprehensive plan, either: (1) the plan must be amended to map land use classifications, densities and intensities of development in the Green Swamp ACSC; (2) the zoning code must be amended as envisioned in the comprehensive plan for the Green Swamp ACSC; or (3) the County must evaluate development orders for projects in the Green Swamp ACSC on a case- by-case basis for consistency with the comprehensive plan. None of these three possibilities happened in this case. 7/ Flood Plain Delineation. Paragraph 12 of the DCA Petition alleges that the Crowder development violates Policy 10 of Objective III, "Natural Resources," of the LUE: "Placement of structures shall be consistent with sound flood plain management practices such as compliance with the Flood Disaster Protection Act of 1973." Specifically, it is alleged that the use of a Federal Emergency Management Agency (FEMA) undetailed "A" zone to map the flood prone area on the site, and the failure to perform a detailed study, did not comply with the Flood Disaster Protection Act of 1973. Other allegations in the DCA Petition also implicate the delineation of the flood prone areas on the site. See, (5) Ground and Surface Water Quality, below. A FEMA "A" zone is the zone depicting the area determined by FEMA to be flood prone. In this context, FEMA defines a "flood prone" area as an area flooded in a 100-year, 24-hour storm. At the time Polk County reviewed the Crowder project for approval of the roadway and construction drainage plans, FEMA was requiring that a detailed study be performed to delineate the flood prone area. Polk County apparently was not aware of this requirement and was not enforcing it. Nor, apparently, was Crowder's engineer aware of it. In any event, Crowder did not have a detailed study performed to delineate the flood prone area on the site, and the County did not require it. In approximately March, 1992, Polk County received a written communication from FEMA advising of the requirement for a detailed study of the flood prone area in the case of developments like Crowder's. Polk County now requires compliance with this FEMA requirement. Crowder did not rely simply on the FEMA undetailed "A" zone to map the flood prone area on the site. Crowder's engineers used the existing undetailed FEMA maps as a starting point for determining base flood elevations. The engineers digitized the areas which had been designated as flood prone on the FEMA panels. The engineer then overlayed the digitized FEMA map with the on- site wetlands survey of the property, which had been field-staked and field- shot. Topographical field shots of the property which had been conducted throughout the site at one foot intervals were also overlayed on the digitized FEMA map. In addition, the engineer took into consideration mapped wetlands soils and compared flooding conditions which had occurred on adjacent property to assess whether all areas actually prone to flooding had been characterized as flood prone on the FEMA map. The methodology used by the project engineers was based on sound engineering practices. Nonetheless, it does not qualify as a "detailed study" as far as FEMA is concerned. A "detailed study" would include the application of a computer program that would "route" hypothetical flood waters onto and through the property to ascertain flood elevations in different stages of the hypothetical flood. It is not possible to determine how a detailed study would change the delineation of the flood prone area in Crowder's proposal. The total area of flood prone area could either increase or decrease; it could increase in some places and decrease in others. As it is, several of the lots platted in the Crowder development would be entirely within both the FEMA undetailed "A" zone and the flood prone area mapped by Crowder's engineers. Ground Water Recharge. DCA alleges that platting Paradise Country Estates will adversely impact recharge of the Floridan Aquifer, contrary to Policy 9 and 11, Objective III, "Natural Resources," of the LUE, and Policies 9 and 10 of the "Water Resource Objective" of the Conservation Element, of the 1985 comprehensive plan. In the vicinity of the project site, the Floridan Aquifer comes to within 35 feet approximately of the ground surface. Above the Floridan Aquifer is a shallow aquifer, which rises to within approximately 12 inches of the surface. There is a layer of clastic soils (sand and clay) between the surficial aquifer and the Floridan Aquifer. This confining layer slows the rate of recharge to the Floridan. As a result, the project site is in an area having low, or even very low, to moderate recharge capabilities, at best. USGS Professional Paper 1403-E, which was released in 1990, uses groundwater modelling to quantify recharge rates, instead of using qualitative terms such as "low," or "poor," "moderate" and "high" to describe recharge capabilities. USGS Professional paper 1403-E reports that many areas in the Green Swamp previously labeled as good, moderate or high recharge areas are actually capable of only recharging at rates of 3 to 4 inches per year. The subject property appears to be in the 2 to 3 inch range per year for recharge according to USGS Professional Paper 1403-E. Only three known sample soil borings have been taken on the project site. As a result, the extent of permeability and overall thickness of the confining layer between the surficial and Floridan aquifers is not certain. But there is no reason to believe that there are any karst features or other geologic faults in the area that would allow for direct connections between the surficial and Floridan aquifers. The soil borings that have been taken on the site verify the various geological surveys and studies describing the recharge capabilities in the area. Due to the site's limited capabilities as a recharge area, it is unlikely that the platting of this site will result in any significant reduction in its natural recharge rate. The project is not inconsistent with Policy 9 or 11, Objective III, "Natural Resources," of the LUE, or Policies 9 or 10 of the "Water Resource Objective" of the Conservation Element, of the 1985 comprehensive plan. Individual Water Well Use. DCA alleges that the planned use of individual water wells in Crowder's Paradise Country Estates will impact the quantity of the Floridan Aquifer (and the surficial aquifer) contrary to Policy 11, Objective III, "Natural Resources," of the LUE, and Policies 9 and 10 of the "Water Resource Objective" of the Conservation Element, of the 1985 comprehensive plan. The potentiometric level of the Floridan Aquifer protects the Floridan Aquifer from salt-water intrusion. Significant de-watering of the aquifer caused by large municipal or industrial wells extracting a high volume of water from the aquifer at an intense rate can lower the potentiometric pressure, thus increasing the potential for salt-water intrusion into the aquifer. (Furthermore, the lowered potentiometric pressure creates a hydraulic gradient which encourages surface waters to percolate downward at a faster rate due to the decreased pressure in the Floridan Aquifer. See the preceding sections on Ground Water Recharge and the following section on Ground and Surface Water Quality.) Large municipal, industrial or agricultural wells which exceed 6 inches in diameter must obtain consumptive use permits from the SWFWMD. The Water Management District takes into account what the District determines to be a safe yield per acre when issuing a consumptive use permit. Small, residential wells are not subject to this permitting process as their impacts are much smaller and less intense, and not a concern with regard to their effect on the potentiometric pressure. For this reason, some coastal areas have begun using smaller, individual wells as an alternative to larger municipal wells. The Floridan Aquifer is replenishing itself fast enough for residential wells not to "de-water" or "draw down" the aquifer's supply of ground water. Residential wells do not lower the potentiometric pressure of the Floridan to a significant degree. Nor would they affect the normal supply of ground water, or contribute to salt-water intrusion. Pumping tests performed within two to three miles west of the project site which utilized several residential-size wells support the foregoing conclusions. For these reasons, it is found that the development will not adversely impact the normal supply of ground water and thus will not interfere with the functions of the potentiometric high of the Floridan Aquifer, including its protection against salt-water intrusion. Since the water wells would pump only from the Floridan Aquifer, they would not impact the supply of surface water. In regard to the use of water wells, the project is not inconsistent with Policy 11, Objective III, "Natural Resources," of the LUE, or with Policies 9 or 10 of the "Water Resource Objective" of the Conservation Element, of the 1985 comprehensive plan. Ground and Surface Water Quality. DCA alleges that Paradise Country Estates will result in unacceptable contamination of the Floridan Aquifer, the surficial aquifer, and the surface water (particularly the Withlacoochee River) contrary to Policies 9, 10 and 14 of the "Water Resource Objective" of the Conservation Element. Paragraph 20 of the DCA Petition alleges that the use of individual on-site disposal systems (OSDS), or septic tank systems, in violation of Section 5-1(6) of Polk County Ordinance 81-28 (the County Flood Protection and Surface Water Management Code), 8/ in particular, will be part of the cause of the unacceptable contamination (other causes being from lawn and garden maintenance and automotive wastes.) On-Site Disposal Systems. Chapter 10D-6, Florida Administrative Code, sets forth requirements for the use of on-site waste disposal, or septic tank, systems in the State of Florida. That chapter, which is administered by the Department of Health and Rehabilitative Services ("HRS") through local health departments, provides construction standards for the installation of on-site waste disposal systems. The septic tank serves as a holding tank designed to separate solids and floatable materials and allows anaerobic digestion of organic materials. The remaining effluent exits the tank into the soil infiltrative process, which is referred to as the drainfield. The drainfield is composed of gravel placed around perforated pipes, which are designed to evenly distribute and release the effluent into soil material where the effluent undergoes aerobic digestion. Eventually, any constituents remaining in the effluent which have not been absorbed by the root zone or otherwise decomposed reach the subsurface waters which are referred to as the surficial water table. Each individual lot owner will be required to obtain a permit from the local health department prior to installing an on-site waste disposal system. Prior to issuing a permit, HRS inspects each site to assess soil limitations and to conduct a percolation test to determine the seasonal high water table for the site. Because the soils on the site are severely limited for filtration purposes and the high water table is only 10 to 12 inches below the surface, individual lot owners will be required to mound their on-site waste disposal systems to overcome these limitations. Although the fill used to mound the systems will be comprised of suitable soils, it is possible that the foreign soils will absorb moisture from the existing soils on this site, a phenomenon referred to as capillary fringe affect. This phenomenon can cause those portions of the fill which come in direct contact with the existing soils on the site to lose their filtration capabilities. Unless the fill becomes saturated from other sources, it is unlikely that capillary fringe affect will render the filtration process ineffective. The effects of capillary fringe affect can be lessened by mixing fill with soils found on the site, a practice undertaken by contractors when installing on-site waste disposal systems. In addition, increasing the amount of fill used to mound the system would decrease the potential affects of this phenomenon. 9/ Floridan Aquifer Water Quality. In some areas of the Green Swamp, the Floridan Aquifer is actually considered a surficial aquifer since no confining layers of soil or clay separate the subsurface water from the Floridan Aquifer. These areas would typically be characterized as areas with high recharge capabilities (or high potential for contamination). However, throughout the project site, a confining layer exists which is composed of clayey sands which have a very low permeability. Therefore, there is relatively little interaction between the surficial aquifer and the Floridan Aquifer on this particular site. For this reason, the use of individual on-site waste disposal systems on this site would pose no significant risk to the water quality of the Floridan Aquifer. Surficial Aquifer and Surface Water Quality.-- As for the surficial aquifer and surface water quality, Chapter 10D-6, Florida Administrative Code, requires on-site waste disposal systems be located at least 75 feet from waterbodies. Normally, and when the systems are operating properly, this assures that adequate filtration and decomposition occurs before wastewater reaches surface waters on or near the site. But, in the case of the Crowder proposal, it is necessary to consider that at least some of the mounded systems will be subjected to flooding and will become saturated. Even based on the analysis by Crowder's engineers, 51 of the lots in Paradise Country Estates are entirely flood prone; there is no place to put an OSDS on those lots that is not flood prone. If a "detailed study" had been done, it is possible that more lots would be entirely within the flood hazard zone. Other lots not entirely within the flood zone may not be able to accommodate an OSDS on the part of the lot not within the flood zone. If the OSDS mound is saturated during flood conditions, the system will fail, and untreated waste, or inadequately treated waste, will be released into the surface flood waters. This waste water will move laterally across the project site. Roots may absorb some nitrates or other organic compounds; 10/ otherwise, the waste water and its constituents will remain in the surface water. Lateral movement across the site generally will be slow, as the site is relatively flat. Some of the waste water and its constituents will get into the surficial aquifer. There are ditches or canals alongside and on the site that will direct the rest of the surface water into Pony Creek and other tributories of the Withlacoochee River, an Outstanding Florida Water approximately three and a half miles to the north. The Department of Environmental Regulation issued a dredge and fill permit for the project's road network's impact on wetlands on the site. But it did not pass on the use of OSDS in the individual lots. It also erroneously referred to the Withlacoochee as a natural Class III, instead of an Outstanding Florida Water. See F.A.C. Rule 17-302.700(9)(i). The Southwest Florida Water Management District (SWFWMD) issued a surface water management permit for the project. In evaluating a permit application, SWFWMD considers surface water quality. But the focus of SWFWMD's inquiry is the pre- and post-development peak flows. Also, when it considers water quality, SWFWMD considers the impact of site alteration on water quality, not the impact of the use of OSDS on the site. In addition, the Crowder project was reviewed under special criteria for low-density rural subdivisions that do not require the submission of as much information. It was not clear from the evidence precisely how SWFMD evaluates water quality under those criteria. For these reasons, based on the evidence, it cannot be said that the Crowder project's OSDS will be meet the minimum standard of being "located to avoid impairment to them or contamination from them during flooding," as required by Section 5-1(6) of Polk County Flood Protection and Surface Water Management Code, or that the project will "protect the normal . . . quality of ground and surface water . . . necessary for the protection of resources of state and regional concern," as required by Policy 10 of the "Water Resource Objective" of the Conservation Element of the Plan. Finally, the project will not "protect or improve existing ground and surface-water quality," as required by Policy 14 of the "Water Resource Objective" of the Conservation Element of the Plan. Other Appeal Issues. Except as set forth above, the Crowder development did not violate the 1985 comprehensive plan and Flood Protection and Surface Water Management Code provisions cited in the DCA Petition. Agency Practice - Other Development in the Area. As previously described, Evans Acres, to the west of the Crowder site, was approved by DCA in 1983. (See Finding 10, above.) As approved, it was comprised of 48 lots on approximately 1,290 acres (a density of one unit per 27 acres). The original lots ranged in size from 5 to 60 acres. Unbeknownst to the DCA, individuals apparently have since split their lots and many of the existing lots are 2 to 5 acres in size. A proposed development known as Turkey Creek is located between the project site and Evans Acres. Turkey Creek is comprised of approximately 57 lots on 170 acres with a gross density of 1 unit per 3 acres. The physical characteristics of the Turkey Creek property, including the abundance of wetlands and floodplains, are essentially the same as the proposed project site. DCA appealed Turkey Creek in June of 1992. However, in that case, the County had been approximately two years late in rendering the Turkey Creek development order to the DCA. Meanwhile, the developer incurred development expenses and already had constructed roads and drainage facilities for the development. The developer, the County and DCA executed a settlement agreement which allows the development to proceed according to the original construction plans, but requires homeowners to install dual septic tank systems and have their septic tanks cleaned and inspected every three years. Several other developments, which are in the general vicinity of the project site and have many of the same physical characteristics, including Yearling Trace and Buck Hill, have been appealed by DCA. Yearling Trace is comprised of 108 units on approximately 544 acres. Buck Hill is comprised of 55 units on approximately 214 acres. Those projects were appealed by DCA in June and April, 1992. In some of these cases, the County did not timely render development orders to DCA in a timely manner. In the case of Buck Hill, the DCA had been mailed an unapproved copy of development plans in October, 1990; in early 1992, DCA contacted the County to inquire, as no County-approved development plans ever had been sent to the DCA. In many of these cases, substantial development expenses had been incurred; in some cases, roads and drainage facilities already had been constructed. DCA decided to settle the pending appeals in which the County was late rendering the development order, and in which the developer already had constructed roads and drainage facilities, consistent with the Turkey Creek settlement. In cases where the County was late rendering the development order, but the developer had not already constructed roads and drainage facilities, the DCA determined to settle not only for stipulations to upgrade the OSDS, as in the Turkey Creek settlement, but also for requirements that a "detailed" flood zone study be done, in accordance with the FEMA requirements. Prior to the DCA appeal, Crowder had expended approximately $31,000 in permit fees. In addition, he has incurred development costs, primarily for engineering fees and related services. Through the time of the final hearing, he had spent approximately $99,000 on engineering fees and services. (The evidence was not clear how much had been incurred by the time of the DCA appeal.) However, the County was not late in rendering the Crowder development order, and Crowder has not constructed roads or drainage facilities. In view of the different circumstances in Crowder's case, DCA's prior agency practices do not compel that Crowder's development be treated in the same manner, i.e., be settled on the same terms, as the Turkey Creek and the others. DCA has argued that FLWAC's Final Order in the case of Dept. of Community Affairs v. Narbi International Company, Inc. and Lake County, 14 FALR 3223 (1992), controls this case and requires the Crowder development order to be overturned on appeal. Narbi involved development Green Swamp ACSC, albeit in Lake County. Factually, there are many differences between Narbi and this case. The Narbi development order was a rezoning from agricultural with a residential density of up to one unit per five acres to a residential planned unit development (PUD) zoning with a density of one unit per 1.35 acres. Also, Lake County's comprehensive plan had an "urban containment policy," which DCA equated with its non-rule policy preventing "urban sprawl" or "leap-frog development." Thirdly, in Narbi, it was found that a geologic fault existed on the project site which allowed a direct connection from the surficial aquifer to the Floridan Aquifer. Because of the factual differences, Narbi does not control the outcome of Crowder's case. Conditions for Approval. Based on the testimony of its witnesses, DCA has proposed that, notwithstanding its deficiencies, the Crowder project can be approved if its density is lowered to between one unit per ten acres and one unit per 20 acres. The rationale of DCA's witnesses seems to be that the proposed lower density, in and of itself, would cure at least the most significant of the deficiencies. Since the Crowder development order under review was for approval of particular road and drainage plans, the plans would have to be redrawn at the lower density and resubmitted for approval by the County subject to the final order to be entered in this case. It is not possible for the Commission to approve, on condition of lowered density, the plans that were the subject of the development order in this case.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Florida Land and Water Adjudicatory Commission enter a final order rescinding and denying approval for the development order in this case. RECOMMENDED this 10th day of March, 1993, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of March, 1993.

Florida Laws (4) 163.3184380.05380.0551380.07 Florida Administrative Code (5) 28-26.00228-26.00328-27.0079J-9.0039J-9.004
# 2
FLORIDA AUDUBON SOCIETY vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 90-002402 (1990)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 24, 1992 Number: 90-002402 Latest Update: Aug. 23, 1996

The Issue The issue is whether the 100 foot separation of respondents/applicants sewage treatment plant from the surface water management system is adequate.

Findings Of Fact Based upon all of the evidence, the following supplemental findings of fact are determined: Background Respondents/applicant, John D. Remington and Bolton S. Drackett (applicants), are the owners of record of approximately two thirds, or around 2,700 acres, of Keewaydin Island (Key Island), which lies just south of the mainland portion of the City of Naples, Florida. In conjunction with a planned luxury development of forty-two homes on Key Island, applicants have filed an application with respondent, South Florida Water Management District (District), seeking the issuance of a permit authorizing the construction and operation of a surface water management system (system) through which stormwater runoff from the project will be directed and controlled. Petitioner, Florida Audubon Society (FAS), has initiated this proceeding to contest the issuance of a permit. In an earlier and separate proceeding (DOAH Case No. 90-2415), applicants applied for a permit from the Department of Environmental Regulation (DER) to construct a wastewater treatment plant (plant) to serve the planned development. The permit was issued on January 2, 1990, and because all appeals by FAS in Case No. 90-2415 have been concluded, that proceeding is now final. Although the wastewater treatment plant has not yet been constructed, the parties agree that it will be situated more than one hundred feet from the surface water management system. This distance (100 feet) is the minimum amount of space allowed by District rule between the plant and system. Even so, the purpose of the remand proceeding is to determine whether that amount of separation is adequate. Thus, the factual issue here is whether the treated wastewater from the plant and filter fields will enter the surface water management system and cause a violation of applicable water quality standards and other relevant District criteria. In support of their respective positions on this issue, the parties have presented the testimony of a number of experts. In resolving the conflict in their testimony, the undersigned has accepted the more credible and persuasive testimony which is embodied in the findings below. A Brief Description of the Development and System The proposed development and surface water management system were described in detail in the prior recommended order entered in this case. For purposes of this Supplemental Recommended Order, it need only be noted that Key Island now has a lodge, guest quarters and recreation facilities, all presently served by septic tanks. Access to the island is provided by motor launch from an existing shore station. Subaqueous utility crossings from the mainland provide electric power and potable water to the island. The planned development includes the construction of forty-two large luxury homes and an expansion of the lodge facilities to accommodate the needs of the new residents. The homes will be built in phases with approximately ten to be built in the first year. The entire project may take as long as seven or eight years to complete. The proposed surface water management system was designed to handle a seventy-five residential unit development. However, by virtue of a reduction in size imposed by the City of Naples, the project has been reduced to forty-two homes. Even so, the capacity of the system has not been downsized. Therefore, the system as designed will more than accommodate all proposed development on the island. The development area has been divided into seven surface water management basins based upon seven existing natural water sheds on the upland portion of the project. Each basin will have a system of inlets, culverts and swales which will direct runoff to control structures. The dry swales are approximately one foot deep and five to ten feet wide and run parallel on both sides of the cart paths that link the various portions of the project. The cart paths, which will be at an elevation of 5.5 feet above mean sea level (NGVD), will have culverts running underneath to aid in maintaining the natural flow of water and limit impounding of water. The swale bottoms are designed to be one foot below the cart path elevation, or at 4.5 feet NGVD, and will be dry, except during significant rain events, because they are designed so that the bottom of the swale is at least one foot above the average wet season water table. Both the cart paths and swale system utilize a design system that is common to residential developments. Once the water reaches a specified height, it goes over the control structure and is discharged downstream into spreader swales from which the water is dispersed into either interior, low wetland areas or into two artificial lakes (7.3 and 1.0 acres in size) created for wet detention. Basins one, two, three, four and seven are designed to treat water quality by the dry detention method, that is, by the unlined swales that parallel cart paths, while water quality is accomplished in basins five and six by best management practices and wet retention, that is, the two artificial lakes. The Wastewater Treatment Plant The DER permit was issued on January 2, 1990, and carries an expiration date of January 2, 1995. It authorizes applicants to: construct a 0.035 MGD extended aeration process wastewater treatment plant with reclaimed water to dual absorption fields located at the project site as depicted on Wilson, Miller, Barton, Soll & Peek, Inc. design drawings, project number 6270, sheets 1 thru 5 of 5, dated March 20, 1989, revised October 16, 1989 and received October 19, 1989. The design drawings were submitted in support of construction application, engineering report, hydrologeolic characteristics and hydraulic modeling for effluent disposal report and related documents, dated March 20, 1989. The hydraulic capacity of the plant is limited to 0.030 MGD based on the reclaimed water disposal system. The collection system shall not exceed the 0.030 MGD hydraulic capacity as well. The wastewater treatment plant is designed to meet all DER water quality, health and safety standards. For example, the plant must achieve 90% removal of biological oxygen demand (BOD) and 90% removal of total suspended solids from the raw wastewater, or effluent levels below 20 parts per million for BOD and 10 parts per million suspended solids, whichever is more stringent. The plant must also have twenty-four hour detention in the aeration chamber and four hours detention in the clarifer. Further, a chlorine chamber contact time of fifteen minutes is required. In addition, DER has issued the permit with certain specific conditions. Among others, these include standards as to effluent chlorine residuals, the requirement that a professional engineer inspect the construction, operation requirements, sampling schedules, defined perameter levels, and the establishment of a hydraulic plant load (permitted maximum daily flow) at 30,000 gallons per day. By issuing the permit, DER has concluded that up to 30,000 gallons per day of sewage effluent can be treated and disposed of by the plant filter fields without violation of applicable DER water quality, health and safety standards. The wastewater treatment plant will be located on a centralized utility site within basin seven of the system. There are also gravity sand filters and a drainfield effluent disposal system located in basin six, which is the northeastern corner of the project. The plant will provide a high degree of treatment and disinfection for the effluent before it is discharged to the filter field. The filtered (treated) effluent will flow by gravity main to the filter fields located in an adjacent basin. Two filter fields will be used in disposing of the treated wastewater effluent. Constructed as sand mounds at a grade level of two or three feet above the existing island elevation, each filter will have dimensions of twenty feet wide and four hundred feet long. The filter fields will be constructed as a bed of gravel wrapped in filter cloth and placed within a mound of soil. A perforated four-inch pipe will be installed within the gravel bed at 5.5 feet NGVD to distribute the effluent through the filter beds. The effluent will then percolate downward and laterally away from the bed and into the groundwater table. At that point, the effluent will become indistinguishable from the groundwater Because the total daily flow will be pumped alternately into one part of the two sections of the drainfield, this allows one filter field to "rest" for a seven-day period during the use of the other filter field, thereby avoiding saturation. Therefore, the average theoretical maximum input into a filter field over a one year period at the plant's maximum capacity is 15,000 gallons per day. The plant was designed and permitted for maximum daily flows at all times of the year. However, the actual operating conditions will reflect significantly less flows due to the seasonality of the population and occupancy levels. More specifically, the plant was designed and permitted for seventy- five dwelling units and ancillary uses with an estimated maximum design flow of 28,450 gallons per day. The approved planned development will contain only forty-two dwelling units and ancillary uses with a maximum design flow of 21,200 gallons per day. Therefore, the permitted plant will treat the wastewater to a higher level due to the reserve capacity, and the plant will rarely be used at over fifty percent of its available capacity. Revised projected wastewater flows will range from daily loads of 2,325 gallons per day during the months of August and September to a high of 15,137 gallons per day during the month of February. This projected usage is consistent with historical occupancy and usage trends in the Naples area which show that occupancy of homes is at its peak during the dry season (the cooler winter months) and substantially lower during the wet season (the hot summer months). Applicants' projected wastewater flows are found to be reasonable and are hereby accepted. In making this finding, the undersigned has rejected the contention by FAS that the daily wastewater flows will be higher than that projected by the applicants and the plant will operate at maximum capacity for sustained periods of time. The system plans reflect that there will be swales within basin six located between one hundred ten and one hundred twenty feet to the west of the filter fields. These swales run parallel along a cart path and flow to the north discharging into an artificial lake at the north end of the project. The swales in this basin have a bottom elevation of 4.5 feet NGVD and decrease to an elevation of 3.5 feet NGVD at the point of discharge into the artificial lake. Adequacy of Separation Between Plant and System Rule 40E-4.091, Florida Administrative Code, adopts and incorporates by reference a document known as the "Basis for Review for Surface Water Management Permit Applications within the South Florida Water Management District - September 1989" (Basis for Review). Section 3.2.2.8 of the Basis for Review reads as follows: Sewage treatment percolation ponds. Above ground pond dikes shall not be within 200 feet of water bodies or 100 feet of dry detention/ detention areas. Additional calculations by the applicant may be necessary in unusual cases requiring deviations from these dimensions. The purpose of the above section is to provide adequate separation between above-ground percolation ponds and surface water management systems in case the percolation pond dike fails. For example, above grade percolation ponds contain large volumes of sewage treatment plant effluent. If a pond dike should fail, a large portion of effluent would be quickly released into the adjacent ground. The minimum 100-foot separation is designed to provide adequate distance for percolation into the ground prior to infiltrating the surface water management system. However, filter fields contain lesser volumes of effluent than do percolation ponds, and should a filter field fail, the effluent will trickle out the side of the field with a much lower rate of effluent release than from a failed pond dike. In accordance with the District rule, applicants have proposed to locate the surface water management system more than one hundred feet from the wastewater treatment plant and filtration beds. Even though the rule standards have been met, the purpose of this remand proceeding is to determine whether that amount of separation is adequate to prevent adverse impacts to the water quantity and water quality functions of the system from the operation and location of the filter fields. The Computer Models As a part of their application filed with DER in 1989, applicants' witness Missimer prepared and submitted a report known as "Hydrogeologic Characteristics and Hydraulic Modeling for Effluent Disposal at Keewaydin Club". The report was based on a computer model known as "Modflow" and was designed to show the increase in elevation of the water table for a loading rate of 30,000 gallons per day alternating between the two filtration beds. The purpose of the modeling analysis filed with DER was to investigate whether the plant would continue to discharge effluent to the drainfields under the most extreme conditions. The model demonstrated that the effluent discharge would not be impaired even under conditions that are beyond any reasonable or probable operating conditions. After reviewing the model, DER accepted those results and issued a permit. Utilizing in large part the underlying assumptions and parameters of the Missimer model, and without performing any independent field evaluation on the site, FAS witness Chin ran the model to investigate the impact of the operation of the plant on the system. Because the model used by Dr. Chin was not constructed for the design of a surface water management system, but rather was constructed for the purpose of designing an adsorption field, without modification it provided a more than worst case scenario of impacts associated with the operation of a plant. In this case, Dr. Chin utilized the ultra- conservative assumptions used in designing the adsorption field and made no revisions to the model. Thus, it is found that the model as used by Dr. Chin, and any conclusions drawn from the model alone, are not a sufficient or reasonable basis for evaluating the impact of the plant on the system. The model used by Dr. Chin is not representative of the natural occurring conditions on the island or the reasonably expected plant flow rates. Moreover, in developing the worst case scenario, as opposed to reasonable expectations, both the Chin and Missimer models incorporated the simultaneous occurrence of certain conservative assumptions including an impermeable flow boundary, a year round wet season water table elevation, a conservative rate of transmissivity, and a constant rate of evapotranspiration. The use of these assumptions caused the model output to grossly overstate the effects of the plant on the system in the following manner. First, by assuming a flow barrier on the island, the model had the effect of overestimating the height of the groundwater mound from operation of the plant than would occur if no boundary were used. Second, the assumption of a year-round wet season groundwater level is unrealistic since groundwater levels fluctuate seasonally, receding to near zero NGVD on the island during the dry season. Thus, the model overestimated the height of the groundwater level. Further, by using only the upper ten feet of the water table aquifer in calculating the rate of transmissivity, the model incorporated a much lower rate than would be attained had the entire thickness (74 feet) of the aquifer been used. This also resulted in an over-estimation in the height of the mound from the operation of the plant. Finally, by assuming a constant rate of evapotranspiration, the model "grossly exaggerated" the impact to the groundwater level from operation of the plant. In reality, as the water table increases, the loss of water from evapotranspiration increases significantly and constitutes a major output of a water budget. Besides the foregoing assumptions, the Chin model also assumed a continuous loading rate of 30,000 gallons per day for a period of up to one year. While the District should properly consider the permitted flow rate of the plant in evaluating a worst case of potential impact, there was no evidence substantiating any likelihood of the plant actually producing 30,000 gallons per day for 365 consecutive days in conjunction with all other conservative assumptions discussed above. The more reasonable and accepted method of analyzing the impact of plant flows is to examine the peak month's average day flow over a six-month period. As noted earlier, for the proposed forty-two units, the peak day flow is estimated to be approximately 21,200 gallons per day. Therefore, it is highly probable that actual flow rates will be much lower than the maximum plant capacity of 30,000 gallons per day. By failing to use the more reasonable and realistic reduced flow rates, the Chin model overestimated the elevation of the groundwater level from the operation of the plant. In contrast, the Missimer analysis demonstrates that it is extremely unlikely that the plant output will ever elevate groundwater to the extent that it would reach the system swales by either surface water or groundwater flow. The foregoing modeling assessments, including the criticisms of the Chin model, were concurred in by the District expert. Water Quantity Impacts There is no credible evidence to support a finding that the operation of the plant will adversely impact the ability of the system to provide adequate flood protection and drainage. Indeed, the more credible evidence shows that an alteration of existing drainage patterns will not occur by virtue of the operation of the plant, and the post-development discharge rates will not exceed the pre-development discharge rates. Therefore, the undersigned's previous finding that applicants have provided reasonable assurance that the the system provides adequate protection and drainage is not altered after considering the operation and location of the plant. There is insufficient credible evidence to support a finding that the plant's operation will adversely impact the system functions in such a way as to cause adverse water quantity impacts on receiving waters and adjacent lands. Indeed, the post-development discharge rate approximates the pre-development discharge rate on receiving waters, the ultimate receiving water body (the Gulf of Mexico) has an infinite capacity to receive water, and there are no adjacent lands subject to flooding from discharge of the system regardless of whether there is any impact of the plant on the system. There is no credible evidence to support a finding that the plant will cause the system to have an adverse impact on surface and groundwater levels and flows. Rather, the more persuasive evidence shows that the plant's operation will not result in groundwater elevation in the area of the system that would cause the impoundment of water or prevent the percolation of water into the soil. In addition, the overflow levels for control structures will operate as designed to insure against over-drainage or flooding. Finally, the operation of the filter fields will not cause adverse impacts on surface and groundwater levels and flows. Water Quality Impacts The operation of the plant will not impair the water quality functions of the system. This is because the swales will continue to detain the first flush of run-off allowing the majority of the suspended solids and other pollutants to settle out regardless of the operation of the plant. Further, in the unlikely event the treated wastewater effluent reached the system, it would be indistinguishable from the stormwater or rainfall due to the high level of treatment from the plant, the filter fields and dilution from groundwater and rainfall. The operation of the plant will not cause adverse water quality impacts on the receiving waters. In making this finding, the undersigned notes initially that the plant is permitted by DER, and therefore it is assumed to comply with all DER water quality standards. Second, there is no evidence that the system will impact the operation of the plant. In the event the groundwater mixed with treated effluent resurfaces, there would be no adverse impact to the surface water quality. This is because the treated effluent from the plant exceeds state water quality standards. Once the treated effluent becomes a part of the groundwater, it is unlikely that it will resurface again in the areas of the swales, which are more than one hundred ten feet away. Indeed, in order for the groundwater with effluent to travel that distance, it would have been in the groundwater system for at least one hundred days. This period of time is more than sufficient for the denitrification and adsorption processes to remove all nutrients. Even if the worst case scenario became a reality and the groundwater reached the swale bottoms, it would only result in a wetting of the ground and would not be of sufficient quantity to create a flow of water in the swale to travel off-site impacting a receiving water. In any event, at that point, any groundwater resurfacing that distance away would no longer be effluent. Finally, during abnormal conditions, such as a hurricane or large storm event, the groundwater may rise to the surface and mix with the surface water and enter the system. However, any effluent already significantly diluted under normal circumstances would be indistinguishable from the stormwater or rainfall. Adverse Environmental Impacts There is no credible evidence that the operation of the plant filter fields will adversely impact the system in such a manner as to cause an adverse environmental impact. In so finding, the undersigned rejects the contention that the system will act as a conduit for treated effluent to travel off-site to the ponds, marsh, mangrove areas or receiving waters. The evidence shows that the design of the filter fields and high permeability of the island soils will prevent the surface flow of effluent to the system swales. The elevation of the swales above the groundwater table level will prevent the introduction of effluent into the swale system. In the unlikely event the groundwater reaches the bottom elevation of the swale, there would be no significant environmental impact because the quality of effluent would be indistinguishable from the groundwater due to the high level of treatment and dilution, and such water would still be further treated by the system before discharge to receiving bodies. The location of the plant and system will not have an adverse impact on the gopher tortoise population on the island. Rather, the system should enhance the gopher tortoise population by providing mananged land with vegetation suitable for gopher consumption. Further, the general development on the island will reduce the number of raccoons which prey on gopher eggs and young gophers. Miscellaneous During the remand hearing, FAS presented evidence concerning the impact of tides and mean sea level rise and saline lakes on the island. This evidence was essentially the same as that presented in the prior hearing and was rejected in favor of the more credible evidence presented by the applicants on this issue. Nothing was presented during the remand hearing which would alter these prior findings. During the hearing, and in response to a question by District counsel, witness Missimer agreed it would not be unreasonable to install a few monitoring wells to insure that the system is operating properly. Because this requirement is not unreasonable, will serve a valuable purpose, and has been utilized by the District as a special condition on numerous prior occasions, it should be incorporated into the permit conditions. Even though the evidence clearly shows that seasonal tidal fluctuations would not have an adverse impact on the functioning of the system, if such a tidal incursion were to occur, the placement of a check valve device on the water control structures would prevent sea water from flowing back into the system. Such a device would be a minor addition to the system, would not otherwise affect its design, and if deemed necessary by the District, should be incorporated into the permit conditions. Prior to hearing, the District retained the services of an outside consultant to assist it in preparation for trial. The consultant did not testify at final hearing and prepared no reports. He did make several computer runs, none of which are a part of this record. Among other things, District witness Rogers relied upon the computer runs in formulating his opinion on the issue presented on remand.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered granting the requested permit in accordance with the agency's proposed agency action dated March 28, 1990. DONE and ENTERED this 22 day of March, 1991, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22 day of March, 1991.

Florida Laws (3) 120.57373.403373.413 Florida Administrative Code (2) 40E-4.09140E-4.301
# 3
CHARLOTTE COUNTY MOSQUITO CONT ROL C/O CHARLOTTE COUNTY BOARD OF COUNTY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000084 (1986)
Division of Administrative Hearings, Florida Number: 86-000084 Latest Update: Nov. 19, 1986

The Issue The issue to be resolved in this proceeding concerns whether the Petitioner's "groundwater monitoring plan," embodied as a condition in the present operating permit, should be modified at the behest of the Department of Environmental Regulation.

Findings Of Fact On October 2, 1985, the Department issued to Charlotte County a permit to operate a Class I Sanitary landfill, pursuant to Section 403.087 and 403.707, Florida Statutes. A groundwater monitoring plan was part of that permit. One of the purposes of the groundwater monitoring plan was to detect any leachate plume of pollutants which might migrate off the site of the landfill in the groundwater. In accordance with the groundwater monitoring plan, as part of its conditions, the landfill has four monitoring wells, MW-1 - MW-4. One of those monitoring wells, MW-1, was established as a background well. Two of the monitoring wells, numbers 2 and 4, were installed as "interceptor" and "intermediate" wells. The fourth monitoring well is a "compliance well." The purpose of the background well at the landfill site is to determine the quality of the groundwater as it comes onto or enters the property subject to the operating permit. Specific condition number 2 of the monitoring plan incorporated, in the permit, required that once a year, beginning with the first quarter, sampling wells MW-1 and MW-2 should be analyzed for certain synthetic, organic compounds. Eight synthetic, organic compounds (SOCs) were tested for in accordance with Rule 17-22.104(1)(g), Florida Administrative Code. Those compounds were as follows: Trichloroethylene; Tetrachloroethylene; Carbon Tetrachloride; Vinyl Chloride; 1, 1, 1-Trichloroethane; 1, 2-Dichloroethane; Benzene; and Ethylene-dibromide. On December 9, 1985, the Department received the results of the chemical analysis performed by its laboratory in Tallahassee on the samples collected by district personnel on August 5, 1985. Those test results indicate the presence of the following compounds in well MW-1: Ethylbenzene at a concentration of 1.0 micrograms per liter, Methylenechloride at a concentration of 4.5 micrograms per liter, Trichloroethane at a concentration of 3.2 micrograms per liter, Toluene at 2 micrograms per liter, Xylene at 2.4 micrograms per liter, and Acetone at 40 micrograms per liter, as well as other "purgables" at an aggregate of 30 micrograms per liter. On the basis of this analysis, the Department informed the County that it would modify the County's groundwater monitoring plan by requiring it to monitor for "purgables", (synthetic, organic compounds) in all four wells on a quarterly basis. The original groundwater monitoring plan had required monitoring for the eight original SOCs in two of the four wells on an annual basis. This proposed modification would thus modify the conditions of the landfill operation permit held by the County. Since the samples taken on August 5, 1985, further tests have been performed on water samples taken from the four subject wells at the landfill site by both the County and the Department. On December 9, 1985, the County obtained water samples from wells MW-1 and MW-2, which were analyzed for the eight primary SOCs enumerated in the original water monitoring plan. That analysis showed the following: MW-1 1, 1, 1-Trichloroethane - 1.8 micrograms per liter MW-2 1, 1, 1-Trichloroethane - 4.1 micrograms per liter 1, 2-Dichloroethane - 1.1 micrograms per liter The Department took water samples on January 16, 1986, from all four wells. Results of the analyses for SOCs showed that as of that date, MW-1, which had been the well testing "positive," which resulted in the proposed change in the permit and monitoring plan was, on January 16, free of synthetic, organic compounds. Wells MW-2 and MW-3 were also free of purgables. The analysis of water sample from well MW-4 showed that it contained 4.67 micrograms per liter of Benzene, 1.58 micrograms per liter of Chlorobenzene, and 8.27 micrograms per liter of 1, 2- Dichloroethane. Sampling the wells MW-1 and MW-2 on March 13, 1986, the County analyzed for the complete list of "purgables" or SOCs with the result that well MW-1 was shown to contain 1.8 micrograms per liter of Ethylbenzene and 2.7 micrograms per liter of Toluene. Well MW-2 contained 1.3 micrograms per liter of Ethylbenzene and 2.0 micrograms per liter of Toluene. Almost two months later, on May 5, 1986, the Department sampled wells MW-1, MW-3 and MW-4, finding that MW-1 contained no purgables; MW-3 contained 1 microgram per liter of Methylenechloride (an isolated occurrence of this compound); and well MW-4 contained 1 microgram per liter of Chlorobenzene, 2 micrograms per liter of 1, 3-Dichlorobenzene, 10 micrograms per liter of Toluene, 2 micrograms per liter of Cis-1, 2, Dichloroethane and 6 micrograms per liter of "other purgables. Thus, it can be seen that in the August 1985 test, the first monitoring well tested, MW-1, contained SOCs. At the later test performed in December, that well contained SOCs in the form of Trichloroethane and yet on January 16, 1986, the well was free of detectable SOCs. On March 13, 1986, however, that well was shown to contain Ethylbenzene and Toluene. On the other hand, on the May 5, 1986, sample, the well contained no detectable purgable compounds. On the December 9 test, it can be seen that well MW-2 contained Trichloroethane and Dichloroethane and yet on January 16 was free of any detectable SOCs. However, on March 13, 1986, well MW-2 contained Ethylbenze and Toluene. Well MW-3 was free of SOCs at the December test, but on May 5, 1986, contained Methylenechloride, although in a very slight concentration, which could have resulted from contaminated testing equipment. Well MW-4 contained, in December, the above-noted concentrations of Benzene, Chlorobenzene, and Dichloroethane. On March 13, 1986, wells MW-3 and MW-4 were not tested. The Department's test of May 5, 1986, sampled MW-1, MW-3 and MW-4. On that date MW-4 contained Chlorobenzene, Dichlorobenzene, Toluene, Dichloroethane, and "other purgables." Thus, in consecutive samples taken and analyzed by the Department and the County since the date of its proposed modification of the groundwater monitoring plan, it has appeared that organic compounds detected in one sampling did not appear or were below the detection limits in subsequent analyses and yet showed up in other monitoring wells. It is especially significant, however, that well MW-4, which is the well farthest "down" the groundwater gradient and is indeed the compliance well for assessing whether the landfill is performing within the regulatory bounds of its operating permit has, whenever tested, demonstrated the presence of the above-noted contaminants. The fact that some wells demonstrate the presence of contaminants and on a later test, test negative for those contaminants was shown by the Department to likely occur because of variables attributable to rainfall. The amounts and occurrence of rainfall' can play a significant role in determining whether the concentrations in any amount exist in the monitoring wells and can determine in part what concentrations are found in samples from those monitoring wells. The compounds move through the soil or reside in the soil and the rainfall may cause certain compounds to be washed or leached out of the soil in varying amounts and at varying rates. Sampling shortly after a heavy rainfall might result in detection of certain compounds not detectable during a dry period or might increase the amounts detectable. The absence or slight concentrations of the subject contaminants in a well which increase with later samples would indicate that the leachate or contaminant "plume" in the groundwater is passing through that well. The down gradient well, MW-4, is the compliance well and is located down gradient from the perimeter ditch around the landfill. On both the samples taken in January and in May, that well was shown to be contaminated with SOCs as depicted above. Thus, it has been established that there are some leachate contaminant plumes moving in the groundwater through the location of that well, which establishes the likelihood that the leachate in the landfill will migrate off site by the flow of the groundwater. Thus, since DER issued the proposed modification of the monitoring plan, four additional groundwater samplings have revealed more SOCs at the landfill site. SOCs have been found in all wells at one time or another in detectable amounts. The presence or absence of SOCs and the varying amounts present at various sampling times at various wells is explained by variations in the migration rate of the contaminants due to variations in frequency and amount of rainfall percolating into and flowing through the substrate in which the wells are located. Groundwater in the area of the landfill is not well-protected from waste contamination. The landfill is located in an area where the groundwater table is one to two feet above the surface level during the wet season and only four to five feet below the surface level in the dry season. The landfill is not lined with clay or another impervious or semi-impervious material which could retard the migration of contaminants from the landfill itself into the groundwater acquifer. Because of this, ground water can migrate upward into the waste in the landfill during the wet season and the waste in the landfill can percolate into the groundwater acquifer in a downward and outward direction during the dry season. Additionally, the south and west slopes of the landfill are exposed and waste is thus exposed to the water contained in the perimeter ditch around the landfill, which water is connected hydrologically to the groundwater acquifer. The landfill is the only public solid waste disposal site in Charlotte County and thus receives all manner of waste, including some hazardous waste. Leachate contaminant plumes have already developed on the landfill site and may be in the process or may already have migrated off the site. This site is the only municipal landfill in the seven-county South Florida District of the Department where the SOCs are being detected in the groundwater. The groundwater in the area outside the landfill is designated as G-II, which is usable as a drinking water source. It is appropriate to sample the groundwater more frequently in the vicinity of such a landfill when that groundwater is designated as a drinking water supply. Although well number 1 was originally designated as a background well to check the background chemical status of the water before it migrates down gradient to the landfill site, that well, although located generally up gradient of the groundwater flow, has been shown to contain SOCs which in all probability emanated from the landfill. This is because the County has periodically added water from the landfill itself into the perimeter ditch around the landfill causing groundwater flow to move in both directions laterally from the ditch. Finally, although the Petitioner contends that some of the contamination found in the samples is a result of improper testing and contamination with laboratory solvents, the potential for laboratory contamination of the samples and sampling equipment is a possible explanation (although not proven) only for those SOCs found that are common laboratory solvents. Only Methylchloride, which occurred in one isolated sample, and the compound Toluene fit into this category of possible laboratory contaminants. The remaining SOCs found in the samples are not common laboratory solvents and therefore are present in the samples due to their presence in the groundwater itself from which the sample was taken.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is, therefore RECOMMENDED that the modified groundwater plan proposed by the Department in the December 18, 1985, letter to Charlotte County should be adopted into the groundwater monitoring plan for the Charlotte County landfill. DONE and ORDERED this 19th day of November 1986 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of November 1986. APPENDIX - CASE NO. 86-0084 Petitioner's Proposed Findings of Fact 1 - 18. Accepted Rejected as not established by the evidence presented. Accepted, but dispositive of the material issues presented. Rejected as to its asserted import. Accepted, but not dispositive of the material issues presented. Accepted. Accepted. Rejected as not dispositive of the material issues presented. Accepted, but not in itself dispositive. Accepted. Accepted. Accepted, but not dispositive of the material issues presented. Accepted, except as to the last clause. Accepted. Rejected as to its asserted import. Accepted, but not dispositive of the materia issues presented. Respondent's Proposed Findings of Fact 1 - 20. Accepted. COPIES FURNISHED: Matthew G. Minter, Esquire Assistant County Attorney Charlotte County 18500 Murdock Circle Port Charlotte, Florida 33948 Douglas L. MacLaughlin, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Mary F. Smallwood, Esquire General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (3) 120.57403.087403.707
# 4
CONCERNED CITIZENS OF ORANGE LAKE AREA vs CELEBRITY VILLAGE RESORTS, INC., AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 91-002694 (1991)
Division of Administrative Hearings, Florida Filed:Ocala, Florida May 01, 1991 Number: 91-002694 Latest Update: Jun. 10, 1992

The Issue The ultimate issue is whether Celebrity Resorts, Inc., (Celebrity) is entitled to a Management and Storage of Surface Waters (MSSW) permit for a surface management system to serve its proposed development in Marion County, Florida.

Findings Of Fact PROPOSED PROJECT Celebrity is seeking a District MSSW permit to construct a surface water management system to serve a proposed recreation vehicle (RV) park. The facility is to be located in northern Marion County on the southern border of Orange Lake, an Outstanding Florida Water. The entire site is within the geographic boundaries of the District. The RV park is to be located on 75 acres of land, and is to contain 372 RV and "park model" sites, four bath houses, a clubhouse, and an expanded boathouse. There is a "break" in the watersheds of the Celebrity property caused by a ridge across the approximate center of the project site. The effect of this "break" is that approximately one-half of the property drains toward the lake while the approximate southerly half of the property drains into an independent depression creating a watershed separate from the lake. Parts of Marion County and Alachua county have been designated as Sensitive Karst Area Basin by the District. The project site is located in the designated area. The existing land use is open pasture. The property was previously used for citrus groves. STANDING Concerned Citizens of Orange Lake Area is an unincorporated group of approximately 76 individuals who want to prevent pollution of Orange Lake. Of the 76 members, three members were present and testified at the hearing. The members attending the hearing were an artist (Riley), a photographer (Suto), and a bass guide (Solomon). Ms. Suto testified that she lives about 1 to 1 1/2 miles from the site. Ms. Riley testified that she lives next door to Ms. Suto and determined that to be over two miles away from the site. Mr. Solomon testified that he lives on the southeast side of Orange Lake approximately 1 to 1 1/2 miles from the project site. No witness testified that any member has a property interest in the subject property. Of the members who testified, none use the subject property. There was no testimony that other members use the property. Twenty-six members wrote letters of concern to the District. Ms. Suto testified to the existence of high levels of lead in her well water. WATER QUANTITY The existing land use, pasture, was used to determine the pre- development peak rate and volume of discharge. The existing surface drainage of the 75-acre project site is divided into two basins. On the north side of the property, the surface water flows toward Orange Lake. This basin is designated on the plans, sheet 3 of 16, by a "2." The south portion of the property is contained within the landlocked drainage basin which is designated on the plans, sheet 3 of 16, by a "1." The post-development flow of surface water will be in the same direction as the pre-development flow. There are no proposed development plans or encroachments into the 100- year floodplain. Therefore, there is no increase in potential for damages to off-site property or persons caused by floodplain development or encroachment, retardance, acceleration, displacement, or diversion of surface waters. There is no reduction in natural storage areas and, in fact, the proposed project increases the natural storage on site. Drainage Basin 2 The District's criterion for systems discharging to basins with an outlet is that the post-development peak rate of discharge for the 25-year, 24- hour storm event shall not exceed the pre-development peak rate of discharge for the 25-year, 24-hour storm event. The District's criteria also require that the post-development volume of discharge not exceed the pre-development volume of discharge. The retention system which ultimately discharges to Orange Lake is designed to retain the entire 25-year, 24-hour storm event through the series of basins on site. The pre-development peak rate of discharge for the drainage basin which flows to the lake is 55 cubic feet per second (cfs) during the 25-year, 24-hour storm event. The post-development peak rate of discharge from drainage basin 2 is 4 cfs. The post-development peak rate of discharge is less than the pre- development peak rate of discharge. Runoff from each RV site will be collected in an individual, ten-inch- deep retention basin. Runoff from the road will be collected in roadside swales. Runoff from the clubhouse, country store, and associated parking lots will be conveyed to drainage retention area (DRA) No. 8. The individual retention basins have the capacity to retain the 25- year, 24-hour storm event without discharging. Any surface water discharges from the individual retention basins in Basins 2A, 2B, and 2C as designated on sheet 3 of 16 will flow to DRA Nos. 4, 5, and 7, respectively. In Basin 2D, runoff from the road and RV park model sites will flow to DRA No. 6. The discharge from DRA No. 6 in the 25-year, 24-hour storm will be zero (0) cfs. In larger storms, any discharge from DRA No. 6 will flow to DRA No. 7. In the event DRA No. 7 overflows, the runoff will flow to DRA No. 5. Basins 2G and 2F are located around two existing sinkholes which currently collect stormwater runoff. In the proposed project, Basins 2G and 2F continue to drain the same area as pre-development. However, additional impervious surfaces will be placed in the drainage area. For this reason, an additional three to five feet of clean fill will be placed in the bottom of each sinkhole for filtration purposes. Basins 2H and 2I are less than one acre and currently drain off site. Berms are proposed around the property line at the basin to keep the stormwater on site. Basins 2H and 2I retain 3/4 inch of runoff over the individual basin. The runoff from Basins 2E1 and 2E flows to DRA No. 8 via a drainage swale. DRA No. 8 will retain 3/4 inch of runoff from the drainage area and is an off-line retention basin. The DRA No. 8 is equipped with a diversion box which allows the 3/4 inch of runoff to enter the DRA and then diverts the runoff from larger storms around the DRA so that the treatment volume of runoff (3/4 inch) continues to be treated in DRA No. 8 and does not mix with and discharge from DRA No. 8 during larger storms. Drainage Basin 1 Drainage Basin 1 as designated on plan sheet 3 of 16 is a landlocked basin which does not discharge to Orange Lake. In Drainage Basin 1, as in Basin 2, the runoff from the RV sites flows to the individual retention basins which retain the 25-year, 96-hour storm event. The runoff from the road flows to swales. Overflow from the basins and swales flow to the DRAs. Drainage Basin 1 does not discharge during the 100- year, 24-hour or the 25-year, 24-hour storm event, pre-development or post- development Drainage Basin 1 is designed to retain the 100-year, 24-hour storm, which is an 11 inch storm event. Drainage Basin 1 is also designed to retain the 25-year, 96-hour storm event. The 25-year, 96-hour storm event is 143% of the 25-year, 24-hour storm event. WATER QUALITY Design Criteria The District's design criteria for water quality are set out in Section 40C-42.025, Florida Administrative Code. The District's retention criteria require that a proposed system have a treatment/pollution abatement volume of 1/2 inch of runoff from the site. For discharges to an OFW, the pollution abatement volume is increased by fifty percent. Therefore, the system must have the volume to retain 3/4 inch of runoff from the site. Each retention basin retains a minimum of 3/4 inch of runoff from the site. The District's criteria regarding quantity of water discharged require a larger volume of runoff to be retained than the District's criteria regarding quality. Therefore, the retention system exceeds the District's criteria regarding quality in order to meet the criteria regarding quantity. The District's retention criteria require that the basin recover the treatment volume within 72 hours. Most of the retention basins retain more than the required treatment volume of 3/4 inch, and most will also recover, or become dry, within 72 hours. The retention basins are capable of being effectively maintained in that the side slopes and bottom of the basins can easily accommodate mowing equipment. For erosion control, staked hay bales and silt screens will be utilized on site during construction to prevent the off-site transport of soil material. Following construction, the retention basins will be vegetated with sod to prevent erosion. The District's criteria require that facilities which receive stormwater runoff from areas with greater than fifty percent of impervious surface shall include a baffle or other device for preventing oil and grease from leaving the system. DRA Nos. 1, 4, 5, and 8 are equipped with an oil and grease removal device called a baffle. The baffle is an acceptable engineering design for the removal of oil and grease from stormwater in a retention basin. The facility operation is uncomplicated. If the individual basins did fill due to a storm event greater than the 25-year, 24-hour or the 25-year, 96- hour in the landlocked basin, they would simply overflow into a DRA. No structures are involved to prevent flooding in large storm events. Water Quality Impacts The individual retention basin at each RV site is considered off-line because it does not discharge in the 25-year, 24-hour storm event. DRA Nos. 1, 2, 3, 4, 5, 6, and 7 are considered off-line because they do not discharge during the design storm. DRA No. 8 is considered off-line because of the diversion box which provides for the retention of the treatment volume and diversion of the larger storms. Off-line retention systems generally show greater pollutant treatment efficiencies than other types of stormwater treatment. The first 1/2 inch of runoff or the "first flush" of rainfall contains ninety percent of the pollutants from the site. SURFACE WATER Utilizing information and methodologies generally accepted by experts in the field of water quality, the District analyzed and projected the average surface water and groundwater quality of the discharge from the surface water management system for the proposed project. No data on runoff concentrations currently exists for RV parks. This analysis was based on a review of existing data on untreated runoff concentrations from three multifamily developments and one highway study. Because data from studies of multifamily residential and highway projects was used, the District's estimates of the untreated runoff concentrations for this project are conservative in that the actual concentrations are probably less than estimated. The District's analysis of the average quality of the discharge from the proposed system was also based on projecting the treatment efficiencies associated with the system. This analysis was done by reviewing data from documented studies previously conducted to ascertain the treatment efficiency of retention methods of stormwater treatment. Generally, retention of the first 1/2 inch of runoff removes eighty percent of the pollutants. On this project, a treatment efficiency of ninety-five percent was assumed based on the fact that the system is off-line treatment and a minimum of 3/4 inch of runoff from the site will be retained in the basins prior to discharge. The expected average untreated runoff concentrations were then educed by the expected treatment efficiencies to project post-treatment water quality of the discharge from the proposed system. These numbers were then compared to Chapter 17-302, Florida Administrative Code, water quality standards for Class III water bodies, and ambient water quality in Orange Lake. Orange Lake is classified as an OFW. Therefore, the proposed project cannot be permitted if it will cause degradation of that water body. The background data or ambient water quality data for phosphorous and nitrogen was taken from the Orange Lake Biological Report by the Florida Game and Freshwater Fish Commission in 1986. The ambient water quality for the other parameters in Table 2 of District Exhibit 2 was computed using eight years of data from a District monitoring station on Orange Lake. The projected average concentration for each constituent in the discharge from the system is less than the ambient water quality of Orange Lake. Therefore, the proposed surface water discharge will not violate state water quality standards in waters of the state. The post-development pollutant loading rates should be equal to or better than the pollutant loading rates from the use of the property as citrus or pastureland because the runoff is being retained on site and treated before being discharged. GROUNDWATER Groundwater discharges were reviewed by assessing the type of soil below the retention basin and the distance to the water table. The soil on the site contains some organic matter which is beneficial for treatment purposes. Based on the borings submitted by Celebrity, the water table, if any, is five feet or more below the bottom of any proposed retention basin. Runoff in the basin will percolate through the soil. Nutrients such as nitrogen and phosphorus will be taken up by the vegetation in the bottom of the basins. Metals will bind to the soil material below the basin. Oils and greases will be broken down through microbial degradation into nontoxic material. Groundwater discharges from the proposed system will not violate any applicable state groundwater quality standards. These standards will be met within the first three feet below the treatment basins. The standards will also be met by the time the groundwater discharge moves to the edge of the zone of discharge which is at the property boundary. The discharge from the proposed Celebrity project will not cause or contribute to a violation of state water quality standards in the receiving waters. SINKHOLES Sinkholes may form on the site. Sinkholes that form will probably be "cover subsidence" sinkholes. Cover subsidence sinkholes are those in which a void below the surface fills with the soil from above, causing a depression in the ground surface. There are four relict sinkholes on site. They are cover subsidence sinkholes. The sinkhole nearest the lake has water in the bottom. Stormwater runoff is directed away from the sinkhole. Any water which enters the sinkhole from the land surface or above will enter from the sky. The District has proposed criteria for stormwater systems in designated Sensitive Karst Area Basins. Those criteria are that 1) the water in the basins shall be no deeper than ten feet deep; 2) there should be at least three feet of unconsolidated material between the bottom of the basin and the top of the water table; and 3) the basins should be fully vegetated. The District currently applies these criteria as policy. In this project, the basins are shallow, ranging from ten inches deep at the RV sites to 2 1/2 feet in the DRAs. The basins have at least three feet of unconsolidated material between the bottom of the basin and the top of the water table. In the soil borings performed by Celebrity, the water table was shown to exist between five and fifty feet below land surface. The proposed project design meets or exceeds the proposed criteria for Sensitive Karst Area Basins. The basins will be fully vegetated or sodded with grass. Lineations or lineaments are solution features which may indicate a fracture of the underlying limestone. There may be a lineament on the site. There are other sinkholes in the area. If a cover subsidence sinkhole develops in an individual retention basin or DRA, stormwater, if any, will seep or percolate through the several feet of soil prior to reaching an aquifer. Most of the pollutants in the retention basin will meet groundwater quality standards prior to percolation and further treatment in the soil. OPERATION AND MAINTENANCE Special conditions Nos. 13, 14, and 15 on the permit will require Celebrity to inspect the system monthly for sinkhole development. If a sinkhole develops, Celebrity must notify the District within 48 hours of its discovery. Celebrity must submit a detailed repair plan within 30 days for written approval by the District. Celebrity proposes to repair any sinkholes that develop by a District- approved method. Celebrity Resorts, Inc., is a legally established corporation registered in Delaware and owns the subject property. Celebrity does not intend to subdivide the property but to sell memberships to use the property on a time-share basis. Celebrity will administratively operate the site by employing a park manager who will remain on the property 24 hours a day. If any problems occur with the basins, either he or his designee will be on site to respond quickly to the situation. The park manager will have a full-time maintenance staff which will operate the park. Celebrity will financially operate and maintain the proposed system using funds currently raised and in the future by membership fees. Celebrity is a publicly held corporation. Funds raised from the sale of stock, approximately $3,500,000, have paid for legal and administrative fees as well as the land purchase. Approximately $400,000 has been reserved to operate the facility. It will cost approximately $15,000 per month to run the park. Memberships will be sold for $300 per year. Part of the membership fees will go toward the general maintenance of the site. Maintenance of the proposed system will include regular mowing and monthly inspection for sinkholes and repair if necessary. WETLANDS IMPACTS OF THE PROJECT The property contains waters of the state wetlands and isolated wetlands. The waters of the state wetlands are those along the shore of Orange Lake. One isolated wetland exists on site in the sinkhole which is closest to the lake. The sinkhole has standing water in which lemna, or duckweed, is growing. Duckweed is a listed plant species in Section 16.1.1(2) of the Handbook. No construction is proposed in either the waters of the state wetlands or the isolated wetland. The District criteria require the review of impacts to off-site aquatic and wetland dependent species relative to the functions currently provided by the wetlands to these types of fish and wildlife. Since there will be no construction in the wetlands, there will be no impacts to the habitat, abundance and diversity, or food sources of off-site aquatic and wetland dependent species from this proposed project. No threatened or endangered aquatic and wetland dependent species were observed on site. The proposed permit application will not adversely affect natural resources, fish, or wildlife in a manner which is inconsistent with the District criteria. The proposed permit application will not adversely affect hydrologically-related environmental functions in a manner which is inconsistent with the District criteria.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the petition filed by Concerned Citizens of Orange Lake Area be dismissed for lack of standing and that Celebrity Resorts, Inc., be issued a MSSW permit for its system as designed and proposed. DONE and ENTERED this 19th day of July, 1991, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of July, 1991. APPENDIX TO THE RECOMMENDED ORDER The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Concerned Citizens of Orange Lake Area 1. Proposed findings of fact 1-6 are subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Celebrity Resorts, Inc. 1. Proposed findings of fact 1-38 are subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, St. Johns River Water Management District 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1&2(1); 3-7(4-7); 8-20(8- 20); 21(2); 22-31(21-30); 32(16); and 33-107(31-105). COPIES FURNISHED: Crawford Solomon Qualified Representative Concerned Citizens of Orange Lake Post Office Box 481 Citra, FL 32681 William L. Townsend, Jr. Attorney at Law Post Office Box 250 Palatka, FL 32178-0250 Nancy B. Barnard Attorney at Law St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429 Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429

Florida Laws (3) 120.52120.56120.57 Florida Administrative Code (1) 40C-42.025
# 5
COASTAL ENVIRONMENTAL SOCIETY, INC., AND ST. JOHNS PRESERVATION ASSOCIATION, INC. vs. GATE PETROLEUM COMPANY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-001939 (1989)
Division of Administrative Hearings, Florida Number: 89-001939 Latest Update: Oct. 11, 1989

The Issue The issues to be resolved in this proceeding concern whether the Respondent Gate Petroleum Company (Gate) has provided reasonable assurances that Water Quality Standards will not be violated by the proposed modification of Gate's dredge and fill permit No. 160462149 and whether Gate has provided reasonable assurances that the proposed modification of that permit will not be contrary to the public interest, nor be the occasion of adverse cumulative impacts to water quality or public interest considerations so as to make this project contrary to the public interest.

Findings Of Fact The Respondent Gate Petroleum Company, by and through its wholly-owned subsidiary, Gate Maritime Properties, Inc., proposes to construct a ship- berthing facility for two ships adjacent to Blount Island Channel, along the southeastern portion of Blount Island, in the St. Johns River, in Duval County, Florida. The proposed facility would provide for the berthing of two ships of the United States Navy Military Sea-Lift Command in conjunction with the mission of the Navy's Rapid Deployment Force. The proposed facility would be located along the southeasterly portion of "Cut A" of the Blount Island Channel and will consist of a "T-head Pier", a breasting dolphin and cat walk and two mooring dolphins. The pier would be connected to the land by an approach trestle. The facility involved will be constructed by the insertion of concrete pilings into the bottom of the Blount Island Channel and in the adjacent upland, which would support concrete decks and caps. Removal of dredged material will be necessary to accomplish the project and will be performed by a floating hydraulic dredge with associated "Cutter Head." The resulting dredged material would be disposed of in a diked spoil area on either Blount Island or at the Dayson Spoil Site adjacent to the mouth of Clapboard Creek. The Respondent Gate currently holds a DER dredge and fill permit, No. 160462149, authorizing the removal of approximately 3.4 million cubic yards of dredged spoil and the installation of an associated 5,000 feet of shoreline bulkhead. The proposed installation of the pier and mooring facilities would result in a modification of that permit so that approximately 1,000 feet of shoreline bulkhead and most of the related dredging will be unnecessary and not performed. Instead, approximately 7,100 cubic yards of dredging would be necessary, without the necessity for bulkheading. The remaining shoreline bulkhead and dredging authorized under the above permit would be rendered unnecessary and replaced by the addition of two additional T-head piers and associated dredging at some indefinite time in the future. The additional piers and dredging are not involved in this permit modification application and are not before the Hearing Officer at this time. The Blount Island Channel of the St. Johns River, the St. Johns River and Clapboard Creek are classified as Class III surface waters of the state pursuant to Sections 17-3.081 and 17-3.121, Florida Administrative Code. It has been established by stipulation of the parties that the proposed modification of the dredge and fill permit will not adversely affect navigation nor the flow of water in the Class III state waters involved. It is also stipulated that the proposed modification will not adversely affect historical and archaeological resources pursuant to Section 267.061, Florida Statutes. It is stipulated as well that the discharge of effluent from the Dayson spoil site will not violate water quality standards at the point of discharge in the Fulton-Dames Point Cut. On March 22, 1989, the Florida Department of Environmental Regulation issued its intent to approve the proposed permit modification so as to allow the elimination of the previous requirement in the permit to monitor for copper at the site of the effluent discharge; the relocation of the Blount Island spoil site effluent discharge and the construction of a T-head pier on the southeast side of Blount Island adjacent to the Blount Island Channel. The Department did not initially grant the request to relocate the Dayson spoil site effluent discharge from the Corps of Engineer Channel (Dames Point Cut) to the mouth of Clapboard Creek. On January 31, 1986, Gate was issued permit No. 160462149, pursuant to Chapters 403 and 253, Florida Statutes, with an expiration date of January 31, 1991. It authorizes the dredging and filling on and adjacent to Blount Island referenced above. The permit authorizes those operations in two phases, consisting of new dredging of approximately 300,000 cubic yards in the existing slipway and test area to obtain a project depth of 40.2 feet mean low water. Maintenance dredging was authorized in the amount of approximately 1,850,000 cubic yards in the slipway to maintain the above-noted project depth. New dredging of no more than 3 million cubic yards from the northeastern and southern margins of Blount Island to a depth of 38 feet mean low water (MLW) and 20 feet MLW on the northeastern and southern portions of Blount Island respectively, with attendant maintenance dredging, was authorized. The permit also allowed he construction of shoreline bulkheads along the eastern and southern margins of Blount Island. That 1986 permit also required disposal of dredged material from both phases of the project into diked areas on Blount Island and the existing diked off-site disposal area known as the Dayson Site, near the mouth of Clapboard Creek. Effluent from both sites was to be discharged to the Fulton-Dames Point Cut. Effluent from the Dayson site was to be discharged to the Fulton-Dames Point Cut or routed by pipeline to the Blount Island disposal site for additional treatment prior to discharge. All dredging under the 1986 permit was to be done via a suction, cutter-head dredge apparatus, with the speed of the cutter-head to be controlled so as to prevent excessive turbidity; and with all dredged material to be placed in diked areas, with the effluent discharge being conducted over adjustable weirs. The dredging of the approximately 7,100 cubic yards of material associated with the modification application at issue will be performed with the same type of equipment. Both spoil disposal sites have sufficient capacity for disposal of the material involved with the construction of the T-head pier. The effluent or "de-watering water" generated from the disposal of the dredged material at the Dayson on site will be discharged through a pipe under the St. Johns River to a point near the confluence of the Dames Point Cut and the Old River Channel. That material will consist of approximately 10 percent dredged solid material and 90 percent water. The Dayson disposal site is surrounded by dikes 24 feet high and 120 feet wide at their base. They are so constructed that there will be no discharge of effluent from the Dayson disposal site to Clapboard Creek. Since 1974, over four and one-half million cubic yards of material have been disposed of at the Days on site without any violation of state water quality standards in the creek or the adjacent salt marsh. The entire 7,100 cubic yards of dredged material, together with related water could be placed in the Dayson disposal site without causing any discharge. Gate Maritime Properties, Inc. has a five-year lease agreement with Leadermar, Inc. which will operate the T-head pier as a berthing facility for the two ships. The lease was scheduled to commence July 22, 1989. Under the terms of the contract awarded by the Navy to Leadermar, Inc., Gate, or its lessee, is required to maintain a 110 foot, safe working area surrounding the vessels for operation of tugs, lighterage vessels and fendering operations. The contract with the Navy does not require, however, that the safe working area be maintained at a depth of minus 32 feet "mean lower low water" as shown by Gate Exhibit 6 in evidence. 1/ Given the findings made infra., concerning the lack of adverse water quality or public interest impacts caused by the dredging, and the paucity of any attendant suspension of bottom materials in the operation of the ships to be berthed at the proposed facility, the issue of whether the contract with the Navy requires a depth of minus 32 feet "mean low water" or "mean low low water", a reputed difference of 1.03 inches according to the rebuttal exhibit of Respondent Gate, neither Gate's position nor the Navy's reputed position regarding this apparent contractual dispute item, if carried out, would have any adverse water quality or public interest impact in the context referenced in these findings of fact and conclusions of law. The fact remains that Gate has applied for authority to recede from the massive dredging project presently authorized in the existing permit, to stipulate by this modification application that it only seeks to dredge 7,100 cubic yards of material in the area involved. Based upon the depth established by the marine survey conducted by Bennett, Wattels and Associates, there will be an adequate safe working area for tug boats, fuel barges and lighterage vessels, as well as the ships themselves, for operations involving the berthing facilities. See Gate Exhibit 5 in evidence. If the requested modification is granted, Gate will not dredge more than 7,100 cubic yards of material for construction of the pier and related facilities and in order to provide a safe working area as required under Leadermars contract with the Navy. Indeed the amount of material to be dredged for the construction and operation of the T-head pier was based upon the above- referenced Marine survey, unrefuted evidence in this record. The volume of material was calculated by using the Marine Survey depths and the "average end area method," a widely accepted method of such calculation in the marine engineering and construction field. Further, Gate adduced the only substantial evidence in this record concerning the issue of the amount of dredging involved or the extent of the dredged area, as that relates to the "safe working area" and other issues. Water Quality Gates' consulting experts performed various chemical and sediment analyses in the project area in order to establish a general composition of bottom sediments and to establish the likelihood of suspension of any toxic substances or pollutants in those sediments as a result of the dredging operation or the operation of the ships and berthing facilities. Those analyses, and their results, in evidence in this record, were unrefuted. The bottom sediments in the vicinity of the project area are predominantly fine sand with small fractions of silt. In general, the dredged material is most likely to be free from chemical or biological pollutants where it is composed of sand, gravel or other naturally occurring inert materials, as opposed to large percentages of organic materials, which were not shown to exist in the vicinity of the project site. Based upon the characteristics of the bottom sediments in the project area, there will be no re-entrainment of toxins or pollutants which night presently be sequestered in the sediments due to construction, dredging operations or the operations of the berthing facility and ships involved. An elutriate test was performed to predict the effect on water quality from temporary suspension of the bottom sediments during the dredging operation itself. Elutriate testing is a widely recognized, conservative estimate of contaminant releases, caused by dredging, into a water column. The parameters tested for are those specified in the Department's rules for Class III waters and include cyanide, mercury, silver cadmium, selenium, barium, beryllium, nitrogen, (unionized NH3, NO2, total TKN), fluoride, copper, iron, nickel, zinc, aluminum, pesticides, herbicides and PCBs (polychlorinated biphenyls). The elutriate test results did not reveal any excess ion of any of these parameters in terms of the state water quality standards or as to prevailing natural background levels. There are no PCBs, hydrocarbons, heavy metals or pesticides shown to be sequestered in the bottom sediments of the Blount Island Channel in the vicinity of the proposed project. The chemical analyses was performed on composite elutriate samples of sediments which came from the area of the T- head pier location and the area north of the pier, where the propellers of the ships will be located and operated during test trials, after the ships are berthed at the site. Site specific chemical analyses and core borings were taken and compared with historical data or studies for these sites and found to be consistent with them. There is no likelihood of sequestered contaminants in the bottom sediments which would be released, with deleterious effect on water quality, as a result of the action of the dredge equipment or the operation of the ships after the facility is installed. Cutter-head, hydraulic pipeline dredges are not significant generators of turbidity. They are an efficient means of performing dredging and are designed to loosen and remove material from the bottom substrate, without disturbing or redistributing the dredged material around the dredge apparatus in the water column. The use of the hydraulic pipeline dredge will result in minimal water quality disturbance and any dredge-induced turbidity will be of a transitory, short-term nature. It would be localized in the immediate vicinity of the dredge's cutterhead in any event. Ambient water quality conditions can be expected to return to normal background levels in a matter of hours following cessation of the dredging activity. It is estimated by Gate's consultant witnesses that the dredging activity might be accomplished in approximately one day. It has thus been established that the relevant stage water quality standards will not be violated by the action of the dredging equipment and the dredging operation itself. Water Quality Impacts of Facility Operation The two ships of the military sealift command which are to be berthed at the proposed T-head pier are 948 feet in length and approximately 105 feet in beam. They are equipped with two main engines and two propellers. The propellers are 22 feet, 11 and 9/16 inches in diameter. The ships will be in what is known as "reserved operating status". The ships will go through a dry- docking procedure at a local shipyard approximately every two years for major overhauls, repairs and painting. Such maintenance work will not be performed at the project site. The ships will, however, undergo periodic "dock trials" while berthed at the facility. The dock trials will be conducted on a quarterly basis if the vessels have not been out on a mission in that quarter of the year. The dock trial procedure calls for the main propulsion powerplants of the ships to be put into operation and evaluated. Both main engines are tested under this procedure for approximately one hour, at ten revolutions per minute (rpm) ahead and astern. The tests are to be conducted by civilian personnel retained by the Navy or its contractor, with all appropriate safety precaution being taken. These include, but are not limited to, the manning of the bridge during tests by a master or chief mate and by rotating one engine ahead simultaneously with the other engine being rotated astern. The ships are also equipped with onboard, internal sewage treatment plants so as to prevent the discharge of pollutants to state waters. Only routine maintenance or repair work will be performed on the ships at the lay birth facility. The ships will be refueled at the facility from time to time with "bunker c" or diesel fuel brought in by barges. The barges will be conveyed by tugboats of no more than 16 feet draft. The fueling operation will be governed by the U.S. Coast Guard regulations and are performed by Coast Guard certified and licensed personnel. Dr. Neal Boehnke was accepted as an expert in the field of chemical analysis of water and testified on behalf of the Petitioner. In his opinion, water quality in the facility of the proposed project is poor and may contain elevated hydrocarbon levels. His opinions, however, are based upon 1982 and 1983 reports of sampling results allegedly obtained by the City of Jacksonville Bioenvironmental Services Division and the DER, as well as the study entitled "Survey of Hydrocarbons and the Lower St. Johns River in Jacksonville." These documents were not introduced into evidence. While it is true that an expert may base his opinion on facts and data made known to him in the normal course of his practice at or before trial and that those facts or data may be relied upon by him in formulating his opinions, it must be demonstrated that those facts and data are "of a type reasonably relied upon by experts in the subject to support the opinions expressed." See Section 90.704, Florida Statutes. In this proceeding, it was not established by competent evidence or testimony at hearing that the facts or data derived from these documents were of such a type as to be encompassed by this statutory section and thus they cannot serve as a legitimate basis for Dr. Boehnke's opinion. They otherwise constitute inadmissible hearsay, not sufficient to support a finding of fact on the water quality impacts from the proposed project and they do not constitute corroborative or explanatory hearsay related to any accepted, competent, substantial evidence in this record for purposes of the hearsay admissibility provision in Section 120.58, Florida Statutes. Therefore, Dr. Loehnke's opinion concerning alleged elevated levels of hydrocarbons in the water at the project site is not credited and is rejected. Dr. Allan Niedororda was accepted as an expert in the fields of oceanography, hydrology and hydrologic assessment. He conducted a study on the potential impact to water quality in the Blount Island Channel which might result from the dock trials to be carried out as a part of the routine maintenance and testing of the ships. His study evaluated the degree to which the propeller wash from the dock trials might entrain and transport bottom sediments, any related pollutants and the effect of this entrainment on water quality in the surrounding water column. His study consisted of field sampling and measurements of currents in the area, laboratory analysis and related data analysis. Bottom sediment samples from the project area were analyzed for particle size and grain size distribution according to standard, scientifically accepted procedures. The bottom sediments in the area of the project site are characterized by a sandy sediment of a fine to medium particle size characteristic. The bottom sediments largely consist of clean sand and small gravels, with some silt composition. The propeller wash which will be generated by the testing of the ships engines was computed to have a speed of approximately one half foot per second. Maximum speed will occur about three propeller diameters behind the plane of the propeller itself or about 72 feet behind the propellers. The bottom tip of the propeller with which the ships are equipped will be six feet off the bottom of the channel at low tide. At the point the propeller wash contacts the bottom, its speed will be approximately two tenths of a foot per second. Such a velocity will not be of sufficient force to produce such sheer stress on the bottom sediments as to entrain them or, that is, to displace them upward into the water column. Dr. Niedororda established that, even if the propeller wash is added to the natural velocity of the water currents at the project site, there would be no entrainment of the bottom sediments which he sampled in the project area. It has also been established that the routine, minor maintenance of the ships and dockage facilities involved in the permit application and the fueling and other operations associated with the berthing, testing, entry and egress of the ships from the proposed berthing facility will occasion no water quality violations, so long as appropriate Coast Guard regulations attendant to fueling and the prevention of the deposition of refuse and other wastes into the waters involved are observed. Any grant of the proposed permit modifications should be conditioned upon the strict observance of those regulations and procedures, especially with regard to the potential for spillage during fueling operations. Public Interest Standards Section 403.918(2), Florida Statutes provides that a permit may not be issued unless the applicant provides the department with reasonable assurances that the project is not contrary to the public interest. In determining whether this is the case, the Department must consider and balance the following criteria: Whether the project will adversely affect the public health safety or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061; The current condition and relative value of functions being performed by areas affected by the proposed activity. It has been established by stipulation that the project will not adversely affect navigation or the flow of water and that the project will not adversely affect significant historical or archaeological resources. Unrefuted evidence adduced by Gate and the Department have established that the project will not adversely affect the public, health, safety, welfare or the property of others, if the project is constructed, installed and operated as proposed in the modification application and as proved in this case. The conservation of fish and wildlife, including endangered or threatened species, or their habitats, as well as fishing and recreational values and marine productivity in the project area will not be adversely affected. No harmful erosion or shoaling will be caused by the installation or operation of the project facility. In this connection, Dr. A. Quinton White, a member of the Board of Directors of the Petitioner, C.E.S., acknowledged in his testimony that the Manatee Protection Plan and Manatee Watch Program proposed to be inaugurated by Gate will adequately protect any Manatees frequenting the area. Manatees are an endangered species, but it has been established that the permit modification proposed, if installed and operated, will not adversely affect the conservation of Manatees or their habitat. The Petitioner adduced no evidence on this issue or any of the public interest criteria enumerated above. The area at the project site is characterized by fairly firm consolidated bottom substrata, characterized by very few submerged grasses. Due to the sandy, hard bottom in the project vicinity, there is a paucity of marine grass upon which Manatee could feed. Consequently, Manatees do not and are not likely to frequent the area involved at the project site as that might reflect on the likelihood of their injury or destruction due to operation of the ships and any attendant vessels. Dr. Niedoroda established that the project and the attendant operations of the ships will not cause harmful erosion or shoaling and witness Gary Tourtellotte, testifying for Gate, established that the effects of the construction and operation of the T-head pier on the benthic community and marine productivity in the vicinity of the project will not induce any adverse effect on those elements of the public interest standards involved. The Petitioner offered no credible or credited evidence of equivalent value which could contradict the evidence adduced by Gate on this aspect of the public interest standards. It is true that dredging of the bottom substrata will temporarily eliminate the benthic community within the dredged area itself. It was established by expert testimony, however, that the benthic community will rapidly re-colonize itself with similar organisms to a naturally occurring degree within approximately 6-12 months. The benthic community in the project vicinity is of a low density nature, with a low diversity of organisms. Those organisms occurring in the project site area are estuarine, marine benthic species commonly associated with sandy or silty bottom substrates. Because the area to be dredged is quite small or approximately .25 acres, and the dredging operations will be of short duration, approximately one day, the dredging operations will not have a significant adverse effect on the benthic communities occurring in the project area or in the adjacent St. Johns River. The dredging associated with the project will likewise not have a significant long-term adverse impact on fisheries resources or marine productivity of the Blount Island Channel or the St. Johns River. This is because the area to be dredged is minimal in size and does not contain critical marine benthic habitat. The turbidity generated will be minimal because the sediments are predominantly coarse sands and gravels. Because of this, any turbidity occasioned by the installation and operation of the proposed facility will be very brief and not of a sufficient significance as to violate water quality standards. In view of the hydrologic analysis in evidence concerning propeller wash effects, the bottom sediments at the ship mooring area will not be entrained or suspended in the water column to any significant degree due to propeller operation of the ships. Thus the benthic community in the mooring area for the ships will not be disturbed due to currents created by the operation of the propellers. In a similar vein, it has been shown that the dredging and operation of the T-head pier and mooring facilities, including the attendant conduct of periodic dock trials and the entry and egress of the ships will not violate the water quality criteria for biological integrity. Indeed, the periodic dock trials are shown to have no impact on the benthic community, the fisheries or marine habitat involved at the project site. It was neither shown that the dredging associated with the construction of the pier and berthing facilities will have any adverse impact on fin fish or shellfish in the project area. It has been established that the project will be of a permanent nature, but it has not been established that the current condition and relative value of the functions being performed by the areas affected by the proposed activity in terms of their functions as productive marine habitat, as furnishing fishing or recreational values and the like, will be adversely affected by the proposed project and attendant activity. Deletion of Copper Monitoring Requirement The 1986 permit authorizing the removal of approximately 3.4 million yards of dredged material with attendant extensive bulkheading in the Blount Island Channel requires also that Gate Monitor for copper every two weeks during discharges at the downstream boundary of the mixing zone for each point of a effluent discharge. Effluent from both the Blount Island and Dayson Disposal Sites is discharged into the Fulton Dames Point Cut. The Petitioner has stipulated that the discharge of effluent from the Dayson Spoils Site will not violate any water quality standard at that discharge point. Elutriate testing and other analyses submitted in support of the permit modification request to delete the copper monitoring requirement in the present permit have shown that there will be no violation of water quality standards as to copper, or any of the other water quality parameters involved due to any re-suspenions of bottom sediment during dredging. There will be no violation of water quality standards for copper, caused by the deposition of spoil, consisting of those bottom sediments, and the draining of effluent from the spoils site into the Dames Point Cut. The Department has independently verified the data submitted by Gate as a result of this testing and it has been established that there is no occurrence of any man induced pollutants in the sediments at the project site which will be deposited in the spoil site, (from which the effluent will be disposed of in the Dames Point Cut) which represents any elevation over natural background levels. The sediments to be dredged from the berthing area are not distinguishable from naturally occurring sediments and the copper values in the sediments to be dredged are no higher than those naturally occurring throughout the area. Thus there will be no adverse impact on the water quality occasioned by discharge of the effluent from the spoil site to the Dames Point Cut area due to copper occurring in the sediments or as to any of the other pollutants enumerated above. Thus, there has been no demonstrated necessity to continue monitoring the effluent from the spoil site for copper. In this regard, the Petitioner presented no evidence at hearing concerning the issue of whether copper monitoring should be continued or not. Cumulative Impact Blount Island was created in the 1950's and 1960's by the filling of its area with spoil material during the U.S. Army Corps. of Engineers' construction of the Fulton-Dames Point Cut-Off Channel. Since that time, port facilities and an industrial complex have been constructed on Blount Island. It is one of the principle port facilities for the City of Jacksonville. Under the 1982 DER dredge and fill permit issued to Off-Shore Power Systems, and later transferred to Gate in 1986, the developed area of the island adjacent to the original St. Johns River Channel (the Blount Island Channel) was required to be bulk-headed and the channel dredged to -38 feet MLW. The amount of material to be dredged in the old channel of the St. Johns River for construction of the vertical shoreline bulk head totalled approximately 3.4 cubic yards. The T-head pier involved in this modification proceeding, if constructed, would replace 1,000 linear feet of that shoreline bulkhead authorized by the present permit and would substantially reduce the amount or quantity of material to be dredged. Construction of the T-head pier, instead of the permitted shoreline bulkhead, will minimize dredging and the environmental impact of the facility. Gate has elected to rescind its plans to construct the shoreline bulkhead along the eastern shore of Blount Island, as authorized under the existing dredge and fill permit. Gate instead intends to seek future modification of its existing dredge and fill permit to substitute at least 2 additional T-head piers for all of the shoreline bulk head authorized for the eastern shore of Blount Island. The construction of the additional T-head piers will require substantially less dredging than is authorized under the existing permit. Instead of the 3.4 million cubic yards of dredged material authorized under the existing permit, associated with installation of the shoreline bulkhead, the amount of material to be dredged, if indeed 2 additional T-head piers were applied-for and constructed, would amount to only 269,000 estimated cubic yards, as opposed to the originally authorized 3.4 million. Kevin Pope, the DER witness, established that there are no other projects in the area, or reasonably expected to be located in the project area, which would create impacts in addition to or cumulative with the proposed permit modification project so as to create adverse water quality impacts or which would make this project, because of cumulative impact, contrary to the public interest. There are no other dredge and fill projects in the area of the proposed T-head pier which would adversely impact the waters of the Blount Island Channel and the St. Johns River. The proposed modifications are shown not to likely cause any adverse environmental results and, in fact, will result in an environmental benefit as represented by the agreed-upon recession from the extensive dredging and bulkheading authorized by the present permit. No evidence was adduced by the Petitioner to contravene that adduced by Gate and the Department, which establishes the lack of any adverse cumulative impacts to be occasioned by the proposed project, both as to water quality standards and the public interest standards involved in this proceeding.

Recommendation Having considered the foregoing findings of fact, conclusions of law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is therefore, RECOMMENDED: That a Final Order be entered by the Department of Environmental Regulation approving the proposed modification to permit number 160462149 with the proviso that the conditions contained in the above findings of fact and conclusions of law be incorporated as specific conditions in the modified permit, including the additional condition agreed to at Final Hearing that the Manatee Protection Plan and Manatee Watch Program will be inaugurated and be incorporated as a specific condition in the modified permit. DONE and ENTERED this 11th of October, 1989, at Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of October, 1989.

Florida Laws (3) 120.57267.06190.704
# 6
J. T. MCCORMICK AND THE ESTATE OF BENJAMIN R. MCCORMICK vs. CITY OF JACKSONVILLE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-002283 (1988)
Division of Administrative Hearings, Florida Number: 88-002283 Latest Update: Oct. 16, 1989

Findings Of Fact On a site that would abut St. Johns County on two sides, the City proposes to develop as a landfill about 400 of the 880 acres it owns in the southeast corner of Duval County. The proposed southeast landfill is designed to serve the approximately 300,000 people living in Duval County south and east of the St. Johns River, by receiving 1,700 tons of solid waste a day for ten years, 400 or 500 tons a day more than people in that part of the city now generate. Sandhill and Swamp Scattered over the portion of the property proposed for solid waste deposition are cypress marshes and blackgum sloughs isolated from a swamp and from each other by upland pine plantation and sandhills. Except for some 40 acres cut off from the remainder by a fill road, the hardwood swamp covering approximately 265 acres of the City's property is part of the pristine "Durbin Swamp system which is a major wildlife area, including habitat for threatened and endangered species." T. 2820. Durbin Swamp south of J. Turner Butler Boulevard and east of U.S. Highway 1 is "the most valuable wildlife habitat in the area, maybe in the southeastern United States." T.2921, 3058. The City's consultants characterized 64 of the 123 gopher tortoise burrows they found on some 105 acres in the southern part of the site as active. Sherman's fox squirrels feed and nest on the property. Although "very little of the sand hill habitat [remains] in its natural condition on the property," (T. 185) turkey oak, long leaf pine and sand pine communities do survive. Isolated wetlands scattered through the eastern portion of the site have also been timbered, and ditches intersect many of them. St. Regis Paper Company, who owned the land until earlier this decade, "dug a series of canals . . . to drain . . . part of the land ["it was called upper wetlands"] . . . so that the ground could be high enough to raise good grade pine trees." T. 1417. "The isolated wetlands . . . provide habitat diversity for wildlife, a seasonal source of drinking water, possible refuge during forest fires, as well as breeding and forage locations," (T. 1255) according to the City's draft application. "Wildlife noted on the site includes Florida black bear, white-tailed deer, raccoon, armadillo, cottonmouth, river otter, common night-hawk, alligator, yellow bellied sapsucker, turkey, frog, quail, dove and red- shouldered hawk," (T. 1255) also according to the City's draft application. Bobcats are common. According to the St. Johns River Water Management District's chief environmental specialist, "animals that you would find utilizing the uplands . . . would be a range of small rodents [including] mice, rabbits . . . insects, [mostly tree] frogs, toads, snakes [including] black snakes, rat snakes . . . [o]possums . . . pastorine birds, cardinals, bluejays, blackbirds . . . [and] probably some hogs." T.537-8. Wood storks wade and feed in the isolated wetlands on site. Wood stork rookeries have been found five miles to the southeast and seven miles north of the City's property. Bald eagles nest nearby but off site. Eagles used the now abandoned eagle nest on Eagle Nest Island "three-quarters of a mile from this proposed landfill site," (T. 1419) at least as recently as 1983. One or more eagles still perch on a dead cypress limb on the property (T. 2422), if not elsewhere on site. Ospreys, southeastern American kestrels (T.2918) and six or seven species of woodpeckers, including the rare hairy woodpecker (T2914) have also been seen on site. "There are dirt logging roads just as there are in any property in Florida, but not a great number." T. 2751. "Almost all of the pine flatwoods habitat on the site has been replaced with planted pine." T. 184. The property is comparable to the Wacasassa tract in Gilchrist County which is on the Conservation and Recreational Lands list and under consideration for state acquisition because of its "comparatively unaltered nature." T. 2721. In the past, conservation efforts have brought animals to the property for refuge. T. 1420. Listed Species The Florida Game and Freshwater Fish Commission (Game and Fish) lists the gopher tortoise and the Shermans's fox squirrel, said by one witness to be "imminently threatened," (T. 2899) as species of special concern. T. 2875. A species of special concern "is beginning to show a decline and needs to be . . . considered as a target of conservation and if present conditions continue it's going to be listed as threatened." T.2874. Game and Fish lists the Florida black bear, the southeastern American kestrel and the bald eagle as threatened, the same category in which the United States Fish and Wildlife Service (Fish and Wildlife) lists the American alligator. A threatened species is one destined to become endangered "if present trends continue." T.2874. Both Game and Fish and Fish and Wildlife list the wood stork as endangered, and Fish and wildlife lists the bald eagle as endangered. "An endangered animal is one that under present conditions is in danger of becoming extinct in the near future." T.2874. Listed in the Convention on International Trade of Endangered Species are the bobcat and the river otter. By definition, rare animals are not often seen in the wild. The parties stipulated that the staff of CZR, Inc., a consultant engaged by the City, spent an aggregate of 1400 man-hours on the landfill site, of which 429 man-hours were spent on site for the purpose of performing a wildlife survey. T. 2803. Despite their effort and putative expertise, the City's consultants did not see even a single listed animal. This failure contrasts with sightings by hunters and other experts who spent less time on site, and may be attributable to the time of year (two weeks in the fall) the survey was performed (T. 2425-27, 2893, 2899) or to the way in which it was done, (T. 2429, 3067, 3068) which a wildlife ecologist testified rendered it of "trivial value." T. 3079. The study was expedited in anticipation of a hearing date. T. 2426-27. In any case, the survey does not give reasonable assurance that species whose range includes the City's property are not present in suitable habitat on site. T. 2896-97, 3079-80. This is, indeed, the conclusion the City's own experts reached as regards the gopher tortoise itself, because of the clear sign these creatures' burrows give of their use of the property. Similarly, with respect to the Sherman's fox squirrel, although only a single individual was spotted, distinctive nests and piles of pine bracts on site established their presence. Bear tracks corroborate infrequent sightings on the property, as well as south and east of the site. On a large tract of land to the north, bears are fed daily; three or four feed each day. T. 2421. Alligator sign bore witness to the alligator's use of the property, although the only sighting clearly proven at hearing occurred just across the boundary line. Of course, wildlife does not respect legal boundaries. There is no reason not to believe that the red-cockaded woodpeckers, with six active nests within three miles or the Bachman's sparrows heard singing nearby do not frequent the City's property, which offers suitable habitat for both. It is even possible that the Florida panther, common in the area as recently as 30 years ago, may have roamed the site in more recent years in pursuit of deer or feral hogs. Two witnesses swore they had seen Florida panthers within two miles of the site, one only a few months before the hearing, (T. 1362, 1371, 1419), and a third testified he thought a "cat" he had seen two and a half or three years before the hearing just north of the site was a Florida panther. T.2429-32. The Florida Everglades mink, a threatened species according to Game and Fish, has been spotted at least twice in a cypress bog across the street from the City's property, and probably occurs on the property, as well. Not spotted either on the City's property or on adjacent land, the Florida mouse, the eastern indigo snake and the gopher frog are known to make their homes in gopher tortoise burrows. Of these listed commensal species, the indigo snake is particularly likely to inhabit the site. "The blue indigo snake was turned loose on that property in . . . '81 or '82, since it was an endangered species." T. 1420. The site also affords suitable habitat for the long tailed weasel, under review for listing. Game and Fish has listed the Florida mouse and the gopher as species of special concern. Bachman's sparrow is under review for listing. Fish and wildlife views both the red cockaded woodpecker and the Florida panther as endangered, while Game and Fish views the latter as endangered but the former as threatened only. Aquatic or Wetland Dependent An "aquatic and wetland dependent" species is a species that "requires wetlands or aquatic systems to satisfy some critical biological need in its natural life cycle," (T. 524) apart from simply drinking water. "[W]ithout wetlands or aquatic systems, these species would probably be extirpated from the state." Id. The Sherman's fox squirrel, the gopher tortoise, the Florida mouse, the Florida long-tailed weasel, the southeastern kestrel, and Bachman's sparrow are not aquatic or wetland dependent. Because they use watery environments for feeding, reproduction and other purposes, the alligator, the wood stork (the only stork in North America) and the gopher frog are aquatic and wetland dependent. Because "the whole black bear population in our state seems to shift . . . primarily in the fall and winter months, to the wetlands and . . . eat . . . fruit produced in wetland trees," (T. 527) the black bear is deemed wetland dependent. The indigo snake is also so classified because it "seemed to be heavily dependent upon eating frogs." (T. 526). Even though not wetland dependent "historically and naturally," (T. 527) the "less than probably 100 Florida panthers left in the state" are now so viewed because "they have more or less been restricted to the major swamp systems," id., without which they probably would not survive. The contiguous wetlands on site comprise the headwaters of Durbin Creek, which empties into Julington Creek shortly before Julington Creek reaches the St. Johns River. Large scale residential development of lands lying within the watershed of Durbin and Julington Creeks has been proposed. Durbin Creek and the swamp that gives rise to it serve as a "juvenile fish nursery" (T. 2468) for white shrimp, blue crabs, croaker, anchovies, bream, bass, shellfish, bluegill, and sheepshead. Lower dissolved oxygen levels or other stressors in Durbin Creek would decrease populations in fisheries already at carrying capacity, and already threatened by the prospect of overdevelopment. Dredging and Filling The City intends to build a road running east and west between the landfill site and U.S. Highway 1 following, for the most part, an existing dirt logging road, and crossing Old Kings Road, built in 1765 to connect the capital of colonial Georgia with St. Augustine. Turbidity screens and staked hay bales would be used during road construction to protect adjacent waters. After construction, seeding and mulching would stabilize the sloping shoulders of the fill road. In connection with construction of the access road, plans call for filling wetlands contiguous to Durbin Swamp, 2.8 acres within DER's jurisdiction and 3.5 acres within St. Johns River Water Management District's jurisdiction. Fetterbush, gallberry, scrub palmetto, cinnamon fern, bamboo vine and sphagnum moss grow in these contiguous wetlands, under a canopy of slash pine, loblolly bay, cypress and swamp tupelo. The proposed Class III disposal area would lie two hundred feet north of the south property boundary and 600 feet west of the east boundary. Over significant portions of this 88-acre site, fill dirt is to be used to raise the grade, because the land is so low. Enough fill is to be placed in the marshes and sloughs to avoid depositing solid waste in the water. Trucks would haul fill dirt to the eastern part of the site ("the area starting at the northeast corner of the Class III landfill and extending about 300 feet to the west, starting from a point about midway along the eastern margin of the landfill, and extending about 450 or 60 feet to the west, and along the southern portion of the Class III landfill, about . . . 600 feet" T. 1562) and elsewhere on site, smothering isolated wetlands, where more or less healthy vegetation, generally of the kind found in the contiguous wetlands, now grows. The 132-acre Class I disposal area, which would abut the Class III area on the north, would also cover isolated wetlands now on the site. Together with excavation of associated stormwater retention basins, the disposal areas would disturb a total of 46.3 acres of isolated wetlands within the St. Johns River Water Management District's jurisdiction. The St. Johns River Water Management District originally asserted jurisdiction over 48.5 acres of isolated wetlands, City's Exhibit No. 80, but the objectors offered no evidence that staff's subsequent decision that vegetation on one 2.3-acre parcel did not qualify was erroneous. This total does not include isolated wetlands less than half an acre in extent or isolated wetlands lying both within and without the disposal areas which will cease to function as such when truncated by dredging or filling. In this latter category are some ten acres that will not themselves be dredged or filled. T. 2777-8. St. Johns River Water Management District identified 5.3 acres of high quality isolated wetlands with connections off-site that are to be impacted, City's Exhibit No 80, along with another 11.2 acres of "low quality" isolated wetlands. Id. No stormwater retention basin would intrude into DER's jurisdictional wetlands, but approximately nine tenths of an acre falling within the St. Johns River Water Management District's contiguous wetlands boundary would be devoted to stormwater retention basins. Replacement Wetlands To mitigate the planned filling of contiguous wetlands for construction of the access road, the City proposes "to excavate 3.5 acres of nonjurisdictional pine plantation and create a contiguous swamp wetland." City's Exhibit No. 56. Mature dahoon holly, loblolly bay, cypress and gum trees "will be transplanted from on-site [isolated] wetlands proposed for construction impact." Id. A tree spade is to be used to transplant trees with trunks as much as 12 inches in diameter at "breast height" and up to 50 feet tall, along with existing soils, microbial communities and adjacent understory vegetation. The "physical structure of the trees themselves . . . provide a good deal of the habitat." T. 436. Removing mature trees from isolated wetlands and replanting them in created wetlands would, to some extent, mitigate the loss of perches for bald eagles and other birds. Mature trees in the created wetland would be replanted at a density "approximately half that of existing on-site wetlands to be impacted." Id. Only 80 percent of the replantings are to be replaced, if they die; and then only if it is clear within three years that replacement is needed. A six-inch layer of organic soil, to be spread after the trees have been transplanted, would "provide for growth of herbaceous vegetation." Id. The City would monitor the created wetland (part of mitigation area "A") for three years and transplant additional trees, if needed to assure survival of not less than 80 percent of the number of trees originally planted. Of these 3.5 acres, the City has identified 2.8 as specifically intended to mitigate the filling of wetlands within DER's jurisdiction. With respect at least to this portion, the created wetland "will function probably much the same as the 2.8 acres" (T. 2765) to be filled in constructing the access road and "would compensate for the" (T.2765) attendant loss of vegetation. In transplanting mature hardwoods, "[i]t's sort of a physical impossibility to get all the root material . . . [and y]ou also get some loss of branches, limbs and stems just from the physical movement of the tree." T. 2482-83. One reason a wetland "system stays wet . . . is a thick canopy." T.2486. With more sunlight streaming through a sparser canopy, the "vegetation is not going to be the same." T. 2487. "[B]ecause you don't expect the wetlands to function as well as the original wetlands you're replacing, there is a general rule of thumb that . . . you create twice as much wetlands as the wetlands you've destroyed." T. 2488. "A three-to-one ratio would not be unusual for a good mature forested hardwood system." T.467. St. Johns River Water Management District's Applicant's Handbook calls for a ratio between 2:1 and 5:1, but states: "The ratios may also be adjusted when wetlands creation is combined with wetland mitigation proposals such as an open buffer area adjacent to the wetlands, conservation easement, wetland enhancement proposals or alternative mitigation proposals." T. 504. The ratio proposed here is less than one to one. In all, mitigation area A would comprise 11.0 acres of what is now pine plantation. Aside from a .55 acre pond in the middle, mitigation area A would consist of wetlands contiguous to existing wetlands on which three different, if related, vegetative communities are to be planted. In addition, the City proposes to create three different isolated wetland areas, one of which (mitigation area D) it characterizes as "high quality." Six acres of what is now pine plantation would be excavated on the north edge of the property. Using the same, experimental techniques proposed for mitigation area A, cypress trees would be placed on 3.4 acres, and 2.6 acres would be devoted to a combination of loblolly, cypress and dahoon holly. Another 9.8 acres of isolated wetlands would be created within borrow pits, 6.8 acres in borrow area No. 1 (mitigation area B) which would include .55 acres of open water, and 3.0 acres in borrow area No. 2 (mitigation area E.) Just north and east of the truck scales, mitigation area B would receive 200 adult trees per acre planted to the extent they are available on site, or 400 trees per acre planted with nursery stock. The same density is planned for mitigation area E, to be located across the road from stormwater retention basin 4. The City also proposes to remove a segment of a logging road built on fill that now cuts off 40 acres from the remainder of Durbin Creek Swamp. Removal of the fill and revegetation would not only increase the extent of the swamp by 0.3 acres, it would restore historic sheet flow in that part of the swamp. Finally, the City proposes to spread muck, if available, over the shallow, southern part of stormwater retention basin 2 and plant 12 acres of grass ("[w]etland herbaceous species" City's Exhibit No. 80) which, however, the City reserves the right to dredge up "from time to time". Id. p.13. Other Effects, Other Mitigation Building and operating the landfill on the site proposed would displace upland wildlife and fragment largely undisturbed and undeveloped wildlife habitat. Fences along the northern, eastern and southern site boundaries would present a physical barrier. Human activity, particularly daytime traffic on the access road, would also create a "bio-geographical barrier." Developing a landfill at the edge of the swamp amounts to "leapfrogging," instead of expanding existing pockets of industrial or other development. A witness characterized the area to the south of the site as "rural developed"; some 164 people live within a mile of the center of the site. T. 78. But private ranch lands to the north, like undeveloped land to the east, afford good wildlife habitat. Habitat fragmentation divides and isolates animal populations. "Fragmented populations are more susceptible to disease, inbreeding and with time, poaching." T. 2890. The landfill would displace gopher tortoises, their commensals, if any, and other wildlife using sandhill or pine plantation habitat, as well as wildife, including wood storks and other migratory birds, making use of the isolated wetlands that are to be filled over. With the filling of isolated wetlands, migratory birds would lose holly berries and other forage. Filling or excavating acreage at the periphery of the swamp would also destroy habitat and displace wildlife. Wildlife now on site reaching suitable habitat elsewhere will have to compete for limited space against animals that have already established territories. The result should be a net decline in populations. T.2898. Increasingly sequestered, the Durbin Swamp system is already under pressure from urbanization to the north. For animals that remained in the vicinity, development of the landfill would occasion other difficulties. But evidence that landfill noises and odors "would have no discernible impacts to the value of wetlands as habitats for aquatic and wetland dependent species" (T. 528) went unrebutted. A buffer of at least 50 feet would separate contiguous wetlands from stormwater basins and other construction, but this is considerably less than the 528 feet Dr. Harris testified was necessary to avoid "greatly erod[ing] the native faunal diversity of the Durbin Swamp wildlife." T.3073-74. Placement of the landfill on this site would increase the numbers of a half dozen "middle-sized mammal omnivores" (T. 3078) so that gopher tortoises, turkey, quail, "anything that nests on the ground will be subject to the plundering by the enhanced population of raccoons, opossums, gray foxes, red foxes . . . and such." T. 3079. Increased numbers of armadillos would also pose a heightened threat to animals that nest on the ground. Landfill operations can be expected to attract seagulls and birds of other species, including nest predators and the brown-headed cowbird, which takes over other birds' nests to lay its own eggs (T. 3071-2) and would pose a particular threat to Swainson's warbler. It is not clear that any of the mitigation areas the City proposes is intended to replace wood stork feeding habitat that would be lost to dredging and filling. Wood storks feed on dense fish populations in shallow water, when receding water levels make the fish easier to catch. Isolated wetlands on site that have served this function would be lost (T. 2419), although not all of the isolated wetlands to be lost have enough water to support the kind of fish on which wood storks prey. The deep, steep-sided ponds planned for the mitigation areas do not replicate the necessary conditions. Whether birds may safely feed in or drink from untreated stormwater run-off in shallow portions of the retention basins is doubtful. When it rains, particularly the initial flush of run-off would deliver pollutants, including oil, greases and gasoline left by garbage trucks, to the retention basins. T. 1820-1. Removing the fill road and restoring normal flows to the 40-acre patch of the swamp on the other side, as the City proposes, would not add to feeding areas available to wood storks, except for the 0.3-acre roadway itself. The project would disrupt "very superior black bear habitat." T. 3059. Tending to avoid human activity, bears would likely range further east, foregoing foodgathering on site. On the other hand, food or other refuse brought to the landfill might lure bears to their deaths, intentional or accidental. "[C]ollisions with human vehicles," (T. 3062) is the chief cause of black bear mortality in Florida. Bears have been killed in this fashion within a mile of the site, (T. 351 1411-4, 2438) although not during daylight hours when the landfill would be in operation and garbage trucks would travel the access road. Creation of wetlands will not mitigate destruction of upland habitat. On the contrary, additional upland would be taken to create the wetland mitigation areas planned. But the City proposes to give a conservation easement on 129 acres of upland, adjacent to the swamp, that is to remain undeveloped. The upland easement would preclude a host of uses inimical to wildlife, and would mitigate to some extent the loss of wetland habitat for animals which use both uplands and wetlands, like the black bear, even though cut over slash pine plantation is among the very least important or productive wildlife habitats in Florida. The easement would not include sandhill habitat. The City has also undertaken to give a conservation easement covering some 260 acres of wetlands contiguous with Durbin Creek Swamp. This would not, of course, increase the extent of existing wetlands, but it would add a measure of protection for those that survived the project. Perhaps most importantly the wetland conservation easement would preclude expansion of the landfill further into the wetlands, as long as it remained in force. Existing regulatory restrictions on the use of wetlands prevent many uses, even without an easement. Apparently no regulation precludes harvesting bottomland hardwoods, however, so long as no excavation is involved, and vegetation, once severed, is not redeposited on site. But converting deforested areas to pinelands, without a permit from the Army Corps of Engineers would probably not be authorized, under 33 U.S.C. s.1344 (f)(2). See Avoyelles Sportmen's League, Inc. v. Marsh, 715 F.2d 897 (5th Cir. 1983). The City proposes to relocate gopher tortoises and any indigo snakes, gopher frogs or Florida mice that can be found to an unspecified new home off- site. Survival rates for gopher tortoises after similar relocations in the past have ranged between 30 and 100 per cent. By the year 2,000, the St. Johns County gopher tortoise population is predicted to fall by 90 percent, and Duval County is predicted to be devoid of gopher tortoises, even without relocation efforts of the kind proposed. Some or all of the gopher tortoises slated for removal may be descended from those who were brought to the site from Lake City. Perhaps even some who started out in Lake City would themselves make this second exodus to a new promised land. Stormwater Management The site proposed for the southeast landfill does not lie within a basin for which the St. Johns River Water Management District has adopted volumetric requirements. A "set of double [triple (T.1740)] box culverts five feet by eight feet . . . and . . . four other," (T. 425-6), "equalizer culverts," large enough for bears to move through (T. 415) would convey preexisting surface flows. A cross drain in the vicinity of the service plaza would serve the same function. Flood elevations would not increase more than a foot immediately upstream or more than 0.1 feet 500 feet upstream. The access road would not impound surface waters. Exfiltration trenches paralleling the access road "designed based on South Florida's criteria" (T. 1737) would filter contaminants from water running off the road. Within 72 hours of a 24-hour, 25-year return storm, the exfiltration system would be able to treat twice the volume of stormwater that recurrence of such a storm would generate. T. 1743. The scale plaza area where garbage trucks moving east on the access road would be weighed before being directed further down the road to a disposal area, is to be built on an upland portion of the property, and with it a wet detention pond to which surface water from the plaza and associated roadway would drain. Swales and berms would divert surface flow from undeveloped parts of the property that might otherwise reach the detention pond. The interceptor ditch and associated works would reduce by 2.5 hours the time of concentration for runoff from a 202-acre watershed, but cause no other changes in watershed characteristics. A weir would make it possible to regulate overflows and allow detention of run off long enough for biological assimilation of most pollutants. For the 25 year return, 24-hour storm, the pre-development peak rate of discharge (6.3 cubic feet per second) is less than the post-development peak rate without detention (18.4 cubic feet per second) but more than the post- development peak rate of discharge with detention: 3.9 cubic feet per second. An orifice below the weir, with a diameter of 1.5 inches, is designed to discharge less than half the treatment volume (22,088 cubic feet or 2.5 inches times the impervious portion of the area drained) in 64.21 hours. The design meets DER and St. Johns River Water Management District criteria. Portions of stormwater retention basins 1 and 2, situated north of the disposal areas, would lie within the 100-year flood plain. These two retention basins are designed to receive stormwater running off the Class I site or diverted around the site, as is stormwater retention basin 3, while stormwater retention basin 4 is intended to collect stormwater flowing off or around the Class III disposal area. Stormwater retention basins 3 and 4, like the southern area of stormwater retention basin 2, are not to be excavated to a depth of more than five feet below grade, to prevent groundwater from seeping into stormwater retention basins, dewatering the wetlands where it would otherwise emerge. With terraces at 20-foot intervals, to a height of 60 feet above grade for the Class I site and 40 feet above grade for the Class III site, both landfills would resemble Mayan temples, at build out. Ditches around the perimeter of each terrace are designed to convey stormwater to slope drains which would bear water to the level below, eventually to the perimeter ditch on grade, from which it would flow, through box culverts under roads built around the landfill, into the retention ponds. To the extent necessary to prevent groundwater infiltration, the ditches are to be lined. Stormwater retention basin 2 has two discharge structures, while each other basin has a single discharge structure leading to a ditch that would convey stormwater to Durbin Swamp. Perforated pipes, swathed in filter cloth, would be buried under highly permeable sand, along the sides of the retention ponds. Installed above seasonal low groundwater elevations, in order to avoid draining groundwater from the area around the ponds, during dry seasons, (T. 1781) they would have to go below seasonal high groundwater elevations, in order to be low enough to serve as drains for the retention ponds. Ambient groundwater would seep into the pipes, whenever groundwater levels outside the ponds rose above the pipes' elevation. But the pipes would still be able to drain the retention ponds, because of the relatively greater (vis-a-vis soils on site) hydraulic conductivity of the highly permeable sand to be trucked in for use as a filter medium. In time, these side drains or underdrains would clog and require expensive maintenance. But, assuming proper maintenance of the retention pond drains and of the drains that make up the roadway exfiltration system, the landfill and associated development would not flood or dewater wetlands that are not themselves to be dredged or filled. Except what is lost to evaporation, water entering the retention ponds would reach the wetlands, whether through the underdrains, over the weirs and through the conveyance ditches, or by movement underground after seeping through the bottom of the basin. The post-development peak rate of discharge from the area draining into the stormwater retention basins should not exceed pre-development rates for a 24-hour 100 year return storm or any lesser event. Because of roads and other impervious surfaces, a greater volume of surface water should reach the wetlands, causing stages about two inches higher than under pre-development conditions in "a typical summer thunderstorm." T.1782-3. The increase in surface flow corresponds to a decrease in water percolating down into the groundwater, and may result in additional loss to evaporation of water that would otherwise reach wetlands. But any such effect will be slight; surface and groundwater levels and surface water flows will not be adversely affected. T. 1783. Nor will existing surface water storage capabilities be adversely affected, despite the placement of portions of retention basins 1 and 2 within the 100-year flood plain. This encroachment at the very edge of the flood plain would rarely have any effect on surface water flows. Almost all development is to occur outside the ten-year flood plain. The stormwater basins could hold an inch of runoff without discharging water over the weirs. The underdrains, which would, when originally installed, have a hydraulic conductivity of about 130 feet per day, could remove an inch of run-off within approximately 40 hours. On the conservative assumptions that half of a two-foot vadose zone would already be saturated at the time a 24-hour, 25-year return storm dropped an additional 8.9 inches of rain on site, and that soils on site have a porosity of .5, the retention ponds could contain the resultant run-off for treatment, before discharging it first through weirs then through the underdrains. Three surface water monitoring stations are planned. One upstream would make it possible to assess background conditions. Another at the point of discharge from stormwater retention pond 2 would reveal whether the retention ponds and their sidedrains were functioning as intended. A third monitoring station in the southwest corner of the site should give similar information as to the roadside exfiltration system. Hydrogeology Except in the southeastern corner of the City's property, where the ground slopes down to the east, the land the City owns, like the adjacent land to the south owned by the McCormicks, slopes down in a more or less northwesterly direction, falling from 55 feet NGVD on the southern boundary to 15 feet NGVD at the northwest boundary, which intersects an elbow of the swamp. Although groundwater flows east of north under the southeast corner of the property, the flow under the property is generally northwesterly, following the topography. Class II groundwater in the surficial aquifer underlies the property at depths ranging "from almost to land surface to five or 10 feet below." (T. 1517). City's Exhibit No. 161. Groundwater flowing northwesterly crops out in isolated wetlands, evaporates, transpires or discharges into the swamp. To assure that the bottom of each exceeds seasonal high groundwater levels, measured in February of 1987, by the number of inches a 24-hour 25-year return storm would add, fill would be placed under both disposal areas, as needed. Because the Class I solid waste disposal site is to be lined, recharge by rainfall would be precluded there. With a liner intercepting percolating rainwater, groundwater would not attain predevelopment levels. The depression thus induced under the Class I site would more than offset the tendency groundwater under the Class III site would otherwise have to mound up into the bottom layers of solid waste deposited there. Recharge from rainfall (become leachate) would continue at the unlined Class III site; the height of accumulated waste would slow or stop evapotranspiration offsetting percolation there. But groundwater would flow down steeper gradients to lower levels underneath the Class I site (which lies between the Class III site and the wetlands where groundwater discharges) rather than rising into waste disposed of on the Class III site. The horizontal component of flow would continue to exceed the vertical component by several orders of magnitude. Beneath the surficial aquifer, which extends to depths of 50 to 100 feet below ground and consists of sand interspersed with a "matrix of soil, organic materials, clays and silts . . . little layers of clay and hardpan" (T. 1517) lies a continuous, confining layer of gray, sandy material with gravel and shell fragments, 12 to 40 feet thick, blanketing the undulating surface of the Hawthorne formation underneath. "[S]ome 40 percent of the material comprising the Hawthorne formation in this area is clay and the remainder is a mix of sands, silt stone, shell beds and phosphatic sands." (T. 1526) This assures that rainfall or other fluids percolating into the surficial aquifer on site will move horizontally downgradiant, reentering the atmosphere or discharging to the surface, rather than penetrating the thinner aquitard above the Hawthorne formation and sinking another 250 feet or more through the Hawthorne formation itself into the Ocala group and Floridan aquifer below. No subterranean feature in the vicinity permits water in the surficial aquifer to reach the Floridan. No peat, muck or other unstable soils underlie the site. Under 3,000 pounds per square inch, the maximum load anticipated, the ground is not expected to settle more than one inch. The addition of fill dirt does not alter this estimate significantly. Disposal Design The Class III disposal area would not have a liner, a leachate collection system or gas controls. After travelling through soils under the site, leachate from the Class III site would enter the groundwater. The City proposes to train and direct staff, to the end that only yard trash and construction and demolition debris end up in the Class III disposal area, where waste would be deposited directly on fill dirt or naturally occurring soils. No solid waste is to be disposed of within 200 feet of wetlands contiguous to Durbin Swamp lying within DER's jurisdiction. A composite liner of the kind in place at Alachua County's southeast landfill would form the corrugated bottom of the Class I landfill: a 60 mil high density polyethelene layer overlying two six-inch lifts of calcium montmorillonite, a clayey sand that is to be placed on compacted subgrade configured in "a herringbone design with peaks and valleys." T.765 Separating trenches in the valleys, sloping ground would rise, then fall at least two feet for every hundred horizontal feet. Steps would be taken to remove rocks, twigs, roots and the like, before compacting subsoils on site. A machine called a sheepsfoot is to be deployed, once half the montmorillonite has been put down, to pulverize clods and mix the material, in an attempt to assure uniformity within each lift of clayey sand. Other machines would compact each lift to a specified Proctor density. These efforts would not succeed in eliminating all clods or other imperfections, and the sheepsfoot would mix subgrade with the bottom layer of montmorillonite, introducing new impurities. Soils on site have hydraulic conductivity ranging from 1 x 10-3 to 1 x 10-4 centimeters per second. Clayey sand is also subject to desiccation cracking; as it dries out, large cracks appear. On top of this kneaded, compacted and finished 12-inch layer of clayey sand, once it had been inspected to assure the absence of roots, rocks, sticks, glass or other sharp objects, a specialty contractor would unroll strips of unreinforced high density polyethylene. After arranging the panels to minimize seams in the leachate collection trenches, technicians would weld the polyethylene strips to one another. An independent, third-party quality assurance contractor would inspect and test the seams before the synthetic liner was finally positioned, and as flush a fit as possible was achieved. Both the high density polyethylene and the quality assurance program are to meet the requirements of NSF Standard 54 and EPA Publication SW-870, March, 1983. Some wrinkling and occasional flaws in the plastic liner are inevitable. Wrinkling causes ponding, not only of rainwater during construction, but also of leachate, once the landfill is in operation. Tire tracks or other indentations in the montmorillonite layer can also cause ponding. In time, under the growing weight of solid waste, and with heat that biodegradation of the waste would generate, some of the wrinkles might subside, but the liner might also sink into additional depressions. Careful construction could keep ponding to a depth of little more than an inch. T. 2971, 2979. Extrusion welds (when done properly) render the seams stronger than the panels they join. But even if "you are really, really good" (T. 2957) and even when you're careful you get an occasional problem, one or two per acre, no matter how careful you are. And if you're not as careful, you get more, typically something on the order of five holes per acre. T. 2967 Carelessness on one project resulted in as many as 60 flaws per acre. Nondestructive testing methods do not detect all defective welds. T. 2966. Defects may develop after the plastic liner has been inspected. Stress on high density polyethylene associated with "conform[ing] itself to whatever is underneath it" (T. 2962) concentrates in scratches, gouges and crimps to cause "as much as 30 percent" (T. 2964) of the holes in the material. "[T]here is no shortage of scratches on a construction site." T. 2962. Leachate Collection Another high density polyethylene geotextile, chosen for its transmissivity (the geonet), is to be placed on top of the high density polyethylene liner (the geomembrane), where it would act as a synthetic drainage medium. In order to prevent overlying sand's clogging the geonet, compromising its ability to conduct leachate down into the trenches, a third, highly permeable geotextile, "a non-woven needle punched type" (T. 637) (the geofilter) would go directly on top of the geonet. The twelve-inch sand drainage layer blanketing the geofilter would have hydraulic conductivity of 1 x 10-3 centimeters per second, if sufficient quantities of suitable sand could be obtained. (T. 764) Another 12 inches of native soil is to cover the sand drainage layer. While the geofilter and the soil layers above it would parallel the landfill liner on the slopes between trenches, they would form arches over the trenches themselves. Continuing to follow the contours of the montmorillonite, the geomembrane and the geonet would line the trench bottoms. Below these arches, inert drain field rock would fill the lined trenches, supporting one perforated PVC pipe eight inches in diameter in each trench. The Class I landfill is to be built in fourteen 250-foot wide cells, with each cell having two leachate collection pipes on 125-foot centers. Manholes at either end of each leachate collection pipe would allow access, in case unclogging the pipe proved necessary. Longitudinally, the trenches would slope to the north, falling two to 20 feet for every 1,000 horizontal feet. Leachate reaching the trenches would flow along the trench bottoms (or through the pipes) to the manholes on the northern boundary. Also to be made of leachate-impervious PVC, leachate drain pipes, which would not be perforated, would connect all manholes on the northern perimeter. Varying in diameter from eight to twenty inches, depending on the number of manholes they were designed to empty, they would converge at a leachate pumping station north of the perimeter road. T. 590-1. A rupture in one of the single-walled leachate drain pipes could spill massive quantities of leachate on naturally occurring soils. Leachate which reaches the station is to be pumped into a 12,000 gallon storage tank nearby. To be mounted on a concrete slab surrounded by a curb high enough to contain all 12,000 gallons, if the tank failed, the tank would be constructed of high density polyethylene. The plan is to pump leachate from the tank through a four-inch discharge pipe into tanker trucks which would take the leachate to the Buckman wastewater treatment plan for disposal there. During "the maximum leachate production period, when you have 10 cells open," (T.687) an average of 35,000 gallons of leachate a day would require removal for disposal in this fashion. Additional tanks could be built. As a precaution, isolation valves would permit cutting off all flow of leachate to the pump station. In addition, isolation valves would allow cutting off the flow from any of seven pairs of cells (or slowing the flow from all, T. 705) in the event of an abnormal circumstance where leachate production in the facility exceeds the hydraulic capacity of [the] leachate removal system, the pumping station and storage tank and the tanker truck system. T. 591. Isolation berms separate each pair of cells susceptible to being put to use as temporary storage for leachate. The leachate drain pipes themselves afford more than 23,000 gallons of emergency storage. T.703. Ventilation As they decompose, materials to be deposited in the Class I landfill produce methane gas, carbon dioxide, and other, malodorous gases. Collection pipes with eight-inch diameters, running horizontally on 150-foot centers in the second and fifth lifts would allow gas to escape at either end, on the north and south sides of the landfill. This would prevent methane's building up and exploding or catching fire. By assuring their gradual release, it should also minimize the impact of foul smelling gases, which, in any event, are generally undetectable at a distance of more than 1,000 feet. But specific condition eight of the proposed landfill permit requires that the passive system be converted to an active system, if necessary, using vacuum suction and flaring. GIGO Although there "is not much industry in the southeast portion of Duval County," (T. 953) sewage sludges and other industrial wastes "except any hazardous waste as defined in the Federal Register" (T. 947) would be accepted for disposal at the Class I facility, if properly manifested. The proposed southeast landfill would receive waste that would otherwise have gone to the unlined east landfill. Household waste contains toxic materials. Tests of leachate generated in other lined landfills from which hazardous wastes are excluded have demonstrated the presence of some 30 metals and 56 organic compounds. City's Exhibit No. 89. Rainfall percolating through (and moisture already present in) waste deposited at the proposed Class I facility can be expected to leach the same array of substances from materials deposited there. Judging from experience elsewhere, leachate from the Class I facility would contain 13 or 14 (if 4-methyl phenol is included) substances in concentrations in excess of governmental standards or health-based criteria identified by a toxicologist engaged by the City. City's Exhibit No. 90. Among these would be methylene chloride, trichloroethylene, tetrachloroethylene and benzene, (T. 1478) as to which "the current regulatory policy is that it is possible for as little as one molecule . . . to act as . . . a carcinogenic initiator . . . [so] that there is no real threshold." T. 1447. Maximum concentrations would exceed those Florida prescribes as primary drinking water standards for titanium threefold, for benzene fivefold, for chromium more than fivefold, for sodium approximately 16-fold, for manganese 68- fold, for iron 280-fold, and for methyl ethyl ketone almost 130-fold. City's Exhibit No. 90. Methylene chloride would occur in the leachate in concentrations 39 times greater than the "USEPA proposed Preliminary Protective Concentration Limits." Id. Only yard trash "soils/land clearing waste, waste from landscapers" (T.956) and construction and demolition debris, "clean debris, inert materials, construction and demolition wastes that are inert, roofing materials," id., and the like, not mixed either with industrial or with regular household garbage, would be accepted for disposal in the Class III facility. Unless these materials are adulterated, they are "easy to bio-degrade . . . [or] are insoluble," (T. 1923) and rainwater percolating through them should yield a leachate with "neutral pH . . . low to moderate [biological oxygen demand] . . . [and] metals [if any] . . . below detection limits or background conditions." T.1923. But "some materials get in" (T. 2106) despite efforts to exclude them. "Demolition debris can have oiled floors and creosoted pilings as part and parcel of the structure." T. 3008. Old paint contains lead and cadmium. Debris from old houses can include rat poisons. Grass clippings "could contain small amounts of herbicides and pesticides." T.2101. In fact, "it's not unusual for yard waste to be very rich in biocides." T. 3009. Such chemicals are used in Jacksonville. When autopsies of seagulls found at the Girvin Road landfill revealed traces of diazanon, tests of water taken from "the stormwater ponds in the subdivision across the street" (T.990) showed diazanon was present there. Bioassays the DER runs on effluent from the City's Buckman wastewater treatment plant regularly report toxicity in excess of allowable limits (T.1877-8) and the EPA has "identified malathion and diazanon as the toxicants," (T. 1881) which are killing at least one species of flea in certain standard laboratory tests performed on the effluent. Leachate Leakage The composite liner would not keep all leachate generated in the Class I landfill from reaching the naturally occurring soils underneath, and eventually the groundwater under the site. Even under normal operating conditions, and even on the City's optimistic assumption that it can achieve a permeability of 1 x 10-7 centimeters per second, thousands of gallons of leachate a year would escape through flaws in the liner while the landfill was in operation. If leachate drain pipes burst or torrential rains required backing leachate up in the cells, thousands of gallons a day could leak. If two lifts of clayey sand achieve a permeability no lower than 1 x 10-5 centimeters per second, millions of gallons of leachate would enter the groundwater over the ten-year active life of the landfill, even without burst pipes or extraordinary precipitation. Once the Class I landfill attained the design height, it would be capped with impermeable materials to minimize leachate generation. As with the liner underneath, the impermeable cap would be covered with sand to facilitate drainage. Vegetation would hold the drainage soil in place. Closure plans have already been drawn, but they are subject to revision and require DER approval before implementation. If necessary, side slopes could be lined to prevent leachate seepage there. Closure would reduce, but would not end, leachate production and leakage. Virtually impermeable to water, high density polyethylene is highly permeable to certain permeants, including some that occur in landfill leachate. Leachate constituents known as "aromatic hydrocarbons" move "right on through" (T. 3017) high density polyethylene. To some extent, the montmorillonite component of the liner under the Class I area would impede these materials' movement into naturally occurring soils. The evidence did not quantify the montmorillonite's efficacy in this regard, but the City's expert's testimony that leakage of this kind would be "insignificant" (T. 830) went unrebutted. Permeation aside, the rate at which leachate leaks depends on the nature, number and size of flaws in the synthetic liner, the height and duration of the leachate head above the defects, and the transmissivity of what is underneath. Here transmissivity turns both on the hydraulic conductivity of the clayey sand in the vicinity and on the extent of air spaces between the clayey sand and the overlying high density polyethylene. Sand grains cause microscopic spaces, while imperfections in the montmorillonite layer and wrinkling of the polyethylene cause larger spaces. Leachate leaking into a space between the geomembrane and the soil spreads over a larger area before penetrating the clayey soil, in correspondingly larger volumes. Calculations predicated on the transmissivity characteristics of the geonet and the sand layer above it demonstrate a theoretical leachate flow over the liner so rapid that leachate would never accumulate on the geomembrane to a depth of as much as a tenth of an inch. But these calculations assume no ponding behind wrinkles in the synthetic liner, or any other impediment to the flow of leachate. Especially since holes in liners are likely to occur near wrinkles (because stresses are greater there) a more realistic assumption, for calculating leachate leakage rates, is a head of one inch, "the smallest practical hydraulic head you can achieve." T. 2994. On the twelfth day of hearing, when St. Johns County's liner expert testified that a six-inch layer of the montmorillonite might result in permeability as high as 5 x 10-4 centimeters per second, the City had not yet amended its application to increase the thickness of the clayey sand layer from six inches to twelve. The City's proposal now calls for two lifts of a 20 percent clayey sand with a saturated hydraulic conductivity in situ of 1 x 10-7 centimeters per second. This can be achieved, if at all, only with material that laboratory tests indicate has hydraulic conductivity of 1 x 10-9 centimeters per second or less. "[I]f you put down clay that the lab says has a permeability of 10 to the minus 7 centimeters per second, . . . when you put it down in the field you get from one to two orders of magnitude greater permeability than that. . . . related to how thick it is." T. 2988. Even a three-foot liner comprised of six lifts ends up with conductivity ten times greater than the same material under laboratory conditions. Mr. Deans, who designed the liner for the City, testified that a permeability of 1 x 10-7 centimeters per second was "readily achievable" even with six inches of clayey sand, but he had never designed a liner before, and his testimony in this regard has not been credited. To judge from its eleventh- hour amendment, the City did not believe it, either. Only two lifts are to comprise the clayey sand layer. No study of a clayey sand layer as thin as 12 inches has found hydraulic conductivity of less than 1 x 10-5 centimeters per second. Three lifts are necessary to create an effective barrier. "[Y]ou need at least three lifts to get the middle one hopefully working right." T. 2987. "[E]ngineers believe that the bottom layer gets fouled, the top layer cracks and has problems. Your best chance is the in between layers. You need at least three layers, and they would rather have four to be reasonable, and EPA says six." Id. Studies of twelve-inch liners put down in two lifts ("[t]he thinnest one we found anybody had ever studied" T. 2980) showed them to be "inadequate." T. 2987. With an inch of head, assuming defects with an average area of 1 x 10-5 square meters, an assumption with which all the experts seemed comfortable (the City's expert assumed larger holes), the published EPA formula yields a per defect leakage rate of 6.7598 x 10-11 cubic meters per second, assuming hydraulic conductivity for the montmorillonite layer of 1 x 10-7 centimeters per second. But plans to use only two lifts to form a 12-inch layer do not give reasonable assurance of vertical hydraulic conductivity that low. Mr. Coram's testimony to the contrary, expressly predicated on reports of laboratory tests on samples, did not address the evidence that laboratory tests do not tell the whole story, in the case of a thin layer of clayey sand compromised not only by inherent imperfections, but also by highly permeable subgrade soils, kneaded into it by the sheepsfoot. Because "clods are broken down in the laboratory and stones and cobbles are screened from the sample . . . the effects of both are not accounted for in permeability tests on laboratory compacted samples." City's Exhibit No. 190. Substituting a hydraulic conductivity of 1 x 10-5 centimeters per second, the EPA formula yields a leakage rate between 57 and 58 times greater: 3.8898 x 10-9 cubic meters per second. Although the EPA's most recently published leak rate formula makes no allowance for less than an ideal fit between the components of a composite liner, City's Exhibit No. 190, the author of the EPA formula, who testified for St. Johns County, subscribed to modifications to the formula developed to take this factor into account. DER's Exhibit No. 35. The montmorillonite layer's hydraulic conductivity is an unrealistically low measure of the transmissivity of the medium underneath the polyethylene. Using it for this purpose, without adjustment, ignores inevitable, intervening air spaces. Perfect contact between a synthetic liner and the soil it overlies cannot be accomplished, even in a laboratory setting. On a project of the kind proposed, contact would range from good, where the relatively larger size of sand grains in the clayey mix creates air spaces, to poor, where wrinkles (left in to avoid the weakening effects of stretching the material) cause much larger air spaces. No expert found fault with the more recent formulae (Bonaparte/Giroud) set out in DER's Exhibit No. 35, and none quarreled with the proposition that the published EPA formula made unrealistic assumptions about the contact between polyethylene and clayey sand. The Bonaparte/Giroud formula that assumes good contact yields a leakage rate of 1.6090 x 10-8 cubic meters per second per defect, a little more than four times what the EPA formula predicts for an ideal fit, assuming an inch of head and vertical hydraulic conductivity for montmorillonite in situ of 1 x 10-5 centimeters per second. Assuming poor contact, without varying any other assumptions, yields a leakage rate approximately 5.5 times greater: 8.8115 x 10-8 cubic meters per second. In its proposed recommended order, at page 35, DER accepts, at least for purposes of argument, the proposition that contact between soil and geomembrane would be poor in places, and calculates a leachate leakage rate of 5.45 x 10-3 gallons per day (2.3887 x 10-10 cubic meters per second per defect.) But this assumes that "the permeability of the City's clay liner will be 1 x 10- 7 cm per second and the maximum head over liner will be 0.062 inches." The evidence showed that the maximum head could not be kept below one inch, and did not give reasonable assurances that two lifts would result in vertical hydraulic conductivity of 1 x 10-7 centimeters per second for the clayey layer. Substituting an inch for .062 inches gives a rate of 2.9177 x 10-9 cubic meters per second. Substituting 1 x 10-6 for 1 x 10-7 and an inch for 0.062 inches, the leakage rate becomes 1.6034 x 10-8 cubic meters per second. Groundwater Contamination Uncontroverted expert opinion put the flow of groundwater under the Class I disposal area at 0.063 cubic feet or 0.47 gallons per day (2.0592 x 10-8 cubic meters per second) through a hypothetical square or cube one foot on a side. Except under unusual conditions, leachate leaking from the Class I facility would, before entering the groundwater, pass through approximately a foot of fill dirt or naturally occurring soils, which consist in large part (92 to 99 percent) of relatively inert, quartz sand. The presence of organic materials, however small the quantities, raises the prospect of adsorption and other chemical reactions, before steady state is attained. Physically, the soil would disperse the leachate, diminishing concentrations of leachate constituents entering groundwater. After such attenuation as the soil afforded, leachate would enter the groundwater, which would dilute and further disperse it, although not nearly as dramatically as the City's toxicologist testified. This witness assumed uniform mixing, rather than the discrete plume which persons with greater expertise in groundwater contamination convincingly predicted. By using the rate of "groundwater flow beneath a defect and the rate of leakage through that defect . . . [he] c[a]me up with a volume to volume dilution factor to identify a concentration in the groundwater." T. 1214. Because Dr. Jones took an unrealistically low leakage rate as a starting point, he predicted an unrealistically low concentration of one part leachate to 4,400 parts groundwater, inside a cubic foot immediately below each leak. Concentrations vary directly with the leakage rate per defect. T. 1224. The formula that assumes good, but not ideal, contact between liner components yields a leakage rate per defect of 1.609 x 10-8 cubic meters per second, if the layer of clayey sand has hydraulic conductivity of 1 x 10-5 centimeters per second. Substituting this leakage rate, the City witness' methodology yields a dilution ratio of 2.0592 parts groundwater to 1.609 parts leachate, or 1.2798:1, more than a hundred times less than the 130:1 dilution ratio that the City concedes is the minimum it must prove, at the edge of the zone of discharge. See Respondent City of Jacksonville's Motion to Strike St. Johns County's Memorandum Concerning Leachate Rates, p. 5. Substituting the coefficient for poor contact, the ratio in the hypothetical cube under the landfill becomes a paltry 2.0592 parts groundwater to 8.8115 parts leachate or .2337:1. Using Dr. Jones' methodology, a leakage rate of 1.6034 x 10-8 cubic meters per second per defect would result in leachate concentrations in groundwater of one part leachate to 1.2483 parts groundwater. Substituting a rate of 2.9177 x 10-9 cubic meters per second per defect yields a ratio of 2.0592 parts groundwater to .29177 parts leachate, or one part leachate to 7.0576 parts ground water. Even if the contact between geomembrane and montmorillonite were uniformly good and the clayey sand layer had a permeability of 1 x 10-7 centimeters per second at every point, a dilution ratio of only 37.4444:1 would result. In 132 acres of high density polyethylene, the evidence showed that 660 flaws could reasonably be anticipated, and that 132 flaws were absolutely unavoidable. Methylene chloride would end up in the groundwater in proscribed, carcinogenic concentrations as far away as 20 feet from many leaks within 90 days. Under some leaks, perhaps all, benzene, a proven human carcinogen, would also occur in prohibited concentrations. As leachate plumes dispersed, concentrations would diminish, eventually to levels at which they pose "potentially acceptable" (T. 1475) risks even in the case of "a 70-year water consumption of two liters of water per day by a 70-kilogram adult." T. 1217. No evidence suggested that they would remain in concentrations above these levels by the time they reached the edge of the zone of discharge. City's Exhibit No. 193, which uses a leakage rate much lower than the range of leakage rates likely to occur, if the landfill is built, predicts concentrations of various leachate constituents at the edge of the zone of discharge, assuming a leak at the edge of the disposal area. Multiplying predicted concentrations by quotients, obtained dividing likely leakage rates by the assumed rate, suggests carcinogenic leachate constituents would not occur in prohibited concentrations at the edge of the zone of discharge. But extrapolating in this fashion also suggests that violations may occur outside the zone of discharge, absent attenuation in the vadose zone, in the event of a leak at the edge of the Class I disposal area, for iron, manganese and methyl ethyl ketone. Groundwater Monitoring The City proposes to place monitoring wells at intervals of 250 to 500 feet around the Class I and Class III disposal sites. Some 25 shallow monitoring wells would be located 50 to 100 feet from the deposition areas, within the zone of discharge. In addition, seven clusters, each consisting of three wells screened at different depths, would punctuate the boundary of the zone of discharge. A cluster of wells upgradient would make it possible to monitor background conditions. With two-inch diameters and ten-foot screens, each well would receive a flow of less than a gallon a day. The contaminant plume from the Class III landfill would be large enough to be detected readily in samples drawn from a number of wells. But there was testimony that the plume, even from a 10-foot wide leak at the edge of the Class I disposal area, could pass between two wells 500 feet apart, undetected. Rather than a single large leak, moreover, the experts predict hundreds of small leaks in the Class I disposal area liner. The assumption is that flaws in the geomembrane would have an area of only one tenth of a square centimeter, on average. Any one of the plumes emanating from such a leak could easily pass undetected through a 500-foot gap between monitoring wells. The monitoring plan apparently relies on the great number of leaks expected. But even if samples from a monitoring well revealed a leak, the magnitude of hundreds of other leaks would not be disclosed. Well Contrived After the City filed its application for a permit to construct a landfill, but before DER had issued its notice of intent to grant the application, four wells were put in on the McCormick property, within three feet of the southern boundary of the City's property, and within 205 feet of the proposed Class III disposal area. The wells are more than 500 feet from the lined, Class I disposal area. Spaced at 1,000-foot intervals, within a 125- foot-wide utility easement in favor of the City of Jacksonville Beach, three of the wells are 25 feet deep and one is 28 feet deep. McCormicks' Exhibit No. 7. Each consists of a length of PVC pipe, 1 1/4" in diameter, leading to a red pitcher pump mounted on a wooden platform supported by four fence posts. City's Exhibit No. 194. Pumps of this kind must "periodically be pumped and primed or they have to periodically be taken apart and have the internal seals and leather valves replaced." T.2005. On April 7, 1988, the St. Johns River Water Management District issued a warning notice to "Haden McCormick" alleging that the wells had not been grouted, had been dug without necessary permits, and had not been the subject of required well completion reports. The next day, the St. Johns County Environmental Protection Board, apparently in response to applications inspired by the warning notice, issued a permit for each well designating the "usage" of each as irrigation. McCormicks' Exhibit No. 7. Well completion reports dated April 14, 1988, reported that the wells had been grouted. McCormicks' Exhibit No. 3. Asked the purpose of the wells in a deposition on April 25, 1988, J. T. McCormick said, "We need to monitor what [the landfill is] doing . . . [W]e need to . . . prepare ourselves for having people live in this area, to occupy it, to monitor it." T. 2227-8 A week earlier J. C. Williamson, Jr. had requested on behalf of B.B. McCormick and Sons, Inc. that the St. Johns County Environmental Protection Board amend the permits to show well usage as "Private Potable" instead of "Irrigation". This request was granted on April 27, 1988. McCormicks' Exhibit No. 2. On May 2, 1988, St. Johns River Water Management District's chief hydrologist wrote a lawyer for the McCormicks that "the completion reports submitted by a licensed driller, and the St. Johns County permits fulfill the requirements of the District." McCormicks' Exhibit No. 1. Analysis of samples of water taken from the wells on February 27 and 28, 1989, revealed total coliform levels acceptable for private wells. John Haydon McCormick explained the decision to put the wells in: [D]uring that week the City had filed their application with the DER which, in a sense, fixed their design . . . and when we became aware that this Class III landfill was as close as it is to our border, we became concerned about the future use of potable drinking water, and after consulting with counsel we were informed that we could legally install wells along that border. T. 2242. No owner of the property where the wells are located lives on the property nor, as far as the record shows, has an owner or anybody who does live on the property ever drunk water from the wells. About a half mile from the City's property are two other wells near a house on the McCormick property. When an owner's son drank water from one or more of the wells, as recently as the fall of 1988, he had to take water to the site with him in order to do it. The hand pumps require priming and nobody has bothered to store water near them for that purpose. On February 26, 1989, when the City's expert arrived for "splitting samples to submit to different laboratories," (T.1007) The "pumps were in a 20-gallon washtub in the back of . . . one of Mr. McCormick's employee's trucks. They were all removed from the well heads . . . [apparently] being soaked to generally recondition the seals in the pumps and to sanitize the pumps." T.2008 Two "of the old leather seals from the pumps [were] on the ground." T.2009. Within the shallow aquifer, groundwater flows from the wells northerly underneath the proposed Class III disposal area in the direction of Durbin Swamp. Use of the four existing wells "would in no way modify the groundwater flow system." T. 2045. But a well or wells could be so constructed on the McCormick property that continuously pumping from them would reverse some of the groundwater flow under the proposed Class III disposal area, to the extent that water flowing from beneath the Class III disposal area could be drawn from one of the existing wells along the McCormick boundary. T. 2075-80. Nor would consumptive use permits be necessary to dig wells which could cause such a change in groundwater flows. T. 2075. When the City discovered the wells abutting the southern boundary of its property, it did not direct its engineers to alter the design of the landfill to preclude solid waste disposal within 500 feet of the wells. The total project cost, excluding legal fees, is estimated in the neighborhood of $46,000,000. Redrawing the plans now to reduce the size of the Class III disposal area, without altering the size of the Class I disposal area, would take two to three months, and cost approximately $100,000. This approach would require reducing the capacity of the Class III area from 4.1 million cubic yards to 2.5 million cubic yards and, unless construction debris, which can be disposed of without a DER permit, were diverted elsewhere, its useful life from about ten years to about six years. Tipping fees would have to be higher "to recover the capital fixed costs over fewer tons." (T. 2208) Increased design costs alone would require recouping an additional 4 cents per cubic yard (more considering the time value of money) from tipping fees for Class III debris. Operations would be less efficient and presumably more expensive. T. 2207. Alternatively, the entire facility could be redesigned to achieve the same capacity and useful life as now contemplated. Such a redesign would require four to six months' work and cost approximately $250,000. Recovering this cost through increased tipping fees for Class III wastes would add slightly more than 6 cents a cubic yard (again ignoring the time value of money.) Alternative sites for disposal of Class III waste are available to the City. Indeed the site for which the City now seeks a permit was not even among the ten sites originally considered for the project. T. 2224-5. Decreased transportation costs to another site closer to the source of such waste might more than offset increased tipping fees. But separate facilities could create other problems. Ms. Nogas explained: From an operations standpoint . . .If I run out of Class III area and . . . site a separate Class III area somewhere else, if I had a truck coming to that facility and he really should have been in a Class I area, and I say "No, go out the gate and go five miles down the road . . .[to the] Class I facility," . . . I have a much better chance of . . . him never showing up at my Class I facility. T 2208-9. On the other hand, when asked about placing a Class III facility elsewhere in Duval County, Ms. Nogas, reiterating an earlier statement, testified, "[I]f that were what we had to go to, I would have no operational problems with it." T. 221. Mr. Wells' testimony that there "are 16,000 acres of less environmentally flawed acres seven to 12 miles from the generating centroid accessible from four-lane roads and not near residential or commercial properties," (T. 1248) and that the proposed site "is the furtherest site from the generating centroid, 21 and three-quarters miles to the dump site, and will cost taxpayers an extra $3 million to $5 million a year in longer haul time" (T. 1247) was received on the issue of the decisionmakers' credibility only.

Recommendation It is, accordingly, RECOMMENDED: That DER deny the City's request for variance. That DER deny the City's application for a permit to construct a landfill. That DER deny the City's application for a dredge and fill permit. That DER grant the City's application for a permit for management and storage of surface waters, on conditions proposed in the intent to issue, unless modified by agreement of all parties. DONE AND ENTERED this 16th day of October, 1989, in Tallahassee, Leon County, Florida. Robert T. Benton, II Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the division of Administrative Hearings this 16th day of October, 1989. APPENDIX A Petitioner St. Johns County's proposed findings of fact Nos. 1-4, 6, 10-12, 14, 16, 18, 21,23, 24-28, 33, 35, 37, 38, 41-45, 47-48, the first sentence of No. 51, Nos. 52-56, 57 except for the first sentence, which is rejected, 58, 59, 62, 64, 66, 68-74, 95-103, 106-109, 111- 116, 118, 131, 132, 133 except for subpart 7, 134, 136 and 137 have been adopted, in substance, insofar as material. With respect to petitioner St. Johns County's proposed finding of fact No. 5, and the second sentence of petitioner St. Johns County's proposed finding of fact No. 51, the design rate is not the same as the current rate of deposition. Petitioner St. Johns County's proposed findings of fact Nos. 7, 8, 9, 13, 15, 17, 22, 75, 110 and 138 relate to subordinate matters. Petitioner St. Johns County's proposed finding of fact No. 19 accurately recites the testimony. Petitioner St. Johns County's proposed finding of fact No. 20 is immaterial. With respect to petitioner St. Johns County's proposed finding of fact No. 29, the City's evidence that leakage of this kind was insignificant went unrebutted. Petitioner St. Johns County's proposed findings of fact Nos. 32 and 120-123 are immaterial to the present application. With respect to petitioner St. Johns County's proposed finding of fact No. 30, the City's estimates were unreasonably low. With respect to petitioner St. Johns County's proposed finding of fact No. 31, the evidence showed that nine gallons a day was at the upper limit, not that it would actually occur. With respect to petitioner St. Johns County's proposed finding of fact No. 34, at least 13 substances occur in concentrations that exceed health-based standards. Petitioner St. Johns County's proposed findings of fact Nos. 36 and 63, 117, 119 and 135 are proposed conclusions of law. With respect to petitioner St. Johns County's proposed finding of fact No. 39, the probability of a leak on the edge of the disposal area was not established. With respect to petitioner St. Johns County's proposed finding of fact No. 40, the evidence did not show that when "two or more toxic substances are combined" they necessarily have synergistic impacts. With respect to petitioner St. Johns County's proposed finding of fact No. 46, the City's assumption of no attenuation was an appropriately conservative approach that is not inconsistent with the City's unrefuted testimony that attenuation would occur. With respect to petitioner St. Johns County's proposed finding of fact No. 49, the evidence did not prove that the City would allow four feet of leachate to stand on the liner. Petitioner St. Johns County's proposed findings of fact Nos. 50 and 60 immaterial to the present application. With respect to petitioner St. Johns County's proposed finding of fact No. 61, the evidence did not establish the contentions following the clause ending "and into Durbin Creek,". With respect to petitioner St. Johns County's proposed findings of fact Nos. 65 and 67, the McCormick wells have served ornamental and talismanic purposes, but they were not shown to be potable water supply wells, within the meaning of the rule. At the time of hearing the pumps did not function and were not mounted on the wells. Petitioner St. Johns County's proposed finding of fact No. 76 has been adopted, in substance, insofar as material, except that there was at least one effort to collect toxic wastes in Jacksonville. With respect to petitioner St. Johns County's proposed findings of fact Nos. 77 through 94, proposed permit conditions are not proposed findings of fact. With respect to petitioner St. Johns County's proposed finding of fact No. 124, the evidence was clear that more wetlands were to be destroyed than were to be created. Petitioner St. Johns County's proposed finding of fact No. 125 is rejected as against the weight of the evidence. With respect to petitioner St. Johns County's proposed findings of fact Nos. 126, 127 and 128, mitigation , particularly as regards the wood stork, if the landfill is built. Petitioner St. Johns County's proposed finding of fact No. 129, Durbin Creek enters Julington Creek, shortly before the latter reaches the river. Findings of fact proposed by petitioners J.T. McCormick and the Estate of Benjamin R. McCormick (McCormicks) Nos. 1-4, 6-10, 13, 15-17, 20, 21 and 23 have been adopted, in substance, insofar as material. With respect to McCormicks' proposed finding of fact No. 5, a preponderance of the credible evidence did not establish that the wells would be used to supply potable water in the future, even if the pumps are repaired to make it possible. Nor did the evidence establish any such authentic, "non-forensic," use in the past. With respect to McCormicks' proposed finding of fact No. 11, evidence was adduced that other sites had been considered by engineers the City engaged. T. 2224-5. With respect to McCormicks' proposed finding of fact No. 12, testimony put the delay at two to three months. T. 2139. The City could have avoided this delay. McCormicks' proposed finding of fact No. 14 has been adopted, in substance, insofar as material, except that the proportion of the Class III waste stream construction and demolition debris comprises is not stated at T. 2149. With respect to McCormicks' proposed findings of fact Nos. 18 and 19, the four and six cents per ton computations ignore the time value of money, among other things. McCormicks' proposed finding of fact No. 22 is immaterial. McCormicks' proposed finding of fact No. 24 is properly a proposed conclusion of law. Findings of fact proposed by Florida Wildlife Federation, Inc., St. Johns County Audubon Society, Sierra Club, Inc., Coastal Environmental Society and River Systems Preservation, Inc. came in two unnumbered installments. Findings of fact have addressed the substance of each. Without numbering, it is difficult to treat the material. Petitioner STOP's proposed findings of fact Nos. 5-7, 9-10, 12-18, 20, 22- 24, 26-27, 29, 32-47, 49, 50, 52, 55-57, 59-60, 62, 63, 66, 67, 69, 70, 72 and 73 have been adopted, in substance, insofar as material. Petitioner STOP's proposed findings of fact Nos. 1-4, 30, 31, 65, 71, 75 and 76 are properly proposed conclusions of law in part and relate otherwise to DER's preliminary analysis, which is technically immaterial. With respect to petitioner STOP's proposed findings of fact Nos. 8 and 58, Mr. Kappes said he had seen alligator on site but, when asked for specifics, testified to tracks they had left in the southeast corner of the site. Equally ambiguously, the City stated in its draft application that alligator had been "noted" on the property. The evidence did not show that ospreys are protected or listed in Duval County. Petitioner STOP's proposed findings of fact Nos. 11 and 74 relate to subordinate matters. With respect to petitioner STOP's proposed finding of fact No. 19, the inference that all commensals is present is problematic here, since the gopher tortoises were relocated by man from a site many miles away. With respect to petitioner STOP's proposed finding of fact No. 21, 80 to 82 of 105.7 acres of gopher tortoise habitat would be destroyed. Petitioner STOP's proposed finding of fact No. 25 is immaterial to this application. With respect to petitioner STOP's proposed finding of fact No. 28, Mr. Wiley so testified. With respect to petitioner STOP's proposed findings of fact Nos. 48, 51 and 64, although the conservation easement on uplands would not result in additional habitat, it would preclude further diminution. With respect to petitioner STOP's proposed findings of fact Nos. 53 and 54, no eagles are currently nesting on site, and Eagle Nest Island, where eagles nested until 1983, is off site. With respect to petitioner STOP's proposed finding of fact No. 61, the evidence did not establish that Mr. Kappes saw the red-cockaded woodpecker on site, even though he found six active nests within three miles of the site. With respect to petitioner STOP's proposed finding of fact No. 68, Dr. White so testified. DER's proposed findings of fact Nos. 1-9, 11-15, 17, 24, 26, 33, 37, 39, 41-45, the first three sentences of No. 50, Nos. 52-56, 62-64, 66, 67, except as regards inherent legislative facts, 70-87, 89-92 and 95 have been adopted, in substance, insofar as material. With respect to DER's proposed finding of fact No. 10, 0.9 acres of wetlands contiguous to Durbin Swamp and within the jurisdiction of the St. Johns River Water Management District would be used for a storm water retention basin. DER's proposed findings of fact Nos. 18 and 20 have been adopted, in substance, except that these steps do not ensure or guarantee a quick return of water quality functions. DER's proposed findings of fact Nos. 21, 32, 35, the last sentence of No. 50, Nos. 51, 88 have been rejected as against the weight of evidence. With respect to DER's proposed findings of fact Nos. 22 and 28, mitigation areas with deep ponds in the middle will permit fish to avoid the conditions under which wood storks feed. With respect to DER's proposed finding of fact No. 23, the steep sided ponds, sparser canopies and lesser extent of created isolated wetlands offset their "higher quality." With respect to DER's proposed finding of fact No. 25, the mitigation proposed does not amount to a one to one ratio. While significant, the easements preserve the status quo and do not compensate for lost wetland functions. With respect to DER's proposed finding of fact No. 27, the evidence suggested no reason why bears would not forage in isolated, as well as contiguous wetlands. With respect to DER's proposed finding of fact No. 29, to the extent possible, existing trees would be transplanted; if they all survived, the number of perches would be undiminished, except for branches broken in the process. With respect to DER's proposed finding of fact No. 30, sightings nearby and habitat on site amount to evidence of use of the site. As regards the indigo snake, testimony that these animals were introduced to the site was uncontroverted. With respect to DER's proposed finding of fact No. 31, alligator tracks were found in the southeastern part of the site. With respect to DER's proposed finding of fact No. 34, no southeastern kestrel nests were found on site. With respect to DER's proposed finding of fact No. 36, it is not in the public interest to issue a permit for a lined landfill that would cause pollution in violation of DER's water quality standards. If a landfill were properly permitted, it would be in the public interest to have access. With respect to DER's proposed finding of fact No. 38, the first sentence (which seems to contradict the fourth) has been adopted, in substance, insofar as material. With respect to DER's proposed finding of fact No. 40, there was no evidence of cumulative impacts to Durbin Swamp, as opposed to Durbin and Julington Creeks. With respect to DER's proposed findings of fact Nos. 46-48, the clayey sand, placed in two six-inch lifts, would have much greater permeability as a unit than samples of the same material screened for certain imperfections and tested in the laboratory. In the field, it would not be possible to remove all clods and other materials that make for greater vertical hydraulic conductivity of the unit. Subgrade mixing would occur, in putting down the first of the two lifts. A 12-inch layer would be many more times transmissive than a liner of the same material put down in six six-inch lifts to attain the three feet DER requires, when no synthetic liner is used. Mr. Fluet did not testify that a 12-inch layer would achieve a permeability of 1 x 10-7 centimeters per second. He testified that nobody who had studied 12-inch layers had reported permeability of less than 1 x 10-5 centimeters per second for a clayey layer of that thickness. With respect to DER's proposed finding of fact No. 49, the geomembrane is subject to the effects of pressure and temperature variation would contribute to wrinkling. With respect to DER's proposed finding of fact No. 57, leachate leakage would diminish after closure, but would not stop altogether. With respect to DER's proposed findings of fact Nos. 59 and 60, the working hypothesis is that even a single molecule of certain leachate constituents may initiate cancer, although concentrations below the levels identified are said to pose no more than an acceptable risk of doing so. DER's proposed finding of fact No. 61 describes the methodology correctly, but the particular results have not been accepted. With respect to DER's proposed finding of fact No. 65, predicted concentrations depend on the leakage rate assumed. With respect to DER's proposed finding of fact No. 68, data showing the composition of discharges to ground water from other Class III landfills were not presented. Supposed "legislative facts" do not constitute evidence. With respect to DER's proposed finding of fact No. 69, the evidence did not show what concentrations of biocides or other chemical constituents were likely to be. With respect to DER's proposed finding of fact No. 93, the phrase "monitoring well" was not used. With respect to DER's proposed finding of fact No. 94, wells Nos. 21 and 22 were between 25 and 35 feet deep. Haydon McCormick testified that a shallow well near the house was for potable water supply. DER's proposed finding of fact No. 96, has been adopted, in substance, except that additional time might not be required for permitting. With respect to DER's proposed findings of fact Nos. 97 and 99, balancing of social and economic interests is appropriate only if hardship is proven, and immaterial otherwise. The City's proposed findings of fact Nos. 1-9, 16-18, 20-25, 30, 33, 35-38, 42, 44, 46, 49, 50, the first two sentences of No. 55, Nos. 58-62, 65, 73, 74, except for the last sentence, Nos. 75, 77-83, 88-92, 94-100, 104, 107, 108 and 110 have been adopted, in substance, insofar as material. With respect to the City's proposed finding of fact No. 10, despite timbering of the uplands the site was characterized as "relatively unaltered." With respect to the City's proposed finding of fact No. 11, no decline in water levels was shown to be irreversible. With respect to the City's proposed finding of fact No. 12, the study was of "trivial value." With respect to the City's proposed finding of fact No. 13, bald eagles and wood storks do make use of the site and indigo snake(s) were set loose there. With respect to the City's proposed finding of fact No. 14, a witness testified to his "confidence" (T.2918) that the kestrel he spotted was a Southeastern kestrel. Signs of alligator were found near the southeast corner of the property. With respect to the City's proposed finding of fact No. 15, hunting was mentioned. The City's proposed findings of fact Nos. 19, 54, 56 and 84 pertain to subordinate matters. With respect to the City's proposed finding of fact No. 26, the witness so testified. With respect to the City's proposed finding of fact No. 27, it was not proven that noise would be "minimized." With respect to the City's proposed finding of fact No. 28, bears could move through the culvert, but elsewhere the access road (particularly during the day), fences and human activity on site would indeed "impede black bear movement in the area." The City's proposed findings of fact Nos. 29, 48, the last sentence of 55, Nos. 57, 71, 72, 85, 87 and the last sentence of 101 have been rejected as being against the weight of the evidence or as unsupported by the preponderance of evidence. With respect to the City's proposed finding of fact No. 31, mobility will not assure successful relocation if existing populations are fully utilizing habitat in the vicinity. The City's proposed findings of fact Nos. 32, 86 and 93 are properly proposed conclusions of law. With respect to the City's proposed finding of fact No. 34, groundwater was shown unlikely to reach solid waste on site. With respect to the City's proposed finding of fact No. 40, the maximum head would not be less than one inch. With respect to the City's proposed finding of fact No. 41, such sand might not be available on site. With respect to the City's proposed finding of fact No. 43, some leachate would leak through the liner. With respect to the City's proposed finding of fact No. 45, some rainwater would infiltrate. With respect to the City's proposed finding of fact No. 47, the evidence did not show that the clayey sand layer would attain so low a vertical hydraulic conductivity. If these liners have performed well, it has not been without leakage, both through flaws and by permeation. With respect to the City's proposed finding of fact No. 51, the subgrade would be inspected, in an effort to assure complete removal of sharp objects. With respect to the City's proposed findings of fact Nos. 52 and 53, permeability is specific to the permeant. The values quoted are for water. High density polyethylene is highly permeable to aromatic hydrocarbons. That liners leak is not speculation. With respect to the City's proposed finding of fact No. 63, the design engineer envisioned circumstances that would require backing leachate up in the landfill. With respect to the City's proposed finding of fact No. 64, violations were proven, in the absence of sufficient attenuation in the vadose zone, and attenuation there was not quantified. With respect to the City's proposed findings of fact Nos. 66 and 67, these evaluations assumed unrealistically low leachate leakage rates. With respect to the City's proposed finding of fact No. 68, this elaborate house of cards bears little relationship to the language of the free from rule. But this approach, too, shows violations, if realistic leakage rates are used. With respect to the City's proposed finding of fact No. 69, credible and credited evidence of dramatically higher leachate leakage rates than they assumed contradicted their conclusions. With respect to the City's proposed finding of fact No. 70, the witness so testified. With respect to the City's proposed finding of fact No. 76, the precise constituents of the Class III leachate were not proven. With respect to the City's proposed finding of fact No. 102, the witness so testified. With respect to the City's proposed finding of fact No. 103, the well that Haydon McCormick jetted in was 25 to 35 feet deep. With respect to the City's proposed findings of fact Nos. 105 and 106, wells could be placed so that enough water drawn from them would reverse the gradient and cause pollutants to move toward the McCormick property. With respect to the City's proposed finding of fact No. 109, the evidence about the effect on operations was ambiguous. With respect to the City's proposed finding of fact No. 111, it is unlikely that the McCormicks would take steps to reverse the flow of groundwater. APPENDIX B Three methods of calculating per defect leachate leakage rates (in cubic meters per second) were proven at hearing, each expressed as an equation or formula requiring values for three variables, for their solution, viz.: h = height of leachate head over defect (in meters) a = area of defect (in square meters) Ks = permeability (vertical hydraulic conductivity) of clayey sand layer beneath defect (in meters per second) The method advocated by the City, published by the EPA, and shown (by the author) to reflect ideal contact between liner components, which does not obtain in practice, is: Q = (0.7) x (h) x (a0.1 x Ks0.88). The method advocated by the County, endorsed by the author of the formula EPA published, and shown to reflect good contact between liner components, shown likely to occur in places, is: Q = (0.21) x (h0.9) x (a0.1 x Ks 0.74) The method advocated by the County, endorsed by the author of the formula EPA published, and shown to reflect poor contact between liner components, shown likely to occur in places, is: Q = (1.15) x (h0.9) x (a0.1 x Ks 0.74) In each case, Q represents the flow of leachate through each defect. COPIES FURNISHED: Carlos Alvarez and Carolyn S. Raepple Hopping, Boyd, Green and Sams Post Office Box 6525 Tallahassee, Florida 32314-6526 Harrison D. Upchurch and Frank D. Upchurch, III Upchurch, Bailey, and Upchurch, P.A. Post Office Box 170 St. Augustine, Florida 32085-0170 Joseph M. Glickstein, Jr. Glickstein and Glickstein 444 Third Street Neptune Beach, Florida 32233-5111 David S. Dee and Allan Wagner Carlton, Fields, Ward, Emmanuel Smith & Cutler, P.A. Post Office Drawer 190 Tallahassee, Florida 32302 C. Rufus Pennington, III Margol and Pennington, P.A. Suite 1702, American Heritage Tower 76 South Laura Street Jacksonville, Florida 32202 Debra Swim 1323 Diamond Street Tallahassee, Florida 32301 Sidney F. Ansbacher Turner, Ford and Buckingham, P.A. 1904 Gulf Life Tower Jacksonville, Florida 32207 Dan Brooks Hendrickson and 104 Sixth Avenue 4620 Arapahoe Avenue Pass-A-Grille, Florida 32706 Jacksonville, FL 32208 Frank X. Friedman, Jr. T. R. Hainline, Jr. G. Stephen Manning Marcia P. Parker Rogers, Towers, Bailey, Jones & Gay 1300 Gulf Life Drive Jacksonville, Florida 32207 William H. Congdon and Chris McGuire 2600 Blairstone Road Tallahassee, Florida 32399-2400 Kathryn L. Mennella Post Office Box 1429 Palatka, Florida 32078-1429 Larry Gilmore 9131 Fort Caroline Road Jacksonville, FL 32225 Larry A. Wells 237 Pablo Road Ponte Vedra Beach, FL 32082 Dale H. Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 =================================================================

Florida Laws (11) 120.52120.56120.57120.68267.061373.413373.416403.021403.031403.201403.412 Florida Administrative Code (2) 40C-4.09140C-4.301
# 7
HENRY ROSS vs CITY OF TARPON SPRINGS AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 10-003351 (2010)
Division of Administrative Hearings, Florida Filed:Tarpon Springs, Florida Jun. 21, 2010 Number: 10-003351 Latest Update: Apr. 27, 2011

The Issue The issue to be determined in this case is whether the City of Tarpon Springs (“City”) is entitled to a industrial wastewater facility permit for its proposed discharge of demineralization concentrate into the Gulf of Mexico adjacent to Pasco County, Florida.

Findings Of Fact The Parties Henry Ross is a resident of Tarpon Springs. In his petition for hearing, he alleges that he is a recreational fisherman and a "consumer of fish taken from the area" where the proposed wastewater discharge would occur. He presented no evidence at the final hearing to prove these allegations. Neither the City or the Department stipulated to facts that would establish Ross's standing. The City of Tarpon Springs is a municipality in Pinellas County and the applicant for the industrial wastewater permit that is challenged by Ross. The Department is the agency charged by law with the duty, and granted the power, to regulate the discharge of pollutants into waters of the State. The Proposed Permit - General Due to the cost of obtaining potable water from Pinellas County Utilities, the City decided to look for another source of drinking water. In February 2004, an alternative water supply plan was developed by the City’s Office of Public Services which analyzed potable water supply options. It determined that the withdrawal and treatment of brackish groundwater represented the best option for the City. The proposed permit authorizes the City to discharge industrial wastewater into waters of the State. The wastewater is demineralization concentrate, which is produced when RO technology is used to remove salts from brackish water to convert it to potable water. The wastewater would be produced in conjunction with the operation of a not-yet-constructed WTP that would supply public drinking water to the residents of the City. The City must also obtain a consumptive use permit from the Southwest Florida Water Management District for the proposed withdrawal of groundwater. Whether the Town is entitled to a consumptive use permit is not at issue in this proceeding. The industrial wastewater permit would authorize a maximum daily discharge of 2.79 million gallons per day ("mgd") of RO concentrate. The initial operation of the WTP, however, is expected to discharge 1.05 mgd. The RO concentrate would be transported via a force main from the WTP in the City to an outfall in Pasco County. The outfall would discharge the wastewater into a canal which is already being used for the discharge of cooling water from Progress Energy Florida, Inc.’s Anclote Power Generation Facility. The outfall would be 50 feet north of the point in the canal where Progress Energy is required to demonstrate compliance with its own permitting requirements, so as not to interfere with Progress Energy's ability to demonstrate compliance. There is a floating barrier in the channel north of the proposed point of discharge, and a fence along the side of the canal, to prevent swimmers, boaters, and persons on foot from getting near the Progress Energy power plant. The floating barrier and fence would also prevent swimmers, boaters, or pedestrians from reaching the proposed discharge outfall and the area of the canal where the discharge will initially mix. After being discharged into the canal, the wastewater would become diluted and flow northward, out of the canal and into the open waters of the Gulf. The prevailing currents in area would most often force the wastewater south toward Pinellas County and the mouth of the Anclote River. To determine the characteristics of the wastewater, the City's consultants collected water from the three proposed well fields for the new WTP and ran the water through a small, pilot-scale RO unit to generate an RO concentrate that is representative of the proposed RO discharge. It was determined that eight constituents of the wastewater would likely be present in concentrations that would exceed applicable state water quality standards: aluminum, copper, iron, gross alpha (a radioactivity measurement), total radium, selenium, nickel, and zinc. The Mixing Zones The Department may authorize mixing zones in which a wastewater discharge is allowed to mix with the receiving waters. See Fla. Admin. Code R. 62-4.244. Within the mixing zone, certain minimum water quality criteria must be met. At the outer boundary of the mixing zone, the applicable state water quality standards must be met. In this case, the water quality standards for Class III marine waters are applicable. The City's consultants analyzed the wastewater, receiving waters, and other factors and used an analytical model to simulate a number of mixing scenarios. In cooperation with Department staff, a separate mixing zone was established for each of the eight constituents that are not expected to meet water quality standards at the outfall. The largest mixing zone, for copper, is 1,483.9 square meters. The smallest mixing zone, for nickel, is 0.7 square meters. The mixing zones are conservatively large to assure sufficient mixing. Under most conditions, the mixing is expected to occur in a smaller area. Toxicity Analysis Among the minimum criteria that must be met within a mixing zone is the requirement to avoid conditions that are acutely toxic. See Fla. Admin Code R. 62-302.500(1)(a). A wastewater discharge is tested for potential acute toxicity by exposing test organisms to the undiluted discharge and determining whether more than 50 percent of the organisms die within a specified time period. The test organisms, mysid shrimp and silverside minnow, are sensitive species. Therefore, when a discharge is not acutely toxic to these organisms, it can be reasonably presumed that the discharge would not harm the native organisms in the receiving waters. The acute toxicity test for the proposed RO concentrate indicated zero toxicity. The Department requested that the City also analyze the potential chronic toxicity of the proposed discharge. A wastewater discharge shows chronic toxicity if exposure to the discharge adversely affects the growth and weight of the test organisms. The tests performed on the representative discharge showed that the proposed discharge of RO concentrate would not create chronic toxicity in the mixing zones. Petitioner’s expert witness, Ann Ney, did not review the toxicity analyses or other water quality data that were submitted to the Department by the City. However, she expressed a general concern about a salty discharge that could create stratification in the canal with higher salinity at the bottom of the canal that might be hypoxic (little or no dissolved oxygen). The more persuasive evidence shows that salinity stratification, or a hypoxic condition, is unlikely to occur. The proposed permit requires the City to conduct quarterly chronic toxicity tests. The permit also requires the City to periodically test the water and sediments for any unexpected cumulative effects of the discharge. Evaluation of Disposal Options Florida Administrative Code Rule 62-620.625(6) requires that an applicant for a permit to discharge demineralization concentrate must investigate disposal options potentially available in the project area. The City evaluated blending the discharge concentrate with the City's re-use water irrigation program or with the City’s domestic wastewater discharge into the Anclote River. The RO concentrate was too salty for irrigation use and there was an inadequate volume of domestic wastewater available throughout the year. In addition, the Anclote River is an Outstanding Florida Water and, therefore, is afforded the highest water quality protection under Department rules. See Fla. Admin. Code R. 62-4.242(2). The City also looked at underground injection but that was economically unreasonable and there was concern about upward migration of the discharge. It was economically unreasonable to discharge the concentrate farther out into the Gulf. Anti-degradation Analysis For a proposed new discharge, a permit applicant must demonstrate that the use of another discharge location, land application, or recycling that would avoid the degradation of water quality is not economically and technologically reasonable. See Fla. Admin. Code R. 62-4.242(1)(d). As discussed above, the City investigated other disposal options, but they were not economically or technologically reasonable. An applicant for a permit authorizing a new discharge must demonstrate that any degradation is desirable under federal standards and under circumstances that are clearly in the public interest. See Fla. Admin. Code R. 62-302.300(17). In determining whether a proposed discharge is desirable under federal standards and under circumstances that are clearly in the public interest, the Department is required by Rule 62-4.242(1)(b) to consider the following factors: Whether the proposed project is important to and is beneficial to public health, safety or welfare (taking into account the policies set forth in Rule 62-302.300, F.A.C., and, if applicable, Rule 62-302.700, F.A.C.); and Whether the proposed discharge will adversely affect conservation of fish and wildlife, including endangered or threatened species, or their habitats; and Whether the proposed discharge will adversely affect the fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge; and Whether the proposed discharge is consistent with any applicable Surface Water Improvement and Management Plan that has been adopted by a Water Management District and approved by the Department. The proposed project is important to and is beneficial to public health, safety or welfare because it would provide drinking water for the public. In addition, the treatment and use of brackish groundwater converts otherwise unusable water into a valuable resource. The use of brackish water avoids the use of water in the surficial aquifer that is used by natural systems, such as wetlands. The Florida Legislature has found that the demineralization of brackish water is in the public interest, as expressed in Section 403.0882, Florida Statutes (2010): The legislature finds and declares that it is in the public interest to conserve and protect water resources, provide adequate supplies and provide for natural systems, and promote brackish water demineralization as an alternative to withdrawals of freshwater groundwater and surface water by removing institutional barriers to demineralization and, through research, including demonstration projects, to advance water and water by-product treatment technology, sound waste by-product disposal methods, and regional solutions to water resources issues. The proposed discharge would not adversely affect conservation of fish and wildlife. Because the discharge is not toxic to sensitive test organisms provides reasonable assurance that the native fish and other aquatic life would not be adversely affected by the discharge. The only identified threatened or endangered species that frequents the canal waters is the endangered Florida Manatee. Manatees use the canal because of its relatively warm waters. Manatees come to the surface to breathe and they drink fresh water. There is no reason to expect that a manatee moving through the mixing zones would be adversely affected by the RO concentrate. The Florida Fish and Wildlife Conservation Commission, which has primary responsibility for the protection of endangered and threatened species, did not object to the proposed permit. Manatees and many other aquatic species use seagrasses as food or habitat. There are no seagrasses in the area of the canal into which the RO concentrate would be discharged, but there are dense seagrass beds nearby. The proposed discharge would have no effect on the seagrasses in the area. The proposed discharge would not adversely affect fishing or water-based recreational values or marine productivity in the vicinity of the proposed discharge. Because the proposed discharge is non-toxic and would meet Class III water quality standards before reaching the closest areas where humans have access to the canal and Gulf waters, there is no reason to believe that the proposed discharge would be harmful to humans. The proposed discharge would not adversely affect recreational activities, such as swimming, boating, or fishing. Petitioner presented the testimony of two fishermen about fishing resources and water flow in the area, but no evidence was presented to show how the proposed discharge would reduce marine productivity. Petitioner contends that the proposed discharge would adversely affect the Pinellas County Aquatic Preserve. However, the aquatic preserve is two miles away. The proposed discharge would probably be undetectable at that distance. It would have no effect on the waters or other resources of the aquatic preserve. With regard to the requirement that the proposed discharge be consistent with an adopted and approved Surface Water Improvement and Management Plan for the area, there is no such plan.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the Department issue a final order determining that Petitioner lacks standing, and approving the issuance of the industrial wastewater facility permit to the City. DONE AND ENTERED this 16th day of December, 2010, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of December, 2010. COPIES FURNISHED: Nona R. Schaffner, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Thomas J. Trask, Esquire Frazer, Hubbard, Brandt & Trask, LLP 595 Main Street Dunedin, Florida 34698 Henry Ross 1020 South Florida Avenue Tarpon Springs, Florida 34689 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Mimi Drew, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (5) 120.52120.57120.68373.414403.0882 Florida Administrative Code (4) 62-302.30062-302.50062-4.24262-620.625
# 9

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer