The Issue The issues presented in this proceeding are whether Petitioner submitted the lowest and best bid on CTB 5998 and whether Petitioner is entitled to the bid award.
Findings Of Fact On November 5, 1990, Florida A & M University, acting as the agent of the Board of Regents, issued a Call to Bid (CTB) for the repainting and renovation of Bragg Stadium (repainting project). The total project was estimated to cost $595,000.00. The funds for the project would come from the Public Education Capital Outlay and Debt Service Trust Fund appropriated by the legislature and passed into law in the State's budget. 1/ Specifically, the funds for the repainting project were appropriated by the legislature as a specific line item in the 1990-1991 budget. The line in the budget read, "Fire Code Corrections/Repainting-Bragg Stadium (includes $490,000.00 Reimb. to Aux. Fund), of $682,000.00." The $682,000.00 figure was obtained from several documents submitted by FAMU to the Board of Regents. The Board of Regents then submitted the University's budget requests to the Commissioner of Education who, in turn, submitted an integrated budget to the governor and legislature. See Chapter 216 and 235, Florida Statutes, for the specifics of this budgetary process. The beginning of the budgetary process in relation to the repainting project occurred on October 16, 1989, when Louis A. Murray, the Associate Vice President of Florida A&M sent a document titled "the University's 1990-91/1992- 93 Capital Improvement Fee Project List for Legislative Consideration" to Dr. Carl Blackwell, the Vice Chancellor for Budgets. The document contained two attachments entitled "Capital Improvement Fee Project List, Project Information Sheet" (Project Information Sheet) for the fire code corrections at Bragg Stadium and the repainting of Bragg Stadium. It also included a Project Information Sheet for the remodeling of the Commons Building. The Project Information sheet dealing with the repainting and renovation of Bragg Stadium contained the amount of funding being requested by FAMU for the repainting project and a breakdown of the project's estimated costs. The project cost detail for the repainting of Bragg Stadium states: Construction $495,000.00 (Assumes bid date of 1991) Professional Fees . . . . 43,000.00 Resident Supervision . . . (No entry) Equipment . . . . . 30,000.00 Contingency . . . . . 27,000.00 Total Project Cost: $595,000.00 Importantly, the Project Information Sheet for the repainting of Bragg Stadium contains the basis utilized by FAMU to arrive at the repainting project's estimate. FAMU represented in the Project Information Sheet as follows: The basis for the estimate is the bid experience of a prior advertisement of the project by our own Plant Operations Maintenance Office, which came in at over $400,000. 2/ This estimate was again verified in a letter, dated October 25, 1989, from Dr. Murray to Dr. Blackwell. The letter states, in part, as follows: . . . . Since the opportunity for completing this project is between football seasons, the University wishes to advance dollar requirements from its Auxiliary Trust Fund with expected reimbursement from Capital Improvement Trust Fund after Legislative approval on July 1, 1990. This action will permit us to proceed with the Bid process and construction contract through completion before the 1990 football season. The scope of this project is summarized as follows: This project includes sandblasting, repainting and structural repairs for Bragg Stadium. Sandblasting and repainting is estimated at $415,000, while structural repair, primarily isolated rust spots, will cost approximately $75,000. . . . . The total estimate in Dr. Murray's October 25, 1990, letter was $490,000.00. It was this letter which prompted the parenthetical language in the line item of the General appropriations act for 1990-1991, passed by the legislature and enacted it to law. The Project Information Sheet for the fire code corrections to Bragg Stadium (fire code project) contained a project cost detail as follows: Construction $70,000.00 Professional . . . . . 7,000.00 Resident Supervision . . . (No entry) Equipment . . . . . (No entry) Contingency . . . . . 10,000.00 Total Project Cost: $87,000.00 The contract for the fire code corrections was let for bid prior to the repainting project. The amount of the contract for the fire code project was approximately $107,000.00. This contract amount exceeded the amount of the construction portion of the Project Cost Detail of $70,000.00 shown in the Project Information Sheet for the fire code project. Dr. Murray testified that this action was acceptable because it was within the discretion of Florida A&M to use the $682,000.00 appropriation to perform the fire code project in any amount it deemed appropriate, without regard to the break-outs shown in the Project Information Sheets. However, even assuming the correctness of Dr. Murray's position and deducting the amount of the fire code project's contract and the architectural fees of $7,000.00 listed in the Project Information Sheet, $568,000.00 of the original budgeted amount of $682,000.00 would remain for use on the repainting project. Florida A&M University, also prepared a document titled, "Summary of Capital Improvement Fee Projects for 1990-91/1992-93." The document is a summary of Florida A&M's budget requests for those years. This document also lists the fire code project and the repainting project along with the requested funding for those projects for the years 1990 through 1991. The funds requested for the projects are broken into three categories; Planning, Construction and Equipment. The entries for the repainting project show that the amount of $522,000.00 is for "Construction". The $522,000.00 figure was obtained by taking the $495,000.00 figure for construction contained within the Project Information Sheet for the repainting project, and adding the amount of the contingency cost ($27,000.00) for the project which was also shown on the Project Information Sheet. The combined total for the two projects was $682,000.00, the exact amount appropriated by the legislature for the two projects. Once the legislature had appropriated the money, FAMU, on November 5, 1990, requested that A Capital Outlay Implementation Plan be established with the Capital Outlay Trust Fund. The establishment of such a Plan is similar to creating a special account within the trust fund from which the University can draw. On November 26, 1990, the Plan was established for both projects in the amount of $682,000.00, as had been appropriated by the legislature. 3/ The Capital Outlay Implementation Plan contained a section titled, "estimated budget". The estimated budget contained estimates for the various phases of both projects as follows: Construction. $565,000 Professional Fees. 50,000 Furnishings and Equipment. 30,000 Contingencies. 37,000 .................................$682,000 Significantly, these documents were the only pre-established construction budgets developed by FAMU prior to the opening of the bids in this case. 4/ The specific pre-established construction budget for the repainting project was $522,000.00. Later, after the filing of the bid protest, FAMU would attempt to render a strained interpretation of the phrase "pre-established construction budget" contained in the bid specifications and engage in some inappropriate accounting in order to create several lower budget estimates. The Bid Package for CTB 5998 provided in the "Instructions to Bidders", Item D-21, Rejection of Bids, as follows: The owner reserves the right to reject any and all bids when in the opinion of the owner such rejection is in the best interest of the owner. The Bid Package further provided in the "Instructions to Bidders" at B-23, Contract Award, page 16 of 106, in relevant part: The contract will be awarded by the Florida Board of Regents for projects $500,000 or more, and by the President of the University, on behalf of the Florida Board of Regents, for projects of less than $500,000.00, to the lowest qualified and responsible bidder provided the bid is reasonable and it is in the best interest of the owner to accept it. . . . The contract award will be made to the responsible bidder submitting the lowest responsible aggregate bid within the pre-established construction budget. The aggregate bid shall consist of the base bid plus accepted active alternate bids, or less accepted deductive alternate bids, applied in the numerical order in which they are listed on the bid form. If the base bid exceeds the amount of the pre-established construction budget, the owner may reject all bids. (Emphasis added) A mandatory pre-bid conference was held on December 6, 1990, and was attended by seventeen contractors, including Petitioner. By the terms of the bid package, the bid opening date was set for December 18, 1990. However, by addendum, the bid opening date was extended to December 21, 1990. Seven bids were submitted in response to the original solicitation. 5/ The bids were opened at 10:00 a.m. on December 21, 1990, at the conference center of Florida A&M University. The bids were opened by Chuks Onwunli on behalf of Florida A&M, and tabulated by William Sabella, a representative of the architectural firm , Barnett, Fronczak Architects, the consulting architects for the repainting project. The opening and tabulation of all the bids was recorded on a document titled "Bid Tabulation". The result of the opening was that Phoenix Coating was the low bidder with a bid of $419,000.00. Feimster-Peterson, Inc., was the second lowest bidder with a bid of $474,320.00, and Monoko, Inc., was the third low bidder with a bid of 487,462.00. The four other bidders listed on the bid tabulation sheet were all over the amount of $490,000.00. 6/ As can be seen from the numbers, the top three bids were well within the pre-established construction budget for the repainting project. On December 21, 1990, Feimster-Peterson sent a Notice of Protest by telecopy and overnight delivery for delivery on Monday, December 24th. The basis of the protest was that the low bidder, Phoenix Coating, was not responsive because it had not attended the mandatory pre-bid conference and had not complied with the minority participation requirements of the specifications. On December 28, 1990, Feimster-Peterson sent its formal protest to Forrest Kelly, the Director of Capital Programs at the Florida Board of Regents by telecopy and by overnight delivery with delivery on December 31, 1990. The formal protest was filed in a timely manner. On or about January 14, 1991, Oscar Martinez, the Purchasing Director for Florida A&M issued a letter regarding Bid No. 5927 for the repainting and renovation of Bragg Stadium. 7/ The letter rejected all seven bids. Phoenix Coating's bid was found to be nonresponsive because it did not meet the 15% minority participation requirements of Bid 5998 and because the company had not attended the December 6, 1990, mandatory pre-bid meeting. Because Phoenix Coating's bid was non-responsive, Petitioner became the lowest responsive bid on CTB 5998. The letter further advised that the other six bids, including Petitioner's bid, were rejected because all six bids allegedly exceeded the pre- existing construction budget estimate for the project. The letter did not contain any language affording Petitioner a clear point of entry as required by Section 120.53, Florida Statutes. The letter did indicate that the University would modify the scope of work. Attached to the same letter was a new invitation to bid. Clearly, at this point in time, FAMU knew or should have known that there was a bid protest filed with it which was unresolved and which required a formal administrative hearing. However, during this time instead of following its statutory duties under Chapter 120, Florida Statutes, FAMU, at its peril, chose to re-let the project for bids. The new bid opening was set for February 28, 1991, and a new mandatory pre-bid meeting was also set for February 28, 1991. The bid deadline was extended to March 21, 1991. The scope of the work was not significantly altered in the re-bid. 8/ On or about January 16, 1991, counsel for Feimster-Peterson sent a letter to the Florida Board of Regents. The letter was prompted by Robert Petersen's, president and stockholder of Petitioner, belief that something was not right about the monetary and funding claims that FAMU was putting forth as its basis for rejecting all the bids. In essence, the numbers Mr. Petersen was aware of, which did not include any of the Project Information Sheet figures referenced above, did not make any sense to him. The letter stated, in part, as follows: Re-bidding the Project is unfair to all bidders now that the results of the first bid have been made public. Each bidder now has a target . . . to shoot at which will override the customary free market environment. Rewriting the Specifications will not eliminate this effect. Be advised that Feimster-Peterson requests the opportunity to either see the estimates or negotiate with the Board to reach a mutually acceptable scope of work. I request that you delay re-bidding until this option can be explored. (Emphasis added). On January 23, 1991, counsel for Feimster-Peterson again wrote to the Office of General Counsel at Florida A&M University and stated in relevant part: This letter is to reiterate our concern for the actions taken by the Florida A&M Purchasing Department and regarding the painting contract for Bragg Stadium. We filed bid protest for the Florida Board of Regents filed on December 28, 1990 pursuant to paragraph B-22 of the bid documents. Neither the Florida Board of Regents or the administration of Florida A&M has acted upon our bid protest. The bid protest remains unresolved and we intend to pursue the administrative remedies provided to us through the bid protest procedure. Moreover, it is our position that the decisions taken by the Florida A&M Purchasing Department subsequent to our filing may be included and adjudicated within the administrative procedures of the original bid protest . . . Mr. Martinez apparently takes the position that a new bid protest filing is necessary to formally dispute his decision [about the University's available budget]. As indicated, we disagree and intend to dispute this action within the existing, unresolved bid protest . . . By indicating the precise amount of the budget, Mr. Martinez has eliminated the basic purpose of competitive bidding, which is to achieve the lowest responsive price. All bidders now have a target price, and a minor modification of the specifications will not eliminate this effect. This serves neither Florida A&M's interest nor the interest of the original responsive bidders. Feimster-Peterson has requested that negotiations be commenced so that a mutually beneficial contract price be determined and the contract work commenced. To date, Mr. Martinez has refused to enter such negotiations and have given several oral, unsatisfactory reasons for this position. The Purchasing Department's refusal to negotiate with Feimster-Peterson, the lowest responsible bidder, should be clearly articulated in writing and sent to us. Feimster-Peterson believes such negotiations may prove successful, and work could commence without further delay or expense to Florida A&M . . . . (Emphasis added). Feimster-Peterson intends to pursue its rights under the bid protest originally filed on December 28, 1990. As low responsive bidder, Feimster-Peterson is entitled to an award of the contract . . This letter was sent by both telecopy and Federal Express to Mr. Holifield at the Office of the General Counsel and added the additional issues of whether FAMU's action in regard to this bid constituted bid shopping and whether Petitioner's bid, in fact, exceeded the estimated construction budget for Bid 5998. 9/ Significantly, the Martinez letter did not mention that Respondent was rejecting Petitioner's bid because the University believed that it could increase the number of contractors participating in a re-bid and could achieve a lower price by re-bidding the project. This issue was raised for the first time at the hearing. In that regard, the evidence clearly indicates that Respondent was attempting to shop its bid in order to obtain a lower price by re-bidding the project. Bid shopping is a process by which the general contractor or, as in this case, the owner of a project attempts to play off one bidder against another bidder in order to obtain a lower price. Bid shopping is done either by establishing a target figure which is represented to bidders to be a number which must be beaten in order to obtain the contract; or by the bid shopper relaying the amount of a competitor's bid to a bidder or group of bidders in order to encourage the bidder or group of bidders to lower its bid to below that of the competitor in order to secure the contract. A basic assumption in bid shopping is that the scope of the work is not significantly altered in order to lower the cost of the project. Bid shopping is considered to be unethical in a public competitive bidding situation and has been disapproved of by the Florida courts. In this case, Respondent established a target price in its letter of January 14, 1991, by communicating the amount of the alleged overage, enabling a bidder to calculate the budget figures to shoot for and, at the same time, keeping the scope of the work substantially the same in the re-bid. Additionally, the amount of the bids, as well as details involving those bids became public once the bids were opened, converting the possibility of unfair advantage accruing to potential bidders on the re-bid to a probability of such unfair advantage in this instance. 10/ Such a reason for rejecting the bids in this case strikes at the very heart of the bid process, which is to ensure that bidders have an equal and fair opportunity to have their bids considered and prevent an agency from picking and choosing among various bidders or potential bidders. There was absolutely no evidence which indicated that the number of contractors participating in Bid 5998 was non-competitive or was in any way fundamentally unfair. 11/ By rejecting all the bids in order to attempt to shop its bid, Respondent acted in an arbitrary and capricious manner and therefore, its rejection of the bids in this case cannot stand. Additionally, Respondent's attempt to reject the bids in order to allegedly increase the number of bidders participating in the re-bid and thereby reduce the price, violated its own specification in the bid documents which states: The contract award will be made to the responsible bidder submitting the lowest responsible aggregate bid within the pre-established construction budget. (emphasis supplied) By going outside the scope of its bid specifications, Respondent has acted in an arbitrary and capricious manner and may not reject Petitioner's bid on this basis. After the protest of Feimster-Peterson raised the issue of the amount of the budget/estimate and after its request to see the budget, Florida A&M began to review documents to determine its response to Feimster-Peterson. The basis underlying the figures cited in Mr. Martinez's letter of January 13, 1991, was arrived at by subtracting amounts spent by Florida A&M from the $682,000.00 appropriated by the legislature for the fire code and repainting projects. The overage of $55,000.00 claimed in Mr. Martinez's letter of January 14, 1991, was calculated by taking the "proposed budget" of $682,000.00 and subtracting the amount of $257,105.00 "in expenses for the stadium", for an "available balance" of $424,895.00. 12/ It was this account balance which was being claimed by FAMU to be the pre-existing construction budget referred to in the bid documents. Such an account balance does not constitute a pre-established construction budget because the balance was not established prior to the submission or opening of the bids. Additionally, an account balance is simply not a budget as that term is normally defined and used in the bid documents. Mr. Martinez did not identify the source of the expenses or the purpose for those expenditures. Mr. Martinez deferred all questions as to verification of the figures or the purpose of the expenditures to "Bob", which referred to Robert Goodwin, Jr. Mr. Goodwin was and still is, the Director of the Facilities Planning Office of Florida A&M and is responsible for the various purchase orders involved in this case. Mr. Goodwin took his instructions on which purchase order numbers to use from Dr. Murray and/or Dr. Humphries, Associate Vice President and President of Florida A&M University, respectively. For reasons outlined later in this Recommended Order, the expenditures claimed for the stadium are highly suspect. On or about February 6, 1991, Mr. Holifield, General Counsel of Florida A&M University, responded to Petitioner by enclosing a statement of budget estimate for Bid No. 5998. 13/ Attached to Mr. Holifield's letter of February 6th was a memorandum addressed "[t]o whom it may concern" dated February 5, 1991, from Robert Goodwin, Jr., the Director of Facilities & Planning for Florida A&M. The memo stated that the "budget estimate" for the Project was $367,351.00. Mr. Holifield's letter noted that Feimster-Peterson's bid "exceeded the budget estimate by $106,969.00." (emphasis added). He further noted that FAMU had chosen to re-bid the repainting project rather than accept the bid of the Petitioner. Mr. Holifield also addressed the pending bid protest by Feimster-Peterson as follows: Florida A&M University feels that it is the best interest of the citizens and taxpayers of the State of Florida to re-bid this Project rather than to award the job to your client. In view of the discrepancy between the bidder and the client and the estimated budget it would seem that now that you have been provided with the budget estimate, that you and your client would be willing to forego the bid protest which you are attempting to pursue. Rather, it would appear to be far more appropriate for you to simply join in the rebidding process. (emphasis added). Again, the basis for the decreasing budget figure was the legislatively appropriated funds available for the project less amounts which were supposedly attributable to the repainting and fire code projects, i.e. the account balance. However, what the evidence clearly showed was that, like the budget figures underlying Mr. Martinez's assertions in his letter of January 14, 1991, the latest budget figure of $367,351.00 was calculated by Florida A&M subtracting sums for expenditures which were made for projects unrelated to the fire code or repainting projects. In fact, several of the expenditures were for improvements to the public address system at Bragg Stadium. Similarly, some of the amounts claimed to have been expended for the repainting and fire code projects were expended for architectural fees on other projects. 14/ FAMU's officials were aware that such accounting was inappropriate. From this evidence, it appears that FAMU is attempting to spend or has spent money specifically appropriated for two certain purposes on projects unrelated to the appropriation and not approved for such use by either the legislature or the Board of Regents. Since these expenditures are all part of other projects separate and distinct from the fire code and repainting projects, they should not have been subtracted from the amount of money available to FAMU for the repainting project. 15/ There is no doubt that this "budget estimate" and the budget underlying the assertions made by Mr. Martinez in his letter of January 14, 1991, were false and were red herrings, developed after the fact, in an attempt by Respondent to throw Petitioner off the track of an otherwise valid bid protest. Moreover, beyond utilizing improper accounting, one of the most significant facts in this proceeding was that FAMU created no less than eight separate figures which it claimed to be the budgets for this project. Which figure FAMU used depended on who FAMU was dealing with at the time and the result FAMU desired to achieve. Such tactics by an agency are totally unacceptable and the use of such false figures to justify rejection of a bidder's bid is nothing short of bad faith on the part of an agency akin to fraud. Since Petitioner submitted the lowest and best responsive bid, Petitioner, at this point in time, was entitled to the award of Bid 5998. Another point not directly raised by FAMU in this proceeding, but suggested by the underlying facts and necessary to the resolution of this bid protest, is the question of whether bids may be rejected by an agency if the funds necessary to complete the project are no longer available, i.e. the agency has run out of money. On the surface, given the constraints of Florida's finance system, an honest lack of funds would appear to be an appropriate basis for an agency to reject all the bids. See Section 235.42, Florida Statutes. However, in this case, the evidence does not support a finding that the University no longer has the necessary funds to pay for the repainting project since the actual money from the trust fund has not been disbursed to FAMU and since FAMU's representations in regards to the status of the repainting project's account balance appear to be based on unlawful accounting and are less than credible. Since the evidence did not establish that FAMU no longer has the funds necessary to complete the project, Petitioner was entitled to the award of Bid 5998. However, because of FAMU's actions regarding Petitioner's bid protest which actions were highly prejudicial to Petitioner, time had moved on and, on February 25, 1991, FAMU discovered that there was lead in some portion of the paint on Bragg Stadium, in the amount of 1.9% by weight. The test was conducted by Professional Services Industries, Inc. on some paint chips from the stadium. The test utilized by Professional Services is known as the TCLP test. This discovery began a review by Florida A&M, in conjunction with Barnett, Fronczak Architects, of what changes, if any, needed to be made to the Specifications and what options were available for carrying out the repainting of the stadium. 16/ On March 19, 1991, the Project was "cancelled" by Addendum number 4 until the fall of 1991. Presently, it appears uncontradicted that the paint which is on Bragg Stadium contains lead. It is probable that the lead is contained in the primer coat, which is the first coat on the steel. In fact, the current specifications for the repainting project call for a red lead and oil primer coat to be placed on the steel structure of the stadium. Of the options which have been proposed by the architect, two of them assume that the lead paint will not be removed from the structure, but will essentially be sealed in by the new coatings. These options will avoid the creation and need for disposal of any hazardous waste containing lead and should result in either the same cost to perform the work or in a reduction in cost to perform the work. The third option is to completely remove all the paint and possibly create material which may be hazardous waste. This option is essentially the same type of sandblasting called for in Bid 5998, but may require more money to perform. Any possible increase in the cost of Bid 5998 would be due to the greater expense of disposing of any hazardous waste, if any such waste is created by the blasting operation, and whether the presence of the lead is an unforeseen condition as defined in the proposed contract which would entitle Petitioner to an increase of the bid price caused by the potential cost of disposal to it. In this case, the evidence did not demonstrate that the presence of the lead was an unforeseen condition. Article 3.15 of the proposed contract when compared to Article 10.1 appears to comtemplate the discovery of potentially hazardous materials. Additionally, as indicated earlier, the current specifications of Bid 5998 call for a lead primer coat. Under all the facts of this case, the presence of lead or lack of lead in the paint on Bragg Stadium would appear to be a circumstance the risk of which is assumed by the bidder in bidding the project; and therefore, would not be a changed or unforeseen condition which would justify rejecting all the bids. Importantly, the scope of the work, i.e. sandblasting and structural repair, would not change. Sandblasting is the same whether the surface being removed contains lead or does not contain lead. The structural repair required by Bid 5998 is not effected by the presence of lead in the paint on Bragg Stadium. The only differences would occur in the type of equipment used and the type of respirators worn by the workers. The equipment for lead removal has vacuums incorporated in its operation and uses a steel grit instead of sand. The steel grit actually reduces the amount of any potential hazardous waste by compacting it into a smaller volume. The respirators differ in the type of filters. Neither of these differences affect the cost of the work required in Bid 5998. Similarly, disposing of the end product of the blast operation would still be required under Bid 5998 whether the debris contains lead or does not contain lead. The only difference would be the ultimate disposal site of the barrels of debris, i.e whether at a regular landfill or at a disposal site for hazardous waste. All of these differences are already required under EPA, OSHA and DER rules regulating lead abatement, toxic chemicals and hazardous waste and are utilized by Petitioner when it encounters lead in its paint removal operations. Moreover, the bid documents contemplate that the bidder is familiar with all federal, state and local laws and regulations which affect the project in any manner. See Section B-3 "Instructions to Bidders." While it is uncontroverted that the paint contains lead, it is also not clear whether the end product created by a blasting operation would be hazardous waste requiring expensive disposal in a hazardous waste landfill and what amount, if any, would need to be placed in a hazardous waste landfill. The TCLP tests performed by Professional Service Industries were run on paint chips and not the abrasive debris that remains after a blasting operation. Therefore, the TCLP test results have no relevance as to what amount of hazardous waste, if any, would need to be removed from the site. In fact, it is impossible to determine whether the debris left over from the blast operation will be hazardous waste until the blast operation has begun and produced debris sufficiently representative of what may be expected during the course of the work and which is capable of being tested. The issue of lead arose long after the rejection of the bids on the basis of Feimster-Peterson's bid being over the budget and would not have become a potential basis had FAMU acted in a responsible manner in the award of this bid. It is understood that the University and its architects are still trying to determine what, if any, action needs to be taken regarding the presence of lead in the paint. The evidence established that at a minimum the architect would have suspended the project to give them time to study the lead and determine what course of action should be taken. At the most, the architect would have cancelled the project. Added to such an analysis is the fact that the Bid specifications appear to require a red lead and oil primer paint to be placed on the structural steel of the stadium and that under the facts of this case, the presence of lead in the paint on the stadium would not be an unforeseen condition. In either event, the discovery of the lead did not undermine the scope of the repainting project as it is comtemplated in the bid documents and may have only resulted in change orders under the terms of the proposed contract. 17/ The General Conditions of the contract provide in Article 3, Administration of the Contract, paragraph 4.3, Claims and Disputes, subparagraph 4.3.6, Claims for Concealed or Unknown Conditions, as follows: If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the contract documents or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than twenty-one days after the first observance of the conditions. The Architect/Engineer will promptly investigate such conditions and, if they differ materially and cause an increase or decrease in the contractor's cost of, or time required for, performance of any part of the work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both . . . . Article 7, Changes in the Work, also provides a mechanism by which the Architect/Engineer and the Owner may order changes in the work after execution of the contract. Paragraph 7.3, Construction Change Directives, provides the mechanism by which the amount of a construction change directive is determined. A change order is simply a revision of the scope of the contract, requiring that something be done differently, that more be done, or that less be done, than what is within the original scope of work of the contract. Article 14, Termination or Suspension of the Contract, paragraph 14.3, Suspension by the Owner for Convenience, provides in relevant part: The owner may, without cause, order the contractor in writing to suspend, delay or interrupt the work in whole or in part for such period of time as the owner may determine. An adjustment shall be made for increases in the cost of performance of the contract including profit on the increased cost performance, caused by suspension, delay or interruption . . . . (Emphasis added). It is clear that conditions, such as the lead in this case, are contemplated by both the bid and the contract which is part of that bid. In this case, but for FAMU's actions, Petitioner would have been awarded the contract prior to the discovery of the lead. Had Florida A&M entered into a contract with Feimster-Peterson to perform the repainting project when it should have, it would have been guided by Article 14.3 of the specifications, "Suspension by the Owner for Convenience." The evidence did not demonstrate that the discovery of the lead would sufficiently change the scope of the repainting project to the extent that a new bid would have to be developed and that the contract terms of Bid 5998 were inadequate to handle any changes in the scope of the work for the repainting project. Such a result is especially desirable where, as in this case, the University has acted in such a way so as to undermine the fairness of the competitive bidding process and is attempting to spend appropriated money in a manner not authorized by statute. In essence, FAMU has undermined the competitive bidding process to the extent that it would be unfair to re-bid the project since it is impossible to remove FAMU's past conduct from any rebid on any re-vamped specifications. The only remedy, in this case is to award Bid 5998 to Petitioner as the lowest and best responsible bid.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that Florida A&M University enter, on behalf of the Board of Regents, a Final Order awarding Bid 5998 to Petitioner as the lowest, responsible bidder on the repainting project. RECOMMENDED this 18th day of September, 1991 in Tallahassee, Leon County, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of September, 1991.
The Issue Whether Petitioner/Intervenor Hedin's challenge to Respondent's preliminary determination to award Lease No. 590:2241 to 1436 Building, Inc. should be sustained? Whether Petitioner/Intervenor Schlitt's challenge to said preliminary determination should be sustained?
Findings Of Fact Based upon the record evidence, the following Findings of Fact are made: 1 In March, 1991, after requesting and receiving approval from the Department of General Services, the Respondent issued an Invitation to Bid for Lease No. 590:2241 (hereinafter referred to as the "ITB"). The cover page of the ITB contained the Bid Advertisement, which read as follows: The State of Florida, Department of Health and Rehabilitative services is seeking approximately 17,064 net rentable square feet of office space to lease in Indian River County within the following boundaries: North, to Lindsey Road, South to Olso Road, East to A1A and West to Kings Highway. Space must be in an existing building. Occupancy no later than October 1, 1991, or within 120 days after notification of bid award, whichever occurs last. Desire a five (5) year lease with five (5) one year renewal options. Sealed bids will be received until 3:30 p.m.,, April 24, 199[1] at Riviera Beach, FL. Information and specifications will be provided to all interested parties at a mandatory pre-proposal conference to be held at Department of Health and Rehabilitative Services, 1050 15th Street West, Riviera Beach, FL. 33404, April 5, 1991 at 1:00 p.m. The Department of HRS reserves the right to reject any and all bids received and if necessary to reinstate procedures for soliciting competitive bids. The office space sought by Respondent was to house a client service center that is currently operating out of a 12,000 square foot facility owned by Petitioner/Intervenor Hedin. Respondent needs approximately 5,000 more square feet of office space for this center. Page B-1 of the ITB contained the definitions of various terms used in the ITB. Among the terms defined was "lowest and best bid." "Lowest and best bid" was defined as follows: That bid selected by the District Administrator, designee, or Deputy Secretary upon the recommendation of the bid evaluation committee following an objective and detailed process to evaluate and compare bids. "Lowest" refers to the total evaluation score. Weights for evaluation criteria are prescribed on pages B-7 through 9. Actually, this information was found on pages B-5 though 7 of the ITB, which read in pertinent part as follows: EVALUATION OF BIDS Bids received are first evaluated to determine technical responsiveness, such as use of Bid Submittal Form, inclusion of required information, data, attachments, and signatures. Non- responsive bids will be withdrawn from further consideration. Non-responsive bidders will be informed promptly by certified mail. Responsive bids are presented to a bid evaluation committee for comparison and formulation of a recommendation for award. This is accomplished by a visit to each proposed property and application of the evaluation criteria. The committee's recommendation will be presented to the Department official having award authority for final evaluation and determination of a successful bidder. EVALUATION CRITERIA AWARD FACTORS The successful bidder will be that determined to be the lowest and best. All bids will be evaluated based upon the award factors enumerated below: Associated Fiscal Costs Rental Rental rates for basic term of lease. Evaluated using present value methodology by application of she present value discount rate of 8.74%. 2/ (Weighting: 35 minimum) Rental rates for optional renewal terms of lease. Rates proposed are within projected budgeting restraints of the Department. (Weighting: 5 minimum) Total for rental shall be not less than 40. Moving Costs: a) Cost of relocating communications network computer drop lines as determined by a site survey conducted at each proposed facility by the Department's management information office, or: (Weighting: 5 maximum) b) Cost of relocation of major statewide operational data system as determined by a site survey conducted at each proposed facility by qualified data center management. (Weighting: 6 maximum) Telephone costs as determined by a site survey conducted at each proposed facility by an engineer from the applicable deregulated vendor. (Weighting: 5 maximum) Relocation of furniture and equipment not addressed above. (Weighting: 5 maximum) LOCATION The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of Departmental operations planned for the requested space. Proximity of facility to a preferred area, such as a courthouse or main traffic arteries. (Will not be applicable if there are no preferred areas within the bid boundaries). (Weighting: 5 maximum) Frequency and availability of satisfactory public transportation near the offered space. (Weighting: 5 maximum) Proximity of offered space to the clients to be served by the Department at this facility. (Weighting: 5 maximum) Aesthetics of the building, property the building site [is] on, and of the surrounding neighborhood. (Weighting: 1 maximum) Security issues posed by building and surrounding neighborhood. (Weighting: 1 maximum) PROPERTY Susceptibility of the property's design to efficient layout and good utilization, such as ability of physical structure to house large units together and in close proximity to interdependent units. (Weighting: 15 maximum) Suitability of the building, parking area and property as a whole for future expansion. (Weighting: 5 maximum) Provision of the aggregate square footage in a single building. Proposals will be considered (but fewer points given) which offer the aggregate square footage in not more than two buildings provided the buildings are immediately adjacent to or within 100 yards of each other. If in separate buildings, the structures are connected by enclosed climate controlled walkways. (Weighting: 2 maximum) Prospective bidders were instructed on page B-3 of the ITB that they had to submit their bids on the 22-page Bid Submittal Form, which comprised Section C of the ITB. The Bid Submittal Form (BSF) provided detailed information regarding the needs of the Department and the terms, conditions and requirements that prospective bidders were expected to meet. Among the requirements addressed was that the proposed space be an "existing building," meaning that it was "dry, fully enclosed, and capable of being physically measured." The BSF further indicated that a multistory building would be acceptable, provided that it met certain specified requirements. In addition, pages C-3 through 4 of the BSF informed prospective bidders that, as part of their bid submittal, they would have to provide, among other things, the following: * * * b. A scaled (1/16" or 1/8" or 1/4" 1'0") floor plan showing present configurations with measurements. The final floor plan will be described in the specifications. * * * A scaled site layout showing present location of building(s), location, configuration and number of parking spaces assigned to the Department, access and egress routes and proposed changes. This is to be drawn to scale. Final site layout will be a joint effort between Department and Lessor so as to best meet the needs of the Department. The subject of floor plans was also discussed on page C-11 of the ITB, which provided in pertinent part as follows: Final floor plans will be a joint effort of Departmental staff and the successful bidder. The successful bidder is to provide architectural services by a licensed architect to prepare renovation plans. The final floor plan is subject to Departmental determination and State Fire Marshal review and approval. 3/ Prospective bidders were issued the following advisement and warning on page B-8 of the ITB regarding their protest rights: Any person may dispute any part of the competitive bid process through the filing of a protest. To be considered, a protest must be filed in accordance with Section 120.53(5), Florida Statutes, and Chapter 10-13.11 Florida Administrative Code. Failure to file a protest within the prescribed time limits shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Prospective bidders, who did not want to file a protest, but merely desired clarification regarding a matter relating to the bidding process, were directed, on page B-3 of the ITB, to follow the following procedure: Any questions concerning an interpretation of meaning, ambiguity, or inconsistency on this project are to be received in writing by the project contact person listed on page A-1 [Steven Young) at least 5 working days prior to bid opening so that a written response may be provided to all bidders. 4/ The mandatory pre-proposal conference on the ITB was held as scheduled on April 5, 1991. Petitioner/Intervenor Schlitt, Petitioner/Intervenor Hedin, and Intervenor 1436 Building, Inc. (hereinafter referred to as "`1436") appeared in person or through a representative at the conference. One other prospective bidder, Alan Taylor, was also in attendance. Among the topics discussed at the pre-proposal conference was the present value index discount rate that would be applied in evaluating proposals. The prospective bidders were advised that the rate which appeared on page C-21 of the ITB-- 7.73%--, not the 8.74% rate appearing on page B-5, would be used. Prospective bidders were also told at the pre- proposal conference that the maximum number of total points available for moving costs was not 15 or 16 as a reading of the ITB might suggest, but 21: 5 for item 1)a) (computer drop lines);6 for item 1)b) (statewide operational data system equipment); 5 for item 2 (telephones); and 5 for item 3 (furniture and other equipment). Under the ITB, as originally issued and clarified at the pre-proposal conference (hereinafter referred to as the "Original ITB"), Respondent was to pay its own moving costs, as it had consistently done in the past, without any contribution on the part of the successful bidder and it would award points to each bidder for moving costs based upon what it would cost Respondent, according to its estimates, to relocate computer drop lines, statewide operational data system equipment, telephones, and furniture and other equipment to the facility proposed by that bidder. The less the expense to the Department to relocate these items, the more points a bidder would receive. Accordingly, to the extent that he intended to offer space already occupied by Respondent, Petitioner/Intervenor Hedin had an advantage over the other prospective bidders under the Original ITB. Some time after the pre-proposal conference, David Feldman, 1436's representative, complained to Respondent about this advantage enjoyed by Hedin in the category of moving costs and inquired if anything could be done about it. Steven Gertel, the Respondent's Assistant Staff Director for Facilities Services, Kevin McAloon, the General Services Manager for Respondent's District IX, Louis Consagra, the then Office Operations Manager for General Services for District IX, and Steven Young, the Facilities Services Manager for District IX and the contact person referenced in the ITB, discussed the matter during a telephone conference call held on April 11, 1991. During their discussion, it was decided that it would be in the best interest of the Department, which was operating under severe fiscal constraints, to change the ITB to allow prospective bidders to essentially buy points by agreeing to pay all or a portion of Respondent's estimated moving costs. Such a change, it was thought, would enhance the competitiveness of the bidding process. Before making the change, however, Respondent attempted to quickly estimate what its costs would be if it had to relocate computer drop lines, statewide operational data system equipment, telephones, and furniture and other equipment to another facility in Indian River County within the geographical boundaries prescribed in the ITB. Respondent estimated that it would cost between $25,000 and $30,000 to relocate computer drop lines and statewide operational data system equipment, $35,000 to $45,000 to relocate telephones and $8,000 to $10,000 to relocate furniture and other equipment. In arriving at these estimates, Respondent relied upon agency personnel who, because of their experience, expertise and/or access to contracts with vendors and other pertinent documents, appeared to be reliable sources of information. On April 12, 1991, the day after the telephone conference call and twelve days before the scheduled bid opening, Facilities Services Manager Young, on behalf of the Department, sent by United States Certified Mail, return receipt requested, to all four prospective bidders who attended the mandatory pre- proposal conference on April 5, 1991, the following memorandum: Page C-22 of the Bid Submittal Form has been changed and is enclosed for use in the Invitation to Bid. Please call me if you have any questions on this change/addition or any information that is needed to complete your Bid Submittal on or before 3:30 p.m., April 24, 1991. The "changed" page C-22 of the ITB, which accompanied the foregoing memorandum, provided as follows with respect to moving costs: The bidder will respond to the items as stated in the Bid submittal,, Page B-6, b. Moving Costs: 1) a) b), 2), 3). Department Bidder Estimate Response 1) a) b) $25,000 to $30,000 2) $35,000 to $45,000 3) $8,000 to $10,000 Young also telephoned each of the four prospective bidders and explained to them how moving costs would be evaluated in light of this revision to the ITB. He told them that if they indicated under "Bidder Response" on page C-22 that they would be willing to pay up to $30,000 for item 1, $45,000 for item 2 and $10,000 for item 3, and in Hedin's case, provided he submitted a bid that included the 12,000 square feet of space presently occupied by Respondent, 28% of these amounts, they would capture the maximum number of points available for each of these items, and that if they indicated a willingness to contribute less than these amounts, they would be awarded points in proportion to amount of their proposed contribution. 5/ Respondent's decision to allow Hedin to earn the same amount of points as the other prospective bidders for moving costs by pledging to contribute only 28% of what his competitors had to pledge was based upon square footage considerations. If a bidder other than Hedin was awarded the lease, Respondent would have to move into more than 17,000 square feet of space. If, on the other hand, Hedin submitted a bid that included the 12,000 square feet of space presently occupied by Respondent and he was the successful bidder, Respondents would be occupying only 5,000 or so square feet of space it had not previously occupied, or approximately 28% of the square footage that it would have to move into if the lease had been awarded to another bidder. The ITB, as so revised and clarified by Respondent (hereinafter referred to as the "Revised ITB"), contemplated that the successful bidder would be obligated to pay only Respondent's actual moving costs up to the amounts pledged on page C-22 of the bidder's completed BSF. Moving costs in excess of the amounts pledged by the successful bidder would be borne by Respondent. Respondent wanted to avoid a situation where, because of Respondent's estimating errors, a successful bidder: was forced to bear a cost in connection with its bid that it did not anticipate at the time it had submitted the bid. Respondent, however, was quite confident that the estimates it had made and incorporated in the Revised ITB would not prove to be too low. 6/ All four of the prospective bidders who participated in the mandatory pre-proposal conference submitted timely bids. Each of bids was deemed to be responsive. Facility Services Manager Young then performed the calculations necessary to determine the number of points that each bidder should be awarded for associated fiscal costs, including rental costs and moving costs. This was purely an objective and non-judgmental exercise. Young performed these calculations in accordance with the methodology that had been described to all of the bidders prior to the submission of their bids. Schlitt had the lowest rental rates for the basic term of the lease, as well as for the five option years. Accordingly, he was awarded the maximum 35 points for the former and the maximum 5 points for the latter, for a total of 40 points. The scores received by the other bidders for rental costs were as follows: 1436- basic term: 34.125, and option years: 4.340; Hedin- basic term: 28.865, and option years: 3.710; and Taylor- basic term: 31.938, and option years: 4.575. Schlitt and 1436 indicated on page C-22 of their completed BSFs that they were each willing to pay up to $30,000 for the relocation of computer drop lines and statewide operational data system equipment, up to $45,000 for the relocation of telephones and up to $10,000 for the relocation of furniture and other equipment. Accordingly, they were both awarded the maximum 21 points for moving costs. Hedin indicated on page C-22 of his completed BSF that he was willing to pay up to 28% of these amounts ($8,400.00 for the relocation of computer drop lines and statewide operational data system equipment, $12,600 for the relocation of telephones and $2,800 for the relocation of furniture and other equipment). Accordingly, he too was awarded the maximum 21 points for moving costs. Taylor, who indicated on page C-22 of his completed BSF a willingness to contribute only a small fraction of the Respondent's estimated moving costs, received a total of 1.667 points for moving costs. After computing these scores 7/ Young prepared a written synopsis of all four bids that had been submitted. He gave copies of his synopsis to the four members of the bid evaluation committee, along with score sheets for them to use in their evaluation of these bids. Typed in on each score sheet were the scores the bidders had received for rental costs and moving costs. These scores were accurately reported on the score sheets except for the score that Hedin had been awarded for rental costs associated with the basic term of the lease. The score sheets erroneously indicated that Hedin had been awarded 32.375 points, rather than 28.665 points, for this item. The four members of the bid evaluation committee were: General Services Manager McAloon; Frank Mueller, District IX's chief financial officer; and Kathy Pelaez and Alfred Swanson, two HRS administrators who supervise staff headquartered in Respondent's Indian River County client service center. 8/ Young, because he was the Facilities Services Manager, was prohibited by agency practice 9/ from serving on the bid evaluation committee. The bid evaluations committee visited each of the bidder's proposed facilities before determining the amount of points to award them for the non- economic categories, i.e., location and property, set forth in the Revised ITB. The committee members visited Schlitt's, 1436's and Taylor's proposed facilities on the same day. They subsequently paid a visit to Hedin's proposed property, which consisted of the building presently occupied by Respondent, plus an addition of approximately 5,000 square feet connected to the existing building by a walkway. The delay in visiting Hedin's proposed facility was the result of a determination, later overturned, that the entire facility was not dry and measurable as required by the Revised ITB. Following their visits to Schlitt's, 1436's and Taylor's proposed facilities, the members of the bid evaluation committee met as a group and discussed each of these proposed facilities. They had a similar meeting and discussion about Hedin's proposed facility after their visit to that proposed facility. Applying the criteria set forth in the Revised ITB, the committee members agreed that the following point awards should be made for the categories of location and property: location/proximity to preferred area (evaluation criterion 2.a., 5 point maximum)- Schlitt: 3, 1436: 2, Hedin: 5, and Taylor: 1; location/public transportation (evaluation criterion 2.b., 5 point maximum)- all four bidders: 0; location/proximity to clients (evaluation criterion 2.c., 5 point maximum)- Schlitt: 3, 1436: 2, Hedin: 5, and Taylor: 1; location/aesthetics (evaluation criterion 2.d., 1 point maximum): Schlitt, 1436, and Hedin: 1, and Taylor: 0; location/security (evaluation criterion 2.e., 1 point maximum)- all bidders: 1; property/design (evaluation criterion 3.a., 15 point maximum)- Schlitt: 9, 1436: 15, Hedin: 14, and Taylor 10; property/future expansion (evaluation criterion 3.b., 5 point maximum): Schlitt: 4, 1436: 5, Hedin 3.5, and Taylor 3, and property/square footage in single building (evaluation criterion 3.c., 2 point maximum)- Schlitt, 1436, and Taylor: 2, and Hedin: 1. Each of the members of the evaluation committee then recorded these scores on their individual score sheets. Although they agreed to each award the same number of points, evaluation committee members were free to do otherwise. They were not subjects to any threats or coercion. The members of the evaluation committee made a good faith effort to fairly base their point awards on the evaluation criteria for the categories of location and property prescribed in the Revised ITB. For instance, they awarded Schlitt only nine out of a possible 15 points for property/design because of their reasonable concerns that the space he offered, which was located in a multistory building which would have other tenants in addition to the Department, would not be able to house large units together and in close proximity to interdependent units. The committee members did not have similar concerns about the space offered by 1436. Accordingly, they awarded 1436 the maximum 15 points for this category. The points awarded by the evaluation committee for location and property were added to the points the bidders had previously received for rental and moving costs to obtain a total point award for each bidder. The; results were as follows: 1436- 87.465 total points; Schlitt- 84 total points; Hedin- 83.875 total points; and Taylor- 56.18 total points. 1436's bid was therefore the "lowest and best bid," as defined on page B-1 of he Revised ITB. Consistent with the Revised ITB's pronouncement that "[t]he successful bid will be that determined to be the lowest and best," the evaluation committee recommended to the District IX Administrator that 1436 be awarded Lease No. 590:2241. General Services Manager McAloon, in his capacity as chairman of the evaluation committee, provided the District IX Administrator with a written justification for the committee's recommendation. 10/ The committee's recommendation, as well as its written justification, were adopted by the District IX Administrator, who, by letter dated October 3, 1991, to 1436, gave notice of the Department's intention to award 1436 Lease No. 590:2241. Copies of this letter were sent to all bidders. The Department's preliminary decision to award the lease to 1436 was the product of, not any fraudulent, arbitrary, capricious or unlawful conduct on the Department's part, but rather the honest exercise of the agency's discretion. After receiving their copies of the District IX Administrator's October 3, 1991, letter to 1436, Schlitt and Hedin filed protests and initiated the instant proceedings.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Health and Rehabilitative Services enter a final order awarding Lease No. 590:2241 to 1436 over the protests of Schlitt and Hedin. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 24th day of February, 1992. STUART M. LERNER Heading Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of February, 1992.
Findings Of Fact On June 7, 1988, the School Board of Broward County, Florida, sent an invitation to several insurance companies to submit bids on student accident insurance, Bid No. 89-1105, by 2:00 p.m. on June 20, 1988. The invitation required the bidding vendor to complete a bid form, attach a specimen policy to the bid form, and return this information to the School Board by the specified date. Joseph Herman Hughes, Jr., received a copy of the Invitation to Bid as the Petitioner's agent. Petitioner through its agent Hughes hand-delivered a bid form and a specimen policy to the Department of Purchasing for the School Board on June 20, 1988, in Fort Lauderdale, Florida. When Hughes arrived in Fort Lauderdale on June 20, 1988, he was informed by the Department of Purchasing that the bid opening date had been extended to June 28, 1988. On June 20, 1988, Hughes received a copy of an addendum dated June 14, 1988, which revised page 8 of 14 pages to Bid No. 89- 1105 and page 9 of 14 pages to Bid No. 89-1105. Reliable timely submitted its bid on June 28, 1988. The bids were opened by the Department of Purchasing and Petitioner's bid of $210,820 per year for the 1988-1989 and 1989-1990 school years was the lowest bid that was submitted. The bid specifications stated that a recommendation by the Director of the Department of Risk Management would be posted subsequently. On July 8, 1988, the recommendation of Risk Management was posted. The recommendation letter dated July 6, 1988, stated that the bid for student accident insurance should be awarded to Davis-Gillingham Associates, Inc., which bid $313,514 for the first year and $334,772 for the second year. The recommendation letter also stated that the bid from Reliable had been rejected because Part IV of the Reliable specimen policy included an additional exclusion which altered the specifications of Bid No. 89-110S. Reliable timely filed a protest to the recommendation and, after considering the protest, The School Board rejected it. Hughes was aware of Paragraph 8 of the General Conditions on Page 2 of the Invitation to Bid, which reads as follows: INTERPRETATIONS: Any questions concerning conditions and specifications should be submitted in writing and received by the Department of Purchasing no later than three (3) working days prior to the bid opening. Hughes had questions concerning the interpretation of the conditions and specifications of the bid, but did not follow that provision. Further, he was familiar with Paragraph 14 appearing on Page 4 of 14 entitled "INFORMATION," which reads as follows: Any questions by prospective bidders concerning this Invitation to Bid should be addressed to Mrs. Sharon Swan, Purchasing Agent, Purchasing Department, (305) 765- 6086 who is authorized only to direct the attention of prospective bidders to various portions of the Bid so they may read and interpret such for themselves. Neither Mrs. Swan nor any employee of the School Board of Broward County is authorized to interpret any portion of the Bid or give information as to the requirements of the Bid in addition to that contained in the written Bid Document. Interpretations of the Bid or additional information as to its requirements, where necessary, shall be communicated to bidders only by written addendum. It is clear that Hughes had from approximately the 9th or 10th of June to the 28th of June to make any written inquiries to Mrs. Swan concerning either an interpretation or information, as provided for on Page 2 in Paragraph 8 of the General Conditions and Page 4 of 14 pages of the Special Conditions, but never did so. The provision entitled "Coverages" subsection "Medical and Hospital Expense Benefits" on Page 8 of the Invitation to Bid provides as follows: If the insured, within thirty days following the date of accident, because of injury caused accidently and independently of all other causes, shall require treatment by a licensed physician, the Company will pay, on the basis specified in Paragraphs A through K as follows, the expenses incurred within fifty-two (52) weeks after date of accident for ... Hughes wrote, in the exclusion portion of the specimen policy required to be attached to the bids submitted, Reliable's Paragraph J (1): "Any injury not treated within 30 days by a licensed physician ... after date of accident." The exclusion Hughes wrote specifically means that if a person is not treated within thirty days of the date of the accident there will be no coverage. The wording in the bid specifications does not provide that treatment must be rendered within thirty days; rather, the specification is that the treatment be required within thirty days. The exclusionary provision provided for in Reliable's specimen policy constitutes a significant restriction in coverage from the coverage described in the bid specifications. Therefore, the wording contained in J-1 of the exclusions of the specimen policy submitted by Reliable materially altered the specifications required by the School Board's Invitation to Bid number 89-1105 for student accident insurance. Reliable's bid was properly rejected from consideration in the award of the bid. Paragraph 7 of page 3 of 14 pages, Special Conditions, Bid No. 89- 1105, states as follows: All bids shall be for the benefits as specified in this Bid Document. In the event of any conflict between the terms of these specifications and terms of the Policy issued on a bid submitted under these specifications, it is understood and agreed to by the bidder and the insurance company that the policy is amended to conform with these specifications, unless specifically waived in writing by the School Board of Broward County, Florida. The clear intent of the wording in Paragraph 7 of the Special Conditions provides that if the policy that is issued after the bid is awarded does not conform to the bid, then the effect of Paragraph 7 of the Special Conditions is to automatically reform the policy to be read as though it did comply with the bid. However, all bids must be for the benefits (coverage) specified in the Invitation to Bid. Paragraph 7 of the Special Conditions found on Page 3 of the Invitation to Bid applies, if at all, only after the award of the bid and does not serve to cure defects in bid submissions. Reliable's policy does not conflict with the bid specifications; rather, its bid materially alters the bid specifications. Paragraph 1 of page 3 of 14 pages, Special Conditions, Bid No. 89- 1105, states as follows: The School Board of Broward County, Florida, desires bids on Student Accident Insurance as specified herein. This aid is to, establish a two (2) year term contract from August 29, 1988 through August 30, 1990 or the day preceding the opening day of school for students in the school year 1990-91. Prices quoted shall remain firm for the two year contract period. Requiring policies to be firm or definite for multiple contract periods is common in the industry. To require prices to remain firm for a 2- year contract period means that the premium for year one and the premium for year two must each remain fixed at the amounts bid for those respective years. The fact that there are different premiums for the two different years does not require a separate policy. The submission by Davis-Gillingham Associates, Inc., was in compliance with that bid specification of the Invitation to Bid as the premium for each coverage year is not required to be identical. Rather, the prices quoted for the two coverage years may not be altered during the contract period.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that a Final Order be entered denying the bid protest of The Reliable Life Insurance Company and awarding Bid No. 89-1105 to Davis-Gillingham Associates, Inc. DONE and RECOMMENDED this 27th day of October, 1988, at Tallahassee, Florida. LINDA M. RIGOT, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of October, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3842BID Petitioner's proposed findings of fact numbered 1-6, 11, 13-15, 25, 27, 29 and 30 have been adopted either verbatim or in substance in this Recommended Order. Petitioner's proposed findings of fact numbered 7, 8, 16-19, and 22 have been rejected as being irrelevant to the issue under consideration herein. Petitioner's proposed findings of fact numbered 9, 10 and 20 have been rejected as not being supported by the weight of the credible evidence. Petitioners proposed finding of fact numbered 12 has been rejected as being unnecessary for determination of the issues herein. Petitioner's proposed findings of fact numbered 21, 23, 24, 26, 28 and 31 have been rejected as being contrary to the weight of the evidence in this cause. Respondent's proposed findings of fact numbered 1-4, 6, 7, 10, 11, 13, 16, 17, 20 and 21 have been adopted either verbatim or in substance in this Recommended Order. Respondents's proposed findings of fact numbered 5, 8, 9, 12, 14, 15, 18 and 19 have been rejected as not constituting findings of fact but rather as constituting argument of counsel, conclusions of law, or recitation of the testimony. COPIES FURNISHED: William J. Leary, Superintendent School Board of Broward County 1320 Southwest Fourth Street Fort Lauderdale, Florida 33312 K. Michael Swann, Esquire William M. Rishoi, Esquire 280 West Canton Avenue, Suite 240 Winter Park, Florida 32789 Edward J. Marko, Esquire Post Office Box 4369 Fort Lauderdale, Florida 33338 Arthur Hanby, Director School Board of Broward County Purchasing Department 1320 Southwest Fourth Street Fort Lauderdale, Florida 33312
The Issue The first issue to be determined is whether the BOARD can reject all bids, with or without cause. The second issue is to determine if the BOARD is required to have cause, was there a sufficient basis for the rejection of all bids in Bid NO. 3996?
Findings Of Fact On December 14, 1987, the BOARD sent invitations to bid to a list of approved vendors in Bid NO. 3996. The purpose of the invitation was to obtain the lowest responsible bid on a purchase of one hundred and fifty typewriters. The bids were to be submitted prior to January 11, 1988 at 2:00 P.M.. They were opened by the BOARD on the same day. OFFICE did not receive an invitation to bid despite its request to be placed on the approved vendor's list in November of 1987. When OFFICE learned of the outstanding invitation to bid, its representative, Mr. Richard Foss, went to the BOARD's Purchasing Department and requested a bid package. The bid documents given to OFFICE mistakenly gave January 14, 1988 at 2:00 P.M. as the deadline for the bid submission. Because of the later date given by the BOARD to OFFICE, the company's bid was received after the opening of the bids. When the results of the bidding were made known at the public bid opening, NAPLES bid was the lowest received. On January 14, 1988, after 10:42 A.M., it was discovered by the BOARD that OFFICE's bid price was lower than the price submitted by NAPLES. At this time, NAPLES bid had not yet been accepted by the BOARD, and no formal announcement had been made awarding the contract to NAPLES. During the BOARD's Purchasing Department's bid analysis, a request was made to reject all bids in Bid NO. 3996. The reason given by Purchasing for the request for rejection was that the specifications were being revised. The bids were rejected on the same date. The written reason sent to the vendors on January 14, 1988 for the bid rejection was that one vendor had been given an incorrect opening date. Attached to the written notice to the vendors was a new bid invitation for Bid NO. 4013. The BOARD explained its mistake was unfair to the one vendor. A new bid opening date was given of February 1, 1988. On January 14, 1988, in addition to the required bid documents, OFFICE submitted a letter which listed additional offerings or incentives that OFFICE would give the BOARD if OFFICE was awarded the contract. These additional purchasing incentives were: wall charts and teacher/student manuals for each typing classroom in the county. OFFICE also informed the BOARD that one of the BOARD's own service personnel was already trained in the servicing of Swintec typewriters. The bid submitted by OFFICE did not meet either the weight or the print wheel specifications as set forth in Bid NO. 3996. The specifications as written in Bid NO. 3996 were not written to eliminate all other typewriters but the Brothers 511-11. Weight specifications required were below the Brother's minimum weight, and at least two other manufacturers provide protected drop-in cassette print wheels in electronic typewriters. The Invitation to Bid contained specific provisions which encouraged the bidding of typewriters other than the Brother 511-11, and set up procedures under which other typewriters, which substantially meet the specifications, could be reviewed on their merits. NAPLES was the lowest responsible bidder for the electronic typewriter contract in the prior school year. The BOARD had rejected all bids at that time because of the decision to consider a different brand of typewriter once bids were opened. A notice of protest was filed by NAPLES, and the BOARD agreed to honor NAPLES bid and award the company the contract. The BOARD revised its bid specifications from last year prior to its solicitations for bids in Bid NO. 3996. The protected drop-in cassette print wheel and the weight requirements were two new technical specifications. During the hearing, the BOARD was unable to determine whether the weight factor or the protected drop-in cassette print wheel requirement will continue to be included in future revisions of the specifications.
Recommendation Based on the foregoing, it is RECOMMENDED: That the BOARD reject the bid submitted by OFFICE as it was nonconforming and sought an advantage not enjoyed by the other bidders. Reinstate the bids which were rejected in Bid NO. 3996, consider the bids, and make an award of the contract to NAPLES. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. VERONICA D. DONNELLY Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: Stephen Emens, President Naples Business Equipment and Systems, Inc. 859 4th Avenue South Naples, Florida 33940 Harry A. Blair, Esquire 2138-40 Hoople Street Ft. Myers, Florida 33901 Richard Foss, Typewriter Sales Manager 8A-Del Prado Boulevard Cape Coral, Florida 33904 Karl Engel, Superintendent Lee County Public Schools The School Board of Lee County 2055 Central Avenue Fort Myers, Florida 33901
The Issue Whether the Department of Health and Services acted fraudulently, arbitrarily, capriciously, illegally or dishonestly in issuing an award of bid or HRS Lease No. 590:2069 to Harpaul S. Ohri.
Findings Of Fact Sometime before March, 1989, the Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide social services in the western portion of Orlando, Orange County, Florida, including a food stamp distribution office. HRS was authorized to procure, through competitive bidding, a lease for 17,250 net rentable square feet of existing office space, plus or minus 3 percent. The said lease was to provide for a full service period of seven years and two options to renew for three years each at specified rates, with occupancy no later than December 1, 1989 or 175 days after the bid award is finalized. The geographic area designated in the bid package for the office space was limited to the following area of Orange County, Florida: Beginning at the intersection of Colonial Drive and Kirkman Road to the intersection of L.B. McLeod Road, then east on L.B. McLeod Road to the, intersection of Rio Grande Avenue then north on Rio Grande Avenue to the, intersection of Colombia Street,, then east on Colombia Street to Interstate 4, then north on Interstate 4 to the intersection of Colonial Drive, then west on Colonial Drive to the point of Beginning. Public notice that HRS was seeking competitive bids was given and HRS prepared a document entitled Invitation to Bid for Existing Office Space (ITB), which set forth in detail all of HRS requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. Specific areas of importance to Respondent as reflected in the ITB and addressed by the evidence herein were as follows: 17,250 net rentable square feet (plus or minus 3 percent) of existing office space. General office use for use, as a client service center. Seven year term with two options to renew of three years each. 120 off-street, on-site, full size parking spots designated exclusively for use of Department employees and clients, suitably paved and lined, with a minimum of two for the handicapped. Availability of public transportation within reasonable proximity. Availability to adequate dining facilities within two miles. Photographs of the exterior front of the facility, along with documentation of present facility configuration and parking areas including access and egress to public roadways. Availability of elevator for multi-story use. i). Space requirement criteria: Minimum telephone requirements. Back-up interior emergency lighting. Three separate sets of rest rooms, male and female, one meeting the needs of the handicapped General security requirements. Specific security requirements for food stamp distribution center. Window covering over exterior widows to allow both sunlight and energy control; if bidded space without existing windows, then all rooms comprising the exterior of the building would require windows measuring approximately 24 x 36, all secured and inoperable. Full Service including all utilities and janitorial. The evaluation factors and their relative weights were stated in the ITB as follows: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease Evaluated using present value methodology by application of the present value discount rate of 8.69 percent. (Weighting: 25) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 10) Associated moving costs, i.e., furniture, equipment, telephone systems, etc,. (Weighting: 5) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 10) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 10) Facility Susceptibility of design of the space offered to efficient layout and good utilization. (Weighting 15) Provision of the aggregate square footage in a single building. Proposals will be con- sidered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100 percent The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Sealed bids were submitted by three bidders, Petitioner, Harpaul S. Ohri and Kensington Gardens Builders Corp. The bids were opened on April 25, 1989, and Ernie Wilson, HRS District 7 Facilities Services Manager, determined that all three bids were responsive, and within the mandatory geographical area designated in the bid package. The District Administrator appointed a bid evaluation committee to review and grade, the responsive bids under the criteria established in the bid package, and to recommend to him the committees choice of the lowest and best bid. Four individuals who were familiar with the type of work to be done in the proposed space and familiar with the bid process were appointed to the Committee. On or about May 1, 1990 the bid evaluation committee determined that the bid of Harpaul S. Ohri was the "lowest and best bid" and submitted its determination, in writing, to the District Administrator who, subsequently approved the selection. On or about June 26, 1989, on behalf of the Department, Ernie Wilson, Facilities Services Manager, notified the bidders of the Departments intent to award the bid to Harpaul S. Ohri, as being in the best interest of the Department. The bid evaluation committee consisted of four representatives of the Department who visited two of the three bidders sites and questioned the bidders representatives. The members of the committee were familiar with the Petitioners site from previous experience. They choose not to make an on-site visit prior to completing the bid evaluation sheet, although instructed to do so on the Evaluation Committee Duties and Responsibilities/Real Property, Leasing instruction sheet. Each committee member completed an evaluation sheet and gave a higher total score to Mr. Ohri. The three major bid evaluation criteria were Fiscal Cost, Location and Facility. Under the Fiscal Cost criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioner received an average of 22.7 points out of 30 possible,, while Ohri received 21.7, and Kensington Gardens received 23.7 points. The points were individually assessed by the evaluation committee, after the rental rates were compared by Ernie Wilson based on the present value analysis of bidders proposed rates. For Renewal Rates, each of the bidders, including Petitioner, received 5 points out of 10 possible. The present value analysis was not applied, as was noted in the ITB. However, even a cursory examination of the renewal rates submitted by the bidders shows that there is a 15 percent to 33 percent yearly differential in the rates, with the Petitioners rates as the lowest and Kensington Gardens as the highest. Although the committee assigned all three bidders an equal rating, the renewal rates submitted by the bidders were not equal should the Department wish to exercise its options, the rates submitted by Petitioner were substantially lower than the other two bidders and would result in a cost savings to the Department of several hundred thousand of dollars. The award factor points should not have been awarded equally. For Moving Costs, Petitioner received 5 points on each of the committee members sheets, while Ohri received 4 points and Kensington Gardens received, an average of 3.7 points. The maximum points possible was 5 points. Petitioner was awarded the maximum points because HRS is presently in the same building and no moving costs would be experienced. The other two bidders were awarded 4 points each by committee members. That determination was based on each members personal experiences. No cost or time lost data was provided or requested. The LOCATION criterion also had three sub-categories: Proximity to other governmental agencies - 10 points - with all three bidders receiving the same rating; Public Transportation -10 points - with all three ,bidders, receiving the same rating; and Environmental Factors - 10 points - out of which Petitioner received an average of 5.7 points; Ohri - 9.7 points and Kensington Gardens - 6.5 points. In considering the proximity to other governmental agencies of each of the facilities being considered, the committee relied on their own knowledge of the area. They determined that since each was within the geographical area designated in the ITB, each was equally distant from the most frequently visited government agencies in the vicinity. However, Petitioners facility is the most centrally located of the three facilities offered, while the two other facilities were considerably distant from other government agencies. The award factor points should not have been awarded equally. For Public Transportation, the committee determined that local bus service went near each of the three facilities. They were neither provided, nor did they request, route maps, schedules or passenger capacity for buses servicing each facility. Petitioners facility is centralized in the area served within the bid district, and serviced by, numerous bus lines which pass near the facility ten times per hour. The bus service to the other two facilities are limited to four buses per hour, with buses having a smaller capacity. In addition, most clients would be required to travel to the central bus terminal and transfer to a different route in order, to reach the Ohri or Kensington Gardens facilities, making bus transportation a very time-consuming process. No other form of transportation is available, except for taxi service. In addition, in order for a client to walk from the nearest bus stop to the Ohri facility, a person would cross two heavily traveled six lane streets and then walk across an open shopping center parking lot. This would require approximately a fifteen minute walk. In order to reach Petitioners facility, a client would require approximately a five minute walk utilizing public sidewalks. The committee did not consider these facts in its evaluation. The award factor points should not have been awarded equally. (c)(1). For Environmental Factors, the committee considered each buildings physical characteristics and the surrounding area. The committee, in their letter to the District Administrator, dated May 1, 1989, identified this category as "a very critical area for the new lease." The letter also stated: "The committee took the following into account when evaluating this section: Cleanliness of the building aid surrounding areas. Lack of traffic congestion by motorized vehicles close to the facility. Easiness of getting to and from the facility by vehicle. Safety for clients and staff walking to and from the facility. Upkeep of the surrounding buildings or other sections of the bidders building." The following was also taken into account when evaluating this section, but was not so stated in the letter. At least one committee member believed the lack of window space in Petitioners facility was disabling to his bid, and that the willingness of the Ohri representative to install windows on exterior walls was a significant factor in her determination of award. At least one committee member indicated that future expansion was a substantial factor in her favoring the Ohri bid, and that there was janitorial and security problems at Petitioners facility. The committee received no other information other than the committee members opinion regarding the same. The committee as a whole erroneously believed that the extra square footage visible at the Ohri facility at the time of their inspection would necessarily be available to HRS if and when it might expand its offices. Future expansion was specifically removed from the ITB at the pre-bid conference and it was clearly erroneous for them to have included this factor in their bid evaluation. The ITB specifically calls for the installation of exterior windows by the winning bid prior to occupancy. However, none of the committee members reviewed the ITB or the actual bids submitted. They relied primarily on the synopsis of the bids prepared by Ernie Wilson. The ITB states substantial general and specific security requirements in detail; however, the evaluation criteria forms do not provide a category for evaluating security other than generally under the sub-category of environmental factors. The ITB, under General Specifications and Requirements, called for the availability of adequate dining facilities within two miles of the proposed facility. The evaluation criteria did not provide a category for the committee to rate dining facility availability. In consideration of the environmental factors, the committee overlooked or failed to consider a hazardous unfenced high voltage transmission station adjacent to the Ohri facility. In addition, the photographs submitted by Ohri as the front of the building (as required by the ITB) are in fact the rear of the building which was not offered as part of the proposed leased facility. Of the three sub-categories under FACILITY, out of 15 possible points, Petitioner received an average rating of 9.5, Ohri received an average of 13.7 and Kensington Gardens received 11.2 for Layout/Utilization. Ohri received the most points because his building configuration was a, shell and was more flexible and could be reconfigured for more efficient layout to suit the Departments needs. All three bidders submitted proposals wherein the total square footage of rentable space was to be contained in a Single Building. Therefore, all three bidders received the maximum 10 points. A maximum 5 points was provided for facilities with Street-level space. All three bidders were awarded the maximum 5 points. However, a portion of Petitioners space was offered on the second floor, a fact which the committee overlooked. The Petitioner should not have received the full 5 points for having street-level space. The unanimous recommendation of the evaluation was to award the lease to Ohri. In reaching that conclusion, the committee did not properly utilize the weighted bid criteria and, in addition, included improper bid considerations in their evaluation of the three facilities. Some of the reasons given by the committee for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. However, others were erroneous and improper.
Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a Final Order rejecting all bids for lease number 590:2069 and issue a new invitation to bid. DONE AND ENTERED this 12th day of February, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1990. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Proposed Findings of Fact submitted by the Petitioner: Accepted: paragraphs 1, 2, 3, 5, 6, 7, 9 (in substance, except for subparagraphs f, g, j and k which are not relevant), 10 (in substance), 12(a), (b), (f-in substance), (g-in substance), (h-in substance), (j), (k-in substance), (l-in substance), (p-in substance). Rejected: Not relevant: paragraphs 4, 12(c), (d), (e), (m), (n), (o), (p- the proposed future location of the Greyhound Station; insure wooded area nearby), (q), (r). Argument: paragraphs 11 and 13. Procedural matters, covered in the preliminary statement: paragraphs 8 and 14. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Terrence W. Ackert, Esquire 201 East Pine Street Suite 1402 Orlando, Florida James Sawyer, Jr., Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700
The Issue Whether Respondent properly rejected Petitioner's bid on the grounds that the bid did not meet a fatal item requirement.
Findings Of Fact On April 24, 1992, Respondent published a Request for Proposals (RFP) for the provision of housekeeping services to South Florida State Hospital. Attached to the RFP as Appendix I was a blank copy of Respondent's "Standard Contract" which is also referred to as its "core model contract". Paragraph 1.a. of Section D of the RFP contains the following instructions to bidders: BIDDER RESPONSE a. State of Florida Request for Proposal Contractual Services Acknowledgment Form, Pur 7033 The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, Appendix II must be signed and returned ... with the proposal or submitted by itself if you choose not to submit a proposal and wish to remain on the department's active vendor list. Paragraph 1.g. of Section D of the RFP, contains the following instructions to bidders: Required Bidders Certification Contract Terms and Conditions The proposal must include a signed statement in response to the RFP indicating acceptance of the terms and conditions of provisions of service as specified in the RFP and contained in the core model contract. Bidders were provided a copy of the RFP rating sheet which contained the following under the heading of Fatal Items: The following criteria must be met in order for the proposal to be considered for evaluation, failure to receive a "Yes" response for any time [item] will result in automatic rejection of the proposal. * * * Does the proposal include a statement agreeing to terms and conditions set forth in the core model contract and the RFP? Petitioner was represented at a "Bidders' Conference" held May 15, 1992, at which the fatal items were discussed. Bidders were advised that it would be necessary for the responses to contain a statement agreeing to the terms and conditions set forth in the core model contract. The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, contains the following certification: I certify that this proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same contractual services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal for the proposer and that the proposer is in compliance with all requirements of the Request for Proposal, including but not limited to, certification requirements. In submitting a proposal to an agency for the State of Florida, the proposer offers and agrees that if the proposal is accepted, the proposer will convey, sell, assign or transfer to the State of Florida all rights, title and interest in and to all causes of action it may now or hereafter acquire under the Anti-trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the State of Florida. At the State's discretion, such assignment shall be made and become effective at the time the purchasing agency tenders final payment to the proposer. The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, was signed by Richard A. Cosby on behalf of Petitioner and submitted as part of Petitioner's response to the RFP. Upon receipt of all responses, Respondent convened an evaluation committee to evaluate the responses. The evaluation committee determined that the response submitted by Petitioner did not contain the required statement agreeing to the terms and conditions set forth in the core model contract and the RFP. Consequently, the evaluation committee rejected Petitioner's proposal from further consideration. Petitioner does not challenge the specifications of the RFP, but, instead, asserts that Mr. Cosby's execution of the State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, was sufficient to meet the requirement the evaluation committee found lacking. The language of the Contractual Services Acknowledgment Form, PUR 7033, that most closely approximates the certification that the bidder accepts the terms and conditions set forth in the core model contract and of the RFP is as follows: I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal for the proposer and that the proposer is in compliance with all requirements of the Request for Proposal, including but not limited to, certification requirements. The proposal submitted by Petitioner did not contain any other statement which could be construed as accepting the terms and conditions set forth in the core model contract and the RFP. The broad language of the Contractual Services Acknowledgment Form, PUR 7033, upon which Petitioner relies does not state that the bidder accepts the terms and conditions set forth in the core model contract and the RFP. The evaluation committee properly determined that Petitioner's response failed to meet this fatal item. In this proceeding, there was evidence that the Respondent routinely inserts in its Request for Proposals the fatal item requirement that the bidders agree in writing to accept the terms and conditions set forth in the core model contract and the RFP, and that Respondent has never waived that fatal item requirement. There was no evidence that Respondent was using this fatal item requirement to discriminate against or in favor of any bidder.
Recommendation Based upon the foregoing findings of fact and conclusion of law, it is hereby RECOMMENDED that the Respondent dismiss Petitioner's bid protest. DONE AND ENTERED this 18th day of August, 1992, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of August, 1992. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 92-4311BID The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioner. 1. The proposed findings of fact submitted by Petitioner are accepted in material part by the Recommended Order. Petitioner's conclusions based on those facts are rejected for the reasons discussed in the Recommended Order. The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. 1. The proposed findings of fact submitted by Respondent are adopted in material part by the Recommended Order. COPIES FURNISHED: Richard A. Cosby, Vice President National Cleaning of Florida, Inc. 1101 Holland Drive, #32 Boca Raton, Florida 33487 Colleen A. Donahue, Esquire District 10 Legal Office Room 513 201 West Broward Boulevard Fort Lauderdale, Florida 33301-1885 Sam Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Slye, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700
The Issue The issues are: (1) whether the Petitioner's notice of bid protest filed on June 5, 1996, was timely under Section 120.53(5), Florida Statutes, and, if not, whether Petitioner has waived its right to participate in bid protest proceedings; and (2) if Petitioner's bid protest was timely filed, whether the Respondent acted fraudulently, arbitrarily, illegally or dishonestly in rejecting the Petitioner's bid.
Findings Of Fact The Petitioner is a general contractor which operates in Alachua County and surrounding areas. The Respondent is the governing body of the school district in Alachua County. In April and May, 1996, the Respondent publicly advertised an Invitation to Bid on the Project which consists of hard courts for basketball, driveway paving and new drainage provisions. Petitioner and three other bidders timely submitted sealed bids to the Respondent at its office located at the E. Manning, Jr. Annex, 1817 East University Avenue, Gainesville, Florida. Petitioner's bid proposal included a Contractor's Qualification Statement setting forth Petitioner's experience and financial qualifications to act as the general contractor for the Project. There is no evidence that Petitioner is disqualified as a responsible bidder because: (a) it colluded with other bidders; (b) it based its proposal on bid prices which were obviously unbalanced; (c) it included any false entry in its bid proposal; or (d) it failed to completely fill out the required list of subcontractors. The Invitation to Bid does not set forth any other specific conditions which would disqualify an otherwise responsible bidder. However, Respondent reserves the right to reject any and all bids when it determines that such rejection is in its interest. Respondent publicly opened the bids and read them aloud at 2:00 P.M. on May 9, 1996 as required by the Invitation to Bid. Petitioner did not attend the opening of the bids. The Invitation to Bid specified that the bids would be "tabulated and evaluated by the Superintendent of Schools of Alachua County or member or members of his staff or other individual or individuals designated by him." Edward Gable is Respondent's Director of Facilities. The Superintendent designated Mr. Gable to evaluate bids received for facility projects and to formulate recommendations to Respondent. The Invitation to Bid does not set forth a time certain in which Respondent will notify bidders of its decision or intended decision. However, it does state as follows: At the next regular or special meeting of the Board or at the designated meeting thereafter, the bids, as so opened, tabulated and evaluated, and the recommend- ation of the Superintendent of Schools of Alachua County regarding them shall be presented to the lowest responsible bidder meeting the requirements of the law and the State Board of Education Regulations. In Section 19.1 of the Instructions to Bidders, Respondent informs bidders that it will award the contract to the lowest bidder as soon as possible provided that the lowest bid is reasonable and in Respondent's best interest. The Invitation to Bid provides bidders with the following notice relative to Respondent's decision or intended decision concerning a contract award: The Board shall provide notice of its decision or intended decision concerning a contract award. Notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statues, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Any person who is affected adversely by the decision or intended decision shall file with the Board a written "Notice of Protest" within seventy-two (72) hours after posting or notification. A formal written protest shall be filed within ten (10) calendar days after filing the 'Notice of Protest.' Section 17.1 of the Instructions to Bidders contains the following language concerning Respondent's decision or intended decision: 17.1 The Board shall provide notice of its decision or intended decision concerning a contract award. For any other decision, notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. Section 18.1 of the Instructions to Bidders provides as follows: Bid tabulations with recommended awards will be posted for review by interested parties at the Planning and Construction Department, 1817 East University Avenue, Gainesville, Florida, following the bid opening, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute as (sic) waiver of proceeding under Chapter 120, Florida Statutes. The Invitation to Bid and the Instructions to Bidders distinguish between a protest concerning a contract award and a protest related to the specifications contained in an invitation to bid or in a request for proposals. In the latter context, a bidder must file a written protest within seventy-two (72) hours after receipt of the project plans and specifications. This case does not involve a protest of a bid solicitation. By virtue of the above referenced provisions in the Invitation to Bid and the Instructions to Bidders, Respondent gave all bidders sufficient and reasonable notice that a posted tabulation together with its recommendation constituted Respondent's intended decision. The bid specifications in the instant case required bidders to submit a bid on a base contract for certain school facility improvements with alternate bids relative to additional improvements in the event Respondent decided to include such features in the Project. Petitioner's base bid was $135,000; it was the lowest bid submitted. The next low bid was from Watson Construction Company, Inc. (Watson) at $133,345. Two additional bids were higher than Watson's bid. On the morning of May 30, 1996 one of Petitioner's employees, Roger "Dave" Williams" phoned Mr. Gable to inquire about the status of the bid award. Mr. Gable was unavailable to take the call. Mr. Williams left a message for Mr. Gable to return the call. Next, at approximately 10:00 a.m. on May 30, 1996, Mr. Williams called a member of Mr. Gable's staff who stated that, as far as he knew, Respondent had not made a decision on the contract. Mr. Gable completed his evaluation and posted the bid tabulation on May 30, 1996 at 3:00 p.m. Included on the bid tabulation was the following statement: RECOMMENDED ACTION: It is recommended that the Board reject the low base bid as submitted by D. E. Wallace Construction Corporation, Alachua, Florida, due to past unsatisfactory contract performance. It is recommended that the Board accept the base bid of $133,345. and award a contract for construction totaling $133,345. to Watson Construction, Gainesville, Florida. Completion of this project shall be within ninety (90) consecutive calendar days from the date indicated in the 'Notice to Proceed.' The bid tabulation clearly notes that "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes." Respondent regularly posts notices of intended decisions concerning bid awards on a bulletin board in the main hallway of the E. D. Manning Annex. A title at the top of the bulletin board identifies it as the location for bid postings. Respondent posts a copy of Section 120.53(5), Florida Statutes, and a copy of the Respondent's Policy DJC--Bidding Requirements below the title of the bulletin board. Respondent has adopted Policy DJC as a rule through a formal rulemaking process. Policy DJC states as follows in pertinent part: The Board shall provide notice of its decision or intended decision concerning a bid solicitation or a contract award. For a bid solicitation, notice of a decision or intended decision shall be given by United States mail or by hand delivery. For any other Board decisions, notice shall be given either by posting the bid tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. The notice shall contain the following two paragraphs. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Any person who is affected adversely by the decision or intended decision shall file with the Board a written notice of protest within 72 hours after the posting or notification. A formal written protest shall be filed within 10 calendar days after filing the notice of protest. . . . Failure to file a timely notice of protest or failure to file a timely formal written protest shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Immediately below Policy DJC is a space where Respondent always posts its bid tabulations which include the recommended action on each project and notice that "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes." The bottom of the board, in large letters, contains the following words: "Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes." This permanent bulletin board, read as a whole, contains more than enough information to provide bidders with notice of an intended decision and the time frames within which a disappointed bidder must file a written protest. Although he was not required to do so, Mr. Gable telephoned Petitioner's office on the afternoon of May 30, 1996 to advise its president, D. Wallace, of the recommendation. Petitioner was not available to accept that call. Mr. Gable placed another courtesy telephone call to Petitioner on the morning of May 31, 1996. During that conversation, Mr. Gable informed Mr. Wallace of the recommendation for Respondent to reject Petitioner's bid and accept the next lowest bid. Petitioner's representative inspected the posting board in the afternoon on May 31, 1996. On June 3, 1996, Respondent sent Petitioner by facsimile transmission a copy of the agenda for Respondent's June 4 meeting, items H.1. of which was: H.1. Bid Award for Project SBAC CB436 - Newberry High School Site Improvements. Bids for the construction of this project were received on May 9, 1996. Recommendation will be presented. The seventy-two hour window in which a bidder may file a protest does not include Saturdays, Sundays or holidays. Therefore, the time in which a bidder could have filed a protest of Respondent's intended decision in this case, expired June 4, 1996 at 3:00 p.m. No bidder had filed a written protest at that time. Respondent held a regular meeting on June 4, 1996, at 7:00 p.m. When Respondent considered the bid award for Project SBAC CB 436, Mr. Gable presented the recommendation that the Board reject Petitioner's bid and accept Watson's bid due to Petitioner's past unsatisfactory contract performance. Petitioner's counsel spoke against the recommendation. At that time the Petitioner had not filed any written notice of protest. After discussion, Respondent voted to award the contract to Watson. Respondent and Watson executed a contract for the construction of the Project on June 4, 1996. The next day, on June 5, 1996, at 3:40 p.m., Petitioner filed with Respondent, by facsimile transmission, a Notice of Protest challenging the award of the contract for the Project to Watson. The filing of this protest was untimely. Therefore, Petitioner waived its right to protest Respondent's decision or intended decision on the Project. The basis of Respondent's intended decision and ultimate final decision to reject Petitioner's low bid was due to Petitioner's past unsatisfactory performance. The following facts support a finding that Petitioner was not a responsible bidder. Respondent awarded Petitioner the contract for a previous construction project, Project SBAC CA 149, Additions and Renovations for Terwillegar Elementary School. That project included the construction of a number of school buildings. The contract amount was approximately 5.1 million dollars. The last building in the Terwillegar project became "substantially complete" in September, 1995. In January, 1996, Mr. Gable wrote a letter to Petitioner, informing him of the outstanding punch list items for the Terwillegar project. A contractor must complete punch list items and have them approved prior to "final completion." In the Terwillegar Project, the contract provided for compilation of items on the punch list within thirty (30) days from "substantial completion." As of May 30, 1996, Petitioner had not responded to Mr. Gable's letter about the Terwillegar punch list, nor had it completed the punch list. Many of the items on the list were minor, but some of the items involved the safety or integrity of the building structure. The Terwillegar project contract also contained a project closeout section which listed a variety of documents and other materials that Petitioner had to provide to Respondent as part of the "final completion." Included in the Terwillegar project's closeout were items such as insurance change-over requirements, warranties, workmanship bonds, maintenance agreements, final certifications, a final payment request, consent of surety, maintenance manuals, record drawings, record specifications, record project date, and operating instructions. As of May 30, 1996, Petitioner had not provided any of the Terwillegar project closeout materials to the Respondent. The delay in project closeout, after substantial completion, is completely unacceptable to the Respondent. Prior to the opening of bids in this case, Petitioner filed a civil suit against Respondent seeking approximately $1,500,000 representing the unpaid contract balance, subcontractors' and material suppliers' claims for labor and material, and other delay-related damages on the Terwillegar project. Petitioner's claim that Respondent's intended decision and/or final decision was based on personal animosity and bias against Mr. Wallace is contrary to more persuasive evidence. Specifically, Petitioner's Exhibit 6 is not persuasive evidence of bias. The Petitioner's president, D.E. Wallace, has over 30 years in the construction field, including 22 years as an owner/operator of a general contractor company. He has completed more than 100 projects in north Florida in the past eighteen (18) years, including 30 school board construction projects. Mr. Wallace has worked on approximately nine (9) school board projects in Alachua County. He holds himself out as being "completely familiar and knowledgeable in government and building codes, ordinances, regulations, etc."
Recommendation Based upon the findings of fact and the conclusions of law, it is, RECOMMENDED: That the Respondent enter a final order dismissing the Petitioner's protest as untimely. DONE and ENTERED this 9th day of October, 1996, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of October, 1996. COPIES FURNISHED: David L. Worthy, Esquire 4128 Northwest 13th Street Gainesville, Florida 32609 Thomas L. Wittmer, Esquire 620 East University Avenue Gainesville, Florida 32601 Robert W. Hughes, Superintendent Alachua County School Board 620 East University Avenue Gainesville, Florida 32601-5498 Frank T. Brogan, Commissioner Department of Education The Capitol, Plaza Level 08 Tallahassee, Florida 32399-0400
The Issue Whether Capital City Security, the low bidder, was responsive in its bid submitted for Bid No. GFC 87-139. The Petitioner, Capital City Security (Capital City), presented the testimony of Tony Ash. The Respondent, Florida Game and Fresh Water Fish Commission (The Commission), presented the testimony of Richard D. Maxey and Luke Gibbs. Respondent's Exhibits 1-9 were admitted in evidence. The filing of a transcript was waived. Capital City also waived the filing of a proposed order. The Commission filed its proposed findings of fact and conclusions of law on April 6, 1988, and they have been considered. A ruling on each proposed finding of fact is made in the Appendix attached hereto and made a part of this Recommended Order.
Findings Of Fact The parties have stipulated that Capital City submitted the lowest bid and that the protest filed by Capital City was timely. The only issue of fact remaining is whether the bid submitted by Capital City was responsive. The Commission issued an Invitation to Bid (ITB) for Security Services for the Bryant Building in Tallahassee, Florida, which houses the Commission. The Bid No. was GFC 87- 139. The Notice of the ITB was published on February 12, 1988, in the Florida Administrative Weekly. The ITB and bid specifications contained a requirement that the bidder "provide proof of providing security services for similar size office buildings for a minimum of two years." References from the clients for whom such services were provided were to be provided when the bid was submitted. At the pre-bid conference held on February 17, 1988, Ash was present for Capital City. The experience requirements were discussed. Richard Maxey indicated that the Bryant Building contained 60,000 square feet and that a bidder needed to submit a reference to show that security services had been provided in a similar sized building. Maxey said a 40,000 square-foot building would be considered Similar. Ash indicated that his company had provided services to the Florida A & M University football games and to the Department of Health and Rehabilitative Services Food Stamp Office. Ash suggested that there was no reason for him to bid since he may not meet the specifications Maxey encouraged him to bid and submit references for the work which Capital City had done. Ash testified that he told Maxey that Capital City had provided security for the Department of Professional Regulation at the Old Courthouse Square Building. Neither Maxey nor Luke Gibb, who were both at the pre-bid conference, recall such a conversation. Capital City did submit a bid and so did Maxwell Security. The bids were opened on February 23, 1988. The bid of Capital City was for $2,228 per month and it was the low bid. Maxwell Security submitted a bid of $29,834.78 and indicated verbally at the opening that it was a annual bid and could be broken down to a monthly bid of $2,486.23. Capital City did not attach any references to its bid. The Commission determined that this was a minor irregularity and notified Ash that he had 24 hours to provide written references. Ash orally provided two names as references. He was told that he needed written references. On February 25, 1988, Ash provided the names and telephone numbers for two references. One was at Florida A & M University (FAMU) and the other was at the Department of Health and Rehabilitative Services (HRS). The references were checked out and it was determined that Capital City provided security for the FAMU football games and for the 650 square-foot Food Stamp Office of HRS in Leon County, Florida. HRS sent a letter to the Commission which was dated February 25, 1988. When no further information was provided by Capital City, the Commission determined that its low bid was rejected because Capital City was a non-responsive bidder. The reason for this determination was as set forth in a memorandum signed by Maxey on March 3, 1988, that Capital City did not meet the qualifications specified in the ITB and bid specifications. The Commission posted the award of the bid to Maxwell Security on March 3, 1988. On March 4, 1988, Capital City filed a protest of the bid award. Attached to the protest was a letter from the Executive Director of the Board of Dentistry of the Department of Professional Regulation, William H. Buckhalt. This letter stated that Tony Ash had provided security services for the Old Courthouse Square Building occupied by the Department of Professional Regulation and that he did an excellent job. The letter did not state the size of the building and did not mention Capital City Security. Capital City Security submitted a bid that was not responsive to the bid specifications and did not supply references which were responsive, even when given additional time to do so.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Game and Fresh Water Fish Commission enter a Final Order finding that Capital City Security was a non-responsive bidder and awarding the contract for Bid No. GFC 87-139 to Maxwell Security. DONE and ENTERED this 8th day of April, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day April, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-1356BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the Respondent in this case. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Florida Game and Fresh Water Fish Commission Each of Respondent's proposed findings of fact numbered 1-9 are adopted in substance as modified in Findings of Fact 1-13 of this Recommended Order. COPIES FURNISHED: Kenneth McLaughlin, Esquire Florida Game and Fresh Water Fish Commission 620 South Meridian Street Tallahassee, Florida 32399-1600 Mr. Tony Ash Capital City Security 1717 Harris Street Tallahassee, Florida 32308 Colonel Robert M. Brantly Florida Game and Fresh Water Fish Commission 620 South Meridian Street Tallahassee, Florida
The Issue The issue in this proceeding is whether the award of a bid for the sale of scrap metal to Cumbaa Enterprises, Inc. was arbitrary, capricious, clearly erroneous, or contrary to competition or the bid specifications.
Findings Of Fact On January 19, 2011, the Department issued Invitation to Bid (ITB) #10-Apalachee-8252. The ITB was a revenue- generating contract for the sale of scrap metal at Apalachee Correctional Institution in Sneads, Florida. Since the contract would generate revenue to the State, the Department’s purpose was to award the contract to the highest responsive bid and developed bid specifications and criteria to accomplish that goal. The specifications for the ITB stated in relevant part: Material Deviations: The Department has established certain requirements with respect to bids to be submitted by bidders. The use of shall, must or will (except to indicate simple futurity) in this ITB indicates a requirement or condition which may not be waived by the Department except where the deviation therefrom is not material.[emphasis added]. A deviation is material if, in the Department’s sole discretion, the deficient response is not in substantial accord with this ITB’s requirements, provides an advantage to one bidder over other bidders, has a potentially significant effect on the quantity or quality of items bid, or on the cost to the Department. Material deviations cannot be waived and shall be the basis for rejection of a bid. Minor Irregularity: A variation from the ITB terms and conditions which does not affect the price of the bid or give the bidder an advantage or benefit not enjoyed by other bidders or does not adversely impact the interests of the Department. 1.10 Responsive Bid: A bid submitted by a responsive and responsible vendor that conforms in all material respects to the solicitation. * * * 4.3.1 Submission of Bids Each bid shall be prepared simply and economically, providing a straightforward, concise delineation of the bidder’s capabilities to satisfy the requirements of this ITB, fancy bindings, colored displays, and promotional material are not desired. Emphasis in each bid must be on completeness and clarity of content. In order to expedite the review of bids, it is essential that bidders follow the format and instructions contained in the Bid Submission Requirements (Section 5), with particular emphasis on the Mandatory Responsiveness Requirements. Rejection of Bids The Department shall reject any and all bids containing material deviations. The following definitions are to be utilized in making these determinations. Material Deviations The Department has established certain requirements with respect to bids to be submitted by bidders. The use of shall, must or will (except to indicate simple futurity) in this ITB indicates a requirement or condition which may not be waived by the Department except where the deviation therefrom is not material. A deviation is material if, in the Department’s sole discretion, the deficient response is not in substantial accord with the ITB’s requirements, provides an advantage to one bidder over other bidders, has a potentially significant effect on the quantity or quality of items bid, or on the cost to the Department. Material deviations cannot be waived and shall be the basis for rejection of a bid. Minor Irregularities A variation from the ITB terms and conditions which does not affect the price of the bid or give the bidder an advantage or benefit not enjoyed by other bidders or does not adversely impact the interests of the Department. As indicated, Section 5 of the specifications outlined the contents of the bid. Section 5 stated in relevant part: SECTION 5 - CONTENTS OF BID This section contains instructions that describe the required format for the submitted bid. Bids shall be submitted in a sealed envelope, clearly marked “Bid - ITB#- Apalachee-8252”. . . . . [T]he following paragraphs contain instructions that describe the required format for bid responses. Responsiveness Requirements The following terms, conditions, or requirements must be met by the bidder to be considered responsive to this ITB. Failure to meet these responsiveness requirements may cause rejection of a bid. [emphasis added]. Bidder shall complete, sign and return the ITB Bidder Acknowledgement Form (page 1 & 2). The bidder must return either the original or a copy of both pages with an original signature on page one (1). The bidder shall complete, sign, date, and return (all) pricing pages, entitled Cost Information Sheet, which consists of page 28. By submitting a bid or bids under this ITB, each bidder warrants its agreement to the prices submitted. The Department objects to and shall not consider any additional terms or conditions submitted by a bidder, including any appearing in documents attached as part of a bidder’s response. In submitting its bid, a bidder agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Any qualifications, counter-offers, deviations, or challenges may render the bid un-responsive . . . . * * * 5.3 Certificate of Insurance Bidders shall return a fully executed Certificate of Insurance . . . . In this case, Section 5.1 contains two bid specifications essential to a bid's responsiveness. Those two requirements were submission of a signed and completed, original or copy, of the bidder acknowledgement form and submission of a completed Cost Information Sheet. The Cost Information Sheet is not at issue here. The bidder acknowledgement form is a double-sided Department of Management Services form containing general boilerplate contractual language. The back of the form is a continuation of standard contractual terms from the front. Oddly, signatures acknowledging these terms and the terms of the ITB are on the front page (page 1) of the form. By signing the front page of the bidder acknowledgement form the bidder agrees to abide by all conditions of the bid. The remainder of Section 5 of the ITB contains bid specifications that are not considered essential to determine the initial responsiveness of the bid at the bid opening, but are to be returned at some later point in time after the bid's are opened. However, the language of Section 5 effecting that intent is unclear. In particular, the bid specification contained in Section 5.3 requires the bidder to "return" an "executed" Certificate of Insurance. The Certificate of Insurance provides the Department with proof of a variety of required insurance coverage of the vendor. However, later in the ITB Section 7.14 clarifies that the Certificate of Insurance need only be supplied with the later-signed contract documents. Section 7.14 states, in relevant part: 7.14 Contractor's Insurance The contractor shall not commence any work in connection with this ITB . . . until he has obtained all of the . . . types of insurance and such insurance has been approved by the Department. The Department shall be furnished proof of coverage of insurance by Certificates of Insurance . . . accompanying the contract documents and shall name the Department as an additional named insured [emphasis added]. Indeed, the evidence demonstrated that the Department has long interpreted these provisions to require a winning bidder to provide Certificates of Insurance at the time a contract is entered into and not as part of the essential requirements of the bid due at bid opening. While the Department could (and probably should) clarify this provision, its interpretation of its bid specifications is not unreasonable under these facts. In this case, five bids were timely submitted in response to the ITB, including those of K & M and Cumbaa. On March 8, 2011, the Department opened bids for the ITB. Cumbaa submitted the highest bid for the contract, at $22,197.48. K & M submitted the next highest bid at $20,001.00. At the bid opening, Cumbaa's bid included a Cost Information Sheet, a copy of the signed front page of the bidder acknowledgement form, and the Contact for Contract Administration form known as Attachment 1. However, the bid did not contain the second side of the bidder acknowledgement form or a Certificate of Insurance form at the time the bid was opened. K & M's bid contained the same documents as Cumbaa's bid, as well as the second side of the bidder acknowledgement form and a number of certificates of insurance for K & M. The evidence showed that Cumbaa did not include the Certificate of Insurance form in its sealed bid upon the advice of the Department that the form was not required at bid opening. However, Cumbaa had insurance coverage in place at the time of the bid opening and faxed its certificates of insurance to the Department on March 10, 2011. Given these facts and the Department's reasonable interpretation of its ITB, the omission of Cumbaa's certificate of insurance was neither required at the time of the bid opening, nor material to the award of the bid. The omission of the second page of the bidder's acknowledgement form was not noticed by anyone reviewing the bids until its omission was pointed out by K and M in this bid protest. Cumbaa faxed a copy of the back side of the document to the Department on April 11, 2011. Clearly, this lack of notice demonstrates the immateriality of the back side of the bidder's acknowledgement form. Additionally, since the signatures of both bidders were on the front page of the form submitted by them and those signatures bound the bidders to the terms of the ITB, there was no evidence that demonstrated why submission of a copy of the back side of the form was material to the award of this bid. Ultimately, the Department reviewed the bids for responsiveness and determined that Cumbaa was the highest responsive bid. On March 11, 2011, the Department posted its intent to award the bid to Cumbaa Enterprises, Inc. As indicated, there was no evidence that the omission of these two documents from the Cumbaa bid were material deviations from the bid specifications since neither omission impacted the ultimate contract requirements and did not materially impact the integrity of the bid process. Indeed, the insurance certification was not required for responsiveness under Section 5.1 of the bid under a long-standing and reasonable interpretation of that requirement by the Department. For these reasons, this bid protest should be dismissed.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent, Department of Corrections, enter a final order dismissing the Protest of K & M Pine Straw. DONE AND ENTERED this 1st day of July, 2011, in Tallahassee, Leon County, Florida. S DIANE CLEAVINGER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of July, 2011. COPIES FURNISHED: Kurt Eldridge K and M Pine Straw 20583 John G Bryant Road Blountstown, Florida 32424 Edith McKay, Esquire Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Edwin G. Buss, Secretary Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Jennifer Parker, General Counsel Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500
Findings Of Fact Respondent issued an invitation to bid on March 13, 1992. Bid number SB 92-244I involved the disassembly and removal of an existing walk-in freezer and the furnishing and installation of a new walk-in freezer at Coral Sunset Elementary School. The invitations to bid provided in paragraph Y of the Special Conditions: Failure to file a specification protest within the time prescribed in Florida Statutes 120.53 3.(b) shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. (sic) Bid specifications were included in the invitations to bid issued on March 13, 1992. Twenty-three bids were solicited. There were five responses. One of the responses was submitted by Choice Restaurant Equipment, Inc. ("Choice"). Choice is a vendor for equipment manufactured by Petitioner, Nor-Lake, Inc. ("Nor-Lake"). Nor-Lake is an out-of-state corporation with manufacturer's representatives in numerous states including Florida. 4, Petitioner, CHD Marketing Group ("CHD"), is the manufacturer's representative for Nor-Lake in Florida. CHD represents no other manufacturer of the product included in the bid response. Choice is a sales agent for CHD and other manufacturer's representatives in Florida. Choice sells the products of a variety of manufacturers but is the exclusive sales agent for CHD pursuant to a verbal agency agreement. Choice timely submitted a bid for bid number SB 92-244I on April 8, 1992, prior to the bid deadline of 2:00 p.m. on the same day. The successful bidder submitted its bid by Federal Express at 4:51 p.m on April 8, 1992. Respondent's Department of Purchasing and Stores (the "Department") had stated on March 13, 1992, when the invitations to bid were issued, that bid responses must be received by the Department no later than 2:00 p.m. on April 8, 1992, at the Department's address at 3980 RCA Boulevard/Suite 8044, Palm Beach Gardens, Florida, 33410-4276. Prior to April 8, 1992, the Department relocated to a new facility at 3326 Forest Hill Boulevard, West Palm Beach, Florida. The new address was posted at the old location and Department representatives were present at the old address to accept walk-in bids. Federal Express first attempted to deliver the successful bid at the Department's old address at 10:30 a.m. on April 8, 1992. Federal Express delivered the successful bid to the Department's new address at 4:51 p.m. At 2:00 p.m. on the same day, The Department announced that all bids were in and opened the bids that had been delivered. The successful bid and one other bid were delivered on April 8, 1992, after the public opening conducted at 2:00 p.m. on the same day. Bids were tabulated on April 9, 1992. Bid tabulations were posted on April 13, 1992, and the successful bid was announced. The successful bid was for $8,174.00. Three bids were lower than the successful bid. Choice's bid was for $7,742.56. The other two lower bids were for $8,020.00 and $6,620.00. All three lower bids were rejected as non- responsive. Choice's bid was rejected because it did not meet bid specifications for 22 gauge steel, thermostatically controlled door heaters, and reinforced steel door panels. CHD filed a Notice of Protest on April 14, 1992, and a Formal Written Protest on April 24, 1992. CHD's protest alleges that: Choice's bid was lower than that of the successful bidder; the successful bid was not timely made; the bids were not opened publicly in violation of bidding procedure requirements; and the bid specifications were arbitrary and capricious, favored one bidder, and that Choice's bid was responsive. Neither a notice of protest nor a formal written protest was submitted by Choice or Nor-Lake. Neither Choice nor Nor-Lake attended the informal protest conference conducted on April 30, 1992. On May 7, 1992, Respondent's Office of General Counsel issued its written notice of proposed agency action. The written notice recommended that the bid be awarded to the successful bidder and that CHD's protest be dismissed for lack of standing. CHD requested a formal hearing on May 14, 1992, and the matter was referred to the Division of Administrative Hearings for assignment of a hearing officer on May 15, 1992. The bid submitted by Choice was prepared by CHD but signed by the president of Choice. Neither Nor-Lake nor CHD signed a bid or were otherwise bidders of record for bid number SB 92-244I. Neither Choice, CHD, nor Nor-Lake, filed a notice of protest concerning the bid specifications within 72 hours after Choice received the notice of the project plans and specifications on March 13, 1992. The sole basis upon which CHD claims it is substantially affected is the adverse economic impact caused to it by the proposed agency action. The proposed agency action will result in lost sales from this and future transactions. CHD will lose commissions from this and future transactions. The dealer relationship between CHD and Choice will be damaged because Choice will not want to sell a freezer that is not acceptable to Respondent. The marketing strategy developed between CHD and Nor-Lake will be damaged because it is conditioned upon the award of public contracts.