NELSON P. DAVIS vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003868BID (1988)
Division of Administrative Hearings, Florida Number: 88-003868BID Latest Update: Sep. 28, 1988

Findings Of Fact The Department of Health and Rehabilitative Services currently leases approximately 22,000 square feet of space from Nelson P. Davis. The space is contained in two separate buildings, both located at 417 Racetrack Road, Ft. Walton Beach, Florida. The Department and Davis were involved in a legal dispute involving the currently leased premises, which concluded in 1986 with the entry of judgment in Davis' favor. While some antagonism remains between the parties related to the legal action instituted by Davis, Davis has been an acceptable landlord in all other respects. The current lease expires February 1, 1989. Davis has been aware, since late February or early March of 1988, that the Department would need space in excess of the currently occupied 22,000 square feet, but was not aware of the actual additional space requirements until the issuance of the invitation to bid. In general, the Department's space requirements have increased annually. In response to the anticipated need for additional space, Davis initiated plans for design of a third Racetrack Road building that could meet the additional need, but did not construct the facility. In response to the space requirements of previous years, Davis has constructed additional space. The Department has occupied the additional space in such proportions as to avoid the competitive bidding process, however, the current need for additional space exceeds the maximum which can be leased without competitive bidding. The Department on May 11, 1988, issued an invitation to Bid for approximately 26,165 square feet of space in Ft. Walton Beach, Florida. (HO #1) In response to the invitation, Davis submitted a bid proposal. The Davis proposal, the sole proposal received by the Department, was disqualified by the Department as non-responsive. On June 23, 1988, the sole bid was opened by Joseph Pastucha, HRS District One Facilities Manager, who initially reviewed the Davis bid. Mr. Pastucha identified items of concern related to the responsiveness of the bid and then provided the information to his supervisor, who in turn provided the information to Mr. James Peters. The Department did not contact Davis for further information or to provide the opportunity to correct any defects. James Peters, HRS's District One Manager for Administrative Services has expressed on at least one occasion a desire to avoid entering into business arrangements with Nelson P. Davis. The bases for Peters' opinion is the earlier litigation between the parties. Peters was on the committee which was to have evaluated bids submitted in response to the invitation. However, Peters has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that Peters based his opinion regarding the Davis bid submission solely on the earlier litigation or that any other person involved in the agency's action permitted personal opinions to affect the decisional process. Davis' bid proposal included the two buildings constituting approximately 22,000 square feet located at 417 Racetrack Road which the Department currently occupies, plus a third building of approximately 4,000 square feet. The proposed square footage and lease cost were acceptable. The third building was to be either a planned, unconstructed building located at the 417 Racetrack Road location or an existing building located "7/l0ths of a mile southeast of the present HRS offices," (the off-site building). However, a memorandum attached to Davis' submission stated that he did not intend to use the off-site building for HRS purposes, (HO #2). Further, Davis had previously indicated in conversation with the HRS manager of the 417 Racetrack Road offices that he planned to utilize the off-site space otherwise. On page one of the bid submittal form Davis indicated the address of the proposed location as 417 Racetrack Road. By letter dated July 5, 1988, the Department notified Davis that his bid offering was deemed non-responsive and that the Department expected to readvertise for space in Ft. Walton Beach. The letter made no mention of any opportunity to protest the determination. The statement, "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes," which is required to be included in the notice of agency decision by Section 120.53(5)(a), Florida Statutes, was omitted by the Department. (HO #3) On or about July 7, 1988, Davis contacted the Department of General Services to express his dismay regarding the disqualification of his submittal. A meeting, held on or about July 19, 1988, between Davis and Department representatives, did not alter the Department's position. On or about July 25, 1988, the written notice of protest and request for hearing was filed. The Department forwarded the request to the Division of Administrative Hearings. The letter dated July 5, 1988, advising Davis that his bid was deemed non-responsive enumerated five reasons for the Department's decision. The reasons stated were: No photograph of the proposed facility was submitted as requested; No floor plan of the facility was submitted as requested; A substituted site was submitted Proposed space was not an existing building and was not measurable; Three buildings in bid proposal constitute three locations and are unacceptable. The letter was signed by Chuck Bates, DHRS Deputy District Administrator, District One. The letter was drafted by James Peters. (HO #3) Mr. Bates relied upon Peters and Pastucha to provide information sufficient to justify the disqualification of the bid, and was satisfied that the action was justified prior to signing the letter. Examination of the bid submittal package reveals that Davis failed to acknowledge by initial the requirements of page seven, but that he did, on that page, appropriately respond to questions related to proposed parking spaces being bid. The Department did not base the disqualification of the bid on the failure to acknowledge the page and did not include the failure to initial the page in the stated reasons for deeming the bid non-responsive. Paragraph 9(a) of the bid submittal form requires the submission of a clear photograph of the exterior front of the building. (HO #2) Davis submitted no photographs. Paragraph 9(b) of the bid submittal form requires the submission of a scaled floor plan showing present configurations with measurements. (HO #2) Davis submitted floor plans for the proposed-to-be-constructed building and for the off-site building, but failed to submit floor plans for the two buildings which the Department currently occupies. The bid also failed to include calculations of net rentable square footage related to the omitted floor plans. The letter to Davis stated that an additional reason for disqualification of his bid from further consideration was the submission of a substituted site, (HO #3). The "substituted site" refers to Davis' inclusion of the off-site building not identified in the bid submission other than by the statement that the building was located seven-tenths of a mile southeast of the present HRS office location. No map, street address, legal description, or other identifying information was submitted. The proposal submitted by Davis included plans to construct a third building at 417 Racetrack Road, which was rejected as not measurable. The invitation to bid states that to be considered, the space must be existing, dry and physically measurable, at the time of bid submitted. (HO #1) The proposed third building clearly fails to meet this requirement. While the Department may permit the correction of minor deficiencies, the deficiencies were adjudged by the Department to be more than minor. The proposal's inclusion of nonexisting space (Racetrack Road building #3) or in the alternative a building, the location of which can not be determined from the bid information and which the bidder apparently intends not to provide, is non- responsive to the specifications of the invitation. As to the fifth enumerated reason for disqualification of the bid (three buildings/three locations) the Department and Petitioner presented extensive testimony related to paragraph 3(b) of page 15 of the bid submittal form. Page 15 of the bid submittal form is titled "Evaluation Criteria" and contains a list of weighted factors which were to be used in the evaluation of bids. (HO #2) Paragraph 3(b) states, as one factor for consideration in evaluation, whether the bid provides for the required aggregate square footage in a single building, and continues, "[p]roposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within yards of each other." (HO #2) The space left for the specification of maximum yardage was erroneously left uncompleted by the Department and the Department did not learn of the error until the bid was submitted. The Department's disqualification of the bid on this basis relies on the Department's assertion that the three buildings included in the Davis proposal constitute three locations and that a responsive bid may contain not more than two locations. The Department's position is that "location" and "building" are synonymous and that paragraph 3(b) of the evaluation criteria prohibits consideration of a bid submission including more than two buildings. The Department's position is rejected as arbitrary. The bid package does not state that proposals including more than two buildings will be disqualified. The sole reference to the number of buildings in a responsive bid submission is as stated and contained on the page of "Evaluation Criteria", wherein it is identified with a weighting factor of five percent of total possible points.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-3868BID. DONE and ENTERED this 28th day of September, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3868BID The following constitute rulings on the proposed findings of fact submitted by the parties. Petitioner: Accepted in part. The use of the word "required in the fourth sentence is rejected. The referenced section relates to evaluation factors, not specific requirements. Accepted. Accepted in part. The third building was proposed as either the off-site building or the planned, non-existent space. Accepted. Accepted. Accepted. Rejected as restatement of testimony. Other testimony indicated that Petitioner planned to use the off-site location for non-HRS purposes. Rejected, immaterial. Accepted. Accepted. Accepted as modified. Accepted in part. The use of the word "technical" is rejected. Accepted. Accepted as modified. Accepted as modified. Accepted. Accepted. Accepted. Accepted as modified. Accepted as modified. Accepted as modified. The change between the two invitations to bid was to clarify the obvious confusion related to the use of terms "location" and "building" and was made not to the bid specifications but to evaluation criteria. Rejected as restatement of testimony. Rejected, conclusion of law. Accepted so far as relevant. While the Davis bid was disqualified as non-responsive, the right to reject any and all bids encompasses the disqualification of a bid as non-responsive to the specific requirements of an invitation to bid. Respondent: Rejected, conclusion of law. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Floor plan of the off-site building was submitted showing that the building is essentially a hollow, box-like structure. Accepted. Accepted. Accepted. Rejected, irrelevant. While the usual distance may be 100 yards, the actual bid specifications do not state such. Further the sole reference to the distance between "locations" was contained in evaluation criteria. At no time prior to the June 23, 1988 bid opening did the Department attempt to identify the preferred distance between locations. Accepted. Accepted. Accepted. COPIES FURNISHED: Bruce A. McDonald, Esquire Post Office Box 887, Suite 105 151 Mary Esther Cutoff Mary Esther, Florida 32569 Rodney M. Johnson, Esquire Acting District One Legal Counsel Post Office Box 8420 Pensacola, Florida 32505-8420 Joseph J. Pastucha 3300 North Pace Boulevard Room 109 Town & Country Plaza Pensacola, Florida 32505 Jan Kline 417 Racetrack Road Ft. Walton Beach, Florida 32548 James V. Peters Department of General Services 160 Governmental Center Fourth Floor, Room 412 Pensacola, Florida 32501 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Tom Batchelor Staff Director House HRS Committee The Capitol Tallahassee, Florida 32399-1300

Florida Laws (2) 120.53120.57
# 1
MODERN MAILERS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, 94-003593BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 07, 1994 Number: 94-003593BID Latest Update: Oct. 03, 1994

The Issue This case considers whether Petitioner's response to Invitation to Bid, No. 94-014, as revised, issued by the Respondent, is responsive to the terms of the Invitation to Bid. If Petitioner is found responsive, then the question is raised whether Petitioner has offered the lowest and best response to the invitation to bid.

Findings Of Fact On May 26, 1994, Respondent provided a memorandum to prospective vendors concerning Bid No. 94-014, as revised. This memorandum informed the prospective vendors that the new bid due date was June 6, 1994. The memorandum attached the bid instructions. Under general conditions to the invitation to bid the prospective vendors were reminded in Paragraph 7 that the Respondent could ". . . reject any or all bids or waive any minor irregularity or technicality in bids received." Under the heading "Special Provisions" prospective vendors were informed that "The charge per 1,000 for individual items under Exhibit A shall be the rates for the contract with the successful bidder." The prospective bidders were instructed as follows: REQUIRED ITEMS TO BE SUBMITTED WITH BID: The bidder must complete all required items below and submit as part of the bid package. Any bid in which these items are not used or in which these items are improperly executed, may be considered non-responsive and the bid may be subject to rejection. Among the items to be submitted with the bid was Exhibit A. The bidders were informed about the process of EVALUATION/AWARD. There it was stated: Bids will be evaluated and awarded on an all or none basis to one bidder. Award will be based on the total costs of four (4) theoretical jobs (See Exhibit B-Bid Total) requiring varying services and on the bidder's qualifications to best serve the Department's needs. The prospective bidders were then reminded a second time that: "THE DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS AND TO WAIVE ANY MINOR IRREGULARITIES IN BIDS RECEIVED." Within Exhibit A to the bid document was a category referred to as "Tabbing", calling for the charge per 1,000 for that service. Within Exhibit B under the fourth theoretical job was a requirement to quote the subtotal cost for 200,000 newsletter preparations to include "Tabbing." Three vendors submitted responses to the invitation to bid. Those responses were opened on June 6, 1994. The vendors who responded were Petitioner, Educational Clearinghouse, Inc. and Mail Masters of Tallahassee, Inc. In the subtotal for costs for 200,000 newsletter preparations, in activity four, concerning theoretical jobs, found within Petitioner's Exhibit B to the response to the invitation to bid, Petitioner made a mistake. It misplaced the decimal point and described the subtotal cost for 200,000 newsletter preparations as $73.80 instead of $7,380.00. Respondent characterized this as a typographical error or nominal mistake. In fact, this error constituted a minor irregularity which did not preclude the ability to understand Petitioner's response so that it might be compared to the responses by the competition. Petitioner made a second error. This error occurred when Petitioner failed to indicate the amount that it would charge per 1,000 for "Tabbing" within Exhibit A. Respondent did not consider this to be a minor irregularity and rejected Petitioner's bid as non-responsive for the failure to include a quotation for the charge per 1,000 for "Tabbing." This resulted in the intent to award the contract to Educational Clearinghouse, Inc. whose bid total for the four theoretical jobs under Exhibit B was $9,137.25 compared to Petitioner's bid total of $8,374.62. In preparing Exhibit B, activity four, Petitioner included a theoretical charge for "Tabbing" in the amount of $8.00 per 1,000. Petitioner contends that the $8.00 per 1,000 found within that entry may be correlated with the missing information concerning "Tabbing" in Exhibit A to its response to the invitation to bid. In the instructions to the vendors, Respondent has informed the vendors that the charge per thousand for individual items identified in Exhibit A constitutes the rate that the Respondent would expect to pay under a contract with the successful bidder. By contrast, the function of the information provided in Exhibit B is for purposes of awarding the contract based upon total costs of the four theoretical jobs and on the basis of the vendor's qualifications to best serve the Respondent's needs. Although not stated in the invitation to bid it can be inferred that similar references within Exhibits A and B, such as the reference to "Tabbing", calls for a comparable price to be set forth for the item in both Exhibit A and Exhibit B. Otherwise vendors would have the opportunity to quote low prices in completing Exhibit B as a means to win the cost comparison with their competitors for purposes of the award and then have the opportunity to charge higher costs per 1,000 as reflected in Exhibit A when establishing the charges for the contract with the Respondent following the competition contemplated in the comparison of the theoretical bid total under Exhibit B. Therefore, it would be reasonable for the Respondent to expect that the Petitioner would charge $8.00 per 1,000 for "Tabbing" under a contract between the Petitioner and Respondent based upon information that was set forth in the response to Exhibit B, activity four, "Tabbing." In summary, Petitioner's oversight in leaving out reference to the tabbing charge in Exhibit A does not affect the comparison of bid responses as contemplated by the instructions to the vendors, a function performed by comparing the respective Exhibits B. Otherwise, Respondent may gain the necessary understanding of Petitioner's charge per 1,000 for "Tabbing" as contemplated in instructions concerning Exhibit A as a means for entering into the contract. This understanding is achieved by transposing the $8.00 per 1,000 "Tabbing" quotation in Exhibit B to the "Tabbing" charge within Exhibit A as $8.00 per 1,000. With this adjustment, Modern Mailers, Inc. is the lowest responsive bidder and best able to serve Respondent's needs pertaining to Invitation to Bid No. 94-014, as revised.

Recommendation Based upon the findings of fact and the conclusions of law reached, it is, RECOMMENDED: That a final order be entered which finds that Petitioner is a "qualified" and "responsible" bidder who is the lowest and best responsive bidder to Invitation to Bid, No. 94-014, as revised and is entitled to the award of the contract contemplated by that invitation to bid. DONE and ENTERED this 8th day of September, 1994, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of September, 1994. APPENDIX The following discussion is given concerning the proposed findings of fact of the Parties: Petitioner's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is not necessary to the resolution of the dispute. Paragraphs 3 through 5 are subordinate to facts found. Paragraphs 6 and 7 are rejected to the extent that they are intended to establish an excuse for the Petitioner not providing information related to the cost for tabbing called for in Exhibit A in the invitation to bid. Paragraph 8 is subordinate to facts found. Paragraphs 9 through 12 are not necessary to the resolution of the dispute. Paragraph 13 is subordinate to facts found. Paragraph 14 is rejected to the extent that it suggests that Petitioner may amend its response to the invitation to bid to specifically set forth the amount attributable to the tabbing charges per 1,000 in Exhibit A. Nonetheless one may infer that the cost per 1,000 for tabbing is the same as is set forth in Exhibit B. Paragraphs 15 through 17 are subordinate to facts found. Paragraph 18 constitutes legal argument. Respondent's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is contrary to facts found Paragraph 3 is rejected in fact and law. Paragraph 4 is rejected in the suggestion that the Petitioner does not have the ability to perform the contract. COPIES FURNISHED: Daniel W. Dobbins, Esquire Callahan & Dobbins 433 North Magnolia Drive Tallahassee, FL 32308 Vytas J. Urba, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Jack McRay, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 George Stuart, Secretary Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Informational Copies: Ronald W. Brooks, Esquire Brooks and LeBoeuf, P.A. 863 East Park Avenue Tallahassee, FL 32301 Joan Reeves, Vice President Educational Clearinghouse Post Office Box 3951 Tallahassee, FL 32315

Florida Laws (3) 120.53120.57287.012
# 2
PROCACCI FINANCIAL GROUP, LTD., AND PROCACCI COMMERCIAL REALTY, INC. vs DEPARTMENT OF LABOR AND EMPLOYMENT SECURITY, 92-002650BID (1992)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Apr. 28, 1992 Number: 92-002650BID Latest Update: Oct. 27, 1992

The Issue Whether Respondent's rejection of all bids for Lease No. 540:0920 was improper.

Findings Of Fact The Respondent published an invitation to bid seeking to lease approximately 9,907 net square feet of office space in Broward County (the Lease). There was no evidence of any irregularities in the preparation or the issuance of the invitation. The Petitioner, whose responsive bid was rejected by Respondent, timely and properly brought its protest and has standing to protest the Respondent's rejection of all bids for the Lease. Lynn Mobley was the statewide lease manager of the Respondent and had the responsibility to generally oversee the preparation of the bid package and the bid opening procedures. Barbara Lollie was a staff member under the supervision of Ms. Mobley and was in charge of the preparation of the request for bid proposals. Ms. Mobley's supervisor was a Ms. Barron. Five bids in response to the invitation to bid were duly received by Respondent. An evaluation committee chaired by Don Walker, Respondent's area administrator, was appointed to inspect the proposed properties and to evaluate the bids. The evaluation committee ranked the bids in the following order of preference: 1/ 1. In-Rel ($499,141.80) 2. Taft ($519,090.30) 3. Donlon ($541,119.90) 4. Procacci ($618,373.30) 5. Stirlingwood ($761,906.30) Thereafter the responses to the invitation were forwarded to Ms. Mobley's office for evaluation. Ms. Mobley's staff determined that the top two bids, those of In-Rel and Taft, were non-responsive. 2/ Ms. Mobley, who did not actively participate in the evaluation of the proposals, then advised Mr. Walker of that determination and advised him of two alternatives: to award the bid to the lowest responsive bidder or to reject all bids and re-advertise. The evaluation committee chaired by Mr. Walker had wanted to lease the property to either In-Rel or Taft. Mr. Walker told Ms. Mobley that he wanted to reject all bids and to re-advertise. Pursuant to the request for bids promulgated by the Respondent and Rule 13M-1.015, Florida Administrative Code, the Respondent reserved the right to reject any and all bid proposals for the Lease. The request for proposal of bids specifically stated: The Department reserves the right to reject any and all bid proposals for reasons which shall include but not be limited to the agency's budgetary constraints; waive any minor informality or technicality in bids, to accept that bid deemed to be the lowest and in the best interest of the State, and if necessary, to reinstate procedures for soliciting competitive proposals. Following the telephone conversation between Mr. Walker and Ms. Mobley, Ms. Mobley sent a letter dated March 23, 1992, to all bidders which notified each bidder that all bids had been rejected. That letter did not state the reasons for the rejection of all bids. Mr. Walker sent a memo on March 20, 1992, to Ms. Lollie recommending the rejection of all bids. Although this memo predated the rejection letter and was subsequently made available to Ms. Mobley, the memo was received by Ms. Mobley's office after the rejection letter had been sent. The memo gave no explication of Mr. Walker's reasons for wanting to reject all bids. The Department of General Services (DGS) published lease rate guidelines for Broward County to inform the Respondent of maximum acceptable lease rates. The purpose of these DGS guidelines was to advise the Respondent that proposed lease rates above the guidelines would be summarily rejected. At the time of obtaining bid proposals, the DGS lease rate guidelines were the only established guidelines which could be consulted by the Respondent. At no time did the Respondent calculate a pre-bid estimate of what the Respondent felt was an acceptable range of lease rates in order to be used in determining whether lease rates were too high. The Petitioner's bid, along with the other responsive bidders, were within the DGS lease rate guidelines. Mr. Walker made the request for re-bid after he learned that the bids of Taft and In-Rel were non-responsive. Mr. Walker's decision to recommend the rejection of all bids was based only on the information that the two top choices of the evaluation committee had been found to be non-responsive and on his desire to reopen the bid process in the hope of attracting more bidders. 3/ Mr. Walker wanted to modify the specifications of the invitation to bid in two regards. First, he wanted to amend the specifications to permit the leased premises to be in more than one building. Second, he wanted the geographical boundaries in which the leased premises could be located to be expanded to hopefully attract additional bidders. Mr. Walker believed that a re-bid would provide a wider range of buildings at comparable prices from which to choose and would give him an opportunity to make changes to the bid specifications. His decision to recommend the rejection of all bids was not based on a lease bid analysis or on lease rate guidelines. The recommendation was not dictated by budgetary considerations, but by his desire to shop the bid. It was Mr. Walker's understanding that at the end of his telephone conversation with Ms. Mobley that the decision to reject all bids had been made and that all bids would be rejected. Ms. Mobley made the decision to reject all bids pursuant to the recommendation of Mr. Walker after obtaining input from Ms. Lollie and Ms. Barron. Although Ms. Mobley had Ms. Lollie's analysis of the five bids, that analysis made no comparison of the rates contained in the bids with existing lease rates or the DGS guidelines. Ms. Mobley did not consult the DGS lease rate guidelines, although she was generally familiar with those guidelines, and she was unaware of any budgetary constraints that would dictate the rejection of all bids. When Ms. Mobley decided to reject all bids, she did not compare the bid proposals to the existing lease rates paid by the Respondent for leased office space in Broward County. The decision to reject all bids was not made on the advice of an attorney. Although Ms. Mobley testified that all bids on the Lease were rejected solely for price considerations, the evidence presented established that the decision to reject all bids was not based on price, price guidelines, or the Respondent's budgeting constraints. The greater weight of the evidence establishes that Ms. Mobley rejected all bids because that was the action recommended by Mr. Walker. Respondent's invitation to bid did not contain any lease rate guidelines that would notify prospective bidders of a lease rate ceiling. There was no significant difference in the lease rates between the Taft and In-Rel bids that were favored but non-responsive and the third lowest bidder, the Donlon bid, which was responsive but rejected. Mr. Walker conceded that the Donlon bid was not rejected because of price considerations. Mr. Walker was of the opinion that the Donlon bid was at an acceptable price. He did not testify that the Petitioner's bid was at an unacceptable price and he did not testify as to what, other than the DGS guidelines, would be the maximum acceptable price. The DGS Lease Guidelines applicable to the bid for the Lease were as follows: A full service Lease (including electricity) -- $17.84 a square foot. 4/ Lease without electricity -- $15.18 a square foot. The present rate for the existing lease which was to be replaced by the Lease was $16.60 a square foot; this rate did not include electricity. If electricity was factored in at $2.50 a square foot, which was a factor regularly used by DGS, the present lease rate would be approximately $18.00 a square foot. The three responsive bids to the invitation were lower than the present lease after factoring in electricity. Ms. Goodman was of the opinion that Respondent's budget with respect to the Lease would be based on lease rates already in existence and consequently, that the responsive bids received and rejected were within the budget guidelines. Respondent offered no evidence to controvert that opinion. There was no evidence that the decision to reject all bids was based on economic considerations. All lease rates submitted by the rejected bidders were under the ceiling set by the DGS lease guidelines of $17.84. The Respondent acted arbitrarily when it rejected all bids.

Recommendation Based upon the foregoing findings of fact and conclusion of law, it is hereby recommended that the Respondent accept and evaluate the responsive bids submitted for the Lease and determine the proper recipient for an award of the Lease. RECOMMENDED this 29th day of June, 1992, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 1992.

Florida Laws (4) 120.57120.68255.25287.012
# 3
PICKETT, FANELLI AND O'TOOLE, P. A. vs DEPARTMENT OF REVENUE, 96-001122F (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 04, 1996 Number: 96-001122F Latest Update: Oct. 28, 1996

Findings Of Fact The Petitioner, PFO, is a professional corporation organized and existing under the laws of the State of Florida. Petitioner's principal office is located in West Palm Beach, Florida. At all times material to the claims of this case, Petitioner had fewer than 25 full-time employees. At all times material to the claims of this case, Petitioner had a net worth of less than $2 million. On May 22, 1995, the Department provided Petitioner with a clear point of entry to a formal administrative hearing pursuant to Section 120.53(5), Florida Statutes. At that time the Department issued an intent to award the Palm Beach County (Intrastate) CSE contract to a third party. This dispute evolved into DOAH case no. 95-3138BID or "the bid case." The Department was not a "nominal party" in the bid case. A recommended order was entered in the bid case on September 5, 1995. Except for a minor point not relevant to the issues of this matter, the Department adopted the findings and conclusions of the recommended order and entered its final order on December 1, 1995. The final order in DOAH case no. 95-3138BID awarded the Palm Beach County (Intrastate) contract for CSE legal services to Petitioner. Such award was based upon the conclusions that the third party's proposal was nonresponsive and that aspects of the evaluation process were arbitrary. No appeal was timely filed against the final order. Petitioner is, therefore, a prevailing small business party within the meaning of Section 57.111, Florida Statutes. The Petitioner timely filed its request for attorneys' fees and costs in the instant case pursuant to Section 57.111, Florida Statutes. The total amount of attorneys' fees and costs incurred by Petitioner in the bid case was $63,495.25. Of that amount, at least $15,000 was reasonable and necessary for Petitioner to incur in the preparations for, and attendance at, the hearing in the bid case. The solicitation package for the bid case contained mandatory requirements with which all applicants were to comply. The final order in the bid case concluded that the successful applicant had failed to satisfy all mandatory requirements. Its bid was, therefore, nonresponsive to the solicitation. Additionally, the final order determined that the instructions regarding how the proposals were to be evaluated were unclear and that points were inappropriately assigned to the successful applicant. The overall conclusion of the final order found that the Department had acted arbitrarily in the intended award to this third party applicant. All of the material deficiencies relied on in the recommended order and the final order to reach the conclusion that the Department had acted arbitrarily were known to the Department at the time of its initial review and evaluation of the proposals. For example, the Department knew that the applicant had not identified two attorneys who would be expected to perform services under the contract, and had not included certificates of good standing from the Florida Bar for them. Additionally, the applicant had not provided references from three persons as specified in the solicitation package. This was evident upon the opening of the proposal. Nevertheless, the Department scored the nonresponsive proposal and awarded it sufficient points to be the apparent winner among the applicants. An award of attorneys fees' and costs under Section 57.111, Florida Statutes, is capped at $15,000. The agency has not disputed the reasonableness nor the amount of fees claimed in connection with the bid case. The agency has not offered evidence to specify each item of cost or fee in dispute. Discovery requested by the Department sought information for the period September 1995 through January 1996 which included runner logs of Petitioner's counsel, itemized bills regarding another party (not a party to the bid case nor this case), and the deposition of Don Pickett. None of the requested discovery addressed the issue of whether the Department's actions in the bid case were substantially justified. None of the requested discovery addressed facts which the Department had placed in issue by its response to the petition. None of the discovery addressed the issue of whether there are special circumstances which would make an award of reasonable fees and costs unjust. Moreover, the parties have stipulated that there are no special circumstances which would make an award of reasonable fees and costs unjust. No new information pertinent to the claim for fees and costs herein which was unknown to the Department as a result of the bid case proceeding was discovered from the deposition of Don Pickett. No new information pertinent to the reasonableness or amount of the fees claimed was discovered from the deposition of Don Pickett or the other discovery requested. The factual circumstances argued in Respondent's Proposed (sic) Recommended Order, ie. that the agency had relied on findings and conclusions from an unrelated DOAH case in connection with the review of the underlying bid case, were not set forth in the response filed by the agency in the instant case and have not been deemed credible in determining the issues of this case. The proposal submitted by the third party in the bid case was nonresponsive. The Department has stipulated that the award of a contract to a nonresponsive bidder is arbitrary.

Florida Laws (3) 120.53120.6857.111
# 4
D. C. COURTENAY vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-004317BID (1989)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Aug. 10, 1989 Number: 89-004317BID Latest Update: Jun. 08, 1992

The Issue Whether the Department of Health and Services acted fraudulently, arbitrarily, capriciously, illegally or dishonestly in issuing an award of bid or HRS Lease No. 590:2069 to Harpaul S. Ohri.

Findings Of Fact Sometime before March, 1989, the Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide social services in the western portion of Orlando, Orange County, Florida, including a food stamp distribution office. HRS was authorized to procure, through competitive bidding, a lease for 17,250 net rentable square feet of existing office space, plus or minus 3 percent. The said lease was to provide for a full service period of seven years and two options to renew for three years each at specified rates, with occupancy no later than December 1, 1989 or 175 days after the bid award is finalized. The geographic area designated in the bid package for the office space was limited to the following area of Orange County, Florida: Beginning at the intersection of Colonial Drive and Kirkman Road to the intersection of L.B. McLeod Road, then east on L.B. McLeod Road to the, intersection of Rio Grande Avenue then north on Rio Grande Avenue to the, intersection of Colombia Street,, then east on Colombia Street to Interstate 4, then north on Interstate 4 to the intersection of Colonial Drive, then west on Colonial Drive to the point of Beginning. Public notice that HRS was seeking competitive bids was given and HRS prepared a document entitled Invitation to Bid for Existing Office Space (ITB), which set forth in detail all of HRS requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. Specific areas of importance to Respondent as reflected in the ITB and addressed by the evidence herein were as follows: 17,250 net rentable square feet (plus or minus 3 percent) of existing office space. General office use for use, as a client service center. Seven year term with two options to renew of three years each. 120 off-street, on-site, full size parking spots designated exclusively for use of Department employees and clients, suitably paved and lined, with a minimum of two for the handicapped. Availability of public transportation within reasonable proximity. Availability to adequate dining facilities within two miles. Photographs of the exterior front of the facility, along with documentation of present facility configuration and parking areas including access and egress to public roadways. Availability of elevator for multi-story use. i). Space requirement criteria: Minimum telephone requirements. Back-up interior emergency lighting. Three separate sets of rest rooms, male and female, one meeting the needs of the handicapped General security requirements. Specific security requirements for food stamp distribution center. Window covering over exterior widows to allow both sunlight and energy control; if bidded space without existing windows, then all rooms comprising the exterior of the building would require windows measuring approximately 24 x 36, all secured and inoperable. Full Service including all utilities and janitorial. The evaluation factors and their relative weights were stated in the ITB as follows: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease Evaluated using present value methodology by application of the present value discount rate of 8.69 percent. (Weighting: 25) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 10) Associated moving costs, i.e., furniture, equipment, telephone systems, etc,. (Weighting: 5) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 10) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 10) Facility Susceptibility of design of the space offered to efficient layout and good utilization. (Weighting 15) Provision of the aggregate square footage in a single building. Proposals will be con- sidered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100 percent The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Sealed bids were submitted by three bidders, Petitioner, Harpaul S. Ohri and Kensington Gardens Builders Corp. The bids were opened on April 25, 1989, and Ernie Wilson, HRS District 7 Facilities Services Manager, determined that all three bids were responsive, and within the mandatory geographical area designated in the bid package. The District Administrator appointed a bid evaluation committee to review and grade, the responsive bids under the criteria established in the bid package, and to recommend to him the committees choice of the lowest and best bid. Four individuals who were familiar with the type of work to be done in the proposed space and familiar with the bid process were appointed to the Committee. On or about May 1, 1990 the bid evaluation committee determined that the bid of Harpaul S. Ohri was the "lowest and best bid" and submitted its determination, in writing, to the District Administrator who, subsequently approved the selection. On or about June 26, 1989, on behalf of the Department, Ernie Wilson, Facilities Services Manager, notified the bidders of the Departments intent to award the bid to Harpaul S. Ohri, as being in the best interest of the Department. The bid evaluation committee consisted of four representatives of the Department who visited two of the three bidders sites and questioned the bidders representatives. The members of the committee were familiar with the Petitioners site from previous experience. They choose not to make an on-site visit prior to completing the bid evaluation sheet, although instructed to do so on the Evaluation Committee Duties and Responsibilities/Real Property, Leasing instruction sheet. Each committee member completed an evaluation sheet and gave a higher total score to Mr. Ohri. The three major bid evaluation criteria were Fiscal Cost, Location and Facility. Under the Fiscal Cost criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioner received an average of 22.7 points out of 30 possible,, while Ohri received 21.7, and Kensington Gardens received 23.7 points. The points were individually assessed by the evaluation committee, after the rental rates were compared by Ernie Wilson based on the present value analysis of bidders proposed rates. For Renewal Rates, each of the bidders, including Petitioner, received 5 points out of 10 possible. The present value analysis was not applied, as was noted in the ITB. However, even a cursory examination of the renewal rates submitted by the bidders shows that there is a 15 percent to 33 percent yearly differential in the rates, with the Petitioners rates as the lowest and Kensington Gardens as the highest. Although the committee assigned all three bidders an equal rating, the renewal rates submitted by the bidders were not equal should the Department wish to exercise its options, the rates submitted by Petitioner were substantially lower than the other two bidders and would result in a cost savings to the Department of several hundred thousand of dollars. The award factor points should not have been awarded equally. For Moving Costs, Petitioner received 5 points on each of the committee members sheets, while Ohri received 4 points and Kensington Gardens received, an average of 3.7 points. The maximum points possible was 5 points. Petitioner was awarded the maximum points because HRS is presently in the same building and no moving costs would be experienced. The other two bidders were awarded 4 points each by committee members. That determination was based on each members personal experiences. No cost or time lost data was provided or requested. The LOCATION criterion also had three sub-categories: Proximity to other governmental agencies - 10 points - with all three bidders receiving the same rating; Public Transportation -10 points - with all three ,bidders, receiving the same rating; and Environmental Factors - 10 points - out of which Petitioner received an average of 5.7 points; Ohri - 9.7 points and Kensington Gardens - 6.5 points. In considering the proximity to other governmental agencies of each of the facilities being considered, the committee relied on their own knowledge of the area. They determined that since each was within the geographical area designated in the ITB, each was equally distant from the most frequently visited government agencies in the vicinity. However, Petitioners facility is the most centrally located of the three facilities offered, while the two other facilities were considerably distant from other government agencies. The award factor points should not have been awarded equally. For Public Transportation, the committee determined that local bus service went near each of the three facilities. They were neither provided, nor did they request, route maps, schedules or passenger capacity for buses servicing each facility. Petitioners facility is centralized in the area served within the bid district, and serviced by, numerous bus lines which pass near the facility ten times per hour. The bus service to the other two facilities are limited to four buses per hour, with buses having a smaller capacity. In addition, most clients would be required to travel to the central bus terminal and transfer to a different route in order, to reach the Ohri or Kensington Gardens facilities, making bus transportation a very time-consuming process. No other form of transportation is available, except for taxi service. In addition, in order for a client to walk from the nearest bus stop to the Ohri facility, a person would cross two heavily traveled six lane streets and then walk across an open shopping center parking lot. This would require approximately a fifteen minute walk. In order to reach Petitioners facility, a client would require approximately a five minute walk utilizing public sidewalks. The committee did not consider these facts in its evaluation. The award factor points should not have been awarded equally. (c)(1). For Environmental Factors, the committee considered each buildings physical characteristics and the surrounding area. The committee, in their letter to the District Administrator, dated May 1, 1989, identified this category as "a very critical area for the new lease." The letter also stated: "The committee took the following into account when evaluating this section: Cleanliness of the building aid surrounding areas. Lack of traffic congestion by motorized vehicles close to the facility. Easiness of getting to and from the facility by vehicle. Safety for clients and staff walking to and from the facility. Upkeep of the surrounding buildings or other sections of the bidders building." The following was also taken into account when evaluating this section, but was not so stated in the letter. At least one committee member believed the lack of window space in Petitioners facility was disabling to his bid, and that the willingness of the Ohri representative to install windows on exterior walls was a significant factor in her determination of award. At least one committee member indicated that future expansion was a substantial factor in her favoring the Ohri bid, and that there was janitorial and security problems at Petitioners facility. The committee received no other information other than the committee members opinion regarding the same. The committee as a whole erroneously believed that the extra square footage visible at the Ohri facility at the time of their inspection would necessarily be available to HRS if and when it might expand its offices. Future expansion was specifically removed from the ITB at the pre-bid conference and it was clearly erroneous for them to have included this factor in their bid evaluation. The ITB specifically calls for the installation of exterior windows by the winning bid prior to occupancy. However, none of the committee members reviewed the ITB or the actual bids submitted. They relied primarily on the synopsis of the bids prepared by Ernie Wilson. The ITB states substantial general and specific security requirements in detail; however, the evaluation criteria forms do not provide a category for evaluating security other than generally under the sub-category of environmental factors. The ITB, under General Specifications and Requirements, called for the availability of adequate dining facilities within two miles of the proposed facility. The evaluation criteria did not provide a category for the committee to rate dining facility availability. In consideration of the environmental factors, the committee overlooked or failed to consider a hazardous unfenced high voltage transmission station adjacent to the Ohri facility. In addition, the photographs submitted by Ohri as the front of the building (as required by the ITB) are in fact the rear of the building which was not offered as part of the proposed leased facility. Of the three sub-categories under FACILITY, out of 15 possible points, Petitioner received an average rating of 9.5, Ohri received an average of 13.7 and Kensington Gardens received 11.2 for Layout/Utilization. Ohri received the most points because his building configuration was a, shell and was more flexible and could be reconfigured for more efficient layout to suit the Departments needs. All three bidders submitted proposals wherein the total square footage of rentable space was to be contained in a Single Building. Therefore, all three bidders received the maximum 10 points. A maximum 5 points was provided for facilities with Street-level space. All three bidders were awarded the maximum 5 points. However, a portion of Petitioners space was offered on the second floor, a fact which the committee overlooked. The Petitioner should not have received the full 5 points for having street-level space. The unanimous recommendation of the evaluation was to award the lease to Ohri. In reaching that conclusion, the committee did not properly utilize the weighted bid criteria and, in addition, included improper bid considerations in their evaluation of the three facilities. Some of the reasons given by the committee for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. However, others were erroneous and improper.

Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a Final Order rejecting all bids for lease number 590:2069 and issue a new invitation to bid. DONE AND ENTERED this 12th day of February, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1990. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Proposed Findings of Fact submitted by the Petitioner: Accepted: paragraphs 1, 2, 3, 5, 6, 7, 9 (in substance, except for subparagraphs f, g, j and k which are not relevant), 10 (in substance), 12(a), (b), (f-in substance), (g-in substance), (h-in substance), (j), (k-in substance), (l-in substance), (p-in substance). Rejected: Not relevant: paragraphs 4, 12(c), (d), (e), (m), (n), (o), (p- the proposed future location of the Greyhound Station; insure wooded area nearby), (q), (r). Argument: paragraphs 11 and 13. Procedural matters, covered in the preliminary statement: paragraphs 8 and 14. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Terrence W. Ackert, Esquire 201 East Pine Street Suite 1402 Orlando, Florida James Sawyer, Jr., Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (4) 120.53120.57255.249255.25
# 5
WINKO-MATIC SIGNAL COMPANY vs. DEPARTMENT OF TRANSPORTATION, 84-002250 (1984)
Division of Administrative Hearings, Florida Number: 84-002250 Latest Update: Jan. 18, 1985

Findings Of Fact On March 1, 1984, Respondent gave notice to qualified contractors that it would receive sealed bids for State Project No. 72000-3541, referred to as Federal-Aid Project No. M 9041(10). This project involves the installation of a computerized traffic control system for the City of Jacksonville. In response to the opportunity to bid, the Department of Transportation received four bids. Petitioner, Winko-Matic Signal Company, was among the bidders. The other bidders were Georgia Electric Company, Traffic Control Devices, Inc., and Sperry Systems Management. The bids of Traffic Control Devices and Sperry Systems were rejected based upon an error in bid tabulations on the part of Traffic Control, a mistake on the quantities page, with the Sperry rejection being based upon a bid bond problem. Traffic Control had been the apparent low bidder with a bid of $1,964,115. Winko-Matic was the second apparent low bidder with a bid of $2,279,604.70. The Department of Transportation had estimated that the total cost of the Jacksonville project would be $ 2,024,680.61. Having discarded the bid of Traffic Control Devices, the Department of Transportation telegrammed Winko-Matic on April 4, 1984, advising Winko-Matic that it was the apparent low bidder for the Jacksonville project. Subsequently, the awards committee of the Department of Transportation met on April 18, 1984, and determined to reject all bids and re-advertise the job. In the course of this meeting the awards committee was told that there were erratic bids received on contract items, pointing to some perceived confusion among the contractors as to requirements of the contract. Discussion was also held on the possibility of establishing a pre-bid conference if the project was re advertised. The awards committee then voted to reject the bids on the basis that the apparent low bidder, Winko-Matic, had submitted a bid which-was 12.6 percent over the Department's estimate, instead of being within 7 percent of the Department of Transportation's pre-bid estimate, a point above which the Department of Transportation in its non-rule policy would call to question to the acceptability of the apparent low bid. In addition to deciding to reject all bids and re-advertise, it was determined that a pre-bid conference should be scheduled at least 30 days prior to the bid-letting date. Winko-Matic was advised that the Department of Transportation's decision to reject all bids by correspondence of May 4, 1984, in which it was indicated that all bids had been rejected based upon the fact that they were too high. In response to this notice of rejection, Winko-Matic, effective May 17, 1984, filed a written notice of protest. The case was subsequently referred to the Division of Administrative Hearings on June 20, 1984, and a final hearing date was established by Notice of Hearing of July 5, 1984. The hearing date in this cause was September 12, 1984. The Jacksonville project in question requires the utilization of what has been referred to "UTCS Enhanced" software. This software package is unique and has only been used in a limited number of locations within the country. Those locations are Los Angeles, California; San Diego, California; Broward County, Florida; and Birmingham, Alabama. Another unique feature within the project design is the use of an associated coaxial computer sys gem. Given the unique nature of this project and the fact that the Department of Transportation had never advertised for bids related to UTCS software, Department of Transportation obtained assistance from a consulting firm, Harland, Bartholomew & Associates. In fulfilling its function Harland gave estimates to include an estimate related to the projected cost of the software, Item 681-102. The Harland estimate for the overall project was $2,143,130 including a $100,000 estimate for the software system. That estimate relating to the software was subsequently adjusted by the Department of Transportation to depict a cost of $13,780. The Department of Transportation estimate was based upon information within its computer related to a system unlike the enhanced software contemplated by the plans and specifications. In other words, the stored information in the Department of Transportation computer was not the same as contemplated by the plans and specifications in the Jacksonville project. Moreover, the initial estimate of Harland was based upon the idea of an extended software system, as opposed to an enhanced software system. Winko-Matic had bid $389,500 for the software in Item 681-102. That estimate was premised upon figures obtained from JHK and Associates, the group which Winko-Matic intended to use as its subcontractor for the enhanced software portion of the project. JHK developed the software and was responsible for systems integration of the Los Angeles, California, project, one of the locations in which UTCS enhanced software has been utilized. JHK premised its estimate for the software hare upon experience in Los Angeles and an evaluation of the tasks to be performed related to the enhanced software. This included general software development activities, hardware innovation, installation costs during the period of acceptance and testing, and the preparation of data base. The JHK bid price was $339,500. Another $50,000 was added to that price related to what the Petitioner describes as its management costs for that item. By June 20, 1984, when a further meeting was held by the awards committee on the subject of the Jacksonville project, it was concluded that the estimate made by the Department of Transportation of $13,780 was not correct, on the topic of the enhanced software. A more reasonable estimate, according to the information imparted in this session, would be $200,000 for enhanced software as called for in this project, with a $100,000 amount being a reasonable estimate had they chosen to use extended software. Adjusting the initial price related to the UTCS enhanced software to reflect a corrected estimate of the Department of Transportation in its original advertised bid, that estimate becomes $2,210,900.61 and its consultant Harland's estimate becomes $2,243,130. With this adjustment, the differential in the estimate made by the Department of Transportation and the Petitioner approaches 3 percent and not the 12.6 percent originally found. The 3 percent is below the threshold of 7 percent used as the policy for determining whether a bid might be rejected as being far beyond the acceptable limits set forth in the Department of Transportation's estimate. In the aforementioned June 20, 1984, awards committee meeting, the Department of Transportation continued to hold the opinion that all bids in the Jacksonville project should be rejected and the matter re-advertised. Although the problem pertaining to the estimate of the cost of the enhanced software package had been addressed, the committee continued to feel that the prices received in the bid letting were erratic Reference was also made to revisions or modifications to the project plan which would be offered if the matter were re- advertised. It was also pointed out that the Federal Highway Administration would concur in the Department's decision to reject all bids and would accept modifications. The awards committee again voted to reject the bids. The matter was again considered by the awards committee on August 31, 1984. On that occasion, it was pointed out that the revisions contemplated by the Department of Transportation, should the matter be re-advertised, would not affect in a substantial way the cost estimate for the project with the exception of Item 680-101, the system control equipment (CPU), which would promote a lower price for the project. The committee determined in the August, 1984, meeting to reject all bids and re-advertise. While the initial notice of rejection of May 4, 1984, had suggested the basis for rejection as being the fact that Petitioner's bid far exceeded the 7 percent allowance for price above the Department of Transportation's estimate of costs, the meetings of the awards committee and the suggestion of the Respondent in the course of the final hearing in this case indicated that there were other reasons for the decision to reject. Those Were: (a) an apparent lack of clarity among bidders regarding specifications for the Jacksonville job, (b) the desire of the Respondent to revise specifications on the Jacksonville project; and (c) a lack of sufficient competition in the bids. In connection with the first of the additional reasons Respondent suggests that variations within the bid responses related to particular line items within the specifications point out a lack of clarity in the project's specifications or confusion by bidders related to those specifications. Respondent did not bring forth any of the bidders who might speak to the matter of possible confusion or misunderstanding concerning some of the bid items. By contrast, the Petitioner's president; the president of JHK & Associates and James Robinson, Harland's project manager for the Jacksonville job, did not find the specifications in the original documents to be confusing. In addition, the testimony of those individuals established the fact that bid variations related to particular line items are not extraordinary and do not establish any apparent confusion by the bidders as to the requirements of those line items. In effect, what the differentials demonstrate are variations related to the manufacture or in-house capabilities of the bidders and an effort to allocate discretionary costs in various places as to line items. Moreover, they might indicate last- minute adjustments in the bid quote prior to the opening and a possible effort by a contractor to enter into a new job market. Finally, they demonstrate offsetting which is the allocation of item prices by a contractor to maximize profits. To do this, a contractor submits high bids on items representing quantities which the contractor feels will increase after the contract is awarded and submits low bids on items representing quantities which are not likely to change. In summary, while the Department of Transportation in its presentation expressed some concern about the variations in the pricing in the bid quotations offered by the respective bidders in this project, its suspicions on the question of the possible clarity of its specifications were not confirmed and are not convincing. On the topic of revisions which the Department of Transportation would offer if the matter were re-advertised, with one exception those matters appear to be items that could be attended through change orders or supplemental agreements. They are not matters which necessarily must be addressed through a rejection of all bids and a re-advertising of the project. The lone exception to this is the possibility that the Department of Transportation may not be able to protect its proprietary rights in the enhanced software which is being developed for the project, under the terms of the present bid documents. Given that uncertainty, the Respondent would wish to re-advertise the project and make certain that its proprietary interests are protected. Finally, Respondent has alluded to the fact that the Jacksonville project should be re-advertised in view of the lack of competition in the initial letting. Only four bidders expressed an interest in this project at the time of the first letting. Of those, two bidders were found to be responsive. While this is a low number of bidders, there does not appear to be any agency practice on the part of' the Department of Transportation to the effect that this number of bidders would not be accepted. Moreover, no indication has been given that should the matter be re-advertised a greater number of bidders would express an interest than was the case in the first letting. Consequently, this reason for bid rejection is not acceptable. If Respondent did not reject the bids and re-advertise the project, Winko-Matic would be the successful bidder in the Jacksonville project.

Florida Laws (3) 120.53120.57337.11
# 6
TOWNSEND SHEFFIELD AND UNDERWOOD VENTURES vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES AND DEPARTMENT OF GENERAL SERVICES, 84-000402 (1984)
Division of Administrative Hearings, Florida Number: 84-000402 Latest Update: Sep. 05, 1984

Findings Of Fact This case concerns what is called a "turnkey lease." The program was developed by the State of Florida in 1971. It encompasses a situation whereby agencies seeking space for their operation may, after a specific need is determined that cannot be filled by existing adequate space, solicit competitive bids from developers for the provision of land and the construction of a building there sufficient to meet the agency's needs, for lease specifically to the agency requesting it. The Bureau of Property Management within DGS was given the initial responsibility to develop the guidelines, promulgate the rules, and seek statutory authority for such a program. The Bureau's current role is to work with agencies requesting this program. The agency certifies the need to the Bureau, in addition to the fact that there is no available existing space present. The Bureau then determines agency needs and gives the agency the authority to solicit the bids for the turnkey project. Once the bids have been solicited and the preproposal conferences have been held, the bids are then received, evaluated, and a recommendation for an award is forwarded by the agency to the Department of General Services. DGS reviews the supporting documents required by the provisions of the Florida Administrative Code and either concurs or does not concur in the recommendation. If DGS concurs, the submitting agency is notified and is permitted to then secure the lease. Once the lease has been entered into, it is then sent back to DGS for review and approval, as to the conditions, and thereafter the plans and specifications for the building are also referred to DGS for review and approval as to the quality and adequacy of the plans and specifications and code compliance. Section 255.249 and Section 255.25, Florida Statutes, sets forth the requirement for soliciting and awarding bids for lease space in an amount in excess of 2500 square feet. This provision requires that an award of this nature be made to the lowest and best bidder, and DGS subscribes to that standard in evaluating and determining whether or not it will concur with an agency's recommendation. In the instant case, DHRS advertised for bids for the construction of office space in Palatka, Florida for its District III facilities. Before seeking to solicit bids, District III staff conducted a search for other possible existing space within a five mile radius of the downtown area and located no adequate facilities. Thereafter, a certification of need was processed for a solicitation of proposals and approval was granted by DGS to follow through with the solicitation. A preproposal conference was advertised and held on October 14, 1983 and after review by those present at the conference, bid opening date was set for November 22, 1983. Thirty-two bid packages were distributed and twelve bidders submitted proposals. The public bid opening was held as scheduled at 2:00 P.M. on November 22, 1983, in Palatka, Florida by Robert E. Litza, Facilities Service Coordinator for DHRS District III. Of the bids submitted by the twelve bidders, the lowest bid was rejected because of the failure of the bidder to comply with the requirements of the bid package. Of the remaining eleven bids, the four lowest were evaluated with the understanding that additional high bids would be evaluated if the four lowest were found to be unacceptable. Among the four bids considered were bids of Chuck Bundschu, Inc.; Kenneth McGunn, the Intervenor (Mr. McGunn submitted five price schedules for his bid and of these only one was considered); Elizabethan Development, Inc.; and TSU. A recommendation by the evaluation committee which met at DHRS District III that Intervenor's bid be selected was forwarded to DGS in Tallahassee through the Director of DHRS's General Services in Tallahassee on December 22, 1983. The terms of the successful bid and the reasons for its being considered lowest and best are discussed below. The successful bid for the lease in question, lease number 590:8030, was, upon completion of the committee's evaluation, also evaluated by Mrs. Goodman in the Bureau of Property Management of DGS. She also considered the McGunn bid as the lowest and best of the eleven non-disqualified bids. In that regard, not only Mr. McGunn's bid but all of the twelve bids received were considered and reviewed not only at the local level but at DHRS and DGS Headquarters as well. In her evaluation of the proposal and the bids, Mrs. Goodman considered the documentation submitted by DHRS. This included a letter of recommendation supported by a synopsis of all proposals, the advertisements for bids, and any information pertinent to the site selection process. The letter from DHRS dated December 22, 1983, which recommended award of the lease to Mr. McGunn, included Mr. Litza's December 21, 1983 analysis and recommendation letter which, itself, was attached to McGunn's primary bid documents. Her analysis did not include a prior award recommendation and analysis from Mr. Litza, dated December 8, 1983. It also did not include the site plan, the floor plan for the proposed building, or a survey of the site, but these areas are considered to be within the discretion of the leasing agency. Their absence is not considered to be particularly significant. In her analysis, Mrs. Goodman found that Petitioner's bid was also responsive. However, comparing it with Mr. McGunn's bid, she and her staff found that the latter was the lowest bid submitted. The determing factor in her decision was cost. In determining that McGunn's bid was the lowest as to cost of all bids, Mrs. Goodman compared the average rate per square foot per year for each. This did not take into consideration proration of costs per year, but strictly the average over the fifteen years of the term of the lease (10 year basic plus 5 year option) . According to Mrs. Goodman, this same method of calculating cost has been used in every lease involving a turnkey situation and in fact in every lease since 1958 - as long as she has been with DGS. This particular method, admittedly, is not set forth in any rule promulgated by DGS. However, the agencies are instructed by DGS to advertise and bidders to bid on an average square foot basis, the basis utilized by Mrs. Goodman and her staff in analyzing the bids submitted. In that regard, the request for proposals does not, itself, indicate how the calculation of lowest cost would be made by DHRS and DGS but it does tell prospective bidders what information to submit. This procedure has been followed exclusively in situations like this for many years and many of the bidders have bid before using this same system. While Mrs. Goodman is not certain whether TSU has ever bid before, using this system, she does not consider it to be unfair because all bidders are considered on the same footing in an evaluation. They are notified of what information to submit and if they do so, their information will be considered along with all other bidders. Further, anyone who inquires as to the basis for evaluation will be given a straight and complete answer as to the method to be used. In the instant case, DHRS followed procedure for solicitation and evaluation utilized in the past and DGS followed its own policy in evaluating the submissions. In short, the primary consideration for DGS is the price factor and all other factors are considered to be within the expertise of the requesting agency. In Mrs. Goodman's opinion, based on the fact that she worked with the Florida Legislature on the development of the controlling statute, and helped develop the existing rule within DGS, that was the intent of the Legislature. Consequently since the statute requires award to the lowest and best bidder, it can be said that in this case the term "lowest" falls within the purview of both DHRS and DGS but "best" is solely within the purview of DHRS. Therefore, utilizing the lowest and best criteria and accepting the fact that the lowest bid may not be the best bid, the determination of "non-best" should be based on the reasonable "end objective" of the agency and need not be based on a criterion which is set forth in the bid proposal. In other words, it is not necessary for the agency to set forth the manner of evaluation it will use or the factors it will consider, according to Mrs. Goodman. With regard to the bid and evaluation committee process, Mr. Litza, the facilities manager for DHRS in Gainesville, was involved in putting together the bid package along with Mr. George Smith from Tallahassee, Litza's predecessor in the job in Gainesville. He worked with Mr. Smith in order to take advantage of Smith's experience in evaluating bids for leases. So far as he knew, the bid package contained minimum standards for all parts of the bid, and the package was, in fact, approved by officials in Tallahassee before being released. While no particular factors were identified to prospective bidders as being significant, Mr. Litza did conduct a bid conference for them prior to the date the bid was due and was available to answer any questions that prospective bidders might have. He did not receive any questions regarding the significance of any particular factor from any bidder. The bids were advertised and when received, were opened and read properly in accordance with the terms of the solicitation. When the bids were received and opened, it was seen that Mr. McGunn had submitted five different bids for the same project. Litza had not been confronted with this situation before and asked Mr. Smith what to do about it. Mr. Smith's reply was to put all five McGunn bids in with the rest and extract the lowest five of all bids. When this was done, Mr. McGunn was shown to have submitted two of the lowest five bids. In determining which were the lowest five bids, Mr. Litza utilized the average cost per square foot formula utilizing therein the entire 15,772 square feet authorized for the project. Once the five lowest bids were determined, Mr. Litza selected an evaluation committee made up of local Palatka DHRS supervisors except for the fiscal member, Mr. Foust, Mrs. Shinholster, Litza's secretary and Litza himself. He gave each of the members a score sheet with point values for each area. Each member filled out the form independently. Though he gave very little briefing to the evaluation committee, he admits that he did, in advance, tell each member that Mr. McGunn was the lowest bidder and should be awarded the highest points for criteria number 1, which related to cost. There were several irregularities in Mr. Litza's processing of the evaluation committee's results. For example, on the evaluation of the file conducted by member Sheryl Dollar, regarding criteria number 2, which relates to the conformity of space offered to the specific requirements contained in the invitation to bid (with a weight of 25 points), Mr. Litza admitted he lowered Mrs. Dollar's point award in that area from 35 to 25 without first checking with her to insure that his action would meet with her approval. While this is irregular, it is of little or no consequence since - the maximum number of points that could be given for that particular item was 25 and Mr. Litza's actions did not reduce that member's award to less than the maximum allowable. He contends that his action was based on what he considered to be a mistake on her part. In another apparent irregularity, Mr. Litza prepared a recommendation letter based on his and the other committee members' evaluation of the files to DHRS Headquarters in Tallahassee on December 8, 1983. In that letter, be indicated that McGunn would provide gas heat for the proposed building for free. Though McGunn had not specifically stated this, he implied it from the energy features paragraph in the Intervenor's bid. On the other hand, the bid by TSU contained an express comment offering to pay the utility charges. This specific provision was overlooked and omitted from the evaluation and report to Tallahassee by Litza, who contends that this omission was merely an oversight. There are other discrepancies as well. In his testimony, Mr. Litza indicated Mr. McGunn proposed to build one building but his letter of December 8th and that of December 21, 1984, both reflect two buildings. Here again, Mr. Litza explains this as the result of his being confused. Nonetheless, this erroneous information was referred to Mrs. Goodman at DGS. This is significant in that at the evaluation committee meeting, when the forms were given out, several of the members expressed a preference for a two-building complex. After the award, Mr. Litza secured agreement from McGunn to build two buildings. Mr. Litza admits that much of this was done in an attempt to insure that McGunn, as the low bidder, got the award. Mr. Litza equated the lowest bid with the best and had Petitioner been the low bidder, he contends he would have done the same thing. In most areas, he would not, however, have given Petitioner's four-building concept a high score because of the increased heat and air requirements of four buildings. Mr. Litza also downgraded Petitioner on that bid criteria which relates to the proximity of offered space to the clients to be served because Petitioner's site, he contends, was too close to the clients to be served. In this case, a housing project for low income families which make up much of the clientele to be served by DHRS, was located across the street from the proposed site offered by the Petitioner. Mr. Litza contends that he was thinking of the potential damage to the building because of increased activity by virtue of the facility being so close. There were other questionable areas in Mr. Litza's testimony. For example, he testified that though Petitioner provided 15 more parking spaces than Intervenor, this would result in mud being tracked in from the adjacent dirt road 200 feet away in greater quantities than in Intervenor's proposal. He also considered positively that the Intervenor's proposed site was closer to a restaurant than that of the Petitioner. Though it was recommended by DHRS Headquarters in Tallahassee that only two of the committee members be from the Palatka office, Mr. Litza disregarded that advice because, he contends, there was a morale factor in that office and the people assigned there wanted to have a part in this decision. Because of this, he allowed Ms. Stouffenberg to put five extra members of her staff on the committee. Nonetheless, the evaluation committee serves only in an advisory capacity. Its recommendation is no more than an advisory opinion. The ultimate decision as to which of the bidders should be awarded the contract is made at DHRS Headquarters in Tallahassee. Ms. Shinholster, a Clerk IV in the DHRS Gainesville office, who works as a secretary to Mr. Litza and several others, was advised she would be on the committee for the evaluation at the same time she was given the bid file. She did not get an opportunity to meet with other committee members to talk about the standards to be used, nor was she given any standards by which to evaluate the files. All she was told by Mr. Litza was that McGunn was the lowest bidder. She cannot explain how she accorded points on her evaluation sheets except that she gave the low bidder the highest number of points. Mr. George Smith, a Senior Analyst with DHRS in Tallahassee, relied on Mr. Litza's input when he made his recommendation to his superiors that the award should be made to McGunn. He also formulated his own opinion, based on his own analysis of the bids. He resolved any dispute regarding cost in favor of Mr. McGunn on the basis of the average rental, and regarding space, in favor of McGunn on the basis of the number of buildings. Dr. Perry, an economist with the University of North Florida, testified to the Federal Government's policy regarding the desirability of using the present value of money methodology and the determination of an acceptable discount rate or index in calculating the actual cost of the bids. Both experts, Dr. Perry and Dr. Scott, who testified for DGS, agree that the present value methodology is valid and presents a more accurate analysis of cost than the average rental cost methodology which does not utilize this theory. The major difference between the two was primarily in the percentage to be utilized in applying the discount rate. Whereas Dr. Perry adopted the Federal policy and suggested a 10 percent discount rate, Dr. Scott testified that a more viable percentage rate in November, 1983, at the time the award was to be made, would have been 3.3 percent. If the 10 percent rate were used, then the Petitioner's bid would be the lowest of all submitted. On the other hand, if the 3.3 percent rate were used, Intervenor's bid would be the lowest. If a different discount rate, that of 5.7 percent were to he used, the bid of Elizabethan Development Corporation would be low. It is at about the 6 percent point and above that Petitioner's bid becomes the lowest. Nonetheless, the State has not adopted the present value of money theory and the policy followed by the State is not to consider that methodology in analyzing costs. State policy is to use only the average rental methodology. There are no written instructions (rules) on evaluating bids for leases of this nature. Oral instructions given by DGS to each agency are that the average rate per square foot is to be computed using, if the square footage is constant, for each year of the lease, the basic square footage requested, multiplied by the rental rate proposed for each year of the basic lease, divided by the number of years. If the square footage is not constant in every year of the lease, evaluators are directed to apply the rate per square foot proposed in each year to the square footage to be utilized in that year, total up the annual rentals, total up the square footage involved, and divide to arrive at the average rate per square foot per year. Utilizing one or the other of those two methods in evaluating both the McGunn and the TSU bids, it becomes clear that the McGunn bid results in an average of $8.86 cost per square foot per year and the TSU bid an average of $9.58 per square foot per year. Recalculation of DHRS' evaluation by DGS showed the DHRS' figures as stated above were correctly arrived at. This procedure is followed on all turnkey and non-turnkey leases in the State of Florida. The reason the State uses this process instead of the present value of money process is because it is easy. DGS statistics indicate that most landlords in the approximately $32,000,000 worth of leases presently existing with the State are "Mom and Pop" landlords. These people are not normally trained lease evaluators. By using the straight average rental rate method, there are no arbitrary variables. It has always worked because people can understand it and all agencies which lease property in the State of Florida follow this procedure. Also, this procedure does not require computer-based calculations, and it does not require economists to work with it. Both latter reasons are amplifications of the first. In Mrs. Goodman's estimation, if the present value of money system were to be adopted, her division would have to hire at least two $30,000 per year economists and buy an in-house computer to operate the system. This additional cost, she believes, would far outweigh the paper savings to be realized by utilizing the present value of money system. As of the hearing date, considering all the factors, in Mrs. Goodman's opinion, DGS would nonetheless still recommend Mr. McGunn's bid as the lowest and best bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore RECOMMENDED that DHRS lease Number 590:8030 be awarded to Kenneth R. McGunn. RECOMMENDED this 5th day of September, 1984, in Tallahassee, Leon County, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of September, 1984. COPIES FURNISHED: Donald E. Holmes, Esquire William E. Townsend, Jr., Esquire Post Office Drawer D Palatka, Florida 32078-0019 James A. Sawyer, Jr., Esquire District III Legal Counsel Department of Health and Rehabilitative Services 1000 Northeast 16th Avenue Gainesville, Florida 32609 Stephen J. Kubik, Esquire Department of General Services Room 452, Larson Building Tallahassee, Florida 32301 H. Allen Poll, Esquire 112 South Main Street Gainesville, Florida 32601 Linda C. McGurn, Esquire 1717 Northeast 9th Avenue Gainesville, Florida 32301 David H. Pingree, Secretary Department of Health and Rehabilitative Services 1321 Winewood Boulevard Tallahassee, Florida 32301 Ronald W. Thomas, Executive Director Department of General Services 115 Larson Building Tallahassee, Florida 32301

Florida Laws (3) 216.311255.249255.25
# 7
HURST AWNING COMPANY, INC. vs DEPARTMENT OF TRANSPORTATION, 94-002297BID (1994)
Division of Administrative Hearings, Florida Filed:Miami, Florida Apr. 27, 1994 Number: 94-002297BID Latest Update: Jun. 24, 1994

Findings Of Fact Based upon the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made: In January of 1994, FDOT issued an Invitation to Bid ("ITB") for contracts FE2494Z1 and FE2494Z2 to provide storm shutters for the FDOT facilities in Zones 1 and 2 of the Florida Turnpike. The ITB was entitled "Storm Shutters, Removable, Manufacture, Furnish and Install." Prospective bidders for the contracts were provided with a packet which included General Conditions, Special Conditions, Specifications and General Special Provisions. The General Conditions set forth the procedures for submitting and opening the bids. The Specifications called for custom-sized removable storm shutters and detailed the materials and installation procedures that were required. The bid package contained the following pertinent language in the Special Conditions, Section 1.0, entitled "Description", and in the Specifications, Section 1.0, entitled "Scope of Work": Work under this contract consists of providing all labor, materials, equipment, tools and incidentals necessary to manufacture, furnish and install galvanized steel storm panels and accessories for all of Zone 1 & Zone 2 buildings and locations as identified in the building listing listings document, see Exhibit "A" Zone 1 & Exhibit "A" Zone 2. The bid package contained the following pertinent language in Special Conditions Section 8.1, entitled "Required Documents": Bidders are required to complete and return the State of Florida "Invitation to Bid" form as well as the bid sheet(s). These forms must be signed by a representative who is authorized to contractually bind the bidder. All bid sheets and the "Invitation to Bid" form must be executed and submitted in a sealed envelope. At a mandatory pre-bid conference on February 17, 1994, the Department's representatives were available to answer questions regarding the bid package. During the pre-bid conference, John Vecchio of the Department orally advised the prospective bidders that they should return the whole bid package, including the specifications, when they submitted their bid. No written amendment to this effect was issued. The bids were opened on March 3, 1994 in Fort Lauderdale. Bids were received for each contract from at least three bidders, including Accurate and Hurst. The apparent low bidder for both contracts was Broward Hurricane Panel Co. ("Broward"). Prior to the bids being posted on March 28, 1994, Broward's bid was determined to be nonresponsive and Broward was therefore disqualified. After Broward was disqualified, Accurate was the apparent low qualified bidder for Zone 2 and Hurst was the apparent low qualified bidder for Zone 1. Hurst's bid for the contract for Zone 2 was $85,000. Its bid for the Contract for Zone 1 was $36,000. Accurate's bids for the contracts were $84,854.82 and $36,287.16, respectively. Hurst was awarded the contract for Zone 1 and that decision has not been challenged. At the same time the Department announced the award of the Contract for Zone 1 to Hurst, the Department announced its intent to award the contract for Zone 2 to Accurate. Hurst timely filed a notice of protest and a formal written protest of the proposed award of the contract for Zone 2 to Accurate. Initially, FDOT raised as a defense that Hurst had not posted a protest bond as required by Section 287.042(2)(c), Florida Statutes. At the hearing in this matter, FDOT conceded that Hurst had subsequently posted a protest bond which had been accepted by FDOT. Hurst contends that Accurate's bid should have been deemed nonresponsive because Accurate does not have the ability to "manufacture" the specified product in its own facility. The 2 inch corrugated shutter required by the ITB has to be shaped on a special type of machine that rolls, presses and forms the metal. Hurst owns and maintains at its Opa-Locka facility a rolling mill capable of forming the panels to the bid specifications. Accurate is in the business of supplying the types of products sought by the ITB in this case. However, Accurate does not own the kind of machine necessary to shape the metal. The evidence established that for many years, Accurate has had a continuing business relationship with a local subcontractor, Shutter Express, that rolls, presses and forms raw material supplied by Accurate in accordance with Accurate's specifications. Shutter Express has the capability of fabricating shutters with a 2 inch corrugation in accordance with the ITB. Accurate is equipped to attach the headers and sills, drill the necessary holes, complete the assembly and install the final product. The ITB in this case did not preclude subcontracting any or all of the work specified. While the description of the work in the ITB includes the term "manufacture", this reference should not be read to mean that only those companies that were able to fabricate the entire product at their own facility could properly respond to the ITB. There is no logical justification for such a narrow interpretation. Only a few companies have the ability to completely fabricate the shutters on their own property. At the prebid conference, there was discussion amongst the prospective bidders about subcontracting the fabrication work and the FDOT representatives did not raise any objections to such an arrangement. It was widely understood by the parties present at the pre-bid conference that the Department was not interpreting the ITB in the restrictive manner now urged by Hurst. Such a reading of the ITB would have precluded from the bidding process a number of companies such as Accurate that routinely supply and install shutters. Hurst also contends that the bid proposal submitted by Accurate should be deemed nonresponsive because Accurate failed to include the entire ITB with its proposal in accordance with the oral instructions at the pre-bid conference. Hurst's proposals included the entire ITB. As discussed below, Accurate's proposal did not include the entire ITB. FDOT determined that all essential pages were included in Accurate's response and the evidence did not establish that this conclusion was arbitrary, capricious or fraudulent. Paragraph 6 of the General Conditions of the ITB provided: ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and affect and are inapplicable to the bid. As noted above, at the prebid conference held on February 17, 1994, an FDOT employee told all prospective bidders to return the entire bid package when making their submittals. This request that the entire bid package be returned was simply meant as a protection for the bidder to ensure that all the necessary documents referenced in Section 8.1 of the Specifications were submitted. Other than those documents referenced in Section 8.1 of the Specifications, FDOT had no interest in having the remaining portion of the ITB submitted with a proposal. Accurate's submittal contained every document required by Section 8.1 of the Specifications. Accurate's proposal did not contain pages 3 through 12, 14, 15 and 17 through 20 of the ITB, but did include pages 1 and 2, 13, 16, 21 and 22 along with a signed Form PUR 7068 and a signed acknowledgment of Addendum In other words, the submittal contained a signed and completed Bidder Acknowledgment, completed Bid Price Forms for Zones 1 and 2, a signed copy of Addendum #1, a completed copy of the Ordering Instructions, and a signed, but not notarized, statement regarding public entity crimes. 1/ In addition to the "REQUIRED DOCUMENTS," set forth in Section 8.1 of the Specifications and quoted in Findings of Fact 6 above, the ITB included Section 8.2, "PUBLIC ENTITY CRIMES STATEMENT" which provides: Any person submitting a bid or proposal in response to this invitation should execute the enclosed form PUR 7068, SWORN STATEMENT UNDER SECTION 287.133(A), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES, including proper check(s) provided, and submit it with the bid/proposal or within 72 hours of the bid opening. Page 7 of the ITB provided in pertinent part: 10.0 BID PREFERENCE IDENTICAL TIE BIDS - Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quality and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certifies that it had implemented a drug-free workplace program shall be given preference in the award process. . . . Accurate's proposal did not include a certification that it was a drug-free workplace in accordance with this provision. However, such a certification is only used by the Department as a tie-breaker. In other words, in the event of identical bids, any firm with a drug-free workplace would get preference. Since there were no tied bids in this case, certification was totally irrelevant. When the bids were opened, Mary Bailey, the contracts administrator for the Department, noticed that Accurate's submittal was thinner than the others and asked Accurate's representative, Richard Johnson, about the remaining pages. Mr. Johnson replied that the other pages were in his truck and offered to retrieve them. Ms. Bailey told him there was no need to do so. Section 10 of the General Conditions in the bid package provides as follows: As the best interest of the State may require, the right is reserved...to reject any and all bids or waive any minor irregularity or technicality in bids received... It does not appear that Accurate has obtained any competitive advantage as a result of its failure to include the entire ITB with its bid proposals. Even if the oral instructions at the pre-bid conference are deemed to have modified the ITB so that the entire bid package should have been submitted, Accurate's failure to include the entire ITB with its response should be considered a minor technicality, pursuant to Section 10 of the General Conditions cited above, that can and should be waived in evaluating the responsiveness of the bid. Similarly, the failure to have the Form PUR 7068 notarized may have rendered Accurate's bid proposals incomplete, but not necessarily nonresponsive. This oversight can be easily corrected without giving Accurate a competitive advantage.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered finding the bid submitted by Accurate to be responsive and dismissing the challenge filed by Hurst. DONE and ENTERED this 24th day of June 1994, at Tallahassee, Florida. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of June 1994.

Florida Laws (8) 120.53120.57287.042287.087287.133287.16337.02337.11 Florida Administrative Code (2) 60A-1.00160A-1.002
# 8
THE HARTER GROUP vs PINELLAS COUNTY SCHOOL BOARD, 90-003261BID (1990)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida May 25, 1990 Number: 90-003261BID Latest Update: Jul. 17, 1990

Findings Of Fact In order to meet its need for new equipment in the new district administration building, the School Board advertised for competitive bid proposals for clerical, professional task, guest and conference chairs (task seating). Five bids were timely received by the School Board, two of which were determined to be responsive. The bid opening occurred on April 17 1990, and the Knoll Source was determined to be the lowest responsive bidder. In spite of this determination, the bid was rejected by the Director of Purchasing or the appointed designee because sales tax was not included in the bid. The Notice of Award was issued to Haworth, who submitted its bid showing the price it was willing to accept for the sale of the task seating, with and without sales tax. The initial decision to reject the Knoll Source bid, which was $10,393.72 less than Haworth in Sequence I; $12,231.94 less in Sequence II; and $994.17 less in Sequence III, was based upon Section 9.2.2.a in the "Instructions to Interior Bidders". This section of the bid documents provided that the contract for purchase of the task seating would not be exempt from sales tax. This bid specification is incorrect because the School Board does not pay sales tax on acquisitions of furnishings for the Pinellas County School System. Knoll Source was aware of the School Board's sales tax exemption prior to its bid submission. As Section 9.2.2.a of the instructions was inappropriate, the vendor relied on Section 9.2.2.c, and excluded sales tax from the bid because the cost of such tax was not applicable. Section 9.2.2.c instructed bidders to exclude inapplicable taxes from their bids. Pursuant to Section 5.3.1 of the bid instructions, the School Board has the right to waive any irregularity in any bid received and to accept the bid which, in the Board's judgment, is in its own best interest. The Knoll Source and Haworth bids can be comparatively reviewed, and Knoll Source is the lowest responsive bidder if the failure to include sales tax in the bid amount is waived by the School Board. It is in the Board's best interest to waive Knoll Source's failure to include a sales tax in the bid because sales tax does not apply to this purchase.

Florida Laws (2) 120.53120.57
# 9
SWEEPING CORPORATION OF AMERICA, INC. vs DEPARTMENT OF TRANSPORTATION, 91-008230BID (1991)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Dec. 26, 1991 Number: 91-008230BID Latest Update: May 01, 1992

Findings Of Fact Based upon the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made. On October 11, 1991, DOT's District Four office let out for bid district contracts E4551 and E4554. Contract E4551 calls for the mechanical sweeping of Interstate 95 in Broward County. Contract E4554 calls for the mechanical sweeping of Interstate 95 in Palm Beach County. At a mandatory pre-bid conference, the bidders for the Contracts were provided with a packet which included a Notice to Contractors and Standard Specifications. The Notice to Contractors is a four page document which is specific to each contract. The Standard Specifications are the same for all district contracts. Both the Notice to Contractors and the Standard Specifications to the bidders required bidders to submit proof of the ability to acquire a performance and payment bond in an amount equal to the contract bid price. Bidders could satisfy this requirement by submitting a bid guarantee of 5% of the bid, submitting a notarized letter of intent from a bonding company or by providing a Certificate of Qualification issued by Respondent. The Notice to Contractors for both Contracts provided as follows: Failure to provide the following with each bid proposal will result in rejection of the contractor's bid.... District contracts of $150,000 or less require the following as proof of ability to acquire a performance and payment bond: A notarized letter from a bonding company, bank or other financial institution stating that they intend to issue a performance and payment bond in the amount of your bid, should your firm be awarded the project; in lieu of a notarized letter the following may be substituted: (1) a bid guarantee of five percent (5%); or (2) a copy of the Contractor's Certificate of Qualification issued by the Department. (No emphasis added) Similarly, the first Standard Specification provides: 1.1 Bidders (contractors) A contractor shall be eligible to bid on this contract if:... (2) Proof of ability to acquire a performance and payment bond in an amount equal to the contract bid price is provided to the District Contract Administrator with the bid proposal. As such proof all bids must be accompanied by a notarized letter from a bonding company, bank or other financial institution stating that they intend to issue a bond in the amount of your bid, should your firm be awarded the project.... The requirement to submit proof of the ability to acquire a performance and payment bond has been imposed on the Districts by DOT Directive 375-00-001-a (hereinafter the "Directive".) This Directive was in place at all times material to this proceeding. Section 3.2.2 of the Directive provides: A contractor shall be eligible to bid if: ...Proof of ability to acquire a performance and payment bond in an amount equal to the contract bid price is provided to the minicontract administrator with the bid proposal. As such proof all bids must be accompanied by a notarized letter from a bonding company, bank or other financial institution stating that they intend to issue a bond in the amount of the bid, should the firm be awarded the project. A bid guaranty as specified above may substitute as proof of ability to obtain a performance and payment bond. This applies to bids amount over or under $150,000. A copy of the Contractor's Certificate of Qualification issued by the Department may be substituted in lieu of a notarized letter for those contracts not requiring a bid bond. The bids for the Contracts were opened on October 11, 1991 in Fort Lauderdale, Florida. Bids were received from four bidders: CPM, SCA, Florida Sweeping, Inc. and P. F. Gomez Construction Co., Inc. In its bid proposals, SCA included executed bid bonds in an amount sufficient to cover the amount of each bid proposal. Each bid bond cost $55.00. CPM did not submit executed bid bonds with its proposals. Instead, CPM submitted letters from Mark A. Latini dated September 25, 1991. Those letters were provided on the stationery of Bonina-McCutchen-Bradshaw, Insurance and indicate that Mr. Latini is the "bond manager." The letters provide as follows: Amwest Surety Insurance Company is the surety for the above-referenced contractor and stands ready to provide the necessary performance and payment bond for the referenced bid should Certified Property Maintenance, Inc., be low and awarded the referenced contract. All bonds are subject to normal underwriting requirements at the time of the bond request.... The letters submitted by CPM with its bid proposals were not notarized and were not binding obligations to issue bonds since they were conditioned upon meeting certain unspecified underwriting requirements at the time of the bond requests. The submitted bids were reviewed by the District Four Contractual Services Office. The bids submitted by CPM were the lowest for each contract. Its bid for Contract No. E4551 was $109,343.97. Its bid for Contract No. E4554 was $30,312.63. SCA's bids for the Contracts were $139,442.14 and $44,100.00, respectively. During the initial review of the bid proposals, the Contractual Services Office rejected CPM's bids for failure to have its bonding company "letters of intent" notarized. In addition, the bid proposals submitted by Florida Sweeping, Inc. were rejected for failure to note a required addendum and the bids submitted by P. F. Gomez Construction Co., Inc. were rejected because the "proposal bond was not of proper character". On October 18, 1991, DOT posted its Notice of Intent to Award the Contracts to SCA, the only bidder for the Contracts whose proposals had not been rejected. CPM timely filed protests of the proposed awards to SCA on October 22, 1991. The protests filed by CPM argued that its bids should not have been invalidated simply because the bonding company's letters did not include notary seals. At this point, the sole basis for the disqualification of CPM's bids was the failure to have the bonding company letters notarized. Respondent contends that, except for the absence of the notary seal, the letters submitted by CPM met the requirements of the Notice to Contractor and the Standard Specifications cited above. However, those letters are equivocal and do not evidence a binding commitment to issue a bond upon award of the contract. The DOT officials admit that they do not know what "normal underwriting requirements" would or could be required by CPM's bonding company. This conditional language makes it uncertain whether CPM could obtain the necessary bond. Therefore, it is concluded that those letters do not meet the requirements of the Notice to Contractors, the Standard Specifications or the Directive. A hearing on CPM's protest was not held. CPM's president, Raymond Hanousek, who prepared CPM's bid and attended the pre-bid meeting, called DOT's District office the day the bids were opened and was informed that his company's bid was low, but was rejected because its bond commitment letter was not notarized. Mr. Hanousek spoke with Joseph Yesbeck, the District's Director of Planning and Programs. After their conversation, Mr. Yesbeck reviewed the file and met with Teresa Martin, the District's contract administrator for construction and maintenance contracts, and other members of the contracting staff. Ms. Martin explained why CPM's bid had been disqualified, and the matter was thereafter discussed with the District and Department attorneys. After reviewing the situation, Mr. Yesbeck determined that the failure to submit notarized letters should be considered a non-material deviation and the bids submitted by CPM should be accepted and considered the low responsive bids. Mr. Yesbeck concluded that the absence of the notary seal did not give any competitive advantage to CPM and that defects of this nature are routinely allowed to be cured. Therefore, he reversed the contract administrator's decision to disqualify CPM on both Contracts. The District secretary concurred in the decision reached by Mr. Yesbeck to repost the award of the Contracts. Mr. Yesbeck prepared a joint letter of reposting which removed CPM's disqualification and declared CPM to be the low bidder for both Contracts. At the time Mr. Yesbeck made his decision, he had not reviewed the Directive from the Assistant Secretary's office stating that there must be a notarized letter showing proof of ability to obtain a performance and payment bond. Mr. Yesbeck did not review the Directive until his deposition was taken one week prior to the hearing in this case. According to Ms. Martin, the option to provide a notarized letter from a bonding company as an alternative to the posting of a 5% bid guarantee or obtaining prequalification was designed to promote participation in state contracting by small business and minority business enterprise applicants. While DOT was apparently trying to make it easier and cheaper for companies to bid by not requiring a bond to be posted, the DOT Directive and the bid documents still clearly required unconditional proof that a bid bond would be issued if the contract was awarded to the bidder. CPM was not prequalified nor did it post a bond. Thus, in order to meet the requirements of the Notice to Contractors and the Standard Specifications, CPM's only option was to submit a notarized letter showing proof of ability to obtain a performance and payment bond. DOT was never provided with any proof that CPM had been prequalified by the bonding company for a bond and/or that a bond would unconditionally be issued if CPM was awarded the Contracts. Because the letters stated they were "subject to normal underwriting requirements at the time of the bond request", there was some possibility CPM would not be able to obtain a bond. Such a condition was not permissible under the bid doucments. The decision to accept CPM's bid was contrary to the DOT Directive, the Notice to Contractors and the bid specifications which require that a bidder demonstrate proof of ability to obtain a performance and payment bond. Consequently, it is concluded that DOT's decision to accept the conditional, unnotarized letters submitted by CPM was arbitrary and capricious. There is some indication that other DOT Districts have, on occasion, waived the notarization requirement for the bond letter. However, it is not clear whether the language in the bid documents was the same or similar in those cases and/or whether the bond letters were conditional. In the past, whenever District Four has gotten a bid without a notarized bond letter, the bid was rejected. Apparently, there has never been a protest based on such a denial in District Four. Under Section 337.18, DOT does not need to require notarized, unconditional bond letters on contracts under $150,000. Indeed, there was a suggestion that some DOT Districts have dropped the requirement for certain contracts under $150,000. However, the bid documents in this case clearly required some proof that the bidder could acquire a performance and payment bond upon award of the Contracts. It was incumbent for all bidders to meet this requirement. It was arbitrary to delete this requirement after the bids were submitted.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a Final Order finding the bids submitted by CPM to be non-responsive and rejecting those bids. Petitioner should enter into negotiations with SCA regarding the award of the contract. In the absence of a favorable negotiation, Petitioner should enter a Final Order rejecting all bids and opening the Contracts up for new bids. DONE and ENTERED this 24th day of March, 1992, at Tallahassee, Florida. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of March, 1992.

Florida Laws (8) 120.53120.57120.68287.012287.057337.11337.18343.97
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer