The Issue Whether the Department of Health and Services acted fraudulently, arbitrarily, capriciously, illegally or dishonestly in issuing an award of bid or HRS Lease No. 590:2069 to Harpaul S. Ohri.
Findings Of Fact Sometime before March, 1989, the Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide social services in the western portion of Orlando, Orange County, Florida, including a food stamp distribution office. HRS was authorized to procure, through competitive bidding, a lease for 17,250 net rentable square feet of existing office space, plus or minus 3 percent. The said lease was to provide for a full service period of seven years and two options to renew for three years each at specified rates, with occupancy no later than December 1, 1989 or 175 days after the bid award is finalized. The geographic area designated in the bid package for the office space was limited to the following area of Orange County, Florida: Beginning at the intersection of Colonial Drive and Kirkman Road to the intersection of L.B. McLeod Road, then east on L.B. McLeod Road to the, intersection of Rio Grande Avenue then north on Rio Grande Avenue to the, intersection of Colombia Street,, then east on Colombia Street to Interstate 4, then north on Interstate 4 to the intersection of Colonial Drive, then west on Colonial Drive to the point of Beginning. Public notice that HRS was seeking competitive bids was given and HRS prepared a document entitled Invitation to Bid for Existing Office Space (ITB), which set forth in detail all of HRS requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. Specific areas of importance to Respondent as reflected in the ITB and addressed by the evidence herein were as follows: 17,250 net rentable square feet (plus or minus 3 percent) of existing office space. General office use for use, as a client service center. Seven year term with two options to renew of three years each. 120 off-street, on-site, full size parking spots designated exclusively for use of Department employees and clients, suitably paved and lined, with a minimum of two for the handicapped. Availability of public transportation within reasonable proximity. Availability to adequate dining facilities within two miles. Photographs of the exterior front of the facility, along with documentation of present facility configuration and parking areas including access and egress to public roadways. Availability of elevator for multi-story use. i). Space requirement criteria: Minimum telephone requirements. Back-up interior emergency lighting. Three separate sets of rest rooms, male and female, one meeting the needs of the handicapped General security requirements. Specific security requirements for food stamp distribution center. Window covering over exterior widows to allow both sunlight and energy control; if bidded space without existing windows, then all rooms comprising the exterior of the building would require windows measuring approximately 24 x 36, all secured and inoperable. Full Service including all utilities and janitorial. The evaluation factors and their relative weights were stated in the ITB as follows: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease Evaluated using present value methodology by application of the present value discount rate of 8.69 percent. (Weighting: 25) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 10) Associated moving costs, i.e., furniture, equipment, telephone systems, etc,. (Weighting: 5) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 10) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 10) Facility Susceptibility of design of the space offered to efficient layout and good utilization. (Weighting 15) Provision of the aggregate square footage in a single building. Proposals will be con- sidered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100 percent The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Sealed bids were submitted by three bidders, Petitioner, Harpaul S. Ohri and Kensington Gardens Builders Corp. The bids were opened on April 25, 1989, and Ernie Wilson, HRS District 7 Facilities Services Manager, determined that all three bids were responsive, and within the mandatory geographical area designated in the bid package. The District Administrator appointed a bid evaluation committee to review and grade, the responsive bids under the criteria established in the bid package, and to recommend to him the committees choice of the lowest and best bid. Four individuals who were familiar with the type of work to be done in the proposed space and familiar with the bid process were appointed to the Committee. On or about May 1, 1990 the bid evaluation committee determined that the bid of Harpaul S. Ohri was the "lowest and best bid" and submitted its determination, in writing, to the District Administrator who, subsequently approved the selection. On or about June 26, 1989, on behalf of the Department, Ernie Wilson, Facilities Services Manager, notified the bidders of the Departments intent to award the bid to Harpaul S. Ohri, as being in the best interest of the Department. The bid evaluation committee consisted of four representatives of the Department who visited two of the three bidders sites and questioned the bidders representatives. The members of the committee were familiar with the Petitioners site from previous experience. They choose not to make an on-site visit prior to completing the bid evaluation sheet, although instructed to do so on the Evaluation Committee Duties and Responsibilities/Real Property, Leasing instruction sheet. Each committee member completed an evaluation sheet and gave a higher total score to Mr. Ohri. The three major bid evaluation criteria were Fiscal Cost, Location and Facility. Under the Fiscal Cost criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioner received an average of 22.7 points out of 30 possible,, while Ohri received 21.7, and Kensington Gardens received 23.7 points. The points were individually assessed by the evaluation committee, after the rental rates were compared by Ernie Wilson based on the present value analysis of bidders proposed rates. For Renewal Rates, each of the bidders, including Petitioner, received 5 points out of 10 possible. The present value analysis was not applied, as was noted in the ITB. However, even a cursory examination of the renewal rates submitted by the bidders shows that there is a 15 percent to 33 percent yearly differential in the rates, with the Petitioners rates as the lowest and Kensington Gardens as the highest. Although the committee assigned all three bidders an equal rating, the renewal rates submitted by the bidders were not equal should the Department wish to exercise its options, the rates submitted by Petitioner were substantially lower than the other two bidders and would result in a cost savings to the Department of several hundred thousand of dollars. The award factor points should not have been awarded equally. For Moving Costs, Petitioner received 5 points on each of the committee members sheets, while Ohri received 4 points and Kensington Gardens received, an average of 3.7 points. The maximum points possible was 5 points. Petitioner was awarded the maximum points because HRS is presently in the same building and no moving costs would be experienced. The other two bidders were awarded 4 points each by committee members. That determination was based on each members personal experiences. No cost or time lost data was provided or requested. The LOCATION criterion also had three sub-categories: Proximity to other governmental agencies - 10 points - with all three bidders receiving the same rating; Public Transportation -10 points - with all three ,bidders, receiving the same rating; and Environmental Factors - 10 points - out of which Petitioner received an average of 5.7 points; Ohri - 9.7 points and Kensington Gardens - 6.5 points. In considering the proximity to other governmental agencies of each of the facilities being considered, the committee relied on their own knowledge of the area. They determined that since each was within the geographical area designated in the ITB, each was equally distant from the most frequently visited government agencies in the vicinity. However, Petitioners facility is the most centrally located of the three facilities offered, while the two other facilities were considerably distant from other government agencies. The award factor points should not have been awarded equally. For Public Transportation, the committee determined that local bus service went near each of the three facilities. They were neither provided, nor did they request, route maps, schedules or passenger capacity for buses servicing each facility. Petitioners facility is centralized in the area served within the bid district, and serviced by, numerous bus lines which pass near the facility ten times per hour. The bus service to the other two facilities are limited to four buses per hour, with buses having a smaller capacity. In addition, most clients would be required to travel to the central bus terminal and transfer to a different route in order, to reach the Ohri or Kensington Gardens facilities, making bus transportation a very time-consuming process. No other form of transportation is available, except for taxi service. In addition, in order for a client to walk from the nearest bus stop to the Ohri facility, a person would cross two heavily traveled six lane streets and then walk across an open shopping center parking lot. This would require approximately a fifteen minute walk. In order to reach Petitioners facility, a client would require approximately a five minute walk utilizing public sidewalks. The committee did not consider these facts in its evaluation. The award factor points should not have been awarded equally. (c)(1). For Environmental Factors, the committee considered each buildings physical characteristics and the surrounding area. The committee, in their letter to the District Administrator, dated May 1, 1989, identified this category as "a very critical area for the new lease." The letter also stated: "The committee took the following into account when evaluating this section: Cleanliness of the building aid surrounding areas. Lack of traffic congestion by motorized vehicles close to the facility. Easiness of getting to and from the facility by vehicle. Safety for clients and staff walking to and from the facility. Upkeep of the surrounding buildings or other sections of the bidders building." The following was also taken into account when evaluating this section, but was not so stated in the letter. At least one committee member believed the lack of window space in Petitioners facility was disabling to his bid, and that the willingness of the Ohri representative to install windows on exterior walls was a significant factor in her determination of award. At least one committee member indicated that future expansion was a substantial factor in her favoring the Ohri bid, and that there was janitorial and security problems at Petitioners facility. The committee received no other information other than the committee members opinion regarding the same. The committee as a whole erroneously believed that the extra square footage visible at the Ohri facility at the time of their inspection would necessarily be available to HRS if and when it might expand its offices. Future expansion was specifically removed from the ITB at the pre-bid conference and it was clearly erroneous for them to have included this factor in their bid evaluation. The ITB specifically calls for the installation of exterior windows by the winning bid prior to occupancy. However, none of the committee members reviewed the ITB or the actual bids submitted. They relied primarily on the synopsis of the bids prepared by Ernie Wilson. The ITB states substantial general and specific security requirements in detail; however, the evaluation criteria forms do not provide a category for evaluating security other than generally under the sub-category of environmental factors. The ITB, under General Specifications and Requirements, called for the availability of adequate dining facilities within two miles of the proposed facility. The evaluation criteria did not provide a category for the committee to rate dining facility availability. In consideration of the environmental factors, the committee overlooked or failed to consider a hazardous unfenced high voltage transmission station adjacent to the Ohri facility. In addition, the photographs submitted by Ohri as the front of the building (as required by the ITB) are in fact the rear of the building which was not offered as part of the proposed leased facility. Of the three sub-categories under FACILITY, out of 15 possible points, Petitioner received an average rating of 9.5, Ohri received an average of 13.7 and Kensington Gardens received 11.2 for Layout/Utilization. Ohri received the most points because his building configuration was a, shell and was more flexible and could be reconfigured for more efficient layout to suit the Departments needs. All three bidders submitted proposals wherein the total square footage of rentable space was to be contained in a Single Building. Therefore, all three bidders received the maximum 10 points. A maximum 5 points was provided for facilities with Street-level space. All three bidders were awarded the maximum 5 points. However, a portion of Petitioners space was offered on the second floor, a fact which the committee overlooked. The Petitioner should not have received the full 5 points for having street-level space. The unanimous recommendation of the evaluation was to award the lease to Ohri. In reaching that conclusion, the committee did not properly utilize the weighted bid criteria and, in addition, included improper bid considerations in their evaluation of the three facilities. Some of the reasons given by the committee for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. However, others were erroneous and improper.
Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a Final Order rejecting all bids for lease number 590:2069 and issue a new invitation to bid. DONE AND ENTERED this 12th day of February, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1990. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Proposed Findings of Fact submitted by the Petitioner: Accepted: paragraphs 1, 2, 3, 5, 6, 7, 9 (in substance, except for subparagraphs f, g, j and k which are not relevant), 10 (in substance), 12(a), (b), (f-in substance), (g-in substance), (h-in substance), (j), (k-in substance), (l-in substance), (p-in substance). Rejected: Not relevant: paragraphs 4, 12(c), (d), (e), (m), (n), (o), (p- the proposed future location of the Greyhound Station; insure wooded area nearby), (q), (r). Argument: paragraphs 11 and 13. Procedural matters, covered in the preliminary statement: paragraphs 8 and 14. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Terrence W. Ackert, Esquire 201 East Pine Street Suite 1402 Orlando, Florida James Sawyer, Jr., Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700
Findings Of Fact On March 1, 1984, Respondent gave notice to qualified contractors that it would receive sealed bids for State Project No. 72000-3541, referred to as Federal-Aid Project No. M 9041(10). This project involves the installation of a computerized traffic control system for the City of Jacksonville. In response to the opportunity to bid, the Department of Transportation received four bids. Petitioner, Winko-Matic Signal Company, was among the bidders. The other bidders were Georgia Electric Company, Traffic Control Devices, Inc., and Sperry Systems Management. The bids of Traffic Control Devices and Sperry Systems were rejected based upon an error in bid tabulations on the part of Traffic Control, a mistake on the quantities page, with the Sperry rejection being based upon a bid bond problem. Traffic Control had been the apparent low bidder with a bid of $1,964,115. Winko-Matic was the second apparent low bidder with a bid of $2,279,604.70. The Department of Transportation had estimated that the total cost of the Jacksonville project would be $ 2,024,680.61. Having discarded the bid of Traffic Control Devices, the Department of Transportation telegrammed Winko-Matic on April 4, 1984, advising Winko-Matic that it was the apparent low bidder for the Jacksonville project. Subsequently, the awards committee of the Department of Transportation met on April 18, 1984, and determined to reject all bids and re-advertise the job. In the course of this meeting the awards committee was told that there were erratic bids received on contract items, pointing to some perceived confusion among the contractors as to requirements of the contract. Discussion was also held on the possibility of establishing a pre-bid conference if the project was re advertised. The awards committee then voted to reject the bids on the basis that the apparent low bidder, Winko-Matic, had submitted a bid which-was 12.6 percent over the Department's estimate, instead of being within 7 percent of the Department of Transportation's pre-bid estimate, a point above which the Department of Transportation in its non-rule policy would call to question to the acceptability of the apparent low bid. In addition to deciding to reject all bids and re-advertise, it was determined that a pre-bid conference should be scheduled at least 30 days prior to the bid-letting date. Winko-Matic was advised that the Department of Transportation's decision to reject all bids by correspondence of May 4, 1984, in which it was indicated that all bids had been rejected based upon the fact that they were too high. In response to this notice of rejection, Winko-Matic, effective May 17, 1984, filed a written notice of protest. The case was subsequently referred to the Division of Administrative Hearings on June 20, 1984, and a final hearing date was established by Notice of Hearing of July 5, 1984. The hearing date in this cause was September 12, 1984. The Jacksonville project in question requires the utilization of what has been referred to "UTCS Enhanced" software. This software package is unique and has only been used in a limited number of locations within the country. Those locations are Los Angeles, California; San Diego, California; Broward County, Florida; and Birmingham, Alabama. Another unique feature within the project design is the use of an associated coaxial computer sys gem. Given the unique nature of this project and the fact that the Department of Transportation had never advertised for bids related to UTCS software, Department of Transportation obtained assistance from a consulting firm, Harland, Bartholomew & Associates. In fulfilling its function Harland gave estimates to include an estimate related to the projected cost of the software, Item 681-102. The Harland estimate for the overall project was $2,143,130 including a $100,000 estimate for the software system. That estimate relating to the software was subsequently adjusted by the Department of Transportation to depict a cost of $13,780. The Department of Transportation estimate was based upon information within its computer related to a system unlike the enhanced software contemplated by the plans and specifications. In other words, the stored information in the Department of Transportation computer was not the same as contemplated by the plans and specifications in the Jacksonville project. Moreover, the initial estimate of Harland was based upon the idea of an extended software system, as opposed to an enhanced software system. Winko-Matic had bid $389,500 for the software in Item 681-102. That estimate was premised upon figures obtained from JHK and Associates, the group which Winko-Matic intended to use as its subcontractor for the enhanced software portion of the project. JHK developed the software and was responsible for systems integration of the Los Angeles, California, project, one of the locations in which UTCS enhanced software has been utilized. JHK premised its estimate for the software hare upon experience in Los Angeles and an evaluation of the tasks to be performed related to the enhanced software. This included general software development activities, hardware innovation, installation costs during the period of acceptance and testing, and the preparation of data base. The JHK bid price was $339,500. Another $50,000 was added to that price related to what the Petitioner describes as its management costs for that item. By June 20, 1984, when a further meeting was held by the awards committee on the subject of the Jacksonville project, it was concluded that the estimate made by the Department of Transportation of $13,780 was not correct, on the topic of the enhanced software. A more reasonable estimate, according to the information imparted in this session, would be $200,000 for enhanced software as called for in this project, with a $100,000 amount being a reasonable estimate had they chosen to use extended software. Adjusting the initial price related to the UTCS enhanced software to reflect a corrected estimate of the Department of Transportation in its original advertised bid, that estimate becomes $2,210,900.61 and its consultant Harland's estimate becomes $2,243,130. With this adjustment, the differential in the estimate made by the Department of Transportation and the Petitioner approaches 3 percent and not the 12.6 percent originally found. The 3 percent is below the threshold of 7 percent used as the policy for determining whether a bid might be rejected as being far beyond the acceptable limits set forth in the Department of Transportation's estimate. In the aforementioned June 20, 1984, awards committee meeting, the Department of Transportation continued to hold the opinion that all bids in the Jacksonville project should be rejected and the matter re-advertised. Although the problem pertaining to the estimate of the cost of the enhanced software package had been addressed, the committee continued to feel that the prices received in the bid letting were erratic Reference was also made to revisions or modifications to the project plan which would be offered if the matter were re- advertised. It was also pointed out that the Federal Highway Administration would concur in the Department's decision to reject all bids and would accept modifications. The awards committee again voted to reject the bids. The matter was again considered by the awards committee on August 31, 1984. On that occasion, it was pointed out that the revisions contemplated by the Department of Transportation, should the matter be re-advertised, would not affect in a substantial way the cost estimate for the project with the exception of Item 680-101, the system control equipment (CPU), which would promote a lower price for the project. The committee determined in the August, 1984, meeting to reject all bids and re-advertise. While the initial notice of rejection of May 4, 1984, had suggested the basis for rejection as being the fact that Petitioner's bid far exceeded the 7 percent allowance for price above the Department of Transportation's estimate of costs, the meetings of the awards committee and the suggestion of the Respondent in the course of the final hearing in this case indicated that there were other reasons for the decision to reject. Those Were: (a) an apparent lack of clarity among bidders regarding specifications for the Jacksonville job, (b) the desire of the Respondent to revise specifications on the Jacksonville project; and (c) a lack of sufficient competition in the bids. In connection with the first of the additional reasons Respondent suggests that variations within the bid responses related to particular line items within the specifications point out a lack of clarity in the project's specifications or confusion by bidders related to those specifications. Respondent did not bring forth any of the bidders who might speak to the matter of possible confusion or misunderstanding concerning some of the bid items. By contrast, the Petitioner's president; the president of JHK & Associates and James Robinson, Harland's project manager for the Jacksonville job, did not find the specifications in the original documents to be confusing. In addition, the testimony of those individuals established the fact that bid variations related to particular line items are not extraordinary and do not establish any apparent confusion by the bidders as to the requirements of those line items. In effect, what the differentials demonstrate are variations related to the manufacture or in-house capabilities of the bidders and an effort to allocate discretionary costs in various places as to line items. Moreover, they might indicate last- minute adjustments in the bid quote prior to the opening and a possible effort by a contractor to enter into a new job market. Finally, they demonstrate offsetting which is the allocation of item prices by a contractor to maximize profits. To do this, a contractor submits high bids on items representing quantities which the contractor feels will increase after the contract is awarded and submits low bids on items representing quantities which are not likely to change. In summary, while the Department of Transportation in its presentation expressed some concern about the variations in the pricing in the bid quotations offered by the respective bidders in this project, its suspicions on the question of the possible clarity of its specifications were not confirmed and are not convincing. On the topic of revisions which the Department of Transportation would offer if the matter were re-advertised, with one exception those matters appear to be items that could be attended through change orders or supplemental agreements. They are not matters which necessarily must be addressed through a rejection of all bids and a re-advertising of the project. The lone exception to this is the possibility that the Department of Transportation may not be able to protect its proprietary rights in the enhanced software which is being developed for the project, under the terms of the present bid documents. Given that uncertainty, the Respondent would wish to re-advertise the project and make certain that its proprietary interests are protected. Finally, Respondent has alluded to the fact that the Jacksonville project should be re-advertised in view of the lack of competition in the initial letting. Only four bidders expressed an interest in this project at the time of the first letting. Of those, two bidders were found to be responsive. While this is a low number of bidders, there does not appear to be any agency practice on the part of' the Department of Transportation to the effect that this number of bidders would not be accepted. Moreover, no indication has been given that should the matter be re-advertised a greater number of bidders would express an interest than was the case in the first letting. Consequently, this reason for bid rejection is not acceptable. If Respondent did not reject the bids and re-advertise the project, Winko-Matic would be the successful bidder in the Jacksonville project.
Findings Of Fact Respondent HRS published ITB 590:2306 for existing rental space in the central area of Brooksville, Florida. The bid solicitation specified a bid opening time and date of 2:00 p.m. July 17, 1991. Petitioner and Intervenor timely submitted sealed bids. They were the only two bidders. Neither they nor anyone else timely filed any protest of the bid specifications, and therefore the specifications are not subject to attack in this proceeding. Petitioner received a notice of intent to award the bid for lease 590:2306 to Intervenor by letter from Respondent dated August 27, 1991 and timely filed its notice of intent to protest and formal bid protest. Petitioner accordingly has standing to bring this proceeding. Intervenor is the intended awardee and as such has standing to intervene. Petitioner submitted the property located at 7348 Broad Street, Brooksville, Florida, and showed in his bid submittal form that his proposed property contained 22,500 net square feet, with future expansion of 2,100 square feet available. When Petitioner submitted his bid, it included a floor plan, site plan, and a PUR 7068 form. A PUR 7068 form is a "Public Entity Crime Certification Statement," a sworn statement under Section 287.133(a) F.S. The ITB included two separate requirements for bidders to establish that they have control over the property that they submit to HRS. HRS' purposes in requiring bidders to demonstrate control are to prevent bids based on total speculation, to establish a reasonable expectation that the bidder can meet his obligations if awarded the bid, and to establish a reasonable expectation that the property can be occupied on time. Item 1 on page 3 provides as follows: Control of property - This pertains to both the structure(s) and proposed parking areas. To submit a responsive bid, a prospective lessor must meet one of the following qualifications: a.) Be the owner of record of the facility and parking areas (submit copy of deed). b.) Be the lessee of space being proposed and present with bid, a copy of lease with documen- tation of authorization to sublease the facility and parking areas through the base lease term and all renewal option periods. c.) Submit documentation of an option to purchase the facility and/or parking areas. d.) Submit documentation of an option to lease the facility with authorization to in turn, sublease. Any lease must encompass the entire time period of the basic lease and any renewal option periods as required the state. e.) Submit form PUR. 7068 Sworn Statement of Public Entity Crimes (Attachment H). Page 12 provides, in part, as follows: In order for a bid proposal to be accepted the items 1 through 6 must be included in the bid proposal. Items 7 through 11 must be included, if applicable. [Items 11 and 13 state:] 11. Documentation showing bidder as controller of property. 13. Public Enemy [sic] Crime Certification Statement A pre-bid conference attended by Petitioner made clear that evidence of control and the PUR 7068 form were two different items. Petitioner testified that he attached the PUR 7068 form as his sole basis for evidencing control of the building and parking spaces he submitted for lease, and acknowledged that, in fact, the form did not provide any information with regard to his control of the buildings or parking spaces offered for lease. Petitioner's assertion that his name on some of his site plans, etc. constitutes evidence of control is not persuasive. Such assertion is not in line with the ITB requirements or even common sense. Petitioner Proctor owned the buildings he offered HRS in his bid submittal. Petitioner offered multiple buildings separated by parking areas and driveways. The property offered by Petitioner was to have built an awning- covered walkway between buildings but the walkway would have to be placed through the driveway area of the property. The expansion area for Petitioner's property designated in its bid submittal was composed of approximately 10 gated warehouse units which would be converted to office space. Petitioner had leased a portion of the same premises to HRS for 15 years, and HRS was still leasing that portion at the time of the bid opening. At the time of the bid opening, another portion of the property Petitioner proposed to be leased to HRS was also already rented to other tenants, including a lease to the Florida Department of Labor which was not scheduled to expire until December 31, 1991, one day prior to HRS' proposed first day of occupancy under the ITB. The space leased to the Department of Labor would require some renovation for HRS' use, at least to connect it on the interior with the rest of the building. The remainder of the second, adjacent, building to be rented under Petitioner's bid would require more extensive renovation to create office spaces to meet HRS' needs. In addition to the Department of Labor, Petitioner was also renting space in the second building to a beauty salon, a book store, an office supply store, a clothing store, and a barber at the time of bid submittal and opening and at the time of the formal hearing. These latter tenants were on month-to-month leases. In order to ensure that there would be time for necessary renovations before January 1, 1992 and further to ensure that the property would be available for occupancy on January 1, 1992, the ITB required in the following unequivocal language that all bidders file tenant acknowledgments of the bid/proposed lease with their bid submittal: Existing Tenants: If the offered space or any portion thereof (including parking areas) is at present occupied or will be covered by an active lease(s) at the stated availability date, written documentation by the tenant indicating acknowledgment of the bid and ability to vacate premises by the proposed date must be included with the bid submittal. [Emphasis added] Petitioner submitted no tenant acknowledgments from any of his tenants with his bid to HRS. Even though Petitioner failed to submit evidence of control in the form of a deed and further failed to submit the required acknowledgments from tenants occupying the premises on the bid date, HRS did not immediately disqualify Petitioner's bid as nonresponsive. Instead, HRS evaluated Petitioner's bid simultaneously with Intervenor TCC's bid. HRS relied on old leases in its files and actual knowledge that monthly rent was paid to Petitioner for its own currently leased space, and HRS ignored the absence of tenant acknowledgments with Petitioner's bid. HRS followed this course of action despite the requirement of the ITB on page 7, item 1 under EVALUATION OF BIDS which unequivocally provides: Bids received are first evaluated to determine technical responsiveness. This includes submittal on bid submittal forms, inclusion of required information, data, attachments, signatures and notarization, etc. Non responsive [sic] bids will be withdrawn from further consideration. The portion of the ITB designated, Documents Required To Be Submitted With Bid Submittal For Existing Buildings on page 12, item 4. required bidders to submit "Scale Floor Plans showing present configurations with dimensions." Page 3 of 22, Item 9.(b) further required that, as a part of the bid submittal, bidders were to provide "A scaled (1/16" or 1/8" or 1/4" = 1'0") floor plan showing present configuration with measurements." Contrary to the ITB requirement, Petitioner submitted a floor plan scaled at 1/20" = 1', which also failed to reflect the present configurations with all measurements. Petitioner's scaled floor plan submitted with his bid was prepared prior to the present addition to one building and contained a hand- drawn configuration without accurate measurements for the northwest corner of one building. The term of the lease as shown on the ITB and Bid Submittal Form was 9 and one-half years with an option to renew for 2-5 year renewal periods. At the time of the bid opening on July 17, 1991, the bid submitted by Petitioner failed to have any proposed rental rates shown for "Renewal Options: Option II years 1 through 5." HRS permitted Petitioner to correct or supplement its bid after the bid opening (same date and place) to cover this material omission. Page 6, item 4 of the ITB provided for the property owner or other bidding entity to sign the bid submission. The pertinent part states: 4. Each bid submitted shall be signed by the owner(s) corporate officers, or legal representative(s). The corporate, trade, or partnership title must be either stamped or typewritten beside the actual signature(s). If the Bid Submittal is signed by an Agent, written evidence from the owner of record of his/her authority must accompany the proposal. ALL BID SUBMITTAL SIGNATURES MUST BE WITNESSED BY TWO PERSONS. [Emphasis appears in ITB] Petitioner Proctor signed his bid submittal in proper person. TCC's bid submittal was signed by Sharon K. Lane, "Executive Director," of TCC Number 3 Ltd. Inc., Intervenor herein. At all times material, TCC Number 3 Ltd. Inc. has been a Florida corporation. At the time of the bid opening, Ms. Lane was TCC's sole shareholder and "all officers." At the time of formal hearing, Ms. Lane remained the sole shareholder, but others had assumed some of the corporate offices. Her status at the time of the bid submittal was sufficient for her to bid on behalf of the TCC corporation and to execute the PUR 7068 form on that corporation's behalf. Intervenor TCC submitted the required PUR 7068 form, but TCC submitted as sole evidence of control an undated, unrecorded "Contract for Sale and Purchase" by and between Hernando Plaza Ltd. as Seller and Intervenor TCC as Buyer, for the property which Intervenor was offering for lease to HRS. The best date assignable to this document is April 29, 1991. It was executed on behalf of Hernando Plaza Ltd. by Edward M. Strawgate and Harold Brown representing themselves as general partners of the limited partnership. TCC's obligation to proceed to closing under the foregoing contract was contingent upon TCC's securing an anchor tenant. However, the contract requires TCC to take steps to secure an anchor tenant. By its terms, TCC may purchase the property with or without an anchor tenant, but the contract requires TCC, in seeking an anchor tenant, to set time limits for the lease arrangement with the proposed anchor tenant which do not necessarily accord with the timing of HRS' bid process. HRS accepted TCC's contract to purchase from Hernando Plaza Ltd., as evidence of TCC's control of the premises offered by TCC for lease, believing it to constitute an option to purchase and the necessary evidence of control as required by the ITB. (See, Finding of Fact 6, supra.) At the time of the bid opening, HRS had no reliable information as to what entity actually owned the property offered by TCC, and TCC had not disclosed to HRS that its contract to purchase the property was with a legal entity other than the record title owner of the property, which record title owner was and is the Victor and Lillian Brown Foundation (Brown Foundation). See, infra. Up to that date, at least, Hernando Plaza Ltd. had represented itself to TCC as the owner of the property. The ITB did not require that an abstract of title be submitted with the bid, and HRS normally does not require an abstract from successful bidders, although the ITB contains provisions for future disclosure from successful bidders. (See, ITB item 5 under Requirements for Bidders to Submit Bids.) Absent some reason to "go behind" facial evidence of control, HRS attempts to protect itself by requiring successful bidders to put up an irrevocable letter of credit for one-half of one percent of the proposed lease rental obligation over the basic lease term as a penalty in the event a successful bidder cannot perform. (See, ITB page 4, item 10.) Hernando Plaza Ltd.'s certificate from the Florida Secretary of State expired December 31, 1981. That fact was advertised and the certificate cancelled July 16, 1982. At that time, Edward M. Strawgate was listed as a general partner and Harold Brown was listed as a limited partner of Hernando Plaza Ltd. Hernando Plaza Ltd. had been administratively dissolved for failure to file its annual report. Subsequent to the time that Intervenor submitted its bid proposal, but prior to formal hearing, Hernando Plaza Ltd. was reinstated by the Florida Secretary of State. Once reinstated, the limited partnership's ability to act related back and validated its prior actions. At all times material, the record title of the property offered by Intervenor TCC for lease to HRS was owned by "Harold Brown, Lillian Brown and Muriel Kahr as Trustees of the Victor and Lillian Brown Foundation." This title is derived from a recorded June 30, 1967 warranty deed from Hernando Plaza Ltd., which deed was admitted in evidence at formal hearing. The warranty deed was not attached to TCC's bid submittal. Neither TCC, the corporation, nor Sharon K. Lane, individually, held any authority as agent to submit a bid to HRS on behalf of the record title owner, the Brown Foundation. There is also in evidence a recorded December 18, 1985 Amendment to Lease between the Brown Foundation and City National Bank. That Amendment to Lease also was not attached to TCC's bid submittal to evidence control of the premises TCC was offering to lease to HRS. That Amendment to Lease also recites that Hernando Plaza Ltd. leased back the subject property from the Brown Foundation by a lease dated June 30, 1967. The June 30, 1967 lease was not recorded, was not part of TCC's bid submittal, and is not in evidence. The December 18, 1985 Amendment to Lease goes on to recite that Hernando Plaza Ltd. has assigned its lessee interest under the June 30, 1967 lease to City National Bank by a March 14, 1978 assignment. There is also in evidence a recorded March 14, 1978 "Assignment of Lessee's Interest in Lease from Hernando Plaza Ltd. to City National Bank." This assignment was not part of TCC's bid submittal. The December 18, 1985 Amendment to Lease goes on to further recite that the Brown Foundation has "agreed to give and grant to [Hernando Plaza Ltd.] an option to purchase the property." The remainder of the December 18, 1985 Amendment to Lease details the terms or conditions of the option to purchase granted by the Brown Foundation to Hernando Plaza. For instance, in order to exercise that option to purchase the subject property from the Brown Foundation, Hernando Plaza Ltd., among other requirements, would have to demonstrate that all the terms of the unrecorded June 30, 1967 lease are "in good standing." One may reasonably infer that "in good standing" would at a bare minimum mean that the rents under the lease are paid current at the time the option is exercised, but what the other terms of the lease might be are subject to pure conjecture. TCC's bid submittal did not include documentation that the June 30, 1967 lease was "in good standing." There is also in evidence a recorded June 7, 1989 Trustee's Deed (quitclaim deed of the trustee's interest) from City National Bank's successor bank/trustee to Hernando Plaza Ltd. The Trustee's Deed also was not attached to TCC's bid submittal. On the date of bid submittal/opening neither TCC, the corporation, nor Sharon K. Lane, individually, held any authority as agent to submit a bid on behalf of Hernando Plaza Ltd. or City National Bank's successor. At formal hearing, TCC submitted an October 24, 1991 written hearsay statement by Harold Brown as Trustee of the Brown Foundation to the effect that Hernando Plaza Ltd.'s December 18, 1985 option to purchase the property from the Brown Foundation was "in full force and effect" and that the June 30, 1967 lease back from the Brown Foundation to Hernando Plaza Ltd. was "in full force and effect and that the lessee is in good standing thereunder." Assuming these items may be considered in this proceeding pursuant to Section 120.58 (1) F.S. as supplementing or explaining direct evidence, they still do not clarify in any way what all the terms of the unrecorded 1967 lease are or that those terms will remain in good standing on the date in the future that Hernando Plaza Ltd. elects to exercise its option, if it elects to exercise its option to purchase the property from the Brown Foundation so that Hernando Plaza Ltd. may, in turn, convey the property to TCC, pursuant to Hernando Plaza Ltd. and TCC's April 29, 1991 contract for sale and purchase. Oddly enough, there is further explanatory hearsay that on October 24, 1991, Harold Brown was a trustee of the Brown Foundation and that he also was the sole limited partner of Hernando Plaza Ltd., although TCC's contract with Hernando Plaza for sale and purchase previously indicated Harold Brown was one of two general partners. Hernando Plaza Ltd.'s option to purchase the property from the Brown Foundation must be exercised by Hernando Plaza Ltd. before Hernando Plaza Ltd. can honor its contract to purchase/sell to TCC. Since there is no record evidence that the June 30, 1967 lease from the Brown Foundation as lessor to Hernando Plaza Ltd. as lessee will be in good standing on whatever future date Hernando Plaza Ltd. attempts to exercise its option with the Brown Foundation, one may only speculate both as to when and if TCC will be able to purchase the property from Hernando Plaza Ltd. TCC has only an option to become owner of the subject property at some unspecified date conditioned upon Hernando Plaza Ltd.'s first successfully exercising its option from the Brown Foundation and further conditioned upon all the terms of TCC's contract with Hernando Plaza Ltd. Apparently, TCC's only recourse to enforce its contract with Hernando Plaza Ltd. is a Circuit Court action for specific performance. TCC also submitted a site plan and floor plan with its bid submittal. The ITB required that offices on outside walls must provide windows. TCC's plans did not reflect windows in two sides of the building, but given HRS' retaining the right to partially design and locate its own halls and offices during the building's renovation, TCC's failure to show windows in the two outside walls is not, in and of itself, a material, disqualifying deviation from the ITB so as to unilaterally render TCC's bid nonresponsive. HRS staff member Donald J. Cerlanek prepared a bid synopsis of each bid. This involved completing a form from the HRS leasing manual which illustrates the characteristics of each of the bids. The bid requirements included evaluation criteria and a maximum amount of points which could be awarded for each criteria item. Five HRS bid evaluation committee members executed no conflict of interest forms. These were: Thomas C. Little Jr., David Thomley, Sylvia Smoot, Harvey Whitesides, and Mary Hawks. All committee members were given copies of the bid synopsis form to use in evaluating the properties submitted by Petitioner and Intervenor. Some of the committee members did not obtain or review the actual bid submissions of each of the bidders, but all of them had access to the bid submissions and read the bid synopsis forms for both Petitioner's and Intervenor's bid submittals. The bid evaluation committee members, except for Mary Hawks, made site visits to the properties submitted by Petitioner and Intervenor. Ms. Hawks essentially acted only as a facilitator or conduit for the evaluations of the other four evaluators as set out infra. The four site evaluators took notes regarding each location. The four site evaluators each assigned numerical weights to each item of evaluation criteria except for the rent and renewal rent portions of the evaluation criteria. Although on their site visits some committee members visiting TCC's site may have seen a color version of an artist's rendering of what TCC's project could look like after renovation was complete, a black and white version of the same artist's rendering was attached to TCC's bid submittal to which all committee members had access, and it is found that this situation in and of itself presented no false or misleading information nor constituted any prejudice to a fair bid process/evaluation. Likewise, although some evaluators discussed expansion prospects with TCC's and/or Proctor's on-site representatives, the evidence is credible and persuasive that each evaluator who visited the sites assessed the projects' respective expansion prospects substantially upon what they saw on each site and had experienced in Proctor's existing facility. The points awarded and reasons for the recommendations of each evaluator who visited the sites were reasonably based on specific needs of HRS. These specific needs of HRS were reasonably articulated by the two evaluators who made on-site inspections and who also testified at formal hearing and were reasonably set out in writing in the written notes of the two other evaluators who did not testify. Thomas C. Little, Jr., testified that he found the Intervenor's property superior as a result of the security problems at Petitioner's locations, the closer proximity of the courthouse, hospital, and health department to Intervenor's property and the superiority of a single building offered by Intervenor versus multiple buildings offered by Petitioner. Additionally, he found the esthetics of Petitioner's buildings lacking and expansion offered by Petitioner limited and was concerned that HRS would outgrow the space due to the fact that their service area is one of the most rapidly growing in Florida. His contemporaneous notes were to the same effect. Sylvia Smoot, also a member of the evaluation committee, testified that she found Intervenor's facility superior based on its proximity to the courthouse, hospitals, and other key locations, and its flexibility of design and concentration of space in one building. She further found Petitioner's location lacking as a result of the three separate buildings, its limited expansion room, and the necessity for redirecting clients between buildings, and the difficulty for elderly and handicapped clients accessing Petitioner's building. Her contemporaneous notes were to the same effect. Evaluators Whitesides and Thomley made substantially similar contemporaneous notes justifying their scoring of the two bidders. Three of the four site evaluators met as a group following the site visits and discussed the properties submitted by Petitioner and Intervenor. All four of the site evaluators made recommendations to accept the property for lease proposed by Intervenor, but they did not all confer and jointly develop a single recommendation to the facilities manager. The points assigned by each of the four site evaluators for the properties proposed by Petitioner and Intervenor were as follows: Evaluation Committee TCC Number Member's Names Proctor's Points 3's Points Thomley 75 98 Little 78 93 Whitesides 74 95 Smoot 80 91 307 377 The rent portion of the evaluation criteria was ascertained by applying present value methodology as set forth in the HRS leasing manual to the annual rents offered by the bidders. The discount factor was 8.32 percent. The present value of Proctor's bid was $1,934,038 and the present value of TCC's bid was $2,028,316. The leasing manual is considered advisory only. It advises present values be made, a determination of the difference in amounts be calculated and a comparison of the difference be made to determine a percentage. Thereafter, the percentage is applied to the maximum amount of points allocated for rent in the evaluation criteria. The lowest present value receives the maximum number of points allocated, and, thus, Proctor was awarded 35 points. TCC received 33 points, based upon the fact that its present value of rent was close to the present value submitted by Proctor. No penalty is imposed to a bidder whose rental amounts is higher than the lowest bidder. No benefit is conferred upon the lowest cost bidder over the next lowest bidder. Mary Hawks, Manager for Administrative Services, Department of Health and Rehabilitative Services, received each of the individual evaluation recommendations from Thomley, Little, Whitesides and Smoot. As a result of travel restrictions placed on the HRS, the four site evaluators and Ms. Hawks, who was also a fifth committee member, did not meet as a group following the site visits although three of the four site evaluators did meet collectively following the site visits. (See Finding of Fact 43-44, supra.) The committee members could have met by telephone conference call but Mary Hawks found it unnecessary to do so because there was such a clear evaluation in favor of Intervenor based on the total composite evaluation scores of 377 for Intervenor and only 307 for Petitioner, out of a total of 400 points. She assigned no points herself but approved their recommendations and forwarded a single recommendation in favor of TCC for ultimate approval by HRS management. Mary Hawks had spoken to the evaluation committee members subsequent to the evaluation and no member had expressed any reservation regarding his/her evaluation or a need to meet to discuss anything additional regarding the bid evaluation. The HRS Intent to Award to TCC subsequently issued. The evaluation process and formula for rent evaluation are not among the more commonly used methods but were reasonable and rational and fairly applied to the bids in this case. No conflict of interest in the evaluation committee members was demonstrated by Petitioner in these proceedings.
Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Health and Rehabilitative Services enter a Final Order finding that: The bid of TCC Number 3 Ltd. is nonresponsive; The bid of Derick Proctor is nonresponsive; Declining to award the bid for Lease No. 590:2306 to either bidder. RECOMMENDED this 20th day of December, 1991, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of December, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-5963BID The following constitute specific rulings pursuant to Section 120.59(2) F.S. upon the parties' respective proposed findings of fact (PFOF): Proctor's 74 PFOF: The following PFOF are accepted, except to the extent they are unnecessary, subordinate, or cumulative to the facts as found in the recommended order (RO). Unnecessary, subordinate, or cumulative material has not been utilized: 1-3, sentence 1 of PFOF 4, 5-6, 9, 11-12, sentence 1 of PFOF 13, sentence 1 of PFOF 16, 17-26, sentence 1 of PFOF 29, 30-33, 35-36, sentences 1 and 4 of PFOF 38, 39-41, 44-54, 56-57, 60-61, 63. The following PFOF are rejected because they are not FOF as framed but constitute a proposed conclusion of law (PCOL) or are rejected because they constitute mere legal argument: sentences 2 and 3 of PFOF 4, sentence 2 of PFOF 16, 34, 43. The following PFOF are rejected because, as framed, they constitute mere recitation of isolated, unreconciled testimony or other record evidence or are not supported by the greater weight of the credible record evidence as a whole. However, the subject matter is covered in the RO as proven and supported by the competent, substantial evidence in the record: 10, sentence 2 of PFOF 13, 14- 15, sentence 2 of PFOF 29, sentences 2 and 3 of PFOF 38, 55, 58. PFOF 7-8 are accepted as modified because parts are unnecessary, subordinate, or cumulative to the facts as found and other parts are mere recitations of unreconciled portions of the record and legal argument. The following PFOF are accepted in part but not utilized because parts are unnecessary, subordinate, or cumulative to the facts as found, and other parts are rejected as immaterial to the dispositive issues herein, although correctly quoted from the record: 68-73. The following PFOF are rejected as immaterial or not dispositive: 27-28, 37, 42, 59, 62, 65, 67, 74. The following PFOF are covered in preliminary material: 64, 66. HRS 21 PFOF: The following PFOF are accepted except to the extent they are unnecessary, subordinate, or cumulative to the facts as found in the RO. Material unnecessary, subordinate, or cumulative has not been utilized: 1-4, 6-8, 11-12, 16-19. The following PFOF are rejected because they are not FOF as framed but constitute PCOL or are rejected because they constitute mere legal argument: 5, 9-10, 14-15, 21. The following PFOF are rejected because, as framed, they constitute mere recitation of isolated, unreconciled testimony or other record evidence or are not supported by the greater weight of the credible record evidence as a whole. However, the subject matter is covered in the RO as proven and supported by the competent, substantial evidence in the record: 20. PFOF 13 is accepted as modified to correctly reflect the credible record evidence as a whole. TCC Number 3 75 PFOF: The following PFOF are accepted except to the extent they are unnecessary, subordinate, or cumulative to the facts as found in the RO. Material unnecessary, subordinate, or cumulative has not been utilized: 1-31, 34-38, 42- 45, 47-48, 56, 58-60, 64-69, 71-75. The following PFOF are rejected because they are not FOF as framed but constitute PCOL or are rejected because they constitute mere legal argument: 32. The following PFOF are rejected because, as framed, they constitute mere recitation of isolated, unreconciled testimony or other record evidence or are not supported by the greater weight of the credible record evidence as a whole. However, the subject matter is covered in the RO as proven and supported by the competent, substantial evidence in the record: 33, 40-41, 53-55, 57, 61-63, 70. The following PFOF are rejected as immaterial or as not dispositive: 39, 46, 49, 51-52. PFOF 50 is not a sentence, but the subject matter is covered in the RO as understood. COPIES FURNISHED: Thomas V. Infantino, Esquire Infantino & Berman Post Office Drawer 30 Winter Park, FL 32790 Ralph McMurphy, Esquire HRS District 3 Legal Office 1000 Northeast 16th Avenue Gainesville, FL 32609 B. Gray Gibbs, Esquire Sam Power, Clerk Bette B. Lehmberg, Esquire Department of Health and Suite 800 Rehabilitative Services One 4th Street North 1323 Winewood Boulevard St. Petersburg, FL 33701 Tallahassee, FL 32399-0700
Findings Of Fact Sometime before January, 1989, The Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide for social services in Haines City, Florida. HRS was authorized to procure, through competitive bidding, a lease of 9041 square feet of existing office space, plus or minus 3%. Public notice that HRS was seeking competitive bids was given by advertisement in four central Florida newspapers. HRS had prepared a document entitled Invitation to Bid for Existing Facilities (ITB), which set forth in detail all of HRS' requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. The evaluation factors and their relative weights were stated in the ITB: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease. Evaluated using present value methodology by application of the present value discount rate of % (Weighting: 30) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 5) Associated moving costs i.e. furniture, equipment, telephone systems, etc. (Weighting: 0) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 5) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 20) Facility Susceptibility of the design of the space offered to efficient layout and good utilization. (Weighting: 20) Provision of the aggregate square footage in a single building. Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 15 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100% The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: rental rates environmental factors efficient space layout The above areas were important to HRS since the agency would render indigent services to several hundred people every month. The majority of Respondent's clients are served within a 10 day period each month. A great deal of pressure is placed on the surrounding area due to the influx of people. Because of servicing so many people, factors two and three received a great deal of weight under HRS's consideration of the property it desired to lease and occupy. All of the above areas were covered by Respondent's weighted bid evaluation criteria. Sealed bids were submitted by Intervenor, Unirealty Services, Inc. (bid A), and Petitioners, Messrs. Matthews and Walker (bid B). The bids were opened February 20, 1989, and Mr. Michael T. Akridge, former Facilities Services Manager, District VI HRS, determined both bids were responsive. At the time the Intervenors submitted their bid, they included documentation which showed that they had an option contract to purchase the subject facility, and an authorization from the optionees (two principals of Intervenors) for Unirealty to act as their agent. Both Petitioner's and Intervenor's property were within the mandatory geographical area designated in the bid package. Both bids were responsive under the minimum bid specifications and bidder qualifications. The District Administrator appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to him the committee's choice of lowest and best bid. The purpose in establishing the bid evaluation committee was to secure input from a cross section of people who had a variety of backgrounds and knowledge that would be material in evaluating the office space, in light of the uses for which it was intended and the relative public worth of the work space. Six individuals who were familiar with the type of work to be done in the proposed space, as well as persons familiar with the bid process were appointed to the Committee. The bid evaluation committee determined that the bid of Unirealty was the "lowest and best." The bid evaluation committee consisted of six representatives of the Department who visited each bidders' site and questioned the bidders' representatives. Each of the committee members worked with or supervised HRS programs that were to be located in the leased space. The solicitation for bids provided each bidder, among other things, with the bid evaluation criteria, a 100 point scale, which the committee used to evaluate the bids. Each committee member's evaluation scores were averaged and totaled to score Petitioners at 90.8, and Unirealty at 83.9. Each committee member gave a higher score to Unirealty. The three major bid evaluation criteria were FISCAL COSTS, LOCATION and FACILITY. Under the FISCAL COST criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioners received 30 points out of 30 possible, and Unirealty got 23.1. For Renewal Rates, Petitioners got 5 out of 5 possible points, and Unirealty received 3.7 points. No points were awarded for Moving Costs. The evaluation committee did not assess points for Rental or Renewal Rates. These were scored by Michael T. Akridge, bid manager, based on a present value analysis of bidders' proposed rates. Mr. Akridge did not give the Committee the points for Rental and Renewal Rates until after they had completed their evaluations of the LOCATION and FACILITY criteria. The LOCATION criterion also had three sub-categories: Central Area-- 10 points--with both bidders receiving 9.3; Public Transportation--5 points-- which both bidders received; and, Environmental Factors--20 points--out of which Petitioners received 12.8 points and Unirealty 20 points. The Environmental Factors sub-category included building physical characteristics and surrounding area and their effect on the efficient and economical conduct of Department operations. Unirealty received a higher score than Petitioner because the committee believed its building had a better appearance, and was in better shape. The area surrounding the building was more open, while Petitioners' building was in a less desirable neighborhood with a bar or liquor store and bus station nearby which could create problems for clients because of transients. It had far more window space which creates a better work environment, and allows staff to be watchful of clients and their children outside, and the windows would be tinted. The windows at Petitioner's site were limited and no more could be added. Unirealty had more adjacent parking spaces, with handicapped parking closer to the building, and part of it was fenced which provided added protection to clients and staff. Petitioners' site had adjacent businesses whose patrons were using some of the parking spaces which the committee felt could create a problem. The Unirealty building could have an outside food stamp issuance facility which would be far more accessible to clients and to make the lobbies less crowded. It had an existing alarm system. It did not have side streets adjacent to the building, thus there would be less traffic congestion and therefore safer for clients; and, it had outside gathering areas where clients could go to smoke. Of the three sub-categories under FACILITY, Petitioners received 11.8 points out of 20 for Layout/Utilization and Unirealty received 19.7 points; for Single Building, both bidders received 10 points out of 10 possible. For the Layout/Utilization sub-category Unirealty received more points because its building configuration was more flexible and conducive to design of interior space, with less maze effect. The members of the committee each testified that it was important that the Unirealty building had no support poles to get in the way as they did in Petitioners' building. The support poles in Petitioner's building created a safety problem for clients and inhibited the location of desks and corridors. At Unirealty's site each worker could have a window, and mechanical and service areas could be put in the center of the building, with a playroom for clients' children. It provided a better restroom location near the front of Petitioner's building and lobby areas, and clients would not have to wander through work areas to get to the restrooms. Unirealty's building provided better control of clients' movements and thus better security. Members of the committee also upgraded the Unirealty building because its pitched roof was less likely to leak and its air conditioning was zoned thus providing better air quality and temperature control. At Unirealty there was better ingress and egress, and entry ways could be added. This could not be done at Petitioners' site. The Unirealty building could have different entrances for each HRS program, with separate lobbies for each program with less client congestion and better control. During the Committee members inspection of the sites they were told of an existing security alarm system already in place at the Unirealty site and were told that system would remain in place. When asked, the Petitioner's representative was unsure if his client would install a similar system at their site. A security system for the entire building was not included in the bid specifications, and it was improper for the committee to give Unirealty extra points for this unsolicited item. The proposed lease agreement calls for 9041 square feet of office space and a minimum of 66 parking spaces. Unirealty offered 72 parking spaces and Petitioner offered 75. The committee awarded more evaluation points to the Unirealty site based on future expansion capability of the building and the existing additional on-site parking spaces which were visible at the site at the time of inspection. The committee erroneously believed that the extra square footage of building space and extra parking spaces would necessarily be available to HRS if and when it might expand its offices. Future expansion was not in the bid specifications and it was clearly erroneous for them to have included this factor in their bid evaluation. The evaluation committee included the improper bid considerations in their evaluation of the Unirealty property. The two improper factors cannot be considered here. The unanimous recommendation of the evaluation committee was clearly to award the lease to the Intervenor. The evaluation committee based its decision on the scores attributed to each property on the Bid Synopsis sheet by the individual committee members. The committee utilized all the weighted bid criteria. However, two factors were of primary importance. One was its determination that the property offered by the Petitioners presented greater problems for design and flexibility due to the rectangular configuration of the building. The other consideration was that the physical characteristics of the Unirealty site and the surrounding area were considered far superior to the Petitioner's site. A close review of each evaluation sheet and the testimony of each committee member at the hearing shows that the improper factors were not so heavily weighted as to invalidate the committee recommendation. The reasons given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the Bid synopsis score sheets. The scoring was done by each member after inspection of the two buildings and without influence from the other committee members. In essence, the committee felt that Intervenor's property was the better property for the money. Importantly, every committee member came to the conclusion that Intervenor's property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a piece of property. On these facts, the individual scoring methods used by individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. Over an eight year period the Petitioner's rental cost was significantly lower than the Intervenor's. However, it is clear the legitimate considerations of the committee were crucial enough to override awarding the lease to the lowest bidder. The conclusion that the above factors can and do outweigh price and cost considerations in these facts is not an arbitrary and capricious decision, even though others may disagree with that decision. After the committee recommendation was scored and tabulated, Mr. Akridge requested the committee chair, Ms. Gail Newell, to prepare a draft letter of the proposed bid award. This was done in collaboration with the other committee members. Mr. Michael T. Akridge then prepared the bid award letter for the signature of the Administrative Services Director based on the draft letter. In it the two improper considerations were mentioned. The authority to award the lease to Unirealty was approved on March 8, 1989, by King W. Davis, Director of General Services for HRS based on the bid award letter, dated February 26, 1989.
Recommendation Based on the foregoing, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a final order awarding lease number 590:2057 to Unirealty Services, Inc., as the lowest and best bidder. DONE and ENTERED this 21st day of July, 1989, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of July, 1989. APPENDIX Petitioner's Proposed Findings of Fact: The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 15, 23, 26, 27, 28, 30, 34, 38, 39 (in part), 40, 41, 42, 45, 46, 47, 48, 49, 50, 51, 53, 64, 65, 67, 69, 70, 71, 76, 77, 81, 83 (in part) are adopted in substance in so far as material. Paragraphs 14, 16, 17, 18, 21, 22, 24, 25, 29, 33, 36, 37, 73, 74, 80 are rejected as conclusions of law. Paragraphs 13, 19, 20, 44, 54, 59, 60, 61, 63, 68, 72, 75, 778, 82, are rejected as not supported by the evidence. Paragraphs 31, 32, 35, 43, 52, 55, 56, 57, 58, 62, 66 are rejected assubordinate or immaterial. Respondent's Proposed Findings of Fact: The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 are adopted in substance in so far as they are material. Intervenor's Proposed Findings of Fact: The facts contained in paragraphs 1-17 are adopted in substance in so far as they are material. COPIES FURNISHED: Edward D. Matthews, Jr. 2405 Hideaway Court Tallahassee, Florida 32303 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Emory Farley, Esquire HRS District VI Legal Counsel 4000 West Buffalo Avenue, Room 500 Tampa, Florida 33614 Neal A. Sivyer, Esquire Paul J. Ullom, Esquire Shackleford, Farrior, Stallings and Evans, P. A. 501 East Kennedy Boulevard Suite 1400 Tampa, Florida 33601 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, FL 32399-0700 John Miller, Esquire Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, FL 32399-0700
The Issue The issue for determination is whether Respondent acted fraudulently, arbitrarily, illegally, or dishonestly in selecting Intervenor as the lowest bidder for a contract to supply the state with lamps valued at $3,692,499.
Findings Of Fact The Parties Respondent is the state agency responsible for soliciting bids to establish a contract for the purchase of large lamps by state agencies and other eligible users. Petitioner is a Florida corporation and the incumbent vendor under similar contracts for the preceding 10 years. Petitioner does not manufacture lamps. Petitioner sells lamps manufactured by Osram-Sylvania ("Sylvania"). Intervenor is an Ohio corporation doing business in Florida. Intervenor manufactures the lamps it sells. The ITB On March 15, 1996, Respondent issued Invitation To Bid Number 39-285- 400-H, Lamps, Large, Photo and STTV (the "ITB"). The purpose of the ITB is to establish a 24 month contract for the purchase of Large Lamps (fluorescent, incandescent, etc.), Photo Lamps (audio visual, projection, flash), and Studio, Theatre, Television, and Video Lamps ("STTV") by state agencies and other eligible users. The contract runs from July 10, 1996, through July 9, 1998. The ITB estimates the contract price at $3,692,499. The ITB contains General and Special Conditions. General Conditions are set forth in 30 numbered paragraphs and elsewhere in DMS Form PUR 7027. Special Conditions are set forth in various unnumbered paragraphs in the ITB. General Conditions Paragraphs 5, 11, and 24 of the General Conditions are at issue in this proceeding. The terms of each paragraph are: 5. ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and effect and are inapplicable to this bid. If submitted either purposely through intent or design or inadvertently appearing separately in transmittal letters, specifications, literature, price lists, or warranties, it is understood and agreed the general and special conditions in this bid solicitation are the only conditions applicable to this bid and the bidder's authorized signature affixed to the bidder's acknowledgment form attests to this. 11. QUALITY ASSURANCE: The contractor, during the contract term, upon mutual agree- ment with the Division of Purchasing, will provide reasonable travel and lodging accommodations for one (1) to three (3) government employees to perform an on-site inspection of the manufacturing process(es) and review of the manufacturer's product quality control(s) and total quality manage- ment program(s). The contractor will reim- burse the State for actual transportation cost, per diem and incidental expenses as provided in Section 112.061, F.S. It is the State's desire that the contractor provide demonstration of quality control for improvement rather than post production detection. 24. FACILITIES: The State reserves the right to inspect the bidder's facilities at any reasonable time with prior notice. Included Items Special Conditions in the ITB require bidders to submit prices for "Item 1" and "Item 2" lamps ("included items"). 1/ Item 1 lamps consist of Group 1 and 2 lamps. Group 1 lamps are Large Lamps such as fluorescent, incandescent, quartz, mercury vapor, metal halide, and high-pressure sodium lamps. Group 2 lamps are Photo Lamps such as audio visual, projection, flash, and STTV lamps. The total price for each group is multiplied by a weighted usage factor. The product calculated for Group 1 is added to the product calculated for Group 2 to determine the total price for Item 1 lamps. Item 2 consists of a category of lamps described as "T- 10 Lamps." The total price for Item 2 lamps is determined without application of the weighted usage factor used for Item 1 lamps. The total price for Item 2 lamps is a de minimis portion of the contract price. Special Conditions in the ITB require Respondent to award a single contract for included items to a single bidder. Special Conditions state that, "During the term of the contract established by this bid, all purchases of items will be made from the successful bidder." 2/ Excluded Items Special Conditions require that, "The bidder shall offer a fixed discount from retail prices on all excluded items." Excluded items include high technology lamps. The requirement for a fixed discount on excluded items is not considered in evaluating bid prices for included items. Rather, the requirement is intended to reduce the state's cost for both included and excluded items by assuring a meaningful discount on excluded items. Formatting Requirements Special Conditions prescribe the format in which bids must be submitted. Price lists and authorized dealers' lists are required to be submitted in hard copy and on computer diskette. The format prescribed for computer diskette includes requirements for font and graphics. The Special Conditions state that, "Failure to comply with this requirement will result in disqualification of your bid." The Bids The ITB prohibits the alteration of bids after they are opened. Respondent opened bids on April 10, 1996. Seven vendors submitted bids in response to the ITB. Included Items Four vendors, including Petitioner, submitted a bid for both Item 1 and Item 2 lamps. Intervenor and two other bidders did not submit a bid for Item 2 lamps. General Conditions Intervenor deleted paragraphs 11 and 24 of the General Conditions from its bid. At the direction of Intervenor's legal department in Cleveland, Ohio, Intervenor's regional sales manager struck through paragraphs 11 and 24 and initialed the deletions. The deletions are consistent with Intervenor's corporate policy. Intervenor routinely objects to contract provisions requiring inspection of Intervenor's facilities. Excluded Items Petitioner's bid includes a fixed discount of 44 percent on excluded items. Intervenor's bid includes a fixed discount of 0 percent. Formatting Requirements Intervenor included the information required by the ITB on the diskette it submitted with its bid. However, Intervenor supplied the information in Courier 12 characters per inch ("cpi") font, not the Courier 10 cpi font prescribed in the ITB. Proposed Agency Action Respondent determined that Intervenor's bid was responsive. The purchasing specialist for Respondent who reviewed each bid to determine if it was responsive failed to observe the deleted paragraphs in Intervenor's bid. The purchasing specialist forwarded those bids determined to be responsive to the purchasing analyst assigned by Respondent to: determine if the lamps offered in each bid met the specifications prescribed in the ITB; and evaluate bid prices. The purchasing analyst noted that paragraphs 11 and 24 were deleted from Intervenor's bid. The purchasing analyst and purchasing specialist conferred. They determined that paragraph 5 of the General Conditions cured Intervenor's deletions without further action. The purchasing analyst correctly determined: that lamps offered by Petitioner and Intervenor met ITB specifications; that Intervenor's bid is the lowest bid for Item 1 lamps; that Petitioner's bid is the second lowest such bid; and that Petitioner's bid is the lowest bid for Item 2 lamps. Petitioner's bid for Item 1 lamps is approximately five percent greater than Intervenor's bid. Respondent proposes to award one contract for Item 1 lamps to Intervenor. Respondent proposes to award a second contract for Item 2 lamps to Petitioner. At 4:00 p.m. on May 20, 1996, Respondent posted its intent to award the contract for Item 1 lamps to Intervenor. Petitioner timely filed its formal protest on June 3, 1996. Respondent did not award a contract for excluded items. Respondent's failure to award a contract for excluded items is not at issue in this proceeding. Arbitrary Respondent's proposed award of a contract to Intervenor for substantially all of the items included in the ITB is a decisive decision that Respondent made for reasons, and pursuant to procedures, not governed by any fixed rule or standard prescribed either in the ITB or outside the ITB. Respondent's proposed agency action is arbitrary. Excluded Items The requirement for bidders to offer a fixed discount on excluded items operates synergistically with the requirement for Respondent to award a single contract on included items to a single bidder. The combined action of the two requirements operating together has greater total effect than the effect that would be achieved by each requirement operating independently. The requirement for a fixed discount on excluded items, operating alone, may not induce a bidder who could receive a contract solely for Item 2 lamps to offer a discount that is as meaningful as the discount the bidder might offer if the bidder were assured of receiving a contract for Item 1 and 2 lamps upon selection as the lowest bidder. 3/ By assuring bidders that a single contract for Item 1 and 2 lamps will be awarded to a single bidder, the ITB creates an economic incentive for bidders to provide a meaningful discount on excluded items. Respondent frustrated the synergy intended by the ITB by applying the requirements for a fixed discount and for a single contract independently. Respondent penalized the bidder conforming to the requirement for a fixed discount on excluded items by awarding only a de minimis portion of the contract to the bidder. Respondent rewarded the bidder not conforming to the requirement for a fixed discount on excluded items by awarding substantially all of the contract to that bidder. If Respondent elects to purchase all excluded items from Petitioner, Respondent will have used the contract for Item 1 lamps to induce a meaningful discount from Petitioner without awarding Petitioner with the concomitant economic incentive intended by the ITB. Such a result frustrates the ITB's intent. Paragraph 5 Respondent's interpretation of paragraph 5 fails to explicate its proposed agency action. Respondent's interpretation of paragraph 5: leads to an absurd result; is inconsistent with the plain and ordinary meaning of the terms of the ITB; and is inconsistent with Respondent's actions. Respondent's interpretation imbues paragraph 5 with limitless curative powers. Respondent's interpretation empowers paragraph 5 to cure the deletion of all General Conditions in the ITB whether stricken by pen or excised with scissors. Respondent's interpretation of paragraph 5 would transform a bid containing no General Conditions into a responsive bid. Respondent's interpretation of paragraph 5 is inconsistent with the plain and ordinary meaning of its terms. Paragraph 5 operates to cure "additional" terms. It does not operate to restore deleted terms. Respondent's interpretation of paragraph 5 is inconsistent with Respondent's actions. Respondent did not rely on paragraph 5 to cure Intervenor's deletions without further action. Respondent took further action to cure the deletions. Further Action On the morning of May 20, 1996, the purchasing analyst for Respondent telephoned Intervenor's regional sales manager. The purchasing analyst demanded that Intervenor accept the conditions Intervenor had deleted from its bid by submitting a letter of acceptance before the bid tabulations were posted at 4:00 p.m. on the same day. The regional sales manager contacted Intervenor's corporate headquarters in Cleveland, Ohio. Intervenor authorized the regional sales manager to accept the deleted paragraphs. By letter faxed to Respondent at approximately 3:20 p.m. on May 20, 1996, Intervenor accepted the paragraphs it had previously deleted. The letter stated that, "GE Lighting [will accept] the Contract Conditions noted in Paragraphs 11 and 24 of the Lamp Quotation." [emphasis not supplied] At 4:00 p.m. on May 20, 1996, Respondent posted the bid tabulation form. The bid tabulation form stated that the "award is contingent upon General Electric's acceptance of all the terms in conditions (sic)" in the ITB. Respondent argues that the purchasing analyst who contacted Intervenor on the morning of May 20, 1996, exceeded her authority. Respondent characterizes the word "contingent" in the bid tabulation form as "poorly written" and a "bad word." Agency Construction Of ITB Terms Respondent construes terms in the ITB in a manner that is inconsistent with their plain and ordinary meaning. The ITB requires that, "The bidder [shall] offer a fixed discount from retail price list on all excluded items." [emphasis supplied] Respondent interprets the quoted provision as meaning the bidder may offer such a fixed discount if the bidder elects to do so. The purpose of the ITB is to establish "[a] 24 month contract" to supply large lamps to the state. [emphasis supplied] Respondent interprets the quoted provision as meaning that the purpose of the ITB is to establish two contracts. The ITB states that, "During the term of the contract established by this bid, all purchases of items [will] be made from [the] successful bidder." [emphasis supplied] Respondent interprets the quoted provision as meaning that purchases of some items will be made from one successful bidder and that purchases of other items will be made from a second successful bidder. The ITB states that the contract "[shall] be made statewide on an all or none basis" to the responsive bidder who satisfies the conjunctive requirements for: "[the] lowest "Award Figure Item (1; [and] lowest Award figure for Item (2." [emphasis supplied] Respondent interprets the quoted provision as meaning that separate contracts may be made statewide on less than an all or none basis to separate responsive bidders who satisfy the disjunctive requirements for either the lowest bid for Item 1 lamps or the lowest bid for Item 2 lamps, or both. The ITB requires offers to be submitted for all items listed within a group for a bid to qualify for evaluation. Respondent interprets the requirement as meaning that a bidder who does not qualify for evaluation for all of the groups in the contract nevertheless qualifies for evaluation for the contract. Finally, the ITB states that failure to comply with the formatting requirements for the diskette "[will] result in disqualification of your bid." [emphasis supplied] Respondent interprets the quoted language to mean that failure to comply with prescribed formatting requirements may result in disqualification of a bid. The interpretations of the quoted terms proposed by Respondent, individually and collectively, frustrate the purpose of the ITB. They also ignore material requirements of the ITB. Material Deviation Respondent deviated from the rule or standard fixed in the ITB in several respects. First, Respondent altered the bid evaluation procedure prescribed in the ITB. Second, Respondent ignored the requirement to award a single contract to a single bidder. Third, Respondent ignored the requirement that bidders provide a fixed discount on excluded items. Fourth, Respondent ignored the requirement to comply with the formatting requirements prescribed in the ITB. Each deviation from the rule or standard fixed in the ITB is a material deviation. Each deviation gives Intervenor a benefit not enjoyed by other bidders. Each deviation affects the contract price and adversely impacts the interests of Respondent. 4/ 5.5(a) Benefit Not Enjoyed By Others Intervenor enjoyed a benefit not enjoyed by other bidders. Intervenor obtained a competitive advantage and a palpable economic benefit. Respondent altered the bid evaluation procedure prescribed in the ITB. On the morning of May 20, 1996, Respondent disclosed the bid tabulations to Intervenor alone, 5/ gave Intervenor an opportunity that lasted most of the business day to determine whether it would elect to escape responsibility for its original bid, allowed Intervenor to cure the defects in its bid, accepted Intervenor's altered bid, and conditioned the bid tabulations on Intervenor's altered bid. Respondent used a bid evaluation procedure that is not prescribed in the ITB and did not allow other bidders to participate in such a procedure. 6/ In effect, Respondent rejected Intervenor's initial bid, with paragraphs 11 and 24 deleted, and made a counter offer to Intervenor to accept a bid with paragraphs 11 and 24 restored. Intervenor accepted Respondent's counter offer. Respondent excluded other bidders from that process. Respondent gave Intervenor an opportunity to determine whether it would elect: to escape responsibility for its original bid by declining Respondent's counter offer; or to perform in accordance with an altered bid by restoring paragraphs 11 and 24. A bidder able to elect not to perform in accordance with its bid has a substantial competitive advantage over other bidders unable to escape responsibility for their bids. 7/ Respondent awarded substantially all of the contract to Intervenor even though Intervenor failed to provide a meaningful discount on excluded items. Respondent provided Intervenor with a palpable economic benefit. 5.5(b) Bid Price And Adverse Impact On The State Respondent did not award a contract for excluded items. Respondent's proposed agency action allows Respondent to purchase excluded items from either Intervenor or Petitioner. If Respondent were to purchase all of the excluded items it needs from Intervenor, Respondent could pay substantially more for excluded items than Respondent would save from the five percent price advantage in Intervenor's bid for Item 1 lamps. In such a case, Respondent's proposed agency action would effectively increase costs to the state that are inherent, but not stated, in the ITB. 8/ Conversion of incorrectly formatted data to the required font shifts prices to incorrect columns and causes other problems in accessing information in the diskette. Such problems can not be rectified easily but require substantial time and effort. Responsive Bidder Respondent did not award the contract intended by the ITB to the lowest responsive bid. Although Intervenor's bid is the lowest bid for Item 1 lamps, it is not the lowest responsive bid for Item 1 and 2 lamps. Petitioner's bid is the lowest responsive bid for Item 1 and 2 lamps. 9/ Respondent is statutorily required to award the contract to the lowest responsive bidder. 10/ Illegal Intervenor's bid is not responsive within the meaning of Sections 287.012(17), Florida Statutes (1995). 11/ It does not conform in all material respects to the ITB. Intervenor's unaltered bid deletes paragraphs 11 and 24. It does not include a fixed discount on excluded items, does not include a bid for Item 2 lamps, and does not conform to the formatting requirements in the ITB. Section 287.057 requires Respondent to award the contract to the bidder who submits the lowest responsive bid. Respondent has no authority either: to consider bids that are not responsive; or to award the contract to a bidder other than the lowest responsive bidder. Respondent's attempt to engage in either activity is ultra vires and illegal. Minor Irregularities The ITB encourages, but does require, bidders to include quantity discounts for Item 1 and 2 lamps. Petitioner's bid does not include quantity discounts. Petitioner's bid does not fail to conform to material requirements in the ITB. Petitioner does not manufacture Item 1 and 2 lamps. Sylvania manufactures the lamps Petitioner sells. Petitioner has no legal right to require Sylvania to allow inspection of its facilities pursuant to paragraph 11 of the General Conditions. Petitioner's ability to provide the requisite inspections requires the cooperation of Sylvania. Petitioner's bid requires payment by the state within 30 days of an invoice. Section 215.422 and the ITB provide that Respondent has 40 days to issue warrants in payment of contract debts and that interest does not accrue until after 40 days. The defects in Petitioner's bid are minor irregularities within the meaning of Florida Administrative Code Rule 60A-1.001(16). 12/ They neither affect the bid price, give Petitioner a competitive advantage, nor adversely impact Respondent's interests. Petitioner has the practical ability to arrange inspection's of Sylvania's facilities. Petitioner is legally responsible for failing to do so. Respondent's employees have never visited Sylvania's facilities during the 10 years in which Petitioner has been the contract vendor to the state. The requirement for payment within 30 days does not obviate the provisions of Section 215.422. Private contracts can not alter mutually exclusive statutory provisions.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order granting Petitioner's protest of Respondent's proposed agency action. RECOMMENDED this 26th day of September, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of September, 1996.
The Issue The first issue to be determined is whether the BOARD can reject all bids, with or without cause. The second issue is to determine if the BOARD is required to have cause, was there a sufficient basis for the rejection of all bids in Bid NO. 3996?
Findings Of Fact On December 14, 1987, the BOARD sent invitations to bid to a list of approved vendors in Bid NO. 3996. The purpose of the invitation was to obtain the lowest responsible bid on a purchase of one hundred and fifty typewriters. The bids were to be submitted prior to January 11, 1988 at 2:00 P.M.. They were opened by the BOARD on the same day. OFFICE did not receive an invitation to bid despite its request to be placed on the approved vendor's list in November of 1987. When OFFICE learned of the outstanding invitation to bid, its representative, Mr. Richard Foss, went to the BOARD's Purchasing Department and requested a bid package. The bid documents given to OFFICE mistakenly gave January 14, 1988 at 2:00 P.M. as the deadline for the bid submission. Because of the later date given by the BOARD to OFFICE, the company's bid was received after the opening of the bids. When the results of the bidding were made known at the public bid opening, NAPLES bid was the lowest received. On January 14, 1988, after 10:42 A.M., it was discovered by the BOARD that OFFICE's bid price was lower than the price submitted by NAPLES. At this time, NAPLES bid had not yet been accepted by the BOARD, and no formal announcement had been made awarding the contract to NAPLES. During the BOARD's Purchasing Department's bid analysis, a request was made to reject all bids in Bid NO. 3996. The reason given by Purchasing for the request for rejection was that the specifications were being revised. The bids were rejected on the same date. The written reason sent to the vendors on January 14, 1988 for the bid rejection was that one vendor had been given an incorrect opening date. Attached to the written notice to the vendors was a new bid invitation for Bid NO. 4013. The BOARD explained its mistake was unfair to the one vendor. A new bid opening date was given of February 1, 1988. On January 14, 1988, in addition to the required bid documents, OFFICE submitted a letter which listed additional offerings or incentives that OFFICE would give the BOARD if OFFICE was awarded the contract. These additional purchasing incentives were: wall charts and teacher/student manuals for each typing classroom in the county. OFFICE also informed the BOARD that one of the BOARD's own service personnel was already trained in the servicing of Swintec typewriters. The bid submitted by OFFICE did not meet either the weight or the print wheel specifications as set forth in Bid NO. 3996. The specifications as written in Bid NO. 3996 were not written to eliminate all other typewriters but the Brothers 511-11. Weight specifications required were below the Brother's minimum weight, and at least two other manufacturers provide protected drop-in cassette print wheels in electronic typewriters. The Invitation to Bid contained specific provisions which encouraged the bidding of typewriters other than the Brother 511-11, and set up procedures under which other typewriters, which substantially meet the specifications, could be reviewed on their merits. NAPLES was the lowest responsible bidder for the electronic typewriter contract in the prior school year. The BOARD had rejected all bids at that time because of the decision to consider a different brand of typewriter once bids were opened. A notice of protest was filed by NAPLES, and the BOARD agreed to honor NAPLES bid and award the company the contract. The BOARD revised its bid specifications from last year prior to its solicitations for bids in Bid NO. 3996. The protected drop-in cassette print wheel and the weight requirements were two new technical specifications. During the hearing, the BOARD was unable to determine whether the weight factor or the protected drop-in cassette print wheel requirement will continue to be included in future revisions of the specifications.
Recommendation Based on the foregoing, it is RECOMMENDED: That the BOARD reject the bid submitted by OFFICE as it was nonconforming and sought an advantage not enjoyed by the other bidders. Reinstate the bids which were rejected in Bid NO. 3996, consider the bids, and make an award of the contract to NAPLES. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. VERONICA D. DONNELLY Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: Stephen Emens, President Naples Business Equipment and Systems, Inc. 859 4th Avenue South Naples, Florida 33940 Harry A. Blair, Esquire 2138-40 Hoople Street Ft. Myers, Florida 33901 Richard Foss, Typewriter Sales Manager 8A-Del Prado Boulevard Cape Coral, Florida 33904 Karl Engel, Superintendent Lee County Public Schools The School Board of Lee County 2055 Central Avenue Fort Myers, Florida 33901
Findings Of Fact The Department of Health and Rehabilitative Services currently leases approximately 22,000 square feet of space from Nelson P. Davis. The space is contained in two separate buildings, both located at 417 Racetrack Road, Ft. Walton Beach, Florida. The Department and Davis were involved in a legal dispute involving the currently leased premises, which concluded in 1986 with the entry of judgment in Davis' favor. While some antagonism remains between the parties related to the legal action instituted by Davis, Davis has been an acceptable landlord in all other respects. The current lease expires February 1, 1989. Davis has been aware, since late February or early March of 1988, that the Department would need space in excess of the currently occupied 22,000 square feet, but was not aware of the actual additional space requirements until the issuance of the invitation to bid. In general, the Department's space requirements have increased annually. In response to the anticipated need for additional space, Davis initiated plans for design of a third Racetrack Road building that could meet the additional need, but did not construct the facility. In response to the space requirements of previous years, Davis has constructed additional space. The Department has occupied the additional space in such proportions as to avoid the competitive bidding process, however, the current need for additional space exceeds the maximum which can be leased without competitive bidding. The Department on May 11, 1988, issued an invitation to Bid for approximately 26,165 square feet of space in Ft. Walton Beach, Florida. (HO #1) In response to the invitation, Davis submitted a bid proposal. The Davis proposal, the sole proposal received by the Department, was disqualified by the Department as non-responsive. On June 23, 1988, the sole bid was opened by Joseph Pastucha, HRS District One Facilities Manager, who initially reviewed the Davis bid. Mr. Pastucha identified items of concern related to the responsiveness of the bid and then provided the information to his supervisor, who in turn provided the information to Mr. James Peters. The Department did not contact Davis for further information or to provide the opportunity to correct any defects. James Peters, HRS's District One Manager for Administrative Services has expressed on at least one occasion a desire to avoid entering into business arrangements with Nelson P. Davis. The bases for Peters' opinion is the earlier litigation between the parties. Peters was on the committee which was to have evaluated bids submitted in response to the invitation. However, Peters has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that Peters based his opinion regarding the Davis bid submission solely on the earlier litigation or that any other person involved in the agency's action permitted personal opinions to affect the decisional process. Davis' bid proposal included the two buildings constituting approximately 22,000 square feet located at 417 Racetrack Road which the Department currently occupies, plus a third building of approximately 4,000 square feet. The proposed square footage and lease cost were acceptable. The third building was to be either a planned, unconstructed building located at the 417 Racetrack Road location or an existing building located "7/l0ths of a mile southeast of the present HRS offices," (the off-site building). However, a memorandum attached to Davis' submission stated that he did not intend to use the off-site building for HRS purposes, (HO #2). Further, Davis had previously indicated in conversation with the HRS manager of the 417 Racetrack Road offices that he planned to utilize the off-site space otherwise. On page one of the bid submittal form Davis indicated the address of the proposed location as 417 Racetrack Road. By letter dated July 5, 1988, the Department notified Davis that his bid offering was deemed non-responsive and that the Department expected to readvertise for space in Ft. Walton Beach. The letter made no mention of any opportunity to protest the determination. The statement, "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes," which is required to be included in the notice of agency decision by Section 120.53(5)(a), Florida Statutes, was omitted by the Department. (HO #3) On or about July 7, 1988, Davis contacted the Department of General Services to express his dismay regarding the disqualification of his submittal. A meeting, held on or about July 19, 1988, between Davis and Department representatives, did not alter the Department's position. On or about July 25, 1988, the written notice of protest and request for hearing was filed. The Department forwarded the request to the Division of Administrative Hearings. The letter dated July 5, 1988, advising Davis that his bid was deemed non-responsive enumerated five reasons for the Department's decision. The reasons stated were: No photograph of the proposed facility was submitted as requested; No floor plan of the facility was submitted as requested; A substituted site was submitted Proposed space was not an existing building and was not measurable; Three buildings in bid proposal constitute three locations and are unacceptable. The letter was signed by Chuck Bates, DHRS Deputy District Administrator, District One. The letter was drafted by James Peters. (HO #3) Mr. Bates relied upon Peters and Pastucha to provide information sufficient to justify the disqualification of the bid, and was satisfied that the action was justified prior to signing the letter. Examination of the bid submittal package reveals that Davis failed to acknowledge by initial the requirements of page seven, but that he did, on that page, appropriately respond to questions related to proposed parking spaces being bid. The Department did not base the disqualification of the bid on the failure to acknowledge the page and did not include the failure to initial the page in the stated reasons for deeming the bid non-responsive. Paragraph 9(a) of the bid submittal form requires the submission of a clear photograph of the exterior front of the building. (HO #2) Davis submitted no photographs. Paragraph 9(b) of the bid submittal form requires the submission of a scaled floor plan showing present configurations with measurements. (HO #2) Davis submitted floor plans for the proposed-to-be-constructed building and for the off-site building, but failed to submit floor plans for the two buildings which the Department currently occupies. The bid also failed to include calculations of net rentable square footage related to the omitted floor plans. The letter to Davis stated that an additional reason for disqualification of his bid from further consideration was the submission of a substituted site, (HO #3). The "substituted site" refers to Davis' inclusion of the off-site building not identified in the bid submission other than by the statement that the building was located seven-tenths of a mile southeast of the present HRS office location. No map, street address, legal description, or other identifying information was submitted. The proposal submitted by Davis included plans to construct a third building at 417 Racetrack Road, which was rejected as not measurable. The invitation to bid states that to be considered, the space must be existing, dry and physically measurable, at the time of bid submitted. (HO #1) The proposed third building clearly fails to meet this requirement. While the Department may permit the correction of minor deficiencies, the deficiencies were adjudged by the Department to be more than minor. The proposal's inclusion of nonexisting space (Racetrack Road building #3) or in the alternative a building, the location of which can not be determined from the bid information and which the bidder apparently intends not to provide, is non- responsive to the specifications of the invitation. As to the fifth enumerated reason for disqualification of the bid (three buildings/three locations) the Department and Petitioner presented extensive testimony related to paragraph 3(b) of page 15 of the bid submittal form. Page 15 of the bid submittal form is titled "Evaluation Criteria" and contains a list of weighted factors which were to be used in the evaluation of bids. (HO #2) Paragraph 3(b) states, as one factor for consideration in evaluation, whether the bid provides for the required aggregate square footage in a single building, and continues, "[p]roposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within yards of each other." (HO #2) The space left for the specification of maximum yardage was erroneously left uncompleted by the Department and the Department did not learn of the error until the bid was submitted. The Department's disqualification of the bid on this basis relies on the Department's assertion that the three buildings included in the Davis proposal constitute three locations and that a responsive bid may contain not more than two locations. The Department's position is that "location" and "building" are synonymous and that paragraph 3(b) of the evaluation criteria prohibits consideration of a bid submission including more than two buildings. The Department's position is rejected as arbitrary. The bid package does not state that proposals including more than two buildings will be disqualified. The sole reference to the number of buildings in a responsive bid submission is as stated and contained on the page of "Evaluation Criteria", wherein it is identified with a weighting factor of five percent of total possible points.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-3868BID. DONE and ENTERED this 28th day of September, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3868BID The following constitute rulings on the proposed findings of fact submitted by the parties. Petitioner: Accepted in part. The use of the word "required in the fourth sentence is rejected. The referenced section relates to evaluation factors, not specific requirements. Accepted. Accepted in part. The third building was proposed as either the off-site building or the planned, non-existent space. Accepted. Accepted. Accepted. Rejected as restatement of testimony. Other testimony indicated that Petitioner planned to use the off-site location for non-HRS purposes. Rejected, immaterial. Accepted. Accepted. Accepted as modified. Accepted in part. The use of the word "technical" is rejected. Accepted. Accepted as modified. Accepted as modified. Accepted. Accepted. Accepted. Accepted as modified. Accepted as modified. Accepted as modified. The change between the two invitations to bid was to clarify the obvious confusion related to the use of terms "location" and "building" and was made not to the bid specifications but to evaluation criteria. Rejected as restatement of testimony. Rejected, conclusion of law. Accepted so far as relevant. While the Davis bid was disqualified as non-responsive, the right to reject any and all bids encompasses the disqualification of a bid as non-responsive to the specific requirements of an invitation to bid. Respondent: Rejected, conclusion of law. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Floor plan of the off-site building was submitted showing that the building is essentially a hollow, box-like structure. Accepted. Accepted. Accepted. Rejected, irrelevant. While the usual distance may be 100 yards, the actual bid specifications do not state such. Further the sole reference to the distance between "locations" was contained in evaluation criteria. At no time prior to the June 23, 1988 bid opening did the Department attempt to identify the preferred distance between locations. Accepted. Accepted. Accepted. COPIES FURNISHED: Bruce A. McDonald, Esquire Post Office Box 887, Suite 105 151 Mary Esther Cutoff Mary Esther, Florida 32569 Rodney M. Johnson, Esquire Acting District One Legal Counsel Post Office Box 8420 Pensacola, Florida 32505-8420 Joseph J. Pastucha 3300 North Pace Boulevard Room 109 Town & Country Plaza Pensacola, Florida 32505 Jan Kline 417 Racetrack Road Ft. Walton Beach, Florida 32548 James V. Peters Department of General Services 160 Governmental Center Fourth Floor, Room 412 Pensacola, Florida 32501 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Tom Batchelor Staff Director House HRS Committee The Capitol Tallahassee, Florida 32399-1300
The Issue This case considers whether Petitioner's response to Invitation to Bid, No. 94-014, as revised, issued by the Respondent, is responsive to the terms of the Invitation to Bid. If Petitioner is found responsive, then the question is raised whether Petitioner has offered the lowest and best response to the invitation to bid.
Findings Of Fact On May 26, 1994, Respondent provided a memorandum to prospective vendors concerning Bid No. 94-014, as revised. This memorandum informed the prospective vendors that the new bid due date was June 6, 1994. The memorandum attached the bid instructions. Under general conditions to the invitation to bid the prospective vendors were reminded in Paragraph 7 that the Respondent could ". . . reject any or all bids or waive any minor irregularity or technicality in bids received." Under the heading "Special Provisions" prospective vendors were informed that "The charge per 1,000 for individual items under Exhibit A shall be the rates for the contract with the successful bidder." The prospective bidders were instructed as follows: REQUIRED ITEMS TO BE SUBMITTED WITH BID: The bidder must complete all required items below and submit as part of the bid package. Any bid in which these items are not used or in which these items are improperly executed, may be considered non-responsive and the bid may be subject to rejection. Among the items to be submitted with the bid was Exhibit A. The bidders were informed about the process of EVALUATION/AWARD. There it was stated: Bids will be evaluated and awarded on an all or none basis to one bidder. Award will be based on the total costs of four (4) theoretical jobs (See Exhibit B-Bid Total) requiring varying services and on the bidder's qualifications to best serve the Department's needs. The prospective bidders were then reminded a second time that: "THE DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS AND TO WAIVE ANY MINOR IRREGULARITIES IN BIDS RECEIVED." Within Exhibit A to the bid document was a category referred to as "Tabbing", calling for the charge per 1,000 for that service. Within Exhibit B under the fourth theoretical job was a requirement to quote the subtotal cost for 200,000 newsletter preparations to include "Tabbing." Three vendors submitted responses to the invitation to bid. Those responses were opened on June 6, 1994. The vendors who responded were Petitioner, Educational Clearinghouse, Inc. and Mail Masters of Tallahassee, Inc. In the subtotal for costs for 200,000 newsletter preparations, in activity four, concerning theoretical jobs, found within Petitioner's Exhibit B to the response to the invitation to bid, Petitioner made a mistake. It misplaced the decimal point and described the subtotal cost for 200,000 newsletter preparations as $73.80 instead of $7,380.00. Respondent characterized this as a typographical error or nominal mistake. In fact, this error constituted a minor irregularity which did not preclude the ability to understand Petitioner's response so that it might be compared to the responses by the competition. Petitioner made a second error. This error occurred when Petitioner failed to indicate the amount that it would charge per 1,000 for "Tabbing" within Exhibit A. Respondent did not consider this to be a minor irregularity and rejected Petitioner's bid as non-responsive for the failure to include a quotation for the charge per 1,000 for "Tabbing." This resulted in the intent to award the contract to Educational Clearinghouse, Inc. whose bid total for the four theoretical jobs under Exhibit B was $9,137.25 compared to Petitioner's bid total of $8,374.62. In preparing Exhibit B, activity four, Petitioner included a theoretical charge for "Tabbing" in the amount of $8.00 per 1,000. Petitioner contends that the $8.00 per 1,000 found within that entry may be correlated with the missing information concerning "Tabbing" in Exhibit A to its response to the invitation to bid. In the instructions to the vendors, Respondent has informed the vendors that the charge per thousand for individual items identified in Exhibit A constitutes the rate that the Respondent would expect to pay under a contract with the successful bidder. By contrast, the function of the information provided in Exhibit B is for purposes of awarding the contract based upon total costs of the four theoretical jobs and on the basis of the vendor's qualifications to best serve the Respondent's needs. Although not stated in the invitation to bid it can be inferred that similar references within Exhibits A and B, such as the reference to "Tabbing", calls for a comparable price to be set forth for the item in both Exhibit A and Exhibit B. Otherwise vendors would have the opportunity to quote low prices in completing Exhibit B as a means to win the cost comparison with their competitors for purposes of the award and then have the opportunity to charge higher costs per 1,000 as reflected in Exhibit A when establishing the charges for the contract with the Respondent following the competition contemplated in the comparison of the theoretical bid total under Exhibit B. Therefore, it would be reasonable for the Respondent to expect that the Petitioner would charge $8.00 per 1,000 for "Tabbing" under a contract between the Petitioner and Respondent based upon information that was set forth in the response to Exhibit B, activity four, "Tabbing." In summary, Petitioner's oversight in leaving out reference to the tabbing charge in Exhibit A does not affect the comparison of bid responses as contemplated by the instructions to the vendors, a function performed by comparing the respective Exhibits B. Otherwise, Respondent may gain the necessary understanding of Petitioner's charge per 1,000 for "Tabbing" as contemplated in instructions concerning Exhibit A as a means for entering into the contract. This understanding is achieved by transposing the $8.00 per 1,000 "Tabbing" quotation in Exhibit B to the "Tabbing" charge within Exhibit A as $8.00 per 1,000. With this adjustment, Modern Mailers, Inc. is the lowest responsive bidder and best able to serve Respondent's needs pertaining to Invitation to Bid No. 94-014, as revised.
Recommendation Based upon the findings of fact and the conclusions of law reached, it is, RECOMMENDED: That a final order be entered which finds that Petitioner is a "qualified" and "responsible" bidder who is the lowest and best responsive bidder to Invitation to Bid, No. 94-014, as revised and is entitled to the award of the contract contemplated by that invitation to bid. DONE and ENTERED this 8th day of September, 1994, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of September, 1994. APPENDIX The following discussion is given concerning the proposed findings of fact of the Parties: Petitioner's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is not necessary to the resolution of the dispute. Paragraphs 3 through 5 are subordinate to facts found. Paragraphs 6 and 7 are rejected to the extent that they are intended to establish an excuse for the Petitioner not providing information related to the cost for tabbing called for in Exhibit A in the invitation to bid. Paragraph 8 is subordinate to facts found. Paragraphs 9 through 12 are not necessary to the resolution of the dispute. Paragraph 13 is subordinate to facts found. Paragraph 14 is rejected to the extent that it suggests that Petitioner may amend its response to the invitation to bid to specifically set forth the amount attributable to the tabbing charges per 1,000 in Exhibit A. Nonetheless one may infer that the cost per 1,000 for tabbing is the same as is set forth in Exhibit B. Paragraphs 15 through 17 are subordinate to facts found. Paragraph 18 constitutes legal argument. Respondent's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is contrary to facts found Paragraph 3 is rejected in fact and law. Paragraph 4 is rejected in the suggestion that the Petitioner does not have the ability to perform the contract. COPIES FURNISHED: Daniel W. Dobbins, Esquire Callahan & Dobbins 433 North Magnolia Drive Tallahassee, FL 32308 Vytas J. Urba, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Jack McRay, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 George Stuart, Secretary Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Informational Copies: Ronald W. Brooks, Esquire Brooks and LeBoeuf, P.A. 863 East Park Avenue Tallahassee, FL 32301 Joan Reeves, Vice President Educational Clearinghouse Post Office Box 3951 Tallahassee, FL 32315
Findings Of Fact On August 31, 1994, the Respondent received and opened bids for its Project No. HSMV 92044000, Repairs, Art Sutton Drivers' License Office, Miami, Florida (the Project). The bid specification documents (the Specifications) for the Project included requirements for a Base Bid and for specific alternate proposals with respect to three defined items of alternate work. Section 01100 of the Specifications stated that "[a]ll Alternates described in this Section are required to be reflected on the Bid Form as submitted by the bidder." Part 2 of that section provided: ALTERNATE NO. 1 A. Provide a deductive price to the base bid for the removal of existing window units and the installation of new units as indicated in plans and specification Section 08520. ALTERNATE NO. 2 A. Provide a deductive price to the base bid for the provision of communications conductors see specification Section 16400. ALTERNATE No. 3 A. Provide a deductive price to the base bid for the installation of all landscape materials as indicated on plans and as per specification Section 02960. Also included in the Specifications as Exhibit 4 was a Proposal Form. The Specifications required each bidder to submit this form in triplicate on the bidder's letterhead. With respect to alternates, the Proposal Form required: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications. Alternate No. 1 Add or Deduct $ Alternate No. 2 Add or Deduct $ Alternate No. 3 Add or Deduct $ The Respondent's architect received four bids on August 31, 1994. As recorded on the Bid Tabulation and Notice of Award Recommendation, three bidders provided specific prices for the three alternates, as well as a Base Bid. The Bid Tabulation shows that two bidders provided specific prices for the three alternates and included the alternate prices in their Base Bids. The Petitioner provided specific prices for the three alternates, but excluded the alternate prices from its Base Bid. The fourth bidder provided a specific price for only one alternate and excluded that alternate price from its Base Bid. (The fourth bidder was disqualified as non-responsive for failing to submit prices on all three alternates.) In pertinent part, the Petitioner's proposal read: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications: Alternate No. 1 Add or Deduct . . . $4,400.00 Alternate No. 2 Add or Deduct . . . $1,158.00 Alternate No. 3 Add or Deduct . . . $2,084.00 These Alternates were in addition to the Petitioner's Base bid of $204,322.00. The proposal form submitted by the Petitioner comports with Exhibit 4 to the Specifications, which was the mandatory Proposal Form. On August 31, 1994, William Phillip Austin, Peitioner's President, wrote the architect: Per our telephone conversation this date regard- ing the confusion relating to the Add/Deduct for Alternates 1, 2 and 3 for the above project, please be advised that our base bid did not include the work described in the Alternates. As stated if you want work described in Alternates 1, 2 and 3, you must add the cost to our base bid. The base bid including Alternates 1, 2 and 3 would, therefore, be $211,964.00. If we can provide additional information, please do not hesitate to contact us. The Respondent's architect completed and submitted the bid Tabulation and Notice of Award Recommendation to the Respondent in early September. The document clearly discloses the amounts of each bidder's Base Bid and Alternate proposals. Using plus (+) and minus (-) signs, the Bid Tabulation further shows each bidder's method of calculation. The record is devoid of evidence that the Respondent had any problem in evaluating the bids and identifying the lowest bidder. The Petitioner was the lowest bidder on any combination of base bid plus or minus any or all alternates. Subsequently the Petitioner received a NOTICE OF AWARD RECOMMENDATION dated October 4, 1994. The Notice informed the Petitioner that the Respondent "has recommended that the contract be awarded to your firm in the total amount of $211,964.00, accepting the Base Bid and Alternates #1, #2 & #3. The Administrator of Contracts Design and Permitting, Division of Building Construction, Department of Management Services, State of Florida will consider this recommendation." Larry R. Coleman, Construction Projects Administrator, signed the letter. The Petitioner acknowledged receipt. A representative of the second lowest bidder, Kalex Construction, then contacted the Respondent, complaining of the Award Recommendation. The grounds for the Kalex complaint are not in the record. However, on October 14, 1994, H. R. Hough, the Respondent's Contracts Administrator, sent the Petitioner a letter "to notify you of the State's decision to reject all bids on the above referenced project due to ambiguities in the specifications." Mr. Hough's reasons for the rejection are "other than those stated by the protestor," Kalex. The Respondent's Rule 60D-5.007, Florida Administrative Code, states: Determination of Successful Bidder. All projects except where competitive bidding is waived under the provisions of Rule 60D-5.008 will be publicly bid in accordance with the provisions in the project specifications bidding documents. Award of contract will be made to the responsive bidder, determined to be qualified in accordance with the provisions herein and meeting the requirements of the bidding documents, that submits the lowest valid bid for the work. The lowest bid will be determined as follows: The lowest bid will be the bid from the responsive bidder that has submitted the lowest price for the base bid or the base bid plus the additive alternates or less the deductive alternates chosen by the Agency to be included in or excluded from the proposed contract, taken in numerical order listed in the bid documents. The order of the alternates may be selected by the Agency in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. Under the above-quoted rule, the Respondent compares bids beginning with the lowest "base bid." The Respondent is of the view that for this comparison to be fair and equal, all bidders must include the same scope of work in the "base bid." The Respondent does not interpret the above-quoted rule to allow deductive alternates from some bidders and additive alternates from others. (For reasons discussed in the Conclusions of Law which follow, the Respondent's interpretation and application of the above-quoted rule is erroneous.) The Specifications contain some ambiguous and inconsistent language regarding whether alternates should be treated as additive or deductive. The ambiguous and inconsistent language did not provide any bidder with an advantage or a disadvantage, nor did it otherwise affect the fairness of the bidding process.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Management Services issue a Final Order in this case awarding a contract for the subject project to the Petitioner. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 16th day of December 1994. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of December 1994. APPENDIX The following are my specific rulings on all proposed findings of fact submitted by all parties. Proposed findings submitted by Petitioner Paragraph 1: This is primarily a statement of position and is addressed in the Preliminary Statement. Paragraphs 2 through 10: Accepted in substance with a few unnecessary details omitted. Proposed findings submitted by Respondent Paragraphs 1 through 6: Accepted in substance. Paragraph 7: First sentence accepted in substance. Second sentence rejected as constituting a conclusion which is not warranted by the evidence. Third sentence is accepted as an accurate statement of how Respondent has been interpreting the subject rule, but is not accepted as constituting a correct interpretation of the rule. Paragraph 8: Rejected as misleading and confusing because the "scope of work" to be performed under the contract can only be determined after the Respondent decides which alternates to include and which to exclude. Paragraph 9: The first two sentences are accepted in substance. The last sentence is rejected as constituting a conclusion which is not warranted by the evidence. COPIES FURNISHED: Timothy J. Armstrong, Esquire Armstrong & Mejer Suite 1111 Douglas Centre 2600 Douglas Road Coral Gables, Florida 33134 Stephen S. Mathues, Esquire Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 Paul A. Rowell, General Counsel Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 William H. Lindner, Secretary Department of General Services Knight Building, Suite 307 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950
Findings Of Fact In February 1994 the School Board, by and through its design consultants, W. R. Frizzell Architects, Inc., and, more particularly, its project architect, Byron Tramonte, issued plans, specifications, and related contract documents associated with additions, remodeling, and reroofing of John F. Kennedy Middle School, Palm Beach County, Florida. At a pre-bid conference conducted at the project job site attended by representatives of the School Board, its consultants, as well as representatives of Petitioner, Respondent, and Intervenor, among others, Petitioner's Greg Hill questioned the sufficiency of the drawings with respect to the earth work requirements associated with Alternate 1. As a result of this inquiry, the owner's design consultant issued Addendum 2 (including an as-built drawing) dated February 23, 1994, which was ". . . made available for grading estimates." The drawing attached to Addendum 2 had two sets of elevation numbers on it. One set of elevation numbers were underlined. The clearest of the underlined numbers were difficult to read. Many of the underlined numbers were impossible to read. The other set of elevation numbers on the subject drawing were boxed. The boxed numbers were all clear and legible. In view of the purpose for which the drawing was attached to Addendum 2, the most logical interpretation of the drawing was that the boxed elevation figures represented the existing elevations. The drawing attached to Addendum 2 also included some circled handwritten information. In large letters the circled information read: "JFK MIDDLE SCHOOL AS BUILT EXIST. ELEV." Immediately below in smaller letters it read: "Note: The 2 softball fields were not constructed. 2/23/94." The circled handwritten information was to some extent ambiguous. But it was an ambiguity that could be resolved by careful site inspection. Careful site inspection would have revealed that the boxed numbers corresponded to existing site conditions and that the underlined numbers, to the extent they were legible, did not. Petitioner's Vice President Greg Hill was primarily responsible for the preparation of the portion of the Petitioner's bid relating to Alternate 1. Greg Hill visited the job site during the prebid conference and also visited the job site on one other occasion after receiving Addendum 2, but before submitting the Petitioner's bid. Greg Hill is an experienced estimator with respect to matters involving the type of work encompassed by Alternate 1. In spite of his experience and in spite of his two pre-bid site visits, Greg Hill misinterpreted the architect's intent and used the underlined elevations on the drawing attached to Addendum 2 as a basis for estimating portions of the work associated with Alternate 1. As a result of this mistake Greg Hill reached erroneous conclusions about the amount of fill that would be required and substantially overestimated the amount of fill. This mistake caused the Petitioner's bid for Alternate 1 to be somewhat higher than it would have been if Greg Hill had based his estimates on the boxed elevation numbers. A similar mistake was made by CSR Heavy Construction-North, Inc., a company that was seeking work as a subcontractor on Alternate 1. On the last day for submitting bids on the subject project, the Intervenor received an unsolicited bid from CSR Heavy Construction-North, Inc., to perform some or all of the work encompassed by Alternate 1. CSR's bid was much higher than the Intervenor's proposed bid for that work, which caused the Intervenor's President to become worried that perhaps he had misinterpreted the drawings attached to Addendum 2. Intervenor's President called the School Board Architect and asked for confirmation of his interpretation to the effect that the bidders should base their estimates on the boxed elevation numbers on the drawing attached to Addendum 2. The architect confirmed that the Intervenor's President had correctly interpreted the drawing. The architect did not call any other potential bidders to tell them they should use the boxed numbers because he thought it was obvious that all potential bidders should use the boxed numbers. The bids for the subject project were opened on March 3, 1994. The Petitioner was the apparent responsive low bidder for the base bid. The Intervenor was the apparent responsive low bidder taking together the base bid and the bids on Alternates 1 and 2. The School Board published notice of its intent to award a contract to the Intervenor for the base bid and Alternates 1 and 2. The Instructions To Bidders portion of the subject bid specifications included the following provisions: BIDDER'S REPRESENTATIONS: Each Bidder, by making his Bid, represents that he has read and understands the Bidding Documents. Each Bidder, by making his Bid, represents that he has visited the site and familiarized himself with the local conditions under which the Work is to be performed. BIDDING PROCEDURES: * * * 3.11 Familiarity with Laws: The Bidder is assumed to be familiar with all Federal, State and Local Laws, Ordinances, Rules and Regulations, that in any manner affect the Work. Public Contracting and Purchasing Process Florida Statute, Section 287.132-.133 (Public Entity Crimes) is applicable. Ignorance on the part of the Bidder will in no way relieve him from responsibility. * * * AWARD OF CONTRACT: The Contract, if awarded by the Owner, will be awarded to the lowest bona fide responsible Bidder; provided the Bid is reasonable and it is in the interest of the Owner to accept the Bid. The method of determining the lowest bona fide Bid from Bidders shall be the Base Bid price plus or minus Alternate Prices listed on the Bid Proposal Form which are accepted by the Owner. Alternates will be considered for acceptance by the Owner as set forth in the Alternate section of the Specifications, Division One-General Requirements, Section 01030-Alternates. * * * BID PROTEST PROCEDURES: * * * 10.02 The Bid Documents/"Advertisement tol Bid" will be posted in the office of thel Department of Capital Projects at the time of the solicitation to Contractors. Any person who is affected adversely with respect to the Bid Documents shall file a notice of protest in writing within seventy-two (72) hours after the receipt of the Bid Documents, and SHALL FILE A FORMAL WRITTEN PROTEST WITHIN TEN (10) DAYS AFTER THE DATE HE FILED THE NOTICE OF PROTEST. Failure to file a notice of protest or failure to file a formal written protest shall constitute a waiver of proceedings under Chapter 120. It is important to the proper functioning of the public works bidding process that all bidders be treated alike. To this end, important information furnished to one potential bidder should be furnished to all other potential bidders.
Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the School Board enter a Final Order in this case dismissing the protest of the Petitioner and awarding a contract to the Intervenor for the base bid and Alternates 1 and 2. DONE AND ENTERED this 17th day of May 1994 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of May 1994. APPENDIX The following rulings are the specific rulings on all proposed findings of fact submitted by all parties: Findings submitted by Petitioner. Paragraphs 1 through 5: Accepted in whole or in substance. Paragraph 6: Rejected as not completely accurate. The practices described are common, but not universal. Drawings usually have a legend to explain the difference between existing elevations and elevations to be achieved. Paragraph 7: The first sentence of this paragraph is rejected as contrary to the greater weight of the evidence. The remainder is accepted in substance. Paragraph 8: The first sentence of this paragraph is rejected as constituting subordinate and unnecessary details. The last sentence of this paragraph is rejected as constituting inferences or arguments not supported by the greater weight of the evidence. Paragraphs 9, 10, and 11: Accepted in substance, but with some modifications in the interest of clarity and accuracy. Paragraph 12: Rejected as contrary to the greater weight of the evidence. Paragraph 13: Accepted in part. Accepted that if the Petitioner had used the boxed elevation numbers, it's proposal on Alternate 1 would probably have been substantially lower. The remainder of this paragraph is rejected as speculation Paragraph 14: Rejected as not fully supported by competent substantial evidence and as, in any event, subordinate and unnecessary details. Paragraph 15: Rejected as constituting primarily argument, rather than proposed findings of fact. To the extent the material in this paragraph purports to be factual, it tends to be contrary to the greater weight of the evidence. The greater weight of the evidence is to the effect that there were no ambiguities in Addendum 2 that could not have been resolved by careful site inspection. Paragraph 16: Accepted in substance. Paragraph 17: Rejected as constituting subordinate and unnecessary details. Paragraph 18: Rejected as contrary to the greater weight of the evidence; careful site inspection would have confirmed that the boxed numbers represented the existing elevations. Paragraph 19: Accepted. Paragraph 20: Rejected as speculative and as not supported by persuasive competent substantial evidence. Paragraph 21: Rejected as constituting a proposed ultimate conclusion of law, rather than a proposed finding of fact, and as, in any event, a conclusion that is not warranted by the evidence. Findings submitted by Respondent. Paragraphs 1 through 8: Accepted in whole or in substance. Paragraph 9: Rejected as constituting subordinate and unnecessary details. Paragraph 10: Accepted in substance. Paragraph 11: Rejected as constituting subordinate and unnecessary details. Paragraph 12: Rejected as constitution a proposed ultimate conclusion of law, rather than a proposed finding of fact. (The conclusion is warranted, but it is a conclusion nevertheless.) Findings submitted by Intervenor: (No separate proposals; the Intervenor adopted the proposed findings of the Respondent.) COPIES FURNISHED: Robert A. Rosillo, Esquire School Board of Palm Beach County 3318 Forest Hill Boulevard, Suite C-302 West Palm Beach, Florida 33406-5813 Alan C. Brandt, Jr., Esquire Leiby, Ferencik, Libanoff and Brandt Suite 400 150 South Pine Island Road Fort Lauderdale, Florida 33324 Richard B. Warren, Esquire Kelley, Aldrich & Warren, P.A. 801 Spencer Drive West Palm Beach, Florida 33409 Dr. C. Monica Uhlhorn, Superintendent Palm Beach County School Board 3340 Forest Hill Boulevard West Palm Beach, Florida 33406-5869