Findings Of Fact FMCC's application is to provide a 102-bed long-term care nursing facility in Fort Myers, Florida, while AHC's and HSI's applications are to provide 120-bed long-term nursing care facilities. When each of these applications was presented to the south Central Florida Health Systems Council, Inc. (HSA), the application of FMCC was approved and forwarded to Respondent recommending approval and the other two applications were disapproved and so forwarded. The primary reason given by HSA for disapproving HSI's application was lack of firm financing and for disapproving AHC's application was cost of construction. Trained personnel to man the proposed facilities are in short supply in Lee County. Applicants' plans to import personnel, if necessary, from other parts of the country were supported by no evidence to indicate such personnel would be amenable to move to Lee County. All applications were disapproved by Respondent and each applicant requested a hearing which resulted in this consolidated hearing. At present there are 741 existing or approved long-term care nursing home beds in Lee County, Florida. A 120-bed facility at Cape Coral became operative in February, 1979 and a 60-bed addition to Beacon-Donegan Manor nursing home has also been approved. Prior to the opening of the newest 120-bed facility at Cape Coral, the occupancy rate for the other long-term care nursing homes was greater than 90 percent. Due to its recent opening, no evidence was presented as to the occupancy rate in Lee County following the opening of the Cape Coral facility. The population of Lee County in 1978 was 184,841 with 41,984 more than 65 years old, which is less than 23 percent of the population. This is in line with the population forecasts by the University of Florida and validates the estimated 1980 population figures which were used by all parties in submitting their applications. In 1978 Respondent proposed a State Health Plan which included a determination that the long-term care nursing home bed needs were 27 per 1,000 population greater than 65 years old. This determination was unacceptable to the Department of Health, Education and Welfare (HEW) whose decision is binding on Respondent. In refusing to accept this standard, HEW reaffirmed the requirement that the formula contained in the Hill-Burton Act be utilized in determining certificates of need. Following the Hill-Burton formula results in no additional long-term care nursing home beds needed in Lee County. Modification of the results produced by use of the Hill-Burton formula when extenuating and mitigating circumstances exist is authorized by the Florida Medical Facilities Plan. Accordingly, when use of Hill-Burton formula produces results contrary to obvious facts, such as a showing of no need for additional facilities when occupancy rates are high and long waiting lists for admission exists, these extenuating circumstances are considered and a finding of need is made. The parties stipulated that extenuating circumstances, notably the greater than 90 percent occupancy rate in nursing homes in 1977 and most of 1978 and the existing waiting lists created need for 100 to 120 additional beds. No evidence was presented establishing a need for more than 100-120 additional long-term care nursing home beds in Lee County. In fact, no evidence was presented showing the current occupancy rate, current waiting lists, or any other information not previously submitted to the Health Systems Agency was here presented other than the latest Census Report, which merely confirmed the accuracy of the forecasts. Even if the 27 beds per 1,000 population greater than 65 which was proposed by the South Central Florida Health Systems Agency were used to establish the number of beds needed, their limitation, that no more than 50 percent be added in the two-year planning period, would preclude approving more than one additional nursing home at this time. Absent evidence showing a need for more than one additional nursing home, the only issue remaining is which of the applicants is best qualified to provide the best service at the lowest cost for the stipulated need. HSI submitted proposed construction costs and patient charges in line with those submitted by FMCC. However, although their application states, and the Health Systems Agency apparently accepted, their allegation that an option to lease had been obtained on the property on which the proposed facility was to be erected, testimony at the hearing disclosed that only an oral agreement to lease the property had been obtained by HSI. An oral agreement affecting a long-term lease of real property comes within the Statute of Frauds and is unenforceable. This fact alone renders all cost estimates submitted by HSI suspect. Further, the financing proposed by HSI to construct the facility shows less than $200,000 equity capital available and a requirement to borrow $1,300,000. One ground noted by the Health Systems Agency for disapproving this application was the inadequacy of their financing. No evidence presented at this hearing contradicted this Health System Agency's finding. AHC operates some 50 nursing homes in 14 states with two nursing homes in the Orlando area. A certificate of need has been obtained for a third nursing home in Jacksonville. Florida Living Care, Inc., the parent corporation of FMCC, manages some 44 nursing homes and owns 25. It has certificates of need for 6 nursing homes in Florida, one of which is completed and in operation, while 3 are under construction. AHC proposes to finance 87 percent of the cost of the 120-bed project, or $2,160,000, in a 40-year loan at 8.5 percent interest. FMCC proposes to finance 80 percent of the cost of a 102-bed project, or $1,000,000, in a 25-year loan at 9.5 percent interest. Although no testimony regarding the current status of mortgage money was presented, it is recognized that interest rates are at historically high levels and that FMCC is more likely to get financing on the terms it proposed than is AHC on the terms the latter proposed. HSI proposed costs and charges result in average costs of $30.16 per patient per day. FMCC proposed costs and charges result in average costs of $30.96 per patient per day. AHC proposed costs and charges result in average costs of $34.40 per patient per day. No significant difference exists in the services proposed by each of the applicants. Savings from combined purchasing can result when numerous facilities are operated. Both AHC and FMCC are in a better position in this regard than is HSI. Additional savings in group food purchasing can result when facilities are within 200 miles of each other. The facilities FMCC's parent corporation is opening in Sebring and Port Charlotte are close enough to Fort Myers to allow group food purchasing for these facilities. AHC's construction costs are approximately 50 percent higher per bed than are the costs submitted by FMCC and HSI. This factor must result in higher charges to amortize these higher construction costs.
The Issue The issue is whether Petitioner, Melvin Alston, is entitled to insurance coverage under the State of Florida Health Plan for services received at Miracle Hill Nursing Home.
Findings Of Fact Doris Alston, widow of Melvin Alston, is requesting payment for services rendered to Melvin Alston at Miracle Hill Nursing Home. Melvin Alston died on December 31, 1985. Melvin Alston, as a retired state employee, became eligible for coverage under the State Health Plan on July 1, 1985. He was a professor and dean at Florida A&M University from 1946 until 1969, when he retired. Thereafter he became a professor at Southern Illinois University, from which he retired in 1976. Alston was admitted to Tallahassee Memorial Regional Medical Center (TMRMC) in September, 1984, and was transferred to the extended care unit on September 20, 1984, because there were no available nursing home beds. On October 31, 1984, a bed became available at Goodwood Manor, a skilled nursing home facility, and Alston was admitted to Goodwood Manor from the TMRMC extended care unit. Alston remained at Goodwood Manor until August 22, 1985, when Mrs. Alston removed him and placed him at Miracle Hill Nursing Home. While at Goodwood Manor, Alston was receiving essentially custodial care. He had a routine diet and simply needed assistance with his activities of daily living, such as bathing and feeding. He was able to take his medications as they were given to him and he could leave the nursing home on a pass basis. While at Goodwood, Alston's medical orders were reviewed monthly and he was not seen daily by a physician. Alston received the same level of care at Miracle Hill Nursing Home. In skilled nursing facilities, the range of services needed and provided goes from skilled through intermediate levels to custodial. Skilled care includes such services as injections or intravenous medications on a daily basis which must be administered by a nurse. Dr. C. E. Richardson became Alston's physician at Miracle Hill Nursing Home. In the course of his deposition, Dr. Richardson testified that Alston received medical level care at Miracle Hill. However, Dr. Richardson stated several times that he did not know the level of care given to Alston under the definitions of the care levels available. He acknowledged that the levels of care ranged from skilled to custodial. Dr. Richardson also did not know the terms of the benefit document for the State Health Plan. Dr. Richardson only provided the medical care, which was the same no matter what level of nursing care he needed or received. According to Dr. Richardson, Alston was on a fairly routine diet, could engage in activities as tolerated, and could go out on a pass at will. One of Dr. Richardson's orders dated 11/27/85 shows that Dr. Richardson did not order a skilled level of care, but instead checked the level of care to be intermediate. Alston did not receive or need skilled nursing care at Miracle Hill. It is more appropriate to classify the level of care as custodial, as that term is defined in the State Health Plan Benefit Document. Alston's primary insurer was Blue Cross/Blue Shield of Illinois, based on coverage he had from his employment there. Blue Cross/Blue Shield of Illinois denied the claim for services at Miracle Hill because the services were custodial and were not covered by that plan. It also denied the claim because Miracle Hill's services did not fit its criteria for skilled nursing care. William Seaton is a State Benefits Analyst with the Department of Administration and his duties include assisting people who have a problem with the settlement of a claim with Blue Cross/Blue Shield of Florida, which administers the State Health Plan. After the claim was denied by Blue Cross/Blue Shield of Illinois, Mr. Seaton assisted Mrs. Alston by filing a claim under the State Health Plan. Blue Cross/Blue Shield of Florida concluded that no benefits were payable for facility charges at a nursing home and that an extended care or skilled nursing facilities would have limited coverage; however, because Alston was not transferred to Miracle Hill directly from an acute care hospital, no coverage existed. The pertinent provisions of the benefit document of the State Health Plan are as follows: I.G. "Custodial Care" means care which does not require skilled nursing care or rehabilitative services and is designed solely to assist the insured with the activities of daily living, such as: help in walking, getting in and out of bed, bathing, dressing, eating, and taking medications. * * * I.N. "Hospital", means a licensed institution engaged in providing medical care and treatment to a patient as a result of illness or accident on an inpatient/outpatient basis . . . and which fully meets all the tests set forth in ., 2., and 3. below: . . . In no event, however, shall such term include . . . an institution or part thereof which is used principally as a nursing home or rest for care and treatment of the aged. * * * I.AH. "Skilled Nursing Care" means care which is furnished . . . to achieve the medically desired result and to insure the insured's safety. Skilled nursing care may be the rendering of direct care, when the ability to provide the service requires specialized (professional) training; or observation and assessment of the insured's medical needs; or supervision of a medical treatment plan involving multiple services where specialized health care knowledge must be applied in order to attain the desired medical results. * * * I.AI. "Skilled Nursing Facility" means a licensed institution, or a distinct part of a hospital, primarily engaged in providing to inpatients: skilled nursing care . . . or rehabilitation services . . . and other medically necessary related health services. Such care or services shall not include: the type of care which is considered custodial . . . . * * * II.E. Covered Skilled Nursing Facility Services. On or after August 1, 1984, when an insured is transferred from a hospital to a skilled nursing facility, the Plan will pay 80% of the charge for skilled nursing care . . . subject to the following: The insured must have been hospital confined for three consecutive days prior to the day of discharge before being transferred to a skilled nursing facility; Transfer to a skilled nursing facility is because the insured requires skilled care for a condition . . . which was treated in the hospital; The insured must be admitted to the skilled nursing facility immediately following discharge from the hospital; A physician must certify the need for skilled nursing care . . . and the insured must receive such care or services on a daily basis; . . . 6. Payment of services and supplies is limited to sixty (60) days of confinement per calendar year. * * * VII. No payment shall be made under the Plan for the following: * * * L. Services and supplies provided by . . . a skilled nursing facility or an institution or part thereof which is used principally as a nursing home or rest facility for care and treatment of the aged. * * * N. any services in connection with custodial care . . . .
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Administration enter a Final Order denying the request for benefits for services rendered to Melvin Alston at Miracle Hill Nursing Home. DONE AND ENTERED this 24th day of May, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of May, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 87-4674 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Melvin Alston 1 . Proposed findings of fact 1-3 and 5 are rejected as being subordinate to the facts actually found in this Recommended Order. Additionally, proposed findings of fact 3 and 5 contain argument which is rejected. 2. Proposed finding of fact 4 is irrelevant to the resolution of this matter. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Administration Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(1); 4(2); 5(2); 6(11); 8(11); 9(12); 10(3 & 4); 11(5); 12(4); 14(5); 15(7); 19- 21(8 & 9) 23(13); and 24(13). Proposed findings of fact 2, 3, and 16 are unnecessary. Proposed findings of fact 7, 13, 18, 26, and 27 are rejected as being irrelevant. Proposed findings of fact 17 and 22 are subordinate to the facts actually found in the Recommended Order. 2. Proposed finding of fact 25 is unsupported by the competent, substantial evidence. COPIES FURNISHED: James C. Mahorner Attorney-at-Law P. O. Box 682 Tallahassee, Florida 32301 Andrea Bateman Attorney-at-Law Department of Administration 435 Carlton Building Tallahassee, Florida 32399-1550 Adis Villa, Secretary Department of Administration 435 Carlton Building Tallahassee, Florida 32399-1550
The Issue Whether the Department of Health and Rehabilitative Services should approve the application for certificate of need (CON) of any one or more of five applicants for community nursing home beds in Lee County for the July 1989 planning horizon.
Findings Of Fact The Applicants Applications for certificates of need (CON) for nursing homes are accepted by the Department of Health and Rehabilitative Services (Department) in batching cycles and are subject to competitive review. The Department comparatively reviewed and analyzed 13 individual applications for proposed nursing services for District VIII, Lee County, in the July, 1986 nursing home batching cycle. Five of those applications are at issue for purposes of this proceeding. Pertinent to this proceeding, petitioner, Maple Leaf of Lee County Health Care, Inc., a wholly owned subsidiary of Health Care and Retirement Corporation of America (HCR filed an application for a 120-bed nursing home (CON 4746), petitioner Forum Group, Inc. (Forum), filed an application for a 60-bed nursing home (CON 4755), petitioner, Health Quest Corporation (Health Quest), filed an application for a 60-bed nursing home (CON 4747), petitioner, Hillhaven, Inc., d/b/a Hillhaven Health Care Center Lee County (Hillhaven) filed an application for a 120-bed nursing home (CON 4756), and respondent, Gene Lynn d/b/a Careage Southwest Healthcare Center (Careage) filed an application for a 120-bed nursing home (CON 4748). Each of these applications was timely filed. The Department's "preliminary" action The Department is the state agency charged with implementing and regulating the CON program for medical facilities and services in Florida. Within the Department, the Office of Community Medical Facilities is responsible for the review of CON applications and provides a recommendation for approval or disapproval after its analysis is concluded. The Department assigned the subject District VIII applications for the July, 1986 hatching cycle to Medical Facilities Consultant Robert May for review. Mr. May was supervised in his work by Elizabeth Dudek, an experienced Medical Facilities Consultant Supervisor, who has reviewed or supervised the review of approximately 1200 CON applications. Robert Nay and Elizabeth Dudek concurred in their evaluations of the applications and recommended that Hillhaven's application be approved for 60 beds in Lee County. This recommendation was forwarded to the Administrator of the Office of Community Medical Facilities, Robert E. Naryanski, who also occurred with the recommendation on or about December 20, 1986, and forwarded the recommendation to Marta Hardy, Deputy Assistant Secretary for Health Planning and Development, for final approval. An unusual set of circumstances evolved from that approximate point in time with respect to the applications at issue. Sometime in late November 1986 Marta Hardy talked to Robert Sharpe, Administrator of the Office of Comprehensive Health Planning, concerning the applications in this batching cycle and stated that she intended to involve him in the review procedure. In late December, she asked Mr. Sharpe to review the applications for four of the counties in the cycle, including Lee County. Mr. Sharpe is in a separate and distinct part of the Department, which reports to the Deputy Assistant Secretary but does not, in the ordinary course of operations, review certificate of need applications. Mr. Sharpe's involvement with reviewing nursing home applications had never occurred before and has not occurred since. However, Mr. Sharpe has been involved on limited occasions with reviewing hospital CON applications in preparation for administrative hearings. Careage had a CON application in each of the four districts that Mr. Sharpe was asked to review. Mr. Sharpe was not asked to review any other districts other than the four districts in which Careage had applications pending. In Mr. Sharpe's conversation with Ms. Hardy, Ms. Hardy specifically mentioned Careage while expressing her concern about the Department's ability to discriminate the best applicants on the basis of quality of care. Ms. Hardy mentioned no other applicant by name. Mr. Sharpe, in all circumstances, recommended Careage for approval. Mr. Sharpe did not attempt to do a complete re-review the applications, and did not redo any part of the review that had been performed by the Office of Community Medical Facilities specifically the need calculations and comparing the applications to the statutory review criteria. Mr. Sharpe did not apply statutory review criteria in his review of the applications because it had been determined that all the applicants were minimally qualified and met the statutory review criteria. Mr. Sharpe felt that the responsibility of his office was simply to do a comparative review to determine the best applicant. Mr. Sharpe placed information in the applications into what has been termed a "matrix." The purpose of the matrix was to present the information in the applications in a format which would facilitate a comparative analysis based on a greater number of factors than had previously been considered. Traditionally, the predominant factors utilized by the Department in reviewing applications were construction costs, Medicaid participation percentages, proposed sites, and charges. The matrix developed by Mr. Sharpe included additional factors which he felt would better address the quality of care to be provided, such as the size of facility, the size of the patient rooms, the amenities available to the patients and their families, the type and level of staffing, availability of special programs, and operating costs. By including a greater number of factors in the matrix, more information was considered in selecting the best applicant. As a result, the factors that traditionally had been considered by the Department were given relatively less weight. There was no notice to the applicants of this change in practice. Further, although all the information considered by Mr. Sharpe was taken from the applications and generally required to be in the application, the applicants reported the information differently, making a direct "apples-to-apples" comparison difficult. Mr. Sharpe's review of the applications spanned approximately five to eight days. Mr. Sharpe's staff in the information on the matrix from the applications, and, although Mr. Sharpe had personally reviewed all the applications, Mr. Sharpe did not personally check the information placed on matrix for accuracy. The Office of Community Medical Facilities' initial review covered a period of approximately six months. There was no evidence that the duties and responsibilities of the Office of Community Medical Facilities were not carried out in a thorough and appropriate manner. Ms. Dudek has more experience in reviewing CON applications than Mr. Sharpe, and she took into account, among other review criteria requirements, the type programs offered by the applicant and the quality of care the applicant had demonstrated and was capable of providing. Mr. Sharpe never talked to Ms. Dudek to find out the basis for her recommendation because he felt his responsibility was to do an independent review. Robert Sharpe reported his findings with regard to Lee County to Marta Hardy who apparently accepted Mr. Sharpe's recommendation on or about January 7, 1987, approving Careage's application for 60 beds and denying all others. On or about January 23, 1987, in the Florida Administrative Weekly, it was published that Careage was approved fob a 120-bed facility in Lee County. Actually HRS approved Careage for a 60-bed facility; the 120-bed figure in the Florida Administrative Weekly was erroneous. As a result of a new administration and Bob Griffin succeeding Ms. Hardy as Deputy Secretary in the Office of Health Planning, and due to his concerns about the unique manner in which these applications were reviewed and a decision made, another review of the applications for Lee County was conducted. The Office of Community Medical Facilities, the office originally responsible for reviewing the applications, was asked to do this review. This third review was conducted during the summer of 1987 by Bob May while this case was pending before the Division of Administrative Hearings. In this third review, a matrix was also used, but not the identical matrix previously used by Mr. Sharpe. Indeed, the Office of Community Medical Facilities was instructed not to look at what Mr. Sharpe's office had done. The review resulted in a decision that HRS would maintain its position of supporting partial approval of the Careage application for 60 beds. By letter dated September 4, 1987, the parties were formally notified of the HRS decision and a Correction Notice was published in the Florida Administrative Weekly indicating that the notice published in January, 1987, stating that Careage had received a CON for 120 beds, should have shown a partial approval of 60 beds, and a denial of 60 beds. HCR, Forum, Health Quest and Hillhaven timely contested initial approval of the Careage application and their own respective denials. Careage and HRS are the respondents. Hillhaven, prior to final hearing, dismissed its case contesting the Careage approval for 60 beds, and in this proceeding contends that Hillhaven should be awarded a certificate of need because there is a bed need in excess of 60 beds in Lee County. Careage did not timely contest the denial of the 120 beds requested in its original application. Health Care and Retirement Corporation of America HCR, through its wholly owned subsidiary, Maple Leaf of Lee County Health Care, Inc., proposes to construct a 120-bed community nursing home in Lee County, Florida. At the time its application was submitted, HCR had not selected a site on the proposed facility, but at hearing proposed to locate it in the Ft. Myers area. Currently, HCR owns and operates 92 nursing homes in 19 different states, including seven within the State of Florida. Its existing Florida facilities are Pasadena Manor Nursing Home (South Pasadena, Florida), Community Convalescent Center (Plant City Florida), Kensington Manor (Sarasota, Florida), Jacaranda Manor (St. Petersburg, Florida) Wakulla Manor (Crawfordville, Florida, Heartland of St. Petersburg (St. Petersburg, Florida, and Rosedale Manor (St. Petersburg, Florida). Each of these facilities received superior ratings on their latest licensure and certification survey with the exception of Heartland and Rosedale, which received a standard and conditional rating respectively. Significantly, the conditional rating assigned to the Rosedale facility occurred less than six months after that facility was acquired by HCR, and all deficiencies were corrected within 19 days of the survey. HCR's current proposal for a 120-bed facility will be a one-story structure containing 40,000 gross square feet, including 2,000 square feet for an ancillary adult day care center. It will have 58 semi-private rooms with half-bath (toilet and sink) and four private rooms with full bath (toilet, sink and shower) located within four patient wings, two nursing stations, two dining rooms, central bathing facilities, beauty- barber shop, quite lounge, physical therapy room, occupational therapy room, multi-purpose rooms, outdoor patio areas and the other standard functional elements required to meet licensure standards. In all, the proposed facility meets or exceeds state requirements for the construction of nursing homes. HCR proposes to dedicate one wing (14 semi-private and 1 private room) of its facility to the care of patients suffering from Alzheimer's Disease and related disorders. Alzheimer's Disease is a brain disorder that results in gradual memory loss and, as such loss progresses, a need for increased personal care. Historically, Alzheimer's patients have been mixed with other patients in nursing homes, often disrupting other patients and presenting problems of control for staff separate Alzheimer's care unit enables the nursing home to utilize special techniques to manage the patient without restraint or sedation, and provides the patient with a smaller, safer and specially designed area with specially trained staff to address the needs of such patients. However, absent fill-up, HCR does not propose to limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders. HCR's Alzheimer's unit is reasonably designed, equipped and minimally staffed for its intended purpose. HCR also proposes to provide, as needed, subacute care at its facility. Due to the impacts of the federal DRG (diagnostically related group) system which encourages hospitals to discharge patients earlier, there has been an increased demand for subacute services in nursing homes. Included within the subacute services HCR proposes to offer are ventilator care, IV therapy, pulmonary aids, tube feeding, hyperalimentation, and percentage and long term rehabilitation. HCR currently provides a wide variety of such subacute services at its existing facilities, and it may reasonably be expected to continue such practice at the proposed facility. As an adjunct to the proposed nursing home, HCR proposes to operate an adult day care unit for 12 Alzheimer's Disease patients. Additionally, HCR will offer respite care within the nursing home when beds available. Adult care and respite care provide alternatives to institutional long-term care in nursing homes, aid in preventing premature rising home admissions, and promote cost containment. As initially reviewed by the Department, HCR's activity would be a single story building containing 40,000 gross square feet, including the day care area, with an estimated total project cost of $3,894,000. As proposed, the total project cost equates to $32,450 per bed, and as designed provides 127 net square feet of living space for private rooms and 166 square feet for semi- private rooms. Construction equipment costs were as follows: Construction costs $2,200,000; costs per square foot $55.00; construct cost per bed 17,417; equipment costs $420,000; and equipment cost per bed $3,500. HCR's estimate of project costs is reasonable. At hearing HCR updated its project costs to account for changes that arose during the delay between initial review and de novo hearing. As updated, the total project cost was $4,375,500, or $36,462 per bed. Construction equipment costs, as updated were as follows: construction costs $2,400,000; cost per square foot $60.00; construction cost per bed $19,000, equipment costs $420,000; and equipment cost per bed $3,500. HCR's updated estimate of cost is reasonable. Staffing at the proposed 120-bed facility is designed to accommodate the needs of the skilled and intermediate care patients, as well as the special needs of the Alzheimer's and subacute patients. HCR will provide 24-hour registered nurse coverage for subacute patients and a higher staffing level in the Alzheimer's unit. The nursing home will provide 3.59 hours per patient in the Alzheimer's unit and 2.73 nursing hours overall, based on the assumption that 50 percent of the Alzheimer's patients will wanderers and that 50 percent of all patients will require skilled care. Precise staffing for subacute patients will be determined by the nature of the subacute services needed. HCR's staffing levels, as originally proposed and as updated, meet or exceed state standards. The salary and benefit estimates provided by HCR in its original application reflect salary and benefit levels current at the time of application, and the salary and benefit projections provided by HCR at bearing reflect current (1987) salaries and benefits inflated to the date of opening. Both estimates are reasonable. HCR's projection of utilization by class of pay as initially proposed was as follows: Private pay 51 percent, Medicaid 46 percent, and Medicare 3 percent. Due to its experience over the intervening 17 months since submittal of its application, HCR updated its assessment of utilization as follows: Private pay 50 percent, Medicaid 46 percent, and Medicare 4 percent. The current Lee County Medicaid experience level is 46 percent, and HCR provides an average 71 percent Medicaid occupancy in its Florida facilities. HCR's projections for payor mix are reasonable. HCR's initial application contained estimates of expenses and revenues current as of the date of application (July 1986) but failed to include an inflation factor to accommodate anticipated increases in expenses and revenues. Initially, T. projected its per diem room charges to be $60 to $85. At hearing, HCR projected its per diem room charges in the year opening (1990) to be $90 for a private room, $75 for a semiprivate room, $76.00 for Medicare patients, and $72 for Medicaid patients. The private, semi-private and Medicare charges were determined by inflating current (1987) Lee County charges forward to the year of opening. The Medicaid charges were based on a calculation of the Medicaid reimbursement formula. These charges, when multiplied by patient days, are a reasonable estimate of the projected revenues of the facility. HCR's estimate of expenses in its initial application was based on its current experience. Intervening events have lent new insight to its evaluation of expenses, as have intervening inflationary factors. While HCR's estimate of expenses and revenues was reasonable in its initial application, its current estimates comport with the reality of a 1990 opening and are reasonable. HCR has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other personnel necessary to staff its facility. Since HCR does not propose to initially limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders, its pro formas are premised on reasonable assumptions, and it has demonstrated the financial feasibility project in both the short term and long term. The proof demonstrates that HCR provides and Bill continue to provide quality care. HCR's corporate standards and guidelines regulate such areas as patient rights, staff development and orientation, physician and nurse services, pharmacy services and medication administration, social services, and infection control. HCR's manager of quality assurance, house professional services consultants, and quality assurance consultants regularly visit each HCR nursing home to implement the quality assurance standards and guidelines. Each HRC nursing home provides a staff development director who is responsible for the orientation of new employees, training new employees, and continuing training for all employees. Forum Group Inc. Forum is a publicly held health services company which owns, develops and operates retirement living centers and nursing homes on a national basis. Currently Forum operates 22 Lang facilities and an additional 11 retirement living centers with attached nursing facilities, including one nursing facility in Florida. Its Florida facility holds a standard rating. Other facilities owned by Forum in Texas, Kentucky and Illinois do, however, hold superior ratings. Pertinent to this case, Forum proposes to develop a retirement living center in Lee County that would consist of its proposed 60-bed skilled and intermediate care nursing home, an adult congregate living facility, and apartments or Independent living. Each of the three components which comprise Forum's retirement living center are physically connected and share some operational functions, such as a central kitchen, laundry, administrative area and heating plant. Such design provides for an efficient operation, as well as an economical distribution costs facility wide. The nursing facility proposed by Forum will be a single story building of wood frame and brick veneer construction containing 27,000 gross square feet. It will include 20 semi- private rooms with half bath, 16 private rooms with half bath, 3 private rooms with full bath, and one isolation room with full bath. Also included are a beauty-barber shop, quite lounge, physical therapy room, occupational therapy room, and exam-treatment room. But for the length of the corridors in the patient wings, discussed infra, the proposed facility meets or exceeds state requirements for the construction of nursing homes. Forum's proposal, as initially reviewed by the Department, would have a total project cost of $2,314,800. This equates to $38,580 per bed, and as designed provides 150 net square feet of living space for private rooms and 228 net square feet for semi-private rooms. Construction equipment costs were as follows: Construction costs $1,377,000; cost per square foot $51.00; construction cost per bed $22,950; equipment costs $200,000; and equipment costs per bed $3,333. Forum's estimate of project cost is reasonable. Forum provided a single-line drawing indicating the general arrangement of spaces for its proposed facility. As proposed, the facility would consist of two patient wings, and a central nurse's station. The corridor lengths in the patient wings exceed state standards by 40 feet. They could, however, be modified to conform to State standards without significantly affecting the cost of construction. The project would have energy conservation features such as heavy duty roof and side insulation, double-glazed windows, and high efficiency heating and air conditioning equipment. The forum facility will offer skilled and intermediate care, and subacute care, including IV therapy, ventilator care, hyperalimentation, pulmonary aids, and short and long term rehabilitation. Forum would contract out for physical therapy, speech therapy, pharmacy consultation and a registered dietician. If needed, Forum would offer respite care when beds are available. The proposed staffing levels and salaries proposed by Forum in its application are reasonable and meet or exceed state standards. Forum has a staff training program, with pre-service and in-service training, and utilizes a prescreening procedure to assure it hires competent staff. Twenty-four hour coverage by registered nurses will be provided, and a staffing ratio of 2.9 will be maintained. The staffing level at the proposed facility is consistent with that experienced at Forum's existing Florida Facility. Forum provides, and will continue to provide, quality care. Forum's application projected its utilization by class of pay as follows: private pay 58.47 percent, Medicaid 37.16 percent, and Medicare 4.37 percent. Currently, Forum experiences a 48 percent Medicaid occupancy rate system-wide, although it only has 2 of 35 beds dedicated to Medicaid care in its present Florida facility. Forum estimated its revenues based on patient charges ranging from $50.64 per day for Medicaid/semi-private room to $75.00 per day for SNF/private pay/private room. Based on such revenues, its pro forma, utilizing a conservative 86.25 percent occupancy rate at the end of the second year of operation, demonstrated the short term and long term financial feasibility of the project as initially reviewed by the Department notwithstanding the fact that it had underestimated its Medicaid and Medicare reimbursement rates. At hearing, Forum sought to demonstrate that its project was currently feasible by offering proof that intervening events had not significantly impacted the financial feasibility of its project. To this end, Forum offered proof that the contingencies and inflation factors it had built into the construction of its initial proposal would substantially offset any increased costs or expenses of construction. Additionally, Forum sought to update its proposal at hearing by offering testimony that included an increase in the administrator's salary from $27,000 to $39,000, a decrease in interest in year one to $187,803, an increase in interest in year two to $250,790, and an increase in revenues based on patient charges ranging from $69.19 per day for Medicaid/semi private room to $90.00 per day for SNF/private pay/private room. Some of the applicants objected to Forum's proof directed at the current financial feasibility of its project because it had not previously provided them with a written update of its application as ordered by the Hearing Officer. The applicants' objection was well founded. Further, the proof was not persuasive that any contingencies and inflation factors it had built into its initial proposal would substantially offset any increased costs or expenses of construction, nor that salaries, benefits and other expenses that would be currently experienced were appropriately considered in addressing the present financial feasibility of Forum's project. While Forum has the available resources, including management personnel and funds for initial capital and operating expenditures, for project accomplishments and operation, and will be able to recruit any other personnel necessary to staff its facility, it has failed to demonstrate that its proposal, as updated, is financially feasible in the long term. Health Quest Corporation Health Quest is a privately held corporation which owns, develops and operates health care facilities and retirement centers on a national basis. Health Quest has been in business for approximately 20 years, and currently operates 11 long-term care facilities and three retirement centers in Indiana, Illinois, and Florida. Its existing Florida facilities are located in Jacksonville, Boca Raton, and Sarasota. It also has facilities under construction in Winter Park and Sunrise, Florida. Health Quest also held a number of other certificates of need to construct nursing facilities in Florida. Recently, however, it decided to transfer or sell 3-4 of those certificates because its initial decision to develop nine new projects simultaneously would have, in its opinion, strained its management staff and commitment to high quality standards. HCR is, however, currently proceeding with several projects in Florida, and anticipates that the proposed Lee County facility will be brought on line thereafter. Pertinent to this case, Health Quest proposes to develop a retirement center in Lee County that would consist of a 60-bed skilled and intermediate care nursing home, and 124 assisted living studio apartments (an ACLF). 4/ The two components which comprise Health Quest's retirement center are physically connected and share some operational functions such as a common kitchen, laundry, therapy areas, maintenance areas, and administrative areas. Such design provides for an efficient operation, as well as an economical distribution of costs facility wide. In addition to providing an economical distribution of costs, the two components of the retirement center are mutually supportive. The nursing care unit supports the ACLF by making sure that health care services are available to the assisted living people. The ACLF supports the nursing unit as a source of referral and as an alternative to nursing home placement. The nursing facility proposed by Health Quest will be a single story building of masonry and concrete construction. It will include 6 private rooms and 27 semi-private rooms with half-bath attached, central nurse's station, central bathing facilities, beauty-barber shop, quite lounge, central dining area, physical and occupational therapy room and outdoor patio The center, itself, will provide patios, walkways and other outdoor features to render the facility pleasant and attractive, and will provide multi-purpose areas to be used for religious services and other activities, an ice cream parlor and gift shop. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Health Quest's proposed facility contained 25,269 gross square feet, with an estimated total project cost of $2,244,505. As proposed, the total project cost equates to $37,408 per bed, and as designed provides 240 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows: Construction costs $1,470,333; cost per square foot $58.19; construction cost per bed $24,506; equipment costs $298,200; and equipment cost per bed $4,970. While the majority of Health Quest's costs are reasonable, its equipment costs are not. These costs are substantially the same as those projected in its original application for a 120-bed facility, which at an equipment cost of $300,000 derived an equipment cost per bed of $2,500. Why the same cost should prevail at this 60-bed facility was not explained by Health Quest, and its equipment cost per bed of $4,970 was not shown to be reasonable. As with most applicants, Health Quest updated its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing. As updated, the estimated project cost is $2,290.331, $38,172 per bed. Construction equipment costs were as follows: Construction costs $1,507,043; cost per square foot $59.64; construction cost per bed $25,117; equipment costs $302,700; and equipment costs per bed $5,045. Again, while the majority of Health Quest's costs are reasonable its equipment costs are, for the reasons heretofore expressed, not shown to be reasonable. The Health Quest facility will offer skilled and intermediate nursing care, and subacute care, including IV therapy, chemotherapy, TPN therapy and tracheostomy care. Also to be offered are respite care as beds are available and, within the complex, adult day care. Health Quest will maintain a nursing staffing ratio of approximately 3.25 hours per patient day for skilled care and 2.5 for intermediate care. As originally reviewed by the Department, Health Quest's staffing levels and expenses were reasonable. At hearing, Health Quest increased its staffing levels to account for an increased demand in labor intensive care, and increased its staffing expenses to account for the intervening changes in the market place. As updated, Health Quest's staffing levels and expenses are reasonable. Health Quest's projection of utilization by class of pay in the application reviewed by the Department was as follows: private pay 51.6 percent, Medicaid 45 percent, and Medicare 3.4 percent. Health Quest's utilization projection, as updated at hearing, was as follows: private pay 50.9 percent, Medicaid 45 percent, and Medicare 4.1 percent. TAB Health Quest currently serves 30 percent Medicaid patients at its Jacksonville facility, 10 percent Medicaid patients at its Boca Raton facility, and no Medicaid patients at its Sarasota facility. It has, however, committed to serve 40 percent and 48 percent Medicaid patients at its Sunrise and Winter Park facilities, respectively. Health Quest's projections of payor are reasonable. Initially, Health Quest projected its per diem room charges to range from $52 for skilled and intermediate care Medicare patients to $57.25 for skilled care-private and Medicare patients. It did not, however, draw any distinction between private and semi-private rooms. At hearing, Health Quest projected its per diem room charges as follows: $90 for SNF/single/private pay; $73 for SNF/double/private pay; $73 for SNF/double/Medicare; $68 for SF/double Medicaid; $68 for ICF/single/private pay; $70.75 for ICF/double/private pay; and $68 for ICF/double/Medicaid. Health Quest's fill-up and occupancy projections, as well as its projections of revenue and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and as updated. During the course of these proceedings, a serious question was raised as to whether Health Quest had demonstrated that it had the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, or that it was committed to the subject project. Within the past three years, Health Quest has sold three of its approved CONS and is considering the sale a fourth due to its inability to handle that number of projects, and the adverse impact it would have on its ability to deliver quality care. Notwithstanding its inability to proceed with approved projects, Health Quest proceeded to hearing in October 1987 and December 1987 for nursing home CONs in Hillsborough County and Lee County (the subject application), and also had nine such applications pending in the January 1987 batching cycle and eight such applications in the October 1987 batching cycle. Health Quest's actions are not logical, nor supportive of the conclusion that it is committed to this project or that it possesses available resources for project accomplishment. Under the circumstances, Health Quest has failed to demonstrate that it has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation. Health Quest's facilities in Jacksonville and Boca Raton currently hold superior ratings from the Department. A superior rating includes consideration of staffing ratios, staff training, the physical environment, physical and restorative therapies, social services, and other professional services. Those facilities are monitored, as would the subject facility, by Health Quest for quality care through a system of quarterly peer review, and provide extensive staff education programs that include orientation training for new staff and on-going education for regular staff. Health Quest has demonstrated that it has provided quality care. However, in light of the strain its current activities have placed on its resources, it is found that Health Quest has failed to demonstrate that it could provide quality care at the proposed facility were its application approved. Hillhaven, Inc. Hillhaven is a wholly owned subsidiary of the Hillhaven Corporation, which is a subsidiary of National Medical Enterprises. The Hillhaven Corporation has been business for almost 30 years, and is currently responsible for the operation of approximately 437 nursing homes and retirement centers nationally, including 15 nursing homes which it owns or operates in the State of Florida. Hillhaven proposes to develop a new 120-bed skilled and intermediate care community nursing home in Fort Myers, Lee County, consisting of 38,323 square feet. It will include 14 private rooms and 53 semi-private rooms, a full bath attached to each room (shower, toilet and sink), central tub rooms, beauty- barber shop, quite lounge, chapel, physical therapy room, occupational therapy room, and outdoor patio areas. In all, Hillhaven's proposed facility meets or exceeds state requirements for the construction of nursing homes. As initially reviewed by the Department, Health Quest's proposed facility would be a single-story building containing 38,323 gross square feet, with an estimated total project cost of $3,544,444. As proposed, the total project cost equates to $29,537 per bed, and as designed provides 217 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows; construction costs $2,146,000; cost per square foot $56.00; construction cost per bed $17,884; equipment costs $442,005; and equipment cost per bed $3,683.38. Hillhaven's project costs are reasonable. As with the other applicants, Hillhaven update its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing, certain oversights in its initial submission, and its decision to proceed with type 4 construction as opposed to type 5 construction as originally proposed. As updated, the estimated project cost is $4,089,639, or $34,155.33 per bed. Construction equipment costs, as updated, were as follows: construction costs $2,446,088; cost per square foot $63.82; construction cost per bed $20,384; equipment costs $521,200; and equipment costs per bed $4,343.33. By far, the biggest factor in the increased construction costs was Hillhaven's decision to proceed with type 4 construction as opposed to type 5 construction. Either type of construction would, however, meet or exceed state standards, and Hillhaven's estimates of construction and equipment costs are reasonable. The Hillhaven facility will offer skilled and intermediate care, occupational therapy, speech therapy, physical therapy, recreational services, restorative nursing services, and social services. Hillhaven does not discriminate on admission, and would admit Alzheimer's and subacute patients as presented. Were sufficient demand experienced, Hillhaven has the ability to provide and would develop a full Alzheimer's unit, and provide day care and respite care. Currently, Hillhaven operates 36 Alzheimer's units at its facilities nation wide, but has experienced no demand for such a special unit or other special care at its existent Lee County facility. As originally reviewed by the Department, Hillhaven's staffing levels an expenses were reasonable. At hearing, Hillhaven increased its staffing levels to account for staff inadvertently omitted from its initial application, and increased its staffing expenses to account or intervening changes in the market place. As updated, Hillhaven's staffing level is 2.5, and its staffing levels and expenses are reasonable. Hillhaven's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 30 percent, Medicaid 60 percent, and Medicare 10 percent. As updated at hearing, Hillhaven's utilization projection was as follows: private pay 44 percent, Medicaid 53 percent, and Medicare 3 percent. Currently, Hillhaven provides, on average, 53 percent Medicaid care at its facilities in Florida. Hillhaven's estimate of payor mix was reasonable and, in light of intervening changes in circumstance, was reasonable as updated. Hillhaven's patient charges for its second year of operation as originally reviewed by the Department ranged from $58.60 to $62.00 per day. As updated, Hillhaven's patient charges ranged from $52.13 to $73.50 per day. Hillhaven's estimated charges were achievable when initially proposed and as updated, and are reasonable. Hillhaven's fill-up and occupancy projections, as well as its projections of revenues and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and comport, as updated, with the current experience in Lee County. Hillhaven has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates are premised on reasonable assumptions, and Hillhaven has demonstrated the short term and long term financial feasibility of its project. Currently, Hillhaven owns or operates 15 facilities in the State of Florida. Of these 15 facilities, two have opened within the past year and are not eligible for ratings. Nine of the 13 eligible facilities are operating with superior licenses. Of the remaining four facilities, two have a standard license and two have a conditional license. The two facilities with conditional ratings have both resolved their deficiencies. Hillhaven has provided and will continue to provide quality care. It ensures that quality care will be maintained within its facilities by drawing upon the professional resources four regional offices comprised of registered nurses, quality assurance monitors, regional dietitians, maintenance supervisors, employee relations specialists, and other administrative support personnel. Regional consultants visit company facilities monthly to plan, organize and monitor operations, and to conduct in-service training workshops. Overall, Hillhaven provides each facility with an in-depth quality assurance program. Gene Lynn d/b/a Careage Southwest Healthcare Center Gene Lynn (Careage) is the president and 100 percent owner of Careage Corporation. Since 1962, Careage has developed approximately 150 nursing homes and retirement centers, as well as 100 medically related facilities, in 22 states and the Virgin Islands. Until December 1986 it did not, however, own or operate any facilities. Currently, Careage operates four nursing homes in the United States (one in the State of Washington, two in the State of California, and one in the State of Arizona) , but none in Florida. The home office of Careage is located in Bellevue, Washington. Careage proposed to develop a new 120-bed skilled and intermediate care nursing home in Lee County with specialty units for subacute and Alzheimer's care, consisting of 45,500 square feet. It would include a patient care unit consisting of 2 isolation rooms and 7 private rooms with full bath and 45 semiprivate rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semiprivate rooms with half bath, central dining area, beauty-barber shop, quiet lounge, chapel, physical therapy room, occupational therapy room, outdoor patio areas, and exam-treatment room. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Careage's proposed facility was a single-story building containing 45,500 gross square feet, with an estimated total project cost of $4,150,000. As proposed, the total project cost equates to 34,583 per bed, and as designed provides 184-227 net square feet of living space for isolation/private rooms, and 227-273 net square feet of living space or semi-private rooms. Construction equipment costs were as follows: construction costs $2,583,125; cost per square foot $56.77; construction cost per bed $21,526; equipment costs $420,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipment costs, are reasonable. The Careage facility would offer skilled and intermediate care, occupational therapy, physical therapy, recreational services and social services. Additionally, the proposal includes a special 21-bed unit dedicated solely to the treatment of Alzheimer's disease patients, and a dedicated 10-bed unit for subacute care which will accommodate technology dependent children care. Among the subacute services to be offered are hyperalimentation, IV therapy, ventilators, heparin flush, and infusion pumps for administration of fluids. Careage will offer respite care as beds are available, and will offer day care in a separate facility. Careage's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 49 percent, Medicaid 40 percent, Medicare 3 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patients charges for its facility were projected as follows: private and VA (room rate only) $63.86, Medicaid (all inclusive rate) $59.23, Medicaid (all inclusive rate) $108.15, and private (other) /subacute (room rate only) $128.75. Careage's fill-up and occupancy projections as well as its projections of revenues and expenses, for its 120-bed facility were not shown to be reasonable. First, in light of the fact that there was no quantifiable demand for a dedicated Alzheimer's unit and subacute care unit, as discussed infra at paragraphs 126-129, no reliable calculation of fill-up and occupancy rates or revenues and expenses could be derived that was, as the Careage application is, dependent on such revenue stream. Second, the Careage pro forma was predicated on average rates experienced in Lee County. Since Careage proposes heavier nursing care than that currently experienced in Lee County, its estimates of patient charges are not credible. At hearing, Careage updated its 120-bed application to account for inflationary factors that had affected the project since it was first reviewed, and to correct two staffing errors. These updates did not substantially change the project. Careage has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates were not, however, premised on reasonable assumptions, and Careage has failed to demonstrate the short term and long term financial feasibility of its 120-bed project. Following the Department's initial review of the applications in this batching cycle, it proposed to award a certificate of need to Careage for a 60- bed facility, premised on its conclusion that there was insufficient numeric need to justify an award of beds exceeding that number, notwithstanding the fact that the application of Careage was for 120 beds and did not request or propose a 60-bed facility. Notably, all financial, staffing, construction, equipment and other projections described in the Careage application were based on a 120- bed facility, and no information was provided regarding a 60- bed facility. Also notable is the fact that the other applicants were not accorded equal consideration. Not surprisingly, the proposed award of a CON for 60-beds to Careage was timely challenged, but Careage did not protest the Department's denial of its application for 120 beds but appeared as a respondent to defend the Department's decision to award it 60 beds. At hearing, Careage offered proof of the reasonableness of its 120- bed proposal over the objection of the other applicants. /5 Careage contends that its proposed 60-bed facility is a scaled down version of its 120-bed proposal Careage proposes to offer the same services in its 60-bed facility as it proposed in its 120-bed facility, including the 21-bed Alzheimer's unit and 10-bed subacute care unit. Its proposed 60- bed facility is not, however, an identifiable portion of its initial project. As proposed, the 60-bed facility would contain 26,900 gross square feet, and meet or exceed state standards. It would include a patient care unit consisting of 1 isolation room and 4 private rooms with full bath, 17 semi- private rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semi-private rooms with half-bath, together with the same amenities offered by the 120-bed facility, but on a reduced scale. As proposed, the total project cost for the 60-bed facility is $2,475,000, which equates to $41,250 per bed. As designed, the facility would provide the same net square footage of living space for private and semi-private rooms as the 120-bed facility. Construction equipment costs would be as follows: construction costs $1,431,750; cost per square foot $53.22; construction cost per bed $23,863; equipment costs $210,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipments costs, are reasonable. Careage's projected utilization by class of pay in its 60-bed facility was as follows: private pay 47 percent, Medicaid 40 percent, Medicare 5 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patient charges for its 60-bed facility were projected as follows: private and VA (room rate only) $66.00, Medicaid (all Inclusive rate) $63.50, Medicare (all inclusive rate) $120.00, private (other)/subacute (room rate only) $130.00. Careage's fill-up and occupancy projections, its projections of revenue and expenses, and its pro forma estimates for its 60-bed facility suffer the same deficiencies as those for its proposed 120-bed facility. Under the circumstances, Careage has failed to demonstrate the short term and long term financial feasibility of its 60-bed facility. While Careage has only owned and operated nursing homes for a short time, the proof demonstrates that it has and will continue to provide quality care for its residents. The Alzheimer's unit and subacute care units are reasonably designed, equipped and staffed for their intended functions. Staffing ratios in the subacute unit will be 6.0, and in the other areas of the facility 3.0. Careage currently utilizes a quality assurance program at each facility which includes a utilization review committee, safety committee, infection control committee, and pharmaceutical committee. Each facility also has a resident advisory council, community advisory council, and employee advisory council. Presently, Careage is developing a company level quality assurance program, and has initiated announced and unannounced site visits by a quality assurance expert to evaluate resident care, operations, maintenance and physical environment. The Department of Health and Rehabilitative Services The opinions expressed by the witnesses offered by the Department were premised on information available to them while these applications underwent "preliminary" review. The information available to them at that time, and represented by the State Agency Action Report (SAAR), was incomplete and inaccurate in many respects, including the services to be provided by some of the applicants and the approved bed inventory and occupancy rates utilized in the need methodology. These witnesses were not made privy to, and expressed no opinions, regarding the relative merits of the applications in light of the facts developed at hearing. Throughout the hearing, counsel for the Department objected to evidence from any applicant regarding "updates" (changes) to their applications as they were deemed complete by the Department prior to its initial review. It was the position of the Department's counsel, but otherwise unexplicated, that the only appropriate evidence of changed conditions after the date the application was deemed complete were those changes which relate to or result from extrinsic circumstances beyond the control of the applicant, such as inflation and other current circumstances external to the application. The majority of the "updated" material offered by the applicants at hearing did result from the effects of inflation, the passage of time between the application preparation and the dates of final hearing, changes in the market place regarding nursing salaries, changes in the Medicaid and Medicare reimbursement system and typographical errors in the application. Some changes in design were offered as a result of the applicant's experience with other construction projects and in order to comply with licensing regulations. There were also some changes which resulted from better information having been secured through more current market surveys. None of the applicants attempted to change their planning horizon, the number of beds proposed, the proposed location of the facility or the services to be offered except Careage. The Department has established by rule the methodology whereby the need for community nursing home beds in a service district shall be determined. Rule 10-5.011(1)(k)(2), Florida Administrative Code; formerly, Rule 10- 5.11(21)(b) Florida Administrative Code. The first step in calculating need pursuant to the rule methodology is to establish a "planning horizon." Subparagraph 2 of the rule provides: Need Methodology... The Department will determine if there is a projected need for new or additional beds 3 years into the future according to the methodology specified under subparagraphs a. through i. The Department interprets subparagraph 2, and the applicants concur, as establishing a "planning horizon" in certificate of need proceedings calculated from the filing deadline for applications established by Department rule. This interpretation is consistent with the numeric methodology prescribed by subparagraph 2, and with the decision in Gulf Court Nursing Center v. Department of Health and Rehabilitative Services, 483 So.2d 700 (Fla. 1st DCA 1986). Applying the Department's interpretation to the facts of this case establishes a "planning horizon" of July 1989. Pertinent to this case, subparagraphs 2a-d provide the methodology for calculating gross bed need for the district/subdistrict in the horizon year. In this case, the applicable district is District 8, and the applicable subdistrict is Lee County. The first step in the calculation of gross need for the horizon year is to derive "BA", the estimated bed rate for the population age group 65-74 in the district. This rate is defined by subparagraph 2b as follows: BA LB/ (POPC + (6 x POPD) Where: LB is the number of licensed community nursing home beds in the relevant district. POPC is the current population age 65-74 years. POPD is the current population age 75 years and over. The parties concur that the district licensed bed figure (LB), as well as the subdistrict licensed bed figure (LBD) is calculated based on the number of community nursing home beds as of June 1, 1986. The Department's Semi-Annual Nursing Home Census Report and Bed Need Allocation prepared for the July 1986 review cycle (July 1989 planning horizon) listed 4,193 licensed community nursing home beds in District 8 and 996 in Lee County. However, that count taken on May 1, 1986, did not include 120 new beds which were licensed in Charlotte County on May 8, 1986. The count also excluded 287 beds at four other facilities in the district, including 60 beds at Calusa Harbor in Lee County, because they were listed as sheltered beds according to Department records at that time. After passage of Section 651.118(8), Florida Statutes, the Department surveyed the facilities and found that the beds at these four facilities were operated as community beds rather than sheltered beds. Under the circumstances, the proof demonstrates that as of June 1, 1986, there were 4,600 licensed community nursing home beds in district 8 (LB) and 1,056 in Lee County (LBD). The formula mandated by the rule methodology or calculating BA requires that the "current population" for the two age groups be utilized. The rule does not, however, prescribe the date on which the "current population" is to be derived. Some of the applicants contend that the current population" for POPC and POPD should correspond to the period for which the average occupancy rate (OR) is calculated or the July batching cycle, OR based upon the occupancy rates of licensed facilities for the months of October through March preceding that cycle. Under this theory, January 1, 1986, as the midpoint of that period, is the appropriate date to calculate "current population" to derive PCPC and POPD. The Department contends that "current population" for POPC and POPD should be calculated as of July 1986, the filing deadline for applications in this review cycle. The Department's position is, however, contrary to its past and current practice. The need reports issued by the Department between December 1984 and December 1986, routinely used a three and one- half year spread between the base population period and the horizon date for "current population." In the January 1987 batching cycle, which cycle immediately followed the cycle at issue in this case, the Department utilized a three and one-half spread between the base population period and the horizon date for "current population" when it awarded beds in that cycle. The Department offered no explanation of why, in this case, it proposed to deviate from its past and current practice. Under the circumstances, January 1, 1986, is the appropriate date on which the "current population" is to be calculated when deriving POPC and POPD. The parties are also in disagreement as to whether population estimates developed after the application deadline can used to establish the current population. Rule 10- 5.011(k)2h, Florida Administrative Code, mandates that population projections shall be based upon the official estimates and projections adopted by the Executive Office of the Governor, but does not limit such proof to any particular estimate. The Department advocates the use of population estimates existent at the application deadline. Accordingly, it would apply the official estimates and projections adopted by the Executive Office of the Governor as of July 1, 1986. Other parties would apply the more recent estimates adopted by the Office of the Governor as of July 1, 1987. In this case, the use of either estimate would have no significant effect on the result reached under the rule methodology; however, since all population estimates and projections are only approximations rather than actual counts, it would be more reasonable from a health planning perspective to use the latest estimates of the 1987 population than the estimates available at the time of application. In this case, this means using July 1, 1987, estimates of January 1986 populations. These estimates are still "current" as of January 1986, since It is still the January 1986 population that is to be measured, and more reliable from a health planning perspective than the prior projection. In the same manner, July 1, 1987, estimates of horizon year 1989 populations (PCPA and POP), infra, would also be used rather than July 1, 1986, estimates of that population. Accordingly, Forum's calculation POPC (128,871), POPD (77,194), POPA (149,645), and POPB (95,748) is appropriate. (Forum Exhibit 10, Appendix A) Application of the methodology prescribed by subparagraph 26 to the facts of this case produces the following calculation: BA 4,600/(128,871 + (6 x 77,194) BA 4,600/(128,871 + 463,164) BA 4,600/592,035 BA .0077698 The second step in the calculation of gross need for the horizon year is to derive "BB", the estimated bed rate for the population age group 75 and over in the district. This methodology is defined by subparagraph 2c, and calculated in this case as follows: BB 6 x BA BB 6 x .0077698 BB .0466188 The third step in the calculation of gross need for the horizon year is to derive "A", the district's age adjusted number of community nursing homes beds" at the horizon year. This methodology is defined by subparagraph 2a as follows: A (POPA x BA) + (POPB x BB) Where: POPA is the population age 65-74 years in the relevant department district projected three years into the future. POPR is the population age 75 years and older in the relevant departmental district projected three years into the future. Application of the methodology prescribed by subparagraph 2a to the facts of this case produces the following calculation: A (149,645 x .0077698) + (95,748 x .0466188) A 1,162.7117 + 4,422.4086 A 5,585.12 The final step in the calculation of gross need in the horizon year is to derive "SA", the preliminary subdistrict allocation of community nursing home beds;" gross need in the case. 7/ This calculation is defined by subparagraphs 2d as follows: SA A x (LBD/LB) x (OR/.90) Where: LBD is the number of licensed community nursing home beds in the relevant subdistrict. OR is the average 6 month occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Occupancy rates established prior to the first batching cycle shall be based upon nursing home patient days for the months of July 1 through December 31; occupancy rates established prior to the second batching cycle shall be based upon nursing home patient days for the months of January 1 through June 30. The batching cycle in which these applications were filed, however, occurred before the Department amended its rule to include the fixed need pool concept contemplated by subparagraph 2d. Accordingly, the parties concur that the six month period on which the average occupancy rate is calculated is not as set forth in subparagraph 2d of the current rule, but, rather, defined by former rule 1C--5. 11(21)(b)4 as follows: OR is the average occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Review of applications submitted for the July batching cycle shall be based upon occupancy data for the months of October through March preceding that cycle... In calculating the occupancy rate (OR) for the licensed community nursing homes in the subdistrict (Lee County) the Department derived a figure of 91.91. The Department arrived at this figure based on the first day of the month patient census of each facility considered to have community beds (LBD=1,056), which included the 60 beds at Shell Point Nursing Pavilion; assumed that such census was maintained throughout the entire month; and then divided such patient days by the actual number of beds available. The Department's methodology is an accepted health planning technique, and comports with its previous practice. Some of the parties disagree with the technique utilized by the Department to calculate OR, and advocate the use of actual patient day occupancy to derive OR. This technique differs from the "first of the month" technique by utilizing the actual number of patient days experienced by the facility, as opposed to assuming a constant census based on first of the month data. This alternative methodology is, likewise, an accepted health planning technique, and if proper assumptions are utilized will yield a more meaningful result than the Department's methodology. In this case, the proponents of the "actual patient day occupancy" methodology, erroneously assumed that 160 beds at Shell Point Nursing Pavilion were community nursing homes beds, as opposed to 60 beds; and, based on an erroneous LBD of 1,156, derived a subdistrict occupancy rate of 92.97. Under such circumstances, these proponents calculations are not reliable, and the subdistrict occupancy rate derived by the Department is accepted. Applying the facts of this case to the methodology prescribed by subparagraph 2d produces the following gross need calculation for the subdistrict: 5A 5,585.12 x (1,056/4,600) x (.9191/.9) SA 5,585.12 x .2295652 x 1.0212222 SA 1309.36 The final step in the numeric need methodology is to derive net need from gross need. According to subparagraph 2i, this need is calculated as follows: The net bed allocation for a subdistrict, which is the number of beds available for Certificate of Need approval, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant department subdistrict from the bed allocation determined under subparagraphs 2.a. through f. unless the subdistrict's average occupancy rate for the most recent six months is less than 80 percent, in which case the net bed allocation is zero. The number of approved and licensed nursing home beds for the second batching cycle in 1987 shall be based on the number of approved and licensed beds as of August 1, 1987, in subsequent nursing home batching cycles, the number of licensed and approved beds to be used in establishing net need for a particular batching cycle shall be determined as of the agency's initial decision for the immediately preceding nursing home batching cycle. While the rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" In the subdistrict from the cross need previously calculated, it is silent as to the date that inventory should be calculated when, as here, the batching cycle at issue predates its enactment. In the face of this dilemma, the parties rely on the provisions of former rule 10-5.11(21)(b) , Florida Administrative Code, which was existent when their applications were filed to resolve their dispute. Under the circumstances, reference to former rule 10-5.11(21)(b), is appropriate. Former rule 10-5.11(21)(b)9 provides: The net bed allocation for a subdistrict, which is the number of beds available, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant departmental subdistrict from the bed allocation determined under subaragraphs 1 through 9 (sic 8).... (Emphasis added) While the former rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" in the subdistrict from the gross need calculated under subparagraphs (b)1-8, it is silent as to the date that inventory should be calculated. The Department asserts that the number of licensed beds should be calculated as of June 1, 1986 (the date established by subparagraph (b)7 of the former rule as the data base for calculating LB and LBD, and the number of approved beds as of December 18, 1986 (the date the Department's supervisory consultant signed the state agency action report). The other parties would likewise calculate licensed beds as of June 1, 1986, but would also calculate approved beds as of that date. The Department offered no reasonable evidentiary basis for its interpretation of the date at which the total number of licensed and approved beds are to be calculated under subparagraph (b)9 of the former rule. As discussed below, the dates used by the Department and the other parties for purposes of calculating net need were facially unreasonable. The Inventory of licensed and approved beds under subparagraph (b)9 of the former rule, as well as subparagraph 2i of the current rule, are inextricably linked. As approved beds are licensed, the approved bed inventory decreases and the licensed bed inventory increases. The Department's interpretation of the dates at which licensed and approved beds are to be counted is neither logical nor rational, since it could result in some beds not being counted as either licensed or approved. For example, if beds were approved and not yet licensed on June 1, 1986, but licensed before the consultant supervisor signed the SAAR (state agency action report), they would not be counted in either inventory. On the other hand, the other parties' approach would ignore all beds licensed or approved from previous batching cycles after June 1, 1986 which beds were intended to serve at least a portion of the future population. The fundamental flaw in the parties' approach to establishing an inventory date under subparagraph (b)9, was the assumption that subparagraph (b)7 of the former rule defined licensed bed inventory for purposes of subparagraph (b)9. The Department's rule must be construed in its entirety, and all parts of the rule must be construed so as to work harmoniously with its other parts. So construed, the only logical conclusion to be drawn, as hereinafter demonstrated, is that subparagraph (b)7 defines LB and LBD ("current" licensed beds) for the cross need calculation under the methodology defined by subparagraphs (b)1-4, and does not presume to define licensed beds for the net need calculation under subparagraph (b)9. Subparagraphs (b)1-4 and 7 of the numeric need methodology prescribed by the former rule is designed to yield a gross bed need for the horizon year. The keys to this methodology are the calculation of a current bed rate (BA) and current occupancy rate (OR) for the current using population, and the projection of those rates on the population to be served in the horizon year. A meaningful calculation of the current bed rate cannot, however, be derived without a current inventory of licensed beds (LB and LBD). Accordingly, the relationship between subparagraph (b)7, which defines the data base (June 1, 1986 in this case) for defining LB and LBD (the "current" licensed bed inventory) to the gross bed need calculation is apparent. The parties' suggestion that subparagraph (b)7 defines licensed bed inventory under subparagraph (b)9 not only ignores the inextricable link between subparagraph (b)7 and the gross bed need methodology, but also the language and purpose of subparagraph (b)9. The purpose of that subparagraph is to derive a realistic estimate of actual (net) bed need in the horizon year. Since all licensed and approved beds from previous batching cycles were intended to serve at least a portion of the horizon population, it would be illogical to ignore any of those beds when calculating net need. Accordingly, it would be unreasonable in this case not to count any beds that were licensed or approved from previous batching cycles between June 1, 1986, and the date a decision is rendered on these applications. Indeed, subparagraph (b)9 speaks to "the total number" of licensed and approved beds, not beds existent on June 1, 1986. In sum, subparagraph (b)7 cannot be read to define licensed bed inventory under subparagraph (b)9, and the parties' suggestion that it can is rejected as contrary to the clear language of the rule methodology. See: Boca Raton Artificial Kidney Center, Inc. v. Department of Health and Rehabilitative Services, 493 So.2d 1055 (Fla. 1st DCA 1986). Since the purpose of subparagraph (b)9 is to calculate a realistic estimate of the net bed need for the horizon year, it is appropriate to use the most current inventory of licensed and approved beds at the point a decision is rendered on an application. This assures to the greatest extent possible that the horizon population will not be over or undeserved. In those circumstances where the SAAR becomes final agency action, the Department's approach of calculating inventory on the date the supervisory consultant signs the SAAR, assuming that inventory includes licensed and approved beds on that date, might be reasonable. However, where, as here, the SAAR constitutes only preliminary agency action, and a de novo review of the application is undertaken, there is no rational basis for subsuming that inventory. The rule methodology considered, the only rational conclusion is that net need be derived on the date of de novo review, and that it be calculated reducing the gross need calculation by the inventory of licensed and approved beds from previous batching cycles existent on that date. As of the date of administrative hearing there were 1,056 licensed beds and 120 approved beds in the subdistrict. Applying the methodology prescribed by subparagraph 2i to the facts of this case calculates a net need of 145 community nursing home beds for the July 1989 planning horizon. Special Circumstances. The Department will not normally approve an application for new or additional nursing home beds in any service district in excess of the number calculated by the aforesaid methodology. Rule 10-5.011(1)(k), Florida Administrative Code. Succinctly, the need for nursing home services, whether they be general or special, is a product of the rule methodology, and not relevant to a calculation of need absent a demonstration of special circumstances. The Department has adopted by rule the methodology to be utilized in demonstrating special circumstances that would warrant a consideration of factors other than the numeric need methodology in deciding the need for nursing home services. That rule, 10-5.011(1)(k)2; Florida Administrative Code, provides: In the event that the net bed allocation is zero the applicant may demonstrate that circumstances exist to justify the approval of additional beds under the other relevant criteria specifically contained at Section 10-5.011. Specifically, the applicant may show that persons using existing and like services are in need of nursing home care but will be unable to access nursing home services currently licensed or approved within the subdistrict. Under the provision, the applicant must demonstrate that those persons with a documented need for nursing home services have been denied access to currently licensed but unoccupied beds or that the number of persons with a documented need exceeds the number of licensed unoccupied and currently approved nursing home beds. Existing and like services shall include the following as defined in statute or rule, adult congregate living facilities, adult foster homes, homes for special 505 home health services, adult day health care, adult day care, community care for the elderly, and home care for the elderly. Patients' need for nursing home care must be documented by the attending physicians' plans of care or orders, assessments performed by staff of the Department of Health and Rehabilitative Services, or equivalent assessments performed by attending physicians indicating need for nursing home care. In the instant case, some of the applicants have proposed special services, including an Alzheimer's unit, subacute care unit, and beds for technology dependent children. They offered, however, no proof that any person with a documented need for such services had been denied access to available beds that the number of persons with a documented need exceeded the number of available beds. Succinctly, there is no credible proof that the need for nursing home services in Lee County exceeds that calculated pursuant to the numeric need methodology. While there are no special circumstances existent in this case that would justify an award of beds in excess of that calculated by the rule methodology, that does not mean that consideration of the Alzheimer's, subacute and technology dependent children services offered by some of the applicants is not relevant to the comparative review of the subject applications. Rather, it means that the need for such services will presumptively be met within the need calculated by the rule methodology. How the applicants propose to address that need is, however, a matter for consideration in a comparative review of their applications. Each of the applicants propose to provide subacute care, with Careage proposing a special 10-bed subacute care unit which would accommodate technology dependent children. HCR and Careage propose special Alzheimer's care units; a 15-bed unit by HCR and a 21-bed unit by Careage. Hillhaven will admit Alzheimer's disease patients as presented, and will develop a dedicated Alzheimer's unit if demand should subsequently develop. The prevalence of Alzheimer's disease and the increased demand for subacute services brought about by DRGs, demonstrates that there will be a demand for such services within existing and proposed facilities. There was, however, no persuasive proof of any demand for technology dependent services in Lee County. While there is a demand for Alzheimer's disease care, and the preferred mode of care is in a separate unit specifically designed, staffed, and equipped to deal with this degenerative disease, there was no persuasive proof that the demand is such as to warrant the creation of a separate unit such as proposed by HCR and Careage. 10/ Absent such quantifiable demand, the application of Hillhaven more realistically addresses the need for Alzheimer's disease patients than does that of the other applicants. With regard to subacute care services, the proof likewise fails to quantify the demand for such services. Under such circumstances, Careage's proposed 10-bed subacute care unit is not objectively warranted, and does not serve to better its proposal to provide such services over the proposals of the other applicants. Consistency with district plan and state plan The District 8 health plan contains the following pertinent standards and criteria: Community nursing home services should be available to the residents of each county, 4 within District Eight. At a minimum, community nursing home facilities should make available, in addition to minimum statutory regulation, in the facility or under contractual arrangements, the following services: a. pharmacy h. occupational therapy b. laboratory i. physical therapy c. x-ray j. speech therapy c. dental care k. mental health counseling e. visual care l. social services f. hearing care m. medial services g. diet therapy New and existing community nursing bed developments should dedicate 33-1/3 percent of their beds to use for Medicaid patients. Community nursing home (skilled and intermediate care) facilities in each county should maintain an occupancy rate of at least 90 percent. No new community nursing home facility should be constructed having less than 60 beds... Each nursing facility should have a patient transfer agreement with one or more hospitals within an hour's travel time, or the nearest hospital within the same county. All community nursing homes and applicants for community nursing homes should document their history of participation in Medicaid and Medicare programs. ... The State Health Plan contains the following pertinent goals: GOAL 1: TO DEVELOP AN ADEQUATE SUPPLY OF LONG TERM CARE SERVICES THROUGHOUT FLORIDA. GOAL 2: TO ENSURE THAT APPROPRIATE LONG TERM, CARE SERVICES ARE ACCESSIBLE TO ALL RESIDENTS OF FLORIDA. Each of the applicants demonstrated that their proposal would conform, at least minimally, with the foregoing provisions of the state and local health plans. Of particular significance to Lee County is, however, an applicant's commitment to Medicaid service. The District 8 Council has reported that hospitals in Lee County are having difficulty placing Medicaid patients in nursing homes due to the unavailability of Medicaid beds. The current Medicaid experience is 46 percent. Therefore, the local council has directed that new and existing community nursing home developments should dedicate at least 33-1/3 percent of their beds for Medicaid patients. While all applicants propose to meet this standard, Hillhaven's proposal to dedicate 53 percent of its beds to Medicaid care is substantially greater than the commitment of the other applicants, and is consistent with its current experience in meeting a community's need for nursing home care. Availability, appropriateness, and extent of utilization of existing health care services Section 381.705(1)(b), Florida Statutes, requires Consideration of the availability, quality of care, efficiency, appropriateness, accessibility, extent of utilization, and adequacy of like and existing health care services in the service district. When the subject applications were filed, there were 1,056 licensed beds in Lee County with an occupancy rate of 91.91 percent. The nursing home bed supply in Lee County is obviously strained, and there exist no reasonable alternatives to the addition of new beds to the subdistrict. To coordinate with existing health facilities, each applicant proposes to establish appropriate transfer agreements and affiliations with local physicians, hospitals, and other health care providers. While some of the applicants have proposed an Alzheimer's unit and subacute care unit, the proof failed to demonstrate any quantitative need for such units in the subdistrict. Some applicants also proposed to provide day care in conjunction with their nursing home. Currently, there exists adequate day care in Lee County at little or no expense to the patient, and there was no persuasive proof of a need for additional day care services. Economies derived from joint health care resources HCR and Hillhaven each proposed 120-bed facilities which would provide for a more efficient and economical operation than a 60-bed facility. The 60-bed facilities proposed by Forum and Health Quest are, however, part of a larger complex which likewise lends itself to an efficient and economical operation. HCR, Hillhaven, Forum and Health Quest are major operators of nursing home facilities, and are thereby able to negotiate and obtain bulk prices for food, medical and nursing supplies. These savings are ultimately passed on to the residents. Additionally, by drawing upon a broad spectrum of expertise existent within their corporate networks, these applicants are best able to maintain and improve the services they offer. The criteria on balance In evaluating the applications at issue in this proceeding, none of the criteria established by Section 381.705, Florida Statutes, or Rule 10- 5.011(k), Florida Administrative Code, have been overlooked. As between the competing applicants, consideration of those criteria demonstrates that Hillhaven is the superior applicant whether it is evaluated on its application as initially reviewed by the Department or as updated at hearing. Among other things, the Hillhaven facility is spacious with large and well appointed patient rooms, its project costs are most reasonable (whether type 5 or type 4 construction), its programmatic proposal and staffing levels are most reasonable in light of existing demand, its provision for Medicaid services is the highest, and its patient charges are the lowest.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered granting Hillhaven's application for a certificate of need to construct a new 20-bed community nursing home in Lee County, and denying the applications of HCR, Forum, Health Quest and Careage. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 22nd day of November, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of November, 1987.
The Issue The issue in this proceeding is whether DHRS should approve the application for certificate of need of any one or more of the January, 1987, applicants for community nursing home beds in Hillsborough County. STIPULATIONS The parties stipulated to the following facts: All applicants timely filed their respective letters of intent, applications and omission responses with DHRS and the appropriate local health council for the January, 1987, batching cycle. The petitioners each timely filed a petition requesting a Section 120.57(1) hearing and have standing in this proceeding. The parties agree the Division of Administrative Hearings has jurisdiction over this matter and the parties. The CON application content requirements of Section 381.494, Florida Statutes (1985), apply as that was the statute in effect at the time the applications were filed. The review criteria in Section 381.705(1) and (2), Florida Statutes (1987), apply to this proceeding. The following statutory criteria have been met orare not applicable in this proceeding: Section 381.705(1)(d), (f), (g), (j) and (k) and all of Section 381.705(2), Florida Statutes (1987). Except for the effects the project will have on clinical needs of health professional training programs, the extent to which services will be accessible to schools for health professionals and the availability of alternative uses of such resources for the provision of other health services, Section 381.705(1)(h) is in dispute and remains to be litigated.
Findings Of Fact SUMMARY DESCRIPTION OF THE PARTIES. HCR's application (CON Action No. 5000) is to construct a 120-bed nursing home consisting of 40,000 square feet at a cost of $3,964,000.00, or $33,033 per bed (including adult day care; $32,1127 when the cost for day care is excluded.) The HCR application describes special programs and services for Alzheimer's Disease and related disorder patients in a distinct special care unit and an Alzheimer's day care center, both Identified in the plans submitted by HCR showing special design elements. HCR also proposes to offer sub-acute care and respite care. The HCR nursing home will have 2.08 (120/57.6) patients per staff, which includes the assistant director of nursing and occupational therapy and recreational therapy aides listed by HCR in its application. FCP submitted an application for 30 nursing home beds to be constructed as a part of a retirement facility (CON Action NO. 4993). The 30 beds will comprise approximately 17,558 square feet at a cost of $1,549,599.00, or $51,653 per bed. The Florida Country Place application proposes a patient staff ratio of approximately 2.3 (30/13). Palm Court submitted an application for a 60-bed addition to its existing 120-bed facility (CON Action No. 4987). The 60-bed addition would consist of 15,260 square feet at a cost of $1,472,435.00, or $24,571 per bed. The Palm Court facility is located in Plant City in the far eastern portion of Hillsborough County, near the Polk County line. Palm Court proposed a ratio of 2.31 (60/26) patients per nursing staff. Manor Care submitted an application (CON Action No. 5006) to add 60 beds to an approved certificate of need for 60-beds for which construction has not yet begun. The area to be added would consist of 19,000 square feet at a cost of $2,187,045.00, or $36,451 per bed. The Manor Care addition would include a distinct special care unit for Alzheimer's Disease and related disorder victims and the 60-bed addition would provide a patient staff ratio of 1.98 (60/30.3), which includes a half-time physical therapy aide, a half-time recreational therapy assistant and an assistant director of nursing. Forum submitted an application (CON Action No. 4999) to construct a 120-bed nursing home as a part of a retirement complex. The nursing home element will consist of 49,283 square feet at a cost of $5,053,301.00, or $42,111 per bed. Forum proposes a staffing ratio of 3.0 patients per staff FTE. Forum proposed to provide respite care and hospice care, and adult day care and meals on wheels during or after the second year of operation. HHL submitted an application (CON Action No. 4978) for 120-bed nursing home consisting of 37,700 square feet at a cost of $3,900,000.00, or $32,500 per bed. The HHL facility proposes 2.27 (120/52.8) patients per staff, which includes the rehabilitation assistants and the assistant director of nursing listed by HHL. HHL proposes sub-acute care, respite care, programs for Alzheimer's Disease victims (but not a distinct special care unit) and an Alzheimer's adult day care program of from four to six patients. Cypress submitted an application (CON Action No. 5004) to construct a 60-bed nursing home in Sun City Center in southeastern Hillsborough County. The nursing home described in the application would contain 24,069 square feet at a cost of $2,125,000.00, or $35,419 per bed. But Cypress' estimated construction cost per square foot of $49.81 does not account for inflation and is unreasonably low. Median cost of nursing home construction in Florida is $55 per square foot. It is estimated that Cypress' construction cost estimate is 10-15 percent too low. Assuming that the cost estimate is 12.5 percent too low, the cost of construction would increase to approximately $2,274.485 or $37,914 per bed. Cypress did not detail any special programs in its application and proposed 2.45 (60/24.5) patients per staff. However, this ratio is questionable in view of the confusion surrounding Cypress' evidence regarding staffing and the apparent inaccuracy of the staffing presented by the application. DHRS is the state agency that preliminarily reviewed and passed on the applications and is responsible for final agency action on them. DHRS PRELIMINARY REVIEW AND ACTION. HCR, FCP, Palm Court, Manor Care, Forum, HHL, Cypress, and others filed their applications for community nursing home bed certificates of need for Hillsborough County in the January, 1987, batching cycle. On June 18, 1987, DHRS issued its State Agency Action Report (SAAR), in which it denied all of the applications except HCR's, FCP's and VHA/Oxford's (for 120 beds). Review of the SAAR in light of the evidence introduced at the final hearing indicates that DHRS erred in reviewing the applications in at least the following respects: Manor Care. -- The SAAR indicates that DHRS was not cognizant that Manor Care had a final approval for a 60-bed nursing home CON (No. 4155) to which to add the 60 beds applied for in this case, CON Action No. 5006. The SAAR was somewhat critical of the Manor Care proposal for being a two-story structure. It appears that DHRS confused the proposal to add 60-beds (CON Action No. 5006) with a parallel contingent proposal to build a new 120-bed facility (CON Action No. 5005), which Manor Care eventually withdrew during the final hearing. Actually, CON Action No. 5006, added to the approved CON No. 4155 for a new 60-bed nursing home, would result in a one-story 120-bed nursing home. On page 7 of the SAAR, DHRS indicated its understanding that Manor Care had not specified a location for its proposal. Later, on page 11, the SAAR acknowledges the true fact that Manor Care's proposed nursIng home would be located in the Northwest Hillsborough County subdistrict, which is the Local Health Plan's first priority for location of additional nursing home beds in DHRS District 6. HHL. The SAAR (p. 13) states that Convalescent Services, Inc. (CSI), the management corporation HHL and other limited partnerships for which the Kellett Brothers are the general partners, has no other nursing homes in Florida. While technically correct, Kellett limited partnerships do have other nursing homes in Florida. Staffing tables on page 17 of the SAAR are incorrect, attributing no LPNs to the HHL proposal instead of 6 and only 36 aides instead of 38. On page 18 of the SAAR, the table of patient privileges incorrectly states that the HHL applications had no patients' bill of rights. Also on page 18 of the SAAR, DHRS incorrectly omitted adult day care and community outreach from the table of programs provided by HHL. On page 26 of the SAkR, it gives HHL's private pay private room rate ($101) as its semi-private room rate (actually $69.92) The SAAR Review Matrix incorrectly omits adult day care, community outreach and sub-acute care from HHL's proposed programs and omits HHL's patients' bill of rights. Forum. -- The SAAR starts out on page 3 by misidentifying Forum as being affiliated with Hospital Corporation of America. On pages 4, 6 and 15, the SAAR incorrectly fails to recognize that a retirement living center (apartments) is part of the overall development Forum proposes. The semi-private room rate of $110 attributed to Forum's application on page 26 of the SAAR is wrong; it should have been $85. Cypress. -- The Review Matrix in the SAAR failed to identify several services and programs Cypress stated in its application that it would offer. The matrix did not recognize that Cypress would offer social activity functions within the community, would offer rehabilitation, would provide some Alzheimer's type services, (which Cypress called supportive care and mentally frail services) and physically frail services. Cypress also spoke of hospice care and respite care in its application, as well as specialized rehabilitation, physical therapy, and speech therapy. Cypress also spoke of community outreach programs, psychiatric services, home health agencies, and numerous other areas that were not recognized by DHRS in its matrix. However, there are valid reasons for some of these omissions. On May 9, 1988, the first day of the final hearing, VHA/Oxford withdrew its application. On the afternoon of May 17, 1988, DHRS announced it was supporting the grant of Palm Court's application since VHA/Oxford had withdrawn. But the only evidence to support the new DHRS position was through the testimony of Reid Jaffe, DHRS Health Services and Facilities Consultants Supervisor, who did not express a personal opinion but acted as a messsenger to relay the positions taken by others at DHRS who did not testify. NUMERIC NEED. Rule 10.5.011(1)(k), Florida Administrative Code, is a methodology for calculating net numeric need for nursing home beds. Under the methodology, gross numeric need is calculated essentially by multiplying the population of two age cohorts projected on the planning horizon by a use rate. The use rate is calculated by divIding current population by the current number of licensed beds. To obtain net need in a health planning sub-district, the methodology first prorates the gross need in the entire district, using the proportion of current licensed beds in the subdistrict to the current licensed beds in the district, and adjusts the resultant by a current occupancy rate factor (occupancy rate /0.90); then, the number of licensed beds, plus 90 percent of the number of approved beds in the subdistrict, are subtracted from the adjusted gross need in the subdistrict. With three exceptions, the parties agree on how net numeric need is calculated under the rule methodology. The parties disagree only on the current licensed bed count, the current approved bed count, and the occupancy rate at one facility that has both community nursing home beds and sheltered nursing home beds. (Sheltered nursing home beds generally are not factored into the formula.) As for the licensed bed count, the issue is whether The Home Association, a 96-bed facility in Hillsborough County, should be included as a licensed community nursing home facility or excluded as a sheltered facility. At hearing, all of the parties presenting evidence on the issue except Forum counted The Home Association's 96 beds as licensed community beds. Forum excluded The Home Association from the licensed bed count because it was not listed on the Department's Community Nursing Home Report for January 1, 1988. This same report reflects three other facilities in Hillsborough County in which the beds were formerly sheltered but as of August 1, 1987, began to be counted by the Department as community beds. Forum conceded, however, that if the Department recognizes The Home Association as a community facility, then it would be appropriate to include those beds in the licensed bed count under the rule formula. In its proposed recommended order, even Forum agrees that The Home Association beds are included in the licensed bed count. Two issues are presented relating to the inventory of approved beds under the rule formula: the date at which approved beds are to be counted; and whether the 120 beds under Careage CON #4714 and Manor Care's 60 beds under CON #4155 were approved at the pertinent time. On the first question, Forum again stands alone. In the face of a rule which is silent as to the date on which approved beds are to be counted, Forum suggests that they be counted cn the same day licensed beds are counted, December 1, 1986, for this batch. All other interested parties follow the Department's general practice of counting approved beds as of the date the State Agency Action Report for this batch was executed, June 18, 1987. Forum supports its position on the ground that use of the same date for both licensed and approved beds avoids the prospect that beds may be "lost" from the calculation if they are not licensed as of December 1, 1986, but become licensed before June 18, 1987, and therefore are no longer approved beds on that latter date. The argument is meritless. There is no evidence of any "lost" beds under this policy for this batch. Indeed, the evidence is that such beds are not lost: 120 beds at Carrollwood were licensed on December 15, 1986, after the December 1 licensed bed cut-off and before the June 18, 1987, SAAR date. These beds were included in the approved bed inventory on June 18, 1987. The Department's policy under its numeric need rule is to count approved beds as of the execution date of the SAAR. Under this policy, the need for beds in the future is predicated on the number of beds currently or soon to be available to meet the need. When more than seven months can elapse after licensed beds are counted but before the agency decision is formulated, it makes sense to count beds approved during this intervening period. A 120-bed award to Careage in the prior batch was published by DHRS in the Florida Administrative Weekly of January 23, 1987, reflecting approval on January 7, 1987. However, DHRS then received criticism.of the approval, and a new supervisor in charge initiated a second review of the circumstances and of the Careage approval. The second review did not conclude until after June 18, 1987. When it did, DHRS re- affirmed its decision to approve Careage and issued a CON for 120 beds on August 18, 1987. Although the Careage CON was issued after June 18, 1987, DHRS proved that there is a rational basis for including it in the approved bed count under these unusual circumstances. The Careage CON represents 120 beds approved in the batching cycle preceding the one at issue in this case. Counting the 120 beds as approved promotes sound health planning. The projection of net need on the planning horizon is predicated on the most accurate count of approved beds from prior batching cycles that can be anticipated to come on line in the near future. As of June 18, 1987, there were 308 other beds approved but not yet licensed in Hillsborough County. Included among these 308 approved beds are 60 beds awarded to Manor Care under CON 4155 by Stipulation dated March 30, 1987. By mistake, DHRS did not count Manor Care's 60-bed CON in the SAAR. This mistake was not discovered, and DHRS served discovery responses and took a final position on need, as required by prehearing orders, that did not count the Manor Care CON. But this mistake f fact should now be corrected, even if it could have been discovered earlier through the use of due diligence, so that the health planning decision resulting from these de novo proceedings will be predicated on the correct facts. See Gulf Court Nursing Center v. HRS, 483 So.2d 700, 712 (Fla. 1st DCA 1986). It is appropriate to include Manor Care's finally approved 60 beds in the rule formula. Adding Careage's 120 beds, the total approved bed count is 428. The final variation accounting for the differences in the parties' calculations under the formula is the manner in which the occupancy rate should be computed at John Knox Village, a facility containing both community and sheltered beds. The issue is whether the patient days in this mixed facility should be prorated between the two types of beds or whether the full patient days for both types of beds should be used in calculating the occupancy rate in the facility. There is no separate report of occupancy by bed type for this mixed facility. The number of patient days delivered in the community beds at John Knox is not known. If the patient days for the entire facility are prorated according to the percentage the community beds bear to the total number of beds, there is a necessary but wholly unsupported and speculative assumption that the proportion of patient days delivered in community beds is identical to the proportion of community beds. DHRS historically has been unwilling to make this assumption and has always included the total number of beds and patient days in mixed facilities to determine the occupancy rate under the community bed rule. The rationale supporting this policy has been appropriately explicated on the record. The use of prorated patient days to determine occupancy in mixed facilities, as suggested by DHRS for the first time at final hearing, also is a change from the position the Department took when exhibits were exchanged and the prehearing stipulation was executed and then relied on by the parties. Because the Department, as a party litigant, did not prorate in its prehearing submissions, it cannot do so at hearing in the absence of fraud, mistake of fact, or newly discovered evidence. No evidence of any such extenuating circumstances was presented. The only explanation DHRS gave for changing its treatment of the John Knox occupancy data was that more accurate recent data (using daily census data instead of first day of the month census data) furnished by the Local Health Council was prorated. But DHRS just as easily could have prorated the older, less accurate data if it had chosen to take that position at the time the parties were required to take final positions in prehearing procedures. The Department, therefore, is precluded from adopting a posture at hearing relating to the treatment of patient days in mixed facilities which is different from that reflected in the Department's prehearing stipulation and exchanged exhibits. In summary, the appropriate numeric need calculation must include The Home Association in licensed beds, count both Careage's 120-bed CON and Manor Care's 60-bed CON in the approved bed count, and use the full John Knox bed complement and patient days in determining the Hillsborough County occupancy rate. Using these factors in the rule methodology, the net need for community nursing home beds in Hillsborough County for the January, 1990, planning horizon is 231, as reflected in the calculation included in the attached Appendix To Recommended Order, Case Nos. 87-3409, etc. Rule 10-5.011(1)(k), Florida Administrative Code, provides that DHRS normally may not approve more beds than the numeric net need calculated under rule methodology. In this case, none of the circumstances specified in the rule that would justify exceeding the numeric net need were proven by the evidence. At the same time, the rule does not require DHRS to fill all, or as much as possible, of the numeric net need by attempting to "mix and match" applications to come as close as possible to the calculated number. LOCAL GEOGRAPHIC NEED PRIORITIES. The current, 1985 District VI Local Health Plan provides that, after consideration of numeric bed need under the rule need methodology, its "priority need rankings" should be considered in the competitive review for new nursing homes. Hil1sborough County, Northwest, is priority rank number one. HCR, FCP, Manor Care, Forum and HHL all propose to locate their nursing homes there. Cypress proposes to locate in Sun City Center and Palm Court is in Plant City, both in Hillsborough County, Southeast, an area ranked fifth in priority in District VI. Plant City is close to Polk County, which the Local Health Plan designates as the fourth ranked area in priority. Cypress proposes its 60-bed nursing home approximately 1/4 mile down the road from an existing nursing home called Sun Terrace, operated by CSI. Quality of care concerns have arisen due to rapid fill-up of 60 additional beds recently licensed at Sun Terrace and opened in September, 1987. See Findings of Fact 83-87, below. As a result, Sun Terrace has imposed on itself a moratorium on new admissions until quality of care concerns can be addressed. In part as a result of the moratorium, Sun Terrace's occupancy rate at the time of the final hearing was only approximately 65 percent, leaving 42 empty beds. MEDICAID NEED. One of the three major considerations for competitive review of nursing home CON applications in the Longterm Care section of the 1985-1987 State Health Plan is "resource access." Except as reflected in the priority rankings, geographic access is not an issue in this proceeding. (Priority/Policy 7 of the Local Health Plan, setting a goal of providing for nursing home services within 30 minutes travel time of 90 percent of urban residents and within 45 minutes travel time of 90 percent of rural residents, already has been achieved in District VI.) But, to address concern for financial access, Priority/Policy 2 of the Local Health Plan provides that applicants "should commit, at a minimum, to serve Medicaid eligible patients in proportion to the representation of elderly poor in the subdistrict." In Hillsborough County, Northwest, where all but two of the applicants propose to locate, the elderly poverty rate is 18.6; in Hillsborough County, Southeast, where Cypress and Pal:n Court would be located, the elderly poverty rate is 15.6 percent. The applicants propose to commit the following percentages of their nursing home beds to the care of Medicaid- 4 eligible patients: HCR, 70 percent; FCP, 70 percent; Manor Care, 30 percent; HHL, 45 percent; Palm Court, 70 percent; and Cypress, approximately 10 percent. Cypress proposed in its application to commit 10 percent of its beds for Medicaid use. It attempted to update its application to provide for a 15 percent Medicaid commitment. The update was said to have been the result of a decrease in the average age of the residents of Sun City Center, Cypress' proposed primary service area, from 73 to 70. But the percentage was calculated by first estimating 60 percent private pay and "backing down" to a Medicare percentage of 25 percent, leaving 15 percent Medicaid. The evidence was persuasive that this attempted update was not due to extrinsic factors. See Conclusions of Law 20 to 25, below. Forum has committed only to have 50 percent of its beds Medicaid- certified and to meet the requirements of Priority/Policy 2. Although Priority/Policy 2 is written as a minimum Medicaid percentage, no evidence was presented from which to determine how high a percentage of Medicaid commitment is desirable. There was, e.g., no evidence on which to find that a Medicaid percentage as high as four times the elderly poverty rate is more desirable than a percentage approximately equal to or perhaps just a bit higher than the elderly poverty rate. To the contrary, the only evidence on the subject was that DHRS does not now consider the Medicaid percentage to be as important as it was considered to be in the past and that DHRS now just checks to see that the percentage approximates the elderly poor rate in the County. NEED FOR ALZHEIMER'S DISEASE PROGRAMS. Description Of The Disease And The Need. There is a need in Hillsborough County for additional nursing home beds and services for Alzheimer's Disease and related disorder victims. There is no known nursing home in Hillsborough County which provides a distinct care unit for Alzheimer's Disease and related disorder victims. There is an estimated unmet need by Alzheimer's patients for nursing home care in Hillsborough County of approximately 1,271 by July, 1989. DHRS has recommended that "preference should be given to applicants for new nursing home beds which propose the development of special Alzheimer's units" and "greater preference should be given to units that will also provide adult day care and/or respite care." Alzheimer's Disease is a brain disorder that was discovered at the turn of the century. It primarily affects persons over the age of 60. The term "related disorders" is used because some non-Alzheimer's disorders mimic Alzheimer's Disease symptoms and create many of the same needs for specialized care. Typically, Alzheimer's Disease results in gradual memory loss and, as memory loss progresses, results in the need for ever- increasing personal care. In the earlier stages, the victim is often in reasonably good physical condition and simply exhibits signs of recent memory loss. However, as memory loss increases, various activities of daily living are disrupted. Victims encounter more serious physical problems and exhibit symptoms such as wandering, significant weight loss, clumsiness, incontinence and antisocial behavior. In the last stages of the disease, the victim requires increasingly intense medical attention, becomes totally dependent on others, and may eventually require total skilled nursing care. The intensity of care required for the Alzheimer's Disease and related disorder victim increases as the disease progresses. In early stages, the victims are typically cared for at home by a family member. The nature of care required for an Alzheimer's Disease or related disorders victim is very exhausting for the care giver. Toward the end of the first stage of the disease when the victim requires increasing supervision, the victim can be maintained longer in the home if there is available to the care giver some form of occasional rest, such as adult day care or respite care. Adult day care and respite care provide opportunities for the primary care giver to "take a break". See Findings of Fact 133 to 135, below. An Alzheimer's Disease patient usually requires inpatient nursing home care late in the second stage of the disease. If the patient is ambulatory, he often exhibits a wandering behavior. Approximately 50 percent of the Alzheimer's victims admitted to a nursing home have the potential to wander. Ultimately, Alzheimer's victims become bed-ridden and require skilled or sub- acute nursing home care, including tube feedings, cathethers, and artificial life support. Historically, ambulatory Alzheimer's patients in nursing homes have been mixed with other patients. The Alzheimer's victim has often disrupted life in the nursing home because of the victim's wandering, incontinence, confusion, and socially unacceptable behavior. Because of these characteristics, some nursing homes avoid admitting Alzheimer's patients and others control problem behavior with sedation and physical restraint. A separate Alzheimer's care unit enables the nursing home to utilize special techniques to manage the Alzheimer's disease victim and allows the victim to maintain his cognitive capabilities for as long as possible, without restraint and sedation. Nursing home patients who do not suffer from Alzheimer's and related diseases are often agitated and disrupted by the Alzheimer's patients' unacceptable social behavior. A separate unit for Alzheimer's Disease victims accommodates the needs of the non-Alzheimer's patient by eliminating unpleasant, often violent encounters between dementia victims and other patients. Distinct Alzheimer's special care units provide better care for Alzheimer's disease and related disorder victims for several reasons. A separate unit eliminates the tendency of the Alzheimer's disease patient to disrupt the remainder of the nursing home. A separate unit provides a smaller, safer, specially designed area with specially trained staff to address the unique needs of the Alzheimer's disease victim. A separate unit is preferable to mixing Alzheimer's patients with non- Alzheimer's patients. Traditional nursing home programs and activities are often inappropriate and counterproductive for the Alzheimer's patient. HCR's Proposal. The 120-bed nursing home proposed by HCR will help meet the needs in Hillsborough County for adult day care, respite care, sub-acute care and a special care unit for Alzheimer's Disease and related disorder victims. The programs and services will enable the HCR nursing home to provide at one location a complete continuum of care from the least intense level of care in adult day care to total (sub-acute) care. HCR's Alzheimer's special care unit will incorporate special design features, special patient activities and programs and higher staffing levels to meet the unique needs cf Alzheimer's disease victims. These features are intended to compensate for memory loss and provide a safe environment where cognitive capabilities can be maintained for as long as possible while patients enjoy personal freedom without the use of restraints and sedation which have typified the treatment of unmanageable Alzheimer's and dementia patients. The architectural design of the HCR nursing home will accommodate the tendency of Alzheimer's victims to wander by allowing the victims to ambulate in circular patterns through the facility and the adjacent court yard and by providing an electronic warning system to prevent inadvertent exit from the nursing home. Patient bathrooms are specially designed to avoid fright and confusion through the use of automatic lighting fixtures, appropriate coloring and distinctly shaped fixtures and waste baskets. Calming colors, color coding, carefully selected art work, special floor coverings and labeling are provided. Separate dining and activities areas enable the nursing home to provide programs and activities for Alzheimer's disease victims in a more effective and efficient manner than would be possible if the same areas also had to be used for non- Alzheimer's Disease victims. The proposed HCR nursing home includes a discreet area designed for an adult day care center, which will share some resources with the nursing home. The program will accommodate 12 persons and be operated in accordance with adult day care regulations. The physical spaces include an entry separate from the main nursing home entry, a lobby, an office, a therapeutic kitchen for use by the patients, toilet facilities, an activities center, and a lounge with an adjacent covered porch. The adult day care program will be staffed by a nurse director, an assistant and volunteers. The participants in this program will be provided with various activities of daily living in an environment developed for Alzheimer's Disease victiMs. This program is intended to provide placement for persons not yet in need of in-patient care and will provide an alternative to premature nursing home admission. Manor Care's Proposal. Manor Care proposes a dedicated 30-bed specialized unit for persons suffering from Alzheimer's disease and related disorders. In 1985, Manor Care perceived the need to treat Alzheimer's patients in a manner different than patients in the general nursing home population. Manor Care's task force of nurses, administrators, architects, and designers developed an Alzheimer's program which recognizes the special needs of the patient. Manor Care now operates 21 special dedicated Alzheimer's units throughout the country and is planning 16 additional Alzheimer's units. Manor Care's comprehensive Alzheimer's program encompasses five components: (1) environment, (2) staffing and training, (3) programming, (4) specialized medical services, and (5) family support. Environment. The proposed 30-bed Alzheimer's unit will be separate from the rest of the facility and self-contained, with its own dining room, activities room, lounge, quiet/privacy room, nurses sub-station, director's office, and outdoor courtyard. A separate dining room for Alzheimer's residents enables staff to provide individualized attention and special assistance. By providing a simple and separate dining environment, residents are no longer embarrassed by confusion and agitation displayed in the presence of non-Alzheimer's residents during mealtime. A separate lounge area is provided for families to visit with residents. In a typical nursing center, the family must visit a confused resident in the presence of other families; families of Alzheimer's residents can find this embarrassing. A separate lounge makes visitation more desirable for Alzheimer's residents and families. The quiet/privacy room can be used by families as a quiet area to visit with a family member, by residents who want to spend time alone, or by staff persons and residents for individualized programming away from the activity on the unit. The outdoor courtyard, which is enclosed and accessible to the unit through the activities room and hallway door, allows Alzheimer's residents to walk outside freely without wandering off. The Manor Care Alzheimer's unit is specially designed with features which reduce environmental stress by minimizing glare (using parabolic lenses), noise and bold patterns which increase agitation in Alzheimer's residents. Throughout the unit, a residential, uncluttered atmosphere is emphasized, using soft, contrasting colors and textures. The unit also contains visual cues to increase orientation. Furnishings are functional, durable and easy to maintain. Staffing and Training. The Alzheimer's unit has its own specialized staff including a Unit Director, Activities Director, and nursing staff. The unit is staffed at a higher "nurse to resident" ratio than the rest of the facility. Staffing patterns emphasizu continuity to ensure that residents receive individualized care. The nurses become f;i1iar with the behavior and abilities of each resident and are able to render care appropriately. Programming. The goal of programming and activities in the Alzheimer's unit is to improve the quality of life of the Alzheimer's resident. This specialized programming results in reducing the use of medications and restraints necessary to manage the Alzheimer's resident. The Manor Care Alzheimer's activity program is success-oriented; staff provide activities designed to allow Alzheimer's residents to succeed more frequently. (They usually fail when mixed in with the general nursing home population.) specialized Medical Services. The use of consultant medical specialists is an integral part of Manor Care's Alzheimer's Program. Specialists provide diagnostic and treatment services for Alzheimer's residents upon admission to the unit, and thereafter when deemed medically appropriate. Family support. Family support is another important aspect of the Manor Care Alzheimer's program. Families are very supportive of the unit's programming and have benef itted from the understanding and support available to them. The Others' Proposals. None of the other applicants propose specialized units for the care of patients with Alzheimer's disease and related disorders. Alzheimer's sufferers will be treated in an "open unit" at the HHL facility and will be placed as compatibly as possible with other residents. Although these residents will be able to intermingle with other residents, their movements will be monitored by the "wander guard" system and all doors will be equipped with buzzers connected to the nurse's stations. The HHL facility will be designed to incorporate secure courtyards and other areas where residents will be free to wander safely throughout the living areas. The facility's nursing personnel will be specially trained to provide services to Alzheimer's sufferers. The proposed HHL facility will also offer an adult Alzheimer's day care program. Although the program will be small (accommodating between four to six individuals) it will interface with the Alzheimer's program offered to the in-house residents. As with the respite program, the Alzheimer's adult day care program will give the families of Alzheimer's disease sufferers an opportunity to take a breather during the day, and the participants will benefit from the special Alzheimer's programs and activities offered. With its proposed 60-bed addition, Palm Court plans to add a program directed specifically at persons suffering from Alzheimers and related brain disorders. Currently, it does not have one. Neither FCP nor Forum make any particular provision for the care of Alzheimer's patients. FCP points out that its facilities in other states historically have cared for this special category of patient, primarily through use of high quality, thereapy-oriented programs, especially at the earlier stages of the disease. Cypress proposes to locate off of a central core: a 60-bed nursing home, offering both intermediate and skilled care, with its own recreation area and dining, serviced from the central kitchen; (2) a 20-bed assisted living unit (which Cypress also calls "supportive care") for mentally frail and physically strong individuals which has its own outdoor recreation area and dining area; and (3) another 40 assisted living beds broken into two 20-unit wings for mentally strong and physically frail individuals, with their own dining and recreation area, including outdoor recreation. The various levels of care are separate since each of the levels have different needs and methods of treatment. However, Cypress will only accept in the mentally frail, physically strong wing, Alzheimer's-type patients who are in the earlier stages of the disease. QUALITY OF CARE. Priority/Policy 9 of the 1985 Local Health Plan states: "Applicants should be evaluated as to their achievement of superior quality ratings by DHRS and other indications of quality as available." Track Record. At the time of application, three of the nursing homes operated by HCR in Florida had superior licenses and the remaining homes had standard licenses. FCP has one nursing home in Florida. It is rated standard by DHRS. None of the facilities operated by FCP's principals, the Phillipses, has ever been in receivership or had a Medicaid or Medicare certification revoked. The Phillipses have an excellent reputation in Ohio for their operation and management of nursing homes and have remained in positive standing with federal and state certification agencies. Manor Care's proposed 60-bed addition will be owned by Manor Care of Florida, Inc., a wholly-owned subsidiary of Manor HealthCare Corporation. Manor HealthCare Corporation is a publicly-held corporation which owns and operates about 130 nursing homes in various states. Manor Care owns and operates nine nursing homes and three adult congregate living facilities (ACLFs) in Florida. All nine Florida nursing homes exceed DHRS licensure standards; the majority of Manor Care's Florida facilities hold a superior license rating. Manor Care has never had a license denied, revoked, or suspended in Florida. Manor Care has opened three nursing homes in Florida in recent years. All three are superior rated. Palm Court Nursing Home has a superior license, with zero deficiencies, from DHRS' Office of Licensure and Certification with the most recent inspection having occurred between May 2 and May 4 immediately preceding the beginning of the final hearing. It is managed by National Health Corp., Murpheesboro, Tennessee. National Health Corp is an owner-operator of other facilities and either owns or operates some 19 facilities in Florida. It has managed Palm Court Nursing Home since its inception and, if the 60 bed addition is approved, will manage the addition. Forum has never had a license denied, revoked or suspended, nor had a facility placed in receivership. Forum has never had any nursing home placed in receivership at any time during its ownership, management or leasing. Forum has a history of providing quality of care and owns and operates facilities in other states which hold superior ratings. Forum has a corporate policy of seeking to attain a superior rating in those states which have such a system. Forum presently owns and operates one facility in Florida. That facility is rated standard and was acquired by Forum within the past two years. That facility, which only has 35 nursing beds, is not a prototype of what Forum proposes in this case. Seventeen (17) of the twenty-one (21) nursing homes currently managed by CSI are located in states which utilize a superior rating system. Of the facilities that are eligible to receive superior licenses, CSI maintains superior ratings in over 80 percent of its beds. CSI's Sun Terrace in Sun City Center was the subject of an extensive survey issued by the Office of Licensure and Certification, an arm of DHRS, in April, 1988, that cited numerous deficiencies in the areas of quality of care, staffing, and programs at the Sun Terrace facility. The licensure survey also cited violations of state and federal laws in the handling of controlled substances and problems with resident care plans at the facility. The findings of DHRS in its licensure survey of Sun Terrace appear to be serious matters, the resolution of which is clearly within the control of CSI. Following the opening of the second 60 beds at Sun Terrace in September, 1987, the facility experienced a shortage of nursing personnel which necessitated a greater use of agency personnel to staff the facility. The problems cited by DHRS at Sun Terrace were largely the result of the increased use of agency personnel, lack of documentation, a newly licensed administrator, and the unexpected resignation of the director of nursing. Even before the DHRS licensure survey, CSI had taken affirmative action to address the problems at Sun Terrace, including a voluntary moratorium on new admissions. In response to the recent problems at Sun Terrac, CSI has moved toward more centralized management of its facilities. CSI now requires administrators to adhere very closely to the corporate policies and procedures. Further, the addition of a second full-time nurse/consultant will double the frequency of quality of care monitoring visits at CSI facilities. The problems experienced at Sun Terrace are atypical of CSI-managed facilities. When CSI's policies and procedures are properly followed, the result is excellent nursing care and services. But the problems at Sun Terrace are examples of what can happen when an organization attempts to expand operations more rapidly than it should. In this connection, CSI has received seven CONs since July 1984. Two of the seven are preliminary approvals that have been challenged and have not yet gone to hearing. One was the 60-bed addition to Sun Terrace which is now licensed. Another is a 73-bed nursing home in Brevard County which is expected to open within the next several months, and another is a 21-bed addition project in Collier County. Cypress has never operated a nursing home and has no track record. Staffing. Staffing arrangments are important considerations in assessing the quality of care to be expected from a proposal, but there is not necessarily a proportional correlation between staffing and quality. How staffing affects quality also depends on the breadth and types of programs to be offered. For example, Alzheimer's programs and sub-acute care will require higher staffing ratios. HCR, FCP, Manor Care, Palm Court and Forum all propose staffing arrangments that meet or exceed state requirements. See Findings Of Fact 1-5, above. Cypress' application, on the other hand, leaves much to be desired in its proposed staffing. The staffing plan presented by Cypress on its Updated Table 11 fails to meet the requirements of Rule 10D-29, F.A.C. Specifically, no provision has been made for an activity director (10D-29.116), a medical director (10D-29.107), a pharmacy consultant (10D-29.112), or a medical records consultant (10D-29.118), all of which are required by rule. (Cypress attempted to explain that it would have a pharmacy consultant on contract who would bill patients separately.) Further, no provision has been made for utilization review to monitor the appropriateness of the placement of residents, as required by Rule 10D-29. Cypress' Updated Table 11 provides for LPNs of 1.5 FTEs on the first shift and night shift and 6.0 FTEs on the second shift. The second shift LPN coverage is over-staffed by 4 1/2 FTEs which will result in inefficiency. Rule 10D-29.108, F.A.C., requires staffing of nursing assistants on all shifts. The Cypress staffing plan makes no provision for nursing assistants on the second shift. In testimony, Cypress attempted to explain that Table 11 was wrong and that the second shift LPNs should have been aides. The proposes Cypress nursing home will not offer 24-hour RN coverage. The third shift has no RN coverage. Based upon the proposed staffing pattern appearing in Cypress' Updated Table 11, its proposed facililty would not qualify for licensure under Florida regulations, much less qualify for a superior rating. Cypress has not secured or identified the day-to-day management of the proposed nursing home. No medical director has been secured or identified. Quality Assurance programs. All of the applicants except Cypress have existing quality assurance (QA) programs that are adequate to assL're quality of care. From the evidence HCR's, Manor Care's, HHL's and Forum's QA programs are comparable and are the best among the applicants. Palm Court has had results comparable to or better than the others , which is itself evidence of an adequate QA program. Meanwhile, CSI, despite an evidently superior QA program, has experienced quality programs due to rapid fill-up of its 60 additiional beds at Sun Terrace. Cypress has no experience operating a nursing home. Not surprisingly, it professes to desire quality and to plan to implement stringent QA programs. But its plans at this stage are not as developed and detailed as the existing QA programs being used by the other applicants at other facilities. Other Factors. Whether Therapies Are In-House or Contracted. Assuming a need for it, and reasonable cost of providing it, provision of therapies--e.g., physical therapy, occupational therapy and speech therapy-- in-house generally is preferable to providing them by contracts with third parties. From an operational and administrative perspective, there are advantages to providing physical therapy services (PT) on an in- house basis. Contracted physical therapy staff tend to be available only for scheduled treatments; in-house staff are always available to assist staff and perform unscheduled maintenance therapy. In-house physical therapy staff work regularly with the nursing home staff. They are present within the facility anc learn the operation of the nursing home facility better than outside agencies. Manor Care proposes to provide in-house physical therapy staff, as opposed to employing outside physical therapy staff on a contract basis. The evidence was that the other applicants plan to provide all of these therapies through third- party contracts. Palm Court has one full-time PT assistant who works under the direction of a licensed physical therapist who now divides time among three 120- bed nursing homes managed by National Health Corp. The service of this licensed physical therapist is provided as part of National Health Corp's management services. Having to cover another 60 beds at Palm Court will spread the service even thinner. In addition, Palm Court's administrator conceded that the single PT assistant in Palm Court's application will not be enough once 60-beds are added to the facility; two will be required. Of course, the trade-off (implied in Finding of Fact 102, above) for providing in-house therapy is that it is less efficient if full use of the services is not required. De-institutionalization. FCP, Forum and Cypress have made special efforts to "de- institutionalize" nursing home care at their proposed facilities. All three proposals emphasize the provision of nursing care within aresidential development--a combination of retirement apartments, assisted living accommodations and nursing home. (See also this concept's impact on Continuum of Care concerns, Findings of Fact 114-127, below.) FCP's proposed facility is designed with a residential appearance to facilitate and implement the philosophy of de-institutionalization co:tained in its application. It reflects FCP's modular approach to care with residential units in wings tied to a common area of support services. The support services are extensive. There are activities areas, craft areas, exercise rooms, therapy areas, a beauty salon and barber shop, men's and women's recreational areas, private dining rooms, a community dining room, screened patios and porches, a newsstand, a bank, a post office, a library, a chapel, a screened-in gazebo, and a swimming pool. The exterior amenities of the design include a pond, an exercise course, a sitting deck, and a putting green. The center core and its recreation and therapy programs are designed to encourage interact ion among the residents in all the different levels of care. Although the third floor, where the nursing home is located, also has a secondary lounge and supplemental dining area, the primary dining area, as well as all of the other amenities, are on the first floor to enhance the interaction. The 30-bed size of FCP's proposed nursing home unit is a part of the original Phillips concept of a de- institutionalized setting, enabling the provision of more personalized care. Where there are fewer residents to care for, a better rapport between the residents and the care givers and a more family-type, personal atmosphere are achieved. This 30-bed concept previously has been approved by the Department in Lee and Polk Counties. Those projects are operationally, structurally, and physically identical to this proposed project. The symmetrical, 3-story design minimizes the amount of travel distance for the resident at the farthest unit to the amenities of the center core and its services. The nursing unit is on the third and smallest floor so that the distance by elevator to the central core for the nursing home iesidents is at a minimum'while still providing those residents with the greatest opportunity for quiet time. Privacy is an essential element in achieving high quality of care. The semi-private room plan utilized in this proposal is a unique approach to maximizing privacy for each resident. A permanent partial partition separating the two beds in each room effectively creates two private rooms. This provides a private space for each resident with his or her own thermostat, window, storage space, television, and telephone accommodation, and heightened auditory privacy. There will be equal access to and control of the vestibule and bathroom for each resident. The 585 gross square feet per bed in the FCP proposal is approximately one-third greater than standard nursing home room configuration. Forum's proposal's chief effort in furtherance of the goal of deinstitutiona1izationother than the continuum of care concept and overall residential appearance--is in the relatively large and "up-scale" living areas. The Cypress facility will include a central core dividing the two 60- bed portions of the project. The central core will include an administrative area, a chapel, a beauty and barber shop, enclosed courtyard, physical and occupational therapy, dining, a central kitchen, and a laundry area. One trade-off for de-institutionalization is cost. Both FCP and Forum generally cost more than the others. Cypress claims not to, but its projected construction cost of $49 per square foot is unrealistically low. See Findings of Fact 147 and 149, below. PROGRAMS (OTHER THAN ALZHEIMER'S). Continnum of Care. As just alluded to, several of the proposals emphasize the placement of their nursing home within a larger community of persons needing different levels of care. FCP. FCP proposes the construction of a 30-bed nursing unit as part of a family owned and operated, 120-unit, full continuum of care facility for the elderly. The facility also contains 60 independent living apartments and 30 adult congregate living units. The full continuum of care is proposed in a uniquely designed, de-institutionalized, home-like atmosphere. FCP offers a therapeutic community offering individualized, personalIzed care in small self- contained units, each specializing in various levels of care ranging from day care and respite care, through apartments for the elderly and assisted living, to skilled, post-hospital rehabilitation. The continuum of care will provide a homogeneous environment through which residents can move as their medical and personal needs change. Forum. Forum Group, Inc., is a national company which owns, develops and operates retirement living centers in a number of states. Forum's proposed nursing home will be part of a total retirement living center containing two other levels of care, assisted living (or ACLF units) and independent apartment units. Forum's proposal calls for provision of a continuum of care, from independent living to assisted living to nursing care, all on the same campus. Cypress. Cypress Total Care would be part of an overall medical project known as Cypress Park. The corporation was formed and a master plan was created, to be developed in two phases. Phase I is a 120-bed nursing facility consisting of 60 skilled and intermediate nursing beds, the subject of these proceedings, and 60 personal care units. Phase II would consist of a 290-unit adult congregate living facility (ACLF) and 143 units of independent villa housing on a golf course with nature trails and other amenities. Also proposed in Phase II would be units of medical offices and commercial health-related facilities to support the community. The area selected by Cypress is adjacent to the Sun Hill Medical Arts Building and the Community Arts Building, as well as a hospital owned by Hospital Corporation of America known as Sun City Hospital. These components would be worked into the overall master plan proposed by Cypress. Cypress proposes a multi-level assessment program. The 120-bed Cypress Park Community facility will have an independent level one facility in Sun City Center which will admit healthy elderly residents. These elderly may have canes, but no walkers or wheelchairs, and they will function normally in their activities of daily living. These individuals may prepare two meals a day in their apartments, or have them in the dining room. The main meal will be in the dining room. Social services and activities will be provided and recommended to the independent living residents to enhance their lifestyles. A home health agency is planned as a part of the center so that house calls can be made to insure that any necessary medications are taken and that residents receive the services they might need from time to time. (Cypress has not yet applied for a CON for its home health agency.) The next level of living is for patients who need more assistance. These are residents who require 24-hour companion service. These patients do not require skilled nursing care and do not require the institutional environment of a nursing home. Some of these paients may be in the first stage of Alzheimer's, or they may be physically frail, but not enough to require skilled nursing care. This level is primarily for those individuals who are physically frail and mentally strong or mentally frail and physically strong. The physically frail and mentally strong may have limited ambulatory capabilities, need assistance in activities of daily living, need medication, or need all their meals prepared. As noted above, this level of services also will be provided to individuals who are physically strong but mentally frail. The majority of these people will be Alzheimer's residents, they must be carefully monitored 24 hours a day and receive strong psychological support. The next level of care offered is for individuals who require some nursing care and no longer qualify for the level two care described above. This will be intermediate nursing care and will consist of care from certified nursing aides and licensed practical nurses. These individuals do not require skilled nursing care. Rehabilitation is the key to this portion of the plan, and the rehabilitative center will be involved to constantly push these individuals to the point of rehabilitation where they can reenter an independent lifestyle. If individuals progress further, they can move into the skilled nursing care center in which they will receive care not only from nursing aides and licensed practical nurses, but also from registered nurses. The final level would be acute hospital care which would be provided by the existing Sun City Hospital. The medical staff who are involved in the Cypress project also are on the medical staff of the Sun City Hospital and will be working and consulting with individuals both in the acute hospital care and the nursing home setting to provide appropriate levels of care to the individuals who need it. The nursing home will share IV teams, work with tracheotomy patients, A.D.A. dieticians, accounting services, and other services with the existing hospital in Sun City Center. Palm Court. Palm Court, while currently a free-standing 120- bed nursing home, is located on property where construction of a 360-bed adult congregate living facility (ACLF) is now starting. In addition, Palm Court has transfer agreements with area hospitals including Plant City Hospital, South Florida Baptist Hospital, Brandon Humana Hospital and Lakeland Regional Medical Center. It also has formal working relationships with home health agencies and with elderly programs in the area. The Others. The other applicants--HCR, Manor Care and HHL-- propose free-standing nursing homes. But all can be expected to make efforts to achieve transfer and other agreements with local hospitals, home health agencies and providers of care for the elderly where reasonable and appropriate. Sub-Acute Care. The HCR nursing home will be staffed and equipped to provide sub- acute care. The sub-acute care services provided by HCR will include high tech services such as ventilator care, IV therapy, pulmonary aids, tube feeding, hyperalimentation, and short and long term rehabilitation. HCR currently provides a wide variety of these sub-acute services in its existing nursing homes. CSI currently provides sub-acute nursing services at its existing Florida facilities. Those services include ventilators, hyperalimentation, intravenous therapy, Clinitron beds, heparin pumps, nosogastric and Jejunoscopy tube feedings, subclavian lines, and Hickman catheters. These service will be provided at HHL's proposed facility. Forum will provide skilled and intermediate care, and the following services will be offered at the proposed facility: Sterile dressing changes for decubitus care. Brittle diabetics on sliding scale insulin. Continuous administration of oxygen. Sterile case of tracheotomies. Ventilators. Continuous bladder irrigation. Hyper-alimentation or N-G feeding. IV treatment. Special medication monitoring (e.g. heparin, comadin). New post-operative cases facing hospital discharge as a result of D.R.G. reimbursement. The skilled nursing services to be provided by FCP include parenteral nutrition, internal nutrition, tracheostomy care, respirator care, skin wound decubitus care, ostomy care, and head trauma care. Palm Court also will provide sub-acute care. Adult Day Care Adult day care is a part of the specialized Azfleimer's program HCR proposes. In addition, HHL, FCP and Forum offer adult day care. Respite Care. HCR and Manor Care offer respite care as part of their Alzheimer's programs. Both will have no minimum length of stay and no extra charge over the regular daily rate for nursing home care. All the others except Palm Court also offer respite care, but Cypress' proposal for respite care is sketchy. HHL says it will offer respite care at no extra charge. D. Hospice. Only HCR, Forum and HHL offer hospice care as part of their nursing home programs. F. Rehabilitation and Community Outreach. All of the applicants propose rehabilitative (or restorative) care and some kind of community outreach programs. The distinctions among the ideas expressed by the applicants are not particularly competitively significant. However, the manner in which the therapies are delivered can be significant. See Finding of Facts 102 to 105, above. HOW SOON THE PROJECT BECOMES OPERATIONAL. Because there is a shortage of nursing home beds in Hillsborough County, there is a valid concern how long it would take for the holder of a CON to get its facility operational. Priority/Policy 3 of the 1985 Local Health Plan gives expression to this concern as follows: In competitive reviews, preference should be given to applicants with a documented history of implementing certificates of need within the statutory time frames. Of the applicants who have developed nursing homes in the past (i.e., excluding Cypress), all but Palm Court have a history of timely implementing their CONs. Palm Court had to request an extension of time in implementing its existing 120-bed facility. But Palm Court bought the CON for that project from the original owners in 1982 or 1983. Palm Court then had to secure another, more suitable location, re-design the facility, get construction financing and enter into a construction contract before construction could begin. This delayed the project and resulted in administrative litigation to decide whether Palm Court should lose the CON for failure to timely implement it or be given an extension of time. Palm Court prevailed, and the facility opened in September, 1985. HHL, through CSI, also has a history of timely implementing CONs but recent expansion in Florida raises some question whether it can continue to be as timely in implementing this CON, along with the others. See Findings of Fact 82-87,98, and 100, above. Generally, an addition of beds to an existing nursing home can be constructed more quickly than a new facility, giving Palm Court an advantage in potential speed of implementation. similarly, Manor Care, which is prepared to begin construction on its finally approved 60-bed CON, has an advantage over the others, as well as a potential construction cost savings over Palm Court. See Findings of Fact 146, below. COST OF CARE. Cost of Construction And Development. Advantage of Additions. Within limits placed on recovery of capital costs under the Medicaid and Medicare reimbursement programs now in place (which, to some extent, are emulated by private health care insurers and employers' health benefit plans), construction and development costs generally are reflected in the charges patients pay for nursing home care. Additions, such as Palm Court's and Manor Care's proposals, have a cost advantage over the other proposals. Construction sites already have been prepared, and it is not ncessary to duplicate some features already incorporated in the original structure, such as the kitchen, laundry and building plant. Due to delays in finalization of its approved CON for 60 beds, Manor Care has the fortuitous additional potential cost advantage of being able to construct both the "original facility" and the 60-bed "addition" at the same time. Quality vs. Cost Trade-Off. Other than the cost advantage of adding on, and of saving the contractor's fee by using an in-house construction team (as HCR does), reduced cost of construction generally will reflect reduced quality. For example, some of the quality features incorporated in the proposals of Forum, FCP and Cypress will cost more. See Finding of Fact 113, above. Put another way, lower costs may result in lower patient charges but also may result in lower quality, everything else being equal. The costs of construction of the various proposals may be found in Findings of Fact 1 to 7, above. It should also be noted at this point that Cypress' facility design has features--primarily unusual wall and roof angles and one water heater requiring larger pipe sizing-- which make its construction costs appear lower than they should be. Cost Overruns. The applicants' respective records for cost overruns in implementing CONs mirror their records for timeliness. See Findings of Fact 138-143, above. Cypress has no track record; all the others except Palm Court have experienced no cost overruns; Palm Court's $1.3 million cost overrun was precipitated by the need to secure another site and re-design the facility after it acquired the CON for 120 beds; and CSI, which would be responsible for implementing HHL's proposal, is involved in recent expansion which could affect its ability to bring all of its' CONs on line within budget. Cost of Operations. Economies of Scale--Size of Facility. In addition to construction and development costs, cost of operations are reflected in patient charges. It generally is accepted that a 120-bed nursing home is the optimal size for operational efficiencies. In this respect, the proposals by HCR, Forum and HHL have an advantage over the others. Manor Care has the advantage of proposing to expand a less efficient 60-bed nursing home to an optimally efficient 120-bed facility. To some extent, the generally accepted principle that 120-bed nursing homes are more desirable may have become dated. Two of the proposals--FCP's and Cypress'--combine some of the operating efficiencies of a 120-bed nursing home with the continuum of care and quality of care that can be achieved in a 120-bed living complex that incorporates a smaller nursing unit with other living units of different levels of care. By c(Jmparison, these type facilities are less institutionalized than a 120-bed nursing home, whether free-standing or incorporated within a larger complex with other living units. See Findings of Fact 106 to 113, above. Economies of Scale--Size of Organization. Economies of scale also can be realized from the size of the organization that owns or manages a nursing home. The proposals of all of the applicants except Cypress benefit from this principle, Palm Court to a lesser extent than the others, including in the area of quality assurance, nurse training and nurse recruiting. At the time of hearing, HCR operated nine nursing homes in Florida. HCR has approximately twelve nursing homes scheduled to begin construction in Florida within the next year. Nationwide, HCR operates more than 125 facilities containing approximately 16,000 beds. HCR has designed and built over 200 nursing homes and related health care facilities. HCR realizes substantial savings by using national contracts for the purchase of furniture, equipment, hardware and other operating supplies. Forum, as a national company, has the experience and purchasing power to cut operational costs through national purchase contracts and through economies and improvements experienced at the local level with a total retirement facility all on one campus. The Manor Care Florida Regional Office offers the services of a Regional Director, a Regional Nurse, a Nurse Recruiter, and a Comptroller to work with the corresponding departments of the Manor Care Florida nursing homes. FCP's long term plans are to develop homes in clusters, currently concentrating on the central west coast area of Florida. FCP has previously been granted certificates of need in Lee County and Polk County and has been recommended by the Department for a certificate of need in Hillsborough County. This cluster will operate under a unified local administration and share rehabilitative, medical, social, dietary and transportation personnel, enhancing economies of operation. CSI was formed in 1978 for the purpose of operating extended care facilities, including nursing homes and retirement centers. Since that time, the company has grown to its current operations of twenty-one (21) nursing homes, two (2) retirement centers and one (1) home for the aged located in seven states. Historically, much of this growth has occurred through the acquisition of existing facilities, although more recently the focus has shifted to the development of new facilities. Because CSI has established "national accounts" for the acquisition of movable equipment CSI can purchase nursing home equipment and furnishings and other operating supplies for HHL at reduced prices. (3) Patient Charges. The applicants propose the following room charges for semi-private rooms. Applicant Medicaid Medicare Private Pay HCR 60.94 76.00 75.00 FCP 60.00 65.00 80.00 Manor Care 1/ 69.37 ---- 72.57 HHL 66.30 109.33 2/ 72.76 Forum 67.18 80.67 79.50 Palm Court 77.00 100.00 77.00 Cypress 58.00 65.00 69.00 However, Cypress' charges are suspect; they probably are unrealistically low. Palm Court's charges also are suspect. It is difficult to understand from the evidence whether they are charges or Medicaid reimbursements. It also is difficult to tell if they are current or projected. In any event, they do not relate to the information in Palm Court's pro forma. As previously alluded to, patient charges do not necessarily proportionately reflect construction and development and operating efficiencies. They also are affected by programs and quality. BUILDING DESIGN AND ENERGY FEATURES. Patient Care and Safety. Overall, HCR's design is excellent. Functional elements are effectively inter-related, the building is designed to be open to landscaping, sunlight and court yards, and there is a wide range of amenities. Cypress' patient rooms are smaller than allowed under state requirments. The state minimum in Chapter 10D-29, Florida Administrative Code, is 80 net square feet per bed for multi-bed and 100 net square feet in a single room. Cypress' proposal only has approximately 65.58 gross square feet per bed. Cypress' building design also has rooms that are approximately 130 feet from the nurses' stations and clean utility and soiled utility rooms, 10 feet over the state maximum under Rule 10D-29.121(24), Florida Administrative Code. Forum's :4 floor plan also violates this standard. Rule 10D-29.121(6), Florida Administrative Code, requires a 20 foot clear view out room windows. Cypress' design also violates this standard. Manor Care's floorplan is the most compact one- story design. It has four compact wings off a central core. Forum proposes a two-story structure, creating a potential increased hazard for patients with reduced mobility. But DHRS rules provide for nursing homes of more than one floor, and required safety features, which Forum will provide, keep the potential to an insignificant minimum. FCP proposes a three-story facility with the nursing home on the third floor adjacent to the elevators connecting it to the first floor central core and amenities. FCP, too, adequately addresses DHRS safety concerns and actually could be more convenient to more nursing home patients than a one-story structure. Energy Conservation Features. All of the applicants propose to insulate their facilities for energy efficiency, some, e.q., HHL, somewhat better than others. Building design itself also affects energy consumption. Cypress' high exterior building surface area makes it a less energy-efficient design; Manor Care's compact design aces it a more energy-efficient design. FCP's three-story design also is a more energy-efficient design. Cypress' design incorporates only one water heater. This will produce line loss and lower energy efficiency, as well as potential total loss of hot water. (Cypress also has only one electrical plant.) Other Unique Design Features. Several unique features in FCP's room design helps "de- institutionalize" the facility and contributes to overall quality of care. Similarly, residents at FCP will be able to offer their guests refreshments from the kitchen at any time of the day or nights and children, spouses, and entire families will be encouraged to join residents for meals as often as they wish, assisting in the maintenance of ties with the community. Dining may be either communal or in the several lounge areas and private dining rooms. One of Cypress' unique design features is of the bizarre and morbid variety--a room designed to store deceased residents. FINANCIAL FEASIBILITY. The short-term and long-term feasibility of the proposals of HCR, FCP, Manor Care, Forum and HHL was never seriously questioned and was easily proven. Not so with Palm Court and Cypress. Palm Court. The duty to defend the immediate and long term financial feasibility of Palm Court's project rested with Steve Jones. Mr. Jones, who was not involved in the preparation of the application, offered his opinion that the Palm Court 60-bed addition would be feasible in the immediate and long terms. In giving his opinion of the project's financial feasibility, Mr. Jones stated he believed the pro forma in years 1 and 2 relate back to the corresponding tables in the application; but acknowledged he performed no analysis of his own, but rather he took the information provided him at face value. The pro forma is one of the key components of an application, as literally the heart of the application ties directly or indirectly into developing the pro forma, including Tables 1, 2, 3, 7, 8, 10, 11 and 25, as well as the amortization schedule. It is a required component of the application. Section 381.494(4)(e), F.S. (1985). Mr. Jones was asked to render an opinion on the reasonableness of Tables 8, 10, 11 and 25, which he did. On cross examination, however, Mr. Jones acknowledged he did not evaluate existing staff at Palm Court to determine the reasonableness of the pro forma. He did not verify the projected management fee and, in fact, stated he didn't know if it was included as a line item under "administration and general" on the pro forma nor how the management fee was computed. Mr. Jones, who has never prepared all the financial information in a CON application, also admitted he didn't know what current nursing salaries were in Hillsborough County, or any other salaries for that matter. He further acknowledged that he could not testify that the application's hourly wage times the number of working hours in a year would give you the stated nursing salaries. In sum, Mr. Jones admitted his opinion of the project's feasibility was based solely on his review of Tables 8, 11, 20 and 25 and his firm's involvement in the preparation of Palm Court's two most recent cost reports and not on the pro forma filed with Palm Court's application. Mr. Jones' accounting firm, in preparing Palm Court's cost reports, does not conduct an audit or express any opinion relating to the reasonableness of the statement of revenues and expenses. Joseph Lennartz, an expert in financial feasibility analysis, gave persuasive testimony outlining the inconsistencies in Palm Court's application. Palm Court's total revenue projections appearing in Table 7 for years 1 and 2 do correspond to the daily room and board revenues appearing in the pro forma, yet none of the Table 7 revenue projections correspond to the projected charges on Table 8. Assuming the salaries on Table 11 do not include fringe benefits, all FTE's and salaries on Table 11 are not accounted for in the pro forma. The pro forma salaries are significantly lower than on Table 11: RNs ,- understated by $12,426 LPNs - understated by $30,518 CNAS -understated by $239,541 Social Worker - understated by $2,983 Dietary - understated by $3,009 Maintenance - understated by $10,165 Activities - understated by $4,486 Housekeeping - understated by $6,365 Laundry & Linen - understated by $6,498 Admin & General - understated by $2,560 Palm Court's salary information on Table 11 is in 1987 dollars and needs to be inflated forward at least two to three years. Palm Court's current average salaries exceeded the proposed salaries on Table 11--including the administrator's salary, proposed at an annual salary of just over $31,000 when it actually was over $50,000 in 1987. Based on Palm Court's answers to interrogatories, Palm Court's management fee is not accurately reflected in the pro forma and is $44,559 too low in year 2; the projected dietary expense is understated by $112,386 in year 2; the projected housekeeping expense is understated by $46,609 in year 2; the projected laundry expense is understated by $35,308 in year 2; and plant expenses are understated by $100,116 in year 2. The terms of debt financing appearing on Table 2 of Palm Court's application do not conform to the amortization table, causing the interest expense line item on the pro forma to be understated. Cypress. As previously alluded to, the reasonableness of Cypress' projected Medicaid and Medicare rates appearing on its Updated Table 8 has not been established by competent substantial evidence. The Cypress pro forma fails to make provision for interest expense, depreciation, and property tax expense. These omissions represent an understatement of expenses as follows: YEAR ONE YEAR TWO INTEREST $177,818 $176,186 DEPRECIATION $110,000 $100,000 PROPERTY TAXES 2,200 25,000 (at assessed value 75 percent of market) TOTAL $290,018 $301,186 When interest, depreciation, and property taxes are included in the Cypress pro forma, the result is a loss of $90,000 in year one and $80,000 in year two. Furthermore, from a cash flow perspective, Cypress will incur a cash loss of $2,037 in year one and a cash gain of just $6,342 in year two. If property taxes are based on an assessed value at 100 percent of fair market value, there would be a $2,000 cash loss even in year two. It is not unusual for a nursing home to experience a negative cash flow in its first year of operation due to its low occupancy. However, it is unusual for a nursing home to experience a negative cash flow, as the Cypress facility will, while operating at optimal occupancy (95 percent). Cypress' owner/investors are willing to proceed with the project because they expect to be able to use some of the approximately $90,000 per year tax loss in years one and two to offset personal income, resulting in a cash on cash return of approximately $23,000 or 5.4 percent. Cypress' Table 1, "source of funds" states that the applicant has $425,000 "in hand". In fact, Cypress does not have those funds in hand. They are in the hands of the Cypress owner/investors. So far they have contributed $90,000 to the venture and will have to contribute not only an additional $425,000 to fund the nursing home but also an unspecified larger sum to fund Cypress planned ACLF and other projects. The evidence suggests that at least $425,000 more of equity contribution would be required for the rest of the project. Cypress did not prove that its proposed facility is financially feasible, either in the immediate or long term. BALANCED CONSIDERATION. Giving a balanced consideration to all of the statutory and rule factors addressed in the preceding findings, it is found that there is a net need for 231 community nursing home beds in Hillsborough County, that the applications of HCR, FCP and Manor Care should be granted and that the other applications should be denied.
Recommendation Based on the foregoing Findings Of Fact and Conclusions Of Law, it is recommended that the Department of Health and Rehabilitative Services enter a final order granting the applications of HCR (CON Action No. 5000), FCP (CON Action No. 4993) and Manor Care (CON Action No. 5006) and denying the applications of Forum (CON Action No. 4999), HHL (CON Action No. 4978) Palm Court (CON Action No. 4987) and Cypress (CON Action No. 5004). RECOMMENDED this 14th day of November, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of November, 1988.
Findings Of Fact Petitioner, Florida Convalescent Centers, Inc. (FCC), filed an application with respondent, Department of Health and Rehabilitative Services (HRS), on October 14, 1983, seeking a certificate of need authorizing the construction of a 120-bed skilled and intermediate care nursing home facility in Manatee County, Florida. /1 The proposed project carries an estimated cost of $3,530,000. After reviewing the application, HRS issued its proposed agency action on February 21, 1984, in the form of a state agency action report in which it advised petitioner that it intended to deny the application. The report stated in part that "(e)xisting and approved bed capacity in Manatee County... is sufficient to satisfy projected need for 1986," that 240 nursing home beds had just been approved for the county, and when added to the existing nursing home supply, would "maintain a reasonable subdistrict occupancy level through 1986 and satisfy the need for additional beds in Manatee County." The service area in which FCC proposes to construct its new facility is the Manatee County subdistrict of HRS District 6. That district contains five counties, including Manatee. In order to determine need, HRS has adopted Rule 10-5.11(21), Florida Administrative Code, which contains a formula (or methodology) for determining need at both the district and subdistrict level. Under that formula, HRS is required to utilize the "most recent 6 month nursing home utilization in the subdistrict." In this regard, HRS prepares on an on- going basis an internal document entitled "Quarterly Report" which contains the latest available data over a six-month period. In this proceeding, HRS used a report containing data for the period October, 1983, through March, 1984. This was the most current and complete available data at the time of hearing. According to the methodology in Rule 10-5.11(21), there is a gross need in District 6 for 7,336 nursing home beds. At the same time, there are presently 4,910 licensed and 960 approved beds in the District. Therefore, this results in a district-wide shortage of 1,466 nursing home beds through the year 1987, which is the three year planning horizon used by HRS in determining need. Evidenced introduced by HRS indicated there are presently 765 licensed and 240 approved beds in Manatee County. Under the rule, the methodology reflects a need for 1,518 beds, or a subdistrict deficiency of 513 beds through the year 1987. But even if beds are mathematically required under the formula at the subdistrict level, the rule requires that the current utilization of existing facilities be at least 85 percent, and the prospective utilization rate exceed 80 percent. If they do not, no additional beds may be authorized. The current utilization rate in Manatee County is 91.7 percent which meets the 85 percent threshold. However, the prospective utilization rate for the existing and approved operating nursing homes within the county is 69.8 percent, or substantially less than the minimum threshold of 80 percent called for by the rule. If petitioner's proposed beds are added to the calculation, the prospective utilization rate drops to 62.9 percent, or far below the requisite minimum rate. Therefore, there is no need for additional beds in Manatee County. FCC points out that special circumstances are present which justify a deviation from the rule. These include the allocation under the rule of only 15 percent of the district beds to Manatee County even though 21 percent of the elderly population (over 65 years) resides within the county, and the fact that Manatee has the highest percentage of people over 75 years of age of any county within the district. FCC also contends that the county has more persons in poverty than the statewide average, and that it will dedicate some 50 percent of its beds to Medicaid patients if the application is approved. However, these factors are taken into account in the formula devised by HRS, and do not constitute special circumstances that would warrant a departure from the need calculation encompassed in the rule.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the application of Florida Convalescent Centers, Inc., for a certificate of need to construct a 120-bed skilled and intermediate care nursing home facility in Manatee County, Florida be DENIED. DONE and ORDERED this 31st day of October, 1984, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of October, 1984.
The Issue The issue presented for determination herein is whether or not F.A.C. Health Care, Inc., d/b/a Spring Hill Health Facility (Petitioner) is entitled to a Certificate of Need to establish a 60-bed nursing home to serve Hernando County.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at hearing, including the pre-hearing stipulation, the following relevant facts are found. F.A.C. Health Care, Inc. is a wholly-owned subsidiary of First American Corporation. First American Corporation has owned, operated and developed approximately 75 long-term care and retirement facilities over the past 15 years. These operations are primarily located in the southeastern United States. At present, First American Corporation operates 20 facilities and has seven Certificates of Need in the developmental stages. (TR. 35, Fulmer) On January 14, 1984, Petitioner filed an application with the Respondent for a Certificate of Need to construct and operate a community nursing home in the City of Spring Hill in Hernando County, at a total cost of $3,180,000. (Petitioner's Exhibit 1) The letter of denial accompanying the state agency action report dated April 30, 1984, noted the basis for denial as follows: Existing and approved bed capacity in Citrus/Hernando Counties is sufficient to satisfy projected need for 1986. There are 60 nursing home beds that have been approved but have not been constructed at the present time, which, when added to the existing nursing home bed supply in Citrus/Hernando Counties, will serve to satisfy a portion of the projected need for skilled nursing home beds in the sub-district through 1986. The proposed 120 beds are in excess of the 37 beds needed to reduce the prospective base utilization rate to a reasonable level by 1986. (TR. 36, Fulmer; Petitioner's Exhibit 2) On September 26, 1984, Petitioner amended its original application to reflect a reduction from 120 to 60 nursing home beds. Documents reflecting the corresponding reduction in project costs from 53,180,000 to 51,780,000 were submitted with the amended proposal. (Petitioner's Exhibit 3) FINANCIAL FEASIBILITY OF THE PROPOSED SPRING HILL FACILITY The immediate and long-term financial feasibility of a project is one criteria considered during the Certificate of Need review process. Section 381.494(6)(c)9., Florida Statutes. The total cost of the project of 51,780,000 appears reasonable and in line with similar projects. Funds for full 100 per cent financing of the project are available through industrial revenue bonds at 14 per cent interest over 30 years. In order to acquire an industrial revenue bond application, Petitioner would maintain a $150.000 debt service reserve fund. (Petitioner's Exhibit 3) Other methods of financing available to finance the subject project include conventional financing, syndicated equity programs and insurance investment programs. (Testimony of Fulmer at TR. 39-40) Due to the largely rural setting, projected utilization for the first year would be 81 per cent Medicaid, 5 per cent Medicare and 14 per cent private pay. Occupancy is projected to reach 97 per cent by the fifth full month of operation and would be supported in part by the increased utilization of nursing home beds as a direct result of the implementation of diagnostic related groupings. Pro forma statements for the first and second years of operation show a net operating profit beginning in the ninth month and continuing through the second year. The equipment costs, staffing patterns and personnel budget also appear reasonable for this type of project. METHODS AND CONSTRUCTION COSTS Another issue in this proceeding was whether Spring Hill satisfied the criteria in Section 381.494(6)(c)13., Florida Statutes, regarding the cost and methods of construction. Spring Hill's proposed facility will provide 11,981 square feet devoted to patient care and 9,710 square feet for administrative and common service areas at a construction cost of $41.50 per square foot. (Petitioner's Exhibit 3) Proposed construction costs and methods of construction efficiently minimize square footage space requirements and related construction costs and will permit the most efficient operation of the facility at a low per diem cost. The construction cost appears reasonable and is also supportive of a primarily Medicaid based facility. Finally, Respondent offered no evidence to controvert the reasonableness of construction costs and methods proposed by Petitioner. IMPACT ON HEALTH CARE COSTS Section 381.494(6)(c)12., Florida Statutes provides that as part of the Certificate of Need review, probable impact of the proposed project on the cost of providing health care services be considered. Petitioner's expert, Fulmer, urges that there would either be no impact on the cost of care or due to the availability of additional Medicaid beds, costs would be reduced since the private pay demands of family and relatives having to pay for the care of an individual rather than participating in the Medicaid program would reduce the costs of health care to the community rather than increase the financial burden. In this regard, Petitioner offered no evidence to substantiate the claim that the demand for Medicaid beds exceeded the supply, or that Medicaid patients had been refused health services by the available Medicaid health care providers. AVAILABILITY AND ACCESSIBILITY OF EXISTING SERVICES Hernando County lies within HRS District III which is composed of 16 counties in north-central Florida, stretching from the Gulf of Mexico north of Tampa to the Georgia border. (Petitioner's Exhibit 6) The District is further divided into sub-districts. Hernando County represents a separate sub-district. Petitioner's facility is proposed to be located in the City of Spring Hill, located in the fastest growing area of Hernando County. (Petitioner's Exhibits 1 and 2) The latest bulletin (No. 69) from the University of Florida, Bureau of Economic and Business Research, shows a 90 per cent projected growth between 1980 and 1990. Much of the population in the Spring Hill area falls in the 65 and older age bracket. County age group projections released by HRS on September 24, 1984, reveal that the elderly population of 65 and over in Hernando County in 1985 is projected as 17,616, or approximately 27 per cent of total population. By 1990, those projections will grow to 24,887 or approximately 29 per cent of total population. (Respondent's Exhibit 2) The growth trend in Hernando County is an extension of the rapid coastline development occurring in the New Port Richey- Clearwater areas and the counties to the south of Hernando. Previously, the only major development in Hernando County was centered in Brooksville, the middle of the county. Consequently, the existing community nursing home services in Hernando County are concentrated in the Brooksville area. Although Petitioner, through its expert (Konrad) testified that there is a mal-distribution of existing beds and community nursing home services which renders them neither available nor accessible to the rapidly growing elderly population in the southwestern Hernando County corridor and that high occupancy rates in existing community nursing homes in the area and the existence of waiting lists corroborates the lack of availability and accessibility of community nursing home services in the area, the evidence introduced herein failed to establish either the existence of waiting lists or that the existing community nursing homes in the area were overcrowded. SHELTERED VERSUS COMMUNITY NURSING HOME BEDS Petitioner contends that certain nursing home beds associated with the adult congregate living facility at Evergreen Woods in the Spring Hill area are not actually available and accessible to the general public but instead are functioning as sheltered nursing home beds. Respondent, on the other hand, considers the 60 nursing home beds associated with Evergreen Woods to be available and accessible to the general public. A review of the entire record compiled herein failed to substantiate Petitioner's claim that those beds at Evergreen Woods are unavailable and/or inaccessible to the general public. DETERMINATION OF NEED, SECTION 381.494(6)(c)1., FLORIDA STATUTES. In determining need for nursing home beds, a Certificate of Need project is reviewed on a 3-year planning horizon. In this case, predicted need for nursing home beds in District III and the sub-district of Hernando County is calculated through 1987. Hernando County is a single county sub-district located within in HRS planning District III in north central Florida. HRS has determined the overall nursing home bed need for District III as well as sub-district allocations by applying the uniform nursing home bed need methodology for community nursing home services contained in Florida Administrative Code Rule 10- 5.11(21). (Petitioner's Exhibit 5) Respondent provided a step-by-step application of the community nursing home bed need rule and introduced their exhibits supporting the calculation period (Testimony of expert medical facilities consultant, R. Jaffe and Respondent's Exhibits 1 and 2). Briefly stated, application of the pertinent rules reveals an extrapolated need for 31 beds which are available for CON approval based on data available to Respondent on June 29, 1984 and that 36 beds are available based on later data released on September 24, 1984. (TR. 91, Conrad; TR. 130, Jaffe and Petitioner's Exhibit 6) The census report applicable herein reflects that there were 360 licensed beds in the Hernando sub-districts and no approved beds for a total of 360 beds. 2/ Application of the nursing home bed need methodology is not the sole factor used in determining whether a CON application should be granted. Other factors, such as access, high occupancy rates, chronically underserved population and high Medicaid utilization are definite factors in approval of additional beds in cases where the rule shows either no need or only slight need. Respondent has, on several occasions, granted 60-bed applications where accessibility issues justified the grant of a minimum-sized facility in spite of the lesser numerical need indicated under the rules. 3/ Petitioner referred to instances wherein Respondent had granted approval for CON's in other districts where there were unusual circumstances such as accessibility issues as referred to herein above. A review of those cases reveals that a departure from the usual bed-need methodology is warranted in cases of extremely high occupancy rates (95 per cent or higher) or the facilities with lower occupancy rates, e.g. 85.7 per cent for homes in Sarasota County, which were located in inaccessible distances away from the population concentration. Petitioner has not demonstrated sufficient basis herein to warrant a departure from the usual bed need rule methodology. The instances wherein a departure from the usual bed need rule methodology has occurred are distinguishable, inasmuch as in the instant case, there are three existing facilities presently in Hernando County offering 360 nursing home beds. Current occupancy rate has been shown to be reasonable and is standing at or below average for District III. Additionally, Respondent introduced a "Stipulation of Settlement" dated September 28, 1984 which was entered into by and between Evergreen Woods Health Care Center and Respondent. The substance of that stipulation reveals that during October of 1983, Evergreen Woods Health Care Center (EWHCC) as Petitioner, filed an application with Respondent for a Certificate of Need to add 60 beds to its existing 60-bed nursing home located in Spring Hill, Hernando County, Florida. The application sought 45 community beds and 15 sheltered beds. As a means of amicably resolving that proceeding and based on available need data based on applicable quarterly census reports and application of the need criteria, EWHCC, as Petitioner in that proceeding, amended its Certificate of Need application filed October, 1983, to add a total of 60 beds to its existing facility; 31 beds to be designated as community beds and 29 to be designated as sheltered beds. A review of the public records reveal that the Certificate of Need has been issued (amended CON No. 2959 issued early October, 1984) pursuant to that stipulation of settlement. 4/
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that: The application of First American Corporation d/b/a Spring Hill Health Facility for establishment of a 60-bed nursing home facility in Hernando County, Florida, be DENIED. RECOMMENDED this 14th day of February, 1985, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of February, 1985.
Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the documentary evidence received, the stipulations of the parties and the entire record complied herein, I hereby make the following findings of fact: THE STIPULATIONS OF THE PARTIES The parties stipulated to the following facts: Forum timely filed its letter of intent and application with DHRS and the District IX Local Health Council for the July 1986 batching cycle. DHRS ultimately deemed the application complete and, following review, published its notice of intent to deny the application. Forum timely filed a petition requesting a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The sole issue is whether there is a need for Forum's proposed services; additionally, it is DHRS's position that a lack of need for the project results in the project not being financially feasible in the short or long term. All other statutory and rule criteria were satisfied, at least minimally, except proof of need pursuant to Rule 10-5.011(1)(k) [formerly 10-5.11(21)(b)], Florida Administrative Code, and financial feasibility as it relates to need. FORUM'S PROPOSAL Forum is a publicly held health services company which owns, develops and operates retirement living centers and nursing homes on a national basis. Forum proposes to develop a retirement living center in Palm Beach County that would consist of 120 to 150 apartment units for independent living, a separate personal care unit (known in Florida as an adult congregate living facility), and a 60-bed nursing home component certified for skilled and intermediate care. Palm Beach County is in HRS Service District IX, Subdistrict 4. All three components of Forum's retirement living center would be physically connected and share some operational functions, such as dietary facilities and the heating plant. Such a design provides for an efficient operation as well as an economic distribution of costs facility wide. No specific site has been selected , although Forum has narrowed its focus to the eastern half of Palm Beach County. It is not economically feasible to acquire property or pay for an option on property until after receiving CON approval. The projected total cost of Forum's proposed 60-bed nursing home is $2,329,800. Forum has the necessary resources for project accomplishment and operation. Forum proposes to seek Medicare certification and will provide up to 25 of its beds for Medicaid patients. FINANCIAL FEASIBILITY Forum is a national company, with substantial experience in developing and operating nursing homes and retirement living centers. If need for the facility is shown, Forum would be able to capture a sufficient share of the nursing home market to render its proposed nursing home financially feasible while at the same time having no material negative impact on existing providers in the district. NUMERIC NEED Need for new or additional community nursing home beds in Florida is determined, preliminarily, by use of the methodology found in Rule 10- 5.011(1)(k), Florida Administrative Code. Additional beds normally are not approved if there is no need for beds as calculated under the rule. Pursuant to the rule, need for a defined nursing home subdivision is projected to a three- year planning horizon, in this case July 1989. The need methodology prescribed in the rule is as follows: A (POPA x BA) + (POPB x BB) or: The District's age-adjusted number of community nursing home beds for the review cycle for which a projection is being made [A] (The population age 65-74 years in the relevant departmental districts projected three years into the future [POPA] x the estimated current bed rate for the population age 65-74 years in the relevant district [BA]) + (The population age 75 years and older in the relevant departmental district projected three years into the future [POPB] x the estimated current bed rate for the population age 75 years and over in the relevant district [BB].) BA LB/(POPC) + (6 x POPD) or: The estimated current bed rate for the population age 65-74 years in the relevant district [BA] (The number of licensed community nursing home beds in the relevant district [LB]/the current population age 65-74 years [POPC] + (6 x the current population age 75 years and over [POPD]) BB 6 x BA or: The estimated current bed rate for the population age 75 years and over in the relevant district [BB] 6 x the estimated current bed rate for the population age 65-74 years in the relevant district [BA]. SA A x (LBD/LB) x (OR/.90) or: The preliminary subdivision allocation of community nursing home beds [SA] The district's age-adjusted number of community nursing home bids for the review cycle for which a projection is being made [A] x (The number of licensed community nursing home beds in the relevant subdistrict [LBD]/the number of licensed community nursing home beds in the relevant district [LB]) x (The average occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district [OR]/.90) Rule 10-5.011(1)(k)(2)(i), Florida Administrative Code, provides that: The new bed allocation for a subdistrict, which is the number of beds available for CON approval, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant departmental subdistrict from the bed allocation determined under subparagraphs a. through i., unless the subdistrict's average estimated occupancy rate for the most recent six months is less than 80 percent, in which case the net bed allocation is zero. The appropriate planning horizon for the instant case is July 1989, corresponding to the review cycle which began July 15, 1986, and the subdistrict is Palm Beach County. THE NUMBER OF LICENSED COMMUNITY NURSING HOME BEDS IN THE RELEVANT DISTRICT (LB)/THE NUMBER OF LICENSED COMMUNITY NURSING HOME BEDS IN THE RELEVANT SUBDISTRICT (LBD) Rule 10-5.011(1)(k) requires that "review of applications submitted for the July batching cycle shall be based upon the number of licensed beds (LB and LBD) as of June 1 preceding this cycle..." On June 1, 1986, there were 5,459 licensed community nursing home beds in District XI (LB) and 4,084 licensed community nursing home beds in subdistrict 4 (Palm Beach County LBD). These figures include 220 licensed beds that were previously categorized as sheltered. In the instant case, the appropriate figure for LB is 5,459, and the appropriate figure for LBD is 4,084. APPROVED BEDS WITHIN THE RELEVANT DEPARTMENTAL SUBDISTRICT DHRS's interpretation of the rule is to include in the count of approved beds, those approved up to the date of the supervisor's signature on the State Agency Action Report (SAAR). In this case, there were 640 approved beds in Palm Beach County at that time. As of June 1, 1986, the same date as the licensed bed cutoff, there were 640 approved beds in the subdistrict. In Dr. Warner's opinion, approved beds should be determined as of the same time period as licensed beds in order to have consistency and avoid anomalies in the formula. This opinion is reasonable and appropriate. In the instant case, the figure to be applied in the formula for approved beds in the subdistrict is 640 approved beds. THE POPULATION AGE 65-79 YEARS IN THE RELEVANT DEPARTMENTAL DISTRICT PROJECTED THREE YEARS INTO THE FUTURE (POPA). THE POPULATION AGE 75 YEARS AND OVER IN THE RELEVANT DEPARTMENTAL DISTRICT PROJECTED THREE YEARS INTO THE FUTURE (POPB). The rule provides that the three year projections of population shall be based upon the official estimates and projections adopted by the Office of the Governor. For the purposes of calculating need, DHRS utilizes at the final hearing the figures for estimated population obtained from data available at the time of initial application and review. The set of population projections which were available when Petitioner's application was filed and reviewed were those published on July 1, 1986. Based on this data, which is reasonable to use, POPA 170,639; and, POPB 122,577. THE CURRENT POPULATION AGE 65-74 YEARS (POPC)/THE CURRENT POPULATION AGE 75 YEARS AND OVER (POPD). In calculating POPC and POPD, DHRS also utilizes at final hearing the most current data available at the time of initial application and review, in this case the July 1, 1986, release. Based on that data, POPC 153,005 and POPD 112,894. In the opinion of Dr. Warner, Forum's expert, the base for POPC and POPD should correspond to the period for which the average occupancy rate (OR) is calculated. For the July batching cycle, OR is based upon the occupancy rates of licensed facilities for the months of October through March preceding that cycle. According to Warner, January 1, 1986, as the midpoint of this time period, is the appropriate date to derive POPC and POPD in this case. The formula mandated by the rule methodology for calculating the estimated current bed rate requires that the "current population" for the two age groups be utilized. It is reasonable and appropriate for the base for POPC and POPD to correspond to the period for which the average occupancy rate is calculated. Supportive of Dr. Warner's opinion are the past practices of DHRS. Between December 1984 and December 1986, DHRS routinely used a three and one half year spread between the base population period and the horizon date in determining "current population" in its semiannual nursing home census report and bed need allocation. In the January 1987 batching cycle, which cycle immediately followed the cycle at issue in this case, DHRS utilized a three and one half year spread between the base population period and the horizon data for "current population" when it awarded beds. DHRS offered In this case, it proposed to use a three year spread between the base population period and the horizon dated for "current population" in calculating POPC and POPD. Using the July 1986 population release, POPC for January 1986 is 149,821 and POPD for January 1986 is 98,933. THE AVERAGE OCCUPANCY RATE FOR ALL LICENSED COMMUNITY NURSING HOMES WITHIN THE SUBDIVISION OF THE RELEVANT DISTRICT (OR). The rule requires the use of occupancy data from the HRS Office of Health Planning and Development for the months of the previous October through March when calculating a July batch of nursing home applicants. However, the rule is not instructive as to how one calculates this number. In this case, DHRS computed average occupancy rates based on the existing occupancy rates at applicable facilities on the first day of each month. Based on this occupancy data, which includes the data for the 220 previously sheltered beds in the subdistrict, occupancy rates for the July 1986 batch of Palm Beach County nursing home applicants is 83.75 percent. Forum's witness, Dr. Warner, determined that the correct occupancy rate was 85.46 percent for Palm Beach County for the period October 1985 to March 1986. Dr. Warner arrived at this figure by including paid reservation days. A paid reservation day is a day which is paid for by the patient or the patient's intermediary during which the patient is not physically in the bed. Typically, the patient will either be in the hospital, visiting relatives or otherwise away from the facility and will continue to pay for the nursing home bed, so that they will be able to return and not have someone occupy the bed. One of the goals and objectives of the District IX Local Health Plan is that paid reservation days be considered when bed need calculations are made. Calculating prepaid reservation days is consistent with the Rule because such beds are no longer available to the public and are therefore in use. Dr. Warner determined that during the applicable period, 1.25 percent of the licensed beds in the subdistrict were paid reservation days. Although taking paid reservation days into account would not be inconsistent with the rule, Forum failed to demonstrate that the 1.25 percent figure arrived at is valid for the applicable period, i.e., October 1985 to March 1986. Dr. Warner merely calculated a two-year average number of paid reservation days, broke this figure down to a six-month average and applied this average to the six-month period specified in the Rule. Gene Nelson, an expert called on behalf of Forum, calculated the occupancy rate as 88.72 percent in Palm Beach County for the appropriate period called for in the Rule. Nelson used the average monthly occupancy data obtained from medicaid cost reports for some facilities rather than first-day of the month data as used by DHRS. In addition, Nelson did not factor in the occupancy date of licensed beds in the extreme western portion of the County based on his belief that the District IX Local Health Plan mandates that the western area not be considered in any way with the eastern coast section of Palm Beach County for purposes of determining competitiveness. While the use of average full-month occupancy data is generally more reliable than using first-day of the month data, it is best, from a health planning prospective, to be able to use either all full-month data or all first- day of the month data. In making his calculations, Mr. Nelson mixed the two types of data, using full-month data when available and in other cases using first-day of the month data when full-month data was not available. It is inappropriate to fail to consider licensed beds in the extreme western portion of the County based solely on the local health plan. Among other reasons, the rule does not provide for exclusions for any of the subdistricts licensed facilities from the methodology. The appropriate and most reasonable occupancy rate (OR) in the instant case for the applicable time period is 83.75 percent. NET NEED Applying the above-referenced variables to the Rule formula produces the following results. July, 1986. District Allocation BA LB (POPC + (6 x POPD) - 5459 [149,821 + (6 x 98,833)] - .007349 BB - 6 x BA .044094 (.007349) July, 1989 Allocation (POPA x BA) + (POPB x BB) - (170,639 x .007349) + (122,577 x .044094) - 6659 Subdivision Allocation and Need SA A x (LBD / LB) x (OR 1.9) - 6659 x (4084 / 5459) x (.8375/.9) - 6659 x .74812236673 x .93055555555 4636 Subdistrict Allocation for Palm Beach County 4084 (Licensed Beds) 576 (90 percent of 640 Approved Beds) -24 (Bed Surplus)
Recommendation Based on the foregoing Findings of Fact, and Conclusions of Law, it is, RECOMMENDED that the application for certificate of need filed by Forum be Denied. DONE AND ORDERED, this 4th day of April, 1988, in Tallahassee, Florida. W. MATTHEW STEVENSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of April, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-0704 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Adopted in substance in Finding of Fact 2. Adopted in substance in Finding of Fact 3. Adopted in substance in Finding of Fact 4. Adopted in substance in Finding of Fact 5. Adopted in substance in Finding of Fact 5. Adopted in substance in Finding of Fact 6. Adopted in substance in Finding of Fact 6. Adopted in substance in Finding of Fact 7. Adopted in substance in Finding of Fact 9. Sentence 1 is rejected as contrary to the weight of the evidence. Rejected as subordinate and/or unnecessary. 11. Adopted in substance in Finding of Fact 9. 12. Adopted in substance in Finding of Fact 9. 13. Adopted in substance in Finding of Fact 10. 14. Adopted in substance in Finding of Fact 12. 15. Adopted in substance in Finding of Fact 1. 16. Adopted in substance in Finding of Fact 14. 17. Adopted in substance in Finding of Fact 21. 18. Adopted in substance in Finding of Fact 20. 19. Adopted in substance in Finding of Fact 22. 20. Adopted in substance in Finding of Fact 22. 21. Adopted in substance in Finding of Fact 18. Adopted in substance in Finding of Fact 15. Adopted in substance in Finding of Fact 17. Adopted in substance in Finding of Fact 17. Adopted in substance in Finding of Fact 23. Rejected as a recitation of testimony and/or unnecessary. Rejected as subordinate and/or unnecessary. Adopted in substance in Finding of Fact 24. Rejected as a recitation of testimony and/or unnecessary. Adopted in substance in Finding of Fact 25. Rejected as a recitation of testimony and/or subordinate. Adopted in substance in Finding of Fact 25. Adopted in substance in Finding of Fact 21. Rejected as contrary to the weight of the evidence. Rejected as not supported by the weight of the evidence and/or unnecessary. Rejected as subordinate and/or unnecessary. Rejected as subordinate and/or unnecessary. Adopted in substance in Finding of Fact 27. Adopted in substance in Finding of Fact 28. Adopted in substance in Finding of Fact 27. Adopted in substance in Finding of Fact 28. Rejected as a recitation of testimony and/or subordinate. Rejected as misleading and/or subordinate. Rejected as subordinate and/or unnecessary. Rejected as contrary to the weight of the evidence. Rejected as contrary to the weight of the evidence. Rulings on Proposed Findings of Fact Submitted by the Respondent Adopted in substance in Finding of Fact 1. Adopted in substance in Finding of Fact 1. Adopted in substance in Finding of Fact 9. Adopted in substance in Finding of Fact 3. Rejected as contrary to the weight of evidence. Adopted in substance in Finding of Fact 13. Adopted in substance in Finding of Fact 18 and 19. Adopted in substance in Finding of Fact 16. Adopted in substance in Finding of Fact 23. Addressed in Conclusions of Law. Addressed in Conclusions of Law. Rejected as subordinate and/or unnecessary. COPIES FURNISHED: Thomas W. Stahl, Esquire 102 South Monroe Street Tallahassee, Florida 32301 R. Terry Rigsby, Esquire 325 John Knox Road Building C, Suite 135 Tallahassee, Florida 32303 Richard Patterson, Esquire Department of Health and Rehabilitative Services 2727 Mahan Drive Tallahassee, Florida 32308 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 John Miller, Esquire Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power HRS Clerk Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 =================================================================
Findings Of Fact The department hereby adopts and incorporates by reference the findings of fact set forth in the Recommended Order.
Recommendation It is recommended that a Final Order be entered granting Kensington Manor Inc. CON No. 6430 to construct a 120 bed nursing home and to rehabilitate the existing 147 bed nursing home to an 87 bed nursing home in Sarasota County. RECOMMENDED this 14th day of March, 1991, in Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The Desoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of March, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 90-3665 Petitioner's proposed findings are accepted, except #5. Sentence stating "There are no laundry facilities in the nursing home." is rejected as inconsistent with proposed finding #7. Respondent's proposed findings are also accepted. Most of the defects in the application which Respondent finds to be not in compliance with the statutory requirements were corrected by the testimony at this hearing. COPIES FURNISHED: Alfred W. Clark, Esquire 1725 Mahan Drive Tallahassee, FL 32308 Richard Patterson, Esquire 2727 Mahan Drive Tallahassee, FL 32308 Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda Harris General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 =================================================================
Findings Of Fact The Parties Manor-Sarasota Manor Health Care Corporation operates 140 nursing centers throughout the country with nine nursing homes and three adult congregate living facilities (ACLF) in Florida. Seven of the nine Florida nursing homes are rated superior and two are standard. Manor-Sarasota is a wholly-owned subsidiary of Manor Health Care Corporation, and currently owns and operates a 120 bed nursing home, with a 120 bed ACLF, at 5511 Swift Road, Sarasota, Florida. The facility opened in December, 1983 and currently has a standard license, although for a period in 1986 its license was conditional. Manor-Sarasota is currently licensed as a skilled nursing home providing trach care, nasogastric feedings, wound care, physical, speech and occupational therapy, as well as Clinatron beds for patients with severe decubitus ulcers. On or about January 15, 1987, Manor-Sarasota filed CON application number 5050 for the addition of sixty community nursing home beds at its facility. The proposed additional beds will include a separate 30-bed specialized unit for elderly persons suffering from Alzheimer's Disease and related disorders. Manor Health Care Corporation currently operates 13 to 15 Alzheimer's units within their existing centers. Between 30 percent - 50 percent of Manor-Sarasota's current patients are diagnosed as having Alzheimer's or related disorders. There are no specialized facilities for Alzheimer's patients in Sarasota at the current time. The current facility is a two-story nursing home, and the additional beds would be configured in a two-story addition of thirty-five beds on the first floor and twenty-five beds on the second floor. The thirty-bed Alzheimer's unit would be located on the first floor. A separate dining room for Alzheimer's patients will also be provided. An additional nurse's station would be added to provide 4 nurse's stations for 180 beds. Total project costs are reasonably projected at $1.85 million, with construction costs of $1.26 million, equipment costs of approximately $170,000, professional services of approximately $137,000 and related costs of approximately $253,000. The proposal would add 16,683 gross square feet to the existing 49,454 gross square feet. The total project cost per additional bed would be $30,872, while the construction cost per square foot would be $55.00. The gross square footage per bed would be 278 feet. Manor-Sarasota projects a 40 percent Medicaid and 60 percent private pay utilization for the 60 bed addition, although its Medicaid utilization at the existing facility has only been between 15 percent and 24 percent. Since there is an upward trend in Medicaid utilization, Manor-Sarasota would accept a 40 percent Medicaid condition on its CON, if approved. Medicare patients will continue to be served within the existing facility. The project will be funded through 25 percent equity and 75 percent financing. Manor Health Care Corporation will finance the project internally through the sale of assets, and the sale of senior subordinated notes and convertible subordinated debentures, and this financing proposal is reasonable and realistic. In Manor-Sarasota's original application, six 3-bed wards were proposed. As a result of criticism of 3-bed wards in the Department's State Agency Action Report (SAAR) concerning this application as well as other facilities, the applicant modified its proposed design to eliminate all 3-bed wards and to include 24 semiprivate and 12 private rooms. The square footage of the addition was also increased by 21 percent from 13,750 to 16,683 square feet. This modification was presented at hearing and was filed subsequent to the application being deemed complete, and the SAAR being prepared. Competent substantial evidence in support of the original application was not offered, but rather evidence was presented in support of the substantially modified proposal. The applicant's existing 120-bed nursing home has experienced over 90 percent occupancy for the months of November, 1987 to the date of hearing, and also experienced an average occupancy of approximately 86 percent for 1986 and the first ten months of 1987. During the first year of operation, 65 percent occupancy is projected for the 60 new beds which are now being sought, and 95 percent occupancy is projected for the second year of operation. Sarasota Healthcare Sarasota Healthcare, Ltd., is a Georgia limited partnership whose general partners are Stiles A. Kellett, Jr. and Samuel B. Kellett. Sarasota Healthcare proposes to enter into a management agreement with Convalescent Services, Inc., (CSI) for the operation and administration of their proposed facility. The Kelletts, as 100 percent owners, comprise the Board of Directors of CSI and also serve as its Chairman and President. CSI operates 21 nursing homes in seven states, and 85 percent of its beds have superior licenses. There are 6 CSI operated nursing homes in Florida, one of which, Pinebrook Place, is located in Sarasota County in the City of Venice. Pinebrook Place is a 120 bed nursing home and has a superior license. Sarasota Healthcare does not own or operate any other nursing homes. A new 120 bed freestanding nursing home is proposed by Sarasota Healthcare in CON application 5025, which was filed with the Department in January, 1987. The project would be located in Sarasota County at a specific site which has not yet been identified. Sarasota Healthcare projects a utilization of 40 percent Medicaid, 5 percent Medicare and 55 percent private pay at its proposed facility, and would accept a 40 percent Medicaid condition of this CON, if approved. The proposed facility would offer skilled, intermediate, respite and hospice care; specialized services for Alzheimer's patients; physical, occupational, speech and rehabilitative therapy; counseling; and social services. Alzheimer's patients will not be located in a separate unit but will be intermingled with other patients while receiving specialized services and protections for their disease. Sarasota Healthcare proposes a 120 bed nursing home comprised of 12 private and 54 semiprivate rooms, 37,7000 gross square feet and a total project cost of $3.9 million The proposed size and cost of this facility are reasonable. The cost per bed would be $32,500 and the construction cost per square foot would be $58.00. Total project costs are reasonable and consist of approximately $2.45 million in construction costs, $385,000 in equipment costs, $145,000 for professional services, land acquisition of $600,000 for 3 to 5 acres, and $324,000 in related costs. The gross square footage per bed would be 314 feet. The project will be funded with 25 percent equity funding from the general partners, Stiles and Samuel Kellett, and 75 percent from a commercial bank, assuming a 9.5 percent interest rate with 1 percent discount point. The proposal is reasonable, but is dependent upon the general partners' ability to personally fund 25 percent of the costs of the project through an equity contribution, and on their ability to obtain commercial financing for the remaining project costs. Financial statements of the Kelletts provided in the record of this proceeding are unaudited, and were not prepared in accordance with generally accepted accounting principles. The Kelletts have 15 CON applications currently pending, and 4 have already been approved. They have a 6 to 1 debt to equity ratio. Health Quest On or about January 15, 1987, Health Quest corporation submitted an application for CON number 5046 on behalf of Regents Park of Lake Pointe Woods for the addition of 58 new beds to its existing 53 sheltered bed nursing home at a projected cost of approximately $1.29 million. The existing sheltered nursing home facility is known as Regents Park of Sarasota which is part of the Lake Point Woods Retirement Center containing a 110 bed ACLF and 212 retirement apartment units. The sheltered nursing home opened in November, 1986, and has achieved 90 percent occupancy since October, 1987. It is licensed under Chapter 651, Florida Statutes, as a continuing care facility. Health Quest owns and operates nine nursing centers in three states, and has received CON approval for 12 additional facilities in three states, including four in Florida. One of these Florida CONs is for 180 new community nursing home beds in Sarasota County. Health Quest's existing Regents Park of Sarasota nursing home is located at 7979 South Tamiami Trail, Sarasota, Florida. Although it is a sheltered nursing home, only one or two beds are generally occupied by Lake Point Woods residents at any one time. During 1987, only 26 admissions to Regents Park came from Lake Pointe Woods, and most of these admissions were for episodic illnesses of less than 30 days rather than for longer term care. Thus, the vast majority of admissions at Regents Park have been from the community, including admissions directly from home, hospitals and other nursing homes, rather than from the retirement center, Lake Pointe Woods, of which Regents Park is a part. However, since existing beds at Regents Park are sheltered, community patients will not be able to be admitted there beyond November, 1991, the expiration of five years from its opening. During its year and a half of operation, Regents Park has not shown a profit, despite original projections of profitability after only one year. In response to the Department's omissions letter dated February 19, 1987, Health Quest notified the Department, by letter dated March 27, 1987, of its amendment to CON application 5046. Rather than pursuing its request for 58 new community nursing home beds, Health Quest amended the application to seek conversion of the 53 sheltered beds to community beds and to add 7 new community nursing home beds. Since no new space is proposed for construction under the amendment, and since virtually all equipment is already in place, Health Quest projected no cost associated with the amended project. However, there would be some minor costs to equip seven new beds, as well as legal and consulting costs associated with this application and hearing. Currently, the Regents Park nursing home has approximately 31,000 total gross square feet, which would result in 520 gross square feet per bed if its application is approved. On April 10, 1987, the Department published its notice of completeness regarding Health Quest's amended CON application 5046 at Florida Administrative Weekly, Volume 13, No. 15, p. 1365. The Department reviewed and evaluated Health Quest's amended application, rather than the original application, in preparing its SAAR on the applications at issue in this case dated June 15, 1987. Despite this notice of completeness, the record shows that Health Quest's conversion proposal was incomplete since no balance sheet, profit and loss statement for precious fiscal years of operation, detailed statement of financial feasibility or pro forma were introduced. Although sheltered beds can be certified to accept Medicaid patients, Health Quest has not sought such certification for any of the 53 existing beds at Regents Park. Health Quest proposes to seek Medicaid certification for 5 beds, and to serve 8 percent Medicaid patients if CON 5046 is approved. Health Quest does not propose a separate unit for Alzheimer's patients, but would offer special outdoor activities for these patients as well as an Alzheimer's club for patients with this primary diagnosis. Health Quest specializes in caring for patients with hip fractures, and offers a wheelchair mobility and ambulation program, rehabilitation and occupational therapy, bowel and bladder rehabilitation, as well as physical and horticulture therapy. Regents Park has patients on intravenous therapy and who require hyperalimentation and total parenteral nutrition. LPN and nurse's aide students from Sarasota Vo/Tech School receive training at the Regents Park nursing home. HCR In 1986, HCR purchased, and currently owns and operates a 147 bed nursing home located at 3250 12th Street, Sarasota, Florida, known as Kensington Manor, which holds a standard license. HCR is a wholly owned subsidiary of Owens-Illinois, a publicly held corporation, and has built over 200 nursing homes in the last 25 years. At the present time, HCR operates approximately 125 facilities with approximately 16,000 beds in 19 States. HCR owns and operates a total of 9 nursing homes in Florida, and has about 10 nursing home projects under development which it intends to operate upon completion. On or about January 14, 1987, HCR filed CON application 5049 with the Department. This application seeks approval of 60 new community nursing home beds at Kensington Manor, at a currently projected cost of $1.82 million, which is a reasonable projection. The cost per new bed would be $30,030. HCR proposes to finance to project with a 25 percent equity contribution, and 75 percent internally financed by HCR through its parent company, Owens-Illinois, and this proposal is realistic and reasonable. Throughout 1986, Kensington Manor had an occupancy level of between 85 percent - 95 percent and is currently operating at 95 percent - 96 percent occupancy. HCR reasonably projects 95 percent occupancy for the 60 new beds in the second year of operation. HCR reasonably proposes a patient mix in the new addition of 45 percent Medicaid, 4 percent Medicare and 51 percent private pay. Kensington Manor is currently 75 percent - 80 percent Medicaid, 1 percent Medicare, and the remainder is private pay, but its proposed patient mix for the new addition is realistic because there will be no three-bed wards in the addition, and sub- acute services will be provided, thereby increasing the Medicare percentage. The HCR proposed addition at Kensington Manor provides a distinct 29 bed wing for Alzheimer's patients where a special care program and special staffing can be made available. Additionally, a 12 person Alzheimer's adult day care center will be physically attached to the new addition where a less intense level of care outside the home can be made available to these patients. Respite care and sub-acute care will also be provided. The project will add a 60 bed, single story addition to Kensington Manor, with a special Alzheimer unit consisting of 1 private and 14 semiprivate rooms, an enclosed courtyard and porch. A second dining room will be added, as well as 2 central bathing areas, multipurpose and physical therapy rooms. The addition would total 18,000 gross square feet, or 267 gross square feet per bed in the new addition. Kensington Manor currently has approximately 30,000 gross square feet, with 1 private and 52 semiprivate rooms, and 14 three-bedroom wards. Therefore with the addition, Kensington Manor would have approximately 48,000 gross square feet which would be approximately 223 square feet per bed for the entire facility. Sisters of Bon Secours The Sisters of Bon Secours, a Catholic religious order, are currently responsible for the operation and ownership, through not-for-profit corporations, of a JCAH accredited 272 community bed nursing home in North Miami having a superior license, a nursing home in Port Charlotte, Charlotte County, and they also have a CON for an additional nursing home to be located in Collier County. On or about January 15, 1987, Sisters filed CON application 5039 for a new 120 community bed nursing home to be located in Sarasota County, and to be known as Villa Maria of Sarasota County. Sisters is the only applicant involved in this case which is not already providing services in Sarasota County. The proposal calls for the development of a teaching nursing home to be designated as a center for training and research in the study of gerontology and long term care. Affiliations with schools and universities will be developed to allow health care administrators, social workers, medical and nursing students, and practitioners interested in developing a specialization to fulfill their clinical studies and requirements. There will be an emphasis on restorative and rehabilitative care, with 20 percent of the beds being designated for sub-acute care patients who could return home after 30-45 days of therapy and transitional care. Sisters will develop a continuum of care by networking in the community. It is the only applicant that proposes to provide a site for education and research in Sarasota County. The proposed facility is intended to serve the needs of members of the Venice Diocese who reside in Sarasota County, where there is currently no Catholic nursing home. The Venice Diocese is now served by the Sisters' nursing home in Charlotte County, and will also be served by the facility to be located in Collier County, for which a CON has already been issued. However, treatment at these nursing homes, including the proposed Villa Maria of Sarasota County, is not limited to Catholics; the Sisters accept, treat and care for persons in need from all religions backgrounds and denominational affiliations. Total project costs are estimated at $6.64 million, including $3.86 million for construction, approximately $592,000 for equipment, $762,000 to acquire a seven acre site, $237,000 for professional services, $888,000 for financing costs and approximately $300,000 in other related costs. The project would encompass almost 60,000 gross square feet, and would cost approximately $55,300 per bed and $64.50 per square foot. Almost 500 gross square feet would be available per bed, which represents the most square footage per bed of any application under consideration. The proposed facility would have 8 private and 56 semiprivate rooms, with in-room tubs and showers, 3 patient lounges, and a 100 seat dining room. Due to the large size of the proposal, some patient rooms exceed 120 feet from nurse's stations. However, this licensure requirement can easily be met with minor design modifications during the licensure process. Sisters project a 33.3 percent Medicaid, 17.6 - 19.7 percent Medicare, 4 percent indigent and 43 percent - 45 percent private pay utilization for the 120 bed nursing home in its first two years of operation. While Medicaid utilization in Dade County during 1987 rose to 68 percent as a county-wide average, Sisters' Dade County nursing home experienced a drop in Medicaid to 14.6 percent. The high Medicare utilization level which has been projected is consistent with, and based on, the experience of the Sisters at their Dade County nursing home which currently has 21 percent Medicare utilization. However, due to the greater number of hospital referral sources, as well as the larger population and fewer competing nursing homes in Dade County compared with Sarasota County, Medicare utilization projections may be overstated, and actually fall between the 3-4 percent historical utilization in the Sarasota area and Sisters' projection. It will be somewhat above 3-4 percent due to the fact that this will be a teaching nursing home which will attract more Medicare patients. The project will be funded with an equity contribution of 10.6 percent ($635,455) and the remaining 89.4 percent ($6 million) will be funded through the issuance of tax exempt bonds. This financing proposal is realistic and reasonable. The proposed nursing home is intended to offer services to AIDS patients, adult day care, and a meals-on-wheels program. However, it was not established at hearing that such patients would definitely be served, or that space would be available at this facility for these services until the Sisters can determine the actual level of need for these services in Sarasota County, if this CON is approved. Department of HRS On or before January 15, 1987, the Department received the CON applications at issue in this case for additional community nursing home beds in Sarasota County. As it relates to this case, the Department issued its SAAR on June 15, 1987, in which the application of HCR (CON 5049) for a 60 community nursing home bed addition to Kensington Manor was approved, and all other applications in this case were denied. In addition to the HCR application, the Department also supported at hearing the applications of Manor Care (CON 5050) for a 60 bed addition to Manor-Sarasota and Sisters of Bon Secours (CON 5039) for a new 120 bed community bed nursing home to be known as Villa Maria of Sarasota County. The Department opposed the issuance of a CON to the remaining applicants. It is the position of the Department that changes or updates to CON applications made after an application has been deemed complete and reviewed in a SAAR, cannot be considered at hearing if such changes or updates are the result of matters or events within the control of the applicant, and which therefore could have been foreseen and considered at the time the application or responses to omissions were filed. However, matters involving payor mix, salaries and charges could result from changes in demographics and economic factors outside of the applicants' control. In such instances, updates or changes to an application based upon current demographics or economics can, and should be, considered at hearing. The updated pro forma submitted by Sarasota Healthcare at hearing resulted from the applicant's desire to reflect current salaries in the Sarasota County labor market, which have increased dramatically since the original application was submitted. As a result of updating salary expense projections, Medicaid and Medicare rates also had to be updated. Associated projections throughout the pro forma which are dependent upon these reimbursement rates, as well as salary expense projections, also had to be updated. The updated pro forma presented by Sarasota Healthcare results from a factor outside of the control of the applicant, inflation, which could not have been foreseen or predicated with certainty in January, 1987. To ignore actual, current inflation data in Sarasota County is to ignore reality. This update is permissible and has been considered. Manor-Sarasota's application presented at hearing includes changes in its proposed payor mix, charges and salaries, as well as its pro forma. These updates are permissible since they result from changes in demographics and inflation outside of the applicant's control which could not have been foreseen in January 1987. However, a 21 percent increase in square footage and elimination of three-bed wards, with associated changes in proposed staffing, capital costs and equipment, while certainly having a positive effect on quality of care, is nevertheless a matter totally within the control of the applicant. The desireability of these changes could have been foreseen at the time the application was filed, and therefore these substantial changes in design represent impermissible amendments to Manor-Sarasota's application. Stipulations The appropriate planning area for these applications is Sarasota County, and the appropriate planning horizon is January, 1990. Sarasota County is in subdistrict 6 of the Department's service district 8. The parties have stipulated that there is a need for 240 additional community nursing home beds in the January, 1990, planning horizon in Sarasota County, in accordance with the bed need formula in Rule 10-5.011(1)(k), Florida Administrative Code. The parties have agreed that Section 381.705(1)(d) and (j), Florida Statutes (1987), have been met, or are not applicable to this case. This statutory criteria deals with the adequacy and availability of alternative health care facilities and the special needs and circumstances of health maintenance organizations. All remaining criteria found at Section 381.705(1) and (2), Florida Statutes (1987), are at issue in this case. Further, the parties stipulate that 1987 amendments to Chapter 381, Florida Statutes, relating to the content of applications, are inapplicable in this proceeding since these applications were filed prior to the effective date of said law. Therefore, application content provisions of Section 381.494(4), Florida Statutes, govern. State and Local Health Plans The 1985 Florida State Health Plan, Volume II, Chapter 8, identifies areas of concern relating to the provision of long-term care services in Florida, which traditionally has been synonymous with nursing home care. These concerns include resource supply, cost containment and resource access. The State Health Plan seeks a reduction in the fragmentation of services and encourages development of a continuum of care. These proposals are consistent with, or do not conflict with, the State Health Plan. The 1984 District Eight Local Health Plan for Nursing Home Care is applicable to these applications for community nursing home beds in Sarasota County. The Local Health Plan contains the following pertinent criteria and standards for review of these applications: Community nursing home services should be available to the residents of each county within District Eight. At a minimum community nursing home facilities should make available, in addition to minimum statutory regulation, in the facility or under contractual arrangements, the following services: pharmacy h. occupational therapy laboratory i. physical therapy x-ray j. speech therapy dental care k. mental health visual care counseling hearing care l. social services diet therapy m. medical services New and existing community nursing home bed developments should dedicate 33 1/3 percent of their beds to use for Medicaid patients. Community nursing home (skilled and intermediate care) facilities in each county should maintain an occupancy rate of at least 90 percent. New community nursing home facilities may be considered for approval when existing facilities servicing comparable service areas cannot reasonably, economically, or geographically provide adequate service to these service areas. No new community nursing home facility should be constructed having less than 60 beds. However, less than 60 beds may be approved as part of an established acute care hospital facility. Each nursing home facility should have a patient transfer agreement with one or more hospitals within an hour's travel time, or the nearest hospital within the same community. The proposed project should have a formal discharge planning program as well as some type of patient follow-up services with discharge/transfer made available seven days a week. Community nursing homes should be accessible to residents throughout District Eight regardless of their ability to pay. All community nursing homes and applicants for community nursing homes should document their history of participation in Medicaid and Medicare programs, and provide data on an ongoing basis to the District Eight Local Health Council as requested. The specifically stated goal of the Local Health Plan is to develop new community nursing home facilities in which at least 33 1/3 percent of the total beds should be Medicaid. The impact of this long range recommended action is stated as follows: The provision of Medicaid care beds in existing nursing homes would assure continuity of care for nursing home patients, and should improve placement in appropriate levels of care by hospitals, physicians, social services, health departments, and other referral groups. The provision for Medicaid beds would reduce cost to patients, utilizing skilled care beds, who could adequately be served by Medicaid. With the exception of Health Quest's application, all other applicants meet the above stated standards and criteria contained in the Local Health Plan. Health Quest's application does not conform to the Local Health Plan. All applicants in this proceeding have indicated that they will provide therapies and services recommended in the Local Health Plan. All applicants, except Health Quest, indicate a commitment to dedicate at least 33 1/3 percent of their beds for Medicaid patients. The new nursing home facilities proposed by Sisters and Sarasota Healthcare would each be for 120 beds, consistent with the Local Health Plan standard that new facilities have at least 60 beds. Health Quest has proposed a 60 bed community nursing home through conversion of 53 sheltered nursing home beds and the addition of 7 new community beds. As existing providers, Manor-Sarasota, HCR band Health Quest have patient transfer agreements with one or more hospitals, as well as formal discharge planning programs and patient follow-up services, as recommended in the Local Health Plan. The applications for new facilities of Sarasota Healthcare and Sisters indicate they will also comply with these priorities if approval is granted and their facilities are opened. By virtue of its existing service and transfer agreements through the CSI facility in Sarasota County, Pinebrook Place, Sarasota Healthcare will be able to obtain these necessary agreements. Based upon Sisters' experience in Dade County at Villa Maria, as well as the fact that this will be a teaching nursing home, Sisters will also be able to obtain such agreements. Data has been provided by the existing nursing homes (Manor-Sarasota, HCR and Health Quest) which documents the history of their participation in the Medicaid and Medicare programs. The other applicants (Sarasota Healthcare and Sisters) have provided Medicaid/Medicare data for other existing facilities with which they are affiliated or upon which their application at issue in this case is based. Based upon this data, Pinebrook Place in Sarasota County, which is owned and operated by Sarasota Healthcare's general partners has not met the Medicaid condition on its CON, and the existing Manor-Sarasota facility has had only 24.8 percent Medicaid utilization in fiscal year 1988: Availability, Accessibility and Adequacy of Like and Existing Services HCR and Manor-Sarasota would increase the availability and adequacy of existing services they are now offering with the 60 bed additions each is seeking. The separate 30-bed specialized unit proposed by Manor-Sarasota and the 29-bed wing proposed by HCR for Alzheimer's patients will clearly increase the availability of specialized services for persons with Alzheimer's and related disorders, as well as their families. HCR will also dedicate 10 beds for sub-acute care, while Manor-Sarasota will offer community outreach, as well as respite care. Sarasota Healthcare, Sisters and Health Quest do not propose special units for Alzheimer's patients, but would offer special programs and services for them and their families. It was established that there is a need for additional services and programs to serve nursing home patients with Alzheimer's and related disorders in Sarasota County, as well as a special need for sub-acute, restorative, hospice, respite, and adult day care in the County. It was not established that there is a need for additional Medicare beds in Sarasota County. Sisters have indicated an interest in offering services to patients with AIDS and patients in need of adult day care, for which there is also a need in Sarasota County. In addition, their application will enhance the availability of sub-acute nursing home services, restorative and rehabilitative care, and respite care in Sarasota County. While it would serve patients of all denominations and religious affiliations, it would be the only Catholic nursing home in Sarasota County. The teaching component of the Sisters' application would provide access for students and other health professionals seeking to further their professional training. The Sarasota Healthcare proposal also places special emphasis on increasing the availability of sub-acute services in Sarasota County. Quality of Care The Sisters will seek JCAH accreditation of the proposed facility if their CON is approved, just as their nursing home in North Miami is currently accredited. The proposed affiliation with a college of medicine and nursing school, and the intent to operate this facility as a teaching nursing home will insure quality of care at this nursing home by utilizing state-of-the-art treatment and therapy programs. Florida nursing homes currently owned or operated by each of the applicants or their affiliated corporations have standard or superior licenses which means they meet or exceed State Standards. Licensure status of facilities owned or operated in other states by the applicants, or their affiliated companies, has not been considered since it was not established that licensure standards in other states are similar, or even comparable, to those in Florida. Each applicant has significant experience rendering quality nursing home care, and each has proposed a reasonable and comprehensive quality assurance program which will insure that quality nursing home services will be provided to their residents. The architectural design proposed by each applicant is reasonable and sufficient to allow quality care to be provided at each facility. All instances where an applicant's design fails to meet final construction standards are relatively minor, and can easily be met during the licensure process with slight modifications and adaptations in design. Staffing proposals by each, while different, will all insure that adequate medical, nursing, counseling and therapeutic staff will be trained and available either on-staff or through contract, to implement quality care programs at each facility. Manor-Sarasota's past reliance on temporary nursing services is decreasing and this will have a positive effect on quality of care. HCR has just completed extensive repairs and renovations costing $350,000 at Kensington Manor which will improve the atmosphere, living conditions and overall quality of care at the facility. Sisters' educational affiliations will aid in recruiting and retaining well-trained staff for its facility. Each facility will be equipped to provide quality care. There was extensive testimony about the advantages and disadvantages of central bathing facilities compared with private baths or showers in patient rooms. Sisters and Health Quest would provide private bathing facilities in patient rooms, while the others would have central facilities. Obviously, individual bathing facilities in patient rooms offer more privacy than central facilities, but privacy can also be achieved in a central bathing area by taking only a single, or limited number of patients to a partitioned central facility at any one time. The central facility is less costly than bathing facilities in each room, and also requires less staff time and involvement to assist with, and insure safety in, the patients' bathing. It has not been shown that one type of bathing facility provided in a nursing home, to the exclusion of all others, affects the quality of care in a positive or adverse manner. Quality care can be, and is, provided under both designs. The elimination of 3-bed wards from Manor-Sarasota's application would have a positive impact on quality of care, and be consistent with the Department's position of discouraging the creation of additional 3-bed wards in nursing homes. However, such elimination was proposed after this application was deemed complete by the Department. Patients suffering from Alzheimer's and related disorders can benefit from programs and treatment conducted in separate units, or while comingled with other patients, particularly in the early and middle phases of the disease. In the later phase of the disease it may be less disruptive to other patients if Alzheimer patients reside in a separate wing or unit of the nursing home. Quality care can be rendered through separate or integrated programming, and all applicants in this case that propose to offer specialized services to these patients have proposed programs and facility designs which will provide quality care to persons with Alzheimer's and related disorders. While there are differences in facility design, such as the two-story construction of Manor-Sarasota compared with the single level construction of all other applicants, and the central heating and cooling proposed by Sisters compared with individual wall units to be used by Sarasota Healthcare, the proposed designs of all applicants allow for the rendering of quality care to patients. Access for Chronically Underserved The Health Quest proposal is inconsistent with the Local Health Plan policy that 33 1/3 percent of all nursing home beds should be dedicated for Medicaid patients since it proposes that only 5 of its 60 beds (8 percent) will be certified for Medicaid patients if CON 5046 is approved. Although Medicaid utilization at Manor-Sarasota has not been consistent with the Local Health Plan, it is projected that if CON 5050 is approved Medicaid utilization will rise to 40 percent. Sarasota Healthcare, HCR and Sisters propose to meet or exceed this Local Health Plan policy. HCR has experienced a 75-80 percent Medicaid utilization at Kensington Manor, and proposes a 45 percent Medicaid level in the new addition if CON 5049 is approved. Financial Feasibility The proposals of Manor-Sarasota, HCR and Sisters are financially feasible. Health Quest did not file a pro forma and has not shown a profit in its year and a half of operation at Regents Park. Based upon its actual per patient operating expense at Pinebrook Place, Sarasota Healthcare has underestimated expenses in its second year of operation by approximately $8 per patient day. Its projection of a profit in the second year of operation is questionable due to this underestimation. Manor-Sarasota, HCR and Sisters have established their ability to finance, through equity and debt, the construction, equipment, supplies, and start-up costs associated with their proposals. Health Quest will have no construction costs, and only very minor costs to equip and supply seven new beds it is requesting. The entire financial structure of CSI and Sarasota Healthcare is dependent upon the financial strength of their general partners, the Kelletts, who currently have $76 million in long term debt and $12 million in equity. This is a relatively high debt to equity ratio of 6 to 1 which makes them susceptible to adverse impacts from any downturn in the economy, especially since they have 15 additional CON applications pending in Florida, totaling $60 million in construction costs. In contrast to the Kelletts' high debt to equity ratio, Sisters have $159 million in long term debt and $160 million in equity for a very secure 1 to 1 debt to equity ratio. Projections of revenue and expense, as well as assumptions concerning projected utilization, Medicaid and Medicare rates, private pay rates, and patient mix used by Manor-Sarasota, HCR and Sisters in their pro forma are reasonable, based upon that applicant's experience and the services proposed in their applications at issue. Adequacy of Staffing All proposals have adequate and reasonable staffing patterns, as well as staff training programs, to insure that quality care is provided. Proposed salaries are reasonable and will allow qualified staff to be hired, based upon the recruiting experience and salaries currently offered by Sarasota nursing homes. Adequate staff resources exist in the area. I. Most Effective and Less Costly Alternative Since it is generally not necessary to construct support areas for storage, laundry, kitchen and administration, adding additional beds to existing facilities is a less costly alternative to an entirely new facility. Health Quest, HCR and Manor-Sarasota are, therefore, less costly per bed than Sarasota Healthcare and Sisters' proposals to construct new 120 bed nursing homes. Specifically, there are only minor costs associated with Health Quest's proposal, while the cost per bed of the Manor-Sarasota and HCR proposals are $30,872 and $30,030, respectively, compared with $32,500 per bed for Sarasota Healthcare and $55,295 for Sisters. Health Quest's application is the least costly alternative since it involves no construction costs to add seven beds to the existing 53 sheltered beds which would be converted to community nursing home beds, although minor costs for equipping seven new beds would be incurred. Effect on Costs and Charges Sisters and Health Quest have proposed, or actually experienced, the highest costs and charges of all applicants. Health Quest has not shown any basis upon which it can be reasonably expected that room rates will decrease, as it asserts, if this CON is approved. Due to the large size of its proposed building, higher food costs and number of staff, Sisters projects the highest operating expense per patient day in the second year of operation. Sisters will provide almost 500 gross square feet per bed, while Manor-Sarasota, HCR, and Sarasota Healthcare will provide 278, 267 and 314 gross square feet per bed, respectively. Enhanced Competition Since the other applicants are already represented in the service area, the approval of Sisters' application would enhance competition by adding another provider to Sarasota County. This will provide more choices to nursing home residents, and should increase the quality of long term care in the community with the added emphasis this proposal will place on rehabilitative programming. Costs and Methods of Construction The costs and methods of construction proposed by the applicants are reasonable, as well as energy efficient.
Recommendation Based upon the foregoing, it is recommended that the Respondent enter a Final Order, as follows: Approving HCR's application for CON 5049; Approving Sisters' application for CON 5039; Denying the application of Manor-Sarasota, Sarasota Healthcare and Health Quest for CONs 5050, 5025 and 5046, respectively. DONE AND ENTERED this 9th day of August, 1988, in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of August, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 87-3471, 87-3473, 87-3475, 87-3478 and 87-3491 Rulings on the Department's Proposed Findings of Fact Adopted in Findings of Fact 3, 12, 17, 19, 24, 30, 37. Adopted in Finding of Fact 37. 3-4. Adopted in Finding of Fact 43. 5. Adopted in Finding of Fact 42. 6-10. Rejected as irrelevant and unnecessary since the parties have stipulated to need. Adopted in Findings of Fact 37, 38. Adopted in Findings of Fact 26, 27, 55, 69, 70. Adopted in Findings of Fact 30, 56, 58, 60. Adopted in Findings of Fact 3, 55. Rejected as irrelevant since the parties have stipulated to need. Rejected in Findings of Fact 48, 57. Rulings on Manor-Sarasota's Proposed Findings of Fact: Adopted in Findings of Fact 3, 12, 17, 19, 24, 30. Adopted in Findings of Fact 37, 38, 43. Adopted in Findings of Fact 15, 30, 32. Rejected in Finding of Fact 17 and Adopted in Finding of Fact 19. Adopted in Findings of Fact 3, 5, 24. Adopted in Finding of Fact 38. Adopted in Findings of Fact 13, 14 but Rejected in Findings of Fact 71, 73. Adopted in Findings of Fact 29, 31. Adopted in Finding of Fact 34. Adopted in part in Finding of Fact 35, but otherwise Rejected as unnecessary. Adopted in Finding or Fact 2. Rejected as unsupported and unnecessary. Adopted in Findings of Fact 29, 60, 61 but also Rejected in part in Finding of Fact 60. Adopted in Finding of Fact 31. Adopted and. Rejected in Finding of Fact 60, and otherwise Rejected as irrelevant and unsupported in the record. Adopted in Finding of Fact 29 but otherwise Rejected as unsupported argument on the evidence, without any citation to the record, rather than a proposed finding of fact. Rejected in Findings of Fact 63, 76. Adopted in Findings of Fact 32, 33, 82 but Rejected in part in Finding of Fact 33. Rejected as unsupported by the record. Adopted in Findings of Fact 33, 64 in part, but otherwise. Rejected in Finding of Fact 64 and as not supported by the record. Rejected as unnecessary and without citation to the record. Adopted and. Rejected in Findings of Fact 33, 63. Rejected as cumulative and unnecessary. Rejected in Findings of Fact 33, 63. Rejected in Findings of Fact 17. Adopted in Finding of Fact 17, but otherwise Rejected as irrelevant. Adopted in Finding of Fact 18. Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 17, 18. Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 20, 71. Rejected as cumulative and unnecessary. 33-34. Rejected as irrelevant and unnecessary. 35-36. Adopted in Finding of Fact 81. Adopted in Finding of Fact 21. Rejected as speculative. Adopted in Finding of Fact 18 but otherwise Rejected as irrelevant and unnecessary. Rejected as unnecessary and irrelevant. 41-43. Rejected as not supported by the record and speculative. Adopted in Findings of Fact 19, 80. Adopted in Findings of Fact 48, 51, but Rejected in Finding of Fact 21. Rejected in Findings of Fact 63, 76 and otherwise as unnecessary and irrelevant. Adopted in Findings of Fact 24-26. Adopted in Finding of Fact 23. Adopted in Finding of Fact 79. Adopted in Finding of Fact 27. Adopted in Finding of Fact 1. Adopted in Findings of Fact 61, 63 and otherwise Rejected as unnecessary. Rejected as unnecessary. Adopted in Findings of Fact 5, 81. Adopted in Findings of Fact 71, 75. 56-57. Adopted in Finding of Fact 63, but otherwise Rejected as irrelevant and unnecessary. 58. Adopted in Findings of Fact 3, 55, 56. 59-61. Rejected as irrelevant, unnecessary and cumulative. Rejected in Finding of Fact 66. Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 63, 76. Adopted in Findings of Fact 4, 6. Adopted in Finding of Fact l. Adopted in Finding of Fact 81 but otherwise Rejected as unnecessary. Rulings on HCR's Proposed Findings of Fact: 1-2. Adopted in Findings of Fact 42, 43. 3-4. Rejected as unnecessary and irrelevant. 5. Adopted in Finding of Fact 57. 6-7. Rejected as unnecessary. 8-9. Adopted in Finding of Fact 57. 10-15. Rejected in Finding of Fact 66 and otherwise as unnecessary and cumulative. Adopted in Finding of Fact 57. Adopted in Findings of Fact 27, 55. Rejected as unnecessary. Adopted in Finding of Fact 57. Adopted in Findings of Fact 23, 28, 63. Adopted in Finding of Fact 23. Adopted in Findings of Fact 25, 26, 28. Adopted in Findings of Fact 24, 27, 28. 24-25. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary. 26-27. Adopted in Finding of Fact 27, but otherwise Rejected as unnecessary. 28-29. Adopted in Finding of Fact 66, but otherwise Rejected as unnecessary. 30. Adopted in Findings of Fact 46-49. 31-37. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary. Rejected as unnecessary and irrelevant. Adopted in Finding of Fact 24. 40-42. Adopted in Findings of Fact 25, 26, 71, 75. Adopted in Finding of Fact 71. Rejected as unnecessary. 45-46. Rejected as cumulative and unnecessary. Adopted in Findings of Fact 63, 81. Adopted in Finding of Fact 24. Adopted in Finding of Fact 28, but otherwise Rejected as cumulative and unnecessary. Adopted in Finding of Fact 79. 51-54. Adopted in part in Finding of Fact 24, but otherwise Rejected as unnecessary. 55. Adopted in Finding of Fact 37, but otherwise Rejected as unnecessary and cumulative. 56-57. Rejected as unnecessary. Adopted in part in Finding of Fact 17, but otherwise Rejected as unnecessary. Adopted in Finding of Fact 19. Adopted in part in Findings of Fact 18, 42. Adopted in Finding of Fact 18. 62-63. Adopted in Finding of Fact 20. Adopted in Findings of Fact 22, 55. Adopted in Findings of Fact 21, 49, 51. Adopted in Findings of Fact 32, 33. Adopted and. Rejected in Finding of Fact 33. Adopted in Finding of Fact 82. 69-70. Adopted in Finding of Fact 63. Adopted in Finding of Fact 56. Adopted and Rejected in part in Finding of Fact 34. Rulings on Sisters' Proposed Findings of Fact: Adopted in Findings of Fact 3, 12, 17, 19, 24, 30. Rejected as unnecessary as a Finding of Fact. Adopted in Finding of Fact 43. Rejected as unnecessary as a Finding of Fact. Adopted in Finding of Fact 30. Adopted in Findings of Fact 12, 14, but otherwise Rejected as irrelevant. Adopted in Finding of Fact 3. Adopted in Findings of Fact 24, 29. Adopted in Finding of Fact 19, but otherwise Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 37, 38. 11-12. Adopted in Finding of Fact 46. 13-15. Adopted in Findings of Fact 47-54. Rejected as unnecessary and not supported by the record. Adopted in Finding of Fact 30. 18-22. Adopted in Finding of Fact 57, but otherwise Rejected as unnecessary and cumulative. 23. Adopted in Finding of Fact 34. 24-26. Adopted in Finding of Fact 57, but otherwise Rejected as unnecessary and cumulative. Adopted in Finding of Fact 34. Adopted in Finding of Fact 57, but Rejected in Finding of Fact 34. Adopted in part in Finding of Fact 30, but otherwise Rejected as argument unsupported by any citation to the record. 30-38. Adopted in part in Finding of Fact 63, but otherwise Rejected as unnecessary, irrelevant and as argument on the evidence rather than a Finding of Fact. Adopted in Finding of Fact 40. Rejected in Finding of Fact 40. 41-51. Adopted in Findings of fact 60, 63, but otherwise Rejected as unnecessary, irrelevant and as argument on the evidence rather than a Finding of Fact. 52-58. Adopted in Findings of Fact 29, 60, 61, but otherwise Rejected as unnecessary and irrelevant. 59. Adopted in Finding of Fact 11, but otherwise Rejected as irrelevant. 60-75. Rejected as unnecessary irrelevant, and cumulative. Rejected as unnecessary. Adopted in Finding of Fact 82. Rejected as unnecessary. Adopted in Findings of Fact 33, 82. Adopted in Findings of Fact 33, 82. Adopted in Finding of Fact 33, but Rejected in Finding of Fact 64. 82-83. Rejected as unnecessary. 84. Adopted in Finding of Fact 9. 85-86. Rejected as unnecessary. 87-88. Adopted in Findings of Fact 9, 41. 89. Adopted in Finding of Fact 4, but otherwise Rejected as not supported by the record. 90-91. Rejected in Finding of Fact 63 and otherwise not supported by the record. 92-105. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary, cumulative and irrelevant. Rejected as unsupported in the record and otherwise unnecessary. Adopted in Finding of Fact 29. Adopted in Finding of Fact 11. Rejected as irrelevant, unnecessary and speculative. Rejected as unnecessary. 111-112. Adopted in Finding of Fact 30. 113. Adopted in Finding of Fact 63. 114-115. Rejected as unnecessary and cumulative. 116-120. Adopted in Findings of Fact 60, 63, but otherwise Rejected as unnecessary and cumulative. 121. Adopted in Finding of Fact 30. 122-123. Adopted in Finding of Fact 63, but otherwise Rejected as cumulative. 124. Adopted in Findings of Fact 31, 34, but otherwise Rejected as unsupported in the record. 125-126. Adopted in Finding of Fact 35. 127-129. Rejected as unnecessary and irrelevant since no applicant has locked in interest rates, and therefore these rates will vary and are speculative. Rejected as speculative and irrelevant. Rejected as irrelevant. 132-135. Adopted in Finding of Fact 73. 136. Adopted in Finding of Fact 74. 137-139. Adopted in Finding of Fact 71, but otherwise Rejected as unnecessary and cumulative. 140. Rejected as unnecessary and irrelevant. 141-145. Adopted in Finding of Fact 71. 146-147. Adopted in Finding of Fact 83. Adopted in part in Finding of Fact 71, 84, but Rejected in Findings of Fact 81, 82. Adopted in Finding of Fact 63. Rejected in Finding of Fact 67. Rejected as irrelevant and unnecessary. Rejected as unnecessary and cumulative. Adopted in Finding of Fact 34. Rejected as cumulative and unsupported by the record. 155-158. Adopted in Finding of Fact 54. 159. Rejected as irrelevant and unnecessary. Rulings on Sarasota Healthcare's Proposed Findings of Fact: Adopted in Findings of Fact 3, 12, 17, 19, 24, 30. Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 37, 38, 43. 4-6. Adopted in Finding of Fact 11, but otherwise Rejected as unnecessary and irrelevant. 7-13. Adopted in Findings of Fact 12-16, but otherwise Rejected as unnecessary and irrelevant. 14-17. Adopted in Finding of Fact 46. Adopted in Finding of Fact 47. Adopted in Finding of Fact 49. Adopted in Finding of Fact 63, but otherwise Rejected as cumulative and unnecessary. Adopted in Findings of Fact 11, 61. 22-23. Rejected as cumulative and unnecessary. 24-41. Adopted in Finding of Fact 63, but otherwise Rejected as cumulative and unnecessary. Adopted in part in Findings of Fact 14, 57, but otherwise. Rejected in Finding of Fact 83 and as unsupported in the record. Rejected in Finding of Fact 54, and otherwise as irrelevant. Adopted in Findings of Fact 13, 51, but Rejected in Finding of Fact 54. Adopted in Finding of Fact 13. Adopted in Findings of Fact 14, 57. 47-49. Adopted in Findings of Fact 56, 66. Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 14. Adopted in Finding of Fact 57. 53-58. Adopted in Finding of Fact 63, but otherwise Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 14. Adopted in Finding of Fact 57. Adopted in Finding of Fact 14. Adopted in Finding of Fact 53. Adopted in Finding of Fact 81. Adopted in Finding of Fact 63, but otherwise Rejected as cumulative and unnecessary. 65-78. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary and cumulative. 79-85. Adopted in Findings of Fact 76, 77, but otherwise Rejected as unnecessary and irrelevant. 86-97. Adopted in Findings of Fact 15, 63, 84, but otherwise Rejected as cumulative and unnecessary. Adopted and. Rejected in Finding of Fact 64. Rejected as unsupported in the record. Rejected as cumulative and unnecessary. 101-103. Adopted in Findings of Fact 15, 84. 104. Rejected as unnecessary and cumulative. 105-109. Adopted in Findings of Fact 63, 84, but otherwise Rejected as irrelevant and unnecessary. Rejected as unsupported in the record. Adopted in part in Finding of Fact 16, but Rejected in Finding of Fact 73. 112-116. Adopted and Rejected in part in Findings of Fact 71, 73, 75, but otherwise. Rejected as irrelevant and unnecessary. 117. Adopted in Finding of Fact 16. 118-119. Adopted in Finding of Fact 75. 120-121. Rejected in Finding of Fact 71. 122-126. Adopted in Finding of Fact 40. 127-128. Adopted in Findings of Fact 30, 32. Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 31. Adopted in Finding of Fact 33. Adopted and Rejected in Finding of Fact 67. 133-135. Adopted and Rejected in part in Findings of Fact 33, 63, and otherwise. Rejected as irrelevant since all licensure requirements can easily be met with minor modifications. Adopted in Finding of Fact 36. Rejected as unsupported in the record. Adopted in Findings of Fact 15, 30, 32, 33. Adopted in Finding of Fact 31, but otherwise Rejected as simply a summation of testimony. 140-142. Adopted in Finding of Fact 36. Rejected as irrelevant. Adopted in Finding of Fact 34, but Rejected in Finding of Fact 51. 145-146. Adopted in Finding of Fact 34, but otherwise Rejected as unnecessary. 147-148. Adopted in Finding of Fact 30, but Rejected in Finding of Fact 57 and as unsupported in the record. 149-150. Adopted in Finding of Fact 34. Adopted in Finding of Fact 57. Rejected as unnecessary and cumulative 153-156. Rejected in Findings of Fact 63, 76, 77 and otherwise not supported in the record. Rejected as unnecessary. Adopted in Finding of Fact 36. Adopted in Finding of Fact 82. Rejected as unnecessary. Adopted in Finding of Fact s. Adopted in Findings of Fact 17, 19. Adopted in Finding of Fact 71, but otherwise Rejected as cumulative and unnecessary. Rejected as cumulative and unnecessary. Adopted in Finding of Fact 18, but otherwise Rejected as irrelevant and unsupported in the record. Adopted in Findings of Fact 17, 18, but otherwise Rejected as cumulative and as argument on the evidence. Adopted in Findings of Fact 48, 49, 51. Rulings on Health Quest's Proposed Findings of Fact: Adopted in Finding of Fact 24. Adopted in Finding of Fact 3. Adopted in Findings of Fact 17, 19. Adopted in Finding of Fact 12. Adopted in Finding of Fact 30. 6-10. Adopted in Finding of Fact 37. Rejected as irrelevant and unnecessary. Adopted in Findings of Fact 42, 43. Adopted in Finding of Fact 20. Adopted in Findings of Fact 19, 20, 39. Adopted in Finding of Fact 18. Adopted in Findings of Fact 61, 63. Adopted in Finding of Fact 61, but otherwise Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 17. Adopted in Finding of Fact 18. Rejected as argument on the evidence rather than a proposed finding of fact. Rejected as speculative and unsupported in the record. Adopted in Findings of Fact 19, 80. Rejected as argument on the evidence rather than a proposed finding of fact. Adopted in Finding of Fact 80. Rejected in Finding of Fact 71. Rejected as irrelevant. 27-34. Adopted in Findings of Fact 22, 63, 76, but otherwise Rejected as unnecessary and cumulative. 35-39. Adopted in Finding of Fact 22. 40. Adopted in Finding of Fact 66. 41-58. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary and cumulative. Adopted in Finding of Fact 61, but otherwise Rejected as irrelevant. Rejected as simply a statement on the evidence rather than a proposed finding of fact and otherwise irrelevant. Adopted in Finding of Fact 17, but otherwise Rejected as unnecessary. 62-63. Adopted in Finding of Fact 18. Rejected as unnecessary and cumulative. Adopted in Finding of Fact 80. Adopted in Finding of Fact 63. Adopted in Findings of Fact 19, 80. 68-70. Adopted in Finding of Fact 63, but otherwise Rejected as unnecessary and cumulative. 71. Adopted in Finding of Fact 21. 72-74. Rejected in Findings of Fact 48, 49, 51 and otherwise as irrelevant. 75-76. Rejected as unnecessary, although it is agreed that these matters are irrelevant and speculative. Adopted in Findings of Fact 63, 80. Adopted in Finding of Fact 9. Rejected as argument on the evidence rather than a proposed finding of fact. Adopted in Finding of Fact 9. 81-82. Adopted in Finding of Fact 39. 83. Rejected in Finding of Fact 39. 84-88. Adopted in Finding of Fact 41. Adopted in Finding of Fact 9. Rejected as argument on the evidence and as legal argument rather than a proposed finding of fact. Rejected as unnecessary. 92-94. Adopted in Finding of Fact 41. 95. Adopted and. Rejected in part in Finding of Fact 41. 96-101. Rejected in Findings of Fact 63, 76 and otherwise as irrelevant. 102. Rejected as cumulative. 103-104. Adopted in Finding of Fact 1. Rejected in Findings of Fact 61, 63. Rejected as simply a summation of testimony. 107-109. Rejected in Finding of Fact 63. 110-111. Rejected as unsupported in the record and irrelevant. 112-114. Adopted in Finding of Fact 9, but otherwise Rejected as unsupported by the record. 115. Adopted in Finding of Fact 41. 116-117. Rejected as unnecessary. 118-120. Rejected in Finding of Fact 66 and otherwise simply as a summation of testimony. 121-122. Rejected as irrelevant and as argument on the evidence. Adopted in Finding of Fact 38. Rejected as a conclusion of law rather than a proposed finding of fact. 125-127. Rejected as argument on the evidence and as a summation of testimony. 128. Rejected as cumulative. 129-131. Rejected as simply a summation of testimony rather than a proposed finding of fact. 132-134. Rejected in Findings of Fact 61, 63 and otherwise as irrelevant. 135. Rejected in Findings of Fact 43, 48, 57 and otherwise as irrelevant. 136-142. Rejected as irrelevant. The issue in this case is not the accuracy of the SAAR, but rather whether applicants have sustained their burden of establishing entitlement to a CON based on the record established at hearing. COPIES FURNISHED: Richard A. Patterson, Esquire Department of HRS 2727 Mahan Drive, 3rd Floor Tallahassee, Florida 32308 Alfred W. Clark, Esquire Post Office Box 623 Tallahassee, Florida 32302 Donna H. Stinson, Esquire The Perkins House - Suite 100 118 North Gadsden Street Tallahassee, Florida 32301 David Watkins, Esquire Harry F. X. Purnell, Esquire Post Office Box 6507 Tallahassee, Florida 32314-6507 Byron B. Matthews, Jr., Esquire Vicki Gordon Kaufman, Esquire 700 Brickell Avenue Miami, Florida 33131-2802 Steven W. Huss, Esquire 1017 Thomasville Road, Suite C Tallahassee, Florida 32303 Gregory Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Room 407 Tallahassee, Florida 32399-0700 John Miller, Acting General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Room 407 Tallahassee, Florida 32399-0700 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Room 407 Tallahassee, Florida 32399-0700 =================================================================