Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
BRENDA B. SHERIDAN vs DEEP LAGOON MARINA, A/K/A DEEP LAGOON BOAT CLUB, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-002234 (1999)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida May 18, 1999 Number: 99-002234 Latest Update: Mar. 08, 2000

The Issue The issues in this case are whether the Department of Environmental Protection (DEP) should modify the conditions of permits held by the Deep Lagoon Boat Club, Ltd., d/b/a Deep Lagoon Marina (Applicant), to allow Applicant to construct and operate a boat travel lift in a new location at the marina and to substitute a 60-foot wide flushing channel required by the prior permits with two-48 inches box culverts.

Findings Of Fact Applicant owns and operates Deep Lagoon Marina (the Marina). The Marina comprises uplands and three canals adjoining MacGregor Boulevard south of downtown Fort Myers. The Marina presently consists of 61 wet slips, 200 dry slips, and other marina-related buildings. The Marina is on Deep Lagoon, a Class III surface water body less than one-half mile from the Caloosahatchee River. Deep Lagoon is a short, largely mangrove- lined waterway that runs north into the Caloosahatchee River. The Caloosahatchee River runs west from Lake Okeechobee past Fort Myers to the Gulf of Mexico. One of Applicant's predecessors in interest dredged the three canals in the 1950s or 1960s, and a marina has existed at this location since that time. As a result of a purchase in 1997, Applicant owns at least the uplands and claims ownership of the submerged bottoms of the canals. The parties have stipulated that ownership of the submerged bottoms of the canals is not being litigated or decided in this proceeding and that, subject to the issue's being decided adverse to the Applicant in other proceedings, sufficient ownership is presumed for purposes of this proceeding. From north to south, the Marina comprises the north canal, which is about 1200 feet long and bounded on the north by a red mangrove fringe 10-20 feet wide; a peninsula; the central canal, which is also known as the central or main basin and is roughly the same length as the north canal; a shorter peninsula; and the south canal, which is about half the length of the central canal and turns to the southeast at a 45-degree angle from the midway point of the central canal. The three canals are dead-end canals, terminating at their eastern ends a short distance from MacGregor Boulevard. Petitioner, Brenda Sheridan, resides at 842 Cal Cove Drive, Fort Myers, Florida, which is on the shores of the Caloosahatchee River at Deep Lagoon, just across the south canal from the Marina. Intervenor, Save the Manatee Club (STMC), is a non- profit Florida corporation with approximately 40,000 members. The organization's stated purpose includes protecting the manatee and its habitat through public awareness efforts, research support and advocacy, which activities benefit manatees, STMC, and its members. The Florida Legislature has recognized STMC's substantial interest in manatee protection by designating it a member of the manatee protection committee provided by the Florida Manatee Sanctuary Act at paragraph 370.12(2)(p), Florida Statutes, and by requiring the state to solicit recommendations from STMC regarding the use of Save the Manatee Trust Fund monies, at Section 370.12(5)(a), Florida Statutes. Numerous members of STMC reside within Lee County, where they observe, study, photograph, and actively attempt to protect manatees from collisions with watercraft. These efforts benefit manatees and provide STMC's members with educational and recreational benefits in the waters of Lee County that would be affected by the proposed activity. STMC has expended substantial resources in advocating increased legal protection of manatees in Lee County, including additional boat speed regulations on the Caloosahatchee River. STMC has also constributed funds for the rescue and rehabilitation of manatees exposed to red tide in Lee County waters. Injury, mortality, and loss of important habitat would produce significant, adverse impacts to the manatee, thereby diminishing the ability of STMC's members to observe, study, and enjoy manatees in waters that would be affected by the proposed activity and frustrating STMC's efforts to preserve and protect manatees in Lee County. Permit History On December 9, 1986,, Applicant's predecessor in title applied to DEP's predecessor agency, the Department of Environmental Regulation (DER), for a dredge and fill permit to rehabilitate the 61 existing wet slips at the Marina and add 113 new wet slips. Because Deep Lagoon violated Class III water quality standards, and there was concern for the West Indian manatee, a listed endangered species which uses the waters in and around Deep Lagoon, DER placed conditions on the permit and gave notice of intent to grant the permit, with conditions, on July 26, 1988. Petitioner and others challenged the issuance of the permit, and formal administrative proceedings were conducted, culminating in a final order on August 24, 1989, approving the permit, with additional conditions, and certifying under the federal Clean Water Act that state water quality standards were met because there would be a net improvement in water quality of the poorly-flushed canals. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 11 F.A.L.R. 4710 (DER 1989). Wetland Resource Permit 361279929, incorporating all of the conditions, was issued on September 22, 1989, for construction and operation of the project for five years (the 1989 Permit). Petitioner and the others appealed the final order. In Sheridan v. Deep Lagoon Marina, 576 So. 2d 771, 772 (Fla. 1st DCA 1991), the court, relying on the 1987 water quality data, noted the "very poor water quality" of Deep Lagoon, as reflected in part by the presence of oil and grease 20 times the Class III standard, copper 13 times the standard, lead 20 times the standard, mercury 1000 times the standard, and coliform bacteria "too numerous to count." However, the court affirmed the issuance of the 1989 Permit under the statutory authorization of a permit where ambient water quality does not meet applicable standards, but the activity will provide a net improvement to the waters. On the certification issue, though, the court reversed and remanded. The court held that the hearing officer erroneously excluded evidence on DER's certification of the activity as in compliance the federal Clean Water Act. Following proceedings on remand, DER entered Final Order on Remand on April 10, 1992, which revoked the earlier certification of compliance and, citing 33 United States Code Section 1341, as authority, waived certification as a precondition to federal permitting. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 14 F.A.L.R. 2187 (DER 1992). The 1989 Permit expired on September 22, 1994, but Environmental Resource Permit 362504599 was issued on October 9, 1995, essentially extending the 1989 Permit conditions for ten years, to October 9, 2005. Minor modifications were approved on November 17, 1995, March 26, 1997, and April 15, 1997. Environmental Resource Permit 362504599, with all conditions and subsequent modifications, is referred to as the 1995 Permit. Permit Conditions In general, the 1995 Permit authorizes the owner of the Marina: to renovate and expand an existing marina from 61 wet slips to 174 wet slips by: excavating 0.358 ac of uplands to create a flushing canal, installing 375 linear feet of seawall along the sides of the flushing canal, excavating 2.43 ac of submerged bottom to remove contaminated sediments, backfilling 2.41 acres of the dredged area (the main basin and south canal to -7 ft. MLW and the north canal to -6 ft. MLW) with clean sand, renovating the existing 61 slips, and constructing an additional 14,440 square feet of overwater decking for 113 new slips, providing after-the-fact authorization for construction of 2 finger piers, creating a 400 sq. ft. mangrove fringe, constructing 180 linear feet of seawall in the vicinity of the mangrove fringe, and relocating and upgrading fueling facilities. The 1995 Permit authorized activities to proceed in three phases: First, the majority of the water quality improvement measures will be implemented as required in Specific Condition 5. Second, the over water docking structures will be constructed and the fueling facilities will be upgraded and relocated as required in Specific Conditions 6 and 7. Third, the new slips will be occupied in accordance with the phasing plan in Specific Condition 9. Specific Condition 5 imposed several requirements designed "to ensure a net improvement in water quality." Among them, Specific Condition 5 stated in pertinent part: In order to ensure a net improvement to water quality within the basin, the construction of any new docking structures or installation of any new pilings shall not occur until the below-listed conditions (A-K) have been met. . . . A baseline water quality study . . .. A stormwater treatment system providing treatment meeting the specifications of Florida Administrative Code 40E-4 for all discharges into the basins from the project site shall be constructed. . . . The boat wash area shall be re-designed and constructed as shown on Sheets 23 and 23A. All water in the washdown area shall drain into the catch basin of the wastewater treatment system shown on Sheet 23. The water passing through the wastewater treatment system shall drain to the stormwater management system which was previously approved by the South Florida Water Management District. The filters of the wastewater treatment system shall be maintained in functional condition. Material cleaned from the filter shall be disposed of in receptacles maintained specifically for that purpose and taken to a sanitary landfill. This system shall be maintained in functional condition for the life of the facility. Contaminated sediments shall be dredged from the areas shown on Sheets 5 and 7 of 23. A closed-bucket clam shell dredge shall be used. The north canal shall be dredged to at least -9.9 feet MLW and backfilled with clean sand to -6 feet MLW. The [main] basin shall be dredged to at least -7.3 feet MLW and backfilled with clean sand to -7 feet MLW. The south canal shall be dredged to at least -10.5 feet MLW and backfilled with clean sand to at least -7.0 feet MLW. Backfilling shall be completed within 120 days of completion of dredging. . . . The sediments shall be placed directly in sealed trucks, and removed to a self-contained upland disposal site which does not have a point of discharge to waters of the state. A channel, 260 ft. long, 60 ft. wide, with a bottom elevation of -4.5 ft. MLW shall be excavated between the north canal and the main basin to improve flushing. * * * K. Upon completion [of] conditions A-J above, renovation of the existing 61 wet slips and construction of the 113 additional wet slips may proceed with the understanding that construction of all 113 additional slips is at the risk of the permittee and that if the success criteria in the monitoring and occupancy program are not met, removal of all or part of the additional slips may be required by the Department. Specific Condition 8 addressed the phasing of occupancy of the wet slips. Specific Condition 8 provided in pertinent part: Occupancy of the additional 113 wet slips shall occur in two phases, described below. Permanent occupancy of the slips shall require [DEP] approval, contingent upon the water quality monitoring program demonstrating a statistically significant (Specific Condition 9) net improvement for those parameters which did not meet State Water Quality Standards in the baseline study. The permittee agrees that if [DEP] determines that net improvement has not occurred, or if violations of other standards occur, and if the corrective measures described in Specific Condition 10 are not successful, all of the additional slips occupied at that time shall be removed. . . . Phase I--Upon completion of the baseline water quality study and the work specified in Specific Condition No. 5, the existing 61 slips and an additional 56 slips, totalling 117 slips, may be occupied. . . . If at the end of one year of monitoring, the data generated from the water quality monitoring program shows a statistically significant improvement over baseline conditions, for those parameters in violation of State Water Quality Standards, and no violations of additional parameters, . . . the new 56 slips which were occupied shall be considered permanent. Phase II--Upon written notification from [DEP] that Phase I was successful, the remaining 57 additional slips may be occupied. Water and sediment quality monitoring shall continue for two years after the occupancy of 140 of the 174 slips. If a statistically significant net improvement to water quality over baseline conditions for those parameters in violation of State Water Quality Standards [sic] and no violation of additional parameters is shown by the monitoring data, and confirmed by [DEP] in writing, the additional slips shall be considered permanent. Specific Condition 11 added: Implementation of the slip phasing plan described in Specific Condition 8 shall be contingent on compliance of boaters with existing speed zones in the Caloosahatchee River and trends in manatee and [sic] mortality. . . . Approval of additional slips will depend upon manatee mortality trends and boater compliance with speed zones in the Caloosahatchee River and additional slips may not be recommended. . . . Based on the results of the evaluations of Phases I and II, [DEP] may require that slips be removed to adequately protect manatees. Specific Condition 12 required the construction of a 400 square-foot intertidal area for the planting of mangroves to replace the mangroves lost in the construction of the flushing channel. Specific Condition 14 prohibited live-aboards at the marina. Specific Condition 15 added various manatee-protection provisions. Applicant's DOAH Case Nos. 98-3901 and 98-5409 Seeking to satisfy certain of the requirements of Specific Condition 5 of the 1995 Permit, Applicant filed with DEP, on December 10, 1997, an application for an Environmental Resource Permit (ERP) and water quality certification to construct a surface water management system to serve 15.4 acres of its 24-acre marina. On March 3, 1998, Applicant's engineering consultant submitted drawings to DEP with notification that Applicant intended to "maintenance dredge the internal canals of Deep Lagoon Marina," in conformity with Rule 62-312.050(e), Florida Administrative Code. The letter described the proposed dredging as mechanical "with no discharge back into Waters of the State." The letter assured that Applicant's contractor would use turbidity curtains "around the dredging and spoil unloading operation" and advised that the contractor would unload the spoil "to the north peninsula upland area." The letter stated that the dredging would "be to the design depth/existing canal center line depth of -7 NGVD," which was established by the 1995 Permit, and would be "done in conjunction with the required dredging under [1995 Permit] Condition 5(D)." The consultant attached to the March 3 letter several drawings showing the dredging of all three canals. For each canal, the drawings divided the dredging into two areas. (For 1.82 acres, the contractor would dredge contaminated materials from the dead-ends of the three canals and then replace these materials with clean backfill material, as already authorized in the 1995 Permit.) For 4.84 acres, which ran through the remainder of the three canals, the contractor would maintenance dredge in accordance with the cross-sections provided with the letter. By letter dated March 13, 1998, DEP stated its determination that, pursuant to Rule 40E-4.051(2)(a), Florida Administrative Code, the proposed activity was exempt from the requirement to obtain an ERP. The letter warned that, pursuant to Chapter 62-302, Florida Administrative Code, the construction and operation of the project must not cause water quality violations. The letter added that DEP could revoke its determination of exemption if the "basis for the exemption is determined to be materially incorrect, or if the installation results in water quality violations." The letter provided a point of entry for persons whose substantial interests are affected by DEP's determination. Petitioner challenged the exempt status of the maintenance dredging, and STMC intervened in support of the challenge, which was referred to DOAH and given DOAH Case No. 98-3901. But Applicant's contractor proceeded during the pendency of the challenges and completed the maintenance dredging in the three canals. (Applicant's contractor also performed the contaminant dredging and clean backfilling authorized by the 1995 Permit.) On November 5, 1998, DEP gave notice of intent to issue the ERP for the surface water management system and certify compliance with state water quality standards, pursuant to Section 401 of the Clean Water Act, 33 United States Code, Section 1341. Petitioner filed a challenge on December 8, 1998, and the matter was referred to DOAH, where it was given DOAH Case No. 98-5409. On February 6, 1999, DEP revised the notice of intent by withdrawing its certification of state water quality compliance. As it did with the 1989 Permit, DEP again waived state water quality certification, consistent with a letter dated February 2, 1998, in which then-DEP Secretary Virginia Wetherell announced that DEP would waive state water quality certification for all activities in which the agency issues an ERP based on the "net improvement" provisions of Section 373.414(1)(b), Florida Statutes. DOAH Case Nos. 98-3901 and 98-5409 were pending when Applicant sought the modifications to the conditions of the 1995 Permit which are the subject of this case (DOAH Case No. 99- 2234). DOAH Case Nos. 98-3901 and 98-5409 were consolidated and heard by Administrative Law Judge (ALJ) Robert E. Meale on February 11 and May 3-4, 1999. On November 24, 1999, ALJ Meale entered a Recommended Order recommending a final order revoking DEP's determination of an exemption for maintenance dredging in DOAH Case No. 98-3901 and denying the ERP in DOAH Case No. 98- 5409. The recommendation to deny the ERP in DOAH Case No. 98- 5409 was based on findings and conclusions: (1) that Applicant had not provided reasonable assurances that the construction and operation of the proposed surface water management system would result in a "net improvement" in water quality; and (2) that the direct and secondary impacts of the construction and operation of the system would adversely affect the West Indian manatee. Water Quality As indicated in relating the permitting history of this site, water quality in the waters of the Marina has been poor. See Findings 10 and 12, supra. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is laden with sediments, partly due to intermittent discharges from Lake Okeechobee. Seagrass in the riverbottom cannot grow in water much deeper than four feet. Some seagrass grows at the mouth of Deep Lagoon, but little seagrass extends into the lagoon itself. The water quality in the canals is very poor for dissolved oxygen and copper. Applicant stipulated that the water quality in Deep Lagoon violates state standards for dissolved oxygen, copper, and coliform bacteria. In 1997, the canals violated water quality standards for dissolved oxygen nearly each time sampled during the wet season and one-third of the times sampled during the dry season. The dissolved oxygen levels violated even the lower standards for Class IV agricultural waters two-thirds of the times sampled during the wet season. In 1997, the canals violated water quality standards for copper in the water column each time sampled during the wet season and two-thirds of the times sampled during the dry season. During three of the dry season samplings, copper levels were 20 to 30 times lawful limits. The three lowest wet season copper levels were double lawful limits. Copper is a heavy metal that is toxic to a wide range of marine organisms. Copper is applied to boat hulls to prevent marine life from attaching to the hulls. In 1997, the canals violated water quality standards for total coliform bacteria (for any single reading) three of the 60 times sampled during the dry season and one of the 56 times sampled during the wet season. The canals violated the more relaxed, 20-percent standard (which is violated only if 20 percent of the readings exceed it) during the wet season, but not during the dry season. In 1997, the canals violated water quality standards for lead in the water column in one sample (by 25 percent) out of 36, but did not violate water quality standards for oil and grease or fecal coliform bacteria. Results of testing for mercury in the water column (as opposed to sediments) are not contained in the record. As compared to 1987, the water quality in the canals has improved in all but one important respect. In 1987, the water column readings for copper were five to six times higher than the highest 1997 reading. In 1987, the total coliform bacteria were too numerous to count because the colonies had grown together in the sample. However, comparing the April 1987 data with the May 1997 data for the same approximate times of day and the same locations, the dissolved oxygen levels in the three canals have declined dramatically in the last 10 years. Ten years ago, in a one- day sampling period, there were no reported violations; ten years later, in a one-day sampling period, there were four violations. Even worse, the amount of dissolved oxygen in the water during daylight hours has been halved in the last 10 years with a smaller decrease during nighttime hours. In this case, the parties stipulated that the waters of Deep Lagoon and the Marina are Class III marine waters that do not meet Florida water quality standards for dissolved oxygen, copper, and total coliform bacteria. They also stipulated that there were violations in 1987 for oil and greases (20 times standard), fecal coliform (too numerous to count), lead (20 times standard), cadmium (ten times standard), mercury (1,000 times standard), biological diversity, and tributytin (150 times standard) (although DEP and Applicant do not think the 1987 data are relevant). Data collected in 1987 showed average flushing time in the north canal to be 183 hours (tidal prism method), 90.5 hours (current velocity), and 50 hours (dye concentration reduction method). Data collected in 1987 showed average flushing time in the main basin to be 208 hours (tidal prism method), 48 hours (current velocity), and 154 hours (dye concentration reduction method). Manatees The parties stipulated that Lee County is a heavy use area for the West Indian Manatee and that manatees use the water south of Deep Lagoon and the Caloosahatchee River on a year-round basis. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is critical habitat for the endangered West Indian manatee. Up to 500 manatees use the river during the winter. When, during the winter, the water cools, the animals congregate in waters warmed by the thermal discharge from a power plant about 13 miles upstream of Deep Lagoon. When, during the winter, the water warms, the manatees swim downstream, past and into Deep Lagoon searching for food. Manatees frequently visit Deep Lagoon. It is one of the few places between the power plant and the Gulf where manatees can find a quiet place, relatively free of human disturbance, to rest and feed. Within Deep Lagoon, the Iona Drainage District ditch runs parallel to the north canal, separated from the canal by the previously described mangrove fringe. The Iona Drainage District ditch empties into Deep Lagoon just north of the mouth of the north canal. Manatees frequently visit the ditch because it is a seasonal source of freshwater, which the manatees drink. Manatees visit the north canal due to its moderate depths and proximity to the freshwater outfalls of the Iona Drainage District ditch. Manatee mortality from watercraft is extremely high in the immediate vicinity of Deep Lagoon, and the mortality rate has increased in recent years. The rate of manatee deaths from collisions with watercraft has increased with the popularity of motorboating. Boat registrations in Lee County rose from 13,000 in 1974 to 36,000 in 1997. The potential for mitigation offered by the enactment of speed zones has been undermined by the fact that nearly half of the boaters fail to comply with the speed limits. It is clear that manatees frequent Deep Lagoon near the mouth of the north canal. There are seagrass beds there to serve as a food source, and freshwater from the Iona Drainage District ditch discharges in that area. The evidence in this case includes testimony and numerous photographs of manatees not only in that vicinity but up to 200 feet into the north canal. While there are no seagrass beds in the north canal itself, freshwater from the Iona Drainage District ditch discharges into the north canal all along the length of mangrove fringe on the north shore of the canal. It is not clear how much further up the north canal manatees go, but they probably frequently continue further into the north canal since one primary attraction of the north canal for manatees at this time is its relative quiet and peacefulness. Manatees also make some use of the central and south canals of the Marina, but they seem to prefer the north canal for its peacefulness and for the fresh water supply from the Iona Drainage District ditch. The Florida Department of Transportation recently has constructed a retention pond for MacGregor Boulevard in the vicinity of the Marina which will discharge fresh water into the main basin of the central canal. This may make the central canal more attractive to manatees than it is at this time, notwithstanding the relatively high level of boating-related activity there. New Boat Travel Lift The Marina's existing boat travel lift is located in the main basin of the central canal. There also are the remnants of an older travel lift operation at the western end of the central peninsula extending into Deep Lagoon. Applicant proposes to construct and use a new boat travel lift at the eastern terminus of the north canal. The proposed location of the new travel lift will be closer to the approved location of a new service center building. A travel lift essentially consists of a heavy-duty, U-shaped frame which is built on wheels and motorized for mobility. Heavy-duty straps are suspended from the frame using pulley systems. The travel lift is driven out over water on specially-built tracks so the straps can be placed underneath large vessels (over 40 feet) and tightened using the pulleys to secure the vessels; the travel lift is then driven off the tracks, and the vessels are transported to a dry storage or repair location, where the vessels are lowered, and the straps are removed. The process essentially is reversed to return vessels to the water. The direct impact of construction of the new boat travel lift involves removal of some mangroves existing at the terminus of the north canal and sinking pilings to support the tracks extending into the water on which the travel lift operates. Applicant proposes to mitigate the mangrove impacts by filling areas on either side of the proposed travel lift to just above the mean-high waterline and planting the areas with mangroves. Not only will this be a net increase the amount of mangrove fringe, the decrease in water depth at the east end of the north canal also will improve flushing of the canal to some extent. Applicant also proposes to remove exotic plants all along the shoreline of the Marina's canals for the life of the Marina. It is the Marina's intent to use the travel lift only for vessels too large to be lifted by forklifts operated at the main basin of the central canal. The Marina is purchasing new, larger (37,000 pound) forklifts (compared to the 10,000 pound forklifts currently in use), which can lift vessels up to approximately 42 feet long. Use of the larger forklifts will reduce the use of the travel lift. At this time, there is no proposed specific condition to limit use to the travel lift to vessels too large to be lifted by the new forklifts. New Specific Condition 33 in the proposed permit modifications provides: "Launching of vessels from the dry storage facilities shall be prohibited in the north canal at the site." New Specific Condition 34 in the proposed permit modifications provides in part: "Launching and retrieval of vessels in the north canal shall be restricted to vessels stored/moored at the marina facility that require boat repair." New Specific Condition 34 also would require Applicant to maintain logs for the travel lift and boat repairs to allow DEP to verify compliance by comparing the two logs. There was some disagreement as to the intent of the quoted proposed new specific conditions. A DEP witness thought it meant that the Marina only could use the travel lift for repair of vessels permanently moored at the Marina, but the Marina's representative did not think the language would prohibit the repair of other vessels as well. Assuming that vessels not permanently moored at the Marina will be accepted for repairs, and that only vessels too large for the new forklifts will use the new travel lift, it can be anticipated that an average of 6-10 vessels a week will use the travel lift for retrieval from the water and discharge back to the water. To some extent, use of the travel lift is limited by the average time it takes to use the lift. But considering only those limitations, it is possible use the lift as many as 19 times in a day in an emergency--e.g., when a hurricane is approaching, and the Marina is trying to get as many boats out of the water as possible. On average, use of the travel lift also will be limited by market conditions and the capacity of the new service center to store and repair large vessels. More than half of the average use of 6-10 vessels a week probably will occur on Fridays (for repairs before peak weekend boating) and Mondays (for repairs after the weekend peak). At this time, there is no proposed specific condition to limit use of the new travel lift. But at final hearing, the Marina expressed its willingness to accept a limit of an average of ten vessels a week. (Counting retrieval from the water and discharge back to the water for each vessel, the agreed limit would be an average of 20 uses of the travel lift a week). The Marina was not willing to accept a daily limit. Secondary impacts from such a limited use of the proposed new travel lift on water quality and manatees are difficult to assess precisely. The travel lift itself uses some form of lubrication, but only the straps enter the water during operation. Historically, vessels have been pressure-washed and had their bilges and engines flushed while on the existing travel lift in the main basin of the central canal at the Marina, and wash-water from these operations has entered the main basin at that location. Wash-water from such operations at the proposed new travel lift location would enter the north canal, subject to the construction and operation of an adequate surface water management system, as required by Specific Condition 5.C. of the 1995 Permit. Cf. DOAH Case No. 98-5409, supra. It is possible that vessels in need of repair entering the north canal and proceeding to the proposed new travel lift location (whether under power or being towed) could leak oil or gasoline. Both contaminants would rise to the surface. Leaked gasoline and the more volatile components of oil could be expected to evaporate relatively quickly; the residue of oil contamination would be persistent. Such spills would affect water quality and could affect manatees drinking fresher water from the surface of the north canal. There was no evidence from which to predict or quantify such impacts. It would be possible for manatees to be injured by vessels using the proposed new travel lift. Although such vessels would be traveling at low speed (1-2 mile per hour), maneuvering such large vessels in close quarters like the north canal sometimes is accomplished by intermittent bursts of high engine and propeller speeds, both in forward and reverse gears. Such operations could cause a vessel to lurch in the direction of a manatee; if done in reverse gear, a manatee could be sucked into the speeding propellers. It also is possible for a manatee to be crushed against the bottom or against a structure of the Marina facility during such operations. Despite the possibility of injury to manatees from use of the new proposed travel lift, it is clear that most manatee injuries and deaths from boat collisions occur as a result of propeller injuries from boats being operated at high-speed. Manatees are known to frequent and safely use marinas where large vessels operate at low speed. The risk of danger to manatees from use of the proposed new travel lift can be characterized as being minimal if not speculative, especially in view of the manatee protections in Specific Condition 15 of the 1995 Permit. Initially, DEP misunderstood the nature of the proposed new travel lift, thinking it would greatly increase boat traffic in the north canal. When the minor impact of the project was explained, DEP's concerns were allayed. Greater risk of danger to manatees would occur from the addition of wet slips in the north canal, but those impacts are not secondary to the travel lift proposal; they are completely separate impacts that are governed by the pre-existing 1995 Permit. Petitioner and Intervenor were critical of the absence of a specific condition for the daily logs to be presented to DEP for inspection on a regular basis. See Finding 42, supra. They contended that absence of such a requirement would compromise compliance enforcement. But DEP inspection of the logs at times of its own choosing could be just as effective. The key to enforcement is having an enforceable specific condition limiting use of the travel lift. Petitioner and Intervenor also were critical of using a simple weekly average to limit use of the new travel lift. They correctly argue that the time over which the weekly average would be computed must be designated for such a use limitation to be enforceable. They also contend that there should be a daily limit. Assuming a weekly average limitation of ten, a daily limit of ten would not be unreasonable if it allowed leeway to exceed the daily limit in cases of emergencies such as approaching hurricanes. Replacing Flushing Channel with Culverts Applicant's proposal to replace the 60 foot by 4.5 foot-deep flushing channel with two 48-inch culverts is motivated by practical considerations. Applicant essentially wishes to avoid the expense of constructing the channel required under the 1995 Permit and having to bridge the channel to make use of the peninsula between the central and north canals. Part of the Marina's initial motivation for the channel was to expand operations and allow access to the north canal from the main basin. Part of the channel was to have been used by the Marina as a new forklift area with access to boat storage areas on both sides of the channel. In the 1989 Permit, it was stated that the channel was "to act as a sediment sump." It was not until the 1995 Permit that the channel was said to serve to "improve flushing." Most of the "net improvement" of water quality at the Marina was to come from proposed contamination dredging of the canals (and backfilling with clean sand), removal of contaminated soil from Marina uplands, installation of a redesigned boat-wash area, and installation of an adequate surface water management system. Most flushing benefits were anticipated to come from making the canals shallower by back-filling after dredging. Flushing from the channel was presented as "frosting" on the "net improvement cake." The hydrographic evidence was that the channel, in conjunction with back-filling the Marina's canals, would indeed increase flushing of the Marina's canals to some extent. Looking at the main basin only, the channel would improve flushing by up to 27 percent. But looking at the Marina's canals overall, the channel would only increase flushing by up to 0.6 percent. By comparison, the hydrographic evidence was that the proposed flushing culverts also would contribute to increased flushing but by a smaller amount. Looking at the main basin only, the proposed flushing culverts would improve flushing by up to 4 percent. Looking at the Marina's canals overall, the proposed flushing canal would only increase flushing by up to 0.2 percent. Petitioner and Intervenor question the reliability of Applicant's calculations of flushing times without more up-to- date data on the depths of the canals after contamination and maintenance dredging. But the evidence was that differences in the starting depths would not have a significant effect on the relative changes in flushing times from the channel versus the culverts; the differences would be approximately proportional regardless of the starting depths. In addition, the depths assumed in Applicant's calculations are based on the 1987 data and the requirements of the 1995 Permit. Compliance with the requirements of maintenance dredging and the 1995 Permit can be enforced, if necessary, in other proceedings. See, e.g., DOAH Case No. 98-3901, as to maintenance dredging. Applicant's calculations on flushing times do not account for the possibility of an additional benefit from the proposed flushing culverts. Applicant proposes to locate the culvert inverts at a depth of 6 feet. If a greater salinity gradient exists at that depth, the culverts would have a relative advantage over a 4.5 foot-deep channel in terms of flushing and the exchange of more oxygenated water between the north canal and the main basin. The existence of such a salinity gradient is suggested by data collected in 1997. But salinity gradients are not constant, and water samples were collected only during one 24- hour period in May 1997 and another 24-hour period in September 1997. In addition, no data has been collected after the maintenance and contamination dredging. The sampling in this case was too limited to give reasonable assurance that the proposed flushing culverts would have advantages over the required channel in promoting of flushing. Petitioner and Intervenor contend that changing the open channel to closed culverts would decrease the benefit of oxygen exchange in an open-channel system. It is true that, generally, more oxygen would be introduced in an open system. But the evidence was that none of the "net improvement" to water quality from the specific conditions to the 1995 Permit was anticipated to derive from increases in dissolved oxygen from oxygen exchange in the channel. Conversely, Applicant contended that the proposed culverts would decrease the chances of contamination from the uplands, as compared to an open channel. But there was no specific evidence to support or quantify this speculative benefit. In addition, required improvements in surface water management at the Marina would reduce any such benefits from the culverts. See, Specific Condition 5.B. and DOAH Case No. 98-5409. Approximately 60 feet of mangrove fringe would have to be removed from the north canal to accommodate a flushing channel. In contrast, only approximately 8 feet of mangrove fringe would have to be removed to accommodate the proposed culverts. But there was no evidence as to how removing less of the mangrove fringe would improve flushing or water quality. In addition, Specific Condition 12 of the 1995 Permit required replacement of the mangroves lost in the construction of the flushing channel. There was no evidence that installation of flushing culverts instead of the flushing channel required under the 1995 Permit would have any impact on manatees.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order: granting Applicant's proposed modifications to the 1995 Permit, with the following additional modifications: No use of the new travel lift for boats less than 40 foot in length except in emergencies, e.g., approaching hurricane. Limitation on use of travel lift to a 28- day rolling average of ten vessels a week, except in emergencies, e.g., approaching hurricane. Prohibition against pressure-washing and flushing bilges and engines of vessels on the new travel lift except in the boat wash area to be constructed and operated in accordance with Specific Condition 15 of the 1995 Permit. A requirement to report and promptly clean-up any spills of oil or gasoline in the north canal related to operation of the new travel lift. waiving certification as a precondition to federal permitting under 33 United States Code, Section 1341. DONE AND ENTERED this 21st day of January, 2000, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of January, 2000. COPIES FURNISHED: T. Elaine Holmes, Esquire 14502 North Dale Mabry, Suite 200 Tampa, Florida 33618 David Gluckman, Esquire Gluckman and Gluckman 541 Old Magnolia Road Crawfordville, Florida 32327 Matthew D. Uhle, Esquire Humphrey & Knott, P.A. 1625 Hendry Street Fort Myers, Florida 33901 Francine M. Ffolkes Senior Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri Donaldson, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

USC (2) 33 U. S. C. 134133 U.S.C 1341 Florida Laws (12) 120.52120.569120.57120.60120.6826.012267.061373.406373.4136373.414373.421403.031 Florida Administrative Code (14) 40E-4.05140E-4.30140E-4.30262-312.01062-312.03062-312.05062-312.06062-312.07062-312.10062-343.07062-343.10062-4.04062-4.05062-4.080
# 1
CYNTHIA VALENCIC vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND SARASOTA COUNTY, 01-003535 (2001)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Sep. 06, 2001 Number: 01-003535 Latest Update: Jun. 07, 2004

The Issue The issue is whether Sarasota County's application for a permit authorizing the construction of a Class V, Group 3 aquifer storage and recovery well system at the Central County Water Reclamation Facility in Sarasota, Florida, should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background On September 14, 1999, the County, through its Utilities Department, filed with the Department an application for a permit to construct a Class V, Group 3 aquifer storage and recovery (ASR) test well and monitor well system at its Central County Water Reclamation Facility, 79005 South McIntosh Road, Sarasota, Florida. The Department is charged with the responsibility of issuing such permits. On July 19, 2001, the Department issued its Notice of Intent to issue Permit No. 160882-001-UC. The permit authorizes the County to construct one test well to determine the feasibility for the storage and recovery of reclaimed water from the Suwannee Limestone of the Upper Floridan aquifer system at a depth of between 500 and 700 feet below land surface. Also, the County is authorized to construct three monitor wells, one into the target storage zone, the second into the first overlying transmissive unit, and the last into the overlying Arcadia Formation. The storage capacity of the test well is projected to be between one and two million gallons per day. On August 10, 2001, Petitioner, who is a citizen of the State of Florida, resides in Tallahassee, and is a long- time employee of Legal Environmental Assistance Foundation, Inc., filed her verified Petition for Formal Administrative Hearing (Petition) under Sections 120.569, 120.57(1), and 403.412(5), Florida Statutes. In her Petition, she generally contended that the permitting would have the effect of impairing, polluting, or otherwise injuring the water of the State because the proposed injectate (being placed in the well) will not meet primary and secondary drinking water standards, may be harmful to human health, and will violate the minimum criteria for groundwater. She also contends that the permit application was not signed by the proper signatory and that the Department failed to require the County to first drill an exploratory well (as opposed to a test well). While these allegations were not sufficient to demonstrate that Petitioner's substantial interests were affected by the proposed permitting, they were deemed sufficient (subject to proof at final hearing) to satisfy the pleading requirements of Section 403.412(5), Florida Statutes. Water Reuse Generally Water reuse is the use of reclaimed water for a beneficial purpose. Because of Florida's continuing population growth and occasional water shortage, the use of reclaimed water is an important conservation tool. Indeed, in 2002 the Legislature showed strong support for water conservation and reuse by amending Section 403.064(1), Florida Statutes, and adding language which states that "the reuse of reclaimed water is a critical component of meeting the state's existing and future water supply needs while sustaining natural systems." To this end, the County has filed its application for the purpose of using reclaimed water for such lesser uses as irrigation so that the existing high quality fresh groundwater can be used for higher and better purposes such as drinking water for the general public. The Southwest Florida Water Management District (District) has also encouraged the use of reclaimed water by providing funding for this type of program to induce utilities to move forward with reuse programs. In addition, the Department has been proactive in promoting the reuse of water throughout the State in order to conserve water resources. Aquifer Storage and Recovery Aquifer storage and recovery (ASR) is a reuse program encouraged by the Legislature, Department, and District. It involves the storage of water underground in a suitable formation, through a well, during times when water is available to put into the well, and then recovery of that stored water from the well during times when it is needed for some beneficial purpose. Put another way, an ASR operates like an underground storage tank. Water is placed into the ASR wells (by means of pumping) during recharge periods when it is raining and there is no demand for reclaimed water. When the water is pumped into the well, a stored water bubble is created by using buffer zones made of water with more salinity than the stored water. These buffer zones are designed so that there can be full recovery of the stored water. The recovery rate is generally around 100 percent. There are three ways to store reclaimed water: surface ponds, storage tanks, and ASR. The ASR storage method is the most efficient method of storing reclaimed water, and it has significant environmental, utility, and economic benefits. The ASR method has no impact on wetlands and ecosystems, and unlike pond storage (and to a lesser degree storage tanks), it does not require the use of large surface areas and is not affected by evapotranspiration and seepage. (There is typically a 60 percent loss of water due to evaporation in surface storage areas.) It also results in cost savings (up to a 50 percent reduction in capital costs) and avoidance of wetlands impacts. One of the goals of the County's Comprehensive Plan is to maximize the use of reclaimed water for irrigation purposes. Because other storage methods have proved to be inefficient, ASR is the County's preferred storage method to meet this goal. At the time of the final hearing (August 2002), there were at least fifty-six ASR systems operating outside the State of Florida (and around one hundred more in various stages of development) and eleven ASR systems successfully operating in the State, the first one having been established in 1983. At that time, there were also two ASR test programs underway in the area, including one in the Englewood Water District, a few miles to the south of the proposed project, and the Northwest Hillsborough ASR program, which is located just north of the County. Also, ASR systems are located in Manatee County and near the Peace River, which is in the same storage area being proposed here. Therefore, the County has the benefit of drawing upon twenty years of experience with this type of system. The Permit The County began an informal water reuse program in 1988, when it first used effluent disposal for irrigation purposes at a local golf course. A formal program (the Reuse Master Plan) was commenced in 1994; however, the County still lacks the storage capacity to meet the seasonal demands of its reuse customers.3 Without storage, any excess water must be discharged and lost. In order to meet the County's goal of maximizing reclaimed water use, it must be able to adequately store reclaimed water. Due to projected population growth and issues concerning management of limited resources, in 1997 the County began considering the use of ASR as a means to better manage its reclaimed water supply and demand for those facilities which serve the North County Reuse System. If all necessary permits are obtained, the County intends to use reclaimed water from its Central County wastewater facility. Currently, that effluent receives advanced tertiary treatment with deep bed filtration and high level disinfection. The proposed test well will be approximately 700 feet deep; at that depth, the injection (or storage) zone will consist of the Suwannee Limestone formation of the Upper Floridan aquifer system. The storage zone is brackish, with the water quality or salinity having about six times the acceptable degree of salinity for a drinking water source. It is anticipated that the total dissolved solids (TDS) concentration in the injection zone will be greater than 3,000 TDS. If water quality at the proposed injection zone is greater than 3,000 TDS, this fact will be revealed during the construction of the test injection well and during the various tests to be conducted during construction. (Assuming this level of TDS is found, then at that point the County would have to provide reasonable assurance that the water reclamation facility is providing full or principal treatment to the domestic waste.) The evidence establishes that there is some level of transmissivity in the confining layer overlying the proposed injection zone. That is to say, there is some small degree of connectivity between the proposed injection zone and the aquifer above it. The actual level of transmissivity will be determined based upon tests run during the construction of the first monitor well. The effluent produced from the County's water reclamation facility meets drinking water standards. If the plant is unable to produce effluent that meets or exceeds the applicable water quality standards, this issue is an operational concern which can be addressed in a permit modification authorizing operational testing. Under the Department's permit process, if the construction permit is approved, the County will construct a monitor well to obtain more site-specific information concerning such things as the geology, hydrology, and water quality at the site. (At this point, while the County has published literature sources and regional geologic information from two nearby ASR systems using the same storage area to rely upon, it has no specific data for the very small parcel where the well will be constructed.) Once the information is obtained, an engineering report is prepared and submitted to the Department. That report contains a wide array of technical data, including construction data, hydrogeologic data, formation samples, water quality samples, hydraulic data, core data, Packer data, and geophysical data. This information is then used by the Department (and a special advisory committee called the Technical Advisory Committee) to evaluate whether the site can be authorized for cycle testing and later for operational purposes. If cycle testing is appropriate, the County must then request a modification to its construction permit to authorize cycle testing of its ASR well. That modification, and any others that may be warranted by the new information, are "final agency action subject to the procedural safeguards contained in Chapter 120, F.S." Fla. Admin. Code R. 62- 528.100(2). When the test injection well is constructed and eventually placed into operation, monitor wells will be used to monitor background water in both the injection zone and in the two aquifers overlying the proposed injection zone. However, until further Department approval is obtained, no injection of reclaimed water is authorized; the permit being sought here authorizes only the construction of the well itself. Finally, Florida Administrative Code Rule 62- 528.640(1)(a) requires that the County obtain a separate operation permit after the construction permit has been issued and testing completed. Criteria and Standards for a Class V Well Florida Administrative Code Chapter 62-528 governs all injection wells defined as Class I, III, IV, or V wells. (In Class II wells, the injected fluids are used in connection with oil and natural gas production and are regulated by the Florida Geological Survey under Chapter 377, Florida Statutes.) The category of wells in which the County seeks a permit is a Class V, Group 3 permit, which includes all domestic wastewater wells. See Fla. Admin. Code R. 62- 528.300(1)(e)3. A Group 3 well involves the injection of fluids that have been processed through a permitted domestic wastewater treatment plant. Even though the County is requesting a permit for a Class V well, at the request of the Department, it submitted a different (and more stringent) type of application (a "900" application) since the Department has the authority to apply "any of the criteria for Class I wells" if it believes that the well may cause or allow fluids to migrate into an underground source of drinking water which may cause a violation of primary or secondary drinking water standards. See Fla. Admin. Code R. 62-528.605(2). (A Class I well is a well used to inject hazardous waste below the lowermost formation containing an underground source of drinking water.) In this case, the Department opted to apply certain Class I construction standards for the well, in addition to the normal standards for Class V wells. Those standards are found in Florida Administrative Code Rule 62-528.400. This means that the County will be held to a higher standard than a general underground injection control permit. Florida Administrative Code Rule 62-528.605 contains the Class V well construction standards. For the following reasons, the County has given reasonable assurance that all criteria will be met. Subsection (1) of the rule requires that "a well shall be designed and constructed for its intended use, in accordance with good engineering practices, and the design and construction shall be approved by the Department with a permit." The evidence clearly establishes that good engineering practices have been followed by the County for the design and construction of the well. Subsection (2) requires that an applicant design and construct the well so that it will not "cause or allow fluids to migrate into an underground source of drinking water which may cause a violation of a primary or secondary drinking water standard . . . or may cause fluids of significantly differing water quality to migrate between underground sources of drinking water." Subsection (3) is also directed at the migration of fluids. The evidence shows that the migration of fluids between aquifers will be prevented as a part of the design and construction of the ASR well program. The design chosen by the County has been proven to prevent migration of fluids between aquifers, and it will preserve the integrity of the confining beds. The combination of steel casing and cementing prevents the migration of fluids along the borehole. The well will be constructed by a Florida licensed contractor, as required by Subsection (4). The remaining criteria in the rule will be satisfied during the construction process. Florida Administrative Code Rule 62-528.620 contains reporting requirements for Class V wells. All of these requirements are included in the draft permit and will be met by the County. The Department has also included Special Condition 1(h) in the draft permit, which provides that nothing will be injected into the well that does not meet the Federal Primary Drinking Water Standard. This condition is drawn from Florida Administrative Code Rule 62-528.307, which specifies general conditions to be included in underground injection control permits. In accordance with this condition, the County will monitor the movement of fluid to ensure that there are no violations. The County has also demonstrated that there will be no hazardous waste injection, as prohibited by Florida Administrative Code Rule 62-528.600(1)(a). Finally, the requirements of Florida Administrative Code Rule 62-528.630(3) do not apply at this time since the proposed permit is only for construction of a well, and not the injection of water. Class I Well Construction Standards Because the Department has imposed more stringent construction standards on the County, the Class I well construction standards found in Florida Administrative Code Rule 62-528.410(1) come into play. The County has demonstrated that it has complied with the requirement that the well be cemented and cased. In addition, the County has considered corrosion protection in the cementing and casing of the proposed well. Because the casing will be cemented, coating is not required. Finally, there will be no open annulus (spacing between the casings and the bore hole) in the ASR test well. Other Requirements Drilling Geophysical surveys will be conducted during the pilot hole drilling stages to collect hydrogeologic information. Further, drill stem tests will be conducted throughout the drilling, and a driller's log will be maintained. See Fla. Admin. Code R. 62-528.410(3). Casing Steel casing will be used, taking into consideration the possible corrosion of steel. The life expectancy of the well was considered, as required by Florida Administrative Code Rule 62-528.410(4)(a), and was determined to be unknown. Cement Type 2 cement will be used, which is sulfate resistant and is specifically designed for use in regions such as Florida. Testing Geophysical logs will be used during the construction and testing of the well to verify the physical conditions of the well and confirm that construction is proceeding according to the plan. Also, geophysical surveys will be conducted during pilot hole drilling stages to collect subsurface hydrogeologic information. Environmental concerns Once a drilling contractor is selected, the location for the disposal of drilling fluids will be submitted for Department approval in accordance with Special Condition 1(b) in the draft permit. Monitor well construction standards The monitor well will meet all construction requirements under Florida Administrative Code Rule 62- 528.420. (The same standards that are applied to Class V wells are also applied to monitor wells.) General design considerations Exploratory pilot hole drilling stages will be conducted to collect hydrogeologic information, and complete sets of geophysical surveys will be performed. Because cement generates heat, temperature surveys will be run as a part of the construction sequence to verify coverage of the cement. This means that tools will be lowered into the hole after each cementing stage to verify coverage. Monitoring requirements Florida Administrative Code Rule 62-528.425(1)(d) requires that an applicant perform "a demonstration of mechanical integrity . . . at least once every five years during the life of the well." Details to accomplish this are found in both the application and the draft permit. Florida Administrative Code Rule 62-528.425(1)(f) requires that the background water quality of the injection zone and monitoring zone be determined prior to injection. The County will perform this task before injection occurs. Florida Administrative Code Rule 62-528.425(1)(g) requires that monitor wells be installed above the injection zone near the project. The County will construct three wells, as required by the rule. They will also be placed at a sufficient distance from the project, as required by Florida Administrative Code Rule 62-528.425(1)(h), and the specific monitoring intervals are detailed in the draft permit. Reporting requirements The Department requires periodic data reports and progress reports regarding eight separate types of information. See Fla. Admin. Code R. 62-528.430(1)(a). These reporting requirements will be performed and followed. Because a Class V well may be required to be plugged and abandoned, the Department requires a plugging and abandonment report. See Fla. Admin. Code R. 62-528.625. All requirements under this rule have been met, and the County has the financial resources to accomplish this task, when required. General Class I permitting requirements Florida Administrative Code Rule 62-528.440 sets forth general permitting requirements for Class I and III wells. Because the Department has opted to impose certain Class I criteria on the County's application, some of the criteria in this rule apply. They include special conditions 1(a), (c), and (e) in the permit for well construction, system modification, and fluid injection, all of which have been, or will be, met by the County. In addition, the duration for the operation permit cannot exceed five years, and the County was required to submit an application for a permit which conformed with the requirements of the rule. As a part of its application, the County established an area of review for the construction permit, taking into account the zone of endangering influence. See Fla. Admin. Code R. 62-528.300(4). (An area of review is the area surrounding an injection well, including the area of possible endangering influence.) This requirement was met because the established area of review is one mile even though the predicted area of influence is expected to be no more than 400 feet. As a part of the preceding analysis, the County also conducted an area of review study, as required by Florida Administrative Code Rule 62-528.440(6)(a). In doing so, the County evaluated the impact on the ASR well, and the impact the ASR well would have on the surrounding area. That evaluation determined that there are no water supply wells within the area of review. Because the construction permit only has a duration of five years, and given the County's supporting information submitted with the area of influence study, the Department has not required that the County provide a corrective action plan. See Fla. Admin. Code R. 62-528.300(5)(a). Class I well construction permit criteria All guidelines for constructing the well have been followed, and the construction of the well will not be a source of pollution. The County has provided reasonable assurance that the project will function in accordance with the requirements of Florida Administrative Code Chapter 62- 528. Hydrological modeling Finally, Florida Administrative Code Rule 62-528.405 specifies criteria for evaluating the geologic and hydrologic environment of Class I wells. The County has satisfied all criteria in the rule. Other Issues Exploratory well Petitioner contends that the Department should require the County to construct an exploratory well, as defined in Florida Administrative Code Rule 62-528.603(1), rather than a test well. That rule defines an exploratory well as one being "drilled for the specific purpose of obtaining information to determine the feasibility of underground injection at the proposed site." However, Florida Administrative Code Rule 62-528.450(1)(b) requires an exploratory well only "for those projects located in an area where available information is lacking concerning geologic or hydraulic confinement or existing information indicates that geologic or hydraulic confinement may be poor or lacking." For example, an exploratory well would be required in a remote area (such as certain parts of Polk County) where the Department had insufficient literature, studies, or prior history concerning the general geology across and around the site. In this case, two nearby ASR systems are located in the Englewood Water District and near the Peace River and use the same storage zone as that proposed by the County. Those systems have been operating for a number of years, and the County and Department can draw upon that experience. Given this significant regional geologic information, an exploratory well is not required. More importantly, the requirement for an exploratory well applies only to Class I well construction, and not Class V wells, and the Department properly exercised its discretion to not apply that requirement to the County's Class V application. Signature on the application and other documents Florida Administrative Code Rule 62-528.340(1)(c) requires that all permit applications by a local government be signed by "either a principal executive officer or ranking elected official." Also, subsection (2) of the same rule requires that "reports required by permits and other information requested by the Department shall be signed by a person described in subsection (1) of this section [a principal executive officer or the highest ranking elected official], or by a duly authorized representative of that person." Petitioner contends that these requirements were not met. The County's application was signed by James E. Caldwell, who was then the Manager of Sarasota County Utilities. At that time, Mr. Caldwell had overall responsibility for the County's utility operations. On August 27, 2002, James L. Ley, the County Administrator (and principal executive officer of the County), also executed the original copy of the application. (That is, on that date he signed the original application underneath Mr. Caldwell's signature.) By doing so, Mr. Ley cured any previous technical deficiency in the application. Responses to requests for additional information which were submitted to the Department during the review process were signed by one of the County's outside consultants. However, on January 13, 2002, Mr. Ley submitted a letter to the Department authorizing various County employees and agents to act on his behalf in processing the instant application. Accordingly, the outside consultant was a duly-authorized representative of the chief executive and was authorized to sign those documents. Satisfaction of injection criteria Petitioner also contends that before a construction permit may be issued, the County must meet all principal treatment and disinfection requirements, as required by Florida Administrative Code Rules 62-610.466 and 62-528.563. However, those rules apply to permits which authorize the injection of reclaimed water into the groundwater. Here, the requested permit does not authorize injection, and therefore those requirements do not apply. Groundwater criteria Even though Petitioner conceded at hearing that the issue of whether the construction of the proposed wells would harm the environment was not raised in her Petition, the County provided reasonable assurance that this was not an issue of concern. Adequacy of permit conditions Petitioner also suggested at hearing that the proposed conditions in the permit are insufficient. However, she failed to show in what respect they were insufficient or how they should be amended. Water quality concerns Florida Administrative Code Rule 62-528.605(3) requires that a Class V well be constructed so that its intended use does not violate the applicable water quality standards. On this issue, the evidence establishes that the construction of the proposed test well and monitor system will not discharge, emit, or cause pollution. Indeed, a well and monitor station does not emit or discharge pollution and, if constructed according to the technical requirements of Florida Administrative Code Chapter 62-528, does not cause pollution. Therefore, the County's compliance with the technical requirements of the Department's regulations is reasonable assurance that the proposed system will not cause pollution. I. Request for Attorney's Fees and Costs In its Proposed Recommended Order, the County has requested an award of attorney's fees and costs on the theory that Petitioner is a non-prevailing party who has participated for a "frivolous, meritless, and improper purpose" within the meaning of Section 120.595(1), Florida Statutes. This argument is based on the assertion that Petitioner is a non- prevailing party, that is, she failed to substantially change the outcome of the proposed final agency action which is the subject of this proceeding, and she "failed to produce any witnesses or evidence to support [her] claim that the proposed permit that was the subject of this proceeding should not be issued." While it is true that Petitioner is a non-prevailing party, she attempted to utilize the testimony of three expert witnesses previously retained by the City of Venice, a former party in Case No. 01-3516. Those subpoenas, however, were quashed on August 16, 2002, and that ruling was memorialized in an Order dated August 19, 2002, or just before the final hearing began. Without those witnesses, Petitioner's presentation was obviously limited in some respects.4 Further, until the final hearing, Petitioner assumed that evidence in support of her allegation that the injectate would harm the water quality would be admissible and relevant. (As this Recommended Order clearly points out, however, not a single drop of water can be injected into the well until a modification of the permit is obtained, and therefore such evidence is irrelevant.) During the course of the hearing, the undersigned sustained objections by the County and Department to the introduction of such evidence. This ruling had the effect of limiting the scope of the issues to be tried. Despite these limitations, her participation cannot be described as being frivolous or meritless, as claimed by the County, and it is found that she did not participate for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting Permit No. 160882-001- UC authorizing the County to construct one Class V, Group 3 aquifer storage and recovery injection well and monitor well system in Sarasota County, Florida. DONE AND ENTERED this 19th day of April, 2004, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of April, 2004.

Florida Laws (6) 120.569120.57120.595403.064403.0881403.412
# 2
L. BERDEAL vs. JAMES L. CARPENTER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-000659 (1988)
Division of Administrative Hearings, Florida Number: 88-000659 Latest Update: Aug. 29, 1988

Findings Of Fact Respondent/applicant, James L. Carpenter (applicant or Carpenter), is the owner of upland property bordering on and contiguous to a man-made lagoon in Vaca Key near Marathon, Florida. The property is also adjacent to an artificial man-made canal which connects the lagoon to the open waters of Florida Bay. The lagoon and canal are classified as Class III waters of the State while Florida Bay is a Class III Outstanding Florida Water. A more precise location of the property is Section 9, Township 66 South, Range 32 East, Monroe County, Florida. By application dated June 23, 1987 applicant sought the issuance of a dredge and fill permit from respondent, Department of Environmental Regulation (DER), authorizing the construction of an "L" shaped 125'x8' commercial dock with a 10'x8' access walkway waterward of mean high water (MHW) in the canal. The dock and walkway will be located on the property described in finding of fact 1. According to the application, Carpenter owns several "landlocked residences" in the vicinity of the proposed dock and desires to provide dockage for residents who rent his houses. Because of DER concerns that shading might affect photosynthetic capabilities in the vicinity of the project, applicant agreed to revise his application. This revision was made on December 21, 1987 and reduced the dock size to 102'x6' while the access walkway was increased slightly to 12'x8'. Thus, the dock will extend eight feet into the canal beyond the MHW. On January 5, 1988 DER's district office issued an Intent to Issue a permit subject to seven specific conditions incorporated in the permit. This prompted the filing of a petition by petitioner, Lillian Berdeal (Berdeal), who owns upland property bordering on and contiguous to the lagoon, canal and Florida Bay. She operates a commercial seafood business directly across the canal from Carpenter. According to her petition, Berdeal asserts that Carpenter's dock would adversely affect navigation in the canal and the health, safety and welfare or the property of others. The water body in question is a man-made canal facing to the north and providing an outlet for the lagoon to Florida Bay. The lagoon, which measures approximately 150'x100', is fairly well developed. On the east and southeast side of the lagoon lie an outdoor restaurant and Carpenter's boat rental business. Petitioner's seafood processing operation lies on the west and southwest sides of the lagoon and lagoon entrance. Photographs of the area have been received in evidence as DER exhibits 1 and 2 and petitioner's exhibit 1. Presently, there are five finger piers (docks) in front of Berdeal's property at the narrowest point of the canal. These piers are directly across the canal from Carpenter's proposed dock addition. They extend out eight feet perpendicular to the shoreline and are now used by commercial fishermen for docking purposes while using Berdeal's facility. Approximately thirty or forty boats use the finger piers during fishing season (August - May) while up to twenty may use them in the off-season (June - July). Berdeal described those boats as ranging from thirty to forty-five feet in length and having beams up to, but not exceeding, sixteen feet. However, vessels at petitioner's facility on the day of DER's inspection had an average beam of ten feet. The evidence is conflicting as to the canal's width at its most narrow point. According to DER's expert, the minimum width is seventy-six feet, and this figure is accepted as being more credible than Berdeal's own measurement of sixty-three feet. If the project is constructed, Carpenter's dock, together with a boat having a ten foot beam, would use around eighteen feet of the channel at its most narrow width while Berdeal's facility, if used by the largest boat, would take up another twenty-three feet. This would still leave around thirty-five feet of channel for navigation purposes between the two docks at the canal's most narrow point. According to applicant's expert in navigation, James J. Morrison, who has piloted boats in the area for over thirty years, a boat may safely operate in the canal if it has five feet of water on each side. This margin of safety is sufficient in all weather conditions up to and including a small craft warning. If the project is approved, the necessary margin of safety would be available. It is noted also that there are no significant currents in the canal that would adversely affect navigation, and under normal weather conditions, the canal and basin are easily navigable. Petitioner presented the testimony of a commercial fisherman, Leonard Quasney, who expressed concerns that northerly winds periodically drive aquatic weeds and grasses into the lagoon and canal thereby impairing the ability of a boat to safely operate. These weeds are shown in photographs received as petitioner's exhibit 1. It was Quasney's contention that, coupled with the periodic influx of weeds, the addition of a dock at the canal's most narrow point will make navigation more hazardous. However, this theory was discounted by expert witness Morrison who pointed out that, while it is true that floating mats of weeds affect the ability of a person to handle a boat by making the boat's rudder and propeller action less responsive, they do not affect the ability to navigate the canal. In other words, as long as the margin of safety is available in the canal, the presence of the weeds would not hinder a ship's ability to enter and exit the lagoon. This testimony is accepted as being more credible on the issue, and it is found that the new dock will not create a navigational hazard as a result of the weeds. Berdeal is concerned also that the new dock would make it more difficult for fishermen to access her property and therefore cause economic harm to both her and the fishermen. However, this contention was not substantiated. The parties have stipulated that, with the following special conditions proposed by DER at hearing regarding limitations on commercial use, liveaboards and scraping boat bottoms, all water quality standards will be met: All temporary and permanent use of liveaboard or liveaboard type vessels for residential use is prohibited. All on site fueling activities are prohibited. All major vessel repair, such as hull scraping and painting, with the boat in the water is prohibited. Only private use of the dock is permitted. All double parking or rafting of boats along the dock is prohibited. General conditions common to all dredge and fill permits. The parties have stipulated that the "public interest" criteria in Subsection 403.918(2)(a)2. and 4.-7., Florida Statutes (1987), have been satisfied. In addition, a registered engineer has certified that the dock's construction and use will not have an adverse effect on the public health, safety and welfare or the property of others. Petitioner has applied for the issuance of a permit allowing the construction of additional docks at her facility. If the application is approved, these docks will be used for commercial purposes. The proposed impact of this project, and its cumulative impact on the area, was considered by DER in its evaluation of Carpenter's application. However, conditions to be included in Berdeal's permit will minimize any water quality or navigation impacts of the project, even on a cumulative basis.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the application of James L. Carpenter for a dredge and fill permit be granted subject to those specific, special and general conditions imposed by the agency. DONE and ORDERED this 29th day of August, 1988, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 FILED with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988.

Florida Laws (1) 120.57
# 3
JOE BURGESS, EARL KAIMER, KEITH FINLAYSON, ET AL. vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 80-001899RX (1980)
Division of Administrative Hearings, Florida Number: 80-001899RX Latest Update: Dec. 30, 1980

Findings Of Fact The Respondent is a multi-county water management district which was created by Chapter 25270, Laws of Florida, 1949, and which operates pursuant to the provisions of Chapter 373, Florida Statutes. The District is the local sponsor for the federally-authorized "Central and Southern Florida Project for Flood Control" and as such, operates and maintains various water control facilities and impoundments in South Florida, as authorized and constructed by the Federal Government. The jurisdiction of the District encompasses 16 counties in southern and central Florida, from Marion County in the north to Monroe County in the south. Water Conservation Area 2A is one of several water conservation areas within Respondent's jurisdiction and is a part of the federally-authorized Central and Southern Florida Project for Flood Control. On April 13, June 2, August 10, September 26, October 19, and October 20, 1978, the Governing Board of the District held public hearings and workshop meetings to receive comments from the District staff and the general public concerning the proposed "draw down" or alteration of water levels in Water Conservation Area 2A. Notice of the September 26, 1978 public hearing was published in the Florida Administrative Weekly, Volume No. 4, No. 36, on September 8, 1978. By the terms of the notice, the purpose of the September 26th public hearing was: To provide interested citizens with an opportunity to express their opinions and hear testimony regarding the District's proposal to lower the water level in Conservation Area 2A, located in western Palm Beach and Broward counties. The purpose of the draw down is to con- solidate the bottom sediments so that a more flexible water schedule can be begun to preserve the natural Everglades ecology . . . . After considering information received from staff and the general public, the Governing Board entered its "Order" No. 78-12 dated October 20, 1978 containing findings of fact and conclusions of law. This "order" provided, in pertinent part: That the staff take appropriate measures to accomplish the following: A draw down from current high water levels will be initiated October 31, 1978, with the goal of reducing water levels in the central portion of the marsh to ground level by December 31 (about 11.2 feet msl). From this point, water levels shall be allowed to continue to recede to a minimum level of 9.5' by the end of May, 1979. Water levels will be allowed to rise to about 12.5' msl by October 31, 1979. That the staff take appropriate measures to regulate water levels in Conservation Area 2A between 12.5' and 9.5' msl as provided in Paragraph 1. until November of 1981. That the regulation of Conservation Area 2A be carried out in a flexible manner to insure maximum environmental benefits and that adjustments in water level fluctuations and stages may be made predicated upon the environmental response of the Conservation Area 2A ecosystem resulting from the previous year's hydroperiod. That the staff pursue such research and data collection as is necessary to fully document the conditions of the marsh throughout the three year duration of the project. No formal hearings pursuant to Section 120.57(1), Florida Statutes, were requested as a result of the aforementioned workshop, public hearings or agency action embodied in the "order" of October 20, 1978. It is undisputed that Respondent did not comply with the requirements of Section 120.54, Florida Statutes, relating to rule making in issuing its Order of October 20, 1978. Petitioner, Joe Burgess, is the owner of Hinckle's Bait and Tackle Shop on State Road 84 in Broward County, approximately 12 miles from Conservation Area 2A. Petitioner Burgess derives approximately 60 to 70 percent of his business from customers who use Conservation Area 2A for hunting, fishing, and other recreational purposes. In addition, Petitioner Burgess personally uses Conservation Area 2A for hunting and fishing. Petitioner, Keith Finlayson, is an environmentalist who uses Conservation Area 2A for recreational purposes, including fishing, bird watching, observing animals in their natural habitats and flora identification. Petitioner Finalyson uses Conservation Area 2A for recreational purposes approximately two to three times per week. Petitioner, Concerned Citizens for the Everglades, Inc., is a not-for- profit Florida corporation, some of whose members presently use Conservation Area 2A for hunting, fishing, and other recreational purposes. Other members of the organization derive their living from businesses supported by revenues obtained from the general public directly attributable to "use" of Conservation Area 2A. One of the effects of the "draw down" will be to make certain portions of Conservation Area 2A inaccessible by boat during some periods of the year, thereby curtailing recreational and other use of the those areas. Water Conservation Area 2A, and other such areas within the jurisdiction of Respondent, is surrounded by levies and various water control structures and is operated independently of other water conservation areas, which are also surrounded by levies and water control structures. All of the water conservation areas within Respondent's jurisdiction are subject to different and independent water regulation schedules. The evidence establishes that it is not feasible to apply the same regulation schedule to all water conservation areas due to differences in topography. In fact, it is anticipated that a different regulation schedule for Water Conservation Area 2A will be developed after the current three-year draw down period is concluded. Although originally scheduled to commence on November 1, 1978, the "draw down" of water levels in Conservation Area 2A was delayed as a result of legal actions taken in state courts. As a result, the District did not actually begin the "draw down" until August, 1980.

Florida Laws (4) 120.52120.54120.56120.57
# 4
BAKER CUT POINT COMPANY AND JAMES C. DOUGHERTY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-002320RX (1980)
Division of Administrative Hearings, Florida Number: 80-002320RX Latest Update: Jan. 28, 1982

The Issue The matters here presented concern the challenges by the named Petitioners to Rule Sections 17-3.061(2)(b), 17-3.111 (11), 17-3.121(14), 17-4.02(17),(19), and 17-4.28(2), Florida Administrative Code, related to definitions of "submerged lands" and "transitional zone of a submerged land" and the requirements set forth by rule provisions for permits related to dredge and fill activities in "submerged lands" and in the "transitional zone of submerged land" and water quality in Florida. The rule challenges are in keeping with the provisions of Section 120.56, Florida Statutes. Specifically, Petitioners claim that the rules are invalid exercises of delegated legislative authority. The Petitioners do not, by the challenges, question the procedures utilized in the promulgation of the subject rule provisions.

Findings Of Fact Petitioner, Baker Cut Point Company, is a corporation which owns real estate in Key Largo, Florida, and James C. Dougherty owns the company. The Respondent, State of Florida, Department of Environmental Regulation, is a governmental body which has been granted certain regulatory powers, to include the responsibility for requiring environmental permits for certain activities over which the Respondent has jurisdiction. In furtherance of that responsibility, the Respondent has promulgated the aforementioned rules which are the subject of this rules challenge case. The Petitioners have been subjected to the terms and conditions of the aforementioned rule provisions in the course of their application for environmental permits for developments in property in Key Largo, Florida, under DER File Nos. 44-21381 and 44-14356. Those matters were the subject of a Subsection 120.57(1), Florida Statutes, hearing in Division of Administrative Hearings' Cases Nos. 80-760 and 80-1055. The hearings in those cases were conducted on the dates described in this order and were held in view of the disputed material facts between the parties occasioned by the Respondent's stated intention to deny the permits based upon the Respondent's belief that the activities contemplated within the permit process would be in violation of certain regulatory provisions, to include those rule provisions which are the subject of this action. Throughout the process of permit review and the hearing de novo, and in response to the revisions to the original permit requests, the Respondent has continued to claim jurisdiction in keeping with the rule provisions at issue. The Baker Cut Point Company DER File No. 44-14356 letter of intent to deny dates from April 3, 1980, and the corresponding letter of intent to deny related to DER File No. 44-21381, James C. Dougherty, dates from May 27, 1980.

Florida Laws (6) 120.56120.57403.021403.031403.061403.087
# 5
OLD FLORIDA PLANTATION, LTD. vs POLK COUNTY BOARD OF COUNTY COMMISSIONERS AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 00-004928 (2000)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 07, 2000 Number: 00-004928 Latest Update: Nov. 05, 2001

The Issue The issue in this matter is whether Respondent, Polk County Board of Commissioners (Polk County or County) has provided Respondent, Southwest Florida Water Management District (SWFWMD), with reasonable assurances that the activities Polk County proposed to conduct pursuant to Standard General Environmental Resource Permit (ERP) No. 4419803.000 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, and 40D-40.302, Florida Administrative Code. (All rule citations are to the current Florida Administrative Code.)

Findings Of Fact Events Preceding Submittal of ERP Application The Eagle-Millsite-Hancock drainage system dates back to at least the 1920's, and has been altered and modified over time, especially as a result of phosphate mining activities which occurred on OFP property in the 1950's-1960's. The system is on private property and is not owned and was not constructed by the County. Prior to 1996, the Eagle-Millsite-Hancock drainage system was in extremely poor repair and not well- maintained. The Eagle-Millsite-Hancock drainage system originates at Eagle Lake, which is an approximately 641-acre natural lake, and discharges through a ditch drainage system to Lake Millsite, which is an approximately 130-acre natural lake. Lake Millsite drains through a series of ditches, wetlands, and ponds and flows through OFP property through a series of reclaimed phosphate pits, ditches and wetlands and ultimately flows into Lake Hancock, which is an approximately 4500-acre lake that forms part of the headwaters for the Peace River. The drainage route is approximately 0.5 to 1 mile in overall length. The Eagle-Millsite-Hancock drainage system is one of eight regional systems in the County for which the County and SWFWMD have agreed to share certain funding responsibilities pursuant to a 1996 letter agreement. To implement improvements to these drainage systems, Polk County would be required to comply with all permitting requirements of SWFWMD. During the winter of 1997-1998, Polk County experienced extremely heavy rainfall, over 39 inches, as a result of El Nino weather conditions. This unprecedented rainfall was preceded by high rainfalls during the 1995-1996 rainy season which saturated surface waters and groundwater levels. During 1998, Polk County declared a state of emergency and was declared a federal disaster area qualifying for FEMA assistance. Along the Lake Eagle and Millsite Lake drainage areas, septic tanks were malfunctioning, wells were inundated and roads were underwater. The County received many flooding complaints from citizens in the area. As a result of flooding conditions, emergency measures were taken by the County. The County obtained SWFWMD authorization to undertake ditch cleaning or vegetative control for several drainage ditch systems in the County, including the Eagle-Millsite-Hancock drainage system. No SWFWMD ERP permit was required or obtained for this ditch cleaning and vegetative control. During its efforts to alleviate flooding and undertake emergency ditch maintenance along the Eagle-Millsite-Hancock drainage route, the County discovered a driveway culvert near Spirit Lake Road which was crushed and impeding flow. The evidence was unclear and contradictory as to the size of the culvert. Petitioner's evidence suggested that it consisted of a 24-inch pipe while evidence presented by the County and by SWFWMD suggested that it was a 56-inch by 36-inch arched pipe culvert. It is found that the latter evidence was more persuasive. On February 25, 1998, the County removed the crushed arched pipe culvert at Spirit Lake Road and replaced it with two 48-inch diameter pipes to allow water to flow through the system. The replacement of this structure did not constitute ditch maintenance, and it required a SWFWMD ERP. However, no ERP was obtained at that time (although SWFWMD was notified prior to the activity). (One of the eight specific construction items to be authorized under the subject ERP is the replacement of this culvert.) Old Florida Plantation, Ltd. (OFP) property also experienced flooding during February 1998. OFP's property is situated along the eastern shore of Lake Hancock, and the Eagle- Millsite-Hancock drainage system historically has flowed across the property before entering Lake Hancock. In the 1950's and 1960's, the property was mined for phosphate. The mining process destroyed the natural vegetation and drastically altered the soils and topography, resulting in the formation of areas of unnaturally high elevations and unnaturally deep pits that filled with water. OFP purchased the property from U.S. Steel in 1991. The next year OFP initiated reclamation of the property, which proceeded through approximately 1998. In 1996, OFP applied to the County for approval of a development of regional impact (DRI). OFP blamed the flooding on its property in 1998 on the County's activities upstream, claiming that the property had never flooded before. But upon investigation, the County discovered a 48-inch diameter pipe on OFP property which, while part of OFP's permitted drainage system, had been blocked (actually, never unopened) due to OFP's concerns that opening the pipe would wash away wetlands plants recently planted as part of OFP's wetland restoration efforts. With OFP and SWFWMD approval, the County opened this pipe in a controlled manner to allow flowage without damaging the new wetlands plants. Following the opening of this blocked pipe, OFP property upstream experienced a gradual drop in flood water levels. When the water level on OFP's property stabilized, it was five feet lower and no longer flooded. Nonetheless, OFP continues to maintain not only that the County's activities upstream caused flooding on OFP property but also that they changed historic flow conditions. This contention is rejected as not being supported by the evidence. Not only did flooding cease after the 48-inch pipe on OFP's property was opened, subsequent modeling of water flows also demonstrated that the County's replacement of the crushed box culvert at the driveway on Spirit Lake Road as described in Finding 8, supra, did not increase flood stages by the time the water flows into the OFP site and did not cause flooding on OFP property in 1998. (To the contrary, OFP actions to block flows onto its property may have contributed to flooding upstream.) On October 6, 1998, the County entered into a contract with BCI Engineers and Scientists to initiate a study on the Eagle-Millsite-Hancock drainage system, identify options for alleviating flooding along the system and prepare an application for an ERP to authorize needed improvements to the system. Prior to the County's submittal of an ERP application, SWFWMD issued a conceptual ERP to OFP for its proposed wet detention surface water management system to support its proposed DRI on the OFP property. OFP's conceptual permit incorporated the Eagle-Millsite-Hancock drainage system and accommodated off-site flowage into the system. Before submitting an ERP application to SWFWMD, the County had communications with representatives of OFP concerning an easement for the flow of the drainage system through OFP property. In March 1999, the County reached an understanding with OFP's engineering consultant whereby OFP would provide the County with an easement across OFP lands to allow water to flow through to Lake Hancock. In turn, the County would: construct and pay for a control structure and pipe east of OFP to provide adequate flowage without adversely affecting either upstream or downstream surface waters; construct and upgrade any pipes and structures needed to convey water across OFP property to Lake Hancock; and provide all modeling data for OFP's review. The ERP Application Following completion of the engineering study, the County submitted ERP Application No. 4419803.000 for a Standard General ERP to construct improvements to the Eagle-Millsite- Hancock drainage system on August 18, 1999. Eight specific construction activities are proposed under the County's project, at various points along the Eagle- Millsite-Hancock drainage system as follows: 1) Add riprap along channel bottom; 2) Modify culvert by replacing 56-inch by 36- inch arch pipe by two 48-inch pipes (after-the-fact, done in 1998, as described in Finding 8, supra); 3) Add riprap along channel bottom; 4) Add box, modify culvert by replacing existing pipe with two 48-inch pipes, add riprap along channel bottom; 5) add riprap along channel bottom; 6) Add weir, modify culvert by replacing existing 24-inch pipe with two 48-inch pipes, add riprap along channel bottom; 7) Add box and modify culvert by replacing existing 24-inch pipe with two 48-inch pipes; 8) Modify existing weir. Under the County's application, construction activities Nos. 6, 7, and 8 would occur on OFP property. In addition, it was proposed that surface water would flow across OFP's property (generally, following existing on-site drainage patterns), and it was indicated that flood elevations would rise in some locations on OFP's property as a result of the improvements proposed in the County's application. (Most if not all of the rise in water level would be contained within the relatively steep banks of the lakes on OFP's property--the reclaimed phosphate mine pits.) In its application, the County stated that it was in the process of obtaining easements for project area. As part of the ERP application review process, SWFWMD staff requested, by letter dated September 17, 1999, that the County clarify the location of the necessary rights-of-way and drainage easements for the drainage improvements and provide authorization from OFP as property owner accepting the peak stage increases anticipated in certain OFP lakes as a result of the County's proposed project activities. On September 28, 1999, OFP obtained a DRI development order (DO) from the County. In pertinent part, the DRI DO required that OFP not adversely affect historical flow of surface water entering the property from off-site sources. Historical flow was to be determined in a study commissioned by the County and SWFWMD. The DO appeared to provide that the study was to be reviewed by OFP and the County and approved by SWFWMD. Based on the study, a control structure and pipe was to be constructed, operated and maintained by the County at the upstream side of the property that would limit the quantity of off-site historical flow, unless otherwise approved by OFP. OFP was to provide the County with a drainage easement for this control structure and pipe, as well as a flowage easement from this structure, through OFP property, to an outfall into Lake Hancock. The DO specified that the flowage easement was to be for quantitative purposes only and not to provide water quality treatment for off-site flows. The DO required OFP to grant a defined, temporary easement prior to first plat approval. In its November 11, 1999, response to SWFWMD's request for additional information, the County indicated it would obtain drainage easements and that it was seeking written acknowledgment from OFP accepting the proposed increases in lake stages. During the ERP application review process, the County continued efforts to obtain flowage easements or control over the proposed project area and OFP's acknowledgment and acceptance of the increase in lake stages. At OFP's invitation, the County drafted a proposed cross-flow easement. But before a binding agreement could be executed, a dispute arose between OFP and the County concerning other aspects of OFP's development plans, and OFP refused to enter into an agreement on the cross- flow easement unless all other development issues were resolved as well. On August 4, 2000, in response to SWFWMD's request that the County provide documentation of drainage easements and/or OFP's acceptance of the increased lake stages on OFP property, the County submitted a proposed and un-executed Perpetual Flowage and Inundation Easement and an Acknowledgment to be signed by OFP accepting the increased lake stages. On August 7, 2000, the OFP property was annexed by the City of Bartow (the City). On October 16, 2000, the City enacted Ordinance No. 1933-A approving OFP's DRI application. The City's DO contained essentially the same provision on Off- Site Flow contained in the County's DO. See Finding 18, supra. However, the City's DO specified that the historical flow study was required to be reviewed and approved by OFP (as well as by the County and by SWFWMD). OFP has not given formal approval to historical flow studies done to date. On October 6, 2000, SWFWMD issued a Notice of Final Agency Action approving Polk County ERP No. 4419803.000. Permit Specific Condition No. 7 provides that "all construction is prohibited within the permitted project area until the Permittee acquires legal ownership or legal control of the project area as delineated in the permitted construction drawings." As a result of this permit condition, the County cannot undertake construction as authorized under the Permit until any needed easement or legal control is obtained. Precise Easement Route Approximately two months before final hearing, a dispute arose as to the precise cross-flow easement route proposed by the County. OFP had understood that the County's proposed route was based on a detailed survey. But closer scrutiny of the County's proposed route indicated that it cut corners of existing lakes on OFP's property, crossed residential lots proposed by OFP, and veered north into uplands (also proposed for residential use) in the western portion of the route before looping south and then north again to the outfall at Lake Hancock. Information subsequently revealed in the course of discovery suggested that the County's proposed route may have been based on pre-reclamation topography of OFP's property. After OFP recognized the implications of the cross- flow easement route being proposed by the County, OFP provided the County with several different alternative easement routes through the OFP property. While agreement as to the precise route has not yet been reached, the precise route of the easement is not significant to the County, as long as water can flow across OFP property to Lake Hancock and so long as the County does not have to re-locate existing ditches. Such adjustments in the location of the proposed flowage easement would not affect SWFWMD staff's recommendation for permit issuance, as long as it covered the defined project areas. In addition, OFP's current site plan is a preliminary, conceptual plan subject to change before it is finalized. Regardless what cross-flow easement route is chosen, it will be temporary and subject to modification when OFP's development plan is finalized. If the County is unable to not negotiate a flowage easement across OFP property, it could obtain whatever easement is required through use of the County's eminent domain powers. The County's acquisition of an easement to accommodate a flowage route and anticipated increased stage on OFP property gives reasonable assurance that any stage increases will not cause adverse impacts to OFP property and gives reasonable assurance that the County will have sufficient legal control to construct and maintain the improvements. Project Area The County applied for a Standard General Permit and specified a total project area of 0.95 acre. This acreage reflects the area required for actual construction and alteration of control structures and drainage ditches in the preexisting Eagle-Millsite-Hancock system. It does not reflect the entire acreage drained by that system (approximately 1,800 to 2,000 acres). It also does not reflect the area of the cross-flow easement, which the County has yet to obtain. When determining project size for purposes of determining the type of permit applicable to a project, SWFWMD staff considers maximum project area to be limited to the acreage owned or controlled by the applicant. In addition, since this is a retrofit project for improvement of an existing drainage system not now owned or controlled by the County, SWFWMD staff only measured the area required for actual construction and alteration of control structures and drainage ditches. Future easements necessary for future maintenance of the system were not included. When OFP applied for its conceptual ERP for its proposed DRI, the project area was considered to be the acreage owned by OFP. The rest of the basin draining through OFP's property to Lake Hancock (again, approximately 1,800 to 2,000 acres) was not considered to be part of the project area. Water Quantity Impacts The County's project will retrofit certain components of the same drainage system which OFP will utilize for surface water management and treatment pursuant to its conceptual ERP. Modeling presented in the County's application demonstrates that there will be some rises and some lowering of some of the lake levels on OFP's property during certain rain events. Anticipated rises are lower than the top of banks authorized in OFP's conceptual permit; hence the system will continue to function properly. While there are some differences in the County's permit application and OFP's conceptual permit application concerning modeling estimates of flow rates through OFP property, the differences are minor and are attributed to differences in modeling inputs. The County used more detailed modeling information. Any such differences are not significant. Differences in flow rates provided in the County's proposed permit and in OFP's conceptual permit do not render the permits as incompatible. If the County's permit were issued, any modeling undertaken in connection with a subsequent application by OFP for a construction permit would have to be updated to include the County's improvements to the system. This outcome is not a basis for denial of the County's permit. While the rate at which water will flow through the system will increase, no change in volume of water ultimately flowing through the drainage system is anticipated as a result of the County's proposed improvements. The increased lake stages which are anticipated to occur on OFP property as a result of the County's project will not cause adverse water quantity impacts to the receiving waters of Lake Hancock or adjacent lands. The project will not cause adverse flooding to on-site or off-site property. The project will not cause adverse impacts to existing surface water storage and conveyance capabilities. The project will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Chapter 373.042, Florida Statutes. Water Quality Impacts No adverse impacts to water quality on OFP property are anticipated from the County's proposed drainage improvements. The project will not add any pollutant loading source to the drainage system and is not expected to cause any algae blooms or fish kills in OFP waters or cause any additional nutrient loading into OFP's surface water management systems. As reclaimed phosphate mine pits, the lakes on OFP's property are high in phosphates. Meanwhile, water quality in upstream in Millsite Lake and Eagle Lake is very good. Off-site flow of higher quality water flushing the OFP lakes will improve the water quality on the OFP site. The County's project will have no adverse impact on the quality of water in the downstream receiving of Lake Hancock (which currently has poor water quality due in large part to past phosphate mining). Upstream of OFP, the project will not cause any adverse water quality impacts and is anticipated to result in positive impacts by lessening the duration of any flooding event and thereby lessening septic tank inundation from flooding. This will have a beneficial impact on public health, safety, and welfare. Thus, there is a public benefit to be gained in having the County undertake the proposed drainage and flood control improvements now, rather than waiting for OFP to finalize its plat and construct its development project. The County's proposed improvements do not require any formal water quality treatment system. The improvements are to a conveyance system and no impervious surfaces or other facilities generating pollutant loading will be added. Upstream of OFP, the Eagle-Millsite-Hancock drainage system flows through natural lakes and wetlands systems that provide natural water quality treatment of the existing drainage basin. OFP expressed concern that the County's improvements to drainage through these areas (including the ditch maintenance already performed in 1998) will increase flow and reduce residence time, thereby reducing natural water quality treatment. But ditch maintenance does not require an ERP, and the County gave reasonable assurances that reduction in natural water quality treatment will not be significant, especially in view of the good quality of the water flowing through the system out of Eagle Lake and Millsite Lake. As a result, it is found that the County's proposed project will not adversely affect the quality of receiving waters such that any applicable quality standards will be violated. Indeed, OFP's expert consultant conceded in testimony at final hearing that OFP has no reason to be concerned about the quality of water at present. Rather, OFP's real concern is about water quality in the future. Essentially, OFP is asking SWFWMD to require the County to guarantee OFP that future development in the area will not lead to any water quality problems. Requiring such a guarantee as a condition to issuance of an ERP would go far beyond SWFWMD requirements and is never required of any applicant. Besides being speculative on the evidence in this case, future development in the area will be required to meet applicable SWFWMD water quality requirements. SWFWMD permitting required for such future development would be the proper forum for OFP to protect itself against possible future reduction in water quality (as well as possible future increase in water quantity). Environmental Impacts The drainage ditches to be improved by the County's project were originally constructed before 1984. These upland cut ditches were not constructed for the purpose of diverting natural stream flow, and are not known to provide significant habitat for any threatened or endangered species. The County provided reasonable assurance that the proposed project will not change the hydroperiod of a wetland or other surface water, so as to adversely affect wetland functions or other surface water functions. The functions of the wetlands and surface waters to be affected by the proposed project include conveyance, some water quality treatment, and possibly some wildlife movement or migration functions between the wetlands served by the ditches. Wetland impacts from the project consists of .63 acre of permanent impacts and .21 acre of temporary impacts, for a total of .84 acre of impact. The permanent impacts consist of the replacement of pipes with new structures in the ditches and the addition of rip rap in areas to prevent sedimentation and erosion. The proposed project's anticipated increase in the rate of flow is expected to lessen the duration of any flooding event at the upper end of the drainage system, and at the downstream end is expected to create a subsequent rise in some of the lakes and storage areas on the OFP property during certain rain events. The anticipated rise in some of the reclaimed lakes on OFP property is not anticipated to have any adverse impact on the functions that those surface waters provide to fish, wildlife or any threatened or endangered species. The reclaimed lakes subject to rise in water levels for certain rain events are steep-sided and do not have much littoral zone, and little, if any, loss of habitat will result. The County's application provides reasonable assurance that the anticipated stage increase in affected wetlands or surface waters will not adversely affect the functions provided by those wetlands or surface waters. The County provided reasonable assurance that the proposed project will not violate water quality standards in areas where water quality standards apply, in either the short- term or the long-term. Long-term effects were addressed in Finding 43-51, supra. Short-term water quality impacts anticipated during the construction of the proposed improvements will be addressed through the use of erosion and sediment controls. The proposed project also will not create any adverse secondary impacts to water resources. The project will not cause any adverse impacts to the bird rookery located to the north on OFP property. The project will not cause any adverse impacts to the bass in OFP's lakes, a concern expressed by OFP relatively recently. To the contrary, since the project will improve water quality in OFP's lakes, the impact on OFP's bass is expected to be positive. OFP raised the issue of a bald eagle nesting site located on its property. The evidence was that a pair of bald eagles has built a nest atop a Tampa Electric Company (TECO) power pole on the property in October of each year since 1996. Each year the pair (which is thought to be the same pair) has used a different TECO power pole. Most of the nests, including the one built in October 2000, have been on poles well south of any construction proposed under the County's ERP and clearly outside of the primary and secondary eagle management zones designated by the U.S. Fish and Wildlife Service. But one year, a nest was built on a pole farther north and possibly within the secondary eagle management zone. OFP presented testimony that U.S. Fish and Wildlife would require OFP to apply for an "incidental take" in order to build homes within the primary eagle protection zones around any of the four poles on which eagles have built nests since 1996; timing of construction of homes within the secondary protection zones may be affected. Even accepting OFP's testimony, there was no evidence as to how U.S. Fish and Wildlife would view construction of the County's proposed drainage improvements on OFP property within those zones. In addition, the evidence was that, in order to accomplish its DRI plans to build homes in the vicinity of the TECO power poles that have served as eagle nests in recent years, without having to apply for an "incidental take," OFP plans to place eagle poles (more suitable for eagle nests than power poles, which actually endanger the eagles) in another part of its property which is much more suitable habitat in order to encourage the eagles to build their nest there. The new location would put the County's proposed construction activity far outside the primary and secondary eagle management zones. Other Permitting Requirements The County's proposed project is capable, based on generally accepted scientific engineering and scientific principles, of being effectively performed and of functioning as proposed. The County has the financial, legal, and administrative capability of ensuring that the activity proposed to be undertaken can be done in accordance with the terms and conditions of the permit. No evidence was presented by Petitioner that the Project will cause adverse impacts to any work of the District established under Section 373.086, Florida Statutes. No evidence was presented by Petitioner that the project will not comply with any applicable special basin or geographic area criteria established under Chapter 40D-3, Florida Administrative Code.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Standard General Environmental Resource Permit No. 4419803.000. DONE AND ENTERED this 17th day of September, 2001, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of September, 2001. COPIES FURNISHED: Linda L. McKinley, Esquire Polk County Attorney's Office Post Office Box 9005, Drawer AT01 Bartow, Florida 33831-9005 Gregory R. Deal, Esquire 1525 South Florida Avenue, Suite 2 Lakeland, Florida 33803 Margaret M. Lytle, Esquire Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (2) 373.042373.086 Florida Administrative Code (12) 40D-1.60340D-1.610540D-4.02140D-4.09140D-4.10140D-4.30140D-4.30240D-4.38140D-40.04040D-40.30262-302.30062-4.242
# 6
NANCY CONDRON vs ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND 1044PVB, LLC, 16-000806 (2016)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Feb. 12, 2016 Number: 16-000806 Latest Update: Aug. 01, 2016

The Issue The issue to be determined in this case is whether 1044PVB, LLC (“Applicant”), is entitled to Environmental Resource Permit (“ERP”) No. IND-109-143282-1 from the St. Johns River Water Management District (“District”), authorizing the construction of a surface water management system to serve a proposed residential development in St. Johns County, Florida.

Findings Of Fact The Parties Petitioner Nancy Condron is a resident and landowner in St. Johns County. Her residence is located across Ponte Vedra Boulevard from the Project. Petitioner uses the nearby Guana River Wildlife Management Area for nature-based recreation, including hiking and bird-watching. Applicant is a foreign limited liability company and the applicant for the ERP at issue in this case. The District is an independent special district granted powers and assigned duties under chapter 373, Florida Statutes, including powers and duties related to the regulation of construction activities in wetlands. The Project is within the boundaries of the District. The Project Site The Project site is 17.13 acres located at 1044 Ponte Vedra Boulevard in St. Johns County, Florida. The site currently consists of forested lands on the east and west and pasture areas in the middle. There is an existing trail road that runs the length of the property and a small residence. The site has four small ponds excavated as watering holes, ranging in size from 0.04 to 0.24 acres. There are 4.41 acres of wetlands and other surface waters on the site. There is a 3.49-acre area of mixed forested wetland on the site that continues offsite to the south and west. There are also three isolated wetlands on the site, each less than a half-acre in size. The wetland system adjacent to the Project site flows to the Guana River. The Guana River is a freshwater, Class III waterbody. It is an Outstanding Florida Water, but has been designated by the Department of Environmental Protection as impaired for nutrients. The site is not used by threatened or endangered species for feeding, nesting, or breeding. The Project The proposed Project is a 22-lot, single-family subdivision. The proposed surface water management system for the Project includes curb and gutter paved roadways, storm inlets, concrete pipes, vegetated natural buffers, treatment swales, and a wet detention stormwater pond. The wet detention stormwater pond would discharge into adjacent wetlands that flow to the Guana River. Wetlands The point of discharge from the Project’s stormwater management system is not in the designated Outstanding Florida Water. Applicant proposes to fill the four ponds and the three isolated wetlands. Applicant also proposes to fill 0.28 acres of the larger wetland. The Project includes a number of upland buffers that are a minimum of 15 feet in width and average of 25 feet in width. These buffers are intended to prevent potential adverse secondary impacts to adjacent wetlands. All wetland impacts and mitigation were assessed using the Uniform Mitigation Assessment Method (UMAM) in Florida Administrative Code Rule 62-345. The UMAM assessment takes into consideration the location and landscape support, water environment, and community structure of the wetlands to be impacted. The District also considers the condition, hydrologic connection, uniqueness, location, and the fish and wildlife utilization of the wetlands and other surface waters. The District did not require mitigation for filling the artificial ponds. The District also did not require mitigation for filling the isolated wetlands because each is less than a half-acre in size. As mitigation for filling 0.28 acres of the larger wetland, Applicant would purchase 0.25 mitigation bank credits from the St. Marks Pond Mitigation Bank. The St. Marks Pond Mitigation Bank is located in the same drainage basin as the wetland area that would be filled. The District determined that purchasing the mitigation bank credits would offset the functional loss associated with filling part of the wetland. Two areas on the site where no upland buffers are proposed were assessed for secondary impacts to wetlands in the UMAM evaluation. The mitigation bank credits proposed for the Project would offset all of the adverse, direct, and secondary impacts to wetlands or surface waters associated with this Project. Because direct and secondary impacts would be fully mitigated, the Project would not cause cumulative impacts. Water Quantity A majority of the Project’s stormwater runoff would be conveyed to the wet detention pond. The wet detention pond provides water quantity protection by attenuating the post- development peak rate of discharge. Applicant modeled the pre-development peak rate of discharge and the post-development peak rate of discharge. The modeling indicated that the post-development peak rate of discharge will not exceed the pre-development peak rate of discharge for the 25-year, 24-hour storm event. Section 3.3 of the Applicant's Handbook, Volume II, prohibits a reduction in the 10-year or 100-year floodplain for projects with an upstream drainage basin of five square miles or greater. The proposed Project has an upstream drainage basin of 4.6 square miles, so this criterion is not applicable. Applicant showed the Project would increase offsite flood elevations by only 0.01 feet, which is negligible. The Project would not cause adverse water quantity impacts to receiving waters or adjacent lands. Water Quality Water quality would be managed in the Project through a combination of wet detention pond, swales, and vegetative natural buffers (“VNBs”). The wet detention pond would treat a majority of the runoff from the Project. Section 8 of the Applicant’s Handbook, Volume II, contains presumptive criteria for the design of a wet detention pond. The proposed wet detention pond meets the presumptive criteria. Therefore, the detention pond is presumed to provide reasonable assurance that the water quality of receiving waters will be protected. Applicant is proposing to construct swales at the back of Lots 20, 21, and 22 to treat runoff by infiltration. Section 9 of the Applicant’s Handbook, Volume II, contains presumptive criteria for swale system design and performance. The Project meets the presumptive criteria for swales. Applicant is proposing VNBs on Lots 1 through 14. The use of VNBs is a commonly-used best management practice accepted by the District for treating stormwater runoff. Like swales, VNBs treat runoff by infiltration. Stormwater runoff from the backyards of Lots 1 through 14 would drain to the VNBs. On some of these lots, stormwater runoff from the front yards, side yards, and rooftops would also drain to the VNBs. The lots would be graded so that runoff would sheet flow to the VNBs to maximize their treatment function. The VNBs would have native soils and plants. The VNBs would have Type A soils, which are well-drained soils that provide the highest rate of infiltration and the most permeability. Petitioner contends that, because soil borings were not taken at the location of the VNBs, reasonable assurance was not provided that the VNBs would function as proposed. However, Petitioner did not show that the soils at the VNB locations were unsuitable soils. In addition, Applicant agreed to use Type A soils in the VNBs. Therefore, reasonable assurance that the VNBs would have suitable soils was provided by Applicant. Petitioner referred to a draft rule to support her contention that the proposed VNBs are not properly designed, but the draft rule has no controlling effect and is hearsay. The Applicant’s Handbook does not contain presumptive criteria for VNBs. Applicant demonstrated that the VNBs would infiltrate 80 percent of the runoff from a three-year, one-hour storm event, which is the same treatment efficiency the District requires when swales are used. Reasonable assurance was provided that the VNBs would function as proposed. Because the Project would discharge to wetlands that flow to the Guana River, a waterbody impaired by nutrients, section 2.2 of the Applicant’s Handbook, Volume II, requires Applicant to demonstrate there would be a net improvement in water quality with respect to nutrients. Applicant performed a pollutant loading analysis using the BMPTRAINS model. The BMPTRAINS model is a generally-accepted tool used by stormwater engineers for this purpose. The BMPTRAINS model incorporates the information about the pre- and post-development conditions associated with land use and impervious area. The model accounts for site-specific conditions, including the elevation of the groundwater table and storage capacity of the soil. The design of the surface water management system is then incorporated into the model to estimate the pollutant removal efficiency and estimate the average annual pollutant load that will leave the site. Applicant’s BMPTRAINS modeling indicated that the average annual post-development loading for total nitrogen and total phosphorus would be substantially less than the pre- development loading for those nutrients. Therefore, Applicant demonstrated the Project would result in a net improvement. Operation & Maintenance The Ponte Vedra Beach Preserve Homeowners Association would be the entity responsible for operation and maintenance of the stormwater management system. The wet detention pond, swales, and VNBs would be located within an easement and maintained by the homeowner’s association. Applicant and the Ponte Vedra Beach Preserve Homeowners Association have the ability to accept responsibility for the operation and maintenance of the Project. Public Interest An applicant for an ERP must demonstrate that a proposed project affecting wetlands and other surface waters would not be contrary to the public interest. This determination is made by balancing seven factors found in section 10.2.3(a) through (g) of the Applicant’s Handbook, Volume I. Public interest factor (a) is whether the regulated activity will adversely affect public health, safety, or welfare, or the property of others. There is no aspect of the Project that would affect public health, safety, or welfare, except the potential for flooding. Reasonable assurance was provided by Applicant that the Project would not cause flooding. Factor (b) is whether the regulated activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species or their habitats. The mitigation bank credits offset all of the potential adverse impacts that the proposed project would have on the conservation of fish and wildlife. Factor (c) is whether the regulated activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The parties stipulated that the Project will not adversely affect navigation or cause harmful erosion or shoaling. The record evidence shows the Project will not adversely affect the flow of water. Factor (d) is whether the regulated activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The Project would not affect fishing or recreational values in the vicinity. The mitigation bank credits offset all of the potential adverse impacts the proposed project would have on marine productivity in the vicinity. Factor (e) is whether the regulated activity will be of a temporary or permanent nature. The activities are of a permanent nature. The mitigation is also permanent. Factor (f) is whether the regulated activity will adversely affect or will enhance significant historical and archaeological resources. The Project will have no effect on historical and archaeological resources. Factor (g) is the current condition and relative value of functions being performed by areas affected by the proposed regulated activity. The relatively small loss of functional value would be offset by the proposed mitigation. Considering and balancing these seven factors, the Project would not be contrary to the public interest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the issuance of Environmental Resource Permit No. IND-109-143282-1 to 1044PVB, LLC, with the conditions set forth in the Technical Staff Report dated April 11, 2016. DONE AND ENTERED this 16th day of June, 2016, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of June, 2016. COPIES FURNISHED: Karen C. Ferguson, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 (eServed) Jane West, Esquire Josh Smith, Esquire Jane West Law, P.L. 6277 A1A South, Suite 101 St. Augustine, Florida 32080 (eServed) Eric Olsen, Esquire Amelia A. Savage, Esquire Hopping, Green and Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 (eServed) Ann B. Shortelle, Ph.D., Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 (eServed)

Florida Laws (3) 120.52120.56917.13
# 7
CONCERNED CITIZENS OF ORANGE LAKE AREA vs CELEBRITY VILLAGE RESORTS, INC., AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 91-002694 (1991)
Division of Administrative Hearings, Florida Filed:Ocala, Florida May 01, 1991 Number: 91-002694 Latest Update: Jun. 10, 1992

The Issue The ultimate issue is whether Celebrity Resorts, Inc., (Celebrity) is entitled to a Management and Storage of Surface Waters (MSSW) permit for a surface management system to serve its proposed development in Marion County, Florida.

Findings Of Fact PROPOSED PROJECT Celebrity is seeking a District MSSW permit to construct a surface water management system to serve a proposed recreation vehicle (RV) park. The facility is to be located in northern Marion County on the southern border of Orange Lake, an Outstanding Florida Water. The entire site is within the geographic boundaries of the District. The RV park is to be located on 75 acres of land, and is to contain 372 RV and "park model" sites, four bath houses, a clubhouse, and an expanded boathouse. There is a "break" in the watersheds of the Celebrity property caused by a ridge across the approximate center of the project site. The effect of this "break" is that approximately one-half of the property drains toward the lake while the approximate southerly half of the property drains into an independent depression creating a watershed separate from the lake. Parts of Marion County and Alachua county have been designated as Sensitive Karst Area Basin by the District. The project site is located in the designated area. The existing land use is open pasture. The property was previously used for citrus groves. STANDING Concerned Citizens of Orange Lake Area is an unincorporated group of approximately 76 individuals who want to prevent pollution of Orange Lake. Of the 76 members, three members were present and testified at the hearing. The members attending the hearing were an artist (Riley), a photographer (Suto), and a bass guide (Solomon). Ms. Suto testified that she lives about 1 to 1 1/2 miles from the site. Ms. Riley testified that she lives next door to Ms. Suto and determined that to be over two miles away from the site. Mr. Solomon testified that he lives on the southeast side of Orange Lake approximately 1 to 1 1/2 miles from the project site. No witness testified that any member has a property interest in the subject property. Of the members who testified, none use the subject property. There was no testimony that other members use the property. Twenty-six members wrote letters of concern to the District. Ms. Suto testified to the existence of high levels of lead in her well water. WATER QUANTITY The existing land use, pasture, was used to determine the pre- development peak rate and volume of discharge. The existing surface drainage of the 75-acre project site is divided into two basins. On the north side of the property, the surface water flows toward Orange Lake. This basin is designated on the plans, sheet 3 of 16, by a "2." The south portion of the property is contained within the landlocked drainage basin which is designated on the plans, sheet 3 of 16, by a "1." The post-development flow of surface water will be in the same direction as the pre-development flow. There are no proposed development plans or encroachments into the 100- year floodplain. Therefore, there is no increase in potential for damages to off-site property or persons caused by floodplain development or encroachment, retardance, acceleration, displacement, or diversion of surface waters. There is no reduction in natural storage areas and, in fact, the proposed project increases the natural storage on site. Drainage Basin 2 The District's criterion for systems discharging to basins with an outlet is that the post-development peak rate of discharge for the 25-year, 24- hour storm event shall not exceed the pre-development peak rate of discharge for the 25-year, 24-hour storm event. The District's criteria also require that the post-development volume of discharge not exceed the pre-development volume of discharge. The retention system which ultimately discharges to Orange Lake is designed to retain the entire 25-year, 24-hour storm event through the series of basins on site. The pre-development peak rate of discharge for the drainage basin which flows to the lake is 55 cubic feet per second (cfs) during the 25-year, 24-hour storm event. The post-development peak rate of discharge from drainage basin 2 is 4 cfs. The post-development peak rate of discharge is less than the pre- development peak rate of discharge. Runoff from each RV site will be collected in an individual, ten-inch- deep retention basin. Runoff from the road will be collected in roadside swales. Runoff from the clubhouse, country store, and associated parking lots will be conveyed to drainage retention area (DRA) No. 8. The individual retention basins have the capacity to retain the 25- year, 24-hour storm event without discharging. Any surface water discharges from the individual retention basins in Basins 2A, 2B, and 2C as designated on sheet 3 of 16 will flow to DRA Nos. 4, 5, and 7, respectively. In Basin 2D, runoff from the road and RV park model sites will flow to DRA No. 6. The discharge from DRA No. 6 in the 25-year, 24-hour storm will be zero (0) cfs. In larger storms, any discharge from DRA No. 6 will flow to DRA No. 7. In the event DRA No. 7 overflows, the runoff will flow to DRA No. 5. Basins 2G and 2F are located around two existing sinkholes which currently collect stormwater runoff. In the proposed project, Basins 2G and 2F continue to drain the same area as pre-development. However, additional impervious surfaces will be placed in the drainage area. For this reason, an additional three to five feet of clean fill will be placed in the bottom of each sinkhole for filtration purposes. Basins 2H and 2I are less than one acre and currently drain off site. Berms are proposed around the property line at the basin to keep the stormwater on site. Basins 2H and 2I retain 3/4 inch of runoff over the individual basin. The runoff from Basins 2E1 and 2E flows to DRA No. 8 via a drainage swale. DRA No. 8 will retain 3/4 inch of runoff from the drainage area and is an off-line retention basin. The DRA No. 8 is equipped with a diversion box which allows the 3/4 inch of runoff to enter the DRA and then diverts the runoff from larger storms around the DRA so that the treatment volume of runoff (3/4 inch) continues to be treated in DRA No. 8 and does not mix with and discharge from DRA No. 8 during larger storms. Drainage Basin 1 Drainage Basin 1 as designated on plan sheet 3 of 16 is a landlocked basin which does not discharge to Orange Lake. In Drainage Basin 1, as in Basin 2, the runoff from the RV sites flows to the individual retention basins which retain the 25-year, 96-hour storm event. The runoff from the road flows to swales. Overflow from the basins and swales flow to the DRAs. Drainage Basin 1 does not discharge during the 100- year, 24-hour or the 25-year, 24-hour storm event, pre-development or post- development Drainage Basin 1 is designed to retain the 100-year, 24-hour storm, which is an 11 inch storm event. Drainage Basin 1 is also designed to retain the 25-year, 96-hour storm event. The 25-year, 96-hour storm event is 143% of the 25-year, 24-hour storm event. WATER QUALITY Design Criteria The District's design criteria for water quality are set out in Section 40C-42.025, Florida Administrative Code. The District's retention criteria require that a proposed system have a treatment/pollution abatement volume of 1/2 inch of runoff from the site. For discharges to an OFW, the pollution abatement volume is increased by fifty percent. Therefore, the system must have the volume to retain 3/4 inch of runoff from the site. Each retention basin retains a minimum of 3/4 inch of runoff from the site. The District's criteria regarding quantity of water discharged require a larger volume of runoff to be retained than the District's criteria regarding quality. Therefore, the retention system exceeds the District's criteria regarding quality in order to meet the criteria regarding quantity. The District's retention criteria require that the basin recover the treatment volume within 72 hours. Most of the retention basins retain more than the required treatment volume of 3/4 inch, and most will also recover, or become dry, within 72 hours. The retention basins are capable of being effectively maintained in that the side slopes and bottom of the basins can easily accommodate mowing equipment. For erosion control, staked hay bales and silt screens will be utilized on site during construction to prevent the off-site transport of soil material. Following construction, the retention basins will be vegetated with sod to prevent erosion. The District's criteria require that facilities which receive stormwater runoff from areas with greater than fifty percent of impervious surface shall include a baffle or other device for preventing oil and grease from leaving the system. DRA Nos. 1, 4, 5, and 8 are equipped with an oil and grease removal device called a baffle. The baffle is an acceptable engineering design for the removal of oil and grease from stormwater in a retention basin. The facility operation is uncomplicated. If the individual basins did fill due to a storm event greater than the 25-year, 24-hour or the 25-year, 96- hour in the landlocked basin, they would simply overflow into a DRA. No structures are involved to prevent flooding in large storm events. Water Quality Impacts The individual retention basin at each RV site is considered off-line because it does not discharge in the 25-year, 24-hour storm event. DRA Nos. 1, 2, 3, 4, 5, 6, and 7 are considered off-line because they do not discharge during the design storm. DRA No. 8 is considered off-line because of the diversion box which provides for the retention of the treatment volume and diversion of the larger storms. Off-line retention systems generally show greater pollutant treatment efficiencies than other types of stormwater treatment. The first 1/2 inch of runoff or the "first flush" of rainfall contains ninety percent of the pollutants from the site. SURFACE WATER Utilizing information and methodologies generally accepted by experts in the field of water quality, the District analyzed and projected the average surface water and groundwater quality of the discharge from the surface water management system for the proposed project. No data on runoff concentrations currently exists for RV parks. This analysis was based on a review of existing data on untreated runoff concentrations from three multifamily developments and one highway study. Because data from studies of multifamily residential and highway projects was used, the District's estimates of the untreated runoff concentrations for this project are conservative in that the actual concentrations are probably less than estimated. The District's analysis of the average quality of the discharge from the proposed system was also based on projecting the treatment efficiencies associated with the system. This analysis was done by reviewing data from documented studies previously conducted to ascertain the treatment efficiency of retention methods of stormwater treatment. Generally, retention of the first 1/2 inch of runoff removes eighty percent of the pollutants. On this project, a treatment efficiency of ninety-five percent was assumed based on the fact that the system is off-line treatment and a minimum of 3/4 inch of runoff from the site will be retained in the basins prior to discharge. The expected average untreated runoff concentrations were then educed by the expected treatment efficiencies to project post-treatment water quality of the discharge from the proposed system. These numbers were then compared to Chapter 17-302, Florida Administrative Code, water quality standards for Class III water bodies, and ambient water quality in Orange Lake. Orange Lake is classified as an OFW. Therefore, the proposed project cannot be permitted if it will cause degradation of that water body. The background data or ambient water quality data for phosphorous and nitrogen was taken from the Orange Lake Biological Report by the Florida Game and Freshwater Fish Commission in 1986. The ambient water quality for the other parameters in Table 2 of District Exhibit 2 was computed using eight years of data from a District monitoring station on Orange Lake. The projected average concentration for each constituent in the discharge from the system is less than the ambient water quality of Orange Lake. Therefore, the proposed surface water discharge will not violate state water quality standards in waters of the state. The post-development pollutant loading rates should be equal to or better than the pollutant loading rates from the use of the property as citrus or pastureland because the runoff is being retained on site and treated before being discharged. GROUNDWATER Groundwater discharges were reviewed by assessing the type of soil below the retention basin and the distance to the water table. The soil on the site contains some organic matter which is beneficial for treatment purposes. Based on the borings submitted by Celebrity, the water table, if any, is five feet or more below the bottom of any proposed retention basin. Runoff in the basin will percolate through the soil. Nutrients such as nitrogen and phosphorus will be taken up by the vegetation in the bottom of the basins. Metals will bind to the soil material below the basin. Oils and greases will be broken down through microbial degradation into nontoxic material. Groundwater discharges from the proposed system will not violate any applicable state groundwater quality standards. These standards will be met within the first three feet below the treatment basins. The standards will also be met by the time the groundwater discharge moves to the edge of the zone of discharge which is at the property boundary. The discharge from the proposed Celebrity project will not cause or contribute to a violation of state water quality standards in the receiving waters. SINKHOLES Sinkholes may form on the site. Sinkholes that form will probably be "cover subsidence" sinkholes. Cover subsidence sinkholes are those in which a void below the surface fills with the soil from above, causing a depression in the ground surface. There are four relict sinkholes on site. They are cover subsidence sinkholes. The sinkhole nearest the lake has water in the bottom. Stormwater runoff is directed away from the sinkhole. Any water which enters the sinkhole from the land surface or above will enter from the sky. The District has proposed criteria for stormwater systems in designated Sensitive Karst Area Basins. Those criteria are that 1) the water in the basins shall be no deeper than ten feet deep; 2) there should be at least three feet of unconsolidated material between the bottom of the basin and the top of the water table; and 3) the basins should be fully vegetated. The District currently applies these criteria as policy. In this project, the basins are shallow, ranging from ten inches deep at the RV sites to 2 1/2 feet in the DRAs. The basins have at least three feet of unconsolidated material between the bottom of the basin and the top of the water table. In the soil borings performed by Celebrity, the water table was shown to exist between five and fifty feet below land surface. The proposed project design meets or exceeds the proposed criteria for Sensitive Karst Area Basins. The basins will be fully vegetated or sodded with grass. Lineations or lineaments are solution features which may indicate a fracture of the underlying limestone. There may be a lineament on the site. There are other sinkholes in the area. If a cover subsidence sinkhole develops in an individual retention basin or DRA, stormwater, if any, will seep or percolate through the several feet of soil prior to reaching an aquifer. Most of the pollutants in the retention basin will meet groundwater quality standards prior to percolation and further treatment in the soil. OPERATION AND MAINTENANCE Special conditions Nos. 13, 14, and 15 on the permit will require Celebrity to inspect the system monthly for sinkhole development. If a sinkhole develops, Celebrity must notify the District within 48 hours of its discovery. Celebrity must submit a detailed repair plan within 30 days for written approval by the District. Celebrity proposes to repair any sinkholes that develop by a District- approved method. Celebrity Resorts, Inc., is a legally established corporation registered in Delaware and owns the subject property. Celebrity does not intend to subdivide the property but to sell memberships to use the property on a time-share basis. Celebrity will administratively operate the site by employing a park manager who will remain on the property 24 hours a day. If any problems occur with the basins, either he or his designee will be on site to respond quickly to the situation. The park manager will have a full-time maintenance staff which will operate the park. Celebrity will financially operate and maintain the proposed system using funds currently raised and in the future by membership fees. Celebrity is a publicly held corporation. Funds raised from the sale of stock, approximately $3,500,000, have paid for legal and administrative fees as well as the land purchase. Approximately $400,000 has been reserved to operate the facility. It will cost approximately $15,000 per month to run the park. Memberships will be sold for $300 per year. Part of the membership fees will go toward the general maintenance of the site. Maintenance of the proposed system will include regular mowing and monthly inspection for sinkholes and repair if necessary. WETLANDS IMPACTS OF THE PROJECT The property contains waters of the state wetlands and isolated wetlands. The waters of the state wetlands are those along the shore of Orange Lake. One isolated wetland exists on site in the sinkhole which is closest to the lake. The sinkhole has standing water in which lemna, or duckweed, is growing. Duckweed is a listed plant species in Section 16.1.1(2) of the Handbook. No construction is proposed in either the waters of the state wetlands or the isolated wetland. The District criteria require the review of impacts to off-site aquatic and wetland dependent species relative to the functions currently provided by the wetlands to these types of fish and wildlife. Since there will be no construction in the wetlands, there will be no impacts to the habitat, abundance and diversity, or food sources of off-site aquatic and wetland dependent species from this proposed project. No threatened or endangered aquatic and wetland dependent species were observed on site. The proposed permit application will not adversely affect natural resources, fish, or wildlife in a manner which is inconsistent with the District criteria. The proposed permit application will not adversely affect hydrologically-related environmental functions in a manner which is inconsistent with the District criteria.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the petition filed by Concerned Citizens of Orange Lake Area be dismissed for lack of standing and that Celebrity Resorts, Inc., be issued a MSSW permit for its system as designed and proposed. DONE and ENTERED this 19th day of July, 1991, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of July, 1991. APPENDIX TO THE RECOMMENDED ORDER The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Concerned Citizens of Orange Lake Area 1. Proposed findings of fact 1-6 are subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Celebrity Resorts, Inc. 1. Proposed findings of fact 1-38 are subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, St. Johns River Water Management District 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1&2(1); 3-7(4-7); 8-20(8- 20); 21(2); 22-31(21-30); 32(16); and 33-107(31-105). COPIES FURNISHED: Crawford Solomon Qualified Representative Concerned Citizens of Orange Lake Post Office Box 481 Citra, FL 32681 William L. Townsend, Jr. Attorney at Law Post Office Box 250 Palatka, FL 32178-0250 Nancy B. Barnard Attorney at Law St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429 Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429

Florida Laws (3) 120.52120.56120.57 Florida Administrative Code (1) 40C-42.025
# 8
CLYDE TOWNSEND AND MRS. CLYDE TOWNSEND vs. PLANMAC COMPANY, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000107 (1986)
Division of Administrative Hearings, Florida Number: 86-000107 Latest Update: Apr. 23, 1986

Findings Of Fact On March 12, 1985, Applicant filed a request with the Department for a permit to construct a marina in a manmade basin (Captain's Cove) located on Lower Matecumbe Key, Monroe County, Florida. The permit sought by the Applicant, as modified, would allow it to construct a 52-slip docking facility consisting of two 5' x 248' docks, each with fourteen 3' x 40' finger piers and twelve associated mooring piles; and, approximately 590 linear feet of riprap revertment requiring the disposition of approximately 300 cubic yards of rock boulders landward and waterward of mean high water (MHW). All docks and finger piers would be constructed of prestressed concrete supported by concrete piles; mooring piles would be pressure treated wood. The Applicant proposes to organize the facility as a condominium development; however, live-aboard use will be prohibited. A manager's quarters, office, restrooms and a parking area will be provided on the adjacent uplands. The Department's October 3, 1985, notice of intent to issue, proposed to issue the requested permit subject to the following condition: The permittee is hereby advised that Florida law states: "No person shall commence any excavation, construction, or other activ- ity involving the use of sovereign or other lands of the state, title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund or the Department of Natural Resources under Chapter 253, until such person has received from the Board of Trustees of the Internal Improvement Trust Fund the required lease, license, easement, or other form of consent authorizing the proposed use." If such work is done without consent, a fine for each offense in an amount of up to $10,000 may be imposed. Turbidity screens shall be utilized and properly maintained during the permitted construction and shall remain in place until any generated turbidity subsides. Only non-commercial, recreational boats shall be allowed to use the proposed marina. The applicant shall incorporate this condition into the condominium document for the proposed marina and supply the Department with a copy of the document prior to any sales of the condominium. No live-aboard boats shall be allowed in the marina. This condition shall also be placed in the condominium document. A portable sewage pumpout wagon shall be provided at the marina. Pumpout effluent shall be properly disposed of by methods acceptable to the department; these methods and locations shall be approved by the department prior to construction. A supply of oil absorbent materials, designed to clean up small oil spills, shall be maintained at the marina office. At least sixty (60) days prior to construction, the applicant shall submit to the Punta Gorda DER office for review, a detailed list of equip- ment to be permanently maintained on site. This list of equipment shall be modified as necessary and approved by the department prior to construction. The uplands on the permittee's property shall be graded to direct stormwater away from the edge of the boat basin. No fuel facilities nor storage shall be allowed at the project. Only clean rock boulders free from attached sediments or other deleterious compounds, and of a minimum diameter of 2' or greater shall be installed as riprap. 1O. The Marathon Department of Environmen- tal Regulation office shall be notified 48 hours prior to commencement of work. "IDLE SPEED-NO WAKE" signs shall be placed at conspicuous locations at the docking facility with additional language that "this precaution exists throughout the length of the canal channel during ingress and egress". At least two trash receptacles shall be provided on each of the two main walkway piers: these receptacles shall be routinely maintained and emptied. Prior to dockage use by boats, marker buoys shall be established around all vege- tated shallow zones within the limits of the submerged property limits with signs advising boaters of "SHALLOW WATERS-NO ENTRY". Prior to construction, the applicant and the Mara- thon DER office shall meet to discuss accept- able locations for these markers. The project shall comply with applic- able State Water Quality Standards, namely: 17-3.051 - Minimum Criteria for All Waters at All Times and All Places. 17-3.061 - Surface Waters: General Criteria 17-3.121 - Criteria - Class III Waters - Recreation, Propagation and Management of Fish and Wildlife: Surface Waters. The Applicant has agreed to comply with all conditions established by the Department. The Marina Site Captain's Cove is a manmade navigable lagoon with access to Florida Bay through a 2,500' long by 100' wide canal located opposite the project site. The waters of Captain's Cove and the canal are designated Class III surface waters, and those of Florida Bay as Outstanding Florida Waters. The controlling depth for access to the proposed marina is found at the mouth of the canal, where Florida Bay is approximately 6' mean low water (MLW). Depths within the canal are typically 1' or 2' deeper than the controlling depth at the mouth. Captain's Cove is roughly rectangular in shape. It measures 1,400' northeast to southwest, and up to 500' northwest to southeast. In the vicinity of the Applicant's property, which is located in the northeast fifth of the cove, the cove measures 350' wide. The bottom depth of the cove is variable. The southwestern four-fifths of the cove was typically dredged to a depth of 25' MLW. Within the northeast fifth of the cove (the basin), a gradation in depths is experienced. The northwest portion of the basin, located outside the project site, is typically 5' - 6' MLW, and heavily vegetated by sea grasses (turtle grass, manatee grass, and Cuban shoalweed). The southeast portion of the basin, which abuts the Applicant's property, consists of a shallow shelf 10' - 20' in width. Beyond this shelf, the bottom drops off steeply to a depth of 20' MLW. The shelf abutting the Applicant's property is sparsely vegetated with mangroves, and provides limited habitat for aquatic fauna such as domingo mussels and paper oysters. Replacement of these mangroves and other shoreline vegetation with riprap would not significantly affect the biological balance within the cove and would provide suitable habitat for existing species. The waters within the cove are quite clear, and meet the Department's water quality standards except for a thin layer at the deepest part of the cove where dissolved oxygen violations were noted. The proposed marina is, however, to be located in the northeast fifth of the cove, opposite the access canal, where the waters are more shallow and water circulation more prevelant. As sited, the proposed marina will not exacerbate or contribute to a violation of the Department's water quality criteria. Areas of Concern During construction of the marina elevated turbidity may be expected by disruption of the basin sediments caused by installation of the facility's pilings. This can be adequately controlled, however, by the use of turbidity curtains during construction. Shading of the benthic environment is a long term impact associated with marinas. Since the boat slips will be located in the deeper 20' MLW depth of the basin, where seagrasses are not present, sunlight will be permitted to reach the productive areas of the basin lying at 5' - 6' MLW and no adverse impact from shading will be experienced. Boats by their very existence and operation present potential negative short term and long term impacts to the environment. Potential damage to the seagrass beds in the northwest portion of the basin will be eliminated or minimized by the planned installation of buoys and/or signs prohibiting navigation in that area. Potential damage from wave action generated by boat operation will be eliminated or minimized by designating and posting the marina and access channel as an "idle speed-no wake" zone.[footnote 1] [footnote 1: Intervenors raised some concern regarding possible impact to the Florida manatee. While manatee have been sighted in the access channel, their occurrence is infrequent. Marking the shallow areas and designating the area as an "idle speed-no wake" zone will provide reasonable assurances that the manatee will not be adversely affected by the proposed marina.] The fueling of boats, hull maintenance, boat cleaning (detergents), and sewage discharge are additional pollution sources associated with marinas. While the proposed marina will have no fueling facilities and no live-aboards will be allowed at the marina, additional conditions must be attached to the permit to eliminate or minimize potential impacts from these potential pollution sources. In addition to the conditions established by the Department, the following conditions are necessary: All craft docked at the marina shall be prohibited from pumping sewage into the waters of the cove. Use of the boat slips shall be limited to those person(s) who own the slip. Leasing of boat slips shall be prohibited. Living aboard any boat docked at the marina is prohibited at all times.[footnote 2] [footnote 2: During hearing some concern was raised regarding the definition of live- aboard. The Department's intent in specifying no live-aboards was that no person(s) stay overnight on any boat moored at the marina. The purpose of this condition is to clarify that intent.] No boat cleaning, hull maintenance, nor fish cleaning shall be allowed at the permitted facility. Limiting use of the boat slips to owners will provide reasonable assurances that the conditions imposed on the requested permit will be complied with. Prohibiting live- aboards, the pumping of sewage, fish cleaning, boat cleaning and hull maintenance, will provide reasonable assurances that Department standards for bacteriological and water quality will not be violated.

# 9
ROOKERY BAY UTILITIES, INC. (PRISCILLA SPADE) vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-001318 (1996)
Division of Administrative Hearings, Florida Filed:Naples, Florida Oct. 10, 1996 Number: 96-001318 Latest Update: Jun. 20, 1997

The Issue The issue is whether Petitioner is entitled to an operating permit for an existing domestic wastewater treatment facility operating in Naples.

Findings Of Fact On May 10, 1991, Respondent issued Petitioner a five- year permit to operate a 0.3 million gallon per day (GPD) domestic wastewater treatment plant known as the Rookery Bay facility in Naples. This permit, which is number DO11-187204, allowed Petitioner to operate an extended aeration plant, using chlorine for basic disinfection and disposing of the reclaimed water in two percolation ponds. The 1991 permit required Petitioner to allow Respondent access to the facility for inspections at reasonable times, notify Respondent of any violations of any permit conditions, maintain total chlorine residual of at least 0.5 milligrams per liter (mg/L) of effluent sample after at least 15 minutes’ contact time at maximum daily flow, maintain annual average effluent quality values for carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) of not more than 20 mg/L of effluent sample with maximum effluent quality concentrations of 60 mg/L in any single effluent sample, maintain a monthly average effluent quality value for fecal coliform of not more than 200 per 100 ml of effluent sample with a maximum effluent quality value of 800 per 100 ml in any single effluent sample, notify Respondent of any discharge from the percolation pond overflows, and monitor influent loading to the facility and apply for a permit modification if the monthly average influent flows approach or exceed the design capacity of 0.3 MGD or if the facility violates treatment standards. Respondent also issued Petitioner a five-year permit to operate a 0.15 GPD domestic wastewater treatment plant at the Rookery Bay facility. This permit, which is number DO11-167093, allowed Petitioner to operate a contact stabilization process plant. On December 29, 1995, Petitioner submitted a renewal application for permit number DO11-167093. Although the permit number references the smaller tank, the renewal application requests a permitted capacity of 0.3 MGD. By Notice of Permit Denial dated February 9, 1996, Respondent denied the permit application on the ground that Petitioner could not provide reasonable assurance that it would operate the facility in compliance with state standards based on a “continued and long standing pattern of noncompliance and violation of . . . rules and standards.” Petitioner’s operation of the Rookery Bay treatment plant has been poor. Respondent has brought an enforcement action against Petitioner, which signed a consent final judgment in January 1994. The consent final judgment required Respondent to pay $4500 in civil penalties. As it applied to the Rookery Bay facility, the consent final order required Petitioner to evaluate the facility to discover the causes of past violations and modify the facility to eliminate these violations. But Petitioner has not complied with material provisions of the consent final judgment. Petitioner’s operator has been held in contempt of court several times for violations at Rookery Bay and a nearby smaller treatment facility known as Port au Prince. Petitioner has several times refused Respondent’s representatives reasonable access to the Rookery Bay facility. At least twice, Petitioner has failed to advise Respondent of equipment failures that resulted in violations of treatment standards. On January 11, 1995, Petitioner cut off the power for several hours to a lift station pump serving a nearby a condominium complex. Predictably, the sewage backed up and overflowed into the street. Petitioner failed to restore the power timely or remove the overflowed sewage. On several occasions, raw or inadequately treated sewage has leaked from the tanks at the Rookery Bay facility. Petitioner has failed to eliminate this problem over the course of its five-year operating permit. On numerous occasions, Respondent’s representatives have detected violations of effluent quality. These violations have arisen inadequate detention time in the chlorine contact chamber. Consequently, the TSS and CBOD levels have repeatedly exceeded permitted standards. The parties dispute the adequacy of the capacity of the Rookery Bay facility. There is considerable evidence, including one statement in the application, that suggests that the facility’s capacity is seriously inadequate. Either the capacity of the Rookery Bay is, and has been, inadequate--in which case at least some of the violations are attributable to overcapacity operation--or, if the facility has had adequate capacity, the operational competence of Petitioner is below the minimum level necessary to provide reasonable assurance of proper operations at this facility in the future. Most likely, the Rookery Bay facility lacks adequate capacity, at least part of the year, and Petitioner lacks the minimum requisite competence to operate the facility in a responsible manner. The strongest evidence in the record suggests that the Rookery Bay facility serves, during peak season, 1500 mobile home connections and 400 apartment connections. These connections generate about 377,500 GPD of raw sewage. A slightly lower value is probable after consideration of the likely presence of recreational vehicles among the mobile home count. But this reduction, even without adjustment for dry-season infiltration and inflow, would not yield sufficient savings in raw sewage as to provide reasonable assurance that the Rookery Bay facility has adequate capacity to serve the present demand or adequate capacity to serve the demand projected over the five-year term of the permit that Petitioner seeks. Even if one were to credit Petitioner’s volume-to- capacity calculations, the results fail to constitute reasonable assurance of violation-free operation of the Rookery Bay facility. Petitioner's calculations leave little if any margin for error at present demand levels, and, given Petitioner’s singularly poor operating history at this facility, these calculations provide poor assurance of compliant operation of this troubled facility.

Recommendation Based on the foregoing, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner’s renewal application for a domestic wastewater treatment operating permit for the Rookery Bay facility. DONE AND ORDERED in Tallahassee, Florida, this 9th day of May, 1997. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of May, 1997. COPIES FURNISHED: Sanford M. Martin 2500 Airport Road, Suite 315 Naples, Florida 34112-4882 Thomas I. Mayton, Jr. Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Perry Odom General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (4) 120.57403.085403.087403.088 Florida Administrative Code (1) 62-620.320
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer