Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
GREENHUT CONSTRUCTION COMPANY, INC. vs DEPARTMENT OF GENERAL SERVICES, 92-001297BID (1992)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 24, 1992 Number: 92-001297BID Latest Update: Jun. 04, 1992

The Issue The issue for consideration herein is whether the Respondent's proposed award on BID No. HSMV - 90022010 to Dunn Construction Company, Inc., should be upheld.

Findings Of Fact At all times pertinent to the issues herein, the Department was the state agency responsible for the solicitation of bids for and award of contracts for the construction of state buildings in Florida. Both Greenhut and Dunn are qualified contractors who are certified to bid on state construction contracts in general and this procurement in particular. In December, 1991, the Department issued an advertisement for bids for the project in issue herein, the construction of the Kirkman Complex Addition Data Center in Tallahassee, Florida. According to the Advertisement for Bids, all bids "must be submitted in full accordance with the requirements of the Drawings, Specifications, Bidding Conditions and Contractual Conditions, which may be examined and obtained ..." from the Department's designated architect/engineer, Clemons, Rutherford and Associates, Inc. in Tallahassee. Section B-21 of the request for proposals (invitation to bid) reads, in pertinent part: The recommendation for contract award will be for the bidder qualified in accordance with Section B-2 and submitting the lowest bid provided his bid is responsible and it is in the best interest of the Owner to accept it. The Owner reserves the right to waive any informality in bids received when such waiver is in the interest of the owner. Bids received on this project were originally scheduled to be opened and read aloud on January 15, 1992 with the tabulation and Bid Award Recommendation to be posted the following days at the location where the bids were opened. The proposal as originally issued called for the submittal of a Base Bid with four Alternates, 1a, 1b, 2, and 3. Alternate 1a was a deduct for merely extending the existing Johnson Controls System to incorporate the new work instead of providing a totally new and independent control system. Alternate 1b called for adding furniture and landscaping for certain of the rooms shown on the drawings; Alternate 2 called for adding a "shelled" fourth floor as described in the proposal; and Alternate 3, as originally issued, called for: Add a complete fourth floor as indicated in drawings including the finished interior partitions with full HVAC, Plumbing and Electrical Service. Include furniture and landscaping for rooms 414 and 419. (Includes items in Alternate No. 2) As a result of questions received from prospective bidders at the pre-bid conference which indicated some confusion as to the meaning and intent of the Department regarding Alternate No. 3, by letter to all prospective bidders, dated January 8, 1992 the Department's architect indicated: Alternate #3 shall be the fourth floor complete, as shown on drawings, which includes items in Alternate #2. Addendum #1 to the request for bids, dated January 10, 1992, clarified Item 1-3.6), PROPOSAL FORM, of the PROJECT MANUAL to ADD to "Alternate #3", "(Include items in Alternate #2)". Item #2-1 of Addendum #2, dated January 16, 1992, deleted the sentence changed by Item #1- 3.6, and revised the sentence to read as follows: This includes any items required in addition to Alternate #2 to complete the remainder of the work for the Fourth Floor. Information contained at the beginning of each Addendum calls the bidders' attention to the change and indicates that failure to incorporate it may result in disqualification. The due date for bids was extended at the instance of the Department. Both Petitioner and Intervenor submitted bids for this project as did several other concerns on January 23, 1992. Greenhut's base bid was $4,139,000 with a deduct of $63,600 for Alternate 1a, and additions for Alternates 1b, 2, and 3 of $69,500, $239,000, and $209,000 respectively. Greenhut's total bid, therefore, through Alternate 3, was $4,592,900. Dunn's base bid was $4,079,000 with a zero deduct for Alternate 1a, and additions for Alternates 1b through 3 of $67,000, and $428,000. Dunn's total bid, therefore, was $4,574,000 for a difference of $18,900. Greenhut's bid was submitted on a form which provided for the base bid, the deduct for 1a, and the additions for 1b. 2 and 3 with the figure for 3 being those costs in addition to those identified in Dunn's bid was submitted on a prior form which provided for a base bid, a 1a deduction if any, (there was none), and additions for 1b, 2, and 3 with the figure for 3 including the figure listed for 2. An initial review of Dunn's bid form, then, showed a base bid of $4,079,000, no 1a deduction, a 1b addition of $67,000, a 2 addition of $311,000, and a 3 addition of $428,000. This letter figure included the $311,000 figure for Alternate 2, which should have been deducted from the bid during tabulation. When the bids were opened on January 23, 1992 by Mr. Everline, each figure on each bid was read off and listed on the bid tabulation form in the appropriate area. No attention was given at that time to the appropriateness or correctness of the figures listed on each bid form, nor was any attention paid to any other technical requirement of the procurement. This was merely a transfer of figures from the bid form to the tabulation form, and when this was done, Mr. Everline announced to all in attendance, including many contractor representatives, that the "apparent low bidder" was Greenhut. In arriving at that conclusion, Mr. Everline added all of Dunn's figures together without deducting the $311,000 listed for Alternate 2, a figure which was included in the $428,000 figure listed for Alternate 3. This resulted in an incorrectly large total bid for Dunn. Sometime later that day, a representative of Dunn contacted Mr. Everline to indicate that Dunn had inadvertently bid on the wrong form which precipitated its misleading presentation. Mr. Everline properly declined to discuss the matter and referred the Dunn representative to the Department's legal counsel. Sometime thereafter, when the bids had been tabulated and reviewed for responsiveness and legal qualification of bidders, Mr. Everline suggested to representatives of DHSMV that in order to forestall a protest, only so much of the project as extended through Alternate 2 be awarded. DHSMV officials, however, had sufficient funds available for the entire project, including some additional funds, if necessary, for cabling, and insisted they wanted the entire project awarded. The Department's legal counsel, upon review of the situation, concluded that the Dunn's actual bid intent was clear to include the amount listed for Alternate 2 within that listed for Alternate 3, and not to consider the two as additives to each other. It further concluded that Dunn's use of the improper form on which to submit its bid was immaterial and afforded it no improper competitive edge over other bidders. Therefore, it was concluded that Dunn was the low responsive bidder and, on February 4, 1992, the Department issued a Notice of Award to Dunn. Thereafter, Greenhut filed its Petition For Hearing taken as a protest to the award. Both the Department and Dunn agreed that Greenhut had standing to protest the award and that the protest was timely filed. It is so found.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of General Services enter a Final Order in this case dismissing the protest of Greenhut Construction Company, Inc., in regard to the proposed award of contact in bid number HSMV - 90022010 to Dunn Construction Company, Inc. RECOMMENDED in Tallahassee, Florida this 21st day of April, 1992. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-1297 BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of fact submitted by the parties to this case. FOR THE PETITIONER: 1. - 6. Accepted and incorporated herein. 7. - 9. Accepted. Accepted. & 12. Accepted and incorporated herein. Accepted. Accepted. & 16. Accepted and incorporated herein. Accepted and incorporated herein. & 19. Accepted and incorporated herein. Accepted. & 22. Accepted and incorporated herein. Argument and not Finding of Fact except for 1st sentence which is accepted. & 25. Accepted and incorporated herein. FOR THE RESPONDENT: 1. - 3. Accepted. 4. - 6. Accepted and incorporated herein. 7. & 8. Accepted. 9. - 12. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. & 17. Accepted and incorporated herein. Irrelevant but accepted as true. Accepted. Accepted and incorporated herein. Accepted. Accepted. Irrelevant but accepted as true. Accepted. Accepted and incorporated herein. Irrelevant. Accepted and incorporated herein. Accepted. FOR THE INTERVENOR: Accepted. - 5. Accepted and incorporated herein. Accepted and incorporated herein. & 8. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 15. Accepted. 16. - 19. Accepted. 20. & 21. Accepted. Accepted and incorporated herein. & 24. Accepted. COPIES FURNISHED: Robert A. Emmanuel, Esquire 30 South Spring Street Post Office Drawer 1271 Pensacola, Florida 32596 Sylvan Strickland, Esquire Suite 309, Knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950 Harry R. Detwiler, Jr., Esquire 315 S. Calhoun Street, Suite 600 Tallahassee, Florida 32301 Ronald W. Thomas Executive Director Department of General Services Suite 307, Knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950 Susan Kirkland General Counsel Department of General Services Suite 309, knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950

Florida Laws (1) 120.57
# 1
ECCELSTON PROPERTIES, LTD. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-004901BID (1988)
Division of Administrative Hearings, Florida Number: 88-004901BID Latest Update: Jan. 12, 1989

Findings Of Fact Prior to June, 1988, HRS determined that it needed 23,871 square feet of office space to house some of its social services for indigents in Northern Escambia County. Since HRS desired more than 2,000 square feet of office space, it was required to bid lease number 590:1987 competitively. To that end, Respondent prepared an Invitation to Bid and a bid submittal package. The package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: client safety public access, ingress and egress availability of public transportation. The above areas were important to HRS since the agency would render indigent services to approximately 1000 people a month, many of whom are handicapped or lack good mobility due to age or infirmity. The majority of Respondent's clients are served within a 10 day period during each month. A great deal of pressure is placed on the surrounding area due to the in flux of people. Additionally, many of Respondent's clients utilize public transportation since they do not own or have access to personal vehicles. Because of servicing so many people the above factors received a great deal of weight under HRS's consideration of the property it desired to lease and occupy. All of the above areas were covered by Respondent's weighted bid evaluation criteria. Additionally, in order to submit a responsive bid, a prospective lessor was required to meet one of the following qualifications at the time the bid was submitted: (a) be the owner of record of the facility and parking areas; (b) be the lessee of the space being proposed and present with the bid a copy of the lease with documentation of authorization to sublease the facility and parking areas; (c) submit documentation of an option to purchase the facility and/or parking areas; or (d) submit documentation of an option to lease the facility with authorization to, in turn, sublease. The District Administrator of HRS, Chelene Schembera, is ultimately responsible for bidding, selection and leasing of all HRS facilities within District I, including Escambia County, Florida. In order to accomplish this task Ms. Schembera appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to her the committee's choice of the lowest and best bid. Ms. Schembera's purpose in establishing the bid evaluation committee was to secure input from a cross section of people who had a variety of backgrounds and knowledge that would be material in evaluating the office space, in light of the uses for which it was intended and the relative public worth of the work space. Ms. Schembera appointed individuals who were familiar with the type of work to be done in the proposed space, as well as persons familiar with the bid process. On July 21, 1988, HRS received five bids on the lease. Intervenors submitted the apparent low bid which Northside consisted of one building located at the Brentwood Shopping Center in Pensacola, Florida. At the time that the Intervenors submitted their bid, they included documentation which showed that they had a contract to purchase the subject facility; they have since closed on that transaction. This bid package did not include the four acres adjacent to the Brentwood Shopping Center property and no contract to purchase or other documentation was submitted as to the four acre parcel of property. Petitioner submitted the apparent second lowest bid which consisted of one building located at Fairfield Plaza in Pensacola, Florida. Petitioner's interest in Fairfield Plaza is that of a lessee under a Master Lease with rights to sublet the property. All appropriate documentation was submitted with the bid. This property was the subject of a semi-friendly foreclosure action at the time that the Petitioner's bid was submitted. Petitioner was still in possession and control of the property. Both Petitioner's and Intervenors' property were within the mandatory geographical area designated in the bid package. Both bids were responsive under the minimum bid specifications and bidder qualifications. The other three bids which were submitted by HRS are not in contention The committee members personally inspected the sites offered by the Petitioner and the Intervenors. While at the Intervenors' site, the committee's concern over the property's minimal parking (as compared to Fairfield) and limited safe public access, ingress and egress were raised. The only access to Intervenor's property was from a very busy multi-lane highway. Certain turns onto and off the property were extremely dangerous. In order to make its bid package more acceptable, Intervenors' representative orally amended the bid package to include the southerly four acres contiguous to the Brentwood property. The Inclusion of the southerly four acres would adequately increase Intervenors' parking. The amendment would also create additional and safer public ingress and egress since the four acres abutted on Murray Lane which intersects Highway 29. This amendment substantially worked to Intervenors' advantage and was a material change to the previously submitted bid. The improper amendment cannot be considered here. Following the on-site inspections, the committee members met and rated the properties submitted by Petitioner and Intervenors according to a Bid Synopsis evaluation sheet which they had been previously provided. The committee members' review of the Intervenors' property included the improper bid amendment. Even with the improper amendment, the unanimous recommendation of the evaluation committee was to award the lease to the Petitioner and Fairfield Plaza. The evaluation committee based its decision on the scores attributed to each property on the Bid Synopsis sheet by the individual committee members. The committee utilized all the weighted bid criteria. However, two factors were of primary importance. One was its determination that the property offered by the Intervenors presented greater problems for ingress and egress due to the congested nature the area. The other consideration was that service to Fairfield Plaza from public transportation was both more frequent and direct. The property offered by the Intervenors had less public transportation service. The stops were less frequent and a significant number of clients would be required to transfer buses to reach Brentwood when utilizing such public transportation. All bus passengers would be required to walk from the bus stop close to Brentwood and attempt at their peril to cross a very busy, dangerous and congested highway. The reasons given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the Bid synopsis score sheets. The scoring was done by each member after discussion of the two buildings and without influence from the other committee members. In essence, the committee felt that Petitioner's property was the better property for the money. Importantly, every committee member came to the conclusion that Petitioner's property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a piece of property. On these facts, the individual scoring methods used by the individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. The District Administrator initially adopted the committee's recommendation and reported that recommendation to King Davis, the Director of General Services for HRS. The Director of General Services later informed the District Administrator that he and his staff were concerned with the fact that the recommendation was to award the lease to the second lowest bidder. The staff's review considered the improper amendment as part of the Intervenors' bid. Over a ten year period the Petitioner's rental cost was $62,381.00 more than the Intervenors'. In addition, the estimated energy consumption for the first year for the Petitioner's property was approximately $4800 more than for Intervenors. King Davis and his staff did not believe that the justifications cited in the recommendation letter would be considered crucial enough to override awarding the lease to the lowest bidder, should the agency get involved in a bid protest over the award. He and his staff did not disagree that the reasons assigned by the committee and Ms. Schembera were legitimate considerations. Their ultimate concern was that the reasons given by the committee and Ms. Schembera would not be given as great a weight by a Division of Administrative Hearings' hearing officer; and therefore, fail to withstand a potential bid challenge. But the conclusion that the lack of ingress and egress and public transportation could not outweigh the cost differences assumed that Intervenors' bid included the four acres. Without the four acres, the problems with ingress and egress, congestion and public transportation become even more important and can outweigh minor price differences in rent and energy. This is especially true when one considers the impact that the influx of at least 1000 people would have on an already congested and unsafe area. Put simply, the conclusion that the above factors can and do outweigh price and cost considerations in these facts is not an arbitrary and capricious decision, even though others may disagree with that decision. Instead of reconvening the committee after receiving the recommendation from King Davis and discussing the same with him, the District Administrator made the determination that the lease should be awarded to the Intervenors. The District Administrator, acquiesced in Mr. Davis' assessment that HRS could not succeed in a bid challenge. She did not like his advice. In fact, even at the hearing Ms. Schembera still believed Petitioner's property was the lowest and best for HRS purposes. However, through circular reasoning she also concluded that Intervenors' property was the lowest and best bid because she chose it. The agency's ability to succeed in a bid challenge which may or may not happen is not covered by any of the weighted bid evaluation criteria contained in the bid package and is not an appropriate reason to prefer one bid over another. The foregoing is particularly true when the reason given (surviving a bid protest) is based on the occurrence of a future event which may not occur. To reject a bid for a reason outside the bid criteria and one based on an unknowable future event is an arbitrary and capricious act on the part of Respondent. A court-appointed receiver was ordered to take control of the property belonging to the Petitioner on September 28, 1988, after the bid award was announced. Petitioner still retains its right of redemption of the property, and such an interest is sufficient to confer standing on Petitioner to maintain this action. Moreover, the evidence was clear that Petitioner had both the ability and wherewithal to perform the lease should it receive the bid award. Perfected ownership or control is not required. With Petitioner's apparent ability to perform, the fact of the foreclosure action and the receiver should not work against the Petitioner in this bid protest.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the Department of Health and Rehabilitative Services enter a final order awarding lease number 590:1987 to Eccelston Properties, Ltd., as the lowest and best bidder. DONE and ORDERED this 10th day of January, 1989, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of January, 1989.

Florida Laws (7) 120.53120.5720.19255.249255.25255.254255.255
# 2
VICK GRIFFIN CONSTRUCTION COMPANY vs. LONG CONTRACTORS, INC., AND NORTH FLORIDA JR. COLLEGE, 82-000654 (1982)
Division of Administrative Hearings, Florida Number: 82-000654 Latest Update: Apr. 29, 1982

Findings Of Fact On or about December 29, 1981, the College solicited sealed bids for construction of alterations and additions to the Technical and Gymnasium Buildings located on its campus in Madison, Florida. In response, seven general contractors submitted bids. (P-1, P-2, P-3.) Bids were publicly opened on February 9, 1982. Griffin Construction, with a bid of $536,575, was the apparent low bidder; the second lowest bidder was Long Contractors, with a bid of $539,512. (Testimony of Griffin, Sims, Rutherford; P-3, P-4, P-5.) After the low bid was identified, Tom McClanahan, representing Long Contractors, asked that the subcontractor list accompanying the low bid be opened. Griffin Construction's subcontractor list was then opened. McClanahan asked if the license and charter numbers of the subcontractors were listed. 2/ Upon learning that these numbers were not included on Griffin Construction's subcontractor list, McClanahan protested. (Testimony of Sims, Rutherford, Griffin.) At its February 15, 1982, meeting, the College District Board of Trustees ("Board") rejected the low bid of Griffin Construction on the sole ground that the omission of subcontractor license and charter numbers constituted a failure to comply with the conditions of the bid documents. 3/ The Board then voted to award the contract to Long Contractors, the second lowest bidder, on the ground that it was the lowest bid conforming to the bid documents. In so doing, the Board followed the College president's recommendation--a recommendation based on his belief that the non-complying bid must be rejected, that it did not involve a matter of Board discretion. (Testimony of Sims, Rutherford, Griffin; Stipulation of Parties; P-41.) The bid specifications contain instructions to bidders requiring "each Bidder . . . [to] submit with his proposal a list of the subcontractors who will perform the work . . . as indicated by the `List of Subcontractors' form." (P-1, P-2.) The instructions further provide: The applicable subcontractor license registration or certification number must be noted on the bid opposite his name, and in the event that the subcontractor is a corporation, his State Corporate Charter number shall also be noted. If the subcontractor is an out of state firm, their Charter number with the Secretary of State to do business in the State of Florida should also be noted. The "Listing of Subcontractors" form provided with the specifications contains column headings for the names and addresses of the subcontractors but does not contain a separate heading for the requested license or corporate charter numbers. 4/ The form states that the subcontractor list "is an integral part of the bid." (P-1, P-2.) The bid instructions further require bidders to evaluate and determine the qualifications of their listed subcontractors. The bidder shall have determined to his own complete satisfaction that a listed subcontractor has been successfully engaged in this particular type of business for a reasonable length of time, has successfully completed installations comparable to that which is required by this agreement and is qualified both technically and financially to perform that pertinent phase of the work for which he is listed. (P-1, P-2.) The bid documents expressly reserve to the College the right "to reject any or all bids, and to waive informalities." (P-1 P-2.) No bidder correctly listed the required license and corporate charter numbers on its "Listing of Subcontractors" form. Griffin Construction. Griffin failed to include any license or corporate charter numbers. However, by subsequent letters dated February 9 and February 18, 1982, and at hearing, it supplied the required subcontractor license and charter numbers. Long Contractors. Long listed for its roofing subcontractor a sheet metal registration number, not the required roofing license number. [A sheet metal registration does not qualify a contractor for roofing work. See, 489.105, 489.113, Fla. Stat. (1981).] For its electrical subcontractor, Long omitted the prefix, "ER" from the listed number. For its plumbing subcontractor, Long listed a mechanical registration number instead of the required plumbing certification or registration number. [A mechanical registration does not qualify a contractor to perform plumbing work. See, 489.105, 489.113, supra.] Of the four areas requiring state licenses--roofing, heating and air conditioning, electrical, and plumbing--Long listed correctly only the registration number for its heating and air conditioning subcontractor. Long incorrectly listed No. FO6962 as the corporate number of Gandy Enterprises, its painting subcontractor. This is the number of a related corporation, Industrial Coatings, Inc. Remaining Bidders. Of the five other general contractors submitting bids, two-- Richard Walker Construction Company and GRC Contracting, Inc.--omitted all subcontractor license and charter numbers. The other three bidders failed to completely list all the required numbers. (Testimony of Rutherford; P-11, P-12, P-13, P-14, P-15, P-16, P-17, P-34, P-37, R-1, R-5.) The project architect testified that the submittal of incorrect or incomplete subcontractor license and charter numbers was a deficiency which a bidder should be allowed to cure after bid opening. But the failure to submit any required "number" was a deficiency which, in his opinion, could not be similarly corrected. He failed, however, to supply a reasonable basis for drawing such a distinction. Therefore, his opinion on this question is given little weight. 5/ (Testimony of Rutherford.) Subcontractor license and charter numbers are readily obtainable and can be verified by contacting the pertinent state agency--the Florida Department of Professional Regulation, Construction Industry Licensing Board, or the Florida Department of State. (Testimony of Griffin, Rutherford; P-32, P-33, P- 34, P-35, P-36, P-37.) The project architect, William Rutherford, routinely requires the listing of subcontractor license and charter numbers on bids for public construction projects. The main purpose it serves is that it would enable him to identify the listed contractor, since sometimes subcontractors have similar business names. Although if he was uncertain about the qualifications of a subcontractor, he would ordinarily question the general contractor. (Testimony of Rutherford.) Although Mr. Rutherford has customarily required the listing of subcontractor "numbers" on public projects, he has never made any use of those numbers in the past. (Testimony of Rutherford.) The general contractor who is awarded the contract is responsible to Mr. Rutherford and the College for construction of the project in accordance with the bid specifications. If, after bid opening, a listed subcontractor is unable to perform, Mr. Rutherford would ordinarily arrange for substitution of a new subcontractor acceptable to the general contractor and owner. (Testimony of Rutherford.) Griffin Construction's failure to list the license and charter numbers of its listed subcontractors, and its subsequent curing of that failure, did not affect the amount of its bid 6/ by giving it an advantage or benefit not enjoyed by other bidders. The bid omission did not allow Griffin Construction the opportunity to change any material element of its bid after bid opening. The inclusion or exclusion of subcontractor "numbers" at bid opening does not affect the ability of a contractors to obtain the required bond, the quality of bidding general contractors, the quality of listed subcontractors, the quality of work performed, or any material feature of the competitive bidding process. (Testimony of Griffin, Rutherford.)

Recommendation Based on the foregoing, it is RECOMMENDED: That the construction contract in question be awarded to Vick Griffin Construction Company, the lowest responsible bidder. DONE AND RECOMMENDED this 29th day of April, 1982, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of April, 1982.

Florida Laws (3) 120.5720.15489.105
# 3
ADLEE DEVELOPERS, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 92-002798BID (1992)
Division of Administrative Hearings, Florida Filed:Miami, Florida May 06, 1992 Number: 92-002798BID Latest Update: Jul. 31, 1992

The Issue The issue for consideration in this matter is whether Respondent's intended award of a lease for office space to Intervenor, Anthony Abraham Enterprise, is arbitrary and capricious and whether the proposal of the Petitioner, Adlee Developers, the current lessor, is responsive.

Findings Of Fact The parties agreed that on April 7, 1991, the Department issued an Invitation to Bid entitled, "Invitation To Bid For Existing Facilities State Of Florida Lease Number 590:2286, Dade County" This procurement was for the provision of 30,086 net rentable square feet to be used for office space in Dade County. A 3% variance was permitted. The facility was to house the District's Aging and Adult Services office which has been a tenant in Petitioner's building for several years and remained there during the pendancy of this protest process. According to the published advertisement, a pre-proposal conference was to be held on April 22, 1991, with all bids due by the bid opening to be held at 10:00 AM on May 30, 1991. The pre-bid conference was conducted by Philip A. Davis, then the District's facilities service manager and included not only a written agenda but also a review of the evaluation process by which each responsive bid would be examined. Petitioner asserts that the potential bidders were told, at that conference, that annual rental increases for the ten year lease period could not exceed five per cent (5%) and claims that Abraham's bid exceeded those guidelines. Thorough examination of the documentary evidence presented and the transcript of the proceedings, including a search for the reference thereto in Petitioner's counsel's Proposed Findings of Fact, fails to reveal any support for that assertion as to an increase limitation. The ITB for this procurement, in the section related to the evaluation of bids, indicated that pursuant to the provisions of Sections 5-3 and 5-11 of HRSM 70-1, dealing with the procurement of leased space, the responsive bids would be reviewed by an evaluation committee which would visit each proposed facility and apply the evaluation criteria to it in order to determine the lowest and best bidder. The evaluation criteria award factors listed in the ITB defined a successful bid as that one determined to be the lowest and best. That listing of evaluation criteria outlined among its categories associated fiscal costs, location, and facility. As to the first, the committee was to look at rental rates for both the basic term of the lease and the optional renewal period. The rates were to be evaluated using present value methodology applying the present value discount rate of 8.08% and rates proposed were to be within projected budgeting restraints of the Department. The total weight for the rental rate category was to be no more than 40 points with 35 points being the maximum for the basic term and 5 points for the option. Evaluation of the location was to be based on the effect of environmental factors including the physical characteristics of the building and the area surrounding it on the efficient and economical conduct of the operations planned therefor. This included the proximity of the facility to a preferred area such as a co-location, a courthouse, or main traffic areas. This item carried a maximum weight of 10 points. Also included in location were the frequency and availability of public transportation, (5 points); the proximity of the facility to the clients to be served, (5 points); the aesthetics of not only the building but the surrounding neighborhood, (10 points); and security issues, (10 points). The third major factor for evaluation was the facility itself and here the committee was to examine the susceptibility of the offered space to efficient layout and good utilization, (15 points), and the susceptibility of the building, parking area and property as a whole to possible future expansion, (5 points). In that regard, the Bid Submittal Form attached to the ITB called for the successful bidder whose property did not have appropriate zoning at the time of award to promptly seek zoning appropriate to the use classification of the property so that it might be used for the purposes contemplated by the department within 30 days. In the event that could not be done, the award could be rescinded by the department without liability. The committee could award up to 100 points. The basic philosophy of this procurement was found in paragraph 1 of the Bid Award section of the ITB which provided: The department agrees to enter into a lease agreement based on submission and acceptance of the bid in the best interest of the department and the state. After the bid opening, three of the four bids received, excluding Petitioner's which was initially determined to be non-responsive, were evaluated by the Department's bid evaluation committee according to the above point system which allowed no discretion or deviation from the formula in comparing rental rates between bidders. Once Petitioner's bid was thereafter determined to be responsive, it, too was evaluated by the committee. At this second evaluation session, relating to Adlee's bid only, the committee scored the bid and added its scores to the original score sheets upon which the other three bidders' scores had been placed. Abraham had the lowest rental rates for the basic term of the lease and received the maximum award of 35 points for that category while Adlee received points. Abraham received an additional 2.29 points for the optional period rates while Adlee got 0. In the other categories, "location" and "facility", which comprised 60% of the points, Adlee's facility was routinely rated superior to Abraham's except for the area related to susceptibility for future expansion in which Abraham was rated higher by a small amount. Overall, however, Adlee was awarded 620.41 points and Abraham 571.03 points and as a result, Adlee was rated by the committee to be the lowest and best bidder. RCL, another bidder, was rated second, with Abraham third and DCIC fourth. Thereafter, the committee chairman, Mr. VanWerne, forwarded the new (and complete) evaluation results to the District Administrator on June 14, 1991 by an addendum dated June 27, 1991 which recommended award of the bid to Petitioner, Adlee Developers. No award was made at the time. Several factors not pertinent to the issues here caused that delay. Among the major of these was pending legislation which would have transferred the operation needing this space to another agency. This transfer was never consummated, however. On or before March 20, 1992, the new District Administrator, Mr. Towey, who had been appointed to his office in December, 1991, and who was made aware that this procurement had not been finalized, requested all available material on it so that he could study it and make his decision based on his own review of the submission. As a part of his determination process, he visited and inspected both the Adlee and the Abraham sites. One of the factors he considered was what appeared to be the significant monetary discrepancy between the two pertinent bids. Initial calculations indicated that Abraham's bid was approximately $835,000.00 lower than Adlee's over the ten year basic term of the lease. This amount was subsequently determined to be somewhat lower but the discrepancy is still significant. Nonetheless, because of that difference, Mr. Towey called a meeting with the members of the evaluation committee which had evaluated the bidders and had recommended Adlee. His stated reason for calling that meeting was to allow him to hear their reasons for rating the submissions as they had done and to take that information into consideration when he made his final decision. None of the committee members who testified at the hearing at Petitioner's behest indicated any feelings of pressure or intimidation by Mr. Towey. During his meeting with the committee members, Mr. Towey went over several of the evaluation criteria award factors to determine the committee's rationale. Of major importance was the issue of cost, of the availability of the facility to transportation to and from the building, employee security and the ability to control access to the facility, and the availability of on-site parking without cost to both employees and clients. It appears the Adlee facility is a multistory building with some parking available on site and would be easier to control. In addition, it is closer to public transportation access points. There is, however, some indication that on-site parking for clients would not be free and the closest free parking is some distance away. According to Adlee's representative, this matter would not be a problem, however, as adequate, free on site parking, which apparently was not initially identified as a problem, could be provided in any new lease. The Abraham facility is a one story building surrounded by on-site parking. In that regard, however, at hearing, Petitioner raised the claim that the Abraham site did not, in actuality, provide adequate parking because the zoning requirements of the City of South Miami, the municipality in which the facility is located, did not permit the required number of parking spaces to accommodate the prospective need. Petitioner sought and received permission to depose the Building and Zoning Director for the city, Sonia Lama, who ultimately indicated that the Abraham site was grandfathered in under the old zoning rule and, thereby, had adequate parking available. In any case, had this not been true, under the terms of the ITB, any zoning deficiencies could have been corrected after award, or the award rescinded without penalty to the Department. After the meeting with the committee, Mr. Towey indicated he would probably go against the committee's recommendation. One of his reasons for doing so, as he indicated to them, was the appearance certain amenities in the facility would give. In the period between the time the committee met and Mr. Towey was ready to decide, there were several newspaper articles published in the Miami area which were negative in their approach to Department leasing policies and this publicity had an effect on him. In his response to a reporter's question, in fact, Mr. Towey indicated he would not permit the lease of any property which contained such amenities while he was District Director. There is some evidence that the wet bar referred to here was a sink and counter used by agency employees to make coffee. However, before making his decision, Mr. Towey also met with Herbert Adler of Adlee. Mr. Towey advised him he was concerned about the fact that the Adlee property provided a wet bar, a private bathroom and some other amenities in that suite of offices occupied by the Department. Mr. Towey was adamant in his public and private pronouncements on the subject that there would be no such amenities in HRS offices in his District while he was in charge. At the meeting in issue, Mr. Adler made it very clear he was willing to remove all the offending amenities to bring the space into conformity with Mr. Towey's standards. Mr. Towey obviously took Adler at his word as he did not consider this matter to be an issue when he evaluated the bids. Based on his independent evaluation of the proposals, and considering all the pertinent factors, Mr. Towey decided not to concur with the committee's recommendation and instead recommended to the Department's Office of General Services that the bid be awarded to Abraham. Because his recommendation differed from that of the evaluation committee, under the provisions of Section 5-13, HRS Manual 70-1, he was required to forward additional justification for his position. In his forwarding memorandum dated March 20, 1992 to Mr. King Davis of the Department's Office of General Services, Mr. Towey listed as his reasons for disagreement with the committee's recommendation, (1) the lower term cost of Abraham's bid, (2) his opinion that the one story floor plan of Abraham was more convenient and accessible to clients, and (3) the provision for ample free parking at the Abraham site as opposed to the limited parking at the Adlee building. Petitioner claims that Mr. Towey's justification for disagreement was improper because, (a) the rental difference he cited was not based on the ITB formula and did not consider the difference in square footage offered; (b) the rental rate comparison compared a proposed lease with an existing lease, not with a proposal; and (c) the reference to on-site parking referred to the situation under the existing lease with Adlee and not to what could occur under a new lease. The major factor in Mr. Towey's decision was the price differential between the two offerings. While the difference may not have been as great as presented initially by the department staff, even taken in its most conservative light of about half that amount, and considering the appropriate figures, the difference was still considerable and significant. In the continuing period of budgetary austerity under which state operations have been and must continue to be conducted, the financial consideration loomed large in his thinking. As for the parking situation, no change for the better was provided for in Adlee's proposal and even if it were, it was but one of several factors. When Mr. Towey's March 20, 1992 memorandum in justification of his disagreement was evaluated at the Office of General services, it was determined that his decision was rational and objectively justified. Thereafter, by letter dated April 2, 1992, the Office of General Services authorized District 11 to award the lease to Abraham and this decision was transmitted to all responsive bidders by letter dated April 7, 1992. It was this action which prompted Petitioner's protest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered dismissing the protest by Adlee Developers, Inc., of the award of procurement No. 590:2286 to Anthony Abraham Enterprises. RECOMMENDED this 10th day of July, 1992, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-2798 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: - 4. Accepted and incorporated herein. Accepted. Accepted that the pre-bid conference was held but reject the finding that a 5% limit was mentioned. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 11. Accepted and incorporated herein. 12. - 14. Accepted and incorporated herein. 15. - 19. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted except for the next to last sentence which is rejected. Accepted. Accepted and incorporated herein. Accepted but not probative of any material issue. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 30. Rejected. - 33. Accepted and incorporated herein. FOR THE RESPONDENT AND INTERVENOR: & 2. Accepted and incorporated herein. 3. - 5. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 16. Accepted and incorporated herein. 17. - 19. Accepted and incorporated herein. 20. & 21. Accepted and incorporated herein. Accepted and incorporated herein. - 25. Accepted. COPIES FURNISHED: Melinda S. Gentile, Esquire Ruden, Barnett, McClosky, Smith, Schuster & Russell 200 East Broward Blvd. P.O. Box 1900 Fort Lauderdale, Florida 33302 Paul J. Martin, Esquire Department of Legal Affairs The Capitol - Suite 1501 Tallahassee, Florida 32399-1050 Peter W. Homer, Esquire Greer, Homer & Bonner, P.A. 3400 International Place 100 S.E. 2nd Street Miami, Florida 33131 John Slye General Counsel Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power Agency Clerk DHRS 1323 Winewood Blvd. Tallahassee, Florida 32399-0700

Florida Laws (3) 120.53120.57571.03
# 4
DOUGLAS PRINTING COMPANY, INC. vs. DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, DIVISION OF FORESTRY, 83-001984 (1983)
Division of Administrative Hearings, Florida Number: 83-001984 Latest Update: Jul. 03, 1990

Findings Of Fact On May 19, 1983, Respondent mailed official Invitations to Bid (IFB) forms to 18 different firms, including Petitioner, soliciting bids for Class VI printing in accordance with the specifications and conditions attached to the letter, signed by R. E. Read, Jr. This letter contained the comment, "As the best interests of the State may require, the right is reserved to reject any and all bids and to waive any irregularities in bids received." This letter also advised prospective bidders who had questions regarding the IFB to call Larry Amison, the individual who had drafted the accompanying specifications. The notice of IFB, published in the Tallahassee Democrat on Thursday, May 19, 1983, also contained a notice of reservation of the right to reject all bids. Only five IFB forms were returned. Three of the five were returned without bids for various reasons, such as "Not Competitive," "Unable to meet specified delivery date" and "Cannot schedule job of this proportion at this time." This type of explanation, in government procurement circles, need not be taken at face value, but is often used to signal the recipient's thanks for the invitation to bid and a desire to be invited to bid again at some time in the future. The other two forms received were bids: one from Zenith Communications Group, and one from Petitioner. This procurement was somewhat unusual in that the IFB stipulated the amount of money the agency had to spend and requested a hid as to the most product it could get for that money. There were two publications involved: "A" and "B." An alternative was given on delivery date options: one within 30 working days of receipt of approved proofs, and one within 45. Zenith offered to provide 7,180 copies of Book "A" and 7,155 copies of Book "B" (14,335 total books) for a total price of $53,400 1/ within 30 working days. Petitioner offered to provide 9,473 copies of Book "A" and 4,950 copies of Book "B" (15,423 total books) for a total price of $53,344.64 within 45 days. The bids were opened on June 1, 1983, and published from June 1 through June 10, 1983. They were brought to the Director for consideration upon opening. It is his responsibility to evaluate the bids and make a recommendation to the Commissioner of Agriculture on the successful low bidder. Since there was only one bid on each delivery date, the Director felt there were not two comparative bids. As a result, he forwarded the bid package to Ms. Grace Harrison, a purchasing agent with the Department of Agriculture and Consumer Services and an individual very familiar with the procurement of printing services. After a review of the entire bid package, Ms. Harrison's studied opinion was that there were two valid bids and Douglas was the low bidder, and it is so found. Ms. Harrison also felt it was unusual not to receive any more responses than were received on a procurement of this magnitude. This same opinion is held by Mr. Amison, who drafted the specifications. Others have differing opinions, however. Whether it was unusual or not, however, is immaterial. There were two valid bids, and only two are required for an award. However, even in the case of two bids, the agency reserved the right to reject any and all bids. As a result, on or about June 6, 1983, the Director decided, based on his understanding of state policy on the matter and in light of the size of the procurement, to seek more bids through rebidding. In this case, the Director felt more bids were available because of the responses of the nonbidders which referred to the response times being so short. Therefore, he directed a rebid, and this information was communicated to all bidders, including Petitioner. On June 7, 1983, Petitioner wrote to the Director, disagreeing with his decision and notifying him of its protest. On the following day, the Director notified Petitioner the rebidding was being delayed, giving Petitioner 10 days to file a formal notice of protest. This was done in a timely manner. The phrase regarding the agency's right to reject bids is contained in every State IFB. Its purpose is to permit state agencies to reject bids where it becomes apparent there is a valid and legitimate benefit to be gained by the agency in doing so. One such situation is when, in the bona fide opinion of the agency, there are insufficient bids. While there is a difference of opinion as to whether only two bids are unusual in a procurement of this nature, there is no dispute that it would have been beneficial to the agency to have received more than two, since more bids would increase competition. To rebid the contract at this juncture would undoubtedly increase competition to the potential benefit of the Respondent. However, Petitioner claims it would also work to its detriment because other potential bidders would have access to the details of the two present bids and would thereby gain an advantage. This may be the result of rebidding.

Recommendation In light of the foregoing, it is RECOMMENDED: That Petitioner, Douglas Printing Company, Inc., be awarded Contract DOF- ADM-79. RECOMMENDED this 8th day of September, 1983, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of September, 1983.

Florida Laws (1) 120.57
# 5
U. S. FOODSERVICE vs HILLSBOROUGH COUNTY SCHOOL BOARD, 98-003415BID (1998)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jul. 27, 1998 Number: 98-003415BID Latest Update: Nov. 17, 1998

The Issue The issue is whether Respondent lawfully awarded the main-line food contract to Mutual Distributors, Inc., and, if not, whether Respondent is required by law to award the contract to Petitioner.

Findings Of Fact Background This case arises out of Respondent's award of contracts for main-line food and snack foods and beverages. Through these contracts, Respondent obtains the delivery of 334 different items--297 items of main-line food and 37 items of snack foods and beverages--to over 160 sites for preparation and service to Respondent's students, teachers, and noninstructional staff. During the school year, Respondent serves over 150,000 meals daily, and the Director of Respondent's Food Service Operations manages an annual budget of $55 million. The two relevant bidders in this case are Petitioner and Mutual Distributors, Inc. (Mutual). These are the only bidders that submitted nondisqualified bids for the main-line food contract. Petitioner and Mutual also submitted bids for the snack foods and beverages contract. A third bidder, Magic Vending, also submitted a bid for the snack foods and beverages contract. Mutual has held Respondent's main-line food contract in the past. However, for at least the past seven years, Petitioner has held the main-line food and snack foods and beverages contracts. Petitioner was the only bidder for the main-line food contract for the 1996-97 school year, and, pursuant to a provision of that contract, Respondent renewed this contract for the 1997-98 school year. Petitioner presently supplies school food for the school districts in Dade, Palm Beach, Collier, Lee, Indian River, Martin, St. Lucie, Hardee, Hendry, DeSoto, and Glades counties. The size of the Hillsborough school district limits the number of vendors capable of handling the main-line food contract, although nothing in the record suggests that either Petitioner or Mutual lacks the resources to provide the specified food in a timely fashion. Invitation to Bid By Invitation to Bid dated April 30, 1998, concerning Bid Number 3743-HM (ITB), Respondent solicited bids for two product groups: main-line food, which consists of frozen entrees, frozen foods, canned goods, and staples, and snack foods and beverages. The cover sheets to the ITB advise all interested parties that Respondent would accept sealed bids until 3:00 P.M. on May 26, 1998. The cover sheets state that, on or about June 16, 1998, Respondent would award the contract, which would be in effect August 6, 1998, to August 5, 1999. The cover sheets state that Respondent would make its decision "in the best interest of the District " The cover sheets require that all bids incorporate the following language: POSTING OF RECOMMENDATIONS/TABULATIONS Recommendations and Tabulations will be posted at the Hillsborough County School District, Purchasing Department, 901 East Kennedy Boulevard, 3rd Floor, Tampa, Florida 33602 at 10:30 A.M. on 06/11/98 for seventy-two (72) hours. Actions against the specifications or recommendations for award shall follow F.S. 120.53. Procedures are available and on file in the Purchasing Office at the address listed above. The cover sheets identify the schedule of bidding events. The month of April would be for testing new products and evaluating the nutritional information of approved brands. April 30 would be the date of mailing draft copies of the ITB to all interested persons. May 8 would be the date of the pre-bid conference, at which interested persons could bring product information forms for possible approval of other products than those tentatively specified in the ITB. The cover sheets reserved a couple of days immediately after the pre-bid conference for testing any additional new products. The schedule listed May 13 as the date on which Respondent would mail the final copy of the ITB to interested persons. The schedule states that Respondent would review bids and conduct a "pre-award audit," if necessary, from May 26 through June 3. Part I of the ITB contains "general terms and conditions." Part I states: When an item appearing in this bid document is listed by a registered trade name and the wording "no substitute, bid only or only" is indicated, only that trade-named item will be considered. The District reserves the right to reject products that are listed as approved and wa[i]ve formalities. Should a vendor wish to have products evaluated for future bid consideration, please contact, in writing, the buyer listed on the 2nd page of this bid. If the wording "no substitute, bid only or only" does not appear with the trade name, bidders may submit prices on their trade-named item, providing they attach a descriptive label of their product to this proposal. Sample merchandise bid hereunder as "offered equal" may be required to be submitted to purchase in advance of bid award. Substitutions of other brands for items bid, awarded and ordered is prohibited except as may be approved by the supervisor of purchasing. Part I of the ITB includes a number of "stipulations" that are deemed a part of all bids. The stipulations provide: Tabulations of this bid will be based only on items that meet or exceed the specifications given in Part III. All other lesser items will not be considered. Failure to submit, at time of bid opening, complete information as stated in Part III can and may be used as justification for rejection of a bid item. The bidders will not be allowed to offer more than one product/price/service on each item even though the vendor feels that they have two or more types or styles that will meet specifications. If said bidder should submit more than one product/price on any item, all prices for that item will be rejected. . . . The District reserves the right to reject any and all bids or parts thereof, and to request a re-submission. The District further reserves the right to accept a bid other than the lowest bid, which in all other respects complies with the invitation to bid and the bid document, provided that, in the sole judgement and discretion of the District, the item offered at the higher bid price has additional value or function, including, but not limited to: life cycle costing, product performance, quality of workmanship, or suitability for a particular purpose. . . . All bids shall be evaluated on all factors involved, including the foregoing, price, quality, delivery schedules and the like. Purchase orders or contracts shall be awarded to the responsible offeror whose proposal is determined to be advantageous to the District, taking into consideration the factors set forth above and all other factors set forth in the request for bid as "lowest or lowest and best bid." The information called for on the item must be on the line with the item. When omitting a quotation on an item, please insert the words: no quotation, no bid or n/b. to eliminate any confusion about the item(s) being bid. . . . Any requirement by the bidder that certain quantities, weights, or other criteria must be met, in order to qualify for bid prices, will result in disqualification of the bid. Likewise, expiration dates or other constraints, which are in conflict with bid requirements, will result in disqualification. Bids may not be changed after the bid closing time. The exception would be if there was a misinterpretation of the unit for which the bid was requested. In which case, no dollar amount change would be allowed, and only a clarification as to the unit your bid represents will be considered. This must be done in writing 24 hours after notification to the bidder from the supervisor of purchasing. The submittal of a bid proposal shall constitute an irrevocable offer to contract with the District in accordance with the terms of said bid. The offer may not be withdrawn until or unless rejected or not accepted by the District. . . . 13. The District shall be the sole judge as to the acceptability of any and all bids and the terms and conditions thereof, without qualifications o[r] explanation to bidders. 27. This bid and the purchase orders issued hereunder constitute the entire agreement between the School District and the vendor awarded the bid. No modification of this bid shall be binding on the District or the bidders. 30. Variance in condition--Any and all special conditions and specifications attached hereto which vary from general conditions shall have precedence. Part II of the ITB contains "special terms and conditions." Section A of Part II explains that the purpose of the ITB is to establish a "'cost plus fixed fee per carton' annual contract for the delivery of main-line food and snack and beverages . . .." Section A projects that the annual value of Group A and Group B will be $8.5 million. Section A explains that the "product cost" is the vendor's actual cost, including delivery to its warehouse. The "fixed fee" is the difference between the vendor's cost and its selling price to Respondent. Section A notes that, while Respondent’s cost price may vary during the term of the contract, the fixed fee shall remain unchanged. However, Section K fixes the cost prices until December 31, 1998. As used in this order, "total cost" refers either to the total costs per item (i.e., the unit costs times the projected number of units to be purchased) or the total costs of all items, and the "bottom-line cost" is the total of the total costs of all items plus the fixed fee. The fixed fee includes the bidder's profit and is calculated by multiplying the fixed fee per carton, as stated in the bid, times the number of cartons actually delivered. Section B states: Bids will be awarded on the total bottom line cost and fixed fee for each group. To be considered for an award, the vendor must bid on each item within each group. Failure to bid on each item within each group will disqualify the vendor for the bid award. A distributor may choose to bid on both groups, or on only one group. In the event of default or non- availability of product, the School District reserves the right to utilize the next rated low bidder and their stated bid prices as needed. Sections C and D explain that the term of the contract is one year, ending August 5, 1999, but the parties may extend the term, in one-year increments, through August 5, 2001. Section G provides that potential bidders "may attend a pre-bid conference," but attendance is not mandatory. Section G identifies the time, date, and place of the pre-bid conference. Section G adds: If you wish to submit additional brands within a current product description for approval, you must bring from the appropriate broker/rep, a District product information form with all requested attachments to the conference. Do not bring samples. We will evaluate the product information forms and determine if testing an additional brand is necessary at this time. Submitting a product information form does not guarantee that the product will be tested. Samples must be made immediately for any product information forms submitted. Section H states: To be considered for an award, the vendor must bid on each item within each group. Failure to bid on each item within each group will disqualify the vendor for that group bid award. Section I provides: After the opening of the bids, school officials will review the line-by-line prices. Accuracy of additions and extensions, brands, and compliance with all instructions will be reviewed in order to ascertain that the offer is made in accordance with the terms of the request for bid proposal. School officials who find any error(s) in calculations will adjust the bottom line figure accordingly. However, if errors are found which either disqualify the bidder, or will raise the bottom line offer to the point where the vendor may no longer be the apparent low bidder, school officials will review the line-item prices of the next lowest bidder. This procedure will continue until a suitable offer is selected. During the review of the low bid, school officials may audit invoices or quotations on selected items for the accuracy of cost prices quoted. The extent of this audit will be at the discretion of school officials. In reviewing bids, school officials reserve the right to waive technicalities when it is in the best interest of the school system. Section O states that vendors must deliver "the brand that is quoted on the bid sheet." If vendors are "temporarily out-of-stock of a particular item, they must deliver an equal or superior product at an equal or lower price with prior approval of the District Food Service Department." Section O warns that "[e]xcessive occurrences of out-of-stock items is cause for contract cancellation." Part III of the ITB contains "instructions for completing bid sheets," followed by 65 pages of bid specifications for main-line food and nine pages of bid specifications for snack foods and beverages. Each page of specifications contains several rows, with each row devoted to a separate item, and seven columns, with the columns labeled as item number, product descriptions, approved brands, bid unit, unit cost, estimated annual usage, and total cost. Part III provides detailed instructions for describing the items bid and listing the costs for each item. Detailed specifications describe each of the items to be bid. Under "product descriptions," the two paragraphs of Section B address the issue of domestic versus imported products. The first paragraph describes products that the winning bidder may purchase, but the second paragraph limits items than can be bid. The two paragraphs state: Except for items normally not produced in the United States commercially, the contractor should make every effort to purchase domestic products. Products may be allowed from outside the United States provided specifications are met and there is a significant price differential between imported products and those produced within the States. Written documentation of these price differentials must be provided in writing to the School District by the distributor prior to the approval of such purchases. Please note: for purposes of awarding the bid, all distributors shall bid domestic products (pineapple exempt). Under "product descriptions," Section C provides: The contractor must bid on the approved brands (Column 3), packer label or house label for all items. If Column 3 is blank, the School Board will accept the brand quoted provided it meets the product description. For example, if bidding on a distributor's choice of pasta, the contractor would enter the following: Brand: Prince Product Code: 5115 If bidding on a distributor group label for green beans, the distributor must stipulate the code designation which may be a color or label, that denotes a product as being a particular grade. For example, Brand: North American/Larson Product Code: Blue If bidding a packer label the bidder must stipulate the name of the packer and the grade label designation, for example: Brand: Larsen Product Code: Lake Region For all packer label products Hillsborough County School Food Service Form "Private Label Chart for Fruits and Vegetables" (see Attachment D) must be completed and returned with the bid. Under "product descriptions," Section D states: "Bidder shall enter the grade of the brand offered only for those line items where grade is specified. " Under "approved brands," Part III provides: The bidder must bid on the approved brand and product code that is listed. If the column states "house brand," the School Board will accept the brand quoted provided it meets the product description. Some of the code numbers listed may be obsolete or incorrect, in which case the contractor may enter the correct code and submit written documentation provided by the manufacturer, verifying the correct code number. If any inconsistency exists between the approved brands and/or code numbers and the product description, the approved brand/code number will prevail. The decision as to whether a product does or does not meet the description provided in column 2 is at the discretion of the School District. A bidder may be requested to furnish acceptable confirmation from a packer that a product meets the requirements set forth in Column 2. Whenever approved brands are listed with house brands, the distributor's choice brand should be of equal or better quality than the approved brands listed. Buying group brands and codes are acceptable on frozen and canned fruits, vegetables, and juices, however, on further processed and manufactured foods the contractor shall quote a packer's brand. For example, a contractor may quote "Ore-Ida #1234, packed under the 'Code Red Label.'" Pre-Bid Conference Hank Morbach, Principal Buyer of Respondent's Purchasing Department, conducted the pre-bid conference on May 8. Also representing Respondent at the conference were Mr. Morbach's immediate supervisor, William Borrer, who is the Supervisor of Purchasing; Sherry Ebner, who is a Supervisor of Food Service Operations and a registered dietitian; and Mary Kate Harrison, who is Director of Food Service Operations, a registered dietitian, and Ms. Ebner's immediate supervisor. Minutes of the pre-bid conference reveal that Mr. Morbach and Ms. Ebner told the persons in attendance that they did not have to bid both groups, but must bid all items within the group for which they were submitting a bid. In response to a question from Mutual's representative, Mr. Morbach said that the bottom-line cost, not the fixed fee, would be the "deciding factor." In response to a question from Petitioner's representative, Mr. Morbach stated that, where code numbers were omitted for any item, specifications would prevail. The minutes disclose a discussion regarding imported versus domestic products. Although Respondent's representatives were initially ambivalent, Mr. Morbach "clarified by stating all products must be domestic." Likely, everyone understood that pineapples could still be imported. Following the pre-bid conference, Respondent issued a revised ITB on May 13. Presumably, the ITB identified as Joint Exhibit 1 is the revised ITB, so all references in this order to the ITB are to the ITB as it was finally revised. Adverse Publicity Toward the end of the pre-bid conference, a representative of the Weekly Planet appeared. The Weekly Planet is a free weekly Tampa newspaper, and the representative was a reporter, who, since October 1997, had written several articles asserting, at least by implication, that Respondent's food program suffered from excessive costs, favoritism, and possibly even wrongdoing. Part of the adverse publicity concerned Ms. Harrison's husband, who represented several manufacturers from which Petitioner had purchased food for resale to Respondent while Petitioner had the main-line food contract. The Weekly Planet published an article asserting that the husband of Ms. Harrison had lost a civil action brought by his employer for diverted commissions. By the time of the subject procurement, an internal audit had disclosed no conflict of interest on the part of Ms. Harrison, but had suggested that Respondent add personnel in Food Service Operations to monitor vendor compliance and seek more competition in awarding the food contracts. To Ms. Harrison's credit, since her employment with Respondent in 1990, she has converted a food service program that was losing $2.5 million annually into a profitable operation. The record suggests, though, Respondent's staff was extremely sensitive during this bidding process to the adverse publicity surrounding Respondent's business relationship with Petitioner. The Bids Four bidders timely submitted sealed bids for the main-line food contract. However, Respondent promptly disqualified two of the bidders because they did not submit complete bids. One disqualified bidder submitted a bid that was incomplete, unsigned, and omitted five items in the main- line food group. The other disqualified bidder submitted an incomplete bid with only six items in the main-line food group. After submitting their bids, Petitioner and Mutual each sent Respondent letters stating that each bidder did not want the snacks and beverages contract unless it also received the main-line food contract. Respondent did not object to these late-attached conditions to the two bids and did not consider either bidder for only the snack foods and beverages contract. As provided in the ITB, Respondent's staff contacted bidders, after bid opening, to confirm that certain bid items complied with the specifications. By letter dated June 3, Respondent asked Mutual for documentation that 41 listed items met the specifications, that the Fineline/Paris brand that Mutual had bid is Grade A quality, and for a complete private label chart for all canned and frozen fruits and vegetables. The letter requests a response by June 5. By letter dated June 10, Respondent asked Petitioner for documentation that thirty-seven listed items met the specifications and for a complete private label chart for all canned and frozen fruits and vegetables. The letter requests a response by June 12. Respondent wrote each bidder follow-up letters. In a letter dated June 12, Respondent asked Petitioner to document that five items met the specifications, and, in a letter dated June 15, Respondent asked Mutual to document that the same five items met the specifications. The deadlines in both letters were June 16. Mutual and Petitioner responded to these requests for additional information. By letter dated June 5, Mutual disclosed that Items 202 (broccoli), 300 (apple slices), and 366 (raisins) were imported. After receipt of the responses from the bidders, Respondent's employees further reviewed the bids. Early in this review, Respondent's employees realized that neither bid had complied entirely with the specifications. Among the deficiencies of Mutual's bid was the failure to quote a cost for Item 114, which is chicken wings. Mutual's bid identifies only a product, but no cost. Mutual's bid includes a cost for each of the other 296 items and a total cost, presumably for all 297 items. The ITB projects annual purchases for each of the 297 items. The ITB projects the purchase of 283,044 chicken wings. Petitioner bid 12.5 cents per chicken wing for a total cost of $35,309.50. Mr. Morbach justifiably tried to deduce Mutual's quote for chicken wings from the information contained in its bid. He logically assumed that the cost for Item 114 would be the difference between the total cost shown on Mutual's bid, which is shown on the bid, and the total cost for the other 296 items, which must be calculated separately. The details of Mr. Morbach's calculations did not emerge at the hearing, but it is possible to perform these calculations. Mutual's bid shows a total cost for all 297 items of $8,131,470.29. The total costs of each of the quoted 296 items comes to $6,785,080.14. The difference is $1,346,390.15. This figure clearly does not represent Mutual's bid for chicken wings, which would be thirty-eight times greater than Petitioner's bid and would representative the extraordinary cost of $4.75 per chicken wing. The calculations in the preceding paragraph are taken from Mutual's bid, including all changes shown on the bid, as it was submitted, that were made by Mutual. Mutual's representative initialed these changes. The calculations exclude all adjustments made by Respondent's staff because these calculations, which were made after bid opening, logically have no relevance in determining what, if anything, Mutual quoted for chicken wings. These adjustments can play no role in trying to determine, on the face of Mutual's bid, what it intended to bid for chicken wings. In addition to omitting the cost of one item, Mutual failed to bid numerous other items according to the specifications. Petitioner also failed to bid certain items according to the specifications, although Petitioner's bidding errors are fewer in number and less serious than Mutual's bidding errors. Incorporating the information charted by Food Service Operations staff, the following 25 paragraphs identify the errors in both bids. Item 121 is frozen Grade A turkey roasts with a 60/40 ratio of light to dark meat. Mutual's bid does not reveal the extent of white meat or whether the turkey roast is Grade A meat. Petitioner's bid does not reveal whether its turkey roast is Grade A meat. Item 128 is frozen corn dogs. Mutual bid an unapproved code number for an approved brand. Petitioner's bid complied with the specifications. This is a relatively large component of the overall bid, representing over $160,000 in each of the bids. Item 146 is natural swiss cheese. Mutual bid processed cheese. Petitioner's bid complied with the specifications. Item 202 is Grade A cut broccoli in bulk. Mutual bid an imported product. Petitioner's bid complied with the specifications. Item 220 is shoestring French-fried potatoes. Mutual bid a shorter French-fried potato than specified. Petitioner's bid complied with the specifications. Item 223 is shredded triangle potatoes. Mutual and Petitioner bid the same products, but Mutual's bid did not contain required information regarding grade, oil, and region grown. This is a relatively large component of the overall bid, representing over $140,000 in each of the bids. Item 232 is soft eight-inch tortillas weighing 1.39 ounces per serving. Mutual and Petitioner bid the same product, which weighs only 1.29 ounces per serving. Item 300 is canned sliced apples. Mutual bid an imported product. Petitioner's bid complied with the specifications. Item 328 is light, 26-percent concentration tomato paste. Mutual bid a product that does not meet the minimum- concentration specification. Petitioner's bid complied with the specifications. Item 335 is boneless chicken meat that is predominantly white meat. Mutual and Petitioner bid the same brand, but different product code numbers. Mutual's bid is not predominantly white meat. Petitioner's bid complied with the specifications. Item 366 is seedless raisins. Mutual bid an imported product. Petitioner's bid complied with the specifications. Item 399 is 100 percent semolina, spiral macaroni. Mutual's bid complied with the specifications. Petitioner bid a twisted egg noodle, instead of eggless spiral pasta. Item 431 is sugar sprinkles from one of five approved brands. Mutual bid an unapproved brand. Petitioner's bid complied with the specifications. Item 448 is instant yeast. Mutual's bid includes information on a product that it did not bid. Petitioner's bid complied with the specifications. Item 474 is Grade A Fancy apple jelly with no less than 65 percent soluble solids, and Item 475 is Grade A Fancy grape jelly with no less than 65 percent soluble solids. Neither bid provides sufficient information to determine if it met the specifications on either of these items. Item 480 is Dijon mustard. Mutual bid Dijon-style mustard. Petitioner's bid complied with the specifications. Item 484 is whole pitted medium, ripe olives. Mutual bid an imported product. Petitioner's complied with the specifications. Item 492 is whole, kosher pickles of approximately 95 in number per five gallon pail. Mutual and Petitioner bid larger pickles than specified. Item 505 is 50-grain white vinegar. Neither Mutual nor Petitioner provided the information necessary to determine if its bid complied with the specifications. Items 301, 308, 309, 323, and 331 are, respectively, unsweetened canned applesauce, crushed canned pineapple, sliced canned pineapple, canned pumpkin, and whole canned tomatoes. For each of these items, Mutual's bid did not provide the label to prove quality. Petitioner's bid complied with the specifications. Item 325 is Grade A canned sweet potatoes. Mutual and Petitioner both bid Grade B. Item 212 is yellow frozen squash. Mutual bid an imported product. Petitioner's bid complied with the specifications. Respondent's staff also noted on the chart that the yellow frozen squash was the second item manufactured by Fineline that was imported (the other was Item 202), and staff noted that it was "unable to determine if other frozen vegetables bid by this manufacturer are domestic as grading certificates were not provided." Mutual bid Fineline products for Items 201 (lima beans), 205 (corn), 208 (okra), 209 (peas), 211 (spinach), 214 (Italian-style vegetable blend), and 215 (Oriental-style vegetable blend). Cumulatively, the Fineline frozen vegetables represent a moderately large part of the overall cost, in excess of $53,000 of Mutual's bid. Coupled with the fact that two Fineline products were imported, Mutual's failure to demonstrate affirmatively that these produce are domestic constitutes additional failures to comply with the specifications and supports the inference that the products are imported. In an earlier version of their chart showing bidding errors, Respondent's staff identified problems with Items 217-19, 221-22, and 224. These are potatoes that the ITB specifies must be from the Pacific Northwest and processed in 100 percent canola oil. Respondent's staff determined that it was impossible to identify the source of these potatoes. However, Petitioner was able to document that some, but not all, of the potatoes that it bid for these six items were from the Pacific Northwest. In addition to failing to bid a cost for Item 114 and misbidding the numerous items charted by Respondent's staff, Mutual's bid failed to comply with the specifications for four other items. Item 229 is a frozen Gyro Wrap. Mutual bid a pita- fold bread product, even though a more expensive Gyro Wrap is available from the same manufacturer. Petitioner's bid complied with the specifications Item 378 is pure almond extract flavoring. Mutual bid an imitation flavoring. Petitioner's bid complied with the specifications. Item 402 is thin spaghetti of .062-.066 thickness in diameter. Mutual bid a thin-spaghetti product of 1.6 thickness in diameter. Petitioner's bid complied with the specifications. Item 456 is pancake syrup. Mutual bid an invalid code number. Petitioner's bid complied with the specifications. The parties devoted some attention during the hearing to Item 483, which is green olives. Mutual and Petitioner bid imported green olives, but domestic green olives are not available, at least in institutional quantities, so compliance with the specification of domestic green olives was impossible. Bid Evaluation and Award When Ms. Ebner informed Mr. Morbach of the errors that she had found in both bids, he suggested that they should eliminate the same item from both bidder's bids, if one bidder improperly bid the item. For example, if Mutual misbid fruit cocktail and Petitioner properly bid fruit cocktail, Respondent would delete the cost of fruit cocktail from both bids. The purpose of this adjustment, which reportedly is not atypical in school food procurements, is to avoid the unfair result of lowering the noncompliant bidder's bid, by reducing it for the cost of the misbid fruit cocktail, and leaving the compliant bidder's bid higher by the amount of the properly bid fruit cocktail. Ms. Ebner and Ms. Harrison agreed with this suggestion, and Respondent tabulated the bid costs accordingly. Mr. Morbach also suggested that they consider the bid of one of the disqualified bidders. Ms. Ebner disagreed with this suggestion. She rightly believed that they should not reconsider a bid that did not contain all of the specified items, and Mr. Morbach did not press the matter further. Although Ms. Ebner spoke daily with Ms. Harrison and Mr. Morbach, there were three larger meetings in late June and early July concerning the bids. The first meeting was during the week of June 22, the second meeting was early in the week of June 29, and the third meeting was on the Friday of that week, July 3. The only participants at the first of the three meetings were Ms. Ebner, Ms. Harrison, Mr. Morbach, and Mr. Borrer. For the second meeting, these four persons were joined by Dr. Michael Bookman, the Assistant Superintendent for Business and Research, which includes overall responsibility for the Purchasing Department; Michelle Crouse, of the Auditing Department; and Lee Chistiansen, another of Respondent's staff. The persons present at the third and final meeting were the same as at the second meeting, except that Respondent's counsel, Mr. Few, replaced Ms. Crouse. At the first meeting, Ms. Ebner expressed her belief that Petitioner's bid was better than Mutual's bid because Petitioner's bid complied with more of the specifications. She also expressed concern about the ability of Magic Vending to service the snack foods and beverages. Ms. Ebner's preference for Petitioner's bid was partly the result of her misplaced emphasis on awarding both contracts to the same bidder. It is likely that, at the first meeting, Mr. Morbach or Mr. Borrer informed Ms. Ebner that nothing in the ITB required that Respondent award both contracts to the same bidder. At the first meeting, everyone confirmed their agreement to adopt Mr. Morbach's suggestion to discard the cost of any misbid item in both bids, even if only one bidder misbid the item. Everyone agreed that this approach would facilitate a better comparison of bottom-line prices. Respondent's decision to eliminate the cost of any misbid item from both bids, even if one bid correctly bid the item, encourages bidding abuses. A bidder knowing that a competitor can quote lower prices for a wide range, for instance, of chicken items can neutralize this advantage by misbidding each of the chicken items, forcing Respondent to award the bid without regard to the lesser costs quoted by the competitor for the chicken items. The potential destructive impact on competitive bidding is incalculable where, as here, this kind of bid-tabulation method is unaccompanied by a provision in the ITB rejecting a bid in its entirety if it misbids more than a specified number or value of items. The ITB does not authorize Respondent's method of tabulating misbid items. As already noted, Stipulation 2 allows Respondent to tabulate bids based only on items that meet the specifications, but nothing in Stipulation 2 or anywhere else in the ITB authorizes the deletion of quotes for items bid in compliance with the specifications. Part I of the ITB allows Respondent to reject approved products, but this provision is part of a discussion of items approved for bidding and does not authorized the rejection of a cost quoted for an approved product. Nor do Mr. Morbach and Ms. Ebner rely on Stipulation 2 to justify tabulating bid costs by eliminating the costs of any misbid items, even if only one bidder misbid the item. Mr. Morbach and Ms. Ebner believe that the 1998 ITB permitted this approach, but the 1996 invitation to bid for school food did not. However, both invitations to bid contain Stipulation 2. Respondent has not cited the difference between the 1996 and 1998 invitations to bid to justify the tabulation method adopted by Respondent in this procurement. Respondent's staff have relied on ITB provisions allowing Respondent to waive formalities or reject all bids for support of their tabulation method. However, even if these provisions were not in the 1996 invitation to bid, they do not authorize Respondent's tabulation method. Mr. Borrer may have implicitly acknowledged the inadequacy of the claimed authority in the ITB for Respondent's tabulation method when he sensibly deleted the following language from a draft memorandum dated June 25 and bearing his name, but drafted for his revision by another employee: Products that were inconclusive or failed to meet specification were eliminated from all bids for the purpose of data analysis. Purchasing is given this authority to eliminate products by bid specifications, statutory guidelines and Board policy. Item 4, Page 3 of the bid specifications states, "The District reserves the right to reject any and all bids or parts thereof, and request re-submission. The District further reserves the right to accept a bid other than the lowest bid. . ." In addition, Item I, Page 11 of the bid specifications states, "In reviewing bids, school officials reserve the right to waive technicalities when it is in the best interest of the school system." Also Board Policy H-5.6 states, ". . ., in accepting bids the School Board shall accept the lowest and best bid". (Legal Reference Florida Statutes 230.23, 237.02) The most succinct description of Respondent's tabulation method lacks much of a justification for its use. This description occurs in a typewritten question and answer that appears at the end of Petitioner Exhibit 36, but probably does not belong with that exhibit, which is a fax from Mr. Borrer to Respondent's counsel, Mr. Few. The question is, "Why did you choose to award the contract rather than re-bid after you determined that each vendor had made errors?" The answer states: Bids may not be rejected arbitrarily, but may be rejected and re-bid when it is in the best interest of the public (School District) to do so. . . . To re-bid without changing the bid would be unfair because the vendors had exposed their competitive price structure in public. Through the efforts of our skilled Food Service staff "errors" were discovered in products bid by Mutual and [Petitioner]. Since all vendors bid products that did not meet specifications, we determined that it would be proper to build a mathematical model in which we removed all identified items that did not meet specifications from both vendors. Our analysis based the award criteria on the same set of specifications and conditions for each vendor. Achieving comparability of food products was a complex time- consuming task. The award was recommended to go to the low vendor who would agree and be held to meeting our bid specifications at the price bid. Probably not more than one or two days after the date of the first meeting, Ms. Ebner prepared a draft memorandum, dated June 25, to Mr. Borrer, through Ms. Harrison. The draft memorandum states that Mutual bid 14 items not meeting specifications, and Petitioner bid three such items. The draft memorandum states that Mutual bid 11 items for which compliance was inconclusive, and Petitioner bid five such items. The draft memorandum also states that Mutual bid five imported items, despite the "discussion at the pre-bid conference that only domestic products were allowed." In the draft memorandum, Ms. Ebner recalculated the bottom-line costs of the bids of Petitioner and Mutual after discarding all costs for items that either bidder had misbid. She determined that Petitioner had the lowest snack foods and beverages bid. She also determined that Petitioner had the lower total bid for the main-line food and snack foods and beverages contracts. Still preferring an award of both contracts to a single bidder, Ms. Ebner concluded in the draft memorandum that Respondent should award both contracts to Petitioner, and Ms. Harrison concurred with Ms. Ebner's recommendation. At the same time, Mr. Morbach and Mr. Borrer were headed in the opposite direction from Ms. Ebner and Ms. Harrison. At the direction of Mr. Borrer, Mr. Morbach elicited a letter dated June 24 from Magic Vending to Mr. Morbach, in which Magic Vending stated: "As a follow up to our conversation and subsequent to our bid submission, we are prepared to offer you a reduction in our overall bid of $15,000." The letter concludes: "The purpose of this reduction is to make the overall award process run more smoothly and to remove any potential complications." Although Petitioner had already written Respondent expressing no interest in only the snack foods and beverages contract, Respondent obtained this cost concession, which made Magic Vending's bid lower than Petitioner's bid, in case Petitioner changed its mind. By letter dated June 26 from Magic Vending to Mr. Morbach, Magic Vending assured that it would "abide by all the rules and specifications in addition to giving a $15,000.00 discount . . .." The letter concludes with a well- earned expression of gratitude by Magic Vending for Mr. Morbach's "consideration in this matter." As for the main-line food contract, Mr. Borrer obtained from Mutual a one-line letter dated June 26 from Mutual stating: "This letter is to assure you that all products quoted by [Mutual] on bid #3743-HM will meet the specifications as required." At the second meeting between the staff of Food Service Operations and the Purchasing Department, which evidently took place after the Purchasing Department had received the correspondence from Mutual and Magic Vending, Food Service Operations staff continued to recommend that the contracts be awarded to Petitioner. Everyone discussed the errors in Mutual's bid and the fact that the Magic Vending bid was $5000 more than Petitioner's bid for the snack foods and beverages contract. It is unclear if Ms. Ebner or Ms. Harrison yet knew of the price concession of Magic Vending, but everyone discussed that it would be controversial to award the contracts to a bidder that was not the lowest bidder. Apparently in anticipation of the award ultimately made, Petitioner served Respondent, on July 1, with a Notice of Intent to Protest the award of both contracts. By letter dated the same date, Respondent informed Petitioner that it would not stop the procurement process due to the "critical importance of this bid and the serious danger to the health of our children." In fact, Mutual and Magic Vending have been supplying main-line food and snack foods and beverages, respectively, since early August 1998. At the third meeting between the staff of Food Service Operations and the Purchasing Department, everyone agreed to recommend that the School Board award the contracts to Mutual and Magic Vending. The discussion at this last major staff meeting largely involved the matters that they had previously discussed. Unfortunately, no one ever discussed at these or other meetings involving Ms. Ebner how many errors a bid could contain before it should be disqualified. Likewise, no one ever discussed with her the distinction between awarding a contract on the basis of the lowest bid and on the basis of the lowest and best bid. However, Ms. Harrison discussed with Ms. Ebner the safety issues presented by imported, rather than domestic, foods. On the day prior to the July 7 School Board meeting now designated for the School Board to vote on the awards, Ms. Harrison advised Mutual by letter that Respondent's staff would recommend Mutual, "provided that any and all products found not to meet specifications will be replaced with products meeting specifications at the original bid cost." Petitioner Exhibit 13, which is a copy of this letter, lacks the attachment listing the noncompliant items. At the bottom of the July 6 letter is a signature space for Mutual's representative, indicating assent to the following sentence: "Indicate, by signing below, that you are in agreement to provide all products meeting specifications, including USDA Grade A products, at the original bid price." Petitioner Exhibit 13 contains the signature of Mutual's representative. On July 7, the School Board met and gave Petitioner's counsel and corporate representative brief opportunities to explain why Respondent should not award the main-line food contract to Mutual. However, the Board did not give Petitioner's representatives sufficient time to convey much meaningful or detailed information. Mr. Few, Dr. Bookman, and Ms. Harrison supplied the Board with more information, but unfortunately never disclosed that Mutual's bid contained more errors than did Petitioner's bid and that Mutual's bid contained more errors involving more substantive matters than did Petitioner's bid, as discussed below. Contradicting the advice given by Mr. Morbach at the pre-bid conference and ignoring the contrary provision in the ITB and ignoring the distinction in the ITB between items that the winning bidder may purchase additional items that may be bid, Mr. Few advised the Board that the ITB expressed only a preference toward domestic products and cited the unique example of olives as support for this interpretation. Dr. Bookman advised the Board that Mutual had assured them that all items bid were Grade A. He was evidently unaware that, as explained below, Mutual had still not obtained Grade A turkey roast, even though Grade A turkey roast is available. As late as the final hearing, Ms. Ebner admitted that Mutual had still not corrected one or two noncompliant items, although it is unclear if one of them is the turkey roast. Notwithstanding staff's assurances, several Board members expressed misgivings at having to absorb a lot of detailed information in a short period of time. Ms. Harrison informed the Board that they did not have time to defer action, implicitly and correctly informing them that they did not have time to rebid the main-line food contract. One Board member replied that she wanted all of the food to be USDA approved and that parents had enough to be concerned about without being concerned about what Respondent was feeding their children. A motion to award the contracts to Mutual and Magic Vending failed by a 3-4 vote. A second motion to delay awarding these contracts passed 5-2, so that, individually, Board members could talk to staff to learn more about the bids and Petitioner's claim of bidding improprieties. The record does not reveal what staff told individual Board members. After a recess during which Board members, individually, met with staff, one of the Board members who had previously voted not to award the contracts moved to award the contracts to Mutual and Magic Vending, saying that Mutual had agreed to replace noncomplying products with products meeting the specifications. Relying on Mutual's promise to deliver conforming food items, as opposed to the noncomplying items that it had bid, this Board member reasoned that it was one thing to make a mistake with a bid, but another thing to make a mistake with the schoolchildren. The School Board unanimously approved the motion, and the meeting ended. By letter dated July 9 from Mutual to Mr. Borrer, Mutual addressed each of the 25 items charted by Respondent's staff, acknowledging that Mutual's bid had not complied with the specifications for nearly every charted item, but promising that Mutual would supply a product meeting the specifications for all of these items. However, concerning the moderately large component of the bid represented by Item 121 (turkey roasts, which represented over $62,000 in Mutual's bid), the letter states only: "Currently trying to locate an item to meet specifications." Bid Protest On July 10, Petitioner served Respondent with a Protest. The Protest asserts that Mutual's bid did not contain prices on all items, did not propose all domestic products, contained unapproved brands, bid unapproved product codes, and bid products different from those specified in the ITB. The Protest asserts that Respondent allowed Mutual to provide a letter after the deadline for receiving bids assuring that it would provide all Grade A product, as specified in the ITB. The Protest did not mention the snack foods and beverages contract awarded to Magic Vending. The Protest does not allege that Petitioner's bid is responsive. Respondent has not filed any responsive pleading raising the question of the responsiveness of Petitioner's bid. Respondent's Bid Policies Following receipt of Petitioner's Notice of Intent to Protest, Mr. Borrer sent a letter dated July 1 to Petitioner that contained Respondent's rules governing bids. This document, which is part of Petitioner Exhibit 37, is the source of Respondent's bidding rules set forth in the following two paragraphs. Respondent's rules provide for the protest of specifications as follows: Specifications—Any bidder that feels that their firm is adversely affected by an specification contained in a Sealed Bid or Request for Proposal issued by the Purchasing Department may file a written notice of protest with the Supervisor of Purchasing within seventy-two (72) hours after the receipt of the bid documents. . . . A formal written protest shall be filed by the bidder within ten (10) days of the written notice of protest. . . . These rules also provide for the awarding of costs, but not attorneys' fees, as follows: If, after the completion of the Administrative Hearing process and any appellate court proceedings[,] the School District prevails, then the School District shall recover all costs and charges which shall be included in the Final Order or Judgement, including charges made by the Division of Administrative Hearings, but excluding attorney's fees. . . . If the protestor prevails then the protestor shall recover from the School District, all costs and charges which shall be included in the Final Order or Judgement, excluding attorney's fees. Another source of Respondent's rules in the record is Chapter 7 of a compilation of Board policy that was applicable to the present procurement. This document requires that Respondent award bids "on the basis of the lowest and best bid which meets specifications with consideration being given to the specific quality of the product, conformity to the specifications, suitability to school needs, delivery terms and service and past performance of the vendor." Lastly, Mr. Borrer, by memorandum to the file dated July 9, noted that the two disqualified vendors were disqualified under Board Policy H-5.10, which states: "Bids received which do not meet specifications shall not be considered valid and shall not be tabulated." Ultimate Findings of Fact Bid Tabulation Method Is Clearly Erroneous, Contrary to Competition, and Arbitrary It is irrelevant whether the standard of proof governing a protest of specifications is a preponderance of the evidence or the more deferential standard, clearly erroneous, contrary to competition, arbitrary, or capricious. Petitioner has proved that Respondent's tabulation method is clearly erroneous, contrary to competition, and arbitrary. As already noted, Respondent's tabulation method potentially penalizes compliant bidders by eliminating their compliant items from the tabulation when a noncompliant bidder misbids the same item. The anti-competitive, arbitrary effect of this tabulation method may be ameliorated somewhat by the fact that the ITB is for a cost-plus contract. However, the ITB fails to impose any minimum requirement or threshold for compliant items, in terms of number or dollar volume--e.g., if a bid contains noncompliant items totaling more than one percent of the total cost bid, then the entire bid is rejected. This means that Respondent's tabulation method can destroy the competitiveness of the procurement by allowing a bidder purposefully or unintentionally to misbid a large number of items, resulting in the effective elimination of these items from the tabulation of bids submitted by bidders with superior access to these items. Under these circumstances, Respondent's selection of this tabulation method was clearly erroneous, contrary to competition, and arbitrary. Mutual's Bid Is Nonresponsive The standard of proof governing Respondent's determination that Mutual's bid was responsive is clearly erroneous, contrary to competition, arbitrary, or capricious. As already noted, it is impossible to deduce Mutual's quote for Item 114 from the face of Mutual's bid. A failure to quote a cost for an item is little different from a failure to bid the item. In the case of a complete omission, Respondent knows nothing of the item bid; in the case of the omission of only a quote, Respondent knows what item the bidder has bid, but not the cost of the item. The omission of the cost of a single item adequately described in the bid may be a minor irregularity, if the cost can be deduced by subtracting from the total cost of all items the total cost of all but the omitted item. Here, though, the difference between these amounts is clearly wrong, so that, if Respondent overlooks the omission, it leaves open the possibility of a later dispute over the cost of Item 114. Under the present circumstances, including the disqualification of two other bidders for omitting items, Respondent's failure to disqualify Mutual's bid was clearly erroneous, contrary to competition, and arbitrary. Mutual's Bid Contains Material Variances The standard of proof governing Respondent's determination that Mutual's bid did not contain material variances from the ITB is clearly erroneous, contrary to competition, arbitrary, or capricious. Food Service Operations staff identified numerous deficiencies in Mutual's bid. For Mutual's bid, Ms. Ebner's June 25 memorandum counts 14 items not meeting specifications and 11 items for which compliance is inconclusive due to Mutual's failure to submit the required documentation. Treating the misbidding of green olives and the potatoes specified in Items 217-19, 221-22, and 224 as minor irregularities due to the impossibility of compliance with the specifications concerning the origin of these items, Mutual's bid still reveals consequential deviations from the specifications. Using only the chart prepared by Food Service Operations staff and disregarding the green olives and six potato items, Mutual's consequential deviations from the specifications include five imported foods, two meat products that fail to contain the required ratio of light to dark meat (one of the meat products and another product also failing to demonstrate the proper Grade), a lower Grade of canned sweet potatoes, shorter French Fries, excessively diluted tomato concentrate and inadequate documentation of the dilution of two jelly products, processed instead of natural cheese, and a missing ingredient from Dijon mustard. Of all the witnesses, Ms. Ebner was most capable, by training, experience, and job assignment, of understanding the significance of the deviations in Mutual's bid. For instance, addressing the seemingly inconsequential matter of excessively diluted jelly, Ms. Ebner noted that Respondent had had problems with runny jelly not remaining on peanut-butter- and-jelly sandwiches. The nutritional consequences of this seemingly harmless deviation are students discarding peanut- butter-and-jelly sandwiches that have lost their jelly. In each of these consequential deviations from the specifications, Mutual bid a cheaper product than specified, which conferred upon it an unearned competitive advantage, and a product of lower quality than specified, which jeopardized the primary purpose of the specifications to ensure that Respondent obtained food of high nutrition, safety, and taste for students and staff. Any implicit or explicit determination by Respondent dismissing the charted findings of deviations by Food Service Operations staff or treating them as minor irregularities rather than material variances would be clearly erroneous, contrary to competition, and arbitrary. Besides the findings contained in the chart prepared by Food Service Operations staff, Mutual misbid several other items. The consequential deviations from the specifications included seven imported items, a cheaper pita- fold than the specified Gyro wrap, and a cheaper imitation almond flavoring for pure almond flavoring. Any express or implied finding by Respondent discrediting these deviations would be clearly erroneous, contrary to competition, and arbitrary. Although an express or implied determination by Respondent that these deviations, standing alone, are minor irregularities would not be clearly erroneous, contrary to competition, arbitrary, or capricious, such a finding concerning these deviations, together with the previously discussed deviations charted by Food Service Operations staff, would be clearly erroneous, contrary to competition, and arbitrary. The standard of proof governing the determination that Mutual submitted written assurances, after bid opening, that it would supply product in compliance with the specifications, is the preponderance of the evidence. However, the standard of proof governing findings of the significance of the submittal of these assurances is clearly erroneous, contrary to competition, arbitrary, or capricious. Any implied or express determination by Respondent that Mutual's written assurances were not an attempt to change its bid after bid opening would be clearly erroneous, contrary to competition, and arbitrary. As already noted, Petitioner has already proved, by this deferential standard, that Mutual's bid contained material variances from the specifications. The purpose of Mutual's written assurances was to eliminate these material variances, which, in fact, were still not entirely eliminated by the time of the final hearing. Petitioner's Bid Contains Material Variances Consistent with its determination that Mutual's bid is responsive and suffers no material variances, Respondent claims in its proposed recommended order that Petitioner's bid is responsive and contains no material variances. Respondent awarded the main-line food contract to Mutual because it submitted the lower bid. However, Petitioner demands the award of the main- line food contract, so it is necessary to consider whether its bid, which is clearly responsive, contains any material variances. Because of the resolution of this issue, it is unnecessary to consider whether Petitioner's bid contains any minor irregularities, for which Respondent's implied or express refusal to waive would be clearly erroneous, contrary to competition, arbitrary, or capricious. Using the chart prepared by Food Service Operations staff and disregarding the green olives and six potato items, Petitioner misbid only seven items. In fact, the record reveals no other misbid items by Petitioner. Several of Petitioner's misbid items are relatively inconsequential. These are a tortilla slightly lighter than specified, larger pickles than specified, and omitted documentation showing the grain of vinegar. Mutual misbid these items also. However, three of Petitioner's misbid items are consequential. Although Petitioner's bid reflects the specified ratio of light and dark meat, unlike Mutual's bid, Petitioner's bid of turkey roast fails, as does Mutual's bid, to provide sufficient documentation to show that it is Grade A. Like Mutual's bid, Petitioner's bid is for Grade B canned sweet potato and fails to provide documentation that the two jelly products are not excessively diluted. The only consequential deviation in Petitioner's bid not found in Mutual's bid is Petitioner's failure to bid an eggless pasta. However, the standard of reference for determining whether Petitioner's bid contains material variances is not Mutual's bid, but the ITB. Although considerably more compliant than Mutual's bid, Petitioner's bid, when measured against the ITB and the importance of obtaining nutritious, safe, and tasty food for Respondent's schoolchildren, also falls impermissibly short of the mark. Petitioner's consequential deviations from the specifications also mean cheaper items than specified, through which Petitioner would have obtained an unearned competitive advantage, and products of lower quality than specified, which would have jeopardized the primary purpose of the ITB to ensure that Respondent obtained high-quality food. Impossible specifications, like domestic green olives or six potato items from the Northwest, or the failure to comply in some minor respect, such as sugar sprinkles from an unapproved manufacturer or excessively large pickles, may constitute minor irregularities. But the failure to ensure that each of the 297 items bid complies substantially in quality is not. Thus, an implied or expressed determination by Respondent that Petitioner's bid contains no material variances would be clearly erroneous, contrary to competition, and arbitrary. Petitioner has failed to prove that Respondent is liable for attorneys' fees. There is no direct proof of any factual basis to award fees. Perhaps Petitioner infers an improper purpose from the fact that, despite the benefit of highly deferential standards of proof, Respondent has not prevailed. Obviously, Respondent's failure to prevail is due to several express or implied determinations that were clearly erroneous, contrary to competition, arbitrary, or capricious. If this fact alone warranted a fee award, all agencies would be liable for fees in every bid case that they lost. The absence of such a statutory provision reveals the Legislative intent not to make agencies strictly liable for attorneys' fees in bid cases. The better approach is to permit an inference of improper purpose, but only if the agency were aware or reasonably should have been aware that its handling of the award was not merely clearly erroneous, contrary to competition, arbitrary, or capricious, but was so egregiously so as to support an inference of improper purpose. Such is not the case here. There is no evidence of Petitioner's costs, and Petitioner did not request the administrative law judge to reserve jurisdiction or leave the record open for a later determination of costs.

Recommendation It is RECOMMENDED that the School Board of Hillsborough County enter a final order setting aside the award of the main-line food contract to Mutual Distributors, Inc., and rebidding the contract. DONE AND ENTERED this 17th day of November, 1998, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 17th day of November, 1998. COPIES FURNISHED: Dr. Earl Lennard Superintendent School Board of Hillsborough County Post Office Box 3408 Tampa, Florida 33601-3408 Robert W. Rasch 129 Live Oak Lane Altamonte Springs, Florida 32714 W. Crosby Few Few & Ayala, P.A. 109 North Brush Street, Suite 202 Tampa, Florida 33602

Florida Laws (2) 120.53120.57
# 6
LEE A. EVERHART AND COMPANY, INC. vs. DEPARTMENT OF CORRECTIONS, 83-001761 (1983)
Division of Administrative Hearings, Florida Number: 83-001761 Latest Update: May 02, 1990

Findings Of Fact On or about February 9, 1983, the State of Florida, Department of General Services, Division of Construction and Property Management, Bureau of Property Management ("DGS"), received a certification of need from the Department of Corrections ("DOC") requesting authority for DOC to advertise for competitive bids from private persons interested in providing leased office space needed to house DOC's Bureau of Industries. The Bureau of Industries was then located in leased space with leases which were scheduled to expire June 30, 1983. The Bureau of Industries has been located in DOC's central office area since its creation in 1957. The DOC central office includes the Secretary and Deputy Secretary; the Assistant Secretaries for Operations, Programs, Management, and Budget. All these officials, together with subsidiary bureaus, staff, and other subordinates are located in two adjacent buildings of the Winewood Office Complex on Blair Stone Road in Tallahassee. The prison industry program is under the supervision of the industries administrator who reports directly to the Assistant Secretary for Operations. DOC sought approval from DGS to enter into a lease for privately owned office space because of its perceived need to locate within walking distance of its central office. Programs administered by the Bureau of Industries work closely with other DOC personnel and functions located in the central office in the Winewood Office Complex. Moving any distance from the central office would create problems for the DOC mailing system and would require extra time spent traveling to and from the central office. Personnel in the Bureau of Industries utilize central office files, and confer often with staff located in the central office. Locating outside the general area of the central office would require additional expenses with regard to availability of vehicles, pick up of mail and supplies, and duplication of support services. Accordingly, DGS and DOC determined, and the record in this cause establishes, that it would not be in the state's best interest to require DOC to locate its Bureau of Industries program either in state-owned buildings in the Capitol Center, or in any area beyond walking distance of the central office location. On March 21 and 31, 1983, respectively, DOC published an advertisement in the Tallahassee Democrat inviting all interested persons to submit sealed bids at or before 2:00 p.m. on April 19, 1983, in accordance with the Invitation to Bid and Specifications prepared by DOC for the office space needed to house the Bureau of Industries. A portion of the bid specifications required that office space to be leased be located within a circle drawn on a city map of the City of Tallahassee, Florida, which could roughly be described as the southeastern portion of the city, in the vicinity of the Winewood Office Complex. There were four possible bidders in the area within the circle on the map attached to the bid specifications. Of these four possible bidders, two within the area actually submitted bids--Blairstone Center Partners and Washington Square, Ltd. One of the general provisions of the bid specifications provided as follows: The Department of Corrections reserves the right to reject any and all bids, waive any minor informality or technicality in bids received and to accept that bid deemed to be the lowest and best. . . At or before 11:00 a.m. on April 19, 1983, DOC received sealed bids from Petitioner and Intervenors in response to the aforesaid advertisement, and at 11:00 a.m. on April 19, 1983, DOC opened, tabulated, and published each of the bids. The bid submitted by Petitioner was not responsive to the requirements of the Invitation to Bid and Specifications because the property offered by Petitioner in its response was outside the area indicated on the map annexed to the Invitation to Bid. The bid submitted by Intervenor, Blairstone Center Partners, failed to offer the full services specified in paragraph six of DOC's Bid Submittal Form; failed to offer the exclusive parking specified in the paragraph seven of the Bid Submittal Form; failed to supply the photographs specified in paragraph ten of Respondent's Bid Submittal Form; and failed to supply the information specified in paragraphs one through eight of the Bid Submittal Form. Accordingly, the record in this cause fully establishes that the bids submitted by Petitioner and by Intervenors Blairstone Center Partners, failed to comply with the requirements of the Invitation to Bid and Bid Submittal Form, and that the deficiencies in the bids of Petitioner and Intervenor, Blairstone Center Partners, were so material as to require their rejection. The Invitation to Bid and Bid Submittal Form required that bidders offer for lease 2,683 square feet, plus or minus three percent. The bid submitted by Intervenor, Washington Square, Ltd., offered 2,797 square feet, which is approximately 34 square feet more than allowed in the Invitation to Bid. After this fact was discovered upon opening the bid, DOC personnel contacted a representative of Washington Square, Ltd., and advised the net square footage offered in the bid submitted by Washington Square, Ltd., exceeded the net square footage of space that DOC was authorized to lease and pay for under the Invitation to Bid. Washington Square, Ltd., subsequently agreed to modify its proposal by relieving DOC from any obligation to pay for the extra 34 square feet, and reducing the annual rental for the first year from $26,012.10 to $25,695.90, and for the second year from $27,576.60 to $27,243.18. The record in this cause does not establish any misconduct or collusion between Washington Square, Ltd., and DOC personnel obtaining this modification, nor does the record in this cause establish that any actual or prospective bidders suffered any competitive disadvantage as a result of this modification. The effect of Washington Square, Ltd.'s modification of its proposal rendered that proposal the only bid which was responsive to the Invitation to Bid. On August 18, 1983, Washington Square, Ltd., executed a deed to the property which was the subject matter of its bid to Ben Grace. Washington Square also executed an assignment of the proposed bid award to Grace.

Florida Laws (3) 120.57243.18255.25
# 7
MARVIN`S GARDEN AND LANDSCAPE SOUTHEAST SERVICE, INC. vs. DEPARTMENT OF TRANSPORTATION, 85-003337BID (1985)
Division of Administrative Hearings, Florida Number: 85-003337BID Latest Update: Dec. 02, 1985

Findings Of Fact Both DOT and Weekley submitted proposed Recommended Orders. Their proposed findings of fact have generally been adopted here but are addressed in detail in Appendix A, attached and incorporated in this Recommended Order. On or before July 31, 1985, DOT received sealed bids from three bidders for State Project Nos. 86070-3492 and 93220-3403, involving landscaping of interchanges in Broward and Palm Beach counties. Marvin's Garden was the apparent low bidder, with a total of $389,112.19 shown on the face sheet of the bid blank form. Weekley was the next lowest bidder with a total of $419,899.56, and P. J. Constructors, Inc., was the highest bidder with a total of $458,805.90. After review of the bid documents for compliance with DOT bid procedures, a discrepancy was found in the Marvin's Garden bid and DOT notified the parties by letter dated August 20, 1985, that Weekley was the apparent low bidder on the project. The discrepancy was found on page 001 of the bid blank form submitted by Marvin's Garden. For item 570-11, "Water for Plant Establishment," under the column, unit price written in words, Marvin's Garden showed "fourteen thousand two hundred eighty two dollars and sixty six cents." The column, unit price in figures, showed "14,282.66," and the final column, headed "amounts" showed "14,282.16." The bid item was supposed to show the unit price for a thousand gallons of water (which price was to be written in both words and figures) and a total, or extension price for 3,743.125 thousand gallons of water. When the unit price on Marvin's Garden's bid was multiplied by 3,743.125 (number of units), the resulting total price for that bid item was $53,461,781.71. This figure was entered on the form in red ink and was initialled by Raymond Patrick Haverty, the DOT reviewer. Marvin's Garden's total bid for the project was then adjusted to $53,836,611.04, a figure far in excess of either Weekley's or P. J. Constructors' bids. Marvin Gross is the individual responsible for preparing and submitting bids for his corporation. He has been doing bid work for DOT for approximately 20 years and is thoroughly familiar with the bid procedures, forms and standard specifications. He attributes the irregularity on his submission to his "tunnel vision." Unit prices are significant because the quantity designated by DOT is merely an approximate, best guess by the Department engineers. For item 570-II, unpredictable weather conditions will ultimately dictate exactly how much water will be necessary to successfully complete the landscape project. That exact quantity times the unit price will be the basis of payment to the contractor. DOT found no violations of bid requirements in the bids of Weekley and P. J. Constructors, Inc., and none have been raised in this proceeding.

Recommendation For the foregoing reasons, a final order should be issued declaring Weekley the lowest responsible bidder on project Nos. 86070-3492 and 93220-3403, and the contract awarded accordingly. DONE and ORDERED this 2nd day of December 1985, in Tallahassee, Florida. Hearings Hearings MARY CLARK, Hearing Officer Division of Administrative The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative this 2nd day of December 1985. APPENDIX In accordance with Section 120.59(2) Florida Statutes, the following are recommended rulings on proposed findings of fact submitted by Respondent and Intervenor in this case. Respondent's Paragraph: Corresponding R. O. Paragraph or basis for rejection: The corporate status and the addresses of the bidders are not material. See Paragraph 1, R.O. See Paragraph 2, R.O. and Conclusion of law 2, R.O. See Paragraph 3, R.O. See Conclusion of law 2, R.O. See Paragraph 3, R.O. See Paragraph 6, R.O. See Paragraph 2, R.O. Intervenor's Paragraph: Corresponding R.O. Paragraph or basis for rejection: See Paragraphs 1 and 2, R.O. Facts which relate to the composition of bid packages are not material. See Paragraph 3, R.O. See Paragraph 3, R.O. See Conclusion of law 2, R.O. See Paragraph 3, R.0. See Conclusion of law 5, R.O., relating to the specifications of the department. The remainder of the paragraph proposed is immaterial. See Paragraph 5, R.O. COPIES FURNISHED: Thomas E. Drawdy, Secretary Department of Transportation Haydon Burns Building Tallahassee, Florida 32301 A. J. Spalla, Esquire General Counsel 562 Haydon Burns Bldg. 605 Suwannee Street Tallahassee, Florida 32301 Mr. Marvin Gross, President Marvin's Garden and Landscape Services, Inc. 37 North McIntosh Sarasota, Florida 33582 Mel L. Wilson, Esquire Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32301 Harry R. Detwiler, Jr., Esquire HOLLAND & KNIGHT Post Office Drawer 810 Tallahassee, Florida 32302

Florida Laws (3) 112.19120.53120.57
# 8
GUIDING LIGHT ENTERPRISE, INC. vs DEPARTMENT OF TRANSPORTATION, 04-002163BID (2004)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Jun. 21, 2004 Number: 04-002163BID Latest Update: Sep. 17, 2004

The Issue The issue in this case is whether the Department of Transportation's proposed award of a contract to Daniels Janitorial Service is contrary to the agency's governing statutes, the agency's rules or policies, or the specifications of the Invitation to Bid (ITB).

Findings Of Fact In April 2004, DOT issued ITB-DOT-04/05-5002-PDW (the ITB) seeking to contract for janitorial services at two state office buildings in DeLand, Florida. The ITB included a "bid blank," upon which vendors were directed to submit their cost proposals. The bid blank was titled "MONTHLY JANITORIAL SERVICES PER SCOPE OF SERVICES." The bid blank included three spaces where each bidder was to provide cost information. The three spaces were titled as follows: "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and "TOTAL YEARLY AMOUNT BOTH BUILDINGS." In response to the ITB, DOT received 18 bids. The bids were opened at 3:00 p.m. on April 29, 2004. The lowest bid was $5,185.76, submitted by Daniels Janitorial Service, including: $4,895.76 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $200.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $5,186.76 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The second lowest bid was $10,686.00, submitted by Jan-Pro Cleaning Systems, including: $9,971.00 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $715.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $10, 686.00 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The third lowest bid was $67,777.77, submitted by the Petitioner. The remainder of the bids ranged between $69,600.00 to as much as $201,464.64. At the time of the opening, Diane Warnock, a DOT District Contract Specialist and Purchasing Agent in charge of the bid opening, observed that two of the bids (the Daniels Janitorial Service and the Jan-Pro Cleaning Systems bids) appeared to be very low in relation to the other bids. Ms. Warnock believed that the two lowest bids submitted were likely set forth on a monthly basis rather than annual amount, and that the bidders had failed to extend the monthly charges to an annual cost. Ms. Warnock contacted David Callaway, a DOT Procurement Analyst with statewide contract responsibilities, to discuss her observations. Mr. Callaway advised Ms. Warnock that she could contact the two low bidders and ascertain whether the bids submitted reflected a monthly or an annual cost. Ms. Warnock separately contacted each of the individuals responsible for submitting the low bids and inquired as to whether the bids reflected a monthly cost or an annual cost. Ms. Warnock learned that each vendor had submitted a monthly bid amount. Ms. Warnock multiplied the monthly amounts submitted by the two vendors by 12 to arrive at an annual cost. On the bid tabulation form, Ms. Warnock included the bid amount submitted by each bidder. For the two bidders who submitted monthly cost information, Ms. Warnock included the monthly costs submitted and the annual cost figures she had calculated. Based on annual costs, the lowest vendor was Daniels Janitorial Service with an annual bid amount of $62,229.12. Section 13.2 of the ITB provides as follows: 13.2 RESPONSIVENESS OF BIDS Bids will not be considered if not received by the Department on or before the date and time specified as the due date for submission. All bids must be typed or printed in ink. A responsive bid is an offer to perform the scope of services called for in this Invitation to Bid in accordance with all requirements of this Invitation to Bid. Bids found to be non- responsive will not be considered. Bids may be rejected if found to be irregular or not in conformance with the requirements and instructions herein contained. A bid may be found to be irregular or non-responsive by reasons that include, but are not limited to, failure to utilize or complete prescribed forms, modifying the bid requirements, submitting conditional bids or incomplete bids, submitting indefinite or ambiguous bids, or executing forms or the bid sheet with improper and/or undated signatures. Section 13.4 of the ITB provides as follows: 13.4 WAIVERS The Department may waive minor informalities or irregularities in bids received where such is merely a matter of form and not substance, and the correction or waiver of which is not prejudicial to other bidders. Minor irregularities are defined as those that do not have an adverse effect on the Department's interest and does not effect the price of the bid by giving a bidder an advantage or benefit not enjoyed by other bidders.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Transportation enter a final order awarding the contract for ITB-DOT-04/05- 5002-PDW to Daniels Janitorial Service. DONE AND ENTERED this 25th day of August, 2004, in Tallahassee, Leon County, Florida. WILLIAM F. QUATTLEBAUM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of August, 2004. COPIES FURNISHED: C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Anthony Payne 1031 Eagles Forrest Drive Apopka, Florida 32712 James C. Myers, Clerk of Agency Proceedings Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450 Pamela Leslie, General Counsel Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450

Florida Laws (1) 120.57
# 9
KELLOGG AND KIMSEY, INC. vs LEE COUNTY SCHOOL BOARD, 91-007597BID (1991)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 26, 1991 Number: 91-007597BID Latest Update: Mar. 02, 1992

Findings Of Fact Upon consideration of the oral and documentary evidence addressed at the hearing, the following relevant findings of fact are made: The request for sealed bids for the construction of the Project was advertised on October 9, 16 and 23, 1991. There were six addenda to the original bid documents which added, deleted or modified provisions of the original bidding requirements, contract requirements, administrative requirements and technical specifications. The original bid documents plus the six addenda will be referred to herein as the "bid documents". The bid documents required that all bids be in full accord with the contract documents. Sealed bids for the Project were opened on October 30, 1991. Wright submitted the lowest lump sum bid for the Project, with Sovran submitting the second lowest lump sum bid and Kellogg submitting the third lowest lump sum bid. At the time of the bid opening, the bid documents listed only four casework manufacturers that were approved to furnish casework for the Project. Empire Custom Cabinets, Inc. (Empire) was not listed as one of the four approved casework manufacturers in the bid documents. The bid documents did not require the bidder to list the casework manufacturer it intended to obtain the casework from, but only that the bidder name the casework subcontractor. The only work item in the bid documents which requires identifying the name of the manufacturer on the subcontractor's list is the metal roof system. Because Empire's bid on the casework was extremely low compared to other bids received by Wright on the casework, Wright called Empire prior to submitting its bid to confirm that Empire's bid was submitted per plans and specifications. Although Wright did not specifically inquire of Empire at this time as to which manufacturer Empire was obtaining the casework from for the Project, Empire did advise Wright that Empire's bid on the casework was according to plans and specifications. Additionally, Empire did not divulge or advise Wright at this time that the bid was based on Empire manufacturing the casework for the Project. Based on this representation from Empire, Wright listed Empire as its casework subcontractor, and calculated its lump sum bid for the Project using Empire's bid. Although Wright listed Empire as its casework subcontractor in its bid, this did not create an irregularity in Wright's bid since Wright's bid was per plans and specification without exception or exclusion. This would require Wright to furnish casework for the Project manufactured by one of the four approved casework manufacturers listed in the bid documents regardless of which subcontractor Wright listed as the subcontractor for casework. By letter dated November 1, 1991, the Board's architect for the Project requested Wright to have Empire submit written certification by one of the four approved casework manufacturers that its casework was being furnished to Empire for the project. By letter dated November 4, 1991, Empire advised Wright that Empire's bid on the casework for the Project was based on casework to be manufactured by Empire. On the same day, Wright furnished the architect for the Project a copy of Empire's letter of November 4, 1991. In response to a request by the Board, Wright, by letter dated November 7, 1991, advised the Board that Wright would furnish casework manufactured by one of the four approved manufacturers listed in the bid documents for the Project. By letter dated December 3, 1991, Empire advised Wright that Empire would need to withdraw its bid if Empire was required to use casework manufactured by one of the four approved casework manufacturers listed in the bid documents. On that same day, Wright furnished the Board a copy of Empire's letter and requested that the Board allow Wright to remove and replace Empire with Steven Ward and Associates, Inc. (Ward), as the casework subcontractor since Ward would be able to furnish and install casework manufactured by LSI Corporation of America, Inc., one of the four approved casework manufacturers. No Action has been taken on that request. The bid documents provide for a subcontractor to be removed and replaced from the list of subcontractors after the bid is opened if there is a showing of good cause and written approval by the Board and the Project architect is obtained. Although Empire's bid on the casework for the Project submitted to Wright was based on Empire manufacturing the casework, there is competent substantial evidence in the record to establish facts to show that at the time Wright submitted its bid on the Project it had reasonable grounds to believe that Empire's bid on the casework was based on Empire furnishing and installing casework manufactured by one of the four approved casework manufacturers. After determining that Empire could not perform under its bid, Wright obtained a bid from Ward for furnishing and installing the casework for the Project which was less than Ward's original bid submitted to Wright before the bid opening. However, this bid was substantially more than Empire's bid, and if Wright is allowed to substitute Ward for Empire, Wright will have to absorb the additional costs since the bids were lump sum bids. Wright is neither attempting to furnish casework from a manufacturer that is not approved, nor is Wright requesting an increase in the lump sum bid price. The advertisement for Sealed Bids for the Project required that all bidders be prequalified by the Board prior to the bid date. Sovran and one other bidder were not prequalified by the Board prior to the bid date in accordance with Advertisement for Sealed Bids for the Project. Sovran received the bid documents for the Project approximately one month before the bid date but did not file a Notice of Protest of the prequalification requirement contained in the Advertisement for Sealed Bids for the Project. Sovran holds a certificate as a general contractor licensed in the State of Florida in accordance with Chapter 489, Florida Statutes. As a certified general contractor Sovran, pursuant to Section 489.125, Florida Statutes, was authorized to bid on the Project notwithstanding the Board's prequalification requirement. This was explained by the Board's representative at the bid opening. The bid documents required that a subcontractor list be submitted by all bidders, and when submitted with the bid becomes an integral part of the bid. The purpose of the subcontractor list was to prevent bid shopping, and to allow the Board an opportunity to review the subcontractors to determine if any subcontractor on the list had performed unsatisfactorily on previous Board projects. Neither the statutes relating to competitive bidding nor the bid documents prohibit the listing of the general contractor together with a subcontractor on a subcontractor list. The subcontractor list submitted by Sovran indicated "Sovran Constr/Naples" as the name of the subcontractor for the masonry work and "Sovran/Naples" as the name of the subcontractor for the poured-in-place concrete work. "Naples" is Naples Concrete and Masonry Work, Inc. The bid received by Sovran from Naples was for both labor and materials for the poured-in-place concrete and masonry work. Sovran neither requested nor did Naples furnish Sovran a bid to provide labor only for the poured-in-place concrete and masonry work. There was no agreement between Sovran and Naples whereby Sovran would supply the materials and Naples would furnish the labor for the poured-in-place concrete and masonry work. Sovran did request and receive bids from other companies for furnishing materials only for the poured-in-place concrete and masonry work. Sovran listed itself, the general contractor, along with Naples on the subcontractor list for the purpose of supplying the materials for the poured-in- place concrete and masonry work. Sovran's main reason for supplying the materials was that Naples was not bondable. Without a payment bond from Naples, Sovran would be without protection and could be forced into paying double for the materials in the event Naples failed to pay the material suppliers. Although the Superintendent of the Lee County Schools has recommended to the Board that the Board accept Wright's bid for the Project, the Board has not voted on that recommendation. The fact that Wright used Empire's bid to calculate its lump sum bid in no way excuses Wright for the requirement set out in the bid documents that casework used for the Project (when the time comes) be manufactured by one of the four approved casework manufacturers. Wright gains no economic advantage in this regard since the lump sum bid price remains the same. The advertisement for Sealed Bids on the Project provides that the Board reserves the right to waive any and all irregularities of any bid received.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, accordingly RECOMMENDED: That the Board enter a Final Order dismissing the instant bid protest and awarding to Wright the contract for the construction of Elementary School "C", Job No. 91063. DONE and ORDERED this 13th day of February, 1992, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13 day of February, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NUMBER 91-7597B1D The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1 - 3(1,2 and 3 , respectively); 4 - 5(6); 6(4); 7 - 9(5); 12(10); 13(11); 15 - 16(12); 17(13); 18 - 19(16); 20(29); 21(18); 23(19); 24 - 25(20); 26(22); 27(23); 28(22); 29 - 30(29); 32 - 33(25); and 34(26). Proposed finding of fact 10 is rejected as not being supported by competent substantial evidence in the record in that Wright's bid was as per plans and specifications without exceptions or exclusions which included the use of casework manufactured by one of the approved casework manufacturers. Proposed finding of fact 11 is rejected as not being supported by competent, substantial evidence in the record in that the Board knew of Empire's bid being based on nonconforming materials prior to issuing its Notice of Intent. However, the only information the Board had in reference to Wright's bid before issuing its Notice of Intent was that Wright had bid as per plans and specifications and would be installing casework manufactured by one of the approved manufacturers. The only question was whether Empire could furnish casework manufactured by one of the approved manufacturers. Proposed finding of fact 14 is neither material nor relevant. How the Board's architect interpreted Wright's bid is neither material nor relevant to this proceeding. Proposed finding of fact 22 is unnecessary to the conclusion reached in the Recommended Order. Proposed finding of fact 31 is more in the way of an argument than a finding of fact. Proposed findings of fact 35 and 36 are covered in the Preliminary Statement. The timeliness of Kellogg's protest is not an issue and therefore, a finding that it was timely is unnecessary. Rulings on Proposed Findings of Fact Submitted by the Respondent While not specifically adopting proposed finding of fact 1, where material or relevant or necessary to this proceeding, and supported by competent, substantial evidence in the record the stipulated facts have been adopted. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 2(4,5); 3(9); 4 - 5(7); 7 - 8(8); 10(16); 11(14); 12(31); 13(21); and 15(23). Proposed finding of fact 6 is more in the way of an argument than a finding of fact. Proposed finding of fact 9 and 14 are neither material nor relevant. Rulings on Proposed Findings of Fact Submitted by the Intervenor See ruling on Respondent's proposed finding of fact Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 2 - 3(21); 4(24); 5 - 6(21); 13(23); 14(24,28); 15(22); 16 - 17(23,24); and 18(28). Proposed findings of fact 7 through 12 are neither material nor relevant to this proceeding. COPIES FURNISHED: David E. Gurley, Esquire Norton, Gurley & Darnell, P.A. 1819 Main Street, Suite 610 Sarasota, FL 34236 Marianne Kantor, Esquire The School Board of Lee County 2055 Central Avenue Fort Myers, FL 33901 James M. Talley, Esquire Fisher, Rushmer, Werrenrath, Keiner, Wack & Dickson, P.A. Post Office Box 712 Orlando, FL 32802 Karl Engel Superintendent Lee County School Board 2055 Central Avenue Ft. Myers, FL 33901 Honorable Betty Castor Commissioner of Education The Capitol Tallahassee, FL 32399-0400

Florida Laws (3) 120.53120.57489.125
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer